BE835641A - FLOOR SHEATH OR LOST METAL FORMWORK FOR CONCRETE SLAB, HOURDIS - Google Patents

FLOOR SHEATH OR LOST METAL FORMWORK FOR CONCRETE SLAB, HOURDIS

Info

Publication number
BE835641A
BE835641A BE161927A BE161927A BE835641A BE 835641 A BE835641 A BE 835641A BE 161927 A BE161927 A BE 161927A BE 161927 A BE161927 A BE 161927A BE 835641 A BE835641 A BE 835641A
Authority
BE
Belgium
Prior art keywords
emi
profile
sheath
floor
section
Prior art date
Application number
BE161927A
Other languages
French (fr)
Inventor
J R A D Huilly De Chevilly
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to BE161927A priority Critical patent/BE835641A/en
Publication of BE835641A publication Critical patent/BE835641A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/48Special adaptations of floors for incorporating ducts, e.g. for heating or ventilating
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
    • E04B5/38Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
    • E04B5/40Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element with metal form-slabs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

       

  Gaine de plancher ou de coffrage métallique perdu pour

  
 <EMI ID=1.1> 

  
La présente invention concerne les coffrages

  
perdus pour dalles de béton, hourdis nervurés et plus particulièrement une gaine métallique à mettre en oeuvre avec

  
ces coffrages perdus, pour contenir des conduits électriques

  
ou pour former un élément de plancher métallique à surface

  
apparente plane.

  
Lorsque la partie métallique du plancher

  
présente une succession d'ondes, la technique antérieure de réalisation des gaines consiste à ajouter une tôle plane soit par le dessus, soit par le dessous des ondes avec plusieurs inconvénients qui seront décrits dans la suite du présent mémoire.

  
 <EMI ID=2.1> 

  
tion une gaine composée de deux profilés en U superposés

  
et emboîtés l'un dans l'autre, le fond du profilé supérieur présentant une nervure centrale en saillie qui, avec le

  
fond du profilé inférieur délimite la section de passage de la gaine, les ailes des deux profilés étant découpées de façon crénelée de manière à présenter une succession de dents dont chacune constitue un point d'ancrage pour le béton.

  
Le profilé inférieur et le profilé supérieur constituent deux types de profilés conformes au brevet belge n[deg.] 761.067.

  
Ainsi dans chaque profilé, les ailes, qui sont les prolongements des c8tés, sont rabattues en substance parallèlement au fond du profilé et sont découpées

  
de manière à présenter alternativement des dents et des arêtes. La superposition des deux profilés est telle que les dents de l'un sont en coïncidence avec celles de l'autre profilé.

  
Dans une forme de réalisation préférée, les côtés et le fond de la nervure centrale du profilé supérieur forment avec le fond du profilé inférieur une section de passage en trapèze isocèle.

  
Avantageusement, pour faciliter la mise en place des fils électriques et empêcher leur coincement, le fond du profilé inférieur présente deux nervures s'étendant dans le sens de la longueur du profilé, parallèlement aux côtés.

  
pour le montage, qui se fait en chantier, on met d'abord en place le profilé inférieur comme un élément  de plancher conforme au brevet belge précité et on y superpose ensuite un profilé supérieur à nervure centrale.

  
Afin de bien faire comprendre cette invention, on en donnera ci-après un exemple de réalisation non limitatif, après avoir décrit l'état de la technique, en se référant aux dessins dans lesquels :

  
Les figures 1 à 3 montrent en coupe transversale des réalisations de gaines métalliques conformes

  
à la technique antérieure, les tôles planes se fixant soit par le dessus (figures 1 et 2) soit par le dessous (figure 3) des ondes du plancher métallique:
la figure 4 montre en perspective, avec brisure partielle, une réalisation de gaine métallique selon la présente invention, la figure 5 montre schématiquement en coupe transversale, la situation d'une gaine conforme à l'invention dans un ensemble de plancher-coffrage métallique conforme au brevet belge précité: et les figures 6 et 7 illustrent également de façon schématique et en coupe les avantages de la présente invention (figure 7) par rapport à ceux obtenus par la mise

  
 <EMI ID=3.1> 

  
(figure 6).

  
Dans les figures 4 à 7 qui se rapportent à la présente invention , les mêmes notations de référence désignent des éléments identiques.

  
Ainsi qu'on le voit sur les figures 1 et 2 dans les planchers métalliques de la technique antérieure, les gaines métalliques ont été réalisées en fixant les tôles

  
 <EMI ID=4.1>  Beur moindre du béton 103 au-dessus d'une gaine 104 ainsi formée compromet manifestement la stabilité de la dalle.

  
La tôle 100 a renforcé le plancher d'acier au moment du  bétonnage mais n'ajoute rien à la solidité de la dalle de béton qui en résulte. D'autre part, la formation des gaines métalliques par soudure à l'arc demande une main-d'oeuvre onéreuse.

  
En variante, les tôles planes 100 se fixent

  
 <EMI ID=5.1> 

  
105 comme on le voit sur la figure 3. Dans ce cas, les inconvénients précités disparaissent mais il devient impossible de réaliser les gaines à des endroits bien précis et bien délimités. Chaque tôle constituant le plancher métallique doit être gainée sur toute sa largeur. Ainsi, lorsqu'une tôle possède trois ondes et que l'on désire former à

  
cet endroit une seule gaine, en se trouve obligé de fermer les trois ondes d'où deux gaines inutiles et dépense élevée. D'autre part, les profils en forme de gaine ne s'emboîtent pas lors du transport de l'usine au chantier.

  
Pour remédier aux inconvénients précités et procurer encore des avantages qui apparaîtront ci-après, on propose de former la gaine métallique au moyen de deux pro-

  
 <EMI ID=6.1> 

  
des ailes rabattues en substance parallèlement au fond 2, respectivement 2' et découpées de façon crénelée de manière à présenter une succession de dents 3, respectivement 3',

  
 <EMI ID=7.1> 

  
chacune constitue un point d'ancrage pour le béton. Les dents 4, respectivement 4' alternent avec des arêtes 5, res-

  
 <EMI ID=8.1> 

  
Dans l'assemblage de deux profilés superposés, emboîtés l'un dans l'autre pour former une gaine, le profilé

  
 <EMI ID=9.1>  avec le fond 2 du profilé inférieur 1 définit la section de passage de la gaine. Les côtés 7' forment un trapèze isocèle avec le fond 8' de la nervure.

  
Dans les deux sortes de profilés, les dents

  
 <EMI ID=10.1> 

  
les dents 3, 3' étant faiblement inclinées par rapport au

  
 <EMI ID=11.1> 

  
dents 3 sont en coïncidence avec les dents 3'.

  
Le profilé 1 décrit ci-dessus est destiné

  
 <EMI ID=12.1> 

  
même façon qu'un élément de coffrage perdu selon le brevet belge précité, un montage de ce genre étant illustré sur la figure 5. 

  
Le profilé 1 se place aux seuls endroits où on désire former une gaine. Aussitôt après, on y superpose un profilé l'ou bien un profilé normal de plancher tel que

  
 <EMI ID=13.1> 

  
Comme on le voit sur la figure 5, l' adj onction du profilé 1 permet de réaliser une gaine métallique uniquement aux endroits voulus sans diminuer en aucune façon la stabilité de la dalle de béton 103 et sans aucun apport de matière autre que la tale du profilé.

  
Avantageusement le fond 2 du profilé 1 présente deux plia 10 dans le but d'éviter que les fils électriques ne se coincent lors de leur mise en place. Ces deux plis 0 étendant dans le sens de la longueur du prof ilé, parallèlement aux cotés de celui-ci servent alors de guides.

  
Le profilé 1 formant la tôle inférieure de

  
 <EMI ID=14.1> 

  
 <EMI ID=15.1> 

  
oeuvre et prise du béton.

  
Cet avantage est encore plus apparent lorsque la partie métallique du plancher se compose en totalité de gaines de ce genre.

  
En effet, après sa mise en place, le béton reprend seul les efforts de compression, la partie haute du profilé métallique ne jouant plus aucun rôle à cet égara.

  
L'augmentation de matière visant à renforcer la partie métallique doit donc se faire dans le bas du pro-

  
 <EMI ID=16.1> 

  
 <EMI ID=17.1> 

  
Les figures 6 et 7 illustrent la situation respectivement en l'absence et en présence d'un profilé à

  
la partie inférieure de chaque élément de plancher métallique. A droite de chacune de ces figures se trouve un diagramme comportant en ordonnée l'épaisseur de la dalle et en abscisse la contrainte applicable sous forme de compression
(partie droite du diagramme) et sous forme de traction 
(partie gauche du diagramme)* l'aire hachurée représentant 

  
les zones de contraintes admissibles. Le diagramme de la  figure 7 montre que l'adjonction d'un profilé 1 à la partie  <EMI ID=18.1> 

  
l'aire des contraintes admissibles en traction se trouve  augmentée par rapport au diagramme de la figure 6. 

  
La solution offerte par la présente invention  se distingue, corne on le voit, nettement de la technique  antérieure. 

  
D'une part, la gaine ou élément de plancher  se réalise en chantier alors que, dans la technique antérieure on préfère de loin réaliser les gaines en usine. 

  
D'autre part:, l'invention met en oeuvre la  superposition de deux profilés métalliques non seulement  pour former une gaine mais également pour augmenter la ca-  pacité portante et la raideur des profilés,  On a toujours admis jusqu'à présent qu'il vaut mieux doubler l'épaisseur du profilé que de superposer deux profilés de même épaisseur, parce que les profilés devaient être soudés ou rivés l'un à l'autre ce qui entralnait de grosses dépenses.

  
A première vue, pour augmenter la raideur des profilés, il paraissait aussi plus intéressant d'en augmenter soit la hauteur, soit l'épaisseur de manière à maintenir l'axe neutre le plus près possible du centre du profilé. On cherchait également à rendre autant que possible les profilés symétriques par rapport à l'axe neutre

  
ou à équilibrer les sections d'acier de part et d'autre de l'axe neutre afin de ramener cet axe au centre de la section

  
 <EMI ID=19.1> 

  
Il était donc surprenant d'avoir pu obtenir les résultats intéressants décrits plus haut quant à la solidité et l'inertie en superposant deux profilés et en donnant à l'assemblage ainsi formé une section transversale dissymétrique par rapport à l'axe neutre, conformément à l'invention.

  
Le profilé 1 placé à la partie inférieure de

  
 <EMI ID=20.1> 

  
plafond plan. En raison de l'absence de liaison intime entre les deux profilés, les coups et chocs donnés sur le plancher ne risquent pas d'abîmer le profilé inférieur 1 qui devra rester apparent.

  
On peut donc utiliser des tôles de faible épaisseur tant pour le plancher que pour le profilé 1 constituant le plafond apparent et celui-ci peut être peint avant sa mise en place. 

  
Un autre avantage réside dans l'absence complète de fixation par rivetage ou par des points de soudure. 

REVENDICATIONS

  
1. Gaine de plancher ou de coffrage métallique perdu pour dalle de béton, hourdis, etc,, caractérisée en

  
 <EMI ID=21.1> 

  
qui, avec le fond (2) du profilé inférieur délimite la section de passage de la gaine, les ailes des deux profilés étant découpées de façon crénelée de manière à présenter une succession de dents dont chacune constitue un point d'ancrage pour le béton.



  Floor sheath or lost metal formwork for

  
 <EMI ID = 1.1>

  
The present invention relates to formwork

  
lost for concrete slabs, ribbed slabs and more particularly a metal sheath to be implemented with

  
these lost forms, to contain electrical conduits

  
or to form a surface metal floor element

  
apparent plane.

  
When the metal part of the floor

  
presents a succession of waves, the prior technique for producing sheaths consists in adding a flat sheet either from above or from below the waves with several drawbacks which will be described later in this specification.

  
 <EMI ID = 2.1>

  
tion a duct made up of two superimposed U-profiles

  
and nested one inside the other, the bottom of the upper section having a projecting central rib which, together with the

  
bottom of the lower profile delimits the passage section of the sheath, the wings of the two profiles being cut in a crenellated manner so as to present a succession of teeth, each of which constitutes an anchoring point for the concrete.

  
The lower profile and the upper profile constitute two types of profiles in accordance with Belgian patent n [deg.] 761.067.

  
Thus in each section, the wings, which are the extensions of the sides, are folded down substantially parallel to the bottom of the section and are cut

  
so as to have teeth and ridges alternately. The superposition of the two sections is such that the teeth of one are in coincidence with those of the other section.

  
In a preferred embodiment, the sides and the bottom of the central rib of the upper section form with the bottom of the lower section an isosceles trapezoidal passage section.

  
Advantageously, to facilitate the positioning of the electric wires and prevent their jamming, the bottom of the lower section has two ribs extending in the direction of the length of the section, parallel to the sides.

  
for assembly, which is done on site, the lower profile is first set up as a floor element in accordance with the aforementioned Belgian patent and an upper profile with a central rib is then superimposed on it.

  
In order to make this invention fully understood, a non-limiting exemplary embodiment thereof will be given below, after having described the state of the art, with reference to the drawings in which:

  
Figures 1 to 3 show in cross section embodiments of conformal metal sheaths

  
in the prior art, the flat sheets fixing either from above (Figures 1 and 2) or from below (Figure 3) of the waves of the metal floor:
FIG. 4 shows in perspective, with partial breakage, an embodiment of a metal sheath according to the present invention, FIG. 5 shows schematically in cross section, the situation of a sheath according to the invention in a metal floor-formwork assembly according to to the aforementioned Belgian patent: and Figures 6 and 7 also illustrate schematically and in section the advantages of the present invention (Figure 7) compared to those obtained by putting

  
 <EMI ID = 3.1>

  
(figure 6).

  
In Figures 4 to 7 which relate to the present invention, the same reference notations designate identical elements.

  
As seen in Figures 1 and 2 in the metal floors of the prior art, the metal sheaths were made by fixing the sheets

  
 <EMI ID = 4.1> Less content of the concrete 103 above a sheath 104 thus formed clearly compromises the stability of the slab.

  
Sheet 100 reinforced the steel floor during concreting but added nothing to the strength of the resulting concrete slab. On the other hand, the formation of metal sheaths by arc welding requires expensive labor.

  
As a variant, the flat sheets 100 are fixed

  
 <EMI ID = 5.1>

  
105 as can be seen in FIG. 3. In this case, the aforementioned drawbacks disappear but it becomes impossible to produce the ducts at very specific and well defined places. Each sheet constituting the metal floor must be sheathed over its entire width. Thus, when a sheet has three waves and that one wishes to form

  
this place a single sheath, in is obliged to close the three waves from where two unnecessary sheaths and high expense. On the other hand, the duct-shaped profiles do not fit together during transport from the factory to the site.

  
To remedy the aforementioned drawbacks and further provide advantages which will appear below, it is proposed to form the metal sheath by means of two pro-

  
 <EMI ID = 6.1>

  
wings folded down substantially parallel to the base 2, respectively 2 'and cut in a crenellated manner so as to present a succession of teeth 3, respectively 3',

  
 <EMI ID = 7.1>

  
each constitutes an anchor point for the concrete. The teeth 4, respectively 4 'alternate with ridges 5, res-

  
 <EMI ID = 8.1>

  
In the assembly of two superimposed profiles, nested one inside the other to form a sheath, the profile

  
 <EMI ID = 9.1> with the bottom 2 of the lower profile 1 defines the passage section of the duct. The sides 7 'form an isosceles trapezoid with the bottom 8' of the rib.

  
In both types of profiles, the teeth

  
 <EMI ID = 10.1>

  
the teeth 3, 3 'being slightly inclined with respect to the

  
 <EMI ID = 11.1>

  
teeth 3 are in coincidence with teeth 3 '.

  
Profile 1 described above is intended

  
 <EMI ID = 12.1>

  
same way as a lost formwork element according to the aforementioned Belgian patent, an assembly of this type being illustrated in FIG. 5.

  
The profile 1 is placed at the only places where it is desired to form a sheath. Immediately afterwards, a profile or a normal floor profile such as

  
 <EMI ID = 13.1>

  
As can be seen in FIG. 5, the addition of the profile 1 makes it possible to produce a metal sheath only at the desired locations without in any way reducing the stability of the concrete slab 103 and without any addition of material other than the size of the profiled.

  
Advantageously, the bottom 2 of the profile 1 has two folds 10 in order to prevent the electric wires from getting stuck during their installation. These two folds 0 extending in the direction of the length of the prof ilé, parallel to the sides of the latter then serve as guides.

  
Profile 1 forming the bottom sheet of

  
 <EMI ID = 14.1>

  
 <EMI ID = 15.1>

  
work and setting of concrete.

  
This advantage is even more apparent when the metal part of the floor consists entirely of ducts of this kind.

  
In fact, after its installation, the concrete alone takes up the compressive forces, the upper part of the metal profile no longer playing any role in this way.

  
The increase in material aimed at reinforcing the metal part must therefore be done at the bottom of the

  
 <EMI ID = 16.1>

  
 <EMI ID = 17.1>

  
Figures 6 and 7 illustrate the situation respectively in the absence and in the presence of a profile with

  
the lower part of each metal floor element. To the right of each of these figures is a diagram comprising on the ordinate the thickness of the slab and on the abscissa the applicable stress in the form of compression
(right part of the diagram) and in the form of traction
(left part of the diagram) * the hatched area representing

  
the admissible stress zones. The diagram in figure 7 shows that the addition of a profile 1 to the part <EMI ID = 18.1>

  
the area of the admissible tensile stresses is increased compared to the diagram in figure 6.

  
The solution offered by the present invention differs, as can be seen, clearly from the prior art.

  
On the one hand, the sheath or floor element is produced on site while, in the prior art, it is much preferred to produce the sheaths in the factory.

  
On the other hand :, the invention uses the superposition of two metal sections not only to form a sheath but also to increase the bearing capacity and the stiffness of the sections, It has always been admitted until now that it It is better to double the thickness of the profile than to superimpose two profiles of the same thickness, because the profiles had to be welded or riveted to each other which entralnait great expense.

  
At first glance, to increase the stiffness of the sections, it also seemed more advantageous to increase either the height or the thickness so as to maintain the neutral axis as close as possible to the center of the section. We also tried to make the profiles as symmetrical as possible with respect to the neutral axis.

  
or to balance the steel sections on either side of the neutral axis in order to bring this axis back to the center of the section

  
 <EMI ID = 19.1>

  
It was therefore surprising to have been able to obtain the interesting results described above with regard to solidity and inertia by superimposing two profiles and giving the assembly thus formed an asymmetrical cross section with respect to the neutral axis, in accordance with invention.

  
Profile 1 placed at the bottom of

  
 <EMI ID = 20.1>

  
ceiling plan. Due to the absence of an intimate connection between the two profiles, the knocks and shocks given to the floor do not risk damaging the lower profile 1 which must remain visible.

  
It is therefore possible to use thin sheets both for the floor and for the profile 1 constituting the visible ceiling and the latter can be painted before its installation.

  
Another advantage lies in the complete absence of fixing by riveting or by welding points.

CLAIMS

  
1. Floor sheath or lost metal formwork for concrete slabs, slabs, etc., characterized in

  
 <EMI ID = 21.1>

  
which, with the bottom (2) of the lower profile delimits the passage section of the sheath, the wings of the two profiles being cut in a crenellated manner so as to present a succession of teeth each of which constitutes an anchoring point for the concrete.


    

Claims (1)

2. Gaine selon la revendication 1, caractérisée <EMI ID=22.1> 2. Sheath according to claim 1, characterized <EMI ID = 22.1> de manière à présenter alternativement des dents (3,3') et des arêtes (5,5'), les dents (3) du profilé (1) étant en so as to present alternately teeth (3,3 ') and ridges (5,5'), the teeth (3) of the profile (1) being in <EMI ID=23.1> <EMI ID = 23.1> 3. Gaine selon les revendications 1 et 2, caractérisée en ce que les cotés (7') et le fond (8') de la nervure centrale du profilé supérieur (il) forment avec le fond (2) du profilé inférieur (1) une section de passage en trapèze isocèle. 3. Sheath according to claims 1 and 2, characterized in that the sides (7 ') and the bottom (8') of the central rib of the upper section (it) form with the bottom (2) of the lower section (1) an isosceles trapezoidal passage section. 4. Gaine selon l'une quelconque des revendica- 4. Sheath according to any one of the claims <EMI ID=24.1> <EMI ID = 24.1> inférieur (1) présente deux nervures (10) s'étendant dans le sens de la longueur du profilé, parallèlement aux côtés (4). lower (1) has two ribs (10) extending in the direction of the length of the profile, parallel to the sides (4).
BE161927A 1975-11-17 1975-11-17 FLOOR SHEATH OR LOST METAL FORMWORK FOR CONCRETE SLAB, HOURDIS BE835641A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
BE161927A BE835641A (en) 1975-11-17 1975-11-17 FLOOR SHEATH OR LOST METAL FORMWORK FOR CONCRETE SLAB, HOURDIS

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
BE835641 1975-11-17
BE161927A BE835641A (en) 1975-11-17 1975-11-17 FLOOR SHEATH OR LOST METAL FORMWORK FOR CONCRETE SLAB, HOURDIS

Publications (1)

Publication Number Publication Date
BE835641A true BE835641A (en) 1976-03-16

Family

ID=25648954

Family Applications (1)

Application Number Title Priority Date Filing Date
BE161927A BE835641A (en) 1975-11-17 1975-11-17 FLOOR SHEATH OR LOST METAL FORMWORK FOR CONCRETE SLAB, HOURDIS

Country Status (1)

Country Link
BE (1) BE835641A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0003506A1 (en) * 1978-02-02 1979-08-22 H.H. Robertson Company Metal raceway section for wiring distribution system, and floor structure comprising such a raceway section
EP0003507A3 (en) * 1978-02-02 1979-09-05 H.H. Robertson Company Electrical wiring distribution system
EP0129416A3 (en) * 1983-06-17 1986-03-05 H.H. Robertson (U.K.) Limited Flooring systems
EP0372980A1 (en) * 1988-12-09 1990-06-13 John Lysaght (Australia) Ltd. Profiled steel sheet
WO2006097065A1 (en) * 2005-03-15 2006-09-21 Werner Averkamp Floor supporting structure with filled or covered cavities
EP1605112B1 (en) * 2004-06-11 2009-12-16 OP-deck Holding B.V. Method for the production of a building construction as well as formwork therefor

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0003506A1 (en) * 1978-02-02 1979-08-22 H.H. Robertson Company Metal raceway section for wiring distribution system, and floor structure comprising such a raceway section
EP0003507A3 (en) * 1978-02-02 1979-09-05 H.H. Robertson Company Electrical wiring distribution system
EP0129416A3 (en) * 1983-06-17 1986-03-05 H.H. Robertson (U.K.) Limited Flooring systems
EP0372980A1 (en) * 1988-12-09 1990-06-13 John Lysaght (Australia) Ltd. Profiled steel sheet
EP1605112B1 (en) * 2004-06-11 2009-12-16 OP-deck Holding B.V. Method for the production of a building construction as well as formwork therefor
WO2006097065A1 (en) * 2005-03-15 2006-09-21 Werner Averkamp Floor supporting structure with filled or covered cavities

Similar Documents

Publication Publication Date Title
EP1207240A1 (en) Formwork for a concrete wall that also serves as reinforcement
CA2357919C (en) Reinforcing cage for a reinforced concrete element
EP2402531A2 (en) Prefabricated concrete staircase with modular stair carriage
BE835641A (en) FLOOR SHEATH OR LOST METAL FORMWORK FOR CONCRETE SLAB, HOURDIS
EP2377660B1 (en) Method for manufacturing prefabricated construction panels that combine wood and concrete and panels obtained via said method
WO2009092890A2 (en) Prefabricated modular dry-floor element, method of producing such a modular element and dry floor comprising a plurality of modular elements
EP2789756A1 (en) Wall with built-in formwork, method for erecting a building using said wall, and building obtained
FR2954948A1 (en) Composite floor for constructing storey of eight storey building, has concrete flagstone supported by wooden support structure, and metallic traction-resistant reinforcement fixed on fixation unit formed of screws and joists
EP0337120A1 (en) Composite structural beam
FR2873727A1 (en) Thermal bridges limiting process for e.g. slab and outer wall junction, involves erecting wall by forming positioning abutments for insulating units for localized concreting zones of another erected wall, and installing units between zones
FR3036419A1 (en) REINFORCING BEAM FOR WALL FORMWORK OF SWIMMING WALL
EP0005092B1 (en) Construction element in the form of a slab and structure comprising such an element
EP1222340B1 (en) Formwork with a filtering wall
EP2844809B1 (en) Formwork and associated floor
CH376256A (en) Construction component, manufacturing process and use of that component
FR2927342A1 (en) PRECONTRATED CONCRETE BEAM CARRIED OUT BY EMBITION OF TWO LONGERONS AND METHOD OF ATTRACTING TWO BEAMS
FR2551482A1 (en) BEAMS FOR THE MANUFACTURE OF INSULATING FLOOR AND FLOOR COMPRISING SUCH BEAMS
EP3259416A1 (en) Construction element and method for erecting such a construction element
FR3024989A1 (en) INTEGRATED FORMWORK WALL WITH THERMAL BREAK, METHOD FOR CONSTRUCTING A BUILDING THEREFROM, AND BUILDING OBTAINED
BE570650A (en)
BE352951A (en)
BE657224A (en)
EP0533647A1 (en) Mixed construction wall and profiled sheet metal for such a wall
FR2474083A1 (en) Pre-fabricated reinforced beam for floors in building renovation - has overlapping vertical stirrups to increase I-section of reinforcing bars
BE659357A (en)