CN103321405B - Large formwork lifting construction method for shear wall and cylinder concrete structure - Google Patents

Large formwork lifting construction method for shear wall and cylinder concrete structure Download PDF

Info

Publication number
CN103321405B
CN103321405B CN201310251862.7A CN201310251862A CN103321405B CN 103321405 B CN103321405 B CN 103321405B CN 201310251862 A CN201310251862 A CN 201310251862A CN 103321405 B CN103321405 B CN 103321405B
Authority
CN
China
Prior art keywords
operating platform
concrete
operation platform
large formwork
tower crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310251862.7A
Other languages
Chinese (zh)
Other versions
CN103321405A (en
Inventor
陈明宝
刘祖国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201310251862.7A priority Critical patent/CN103321405B/en
Publication of CN103321405A publication Critical patent/CN103321405A/en
Application granted granted Critical
Publication of CN103321405B publication Critical patent/CN103321405B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明公开了剪力墙、筒体混凝土结构大模板提升式施工方法,将模板系统由传统的胶合板改为定制的大模板,同时,以已浇筑混凝土墙壁作为支撑点,设置操作平台,并由塔吊提升,从而完成剪力墙、筒体混凝土墙壁的施工。剪力墙、筒体混凝土结构大模板提升式施工方法,其特征在于:按以下步骤进行:包括安装塔吊、制作大模板和上部操作平台、安装预埋件、浇筑养护混凝土和拆除大模板及其支撑系统、制作中部操作平台和下部操作平台、中部操作平台上安装钢筋、移动清理好的大模板、在新位置上的中部操作平台上安装模板、调直装置和在新位置上的上部操作平台上浇筑混凝土。本发明的优点是不仅简便实用,节约工时,而且降低成本。

The invention discloses a lifting type construction method of large formwork for shear walls and cylindrical concrete structures. The formwork system is changed from traditional plywood to customized large formwork. At the same time, an operation platform is set with the poured concrete wall as a support point, and the The tower crane is lifted to complete the construction of the shear wall and the concrete wall of the cylinder. The construction method of the shear wall and the large formwork lifting type of the cylindrical concrete structure is characterized in that: the following steps are carried out: including installing the tower crane, making the large formwork and the upper operation platform, installing the embedded parts, pouring and curing concrete, and removing the large formwork and its Supporting system, making the middle operation platform and lower operation platform, installing steel bars on the middle operation platform, moving the cleaned large formwork, installing formwork on the middle operation platform at the new position, straightening device and the upper operation platform at the new position Pour concrete. The invention has the advantages of being simple and practical, saving man-hours and reducing costs.

Description

剪力墙、筒体混凝土结构大模板提升式施工方法Large formwork lifting construction method for shear wall and cylinder concrete structure

技术领域 technical field

本发明涉及建筑施工技术领域,尤其涉及剪力墙、筒体混凝土结构大模板提升式施工方法。 The invention relates to the technical field of building construction, in particular to a lifting type construction method of a large formwork for a shear wall and a cylindrical concrete structure.

背景技术 Background technique

随着建筑物越来越高,剪力墙和筒体混凝土结构越来越多,而剪力墙和筒体混凝土国内传统的施工方法,是在建筑物四周搭设双外排钢管脚手架,混凝土墙壁采用胶合板支模,塔吊垂直运输。这种施工方法由于需要搭设双外排脚手架,存在人工量大,塔吊利用效率低,胶合板浪费严重的缺点。 As buildings get taller, there are more and more shear walls and cylindrical concrete structures. The traditional domestic construction method of shear walls and cylindrical concrete is to erect double outer rows of steel pipe scaffolding around the building, and the concrete walls The plywood formwork is used, and the tower crane is transported vertically. This construction method has the disadvantages of large amount of labor, low utilization efficiency of tower cranes, and serious waste of plywood due to the need to erect double outer rows of scaffolding.

发明内容 Contents of the invention

本发明的目的就是针对现有技术存在的不足,提供剪力墙、筒体混凝土结构大模板提升式施工方法,将模板系统由传统的胶合板改为定制的大模板,同时,以已浇筑混凝土墙壁作为支撑点,设置操作平台,并由塔吊提升,从而完成剪力墙、筒体混凝土墙壁的施工。 The purpose of the present invention is to address the deficiencies in the prior art, to provide a large formwork lifting construction method for shear walls and cylindrical concrete structures, to change the formwork system from traditional plywood to customized large formwork, and at the same time, use the poured concrete wall As a support point, an operating platform is set up and lifted by a tower crane to complete the construction of shear walls and cylindrical concrete walls.

本发明的目的是这样实现的:剪力墙、筒体混凝土结构大模板提升式施工方法,其特征在于:按以下步骤进行: The object of the present invention is achieved like this: shear wall, cylinder body concrete structure big formwork lifting type construction method, it is characterized in that: carry out according to the following steps:

1、布置安装塔吊,其半径能覆盖整个建筑物; 1. Arrange and install tower cranes, whose radius can cover the entire building;

2、用18mm厚胶合板制作大模板面板,高度为层高,宽度为6m,用50×100mm方木作竖向背楞,8#槽钢作横向背楞,用对拉螺栓加固。在大模板上部设置宽度0.9m的钢三脚架,钢三脚架上面铺设木板、栏杆,构成用于待浇筑混凝土施工的上部操作平台; 2. Use 18mm thick plywood to make a large formwork panel, the height is the floor height, and the width is 6m. Use 50×100mm square wood as the vertical back corrugation, 8# channel steel as the horizontal back corrugation, and reinforce it with pull bolts. A steel tripod with a width of 0.9m is set on the upper part of the large formwork, and wooden boards and railings are laid on the steel tripod to form an upper operating platform for the construction of concrete to be poured;

3、安装预埋件,待浇筑混凝土墙壁钢筋安装完毕后,在待浇筑混凝土墙壁中安装用于下一步安装中部操作平台和下部操作平台的预埋件; 3. Install the embedded parts. After the steel bars of the poured concrete wall are installed, install the embedded parts for the next step of installing the middle operation platform and the lower operation platform in the concrete wall to be poured;

4、浇筑并养护混凝土,达到一定强度后,拆除大模板及其支撑系统,并用塔吊吊至新浇混凝土楼面上清理、整修。其中,大模板面板、竖向背楞、横向背楞,以及上部操作平台中的钢三脚架、木板、栏杆均一起提升; 4. Pour and maintain the concrete. After reaching a certain strength, dismantle the large formwork and its supporting system, and use a tower crane to lift it to the newly poured concrete floor for cleaning and renovation. Among them, the large formwork panel, the vertical back flute, the horizontal back flute, and the steel tripod, wooden boards, and railings in the upper operating platform are all lifted together;

5、已浇混凝土上的中部操作平台和下部操作平台,制作方法同上部操作平台,即在钢三脚架上铺设木板、栏杆,用塔吊移动提升中部操作平台和下部操作平台,用原待浇混凝土中埋设的两个预埋件分别重新安装固定好中部操作平台和下部操作平台; 5. The middle operation platform and the lower operation platform on the poured concrete are manufactured in the same way as the upper operation platform, that is, planks and railings are laid on the steel tripod, and the middle operation platform and the lower operation platform are lifted by the tower crane. The two buried parts are reinstalled and fixed respectively to fix the middle operation platform and the lower operation platform;

6、施工人员在新位置上的中部操作平台上安装钢筋; 6. Construction personnel install steel bars on the central operating platform at the new location;

7、用塔吊移动清理好的大模板及其支撑系统至下一次混凝土浇筑部位; 7. Use the tower crane to move the cleaned large formwork and its supporting system to the next concrete pouring site;

8、施工人员在新位置上的中部操作平台上安装模板及调直装置,在新位置上的上部操作平台上浇筑混凝土;依此循环,直到完成墙壁混凝土的施工。 8. Construction workers install formwork and straightening devices on the middle operating platform at the new position, and pour concrete on the upper operating platform at the new position; and repeat this cycle until the construction of the wall concrete is completed.

