CN102021906A - Method for reinforcing soft soil foundation at deep mixing pile - Google Patents

Method for reinforcing soft soil foundation at deep mixing pile Download PDF

Info

Publication number
CN102021906A
CN102021906A CN 201010591477 CN201010591477A CN102021906A CN 102021906 A CN102021906 A CN 102021906A CN 201010591477 CN201010591477 CN 201010591477 CN 201010591477 A CN201010591477 A CN 201010591477A CN 102021906 A CN102021906 A CN 102021906A
Authority
CN
China
Prior art keywords
pile
cement
soil
construction
deep
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010591477
Other languages
Chinese (zh)
Inventor
王义忠
王燕
王彦君
郜天伟
郭雷
杨允
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN NEW CENTURY ROAD AND BRIDGE ENGINEERING CONSULT Co Ltd
Original Assignee
HENAN NEW CENTURY ROAD AND BRIDGE ENGINEERING CONSULT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN NEW CENTURY ROAD AND BRIDGE ENGINEERING CONSULT Co Ltd filed Critical HENAN NEW CENTURY ROAD AND BRIDGE ENGINEERING CONSULT Co Ltd
Priority to CN 201010591477 priority Critical patent/CN102021906A/en
Publication of CN102021906A publication Critical patent/CN102021906A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a method for reinforcing a soft soil foundation at a deep mixing pile, which comprises the steps of land formation, construction layout, spray mixing and sinking, curing agent grout mixing, stirring and hoisting, repeated spray mixing and sinking, and shifting, etc.; and the main technological parameters are as follows: 0.55 to 0.75 of water-cement ratio, 0.38 to 0.75 m/min of sinking and empty stirring speed, 0.3 to 0.5 m/min of hoisting speed, 18 to 30L/min of guniting quantity and 0.5 to 0.7 MPa of guniting pressure. Compared with the existing cement mixing pile foundation reinforcing process, the method provided by the invention has the advantages of appropriate water-cement ratio, high pile quality, high strength, less reinforcing agent consumption, low cost and remarkable economic benefit, and is easy to evenly stir; and meanwhile, the method also has the following advantages: (1) the cement can be hydrated fully, and during construction, the role of the cement can be exerted completely; (2) the construction quality is easy to control and guarantee; and (3) the construction on deep piles can be performed.

Description

The method of deep-mixed pile punishment soft foundation
Technical field
The present invention relates to the highway construction applications, be specifically related to a kind of method of deep-mixed pile punishment soft foundation.
Background technology
China region is vast, and the weak soil layer of the various origin causes of formation is arranged, and it has a very wide distribution, and soil thickness is big.The characteristics of this class weak soil are the water content height, void ratio is big, shear strength is low, compressibilty is high, poor permeability, settlement stability time are long.In recent years, fast development along with highway engineering construction, often need on soft foundation, carry out the highway bridge construction construction, because the bad building performance of soft foundation, therefore need carry out artificial consolidation process, the punishment method of soft foundation is a lot, excavates non-adaptation soil and changes and fill out as we are common, cement or lime stabilized soil punishment, throws slabstone and squeezes silt, geotextile punishment, sand cushion and hardcore bed punishment, broken stone pile punishment etc.And cement mixing pile method soft soil foundation is remarkable with its consolidation effect, cost is low, pollution is little, the duration is short, site condition requires advantage such as low and extensive use on engineering.The cement mixing pile method can be divided into the whitewashing type and dust type two big classes, wherein whitewashing type cement mixing pile is suitable for the weak soil or the weak soil of right water content<60%, its job practices and action principle are that utilization is mixed slurry, sent slurry compression pump and deep mixer, cement paste is delivered in the soil layer, make itself and the weak soil of original position force to mix and stir, by the ion exchange between reinforced material and the weak soil, cohesion, chemical bond effect etc., form cement earth pile with certain intensity.Cement earth pile and inter-pile soil layer form composite foundation, thereby improve the bulk strength of ground.
The deep-cement agitation pile is one of method of the most frequent use in the treatment of soft foundation, and these class methods are applicable to the processing weak soil, and obvious processing effect can very fast input be used after the processing.But that the construction of deep-cement agitation pile has is a little many, line length, wide characteristics, the difficult management degree of construction is bigger, and the pile quality of deep water earth agitation pile is closely intimate relevant with continuity and uniformity, the construction technology etc. of hoisting velocity, cement mixed weight, material spray, so realizing how guaranteeing pile quality under the economic condition, and then guaranteeing that the effect of treatment of soft foundation is the problem that we explore in engineering practice.
Summary of the invention
The technical problem to be solved in the present invention provides a kind of method of deep-mixed pile punishment soft foundation, and this method can realize guaranteeing pile quality under the economic condition.
For solving the problems of the technologies described above, the technical solution used in the present invention is:
A kind of method of deep-mixed pile punishment soft foundation may further comprise the steps:
(1) smooth place: should flatten earlier and remove ground, place, stake position and underground all obstructions, the plain soil of low-lying place, place backfill, degree of compaction reaches more than 85%;
(2) construction lofting: the skirt piles of emitting center pile No. and processing with total powerstation, require to mark every row's position then according to drawing, require position, every campshed position to mark every column position according to drawing,, and express a position, stake position with pulverized limestone at last with bamboo chip or little timber spud pile position with steel ruler;
(3) sinking is stirred in spray: start mixer, treat that stirring-head works well after, with the deadweight of cement mixing pile with the rotation of speed limit, the limit of 0.38~0.75m/min cut soil, the limit sinks, until reaching projected depth;
(4) mix system curing compound slurries: when deep mixer stirred, the backstage began to mix system curing compound slurries according to mixing when water/binder ratio, and the curing compound slurries are poured slurries in the aggregate bin into before treating mud jacking through stirring; The curing compound infiltration capacity be compacted soil heavy 8~15%, water/binder ratio is 0.55~0.75, mixes the calcium lignosulfonate into curing compound weight 0.2~0.25% simultaneously, with 1% sodium sulphate and 2% gypsum, to strengthen the flowability of curing compound slurries;
(5) stir lifting: deep mixer sinks to arriving projected depth, with the cement mixer gear shift, counter-rotating promotes, and opens slush pump simultaneously cement paste is injected weak soil after slightly stopping, speed with 0.3~0.5m/min promotes, the whitewashing amount is controlled at 18~30L/min, and spray pressure is controlled at 0.5~0.7MPa, stirs while whitewashing, cement paste and soil are are fully mixed and stirred, until ground, remain in the lifting process and send slurry continuously, middle uninterrupted;
(6) repeat to stir: subjob before repeating, every pile all will stir multiple spray again, and the speed of stirring is limited in 0.5~0.8m/min again for the last time, rotating speed 〉=60r/min, back in-situ transesterification 2min on earth, the normal pile time of every pile should be no less than 40min;
(7) displacement: the stake machine moves to and carries out next position, repeats the construction of above-mentioned steps.
In described step (6), the remixing number of times is twice, adopts " two sprays four are stirred " technology, i.e. twice lifting whitewashing is respectively stirred twice up and down.
In described step (4), used curing compound is No. 32.5 and above Portland cement, and fresh nothing caking.
In described step (7) afterwards, also comprise following quality inspection step:
(1) the cement mixing pile pile can adopt the portable penetrometer method to carry out the pile quality check in 7 days
1. check mixing uniformity: with half-round drill subsidiary in the portable penetrometer device, stirring pile body centre-drilling hole, taking out a stake core, whether consistent, whether have " tuberculosis " of cement paste enrichment or the mass of soil that is not stirred evenly if observing its color;
2. cone penetration test: hit several N10 and soil cement intensity relativity according to existing portable penetrometer, when the hitting several N10 and hit greater than 15 of pile body 1d length of time, pile strength can meet design requirement; Perhaps during the hitting several N10 and hit greater than 30 of 7d length of time, pile strength also can reach designing requirement;
(2) the cement mixing pile pile is after 28 days, check the construction length of its integrality, stake native stir degree and stake with the method for boring and coring, the core that every pile takes out is by the on-the-spot relatively evenly position of specifying of supervising engineer, send the laboratory to do the unconfined compression strength test in the 28 day length of time, stay one group of test specimen to do the no lateral confinement resistance to compression experiment in three months length of time, to measure pile strength, the boring and coring frequency is 1~1.5%;
(3) if certain section or a certain end of the bridge cement mixing pile are got core testing result disqualification rate less than 10%, can think that then this section cement mixing pile integral body meets the demands; If disqualification rate then should be in the equal piling of this section greater than 10% less than 20% o'clock; If disqualification rate is greater than 30%, then this section cement mixing pile is defective;
(4) agitation pile being got the space that stays behind the core, should to adopt the cement mortar of equality strength to recharge closely knit;
In grand bridge abutment or the thick place of weak soil layer depth, or when with suspicion, can specify sampling observation single pile or Bearing Capacity of Composite Foundation at random by the supervising engineer at pile after 28 days to construction quality, the stake number of random inspection should not be less than 0.2% of a number, and must not be less than 3.
The present invention has actively useful effect:
1. compare with other Ground Treatment mode, the inventive method can be saved materials such as great deal of steel, concrete; Compare with existing cement mixing method ground stabilization technology, water/binder ratio is suitable, stir easily, and the pile quality height, the intensity height, and the strengthening agent consumption is few, cost is low, remarkable in economical benefits.
2. the present invention also has the following advantages: the 1. abundant aquation of cement, in construction, can give full play to the effect of cement; 2. construction quality is easy to control and guarantees; 3. can carry out the construction of darker stake.
3. the cohesive soil ground that the inventive method is used for that industry and civilian construction Foundation Design are reinforced dark thicker ooze matter soil silt and water content is higher and bearing capacity of foundation soil is not more than 120kPa is used to prevent to cheat wall and side slope slumping bottom heave and can makes engineering such as underground impervious wall when dark base excavation.
Description of drawings
Fig. 1 is the construction flow chart of deep-mixed pile punishment soft foundation.
The specific embodiment
Embodiment 1 certain section soft soil roadbed processing of expressway engineering
This section circuit is that embankment passes through, embankment maximum height 17.8m, substrate covers mollisol, bury, silty clay, gravelly soil down, total thickness 10~12m, it is gneiss folder migmatite, schist, marble down, earthquake motion peak acceleration is 0.1g in the section, and earthquake motion response spectrum eigenperiod is 0.45s.Perform the agitation pile scope and be positioned on the field wire road, station, be respectively, long 60 meters, wide about 136 meters, long 120 meters, two wide about 46.9~104.7 meters zones.
Engineering geological conditions: top, this area is mollisol or silty clay, and is widely distributed, and engineering geological conditions is relatively poor.Be soft clay, mollisol, silty clay, thick dust soil; Thickness is at 2.90~15m, and the middle part is a gravelly soil, and the bottom is a gneiss folder marble.This soil layer has water content height, big, the high-compressibility of air space ratio, in~high sensitivity, the ground characteristics of load-carrying properties difference should be taked corresponding measures of foundation treatment.
Punish the method for above-mentioned soft foundation with deep-mixed pile,, may further comprise the steps referring to Fig. 1:
(1) smooth place: should flatten earlier and remove ground, place, stake position and underground all obstructions, the plain soil of low-lying place, place backfill, degree of compaction reaches more than 85%;
(2) construction lofting: the skirt piles of emitting center pile No. and processing with total powerstation, require to mark every row's position then according to drawing with steel ruler, require position, every campshed position to mark every column position according to drawing with steel ruler, at last with bamboo chip or little timber spud pile position, and express a position, stake position with pulverized limestone, picture is produced with computer in position, drawing king-pile position, indicate the every row stake of pile No. and every row position, so that help control in the construction;
(3) sinking is stirred in spray: start mixer, treat that stirring-head works well after, with the deadweight of cement mixing pile with the rotation of speed limit, the limit of 0.38~0.75m/min cut soil, the limit sinks, until reaching projected depth;
(4) mix system curing compound slurries: when deep mixer stirred, the backstage began to mix system curing compound slurries according to mixing when water/binder ratio, and cement paste is poured slurries in the aggregate bin into before treating mud jacking through stirring; Cement (32.5 grades of Portland cements, fresh nothing caking) infiltration capacity be compacted soil heavy 15%, water/binder ratio is 0.55, infiltrates calcium lignosulfonate, 1% sodium sulphate and 2% the gypsum of cement weight 0.2% simultaneously, to strengthen the flowability of curing compound slurries;
(5) stir lifting: deep mixer sinks to arriving projected depth, with the cement mixer gear shift, counter-rotating promotes, and opens slush pump simultaneously cement paste is injected weak soil after slightly stopping, speed with 0.3~0.5m/min promotes, the whitewashing amount is controlled at 18~30L/min, and spray pressure is controlled at 0.5~0.7MPa, stirs while whitewashing, cement paste and soil are are fully mixed and stirred, until ground, remain in the lifting process and send slurry continuously, middle uninterrupted;
(6) repeat to stir: subjob before repeating, adopt " two sprays four are stirred " technology, i.e. twice lifting whitewashing, respectively stir twice up and down, the speed of stirring is limited in 0.5~0.8m/min again for the last time, rotating speed 〉=60r/min, back on earth in-situ transesterification 2min, the normal pile time of every pile should be no less than 40min;
(7) displacement: the stake machine moves to and carries out next position, repeats the construction of above-mentioned steps.
The quality inspection method of above-mentioned deep water earth agitation pile:
This engineering agitation pile is pressed equilateral triangle and is arranged, stake footpath 0.5m, and 1.5 meters of pile spacings, the long 10m of stake, cement mixed weight is 15% of a soil mass consolidation quality; Water/binder ratio 0.55.Handle back single pile vertical resistance pressure bearing capacity according to designing requirement and be not less than 150kN, Bearing Capacity of Composite Foundation is not less than 130kPa, and 28 days unconfined compression strengths of pile body are not less than 1.5MPa.In order to reach design objective, this engineering according to construction speed and detection requirement, has been carried out single pile vertical resistance pressure static loading test, Pile Composite Foundation load test and has been carried out the pile body unconfined compression strength test by core boring sampling in the mixing pile construction process.Concrete detection method is:
(1) single pile vertical resistance pressure static loading test
Detection mode is maintained load test (ML-test) at a slow speed, utilizes counter force system to be undertaken by the mode of hierarchical loading, carries out settlement observation in loading procedure, determines the corresponding type Q-S curve that falls suddenly according to sedimentation with the feature of loads change; Determine the s-lgt curve according to the time dependent feature of sedimentation, determine the single pile vertical resistance pressure bearing capacity.
(2) Pile Composite Foundation loading test
Detection mode is maintained load test (ML-test) at a slow speed, utilizes counter force system to be undertaken by the mode of hierarchical loading, carries out settlement observation in loading procedure, determines Bearing Capacity of Composite Foundation according to pressure-subsidence curve.
(3) core boring sampling and unconfined compression strength test
Calculate soil cement intensity according to following formula after getting core as requested.Fcu=ε (4F/ π d2) (fcu-core test specimen soil cement intensity value, Mpa is accurate to 0.1 Mpa; The maximum pressure that F-core test specimen compression test records, N; D-core test specimen average diameter, mm; ε-cement-soil core test specimen compressive strength conversion factor).
Advanced test data was carried out computational analysis, make result of the test summary sheet meter Q-S curve, s-lgt curve, P-S curve, according to tracing pattern in conjunction with national regulation and strata condition analysis-by-synthesis, judge single pile vertical resistance pressure characteristic load bearing capacity and Pile Composite Foundation characteristic load bearing capacity, bore core intensity decompression report according to cement earth pile and determine the unconfined compression strength value.
(4) conclusion
1. pass through the construction of this engineering, the proof cement mixing method is applicable to reinforces the cohesive soil ground that the higher and bearing capacity of foundation soil of dark thicker mud, mucky soil, silt and water content is not more than 120kPa, can improve bearing capacity of foundation soil fast, shorten construction period greatly.
2. detect proof by engineering test, this engineering deep water earth agitation pile vertical compression characteristic load bearing capacity is all greater than 150kN, checking characteristic value of foundation bearing capacity is 130kPa, and 28 days unconfined compression strengths of pile body are not less than 1.5Mpa, satisfy the engineering design requirement.
3. cement mixing method ground friction, noiselessness, environmentally safe in reinforcing process.
4. compare with other Ground Treatment mode, cement mixing method can be saved materials such as great deal of steel, concrete; Compare with existing cement mixing method ground stabilization technology, cost is low, intensity height, pile quality height, remarkable in economical benefits.

Claims (4)

1. the method for deep-mixed pile punishment soft foundation may further comprise the steps:
(1) smooth place: should flatten earlier and remove ground, place, stake position and underground all obstructions, the plain soil of low-lying place, place backfill, degree of compaction reaches more than 85%;
(2) construction lofting: the skirt piles of emitting center pile No. and processing with total powerstation, require to mark every row's position then according to drawing, require position, every campshed position to mark every column position according to drawing,, and express a position, stake position with pulverized limestone at last with bamboo chip or little timber spud pile position with steel ruler;
(3) sinking is stirred in spray: start mixer, treat that stirring-head works well after, with the deadweight of cement mixing pile with the rotation of speed limit, the limit of 0.38~0.75m/min cut soil, the limit sinks, until reaching projected depth;
(4) mix system curing compound slurries: when deep mixer stirred, the backstage began to mix system curing compound slurries according to mixing when water/binder ratio, and the curing compound slurries are poured slurries in the aggregate bin into before treating mud jacking through stirring; The curing compound infiltration capacity be compacted soil heavy 8~15%, water/binder ratio is 0.55~0.75, mixes the calcium lignosulfonate into curing compound weight 0.2~0.25% simultaneously, with 1% sodium sulphate and 2% gypsum, to strengthen the flowability of curing compound slurries;
(5) stir lifting: deep mixer sinks to arriving projected depth, after slightly stopping with the cement mixer gear shift, counter-rotating promotes, open slush pump simultaneously cement paste is injected weak soil, with the speed lifting of 0.3~0.5m/min, the whitewashing amount is controlled at 18~30L/min, spray pressure is controlled at 0.5~0.7MPa, stir while whitewashing, cement paste and soil are are fully mixed and stirred, until ground;
(6) repeat to stir: subjob before repeating, every pile all will stir multiple spray again, and the speed of stirring is limited in 0.5~0.8m/min again for the last time, rotating speed 〉=60r/min, back in-situ transesterification 2min on earth, the normal pile time of every pile should be no less than 40min;
(7) displacement: the stake machine moves to and carries out next position, repeats the construction of above-mentioned steps.
2. according to the method for the described deep-mixed pile punishment of claim 1 soft foundation, it is characterized in that: in described step (6), the remixing number of times is twice, adopts " two sprays four are stirred " technology, i.e. twice lifting whitewashing is respectively stirred twice up and down.
3. according to the method for the described deep-mixed pile punishment of claim 1 soft foundation, it is characterized in that: in described step (4), used curing compound is No. 32.5 and an above Portland cement of fresh nothing caking.
4. according to the method for the described deep-mixed pile punishment of claim 1 soft foundation, it is characterized in that: in described step (7) afterwards, also comprise following quality inspection step:
(1) the cement mixing pile pile can adopt the portable penetrometer method to carry out the pile quality check in 7 days
1. check mixing uniformity: with half-round drill subsidiary in the portable penetrometer device, stirring pile body centre-drilling hole, taking out a stake core, whether consistent, whether have " tuberculosis " of cement paste enrichment or the mass of soil that is not stirred evenly if observing its color;
2. cone penetration test: hit several N10 and soil cement intensity relativity according to existing portable penetrometer, when the hitting several N10 and hit greater than 15 of pile body 1d length of time, pile strength can meet design requirement; Perhaps during the hitting several N10 and hit greater than 30 of 7d length of time, pile strength also can reach designing requirement;
(2) the cement mixing pile pile is after 28 days, check the construction length of its integrality, stake native stir degree and stake with the method for boring and coring, the core that every pile takes out is by the on-the-spot relatively evenly position of specifying of supervising engineer, send the laboratory to do the unconfined compression strength test in the 28 day length of time, stay one group of test specimen to do the no lateral confinement resistance to compression experiment in three months length of time, to measure pile strength, the boring and coring frequency is 1~1.5%;
(3) if certain section or a certain end of the bridge cement mixing pile are got core testing result disqualification rate less than 10%, can think that then this section cement mixing pile integral body meets the demands; If disqualification rate then should be in the equal piling of this section greater than 10% less than 20% o'clock; If disqualification rate is greater than 30%, then this section cement mixing pile is defective;
(4) agitation pile being got the space that stays behind the core, should to adopt the cement mortar of equality strength to recharge closely knit.
CN 201010591477 2010-12-16 2010-12-16 Method for reinforcing soft soil foundation at deep mixing pile Pending CN102021906A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010591477 CN102021906A (en) 2010-12-16 2010-12-16 Method for reinforcing soft soil foundation at deep mixing pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010591477 CN102021906A (en) 2010-12-16 2010-12-16 Method for reinforcing soft soil foundation at deep mixing pile

Publications (1)

Publication Number Publication Date
CN102021906A true CN102021906A (en) 2011-04-20

Family

ID=43863645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010591477 Pending CN102021906A (en) 2010-12-16 2010-12-16 Method for reinforcing soft soil foundation at deep mixing pile

Country Status (1)

Country Link
CN (1) CN102021906A (en)

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102605769A (en) * 2012-04-11 2012-07-25 广州机施建设集团有限公司 Construction method of utilizing short-frame cement stirring pipe to produce cement stirring pile
CN102704467A (en) * 2012-05-25 2012-10-03 重庆中设工程设计股份有限公司 Method for forming hole in elastic clay layer by rotary drilling
CN103015402A (en) * 2012-12-27 2013-04-03 南京林业大学 Construction method for inhibiting frost heaving and thaw collapse of horizontally frozen end through cement-soil reinforcement method
CN103174129A (en) * 2011-12-23 2013-06-26 宁波高新区围海工程技术开发有限公司 Mud flat soft soil foundation rapid consolidation processing method
CN103362131A (en) * 2013-08-02 2013-10-23 江苏正方园建设集团有限公司 Composite bamboo rib combined bolting and shotcrete support for foundation pit supporting and construction method of composite bamboo rib combined bolting and shotcrete support
CN103422497A (en) * 2013-08-21 2013-12-04 国家电网公司 Method for reinforcing soft soil foundation by using cement-soil mixing pile
CN103556631A (en) * 2013-11-18 2014-02-05 高伯明 Pile-forming operation method for stirring pile
CN103790155A (en) * 2014-03-10 2014-05-14 凌志伟 High-speed stirring and pile-forming method
CN104480932A (en) * 2014-12-15 2015-04-01 中铁十九局集团有限公司 Construction method of cement mixing pile for saline-alkali sludge soft foundation
CN104895064A (en) * 2015-04-30 2015-09-09 沈建东 Deep cement mixing pile construction process
CN104891893A (en) * 2015-05-13 2015-09-09 河海大学 Coastal soft foundation soil solidifying and reinforcing material and application thereof
CN105113496A (en) * 2015-08-11 2015-12-02 中铁建大桥工程局集团第五工程有限公司 Construction method for soil-cement mixing piles
CN105672388A (en) * 2014-10-12 2016-06-15 童玉兰 Dredged sediment adding mixing machine for building engineering filling and construction method of machine
CN105818268A (en) * 2016-05-25 2016-08-03 山推建友机械股份有限公司 Offshore soft base layer processing stirring device and reinforcement process thereof
CN106948309A (en) * 2017-02-21 2017-07-14 浙江水利水电学院 It is a kind of applied to sea wall pass the flood period protection in foundation stabilization construction method
CN107687175A (en) * 2017-09-27 2018-02-13 浙江大学 The vertical antifouling isolation wall construction of both sides ground local stiffening type and method
CN108018889A (en) * 2017-10-19 2018-05-11 广州地铁设计研究院有限公司 A kind of long detection determination methods of cement great soil group stake
CN108221969A (en) * 2017-12-15 2018-06-29 中铁五局集团有限公司 Highland and severe cold swampy area soft foundation cement mixing pile constructing process
CN108797629A (en) * 2018-06-07 2018-11-13 北京星河园林景观工程有限公司 A kind of construction method that highway bridge and culvert both sides are soft soil roadbed
CN108956766A (en) * 2018-06-09 2018-12-07 宁波亿诺维信息技术有限公司 A kind of pile foundation quality detection method
CN109826176A (en) * 2019-03-05 2019-05-31 车明凤 Pipe trench engineering construction process for coastal special mud geology
CN109853957A (en) * 2019-03-21 2019-06-07 中电建建筑集团有限公司 A kind of expansive concrete reinforcing strip replaces the continuous placing seamless construction method of post-cast strip
CN110552345A (en) * 2019-08-29 2019-12-10 山东交通学院 Titanium gypsum cement soil pile, construction method and application
CN110952522A (en) * 2019-12-03 2020-04-03 中交天津港湾工程研究院有限公司 Double-spraying bidirectional cement mixing pile drill bit and construction method thereof
CN112252299A (en) * 2020-10-24 2021-01-22 惠州大亚湾市政基础设施有限公司 Soft soil foundation municipal road treatment method
CN112921945A (en) * 2021-01-27 2021-06-08 中钢集团马鞍山矿山研究总院股份有限公司 Method for reinforcing soft soil foundation by taking industrial solid wastes as main raw materials
CN112919834A (en) * 2021-01-27 2021-06-08 中钢集团马鞍山矿山研究总院股份有限公司 Soft soil foundation curing agent and construction method for curing soft soil foundation
CN112962588A (en) * 2021-02-08 2021-06-15 中交路桥建设有限公司 Construction method of cement reinforced soil pile
CN113718761A (en) * 2021-09-09 2021-11-30 中国铁建港航局集团有限公司 Method for forming coastal soft soil foundation cement soil composite mixing pile
CN114292080A (en) * 2022-01-11 2022-04-08 中建市政工程有限公司 Composite curing agent for deep stirring of high-water-content soft soil foundation and preparation method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1208801A (en) * 1998-09-29 1999-02-24 李铁恒 Cement and earth mixed pile for pore-filling and construction method therefor
CN1804230A (en) * 2006-01-12 2006-07-19 上海交通大学 Construction method employing threaded stirring shaft to decrease ambient foundation deformation
CN101644052A (en) * 2009-07-28 2010-02-10 天津市铁路集团勘察设计院有限公司 Treatment method of coastal sludge soft soil foundation cement mixing pile

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1208801A (en) * 1998-09-29 1999-02-24 李铁恒 Cement and earth mixed pile for pore-filling and construction method therefor
CN1804230A (en) * 2006-01-12 2006-07-19 上海交通大学 Construction method employing threaded stirring shaft to decrease ambient foundation deformation
CN101644052A (en) * 2009-07-28 2010-02-10 天津市铁路集团勘察设计院有限公司 Treatment method of coastal sludge soft soil foundation cement mixing pile

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
《山西建筑》 20050228 李志华 水泥搅拌桩处理软土地基 第31卷, 第4期 2 *
《潍坊学院学报》 20051130 刘夕洪 喷浆型水泥搅拌桩施工技术与质量控制的探讨 第5卷, 第6期 2 *
《科技创新导报》 20091231 区伟鹏 水泥搅拌桩在软土地基中的应用 , 第33期 2 *
《科技咨询导报》 20071231 孟德胤 公路工程深层搅拌桩处治软土地基浅谈 , 第11期 2 *
《西部探矿工程》 20050731 李建芸 软基处理深层搅拌桩施工控制 , 第110期 2 *

Cited By (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174129A (en) * 2011-12-23 2013-06-26 宁波高新区围海工程技术开发有限公司 Mud flat soft soil foundation rapid consolidation processing method
CN103174129B (en) * 2011-12-23 2015-07-29 宁波高新区围海工程技术开发有限公司 Mud flat soft soil foundation rapid consolidation processing method
CN102605769A (en) * 2012-04-11 2012-07-25 广州机施建设集团有限公司 Construction method of utilizing short-frame cement stirring pipe to produce cement stirring pile
CN102605769B (en) * 2012-04-11 2015-02-04 广州机施建设集团有限公司 Construction method of utilizing short-frame cement stirring pipe to produce cement stirring pile
CN102704467B (en) * 2012-05-25 2015-04-22 重庆中设工程设计股份有限公司 Method for forming hole in elastic clay layer by rotary drilling
CN102704467A (en) * 2012-05-25 2012-10-03 重庆中设工程设计股份有限公司 Method for forming hole in elastic clay layer by rotary drilling
CN103015402A (en) * 2012-12-27 2013-04-03 南京林业大学 Construction method for inhibiting frost heaving and thaw collapse of horizontally frozen end through cement-soil reinforcement method
CN103362131A (en) * 2013-08-02 2013-10-23 江苏正方园建设集团有限公司 Composite bamboo rib combined bolting and shotcrete support for foundation pit supporting and construction method of composite bamboo rib combined bolting and shotcrete support
CN103362131B (en) * 2013-08-02 2015-10-28 江苏正方园建设集团有限公司 A kind of pattern foundation pit supporting structure compound bamboo reinforcement combined bolting and shotcrete and construction method thereof
CN103422497A (en) * 2013-08-21 2013-12-04 国家电网公司 Method for reinforcing soft soil foundation by using cement-soil mixing pile
CN103556631A (en) * 2013-11-18 2014-02-05 高伯明 Pile-forming operation method for stirring pile
CN103556631B (en) * 2013-11-18 2015-12-02 高伯明 The one-tenth pile operation method of agitation pile
CN103790155A (en) * 2014-03-10 2014-05-14 凌志伟 High-speed stirring and pile-forming method
CN103790155B (en) * 2014-03-10 2016-03-02 凌志伟 High-speed stirred piling method
CN105672388A (en) * 2014-10-12 2016-06-15 童玉兰 Dredged sediment adding mixing machine for building engineering filling and construction method of machine
CN104480932B (en) * 2014-12-15 2016-06-01 中铁十九局集团有限公司 Construction method of cement mixing pile for saline-alkali sludge soft foundation
CN104480932A (en) * 2014-12-15 2015-04-01 中铁十九局集团有限公司 Construction method of cement mixing pile for saline-alkali sludge soft foundation
CN104895064A (en) * 2015-04-30 2015-09-09 沈建东 Deep cement mixing pile construction process
CN104891893A (en) * 2015-05-13 2015-09-09 河海大学 Coastal soft foundation soil solidifying and reinforcing material and application thereof
CN105113496A (en) * 2015-08-11 2015-12-02 中铁建大桥工程局集团第五工程有限公司 Construction method for soil-cement mixing piles
CN105818268A (en) * 2016-05-25 2016-08-03 山推建友机械股份有限公司 Offshore soft base layer processing stirring device and reinforcement process thereof
CN106948309B (en) * 2017-02-21 2019-09-17 浙江水利水电学院 It is a kind of applied to sea wall pass the flood period protection in foundation stabilization construction method
CN106948309A (en) * 2017-02-21 2017-07-14 浙江水利水电学院 It is a kind of applied to sea wall pass the flood period protection in foundation stabilization construction method
CN107687175A (en) * 2017-09-27 2018-02-13 浙江大学 The vertical antifouling isolation wall construction of both sides ground local stiffening type and method
CN108018889A (en) * 2017-10-19 2018-05-11 广州地铁设计研究院有限公司 A kind of long detection determination methods of cement great soil group stake
CN108221969A (en) * 2017-12-15 2018-06-29 中铁五局集团有限公司 Highland and severe cold swampy area soft foundation cement mixing pile constructing process
CN108221969B (en) * 2017-12-15 2020-05-19 中铁五局集团有限公司 Construction process of cement mixing pile for soft foundation in plateau alpine and swamp areas
CN108797629A (en) * 2018-06-07 2018-11-13 北京星河园林景观工程有限公司 A kind of construction method that highway bridge and culvert both sides are soft soil roadbed
CN108956766A (en) * 2018-06-09 2018-12-07 宁波亿诺维信息技术有限公司 A kind of pile foundation quality detection method
CN109826176A (en) * 2019-03-05 2019-05-31 车明凤 Pipe trench engineering construction process for coastal special mud geology
CN109853957A (en) * 2019-03-21 2019-06-07 中电建建筑集团有限公司 A kind of expansive concrete reinforcing strip replaces the continuous placing seamless construction method of post-cast strip
CN110552345A (en) * 2019-08-29 2019-12-10 山东交通学院 Titanium gypsum cement soil pile, construction method and application
CN110952522A (en) * 2019-12-03 2020-04-03 中交天津港湾工程研究院有限公司 Double-spraying bidirectional cement mixing pile drill bit and construction method thereof
CN112252299A (en) * 2020-10-24 2021-01-22 惠州大亚湾市政基础设施有限公司 Soft soil foundation municipal road treatment method
CN112921945A (en) * 2021-01-27 2021-06-08 中钢集团马鞍山矿山研究总院股份有限公司 Method for reinforcing soft soil foundation by taking industrial solid wastes as main raw materials
CN112919834A (en) * 2021-01-27 2021-06-08 中钢集团马鞍山矿山研究总院股份有限公司 Soft soil foundation curing agent and construction method for curing soft soil foundation
CN112962588A (en) * 2021-02-08 2021-06-15 中交路桥建设有限公司 Construction method of cement reinforced soil pile
CN113718761A (en) * 2021-09-09 2021-11-30 中国铁建港航局集团有限公司 Method for forming coastal soft soil foundation cement soil composite mixing pile
CN114292080A (en) * 2022-01-11 2022-04-08 中建市政工程有限公司 Composite curing agent for deep stirring of high-water-content soft soil foundation and preparation method thereof

Similar Documents

Publication Publication Date Title
CN102021906A (en) Method for reinforcing soft soil foundation at deep mixing pile
Patel Geotechnical investigations and improvement of ground conditions
Han Principles and practice of ground improvement
CN101798810A (en) Cement-soil composite pile inserted into reinforced concrete core materials
Zhao et al. Application of construction waste in the reinforcement of soft soil foundation in coastal cities
CN103981861A (en) Pile foundation theory, lime soil pile carrying capacity and lime soil pile stirring impacting operation system
CN113929365B (en) Self-compacting solidified soil and use method thereof
CN108867632A (en) Fiber cement soil mixing pile construction device and method
CN105970946A (en) Basalt fiber reinforced cement soil mixing pile and construction method thereof
Hessouh et al. Physical and mechanical characterization of deep soil mixing (DSM) materials: Laboratory vs construction site
CN114232593A (en) Construction method of end bearing pile foundation of high fill area
CN104649629A (en) Asbestos fiber, cement and pulverized fuel ash slurry and method for reinforcing soft soil with high water content, high plasticity indexes, high organic matter content and high structural performance by using asbestos fiber
CN112195909A (en) Method for reinforcing soft foundation of road and parking lot
CN108643132B (en) Rolled concrete structure with composite slurry injected into stone slag material and construction method thereof
CN101704649A (en) Slurry formula of pile-sinking technique of non-soil borrowing lead-hole prestress pipe pile or prefabricated square pile
CN111663391B (en) Roadbed double-crust layer on-site reinforcing and filling structure and method in muddy soft soil area
Yin Analysis on Foundation Treatment Process and Engineering Visa Scheme of Special Karst Stratum
Garbin, Jr et al. Mass Stabilization for Settlement Control of Shallow Foundations on Soft Organic Clayey Soils
Grzyb-Faddoul Numerical analysis of the reinforcement of existing foundations by the soil mixing technique
CN114032887B (en) Grouting reinforcement material for in-service pile foundation of weak stratum and grouting process thereof
Eriksson et al. MDM combines the advantages of dry and wet mixing
Hussin et al. Recent advancements in the use of dry mass stabilization for structural support in the United States
Mao Study on soft soil foundation treatment technology in industrial building construction
Zhang et al. Researching the application of CFG pile treatment in soft foundation of expressway
Sliwinski et al. PAPER 1 Practical considerations affecting the construction of diaphragm walls

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110420