CN104455726A - Pipe-jacking construction method for pipeline bottom grouting reinforcement - Google Patents

Pipe-jacking construction method for pipeline bottom grouting reinforcement Download PDF

Info

Publication number
CN104455726A
CN104455726A CN201410668028.2A CN201410668028A CN104455726A CN 104455726 A CN104455726 A CN 104455726A CN 201410668028 A CN201410668028 A CN 201410668028A CN 104455726 A CN104455726 A CN 104455726A
Authority
CN
China
Prior art keywords
pipeline
well
construction method
jacking construction
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410668028.2A
Other languages
Chinese (zh)
Inventor
安关峰
叶锡钧
张万辉
李波
张洪彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Municipal Engineering Group Co Ltd
Original Assignee
Guangzhou Municipal Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Municipal Engineering Group Co Ltd filed Critical Guangzhou Municipal Engineering Group Co Ltd
Priority to CN201410668028.2A priority Critical patent/CN104455726A/en
Publication of CN104455726A publication Critical patent/CN104455726A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a pipe-jacking construction method for pipeline bottom grouting reinforcement. The method comprises the following steps that A, a working well and a receiving well are constructed in the direction of laying a pipeline, and a plurality of horizontal direction holes side by side are formed below the preset position, between the working well and the receiving well, of the pipeline; B, high-pressure grouting is carried out in all the horizontal direction holes to form cement and soil composite structure piles; C, the pipeline is jacked into the preset position through cement balancing pipe-jacking equipment. Horizontal direction drills are utilized for drilling the working well and the receiving well in the opposite directions at the same time, high-pressure jet grouting is carried out in the holes, the method for forming the cement and soil composite structure piles at the bottom of the pipeline is used for reinforcing a foundation, the effect that long-distance deep-embedded pipe-jacking construction is carried out in a sludge bottom layer with the high water content can be smoothly achieved, and the problem that vertical high-pressure jet grouting piles can not be adopted on the road surface can be solved smoothly. Good economic benefits and social benefits are obtained. Particularly, the benefits of the method are outstanding for the situation that deep foundation reinforcing can not be carried out conveniently on the road surface with the traffic jam.

Description

A kind of pipe jacking construction method of duct bottom grouting and reinforcing
Technical field
The present invention is used for municipal pipeline Construction Technology field, particularly relates to a kind of pipe jacking construction method pushing up pipe section grouting and reinforcing.
Background technique
Along with the increase of urban size and the raising of people's environmental consciousness, the sewage network in city is built in the ascendant.Traditional open cut embed pipe with trough method is densely populated in old town, road is narrow, and the situation of system-wide section excavation badly influences normal life and the work of urban transportation and resident.And pipe jacking construction method preferably resolves the problems referred to above, be used widely.Jacking construction is a kind of non-excavating construction method, is not excavate or few piping laying construction technology excavated.Construction by pipeline jacking method is the top power by means of jacking device generation in active well, overcomes the frictional force of pipeline and surrounding soil, the gradient of pipeline by design is headed in soil, and the earthwork is transported.After one pipe joint completes and heads into soil layer, more lower second section pipe continues jacking.Its principle is by means of main top oil cylinder end thrust, tool pipe or development machine is advanced in received well through soil layer in active well always, meanwhile, the tube coupling after following tool pipe or development machine closely is embedded between two holes.Now conventional several pipe jacking construction methods have unlimited artificial hand to dig formula, pneumatic process and sealing machine formula, need select according to actual geological condition.
In recent years in Pearl River Delta, the Yangtze River Delta and coastal area construction pipeline many, this area's mud is huge thick, level of ground water is high, soil property is poor, and mud has high void ratio, high-moisture, high-compressibility, and shear resistance is poor, very easily thixotroping, water content is 50% ~ 70%, and normality has soft moulding, the feature of low bearing capacity, engineering properties is poor, brings very large difficulty and risk to construction and the operation of pipeline later stage:
(1) from the angle of construction safety, because mud can not form stable excavation surface, when pipeline top is to time herein, owing to being disturbed, the original fragile stress equilibrium of mud body is destroyed, and mud can pour in pipeline thereupon, underground water also can enter thereupon, serious harm construction safety.
(2) from the angle of construction quality, due to muck foundation Lack of support, pipeline modal common quality defect in Mud Ground jacking is exactly that pipeline uneven subsidence causes conduit axis off-design axis.
(3) from the angle of construction cost, the pipeline being originally designed to push pipe laying is changed into open cut and lays, the increase of construction cost must be caused.For heavy caliber, buried dark pipeline, on amount of excavation and coagulation, consumption considerably increases, and dark comparatively large owing to digging, and also must take corresponding supporting, protective measures and process Mud Ground, greatly improving construction cost.
(4) from the angle of construction speed, if do not have effective way process to reinforce mud, particularly extremely abundant for underground water, the area that underground Mud Ground generally distributes, need pipeline line position to change, this can extend the duration of construction greatly.
(5) from the angle of pipeline operation, after pipeline operation, being subject to internal loading and external load effect, can there is sedimentation in tube coupling; Being subject to the impact that tube coupling interface is closely knit, smooth-going, can there is seepage in tube coupling; By Mud Ground draw, tube coupling can be thrown off, and causes operation accident to occur.
The geological condition that mire water equilibrium tube method is suitable for is wider; The relatively stable of excavation surface can be kept; Advance step pitch less, be most suitable for long-distance pipe jacking; In working pit, working environment is better, and operation is safer; Continuous excavation, fltting speed is fast.To muck soil, mire water equilibrium tube can be reduced expenses l0% ~ 20% compared with directly excavating, and can reduce expenses about 1/3 compared with artificial push pipe.So mire water equilibrium tube method has significant social benefit, economic benefit and environmental benefit, municipal pipeline of constructing under mud and muck soil formation condition, should select mire water equilibrium tube method.
Adopt mire water equilibrium tube method jacking construction in mud soil, head weight is large, run into the large mud bearing capacity value of water content low time, nose drop trend causes the complete off-design axis of pipeline, in Pearl River Delta, Yangtze River Delta Area pipe-jacking project, often there is analogue, be difficult to solve.Existing most engineering adopts deep-mixed pile or vertical high-pressure rotary jet grouting pile to carry out treatment of soft foundation, but comparatively dark for buried depth of pipeline, and pipeline passes the longer situation of mud distance, and cannot use deep-mixed pile, high-pressure rotary jet grouting pile is then invested larger.
Summary of the invention
For solving the problem, the invention provides a kind of pipe jacking construction method of duct bottom grouting and reinforcing, the situation carrying out growing distance, buried jacking construction or can not vertical high-pressure rotary jet grouting pile being adopted on road surface to reinforce in high-moisture mud bottom can be solved smoothly.
The technical solution adopted for the present invention to solve the technical problems is: a kind of pipe jacking construction method of duct bottom grouting and reinforcing, comprises the following steps:
A. along laying direction construction operation well and the received well of pipeline, between active well with received well, some horizontal orientation holes are side by side become in the below of pipeline preset position;
B. in each described horizontal orientation hole inner high voltage slip casting, the stake of cement soil composite structure is formed;
C. by mire water equilibrium tube equipment, pipeline is headed into preset position.
Be further used as the improvement of technical solution of the present invention, described active well and received well all adopt drop shaft sinking to construct.
Be further used as the improvement of technical solution of the present invention, when described active well and received well construction, embedded hole be set in the one-tenth hole site in horizontal orientation hole.
Be further used as the improvement of technical solution of the present invention, in described active well and received well, adopt horizontal directional drilling machine subtend to hole simultaneously, during boring by magnetic steering instrument through a cable carry out controlling to.
Be further used as the improvement of technical solution of the present invention, stirred to pumping mud in horizontal orientation hole by high pressure slurry pump while boring, carry out mud off.
Be further used as the improvement of technical solution of the present invention, during boring, active well and received well subtend drill through, and form lap segment at middle part, and the length of described lap segment is 2m.
Be further used as the improvement of technical solution of the present invention, active well and received well drill through to retreat and bore, and carry cement slurry, after drill bit exits while moving back brill by high pressure jet grouting technique in horizontal orientation hole, shutoff horizontal orientation hole, to form the stake of cement soil composite structure.
Be further used as the improvement of technical solution of the present invention, the stake of described cement soil composite structure arranges two rows altogether, often arranges 7, cement soil composite structure stake distance from top pipeline bottom tube wall 400mm.
Beneficial effect of the present invention: because pipeline be all mud through stratum, buried depth of pipeline is comparatively dark, and pipeline is longer through mud distance, cannot use deep-mixed pile, and through river course, employing high-pressure rotary jet grouting pile is then invested larger.The invention provides one and utilize horizontal directional drill, in active well and received well subtend boring simultaneously (two rows), and high pressure jet grouting is carried out in hole, at the bottom of pipeline pipe, form the method consolidated subsoil of cement soil composite structure stake, the situation carrying out growing distance, buried jacking construction or can not vertical high-pressure rotary jet grouting pile being adopted on road surface to reinforce in high-moisture mud bottom can be solved smoothly.From subtend boring, the high-pressure slip-casting while of active well and received well, successfully solve the problem of push pipe foundation stabilization in Mud Ground, achieve good economic and social benefit.Particularly be located in traffic congestion, inconvenient situation of carrying out deep foundation reinforcing on road surface, benefit of the present invention is particularly outstanding.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the invention will be further described:
Fig. 1 is embodiment of the present invention structure side view;
Fig. 2 is embodiment of the present invention structural front view.
1. active well 1; 2. received well; 3. pipeline; 4. embedded hole; 5. lap segment; 6. cement soil composite structure stake.
Embodiment
With reference to Fig. 1, Fig. 2, the invention provides a kind of pipe jacking construction method of duct bottom grouting and reinforcing, comprise the following steps:
A. the laying direction along pipeline 3 adopts drop shaft sinking construction operation well 1 and received well 2, round-seal reservoir 1 external diameter 16.6 meters, and the degree of depth is subsurface 24.7 meters, concrete sealing bottom; Circular reception well 2 external diameter 9.6 meters, the degree of depth is 22.5 meters, underground, concrete sealing bottom, between active well 1 with received well 2, become some horizontal orientation holes side by side in the below of pipeline 3 preset position, DN150 embedded hole 4 is set in the one-tenth hole site in horizontal orientation hole, prevents hole in boring procedure from spoiling hole.Adopt horizontal directional drilling machine subtend to hole in described active well 1 and received well 2, active well 1 adopts XZ500 directional drilling machine, and received well 2 adopts XZ300 directional drilling machine simultaneously, drill pipe diameter 89mm, drill pipe joint length 4.5m, adopts slip box drilling cramp, adjusting angle 10 ~ 20 degree.During boring by magnetic steering instrument through a cable carry out controlling to.Stirred to pumping mud in horizontal orientation hole by high pressure slurry pump while boring, carry out mud off.During boring, active well 1 and received well 2 subtend drill through, and form lap segment 5 at middle part, and the length of described lap segment 5 is 2m;
B. active well 1 and received well 2 drill through to retreat and bore, in horizontal orientation hole, cement slurry is carried by high pressure jet grouting technique while moving back brill, cement slurry proportioning: high-pressure rotary jet grouting pile solidifying material selects 42.5R level, ordinary Portland cement consumption 230kg/m, adds 5% water glass.After drill bit exits, shutoff horizontal orientation hole, to form cement soil composite structure stake 6, described cement soil composite structure stake 6 arranges two rows altogether, often arranges 7, cement soil composite structure stake 6 distance from top pipeline 3 bottom tube wall 400mm;
C. by mire water equilibrium tube equipment, pipeline 3 is headed into preset position.
Wherein, according to the change of formation condition, mud adopts composite sludge proportion technique, uses the special bentonite clay of Directional Drilling to add fresh water by 5% ~ 10% weight ratio and allots base slurry, then add various mud additive in 2% ~ 4% ratio of base slurry weight.On-the-spot outfit two cover high pressure slurry pumps, the pumping capacity of single pump is not less than 2m 3/ min, ensures that long distance passes through the mud pressure of Mud Ground and flow meets construction requirement.Mud displacement is 15-20L/s, and mud pressure is at about 6-10MPa.
In steps A, during boring by magnetic steering instrument through a cable carry out controlling to, set up during boring and pass through axis database, gather control to data, determine that control is to scheme, mud and driller pay attention to each link, serious analysis parameters, cooperatively interact and get out the horizontal orientation hole of composite demand, when boring horizontal orientation hole, contrast geologic information and instrument Parameter analysis pore-forming situation at any time, reach and be unearthed accurately, pore-forming is good.
1. azimythal angle is set
Accurately make with electronic tachometer and pass through center line, control being placed on to signal rod passes through on center line without magnetic disturbance, signal rod is connected to instrument signaling line with control, control and will show the azimythal angle of this position signal rod to instrument, turn signal rod, often turn 45 ° and survey first power parallactic angles, survey 8 numerical value be averaged after the azimuth value of i.e. position for this reason.Centrally line changes the position of signal rod, and again record azimuth value, three positions are at least got at scene, finally average both to have can be used as and pass through center line large magnetic azinuth accurately.
2. artificial magnetic field is adopted to carry out the control of pilot hole curve offset
When passing through water channel, drilling rod trend should be paid close attention to, and the control of the good every root drilling rod of record is to data, drill bit left-right deviation can not be greater than 1m, if occur, deviation is greater than the situation of 1m, drilling rod should be drawn back in time, in artificial magnetic field, control is adjusted to data, lay artificial magnetic field, especially before passing through waters every about 50 meters, repeatedly check and control to azimythal angle and pass through track, keep true bearing angle and control to azimuthal deviation within allowed band.Passing through in the process of waters, if run into external magnetic field interference, then keeping former and creep into azimythal angle, linearly advance in tool face azimuth, after passing interference range, carry out correction correction at once, make actual deviation of passing through track and planned course within the range of permission, to ensure the success of crossing project.
Certainly, the invention is not limited to above-mentioned mode of execution, those of ordinary skill in the art also can make equivalent variations or replacement under the prerequisite without prejudice to spirit of the present invention, and these equivalent modification or replacement are all included in the application's claim limited range.

Claims (8)

1. a pipe jacking construction method for duct bottom grouting and reinforcing, is characterized in that, comprises the following steps:
Along laying direction construction operation well and the received well of pipeline, between active well with received well, become some horizontal orientation holes side by side in the below of pipeline preset position;
In each described horizontal orientation hole inner high voltage slip casting, form the stake of cement soil composite structure;
By mire water equilibrium tube equipment, pipeline is headed into preset position.
2. the pipe jacking construction method of duct bottom grouting and reinforcing according to claim 1, is characterized in that: described active well and received well all adopt drop shaft sinking to construct.
3. the pipe jacking construction method of duct bottom grouting and reinforcing according to claim 2, is characterized in that: when described active well and received well construction, arrange embedded hole in the one-tenth hole site in horizontal orientation hole.
4. the pipe jacking construction method of duct bottom grouting and reinforcing according to claim 1, is characterized in that: adopt horizontal directional drilling machine subtend to hole in described active well and received well simultaneously, during boring by magnetic steering instrument through a cable carry out controlling to.
5. the pipe jacking construction method of duct bottom grouting and reinforcing according to claim 4, is characterized in that: stirred to pumping mud in horizontal orientation hole by high pressure slurry pump while boring, carry out mud off.
6. the pipe jacking construction method of the duct bottom grouting and reinforcing according to claim 4 or 5, is characterized in that: during boring, active well and received well subtend drill through, and forms lap segment at middle part, and the length of described lap segment is 2m.
7. the pipe jacking construction method of duct bottom grouting and reinforcing according to claim 6, it is characterized in that: active well and received well drill through to retreat and bore, in horizontal orientation hole, cement slurry is carried by high pressure jet grouting technique while moving back brill, after drill bit exits, shutoff horizontal orientation hole, to form the stake of cement soil composite structure.
8. the pipe jacking construction method of duct bottom grouting and reinforcing according to claim 1, is characterized in that: the stake of described cement soil composite structure arranges two rows altogether, often arranges 7, cement soil composite structure stake distance from top pipeline bottom tube wall 400mm.
CN201410668028.2A 2014-11-20 2014-11-20 Pipe-jacking construction method for pipeline bottom grouting reinforcement Pending CN104455726A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410668028.2A CN104455726A (en) 2014-11-20 2014-11-20 Pipe-jacking construction method for pipeline bottom grouting reinforcement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410668028.2A CN104455726A (en) 2014-11-20 2014-11-20 Pipe-jacking construction method for pipeline bottom grouting reinforcement

Publications (1)

Publication Number Publication Date
CN104455726A true CN104455726A (en) 2015-03-25

Family

ID=52902239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410668028.2A Pending CN104455726A (en) 2014-11-20 2014-11-20 Pipe-jacking construction method for pipeline bottom grouting reinforcement

Country Status (1)

Country Link
CN (1) CN104455726A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105065774A (en) * 2015-08-14 2015-11-18 腾达建设集团股份有限公司 Branch connection construction method for underground pipeline
CN108194703A (en) * 2018-02-11 2018-06-22 北京建工土木工程有限公司 A kind of the amendment construction system and its modification method of push pipe of constructing
CN108662281A (en) * 2018-05-31 2018-10-16 成都金玉雄辉建筑工程有限公司 Conduit jacking and pipe jacking construction method
CN109797778A (en) * 2019-03-27 2019-05-24 中铁四局集团有限公司 One kind being suitable for the anhydrous layer of sand area upper pipe working well in desert and construction method
CN109798069A (en) * 2019-01-22 2019-05-24 福建亿钻机械有限公司 Deep basal pit small-bore pipeline repairs complete set of equipments and construction method
CN110094216A (en) * 2019-05-31 2019-08-06 中铁第四勘察设计院集团有限公司 A kind of separate tunnel stratum compensation and grouting system
CN110131479A (en) * 2019-06-13 2019-08-16 福建工程学院 A kind of counterforce structure of soft soil foundation large section push pipe jacking operation
CN110258507A (en) * 2019-06-15 2019-09-20 武汉中力岩土工程有限公司 A kind of soft soil foundation reinforcing method
CN110593274A (en) * 2019-09-20 2019-12-20 上海建工七建集团有限公司 Bottom hole structure for ensuring bottom sealing quality of pipe-jacking working well and bottom sealing construction method
CN110912067A (en) * 2019-12-04 2020-03-24 中国能源建设集团广东省电力设计研究院有限公司 High-voltage cable channel
CN111206934A (en) * 2020-02-14 2020-05-29 上海市城市建设设计研究总院(集团)有限公司 Pipe group isolation jacking pipe construction method
CN113006803A (en) * 2021-04-06 2021-06-22 中冶华南建设工程有限公司 Anti-disturbance pipe jacking construction system and construction process
CN114215111A (en) * 2021-12-31 2022-03-22 广东中都建筑集团有限公司 Construction method for top-pull combined trenchless pipeline

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1391053A (en) * 2002-07-25 2003-01-15 上海隧道工程股份有限公司 Earth pressure balancing technology for laying rectangular top pipe
CN1865650A (en) * 2006-06-22 2006-11-22 刘明明 Construction method for push pipe by cooperation of horizontal auger driller and horizontal directional driller
CN101260784A (en) * 2008-04-23 2008-09-10 北京首尔工程技术有限公司 Tunnel advanced support air circulated drilling construction method and drilling tool
CN101280565A (en) * 2008-05-28 2008-10-08 中冶集团武勘岩土基础工程公司 Horizontal top pipe ground treatment construction method
CN103791159A (en) * 2012-11-02 2014-05-14 成张佳宁 Pipe-jacking construction method for small-diameter pipes

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1391053A (en) * 2002-07-25 2003-01-15 上海隧道工程股份有限公司 Earth pressure balancing technology for laying rectangular top pipe
CN1865650A (en) * 2006-06-22 2006-11-22 刘明明 Construction method for push pipe by cooperation of horizontal auger driller and horizontal directional driller
CN101260784A (en) * 2008-04-23 2008-09-10 北京首尔工程技术有限公司 Tunnel advanced support air circulated drilling construction method and drilling tool
CN101280565A (en) * 2008-05-28 2008-10-08 中冶集团武勘岩土基础工程公司 Horizontal top pipe ground treatment construction method
CN103791159A (en) * 2012-11-02 2014-05-14 成张佳宁 Pipe-jacking construction method for small-diameter pipes

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
中铁二局股份有限公司 卿三惠等: "导向系统", 《土木工程施工工艺隧道及地铁工程》 *
候向伟等: "注浆施工法在顶管施工中的应用", 《内蒙古电大学刊》 *
鄢泰宁等: "岩土钻掘工艺学", 《岩土钻掘工艺学 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105065774A (en) * 2015-08-14 2015-11-18 腾达建设集团股份有限公司 Branch connection construction method for underground pipeline
CN108194703A (en) * 2018-02-11 2018-06-22 北京建工土木工程有限公司 A kind of the amendment construction system and its modification method of push pipe of constructing
CN108194703B (en) * 2018-02-11 2023-06-20 北京建工土木工程有限公司 Correction construction system and correction method for construction jacking pipe
CN108662281A (en) * 2018-05-31 2018-10-16 成都金玉雄辉建筑工程有限公司 Conduit jacking and pipe jacking construction method
CN108662281B (en) * 2018-05-31 2020-07-07 成都金玉雄辉建筑工程有限公司 Pipe jacking device and pipe jacking construction method
CN109798069A (en) * 2019-01-22 2019-05-24 福建亿钻机械有限公司 Deep basal pit small-bore pipeline repairs complete set of equipments and construction method
CN109797778A (en) * 2019-03-27 2019-05-24 中铁四局集团有限公司 One kind being suitable for the anhydrous layer of sand area upper pipe working well in desert and construction method
CN110094216A (en) * 2019-05-31 2019-08-06 中铁第四勘察设计院集团有限公司 A kind of separate tunnel stratum compensation and grouting system
CN110094216B (en) * 2019-05-31 2024-05-03 中铁第四勘察设计院集团有限公司 Separated tunnel stratum compensation grouting system
CN110131479A (en) * 2019-06-13 2019-08-16 福建工程学院 A kind of counterforce structure of soft soil foundation large section push pipe jacking operation
CN110131479B (en) * 2019-06-13 2024-04-16 福建工程学院 Reaction structure for jacking operation of soft soil foundation super-large section jacking pipe
CN110258507A (en) * 2019-06-15 2019-09-20 武汉中力岩土工程有限公司 A kind of soft soil foundation reinforcing method
CN110258507B (en) * 2019-06-15 2021-05-14 武汉中力岩土工程有限公司 Soft soil foundation reinforcing method
CN110593274A (en) * 2019-09-20 2019-12-20 上海建工七建集团有限公司 Bottom hole structure for ensuring bottom sealing quality of pipe-jacking working well and bottom sealing construction method
CN110912067B (en) * 2019-12-04 2021-01-19 中国能源建设集团广东省电力设计研究院有限公司 High-voltage cable channel
CN110912067A (en) * 2019-12-04 2020-03-24 中国能源建设集团广东省电力设计研究院有限公司 High-voltage cable channel
CN111206934A (en) * 2020-02-14 2020-05-29 上海市城市建设设计研究总院(集团)有限公司 Pipe group isolation jacking pipe construction method
CN113006803B (en) * 2021-04-06 2023-10-20 中冶华南建设工程有限公司 Anti-disturbance pipe jacking construction system and construction process
CN113006803A (en) * 2021-04-06 2021-06-22 中冶华南建设工程有限公司 Anti-disturbance pipe jacking construction system and construction process
CN114215111A (en) * 2021-12-31 2022-03-22 广东中都建筑集团有限公司 Construction method for top-pull combined trenchless pipeline

Similar Documents

Publication Publication Date Title
CN104455726A (en) Pipe-jacking construction method for pipeline bottom grouting reinforcement
CN106369223B (en) A kind of silt stratum pipe jacking construction method
CN106402490B (en) Silt stratum push pipe jacking construction method based on steel bushing head tool pipe
CN102032393B (en) Small-bore long distance curved pipe jacking method
CN108442382B (en) In-situ protection and enclosure soil-retaining structure for pressure pipeline crossing deep foundation pit and construction method
CN110359921A (en) Wear the construction method of building in a kind of shield short distance side
CN104153352A (en) Karst geology rotary-drilling bored concrete pile hole forming process
CN105240019A (en) Pipe jacking construction method
CN109371974A (en) A kind of PHC tubular pole implantation construction method suitable for hard geology
CN109594990B (en) Large-section jacking pipe construction method for complex stratum
CN112664221B (en) Pipe jacking construction method for complex geological layer
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN112983456B (en) Water-rich sand layer multi-row pipe jacking ground surface deformation control method
CN109026010A (en) A kind of mine seepage well slip casting type sinking shaft construction method
CN107448137A (en) A kind of rig that circles round enters the construction method of rock pore-forming
CN104532853A (en) Deep foundation pit supporting method and system characterized by steel reinforced cement-soil piles, bolts easy to detach and automatic monitoring and early warning
CN106677791B (en) A kind of construction method of shallow embedding shield driven tunnel crossing highway
CN108071110A (en) Rotary drilling rig Pile method under complex geological condition
CN209384285U (en) One kind closing on the existing bridge bearing platform protection construction of open-cut foundation ditch
CN207080177U (en) A kind of roller cutter bit for entering rock pore-forming for the rig that circles round
CN202416325U (en) Shallow foundation pit space enclosing structure
CN107975376A (en) Tunneling shield push pipe and vertical duct connection structure and construction method
CN205296194U (en) Rich irrigated land layer undercut tunnel interlock pipe curtain
CN111335906B (en) Construction method for drilling boulder
CN114233191A (en) Offshore wind farm submarine cable embankment penetrating construction method based on trenchless directional drilling technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150325

RJ01 Rejection of invention patent application after publication