与现有技术相比,本发明的优点是:不仅简便实用,节约工时,而且降低成本。 Compared with the prior art, the present invention has the advantages of being not only simple and practical, saving man-hours, but also reducing costs.

附图说明 Description of drawings

图1:剪力墙、筒体混凝土结构大模板提升式施工断面图。 Figure 1: Sectional view of large formwork lifting construction of shear wall and cylindrical concrete structure.

图中:1、对拉螺栓   2、待浇筑混凝土   3、预埋件   4、已浇筑混凝土   5、钢三脚架   6、栏杆   7、木板   8、面板   9、竖向背楞   10、横向背楞   11、中部操作平台   12、调直装置   13、下部操作平台 In the figure: 1. Pull bolt 2. Concrete to be poured 3. Embedded parts 4. Concrete already poured 5. Steel tripod 6. Railing 7. Wooden board 8. Panel 9. Vertical back corrugation 10. Horizontal back corrugation 11. Middle operation Platform 12. Straightening device 13. Lower operating platform

具体实施方式 Detailed ways

为进一步描述本发明,下面结合实施例和附图对本发明作进一步描述。 In order to further describe the present invention, the present invention will be further described below in conjunction with the embodiments and accompanying drawings.

如图所示,剪力墙、筒体混凝土结构大模板提升式施工方法,其特征在于:按以下步骤进行: As shown in the figure, the large formwork lifting construction method of the shear wall and the cylindrical concrete structure is characterized in that: the following steps are carried out:

1、布置安装塔吊,其半径能覆盖整个建筑物; 1. Arrange and install tower cranes, whose radius can cover the entire building;

2、用18mm厚胶合板制作大模板面板8,高度为层高,宽度为6m,用50×100mm方木作竖向背楞9,8#槽钢作横向背楞10,用对拉螺栓1加固。在大模板上部设置宽度0.9m的钢三脚架5,钢三脚架5上面铺设木板7、栏杆6,构成用于待浇筑混凝土2施工的上部操作平台; 2. Use 18mm thick plywood to make a large formwork panel 8, the height is the floor height, and the width is 6m. Use 50×100mm square wood as the vertical back corrugation 9, and 8# channel steel as the horizontal back corrugation 10, and reinforce it with the pull bolt 1. A steel tripod 5 with a width of 0.9m is set on the upper part of the large template, and planks 7 and railings 6 are laid on the steel tripod 5 to form an upper operating platform for the construction of the concrete 2 to be poured;

3、安装预埋件,待浇筑混凝土2墙壁钢筋安装完毕后,在待浇筑混凝土2墙壁中安装用于下一步安装中部操作平台11和下部操作平台13的预埋件3; 3. Install the embedded parts. After the concrete 2 wall reinforcement is installed, install the embedded parts 3 for the next step of installing the middle operation platform 11 and the lower operation platform 13 in the wall of the concrete 2 to be poured;

4、浇筑并养护混凝土,达到一定强度后,拆除大模板及其支撑系统,并用塔吊吊至待浇混凝土2楼面上清理、整修;其中,大模板面板8、竖向背楞9、横向背楞10,以及上部操作平台中的钢三脚架5、木板7、栏杆6均一起提升; 4. Pour and maintain the concrete. After reaching a certain strength, dismantle the large formwork and its supporting system, and use a tower crane to lift it to the concrete 2 floor to be cleaned and repaired; among them, the large formwork panel 8, the vertical back corrugated 9, and the horizontal back corrugated 10, and the steel tripod 5, plank 7 and railing 6 in the upper operating platform are all promoted together;

5、已浇混凝土4上的中部操作平台11和下部操作平台13,制作方法同上部操作平台,即在钢三脚架5上铺设木板7、栏杆6,用塔吊移动提升中部操作平台和下部操作平台11、13,用原待浇混凝土2中埋设的两个预埋件3分别重新安装固定好中部操作平台11和下部操作平台13; 5. The middle operating platform 11 and the lower operating platform 13 on the poured concrete 4 are manufactured in the same way as the upper operating platform, that is, planks 7 and railings 6 are laid on the steel tripod 5, and the middle operating platform and the lower operating platform 11 are lifted by a tower crane , 13, reinstall and fix the middle operating platform 11 and the lower operating platform 13 respectively with the two embedded parts 3 buried in the original concrete 2 to be poured;

6、施工人员在新位置上的中部操作平台11上安装钢筋; 6. Construction workers install steel bars on the central operating platform 11 at the new location;

7、用塔吊移动清理好的大模板及其支撑系统至下一次混凝土浇筑部位; 7. Use the tower crane to move the cleaned large formwork and its supporting system to the next concrete pouring site;

8、施工人员在新位置上的中部操作平台11上安装模板及调直装置12,在新位置上的上部操作平台上浇筑混凝土;依此循环,直到完成墙壁混凝土的施工。 8. Construction personnel install formwork and straightening device 12 on the middle operating platform 11 at the new position, and pour concrete on the upper operating platform at the new position; and circulate in this way until the construction of the wall concrete is completed.

Claims (1)

1. shear wall, cylindrical shell concrete structure large form lift-type construction method, is characterized in that: carry out according to the following steps:
1). arrange and install tower crane, its radius can cover whole building;
2). make large form panel (8) with the thick veneer of 18mm, be highly floor height, width is 6m, makes vertical back cord (9) with 50 × 100mm lumps of wood, and horizontal back cord (10) made by 8# channel-section steel, reinforces with split bolt (1); Arrange the steel tripod (5) of width 0.9m on large form top, steel tripod (5) lays plank (7), railing (6) above, is configured for the upper operating platform treating concrete construction;
3). built-in fitting is installed, after concreting (2) wall reinforcement installs, is treating the built-in fitting (3) being used for next step installation middle part operating platform (11) and bottom operating platform (13) is installed in concreting (2) wall;
4). to build and curing concrete, after reaching some strength, remove large form and support system thereof, and winch to tower crane treat pouring concrete (2) flooring is cleared up, trimming; Wherein, large form panel (8), vertical back cord (9), horizontal back cord (10), and steel tripod (5) in upper operating platform, plank (7), railing (6) promote all together;
5). the middle part operating platform (11) on pouring concrete (4) and bottom operating platform (13), preparation method is with top operating platform, namely on steel tripod (5), plank (7), railing (6) is laid, with operating platform (11) in the middle part of tower crane movable lifting and bottom operating platform (13), treat that two built-in fittings (3) buried underground in pouring concrete (2) are reinstalled respectively fix middle part operating platform (11) and bottom operating platform (13) with former;
6). reinforcing bar installed by constructor's middle part operating platform (11) in a new location;
7). the large form and support system concreting position extremely next time thereof cleared up is moved with tower crane;
8). the upper installation form of constructor's middle part operating platform (11) in a new location and machine straightening device (12), concreting on upper operating platform in a new location; Circulate according to this, until complete the concrete construction of wall.
CN201310251862.7A 2013-06-24 2013-06-24 Large formwork lifting construction method for shear wall and cylinder concrete structure Active CN103321405B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310251862.7A CN103321405B (en) 2013-06-24 2013-06-24 Large formwork lifting construction method for shear wall and cylinder concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310251862.7A CN103321405B (en) 2013-06-24 2013-06-24 Large formwork lifting construction method for shear wall and cylinder concrete structure

Publications (2)

Publication Number Publication Date
CN103321405A CN103321405A (en) 2013-09-25
CN103321405B true CN103321405B (en) 2015-11-04

Family

ID=49190427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310251862.7A Active CN103321405B (en) 2013-06-24 2013-06-24 Large formwork lifting construction method for shear wall and cylinder concrete structure

Country Status (1)

