CN103233487A - Method for grouting and floor lifting by directional drilling machine - Google Patents
Method for grouting and floor lifting by directional drilling machine Download PDFInfo
- Publication number
- CN103233487A CN103233487A CN2013101537781A CN201310153778A CN103233487A CN 103233487 A CN103233487 A CN 103233487A CN 2013101537781 A CN2013101537781 A CN 2013101537781A CN 201310153778 A CN201310153778 A CN 201310153778A CN 103233487 A CN103233487 A CN 103233487A
- Authority
- CN
- China
- Prior art keywords
- slip
- casting
- drill
- terrace
- directional drill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
A method for grouting and floor lifting by a directional drilling machine comprises the directional drilling machine, a drill pipe, mixture size, a high-pressure grouting pump and a drill guide instrument, the mixture size is a mixture of slurry and admixtures, the directional drilling machine is combined with the drill guide instrument, directions of the drill pipe can be changed freely, a drill can arrive at a set position for grouting conveniently, the construction does not cause any influence on building usage, the displacement of the drilling machine is little, and the drilling cost is low.
Description
Technical field
The present invention relates to the geotechnical engineering field, relate in particular to the technology of slip casing by pressure reinforcing or jacking basis and terrace.
Background technology
Soft clay area is banketed because of large tracts of land and is caused thick sludge soil base consolidation settlement, the terrace of " the bottom of a pan " shape has brought to use and has had a strong impact on, terrace must cut and reform when serious, has not only influenced productions, cost but also high, has report to adopt in the hole method of cement injection lifting terrace of terrace, the method cement paste consumption is big, cost is high, and intensive boring also influences production, and it is influenced, also many just like the piece stone that bankets under the terrace that terrace is repaired the back quality, Grouting Pipe is squeezed into difficulty, influences the cloth hole.A kind of need not holed at terrace, adopts directional drill to yet there are no report with the method for low-cost mud mixed serum slip-casting lifting terrace.
Summary of the invention
Technical problem to be solved by this invention is to overcome the deficiency of above-mentioned prior art, provides a kind of slip casting convenience, rig displacement less and the method for the directional drill slip-casting lifting terrace that cost is low.
Method according to a kind of directional drill slip-casting lifting terrace provided by the invention comprises directional drill and drilling rod, and the mixed serum that mud mixes with admixture and high-pressure injection pump and drill bit leading instrument is characterized in that comprising following construction sequence:
A, spy barrier and cleaning obstacle;
The inclined-plane bit bore of B, described directional drill, and advance described drilling rod;
C, described drill bit leading instrument are controlled the inclined-plane drill bit direction of propulsion of described directional drill, thereby regulate described drilling rod circuit, arrive the slip casting position, with described mixed serum with described high-pressure injection pump by the slip casting of fixing a point of described drilling rod;
D, repeating step C each precalculated position slip casting under terrace;
Withdraw from described drilling rod after E, the terrace lifting.
Method according to a kind of directional drill slip-casting lifting terrace provided by the invention also has following attached technical characterictic:
Be embedded with probe in the described inclined-plane drill bit, the drill-rod wire route ground drill bit leading instrument commander adjust.
The slip casting precalculated position of described step C and step D is positioned at top or the left and right side of drilling rod principal direction.
Described step D repeats at least two circulation slip castings, and the proportioning of the slurries of each slip casting is different with concentration.
Described mud is the discharging waste mud of bored pile, and described admixture is cement or flyash or lime, and described admixture consumption is the 5-20% of mud weight.
Described admixture is aggregate chips (claiming stone flour again) or sand, and the consumption of described aggregate chips or sand is the 40-70% of mud consumption.
Described admixture is the mixture of aggregate chips (claiming stone flour again) or sand and cement or flyash, and the ratio of mud, aggregate chips or sand, cement or flyash is 1:(1~2): (0.1~0.5).
Described high-pressure injection pump is fine-stone concrete pump or concrete pump, and grouting pressure is 1~20MPa.
The terrace top in described precalculated position is provided with the ballast car.
Method according to a kind of directional drill slip-casting lifting terrace provided by the invention compared with prior art has following advantage:
1, adopt directional drill in conjunction with the drill bit leading instrument, can freely change the drilling rod direction, make drill bit arrive desired location slip casting easily, construction is used building and is not produced any influence, and the rig displacement is few, and the boring cost is low.
2, can select the slip casting point as required arbitrarily, the lifting effect is easy to control.
3, adopt bored pile discharging waste mud, turn waste into wealth, significantly reduce the slurries cost, protected environment simultaneously, two get at one stroke.
4, establish the ballast car at terrace, can effectively control the diffusion radius of terrace protuberance, can reduce the slip casting number of spots.
Description of drawings
Fig. 1 is construction schematic diagram of the present invention
Fig. 2 is slip casting point layout schematic diagram of the present invention
The specific embodiment
Referring to Fig. 1, in the method for a kind of directional drill slip-casting lifting terrace provided by the invention, comprise directional drill 1 and drilling rod 2, the mixed serum that mud mixes with admixture and high-pressure injection pump 5 and drill bit leading instrument 3 is characterized in that comprising following construction sequence:
A, spy barrier and cleaning obstacle
Inclined-plane drill bit 21 borings of B, described directional drill, and advance described drilling rod 2
C, described drill bit leading instrument are controlled the inclined-plane drill bit direction of propulsion of described directional drill, thereby regulate described drilling rod circuit, arrive the slip casting position, with described mixed serum with described high-pressure injection pump 5 by the slip casting of fixing a point of described drilling rod
D, repeating step C each precalculated position slip casting under terrace
Withdraw from described drilling rod after E, the terrace lifting.
But the long distance of directional drill 1 horizontal direction is crept into, can change the drill bit direction of propulsion freely, and under the guide of drill bit leading instrument 3, make drill bit accurately arrive the predetermined degree of depth and position, therefore need not just can be in slip casting under the terrace in terrace boring, low, the easy construction of boring cost, and can not produce any influence to the normal use in ground, described mixed serum is primary raw material by mud, mix the powdery curing compound, both reduced the slurries cost, can make slurries inject soil again and harden, slip casting can divide two to three circulations to carry out, and can make lifting absolute altitude precision higher.
Referring to Fig. 1, Fig. 2, in above-described embodiment that the present invention provides, the slip casting precalculated position of described step C and step D is positioned at top or the left and right side of drilling rod 2 principal directions.Determining and can being located at optional position in the certain limit of drilling rod inceptive direction according to stage difference, purpose difference, the diffusion radius difference of slip casting of slip casting precalculated position only needs to set the drill bit running orbit and just can arrive the slip casting precalculated position.
Referring to Fig. 1, in above-described embodiment that the present invention provides, described admixture is aggregate chips (claiming stone flour again) or sand, and the consumption of described aggregate chips or sand is the 40-70% of mud consumption.Mix the thicker aggregate chips of particle or sand etc. in mixed serum, not only cost is low, and pressure dissipation is fast after the slip casting, and reply volume is little, adds an amount of curing compound such as cement, and it is fixed that mixed serum is accelerated, and reduces reply volume.
Referring to Fig. 1, in above-described embodiment that the present invention provides, described high-pressure injection pump is fine-stone concrete pump or concrete pump, and grouting pressure is 1~20MPa.Adopt fine-stone concrete pump or concrete pump, can strengthen pressure and the flow of slip casting, accelerate terrace lifting speed, relax the restriction to particle diameter in the slurries simultaneously.
Referring to Fig. 1, in above-described embodiment that the present invention provides, described step D repeats at least two circulation slip castings, and the proportioning of each slurries is different with concentration.If the ballast car is the excessive problem of protuberance amount of slip casting point during slip casting under the level ground controllably, the radius of influence of protuberance is enlarged, make protuberance milder, even, and mud adopt the discharging waste mud of bored pile, can turn waste into wealth, reduce the mud cost.
Claims (9)
1. the method for a directional drill slip-casting lifting terrace comprises directional drill and drilling rod, and the mixed serum that mud mixes with admixture and high-pressure injection pump and drill bit leading instrument is characterized in that comprising following construction sequence:
A, spy barrier and cleaning obstacle
The inclined-plane bit bore of B, described directional drill, and advance described drilling rod
C, described drill bit leading instrument are controlled the inclined-plane drill bit direction of propulsion of described directional drill, arrive the slip casting position thereby regulate described drilling rod circuit, with described mixed serum with described high-pressure injection pump by the slip casting of fixing a point of described drilling rod
D, repeating step C each precalculated position slip casting under terrace
Withdraw from described drilling rod after E, the terrace lifting.
2. the method for directional drill slip-casting lifting terrace according to claim 1 is characterized in that being embedded with probe in the described inclined-plane drill bit, and the drill-rod wire route ground drill bit leading instrument commander adjust.
3. the method for directional drill slip-casting lifting terrace according to claim 1 is characterized in that the slip casting precalculated position of described step C and step D is positioned at top or the left and right side of drilling rod principal direction.
4. the method for directional drill slip-casting lifting terrace according to claim 1 is characterized in that described step D repeats at least two circulation slip castings, and the proportioning of the slurries of each slip casting is different with concentration.
5. the method for directional drill slip-casting lifting terrace according to claim 1 is characterized in that described mud is the discharging waste mud of bored pile, and described admixture is cement or flyash or lime, and described admixture consumption is the 5-20% of mud weight.
6. the method for directional drill slip-casting lifting terrace according to claim 1 is characterized in that described admixture is aggregate chips (claiming stone flour again) or sand, and the consumption of described aggregate chips or sand is the 40-70% of mud consumption.
7. the method for directional drill slip-casting lifting terrace according to claim 1, it is characterized in that described admixture is the mixture of aggregate chips (claiming stone flour again) or sand and cement or flyash, the ratio of mud, aggregate chips or sand, cement or flyash is 1:(1~2): (0.1~0.5).
8. the method for directional drill slip-casting lifting terrace according to claim 1 is characterized in that described high-pressure injection pump is fine-stone concrete pump or concrete pump, and grouting pressure is 1~20MPa.
9. the method for directional drill slip-casting lifting terrace according to claim 1 is characterized in that the terrace top in described precalculated position is provided with the ballast car.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101537781A CN103233487A (en) | 2013-04-27 | 2013-04-27 | Method for grouting and floor lifting by directional drilling machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101537781A CN103233487A (en) | 2013-04-27 | 2013-04-27 | Method for grouting and floor lifting by directional drilling machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103233487A true CN103233487A (en) | 2013-08-07 |
Family
ID=48881551
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013101537781A Pending CN103233487A (en) | 2013-04-27 | 2013-04-27 | Method for grouting and floor lifting by directional drilling machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103233487A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023165563A1 (en) * | 2022-03-03 | 2023-09-07 | 北京恒祥宏业基础加固技术有限公司 | Lifting and reinforcing process for dust-free factory floor |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1233697A (en) * | 1999-05-27 | 1999-11-03 | 中国化学工程第一岩土工程有限公司 | Method for lifting concrete foundation level by multiple pipe pouring slurry repeatedly |
JP3446640B2 (en) * | 1998-12-14 | 2003-09-16 | 鹿島建設株式会社 | Flexible submerged tunnel and its construction method |
CN200940444Y (en) * | 2006-05-23 | 2007-08-29 | 中国石油天然气管道局 | Automatic guide system for horizontal positioning drill |
CN101260784A (en) * | 2008-04-23 | 2008-09-10 | 北京首尔工程技术有限公司 | Tunnel advanced support air circulated drilling construction method and drilling tool |
CN101487274A (en) * | 2009-02-23 | 2009-07-22 | 北京交通大学 | Slip-casting lifting method for city tunnel passing through existing buildings |
-
2013
- 2013-04-27 CN CN2013101537781A patent/CN103233487A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3446640B2 (en) * | 1998-12-14 | 2003-09-16 | 鹿島建設株式会社 | Flexible submerged tunnel and its construction method |
CN1233697A (en) * | 1999-05-27 | 1999-11-03 | 中国化学工程第一岩土工程有限公司 | Method for lifting concrete foundation level by multiple pipe pouring slurry repeatedly |
CN200940444Y (en) * | 2006-05-23 | 2007-08-29 | 中国石油天然气管道局 | Automatic guide system for horizontal positioning drill |
CN101260784A (en) * | 2008-04-23 | 2008-09-10 | 北京首尔工程技术有限公司 | Tunnel advanced support air circulated drilling construction method and drilling tool |
CN101487274A (en) * | 2009-02-23 | 2009-07-22 | 北京交通大学 | Slip-casting lifting method for city tunnel passing through existing buildings |
Non-Patent Citations (1)
Title |
---|
李瑞: ""注浆技术在砂砾底层定(导)向钻进施工中的应用研究"", 《中国优秀硕士论文电子期刊基础科学辑》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023165563A1 (en) * | 2022-03-03 | 2023-09-07 | 北京恒祥宏业基础加固技术有限公司 | Lifting and reinforcing process for dust-free factory floor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204662425U (en) | Polygonal cement mixing method | |
CN106368214B (en) | A kind of casing formula cement mixing method at pile operation method | |
CN102021906A (en) | Method for reinforcing soft soil foundation at deep mixing pile | |
CN105113496A (en) | Construction method for soil-cement mixing piles | |
CN104196017B (en) | A kind of method of preventing and treating lava area punching/bored pile spillage, collapse hole | |
CN107989032A (en) | A kind of construction method of punching interlocking pile | |
CN104863132A (en) | Bougainvillea spectabilis willd-shaped cement-soil mixing pile and shaping method thereof | |
CN105297712A (en) | Construction method for composite pile of auger-bored high-pressure-jetting cemented soil composite variable-cross-section concrete pile | |
CN105569071A (en) | Cement-based material underwater grouting or mud-jack rock block foundation construction method | |
CN1718937A (en) | Technology of non soil taking hole guiding prestressed pipe pile or premade square sunk pile | |
KR100699430B1 (en) | The foundation improvement method of construction using high-pressure grout material injection equipment and this | |
KR101746654B1 (en) | Method for constructing pile for reinforce of mine hole | |
CN105297710A (en) | High-pressure-jetting cement soil twist drill and reamed reinforced concrete grouting combined pile and manufacturing method | |
CN110409435A (en) | A kind of novel concrete mixing pile construction method | |
KR100656142B1 (en) | The foundation grouting construction method of having used foundation digging and the equipment for grout material and this | |
CN106192987B (en) | It is a kind of to be crushed the construction method that geology is reinforced to stake periphery | |
CN105672329B (en) | The large size prefabricated building enclosure of deep basal pit and construction method | |
CN102839647A (en) | Stirring pile-permeable concrete pile compound foundation and treatment method thereof | |
CN103233487A (en) | Method for grouting and floor lifting by directional drilling machine | |
CN103603345B (en) | Cement mixing grouting pile foundations and forming method | |
CN104213553A (en) | Construction technology for seamless impervious wall in vibration blunt caissons | |
CN104452752A (en) | Construction method for cement mixing pile in high-dense hardening clay layer | |
CN100374657C (en) | Construction method employing threaded stirring shaft to decrease ambient foundation deformation | |
CN111254939A (en) | Foundation pit enclosure strengthening method for soft soil foundation | |
CN205062809U (en) | End support type screw thread core composite pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130807 |