CN101117805A - Underground engineering one-pile multi-use semi reverse construction method - Google Patents

Underground engineering one-pile multi-use semi reverse construction method Download PDF

Info

Publication number
CN101117805A
CN101117805A CNA2007100709785A CN200710070978A CN101117805A CN 101117805 A CN101117805 A CN 101117805A CN A2007100709785 A CNA2007100709785 A CN A2007100709785A CN 200710070978 A CN200710070978 A CN 200710070978A CN 101117805 A CN101117805 A CN 101117805A
Authority
CN
China
Prior art keywords
construction
underground
pile
support
fender post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2007100709785A
Other languages
Chinese (zh)
Other versions
CN100543241C (en
Inventor
严平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU SOUTH CIVIL ENGINEERING CONSULTATION Co Ltd
Zhejiang University ZJU
Original Assignee
HANGZHOU SOUTH CIVIL ENGINEERING CONSULTATION Co Ltd
Zhejiang University ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU SOUTH CIVIL ENGINEERING CONSULTATION Co Ltd, Zhejiang University ZJU filed Critical HANGZHOU SOUTH CIVIL ENGINEERING CONSULTATION Co Ltd
Priority to CNB2007100709785A priority Critical patent/CN100543241C/en
Publication of CN101117805A publication Critical patent/CN101117805A/en
Application granted granted Critical
Publication of CN100543241C publication Critical patent/CN100543241C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention relates to a method for one pile for a plurality of applications for semi-reversal construction for the underground engineering. A traditional temporary enclosure support system of the underground engineering can be taken as a main beam system of floors; in addition to traditional load bearing and floating resistance function, an internal engineering pile can be taken as an enclosure support pile and a reinforcement structure of columns for the future underground engineering; the surrounding enclosure employs tradition methods, in addition to the enclosure, the surrounding enclosure protection pile is taken as a surrounding engineering pile and the external wall of the future underground engineering; the support system concurrently the floor beam system are excavated from top to bottom, and an underground engineering bottom plate and floors is worked and bearing column and a wall body is loaded to the ground from bottom to top. The present invention has the beneficial effects that the present invention combines the support system and the basement main beam system: the middle engineering pile is taken as pressure bearing, floating resistance and supporting pile and bearing load column for the future basement. Compared with the full-reversal method for the underground continuous wall, the present invention has the advantages of saving project cost, convenient construction, simple construction equipment, etc.

Description

Using the method for semi-inverse method in a kind of underground construction one more
Technical field
The present invention relates to a kind of complete structural system way and job practices that is used for underground engineering construction, be the method for using semi-inverse method in a kind of underground construction one more.
Background technology
Underground engineering construction generally is to set each layer support system that excavate and construct behind peripheral fender post and the middle part supporting pile downwards, treats that excavation constructs behind the sole plate on earth, supports by removing from last cutter successively down again, so speed of application is slow, the cost height, peripheral displacement control is difficult, has a big risk.The full-reverse construction technique that adopts diaphragm wall is also arranged both at home and abroad, promptly set after periphery goes along with sb. to guard him diaphragm wall and middle part engineering piles and supporting pile, the downward excavation construction of underground construction, synchronous ground engineering is upwards construction also, accelerating construction progress like this, but construction is complicated, need special machine, and cost is very high.
Summary of the invention
The present invention will solve the shortcoming of above-mentioned prior art, and the method for using semi-inverse method in a kind of underground construction one is provided more.Each layer of underground construction that tradition is interim gone along with sb. to guard him support system double as each floor face girder system of underground construction from now on; Except that bearing traditional pressure-bearing and anti-floating effect, double as is gone along with sb. to guard him the supporting pile and the arrangement of reinforcement framework of underground construction pillar from now on again with the internal engineering stake; Periphery is gone along with sb. to guard him and can be adopted traditional method, also can be except that bearing the effect of going along with sb. to guard him with peripheral fender post, and double as periphery engineering piles (pressure-bearing or anti-floating) and underground construction exterior wall ingredient again from now on; Each layer of excavation construction support system each floor face girder system of holding concurrently so from top to bottom, construct from bottom to top then underground construction base plate and each floor plate and load-bearing pillar and body of wall be to ground, the stake of one of meaning many with half against making technology.
The present invention solves the technical scheme that its technical problem adopts: use the method for semi-inverse method more in this underground construction one, mainly comprise the steps:
1.1, the native sealing concrete stake curtain of construction retaining, at the fender post of being close to the limit, construction hole, inboard that keep off native sealing concrete stake curtain, interior engineering piles and the supporting pile in construction hole;
1.2, the capping beam of monobloc cast fender post and the support of B1, this supports the girder in length and breadth of double as B1 top board;
1.3, be excavated at the bottom of the B1 floor, underground two layers of waling beam of monobloc cast and underground two layers support, this supports the girder in length and breadth of the underground two floor plates of double as;
1.4, be excavated at the bottom of the underground two floor plates, construct underground two layers of base plate and pile cap, basement bottom board is fixedlyed connected with engineering piles by pile cap, pile cap and base plate and fender post adopt whole the watering of reinforcing bar welding to be connected;
1.5, the construction underground two layers of fender post lay bricks outward chemise whitewash levelling and the construction exterior waterproof coating, construct underground two layers of exterior wall and underground two layers of top board;
1.6, the construction B1 fender post chemise of laying bricks outward whitewashes levelling and construction exterior waterproof coating, construction B1 exterior wall and B1 top board.
Another way of the present invention is that the fender post capping beam is moved down, and so can reduce by one support, has saved cost and convenient construction.Top soil property and surrounding enviroment decision are looked in concrete enforcement: if soil property is good and the surrounding enviroment permission, the slope excavation is directly put on top (if soil property or surrounding enviroment do not allow directly to put the slope in elder generation, can adopt the soil nailing circummure mode of protecting to excavate) to the capping beam bottom position, the capping beam of construction fender post; Be excavated to support (underground two layers) bottom position, put in order and water construction waling beam and support (underground two layers); Connect down with 1.4,1.5 and 1.6.If need utilize double as engineering piles on the fender post, construct simultaneously in 1.6 power transmission bearing beam and power transmission bracket are passed to fender post with the superstructure load by power transmission bracket, power transmission bearing beam and capping beam.
The invention provides a kind of support system and underground construction flooring girder system of will going along with sb. to guard him share; Make the middle part engineering piles play a four-function effect of pressure-bearing, anti-floating, supporting pile and engineering pressure bearing pile steel frame; Periphery is gone along with sb. to guard him and can be adopted traditional method, fender post is played go along with sb. to guard him, the three usages of one pile effect of peripheral engineering piles (pressure-bearing or anti-floating) and exterior wall ingredient; Adopt excavation from top to bottom, the flooring girder system of successively constructing support system, the sole plate of constructing then, the semi-inverse method technology of each layer wall column and floor from bottom to top.The construction costs that reduces like this is accelerated speed of application, and can strictly control lateral displacement, and risk is little, and carrying out underground engineering construction for solution old urban area parking difficulty problem provides than the reliable technique method.
The invention provides in this underground construction more than one a whole set of construction technology way: the way that is connected of underground construction exterior wall and fender post with semi-inverse method; Underground construction middle part stake, post with after water floor and be connected way; Water the way that is connected of floor, secondary beam and the girder of constructing in the underground construction behind each layer.
The present invention is suitable for basement more than two layers fully, and relevant way is the same.
The effect that the present invention is useful is: the technology of the present invention is share support system and basement girder system; With middle part engineering piles double as pressure-bearing, anti-floating, supporting pile and the load-bearing pillar of basement from now on, compare diaphragm wall full-reverse method, have the saving construction costs, easy construction, advantage such as construction equipment is simple.Especially along with China enters auto age, be to solve parking problem, must under the narrow environment in old town, carry out underground engineering construction, it is very risky to press conventional construction method, even can't implement, and the technology of the present invention solves the effective ways of this difficult problem just.
Description of drawings
Fig. 1-Fig. 6 is the construction way flow chart of the embodiment of the invention 1;
Fig. 7-Figure 12 is the construction way flow chart of the embodiment of the invention 2;
Figure 13 be the technology of the present invention underground construction exterior wall with fender post be connected the way schematic diagram;
Figure 14 be the middle part stake of the technology of the present invention underground construction, post with after water floor and be connected way schematic diagram 1;
Figure 15 is the 1-1 sectional view of Figure 14, Figure 16;
Figure 16 be the middle part stake of the technology of the present invention underground construction, post with after water floor and be connected way schematic diagram 2;
Figure 17 be water floor, secondary beam and the girder of constructing in the technology of the present invention underground construction behind each layer be connected way schematic diagram 1;
Figure 18 is the A-A sectional view of Figure 17;
Figure 19 be water floor, secondary beam and the girder of constructing in the technology of the present invention underground construction behind each layer be connected way schematic diagram 2;
Figure 20 is the B-B sectional view of Figure 19;
Description of reference numerals: engineering piles 1, fender post 2 keeps off native sealing concrete stake curtain 3, support 4, capping beam 5, basement bottom board and cushion cap 6, supporting pile 7, bricking wall 8, waterproofing course 9, outer wall of basement 10, basement roof 11, waling beam 12, power transmission bearing beam 13, power transmission bracket 14 is worn the outer wall of basement muscle with giving pipe laying or joint bar 15, fender post and outer wall of basement dowel 16, oblique angle arrangement of reinforcement 17, supporting pile steel framework 18, the radial diagonal bar 19 of cap, cap horizontal loops stirrup 20, cap 21 gives and stays the secondary beam muscle or give pipe laying and wear secondary beam muscle 22, wears girder top muscle 23 when watering build floor, supporting surface gives reserves stirrup 24, flooring secondary beam 25.
The specific embodiment
The invention will be further described below in conjunction with drawings and Examples:
Embodiment 1: this method is encircled and hunted down fender pile and sealing retaining soil-cement stake curtain earlier along the underground construction periphery, these fender posts can be by " three usages of one pile " way, also can interim routinely fender post way construct; Middle part construction works stake, these stakes can be selected part or all of stake by a four-function requirement construction according to the structure design situation.According to each floor plate-girder absolute altitude of underground construction, successively first from top to bottom each layer of construction be floor girder in length and breadth then, and these girder systems should meet the support force request simultaneously.The excavation sole plate of constructing from bottom to top after on earth, the underground construction of successively constructing post, wall and floor to ground get final product.
Using the method for semi-inverse method in this underground construction one more, be that underground each floor face girder system is combined with the interim support system of going along with sb. to guard him, from top to bottom build these floor beams earlier from the face of land, successively excavate on earth half adverse construction method technology of from bottom to top construct then underground construction sole plate, wallboard and pillar and each floor plate downwards.A four-function is adopted in stake in the middle of the underground construction: the first is as pressure bearing pile; It two is as the anti-floating stake; It three is to go along with sb. to guard him the supporting pile in stage as excavation; It four is as the load-bearing pillar of underground construction from now on.The fender post of underground construction periphery adopts three usages of one pile: the first is as fender post; It two is as underground construction periphery engineering piles (pressure-bearing or anti-floating); It three is as the stressed ingredient of underground construction external wall structure, bears the lateral pressure of operational phase jointly.As Fig. 1~shown in Figure 6, specifically mainly comprise the steps:
1.1, the native sealing concrete stake curtain 3 of construction retaining, at the fender post 2 of being close to the limit, construction hole, inboard that keep off native sealing concrete stake curtain 3, interior engineering piles 1 and the supporting pile 7 in construction hole;
1.2, the capping beam 5 of construction B1 fender post 2, the support 4 of doing B1 makes capping beam 5 and support 4 and put in order to water and be connected, this supports the girder of 4 double as B1 top boards;
1.3, be excavated at the bottom of the B1 floor, the waling beam 12 of the underground two layers of fender post 2 of constructing is done underground two layers support 4, make waling beam 12 with support 4 whole watering and be connected, this supports the girder of the underground two floor plates of 4 double as;
1.4, be excavated at the bottom of underground two layers of base plate construction basement bottom board and pile cap 6.Basement bottom board and pile cap 6 are fixedlyed connected with engineering piles 1, and adopt whole the watering of reinforcing bar welding to be connected with fender post 2;
1.5, the construction underground two layers of fender post lay bricks outward chemise whitewash levelling 8 and the construction exterior waterproof coating 9, construct underground two layers of exterior wall 10 and underground two layers of top board 11.
1.6, the construction B1 fender post chemise of laying bricks outward whitewashes levelling 8 and construction exterior waterproof coating 9, construction B1 exterior wall 10 and B1 top board 11.
Embodiment 2: shown in Fig. 7~12, feature is that the fender post capping beam is moved down, and so can reduce by one support, has saved cost and convenient construction.Top soil property and surrounding enviroment decision are looked in concrete enforcement: if soil property is good and the surrounding enviroment permission, the slope excavation is directly put on top (if soil property or surrounding enviroment do not allow directly to put the slope in elder generation, can adopt the soil nailing circummure mode of protecting to excavate) to capping beam 5 bottom positions, the capping beam 5 of construction fender post 2; Be excavated to and support 4 bottom positions, whole watering constructed waling beam 12 and supported 4; Connect down with 1.4,1.5 and 1.6.If need utilize double as engineering piles on the fender post, construct simultaneously in 1.6 power transmission bearing beam 13 and power transmission bracket 14 are passed to fender post with the superstructure load by power transmission bracket 14, power transmission bearing beam 13 and capping beam 5.
The relevant underground construction exterior wall of the technology of the present invention is seen accompanying drawing 13 with the way that is connected of fender post.Outer wall of basement 10 waters together by fender post dowel 16 and fender post are whole, and fender post dowel 16 can adopt digs out the pile ring muscle or bar planting way on fender post.The vertical arrangement of reinforcement 15 of outer wall of basement can adopt to give when building waling beam 12 and insert short muscle and weld up and down and give and stay the pipe mode of passing to dispose.Underground construction floor 11 is by joining oblique angle muscle 17, and the whole steel bar concrete oblique angle that waters makes up and down that outer wall of basement and waling beam form integral body.
The middle part stake of the technology of the present invention underground construction, post with after water floor and be connected way and see accompanying drawing 14-16.Be meant the pile body as a four-function herein, other internal engineering stake and basement post are constructed according to a conventional method.Pile body to these four-function, its way be at foundation ditch with the lower part by engineering piles requirement arrangement of reinforcement and setting, and the end, hole is a steel framework 18 with top, excavation of foundation pit on earth after, basement bottom board and grade beam cushion cap arrangement of reinforcement pass the steel framework, build base plate and grade beam cushion cap, the steel framework 18 that exposes can be used as the arrangement of reinforcement skeleton or the arrangement of reinforcement ingredient of this place's basement pillar.If the steel framework has off normal in the construction, when building the basement bottom board cushion cap, regulate according to this post location arrangement of reinforcement post joint bar.The technology of the present invention underground construction center pillar with after water floor and be connected way and have two: first basement pillar is a square column, and it two is cylinders.Accompanying drawing 14 and 15 are square columns with after water floor and be connected way, its main points are to support to give according to the post arrangement of reinforcement in 4 o'clock in construction to stay part joint bar or pipe, so that weld or pass these post muscle up and down, then directly are communicated with configuration at the bight of pillar arrangement of reinforcement; Every angle disposes radial diagonal bar 19 in the junction, makes floor 11, supports 4 and go up lower prop and be linked to be integral body by the whole four sides pyramid cap 21 that waters down.The part of horizontal rectilineal hoop 20 of four sides inverted pyramid cap adopts to give in support 4 and stays joint bar or pipe to wear the setting of muscle way.Accompanying drawing 16 and 15 are cylinders with after water floor and be connected way, its way main points and square column with, only change four sides inverted pyramid cap into inverted cone cap 21, making up and down, cylinder forms whole with girth 4 of having constructed and floor 11.
Watering floor, secondary beam 11 in the technology of the present invention underground construction behind each layer has two kinds with the way that is connected of the girder of constructing (hold concurrently and support) 4, as shown in figure 17 a kind of; Earlier support to give according to basement floor secondary beam distributing position in 4 o'clock in construction and insert the secondary beam bottom reinforcement bars or give pipe laying 22, for the welding of secondary beam bottom reinforcement bars or pass, way formwork, colligation secondary beam and floor bar are routinely built concrete and are formed whole floor 11 then.These way characteristics are that the height of support 4 is the floor girder height.After water floor, secondary beam 11 the 4 another kind of ways that are connected as shown in figure 18 with the girder of constructing (hold concurrently and support); Be characterized in supporting in construction and on the surface stirrup exposed in 4 o'clock, then floor girder top muscle 23 is passed these stirrups, all the other ways are the same, and to add floor thick in order to support height for the height of building girder behind the concrete, so can reduce the basement story height.
In addition to the implementation, the present invention can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of requirement of the present invention.

Claims (3)

  1. In the underground construction more than one with the method for semi-inverse method, it is characterized in that: mainly comprise the steps:
    1.1), construction retaining native sealing concrete stake curtain (3), the fender post (2) on the limit, construction hole, inboard of being close to the native sealing concrete stake curtain of retaining (3), engineering piles (1) and supporting pile (7) in the construction hole;
    1.2), the capping beam (5) of construction B1 fender post (2), the support (4) of doing B1 makes capping beam (5) and support (4) and put in order to water and be connected the girder of this support (4) double as B1 top board;
    1.3), be excavated at the bottom of the B1 floor, the waling beam (12) of the underground two layers of fender post (2) of constructing is done underground two layers support (4), makes waling beam (12) and support (4) whole watering and be connected the girder of the underground two floor plates of this support (4) double as;
    1.4), be excavated at the bottom of underground two layers of base plate construction basement bottom board and pile cap (6); Basement bottom board and pile cap (6) are fixedlyed connected with engineering piles (1), and adopt whole the watering of reinforcing bar welding to be connected with fender post (2);
    1.5), the construction underground two layers of fender post lay bricks outward chemise whitewash levelling (8) and the construction exterior waterproof coating (9), construct underground two layers of exterior wall (10) and underground two layers of top board (11);
    1.6), the construction B1 fender post chemise of laying bricks outward whitewashes levelling (8) and construction exterior waterproof coating (9), construction B1 exterior wall (10) and B1 top board (11).
  2. 2. use the method for semi-inverse method more in the underground construction according to claim 1 one, it is characterized in that: the fender post capping beam is moved down, reduce together and support, top soil property and surrounding enviroment decision are looked in concrete enforcement, and concrete steps are as follows:
    2.1), if the permission of the good and surrounding enviroment of soil property, first top is directly put the slope and is excavated to capping beam (5) bottom position, if soil property or surrounding enviroment do not allow directly to put the slope, the employing soil nailing circummure mode of protecting is excavated;
    2.2), the capping beam (5) of construction fender post (2), be excavated to supports (4) bottom position, whole water construction waling beam (12) and support (4); Connect down set by step 1.4), 1.5) and 1.6) construct;
    2.3), utilize double as engineering piles on the fender post if desired, in step 1.6) in construct simultaneously power transmission bearing beam (13) and power transmission bracket (14), the superstructure load is passed to fender post by power transmission bracket (14), power transmission bearing beam (13) and capping beam (5).
  3. 3. in the underground construction according to claim 1 more than one with the method for semi-inverse method, it is characterized in that: described support (4) is netted arrangement setting, as the girder system in length and breadth of basement floor from now on.
CNB2007100709785A 2007-08-22 2007-08-22 Using the half contrary method of doing in a kind of underground construction one more Expired - Fee Related CN100543241C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007100709785A CN100543241C (en) 2007-08-22 2007-08-22 Using the half contrary method of doing in a kind of underground construction one more

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007100709785A CN100543241C (en) 2007-08-22 2007-08-22 Using the half contrary method of doing in a kind of underground construction one more

Publications (2)

Publication Number Publication Date
CN101117805A true CN101117805A (en) 2008-02-06
CN100543241C CN100543241C (en) 2009-09-23

Family

ID=39054057

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007100709785A Expired - Fee Related CN100543241C (en) 2007-08-22 2007-08-22 Using the half contrary method of doing in a kind of underground construction one more

Country Status (1)

Country Link
CN (1) CN100543241C (en)

Cited By (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101498133B (en) * 2009-02-25 2010-08-25 广州市住宅建设发展有限公司 Method and supporting construction for enlarging basement top-down method earth excavation space
CN101372874B (en) * 2008-10-20 2010-12-08 中冶实久建设有限公司 Method for implementing hot rolling swirl pool constructional engineering by top-down method using pile foundation
CN102031785A (en) * 2009-09-24 2011-04-27 上海市第一建筑有限公司 Foundation pit supporting technique for replacing temporary enclosing purlin by using plate belt of permanent structure
CN102191779A (en) * 2010-03-05 2011-09-21 中国京冶工程技术有限公司厦门分公司 Topdown construction method of basement exterior wall
CN102493488A (en) * 2011-12-21 2012-06-13 上海市第一建筑有限公司 Construction method for reverse beams and normal plates in foundation pit engineering
CN102493487A (en) * 2011-12-13 2012-06-13 上海市第一建筑有限公司 Method for constructing foundation slab embedded with concrete supports
CN102505695A (en) * 2011-10-09 2012-06-20 浙江荣邦房地产开发有限公司 Construction method for deep foundation pit of three-dimensional garage
CN102518142A (en) * 2011-12-12 2012-06-27 攀钢集团工程技术有限公司 Pile and wall combined sealing system and construction method thereof
CN102704493A (en) * 2012-06-20 2012-10-03 上海建工二建集团有限公司 Force-transferring device for shallow pit base plate and deep pit strut and construction method
CN102777065A (en) * 2012-08-13 2012-11-14 杭州南联地基基础工程有限公司 Reverse building method for lifting-type bucket-shaped underground garage
CN102995659A (en) * 2012-12-03 2013-03-27 杭州南联地基基础工程有限公司 Method for constructing from central area to periphery of ultra-large type underground engineering
CN102995613A (en) * 2012-12-17 2013-03-27 中国水电顾问集团贵阳勘测设计研究院 Connection method and structure for casting wall body and plate girder of powerhouse of hydropower station by stages
CN103103991A (en) * 2013-02-01 2013-05-15 江苏省江建集团有限公司 Composite outer wall structure of ultra-deep basement
CN103243722A (en) * 2012-02-13 2013-08-14 郑鸿彰 Construction method of novel inner support of foundation trench
CN103306301A (en) * 2013-07-04 2013-09-18 天津市天友建筑设计股份有限公司 Pile foundation structure and construction method thereof based on fender post and basement baseplate
CN103321231A (en) * 2013-06-10 2013-09-25 叶长青 Construction method of foundation pit support
CN103790379A (en) * 2014-01-17 2014-05-14 上海建工二建集团有限公司 Method for constructing connection joint between flat slab and post cap in reverse construction method
CN104120740A (en) * 2014-08-11 2014-10-29 广西壮族自治区冶金建设公司 Construction method for basement construction bottom plate
CN104196032A (en) * 2014-08-12 2014-12-10 上海隧道工程有限公司 Subway station supporting plate and inversed operation combined construction method
CN104563130A (en) * 2015-01-14 2015-04-29 济南轨道交通集团有限公司 Cross-shaped enclosure pile and construction method capable of using a structure as enclosure structure and main body structure
CN104563131A (en) * 2015-01-14 2015-04-29 济南轨道交通集团有限公司 Rectangular enclosure pile, and construction method using rectangular enclosure pile as main structure
CN104594361A (en) * 2015-01-14 2015-05-06 济南轨道交通集团有限公司 Construction method of H-shaped enclosure pile and enclosure structure as main structure
CN104612161A (en) * 2013-06-14 2015-05-13 孔志坚 Method for reversed construction of foundation pit with underground diaphragm wall
CN104631466A (en) * 2015-02-06 2015-05-20 天颂建设集团有限公司 Construction method of structural system with structural floors as horizontal braces
CN105274997A (en) * 2015-10-22 2016-01-27 浙江欣捷建设有限公司 Rib type brackets and method for constructing top way steel pipe support and top plate through brackets
CN105369824A (en) * 2015-10-29 2016-03-02 周兆弟 Cement mixing pile protective underground pipe gallery
WO2017071111A1 (en) * 2015-10-29 2017-05-04 周兆弟 Underground pipe gallery protection structure
CN107542108A (en) * 2016-12-22 2018-01-05 深圳建业工程集团股份有限公司 A kind of reverse construction method of building basement structure
CN108060683A (en) * 2017-12-18 2018-05-22 烟建集团有限公司 A kind of middle weathering geology top-down construction method
CN110258583A (en) * 2019-06-20 2019-09-20 中铁第四勘察设计院集团有限公司 A kind of underwater excavation foundation pit self-balancing support system and method
CN111058476A (en) * 2019-08-22 2020-04-24 上海建工二建集团有限公司 Beam lowering construction method of underground structure in reverse construction method
CN112482437A (en) * 2020-10-15 2021-03-12 上海建工二建集团有限公司 Integrated vertical supporting system for reverse construction pile and construction method thereof
CN112962667A (en) * 2021-02-08 2021-06-15 中国建筑第八工程局有限公司 Outer wall structure of sinking yard and construction method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102650133A (en) * 2012-04-19 2012-08-29 苏州工业园区设计研究院股份有限公司 Method and object for constructing half top-down deep base pit supporting structure of side frame

Cited By (45)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101372874B (en) * 2008-10-20 2010-12-08 中冶实久建设有限公司 Method for implementing hot rolling swirl pool constructional engineering by top-down method using pile foundation
CN101498133B (en) * 2009-02-25 2010-08-25 广州市住宅建设发展有限公司 Method and supporting construction for enlarging basement top-down method earth excavation space
CN102031785A (en) * 2009-09-24 2011-04-27 上海市第一建筑有限公司 Foundation pit supporting technique for replacing temporary enclosing purlin by using plate belt of permanent structure
CN102191779A (en) * 2010-03-05 2011-09-21 中国京冶工程技术有限公司厦门分公司 Topdown construction method of basement exterior wall
CN102191779B (en) * 2010-03-05 2012-09-05 中国京冶工程技术有限公司厦门分公司 Topdown construction method of basement exterior wall
CN102505695A (en) * 2011-10-09 2012-06-20 浙江荣邦房地产开发有限公司 Construction method for deep foundation pit of three-dimensional garage
CN102505695B (en) * 2011-10-09 2014-12-03 浙江荣邦房地产开发有限公司 Construction method for deep foundation pit of three-dimensional garage
CN102518142A (en) * 2011-12-12 2012-06-27 攀钢集团工程技术有限公司 Pile and wall combined sealing system and construction method thereof
CN102518142B (en) * 2011-12-12 2014-12-17 攀钢集团工程技术有限公司 Pile and wall combined sealing system and construction method thereof
CN102493487B (en) * 2011-12-13 2014-02-26 上海建工一建集团有限公司 Method for constructing foundation slab embedded with concrete supports
CN102493487A (en) * 2011-12-13 2012-06-13 上海市第一建筑有限公司 Method for constructing foundation slab embedded with concrete supports
CN102493488A (en) * 2011-12-21 2012-06-13 上海市第一建筑有限公司 Construction method for reverse beams and normal plates in foundation pit engineering
CN103243722B (en) * 2012-02-13 2015-10-28 郑鸿彰 The construction method of novel inner support of foundation trench
CN103243722A (en) * 2012-02-13 2013-08-14 郑鸿彰 Construction method of novel inner support of foundation trench
CN102704493A (en) * 2012-06-20 2012-10-03 上海建工二建集团有限公司 Force-transferring device for shallow pit base plate and deep pit strut and construction method
CN102777065A (en) * 2012-08-13 2012-11-14 杭州南联地基基础工程有限公司 Reverse building method for lifting-type bucket-shaped underground garage
CN102995659A (en) * 2012-12-03 2013-03-27 杭州南联地基基础工程有限公司 Method for constructing from central area to periphery of ultra-large type underground engineering
CN102995659B (en) * 2012-12-03 2015-04-08 杭州南联地基基础工程有限公司 Method for constructing from central area to periphery of ultra-large type underground engineering
CN102995613A (en) * 2012-12-17 2013-03-27 中国水电顾问集团贵阳勘测设计研究院 Connection method and structure for casting wall body and plate girder of powerhouse of hydropower station by stages
CN103103991A (en) * 2013-02-01 2013-05-15 江苏省江建集团有限公司 Composite outer wall structure of ultra-deep basement
CN103321231A (en) * 2013-06-10 2013-09-25 叶长青 Construction method of foundation pit support
CN103321231B (en) * 2013-06-10 2015-11-25 叶长青 Base pit stand construction
CN104612161A (en) * 2013-06-14 2015-05-13 孔志坚 Method for reversed construction of foundation pit with underground diaphragm wall
CN103306301A (en) * 2013-07-04 2013-09-18 天津市天友建筑设计股份有限公司 Pile foundation structure and construction method thereof based on fender post and basement baseplate
CN103790379A (en) * 2014-01-17 2014-05-14 上海建工二建集团有限公司 Method for constructing connection joint between flat slab and post cap in reverse construction method
CN104120740B (en) * 2014-08-11 2015-07-08 广西壮族自治区冶金建设公司 Construction method for basement construction bottom plate
CN104120740A (en) * 2014-08-11 2014-10-29 广西壮族自治区冶金建设公司 Construction method for basement construction bottom plate
CN104196032A (en) * 2014-08-12 2014-12-10 上海隧道工程有限公司 Subway station supporting plate and inversed operation combined construction method
CN104563130A (en) * 2015-01-14 2015-04-29 济南轨道交通集团有限公司 Cross-shaped enclosure pile and construction method capable of using a structure as enclosure structure and main body structure
CN104594361A (en) * 2015-01-14 2015-05-06 济南轨道交通集团有限公司 Construction method of H-shaped enclosure pile and enclosure structure as main structure
CN104563131A (en) * 2015-01-14 2015-04-29 济南轨道交通集团有限公司 Rectangular enclosure pile, and construction method using rectangular enclosure pile as main structure
CN104594361B (en) * 2015-01-14 2016-08-24 济南轨道交通集团有限公司 A kind of I shape fender post and building enclosure also serve as the construction method of agent structure
CN104631466A (en) * 2015-02-06 2015-05-20 天颂建设集团有限公司 Construction method of structural system with structural floors as horizontal braces
CN105274997A (en) * 2015-10-22 2016-01-27 浙江欣捷建设有限公司 Rib type brackets and method for constructing top way steel pipe support and top plate through brackets
CN105274997B (en) * 2015-10-22 2017-05-31 浙江欣捷建设有限公司 Muscle formula bracket and the method for pushing up road steel pipe support and top board using bracket construction
CN105369824A (en) * 2015-10-29 2016-03-02 周兆弟 Cement mixing pile protective underground pipe gallery
WO2017071111A1 (en) * 2015-10-29 2017-05-04 周兆弟 Underground pipe gallery protection structure
CN107542108A (en) * 2016-12-22 2018-01-05 深圳建业工程集团股份有限公司 A kind of reverse construction method of building basement structure
CN107542108B (en) * 2016-12-22 2019-11-22 深圳建业工程集团股份有限公司 A kind of reverse construction method of building basement structure
CN108060683A (en) * 2017-12-18 2018-05-22 烟建集团有限公司 A kind of middle weathering geology top-down construction method
CN110258583A (en) * 2019-06-20 2019-09-20 中铁第四勘察设计院集团有限公司 A kind of underwater excavation foundation pit self-balancing support system and method
CN111058476A (en) * 2019-08-22 2020-04-24 上海建工二建集团有限公司 Beam lowering construction method of underground structure in reverse construction method
CN112482437A (en) * 2020-10-15 2021-03-12 上海建工二建集团有限公司 Integrated vertical supporting system for reverse construction pile and construction method thereof
CN112962667A (en) * 2021-02-08 2021-06-15 中国建筑第八工程局有限公司 Outer wall structure of sinking yard and construction method thereof
CN112962667B (en) * 2021-02-08 2022-08-30 中国建筑第八工程局有限公司 Outer wall structure of sinking yard and construction method thereof

Also Published As

Publication number Publication date
CN100543241C (en) 2009-09-23

Similar Documents

Publication Publication Date Title
CN100543241C (en) Using the half contrary method of doing in a kind of underground construction one more
CN100543239C (en) The method of three usages of one pile in a kind of underground construction
CN102182325B (en) Storey adding method for existing building basement with frame structure and independent foundation
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN105089061B (en) Ultra-deep foundation pit supporting method
CN105155554B (en) A kind of deep basal pit of arching system
CN205742213U (en) Foundation pit supporting construction
CN106498953A (en) Cut slope composite supporting construction and its construction method
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN104563130B (en) A kind of cross fender post and the double construction method doing agent structure of space enclosing structure
CN107142856A (en) Bridge pier and the bridge of lifting reconstruction that abutment remodeling method, abutment, abutment are transformed
CN207987927U (en) Multistage echelon foundation pit supporting system
CN104895089A (en) Construction method of permanent retaining system characterized by joint work of basement floor slabs and retaining piles
CN104818728A (en) Permanent supporting system with basement floor and supporting piles capable of working together
CN104594361A (en) Construction method of H-shaped enclosure pile and enclosure structure as main structure
CN101498133B (en) Method and supporting construction for enlarging basement top-down method earth excavation space
CN106065668B (en) A kind of construction techniques
CN206941425U (en) The bridge of abutment, the bridge pier of abutment transformation and lifting reconstruction
KR20210047482A (en) Core wall structure of independent cassion for offshore runway
CN102392417A (en) Dual-cantilever bearing support structure for large steel pipe and installation method
CN106223344B (en) A kind of ground line piled anchor frame foundation pit supporting method
CN201883453U (en) Combined pipe jacking working well
CN112575771B (en) Environment-friendly construction method for vertical support system of reverse-acting underground engineering steel concrete with piles and columns
CN212772394U (en) Underground building supporting system
KR200413303Y1 (en) Stone stacked wall structure using steel beam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090923

Termination date: 20160822

CF01 Termination of patent right due to non-payment of annual fee