CN101289866A - Construction method for precasting concrete moulding bed in local pit of base pit engineering under soft foundation - Google Patents

Construction method for precasting concrete moulding bed in local pit of base pit engineering under soft foundation Download PDF

Info

Publication number
CN101289866A
CN101289866A CNA2007100395171A CN200710039517A CN101289866A CN 101289866 A CN101289866 A CN 101289866A CN A2007100395171 A CNA2007100395171 A CN A2007100395171A CN 200710039517 A CN200710039517 A CN 200710039517A CN 101289866 A CN101289866 A CN 101289866A
Authority
CN
China
Prior art keywords
dell
local
pit
construction
loose tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007100395171A
Other languages
Chinese (zh)
Inventor
吴杏弟
朱王怡
史家定
钱国师
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CNA2007100395171A priority Critical patent/CN101289866A/en
Publication of CN101289866A publication Critical patent/CN101289866A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a construction method for local deep-pit prefabricated concrete tire shuttering in the foundation pit engineering under soft soil foundation. The method comprises the following steps that: 1) earthwork is excavated to a large-area deep-pit bottom, and then a cushion layer is poured and tamped; 2) a reinforced concrete tire shuttering is prefabricated in advance according to the planar dimension and the depth of a local deep pit, and the prefabricated reinforced concrete tire shuttering is arranged in the pit when the earthwork at the local deep pit is excavated to the designed elevation; 3) the backfill is performed, and the vacancy filling of the cushion layer at the local deep pit is performed; 4) a large bottom plate and structural reinforcing steel bars in the local deep pit are bound for construction, a deep-pit internal mould is arranged and is fixed with the reinforcing steel bars on the bottom plate, and then structural concrete of the bottom plate is poured and tamped. The method has the advantages that: the method has less process steps, the prefabricated tire shuttering is performed beforehand, and scattered and redundant concrete can be used for pouring and tamping; the construction speed is quick, the construction of the tire shuttering can backfill to bear pressure without waiting for enough strength; the method has less process steps and quick construction speed, which contributes to the stability of the foundation pit; and the reinforced concrete tire shuttering has large strength and rigidity and is not easy to distort, and the quality of the foundation structure is easy to be guaranteed.

