CN108914942A - A kind of system of deep foundation pit support and its construction method - Google Patents

A kind of system of deep foundation pit support and its construction method Download PDF

Info

Publication number
CN108914942A
CN108914942A CN201810687208.3A CN201810687208A CN108914942A CN 108914942 A CN108914942 A CN 108914942A CN 201810687208 A CN201810687208 A CN 201810687208A CN 108914942 A CN108914942 A CN 108914942A
Authority
CN
China
Prior art keywords
steel pipe
foundation pit
pile
pipe support
support pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810687208.3A
Other languages
Chinese (zh)
Inventor
吴骞
高阔
张勇
于其发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 5 Group Co Ltd
Original Assignee
Shanghai Construction No 5 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 5 Group Co Ltd filed Critical Shanghai Construction No 5 Group Co Ltd
Priority to CN201810687208.3A priority Critical patent/CN108914942A/en
Publication of CN108914942A publication Critical patent/CN108914942A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of system of deep foundation pit support and its construction methods, the system of deep foundation pit support, it is beaten vertically including several into the intracorporal steel pipe support pile (1) of foundation pit side soil, foundation pit side soil body side wall is covered with concrete nail wall (2), and it is inserted into several anchor cables (3) obliquely into the soil body on the concrete nail wall (2), the anchor cable (3) passes through anchorage (4) fixed strain for being placed on the outside of concrete nail wall (2), the top of adjacent steel pipe support pile (1) is fixedly connected by fried dough twist formula reinforcing bar Pan Liang (5) simultaneously;The advantage of the invention is that, the high system of deep foundation pit support of a stability is formed by fried dough twist formula reinforcing bar Pan Liang, it is not only simple in structure, is easy for construction, and difficulty of construction is effectively reduced and shortens the construction period, the safety for also strengthening deep basal pit simultaneously, is particularly suitable for the deep-foundation pit engineering of the more backfill soil property of severe cold area rubble.

Description

A kind of system of deep foundation pit support and its construction method
Technical field
The invention belongs to Geotechnical Engineering fields, more particularly, to a kind of system of deep foundation pit support and its construction method.
Background technique
In deep-foundation pit engineering, deep foundation pit support is the key that guarantee that excavation process is firm, for belonging to Large-scale synclinal basin tectonic geology complex area in North China Platform type, Taizihe River recess, by upper Proterozoic erathem and cold around basin The old stratum composition such as force system, Basin Central is Mesozoic sand, shale and volcanic series.Due to the shadow by multiple diastrophism, Cause to inverted syncline is tiltedly become, axial direction is bordering on thing distribution.This brings very big to large-scale deep pit construction Difficulty, and it is big using existing drilling fender post support construction difficulty, and the construction period is long, and input cost is high.
Summary of the invention
Object of the present invention is to:It provides one kind be not only simple in structure, be easy for construction, and difficulty of construction is effectively reduced and shortens Construction period, while the safety of deep basal pit is also strengthened, it is particularly suitable for the depth of the more backfill soil property of severe cold area rubble Foundation pit supporting system and its construction method.
The technical scheme is that:A kind of system of deep foundation pit support, including several beat into the foundation pit side soil body vertically Interior steel pipe support pile, foundation pit side soil body side wall are covered with concrete nail wall, and on the concrete nail wall into the soil body It is inserted into several anchor cables obliquely, the anchor cable is by the anchorage fixed strain that is placed on the outside of concrete nail wall, while adjacent steel The top of pipe support pile is fixedly connected by fried dough twist formula reinforcing bar Pan Liang, forms a stability height by fried dough twist formula reinforcing bar Pan Liang System of deep foundation pit support, be not only simple in structure, be easy for construction, and difficulty of construction is effectively reduced and shortens the construction period, together When also strengthen the safety of deep basal pit, be particularly suitable for the deep-foundation pit engineering of the more backfill soil property of severe cold area rubble.
The concrete nail wall includes internal layer steel mesh and outer reinforcement net as a preferred technical solution, and is set to Pea gravel concreten layer between the internal layer steel mesh and the outer reinforcement net;Wherein the internal layer steel mesh and the steel pipe Support pile is fixedly connected.
The anchorage includes that level is fixed on concrete nail wall side wall and corresponds to up and down as a preferred technical solution, Two be arranged put more energy into floor, are vertically arranged and are fixed on two anchor plates for putting more energy into floor outboard end, be fixed on oblique on anchor plate Iron block, and be fixed on the wedge block and be used for the anchoring piece of fixed strain anchor cable outboard end, the wherein outboard end of wedge block Face is vertically arranged with anchor cable.
The bottom end of the steel pipe support pile is in sharpening shape as a preferred technical solution, and places pile cover on its top, is cut Pointed steel pipe support pile can be squeezed into more smoothly in the soil body, and the pile cover that steel pipe support pile top is placed can prevent from hammering into shape Steel pipe support pile is damaged when hitting, and foundation engineering measure needs have been taken into account while meeting the durability requirements of foundation pit.
The horizontal distance between adjacent steel pipe support pile is 0.35m~0.4m as a preferred technical solution,.
The steel pipe support pile injects in hollow setting and in it cement slurry as a preferred technical solution, increases steel The strength of the mixing pile of pipe support pile.
The construction method of system of deep foundation pit support as described above, includes the following steps:
Step 1:According to measuring stake site is carried out after stake top absolute altitude excavation section by section operation side, then down-hole hammer is transferred extremely Stake site carries out drawing hole construction;
Step 2:Steel pipe support pile is stacked by piling sequencing, and heap is put the bottom end that rear scene carries out steel pipe support pile well and cut Point construction, and pile cover is placed on the top of steel pipe support pile;
Step 3:Steel pipe support pile is hung into corresponding stake site and carries out vertical pitching pile, while keeping hammer, pile cover and steel pipe branch Fender pile is on the same longitudinal axis;
Step 4:Inject cement slurry into the steel pipe support pile being partially disposed in non cohesire soil, and by adjacent steel pipe supporting The top of stake is fixedly connected by fried dough twist formula reinforcing bar Pan Liang;
Step 5:The excavation pit on the inside of steel pipe support pile, and wall is followed closely in foundation pit side soil body side wall oversite concrete, It is inserted into anchor cable on concrete nail wall obliquely into the soil body and passes through anchorage fixed strain, to complete system of deep foundation pit support Construction.
It is an advantage of the invention that:
1. the present invention carries out fried dough twist formula reinforcing bar Pan Liang on the top of adjacent steel pipe support pile, to form a stability height System of deep foundation pit support, be not only simple in structure, be easy for construction, and difficulty of construction is effectively reduced and shortens the construction period, together When also strengthen the safety of deep basal pit, be particularly suitable for the deep-foundation pit engineering of the more backfill soil property of severe cold area rubble.
2. the present invention is suitable for the deep foundation pit support in most of soil properties, artificial and auxiliary material used in steel pipe supporting pile driving construction Seldom, while again reduce a large amount of artificial and materials that measure facility is spent, save traditional bored concrete pile reinforcing bar and concrete Consumption, save one-time investment.
3. frozen soil layer is thicker when winter construction in severe cold area, and construction area soil property is poor, utilizes down-hole hammer pilot hole Broken frozen soil and rubble, can effectively ensure that the quality problems of steel pipe support pile during the pile driving process, reduce to steel pipe supporting The destruction of stake.
Detailed description of the invention
The invention will be further described with reference to the accompanying drawings and embodiments:
Fig. 1 is system of deep foundation pit support side view of the present invention;
Fig. 2 is system of deep foundation pit support top view of the present invention;
Fig. 3 is steel pipe support pile of the present invention and concrete nail wall connection schematic diagram;
Fig. 4 is the fried dough twist formula reinforcing bar disk beam schematic diagram on steel pipe support pile of the present invention top;
Wherein:1 steel pipe support pile, 2 concrete nail walls, 21 internal layer steel meshes, 22 outer reinforcement nets, 23 pea gravel concretens Layer;3 anchor cables, 4 anchorages, 41 put more energy into floor, 42 anchor plates, 43 wedge blocks, 44 anchoring pieces, 5 fried dough twist formula reinforcing bar Pan Liang.
Specific embodiment
Embodiment:Shown in 4, a kind of system of deep foundation pit support, including several vertically beat into foundation pit side soil Intracorporal steel pipe support pile 1, foundation pit side soil body side wall are covered with concrete nail wall 2, and on concrete nail wall 2 into the soil body It is inserted into several anchor cables 3 obliquely, the anchor cable 3 is while adjacent by being placed in 4 fixed strain of anchorage in the outside of concrete nail wall 2 The top of steel pipe support pile 1 is fixedly connected by fried dough twist formula reinforcing bar disk beam 5, the fried dough twist formula reinforcing bar disk beam 5 using 16 reinforcing bar of Φ into Row construction, and the high system of deep foundation pit support of a stability is formed by the fried dough twist formula reinforcing bar disk beam 5, be not only simple in structure, It is easy for construction, and difficulty of construction is effectively reduced and shortens the construction period, while also strengthening the safety of deep basal pit, it is especially suitable Deep-foundation pit engineering for the more backfill soil property of severe cold area rubble.
Concrete nail wall 2 of the invention includes internal layer steel mesh 21 and outer reinforcement net 22, and is set to internal layer steel mesh Pea gravel concreten layer 23 between 21 and outer reinforcement net 22;Wherein internal layer steel mesh 21 is fixedly connected with steel pipe support pile 1.
Anchorage 4 of the invention includes that level is fixed on two ribbed stiffeners being correspondingly arranged on 2 side wall of concrete nail wall and up and down Plate 41, is vertically arranged and is fixed on two anchor plates 42 for putting more energy into 41 outboard end of floor, the wedge block 43 being fixed on anchor plate 42, And it is fixed on wedge block 43 and is used for the anchoring piece 44 of 3 outboard end of fixed strain anchor cable, the wherein end face outside of wedge block 43 It is vertically arranged with anchor cable 3.
The bottom end of steel pipe support pile 1 of the invention is in sharpening shape, and sharpening length is 20 centimeters, and places stake on its top Cap, while hardwood damping headblock is placed at the position for being directly subjected to hammer on the pile cover, the steel pipe support pile 1 of sharpening shape can More smoothly squeeze into the soil body, and pile cover and damping headblock that 1 top of steel pipe support pile is placed can prevent the damage in hammering Steel pipe support pile 1 has taken into account foundation engineering measure needs while meeting the durability requirements of foundation pit;Adjacent steel pipe simultaneously Horizontal distance between support pile 1 is 0.35m~0.4m, the diameter 159mm of steel pipe support pile 1, wall thickness 6mm, length be 9m~ 12m, and steel pipe support pile 1 injects in hollow setting and in it cement slurry, increases the strength of the mixing pile of steel pipe support pile 1.
Such as the construction method of above-mentioned system of deep foundation pit support, include the following steps:
Step 1:According to measuring stake site is carried out after stake top absolute altitude excavation section by section operation side, then down-hole hammer is transferred extremely Stake site carries out drawing hole construction, is crushed frozen soil and rubble using down-hole hammer pilot hole, can effectively ensure that steel pipe support pile 1 heavy Quality problems during stake reduce the destruction to steel pipe support pile 1;
Step 2:Steel pipe support pile 1 is stacked by piling sequencing, and heap puts the bottom end that rear scene carries out steel pipe support pile 1 well It fines away and constructs, and place pile cover on the top of steel pipe support pile 1;
Step 3:Steel pipe support pile 1 is hung into corresponding stake site and carries out vertical pitching pile, while keeping hammer, pile cover and steel pipe branch Fender pile 1 is on the same longitudinal axis, and when paying attention to piling, 1~2 meter of impact missing first is formally driven piles after correcting verticality again, then when heavy To a certain depth and through review pile sinking quality it is good when, be further continued for hitting, until projected depth, if discovery the incipient stage stake position Not just or inclination, levelling or steel pipe support pile 1 is extracted into inserting piling again;
Step 4:Inject cement slurry into the steel pipe support pile 1 being partially disposed in non cohesire soil, and by adjacent steel pipe branch The top of fender pile 1 is fixedly connected by fried dough twist formula reinforcing bar disk beam 5;
Step 5:Wall 2 is followed closely in 1 inside excavation pit of steel pipe support pile, and in foundation pit side soil body side wall oversite concrete, It is inserted into anchor cable 3 obliquely into the soil body on concrete nail wall 2 and passes through 4 fixed strain of anchorage, to complete deep foundation pit support The construction of system.
The above embodiments merely illustrate the technical concept and features of the present invention, and its object is to allow person skilled in the art Scholar cans understand the content of the present invention and implement it accordingly, and it is not intended to limit the scope of the present invention.It is all according to the present invention Equivalent change or modification made by Spirit Essence, should be covered by the protection scope of the present invention.

Claims (7)

1. a kind of system of deep foundation pit support, which is characterized in that beaten vertically including several into the intracorporal steel pipe branch of foundation pit side soil Fender pile (1), foundation pit side soil body side wall are covered with concrete nail wall (2), and oblique into the soil body on the concrete nail wall (2) Be downwardly into several anchor cables (3), the anchor cable (3) by anchorage (4) fixed strain for being placed on the outside of concrete nail wall (2), The top of adjacent steel pipe support pile (1) is fixedly connected by fried dough twist formula reinforcing bar Pan Liang (5) simultaneously.
2. system of deep foundation pit support according to claim 1, which is characterized in that the concrete nail wall (2) includes internal layer Steel mesh (21) and outer reinforcement net (22), and be set between the internal layer steel mesh (21) and the outer reinforcement net (22) Pea gravel concreten layer (23);Wherein the internal layer steel mesh (21) is fixedly connected with the steel pipe support pile (1).
3. system of deep foundation pit support according to claim 1, which is characterized in that the anchorage (4) is fixed on including level Two be correspondingly arranged on concrete nail wall (2) side wall and up and down put more energy into floor (41), are vertically arranged and are fixed on two and put more energy into floor (41) anchor plate (42) of outboard end, the wedge block (43) being fixed on anchor plate (42), and it is fixed on the wedge block (43) and it to be used for the anchoring piece (44) of fixed strain anchor cable (3) outboard end, wherein the end face outside of wedge block (43) and anchor cable (3) It is vertically arranged.
4. system of deep foundation pit support according to claim 1, which is characterized in that the bottom end of the steel pipe support pile (1) is in Sharpening shape, and pile cover is placed on its top.
5. system of deep foundation pit support according to claim 1, which is characterized in that the water between adjacent steel pipe support pile (1) Flat distance is 0.35m~0.4m.
6. system of deep foundation pit support according to claim 1, which is characterized in that the steel pipe support pile (1) sets in hollow It sets and injects cement slurry in it.
7. a kind of construction method of such as system of deep foundation pit support as claimed in any one of claims 1 to 6, which is characterized in that including Following steps:
Step 1:According to measuring stake site is carried out after stake top absolute altitude excavation section by section operation side, down-hole hammer is then transferred to stake position Point carries out drawing hole construction;
Step 2:Steel pipe support pile (1) is stacked by piling sequencing, and scene carries out the bottom end of steel pipe support pile (1) after heap is put well It fines away and constructs, and place pile cover on the top of steel pipe support pile (1);
Step 3:Steel pipe support pile (1) is hung into corresponding stake site and carries out vertical pitching pile, while keeping hammer, pile cover and steel pipe supporting Stake (1) is on the same longitudinal axis;
Step 4:To injecting cement slurry in the steel pipe support pile (1) being partially disposed in non cohesire soil, and by adjacent steel pipe supporting The top of stake (1) is fixedly connected by fried dough twist formula reinforcing bar Pan Liang (5);
Step 5:The excavation pit on the inside of steel pipe support pile (1), and wall (2) are followed closely in foundation pit side soil body side wall oversite concrete, It is inserted into anchor cable (3) obliquely into the soil body on concrete nail wall (2) and passes through anchorage (4) fixed strain, to complete deep base Cheat the construction of support system.
CN201810687208.3A 2018-06-28 2018-06-28 A kind of system of deep foundation pit support and its construction method Withdrawn CN108914942A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810687208.3A CN108914942A (en) 2018-06-28 2018-06-28 A kind of system of deep foundation pit support and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810687208.3A CN108914942A (en) 2018-06-28 2018-06-28 A kind of system of deep foundation pit support and its construction method

Publications (1)

Publication Number Publication Date
CN108914942A true CN108914942A (en) 2018-11-30

Family

ID=64421967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810687208.3A Withdrawn CN108914942A (en) 2018-06-28 2018-06-28 A kind of system of deep foundation pit support and its construction method

Country Status (1)

Country Link
CN (1) CN108914942A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114892673A (en) * 2022-05-25 2022-08-12 山东曼凯机械化工程有限公司 Foundation pit supporting construction method
CN115341542A (en) * 2022-09-08 2022-11-15 中建八局第二建设有限公司 Breaking hammer with annular clamp and construction method for supporting steel pipe in pit area in deep foundation pit

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114892673A (en) * 2022-05-25 2022-08-12 山东曼凯机械化工程有限公司 Foundation pit supporting construction method
CN115341542A (en) * 2022-09-08 2022-11-15 中建八局第二建设有限公司 Breaking hammer with annular clamp and construction method for supporting steel pipe in pit area in deep foundation pit

Similar Documents

Publication Publication Date Title
US7326004B2 (en) Apparatus for providing a rammed aggregate pier
CN106049505B (en) A kind of construction method of deep pit support supporting system
US8221034B2 (en) Methods of providing a support column
CN103306289B (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
US9243379B2 (en) Method of providing a support column
CN206956742U (en) High precipitous rock roadbed side slope repair system
CN107299650B (en) A kind of remote open caisson casting method for correcting error
KR100762991B1 (en) Precast piling method injected with high-strength mortar
CN109440778A (en) Active inclined in two-way method for supporting and protecting row pile pit
CN1926287B (en) Working method of pile with an extended head
CN106522191A (en) Transformer substation foundation treatment method and application thereof
CN110387879A (en) A kind of concrete filling pile construction method of hydraulic vibration hammer hidden pipe
CN107489164A (en) The heightening and consolidation structure and method of a kind of in-service reinforced concrete retaining wall
CN110777836A (en) Reinforced concrete plate-anchor rod composite foundation and using method thereof
CN109667273A (en) A kind of construction method of deep foundation pit supporting structure
CN110409525B (en) Soft soil and unfavorable geology composite foundation reinforcing method
CN108914945A (en) A kind of deep basal pit pile for prestressed pipe, prestress anchorage cable combined supporting construction method
CN102235007B (en) Method for supporting deep foundation with upper nail-lower pile combination
CN108914942A (en) A kind of system of deep foundation pit support and its construction method
CN201339186Y (en) Soft rock concrete replacement pile composite foundation
CN109440779A (en) Active X-shaped foundation pit supporting method with double rows of piles
CN208668431U (en) A kind of system of deep foundation pit support
CN212656235U (en) Double-row steel pipe pile supporting structure for foundation pit supporting
CN209620033U (en) Active inclined in two-way supporting and protecting row pile pit structure
CN206986915U (en) A kind of fan platform installation foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20181130

WW01 Invention patent application withdrawn after publication