CN104120740B - Construction method for basement construction bottom plate - Google Patents
Construction method for basement construction bottom plate Download PDFInfo
- Publication number
- CN104120740B CN104120740B CN201410391682.3A CN201410391682A CN104120740B CN 104120740 B CN104120740 B CN 104120740B CN 201410391682 A CN201410391682 A CN 201410391682A CN 104120740 B CN104120740 B CN 104120740B
- Authority
- CN
- China
- Prior art keywords
- construction
- wall
- coiled material
- bottom plate
- shear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
A construction method for a basement construction bottom plate includes the following steps that (1) a shear wall and a shear column are normally poured and punned to below the construction bottom plate by 550 mm; (2) inside and outside backfill soil is filled to be below the poured shear wall and the poured shear column by 400 mm and is punned; (3) concrete is poured and punned to construct a bracket, a groove is reserved and an insertion bar is connected normally according to design sizes; (4) an outer wall of the shear wall, the superstructure of the shear column and a coiled material waterproof part of the outer wall are constructed, a coiled material waterproof part is added to a second construction joint, and after a waterproof protection layer of the outer wall is completed, backfill soil is backfilled to the outer wall; (5) after the backfill soil becomes dense and solid within three months under normal circumstances, an under layer of the bottom plate, the coiled material waterproof parts and a protection layer are constructed; (6) bottom plate reinforced concrete is normally constructed; (7) the concrete is maintained, a joint of the construction bottom plate is examined, and if separation occurs, the joint is repaired in a factice caulking mode. The construction technology is simple, the construction period and quality are guaranteed, reworking is avoided, the manufacturing cost is lowered, energy is saved, and the environment is protected.
Description
Technical field
The present invention relates to the construction method of a kind of basement structure base plate, for building field.
Background technology
Base plate and the wall construction of basement are that the problem received publicity is compared in building operations always, " underground waterproof engineering inspection of quality specification " (GB50208-2011) are at 5.1.3 article, and " building operations handbook " (second edition), at 13-1-3-10 constuction joint, at 19-5-9-1, article 6. (2), all explicitly call for: body of wall horizontal construction joint should stay to be located at and exceed backplate surface and should be not less than on the body of wall of 300mm.Vertical construction joints should avoid underground water and the more location of crevice water, and should combine with deformation joint.For above-mentioned requirements, concrete actual conditions are difficult to reach sometimes, such as: Liuzhou City's engineering, and building area more than 110,000 square metre, containing the high building totally 5 of 28 floor to 18 floor, big basement 1 layer more than 1.5 ten thousand square metre, 5 high buildings are raft foundation, and annex is distributing single column foundation, high building and annex buried depth are from-10.5 meters to-5 meters not etc., raft plate and single column foundation banket, then is up structure base plate, be connected with each shear wall and post.During construction, banket by specification palpus compaction by layers and the compacting of every thickness 30cm to 50cm palpus, but the compacting of large-area fill-back earth big machinery is difficult to accomplish, existing bankets the most deeply to reach more than 5 meters is difficult to closely knit problem in a short time, if constuction joint stays by specification and establishes during construction, cavity can be formed under basement bottom board, after spending year half a year to 1, there will be the quality problems of differential settlement and the phenomenon such as bottom slab crack and infiltration.At this moment, usually construction is watered by after structure base plate, constuction joint is established and reserved steel bar or rear bar planting at wall column and plate link position, and only in the concrete of connection construction seam position, stay groove or raggle water expandable waterstop to process to waterproof, this way all forms a vertical line constuction joint at wall column and plate interface, all there is waterproof hidden danger, the general equal humidity of constuction joint interface and infiltration.What is called " the ten seams nine leak " phenomenon of Here it is engineering circles, visible, the waterproof slab of basement is construction work significant problem anxious to be resolved.
Summary of the invention
The object of the invention is to provide the construction method of a kind of basement structure base plate, flowing water can be made to infiltrate circuit and bend long enough, make waterproof coiled material avoid Points And lines interface, take face interface, thus ensure waterproof quality, thoroughly overcome the problems referred to above that existing technique exists.Be applicable to because compactness of banketing is difficult to meet code requirement in short-term, in the construction of the structure base plate that basement bottom board does not stress.
Technical scheme of the present invention is: provide a kind of basement to construct the construction method of base plate, comprise the steps:
1, normally water smash shear wall, post to structure base plate under 550mm,
2, inside and outside backfill is filled to and waters 400mm under shear wall, post and tamp,
3, by design size normally water smash construction concrete bracket and reserved groove be connected joint bar,
4, to construct shear wall exterior wall, post superstrate portion complete exterior wall waterproof coiled material, increase one waterproof coiled material at the 2nd constuction joint place, road, backfill exterior wall after completing external wall waterproof topping and banket,
5, under normal circumstances 3 months backfill closely knit after, constructing structure bottom cushion and waterproof coiled material and topping,
6, normal construction structure baseplate reinforcing bar concrete,
7, curing concrete also checks structure backplane interface, if there is separation to take ointment filleting mode to repair.
Outstanding advantages of the present invention is:
1. construction technology is simple.This method with common water smash shear wall, post is identical with base plate, operational method is simple, and operative is convenient.
2. the duration can be ensured.Water after structure base plate, compactness of avoiding banketing is difficult to meet code requirement in short-term and stop work.
3. can ensure the quality of products, provide against hidden trouble, avoid doing over again, thus cost is reduced.This method makes flowing water infiltrate circuit and bends long enough, and make waterproof coiled material avoid Points And lines interface, waterproof coiled material takes face interface, thus in technique, make waterproof quality be guaranteed.
4. energy-conserving and environment-protective.Material requested with common water smash shear wall, post is identical with base plate, can repeat turnover use, embody the feature of energy-conserving and environment-protective.
Accompanying drawing explanation
Fig. 1 is that step 1 of the present invention stays constuction joint 1 structural representation.
Fig. 2 is the structural representation in step 2 backfill face 2 of the present invention.
Fig. 3 is that step 3 of the present invention bracket 3 of constructing reserves the structural representation of groove 4 joint bar 5.
Fig. 4 is that step 4 of the present invention is constructed shear wall exterior wall, post superstrate portion 7 exterior wall waterproof coiled material 8 structural representation.
Fig. 5 is the structural representation that step 5 backfill of the present invention reaches closely knit constructing structure bottom cushion 9 and waterproof coiled material and topping 10.
Fig. 6 is the structural representation of step 6 constructing structure baseplate reinforcing bar concrete 11 of the present invention.
Be labeled as in figure: constuction joint 1, backfill face 2, bracket 3, stayed groove 4, joint bar 5, the 2nd road constuction joint 6, superstrate portion 7, exterior wall shear wall waterproof coiled material 8, bed course 9, waterproof coiled material and topping 10, structure baseplate reinforcing bar concrete 11.
Detailed description of the invention
Below by way of drawings and Examples, technical scheme of the present invention is further illustrated.
The construction method of basement structure base plate of the present invention, comprises the steps:
(1) as shown in Figure 1, smash shear wall, post way according to common watering, 550mm under the outer wall column normal construction of shear wall to structure base plate, stays constuction joint 1;
(2) as shown in Figure 2, inside and outside backfill is filled to and waters shear wall, post constuction joint 1 time 400 mm also tamp in time as far as possible;
(3) as shown in Figure 3, by design size construction bracket 3, note having stayed groove 4 and being plugged connecting reinforcement 5;
(4) as shown in Figure 4, according to normal construction order, construction shear wall exterior wall, post, superstrate portion 7, and complete exterior wall shear wall waterproof coiled material 8, increase by one waterproof coiled material at the 2nd road constuction joint 6 place, each 200mm is wide up and down;
(5) as shown in Figure 5, under normal circumstances 3 months backfill closely knit after, constructing structure bottom cushion 9 and waterproof coiled material and topping 10, the long 150mm of waterproof connector;
(6) as shown in Figure 6, after carrying out waterproof coiled material topping, normal construction structure baseplate reinforcing bar concrete 11;
(7) curing concrete also carefully checks structure baseplate reinforcing bar concrete connecting interface, if connecting interface has separation, takes the modes such as ointment filleting to repair, ensures construction quality.
Claims (1)
1. a construction method for basement structure base plate, is characterized in that, comprise the steps:
1.1 smash shear wall, post way according to common watering, and 550mm under the outer wall column normal construction of shear wall to structure base plate, stays constuction joint (1);
Inside and outside 1.2, backfill is filled to and waters 400mm under shear wall, post constuction joint (1) and tamp as far as possible in time;
1.3 by design size normally water smash construction concrete bracket and reserved groove be connected joint bar;
1.4 construction shear wall exterior walls, post superstrate portion complete exterior wall waterproof coiled material, increase one waterproof coiled material at the 2nd constuction joint place, road, backfill exterior wall and banket after completing external wall waterproof topping;
1.5 under normal circumstances 3 months backfill closely knit after, constructing structure bottom cushion and waterproof coiled material and topping;
1.6 normal construction structure baseplate reinforcing bar concrete;
1.7 curing concretes also check structure backplane interface, if there is separation to take ointment filleting mode to repair.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410391682.3A CN104120740B (en) | 2014-08-11 | 2014-08-11 | Construction method for basement construction bottom plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410391682.3A CN104120740B (en) | 2014-08-11 | 2014-08-11 | Construction method for basement construction bottom plate |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104120740A CN104120740A (en) | 2014-10-29 |
CN104120740B true CN104120740B (en) | 2015-07-08 |
Family
ID=51766357
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410391682.3A Active CN104120740B (en) | 2014-08-11 | 2014-08-11 | Construction method for basement construction bottom plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104120740B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105089072B (en) * | 2015-09-15 | 2017-01-11 | 四川省建筑科学研究院 | Anti-seepage structure of basement bottom board and construction method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101117805A (en) * | 2007-08-22 | 2008-02-06 | 浙江大学 | A method of multi-purpose semi-upside down method for one pile in underground engineering |
JP2009121204A (en) * | 2007-11-19 | 2009-06-04 | Taisei Corp | Underground structure |
KR20110096339A (en) * | 2010-02-22 | 2011-08-30 | (주)한울구조안전기술사사무소 | Construction method of basement structure of building using soil wall composed of PH pile |
CN102493487A (en) * | 2011-12-13 | 2012-06-13 | 上海市第一建筑有限公司 | Method for constructing foundation slab embedded with concrete supports |
-
2014
- 2014-08-11 CN CN201410391682.3A patent/CN104120740B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101117805A (en) * | 2007-08-22 | 2008-02-06 | 浙江大学 | A method of multi-purpose semi-upside down method for one pile in underground engineering |
JP2009121204A (en) * | 2007-11-19 | 2009-06-04 | Taisei Corp | Underground structure |
KR20110096339A (en) * | 2010-02-22 | 2011-08-30 | (주)한울구조안전기술사사무소 | Construction method of basement structure of building using soil wall composed of PH pile |
CN102493487A (en) * | 2011-12-13 | 2012-06-13 | 上海市第一建筑有限公司 | Method for constructing foundation slab embedded with concrete supports |
Also Published As
Publication number | Publication date |
---|---|
CN104120740A (en) | 2014-10-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102691294B (en) | Construction method of underground continuous wall | |
CN104264688B (en) | Manually digging hole non-uniform pile support construction process | |
CN104099946B (en) | Inspection-pit between a kind of Novel top pipeline section | |
CN110258640B (en) | Construction method of superposed wall system for cover-excavation top-down construction | |
CN107558501B (en) | Construction method for reserved joint structure of underground passage free from later excavation | |
CN107489433B (en) | Anti-leakage structure and anti-leakage method for tunnel CRD construction method | |
CN104652443A (en) | Construction method for temporary horizontal supports serving as permanent structural beams simultaneously of deep foundation pit | |
CN106837341A (en) | A kind of construction method of Metro construction shaft wall | |
CN102168969A (en) | Monitoring device and monitoring method for lift wall deformation of ship lock | |
CN106812153A (en) | Beam and slab type construction elevator foundation construction engineering method in a kind of backfill | |
CN109024609A (en) | A kind of foundation pit supporting construction and its construction method based on old campshed | |
CN103306497B (en) | Shock prevention and strengthening construction method for existing brickwork dwelling house fabricated structure | |
CN101638898B (en) | Suspension type construction method of top pipe shaft | |
CN104727237A (en) | Spliced large-diameter steel corrugated pipe construction method | |
CN104727324B (en) | Irregular basement construction method for supporting | |
CN104120740B (en) | Construction method for basement construction bottom plate | |
CN203668942U (en) | Pile protective self-hanging thin plate in supporting structure of deep foundation pit | |
CN102220764A (en) | Deep foundation pit bracing system and construction method thereof | |
CN104631486A (en) | Independent plinth construction method in narrow environment | |
CN207392240U (en) | For the full bag water proof structure structure of contrary sequence method building | |
CN204959763U (en) | Stake wall composite construction structure | |
CN105507348A (en) | Waterproof construction method and structure for joints between independent columns and frame beams of basements | |
CN104631467A (en) | Method for erecting L-shaped support replacement plate for foundation pit excavation project | |
CN203977465U (en) | After basement, constructing structure base plate and external wall waterproof are processed structure | |
CN204080861U (en) | Inspection-pit between a kind of Novel top pipeline section |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: No. 115 Beiqiao Road, Liuzhou City, Guangxi Zhuang Autonomous Region Patentee after: Guangxi Construction Industry Group Metallurgical Construction Co., Ltd. Address before: No. 115 Beiqiao Road, Liuzhou City, Guangxi Zhuang Autonomous Region Patentee before: Guangxi Zhuang Autonomous Region metallurgical construction company |
|
CP01 | Change in the name or title of a patent holder |