CN205934891U - Dc -to -ac converter case flattens platform - Google Patents

Dc -to -ac converter case flattens platform Download PDF

Info

Publication number
CN205934891U
CN205934891U CN201620900572.XU CN201620900572U CN205934891U CN 205934891 U CN205934891 U CN 205934891U CN 201620900572 U CN201620900572 U CN 201620900572U CN 205934891 U CN205934891 U CN 205934891U
Authority
CN
China
Prior art keywords
platform
pipe pile
inverter box
landing
prestressed concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620900572.XU
Other languages
Chinese (zh)
Inventor
黄万山
王磊
吉春明
李素良
刘欣良
张源
彭秀芳
张瑞云
王泽国
陈勖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Original Assignee
China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Jiangsu Power Design Institute Co Ltd filed Critical China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Priority to CN201620900572.XU priority Critical patent/CN205934891U/en
Application granted granted Critical
Publication of CN205934891U publication Critical patent/CN205934891U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model provides a dc -to -ac converter case flattens platform, include that prestressed concrete pipe pile and setting as basis and post are in the platform of prestressed concrete pipe pile upper end, the platform is the reinforced concrete contignation landing girder and landing slab, landing girder fixes prestressed concrete pipe pile's upper end, the landing slab is fixed landing girder is last.

Description

A kind of inverter box becomes platform
Technical field
This utility model is related to a kind of inverter box and becomes platform, belongs to fishing light complementation photovoltaic power generation project structure technology neck Domain.
Background technology
Photovoltaic generation is the important component part of national green energy construction, and fishing light complementation photovoltaic plant is then ground light One of principal mode of overhead utility.
Traditional inverter box becomes platform and adopts subsoil isolated footing or strip footing, is up steel successively from basis Reinforced concrete column and reinforced concrete platform, platform typically adopts beam and slab type structure.Because of fishing light complementary terms purpose inverter box Become platform and be generally individually arranged in fish pond adjacent edges, basis is still seated in inside fish pond.There is water all the year round due in fish pond, lead to Ground topsoil is generally silt soil, thus basic stock size is larger, buried depth relatively deep to ensure that foundation bearing capacity and ground sink Fall meets requirement simultaneously.Generally require a water during construction all to drain, silt soil is excavated simultaneously, excavate and complete after-pouring Plain concrete cushion layer, then shuttering, colligation reinforcement foundation, pour base concrete;After the completion of foundation construction colligation column and Beam reinforced steel bar, finally carries out column and beam slab concreting.Traditional scheme construction technology is relatively cumbersome, difficulty of construction is inclined Greatly, especially when fish pond, bottom sludge soil is very thick, and when bearing capacity is very poor, difficulty of construction is bigger, and the construction period is longer.
Utility model content
This utility model is in order to solve drawbacks described above present in prior art and deficiency, there is provided a kind of inverter box becomes Platform, this platform both can meet the supporting of inverter box change, easy construction simultaneously, quick, and simplifies work progress, significantly Accelerate the duration.
For solving above-mentioned technical problem, this utility model provides a kind of inverter box to become platform, including based on and post Prestressed concrete pipe pile and the platform being arranged on described prestressed concrete pipe pile upper end, described platform for reinforcing bar mix Solidifying soil contignation, including landing beam and landing slab, described landing beam is fixed on the upper end of described prestressed concrete pipe pile, Described landing slab is fixed on described landing beam.
Further, described landing beam includes 2 crossbeams and 2 tie-beams, 2 described crossbeams be arranged on the pre- of same row The top of prestressed concrete pile tube is connected, and its end is passed through 2 tie-beams and is connected.
Further, it is provided with some secondary beams, described secondary beam and beam vertical and described tie-beam between 2 described crossbeams Parallel.
Further, it is provided with fence at described platform surrounding edge.
Further, described platform is provided with steel ladder, described steel ladder extends to ground, for the upper lower platform of staff.
Further, described steel ladder is collapsible steel ladder.
The Advantageous Effects that this utility model is reached:A kind of inverter box that this utility model provides becomes platform, adopts Replace basis and column with prestressed concrete pipe pile, during making, there is no earth moving, do not found foundation formss, colligation basis steel Muscle, pour the work of base concrete, also found model of the column, colligation column reinforcing bar, pour the work of column concrete.This Construction work amount is greatly reduced, has shortened the construction period.Meanwhile, basis and column are replaced using prestressed concrete pipe pile, Concrete amount, amount of reinforcement have all declined.
Brief description
The inverter box of Fig. 1 this utility model becomes the overlooking the structure diagram of platform;
The inverter box of Fig. 2 this utility model becomes the left view structural representation of platform.
Specific embodiment
Below in conjunction with the accompanying drawings this utility model is further described.Following examples are only used for this is clearly described The technical scheme of utility model, and protection domain of the present utility model can not be limited with this.
As shown in Figure 1-2, this utility model provides a kind of inverter box to become platform, including based on and post prestressing force Concrete tubular pile 1 and the platform being arranged on described prestressed concrete pipe pile upper end, described platform is reinforced concrete girder slab Structure, including landing beam and landing slab 3, described landing beam is fixed on the upper end of described prestressed concrete pipe pile 1, described flat Platen 3 is fixed on described landing beam.
Based on this platform adopts prestressed concrete pipe pile and post, prestressed concrete pipe pile top and platform are even Connect, platform adopts reinforced concrete beam and plate, inverter, box type transformer are seated on reinforced concrete platform.Using side After case, inverter box becomes platform and decreases earth excavation and backfilling of earthwork amount, decreases the quantities on basis, including formwork The techniques such as plate, reinforcing bar binding, casting concrete, simplify the construction technology of column simultaneously, only include piling technique, decrease steel The techniques such as muscle colligation, casting concrete, the quantities of platform is basically unchanged.Become platform in view of fish pond photovoltaic project inverter box Be arranged in fish pond side, the work such as the earthwork, construction of foundation formss affected by fishpond water larger, existing using reducing after this programme Field difficulty of construction.Therefore, the inverter box for fishing light complementation photovoltaic project becomes platform, after this programme, has both saved mixed Solidifying soil consumption and reinforcing bar binding engineering amount, in turn simplify the difficulty of site operation, decrease the construction period.
Described landing beam includes 2 crossbeams 2 and 5,2 described crossbeams 2 of 2 tie-beams and the prestressing force being arranged on same row The top of concrete tubular pile 1 is connected, and its end is passed through 2 tie-beams 5 and is connected.It is provided with some secondary beams between 2 described crossbeams 2 6, described secondary beam 6 is vertical with crossbeam 2 and described tie-beam 5 is parallel.It is provided with fence 7 at described platform surrounding edge, increase platform Security performance.Steel ladder 4 is provided with described platform, described steel ladder 4 extends to ground, for the upper lower platform of staff, institute Stating steel ladder 4 is collapsible steel ladder.
The above is only preferred implementation of the present utility model it is noted that common skill for the art For art personnel, on the premise of without departing from this utility model know-why, some improvement can also be made and deform, these change Enter and deform also to should be regarded as protection domain of the present utility model.

Claims (6)

1. a kind of inverter box become platform it is characterised in that:Including based on and post prestressed concrete pipe pile and setting In the platform of described prestressed concrete pipe pile upper end, described platform is reinforced concrete beam and plate, include landing beam with Landing slab, described landing beam is fixed on the upper end of described prestressed concrete pipe pile, and described landing slab is fixed on described platform Liang Shang.
2. inverter box according to claim 1 become platform it is characterised in that:Described landing beam includes 2 crossbeams and 2 Tie-beam, 2 described crossbeams are connected with the top of the prestressed concrete pipe pile being arranged on same row, and 2 companies are passed through in its end Connect beam to be connected.
3. inverter box according to claim 2 become platform it is characterised in that:It is provided with some between 2 described crossbeams Secondary beam, described secondary beam is parallel with described tie-beam with beam vertical.
4. inverter box according to claim 1 become platform it is characterised in that:It is provided with described platform surrounding edge and enclose Hurdle.
5. inverter box according to claim 1 become platform it is characterised in that:It is provided with steel ladder on described platform, described Steel ladder extends to ground, for the upper lower platform of staff.
6. inverter box according to claim 5 become platform it is characterised in that:Described steel ladder is collapsible steel ladder.
CN201620900572.XU 2016-08-17 2016-08-17 Dc -to -ac converter case flattens platform Active CN205934891U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620900572.XU CN205934891U (en) 2016-08-17 2016-08-17 Dc -to -ac converter case flattens platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620900572.XU CN205934891U (en) 2016-08-17 2016-08-17 Dc -to -ac converter case flattens platform

Publications (1)

Publication Number Publication Date
CN205934891U true CN205934891U (en) 2017-02-08

Family

ID=57919407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620900572.XU Active CN205934891U (en) 2016-08-17 2016-08-17 Dc -to -ac converter case flattens platform

Country Status (1)

Country Link
CN (1) CN205934891U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120690A (en) * 2016-08-17 2016-11-16 中国能源建设集团江苏省电力设计院有限公司 A kind of inverter box flattens platform and preparation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120690A (en) * 2016-08-17 2016-11-16 中国能源建设集团江苏省电力设计院有限公司 A kind of inverter box flattens platform and preparation method thereof
CN106120690B (en) * 2016-08-17 2018-02-13 中国能源建设集团江苏省电力设计院有限公司 A kind of inverter box becomes platform and preparation method thereof

Similar Documents

Publication Publication Date Title
CN102182325B (en) Storey adding method for existing building basement with frame structure and independent foundation
CN108005084A (en) The supporting of deep basal pit combined type and construction method
CN107975059A (en) A kind of assembled pile foundation wharfs structure and its construction method
CN203174619U (en) Reverse raft concrete terrace
CN104863063B (en) Cofferdam method for rapidly reinforcing is exempted from based on the bridge submerged structure of PVC composite shuttering
CN108103939A (en) Oblique section steel trestle construction composite reinforcement mode and construction technology
CN109487812A (en) A kind of concrete assembled basic and its construction method of diagonal-bracing type
CN108277996A (en) The construction method of multi-storey basement is extended under a kind of protection groups of building
CN113931166A (en) Barrel-shaped fan foundation of prefabricated sheet pile assembly type connecting structure and construction method thereof
CN207567784U (en) Deep basal pit combined type supporting
CN106120690B (en) A kind of inverter box becomes platform and preparation method thereof
CN205934891U (en) Dc -to -ac converter case flattens platform
CN103233537A (en) Heavy-load superimposed overhead terrace and construction method
CN211340800U (en) Super dark foundation ditch earthwork excavation platform structure
CN110805049B (en) Construction method of mountain slope ultra-thickness spray anchor permanent supporting structure
CN209339171U (en) A kind of transmission line of electricity assembled sheet pile composite foundation
CN113585336B (en) Quick construction method of sinking type concrete mixing station in soft foundation environment
CN218813780U (en) Slope protection structure for mine geological environment treatment
CN216640550U (en) Prefabricated sheet pile assembled connection structure's section of thick bamboo type fan basis and wind generating set
CN108951654A (en) Different cutting depth basement construction method for supporting
CN207919582U (en) A kind of assembled pile foundation wharfs structure
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
CN203066083U (en) Supporting structure for two adjacent foundation pits
CN209958290U (en) Take shore protection structure of pile foundation
CN109403297A (en) A kind of inverter box flattens platform and preparation method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant