- CN108825134A CN108825134A CN201810841592.8A CN201810841592A CN108825134A CN 108825134 A CN108825134 A CN 108825134A CN 201810841592 A CN201810841592 A CN 201810841592A CN 108825134 A CN108825134 A CN 108825134A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- pipe
- drill bit
- guidance system
- drilling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 39
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 71
- 239000010959 steel Substances 0.000 claims abstract description 71
- 238000005553 drilling Methods 0.000 claims abstract description 54
- 239000000853 adhesive Substances 0.000 claims abstract description 3
- 230000001070 adhesive effect Effects 0.000 claims abstract description 3
- 239000004831 Hot glue Substances 0.000 claims description 8
- 238000001514 detection method Methods 0.000 claims description 7
- 238000004458 analytical method Methods 0.000 claims description 6
- 239000010425 asbestos Substances 0.000 claims description 6
- 239000004033 plastic Substances 0.000 claims description 6
- 229920003023 plastic Polymers 0.000 claims description 6
- 229910052895 riebeckite Inorganic materials 0.000 claims description 6
- 230000008093 supporting effect Effects 0.000 claims description 4
- 238000004364 calculation method Methods 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 238000004088 simulation Methods 0.000 claims description 3
- 238000003892 spreading Methods 0.000 claims description 3
- 230000007480 spreading Effects 0.000 claims description 3
- 238000007569 slipcasting Methods 0.000 claims description 2
- 241001074085 Scophthalmus aquosus Species 0.000 claims 1
- 238000004064 recycling Methods 0.000 claims 1
- 239000007787 solid Substances 0.000 claims 1
- 230000007704 transition Effects 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 7
- 238000000034 method Methods 0.000 description 4
- 230000011218 segmentation Effects 0.000 description 3
- 241000196133 Dryopteris Species 0.000 description 2
- 238000009933 burial Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000012407 engineering method Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000011010 flushing procedure Methods 0.000 description 1
- 238000009440 infrastructure construction Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000002985 plastic film Substances 0.000 description 1
- 229920006255 plastic film Polymers 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000008054 signal transmission Effects 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 239000010409 thin film Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Earth Drilling (AREA)
Abstract
The present invention discloses a kind of drill bit guidance system, including steel pipe, and steel pipe one end has the notch with the end face of steel pipe in angle, and the section part of notch is welded with a guide plate, the smooth-sided transition connection of guide plate and steel pipe, and guide plate protrudes from the end face of steel pipe;Steel duct is installed with the cylindrical mounting box coaxial with steel pipe, and mounting box far from the open at one end of guide plate and is adhesive with baffle, the orientation sensor coaxial with mounting box is installed in mounting box, orientation sensor is connected with the signal wire for both passing through baffle close to one end of baffle and returns dragging line, and the other end of signal wire is electrically connected with monitor supervision platform.A kind of arc large scale piperoof construction method is drilled using the steel pipe of pipe canopy as drilling rod and utilizes above-mentioned drill bit guidance system control bore angle, while drilling and pipe laying.Drill bit guidance system and arc large scale piperoof construction method of the present invention realizes curved pipe canopy and disposably applies, and shortens the activity duration, improves the construction efficiency and construction quality of pipe canopy.
Description
Technical field
The present invention relates to underground structrue engineering technical field, grow up pipe more particularly to a kind of drill bit guidance system and arc
Canopy construction method.
Background technique
In urban underground engineering construction both domestic and external, shallow burial hidden digging is largely used, such as Beijing Metro Xidan Metro Station, length
The underground An Jie underpass, the rich raised path between farm fields subterranean commercial area in Shenzhen etc..With the continuous expansion of infrastructure construction in china scale, ground
Lower engineering construction project is also more and more, and Dryopteris sublaetaChing et Hsu engineering method is also faced with structure section and line style becomes increasingly complex, indulges
To length, increasingly longer, geology and environmental condition such as become increasingly complex at a series of challenge.
China summarizes the principle of a set of shallow burial hidden digging construction in underground engineering construction, i.e., " advanced, the tight slip casting of pipe,
Short excavation, strong supporting, fast closing, diligent measurement ", wherein " pipe " refers to steel tube shed, steel tube shed advance support is to control face landslide
There is remarkable result with surface subsidence etc..It is shorter that traditional steel tube shed disposably sets distance, and is only capable of setting along straight line, and with work
The lengthening of journey longitudinal length and the variation of plane, vertical line type, traditional steel tube shed can not disposably set completion, must setting
The multiple operating room Guan Peng segmentations repeatedly set pipe canopy, to reach the requirement of steel tube shed all standing Dryopteris sublaetaChing et Hsu range.
Traditional large scale piperoof construction is generally using the construction technology of push pipe after first pore-forming, during drilling, because of drilling rod
Slenderness ratio is excessive, bit weight, drilling tool swing big, the soft or hard unequal reason in stratum, and drilling often tilts down, and causes push pipe tired
It is difficult, reduce pipe roof construction quality, pipe canopy one-off construction is apart from short and can only set along straight line;And simply use pipe-following drilling
Construction technology, be unable to control large scale piperoof sets direction, is unable to control the inclination angle of drill bit and towards angle, inclination angle refers to that drilling is worked as
Angle between the tangent line and horizontal plane of preceding point, it reflects the inclined degree of drill bit advancing direction relative level;Towards angle
For the angle between the inclined direction and a certain reference direction of drill bit, it reflects the inclined direction of drilling in next step.It is logical towards angle
It is indicated frequently with the scale in clock disk, such as 6 o'clock direction indicates guide plate downward, and 12 o'clock direction indicates guide plate court
On;Also it is difficult to ensure that pipe canopy sets precision;Guide digging construction technology is simply used, is applied in city underground engineering long pipe shed
Many unfavorable factors such as site condition limitation can be encountered in work again, influence guiding tracking signal transmission.
Summary of the invention
It is above-mentioned existing to solve the object of the present invention is to provide a kind of drill bit guidance system and arc large scale piperoof construction method
The problem of with the presence of technology, realizes that the pipe canopy for setting broken line type segmentation is adjusted to arc and disposably performs, shortens pipe shed support
Construction time, improve drilling success rate, pipe roof construction efficiency and quality.
To achieve the above object, the present invention provides following schemes:The present invention provides a kind of drill bit guidance system, including steel
Pipe, described steel pipe one end has the notch with the end face of the steel pipe in angle, and the section part of the notch is welded with one and leads
To plate, the guide plate is connect with the smooth-sided transition of the steel pipe, and the guide plate protrudes from the end face of the steel pipe;
The steel duct is installed with the cylindrical mounting box coaxial with the steel pipe, and the mounting box is far from the guide plate
It is open at one end and be adhesive with baffle, the orientation sensor coaxial with the mounting box, the guiding are installed in the mounting box
Sensor is connected with the signal wire for both passing through the baffle close to one end of the baffle and returns dragging line, and the signal wire is another
One end is electrically connected with monitor supervision platform.
Preferably, the baffle is fixed on the opening of the mounting box by hot melt adhesive.
Preferably, plastic diaphragms are provided between the orientation sensor and the hot melt adhesive.
Preferably, asbestos are filled in the gap between the orientation sensor and the mounting box.
Preferably, the steel pipe is provided with through-hole on the end face of one end of the guide plate.
Preferably, the material of the baffle is plastics.
Preferably, the monitor supervision platform has detection circuit and display instrument, the signal wire and detection circuit electricity
Connection, the detection circuit are electrically connected with the display instrument, and the display instrument can show the inclination angle of drill bit and towards angle.
The present invention also provides a kind of construction methods of arc large scale piperoof, include the following steps:
(1) by theoretical calculation and Three-dimension Numerical Model simulation analysis, analysis is compared to the supporting effect of pipe canopy, really
Determine diameter, spacing and the setting range of pipe canopy;
(2) according to the setting range of pipe canopy, top and two sides setting guiding wall in pipe canopy setting range, and in guiding wall
In pre-buried diameter be greater than pipe canopy diameter guide pipe, it is ensured that after the position and direction of guide pipe are accurate by guide pipe and guiding
The weldering of wall steelframe is whole;
(3) " three supplies and one leveling " are carried out on pipe canopy operation ground, sets up total sub-semigroup platform, paving on pipe canopy operation ground
If rail, and hardened ground and trapped orbit, then rigging up;
(4) it is rotated with the steel pipe in drilling machine driving drill bit guidance system, using the steel pipe in drill bit guidance system as drilling rod, steel
Pipe is provided with one end of guide plate and drills for drill bit, and using the angle of drill bit guidance system strict control drilling, and and
When rectify a deviation to dilling angle beyond the pipe canopy of tolerance, set pipe canopy according to the curved path being pre-designed;
(5) rear end of the steel pipe with the increase of drilling depth in drill bit guidance system be connected steel pipe and spreading signal wire and
Dragging line is returned, two neighboring steel pipe uses screwed connection, follow up steel pipe and wiring, and the seam of steel pipe in adjacent drilling is made to be staggered;
(6) after the completion of drilling, dragging line is dragged back, so that orientation sensor opens the baffle of mounting box opening, will be led
It is recycled to sensor;
(7) after single hole sets acceptance(check), the first grouting methol into steel pipe increases after the completion of drilling construction around
Grouting pressure carries out secondary grouting.
Preferably, the spacing that the seam of steel pipe is staggered in adjacent drilling is at least 1m.
Drill bit guidance system and arc large scale piperoof construction method of the present invention achieves following technology compared with the existing technology
Effect:
Drill bit guidance system and arc large scale piperoof construction method of the present invention, which is realized, is segmented the pipe canopy set for broken line type
Be adjusted to arc disposably to perform, saved duration and the cost of pipe roof construction, improve pipe canopy construction efficiency and quality and
Drill success rate.Bore angle can accurately be controlled using the drill bit and drill bit guidance system in adjustable direction, and directly will pipe
The steel pipe of canopy realizes the synchronous progress that drilling works with pipe laying, simplifies construction procedure, reduce construction operation as drilling rod
Construction efficiency is measured and improved, while also avoiding drilling progress asynchronous with pipe laying and may cause the risk of collapse hole, raising
Drilling success rate.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment
Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention
Example, for those of ordinary skill in the art, without any creative labor, can also be according to these attached drawings
Obtain other attached drawings.
Fig. 1 is the structural schematic diagram of drill bit guidance system of the present invention;
Wherein, 1- steel pipe, 2- guide plate, 3- mounting box, 4- orientation sensor, 5- baffle, 6- hot melt adhesive, 7- plastics are thin
Film, 8- asbestos, 9- fixed block, 10- signal wire, 11- monitor supervision platform, 12- return dragging line, 13- through-hole.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
The object of the present invention is to provide a kind of drill bit guidance system and arc large scale piperoof construction methods, to solve existing skill
Art there are the problem of, realize that the pipe canopy that sets of broken line type segmentation, which is adjusted to arc, disposably to be performed, and applying for pipe shed support is shortened
Between working hour, drilling success rate, pipe roof construction efficiency and quality are improved.
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real
Applying mode, the present invention is described in further detail.
As shown in Figure 1, the present embodiment drill bit guidance system includes steel pipe 1,1 left end of steel pipe has is in the end face of steel pipe 1
The notch of angle, and the section part of notch is welded with a guide plate 2, guide plate 2 is connect with the smooth-sided transition of steel pipe 1, and
Guide plate 2 protrudes from the end face of steel pipe 1, and the left end of steel pipe 1 and guide plate 2 constitute wedging bit, by adjusting 2 left end of guide plate
Direction can adjust the boring direction of drill bit, the end face of 1 left end of steel pipe is provided with a through-hole 13 as hydrophthalmia, was drilling
By enabling highly pressurised liquid to cool down drill bit by through-hole 13 in journey, and the soil body in front of drill bit is washed away, is revolved convenient for drill bit and drilling rod
Drilling before turning to.
The mounting box 3 of the cylinder coaxial with steel pipe 1 is installed with inside steel pipe 1 by fixed block 9, it is fixed in mounting box 3
There is the orientation sensor 4 coaxial with mounting box 3, is filled with asbestos 8, asbestos in the gap between orientation sensor 4 and mounting box 3
8 can reduce the heat that steel pipe 1 generates in drilling process and vibration to influence caused by orientation sensor 4.The right side of mounting box 3
End opening and baffle 5 is bonded with by hot melt adhesive 6, the material of baffle 5 is plastics, and orientation sensor 4 connects close to one end of baffle 5
It is connected to the signal wire 10 for both passing through baffle 5 and returns dragging line 12, and the other end of signal wire 10 is electrically connected with monitor supervision platform 11, is needed
It is to be noted that orientation sensor 4 and time 12 secure bond of dragging line, need to guarantee orientation sensor 4 and return bonding between dragging line 12
Power be greater than orientation sensor 4 break through between resistance suffered by baffle 5 and orientation sensor 4 and asbestos 8, hot melt adhesive 6 frictional force it
The several times of sum, to ensure that orientation sensor 4 can be recovered under the drive for returning dragging line 12;Orientation sensor 4 in the present embodiment
Right end be also enclosed with plastic film 7, to prevent orientation sensor 4 from bonding together with hot melt adhesive 6, influence sensor return
It drags.
The present invention also provides a kind of construction methods of arc large scale piperoof, include the following steps:
(1) by theoretical calculation and Three-dimension Numerical Model simulation analysis, analysis is compared to the supporting effect of pipe canopy, really
Determine diameter, spacing and the setting range of pipe canopy;
(2) according to the setting range of pipe canopy, top and two sides setting guiding wall in pipe canopy setting range, and in guiding wall
In pre-buried diameter be greater than the guide pipe of pipe canopy diameter, the installation of guide pipe must precise measurement positioning, in the position for ensuring guide pipe
With direction it is accurate after by guide pipe and guiding wall steelframe weldering be whole;
(3) " three supplies and one leveling " are carried out on pipe canopy operation ground, sets up total sub-semigroup platform, paving on pipe canopy operation ground
If rail, and hardened ground and trapped orbit, prevent drilling machine when construction from occurring to settle and be displaced then rigging up on the soil body,
Equipment performance detection and debugging are carried out to drilling machine immediately after drilling machine installation is in place, and strictly check the drilling machine position of each hole location
It sets, height, guarantees the precision of the normal operation and drilling of mechanical equipment in formal drilling construction;
(4) it is rotated with the steel pipe 1 in drilling machine driving drill bit guidance system, with the steel pipe 1 in drill bit guidance system be drilling rod,
One end that steel pipe 1 is provided with guide plate 2 is that drill bit drills, and utilizes the angle of drill bit guidance system strict control drilling;
It is noted that should be carried out to drilling machine positioning scenarios, guide pipe centering situation, flushing liquor current intelligence and guide instrument etc. before drilling
Reinspection comprehensively, and drilling should be spaced the jump of two hole locations and beat, when drilling should keep in low pump pressure, at the uniform velocity middling speed creep into, and the moment leads to
It crosses monitor supervision platform 11 and observes head angle situation of change, while being led by the rigidity of the steel pipe 1 using pipe canopy and flexibility and drill bit
To angle when system is accurate, strict control pipe canopy is set, realize that arc large scale piperoof disposably performs;
(5) the other steel pipes of rear end screwed connection of the steel pipe 1 with the increase of drilling depth in drill bit guidance system, so that
The entire length for obtaining drilling rod adapts to the depth of drilling, and spreading signal wire 10 and time dragging line 12, and makes steel pipe 1 in adjacent drilling
Seam is staggered at least 1m;
(6) after the completion of drilling, dragging line 12 is dragged back, so that orientation sensor 4 opens the baffle 5 of 3 opening of mounting box, with
Orientation sensor 4 is recycled;
(7) after single hole sets acceptance(check), the first grouting methol into the steel pipe of drilling, first grouting pressure should not mistake
Greatly, in order to avoid earlier slurries spread solidification in the earth formation influences surrounding pore-forming, after increase grouting pressure after the completion of drilling construction around
Secondary grouting is carried out, so far the construction of arc large scale piperoof is completed.
In the description of the present invention, it should be noted that the orientation of the instructions such as term "left", "right", "inner" or position are closed
System is merely for convenience of description of the present invention and simplification of the description to be based on the orientation or positional relationship shown in the drawings, rather than indicates
Or it implies that signified device or element must have and deposits specific orientation, is constructed and operated in a specific orientation, therefore cannot understand
For limitation of the present invention.
Specific examples are applied in the present invention, and principle and implementation of the present invention are described, above embodiments
Illustrate to be merely used to help understand method and its core concept of the invention;At the same time, for those skilled in the art, according to
According to thought of the invention, there will be changes in the specific implementation manner and application range.In conclusion the content of the present specification
It should not be construed as limiting the invention.
Claims (9)
1. a kind of drill bit guidance system, it is characterised in that:Including steel pipe, described steel pipe one end has is in the end face of the steel pipe
The notch of angle, and the section part of the notch is welded with a guide plate, the smooth-sided mistake of the guide plate and the steel pipe
Connection is crossed, and the guide plate protrudes from the end face of the steel pipe;The steel duct is installed with the circle coaxial with the steel pipe
Cylindrical mounting box, and the mounting box far from the open at one end of the guide plate and is adhesive with baffle, it is solid in the mounting box
Equipped with the orientation sensor coaxial with the mounting box, the orientation sensor is connected with close to one end of the baffle and both passes through
The signal wire of the baffle and time dragging line, and the other end of the signal wire is electrically connected with monitor supervision platform.
2. drill bit guidance system according to claim 1, it is characterised in that:The baffle is fixed on described by hot melt adhesive
The opening of mounting box.
3. drill bit guidance system according to claim 2, it is characterised in that:The orientation sensor and the hot melt adhesive it
Between be provided with plastic diaphragms.
4. drill bit guidance system according to claim 1, it is characterised in that:The orientation sensor and the mounting box it
Between gap in be filled with asbestos.
5. drill bit guidance system according to claim 1, it is characterised in that:The steel pipe is close to one end of the guide plate
End face on be provided with through-hole.
6. drill bit guidance system according to claim 1, it is characterised in that:The material of the baffle is plastics.
7. drill bit guidance system according to claim 1, it is characterised in that:The monitor supervision platform has detection circuit and shows
Show instrument, the signal wire is electrically connected with the detection circuit, and the detection circuit is electrically connected with the display instrument, described aobvious
Show that instrument can show the inclination angle of drill bit and towards angle.
8. a kind of construction method of arc large scale piperoof, which is characterized in that include the following steps:
(1) by theoretical calculation and Three-dimension Numerical Model simulation analysis, analysis is compared to the supporting effect of pipe canopy, determines pipe
Diameter, spacing and the setting range of canopy;
(2) according to the setting range of pipe canopy, top and two sides setting guiding wall in pipe canopy setting range, and it is pre- in guiding wall
Bury the guide pipe that diameter is greater than pipe canopy diameter, it is ensured that by guide pipe and guiding wall steel after the position and direction of guide pipe are accurate
Frame weldering is whole;
(3) " three supplies and one leveling " are carried out on pipe canopy operation ground, sets up total sub-semigroup platform, laying steel on pipe canopy operation ground
Rail, and hardened ground and trapped orbit, then rigging up;
(4) it is rotated with the steel pipe in drilling machine driving drill bit guidance system, is set by drilling rod, steel pipe of the steel pipe in drill bit guidance system
The one end for being equipped with guide plate is that drill bit drills, the angle to be drilled using drill bit guidance system strict control, and in time to brill
It rectifies a deviation into angle beyond the pipe canopy of tolerance, sets pipe canopy according to the curved path being pre-designed;
(5) be connected steel pipe and spreading signal wire and returning of the rear end of the steel pipe with the increase of drilling depth in drill bit guidance system drags
Line, two neighboring steel pipe use screwed connection, follow up steel pipe and wiring, and the seam of steel pipe in adjacent drilling is made to be staggered;
(6) after the completion of drilling, dragging line is dragged back, so that orientation sensor opens the baffle of mounting box opening, biography will be oriented to
Sensor recycling;
(7) after single hole sets acceptance(check), the first grouting methol into steel pipe, after increase slip casting after the completion of drilling construction around
Pressure carries out secondary grouting.
9. arc large scale piperoof construction method according to claim 8, it is characterised in that:The seam of steel pipe in adjacent drilling
The spacing being staggered is at least 1m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810841592.8A CN108825134B (en) | 2018-07-27 | 2018-07-27 | Drill bit guiding system and arc-shaped long pipe shed construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810841592.8A CN108825134B (en) | 2018-07-27 | 2018-07-27 | Drill bit guiding system and arc-shaped long pipe shed construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108825134A true CN108825134A (en) | 2018-11-16 |
CN108825134B CN108825134B (en) | 2024-07-16 |
Family
ID=64141196
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810841592.8A Active CN108825134B (en) | 2018-07-27 | 2018-07-27 | Drill bit guiding system and arc-shaped long pipe shed construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108825134B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109667603A (en) * | 2018-12-28 | 2019-04-23 | 中铁第四勘察设计院集团有限公司 | A kind of super shallow-buried tunnel structure and construction method |
CN112343509A (en) * | 2020-11-26 | 2021-02-09 | 广州地铁设计研究院股份有限公司 | Guiding and deviation rectifying device for pipe shed construction in sandy cobble stratum |
CN112796764A (en) * | 2020-12-30 | 2021-05-14 | 龚伦 | Peripheral hole arc drilling construction method for controlling tunnel overexcavation |
Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0562147A1 (en) * | 1992-03-27 | 1993-09-29 | Lag Steering Systems, Inc. | Directional drilling system with eccentric mounted motor and biaxial sensor |
US6092610A (en) * | 1998-02-05 | 2000-07-25 | Schlumberger Technology Corporation | Actively controlled rotary steerable system and method for drilling wells |
CN2758434Y (en) * | 2004-12-24 | 2006-02-15 | 江源 | Guiding tube tracing drilling device for large tube canopy construction |
KR100847352B1 (en) * | 2007-05-11 | 2008-07-21 | (주)지중공영 | Supporting tube assembly for tunnel supporting method with grouted steel pipe in the borehole and supporting method of using thereof |
CN101260784A (en) * | 2008-04-23 | 2008-09-10 | 北京首尔工程技术有限公司 | Tunnel advanced support air circulated drilling construction method and drilling tool |
CN201372727Y (en) * | 2009-05-31 | 2009-12-30 | 无锡市钻通工程机械有限公司 | Guide bit for horizontal directional drilling pipe-laying drilling machine |
CN201443303U (en) * | 2009-07-22 | 2010-04-28 | 中国建筑东北设计研究院有限公司 | Reverse drawer used in oriented drilling technique |
CN101737059A (en) * | 2009-12-15 | 2010-06-16 | 中铁二局股份有限公司 | Advancing construction method of long tube shed |
DE202010005672U1 (en) * | 2010-05-27 | 2010-11-11 | Zepf, Martin | Probe for closing a petroleum well |
CN102562087A (en) * | 2011-12-12 | 2012-07-11 | 中铁二局股份有限公司 | Hydraulic drill follow-up pipe-shed construction method |
CN103410522A (en) * | 2013-08-27 | 2013-11-27 | 中铁十三局集团第四工程有限公司 | Continuous close-range underpass railway bridge construction method employing shallow tunneling method |
CN104373041A (en) * | 2014-09-11 | 2015-02-25 | 中铁十六局集团第五工程有限公司 | Drilling deviation rectification method for 60-meter-long hole drilling of tunnel large pipe shed |
CN204226017U (en) * | 2014-10-29 | 2015-03-25 | 北京汽车股份有限公司 | A kind of crankshaft position sensor thermal shield and automobile |
CN106988755A (en) * | 2017-05-10 | 2017-07-28 | 中铁五局集团第五工程有限责任公司 | A kind of tunnel portal weak surrounding rock section overlength pipe shed construction method |
CN206518450U (en) * | 2016-12-10 | 2017-09-26 | 上海谷井不锈钢制品有限公司 | A kind of stable water replenishing type steamed rice box structure |
CN107339109A (en) * | 2017-06-26 | 2017-11-10 | 西安工业大学 | The construction method of existing road is worn under super Shallow tunnel with large cross-section |
CN207599321U (en) * | 2017-12-12 | 2018-07-10 | 北京中燕建设工程有限公司 | Intelligent lubricating device monitoring running state device |
CN208486829U (en) * | 2018-07-27 | 2019-02-12 | 深圳市市政设计研究院有限公司 | A kind of drill bit guidance system |
-
2018
- 2018-07-27 CN CN201810841592.8A patent/CN108825134B/en active Active
Patent Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0562147A1 (en) * | 1992-03-27 | 1993-09-29 | Lag Steering Systems, Inc. | Directional drilling system with eccentric mounted motor and biaxial sensor |
US6092610A (en) * | 1998-02-05 | 2000-07-25 | Schlumberger Technology Corporation | Actively controlled rotary steerable system and method for drilling wells |
CN2758434Y (en) * | 2004-12-24 | 2006-02-15 | 江源 | Guiding tube tracing drilling device for large tube canopy construction |
KR100847352B1 (en) * | 2007-05-11 | 2008-07-21 | (주)지중공영 | Supporting tube assembly for tunnel supporting method with grouted steel pipe in the borehole and supporting method of using thereof |
CN101260784A (en) * | 2008-04-23 | 2008-09-10 | 北京首尔工程技术有限公司 | Tunnel advanced support air circulated drilling construction method and drilling tool |
CN201372727Y (en) * | 2009-05-31 | 2009-12-30 | 无锡市钻通工程机械有限公司 | Guide bit for horizontal directional drilling pipe-laying drilling machine |
CN201443303U (en) * | 2009-07-22 | 2010-04-28 | 中国建筑东北设计研究院有限公司 | Reverse drawer used in oriented drilling technique |
CN101737059A (en) * | 2009-12-15 | 2010-06-16 | 中铁二局股份有限公司 | Advancing construction method of long tube shed |
DE202010005672U1 (en) * | 2010-05-27 | 2010-11-11 | Zepf, Martin | Probe for closing a petroleum well |
CN102562087A (en) * | 2011-12-12 | 2012-07-11 | 中铁二局股份有限公司 | Hydraulic drill follow-up pipe-shed construction method |
CN103410522A (en) * | 2013-08-27 | 2013-11-27 | 中铁十三局集团第四工程有限公司 | Continuous close-range underpass railway bridge construction method employing shallow tunneling method |
CN104373041A (en) * | 2014-09-11 | 2015-02-25 | 中铁十六局集团第五工程有限公司 | Drilling deviation rectification method for 60-meter-long hole drilling of tunnel large pipe shed |
CN204226017U (en) * | 2014-10-29 | 2015-03-25 | 北京汽车股份有限公司 | A kind of crankshaft position sensor thermal shield and automobile |
CN206518450U (en) * | 2016-12-10 | 2017-09-26 | 上海谷井不锈钢制品有限公司 | A kind of stable water replenishing type steamed rice box structure |
CN106988755A (en) * | 2017-05-10 | 2017-07-28 | 中铁五局集团第五工程有限责任公司 | A kind of tunnel portal weak surrounding rock section overlength pipe shed construction method |
CN107339109A (en) * | 2017-06-26 | 2017-11-10 | 西安工业大学 | The construction method of existing road is worn under super Shallow tunnel with large cross-section |
CN207599321U (en) * | 2017-12-12 | 2018-07-10 | 北京中燕建设工程有限公司 | Intelligent lubricating device monitoring running state device |
CN208486829U (en) * | 2018-07-27 | 2019-02-12 | 深圳市市政设计研究院有限公司 | A kind of drill bit guidance system |
Non-Patent Citations (3)
Title |
---|
王建新: "深圳地铁4 号线二期工程某段燃气管线保护技术", 隧道建设, vol. 30, no. 3, pages 331 - 335 * |
赵振江;: "水平定向钻进技术在地铁隧道大管棚施工中的应用", 长沙大学学报, no. 02, pages 37 - 39 * |
赵艳慧;: "青岛地铁长大管棚超前支护施工技术", 山西建筑, no. 11, pages 109 - 192 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109667603A (en) * | 2018-12-28 | 2019-04-23 | 中铁第四勘察设计院集团有限公司 | A kind of super shallow-buried tunnel structure and construction method |
CN112343509A (en) * | 2020-11-26 | 2021-02-09 | 广州地铁设计研究院股份有限公司 | Guiding and deviation rectifying device for pipe shed construction in sandy cobble stratum |
CN112796764A (en) * | 2020-12-30 | 2021-05-14 | 龚伦 | Peripheral hole arc drilling construction method for controlling tunnel overexcavation |
Also Published As
Publication number | Publication date |
---|---|
CN108825134B (en) | 2024-07-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111058855B (en) | Deformation control method and evaluation system for shield underpassing structure | |
CN108825134A (en) | A kind of drill bit guidance system and arc large scale piperoof construction method | |
CN105178970A (en) | Horizontal oriented spiral drilling machine | |
CN109027420A (en) | A kind of municipal pipeline no-dig technique Directional Drilling construction method | |
CN109440794A (en) | A kind of fine method of disposal suitable for shallow embedding subway shield tunnel construction Tunnel Karst | |
CN101575860A (en) | Construction method for embedding inclinometer tube | |
CN110221340A (en) | A kind of set of tunneling construction method for forecasting advanced geology | |
CN104879163A (en) | Downhole small advance orientation exploration water discharging device and method | |
CN114909119B (en) | Drilling method for converting original vertical well or inclined well into U-shaped geothermal well with ultra-short radius | |
CN111914373A (en) | Long-distance rock jacking pipe frictional resistance calculation method and pipe rock contact state detection method | |
CN110306531A (en) | High water level erratic boulder stratum construction of diaphragm wall technique | |
CN112434357A (en) | Weak broken surrounding rock working face reinforcing method based on full-section construction | |
CN108150101B (en) | A kind of pipeline three-dimensional construction method for crossing | |
CN104453705B (en) | Secondary forming method for large-hole-diameter cast-in-place pile rotary drilling rig | |
CN109779634B (en) | Method for determining position of fractured hard top plate of coal mine ground vertical well | |
CN110145309B (en) | Shallow coal seam grouting filling green coal mining method and settlement observation device thereof | |
CN208486829U (en) | A kind of drill bit guidance system | |
CN110397458A (en) | Three-dimensional reinforcement construction method suitable for collapse tunnel extension | |
CN114764844B (en) | Shale gas drilling optimization design method and device | |
CN106522253B (en) | Drill precise holes and the construction method of grouting on a kind of big depth of water toe board | |
CN109083648B (en) | Model test intersects hidden cavern excavation manipulator and method | |
CN108755693B (en) | Grouting device and in-hole sectional grouting method for multiple karst caves | |
CN103437774A (en) | Shield excavation machining method | |
CN115685336A (en) | Comprehensive exploration method based on non-coring horizontal directional drilling process | |
CN107269283B (en) | A kind of big cross section tunneling subway station and running tunnel penetrate through construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |