CN100567698C - Tunnel advanced support air circulated drilling construction method and drilling tool - Google Patents
Tunnel advanced support air circulated drilling construction method and drilling tool Download PDFInfo
- Publication number
- CN100567698C CN100567698C CNB2008103012611A CN200810301261A CN100567698C CN 100567698 C CN100567698 C CN 100567698C CN B2008103012611 A CNB2008103012611 A CN B2008103012611A CN 200810301261 A CN200810301261 A CN 200810301261A CN 100567698 C CN100567698 C CN 100567698C
- Authority
- CN
- China
- Prior art keywords
- drilling
- pipe
- rig
- drill bit
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2008103012611A CN100567698C (en) | 2008-04-23 | 2008-04-23 | Tunnel advanced support air circulated drilling construction method and drilling tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2008103012611A CN100567698C (en) | 2008-04-23 | 2008-04-23 | Tunnel advanced support air circulated drilling construction method and drilling tool |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101260784A CN101260784A (en) | 2008-09-10 |
CN100567698C true CN100567698C (en) | 2009-12-09 |
Family
ID=39961444
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2008103012611A Expired - Fee Related CN100567698C (en) | 2008-04-23 | 2008-04-23 | Tunnel advanced support air circulated drilling construction method and drilling tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100567698C (en) |
Families Citing this family (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101691842B (en) * | 2009-07-15 | 2014-05-14 | 中铁隧道股份有限公司 | Three-arm hydraulic wagon drill and tunnel drilling and grouting construction method |
CN102183240B (en) * | 2011-03-14 | 2012-12-05 | 同济大学 | Inclination detection auxiliary device for pipe roof construction |
CN103510851A (en) * | 2012-06-15 | 2014-01-15 | 湖北江南专用特种汽车有限公司 | Movable horizontal drill machine |
CN103233487A (en) * | 2013-04-27 | 2013-08-07 | 杨众 | Method for grouting and floor lifting by directional drilling machine |
CN103758450B (en) * | 2014-01-17 | 2015-10-07 | 北京市市政工程研究院 | A kind of certainly creeping into can with expansion anchor pole hole-forming device |
CN104455726A (en) * | 2014-11-20 | 2015-03-25 | 广州市市政集团有限公司 | Pipe-jacking construction method for pipeline bottom grouting reinforcement |
US20190112879A1 (en) * | 2016-03-29 | 2019-04-18 | Herrenknecht Ag | Drill pipe, and system and method for laying a pipeline |
CN106677186A (en) * | 2017-02-17 | 2017-05-17 | 北京中岩大地科技股份有限公司 | Free-angle rotary jet grouting technology |
CN106988755A (en) * | 2017-05-10 | 2017-07-28 | 中铁五局集团第五工程有限责任公司 | A kind of tunnel portal weak surrounding rock section overlength pipe shed construction method |
CN107268600A (en) * | 2017-08-01 | 2017-10-20 | 江苏燕宁建设工程有限公司 | Grouting strengthening method, pipe jacking construction method and application |
CN107421816A (en) * | 2017-08-10 | 2017-12-01 | 北京林业大学 | A kind of stratum splitting drag Rapid measuring and its assay method |
CN108825134A (en) * | 2018-07-27 | 2018-11-16 | 深圳市市政设计研究院有限公司 | A kind of drill bit guidance system and arc large scale piperoof construction method |
CN109723454A (en) * | 2019-01-09 | 2019-05-07 | 中水电四局武汉轨道交通工程有限公司 | A kind of bored tunnel advance support is with pipe canopy with the accurate drilling construction method of pipe |
CN110000749B (en) * | 2019-05-07 | 2023-09-05 | 云南电网有限责任公司昆明供电局 | Tunnel inspection robot walking track support hanger and installation method thereof |
CN111133865B (en) * | 2019-12-28 | 2020-11-27 | 郑州宏拓电子技术有限公司 | Square hardened ground digging and transplanting device |
CN111827879B (en) * | 2020-07-03 | 2022-04-08 | 北京中煤矿山工程有限公司 | Horizontal drilling construction method for large-diameter pipe shed in shallow-earth-covered weak stratum |
CN112696207A (en) * | 2020-12-21 | 2021-04-23 | 中铁十局集团第七工程有限公司 | Construction method of overlong large pipe shed of shallow-buried bias-pressure underground excavation tunnel |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4474252A (en) * | 1983-05-24 | 1984-10-02 | Thompson Farish R | Method and apparatus for drilling generally horizontal bores |
US4694913A (en) * | 1986-05-16 | 1987-09-22 | Gas Research Institute | Guided earth boring tool |
-
2008
- 2008-04-23 CN CNB2008103012611A patent/CN100567698C/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4474252A (en) * | 1983-05-24 | 1984-10-02 | Thompson Farish R | Method and apparatus for drilling generally horizontal bores |
US4694913A (en) * | 1986-05-16 | 1987-09-22 | Gas Research Institute | Guided earth boring tool |
Also Published As
Publication number | Publication date |
---|---|
CN101260784A (en) | 2008-09-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100567698C (en) | Tunnel advanced support air circulated drilling construction method and drilling tool | |
CN103306687B (en) | Soft rock tunnel long cantilever horizontal jet grouting Deformation control construction method | |
CN111322048B (en) | Hard roof rock burst subsection direction-control fracturing treatment method | |
CN110454171B (en) | Method for converting construction from step method to double-side-wall pit guiding method in tunnel | |
CN103835661B (en) | A kind of local excavation pre support mine shaft rising boring technique | |
CN105298517A (en) | Soft and weak wall rock tunnel advance reinforced support construction method | |
CN107023300A (en) | A kind of use canopy, which is defended the doctrine, builds the construction method of subway station | |
CN108915736A (en) | The water damage control method of digging laneway under the strong weak cementing water-bearing layer of rich water | |
Liu et al. | Key technologies of drilling process with raise boring method | |
CN110374633A (en) | The Portal Section Construction method of Tunnel Passing loose media | |
CN106988755A (en) | A kind of tunnel portal weak surrounding rock section overlength pipe shed construction method | |
Tonon | ADECO full-face tunnel excavation of two 260 m2 tubes in clays with sub-horizontal jet-grouting under minimal urban cover | |
CN102174894A (en) | Follow-up pipe shed construction method | |
CN103132908A (en) | Device for drilling rock and embedding rock-socketed prestressed pipe pile by down-hole hammer and construction method of device | |
WO2020259059A1 (en) | Tbm parallel heading tunnel trunk construction method | |
CN102536243A (en) | Coal seam freezing type cross-drift coal uncovering method | |
CN110439463A (en) | Mined-out Area control injected hole pore-creating technique | |
CN111472801A (en) | Construction method for passing existing line under shallow-buried underground excavation drainage gallery | |
CN110656947A (en) | Method for tunneling raised section of seabed bedrock | |
CN109139018A (en) | The method for tunnel construction and system that deep hole sleeve valve barrel grouting is combined with horizontal jet grouting | |
CN108374672A (en) | A method of reinforcing Deep Mine soft coal level roadway surrounding rock | |
CN105019917B (en) | Impact drilling type advanced jet grouting pipe shed construction device and construction method | |
CN103615265B (en) | Soft rock tunnel horizontal jet grouting construction method | |
CN111005379A (en) | Construction method for removing pile body of reinforced concrete cast-in-place pile | |
CN109854251A (en) | Tunnel horizontal jet grouting construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Tunnel advanced support air circulated drilling construction method and drilling tool Effective date of registration: 20100624 Granted publication date: 20091209 Pledgee: Zhongguancun Beijing science and technology Company limited by guarantee Pledgor: BEIJING SHOUER ENGINEERING TECHNOLOGY Co.,Ltd. Registration number: 2010990000793 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20110421 Granted publication date: 20091209 Pledgee: Zhongguancun Beijing science and technology Company limited by guarantee Pledgor: BEIJING SHOUER ENGINEERING TECHNOLOGY Co.,Ltd. Registration number: 2010990000793 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Tunnel advanced support air circulated drilling construction method and drilling tool Effective date of registration: 20110603 Granted publication date: 20091209 Pledgee: Bank of Communications Ltd. Beijing Zhongguancun Park sub branch Pledgor: BEIJING SHOUER ENGINEERING TECHNOLOGY Co.,Ltd. Registration number: 2011990000207 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20120614 Granted publication date: 20091209 Pledgee: Bank of Communications Ltd. Beijing Zhongguancun Park sub branch Pledgor: BEIJING SHOUER ENGINEERING TECHNOLOGY Co.,Ltd. Registration number: 2011990000207 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Tunnel advanced support air circulated drilling construction method and drilling tool Effective date of registration: 20120817 Granted publication date: 20091209 Pledgee: Bank of Communications Ltd. Beijing Zhongguancun Park sub branch Pledgor: BEIJING SHOUER ENGINEERING TECHNOLOGY Co.,Ltd. Registration number: 2012990000450 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20131227 Granted publication date: 20091209 Pledgee: Bank of Communications Ltd. Beijing Zhongguancun Park sub branch Pledgor: BEIJING SHOUER ENGINEERING TECHNOLOGY Co.,Ltd. Registration number: 2012990000450 |
|
PLDC | Enforcement, change and cancellation of contracts on pledge of patent right or utility model | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20091209 |