CN209339171U - A kind of transmission line of electricity assembled sheet pile composite foundation - Google Patents
A kind of transmission line of electricity assembled sheet pile composite foundation Download PDFInfo
- Publication number
- CN209339171U CN209339171U CN201822124588.8U CN201822124588U CN209339171U CN 209339171 U CN209339171 U CN 209339171U CN 201822124588 U CN201822124588 U CN 201822124588U CN 209339171 U CN209339171 U CN 209339171U
- Authority
- CN
- China
- Prior art keywords
- foundation
- pile foundation
- attachment beam
- transmission line
- reinforcement cage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 21
- 239000002131 composite material Substances 0.000 title claims abstract description 16
- 230000005611 electricity Effects 0.000 title claims abstract description 14
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 29
- 239000010959 steel Substances 0.000 claims abstract description 29
- 230000002787 reinforcement Effects 0.000 claims abstract description 22
- 238000009434 installation Methods 0.000 claims abstract description 8
- 238000010276 construction Methods 0.000 abstract description 9
- 238000009412 basement excavation Methods 0.000 description 2
- 238000005266 casting Methods 0.000 description 2
- 238000009415 formwork Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a kind of transmission line of electricity assembled sheet pile composite foundations, plate basis includes I-beam, precast slab and attachment beam, an attachment beam is welded in the upper and lower two sides of every I-beam side end, four I-beams are in crossing distribution, and installation cavity is formed between two adjacent I-beams, several precast slabs are placed in each installation cavity, rectangular-shaped plate basis is collectively formed in precast slab and I-beam;Top pile foundation and lower part pile foundation are formed by steel reinforcement cage and concreting, and the bottom end of steel reinforcement cage is fixedly connected with the attachment beam of upside in plate basis in the pile foundation of top, and the top of steel reinforcement cage is fixedly connected with the attachment beam of downside in plate basis in the pile foundation of lower part.The utility model has good integrity, is conducive to upper load and uniformly transfers;Bearing capacity is high on soft foundation, and concrete amount is few, short construction period, and project cost is low;The reliability and economy of work transmission line can be improved.
Description
Technical field:
The utility model relates to a kind of transmission line of electricity assembled sheet pile composite foundations.
Background technique:
With national economy fast development, transmission line of electricity is quickly grown under different geological conditions, in riverine, coastal area
Major part be soft foundation, very big trouble is brought to Design of Foundation of Transmission Lines.With other geological conditions fairways
It compares, soft foundation Transmission Tower Foundation Engineering cost is generally higher than the average level of similar foundation engineering cost.So drop
Low Transmission Tower Foundation Engineering amount is always the emphasis and problem of route design engineering.
At present in Transmission Tower Foundation Engineering soft foundation, generally using cast-in-situ concrete slab basis, it may be assumed that first excavate
Then foundation pit carries out formwork, place steel reinforcement cage, carries out concreting, forms the base form being made of bottom plate and column, at
Form removal after shape, then the soil body is backfilled into foundation pit.This kind of big plate basis has the following disadvantages: in Practical Project construction
1, when upper load is larger, the buried depth and size on big plate basis are larger, lead to excavation of foundation pit earthwork quantitative change
Greatly, construction intensity is very big, and project cost is higher.
2, big plate basis uses cast-in-place concrete form, and complex procedures influence greatly, to be unfavorable for mechanization and apply on construction site
Work, leads to engineering construction inefficiency, and safe mass level is lower.
Summary of the invention:
The utility model is to provide a kind of transmission line of electricity assembled plate to solve the above-mentioned problems of the prior art
Stake composite foundation.
Technical solution used by the utility model has: a kind of transmission line of electricity assembled sheet pile composite foundation, including top
Pile foundation, plate basis and lower part pile foundation, the plate basis includes I-beam, precast slab and attachment beam, in every work
An attachment beam is welded in the upper and lower two sides of word beam side end, and four I-beams are in crossing distribution, and two adjacent works
Installation cavity is formed between word beam, several precast slabs, precast slab and I-beam are placed in each installation cavity
Rectangular-shaped plate basis is collectively formed, and the attachment beam of I-beam end is placed at the center on plate basis;The top pile foundation
It is formed with lower part pile foundation by steel reinforcement cage and concreting, the bottom end of steel reinforcement cage and upside in plate basis in the pile foundation of top
Attachment beam be fixedly connected, the attachment beam of downside is fixedly connected in the top of steel reinforcement cage and plate basis in the pile foundation of lower part.
Further, the attachment beam is the steel angle structure with horizontal sides and vertical edge, the horizontal sides and work of attachment beam
Word beam mutually welds.
Further, the precast slab is trapezoidal shape.
Further, it is fixed between the attachment beam and steel reinforcement cage by steel wire lashing.
Further, the top pile foundation is cylindric with lower part pile foundation, and the diameter of top pile foundation is greater than
The diameter of lower part pile foundation.
The utility model has the following beneficial effects:
The utility model has good integrity, is conducive to upper load and uniformly transfers;Bearing capacity is high on soft foundation,
Concrete amount is few, short construction period, and project cost is low;The reliability and economy of work transmission line can be improved.
Detailed description of the invention:
Fig. 1 is the utility model peg board composite base structure schematic front view.
Fig. 2 is the utility model peg board composite base structure schematic top plan view.
Fig. 3 is schematic diagram after the completion of the utility model pours in foundation pit.
Wherein, the top 1- pile foundation, 2- plate basis, the lower part 3- pile foundation, 21- I-beam, 22- precast slab, 23-
Attachment beam, 11- foundation pit.
Specific embodiment:
The utility model will be further described below with reference to the accompanying drawings.
Such as Fig. 1 to Fig. 3, a kind of transmission line of electricity assembled sheet pile composite foundation of the utility model, including top pile foundation 1,
Plate basis 2 and lower part pile foundation 3.
Plate basis 2 includes I-beam 21, precast slab 22 and attachment beam 23, in every 21 side end of I-beam
An attachment beam 23 is welded in upper and lower two sides, and four I-beams 21 are in crossing distribution, and between two adjacent I-beams 21
Form installation cavity.Several precast slabs 22 are placed in each installation cavity, precast slab 22 and I-beam 21 are total
The plate basis 2 of similar shape rectangular in form, and the attachment beam 23 of 21 end of I-beam is placed at the center on plate basis 2.
Top pile foundation 1 and lower part pile foundation 3 are formed by steel reinforcement cage and concreting, reinforcing bar in top pile foundation 1
The bottom end of cage is fixedly connected with the attachment beam 23 of upside in plate basis 2, the top of steel reinforcement cage and plate basis 2 in lower part pile foundation 3
The attachment beam 23 of middle downside is fixedly connected.
Attachment beam 23 in the utility model is the steel angle structure with horizontal sides and vertical edge, the horizontal sides of attachment beam 23
It is welded with 21 phase of I-beam, steel reinforcement cage is fixedly connected with the vertical edge of attachment beam 23, and is passed through between attachment beam 23 and steel reinforcement cage
Steel wire lashing is fixed.
Precast slab 22 is trapezoidal shape.Top pile foundation 1 is cylindric, and top pile foundation with lower part pile foundation 3
The diameter of plinth 1 is greater than the diameter of lower part pile foundation 3.
The construction method of the utility model transmission line of electricity assembled sheet pile composite foundation, includes the following steps:
1) excavation pit 11, and stake holes is excavated in the bottom of foundation pit 11;
2) steel reinforcement cage is placed into stake holes, and places four I-beams 21 in 11 bottom of foundation pit, in every I-beam 21 1
An attachment beam 23 is welded in the upper and lower two sides of side end, and four I-beams 21 are in crossing distribution, and under 21 end of I-beam
The attachment beam 23 of side is stretched in stake holes and is fixedly connected with the steel reinforcement cage in stake holes;
3) several precast slabs 22, precast slab 22 and work are placed between two adjacent I-beams 21
Rectangular-shaped plate basis 2 is collectively formed in word beam 21;
4) steel reinforcement cage is placed in the upper surface on plate basis 2, and makes the bottom and 21 end of I-beam of the steel reinforcement cage
The attachment beam 23 of upside is fixedly connected, and in the surrounding formwork supporting plate of the steel reinforcement cage;
5) the steel reinforcement cage casting concrete into the basic 2 upper end templates of plate and top pile foundation 1 is formed, the steel into stake holes
Muscle cage casting concrete simultaneously forms lower part pile foundation 3, and top pile foundation 1, plate basis 2 and lower part pile foundation 3 are solid by concrete
Integral type sheet pile composite foundation is formed after knot;
6) template for removing top pile foundation 1, backfills foundation pit 11, completes construction.
The utility model has good integrity, is conducive to upper load and uniformly transfers;Bearing capacity is high on soft foundation,
Concrete amount is few, short construction period, and project cost is low;The reliability and economy of work transmission line can be improved.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art
It for art personnel, can also make several improvements without departing from the principle of this utility model, these improvement also should be regarded as
The protection scope of the utility model.
Claims (5)
1. a kind of transmission line of electricity assembled sheet pile composite foundation, it is characterised in that: including top pile foundation (1), plate basic (2) and
Lower part pile foundation (3), the plate basic (2) includes I-beam (21), precast slab (22) and attachment beam (23), at every
An attachment beam (23) is welded in the upper and lower two sides of I-beam (21) side end, and four I-beams (21) are in crossing distribution,
And installation cavity is formed between two adjacent I-beams (21), several precast slabs are placed in each installation cavity
(22), precast slab (22) and I-beam (21) are collectively formed that rectangular-shaped plate is basic (2), and I-beam (21) end
Attachment beam (23) is placed at the center of plate basic (2);The top pile foundation (1) and lower part pile foundation (3) by steel reinforcement cage and
Concreting forms, and the attachment beam (23) of the bottom end of steel reinforcement cage and the middle upside of plate basic (2) is fixed in top pile foundation (1) connects
It connects, the top of steel reinforcement cage is fixedly connected with the attachment beam (23) of downside in plate basic (2) in lower part pile foundation (3).
2. transmission line of electricity assembled sheet pile composite foundation as described in claim 1, it is characterised in that: the attachment beam (23) is
Steel angle structure with horizontal sides and vertical edge, horizontal sides and the I-beam (21) of attachment beam (23) mutually weld.
3. transmission line of electricity assembled sheet pile composite foundation as described in claim 1, it is characterised in that: the precast slab
It (22) is trapezoidal shape.
4. transmission line of electricity assembled sheet pile composite foundation as described in claim 1, it is characterised in that: the attachment beam (23) with
It is fixed between steel reinforcement cage by steel wire lashing.
5. transmission line of electricity assembled sheet pile composite foundation as described in claim 1, it is characterised in that: the top pile foundation
It (1) is cylindric with lower part pile foundation (3), and the diameter of top pile foundation (1) is greater than the diameter of lower part pile foundation (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822124588.8U CN209339171U (en) | 2018-12-18 | 2018-12-18 | A kind of transmission line of electricity assembled sheet pile composite foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822124588.8U CN209339171U (en) | 2018-12-18 | 2018-12-18 | A kind of transmission line of electricity assembled sheet pile composite foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209339171U true CN209339171U (en) | 2019-09-03 |
Family
ID=67757614
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822124588.8U Expired - Fee Related CN209339171U (en) | 2018-12-18 | 2018-12-18 | A kind of transmission line of electricity assembled sheet pile composite foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209339171U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109440799A (en) * | 2018-12-18 | 2019-03-08 | 南京工业大学 | A kind of transmission line of electricity assembled sheet pile composite foundation and construction method |
CN112482345A (en) * | 2020-11-30 | 2021-03-12 | 上海宝冶冶金工程有限公司 | Method and structure for improving bearing capacity of natural foundation |
-
2018
- 2018-12-18 CN CN201822124588.8U patent/CN209339171U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109440799A (en) * | 2018-12-18 | 2019-03-08 | 南京工业大学 | A kind of transmission line of electricity assembled sheet pile composite foundation and construction method |
CN112482345A (en) * | 2020-11-30 | 2021-03-12 | 上海宝冶冶金工程有限公司 | Method and structure for improving bearing capacity of natural foundation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205975658U (en) | Steel platform tower crane foundation | |
CN209339171U (en) | A kind of transmission line of electricity assembled sheet pile composite foundation | |
CN111779025A (en) | In-situ protection structure crossing foundation pit municipal pipe network box culvert and construction method | |
CN205024712U (en) | Modular tower crane basis | |
CN107227741B (en) | Basement supporting construction | |
CN212129160U (en) | Oblique-pulling foundation pit supporting structure for pile top | |
CN208167770U (en) | Assembled drilledpier foundation | |
CN209211459U (en) | Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA | |
CN106120690B (en) | A kind of inverter box becomes platform and preparation method thereof | |
CN113585336B (en) | Quick construction method of sinking type concrete mixing station in soft foundation environment | |
CN213508572U (en) | Piping lane supporting construction | |
CN205917726U (en) | Stake girder construction integral type tower crane foundation structure | |
CN209339172U (en) | A kind of novel peg board composite foundation | |
CN109440799A (en) | A kind of transmission line of electricity assembled sheet pile composite foundation and construction method | |
CN209555962U (en) | One kind being suitable for III class stake of cast-in-situ bored pile and cushion cap connection structure | |
CN209260748U (en) | A kind of stepped tower crane | |
CN208088311U (en) | Back-pressure de-bowed type pile slab supporting structure after stake | |
CN208685617U (en) | A kind of foundation underpinning system of old brick foundation building | |
CN207143993U (en) | Steel Wall for subway station shield hole side | |
CN111636438A (en) | Deep foundation pit supporting structure and deformation control method thereof | |
CN207919602U (en) | Excavation of foundation pit closes on the supporting construction of existing shallow foundation | |
CN205934891U (en) | Dc -to -ac converter case flattens platform | |
CN106120580B (en) | A kind of change hill wash duct device and its construction method for jacking precast frame | |
CN218263972U (en) | Foundation pit operation pipeline protection device | |
CN108360549A (en) | Anchor pole bar planting foundation construction method of the mountainous region photovoltaic gradient more than 25 degree of angles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190903 Termination date: 20201218 |
|
CF01 | Termination of patent right due to non-payment of annual fee |