Country Link
CN (1) CN103321405B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109869153B (en) * 2019-02-26 2024-06-11 中铁十局集团第一工程有限公司 Integral lifting cantilever formwork device for rapidly constructing shaft lining and construction method
CN110965756A (en) * 2019-12-31 2020-04-07 广西建工集团第五建筑工程有限责任公司 Integrated operation platform for cast-in-situ shear wall and construction method thereof
CN111188489A (en) * 2019-12-31 2020-05-22 广西建工集团第五建筑工程有限责任公司 External frame-free safety protection structure of fabricated building and construction method thereof
CN111648255A (en) * 2020-07-08 2020-09-11 广州市市政工程机械施工有限公司 Variable-section cantilever formwork suitable for rapid construction and construction method adopting variable-section cantilever formwork
CN112012496A (en) * 2020-09-27 2020-12-01 中国建筑一局(集团)有限公司 Platform for concrete pouring conical hopper and using method thereof
CN114687467B (en) * 2022-02-18 2024-04-26 洛阳城市建设勘察设计院有限公司 Vertical connection pouring method and correction support tool for assembled prefabricated shear wall

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2653044Y (en) * 2003-09-02 2004-11-03 江都市庆华机械制造厂 Wall building formwork lifting device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100862737B1 (en) * 2008-04-23 2008-10-10 이정학 Cage device of prefabricated gangform system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2653044Y (en) * 2003-09-02 2004-11-03 江都市庆华机械制造厂 Wall building formwork lifting device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《西门子大厦液压滑模板、整体外爬架设计与施工》;沈振武;《中国学位论文全文数据库》;20090115;第53-62页,图3-2、图3-10 *
建筑施工手册(第5版)编委会.《建筑施工手册(第5版)第2册》.《建筑施工手册(第5版)第2册》.2013,第934-936页,图13-72. *

Also Published As

Publication number Publication date
CN103321405A (en) 2013-09-25

Similar Documents

Publication Publication Date Title
CN103321405B (en) Large formwork lifting construction method for shear wall and cylinder concrete structure
CN106285051B (en) A kind of prefabricated toilet and its construction and installation method
CN102296837B (en) Multi-storey building with prefabricated parts and its semi-prefabricated construction method
CN202090591U (en) Lift type climbing formwork of building operations
CN208023710U (en) A kind of connection structure of assembly concrete shear wall
CN204899180U (en) Steel construction jar body aerial working platform simply sets up device
CN205421616U (en) Assemble integral shear force wall with steel pipe concrete edge member
CN104153579B (en) A kind of formwork for placing structure of non-standard layers structure and construction method
CN102561690A (en) Construction method for supporting structures on two sides of post-cast strip by use of brick column
CN108331334A (en) Shear wall, cylinder concrete structure large form hoisting type construction method
CN102080384B (en) Construction Method of Installing Lift on the Roof of Underground Garage
CN105863253A (en) Integral formwork-supporting type asynchronous casting stairwell wall column formwork supporting system and construction method
CN201962944U (en) Hydraulic climbing formwork for building construction
CN110284702A (en) A kind of constructing device and construction method of hyperboloid arc mixed mud wall
CN202324606U (en) U-shaped force bearing seat
CN104060760B (en) High Rise Building Transfer Floor Structure concrete super large beam construction in layer method
CN204781927U (en) Elevartor shaft formwork and elevartor shaft concrete placement operation platform
CN103485574A (en) Method for constructing reinforced concrete structure of tower top of prilling tower
CN207314829U (en) A kind of wooden model early tears support device open
CN205348761U (en) Basement does not have reinforced structure of no basic lift of installation on back board
CN102787717B (en) Self-supporting combined steel template construction method
CN210025768U (en) A operation platform system for caisson template installation
CN205224420U (en) Anticorrosive industry factory building precast concrete stand
CN104963344B (en) The deep basal pit underground construction method that concrete supporting removal and structure construction are synchronously carried out
CN204059943U (en) A kind of formwork for placing structure of non-standard layers structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant