CN102191779B - Topdown construction method of basement exterior wall - Google Patents
Topdown construction method of basement exterior wall Download PDFInfo
- Publication number
- CN102191779B CN102191779B CN2010101186353A CN201010118635A CN102191779B CN 102191779 B CN102191779 B CN 102191779B CN 2010101186353 A CN2010101186353 A CN 2010101186353A CN 201010118635 A CN201010118635 A CN 201010118635A CN 102191779 B CN102191779 B CN 102191779B
- Authority
- CN
- China
- Prior art keywords
- convex platform
- wooden model
- section concrete
- seal plate
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The invention discloses a topdown construction method of a basement exterior wall, comprising the following steps of: constructing a top plate and a bottom plate, wherein the top plate is provided with a downward upper lug boss, and the bottom plate is provided with an upward lower lug boss; installing a side wall wood mould, wherein the side wall wood mould leans against the outer cylindrical surface of the upper lug boss and the outer cylindrical surface of the lower lug boss in an enclosing way; installing a first water stop plate on the side wall wood mould, and pouring concrete into a part of segments positioned between the upper lug boss inside the side wall wood mould and the first water stop plate, and forming into upper-segment concrete, wherein the upper-segment concrete is connected with the upper lug boss into a whole; arranging a corbel on the side wall wood mould, wherein a port of the corbel is higher than the first water stop plate, and the lower lug boss is provided with a second water stop plate; and pouring the concrete into a part of segments positioned between the upper-segment concrete inside the side wall wood mould and the second water stop plate by utilizing the corbel, and forming into lower-segment concrete, wherein the lower-segment concrete, the upper-segment concrete and the lower lug boss are connected into a whole. The invention has the advantages of being beneficial to preventing of the water seepage of an exterior wall integer and controlling the contraction.
Description
Technical field
The present invention relates to a kind of contrary sequence method outer wall of basement job practices.
Background technology
Existing contrary sequence method outer wall of basement job practices, it comprises: step 1, be used to the roof and floor of constructing, said top board bottom surface and plate top surface are the plane; Step 2 is used to install the side wall wooden model, pre-buried Grouting Pipe within the said wooden model; Step 3 adopts high-pressure slip-casting treatment technology, primary concreting concrete, concrete formation through pre-buried Grouting Pipe.This job practices has following deficiency: 1, be prone to infiltration between side wall and top, the base plate; 2, one-off construction, side wall shrinks wayward.
Summary of the invention
The invention provides a kind of contrary sequence method outer wall of basement job practices, its overcome be prone to infiltration between the existing side wall of contrary sequence method outer wall of basement job practices and top in the background technology, the base plate, side wall shrinks uppity deficiency.
One of technical scheme that is adopted that the present invention solves its technical problem is:
A kind of contrary sequence method outer wall of basement job practices, it comprises:
Step 1 is used to the roof and floor of constructing, and said top board has convex platform down, and said base plate has lower convex platform up;
Step 2 is used to install the side wall wooden model, and said wooden model encloses and leans against convex platform outer cylinder and lower convex platform outer cylinder;
Step 3 is used for installing first seal plate on wooden model, the segment section concreting between the convex platform within the wooden model and first seal plate, and be shaped to section concrete, last section concrete is connected one with convex platform;
Step 4 is used on wooden model, installing bracket, and said bracket port is higher than first seal plate, and second seal plate is set on lower convex platform;
Step 5 is used for utilizing bracket segment section concreting between section concrete and second seal plate within the wooden model, and is shaped to down section concrete, following section concrete, goes up section concrete and is connected one with lower convex platform.
Among one preferred embodiment: said first, second seal plate all is a steel plate for sealing water.
Among one preferred embodiment: spacing is 600-1000mm between the said convex platform and first seal plate.
Among one preferred embodiment: the height of said convex platform and lower convex platform all is 600-1000mm.
Among one preferred embodiment: said step 5 comprises:
The present invention solve its technical problem the technical scheme that is adopted two be:
A kind of contrary sequence method outer wall of basement job practices, it comprises:
Step 1 is used to the roof and floor of constructing, and said top board has convex platform down, and said base plate has lower convex platform up;
Step 2 is used to install the side wall wooden model, and said wooden model encloses and leans against convex platform outer cylinder and lower convex platform outer cylinder;
Step 3 is used on wooden model, installing bracket, installing second seal plate on lower convex platform;
Step 4 is used for installing first seal plate on wooden model, and said first seal plate is lower than the bracket port, the segment section concreting between the convex platform within the wooden model and first seal plate, and be shaped to section concrete, last section concrete is connected one with convex platform;
Step 5 is used for utilizing bracket segment section concreting between section concrete and second seal plate within the wooden model, and is shaped to down section concrete, following section concrete, goes up section concrete and is connected one with lower convex platform.
The present invention solve its technical problem the technical scheme that is adopted three be:
A kind of contrary sequence method outer wall of basement job practices, it comprises:
Step 1 is used to the roof and floor of constructing, and said top board has convex platform down, and said base plate has lower convex platform up;
Step 2 is provided with second seal plate on lower convex platform;
Step 3 is used to install the side wall wooden model, and said wooden model encloses and leans against convex platform outer cylinder and lower convex platform outer cylinder;
Step 4 is used on wooden model, installing bracket;
Step 5; Be used for installing first seal plate on wooden model, said first seal plate is lower than the bracket port, the segment section concreting between the convex platform within the wooden model and first seal plate; And being shaped to section concrete, last section concrete is connected one with convex platform;
Step 6 is used for utilizing bracket segment section concreting between section concrete and second seal plate within the wooden model, and is shaped to down section concrete, following section concrete, goes up section concrete and is connected one with lower convex platform.
The present technique scheme is compared with background technology, and it has following advantage:
1, top, base plate all convex with boss, and exterior wall is located between the boss, help the whole percolation-proof of exterior wall, help installing wooden model, and favourable increase exterior wall bulk strength helps control and shrinks;
2, adopt the bracket technology to build the exterior wall junction, help the whole percolation-proof of exterior wall;
3, the bracket port is higher than first seal plate, and the concrete that helps building combines first seal plate, in conjunction with the concrete between first seal plate and the convex platform, helps the exterior wall junction;
4, section construction has all obtained better controlled for concrete pouring quality and the contraction of concrete crack, helps the construction quality of junction;
5, steel plate for sealing water is set, helps the whole percolation-proof of exterior wall, favourable increase exterior wall bulk strength;
6, spacing is 600-1000mm between the convex platform and first seal plate, and the height of convex platform and lower convex platform is 600-1000mm all, is convenient to processing, ensures the quality of products.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the present invention is described further.
Fig. 1 is the sketch map of contrary sequence method outer wall of basement of the present invention.
Label declaration: top board 10, convex platform 11, base plate 20, lower convex platform 21, wooden model 30, first seal plate 41, go up section concrete 51, bracket 60, second seal plate 42, down at the bottom of section concrete 52, natural ground 71, waterwall 72, snap close beam 73, hand excavated pile 74, the stake end 75, the cushion cap 76.
The specific embodiment
Embodiment one
Please refer to Fig. 1, a kind of contrary sequence method outer wall of basement job practices, it comprises:
Step 1 is used to the roof and floor of constructing, and said top board 10 has convex platform 11 down, and said base plate 20 has lower convex platform 21 up;
Step 2 is used to install side wall wooden model 30, and said wooden model 30 encloses and leans against convex platform 11 outer cylinders and lower convex platform 21 outer cylinders;
Step 3 is used for installing first seal plate 41 on wooden model 30, the segment section concreting between the convex platform 11 within the wooden model 30 and first seal plate 41, and be shaped to section concrete 51, last section concrete 51 is connected one with convex platform 11;
Step 4 is used for installing bracket 60 on wooden model 30, and said bracket 60 ports are higher than first seal plate 41, and second seal plate 42 is set on lower convex platform 21, and the other port of the bracket 60 within wooden model is provided with the 3rd seal plate 43 simultaneously;
Step 5; Be used to utilize bracket 60 segment section concreting between section concrete 51 and second seal plate 42 within the wooden model 30; And be shaped to down section concrete 52; Following section concrete 52, go up section concrete 51 and is connected one, that is to say down that section concrete 52, last section concrete 51, lower convex platform 21 are connected one with convex platform 11 with lower convex platform 21;
Step 6 is used to remove wooden model, removes bracket.
Said first, second, third seal plate all is a steel plate for sealing water.
Spacing is 600-1000mm between the said convex platform and first seal plate.
The height of said convex platform and lower convex platform all is 600-1000mm.
Embodiment two
A present embodiment and a last preferred embodiment difference are: said step 5 comprises:
Embodiment three
A present embodiment and a last preferred embodiment difference are:
A kind of contrary sequence method outer wall of basement job practices, it comprises:
Step 1 is used to the roof and floor of constructing, and said top board has convex platform down, and said base plate has lower convex platform up;
Step 2 is used to install the side wall wooden model, and said wooden model encloses and leans against convex platform outer cylinder and lower convex platform outer cylinder;
Step 3 is used on wooden model, installing bracket, installing second seal plate on lower convex platform;
Step 4 is used for installing first seal plate on wooden model, and said first seal plate is lower than the bracket port, the segment section concreting between the convex platform within the wooden model and first seal plate, and be shaped to section concrete, last section concrete is connected one with convex platform;
Step 5 is used for utilizing bracket segment section concreting between section concrete and second seal plate within the wooden model, and is shaped to down section concrete, following section concrete, goes up section concrete and is connected one with lower convex platform.
Embodiment four
A present embodiment and a last preferred embodiment difference are: a kind of contrary sequence method outer wall of basement job practices, and it comprises:
Step 1 is used to the roof and floor of constructing, and said top board has convex platform down, and said base plate has lower convex platform up;
Step 2 is provided with second seal plate on lower convex platform;
Step 3 is used to install the side wall wooden model, and said wooden model encloses and leans against convex platform outer cylinder and lower convex platform outer cylinder;
Step 4 is used on wooden model, installing bracket;
Step 5; Be used for installing first seal plate on wooden model, said first seal plate is lower than the bracket port, the segment section concreting between the convex platform within the wooden model and first seal plate; And being shaped to section concrete, last section concrete is connected one with convex platform;
Step 6 is used for utilizing bracket segment section concreting between section concrete and second seal plate within the wooden model, and is shaped to down section concrete, following section concrete, goes up section concrete and is connected one with lower convex platform.
The above is merely preferred embodiment of the present invention, so can not limit the scope that the present invention implements according to this, the equivalence of promptly doing according to claim of the present invention and description changes and modifies, and all should still belong in the scope that the present invention contains.
Claims (7)
1. contrary sequence method outer wall of basement job practices, it is characterized in that: it comprises:
Step 1 is used to the roof and floor of constructing, and said top board has convex platform down, and said base plate has lower convex platform up;
Step 2 is used to install the side wall wooden model, and said wooden model encloses and leans against convex platform outer cylinder and lower convex platform outer cylinder;
Step 3 is used for installing first seal plate on wooden model, the segment section concreting between the convex platform within the wooden model and first seal plate, and be shaped to section concrete, last section concrete is connected one with convex platform;
Step 4 is used on wooden model, installing bracket, and said bracket port is higher than first seal plate, and second seal plate is set on lower convex platform;
Step 5 is used for utilizing bracket segment section concreting between section concrete and second seal plate within the wooden model, and is shaped to down section concrete, following section concrete, goes up section concrete and is connected one with lower convex platform.
2. a kind of contrary sequence method outer wall of basement job practices according to claim 1 is characterized in that: said first, second seal plate all is a steel plate for sealing water.
3. a kind of contrary sequence method outer wall of basement job practices according to claim 1, it is characterized in that: spacing is 600-1000mm between the said convex platform and first seal plate.
4. a kind of contrary sequence method outer wall of basement job practices according to claim 1 is characterized in that: the height of said convex platform and lower convex platform all is 600-1000mm.
5. a kind of contrary sequence method outer wall of basement job practices according to claim 1, it is characterized in that: said step 5 comprises:
Step 51 is used for the segment section concreting on second seal plate within the wooden model, and is shaped to section concrete first time, and first time section concrete is connected one with lower convex platform;
Step 52 is used to utilize bracket to first time section concrete within the wooden model and the segment section concreting between the last section concrete, and is shaped to section concrete second time, second time section concrete, first time section concrete and epimere concrete formation.
6. contrary sequence method outer wall of basement job practices, it is characterized in that: it comprises:
Step 1 is used to the roof and floor of constructing, and said top board has convex platform down, and said base plate has lower convex platform up;
Step 2 is used to install the side wall wooden model, and said wooden model encloses and leans against convex platform outer cylinder and lower convex platform outer cylinder;
Step 3 is used on wooden model, installing bracket, installing second seal plate on lower convex platform;
Step 4 is used for installing first seal plate on wooden model, and said first seal plate is lower than the bracket port, the segment section concreting between the convex platform within the wooden model and first seal plate, and be shaped to section concrete, last section concrete is connected one with convex platform;
Step 5 is used for utilizing bracket segment section concreting between section concrete and second seal plate within the wooden model, and is shaped to down section concrete, following section concrete, goes up section concrete and is connected one with lower convex platform.
7. contrary sequence method outer wall of basement job practices, it is characterized in that: it comprises:
Step 1 is used to the roof and floor of constructing, and said top board has convex platform down, and said base plate has lower convex platform up;
Step 2 is provided with second seal plate on lower convex platform;
Step 3 is used to install the side wall wooden model, and said wooden model encloses and leans against convex platform outer cylinder and lower convex platform outer cylinder;
Step 4 is used on wooden model, installing bracket;
Step 5; Be used for installing first seal plate on wooden model, said first seal plate is lower than the bracket port, the segment section concreting between the convex platform within the wooden model and first seal plate; And being shaped to section concrete, last section concrete is connected one with convex platform;
Step 6 is used for utilizing bracket segment section concreting between section concrete and second seal plate within the wooden model, and is shaped to down section concrete, following section concrete, goes up section concrete and is connected one with lower convex platform.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101186353A CN102191779B (en) | 2010-03-05 | 2010-03-05 | Topdown construction method of basement exterior wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101186353A CN102191779B (en) | 2010-03-05 | 2010-03-05 | Topdown construction method of basement exterior wall |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102191779A CN102191779A (en) | 2011-09-21 |
CN102191779B true CN102191779B (en) | 2012-09-05 |
Family
ID=44600577
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101186353A Expired - Fee Related CN102191779B (en) | 2010-03-05 | 2010-03-05 | Topdown construction method of basement exterior wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102191779B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104805864A (en) * | 2015-03-18 | 2015-07-29 | 温州建设集团有限公司 | Basement reverse building method outer wall groove and tongue and water-proofing gel combined waterproof construction technology |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102433894B (en) * | 2011-12-30 | 2013-11-06 | 中铁二局股份有限公司 | Construction method for station side wall by covered top-down excavation method |
CN102808426B (en) * | 2012-04-26 | 2014-06-25 | 常州第一建筑集团有限公司 | Integrated steel plate water stop |
CN102704507B (en) * | 2012-05-28 | 2015-04-29 | 中国建筑第八工程局有限公司 | Construction method of cover-and-cut reverse construction concrete walls and columns with vertical structures |
CN103195050B (en) * | 2013-04-25 | 2015-03-18 | 福州市第三建筑工程公司 | Construction method of tube-jet combined pile supporting underground wall structure |
CN105442848B (en) * | 2015-11-05 | 2018-01-05 | 芜湖赛特施工设备有限公司 | A kind of false bracket mould |
CN105442836B (en) * | 2015-11-05 | 2018-01-05 | 芜湖赛特施工设备有限公司 | A kind of column cast support apparatus |
CN105442846B (en) * | 2015-11-05 | 2018-01-05 | 芜湖赛特施工设备有限公司 | A kind of concrete vacation corbels support device |
CN106703259A (en) * | 2015-11-17 | 2017-05-24 | 中建四局第建筑工程有限公司 | Post-construction method of reinforced-concrete-poured interior wall |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002371570A (en) * | 2001-06-15 | 2002-12-26 | Taisei Corp | Construction method for underground structure |
CN1563612A (en) * | 2004-03-15 | 2005-01-12 | 中国第二十冶金建设公司 | Construction method for underground structure through half reverse course of action of inverting connection |
KR20060096705A (en) * | 2005-03-02 | 2006-09-13 | (주)엠오아이 | Retaining wall method using the reaction of anchor force in site |
CN101117805A (en) * | 2007-08-22 | 2008-02-06 | 浙江大学 | Underground engineering one-pile multi-use semi reverse construction method |
CN101117800A (en) * | 2007-08-22 | 2008-02-06 | 浙江大学 | Method for one-pile-three-use in underground engineering |
-
2010
- 2010-03-05 CN CN2010101186353A patent/CN102191779B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002371570A (en) * | 2001-06-15 | 2002-12-26 | Taisei Corp | Construction method for underground structure |
CN1563612A (en) * | 2004-03-15 | 2005-01-12 | 中国第二十冶金建设公司 | Construction method for underground structure through half reverse course of action of inverting connection |
KR20060096705A (en) * | 2005-03-02 | 2006-09-13 | (주)엠오아이 | Retaining wall method using the reaction of anchor force in site |
CN101117805A (en) * | 2007-08-22 | 2008-02-06 | 浙江大学 | Underground engineering one-pile multi-use semi reverse construction method |
CN101117800A (en) * | 2007-08-22 | 2008-02-06 | 浙江大学 | Method for one-pile-three-use in underground engineering |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104805864A (en) * | 2015-03-18 | 2015-07-29 | 温州建设集团有限公司 | Basement reverse building method outer wall groove and tongue and water-proofing gel combined waterproof construction technology |
Also Published As
Publication number | Publication date |
---|---|
CN102191779A (en) | 2011-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102191779B (en) | Topdown construction method of basement exterior wall | |
CN205276316U (en) | Modular prefabricated piping lane | |
CN105756088A (en) | Combined prefabricated assembled multi-cabin comprehensive pipe rack | |
CN102704507B (en) | Construction method of cover-and-cut reverse construction concrete walls and columns with vertical structures | |
CN203066104U (en) | H-shaped plain concrete brick and small ecological soil-blocking wall bricked by same | |
CN104328790B (en) | Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed | |
CN106968692B (en) | Tunnel excavation supporting structure and construction method thereof | |
CN106284653B (en) | A kind of construction method that balcony construct capital interspaces in advance | |
CN201581397U (en) | Waterproof reinforced concrete cast-in-site pile head | |
CN204059417U (en) | A kind of complete inverse impervious node structure of method wall beam | |
CN103321405B (en) | Shear wall, cylindrical shell concrete structure large form lift-type construction method | |
CN101158163B (en) | Pneumatic caisson bottom closing construction process | |
CN204511457U (en) | Class oval top tube method tube coupling | |
CN103334771A (en) | Concrete pouring method of side wall and joint of middle plate and vault by means of underground excavation reverse construction method | |
CN102817376B (en) | Settlement joint construction method for big-volume slabstone concrete | |
CN202627007U (en) | Plastic concrete secant pile waterstop device | |
CN104975616A (en) | Double-water-stop structure of rotational flow pool outer cylinder constructed through reverse building method and construction method of double-water-stop structure | |
CN204199298U (en) | A kind of formwork system being applicable to large-scale deep trouth hole sty bed course | |
CN203097062U (en) | Anti-seismic anti-cracking interlocking building block | |
CN201818078U (en) | Pool with improved structure | |
CN103397650B (en) | A kind of large-scale steel cylinder cofferdam structure | |
CN202745081U (en) | Large-size rubble concrete settlement joint template system | |
CN202000463U (en) | Prefabricated reinforced concrete drainage inspection well | |
KR200464844Y1 (en) | Instrument structure of A valve room base | |
CN203924086U (en) | Reinforced concrete prefabricated board and for the preparation of the steel form of reinforced concrete prefabricated board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120905 |
|
CF01 | Termination of patent right due to non-payment of annual fee |