CN109403297A - A kind of inverter box flattens platform and preparation method thereof - Google Patents

A kind of inverter box flattens platform and preparation method thereof Download PDF

Info

Publication number
CN109403297A
CN109403297A CN201811379712.3A CN201811379712A CN109403297A CN 109403297 A CN109403297 A CN 109403297A CN 201811379712 A CN201811379712 A CN 201811379712A CN 109403297 A CN109403297 A CN 109403297A
Authority
CN
China
Prior art keywords
platform
pipe pile
prestressed concrete
concrete pipe
flattens
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811379712.3A
Other languages
Chinese (zh)
Inventor
周栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Chenyu Energy Technology Co Ltd
Original Assignee
Ningbo Chenyu Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Chenyu Energy Technology Co Ltd filed Critical Ningbo Chenyu Energy Technology Co Ltd
Priority to CN201811379712.3A priority Critical patent/CN109403297A/en
Publication of CN109403297A publication Critical patent/CN109403297A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The present invention provides a kind of inverter box and flattens platform, including based on and the prestressed concrete pipe pile 1 of column and the platform of the prestressed concrete pipe pile upper end is set, the platform is reinforced concrete beam and plate, including landing beam and platform board 3, the landing beam is fixed on the upper end of the prestressed concrete pipe pile 1, and the platform board 3 is fixed on the landing beam.In addition, flattening the production method of platform the present invention also provides a kind of inverter box, this method process is simple, difficulty of construction is small, and short time limit, project amount are small.

Description

A kind of inverter box flattens platform and preparation method thereof
Technical field
It flattens platform and preparation method thereof the present invention relates to a kind of inverter box, belongs to fishing light complementation photovoltaic power generation project structure Technical field.
Background technique
Photovoltaic power generation is the important component of national green energy construction, and fishing light complementation photovoltaic plant is then ground light One of principal mode of overhead utility.
Traditional inverter box flattens platform using subsoil isolated footing or strip footing, is successively up steel from basis Reinforced concrete column and reinforced concrete platform, platform generally use beam and slab type structure.Because of fishing light complementary terms purpose inverter box The platform that flattens generally is arranged in fish pond adjacent edges, and basis is still located inside fish pond.Due to having water all the year round in fish pond, cause Ground topsoil is generally silt soil, thus basic stock size is larger, buried depth is relatively deep to guarantee that foundation bearing capacity and ground are heavy It drops while meeting the requirements.Water is generally required when construction all to drain, while silt soil is excavated, and is excavated and is completed after-pouring Plain concrete cushion layer, then shuttering, bind reinforcement foundation, pour base concrete;Bind after the completion of foundation construction column and Beam reinforced steel bar finally carries out column and beam slab concreting.Traditional scheme construction technology is relatively cumbersome, difficulty of construction is inclined Greatly, especially when fish pond, bottom sludge soil is very thick, and when bearing capacity is very poor, difficulty of construction is bigger, and the construction period is longer.
Summary of the invention
The present invention provides a kind of inverter box and flattens platform to solve drawbacks described above and deficiency existing in the prior art And preparation method thereof, which both can satisfy the bearing of inverter box change, while easy for construction, quick, and simplify construction Process greatly accelerates the duration.
Flatten platform in order to solve the above technical problems, the present invention provides a kind of inverter box, including based on and column it is pre- Prestressed concrete tubular pole and the platform that the prestressed concrete pipe pile upper end is arranged in, the platform are armored concrete Contignation, including landing beam and platform board, the landing beam is fixed on the upper end of the prestressed concrete pipe pile, described Platform board is fixed on the landing beam.
Further, the landing beam include 2 crossbeams and 2 attachment beams, 2 crossbeams with the pre- of same row is set The top of prestressed concrete tubular pole is connected, and end is connected by 2 attachment beams.
Further, several secondary beams, the secondary beam and beam vertical and the attachment beam are equipped between 2 crossbeams In parallel.
Further, fence is equipped at the platform surrounding edge.
Further, steel ladder is provided on the platform, the steel ladder extends to ground, for the upper lower platform of staff.
Further, the steel ladder is collapsible steel ladder.
It flattens the production method of platform the present invention also provides a kind of inverter box, which comprises the following steps:
Step 1, the production of prestressed concrete pipe pile;
Production place is measured, then the anchor point of true fixed pile is driven piles at anchor point, i.e. production is answered in advance Power concrete tubular pile, the height of prestressed concrete pipe pile are greater than the height of fish pond water level line;
Step 2, after prestressed concrete pipe pile completes, the welded reinforcement on the pre-buried end plate at the top of pile foundation is used for Connect prestressed concrete pipe pile and platform;
Template is arranged in stake top portion in step 3, and the arrangement of template includes the arrangement of landing beam, secondary beam, platform floor;Template Arrangement carries out assembling reinforcement after completing, while burying to built-in fitting, and built-in fitting includes that inverter built-in fitting, case become pre-buried Part, steel ladder built-in fitting;
Step 4, reinforcing bar and built-in fitting construction after the completion of carry out concreting, maintenance, prestressed concrete pipe pile it is upper End is protruded into concrete platform, and apart from platform base 0.1m;
Step 5, steel ladder installation, steel ladder are connected to platform from roadside;
Step 6, the installation that inverter, case become.
Present invention advantageous effects achieved: a kind of inverter box provided by the invention flattens platform, using prestressing force Concrete tubular pile replaces basis and column, and when production does not have earth moving, and vertical foundation forms, pours binding reinforcement foundation The work of base concrete, also without standing model of the column, binding column reinforcing bar, the work for pouring column concrete.This contracts significantly Subtract construction work amount, shortens the construction period.Meanwhile basis and column, concrete are replaced using prestressed concrete pipe pile Dosage, amount of reinforcement are declined.It flattens the production method of platform the present invention also provides inverter box, this method process letter List, difficulty of construction are small, and short time limit, project amount are small.
Detailed description of the invention
A specific embodiment of the invention is described in further detail with reference to the accompanying drawing.
The inverter box of Fig. 1 present invention flattens the overlooking structure diagram of platform;
The inverter box of Fig. 2 present invention flattens the left view structural representation of platform.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings.Following embodiment is only used for clearly illustrating the present invention Technical solution, and not intended to limit the protection scope of the present invention.
As shown in Figs. 1-2, the present invention provides a kind of inverter box and flattens platform, including based on and the prestressed concrete of column Native tubular pole 1 and the platform that the prestressed concrete pipe pile upper end is arranged in, the platform are reinforced concrete girder slab knot Structure, including landing beam and platform board 3, the landing beam are fixed on the upper end of the prestressed concrete pipe pile 1, the platform Plate 3 is fixed on the landing beam.
The platform connects using based on prestressed concrete pipe pile with column, prestressed concrete pipe pile top and platform It connects, platform uses reinforced concrete beam and plate, and inverter, box type transformer are located on reinforced concrete platform.Using side After case, the inverter box platform that flattens reduces earth excavation and backfilling of earthwork amount, decreases the project amount on basis, including formwork The techniques such as plate, reinforcing bar binding, casting concrete, while the construction technology of column is simplified, only include piling technique, reduces steel The techniques such as muscle binding, casting concrete, the project amount of platform are basically unchanged.In view of fish pond photovoltaic project inverter box flattens platform It is arranged in fish pond side, the work such as the earthwork, the construction of foundation forms are affected by fishpond water, existing using that can reduce after this programme Field difficulty of construction.Therefore, it flattens platform for the inverter box of fishing light complementation photovoltaic project, after this programme, has both saved mixed Solidifying soil dosage and steel flxer journey amount, in turn simplify the difficulty of site operation, reduce the construction period.
The landing beam includes 2 crossbeam 2 and 2 piece attachment beam 5,2 crossbeams 2 and the prestressing force that same row is arranged in The top of concrete tubular pile 1 is connected, and end is connected by 2 attachment beams 5.Several secondary beams are equipped between 2 crossbeams 2 6, the secondary beam 6 is vertical with crossbeam 2, parallel with the attachment beam 5.It is equipped with fence 7 at the platform surrounding edge, increases platform Security performance.Steel ladder 4 is provided on the platform, the steel ladder 4 extends to ground, for the upper lower platform of staff, institute Stating steel ladder 4 is collapsible steel ladder.
It flattens the production method of platform the present invention also provides inverter box, comprising the following steps:
Step 1, the production of prestressed concrete pipe pile;
Production place is measured, then the anchor point of true fixed pile is driven piles at anchor point, i.e. production is answered in advance Power concrete tubular pile, the height of prestressed concrete pipe pile are greater than the height of fish pond water level line;
Step 2, after prestressed concrete pipe pile completes, the welded reinforcement on the pre-buried end plate at the top of pile foundation is used for Connect prestressed concrete pipe pile and platform;
Template is arranged in stake top portion in step 3, and the arrangement of template includes the arrangement of landing beam, secondary beam, platform floor;Template Arrangement carries out assembling reinforcement after completing, while burying to built-in fitting, and built-in fitting includes that inverter built-in fitting, case become pre-buried Part, steel ladder built-in fitting;
Step 4, reinforcing bar and built-in fitting construction after the completion of carry out concreting, maintenance, prestressed concrete pipe pile it is upper End is protruded into concrete platform, and apart from platform base 0.1m;
Step 5, steel ladder installation, steel ladder are connected to platform from roadside;
Step 6, the installation that inverter, case become.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvement and deformations can also be made, these improvement and deformations Also it should be regarded as protection scope of the present invention.

Claims (7)

  1. The platform 1. a kind of inverter box flattens, it is characterised in that: including based on and the prestressed concrete pipe pile of column and setting Platform in the prestressed concrete pipe pile upper end, the platform be reinforced concrete beam and plate, including landing beam and Platform board, the landing beam are fixed on the upper end of the prestressed concrete pipe pile, and the platform board is fixed on the platform Liang Shang.
  2. The platform 2. inverter box according to claim 1 flattens, it is characterised in that: the landing beam includes 2 crossbeams and 2 Attachment beam, 2 crossbeams are connected with the top for the prestressed concrete pipe pile that same row is arranged in, and end passes through 2 companies Meet Liang Xianglian.
  3. The platform 3. inverter box according to claim 2 flattens, it is characterised in that: several are equipped between 2 crossbeams Secondary beam, it is the secondary beam and beam vertical, parallel with the attachment beam.
  4. The platform 4. inverter box according to claim 1 flattens, it is characterised in that: be equipped with and enclose at the platform surrounding edge Column.
  5. The platform 5. inverter box according to claim 1 flattens, it is characterised in that: steel ladder is provided on the platform, it is described Steel ladder extends to ground, for the upper lower platform of staff.
  6. The platform 6. inverter box according to claim 5 flattens, it is characterised in that: the steel ladder is collapsible steel ladder.
  7. The production method of platform 7. inverter box according to claim 1-6 flattens, which is characterized in that including following Step:
    Step 1, the production of prestressed concrete pipe pile;
    Production place is measured, then the anchor point of true fixed pile is driven piles at anchor point, i.e. production prestressing force is mixed Solidifying soil tubular pole, the height of prestressed concrete pipe pile are greater than the height of fish pond water level line;
    Step 2, after prestressed concrete pipe pile completes, the welded reinforcement on the pre-buried end plate at the top of pile foundation, for connecting Prestressed concrete pipe pile and platform;
    Template is arranged in stake top portion in step 3, and the arrangement of template includes the arrangement of landing beam, secondary beam, platform floor;Template arrangement Assembling reinforcement is carried out after the completion, while built-in fitting is buried, and built-in fitting includes inverter built-in fitting, case change built-in fitting, steel Terraced built-in fitting;
    Concreting, maintenance, the upper end of prestressed concrete pipe pile are carried out after the completion of step 4, reinforcing bar and built-in fitting construction It protrudes into concrete platform, and apart from platform base 0.1m;
    Step 5, steel ladder installation, steel ladder are connected to platform from roadside;
    Step 6, the installation that inverter, case become.
CN201811379712.3A 2018-11-12 2018-11-12 A kind of inverter box flattens platform and preparation method thereof Pending CN109403297A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811379712.3A CN109403297A (en) 2018-11-12 2018-11-12 A kind of inverter box flattens platform and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811379712.3A CN109403297A (en) 2018-11-12 2018-11-12 A kind of inverter box flattens platform and preparation method thereof

Publications (1)

Publication Number Publication Date
CN109403297A true CN109403297A (en) 2019-03-01

Family

ID=65474244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811379712.3A Pending CN109403297A (en) 2018-11-12 2018-11-12 A kind of inverter box flattens platform and preparation method thereof

Country Status (1)

Country Link
CN (1) CN109403297A (en)

Similar Documents

Publication Publication Date Title
CN102182325B (en) Storey adding method for existing building basement with frame structure and independent foundation
CN103306289B (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN107975059A (en) A kind of assembled pile foundation wharfs structure and its construction method
CN101092850A (en) Method and installation for rising building or historical building / cluster of historical building integrally
CN104878776B (en) A kind of underground shallow layer automatic parking garage the library structure
CN109372018A (en) Soft base Self-sinking type underground space structure construction and construction technology
CN101858082A (en) Soft soil foundation new construction post pile pressing technology and construction method thereof
CN106120690B (en) A kind of inverter box becomes platform and preparation method thereof
CN113931166A (en) Barrel-shaped fan foundation of prefabricated sheet pile assembly type connecting structure and construction method thereof
CN103233537A (en) Heavy-load superimposed overhead terrace and construction method
CN113417300A (en) Slope support system and construction method thereof
CN210766861U (en) Portal formula building pile foundation underpins structure under narrow and small space
CN110258600B (en) Vertical cofferdam construction method suitable for deepwater area
CN204703190U (en) A kind of underground shallow layer automatic parking garage storehouse body structure
CN113585336B (en) Quick construction method of sinking type concrete mixing station in soft foundation environment
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
CN205934891U (en) Dc -to -ac converter case flattens platform
CN207597914U (en) Add the construction stress structure for building multi-layer underground space under a kind of existing building group
CN215211151U (en) Overhead supporting structure based on soil retaining structure
CN109403297A (en) A kind of inverter box flattens platform and preparation method thereof
CN216640550U (en) Prefabricated sheet pile assembled connection structure's section of thick bamboo type fan basis and wind generating set
CN211447000U (en) Foundation pit backfill area construction elevator foundation
CN213709548U (en) Advanced structure system for positive and negative zero beam plates in deep foundation pit building seat area
CN209293069U (en) Soft base Self-sinking type underground space structure construction
CN209958372U (en) Railway newly-added second-line platform back way foundation pile pipe curtain supporting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190301