CN113550318A - Construction method of prefabricated caisson mold capable of replacing brick mold with mucky soil - Google Patents

Construction method of prefabricated caisson mold capable of replacing brick mold with mucky soil Download PDF

Info

Publication number
CN113550318A
CN113550318A CN202110885464.5A CN202110885464A CN113550318A CN 113550318 A CN113550318 A CN 113550318A CN 202110885464 A CN202110885464 A CN 202110885464A CN 113550318 A CN113550318 A CN 113550318A
Authority
CN
China
Prior art keywords
mold
caisson
mucky soil
mould
brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110885464.5A
Other languages
Chinese (zh)
Inventor
曹子英
刘宝堂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202110885464.5A priority Critical patent/CN113550318A/en
Publication of CN113550318A publication Critical patent/CN113550318A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/08Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against transmission of vibrations or movements in the foundation soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/005Lift shafts

Abstract

The invention discloses a construction method of a prefabricated caisson mold capable of replacing a brick forming die with mucky soil, and relates to the technical field of buildings. The construction method of the prefabricated caisson mold capable of replacing the brick molding bed by the mucky soil comprises the following specific operations: and S1, judging the current geological condition, and if the mucky soil has poor cohesive force and is easy to collapse to cause great potential safety hazard, performing S2. The prefabricated caisson mold construction method for replacing the brick molding bed by the mucky soil can be used for immediately hoisting the mold in place after a foundation pit is excavated by prefabricating the caisson type steel mold in advance, so that the risk of side slope collapse is prevented, the safety of excavation of the elevator shaft and the sump pit earthwork is ensured, the engineering cost is reduced, the later maintenance cost is eliminated, the prefabricated caisson mold can replace the brick molding bed, can play a role of a retaining wall, prevents earthwork collapse, is integrated with the bed course, has good waterproof performance and good integrity, and can prevent the bed course of a soft foundation from sinking and cracking due to uneven settlement.

Description

Construction method of prefabricated caisson mold capable of replacing brick mold with mucky soil
Technical Field
The invention relates to the technical field of buildings, in particular to a construction method of a prefabricated caisson mold, wherein mucky soil can replace a brick forming die.
Background
At present, along with the development of economy, the city scale is bigger and bigger, and resident's residence is more and more concentrated, and high-rise building is increasing day by day, in the relatively poor area of soil property, for satisfying high-rise building's foundation bearing capacity requirement, adopts piled raft foundation form usually, but the elevation of sump pit and elevartor shaft is higher relatively, does not reach the holding power layer, and plus southern rainwater and river are more, mostly mucky soil under the general condition, cause very big degree of difficulty to the construction of elevartor shaft and sump pit.
In the actual process of excavating mucky soil earthwork, after the excavation of an elevator shaft and a collector well is finished, when a cushion layer and a masonry brick moulding bed are not reached, collapse is easy to occur, great potential safety hazards are caused, the construction difficulty is high, generally, supporting piles need to be driven for the elevator shaft and the collector well, but the construction period is too long, the cost is too high, and the construction difficulty is too large.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a construction method of a prefabricated caisson mold, which can replace a brick forming die by mucky soil, and solves the problems that in the actual construction of excavation of mucky soil earthwork, after the excavation of an elevator shaft and a collector well is finished, a sealing cushion layer and a brick forming die are not reached, collapse easily occurs, great potential safety hazards are caused, the construction difficulty is high, support piles need to be driven to the elevator shaft and the collector well, the construction period is too long, the cost is too high, and the construction difficulty is too large.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: a construction method of a prefabricated caisson mold capable of replacing a brick bed mould with mucky soil comprises the following specific operations:
s1, judging the current geological condition, if the cohesive force of the mucky soil is poor and the mucky soil is easy to collapse to cause great potential safety hazard, performing S2, otherwise, performing normal brick moulding bed construction operation;
s2, calculating the sizes of the elevator well and the water collecting well in advance according to construction drawings;
s3, adopting steel plates, welding a caisson mould with specified size by taking a steel plate with the thickness of 4mm and stiffening ribs as materials according to the requirements of a drawing, ensuring that the caisson mould has good waterproof performance, flanging the top of the mould towards the periphery, and anchoring the caisson mould into a raft foundation cushion layer to form a whole with the cushion layer;
s4, after the earthwork excavation is finished, the mold is immediately hoisted to the designated position by a tower crane or a crane, so that the brick mould can be replaced, the function of protecting the wall can be played, and the earthwork collapse is prevented.
(III) advantageous effects
The invention provides a construction method of a prefabricated caisson mold, which can replace a brick molding bed by mucky soil. The method has the following beneficial effects: the prefabricated caisson mold construction method for replacing the brick molding bed by the mucky soil can be used for immediately hoisting the mold in place after a foundation pit is excavated by prefabricating the caisson type steel mold in advance, so that the risk of side slope collapse is prevented, the safety of excavation of the elevator shaft and the sump pit earthwork is ensured, the engineering cost is reduced, the later maintenance cost is eliminated, the prefabricated caisson mold can replace the brick molding bed, can play a role of a retaining wall, prevents earthwork collapse, is integrated with the bed course, has good waterproof performance and good integrity, and can prevent the bed course of a soft foundation from sinking and cracking due to uneven settlement.
Drawings
FIG. 1 is a schematic view of the structure of the present invention.
In the figure: 1. 4mm thick steel plate; 2. a stiffening rib.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, the present invention provides a technical solution: a construction method of a prefabricated caisson mold capable of replacing a brick bed mould with mucky soil comprises the following specific operations:
s1, judging the current geological condition, if the cohesive force of the mucky soil is poor and the mucky soil is easy to collapse to cause great potential safety hazard, performing S2, otherwise, performing normal brick moulding bed construction operation;
s2, calculating the sizes of the elevator well and the water collecting well in advance according to construction drawings;
s3, adopting steel plates, welding a caisson mould with specified size by taking a steel plate with the thickness of 4mm and stiffening ribs as materials according to the requirements of a drawing, ensuring that the caisson mould has good waterproof performance, flanging the top of the mould towards the periphery, and anchoring the caisson mould into a raft foundation cushion layer to form a whole with the cushion layer;
s4, after the earthwork excavation is finished, the mold is immediately hoisted to the designated position by a tower crane or a crane, so that the brick mould can be replaced, the function of protecting the wall can be played, and the earthwork collapse is prevented.
In the poor area of geological conditions, the civil buildings who have the basement generally adopt piled raft foundation, but the elevation of sump pit and elevartor shaft is higher relatively, does not reach the holding power layer, and plus southern rainwater and river are more, are mostly mucky soil under the general condition, cause very big degree of difficulty to the construction of elevartor shaft and sump pit.
The cohesive force of the mucky soil is poor, and after the excavation of an elevator shaft and a collector well is finished, a sealing cushion layer and a masonry brick moulding bed are not available, so that the mucky soil is easy to collapse. Causing great potential safety hazard and increasing the construction difficulty.
To this problem, this patent develops a caisson type steel mould prefabricated with steel sheet specially, and the excavation of elevator shaft and collector well is accomplished the back and is hung this caisson type basis to appointed position immediately, can replace the brick bed-jig, can play the effect of dado again, prevents that the earthwork from collapsing.
The caisson type steel mould has good waterproof performance, the top of the mould is turned over towards the periphery, and the mould can be anchored into a raft foundation cushion layer to form a whole with the cushion layer, so that the caisson type steel mould has good waterproof performance.
The caisson type steel mould has good integrity and can prevent the soft foundation cushion layer from sinking and cracking due to uneven settlement.
In conclusion, the construction method of the prefabricated caisson mold capable of replacing the brick moulding bed by the mucky soil has the advantages that the caisson mold can be immediately hoisted in place after the foundation pit is excavated by prefabricating the caisson type steel mold in advance, the risk of slope collapse is prevented, the safety of earth excavation of an elevator shaft and a water collecting well is ensured, the engineering cost is reduced, the later maintenance cost is eliminated, the brick moulding bed can be replaced, the wall protecting effect can be realized, the earth collapse is prevented, the prefabricated caisson mold and the cushion layer form a whole, the waterproof performance is good, the integrity is good, and the sinking and cracking of the soft foundation cushion layer due to uneven settlement can be prevented.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (1)

1. A construction method of a prefabricated caisson die capable of replacing a brick forming die with mucky soil is characterized by comprising the following steps of: the specific operation is as follows:
s1, judging the current geological condition, if the cohesive force of the mucky soil is poor and the mucky soil is easy to collapse to cause great potential safety hazard, performing S2, otherwise, performing normal brick moulding bed construction operation;
s2, calculating the sizes of the elevator well and the water collecting well in advance according to construction drawings;
s3, adopting steel plates, welding a caisson mould with specified size by taking a steel plate with the thickness of 4mm and stiffening ribs as materials according to the requirements of a drawing, ensuring that the caisson mould has good waterproof performance, flanging the top of the mould towards the periphery, and anchoring the caisson mould into a raft foundation cushion layer to form a whole with the cushion layer;
s4, after the earthwork excavation is finished, the mold is immediately hoisted to the designated position by a tower crane or a crane, so that the brick mould can be replaced, the function of protecting the wall can be played, and the earthwork collapse is prevented.
CN202110885464.5A 2021-08-03 2021-08-03 Construction method of prefabricated caisson mold capable of replacing brick mold with mucky soil Pending CN113550318A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110885464.5A CN113550318A (en) 2021-08-03 2021-08-03 Construction method of prefabricated caisson mold capable of replacing brick mold with mucky soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110885464.5A CN113550318A (en) 2021-08-03 2021-08-03 Construction method of prefabricated caisson mold capable of replacing brick mold with mucky soil

Publications (1)

Publication Number Publication Date
CN113550318A true CN113550318A (en) 2021-10-26

Family

ID=78105198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110885464.5A Pending CN113550318A (en) 2021-08-03 2021-08-03 Construction method of prefabricated caisson mold capable of replacing brick mold with mucky soil

Country Status (1)

Country Link
CN (1) CN113550318A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114482061A (en) * 2021-12-27 2022-05-13 华北冶建工程建设有限公司 Excavation method for foundation pit of elevator of middle-rise residential building in silt soil

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101289866A (en) * 2007-04-16 2008-10-22 上海市第七建筑有限公司 Construction method for precasting concrete moulding bed in local pit of base pit engineering under soft foundation

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101289866A (en) * 2007-04-16 2008-10-22 上海市第七建筑有限公司 Construction method for precasting concrete moulding bed in local pit of base pit engineering under soft foundation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114482061A (en) * 2021-12-27 2022-05-13 华北冶建工程建设有限公司 Excavation method for foundation pit of elevator of middle-rise residential building in silt soil

Similar Documents

Publication Publication Date Title
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN212896422U (en) Deep foundation pit water intercepting and draining device
CN100510281C (en) Semi-inverse construction method of super large diameter, ultra-burial depth storage pond
CN105951869A (en) Construction method of steel latticework column tower crane foundation for underground garage without reserving construction joints
CN110206039B (en) Construction method of Larsen steel sheet pile in pit under complex geological conditions
CN104790435A (en) Post-subsidence pouring belt advancing waterstop impermeable concrete structure and construction technology thereof
CN209923959U (en) Open caisson structure for dry-process operation of high-groundwater-level soft soil field
CN113550318A (en) Construction method of prefabricated caisson mold capable of replacing brick mold with mucky soil
CN113482021A (en) Half-pile supporting structure for excavating shallow foundation pit above underground structure floor and construction method
CN104975607A (en) Offshore area local deep foundation pit stanching pit construction method
CN112281888A (en) Excavation supporting method for foundation pit caisson
CN110984352A (en) Steel shell type reinforced concrete water collecting well structure of soft soil foundation pump station and construction method thereof
CN102605801A (en) Suspension semi-reverse-construction method for underground circular water tank
CN215759121U (en) Miniature steel sheet curtain stagnant water supporting construction of multistage foundation ditch
CN112761200A (en) Face box culvert foundation reinforcement structure who combines forever
CN210122735U (en) Underground structure anti-floating system based on outward-protruding wing foot plate
CN210712864U (en) Deep foundation pit supporting system of Larsen steel sheet pile and cement mixing pile for soft soil field
CN214738333U (en) Permanent-faced combined box culvert foundation reinforcing structure
CN112012330A (en) Installation and construction method of integrated sewage lifting equipment under roadway
CN110836030A (en) Clockwise and anticlockwise combined cyclone well construction method suitable for complex geological conditions
CN107338797B (en) Steel plate concrete combined anti-floating water stop structure and construction method thereof
CN211873283U (en) Steel shell type reinforced concrete water collecting well structure of soft soil foundation pump station
CN214940392U (en) Adopt reverse construction method to carry out basement supporting construction for construction
CN217325470U (en) Basement outer wall post-cast strip department assembled retaining wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20211026