CN204199298U - A kind of formwork system being applicable to large-scale deep trouth hole sty bed course - Google Patents

A kind of formwork system being applicable to large-scale deep trouth hole sty bed course Download PDF

Info

Publication number
CN204199298U
CN204199298U CN201420536565.7U CN201420536565U CN204199298U CN 204199298 U CN204199298 U CN 204199298U CN 201420536565 U CN201420536565 U CN 201420536565U CN 204199298 U CN204199298 U CN 204199298U
Authority
CN
China
Prior art keywords
hole
sty
bed course
groove
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420536565.7U
Other languages
Chinese (zh)
Inventor
吴远冰
林成东
张义斌
郑为
蒋世权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Original Assignee
Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Construction Engineering Co of Guangxi Construction Engineering Group filed Critical Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Priority to CN201420536565.7U priority Critical patent/CN204199298U/en
Application granted granted Critical
Publication of CN204199298U publication Critical patent/CN204199298U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

Being applicable to a formwork system for large-scale deep trouth hole sty bed course, is cheat by groove the internal mold of falling truncated rectangular pyramids that bottom cushion, Anti-floating reinforcing steel bar, template and steel pipe support be configured to; Described groove hole bottom cushion is positioned at bottom, groove hole, and Anti-floating reinforcing steel bar is embedded in bottom, groove hole and cheats bottom cushion with groove and pours into a mould and be connected; Steel tube frame is by forming to horizontal steel tube, vertical steel pipe and reinforcing bridging steel pipe in length and breadth, fastener type steel pipe is adopted to set up into the shape of truncated rectangular pyramids between steel pipe, steel tube frame is connected with Anti-floating reinforcing steel bar, template is inverted trapezoidal, be arranged on steel tube frame formed four inverted trapezoidal inclined-planes outside, base is fixed on the bottom cushion of groove hole, the fixing collar of cheating on bottom cushion at groove, having a concrete block to form outside template; The formwork this formwork system being used for large-scale deep trouth hole sty bed course waters smashes the form of construction work that construction method changes traditional large-scale deep trouth hole sty bed course, and scientific construction, overall construction speed is fast, quality good.

Description

A kind of formwork system being applicable to large-scale deep trouth hole sty bed course
Technical field
The utility model relates to a kind of basement structure cushion construction formwork system, particularly a kind of formwork system being applicable to large-scale deep trouth hole sty bed course.
Background technology
Basement structure bed course is important building operations link, and the quality of its construction quality affects huge on building structure and follow-up basement bottom board waterproof construction.
In traditional construction, due to blinding concrete mobility and lack obstruction, in order to ensure that the bed course of groove hole wall is when constructing, can not glide because of the concrete flowing under Action of Gravity Field and cause the uneven thickness of bed course and concrete watering to smash difficulty, the lay bricks mode of fetal membrane of the inclined-plane, gentle slope of applicable concreting or employing of usually the hole wall in large-scale to elevator pit and pile cap hole etc. groove hole need being arranged to be carried out.
But the large-scale groove hole sty using conventional construction method process darker just there will be following problem:
Problem 1: if to smash and to put slope excessively slow to ensure that concrete cushion can water smoothly, not only increase unnecessary earthwork evacuation amount, well volume also can be caused to become large, and the jumbo increase of the structural concrete amount of building finally making large-scale groove cheat, causes unnecessary economic loss and waste.
Problem 2: build brick fetal membrane by laying bricks or stones and the mode of plastering carries out the sty construction of large-scale deep trouth hole if used, its working procedure is loaded down with trivial details, and construction speed is slow, and there is the danger such as work high above the ground, economic benefit is poor.
Problem 3: be not suitable for Karst Geological Landscape situation, when the soil excavation of lava geological conditions, often there is rugged irregular rock face in the domatic place in large-scale groove hole, the words of blinding concrete are directly built at rock surface, difficult forming, construction quality is difficult to control, and easily wastes material and does over again.
Problem 4: sty bed course need divide storehouse disturbing concrete, vibrate insufficient, Forming Quality is poor, and speed of application is slow, affects follow-up construction of waterproof layer.
Summary of the invention
When the purpose of this utility model is to provide a kind of construction, earthwork evacuation amount is less, speed of application is fast, measured " a kind of formwork system being applicable to large-scale deep trouth hole sty bed course; to overcome the weak point of conventional construction method, solve the problem of large-scale dell steep face cushion construction difficulty of matter.
The technical scheme solved the problem is: a kind of formwork system being applicable to large-scale deep trouth hole sty bed course, is characterized in that, this formwork system cheats by groove the internal mold of falling truncated rectangular pyramids that bottom cushion, Anti-floating reinforcing steel bar, template and steel pipe support be configured to; Described groove hole bottom cushion be positioned at bottom, groove hole, for supporting one piece of screeding concrete template of whole template system, described Anti-floating reinforcing steel bar is embedded in bottom, groove hole and cheats bottom cushion with groove and pours into a mould and be connected; Described steel tube frame is by forming to horizontal steel tube, vertical steel pipe and reinforcing bridging steel pipe in length and breadth, fastener type steel pipe is adopted to set up into the shape of truncated rectangular pyramids between steel pipe, steel tube frame is connected with Anti-floating reinforcing steel bar, described template is inverted trapezoidal, be arranged on steel tube frame formed four inverted trapezoidal inclined-planes outside, base be fixed on groove hole bottom cushion on.
Described a kind of further technical scheme being applicable to the formwork system of large-scale deep trouth hole sty bed course is: on the bottom cushion of groove hole, outside template, have a fixing collar, described fixing collar or being built by laying bricks or stones to form or directly build by cement block makes.
Described Anti-floating reinforcing steel bar adopts Φ more than 16 reinforcing bar to be bent into hollow.
Described template adopts the thick above veneer of 15mm or a tree, used in making timber for boats wood.
Compared with prior art, the utility model it " a kind of formwork system being applicable to large-scale deep trouth hole sty bed course " has following beneficial effect:
1, the excavated volume of the cubic metre of earth and stone can be greatly reduced, reduce manpower and materials waste, good in economic efficiency:
Owing to adopting a kind of formwork system being applicable to large-scale deep trouth hole sty bed course of the utility model, therefore, can withcomplete earthwork evacuation, the finishing of dell by design size, and complete groove hole bottom cushion construction after again the steel tube frame carried out in dell set up; Therefore, the problem of " to smash and to put slope excessively slow to ensure that concrete cushion can water smoothly, adding unnecessary earthwork evacuation amount " is overcome.
2, change the form of construction work of traditional large-scale deep trouth hole sty bed course, construction quality is good:
Owing to adopting a kind of formwork system being applicable to large-scale deep trouth hole sty bed course of the utility model, therefore, without the need to sequence placing, once can water the type of being pounded, reduce difficulty of construction, accelerating construction progress.
3, the design idea that designer cheats groove can be ensured, guarantee that the design of the even straight wall of sty that groove is cheated is complete and present, guarantee to carry out casting and compacting of concrete construction smoothly.
The utility model is a kind of is applicable to the formwork system of large-scale deep trouth hole sty bed course at the pre-buried Anti-floating reinforcing steel bar in bottom, groove hole, and this reinforcing bar and groove are cheated bottom cushion 1 and poured into a mould and be connected; Thus ensure that steel tube frame can not float or be shifted when groove hole sty blinding concrete waters and smashes; This formwork system is enclosing concrete block 31 and forms fixing collar 3 at groove hole periphery, bottom cushion face brick work one, the template base pressure excessive problem occurring spillage when can prevent casting and compacting of concrete; Guarantee to carry out casting and compacting of concrete construction smoothly.
4, a kind of formwork system being applicable to large-scale deep trouth hole sty bed course of the utility model is adopted to construct, its scientific construction, overall construction speed are fast, process safety, the bed course scale error after completing is little, surfacing, closely knit, THICKNESS CONTROL is excellent, quality of finished product good:
Cushion construction is carried out owing to adopting a kind of formwork system being applicable to large-scale deep trouth hole sty bed course of the utility model, steel tube frame need be cheated on sty at groove before setting up and be released size Control line, and need size to carry out setting up and the installation of template and reinforcing of steel pipe frame in strict accordance with design, therefore, overall construction speed is fast, process safety, the groove hole sty bed course scale error after completing is little, surfacing, closely knit, THICKNESS CONTROL is excellent, quality of finished product good.
Owing to having above feature and beneficial effect, the utility model it " a kind of be applicable to large-scale deep trouth hole sty bed course formwork system and formwork water smash construction method " applied widely, all kinds of groove hole and bed course can be widely used in, be specially adapted to the concrete cushion of sty under large-scale deep trouth hole or Karst Geology and the construction of rubble concrete bed course.
Be described further below in conjunction with a kind of technical characteristic being applicable to the formwork system of large-scale deep trouth hole sty bed course of drawings and Examples to the utility model.
Accompanying drawing explanation
Fig. 1: the plan view that the utility model " is applicable to the formwork system of large-scale deep trouth hole sty bed course ";
Fig. 2: the longitudinal plan that the utility model " is applicable to the formwork system of large-scale deep trouth hole sty bed course ";
Fig. 3: local, bottom, the groove hole drawing that the utility model " is applicable to the formwork system of large-scale deep trouth hole sty bed course ";
Fig. 4: the stressed schematic diagram figure of entirety that the utility model " is applicable to the formwork system of large-scale deep trouth hole sty bed course ";
Fig. 5: the local internal force analysis schematic diagram that the utility model " is applicable to the formwork system of large-scale deep trouth hole sty bed course ".
In Fig. 1-Fig. 3:
1-groove hole bottom cushion, 2-Anti-floating reinforcing steel bar, 3-concrete block;
4-groove hole sty, 5-template;
6-slope bed course; 7-steel tube frame; 71-is in length and breadth to horizontal steel tube;
72-vertical steel pipe, 73-reinforces bridging steel pipe;
In Fig. 4-Fig. 5:
N-acts on the concrete lateral pressure in template 5, F 1-N decomposes the horizontal applied force of horizontal direction, F 2-N decomposes the vertical upwards active force of vertical direction, F 3the lower pulling force that-Anti-floating reinforcing steel bar provides; F 4the vertical supporting power that-steel pipe provides, F 5the horizontal supporting force that-steel pipe provides, gravity suffered by the whole formwork system of G-.
Detailed description of the invention
Be applicable to a formwork system for large-scale deep trouth hole sty bed course, as shown in Figure 1 and Figure 2, this formwork system is the internal mold of falling truncated rectangular pyramids be made up of groove hole bottom cushion 1, Anti-floating reinforcing steel bar 2, template 5 and steel tube frame 7; Described groove hole bottom cushion 1 be positioned at bottom, groove hole, for supporting one piece of screeding concrete template of whole template system, described Anti-floating reinforcing steel bar 2 is embedded in bottom, groove hole and cheats bottom cushion 1 with groove and pours into a mould and be connected; Described steel tube frame 7 is made up of vertical, horizontal horizontal steel tube 71, vertical steel pipe 72 and reinforcing bridging steel pipe 73, fastener type steel pipe is adopted to set up into the shape of truncated rectangular pyramids between steel pipe, steel tube frame 7 is connected with Anti-floating reinforcing steel bar 2, described template 5 is inverted trapezoidal, be arranged on steel tube frame 7 formed four inverted trapezoidal inclined-planes outside, base is fixed on the bottom cushion 1 of groove hole, the fixing collar 3 of cheating on bottom cushion 1 at groove, having a concrete block 31 to form outside template 5.
Described Anti-floating reinforcing steel bar 2 adopts Φ more than 16 reinforcing bar to be bent into hollow.
Described template 5 adopts the thick above veneer of 15mm or a tree, used in making timber for boats wood.
The design principle being applicable to the formwork system of large-scale deep trouth hole sty bed course of the utility model is:
According to design size, the shape of dell, by setting up steel pipe support and template in the dell inside completing earthwork evacuation, form an internal mold of falling truncated rectangular pyramids, thus ensure that the blinding concrete of dell cliff slope disposablely can water the type of being pounded.
Wherein, the formwork system being applicable to large-scale deep trouth hole sty bed course of the utility model needs to calculate and design through internal force, according to groove hole the gradient, highly, size, form, calculate lateral pressure during slope casting and compacting of concrete, thus determine the spacing in length and breadth of formwork system steel pipe, step pitch and reinforce the setting of bridging, above-mentioned computational methods are known technologies, repeat no more herein.
Force principle, analysis:
The steel tube frame 7 being applicable to the formwork system of large-scale deep trouth hole sty bed course of the utility model is by forming to horizontal steel tube 71, vertical steel pipe 72 and reinforcing bridging steel pipe 73 in length and breadth, adopt fastener type steel pipe to set up into the shape of truncated rectangular pyramids between steel pipe, whole formwork system is set up shaping according to the shape that groove is cheated.
Wherein, the horizontal direction active force that template 5 transmits is born in length and breadth to horizontal steel tube 71, vertical steel pipe 72 bears template 5 and the vertical direction active force suffered by steel pipe support support body 7, and reinforce bridging 73 link level and vertical steel pipe, make support body form stable three-legged structure, increase the globality of support body.
The entirety of formwork system is as shown in Figure 4 stressed:
Wherein, N acts on the concrete lateral pressure in template 5, F 1, F 2be respectively concrete lateral pressure N and decompose the horizontal applied force of level and vertical direction and vertical upwards active force, G is gravity suffered by whole formwork system, F 3for the lower pulling force that Anti-floating reinforcing steel bar provides.
Take out left half of part and do force analysis, as shown in Figure 5:
Wherein, F 4for the vertical supporting power that steel pipe provides, F 5for the horizontal supporting force that steel pipe provides.
In figure, the horizontal supporting force F that steel pipe provides 5with the horizontal component F of N 1balance; Gravity G, lower pulling force F 3, vertical supporting power F 4three power are formed makes a concerted effort downwards, with the vertical upwards directed force F of N 2balance.
Like this, whole formwork system reaches internal force balance, thus guarantees the reliability of whole formwork system.
One as the utility model embodiment converts, and when deep trouth hole sty is not too large, also can arrange fixing collar 3 outside template 5.
As another conversion of the utility model embodiment, described fixing collar also can be built by laying bricks or stones without cement block, and directly builds a circle concrete as fixing collar 3.

Claims (4)

1. be applicable to a formwork system for large-scale deep trouth hole sty bed course, it is characterized in that, this formwork system cheats by groove the internal mold of falling truncated rectangular pyramids that bottom cushion (1), Anti-floating reinforcing steel bar (2), template (5) and steel tube frame (7) form; Described groove hole bottom cushion (1) be positioned at bottom, groove hole, for supporting one piece of screeding concrete template of whole template system, described Anti-floating reinforcing steel bar (2) is embedded in bottom, groove hole and cheats bottom cushion (1) with groove and pours into a mould and be connected; Described steel tube frame (7) is by forming to horizontal steel tube (71), vertical steel pipe (72) and reinforcing bridging steel pipe (73) in length and breadth, fastener type steel pipe is adopted to set up into the shape of truncated rectangular pyramids between steel pipe, steel tube frame (7) is connected with Anti-floating reinforcing steel bar (2), described template (5) is inverted trapezoidal, be arranged on outside four inverted trapezoidal inclined-planes that steel tube frame (7) formed, base is fixed on groove hole bottom cushion (1).
2. a kind of formwork system being applicable to large-scale deep trouth hole sty bed course according to claim 1, it is characterized in that: upper at groove hole bottom cushion (1), have a fixing collar (3) around template (5) outside, described fixing collar (3) or being built by laying bricks or stones to form or directly build by cement block (31) makes.
3. a kind of formwork system being applicable to large-scale deep trouth hole sty bed course according to claim 1, is characterized in that: described Anti-floating reinforcing steel bar (2) adopts Φ more than 16 reinforcing bar to be bent into hollow.
4. a kind of formwork system being applicable to large-scale deep trouth hole sty bed course according to claim 1 and 2, is characterized in that: described template (5) adopts the thick above veneer of 15mm or a tree, used in making timber for boats wood.
CN201420536565.7U 2014-09-18 2014-09-18 A kind of formwork system being applicable to large-scale deep trouth hole sty bed course Withdrawn - After Issue CN204199298U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420536565.7U CN204199298U (en) 2014-09-18 2014-09-18 A kind of formwork system being applicable to large-scale deep trouth hole sty bed course

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420536565.7U CN204199298U (en) 2014-09-18 2014-09-18 A kind of formwork system being applicable to large-scale deep trouth hole sty bed course

Publications (1)

Publication Number Publication Date
CN204199298U true CN204199298U (en) 2015-03-11

Family

ID=52657273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420536565.7U Withdrawn - After Issue CN204199298U (en) 2014-09-18 2014-09-18 A kind of formwork system being applicable to large-scale deep trouth hole sty bed course

Country Status (1)

Country Link
CN (1) CN204199298U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213565A (en) * 2014-09-18 2014-12-17 广西建工集团第五建筑工程有限责任公司 Die supporting system for large deep pit steep slope surface cushion layer and supporting die casting construction method thereof
CN105756068A (en) * 2016-04-06 2016-07-13 中国十七冶集团有限公司 Construction method for driving large-sized deep foundation pit supporting anchor pipe

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213565A (en) * 2014-09-18 2014-12-17 广西建工集团第五建筑工程有限责任公司 Die supporting system for large deep pit steep slope surface cushion layer and supporting die casting construction method thereof
CN104213565B (en) * 2014-09-18 2016-05-18 广西建工集团第五建筑工程有限责任公司 A kind of formwork system that is applicable to large-scale deep trouth hole sty bed course and formwork thereof water smashes construction method
CN105756068A (en) * 2016-04-06 2016-07-13 中国十七冶集团有限公司 Construction method for driving large-sized deep foundation pit supporting anchor pipe
CN105756068B (en) * 2016-04-06 2018-02-02 中国十七冶集团有限公司 A kind of Large Scale Deep Foundation Pit Support anchor tube beats pipe construction method

Similar Documents

Publication Publication Date Title
CN104213565B (en) A kind of formwork system that is applicable to large-scale deep trouth hole sty bed course and formwork thereof water smashes construction method
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN203174619U (en) Reverse raft concrete terrace
CN203475456U (en) GRC cement tire template system
CN204898715U (en) Assembled precast concrete child mould of basis cushion cap
CN102277860B (en) Construction method for fill mortar junction stone dam of mortar stone precast block masonry dam shell
CN104120736A (en) Construction method of reinforced concrete retaining wall
CN103469806A (en) Construction method for replacing brick forming die with prefabricated concrete foundation bearing platform side die
CN101289866A (en) Construction method for precasting concrete moulding bed in local pit of base pit engineering under soft foundation
CN104358275B (en) Darker elevator shaft or collecting well construction method
CN208219694U (en) A kind of prefabricated barricade
CN103334450A (en) Construction method of pile precast slab retaining wall with drainage ditch
CN102071698A (en) Construction method of beddings of foundation downward overturn beam and pile cap
CN110273436A (en) Open trench tunnel utilizes support pile and bear down on one float Structure and its construction method of crown beam
CN106351376A (en) Construction method of garage roof
CN204199298U (en) A kind of formwork system being applicable to large-scale deep trouth hole sty bed course
CN104328790A (en) Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed
CN202628115U (en) Integral-type inverted-arch template device
CN106164380A (en) Wind-driven generator fabricated base
CN204282399U (en) A kind of subway space enclosing structure
CN103790170A (en) Prefabricated concrete hollow framework slope protection structure
CN108442389A (en) The quick construction technology of foundation construction component loose tool
CN208933976U (en) A kind of plant-growing type eco-concrete slope protection
CN203905331U (en) Cast-in-place plate-type staircase with seamless steps
CN203049588U (en) Pit-in-pit cylindrical mould

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150311

Effective date of abandoning: 20160518

C25 Abandonment of patent right or utility model to avoid double patenting