Description

Local dell precast concrete loose tool job practices in the base pit engineering under the soft foundation
Technical field
The present invention relates to the correlative technology field of building operations, relate to that the sole plate part falls to hanging down going along with sb. to guard him and template system of dell in the construction of industrial civil building, municipal public use engineering structures, particularly a kind of at the bottom of the large tracts of land excavation pit during local dell construction, replace the job practices of the exterior sheathing of temporarily going along with sb. to guard him of this part dell and this hole inner concrete structure with the prefabricated reinforced concrete loose tool.
Background technology
At industrial civil building, during the municipal engineering foundation construction, during architectural design in foundation structure operated by rotary motion collecting well, equipment raise etc.Therefore when structure construction, it is low that sole plate wants the part to fall, and forms local dell at the bottom of the large-scale excavation.Fall to hanging down in the construction of dell base plate in traditional part, general construction process is as follows:
A. soil excavation waters subsequently and smashes bed course (in local dell position bed course vacancy) at the bottom of the large tracts of land dell.
B. carry out local stiffening (end, hole, limit, hole) at local dell position;
C. the slope excavation is put in the position earthwork of local dell, waters and smashes local dell concrete cushion, builds brick loose tool (being dell inner concrete structure exterior sheathing) by laying bricks or stones;
D. local dell position brick loose tool outside backfill, large tracts of land dell foot mat fill a vacancy (secondary waters and smashes);
E. big base plate and the construction of local dell inner structure reinforcing bar binding are installed local dell inner formword, subsequently disturbing concrete.
The tradition part lower part base plate dell construction drawback that falls is as follows:
A. processing step is many, as above-mentioned description, need cheat the end, hole limit soil stabilization once more at local dell position, and bed course will divide secondary to water to smash;
B. speed of application is slow, the earthwork easily takes place in local dell soil excavation process cave in;
C. because processing step is many, and speed of application is slow, come risk for the foundation ditch stabilized zone;
D. and after the brick loose tool will wait until certain intensity, just can carry out the later process construction, the brick loose tool can not bear big soil pressure, is easy to generate distortion, other operation construction in the influence hole.
Summary of the invention
The objective of the invention is for local dell precast concrete loose tool job practices in the base pit engineering is provided under a kind of soft foundation, reduce the construction technology step, accelerating construction progress, improve going along with sb. to guard him and template system of structural concrete quality, solved that traditional part falls that lower part base plate dell job practices processing step is many, speed of application slowly, the not good problem of construction quality.
For achieving the above object, the present invention has adopted following technical scheme:
The invention discloses under a kind of soft foundation local dell precast concrete loose tool job practices in the base pit engineering, it is characterized in that, may further comprise the steps:
A. soil excavation waters subsequently and smashes bed course (in local dell position bed course vacancy) at the bottom of the large tracts of land dell;
B. press the local dell planar dimension and degree of depth prefabricated reinforced concrete loose tool in advance, treat local dell place soil excavation, the prefabricated reinforced concrete loose tool is installed in the hole to design elevation;
C. backfill, and carry out local dell place bed course and fill a vacancy;
D. big base plate and the construction of local dell inner structure reinforcing bar binding are installed dell internal mold and base plate reinforcing bar and are fixed, and water subsequently and smash the base arrangement concrete.
Wherein, described prefabricated reinforced concrete loose tool is one the casing at the end to be arranged.
Because adopted above scheme, the beneficial effect that the present invention is possessed is:
A. processing step is few.Prefabricated moulding bedly carry out available fragmentary unnecessary casting and compacting of concrete in advance.
B. speed of application is fast.The loose tool installation is intact, just can carry out backfill immediately and bear pressure.
C. processing step is few, and speed of application is fast, and it is stable to help foundation ditch.
D. steel concrete loose tool intensity, rigidity are big, are not easy to produce distortion, and the foundation structure quality guarantees easily.
E. reduce expenses, can save the soil stabilization expense at local dell position.
Description of drawings
Fig. 1-Fig. 4 is the structural representation of construction process of the present invention.
The specific embodiment
Below in conjunction with drawings and Examples the present invention is further described.
Local dell precast concrete loose tool job practices in the base pit engineering under a kind of soft foundation as Fig. 1-shown in Figure 4, may further comprise the steps:
A. soil excavation waters subsequently and smashes bed course 2 (in local dell position bed course vacancy) at the bottom of the large tracts of land dell 1.
B. press the local dell planar dimension and degree of depth prefabricated reinforced concrete loose tool 3 in advance, treat local dell place soil excavation, prefabricated reinforced concrete loose tool 3 is installed in the hole to design elevation;
C. backfill 4, and carry out local dell place bed course and fill a vacancy 5;
D. big base plate and the construction of local dell inner structure reinforcing bar binding, it is fixing with base plate reinforcing bar 7 that dell internal mold 6 is installed, and waters subsequently and smash the base arrangement concrete eight.
Wherein, described prefabricated reinforced concrete loose tool 3 is one the casing at the end to be arranged.
The present invention adopts the prefabricated reinforced concrete loose tool to replace traditional brick loose tool, can reduce the construction technology step, and accelerating construction progress improves construction quality.The prefabricated reinforced concrete loose tool presses the dell planar dimension and the degree of depth is prefabricated in advance, and its thickness, concrete grade (generally adopt C20, C30) calculate by soil pressure and determine.

Claims (2)

1, local dell precast concrete loose tool job practices in the base pit engineering under the soft foundation is characterized in that, may further comprise the steps:
A. soil excavation waters subsequently and smashes bed course at the bottom of the large tracts of land dell;
B. press the local dell planar dimension and degree of depth prefabricated reinforced concrete loose tool in advance, treat local dell place soil excavation, the prefabricated reinforced concrete loose tool is installed in the hole to design elevation;
C. backfill, and carry out local dell place bed course and fill a vacancy;
D. big base plate and the construction of local dell inner structure reinforcing bar binding are installed dell internal mold and base plate reinforcing bar and are fixed, and water subsequently and smash the base arrangement concrete.
2, local dell precast concrete loose tool job practices in the base pit engineering under the soft foundation according to claim 1 is characterized in that: described prefabricated reinforced concrete loose tool is one the casing at the end to be arranged.
CNA2007100395171A 2007-04-16 2007-04-16 Construction method for precasting concrete moulding bed in local pit of base pit engineering under soft foundation Pending CN101289866A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007100395171A CN101289866A (en) 2007-04-16 2007-04-16 Construction method for precasting concrete moulding bed in local pit of base pit engineering under soft foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007100395171A CN101289866A (en) 2007-04-16 2007-04-16 Construction method for precasting concrete moulding bed in local pit of base pit engineering under soft foundation

Publications (1)

Publication Number Publication Date
CN101289866A true CN101289866A (en) 2008-10-22

Family

ID=40034297

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007100395171A Pending CN101289866A (en) 2007-04-16 2007-04-16 Construction method for precasting concrete moulding bed in local pit of base pit engineering under soft foundation

Country Status (1)

Country Link
CN (1) CN101289866A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433892A (en) * 2011-12-30 2012-05-02 中铁二局股份有限公司 Construction method for cover-excavation reverse method soil moulding bed
CN102505709A (en) * 2011-11-03 2012-06-20 浙江天力建设集团有限公司 Concrete-formwork-precast foundation construction method
CN102535476A (en) * 2010-12-27 2012-07-04 上海勘测设计研究院 Method for reducing side load influence
CN102877485A (en) * 2012-10-12 2013-01-16 绍兴县明煌建材科技有限公司 Ground beam bearing platform moulding bed
CN103469806A (en) * 2013-09-25 2013-12-25 浙江天力建设集团有限公司 Construction method for replacing brick forming die with prefabricated concrete foundation bearing platform side die
CN104213565A (en) * 2014-09-18 2014-12-17 广西建工集团第五建筑工程有限责任公司 Die supporting system for large deep pit steep slope surface cushion layer and supporting die casting construction method thereof
CN104846837A (en) * 2015-04-10 2015-08-19 江苏南通三建集团有限公司 Construction method for ultra-deep well pit in surface drainage foundation pit
CN107288155A (en) * 2017-07-27 2017-10-24 平湖市开元混凝土有限公司 A kind of method for fast mfg of small underground concrete structure
CN109763508A (en) * 2019-01-26 2019-05-17 中煤地建设工程有限公司 A kind of domatic isolated footing structure
CN113136876A (en) * 2021-03-19 2021-07-20 中国建筑第八工程局有限公司 Construction method of pipe trench
CN113550318A (en) * 2021-08-03 2021-10-26 中国十七冶集团有限公司 Construction method of prefabricated caisson mold capable of replacing brick mold with mucky soil
CN114718112A (en) * 2022-04-12 2022-07-08 中天建设集团有限公司 Construction method for erecting formwork of pit-in-pit of vertical wall pit
CN114718112B (en) * 2022-04-12 2024-05-03 中天建设集团有限公司 Pit formwork construction method in straight wall pit

