CN206052767U - The construction elevator basis that can be used in turn - Google Patents

The construction elevator basis that can be used in turn Download PDF

Info

Publication number
CN206052767U
CN206052767U CN201621006264.9U CN201621006264U CN206052767U CN 206052767 U CN206052767 U CN 206052767U CN 201621006264 U CN201621006264 U CN 201621006264U CN 206052767 U CN206052767 U CN 206052767U
Authority
CN
China
Prior art keywords
construction elevator
supporter
munnion
connector
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621006264.9U
Other languages
Chinese (zh)
Inventor
陈井
孟春柳
郑云刚
袁文斌
黄继武
鲁云龙
陈杰
何佳超
高雄兵
王富豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ycih No4 Construction Co ltd
Original Assignee
FOURTH CONSTRUCTION Co Ltd OF YUNNAN ARCHITECTURAL ENGINEERING GROUP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FOURTH CONSTRUCTION Co Ltd OF YUNNAN ARCHITECTURAL ENGINEERING GROUP filed Critical FOURTH CONSTRUCTION Co Ltd OF YUNNAN ARCHITECTURAL ENGINEERING GROUP
Priority to CN201621006264.9U priority Critical patent/CN206052767U/en
Application granted granted Critical
Publication of CN206052767U publication Critical patent/CN206052767U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

本实用新型公开了一种可周转使用的施工电梯基础,旨在提供一种使用方便的施工电梯基础。它包括由两条竖框边和两条横框边构成的框架体,两条两端分别连接两条竖框边的支撑体,两条两端分别连接两支撑体的连接体,以及浇筑于支撑体与连接体围成框体内的混凝土块;竖框边、横框边及连接体均由槽钢制成;所述支撑体由工字钢制成;竖框边的槽口朝外,横框边的两端均焊接有第一连接板,且第一连接板与竖框边搭接并通过螺栓连接;所述支撑体的两端均焊接有第二连接板,且第二连接板与竖框边搭接并通过螺栓连接;两连接体的槽口相对且两端的翼缘切除一段与支撑体槽深相等的切口,使连接体的两端分别伸入两支撑体的槽内,连接体通过焊接与支撑体连接。

The utility model discloses a construction elevator foundation that can be turned around and aims to provide a construction elevator foundation that is easy to use. It includes a frame body composed of two mullion sides and two horizontal frame sides, two supporting bodies whose two ends are respectively connected to two mullion sides, two connecting bodies whose two ends are respectively connected to two supporting bodies, and poured on The supporting body and the connecting body form a concrete block in the frame; the sides of the mullion, the side of the horizontal frame and the connecting body are all made of channel steel; the supporting body is made of I-shaped steel; Both ends of the horizontal frame are welded with a first connecting plate, and the first connecting plate is overlapped with the mullion and connected by bolts; both ends of the support body are welded with a second connecting plate, and the second connecting plate It is overlapped with the side of the mullion and connected by bolts; the notches of the two connecting bodies are opposite to each other, and a section of the flange at both ends is cut out with a cut that is equal to the depth of the groove of the supporting body, so that the two ends of the connecting body respectively extend into the grooves of the two supporting bodies. The connecting body is connected with the supporting body by welding.

Description

可周转使用的施工电梯基础Reusable Construction Elevator Foundation

技术领域technical field

本实用新型涉及施工电梯安装技术领域,尤其是涉及一种可周转使用的施工电梯基础。The utility model relates to the technical field of installation of construction elevators, in particular to a foundation for construction elevators that can be turned around.

背景技术Background technique

施工电梯又叫建筑用施工升降机,是建筑中经常使用的载人载货施工机械, 施工电梯在工地上通常是配合塔吊使用。建筑施工中常用的施工电梯多安装在地下室顶板上,按照施工电梯受力要求,需要在顶板上做一基础,常规的施工电梯基础采用现浇钢筋混凝土基础做法,该种现浇钢筋混凝土基础需要现场立模浇筑,需待混凝土干燥到达受力要求后,并在其下端设置支撑,才可投入使用,不仅施工速度慢,投入成本高,短时间内无法投入使用,而且该种基础不可回收再利用,钢筋、混凝土浪费量大。Construction elevators, also known as construction elevators for construction, are often used in construction for manned and cargo-carrying construction machinery. Construction elevators are usually used in conjunction with tower cranes on construction sites. The construction elevators commonly used in building construction are mostly installed on the roof of the basement. According to the force requirements of the construction elevator, a foundation needs to be built on the roof. The conventional construction elevator foundation adopts the method of cast-in-place reinforced concrete foundation. This kind of cast-in-place reinforced concrete foundation requires On-site vertical formwork pouring needs to be put into use after the concrete has dried to meet the force requirements and supports are set at the lower end. Not only is the construction speed slow, the investment cost is high, and it cannot be put into use in a short time, but this kind of foundation is not recyclable. Utilization, the waste of steel bars and concrete is large.

实用新型内容Utility model content

本实用新型克服了现有技术中的缺点,提供了一种投入成本低,装拆快速且使用方便的可周转使用的施工电梯基础。The utility model overcomes the disadvantages of the prior art, and provides a construction elevator foundation that can be used in turnover with low input cost, fast assembly and disassembly, and convenient use.

为了解决上述技术问题,本实用新型是通过以下技术方案实现的:In order to solve the above technical problems, the utility model is achieved through the following technical solutions:

一种可周转使用的施工电梯基础,包括由两条竖框边和两条横框边构成的框架体,两条沿框架体中线对称设置且两端分别连接两条竖框边的支撑体,两条沿框架体中线对称设置且两端分别连接两支撑体的连接体,以及浇筑于支撑体与连接体围成框体内的混凝土块;所述竖框边、横框边及连接体均由槽钢制成;所述支撑体由工字钢制成;所述竖框边的槽口朝外,所述横框边的两端均焊接有带连接孔的第一连接板,且第一连接板与竖框边搭接并通过螺栓连接;所述支撑体的两端均焊接有带连接孔的第二连接板,且第二连接板与竖框边搭接并通过螺栓连接;两连接体的槽口相对且两端的翼缘切除一段与支撑体槽深相等的切口,使连接体的两端分别伸入两支撑体的槽内,连接体通过焊接与支撑体连接。A construction elevator foundation that can be turned around, including a frame body composed of two mullion sides and two horizontal frame sides, two support bodies symmetrically arranged along the center line of the frame body and connected to the two mullion sides at both ends, Two connecting bodies arranged symmetrically along the center line of the frame body and connected to two supporting bodies at both ends, and concrete blocks poured in the frame enclosed by the supporting body and the connecting body; made of channel steel; the support body is made of I-shaped steel; the notch of the side of the mullion faces outward, and the two ends of the side of the horizontal frame are welded with the first connecting plate with connecting holes, and the first The connection plate is overlapped with the mullion side and connected by bolts; both ends of the support body are welded with a second connection plate with connection holes, and the second connection plate is overlapped with the mullion side and connected by bolts; the two connections The notches of the body are opposite and the flanges at both ends are cut off a section equal to the groove depth of the support body, so that the two ends of the connecting body respectively extend into the grooves of the two supporting bodies, and the connecting body is connected with the supporting body by welding.

优选的是,所述支撑体的一端设置有吊耳。Preferably, one end of the supporting body is provided with a lifting ear.

优选的是,所述连接体采用30#轻型槽钢制成。Preferably, the connecting body is made of 30# light channel steel.

优选的是,所述竖框边和横框边均采用30#轻型槽钢制成。Preferably, both the sides of the mullion and the sides of the horizontal frame are made of 30# light channel steel.

优选的是,所述支撑体采用30#轻型工字钢制成。Preferably, the support body is made of 30# light I-beam.

与现有技术相比,本实用新型具有如下优点:Compared with the prior art, the utility model has the following advantages:

本实用新型的施工电梯基础可预先进行制作,然后运送到施工场地进行安装,施工电梯安装于地下室顶板上后,型钢将受力直接传至结构梁,可不对其进行支撑加固,基础装拆快捷,使用过程中无损耗,可多次周转利用于相同型号施工电梯。The construction elevator foundation of the utility model can be prefabricated, and then transported to the construction site for installation. After the construction elevator is installed on the top plate of the basement, the force of the section steel will be directly transmitted to the structural beams, without supporting and reinforcing them, and the foundation can be assembled and disassembled quickly. , There is no loss during use, and it can be used for the same type of construction elevator for multiple turnovers.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are only some embodiments of the utility model, and those skilled in the art can also obtain other drawings according to these drawings without any creative effort.

图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

图2为图1中A-A的剖视图。Fig. 2 is a sectional view of A-A in Fig. 1 .

图3为第一连接板与横框边连接后的局部示意图。Fig. 3 is a partial schematic diagram after the first connecting plate is connected to the side of the horizontal frame.

图4为第二连接板与支撑体连接后的局部示意图。Fig. 4 is a partial schematic view after the second connecting plate is connected to the supporting body.

图5为连接体的局部示意图。Fig. 5 is a partial schematic diagram of the linker.

具体实施方式detailed description

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有付出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

图1-5所示可周转使用的施工电梯基础,包括由两条竖框边2和两条横框边1构成的框架体3,两条沿框架体3中线对称设置且两端分别连接两条竖框边2的支撑体4,两条沿框架体3中线对称设置且两端分别连接两支撑体4的连接体5,以及浇筑于支撑体4与连接体5围成框体内的混凝土块6;所述竖框边2、横框边1及连接体5均由槽钢制成;所述支撑体4由工字钢制成;所述竖框边2的槽口朝外(框架体外侧),所述横框边1的两端均焊接有带连接孔的第一连接板7,且第一连接板7与竖框边2搭接并通过螺栓连接;所述支撑体4的两端均焊接有带连接孔的第二连接板8,且第二连接板8与竖框边2搭接并通过螺栓连接;两连接体5的槽口相对且两端的翼缘切除一段与支撑体4槽深相等的切口,使连接体5的两端分别伸入两支撑体4的槽内,连接体5通过焊接与支撑体4连接。The construction elevator foundation that can be turned around as shown in Figure 1-5 includes a frame body 3 composed of two mullion sides 2 and two horizontal frame sides 1, and the two sides are arranged symmetrically along the center line of the frame body 3 and connected to two sides at both ends. The support body 4 on the side 2 of the mullion, two connecting bodies 5 arranged symmetrically along the center line of the frame body 3 and connected to the two supporting bodies 4 at both ends, and the concrete blocks poured in the frame enclosed by the supporting body 4 and the connecting body 5 6; the mullion side 2, the horizontal frame side 1 and the connecting body 5 are all made of channel steel; the support body 4 is made of I-beam; the notch of the mullion side 2 faces outward (the frame body The two ends of the horizontal frame side 1 are welded with the first connecting plate 7 with connecting holes, and the first connecting plate 7 is overlapped with the vertical frame side 2 and connected by bolts; the two sides of the support body 4 The ends are welded with a second connecting plate 8 with connecting holes, and the second connecting plate 8 is overlapped with the mullion side 2 and connected by bolts; 4 grooves with equal depth cuts, so that the two ends of the connecting body 5 extend into the grooves of the two supporting bodies 4 respectively, and the connecting body 5 is connected with the supporting body 4 by welding.

所述支撑体4的一端设置有吊耳9。One end of the support body 4 is provided with a lifting ear 9 .

所述连接体5采用30#轻型槽钢制成。The connecting body 5 is made of 30# light channel steel.

所述竖框边2和横框边1均采用30#轻型槽钢制成。Both the vertical frame side 2 and the horizontal frame side 1 are made of 30# light channel steel.

所述支撑体4采用30#轻型工字钢制成。The support body 4 is made of 30# light I-beam.

本实用新型的施工电梯基础可预先进行制作,然后运送到施工场地进行安装,施工电梯安装于地下室顶板上后,型钢将受力直接传至结构梁,可不对其进行支撑加固,基础装拆快捷,使用过程中无损耗,可多次周转利用于相同型号施工电梯。The construction elevator foundation of the utility model can be prefabricated, and then transported to the construction site for installation. After the construction elevator is installed on the top plate of the basement, the force of the section steel will be directly transmitted to the structural beams, without supporting and reinforcing them, and the foundation can be assembled and disassembled quickly. , There is no loss during use, and it can be used for the same type of construction elevator for multiple turnovers.

以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included in the Within the protection scope of the present utility model.

Claims (5)

1. a kind of construction elevator being used in turn is basic, it is characterised in that:Including by two munnion sides and two transverse frame edge structures Into frame body, two are symmetrical arranged along frame body center line and two ends connect the supporter on two munnion sides respectively, and two along frame Support body center line is symmetrical arranged and two ends connect the connector of two supporters respectively, and pours and surround frame in supporter and connector Internal concrete block;The munnion side, transverse frame edge and connector are made by channel-section steel;The supporter is made up of I-steel; Outwardly, the two ends of the transverse frame edge are welded with the first connecting plate with connecting hole, and the first connection to the notch on the munnion side Plate is with munnion edge lap and is bolted;The two ends of the supporter are welded with the second connecting plate with connecting hole, and Second connecting plate is with munnion edge lap and is bolted;The notch of two connectors is relative and the edges of a wing of two ends cut off one section with The equal otch of supporter groove depth, makes the two ends of connector be respectively protruding in the groove of two supporters, and connector is by welding and props up Support body connects.
2. the construction elevator basis that can be used in turn according to claim 1, it is characterised in that:One end of the supporter sets It is equipped with hanger.
3. the construction elevator being used in turn according to claim 1 or claim 2 is basic, it is characterised in that:The connector is adopted 30# thin-wall channels are made.
4. the construction elevator basis that can be used in turn according to claim 3, it is characterised in that:The munnion side and transverse frame edge Made using 30# thin-wall channels.
5. the construction elevator basis that can be used in turn according to claim 4, it is characterised in that:The supporter adopts 30# Lightweight I-beam is made.
CN201621006264.9U 2016-08-31 2016-08-31 The construction elevator basis that can be used in turn Expired - Fee Related CN206052767U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621006264.9U CN206052767U (en) 2016-08-31 2016-08-31 The construction elevator basis that can be used in turn

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621006264.9U CN206052767U (en) 2016-08-31 2016-08-31 The construction elevator basis that can be used in turn

Publications (1)

Publication Number Publication Date
CN206052767U true CN206052767U (en) 2017-03-29

Family

ID=58379321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621006264.9U Expired - Fee Related CN206052767U (en) 2016-08-31 2016-08-31 The construction elevator basis that can be used in turn

Country Status (1)

Country Link
CN (1) CN206052767U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836325A (en) * 2017-04-13 2017-06-13 青岛建集团有限公司 A kind of outdoor construction elevator strengthening of foundation device
CN108951684A (en) * 2018-08-23 2018-12-07 杭州江润科技有限公司 Construction method of turnover type steel reinforced concrete construction elevator foundation
CN110863562A (en) * 2019-11-21 2020-03-06 中建三局集团有限公司 Can have enough to meet need regularization steel construction elevator basis

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836325A (en) * 2017-04-13 2017-06-13 青岛建集团有限公司 A kind of outdoor construction elevator strengthening of foundation device
CN108951684A (en) * 2018-08-23 2018-12-07 杭州江润科技有限公司 Construction method of turnover type steel reinforced concrete construction elevator foundation
CN110863562A (en) * 2019-11-21 2020-03-06 中建三局集团有限公司 Can have enough to meet need regularization steel construction elevator basis

Similar Documents

Publication Publication Date Title
WO2022160388A1 (en) Fabricated concrete beam-column joint and construction method therefor
CN103290952B (en) Assembled integral concrete frame-shear wall syndeton and construction method thereof
CN101629408A (en) Cable-stayed bridge cable tower end anchoring composite structure
CN107268805A (en) A kind of prefabricated assembled beam column box node
CN103343575A (en) Rectangular steel pipe column-H-shaped steel beam bolted connecting structure
CN108755964A (en) A kind of partial precast assembly steel reinforced concrete mixed column and construction method
CN103806593A (en) Precast concrete member
CN206052767U (en) The construction elevator basis that can be used in turn
CN104294920B (en) The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post and preparation method
CN105442756B (en) A kind of combined special-shaped column, the structural system and its construction method for being equipped with the post
CN108166681A (en) A kind of assembled partial precast part external wrapping concrete combination beam and its construction method
CN204570446U (en) The T-shaped simply supported beam of a kind of precast assembly
CN213087125U (en) Prefabricated shear force wall horizontal connection node means
CN103806538A (en) Precast reinforced concrete member
CN113944309A (en) Cold-formed steel support beam framework and construction method thereof
CN209619832U (en) A kind of assembly concrete box girder structure based on steel construction sway bracing
CN108104263A (en) A kind of novel fabricated steel-regeneration concrete combination frame structural system
CN204357001U (en) A kind of prefabrication and assembly construction profile steel concrete column skeleton
CN215563326U (en) A square steel tube restrained reinforced concrete column and reinforced concrete beam joint structure
CN211947880U (en) Half-through type longitudinal block prefabricated box girder
CN204081090U (en) The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post
CN103741857A (en) Floor system with U-shaped steel beams, steel bar trusses and floor bearing plates
CN209040861U (en) A kind of steel reinforced concrete connection structure of assembled inverted arch combination arch wall injection concrete-steel
CN203795608U (en) Prefabricated reinforced concrete beam and steel pipe column connecting joint
CN207194175U (en) A kind of prefabricated assembled bean column node box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 650501 Yunnan Province, Kunming city Wuhua District West Road No. 22

Patentee after: YCIH NO.4 CONSTRUCTION CO.,LTD.

Address before: 650051 Yunnan Province, Kunming city Wuhua District West Road No. 22

Patentee before: THE FOURTH CONSTRUCTION CO.,LTD. OF YUNNAN ARCHITECTURAL ENGINEERING Group

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329