CN106120690A - A kind of inverter box flattens platform and preparation method thereof - Google Patents

A kind of inverter box flattens platform and preparation method thereof Download PDF

Info

Publication number
CN106120690A
CN106120690A CN201610683741.3A CN201610683741A CN106120690A CN 106120690 A CN106120690 A CN 106120690A CN 201610683741 A CN201610683741 A CN 201610683741A CN 106120690 A CN106120690 A CN 106120690A
Authority
CN
China
Prior art keywords
platform
pipe pile
prestressed concrete
concrete pipe
inverter box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610683741.3A
Other languages
Chinese (zh)
Other versions
CN106120690B (en
Inventor
黄万山
王磊
吉春明
李素良
刘欣良
张源
彭秀芳
张瑞云
王泽国
陈勖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Original Assignee
China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Jiangsu Power Design Institute Co Ltd filed Critical China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Priority to CN201610683741.3A priority Critical patent/CN106120690B/en
Publication of CN106120690A publication Critical patent/CN106120690A/en
Application granted granted Critical
Publication of CN106120690B publication Critical patent/CN106120690B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Foundations (AREA)

Abstract

The present invention provides a kind of inverter box to flatten platform, based on including and the prestressed concrete pipe pile 1 of post and be arranged on the platform of described prestressed concrete pipe pile upper end, described platform is reinforced concrete beam and plate, including landing beam and landing slab 3, described landing beam is fixed on the upper end of described prestressed concrete pipe pile 1, and described landing slab 3 is fixed on described landing beam.Flattening the manufacture method of platform it addition, the present invention also provides for a kind of inverter box, the method operation is simple, difficulty of construction is little, and the duration is short, quantities is little.

Description

A kind of inverter box flattens platform and preparation method thereof
Technical field
The present invention relates to a kind of inverter box flatten platform and preparation method thereof, belong to fishing light complementation photovoltaic power generation project structure Technical field.
Background technology
Photovoltaic generation is the important component part of national green energy construction, and fishing light complementary light overhead utility is then ground light One of principal mode of overhead utility.
Traditional inverter box platform that flattens uses subsoil isolated footing or strip footing, is steel the most successively from basis Reinforced concrete column and reinforced concrete platform, platform typically uses beam and slab type structure.Because of fishing light complementary terms purpose inverter box The platform that flattens generally individually is arranged in fish pond adjacent edges, and basis is still seated in inside fish pond.Owing to there being water in fish pond all the year round, cause Ground topsoil is generally silt soil, thus basis stock size is relatively big, buried depth is relatively deeply heavy to ensure foundation bearing capacity and ground Fall meets requirement simultaneously.It is generally required to water is all drained during construction, silt soil is excavated simultaneously, excavated after-pouring Plain concrete cushion layer, then shuttering, colligation reinforcement foundation, pour base concrete;Foundation construction complete after colligation column and Beam reinforced steel bar, finally carries out column and beam slab concreting.Traditional scheme construction technology is relatively cumbersome, difficulty of construction is inclined Greatly, especially the thickest when fish pond bottom sludge soil, when bearing capacity is very poor, difficulty of construction is bigger, and the construction period is longer.
Summary of the invention
The present invention is to solve drawbacks described above and deficiency present in prior art, it is provided that a kind of inverter box flattens platform And preparation method thereof, this platform both can meet the supporting that inverter box becomes, easy construction simultaneously, quick, and simplifies construction Process, is greatly accelerated the duration.
For solving above-mentioned technical problem, the present invention provides a kind of inverter box to flatten platform, including based on and post pre- Prestressed concrete pile tube and be arranged on the platform of described prestressed concrete pipe pile upper end, described platform is armored concrete Contignation, including landing beam and landing slab, described landing beam is fixed on the upper end of described prestressed concrete pipe pile, described Landing slab is fixed on described landing beam.
Further, described landing beam includes 2 crossbeams and 2 tie-beams, 2 described crossbeams be arranged on the pre-of same row The top of prestressed concrete pile tube is connected, and its end is connected by 2 tie-beams.
Further, some secondary beams, described secondary beam and beam vertical and described tie-beam it are provided with between 2 described crossbeams Parallel.
Further, it is provided with fence at described platform surrounding edge.
Further, described platform being provided with steel ladder, described steel ladder extends to ground, for the upper lower platform of staff.
Further, described steel ladder is collapsible steel ladder.
The present invention also provides for a kind of inverter box and flattens the manufacture method of platform, it is characterised in that comprise the following steps:
Step one, the making of prestressed concrete pipe pile;
Measure making place, the anchor point of true fixed pile, then drive piles at anchor point, i.e. make prestressing force and mix Solidifying soil pile tube, the height of prestressed concrete pipe pile is more than the height of fishpond water bit line;
Step 2, after prestressed concrete pipe pile completes, welded reinforcement on the pre-buried end plate at pile foundation top, it is used for connecting Prestressed concrete pipe pile and platform;
Step 3, arranges template at stake top, and the layout of template includes the layout of landing beam, secondary beam, platform floor;Template is arranged Carrying out assembling reinforcement after completing, bury built-in fitting underground simultaneously, built-in fitting includes that inverter built-in fitting, case become built-in fitting, steel Ladder built-in fitting;
Step 4, reinforcing bar and built-in fitting carry out concreting, maintenance after having constructed, the upper end of prestressed concrete pipe pile Stretch in concrete platform, and distance platform base 0.1m;
Step 5, steel ladder installation, steel ladder is connected to platform from roadside;
Step 6, the installation that inverter, case become.
The Advantageous Effects that the present invention is reached: a kind of inverter box that the present invention provides flattens platform, uses prestressing force Concrete tubular pile replaces basis and column, does not has earth moving, do not found foundation forms, colligation reinforcement foundation, pour during making The work of base concrete, does not the most found model of the column, colligation column reinforcing bar, pours the work of column concrete.This contracts significantly Subtract construction work amount, shorten the construction period.Meanwhile, prestressed concrete pipe pile is used to replace basis and column, concrete Consumption, amount of reinforcement have declined.Present invention also offers inverter box to flatten the manufacture method of platform, the letter of the method operation List, difficulty of construction are little, and the duration is short, quantities is little.
Accompanying drawing explanation
The inverter box of Fig. 1 present invention flattens the plan structure schematic diagram of platform;
The inverter box of Fig. 2 present invention flattens the left view structural representation of platform.
Detailed description of the invention
The invention will be further described below in conjunction with the accompanying drawings.Following example are only used for clearly illustrating the present invention Technical scheme, and can not limit the scope of the invention with this.
As shown in Figure 1-2, the present invention provides a kind of inverter box to flatten platform, including based on and the prestressed concrete of post Soil pile tube 1 and be arranged on the platform of described prestressed concrete pipe pile upper end, described platform is reinforced concrete girder slab knot Structure, including landing beam and landing slab 3, described landing beam is fixed on the upper end of described prestressed concrete pipe pile 1, described platform Plate 3 is fixed on described landing beam.
Connect with post, prestressed concrete pipe pile top and platform based on this platform uses prestressed concrete pipe pile Connecing, platform uses reinforced concrete beam and plate, and inverter, box type transformer are seated on reinforced concrete platform.Employing side After case, the inverter box platform that flattens decreases earth excavation and backfilling of earthwork amount, decreases the quantities on basis, including formwork The techniques such as plate, reinforcing bar binding, casting concrete, simplify the construction technology of column simultaneously, only include piling technique, decrease steel The techniques such as muscle colligation, casting concrete, the quantities of platform is basically unchanged.Flatten platform in view of fish pond photovoltaic project inverter box Being arranged in limit, fish pond, the earthwork, the work such as construction of foundation forms are affected relatively big by fishpond water, can reduce and show after using this programme Field difficulty of construction.Therefore, the inverter box of fishing light complementation photovoltaic project is flattened platform, after using this programme, had both saved mixed Solidifying soil consumption and reinforcing bar binding engineering amount, in turn simplify the difficulty of site operation, decrease the construction period.
Described landing beam includes 2 crossbeams 2 and 5,2 described crossbeams 2 of 2 tie-beams and the prestressing force being arranged on same row The top of concrete tubular pile 1 is connected, and its end is connected by 2 tie-beams 5.It is provided with some secondary beams between 2 described crossbeams 2 6, described secondary beam 6 is vertical with crossbeam 2 and described tie-beam 5 is parallel.It is provided with fence 7 at described platform surrounding edge, increases platform Security performance.Being provided with steel ladder 4 on described platform, described steel ladder 4 extends to ground, for the upper lower platform of staff, institute State steel ladder 4 for collapsible steel ladder.
Present invention also offers inverter box to flatten the manufacture method of platform, comprise the following steps:
Step one, the making of prestressed concrete pipe pile;
Measure making place, the anchor point of true fixed pile, then drive piles at anchor point, i.e. make prestressing force and mix Solidifying soil pile tube, the height of prestressed concrete pipe pile is more than the height of fishpond water bit line;
Step 2, after prestressed concrete pipe pile completes, welded reinforcement on the pre-buried end plate at pile foundation top, it is used for connecting Prestressed concrete pipe pile and platform;
Step 3, arranges template at stake top, and the layout of template includes the layout of landing beam, secondary beam, platform floor;Template is arranged Carrying out assembling reinforcement after completing, bury built-in fitting underground simultaneously, built-in fitting includes that inverter built-in fitting, case become built-in fitting, steel Ladder built-in fitting;
Step 4, reinforcing bar and built-in fitting carry out concreting, maintenance after having constructed, the upper end of prestressed concrete pipe pile Stretch in concrete platform, and distance platform base 0.1m;
Step 5, steel ladder installation, steel ladder is connected to platform from roadside;
Step 6, the installation that inverter, case become.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For Yuan, on the premise of without departing from the technology of the present invention principle, it is also possible to make some improvement and deformation, these improve and deformation Also should be regarded as protection scope of the present invention.

Claims (7)

1. an inverter box flattens platform, it is characterised in that: based on including and the prestressed concrete pipe pile of post and arranging At the platform of described prestressed concrete pipe pile upper end, described platform is reinforced concrete beam and plate, including landing beam and Landing slab, described landing beam is fixed on the upper end of described prestressed concrete pipe pile, and described landing slab is fixed on described platform Liang Shang.
Inverter box the most according to claim 1 flattens platform, it is characterised in that: described landing beam includes 2 crossbeams and 2 Tie-beam, 2 described crossbeams are connected with the top of the prestressed concrete pipe pile being arranged on same row, and 2 companies are passed through in its end Connect beam to be connected.
Inverter box the most according to claim 2 flattens platform, it is characterised in that: it is provided with some between 2 described crossbeams Secondary beam, described secondary beam is parallel with described tie-beam with beam vertical.
Inverter box the most according to claim 1 flattens platform, it is characterised in that: it is provided with at described platform surrounding edge and encloses Hurdle.
Inverter box the most according to claim 1 flattens platform, it is characterised in that: it is provided with steel ladder on described platform, described Steel ladder extends to ground, for the upper lower platform of staff.
Inverter box the most according to claim 5 flattens platform, it is characterised in that: described steel ladder is collapsible steel ladder.
7. flatten the manufacture method of platform according to the inverter box described in any one of claim 1-6, it is characterised in that includes following Step:
Step one, the making of prestressed concrete pipe pile;
Measure making place, the anchor point of true fixed pile, then drive piles at anchor point, i.e. make prestressing force and mix Solidifying soil pile tube, the height of prestressed concrete pipe pile is more than the height of fishpond water bit line;
Step 2, after prestressed concrete pipe pile completes, welded reinforcement on the pre-buried end plate at pile foundation top, it is used for connecting Prestressed concrete pipe pile and platform;
Step 3, arranges template at stake top, and the layout of template includes the layout of landing beam, secondary beam, platform floor;Template is arranged Carrying out assembling reinforcement after completing, bury built-in fitting underground simultaneously, built-in fitting includes that inverter built-in fitting, case become built-in fitting, steel Ladder built-in fitting;
Step 4, reinforcing bar and built-in fitting carry out concreting, maintenance after having constructed, the upper end of prestressed concrete pipe pile Stretch in concrete platform, and distance platform base 0.1m;
Step 5, steel ladder installation, steel ladder is connected to platform from roadside;
Step 6, the installation that inverter, case become.
CN201610683741.3A 2016-08-17 2016-08-17 A kind of inverter box becomes platform and preparation method thereof Active CN106120690B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610683741.3A CN106120690B (en) 2016-08-17 2016-08-17 A kind of inverter box becomes platform and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610683741.3A CN106120690B (en) 2016-08-17 2016-08-17 A kind of inverter box becomes platform and preparation method thereof

Publications (2)

Publication Number Publication Date
CN106120690A true CN106120690A (en) 2016-11-16
CN106120690B CN106120690B (en) 2018-02-13

Family

ID=57278647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610683741.3A Active CN106120690B (en) 2016-08-17 2016-08-17 A kind of inverter box becomes platform and preparation method thereof

Country Status (1)

Country Link
CN (1) CN106120690B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930339A (en) * 2017-03-15 2017-07-07 中国能源建设集团江苏省电力设计院有限公司 A kind of pile foundation reinforcement method for becoming platform for inverter box
CN109667277A (en) * 2018-12-25 2019-04-23 中国能源建设集团广东省电力设计研究院有限公司 Cantilevered coupling beam cable termination field

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000129684A (en) * 1998-10-22 2000-05-09 Nippon Steel Corp Slope face press frame structure, framework structure, and slope face reinforcing method
CN101929149A (en) * 2009-06-26 2010-12-29 中国石油天然气集团公司 Shallow sea pile foundation concrete oil drilling and producing platform
CN103114567A (en) * 2013-01-31 2013-05-22 合肥聚能新能源科技有限公司 Photovoltaic power generation system combined with fish farm
CN104532813A (en) * 2014-12-16 2015-04-22 江西省城建建设集团有限公司 Overwater building construction platform and erecting method and use method thereof
CN204455845U (en) * 2015-02-10 2015-07-08 中交一航局第一工程有限公司 A kind of large-scale assembling drilling platform
CN205934891U (en) * 2016-08-17 2017-02-08 中国能源建设集团江苏省电力设计院有限公司 Dc -to -ac converter case flattens platform

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000129684A (en) * 1998-10-22 2000-05-09 Nippon Steel Corp Slope face press frame structure, framework structure, and slope face reinforcing method
CN101929149A (en) * 2009-06-26 2010-12-29 中国石油天然气集团公司 Shallow sea pile foundation concrete oil drilling and producing platform
CN103114567A (en) * 2013-01-31 2013-05-22 合肥聚能新能源科技有限公司 Photovoltaic power generation system combined with fish farm
CN104532813A (en) * 2014-12-16 2015-04-22 江西省城建建设集团有限公司 Overwater building construction platform and erecting method and use method thereof
CN204455845U (en) * 2015-02-10 2015-07-08 中交一航局第一工程有限公司 A kind of large-scale assembling drilling platform
CN205934891U (en) * 2016-08-17 2017-02-08 中国能源建设集团江苏省电力设计院有限公司 Dc -to -ac converter case flattens platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930339A (en) * 2017-03-15 2017-07-07 中国能源建设集团江苏省电力设计院有限公司 A kind of pile foundation reinforcement method for becoming platform for inverter box
CN106930339B (en) * 2017-03-15 2019-11-22 中国能源建设集团江苏省电力设计院有限公司 It is a kind of to flatten the pile foundation reinforcement method of platform for inverter box
CN109667277A (en) * 2018-12-25 2019-04-23 中国能源建设集团广东省电力设计研究院有限公司 Cantilevered coupling beam cable termination field

Also Published As

Publication number Publication date
CN106120690B (en) 2018-02-13

Similar Documents

Publication Publication Date Title
CN102182325B (en) Storey adding method for existing building basement with frame structure and independent foundation
CN101092850A (en) Method and installation for rising building or historical building / cluster of historical building integrally
CN106968256A (en) Foundation ditch assembled steel trestle construction method
CN108005399A (en) Add the construction method for building multi-layer underground space under a kind of existing building group
CN109750681B (en) Filling side slope frame micro-tensioning support anchor plate supporting structure and construction method thereof
CN108277996A (en) The construction method of multi-storey basement is extended under a kind of protection groups of building
CN105064711B (en) Method for constructing underground garage between residential buildings
CN113417300B (en) Slope support system and construction method thereof
CN106120690B (en) A kind of inverter box becomes platform and preparation method thereof
CN103233537A (en) Heavy-load superimposed overhead terrace and construction method
CN110805049B (en) Construction method of mountain slope ultra-thickness spray anchor permanent supporting structure
CN210766861U (en) Portal formula building pile foundation underpins structure under narrow and small space
CN211340800U (en) Super dark foundation ditch earthwork excavation platform structure
CN209339171U (en) Transmission line assembled sheet pile composite foundation
CN113585336B (en) Quick construction method of sinking type concrete mixing station in soft foundation environment
CN207597914U (en) Add the construction stress structure for building multi-layer underground space under a kind of existing building group
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
CN102392417A (en) Dual-cantilever bearing support structure for large steel pipe and installation method
CN205934891U (en) Dc -to -ac converter case flattens platform
CN215211151U (en) Overhead supporting structure based on soil retaining structure
CN111996899B (en) Method for building large-span channel in artificial landscape mountain
CN209293069U (en) Soft base Self-sinking type underground space structure construction
CN209260748U (en) A kind of stepped tower crane
CN208088873U (en) The construction stress structure of multi-storey basement is extended under a kind of protection groups of building
CN109403297A (en) A kind of inverter box flattens platform and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant