CN208668431U - A kind of system of deep foundation pit support - Google Patents

A kind of system of deep foundation pit support Download PDF

Info

Publication number
CN208668431U
CN208668431U CN201821020352.3U CN201821020352U CN208668431U CN 208668431 U CN208668431 U CN 208668431U CN 201821020352 U CN201821020352 U CN 201821020352U CN 208668431 U CN208668431 U CN 208668431U
Authority
CN
China
Prior art keywords
foundation pit
steel pipe
pile
pipe support
deep foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821020352.3U
Other languages
Chinese (zh)
Inventor
吴骞
高阔
张勇
于其发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 5 Group Co Ltd
Original Assignee
Shanghai Construction No 5 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 5 Group Co Ltd filed Critical Shanghai Construction No 5 Group Co Ltd
Priority to CN201821020352.3U priority Critical patent/CN208668431U/en
Application granted granted Critical
Publication of CN208668431U publication Critical patent/CN208668431U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of system of deep foundation pit support, it is beaten vertically including several into the intracorporal steel pipe support pile (1) of foundation pit side soil, foundation pit side soil body side wall is covered with concrete nail wall (2), and it is inserted into several anchor cables (3) obliquely into the soil body on the concrete nail wall (2), the anchor cable (3) is by anchorage (4) fixed strain for being placed on the outside of concrete nail wall (2), while the top of adjacent steel pipe support pile (1) is fixedly connected by fried dough twist formula reinforcing bar Pan Liang (5);The utility model has the advantage of, the high system of deep foundation pit support of a stability is formed by fried dough twist formula reinforcing bar Pan Liang, it is not only simple in structure, is easy for construction, and difficulty of construction is effectively reduced and shortens the construction period, the safety for also strengthening deep basal pit simultaneously, is particularly suitable for the deep-foundation pit engineering of the more backfill soil property of severe cold area rubble.

Description

A kind of system of deep foundation pit support
Technical field
The utility model belongs to Geotechnical Engineering field, more particularly, to a kind of system of deep foundation pit support.
Background technique
In deep-foundation pit engineering, deep foundation pit support is the key that guarantee that excavation process is firm, for belonging to Large-scale synclinal basin tectonic geology complex area in North China Platform type, Taizihe River recess, by upper Proterozoic erathem and cold around basin The old stratum composition such as force system, Basin Central is Mesozoic sand, shale and volcanic series.Due to the shadow by multiple diastrophism, Cause to inverted syncline is tiltedly become, axial direction is bordering on thing distribution.This brings very big to large-scale deep pit construction Difficulty, and it is big using existing drilling fender post support construction difficulty, and the construction period is long, and input cost is high.
Summary of the invention
The utility model aim is: providing one kind and is not only simple in structure, is easy for construction, and difficulty of construction is effectively reduced simultaneously Shorten the construction period, while also strengthening the safety of deep basal pit, is particularly suitable for the more backfill soil property of severe cold area rubble System of deep foundation pit support.
The technical solution of the utility model is: a kind of system of deep foundation pit support, including several beat into foundation pit side vertically The intracorporal steel pipe support pile of soil, foundation pit side soil body side wall are covered with concrete nail wall, and to soil on the concrete nail wall It is inserted into several anchor cables obliquely in vivo, the anchor cable passes through the anchorage fixed strain that is placed on the outside of concrete nail wall, same to phase The top of adjacent steel pipe support pile is fixedly connected by fried dough twist formula reinforcing bar Pan Liang, forms a stabilization by fried dough twist formula reinforcing bar Pan Liang The high system of deep foundation pit support of property, is not only simple in structure, is easy for construction, and difficulty of construction is effectively reduced and shortens construction work Phase, while the safety of deep basal pit is also strengthened, it is particularly suitable for the deep basal pit work of the more backfill soil property of severe cold area rubble Journey.
The concrete nail wall includes internal layer steel mesh and outer reinforcement net as a preferred technical solution, and is set to Pea gravel concreten layer between the internal layer steel mesh and the outer reinforcement net;Wherein the internal layer steel mesh and the steel pipe Support pile is fixedly connected.
The anchorage includes that level is fixed on concrete nail wall side wall and corresponds to up and down as a preferred technical solution, Two be arranged put more energy into floor, are vertically arranged and are fixed on two anchor plates for putting more energy into floor outboard end, be fixed on oblique on anchor plate Iron block, and be fixed on the wedge block and be used for the anchoring piece of fixed strain anchor cable outboard end, the wherein outboard end of wedge block Face is vertically arranged with anchor cable.
The bottom end of the steel pipe support pile is in sharpening shape as a preferred technical solution, and places pile cover on its top, is cut Pointed steel pipe support pile can be squeezed into more smoothly in the soil body, and the pile cover that steel pipe support pile top is placed can prevent from hammering into shape Steel pipe support pile is damaged when hitting, and foundation engineering measure needs have been taken into account while meeting the durability requirements of foundation pit.
The horizontal distance between adjacent steel pipe support pile is 0.35m~0.4m as a preferred technical solution,.
The steel pipe support pile injects in hollow setting and in it cement slurry as a preferred technical solution, increases steel The strength of the mixing pile of pipe support pile.
The construction method of system of deep foundation pit support as described above, includes the following steps:
Step 1: according to measuring stake site is carried out after stake top absolute altitude excavation section by section operation side, then transferring down-hole hammer extremely Stake site carries out drawing hole construction;
Step 2: steel pipe support pile is stacked by piling sequencing, and heap is put the bottom end that rear scene carries out steel pipe support pile well and cut Point construction, and pile cover is placed on the top of steel pipe support pile;
Step 3: steel pipe support pile being hung into corresponding stake site and carries out vertical pitching pile, while keeping hammer, pile cover and steel pipe branch Fender pile is on the same longitudinal axis;
Step 4: injecting cement slurry into the steel pipe support pile being partially disposed in non cohesire soil, and by adjacent steel pipe supporting The top of stake is fixedly connected by fried dough twist formula reinforcing bar Pan Liang;
Step 5: the excavation pit on the inside of steel pipe support pile, and wall is followed closely in foundation pit side soil body side wall oversite concrete, It is inserted into anchor cable on concrete nail wall obliquely into the soil body and passes through anchorage fixed strain, to complete system of deep foundation pit support Construction.
The utility model has the advantages that:
1. the utility model carries out fried dough twist formula reinforcing bar Pan Liang on the top of adjacent steel pipe support pile, to form a stabilization The high system of deep foundation pit support of property, is not only simple in structure, is easy for construction, and difficulty of construction is effectively reduced and shortens construction work Phase, while the safety of deep basal pit is also strengthened, it is particularly suitable for the deep basal pit work of the more backfill soil property of severe cold area rubble Journey.
2. the utility model is suitable for the deep foundation pit support in most of soil properties, it is artificial used in steel pipe supporting pile driving construction and Auxiliary material is seldom, while reducing a large amount of artificial and materials that measure facility is spent again, save traditional bored concrete pile reinforcing bar and mixing The consumption of soil is coagulated, one-time investment is saved.
3. frozen soil layer is thicker when winter construction in severe cold area, and construction area soil property is poor, utilizes down-hole hammer pilot hole Broken frozen soil and rubble, can effectively ensure that the quality problems of steel pipe support pile during the pile driving process, reduce to steel pipe supporting The destruction of stake.
Detailed description of the invention
The utility model is further described with reference to the accompanying drawings and embodiments:
Fig. 1 is the utility model system of deep foundation pit support side view;
Fig. 2 is the utility model system of deep foundation pit support top view;
Fig. 3 is the utility model steel pipe support pile and concrete nail wall connection schematic diagram;
Fig. 4 is the fried dough twist formula reinforcing bar disk beam schematic diagram on the utility model steel pipe support pile top;
Wherein: 1 steel pipe support pile, 2 concrete nail walls, 21 internal layer steel meshes, 22 outer reinforcement nets, 23 pea gravel concretens Layer;3 anchor cables, 4 anchorages, 41 put more energy into floor, 42 anchor plates, 43 wedge blocks, 44 anchoring pieces, 5 fried dough twist formula reinforcing bar Pan Liang.
Specific embodiment
Embodiment: shown in 4, a kind of system of deep foundation pit support, including several vertically beat into foundation pit side soil Intracorporal steel pipe support pile 1, foundation pit side soil body side wall are covered with concrete nail wall 2, and on concrete nail wall 2 into the soil body It is inserted into several anchor cables 3 obliquely, the anchor cable 3 is while adjacent by being placed in 4 fixed strain of anchorage in the outside of concrete nail wall 2 The top of steel pipe support pile 1 is fixedly connected by fried dough twist formula reinforcing bar disk beam 5, the fried dough twist formula reinforcing bar disk beam 5 using 16 reinforcing bar of Φ into Row construction, and the high system of deep foundation pit support of a stability is formed by the fried dough twist formula reinforcing bar disk beam 5, be not only simple in structure, It is easy for construction, and difficulty of construction is effectively reduced and shortens the construction period, while also strengthening the safety of deep basal pit, it is especially suitable Deep-foundation pit engineering for the more backfill soil property of severe cold area rubble.
The concrete nail wall 2 of the utility model includes internal layer steel mesh 21 and outer reinforcement net 22, and is set to internal layer steel Pea gravel concreten layer 23 between muscle net 21 and outer reinforcement net 22;Wherein internal layer steel mesh 21 and the fixed company of steel pipe support pile 1 It connects.
The anchorage 4 of the utility model is fixed on two be correspondingly arranged on 2 side wall of concrete nail wall and up and down including level and adds Strength floor 41 is vertically arranged and is fixed on two anchor plates 42 for putting more energy into 41 outboard end of floor, the wedge being fixed on anchor plate 42 Block 43, and be fixed on wedge block 43 and be used for the anchoring piece 44 of 3 outboard end of fixed strain anchor cable, the wherein outside of wedge block 43 End face is vertically arranged with anchor cable 3.
The bottom end of the steel pipe support pile 1 of the utility model is in sharpening shape, and sharpening length is 20 centimeters, and is put on its top Pile cover is set, while being directly subjected to the position placement hardwood damping headblock of hammering, the steel pipe support pile 1 of sharpening shape on the pile cover It can more smoothly squeeze into the soil body, and pile cover and damping headblock that 1 top of steel pipe support pile is placed can be prevented in hammering Steel pipe support pile 1 is damaged, foundation engineering measure needs have been taken into account while meeting the durability requirements of foundation pit;It is adjacent simultaneously Horizontal distance between steel pipe support pile 1 is 0.35m~0.4m, the diameter 159mm of steel pipe support pile 1, wall thickness 6mm, and length is 9m~12m, and steel pipe support pile 1 injects in hollow setting and in it cement slurry, and the pile body for increasing steel pipe support pile 1 is strong Degree.
Such as the construction method of above-mentioned system of deep foundation pit support, include the following steps:
Step 1: according to measuring stake site is carried out after stake top absolute altitude excavation section by section operation side, then transferring down-hole hammer extremely Stake site carries out drawing hole construction, is crushed frozen soil and rubble using down-hole hammer pilot hole, can effectively ensure that steel pipe support pile 1 heavy Quality problems during stake reduce the destruction to steel pipe support pile 1;
Step 2: steel pipe support pile 1 is stacked by piling sequencing, and heap puts the bottom end that rear scene carries out steel pipe support pile 1 well It fines away and constructs, and place pile cover on the top of steel pipe support pile 1;
Step 3: steel pipe support pile 1 being hung into corresponding stake site and carries out vertical pitching pile, while keeping hammer, pile cover and steel pipe branch Fender pile 1 is on the same longitudinal axis, and when paying attention to piling, 1~2 meter of impact missing first is formally driven piles after correcting verticality again, then when heavy To a certain depth and through review pile sinking quality it is good when, be further continued for hitting, until projected depth, if discovery the incipient stage stake position Not just or inclination, levelling or steel pipe support pile 1 is extracted into inserting piling again;
Step 4: injecting cement slurry into the steel pipe support pile 1 being partially disposed in non cohesire soil, and by adjacent steel pipe branch The top of fender pile 1 is fixedly connected by fried dough twist formula reinforcing bar disk beam 5;
Step 5: wall 2 is followed closely in 1 inside excavation pit of steel pipe support pile, and in foundation pit side soil body side wall oversite concrete, It is inserted into anchor cable 3 obliquely into the soil body on concrete nail wall 2 and passes through 4 fixed strain of anchorage, to complete deep foundation pit support The construction of system.
The above embodiments are only for explaining the technical ideas and features of the present invention, and its object is to allow be familiar with technique Personage can understand the content of the utility model and implement accordingly, do not limit the protection scope of the present invention. All equivalent change or modifications according to made by the spirit of the present invention essence, should all cover the protection scope of the utility model it It is interior.

Claims (6)

1. a kind of system of deep foundation pit support, which is characterized in that beaten vertically including several into the intracorporal steel pipe branch of foundation pit side soil Fender pile (1), foundation pit side soil body side wall are covered with concrete nail wall (2), and oblique into the soil body on the concrete nail wall (2) Be downwardly into several anchor cables (3), the anchor cable (3) by anchorage (4) fixed strain for being placed on the outside of concrete nail wall (2), The top of adjacent steel pipe support pile (1) is fixedly connected by fried dough twist formula reinforcing bar Pan Liang (5) simultaneously.
2. system of deep foundation pit support according to claim 1, which is characterized in that the concrete nail wall (2) includes internal layer Steel mesh (21) and outer reinforcement net (22), and be set between the internal layer steel mesh (21) and the outer reinforcement net (22) Pea gravel concreten layer (23);Wherein the internal layer steel mesh (21) is fixedly connected with the steel pipe support pile (1).
3. system of deep foundation pit support according to claim 1, which is characterized in that the anchorage (4) is fixed on including level Two be correspondingly arranged on concrete nail wall (2) side wall and up and down put more energy into floor (41), are vertically arranged and are fixed on two and put more energy into floor (41) anchor plate (42) of outboard end, the wedge block (43) being fixed on anchor plate (42), and it is fixed on the wedge block (43) and it to be used for the anchoring piece (44) of fixed strain anchor cable (3) outboard end, wherein the end face outside of wedge block (43) and anchor cable (3) It is vertically arranged.
4. system of deep foundation pit support according to claim 1, which is characterized in that the bottom end of the steel pipe support pile (1) is in Sharpening shape, and pile cover is placed on its top.
5. system of deep foundation pit support according to claim 1, which is characterized in that the water between adjacent steel pipe support pile (1) Flat distance is 0.35m~0.4m.
6. system of deep foundation pit support according to claim 1, which is characterized in that the steel pipe support pile (1) sets in hollow It sets and injects cement slurry in it.
CN201821020352.3U 2018-06-28 2018-06-28 A kind of system of deep foundation pit support Active CN208668431U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821020352.3U CN208668431U (en) 2018-06-28 2018-06-28 A kind of system of deep foundation pit support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821020352.3U CN208668431U (en) 2018-06-28 2018-06-28 A kind of system of deep foundation pit support

Publications (1)

Publication Number Publication Date
CN208668431U true CN208668431U (en) 2019-03-29

Family

ID=65826352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821020352.3U Active CN208668431U (en) 2018-06-28 2018-06-28 A kind of system of deep foundation pit support

Country Status (1)

Country Link
CN (1) CN208668431U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130336A (en) * 2019-06-12 2019-08-16 山东建勘集团有限公司 Locking structure built in anchor pole

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130336A (en) * 2019-06-12 2019-08-16 山东建勘集团有限公司 Locking structure built in anchor pole

Similar Documents

Publication Publication Date Title
US7326004B2 (en) Apparatus for providing a rammed aggregate pier
CN102444142B (en) Pile group column replacement expanded basement and construction method of same
CN106049505B (en) A kind of construction method of deep pit support supporting system
KR100762991B1 (en) Precast piling method injected with high-strength mortar
CN206956742U (en) High precipitous rock roadbed side slope repair system
CN105442605B (en) Extract PHC and be reused in deep foundation pit supporting construction method
CN108103939A (en) Oblique section steel trestle construction composite reinforcement mode and construction technology
CN107299650B (en) A kind of remote open caisson casting method for correcting error
CN102828518A (en) Manual hole digging support pile prestress anchor cable anchoring structure and construction method of anchoring structure
CN110387879A (en) A kind of concrete filling pile construction method of hydraulic vibration hammer hidden pipe
CN110777836A (en) Reinforced concrete plate-anchor rod composite foundation and using method thereof
CN106522191A (en) Transformer substation foundation treatment method and application thereof
CN201395794Y (en) Foundation ditch with concealed columns and soil-nailing support
CN109667273A (en) A kind of construction method of deep foundation pit supporting structure
CN108914945A (en) A kind of deep basal pit pile for prestressed pipe, prestress anchorage cable combined supporting construction method
CN102235007B (en) Method for supporting deep foundation with upper nail-lower pile combination
CN108385715A (en) A kind of assembled stake arch combination retaining wall and its construction method
CN108914942A (en) A kind of system of deep foundation pit support and its construction method
CN201339186Y (en) Soft rock concrete replacement pile composite foundation
CN208668431U (en) A kind of system of deep foundation pit support
CN108643166A (en) The construction method for pulling out steel sheet pile soil vibration is beaten in a kind of weakening
CN104895078B (en) A kind of to hold the construction method of the prefabricated pile of holding capacity
CN202672161U (en) Cement-soil mixing drum sheet-pile united slope structure with soil nails
CN212656235U (en) Double-row steel pipe pile supporting structure for foundation pit supporting
CN212656252U (en) Novel transmission line tower foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant