CN106930339B - It is a kind of to flatten the pile foundation reinforcement method of platform for inverter box - Google Patents

It is a kind of to flatten the pile foundation reinforcement method of platform for inverter box Download PDF

Info

Publication number
CN106930339B
CN106930339B CN201710152587.1A CN201710152587A CN106930339B CN 106930339 B CN106930339 B CN 106930339B CN 201710152587 A CN201710152587 A CN 201710152587A CN 106930339 B CN106930339 B CN 106930339B
Authority
CN
China
Prior art keywords
collar tie
tie beam
platform
anchor ear
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710152587.1A
Other languages
Chinese (zh)
Other versions
CN106930339A (en
Inventor
黄万山
王磊
吉春明
刘欣良
彭秀芳
李素良
张源
袁万
王泽国
王广兵
吴慕丹
陈勖
石保磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Original Assignee
China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Jiangsu Power Design Institute Co Ltd filed Critical China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Priority to CN201710152587.1A priority Critical patent/CN106930339B/en
Publication of CN106930339A publication Critical patent/CN106930339A/en
Application granted granted Critical
Publication of CN106930339B publication Critical patent/CN106930339B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

It flattens the pile foundation reinforcement method of platform the invention discloses a kind of for inverter box, collar tie beam, anchor ear and tubular pole is poured into one using concrete after wrapping up tubular pole by the anchor ear connecting with collar tie beam including several tubular poles being coupled by collar tie beam.The present invention increases reinforced concrete circle beam on the flatten ground of platform tubular pole of inverter box, is acted on by the drawknot of collar tie beam and connects tubular pole integral, effectively connects tubular pole and collar tie beam by the anchor ear that two sides are welded with angle steel;When a certain root canal pile causes the relatively low generation of bearing capacity locally to settle due to pile defect, lower pulling force can be transmitted to neighbouring collar tie beam by anchor ear and angle steel, and then it is transmitted to adjacent pile foundation, the pile foundation of final entire platform all shares the power, so that uniform stressed, it avoids adversely affecting due to individual pile foundation differential settlement brings, guarantee the common stress of all pile foundations of entire platform, globality is reinforced, so that inverter above platform, case such as become at the normal operation of electrical equipments, there is very strong practicability and wide applicability.

Description

It is a kind of to flatten the pile foundation reinforcement method of platform for inverter box
Technical field
The present invention relates to a kind of pile foundation reinforcement methods, and in particular to a kind of to flatten the pile foundation reinforcement side of platform for inverter box Method.
Background technique
Photovoltaic power generation is the important component of national green energy construction, and fishing light complementation photovoltaic plant is then ground light One of principal mode of overhead utility.
Currently, there is the inverter box of some fishing light complementation photovoltaic projects to flatten platform using pile integral structure, but The inverter box platform pile foundation construction normalization that flattens for allowing for photovoltaic project is poor, and the general excavator using repacking is applied Work, rather than hammer piling is used, the phenomenon that pile foundation construction existing defects, often occurs, for example pile body has local cracks, pile foundation Construction is not up to designed elevation, the long not up to designing pile length etc. of stake.
Meanwhile all pile foundations of single platform might not exist simultaneously defect, may be that several pile bases exist Defect, this just needs all pile foundations of entire platform being all linked to be entirety, guarantee its can uniform force, collective effect.One As in the case of, only connected in stake top by platform between stake and stake, such connection integrity is not very strong.
Summary of the invention
To solve the deficiencies in the prior art, to reinforce the entire inverter box platform that flattens whole the purpose of the present invention is to provide a kind of The pile foundation reinforcement method of body.
In order to achieve the above objectives, the present invention adopts the following technical scheme that:
It is a kind of to flatten the pile foundation reinforcement method of platform for inverter box, including several tubular poles being coupled by collar tie beam, by with After the anchor ear package tubular pole of collar tie beam connection, collar tie beam, anchor ear and tubular pole are poured into one using concrete.
The lateral surface of above-mentioned anchor ear is equipped with several diagonal steels.
Further, above-mentioned angle steel, any pair symmetrically.
Above-mentioned collar tie beam bottom is equipped with concrete cushion.
Above-mentioned anchor ear includes several monolithic anchor ears.
Above-mentioned collar tie beam includes several transverse ring beams and longitudinal ring beam.
The lateral surface that above-mentioned tubular pole is contacted with collar tie beam, anchor ear is coated with anti-decaying paint.
Above-mentioned collar tie beam is not in ground.
The invention has the beneficial effects that: it is of the invention it is a kind of flatten the pile foundation reinforcement method of platform for inverter box, In The flatten Near Ground of platform tubular pole of inverter box increases reinforced concrete circle beam, is acted on by the drawknot of collar tie beam and connects into tubular pole For entirety, while by the anchor ear that two sides are welded with angle steel tubular pole and ground collar tie beam are effectively connected, when a certain root canal pile When causing the relatively low generation of bearing capacity locally to settle due to pile defect, lower pulling force can be transmitted to neighbouring by anchor ear and angle steel The power is transmitted to adjacent pile foundation again by collar tie beam, collar tie beam, and the pile foundation of final entire platform all shares the lower pulling force, finally uniformly by Power, even if platform has certain sedimentation and uniform, relatively small.It avoids due to individual pile foundation differential settlement bands The adverse effect come guarantees that the common stress of all pile foundations of entire platform, globality are reinforced.
After reinforcing mode of the invention, can effectively handle due to construct caused by pile defect, avoid by It is adversely affected in individual pile foundation differential settlement brings, and then ensure that the electrical equipments such as the inverter above platform, case change Normal operation, ensure that the normal power generation of photovoltaic project, create condition for greatly developing for green energy resource.
It is of the invention it is a kind of flatten the pile foundation reinforcement method of platform for inverter box, structure is simple, easily operated, construction party Just, significant effect has very strong practicability and wide applicability.
Detailed description of the invention
Fig. 1 be it is of the invention it is a kind of for inverter box flatten platform pile foundation reinforcement method ground collar tie beam vertical view signal Figure.
Fig. 2 be it is of the invention it is a kind of for inverter box flatten platform pile foundation reinforcement method hooping structure schematic diagram.
Fig. 3 be it is of the invention it is a kind of for inverter box flatten platform pile foundation reinforcement method structural schematic diagram.
Attached meaning marked in the figure is as follows: 1, collar tie beam, 2, transverse ring beam, 3, longitudinal ring beam, 4, anchor ear, 5, monolithic anchor ear, 6, tubular pole, 7, angle steel, 8, plain concrete cushion layer, 9, anti-decaying paint.
Specific embodiment
Specific introduce is made to the present invention below in conjunction with the drawings and specific embodiments.
It is a kind of to flatten the pile foundation reinforcement method of platform for inverter box, in plain concrete cushion layer 8, by by several transverse directions The collar tie beam 1 positioned at ground that collar tie beam 2 and longitudinal ring beam 3 form is coupled several tubular poles 6, then by it is being connect with collar tie beam 1, by several It, will using concrete after monolithic anchor ear 5 forms, lateral surface is equipped with several package tubular poles 6 of anchor ears 4 to symmetrical angle steel 7 Collar tie beam 1, anchor ear 4, angle steel 7 and tubular pole 6 pour one.
The lateral surface that tubular pole 6 is contacted with collar tie beam 1, anchor ear 4 is coated with anti-decaying paint 9.
When practice of construction, plain concrete cushion layer 8 first is poured in Near Ground, then in the pipe prepared by prestressed concrete Anchor ear 4 is arranged in the pile body of stake 6, is connected with after tightening, and welds angle steel 7, last shuttering, binding collar tie beam 1 in 4 two sides of anchor ear Reinforcing bar pours the concrete of collar tie beam 1 after being connected and fixed anchor ear 4 and collar tie beam 1, dismountable after concrete strength is met the requirements Template.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should Understand, the above embodiments do not limit the invention in any form, all obtained by the way of equivalent substitution or equivalent transformation Technical solution is fallen within the scope of protection of the present invention.

Claims (3)

1. a kind of flatten the pile foundation reinforcement method of platform for inverter box, which is characterized in that flatten platform tubular pole in inverter box Near Ground increases reinforced concrete circle beam;Including several tubular poles being coupled by collar tie beam, wrapped up by the anchor ear being connect with collar tie beam After tubular pole, collar tie beam, anchor ear and tubular pole are poured into one using concrete;
The collar tie beam bottom is equipped with concrete cushion, and collar tie beam is not in ground;
The lateral surface of the anchor ear is equipped with symmetrical angle steel;
The collar tie beam is made of several transverse ring beams and longitudinal ring beam;
Reinforcing step includes:
First in Near Ground casting concrete bed course, then embraced in the pile body setting of the tubular pole (6) prepared by prestressed concrete It binds round (4), is connected with after tightening, weld angle steel (7) in anchor ear (4) two sides, last shuttering, binding ring beam reinforcing steel bar will be embraced After hoop is connected and fixed with collar tie beam (1), the concrete of collar tie beam is poured, the removable removing template after concrete strength is met the requirements.
It a kind of flattens the pile foundation reinforcement method of platform for inverter box 2. according to claim 1, which is characterized in that described Anchor ear includes several monolithic anchor ears.
It a kind of flattens the pile foundation reinforcement method of platform for inverter box 3. according to claim 1, which is characterized in that described The lateral surface that tubular pole is contacted with collar tie beam, anchor ear is coated with anti-decaying paint.
CN201710152587.1A 2017-03-15 2017-03-15 It is a kind of to flatten the pile foundation reinforcement method of platform for inverter box Active CN106930339B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710152587.1A CN106930339B (en) 2017-03-15 2017-03-15 It is a kind of to flatten the pile foundation reinforcement method of platform for inverter box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710152587.1A CN106930339B (en) 2017-03-15 2017-03-15 It is a kind of to flatten the pile foundation reinforcement method of platform for inverter box

Publications (2)

Publication Number Publication Date
CN106930339A CN106930339A (en) 2017-07-07
CN106930339B true CN106930339B (en) 2019-11-22

Family

ID=59433808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710152587.1A Active CN106930339B (en) 2017-03-15 2017-03-15 It is a kind of to flatten the pile foundation reinforcement method of platform for inverter box

Country Status (1)

Country Link
CN (1) CN106930339B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642078A (en) * 2017-10-24 2018-01-30 佛山科学技术学院 A kind of new cuff ice resistant structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004068446A (en) * 2002-08-07 2004-03-04 Arai Gumi Ltd Existing pile investigating method and existing pile reinforcing method
CN103352473A (en) * 2013-05-30 2013-10-16 上海大禺预制构件有限公司 Bearing platform connecting structure for corrosion-resistant hollow square piles
CN203701125U (en) * 2014-01-24 2014-07-09 陈家冬 Connection structure of preformed pile and pile cap and pile feeder of connection structure
CN106120690A (en) * 2016-08-17 2016-11-16 中国能源建设集团江苏省电力设计院有限公司 A kind of inverter box flattens platform and preparation method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202672171U (en) * 2012-06-25 2013-01-16 中国水电顾问集团中南勘测设计研究院 High-pile bearing platform foundation of offshore wind farm

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004068446A (en) * 2002-08-07 2004-03-04 Arai Gumi Ltd Existing pile investigating method and existing pile reinforcing method
CN103352473A (en) * 2013-05-30 2013-10-16 上海大禺预制构件有限公司 Bearing platform connecting structure for corrosion-resistant hollow square piles
CN203701125U (en) * 2014-01-24 2014-07-09 陈家冬 Connection structure of preformed pile and pile cap and pile feeder of connection structure
CN106120690A (en) * 2016-08-17 2016-11-16 中国能源建设集团江苏省电力设计院有限公司 A kind of inverter box flattens platform and preparation method thereof

Also Published As

Publication number Publication date
CN106930339A (en) 2017-07-07

Similar Documents

Publication Publication Date Title
CN105887702B (en) A kind of method of pre-stressed carbon fiber plate and steel concrete reinforced concrete beam
CN201276702Y (en) Pile splicing structure of precast prestressed concrete pipe pile
CN104294769B (en) A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement
CN103437296A (en) Steel tube arch bridge towerless buckling three-section type double-rib folding hoisting construction method
CN107816170A (en) A kind of great diameter and long steel reinforcement cage and its construction method
CN104453270B (en) The bracing means of a kind of deformed bar concrete component and construction method
CN210395128U (en) Hollow core plate beam connection structure in bridge widening
CN106930339B (en) It is a kind of to flatten the pile foundation reinforcement method of platform for inverter box
CN105752864B (en) Derrick crane adheres to node and its construction method
CN104314009A (en) Large segment lifting mechanism and use method thereof
CN205153536U (en) Structure is assembled to self -balancing integral template of reinforced concrete roof beam
CN204097889U (en) A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement
CN209669688U (en) A kind of half assembled thin-wall piers
CN104196023B (en) A kind of using method of the concrete precast pipe pile pile top of band mechanical connecting device
CN101838986A (en) Disassembling tool type lattice column and construction method thereof
CN206052767U (en) The construction elevator basis that can be used in turn
CN105088961A (en) Side-span closure section and cast-in-place section combining construction method
CN211395402U (en) Municipal works road and bridge crack restoration fixed knot constructs
CN209703418U (en) Assembled flood-control wall
CN109722984A (en) Half assembled thin-wall piers of one kind and its assembly method
CN203257121U (en) Novel reinforcing device of reinforced concrete beam and floor plate
CN110185182A (en) Concrete folding plate construction is with being stably connected with structure and construction method
CN104790299A (en) Internal-span unsupported convenient construction support and method for bridge cast-in-place box beam
CN108756202A (en) A kind of recyclable building builder's jack fixing device and application method
CN207761049U (en) A kind of assembly concrete frame beam column connection structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant