BR112020025409A2 - Métodos de geração de certificado de qualidade e de monitoramento de processos e sistema de controle de qualidade - Google Patents

Métodos de geração de certificado de qualidade e de monitoramento de processos e sistema de controle de qualidade Download PDF

Info

Publication number
BR112020025409A2
BR112020025409A2 BR112020025409-6A BR112020025409A BR112020025409A2 BR 112020025409 A2 BR112020025409 A2 BR 112020025409A2 BR 112020025409 A BR112020025409 A BR 112020025409A BR 112020025409 A2 BR112020025409 A2 BR 112020025409A2
Authority
BR
Brazil
Prior art keywords
quality
manufacturing
parameters
machine
manufacturing steps
Prior art date
Application number
BR112020025409-6A
Other languages
English (en)
Portuguese (pt)
Inventor
Bernhard Feyo Gebhard
Original Assignee
Gestamp Servicios, S.A.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gestamp Servicios, S.A. filed Critical Gestamp Servicios, S.A.
Publication of BR112020025409A2 publication Critical patent/BR112020025409A2/pt

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Program-control systems
    • G05B19/02Program-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41875Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by quality surveillance of production
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Program-control systems
    • G05B19/02Program-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/4183Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by data acquisition, e.g. workpiece identification
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K19/00Record carriers for use with machines and with at least a part designed to carry digital markings
    • G06K19/06Record carriers for use with machines and with at least a part designed to carry digital markings characterised by the kind of the digital marking, e.g. shape, nature, code
    • G06K19/06009Record carriers for use with machines and with at least a part designed to carry digital markings characterised by the kind of the digital marking, e.g. shape, nature, code with optically detectable marking
    • G06K19/06046Constructional details
    • G06K19/06121Constructional details the marking having been punched or cut out, e.g. a barcode machined in a metal work-piece
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/018Certifying business or products
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32179Quality control, monitor production tool with multiple sensors
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32196Store audit, history of inspection, control and workpiece data into database
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/36Nc in input of data, input key till input tape
    • G05B2219/36371Barcode reader
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Manufacturing & Machinery (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Tourism & Hospitality (AREA)
  • General Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Game Theory and Decision Science (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Health & Medical Sciences (AREA)
  • Operations Research (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
BR112020025409-6A 2018-06-14 2019-06-13 Métodos de geração de certificado de qualidade e de monitoramento de processos e sistema de controle de qualidade BR112020025409A2 (pt)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP18382425.9 2018-06-14
EP18382425 2018-06-14
PCT/EP2019/065612 WO2019238890A1 (en) 2018-06-14 2019-06-13 Quality monitoring of industrial processes

Publications (1)

Publication Number Publication Date
BR112020025409A2 true BR112020025409A2 (pt) 2021-03-09

Family

ID=62778869

Family Applications (1)

Application Number Title Priority Date Filing Date
BR112020025409-6A BR112020025409A2 (pt) 2018-06-14 2019-06-13 Métodos de geração de certificado de qualidade e de monitoramento de processos e sistema de controle de qualidade

Country Status (8)

Country Link
US (1) US12613514B2 (https=)
EP (1) EP3807730B1 (https=)
JP (1) JP7455765B2 (https=)
CN (1) CN112513755A (https=)
BR (1) BR112020025409A2 (https=)
ES (1) ES3063752T3 (https=)
MX (1) MX2020013585A (https=)
WO (1) WO2019238890A1 (https=)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT521576B1 (de) * 2018-08-21 2022-05-15 Wittmann Tech Gmbh Verfahren zur Qualitätskontrolle und/oder Nachverfolgung eines in einem Produktionszyklus hergestellten Spritzgießteils sowie Kunststoffindustrieanlage hierfür
IL263399B (en) * 2018-11-29 2022-09-01 Inspekto A M V Ltd Centralized analyzes of multiple devices for visual inspection of a production line
CN113804244B (zh) * 2020-06-17 2024-06-25 富联精密电子(天津)有限公司 缺陷分析方法及装置、电子装置及计算机可读存储介质
CN113996953B (zh) * 2020-07-28 2023-08-11 宝山钢铁股份有限公司 一种激光焊机的状态数据综合采集分析系统
US11663548B2 (en) 2020-11-30 2023-05-30 Toyota Motor Engineering & Manufacturing North America, Inc. System and method for rapid defect entry
DE102021125343B4 (de) 2021-09-30 2025-03-20 Schott Ag Verfahren und Vorrichtung zur Herstellung einer Vielzahl von Bauelementen mit zumindest einer elektrischen Durchführung und einem Informationsspeicher, Bauelement sowie Verfahren und Vorrichtung zur Weiterverarbeitung solcher Bauelemente
WO2024121148A1 (en) 2022-12-07 2024-06-13 Gestamp Automoción, S.A. Tracking workpieces in industrial processes and quality control systems and methods
GB2625148B (en) * 2022-12-09 2025-02-19 Degould Ltd Vehicle quality control system
EP4390590A1 (en) * 2022-12-20 2024-06-26 Tetra Laval Holdings & Finance S.A. A computer implemented method for secure transmission of a data message from a source node to a target node
WO2025119451A1 (de) * 2023-12-05 2025-06-12 Plockcontrol Capital Gmbh Verfahren zum prüfen, markieren und sortieren von einzelobjekten