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535476A (en) * 2010-12-27 2012-07-04 上海勘测设计研究院 Method for reducing side load influence
CN102535476B (en) * 2010-12-27 2014-06-18 上海勘测设计研究院 Method for reducing side load influence
CN102505709A (en) * 2011-11-03 2012-06-20 浙江天力建设集团有限公司 Concrete-formwork-precast foundation construction method
CN102433892A (en) * 2011-12-30 2012-05-02 中铁二局股份有限公司 Construction method for cover-excavation reverse method soil moulding bed
CN102877485A (en) * 2012-10-12 2013-01-16 绍兴县明煌建材科技有限公司 Ground beam bearing platform moulding bed
CN103469806A (en) * 2013-09-25 2013-12-25 浙江天力建设集团有限公司 Construction method for replacing brick forming die with prefabricated concrete foundation bearing platform side die
CN104213565B (en) * 2014-09-18 2016-05-18 广西建工集团第五建筑工程有限责任公司 A kind of formwork system that is applicable to large-scale deep trouth hole sty bed course and formwork thereof water smashes construction method
CN104213565A (en) * 2014-09-18 2014-12-17 广西建工集团第五建筑工程有限责任公司 Die supporting system for large deep pit steep slope surface cushion layer and supporting die casting construction method thereof
CN104846837A (en) * 2015-04-10 2015-08-19 江苏南通三建集团有限公司 Construction method for ultra-deep well pit in surface drainage foundation pit
CN107288155A (en) * 2017-07-27 2017-10-24 平湖市开元混凝土有限公司 A kind of method for fast mfg of small underground concrete structure
CN107288155B (en) * 2017-07-27 2020-12-25 平湖市开元混凝土股份有限公司 Rapid manufacturing method of small underground concrete structure
CN109763508A (en) * 2019-01-26 2019-05-17 中煤地建设工程有限公司 A kind of domatic isolated footing structure
CN113136876A (en) * 2021-03-19 2021-07-20 中国建筑第八工程局有限公司 Construction method of pipe trench
CN113550318A (en) * 2021-08-03 2021-10-26 中国十七冶集团有限公司 Construction method of prefabricated caisson mold capable of replacing brick mold with mucky soil
CN114718112A (en) * 2022-04-12 2022-07-08 中天建设集团有限公司 Construction method for erecting formwork of pit-in-pit of vertical wall pit
CN114718112B (en) * 2022-04-12 2024-05-03 中天建设集团有限公司 Pit formwork construction method in straight wall pit

Similar Documents

Publication Publication Date Title
CN101289866A (en) Construction method for precasting concrete moulding bed in local pit of base pit engineering under soft foundation
CN110318393B (en) Construction method of composite pile
CN104859036A (en) Concrete solid square pile mold
CN107059920B (en) Loess formation piping lane construction technology
CN104213565A (en) Die supporting system for large deep pit steep slope surface cushion layer and supporting die casting construction method thereof
CN108330764B (en) Shallow layer solidified pile bearing type embankment and construction method
CN104358275B (en) Darker elevator shaft or collecting well construction method
CN203729424U (en) Modified horseback-riding inspection well for top pipe construction
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN106930277A (en) A kind of construction of manual-excavation cast-in-place pile method
CN112227502A (en) Drainage inspection well construction method
CN106968692B (en) Tunnel excavation supporting structure and construction method thereof
CN213143117U (en) Assembled keyway basis retaining wall structure
CN109137986A (en) Urban road inspection shaft walling crib green promotes reinforced construction method
CN101929245A (en) Thin webbed girder vertical construction method
CN106545071A (en) Inspection shaft, roof drain and cement concrete pavement one-time cast-forming construction method
CN207672389U (en) Roadbed concrete curb cast-in-place mould
CN203096758U (en) Hard concrete smooth foundation pit for installing drainage pipeline
CN215594086U (en) Foundation pile structure of manual intervention bearing stratum
CN115595979A (en) Construction method for treating karst cave by bridge pile foundation under geological condition of strong development of karst
CN108442503A (en) A kind of building basement bottom plate catch pit and construction method
CN210946876U (en) Barricade reinforced structure convenient to road surface is widened
CN207988637U (en) A kind of prefabricated post connection structure for being fixed temporarily, adjusting height
CN210122735U (en) Underground structure anti-floating system based on outward-protruding wing foot plate
CN105839824B (en) Shed deckhead construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20081022