CN104480932B - The soft base cement mixing pile construction method of saline alkali mud matter - Google Patents

The soft base cement mixing pile construction method of saline alkali mud matter Download PDF

Info

Publication number
CN104480932B
CN104480932B CN201410771976.9A CN201410771976A CN104480932B CN 104480932 B CN104480932 B CN 104480932B CN 201410771976 A CN201410771976 A CN 201410771976A CN 104480932 B CN104480932 B CN 104480932B
Authority
CN
China
Prior art keywords
drill bit
mixing pile
stirring
cement
sinks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410771976.9A
Other languages
Chinese (zh)
Other versions
CN104480932A (en
Inventor
寇海军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 19th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
China Railway 19th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 19th Bureau Group Co Ltd, Fifth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical China Railway 19th Bureau Group Co Ltd
Priority to CN201410771976.9A priority Critical patent/CN104480932B/en
Publication of CN104480932A publication Critical patent/CN104480932A/en
Application granted granted Critical
Publication of CN104480932B publication Critical patent/CN104480932B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0038Production methods using an auger, i.e. continuous flight type
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater
    • E02D2250/0076Drilling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to cement mixing pile piling technique field, disclose a kind of soft base cement mixing pile construction method of saline alkali mud matter, comprise the following steps: S1, it would be desirable to the levelling of the land of construction; S2, is transported to place to be onstructed by mixing pile machine, by establishing fixed pile location and centering, connects and send slurry pump; S3, starts mixing pile machine, sinks to stirring first; S4, whitewashing first promotes stirs; S5, repeats to sink to stirring: the sinking velocity of drill bit is 0.3��0.6m/min, sinks at the bottom of being stirred to; S6, repeats whitewashing and promotes stirring; S7, third time sinks to stirring; S8, third time promotes stirring; S9, closes mixing pile machine, and complete machine is displaced to the finger fixed pile of next pile, repeats above often step operation, completes next root mixing pile. The present invention adopts two sprays six to stir constructional method, reduces the use of cement resource, reduces construction costs.

Description

The soft base cement mixing pile construction method of saline alkali mud matter
Technical field
The present invention relates to cement mixing pile piling technique field, particularly relate to a kind of soft base cement mixing pile construction method of saline alkali mud matter.
Background technology
Soft Ground in building foundation engineering is the key link ensureing construction quality, and occupies larger proportion in engineering total price. A large amount of engineering practice shows, the method for mixing cement and soil into pile have construction simple, fast, vibrate the advantages such as little, can effectively improve the stability of soft clay ground, reduce and control settlement amount. Cement mixing method is existing, and oneself develops into a kind of conventional Soft foundation treatment method, is mainly applicable to reinforce saturated soft clay foundation. It specifically uses mixing pile machine to enter in weak soil by solidifying agent pumps such as cement (or lime), and on the spot weak soil and solidifying agent are stirred by the agitating vane of mixing pile machine, make to mix between solidifying agent with weak soil, mainly it is applicable to saturated soft clay, cohesive soil, powder soil, plain fill and the saturated sand soil base without flowing underground water.
Middle Tie Shijiuju group front village railway three work area project management department starts cement mixing pile technical testing pile. Owing to actual geological condition follows the geologic description of design paper to differ greatly, part location is the mud of the soft north flow-like of saline alkali even entirely, and be mingled with and have loose sand layer and powder matter clay layer, very complicated, the stake body soil cement intensity of the technical testing pile that therefore employing in early stage " two sprays two are stirred " and " two sprays four are stirred " are constructed and Bearing Capacity of Composite Foundation all fail to meet design requirement, only there is " three stir six sprays " constructional method can meet requirement, but three constructional methods stirring six sprays need to expend huge cement resource, construction costs height.
Therefore, it is badly in need of wanting a kind of soft base cement mixing pile construction method of saline alkali mud matter that can reduce construction costs.
Summary of the invention
(1) technical problem solved
It is an object of the invention to provide a kind of soft base cement mixing pile construction method of saline alkali mud matter, adopt two sprays six to stir constructional method, reduce the use of cement resource, reduce construction costs.
(2) technical scheme
In order to solve the problems of the technologies described above, the present invention provides a kind of soft base cement mixing pile construction method of saline alkali mud matter, comprises the following steps:
S1, it would be desirable to the levelling of the land of construction;
S2, is transported to place to be onstructed by mixing pile machine, by establishing fixed pile location and centering, connects and send slurry pump;
S3, starts mixing pile machine, sinks to stirring first: the sinking velocity of drill bit is 0.2��0.5m/min, when operator feels that fuselage starts shake, drill bit sinks and obviously becomes slow, and drill bit starts to enter ground bearing stratum, continue to creep into until drill bit no longer sinks, stop creeping into;
S4, whitewashing first promotes stirs: after stopping is crept into, opens and send slurry pump, send slurry pump to carry cement grout in the soil body, changes the turning direction of drill bit, and guarantee lasting stirring 30��50s; Then starting whitewashing limit, limit to promote, the pulling speed of drill bit is 0.3��0.6m/min, is promoted to stake top and stops promoting, and continue stirring 5��20s, closes and send slurry pump;
S5, repeats to sink to stirring: the sinking velocity of drill bit is 0.3��0.6m/min, sinks at the bottom of being stirred to;
S6, repeats whitewashing and promotes stirring: open and send slurry pump to carry out repeating whitewashing, and stir lifting, the pulling speed 0.3��0.6m/min of drill bit simultaneously, be promoted to stake top and stop lifting, and continue stirring 5��20s, close and send slurry pump;
S7, third time sinks to stirring: the sinking velocity of drill bit is 0.3��0.6m/min, sinks at the bottom of being stirred to;
S8, third time promotes stirring: the pulling speed of drill bit is 0.3��0.6m/min, and drill bit is promoted to more than earth's surface 30��50cm;
S9, closes mixing pile machine, and complete machine is displaced to the finger fixed pile of next pile, repeats above often step operation, completes next root mixing pile.
Wherein, step S0 was also comprised before step S3, prepare cement grout, and to giving slurry pump to provide cement grout: cement grout adopts ordinary Portland cement, water cement ratio is 0.48��0.5, cement grout proportion is 1.86��1.87g/ml, it may also be useful to cement grout is stirred by concrete mixer, often the dish cement grout mixing time 30��80min.
Wherein, described ordinary Portland cement is P O42.5.
Wherein, in step S5, S6, S7 and/or S8, change the turning direction of drill bit respectively.
Wherein, in step S5, S7 and S8, keep sending slurry pump to have pressure.
(3) useful effect
The soft base cement mixing pile construction method of saline alkali mud matter provided by the invention, adopts the constructional method of " two sprays six are stirred ", simple to operate, is beneficial to popularization; Relative to " two spray two stirs " and " two sprays four are stirred " constructional method of routine, the stirring number of times increase of the soil body and cement grout, it is ensured that pile quality, especially under saline alkali soft foundation; Stirring number of times increases, and accumulative whitewashing amount and more conventional twice whitewashing of whitewashing number of times do not increase, and again relative to " three sprays six are stirred " constructional method, decrease and once whitewash, saved the construction material of 1/3, energy-conserving and environment-protective.
Accompanying drawing explanation
Fig. 1 is the schema of the embodiment of the present invention;
Fig. 2 is the construction schematic diagram of the embodiment of the present invention.
Embodiment
Below in conjunction with drawings and Examples, the specific embodiment of the present invention is described in further detail. Following instance is for illustration of the present invention, but is not used for limiting the scope of the invention.