Family Cites Families (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5284164A (en) * 1991-11-07 1994-02-08 Brown & Williamson Tobacco Corporation Method for improving the quality of products produced in the cigarette manufacturing process
JPH0765077A (ja) * 1993-08-31 1995-03-10 Kubota Corp 生産ラインのライン品質診断方法とその装置
JP2000243678A (ja) * 1998-12-24 2000-09-08 Toshiba Corp モニタリング装置とその方法
JP4693225B2 (ja) 2000-11-06 2011-06-01 株式会社東芝 製造ラインの自動品質制御方法及びその装置並びに記憶媒体、自動品質制御プログラム
US6909927B2 (en) * 2001-04-06 2005-06-21 Ricoh Electronics, Inc. Apparatus and method for monitoring manufacturing status
JP2003233652A (ja) * 2002-02-12 2003-08-22 Sharp Corp 品質管理システム、品質管理方法、品質管理プログラム及び品質管理プログラムを記録した記録媒体
JP4344918B2 (ja) * 2003-05-30 2009-10-14 三菱自動車工業株式会社 加工情報記憶装置および加工情報追跡システム
US20050285440A1 (en) * 2004-06-23 2005-12-29 Bal Pushpinder S Wheel traceability system
EP1634672B1 (en) * 2004-09-14 2009-03-18 C.R.F. Società Consortile per Azioni System for monitoring the quality of industrial processes and method therefrom
US20060185143A1 (en) * 2004-11-22 2006-08-24 Airbus Deutschland Gmbh Method and device for manufacturing sections for transportation systems
US7493181B2 (en) * 2006-02-23 2009-02-17 International Business Machines Corporation Utilizing an RFID tag in manufacturing for enhanced lifecycle management
US9128481B2 (en) * 2010-01-15 2015-09-08 Rockwell Automation Technologies, Inc. Integrated menu-driven manufacturing method and system
US20110282476A1 (en) * 2010-05-07 2011-11-17 Skinit, Inc. Systems and methods of on demand manufacturing of customized products
US9110452B2 (en) 2011-09-19 2015-08-18 Fisher-Rosemount Systems, Inc. Inferential process modeling, quality prediction and fault detection using multi-stage data segregation
EP2721453A1 (en) * 2011-09-29 2014-04-23 Siemens Aktiengesellschaft Method for verifying process parameters of a manufacturing process
US9910429B2 (en) 2013-09-03 2018-03-06 The Procter & Gamble Company Systems and methods for adjusting target manufacturing parameters on an absorbent product converting line
US9842303B2 (en) * 2014-03-05 2017-12-12 Toyota Motor Engineering & Manufacturing North America, Inc. Method for coupling quality control data of a subassembly of components to a main product assembly
WO2016083897A2 (en) * 2014-11-24 2016-06-02 Kitov Systems Ltd. Automated inspection
CA2993824A1 (en) 2015-07-29 2017-02-02 Illinois Tool Works Inc. System and method to facilitate welding software as a service
US10317891B2 (en) * 2015-11-23 2019-06-11 Toyota Motor Engineering & Manufacturing North America, Inc. Operator and manufacturing quality traceability
JP6096872B1 (ja) * 2015-11-30 2017-03-15 ファナック株式会社 製造ラインの生産実績情報を管理する生産管理装置及び生産システム
US10481597B2 (en) * 2015-12-08 2019-11-19 Sight Machine, Inc. System and method for monitoring manufacturing
US10037024B2 (en) * 2016-01-18 2018-07-31 GM Global Technology Operations LLC Automated stochastic method for feature discovery and use of the same in a repeatable process
US10852712B2 (en) * 2016-02-17 2020-12-01 Plataine Ltd. Tracking production in a production facility using searchable digital threads
DE102016119110A1 (de) * 2016-04-08 2017-10-12 Windmöller & Hölscher Kg Verfahren zur Bewertung mindestens eines industriellen Prozesses
JP6659985B2 (ja) * 2017-01-24 2020-03-04 富士通株式会社 プログラムの利用支援プログラム、プログラム利用支援装置およびプログラム利用支援方法
JP6991833B2 (ja) * 2017-10-31 2022-01-13 株式会社日立製作所 因果関係モデル構築システムおよび方法
EP3743864A4 (en) * 2018-01-25 2021-10-20 BEET, Inc. SYSTEM AND DEVICE FOR DIGITIZING A PROCESS

Also Published As

Publication number Publication date
US20210232126A1 (en) 2021-07-29
EP3807730B1 (en) 2025-11-12
JP2022501683A (ja) 2022-01-06
US12613514B2 (en) 2026-04-28
JP7455765B2 (ja) 2024-03-26
WO2019238890A1 (en) 2019-12-19
EP3807730A1 (en) 2021-04-21
ES3063752T3 (en) 2026-04-20
CN112513755A (zh) 2021-03-16
MX2020013585A (es) 2021-05-12

Similar Documents

Publication Publication Date Title
BR112020025409A2 (pt) Métodos de geração de certificado de qualidade e de monitoramento de processos e sistema de controle de qualidade
US10539380B2 (en) Method and system for thermographic analysis
JP6811018B2 (ja) 品質評価システム、品質評価方法及びプログラム
US12051185B2 (en) Method and apparatus for the determination of defects during a surface modification method
JP6795562B2 (ja) 検査装置及び機械学習方法
SA516380413B1 (ar) طريقة ونظام لتقييم عيوب أنبوب
EP2778818B1 (en) Identification of faults in a target system
EP3482192A1 (en) System and method for combined automatic and manual inspection
JP7509027B2 (ja) 車両検査方法および車両検査システム
JP2020042668A (ja) 検査装置及び機械学習方法
Ahmed et al. Condition monitoring in the management of maintenance in a large scale precision CNC machining manufacturing facility
CN118353920B (zh) 一种设备巡检管理方法、系统、设备及存储介质
JP2012020336A (ja) スポット溶接における一元制御・検知システム
CN117633467B (zh) 一种新能源汽车用端子台电气性能的监测评估方法及系统
JP2008181341A (ja) 製造不良要因分析支援装置
CN120525288A (zh) 电池模组的工序管控方法和系统
CN105069705A (zh) 基于巡检机器人的数据考核方法和系统
Eddy et al. A defect prevention concept using artificial intelligence
WO2023002673A1 (ja) 解析装置、解析システム、解析方法、および解析プログラム
CN119759760B (zh) 一种基于模型与数据驱动的车载软件故障诊断方法及系统
EP4334790B1 (en) A method of virtually inspecting a quality of a product
CN116702030B (zh) 一种基于传感器可靠性分析的高炉状态监测方法及装置
KR102045230B1 (ko) 광학 기구용 마운트의 테스트 장치 및 방법
KR20240067677A (ko) 용접품질 예측장치 및 그 방법
Shitova APPROACH TO CLASSIFYING MEASURING INSTRUMENTS AS INDICATORS, TAKING INTO ACCOUNT THE PROBABLE RISK

Legal Events

Date Code Title Description
B350 Update of information on the portal [chapter 15.35 patent gazette]
B06W Patent application suspended after preliminary examination (for patents with searches from other patent authorities) chapter 6.23 patent gazette]
B09A Decision: intention to grant [chapter 9.1 patent gazette]
B16A Patent or certificate of addition of invention granted [chapter 16.1 patent gazette]

Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 13/06/2019, OBSERVADAS AS CONDICOES LEGAIS