CN208933973U - A kind of positioning connection structure of steel-pipe pile and bored concrete pile - Google Patents

A kind of positioning connection structure of steel-pipe pile and bored concrete pile Download PDF

Info

Publication number
CN208933973U
CN208933973U CN201821599698.3U CN201821599698U CN208933973U CN 208933973 U CN208933973 U CN 208933973U CN 201821599698 U CN201821599698 U CN 201821599698U CN 208933973 U CN208933973 U CN 208933973U
Authority
CN
China
Prior art keywords
steel
pile
pipe
cage
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821599698.3U
Other languages
Chinese (zh)
Inventor
张先亮
刘志勇
黄继华
刘鹤
吴腾飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 24th Bureau Group Co Ltd
Anhui Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd
Original Assignee
China Railway 24th Bureau Group Co Ltd
Anhui Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 24th Bureau Group Co Ltd, Anhui Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd filed Critical China Railway 24th Bureau Group Co Ltd
Priority to CN201821599698.3U priority Critical patent/CN208933973U/en
Application granted granted Critical
Publication of CN208933973U publication Critical patent/CN208933973U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses the positioning connection structures of a kind of steel-pipe pile and bored concrete pile, it is characterized in that: the structure type for the filling pile cage of reinforcement being placed in stake holes is: being made of the outer reinforcement cage in hollow tubular outer ring tie hoop and outer ring longitudinal direction stud, steel grid is welded on the axial position set in outer layer steel reinforcement cage, the grid surface on outer reinforcement cage cross section is formed, welds installation internal layer steel reinforcement cage at one end on steel grid, towards steel-pipe pile;The lower end of column steel pipe is inserted in filling pile cage of reinforcement, and is sleeved on internal layer steel reinforcement cage and is obtained radial positioning, and the base opening Zhi Li of column steel pipe obtains axially position in the plane of steel grid, and the top opening of column steel pipe convexedly stretches in stake holes aperture;Casting concrete makes steel-pipe pile and bored concrete pile realize connection in stake holes.The utility model, which is realized, has good globality and intensity by the entire pile that steel-pipe pile and cast-in-situ bored pile combine.

Description

A kind of positioning connection structure of steel-pipe pile and bored concrete pile
Technical field
The utility model belongs to technical field of building construction, and in particular to a kind of connection structure of steel-pipe pile and bored concrete pile.
Background technique
Effective usable floor area of the continuous quickening of urbanization process, soil is constantly reduced, and building is forced to develop to underground, Due to hypogee stress condition complexity, the requirement to pile foundation is higher and higher.Cast-in-situ bored pile, which is used alone, has construction technology Mature, bearing capacity height, advantage applied widely, but the problem big there is also long in time limit, project amount, and some underground engineerings It may be used as market, cast-in-situ bored pile diameter is big, unsightly.Steel-pipe pile simple, easy to use, bearing capacity with structure By force, the lesser advantage of size is suitable as indoor stanchion and uses, complicated, vibration that there is also sinking apparatus equipments and noise it is larger, Piling protection is not easy, is easy to the problems such as burn into rolled steel dosage is big, project cost is high, needs to carry out sufficient technology when selecting Economic analysis is compared.
Comprehensively consider site operation situation and various time economic factors, is combined using steel-pipe pile and cast-in-situ bored pile Mode construct, be conducive to combine steel-pipe pile and cast-in-situ bored pile the advantages of, reach preferably construction and using effect.Such as What properly carries out the connection of steel-pipe pile and cast-in-situ bored pile, so that entire pile is had good globality and intensity, enables structure Enough reasonable mechanicals are current problems to be solved.
Utility model content
The utility model provides the knot that is located by connecting of a kind of steel-pipe pile and bored concrete pile for the problems of prior art Structure, to properly carry out the connection of steel-pipe pile and cast-in-situ bored pile, so that being combined with steel-pipe pile and cast-in-situ bored pile entire Pile has good globality and intensity.
The utility model adopts the following technical scheme that in order to solve the technical problem
The characteristics of positioning connection structure of the utility model steel-pipe pile and bored concrete pile, is: the bored concrete pile reinforcing bar being placed in stake holes The structure type of cage is: the outer reinforcement cage in hollow tubular is constituted by outer ring tie hoop and outer ring longitudinal direction stud, described It is welded with steel grid on the axial position set in outer reinforcement cage, forms the grid surface on outer reinforcement cage cross section, Installation internal layer steel reinforcement cage is welded on the steel grid, towards steel-pipe pile at one end;The lower end of column steel pipe is inserted in perfusion It in pile cages, and is sleeved on the internal layer steel reinforcement cage and obtains radial positioning, the base opening Zhi Li of column steel pipe is in steel grid Plane on obtain axially position, the top opening of column steel pipe convexedly stretches in stake holes aperture;Casting concrete makes steel-pipe pile in stake holes It realizes and connects with bored concrete pile.
The characteristics of positioning connection structure of the utility model steel-pipe pile and bored concrete pile, lies also in: in the outer of the column steel pipe Radial peg is welded on cylindrical surface, the radial direction peg is distributed in array.
The characteristics of positioning connection structure of the utility model steel-pipe pile and bored concrete pile, lies also in: the base opening of the column steel pipe The depth in filling pile cage of reinforcement is protruded into not less than 2m, to meet the overlap joint requirement of design stake.
Compared with the prior art, the utility model has the beneficial effect that:
1, the utility model completes the positioning of steel-pipe pile using bored concrete pile, greatly reduces process flow;
2, location structure stress is clear, firm reliable in the utility model, substantially increases work progress safety;
3, radial peg is set on the external cylindrical surface of column steel pipe in the utility model, effectively enhance column steel pipe with The attachment force of concrete;
4, the utility model construction method is easy, required auxiliary material is few, the production of filling pile cage of reinforcement and column steel pipe It is completed in terrestrial operation, strong operability.
Detailed description of the invention
Fig. 1 is bored concrete pile and steel-pipe pile attachment structure schematic diagram in the utility model;
Fig. 2 is the A-A sectional view of Fig. 1;
Figure label: 1 filling pile cage of reinforcement;2 column steel pipes;3 outer ring tie hoops;4 stake holes;5 outer ring longitudinal direction studs;6 Steel grid;7 inner ring longitudinal direction studs;8 inner ring tie hoops;9 radial pegs;10 ground;11 internal layer steel reinforcement cages;12 outer reinforcements Cage;13 cast-in-place pile concretes.
Specific embodiment
Referring to Fig. 1 and Fig. 2, the positioning connection structure of steel-pipe pile and bored concrete pile includes: in the present embodiment
The structure type for the filling pile cage of reinforcement 1 being placed in stake holes 4 is: by outer ring tie hoop 3 and outer ring longitudinal direction stud 5 The outer reinforcement cage 12 in hollow tubular is constituted, is welded with steel grid 6, shape on the axial position set in outer layer steel reinforcement cage At the grid surface on outer reinforcement cage cross section, installation internal layer reinforcing bar is welded at one end on steel grid 6, towards steel-pipe pile Cage 11, internal layer steel reinforcement cage are welded by inner ring longitudinal direction stud 7 and inner ring tie hoop 8.
The lower end of column steel pipe 2 is inserted in filling pile cage of reinforcement 1, and is sleeved on internal layer steel reinforcement cage and is obtained radially determining Position, the height of internal layer steel reinforcement cage 11 are preferably the half of the length of the column steel pipe 2 protruded into filling pile cage of reinforcement;Column The base opening Zhi Li of steel pipe 2 obtains axially position in the plane of steel grid 6, and the top opening of column steel pipe 2 convexedly stretches in stake holes aperture. Casting concrete makes steel-pipe pile and bored concrete pile realize connection in stake holes.
In specific implementation, corresponding structure setting also includes:
Radial peg 9 is welded on the external cylindrical surface of column steel pipe 2, radial peg 9 is socket cap peg, radial peg 9 It is distributed on the external cylindrical surface of column steel pipe 2 in array, with 45 degree of arranged for interval, which answers the radial peg of eight, every circle Between 30-90 degree, 0.25m is divided between two adjacent rings, the interval should between 0.1-0.4m, can also in the ranks or column between shape At staggeredly;The base opening of column steel pipe 2 protrudes into the depth in filling pile cage of reinforcement not less than 2m, is wanted with meeting the overlap joint of design stake It asks, meanwhile, radial peg 9 should be not less than 2.5m along the axial arrangement of column steel pipe.
Steel grid 6 is welded by the isometric straight muscle of each segment, and one end of each straight muscle of segment is welded on corresponding position On outer ring longitudinal direction stud 5 on, the other end welds jointly and forms central point, integral into penetrating shape grid;Internal layer steel reinforcement cage 11 and steel Reinforced net 6 is welded and fixed.
The construction method that is located by connecting of steel-pipe pile and bored concrete pile carries out as follows in the present embodiment:
Step 1 prepares filling pile cage of reinforcement 1 and column steel pipe 2;
Step 2 carries out stake holes pore-forming according to the engineering method of conventional cast-in-situ bored pile, hangs and position bored concrete pile steel into stake holes Muscle cage 1,
Step 3 pours cast-in-place pile concrete 13 in advance, is that tremie is extended to bored concrete pile bottom to pour, when Stop pouring when top of concrete rises to the bottom plane of steel grid 6, completes pouring in advance for C35 cast-in-place pile concrete 13;
Step 4, the cast-in-place pile concrete 13 poured in advance reach setting intensity when, hung into filling pile cage of reinforcement 1 Column steel pipe 2 is sleeved on column steel pipe 2 on internal layer steel reinforcement cage 11, and the base opening Zhi Li of column steel pipe 2 is in the flat of steel grid 6 On face, the top opening of column steel pipe 2 convexedly stretches in stake holes aperture;
Step 5 completes pouring for bored concrete pile and steel pipe column interior concrete by tremie, specifically same using double duct When continuous placing directly cause to reach absolute altitude;Wherein a conduit is inserted in the outside of column steel pipe 2, using outer layer steel reinforcement cage as skeleton, Pour C35 concrete;Another conduit is inserted in the inside of column steel pipe 2, pours C60 coagulation by skeleton of internal layer steel reinforcement cage Soil;
In work progress, needs to install dismountable stress support cushion cap on the ground 10 in stake holes aperture, utilize support Cushion cap auxiliary undertake before casting concrete and during concrete setting column steel pipe weight, to ensure column steel pipe in steel mesh Void on lattice is taken, so that avoiding undertaking load and occurring without weight or only seldom load is born on steel grid Deformation;After concrete has some strength, removes platform loop and utilize.

Claims (3)

1. the positioning connection structure of a kind of steel-pipe pile and bored concrete pile, it is characterized in that: the filling pile cage of reinforcement (1) being placed in stake holes Structure type is: the outer reinforcement cage (12) in hollow tubular is made of outer ring tie hoop (3) and outer ring longitudinal direction stud (5), It is welded with steel grid (6), is formed on outer reinforcement cage cross section on the axial position set in the outer reinforcement cage Grid surface welds installation internal layer steel reinforcement cage (11) at one end on the steel grid (6), towards steel-pipe pile;Column steel pipe (2) lower end is inserted in filling pile cage of reinforcement, and is sleeved on the internal layer steel reinforcement cage and is obtained radial positioning, column steel pipe (2) base opening Zhi Li obtains axially position in the plane of steel grid (6), and the top opening of column steel pipe (2) convexedly stretches in stake holes hole Mouthful;Casting concrete makes steel-pipe pile and bored concrete pile realize connection in stake holes.
2. the positioning connection structure of steel-pipe pile according to claim 1 and bored concrete pile, it is characterized in that: in the column steel pipe (2) radial peg is welded on external cylindrical surface, the radial direction peg is distributed in array.
3. the positioning connection structure of steel-pipe pile according to claim 1 and bored concrete pile, it is characterized in that: the column steel pipe (2) base opening protrudes into the depth in filling pile cage of reinforcement not less than 2m, to meet the overlap joint requirement of design stake.
CN201821599698.3U 2018-09-29 2018-09-29 A kind of positioning connection structure of steel-pipe pile and bored concrete pile Expired - Fee Related CN208933973U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821599698.3U CN208933973U (en) 2018-09-29 2018-09-29 A kind of positioning connection structure of steel-pipe pile and bored concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821599698.3U CN208933973U (en) 2018-09-29 2018-09-29 A kind of positioning connection structure of steel-pipe pile and bored concrete pile

Publications (1)

Publication Number Publication Date
CN208933973U true CN208933973U (en) 2019-06-04

Family

ID=66723140

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821599698.3U Expired - Fee Related CN208933973U (en) 2018-09-29 2018-09-29 A kind of positioning connection structure of steel-pipe pile and bored concrete pile

Country Status (1)

Country Link
CN (1) CN208933973U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978667A (en) * 2018-09-29 2018-12-11 中铁二十四局集团安徽工程有限公司 A kind of positioning connection structure and its construction method of steel-pipe pile and bored concrete pile
CN111021353A (en) * 2019-12-30 2020-04-17 中国建筑第四工程局有限公司 Reinforcement method and structure for prestressed pipe pile defects

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978667A (en) * 2018-09-29 2018-12-11 中铁二十四局集团安徽工程有限公司 A kind of positioning connection structure and its construction method of steel-pipe pile and bored concrete pile
CN108978667B (en) * 2018-09-29 2024-02-27 中铁二十四局集团安徽工程有限公司 Positioning connection structure of steel pipe pile and cast-in-place pile and construction method thereof
CN111021353A (en) * 2019-12-30 2020-04-17 中国建筑第四工程局有限公司 Reinforcement method and structure for prestressed pipe pile defects

Similar Documents

Publication Publication Date Title
CN108978667A (en) A kind of positioning connection structure and its construction method of steel-pipe pile and bored concrete pile
CN102071747A (en) Joint of square steel tube concrete column and reinforced concrete floor and production method thereof
CN208933973U (en) A kind of positioning connection structure of steel-pipe pile and bored concrete pile
WO2010121519A1 (en) Inner support pile for supporting sinking well structure during construction
CN109235413B (en) Device for reinforcing soft soil foundation by transverse reinforced rigid-flexible composite piles and construction method
CN207998838U (en) A kind of compound pile pile of resistance to plucking
CN104594343B (en) A kind of assembled stake and its construction method
CN206319334U (en) A kind of prefabricated stealthy T-shaped floor tubular streetlamp foundation
CN111197318B (en) Foundation for a tower of a wind turbine
CN209066594U (en) The connection structure of contrary sequence method foundation pit construction central sill and steel core concrete column
CN203603149U (en) Multipurpose pre-stress preformed pile with changeable strength
CN114657977B (en) Prestressed concrete pipe pile end crack reinforcing device
CN111663521A (en) Club-footed pile for building immersed tube
CN106284331B (en) Method for improving vertical bearing capacity of large-diameter rock-socketed cast-in-place pile
CN113684823B (en) Tubular pile composite foundation suitable for high-filling collapsible loess field and construction method thereof
CN209816835U (en) Club-footed pile for building immersed tube
CN211079943U (en) Culvert structure
CN207193966U (en) A kind of prestressed concrete pipe pile
CN208907225U (en) A kind of double-row pile foundation pit enclosure structure of arch arrangement
CN208251078U (en) A kind of bottom-expanding sinking-pipe pilework
CN207193949U (en) A kind of pile for prestressed pipe of convenient construction
CN206815321U (en) A kind of anxious pilework of hydraulic engineering
CN219011192U (en) Foundation trench maintenance filling pile structure
CN109898505A (en) With the compound tubular pole of reinforced structure in soft stratum
CN218116411U (en) Pile cap and pile foundation structure for prestressed pipe pile composite foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190604

CF01 Termination of patent right due to non-payment of annual fee