CN101200879A - 多跨连续拱桥拱肋竖转技术方法 - Google Patents

多跨连续拱桥拱肋竖转技术方法 Download PDF

Info

Publication number
CN101200879A
CN101200879A CNA2007101686028A CN200710168602A CN101200879A CN 101200879 A CN101200879 A CN 101200879A CN A2007101686028 A CNA2007101686028 A CN A2007101686028A CN 200710168602 A CN200710168602 A CN 200710168602A CN 101200879 A CN101200879 A CN 101200879A
Authority
CN
China
Prior art keywords
arch rib
tower
arch
vertical transfer
knotted rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2007101686028A
Other languages
English (en)
Other versions
CN100582372C (zh
Inventor
秦顺全
潘东发
张立超
周外男
李军堂
毛伟琦
涂满明
王东辉
刘翠云
周超舟
刘崇亮
江涌
张瑞霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CN200710168602A priority Critical patent/CN100582372C/zh
Publication of CN101200879A publication Critical patent/CN101200879A/zh
Application granted granted Critical
Publication of CN100582372C publication Critical patent/CN100582372C/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种桥梁的施工方法,具体地说是桥梁工程中多跨连续拱桥拱肋的竖转技术方法。其施工方法步骤如下:(1)拼装边塔及中塔塔架、提升站、移动门吊、拱肋支架,安装后锚固系统;(2)在拱肋支架上拼装拱肋;(3)挂设第一孔钢管拱肋扣锚索,安装转体张拉设备;(4)第一孔钢管拱肋转体,合龙;(5)挂设第二孔钢管拱肋扣锚索;(6)第二孔钢管拱肋转体,合龙,重复上述工序,完成第n孔钢管拱肋转体、合龙;(7)拱脚合龙,调整吊杆,拆除施工设备。本发明具有施工方便、安全可靠,施工成本低的优点。

Description

多跨连续拱桥拱肋竖转技术方法
技术领域
本发明涉及一种桥梁的施工方法,具体地说是桥梁工程中多跨连续拱桥拱肋的竖转技术方法。
背景技术
常规拱桥进行拱肋竖转时,一般进行的都是单跨拱肋的竖转。单跨拱肋的竖转通常是每个半跨各设一套扣索塔架及锚索、扣索体系,锚索及扣索的张拉均由连续千斤顶进行,两个半跨拱肋的竖转相对独立,不相互影响。对于连续拱桥,由于竖转的跨数较多,如果按照单跨拱肋竖转方法施工,将产生连续千斤顶和扣索塔架数量过多的问题。为此,发明了更加经济的多跨连续拱桥拱肋竖转新技术。
发明内容
本发明的目的是针对多跨连续拱桥的特点,提供一种便于施工、安全可靠的多跨连续拱桥拱肋竖转的施工方法。
多跨连续拱桥拱肋竖转的施工方法,其特征是边塔的锚索配置普通千斤顶,其它塔架扣索均配置连续千斤顶张拉,中塔半跨拱肋竖转时的塔架锚索设在相邻半跨的拱肋上。拱肋竖转顺序为先边塔半跨,之后为中塔半跨,等该跨合龙后再竖转相邻半跨。在拱肋竖转启动时,边塔半跨拱肋塔架锚索采用普通千斤顶张拉,之后不再进行张拉,由其索力自然变化,扣索均采用连续千斤顶张拉,竖转过程中根据竖转角度变化不断地调整索力。当一跨拱肋竖转完成合龙之后,欲竖转其它跨拱肋时,先逐步释放该跨的扣索、锚索索力至零,然后根据力的平衡关系重新张拉索力。
扣索塔架设在拱脚附近,中间的塔架承担两个拱肋的竖转塔底固结,施工中允许塔架承受一定的由索产生的不平衡水平力,其水平力通过塔顶水平位移进行控制。
多跨连续拱桥拱肋竖转施工方法的步骤如下:
(1)拼装边塔及中塔塔架、提升站、移动门吊、拱肋支架,安装后锚固系统。
(2)在拱肋支架上拼装拱肋。
(3)挂设第一孔钢管拱肋扣锚索,安装转体张拉设备。
(4)第一孔钢管拱肋转体,合龙。
(5)挂设第二孔钢管拱肋扣锚索。
(6)第二孔钢管拱肋转体,合龙,重复上述工序,完成第n孔钢管拱肋转体、合龙。
(7)拱脚合龙,调整吊杆,拆除施工设备。
本发明具有施工方便、安全可靠,施工成本低的优点。
附图说明
图1第一孔拱肋竖转施工示意图
图2第二孔拱肋竖转施工示意图
图3a边塔扣索塔架正视剖视图
图3b边塔扣索塔架侧视剖视图
图4a中塔扣索塔架正视剖视图
图4b中塔扣索塔架侧视剖视图
图5a边塔塔顶张拉布置正视剖视图
图5b边塔塔顶张拉布置侧视剖视图
图6a中塔塔顶张拉布置正视剖视图
图6b中塔塔顶张拉布置侧视剖视图
图7~13钢桁梁安装施工步骤图
图中:1.边塔扣索塔,2.中塔扣索塔,3边塔的半跨拱肋,4.第一孔拱肋在中塔扣索塔2上的半跨拱肋,5.普通千斤顶,6.边塔扣索塔1上的连续千斤顶,7.第二孔拱肋在中塔扣索塔2上的半跨拱肋,8.第一孔拱肋,9.中塔扣索塔2上的连续千斤顶I,10.中塔扣索塔2上的连续千斤顶II
具体实施方式
现以三个塔架的桥梁为例说明多跨连续拱桥拱肋竖转的施工方法。
该方法主要步骤是:
1、扣索塔架在刚构梁悬浇一定节段后即可利用塔吊进行安装,至一定高度后改为散拼;三个塔架拼装完毕,安装压塔索和后缆风,并张拉到设计吨位,形成稳定体系。
2、拱肋的组拼
在临近设有钢管拱的边孔设一座门吊提升站。钢管拱肋节段在工厂加工好后由水运运输至提升站起吊位置;由提升站吊装至桥面运输车上,运输至待安装位置。拱肋横撑散件运到工地后由提升站提升,运输车运输至相应位置后再焊接成一体,架拱龙门吊机悬臂端起吊至相应位置安装。由梁面上门吊起吊拱肋节段,调整好角度,逐渐下放拱肋,使拱肋顶端安放在支架上,底端与拱铰连接,通过设置于工作平台上的千斤顶调整拱肋标高,达到施工设计安装精度后锁定,防止移动,同时每个点都要抄垫密实牢固,各点受力均匀。按照上述方法定位后,进行拱肋及横撑的组拼。
3、边塔半跨拱肋的竖转
①安装边塔扣索塔架1的扣、锚索系统,扣锚索同步分级张拉至设计吨位的40%。分级原则:每次张拉10%,按扣、锚索水平力相等的原则进行。
②边塔扣索塔1的锚索配置普通千斤顶5和连续千斤顶6,中塔扣索塔2的扣索配置连续千斤顶9和连续千斤顶10。张拉扣锚索直至边塔扣索塔架1的半跨拱肋3脱离支架,脱架高度考虑拉索在日夜温差变形影响下拱肋至脱离支架5cm。经监控、测量,并计算出拱肋结构及拉索内力,判断是否处于正常状态或提出调整建议。保持上述脱架状态停置24小时,观察组对各个部位进行检查,竖转组观察千斤顶和夹片有无滑移。
③半跨拱肋3脱架后,通过连续千斤顶6继续张拉扣索,使半跨拱肋3开始竖转。主拱脱架后,不再对锚索索力进行人工调整,让其索力自然变化。竖转过程中通过计算机自动控制保持索力的合理比例关系,同时保持半跨拱肋3和半跨拱肋4相对高差及理论标高控制在允许范围。在整个竖转过程中实行索力和标高双控。以高程为主、索力为辅。
施工过程中同时要对边塔扣索塔1塔顶位移进行监测,以控制塔顶不平衡水平力。
4、中塔半跨拱肋的竖转
中塔扣索塔2的半跨拱肋4和半跨拱肋7竖转分先后进行。
先进行竖转半跨拱肋4,其中塔扣索塔2塔架锚索设在待竖转的半跨拱肋4上,其竖转步骤与边塔扣索塔1的半跨拱肋3的竖转相同。
5、第一孔拱肋的合龙
半跨拱肋4竖转到位,通过张拉两组扣、锚索索力调整拱肋8线形,对接法兰盘,安装花篮螺栓;微调花篮螺栓,消除法兰盘间缝隙,焊接法兰盘;旋转顶紧拱顶花篮螺杆,根据监控组监测的当前主拱两半拱拱顶标高和横桥向偏差(拱轴线形)情况,首先调整好横桥向,再调整高度方向(主要通过调整扣索和两半拱对拉进行调整,另微调花篮螺杆配合),直至达到设计要求的拱顶标高,在温度相对恒定的时间内,固定花篮螺杆,完成瞬时合龙。焊接铰座、拱轴;焊接拱顶合龙套管,完成拱肋8的合龙。
6、第二孔拱肋的安装
等先竖转的半跨拱肋4与半跨拱肋3合龙后,再进行半跨拱肋7的竖转。此时,待竖转的半跨拱肋7的扣索塔架锚索设在已合龙的相邻拱肋8上。竖转前,需将边塔扣索塔1和中塔扣索塔2的所有扣索、锚索的索力释放至零,竖转启动时,同步张拉边塔扣索塔1、中塔扣索塔2的扣锚索,直至该半跨拱肋7脱离支架。半跨拱肋7脱架后,继续同步张拉边塔扣索塔1、中塔扣索塔2的扣索,但不再对边塔锚索索力进行人工调整,让其索力自然变化。
其它步骤均与边塔扣索塔2的半跨拱肋4的竖转相同。

Claims (6)

1.一种多跨连续拱桥拱肋的竖转技术方法,它包括以下步骤:
步骤1、拼装边塔及中塔塔架、提升站、移动门吊、拱肋支架,安装后锚固系统;
步骤2、在拱肋支架上拼装拱肋;
步骤3、挂设第一孔钢管拱肋扣锚索,安装转体张拉设备;
步骤4、第一孔钢管拱肋转体,合龙;
步骤5、挂设第二孔钢管拱肋扣锚索;
步骤6、第二孔钢管拱肋转体,合龙,重复上述工序,完成第n孔钢管拱肋转体、合龙;
步骤7、调整吊杆,拆除施工设备。
2.如权利要求1所述的多跨连续拱桥拱肋的竖转技术方法,其特征是:所述边塔的锚索配置普通千斤顶,其它塔架扣索均配置连续千斤顶。
3.如权利要求1所述的多跨连续拱桥拱肋的竖转技术方法,其特征是:步骤2具体为:
在临近设有钢管拱的边孔设一座门吊提升站,将钢管拱肋节段运输至提升站起吊位置;由提升站吊装至桥面运输车上,运输至待安装位置;拱肋横撑散件运到工地后由提升站提升,运输车运输至相应位置后再焊接成一体,架拱龙门吊机悬臂端起吊至相应位置安装;由梁面上门吊起吊拱肋节段,调整好角度,逐渐下放拱肋,使拱肋顶端安放在支架上,底端与拱铰连接,通过设置于工作平台上的千斤顶调整拱肋标高,达到施工设计安装精度后锁定,防止移动,同时每个点都要抄垫密实牢固,各点受力均匀;按照上述方法定位后,进行拱肋及横撑的组拼。
4.如权利要求1所述的多跨连续拱桥拱肋的竖转技术方法,其特征是:步骤4具体为:
(A)、安装边塔扣索塔架(1)的扣、锚索系统,扣锚索同步分级张拉至设计吨位的40%;分级原则:每次张拉10%,按扣、锚索水平力相等的原则进行;
(B)、边塔扣索塔(1)的锚索配置普通千斤顶(5)和连续千斤顶(6),中塔扣索塔(2)的扣索配置连续千斤顶(9)和连续千斤顶(10);张拉扣锚索直至边塔扣索塔架(1)的半跨拱肋(3)脱离支架,脱架高度考虑拉索在日夜温差变形影响下拱肋至脱离支架5cm;经监控、测量,并计算出拱肋结构及拉索内力,判断是否处于正常状态或提出调整建议;保持上述脱架状态停置24小时,观察组对各个部位进行检查,竖转组观察千斤顶和夹片有无滑移;
(C)、半跨拱肋(3)脱架后,通过连续千斤顶(6)继续张拉扣索,使半跨拱肋(3)开始竖转;主拱脱架后,不再对锚索索力进行人工调整,让其索力自然变化;竖转过程中通过计算机自动控制保持索力的合理比例关系,同时保持半跨拱肋(3)和半跨拱肋(4)相对高差及理论标高控制在允许范围;在整个竖转过程中实行索力和标高双控;以高程为主、索力为辅;施工过程中同时要对边塔扣索塔(1)塔顶位移进行监测,以控制塔顶不平衡水平力;
(D)、中塔扣索塔2的半跨拱肋(4)和半跨拱肋(7)竖转分先后进行;
先进行竖转半跨拱肋(4),其中塔扣索塔(2)塔架锚索设在待竖转的半跨拱肋(4)上,其竖转步骤与边塔扣索塔(1)的半跨拱肋(3)的竖转相同。
(E)、半跨拱肋(4)竖转到位,通过张拉两组扣、锚索索力调整拱肋(8)线形,对接法兰盘,安装花篮螺栓;微调花篮螺栓,消除法兰盘间缝隙,焊接法兰盘;旋转顶紧拱顶花篮螺杆,根据监控组监测的当前主拱两半拱拱顶标高和横桥向偏差(拱轴线形)情况,首先调整好横桥向,再调整高度方向(主要通过调整扣索和两半拱对拉进行调整,另微调花篮螺杆配合),直至达到设计要求的拱顶标高,在温度相对恒定的时间内,固定花篮螺杆,完成瞬时合龙;焊接铰座、拱轴;焊接拱顶合龙套管,完成拱肋(8)的合龙。
5.如权利要求1所述的多跨连续拱桥拱肋的竖转技术方法,其特征是:步骤6具体为
等先竖转的半跨拱肋(4)与半跨拱肋(3)合龙后,再进行半跨拱肋(7)的竖转;此时,待竖转的半跨拱肋(7)的扣索塔架锚索设在已合龙的相邻拱肋(8)上;竖转前,需将边塔扣索塔(1)和中塔扣索塔(2)的所有扣索、锚索的索力释放至零,竖转启动时,同步张拉边塔扣索塔(1)、中塔扣索塔(2)的扣锚索,直至该半跨拱肋(7)脱离支架;半跨拱肋(7)脱架后,继续同步张拉边塔扣索塔(1)、中塔扣索塔(2)的扣索,但不再对边塔锚索索力进行人工调整,让其索力自然变化。
6.如权利要求1所述的多跨连续拱桥拱肋竖转技术,其特征是:在拱脚附近处设扣索塔架,塔底固结,施工中允许塔架承受一定的由索产生的不平衡水平力,并按位移进行水平力控制。
CN200710168602A 2007-12-04 2007-12-04 多跨连续拱桥拱肋竖转技术方法 Active CN100582372C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200710168602A CN100582372C (zh) 2007-12-04 2007-12-04 多跨连续拱桥拱肋竖转技术方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200710168602A CN100582372C (zh) 2007-12-04 2007-12-04 多跨连续拱桥拱肋竖转技术方法

Publications (2)

Publication Number Publication Date
CN101200879A true CN101200879A (zh) 2008-06-18
CN100582372C CN100582372C (zh) 2010-01-20

Family

ID=39516219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200710168602A Active CN100582372C (zh) 2007-12-04 2007-12-04 多跨连续拱桥拱肋竖转技术方法

Country Status (1)

Country Link
CN (1) CN100582372C (zh)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864738A (zh) * 2010-06-11 2010-10-20 中铁大桥局集团有限公司 用于多次竖转法施工钢拱桥的支架系统
CN101864727A (zh) * 2010-06-11 2010-10-20 中铁大桥局集团有限公司 拱桥主拱多次竖转施工中上、下拱肋的连接方法及中间铰
CN101864737A (zh) * 2010-06-11 2010-10-20 中铁大桥局集团有限公司 大跨度钢拱桥拱肋二次竖转施工方法
CN101935987A (zh) * 2010-08-27 2011-01-05 中交一公局桥隧工程有限公司 曲线桥大跨度钢管拱整体滑移施工方法
CN102116011A (zh) * 2011-01-07 2011-07-06 中铁四局集团第二工程有限公司 跨越铁路营业线钢桁梁桥无平衡重平转施工方法
CN101623820B (zh) * 2009-08-05 2011-08-31 中铁宝桥集团有限公司 大型桥梁钢塔水平预拼方法
CN102433843A (zh) * 2011-09-30 2012-05-02 腾达建设集团股份有限公司 拱肋自平衡竖转提升施工方法
CN102494077A (zh) * 2011-12-08 2012-06-13 中联重科股份有限公司 塔式起重机与索塔耦合振动的减振系统及减振方法
CN105274940A (zh) * 2015-10-15 2016-01-27 辽宁金建工业安装工程有限公司 一种桥梁拱肋整体安装方法
CN105421248A (zh) * 2015-12-31 2016-03-23 中铁二十局集团第一工程有限公司 大跨度连续梁跨既有车站转体及合龙施工方法
CN106012864A (zh) * 2016-07-27 2016-10-12 中铁上海工程局集团有限公司 一种桥梁拱肋整体提升安装的方法
CN109653102A (zh) * 2018-12-26 2019-04-19 同济大学建筑设计研究院(集团)有限公司 一种中高钢拱桥转体施工装置及施工方法
CN110104548A (zh) * 2018-12-18 2019-08-09 南通振华重型装备制造有限公司 一种龙门吊主梁结构建造方法
CN110205938A (zh) * 2019-05-30 2019-09-06 中铁四局集团第二工程有限公司 下承式梁拱组合桥的钢管拱安装方法
CN111455871A (zh) * 2020-05-19 2020-07-28 中交路桥建设有限公司 一种钢箱拱桥拱肋分节段竖转结构及施工方法
CN113202030A (zh) * 2021-04-16 2021-08-03 中铁大桥局集团有限公司 一种适用于拱肋的安装系统及其安装方法
CN114182647A (zh) * 2021-12-10 2022-03-15 贵州桥梁建设集团有限责任公司 一种弱拱提升转体施工方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101476293B (zh) * 2009-01-16 2010-10-27 广东省长大公路工程有限公司 大型桥梁拱肋无支架施工方法

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101623820B (zh) * 2009-08-05 2011-08-31 中铁宝桥集团有限公司 大型桥梁钢塔水平预拼方法
CN101864738A (zh) * 2010-06-11 2010-10-20 中铁大桥局集团有限公司 用于多次竖转法施工钢拱桥的支架系统
CN101864727A (zh) * 2010-06-11 2010-10-20 中铁大桥局集团有限公司 拱桥主拱多次竖转施工中上、下拱肋的连接方法及中间铰
CN101864737A (zh) * 2010-06-11 2010-10-20 中铁大桥局集团有限公司 大跨度钢拱桥拱肋二次竖转施工方法
CN101864727B (zh) * 2010-06-11 2012-05-30 中铁大桥局集团有限公司 拱桥主拱多次竖转施工中上、下拱肋的连接方法及中间铰
CN101935987A (zh) * 2010-08-27 2011-01-05 中交一公局桥隧工程有限公司 曲线桥大跨度钢管拱整体滑移施工方法
CN101935987B (zh) * 2010-08-27 2012-07-25 中交第一公路工程局有限公司 曲线桥大跨度钢管拱整体滑移施工方法
CN102116011A (zh) * 2011-01-07 2011-07-06 中铁四局集团第二工程有限公司 跨越铁路营业线钢桁梁桥无平衡重平转施工方法
CN102116011B (zh) * 2011-01-07 2012-12-05 中铁四局集团第二工程有限公司 跨越铁路营业线钢桁梁桥无平衡重平转施工方法
CN102433843A (zh) * 2011-09-30 2012-05-02 腾达建设集团股份有限公司 拱肋自平衡竖转提升施工方法
CN102433843B (zh) * 2011-09-30 2013-12-25 腾达建设集团股份有限公司 拱肋自平衡竖转提升施工方法
CN102494077A (zh) * 2011-12-08 2012-06-13 中联重科股份有限公司 塔式起重机与索塔耦合振动的减振系统及减振方法
CN105274940A (zh) * 2015-10-15 2016-01-27 辽宁金建工业安装工程有限公司 一种桥梁拱肋整体安装方法
CN105274940B (zh) * 2015-10-15 2016-08-24 辽宁金建工业安装工程有限公司 一种桥梁拱肋整体安装方法
CN105421248A (zh) * 2015-12-31 2016-03-23 中铁二十局集团第一工程有限公司 大跨度连续梁跨既有车站转体及合龙施工方法
CN106012864A (zh) * 2016-07-27 2016-10-12 中铁上海工程局集团有限公司 一种桥梁拱肋整体提升安装的方法
CN106012864B (zh) * 2016-07-27 2017-10-13 中铁上海工程局集团有限公司 一种桥梁拱肋整体提升安装的方法
CN110104548A (zh) * 2018-12-18 2019-08-09 南通振华重型装备制造有限公司 一种龙门吊主梁结构建造方法
CN109653102B (zh) * 2018-12-26 2023-10-13 同济大学建筑设计研究院(集团)有限公司 一种中高钢拱桥转体施工装置及施工方法
CN109653102A (zh) * 2018-12-26 2019-04-19 同济大学建筑设计研究院(集团)有限公司 一种中高钢拱桥转体施工装置及施工方法
CN110205938A (zh) * 2019-05-30 2019-09-06 中铁四局集团第二工程有限公司 下承式梁拱组合桥的钢管拱安装方法
CN110205938B (zh) * 2019-05-30 2020-07-31 中铁四局集团第二工程有限公司 下承式梁拱组合桥的钢管拱安装方法
CN111455871A (zh) * 2020-05-19 2020-07-28 中交路桥建设有限公司 一种钢箱拱桥拱肋分节段竖转结构及施工方法
CN111455871B (zh) * 2020-05-19 2024-04-19 中交路桥建设有限公司 一种钢箱拱桥拱肋分节段竖转结构及施工方法
CN113202030A (zh) * 2021-04-16 2021-08-03 中铁大桥局集团有限公司 一种适用于拱肋的安装系统及其安装方法
CN113202030B (zh) * 2021-04-16 2022-04-12 中铁大桥局集团有限公司 一种适用于拱肋的安装系统及其安装方法
CN114182647A (zh) * 2021-12-10 2022-03-15 贵州桥梁建设集团有限责任公司 一种弱拱提升转体施工方法

Also Published As

Publication number Publication date
CN100582372C (zh) 2010-01-20

Similar Documents

Publication Publication Date Title
CN100582372C (zh) 多跨连续拱桥拱肋竖转技术方法
CN101519864B (zh) 一种箱型拱桥安装方法
CN100543234C (zh) 一种大跨度连续钢桁拱的合龙方法
CN108374347A (zh) 一种高速铁路大跨度提篮拱桥钢拱肋扣挂系统施工方法
CN112195784B (zh) 采用空中纺线法架设主缆的猫道垂度调整系统及调整方法
CN109024291A (zh) 一种一体化架桥机及其工作方法
CN106245527A (zh) 一种双环式吊具及大跨径猫道承重索的架设方法
CN108221694B (zh) 安装大跨度拱桥系杆的方法
CN103147405B (zh) 斜主桁斜拉桥钢梁架设方法
CN102277836B (zh) 倾斜式混凝土塔座的施工方法
CN113006145B (zh) 大直径工作井移动模架逆作法施工工艺
CN206346120U (zh) 一种拼装式吊索塔架系统
CN110528401A (zh) 悬浇施工挂篮系统
CN110761196A (zh) 可调式猫道锚固连接装置
CN110040632A (zh) 一种大跨度型钢梁的分段吊装施工方法
CN210766430U (zh) 新型悬臂梁用多功能支撑体系
CN211113216U (zh) 索塔施工设备
CN111648596B (zh) 浅圆仓滑模外平台用作外墙涂料施工平台的装置及方法
KR20070040345A (ko) 교량 슬래브 작업차
CN104481148B (zh) 一种超长薄壁彩钢瓦屋面施工方法
CN209779465U (zh) 一种主塔竖转斜拉桥的挂索施工系统
KR20220000699A (ko) 교량시공을 위한 가변형 삭도 시스템 및 이의 설치방법
CN101200876A (zh) 后锚索法架设第二孔大跨度钢梁
CN217174390U (zh) 一种用于猫道的抗风系统
CN219508376U (zh) 用于超长超重斜拉索架设装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150206

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150206

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.