Shown in reference Fig. 1 and 2, the soft base cement mixing pile construction method of the saline alkali mud matter of the present invention, the present embodiment adopts SP-5 mixing pile machine to carry out operating (being not limited to use this kind of mixing pile machine), comprises the following steps:
Step S1, it would be desirable to the levelling of the land of construction.
Step S2, is transported to place to be onstructed by SP-5 mixing pile machine, by establishing fixed pile location and centering, connects and send slurry pump.
Step S3, start the mair motor of mixing pile machine, sink to stirring first: the sinking velocity of drill bit is 0.2��0.5m/min, when operator feels that fuselage starts shake, drill bit sinks and obviously becomes slow, and reometer stable reading is when 90A��100A, illustrates that drill bit has started to enter ground bearing stratum, continue to creep into until drill bit no longer sinks, stop creeping into. Starting the mair motor of mixing pile machine, drive drill bit rotational, meanwhile, drill bit sinks, and sinking velocity can be 0.2m/min, 0.3m/min, 0.4m/min or 0.5m/min; When drill bit sinking obviously becomes slow, when drill bit drill speed is lower than 0.2m/min, it is possible to think that drill bit no longer sinks, now stop creeping into.
Step S4, whitewashing first promotes stirs: after stopping is crept into, opens and send slurry pump, send slurry pump to carry cement grout in the soil body, changes the turning direction of drill bit, and guarantee lasting stirring 30��50s; Then starting whitewashing limit, limit to promote, the pulling speed of drill bit is 0.3��0.6m/min, such as: 0.3m/min, 0.4m/min or 0.6m/min, it is promoted to stake top to stop promoting, and continues stirring 5��20s, as: 5s, 10s, 15s or 20s, to guarantee stake head degree of compactness, close and send slurry pump. It should be noted that, as visual inspection stake top portion soil mass water mud is not enough, it is necessary to suitably benefit is starched and continued to stir the longer time.
Step S5, repeats to sink to stirring: the sinking velocity of drill bit is 0.3��0.6m/min, sinks at the bottom of being stirred to.
Step S6, repeat whitewashing and promote stirring: open and send slurry pump to carry out repeating whitewashing, and stir lifting simultaneously, pulling speed 0.3��the 0.6m/min of drill bit, such as: 0.3m/min, 0.4m/min or 0.6m/min, it is promoted to stake top and stops promoting, and continue stirring 5��20s such as 5s, 10s, 15s or 20s, to guarantee stake head degree of compactness, close and send slurry pump. It should be noted that, as visual inspection stake top portion soil mass water mud is not enough, it is necessary to suitably benefit is starched and continued to stir the longer time.
Step S7, third time sinks to stirring: the sinking velocity of drill bit is 0.3��0.6m/min, such as: 0.3m/min, 0.5m/min or 0.6m/min, sinks at the bottom of being stirred to.
Step S8, third time promotes stirring: the pulling speed of drill bit is 0.3��0.6m/min, and such as: 0.3m/min, 0.5m/min or 0.6m/min, drill bit is promoted to more than earth's surface 30��50cm;
Step S9, closes mixing pile machine, and complete machine is displaced to the finger fixed pile of next pile, repeats above often step operation, completes next root mixing pile.
Above-mentioned construction procedure forms the bore forming method of " two sprays six are stirred ", when not increasing use cement amount and increase whitewashing number of times, improve the mixed effect of cement grout and the soil body, improve the intensity of concrete stake, the ability of the saline alkali soft base of mud matter is reinforced in refinforced cement stake, make it intensity and meet design requirements, save cement consumption, reduce construction costs.
Wherein, the present invention starts also to comprise step S0 before sinking is stirred in the mixing pile machine of step S3, prepare cement grout, and to giving slurry pump to provide cement grout: cement grout adopts ordinary Portland cement, water cement ratio is 0.48��0.5, such as: 0.48, 0.49 or 0.5, cement grout proportion is 1.86��1.87g/ml, concrete mixer is used to be stirred by cement grout, the often dish cement grout mixing time 30��80min, when needing, the intensity of cement grout is more strong, the time then made is more long, as can mixing 30min, 40min, 45min, 50min or 80min. concrete, ordinary Portland cement preferably adopts P O42.5, it is also possible to adopt 42.5R, 52.5,52.5R. the step preparing cement grout can carry out with smooth workyard simultaneously, it is also possible to while installing mixing pile machine, slurries are stirred in preparation. after pile completes, the cement of cement mixing method is reinforce wet soil weight 18%, and pile cement consumption is 67.1kg/m.
Further, above-mentioned step S5, S6, S7 and/or S8 can also change the turning direction of drill bit respectively, to make cement grout mix with the soil body better.
Further, in step S5, S7 and S8, keep sending slurry pump to have pressure, avoid cement grout and the soil body to send slurry pump from counter being poured into of mouth spray, reduce the pile quality of mixing pile, avoid causing danger simultaneously.
It should be noted that, stir and heavy whitewashing promotes in the process stirred whitewashing first to promote, have following some should be noted that:
1) continuously, must not must arbitrarily stop, to avoid plugging for slurry;
2) stop slurry face and must exceed design 0.3m;
3) pulling speed should not be too fast, avoids a body soil body to form cavity so that broken pile;
4) field technician to be counted accurate recording whitewashing amount according to automatic flow.
The present invention adopts two to spray six constructional methods stirred, simple to operate, is beneficial to popularization; Relative to " two spray two stirs " and " two sprays four are stirred " constructional method of routine, the stirring number of times increase of the soil body and cement grout, it is ensured that pile quality, especially under saline alkali soft foundation; Stirring number of times increases, and accumulative whitewashing amount and more conventional twice whitewashing of whitewashing number of times do not increase, and again relative to " three sprays six are stirred " constructional method, decrease and once whitewash, saved the construction material of 1/3, energy-conserving and environment-protective.
The foregoing is only the better embodiment of the present invention, not in order to limit the present invention, within the spirit and principles in the present invention all, any amendment of doing, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (5)

1. the soft base cement mixing pile construction method of saline alkali mud matter, it is characterised in that, comprise the following steps:
S1, it would be desirable to the levelling of the land of construction;
S2, is transported to place to be onstructed by mixing pile machine, by establishing fixed pile location and centering, connects and send slurry pump;
S0, prepares cement grout, and to giving slurry pump to provide cement grout;
S3, starts mixing pile machine, sinks to stirring first: the sinking velocity of drill bit is 0.2��0.5m/min, when operator feels that fuselage starts shake, drill bit sinks and obviously becomes slow, and drill bit starts to enter ground bearing stratum, continue to creep into until drill bit no longer sinks, stop creeping into; S4, whitewashing first promotes stirs: after stopping is crept into, opens and send slurry pump, send slurry pump to carry cement grout in the soil body, changes the turning direction of drill bit, and guarantee lasting stirring 30��50s; Then starting whitewashing limit, limit to promote, the pulling speed of drill bit is 0.3��0.6m/min, is promoted to stake top and stops promoting, and continue stirring 5��20s, closes and send slurry pump;
S5, repeats to sink to stirring: the sinking velocity of drill bit is 0.3��0.6m/min, sinks at the bottom of being stirred to;
S6, repeats whitewashing and promotes stirring: open and send slurry pump to carry out repeating whitewashing, and stir lifting, the pulling speed 0.3��0.6m/min of drill bit simultaneously, be promoted to stake top and stop lifting, and continue stirring 5��20s, close and send slurry pump;
S7, third time sinks to stirring: the sinking velocity of drill bit is 0.3��0.6m/min, sinks at the bottom of being stirred to;
S8, third time promotes stirring: the pulling speed of drill bit is 0.3��0.6m/min, and drill bit is promoted to more than earth's surface 30��50cm;
S9, closes mixing pile machine, and complete machine is displaced to the finger fixed pile of next pile, repeats above often step operation, completes next root mixing pile.
2. the soft base cement mixing pile construction method of saline alkali mud matter as claimed in claim 1, it is characterized in that, in step so), cement grout adopts ordinary Portland cement, water cement ratio is 0.48��0.5, cement grout proportion is 1.86��1.87g/ml, it may also be useful to cement grout is stirred by concrete mixer, often the dish cement grout mixing time 30��80min.
3. the soft base cement mixing pile construction method of saline alkali mud matter as claimed in claim 2, it is characterised in that, described ordinary Portland cement is P O42.5.
4. the soft base cement mixing pile construction method of saline alkali mud matter as claimed in claim 1, it is characterised in that, step S5, S6, S7 and/or S8 change the turning direction of drill bit respectively.
5. the soft base cement mixing pile construction method of saline alkali mud matter as claimed in claim 1, it is characterised in that, in step S5, S7 and S8, keep sending slurry pump to have pressure.
CN201410771976.9A 2014-12-15 2014-12-15 The soft base cement mixing pile construction method of saline alkali mud matter Active CN104480932B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410771976.9A CN104480932B (en) 2014-12-15 2014-12-15 The soft base cement mixing pile construction method of saline alkali mud matter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410771976.9A CN104480932B (en) 2014-12-15 2014-12-15 The soft base cement mixing pile construction method of saline alkali mud matter

Publications (2)

Publication Number Publication Date
CN104480932A CN104480932A (en) 2015-04-01
CN104480932B true CN104480932B (en) 2016-06-01

Family

ID=52755530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410771976.9A Active CN104480932B (en) 2014-12-15 2014-12-15 The soft base cement mixing pile construction method of saline alkali mud matter

Country Status (1)

Country Link
CN (1) CN104480932B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109826176B (en) * 2019-03-05 2021-05-07 车明凤 Pipe trench engineering construction process for coastal special silt geology
CN109914401A (en) * 2019-04-18 2019-06-21 上海强劲地基工程股份有限公司 Superficial layer of sand or saturation layer of sand cement-soil stirring pile construction device and method
CN110284498B (en) * 2019-07-02 2022-02-11 国网江苏省电力有限公司连云港供电分公司 Bidirectional stirring method for manufacturing club-footed powder-spraying pile by using alkaline residues
CN112813967A (en) * 2020-12-26 2021-05-18 江苏盛泰建设工程有限公司 Intelligent control method for pile length operation in construction of cement-soil mixing pile

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102021906A (en) * 2010-12-16 2011-04-20 河南省新开元路桥工程咨询有限公司 Method for reinforcing soft soil foundation at deep mixing pile
CN103422497A (en) * 2013-08-21 2013-12-04 国家电网公司 Method for reinforcing soft soil foundation by using cement-soil mixing pile
CN103556631A (en) * 2013-11-18 2014-02-05 高伯明 Pile-forming operation method for stirring pile
CN103669339A (en) * 2012-08-28 2014-03-26 李孝虎 Wet jetting pile construction technology for strengthening soft soil foundation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102021906A (en) * 2010-12-16 2011-04-20 河南省新开元路桥工程咨询有限公司 Method for reinforcing soft soil foundation at deep mixing pile
CN103669339A (en) * 2012-08-28 2014-03-26 李孝虎 Wet jetting pile construction technology for strengthening soft soil foundation
CN103422497A (en) * 2013-08-21 2013-12-04 国家电网公司 Method for reinforcing soft soil foundation by using cement-soil mixing pile
CN103556631A (en) * 2013-11-18 2014-02-05 高伯明 Pile-forming operation method for stirring pile

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
唐山曹妃甸煤码头水泥搅拌桩施工试验研究;王祯凯等;《东北水利水电》;20130630(第6期);第49-50页 *

Also Published As

Publication number Publication date
CN104480932A (en) 2015-04-01

Similar Documents

Publication Publication Date Title
CN107120121B (en) A kind of shield-tunneling construction supplements slip casting anti-settling control method in real time
CN103556631B (en) The one-tenth pile operation method of agitation pile
CN104480932B (en) The soft base cement mixing pile construction method of saline alkali mud matter
CN105155541B (en) A kind of dual slurry closure construction method of catch pit
CN107989032A (en) A kind of construction method of punching interlocking pile
CN203361143U (en) Combination structure of high-pressure jet grouting pile and prestressed pipe pile
CN101761073A (en) Improved construction technology of CFG (cement fIying-ash gravel) pile
CN104863132A (en) Bougainvillea spectabilis willd-shaped cement-soil mixing pile and shaping method thereof
CN107989023A (en) A kind of Construction of Soft Soil Subgrade technique
CN103396065A (en) Synchronous grouting grout for shield construction control and grouting method thereof
CN104631446A (en) Technical method for improving quality of deep cement soil mixing piles using compressed air foam
CN107338790A (en) The compound pile construction method of jet mixing
CN105040683A (en) Informatization construction method for cement mixing piles
CN102561332B (en) Continuous variable-diameter cement-soil mixed pile forming method
CN104153381A (en) Waterproof curtain pile, waterproof curtain and construction method of waterproof curtain pile
CN103147707A (en) Complete treatment method for pile bottom sediment
CN113943130A (en) Formula and grouting process of shield tunnel timed-setting wall-grouting material
CN101649614A (en) Variable-diameter multi-direction anchor pile
CN110409435A (en) A kind of novel concrete mixing pile construction method
CN104108919A (en) Environment-friendly water-stop curtain
CN102235008A (en) Engineering pile deviation preventing structure of soft soil foundation and pretreatment method
CN106013051A (en) Special clay curing liquid deep stirring method
CN102444137B (en) Construction method of vacuum pre-pressed mortar enclosing wall
CN109881696A (en) A kind of HPPG back cover construction method
CN109024557A (en) A kind of drill-pouring prefabricated pile and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant