BE1030172A1 - A PREFABRICATED REINFORCED CONCRETE WALL FOR USE IN FORMWORK FOR THE CONSTRUCTION OF A CONCRETE WALL - Google Patents

A PREFABRICATED REINFORCED CONCRETE WALL FOR USE IN FORMWORK FOR THE CONSTRUCTION OF A CONCRETE WALL Download PDF

Info

Publication number
BE1030172A1
BE1030172A1 BE20225009A BE202205009A BE1030172A1 BE 1030172 A1 BE1030172 A1 BE 1030172A1 BE 20225009 A BE20225009 A BE 20225009A BE 202205009 A BE202205009 A BE 202205009A BE 1030172 A1 BE1030172 A1 BE 1030172A1
Authority
BE
Belgium
Prior art keywords
concrete
concrete slab
uniwall
wall
formwork
Prior art date
Application number
BE20225009A
Other languages
French (fr)
Other versions
BE1030172B1 (en
Inventor
Koenraad Berghman
Bert Bekaert
Original Assignee
Steenbakkerijen Van Ploegsteert
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Steenbakkerijen Van Ploegsteert filed Critical Steenbakkerijen Van Ploegsteert
Priority to BE20225009A priority Critical patent/BE1030172B1/en
Priority to FR2213435A priority patent/FR3131750A1/en
Priority to NL2033942A priority patent/NL2033942B1/en
Publication of BE1030172A1 publication Critical patent/BE1030172A1/en
Application granted granted Critical
Publication of BE1030172B1 publication Critical patent/BE1030172B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0283Retaining or protecting walls characterised by constructional features of mixed type
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/04Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres
    • E04C2/06Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres reinforced
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • E04B2002/8688Scaffoldings or removable supports therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2002/001Mechanical features of panels
    • E04C2002/002Panels with integrated lifting means, e.g. with hoisting lugs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266Enlarging

Abstract

Paroi préfabriquée en béton armé, appelé « uniwall », configurée pour être utilisé dans un coffrage pour construire un mur en béton contre un mur existant, dans lequel le mur existant fait partie du coffrage et dans lequel la paroi préfabriquée en béton fait partie du mur en béton, dans lequel l’uniwall comprend une seule dalle de béton.Precast reinforced concrete wall, called "uniwall", configured for use in a formwork to build a concrete wall against an existing wall, in which the existing wall is part of the formwork and in which the precast concrete wall is part of the wall concrete, in which the uniwall comprises a single concrete slab.

Description

UNE PAROI PRÉFABRIQUÉE EN BÉTON ARMÉ À UTILISER DANS UNA PREFABRICATED REINFORCED CONCRETE WALL FOR USE IN A

COFFRAGE POUR LA CONSTRUCTION D'UN MUR EN BÉTONFORMWORK FOR THE CONSTRUCTION OF A CONCRETE WALL

Domaine techniqueTechnical area

La présente invention concerne des éléments préfabriqués en béton armé configurés pour être utilisés dans un coffrage pour construire un mur en béton adjacent à un mur existant et dans lequel élément préfabriqué en béton armé fait partie du mur en béton définitif. L'invention concerne également un coffrage qui comprend les éléments préfabriqués en béton armé, ainsi qu’un procédé de construction dudit coffrage et un procédé de construction du mur en béton.The present invention relates to precast reinforced concrete elements configured for use in a formwork to construct a concrete wall adjacent to an existing wall and wherein the precast reinforced concrete element forms part of the final concrete wall. The invention also relates to a formwork which comprises the prefabricated reinforced concrete elements, as well as a method for constructing said formwork and a method for constructing the concrete wall.

État de la techniqueState of the art

Les éléments préfabriqués en béton armé tels que décrits ci-dessus sont connus. La société Ploegsteert produit par exemple des « doubles murs » préfabriqués destinés à être utilisés dans un coffrage pour construire un mur en béton adjacent à un mur existant et dans lequel le « double mur » préfabriqué fait partie du mur en béton. Un tel « double mur » est montré sur la figure 1. Ces « doubles murs » comprennent deux dalles de béton 1, 2 s'étendant sur une « hauteur de dalle » donnée dans une première direction indiquée par la flèche « x », en utilisation sensiblement parallèle à la direction gravitationnelle, depuis une portion inférieure 3 jusqu’à une portion supérieure 4. Les deux dalles de béton du « double mur » sont parallèles l’une à l’autre et forment un espace vide 5 entre elles. Le «double mur» comprend en outre un ou plusieurs organes de renforcement, dans lesquels chaque organe de renforcement comprend une barre métallique allongée inférieure 6, une barre métallique allongée supérieure 7 sensiblement parallèle à la barre métallique allongée inférieure et un treillis métallique 8 reliant la barre métallique allongée inférieure 6 à la barre métallique allongée supérieure 7. La barre métallique allongée inférieure 6 de l'organe de renforcement se trouve à l’intérieur d’une première dalle de béton 1 (des deux dalles de béton dans le « double mur ») tandis que la barre métallique allongée supérieure 7 se trouve à l’intérieur de la seconde dalle de béton 2. En d’autres termes, l’organe de renforcement relie entre elles les première et seconde dalles de béton 1 et 2 duPrecast reinforced concrete elements as described above are known. Ploegsteert, for example, produces precast "double walls" for use in formwork to build a concrete wall adjacent to an existing wall and in which the precast "double wall" is part of the concrete wall. Such a "double wall" is shown in Figure 1. These "double walls" comprise two concrete slabs 1, 2 extending over a given "slab height" in a first direction indicated by the arrow "x", in use substantially parallel to the gravitational direction, from a lower portion 3 to an upper portion 4. The two concrete slabs of the “double wall” are parallel to each other and form an empty space 5 between them. The "double wall" further comprises one or more reinforcing members, in which each reinforcing member comprises a lower elongated metal bar 6, an upper elongated metal bar 7 substantially parallel to the lower elongated metal bar and a metal mesh 8 connecting the lower elongated metal bar 6 to upper elongated metal bar 7. The lower elongated metal bar 6 of the reinforcing member is located inside a first concrete slab 1 (of the two concrete slabs in the "double wall ") while the upper elongated metal bar 7 is located inside the second concrete slab 2. In other words, the reinforcing member connects the first and second concrete slabs 1 and 2 of the

« double mur ». En utilisation, le « double mur » préfabriqué est transporté du lieu de production, par exemple Ploegsteert, sur le lieu de construction. Sur le lieu de construction, le « double mur » préfabriqué est placé sur une dalle de plancher de béton 9 préalablement construite, parallèlement et adjacente à un mur existant 10 qui constitue la fondation ou le sous-sol de la construction à construire. Le mur existant 10 est en particulier un mur existant à base de béton formé comme un mur de soutènement de terre. Différents procédés sont employés pour construire ces murs de soutènement de terre, tels que les murs à mélange de sol par coupeuse, les murs de type « berlinois » ou les murs de type « pieux ». La société « Franki“double wall”. In use, the prefabricated “double wall” is transported from the place of production, for example Ploegsteert, to the place of construction. On the construction site, the prefabricated “double wall” is placed on a previously constructed concrete floor slab 9, parallel to and adjacent to an existing wall 10 which constitutes the foundation or basement of the construction to be built. The existing wall 10 is in particular an existing concrete-based wall formed as an earth retaining wall. Different processes are used to build these earth retaining walls, such as cutter-mixed soil walls, "Berlin" type walls or "pile" type walls. The company "Franki

Foundations » est réputée pour la construction de ces murs de soutènement de terre. Afin de former le mur en béton, l’espace vide 5 entre les deux dalles de béton 1, 2 est rempli de béton 11. Les organes de renforcement qui relient les deux dalles de béton 1, 2 garantissent que les deux dalles de béton ne se séparent pas l’une de l’autre en raison de la pression de béton horizontale appliquée par le béton liquide sur les dalles de béton. Après durcissement du béton 11, on obtient le mur en béton définitif. La dalle de béton 1 qui n'est pas tournée vers le mur existant fait maintenant office de mur intérieur du bâtiment.Foundations” is famous for building these earth retaining walls. In order to form the concrete wall, the empty space 5 between the two concrete slabs 1, 2 is filled with concrete 11. The reinforcing members which connect the two concrete slabs 1, 2 ensure that the two concrete slabs do not separate from each other due to the horizontal concrete pressure applied by the liquid concrete on the concrete slabs. After the concrete 11 has hardened, the final concrete wall is obtained. Concrete slab 1 which is not facing the existing wall now acts as the interior wall of the building.

Il est en outre connu dans l’état de la technique d'employer des éléments de coffrage réutilisables pour construire le mur en béton définitif. Un tel élément de coffrage réutilisable est par exemple connu de la société « Doka », et est montré à la figure 2. Ces éléments de coffrage réutilisables sont des structures métalliques relativement légères comprenant une portion de plancher 13 et une portion de mur 14 reliée à la portion de plancher 13 au moyen d’un goujon 12, et dans lesquelles la portion de mur comprend une plaque de moulage 15. L'élément de coffrage réutilisable est placé sur la dalle de plancher de béton 9 préalablement construite, de sorte que la plaque de moulage 15 fait face au mur existant 10 et se trouve parallèle à celui-ci. Ces éléments de coffrage réutilisables présentent toutefois plusieurs inconvénients. La construction et la déconstruction d’un tel coffrage réutilisable demandent beaucoup de temps. De plus, lors de l’utilisation de tels éléments de coffrage réutilisables légers, il faut compenser le manque de poids en prévoyant un ancrage de plancher à haute résistance 16 dans la dalle de plancher de béton 9. Cet ancrage de plancher à haute résistance 16 nécessite l’'encastrement de tiges métalliques dans la dalle de plancher lors du coulage de la dalle de plancher de béton. Non seulement cela ralentit la construction de la dalle de plancher, mais cela entraîne en outre des étapes supplémentaires de post- traitement. En effet, lors de la déconstruction des éléments de coffrage réutilisables, les tiges d’ancrage de plancher à haute résistance 16 doivent être partiellement retirées, et il faut réparer les dommages causés à la dalle de plancher 9 après ledit retrait. En outre, en raison des coûts de fabrication élevés d’un tel élément de coffrage réutilisable, une quantité limitée d'éléments est achetée. Par conséquent, il n’y a bien souvent pas assez d'éléments de coffrage réutilisables disponibles sur le site de construction pour créer tous les murs en béton en une seule fois, ce qui nécessite la création par étapes de segments de murs en béton.It is also known in the state of the art to use reusable formwork elements to build the final concrete wall. Such a reusable formwork element is for example known from the company "Doka", and is shown in Figure 2. These reusable formwork elements are relatively light metal structures comprising a floor portion 13 and a wall portion 14 connected to the floor portion 13 by means of a dowel 12, and in which the wall portion comprises a molding plate 15. The reusable formwork element is placed on the previously constructed concrete floor slab 9, so that the molding plate 15 faces the existing wall 10 and is parallel thereto. However, these reusable formwork elements have several drawbacks. The construction and deconstruction of such a reusable formwork takes a lot of time. Additionally, when using such lightweight reusable formwork members, the lack of weight must be compensated for by providing a high strength floor anchor 16 in the concrete floor slab 9. This high strength floor anchor 16 requires the embedding of metal rods in the floor slab when pouring the concrete floor slab. Not only does this slow down the construction of the floor slab, but it also leads to additional post-processing steps. Indeed, during the deconstruction of the reusable formwork elements, the high-strength floor anchor rods 16 must be partially removed, and the damage caused to the floor slab 9 after said removal must be repaired. In addition, due to the high manufacturing costs of such a reusable formwork element, a limited quantity of elements is purchased. Therefore, there are often not enough reusable formwork elements available on the construction site to create all the concrete walls at once, which requires the step-by-step creation of concrete wall segments.

DescriptionDescription

Les présents inventeurs ont découvert que les « doubles murs » sont complexes à transporter en raison de leur poids élevé et de leur construction volumineuse. Il existe donc un besoin de fournir des éléments préfabriqués en béton armé configurés pour être utilisés dans un coffrage pour construire un mur en béton adjacent à un mur existant et dans lequel l’élément préfabriqué en béton fait partie du mur en béton, le problème de la technique antérieure étant résolu.The present inventors have found that "double walls" are complex to transport due to their heavy weight and bulky construction. There is therefore a need to provide precast concrete elements configured for use in formwork to construct a concrete wall adjacent to an existing wall and wherein the precast concrete element forms part of the concrete wall, the problem of the prior art being resolved.

À cette fin, la présente invention propose une paroi préfabriquée en béton armé, appelé « uniwall », configurée pour être utilisé dans un coffrage pour construire un mur en béton contre un mur existant, dans lequel le mur existant fait partie du coffrage et dans lequel la paroi préfabriquée en béton fait partie du mur en béton, c'est-à-dire qu’elle fait partie du mur en béton définitif, c'est-à-dire qu’elle nest pas retirée après avoir formé le mur en béton. L'uniwall présente les caractéristiques décrites dans la première revendication. L’uniwall comprend une dalle de béton s'étendant sur une « hauteur de dalle » donnée dans une première direction, en utilisation sensiblement parallèle à la direction gravitationnelle, depuis une portion inférieure, en particulier depuis un bord inférieur, jusqu’à une portion supérieure, en particulier jusqu'à un bord supérieur. En particulier, l’uniwall comprend une seule dalle de béton par opposition aux deux dalles de béton qui sont fournies dans le « mur double » mentionné précédemment de la technique antérieure. Les dalles sont de préférence des dalles plates. Les dimensions de la dalle sont par exemple comprises entre 3 et 5 mètres selon la première direction, et entre 5 et 15 mètres selon une seconde direction perpendiculaire à la première.To this end, the present invention provides a precast reinforced concrete wall, called "uniwall", configured to be used in a formwork to build a concrete wall against an existing wall, in which the existing wall is part of the formwork and in which the precast concrete wall is part of the concrete wall, i.e. it is part of the final concrete wall, i.e. it is not removed after forming the concrete wall . The uniwall has the characteristics described in the first claim. The uniwall comprises a concrete slab extending over a given "slab height" in a first direction, in use substantially parallel to the gravitational direction, from a lower portion, in particular from a lower edge, to a upper, in particular up to an upper edge. In particular, the uniwall comprises a single concrete slab as opposed to the two concrete slabs that are provided in the previously mentioned "double wall" of the prior art. The tiles are preferably flat tiles. The dimensions of the slab are for example between 3 and 5 meters along the first direction, and between 5 and 15 meters along a second direction perpendicular to the first.

L’uniwall comprend en outre au moins une poutre en treillis. De préférence, l’uniwall comprend plus d’une poutre en treillis, c'est-à-dire au moins deux poutres en treillis.The uniwall further comprises at least one truss beam. Preferably, the uniwall comprises more than one lattice girder, i.e. at least two lattice girders.

La poutre en treillis comprend une barre métallique allongée inférieure, une barre métallique allongée supérieure sensiblement parallèle à la barre métallique allongée inférieure et un treillis métallique, par exemple une barre métallique continue, reliant la barre métallique allongée inférieure à la barre métallique allongée supérieure. Le treillis a par exemple une forme sensiblement sinusoïdale dans laquelle les sommets sont reliés à la barre supérieure et dans laquelle les creux sont reliés à la barre inférieure. De préférence, la poutre en treillis comprend une seconde barre inférieure supplémentaire sensiblement parallèle à la première barre inférieure, dans laquelle la barre inférieure supplémentaire est également reliée à la barre supérieure au moyen d'un treillis supplémentaire, ou est reliée à une barre supérieure supplémentaire au moyen d'un treillis supplémentaire.The lattice beam comprises a lower elongated metal bar, an upper elongated metal bar substantially parallel to the lower elongated metal bar and a metal lattice, for example a continuous metal bar, connecting the lower elongated metal bar to the upper elongated metal bar. The trellis has for example a substantially sinusoidal shape in which the vertices are connected to the upper bar and in which the hollows are connected to the lower bar. Preferably, the truss comprises a second additional bottom bar substantially parallel to the first bottom bar, wherein the additional bottom bar is also connected to the top bar by means of an additional truss, or is connected to an additional top bar by means of an additional trellis.

D'autres types d'organes de renforcement peuvent bien sûr être utilisés. De préférence, au moins une poutre en treillis est une poutre en treillis verticale s'étendant sensiblement dans la première direction. De préférence, au moins une poutre en treillis est une poutre en treillis horizontale s'étendant dans une seconde direction sensiblement perpendiculaire à la première direction. De préférence,Other types of reinforcing members can of course be used. Preferably, at least one truss is a vertical truss extending substantially in the first direction. Preferably, at least one lattice beam is a horizontal lattice beam extending in a second direction substantially perpendicular to the first direction. Preferably,

Puniwall comprend une ou plusieurs poutres en treillis verticales et/ou une ou plusieurs poutres en treillis horizontales. La barre métallique allongée inférieure (ou les barres, le cas échéant) se trouve à l’intérieur de la dalle de béton tandis que la barre métallique allongée supérieure (ou les barres, le cas échéant) se trouve à l'extérieur de la dalle de béton. Cela rend la barre métallique allongée supérieure accessible par un utilisateur depuis un premier côté de la dalle de béton, ledit côté étant appelé le côté intérieur par opposition au côté opposé de la dalle de béton qui est appelé le côté extérieur. De préférence, la dalle de béton comprend deux surfaces principales opposées, la surface intérieure exposée au côté intérieur de la dalle de béton, et la surface extérieure exposée au côté extérieur de la dalle de béton. Pour plus de clarté, la barre métallique allongée supérieure est accessible par un utilisateur depuis le côté intérieur de la dalle de béton en laissant le treillis pénétrer la surface intérieure de la dalle de béton. En outre, la barre métallique allongée supérieure est librement accessible par un utilisateur depuis le premier côté de la dalle de béton. Cette barre supérieure est librement accessible parce 5 qu’elle n’est pas encastrée à l’intérieur d’une seconde dalle de béton, comme c'est le cas dans le « double mur » de la technique antérieure mentionné précédemment.Puniwall comprises one or more vertical trusses and/or one or more horizontal trusses. The lower elongated metal bar (or bars, if applicable) is inside the concrete slab while the upper elongated metal bar (or bars, if applicable) is outside the slab of concrete. This makes the upper elongated metal bar accessible by a user from a first side of the concrete slab, said side being called the inner side as opposed to the opposite side of the concrete slab which is called the outer side. Preferably, the concrete slab comprises two opposing major surfaces, the interior surface exposed to the interior side of the concrete slab, and the exterior surface exposed to the exterior side of the concrete slab. For clarity, the upper elongated metal bar is accessible by a user from the interior side of the concrete slab allowing the mesh to penetrate the interior surface of the concrete slab. Further, the upper elongated metal bar is freely accessible by a user from the first side of the concrete slab. This top bar is freely accessible because it is not embedded within a second concrete slab, as is the case in the previously mentioned "double wall" of the prior art.

Les présents inventeurs ont découvert qu’en utilisant l’uniwall, un coffrage peut être créé dans lequel le mur existant fait partie du coffrage. Cela évite d’avoir à incorporer une seconde dalle de béton dans l’élément préfabriqué, comme c'est le cas dans les « doubles murs » de la technique antérieure mentionnés précédemment. L’uniwall a donc un poids plus faible et est Moins volumineux que le « double mur » de la technique antérieure. Il est donc moins complexe de transporter l’uniwall que de transporter le « double mur » de la technique antérieure.The present inventors have discovered that by using uniwall, a formwork can be created in which the existing wall is part of the formwork. This avoids having to incorporate a second concrete slab into the precast unit, as is the case in the previously mentioned prior art "double walls". The uniwall therefore has a lower weight and is less bulky than the "double wall" of the prior art. It is therefore less complex to transport the uniwall than to transport the "double wall" of the prior art.

En outre, aucun des inconvénients des coffrages réutilisables mentionnés précédemment n’est présent lors de l’utilisation de Puniwall.Also, none of the disadvantages of reusable formwork mentioned earlier are present when using Puniwall.

Selon un mode de réalisation de la présente invention, une première rangée de connecteurs de goujons est prévue à l’intérieur de la dalle de béton. La première rangée de connecteurs de goujons est prévue de sorte que les connecteurs de goujons sont accessibles pour connecter de manière amovible les goujons à la dalle de béton depuis le côté extérieur de la dalle de béton. Les connecteurs de goujons sont accessibles depuis le côté extérieur de la dalle de béton parce que les connecteurs de goujons s'ouvrent dans la surface extérieure de la dalle de béton. De préférence, les connecteurs de goujons ne s'ouvrent pas dans la surface intérieure de la dalle de béton. De préférence, les connecteurs de goujons sont des douilles filetées. Les goujons comprennent de préférence une partie filetée qui peut être vissée de manière amovible dans la douille filetée. Les goujons, lorsqu'ils sont connectés aux connecteurs de goujons, relient l’uniwall avec la dalle de plancher et soutiennent l’uniwall pendant le remplissage du coffrage avec du béton. En effet, le béton liquide exerce une pression sur l’uniwall.According to one embodiment of the present invention, a first row of stud connectors is provided inside the concrete slab. The first row of stud connectors is provided such that the stud connectors are accessible to removably connect the studs to the concrete slab from the exterior side of the concrete slab. The stud connectors are accessible from the exterior side of the concrete slab because the stud connectors open into the exterior surface of the concrete slab. Preferably, the stud connectors do not open into the interior surface of the concrete slab. Preferably, the stud connectors are threaded sockets. The studs preferably comprise a threaded part which can be releasably screwed into the threaded sleeve. The studs, when connected to the stud connectors, connect the uniwall with the floor slab and support the uniwall while the formwork is filled with concrete. Indeed, the liquid concrete exerts pressure on the uniwall.

En l'absence du second béton, comme c'est le cas dans les « doubles murs » de la technique antérieure, ce sont les goujons qui contrent la pression du béton liquide. Les goujons sont de préférence des goujons réglables qui peuvent être mis en compression ou en tension entre la dalle de plancher et Vuniwall. En effet, lorsque les goujons sont connectés à des connecteurs de goujons dans la portion inférieure de la dalle de béton, les goujons sont de préférence mis en compression, alors que lorsque les goujons sont connectés à des connecteurs de goujons dans la portion supérieure de la dalle de béton, les goujons sont de préférence mis en tension. Selon un mode de réalisation de la présente invention, la première rangée de connecteurs de goujons s'étend sensiblement dans une seconde direction sensiblement perpendiculaire à la première direction, c’est-à-dire selon la largeur de la dalle de béton. Le nombre de connecteurs de goujons par mètre est de préférence compris entre 0,5 et 3, de préférence entre 1 et 2. Selon un mode de réalisation de la présente invention, la première rangée de connecteurs de goujons est positionnée dans la portion inférieure de la dalle de béton, de préférence en dessous de 50 % de la hauteur de la dalle de béton, de préférence en dessous de 40 % de la hauteur de la dalle de béton, et de préférence au-dessus de 10 % de la hauteur de la dalle de béton, de préférence au-dessus de 20 % de la hauteur de la dalle de béton, de préférence approximativement à 30 % de la hauteur de la dalle de béton. Comme indiqué précédemment, les goujons connectés à ces connecteurs de goujons sont de préférence mis en compression. Selon une variante de mode de réalisation de la présente invention, la première rangée de connecteurs de goujons est positionnée dans la portion supérieure de la dalle de béton, de préférence au-dessus de 50 % de la hauteur de la dalle de béton, de préférence au-dessus de 60 % de la hauteur de la dalle de béton, et de préférence en dessous de 90 % de la hauteur de la dalle de béton, de préférence en dessous de 80 % de la hauteur de la dalle de béton, de préférence approximativement à 70% de la hauteur de la dalle de béton. Comme indiqué précédemment, les goujons connectés à ces connecteurs de goujons sont de préférence mis en tension. Selon un mode de réalisation de la présente invention, une seconde rangée de connecteurs de goujons est prévue à l’intérieur de la dalle de béton.In the absence of the second concrete, as is the case in the "double walls" of the prior art, it is the dowels which counter the pressure of the liquid concrete. The studs are preferably adjustable studs which can be put in compression or tension between the floor slab and Vuniwall. Indeed, when the studs are connected to stud connectors in the lower portion of the concrete slab, the studs are preferably put in compression, whereas when the studs are connected to stud connectors in the upper portion of the concrete slab, the dowels are preferably tensioned. According to an embodiment of the present invention, the first row of stud connectors extends substantially in a second direction substantially perpendicular to the first direction, that is to say along the width of the concrete slab. The number of stud connectors per meter is preferably between 0.5 and 3, preferably between 1 and 2. According to an embodiment of the present invention, the first row of stud connectors is positioned in the lower portion of the concrete slab, preferably below 50% of the height of the concrete slab, preferably below 40% of the height of the concrete slab, and preferably above 10% of the height of the concrete slab, preferably above 20% of the height of the concrete slab, preferably at approximately 30% of the height of the concrete slab. As previously stated, the studs connected to these stud connectors are preferably compressed. According to an alternate embodiment of the present invention, the first row of stud connectors is positioned in the upper portion of the concrete slab, preferably above 50% of the height of the concrete slab, preferably above 60% of the height of the concrete slab, and preferably below 90% of the height of the concrete slab, preferably below 80% of the height of the concrete slab, preferably approximately 70% of the height of the concrete slab. As previously indicated, the studs connected to these stud connectors are preferably tensioned. According to one embodiment of the present invention, a second row of stud connectors is provided inside the concrete slab.

Comme la première rangée de connecteurs de goujons, la seconde rangée de connecteurs de goujons est prévue de sorte que les connecteurs de goujons sont accessibles pour connecter de manière amovible les goujons à la dalle de béton depuis le côté extérieur de la dalle de béton. Les connecteurs de goujons sont accessibles depuis le côté extérieur de la dalle de béton parce que les connecteurs de goujons s'ouvrent dans la surface extérieure de la dalle de béton. De préférence, les connecteurs de goujons ne s'ouvrent pas dans la surface intérieure de la dalle de béton. De préférence, les connecteurs de goujons sont des douilles filetées.Like the first row of stud connectors, the second row of stud connectors is provided such that the stud connectors are accessible to removably connect the studs to the concrete slab from the exterior side of the concrete slab. The stud connectors are accessible from the exterior side of the concrete slab because the stud connectors open into the exterior surface of the concrete slab. Preferably, the stud connectors do not open into the interior surface of the concrete slab. Preferably, the stud connectors are threaded sockets.

Selon un mode de réalisation de la présente invention, la seconde rangée de connecteurs de goujons s'étend sensiblement dans la seconde direction. Le nombre de connecteurs de goujons par mètre est de préférence compris entre 0,5 et 3, de préférence entre 1 et 2. Selon un mode de réalisation de la présente invention, la première rangée de connecteurs de goujons est positionnée dans la portion inférieure de la dalle de béton (de préférence aux hauteurs décrites précédemment) et la seconde rangée de connecteurs de goujons est positionnée dans la portion supérieure de la dalle de béton, de préférence au-dessus de 50 % de la hauteur de la dalle de béton, de préférence au-dessus de 60 % de la hauteur de la dalle de béton, et de préférence en dessous de 90 % de la hauteur de la dalle de béton, de préférence en dessous de 80 % de la hauteur de la dalle de béton, de préférence approximativement à 70 % de la hauteur de la dalle de béton.According to one embodiment of the present invention, the second row of stud connectors extends substantially in the second direction. The number of stud connectors per meter is preferably between 0.5 and 3, preferably between 1 and 2. According to an embodiment of the present invention, the first row of stud connectors is positioned in the lower portion of the concrete slab (preferably at the heights previously described) and the second row of dowel connectors is positioned in the upper portion of the concrete slab, preferably above 50% of the height of the concrete slab, preferably above 60% of the height of the concrete slab, and preferably below 90% of the height of the concrete slab, preferably below 80% of the height of the concrete slab, preferably approximately 70% of the height of the concrete slab.

Selon un mode de réalisation de la présente invention, au moins un, de préférence au moins deux, par exemple deux, connecteurs de profilés en L, de préférence mis en œuvre sous forme de douilles filetées, sont prévus dans la portion inférieure de la dalle de béton adjacente à un bord inférieur de la dalle de béton. Les connecteurs de profilés en L sont positionnés plus près du bord inférieur de la dalle de béton que les connecteurs de goujons prévus dans la portion inférieure de la dalle de béton. Les connecteurs de profilés en L sont positionnés de manière à être accessibles depuis le côté extérieur de la dalle de béton, c'est-à- dire qu'ils s'ouvrent au niveau de la surface extérieure de la dalle de béton. Les connecteurs de profilés en L sont configurés pour se connecter de manière amovible à un profilé en L. Le profilé en L est agencé pour relier la dalle de béton avec le sol de manière à empêcher la translation de la dalle de béton pendant le remplissage du coffrage avec du béton. De multiples profilés en L sont de préférence prévus pour que les profilés en L puissent également exercer un contre- moment le long d’un axe perpendiculaire à la surface de la dalle de béton. Un tel contre-moment peut être nécessaire pour contrer le moment appliqué sur la dalle de béton lorsque celle-ci est pourvue d’un dispositif d’interruption d'écoulement de béton tel qu’un « Stremaform » sur un côté (comme cela sera décrit ci-dessous).According to an embodiment of the present invention, at least one, preferably at least two, for example two, L-section connectors, preferably implemented as threaded bushings, are provided in the lower portion of the slab of concrete adjacent to a lower edge of the concrete slab. L-channel connectors are positioned closer to the bottom edge of the concrete slab than dowel connectors provided at the bottom portion of the concrete slab. The L-profile connectors are positioned so that they are accessible from the exterior side of the concrete slab, i.e. they open at the exterior surface of the concrete slab. L-channel connectors are configured to removably connect to an L-channel. The L-channel is arranged to connect the concrete slab with the ground in such a way as to prevent the translation of the concrete slab during the filling of the formwork with concrete. Multiple L-channels are preferably provided so that the L-channels can also exert a countermoment along an axis perpendicular to the surface of the concrete slab. Such a counter moment may be necessary to counter the moment applied to the concrete slab when the latter is provided with a concrete flow interruption device such as a "Stremaform" on one side (as will be described below).

Selon un mode de réalisation, au moins deux ancrages de levage sont prévus à l'intérieur de la portion supérieure de la dalle de béton. Les ancrages de levage sont prévus de manière être accessibles depuis le côté intérieur de la dalle de béton, c'est-à-dire que les ancrages de levage pénètrent la surface intérieure de la dalle de béton. L’ancrage de levage comprend de préférence une boucle, de préférence une boucle métallique, qui s'étend hors de la surface intérieure de la dalle de béton. Les ancrages de levage sont configurés pour se connecter de manière amovible à un crochet de grue de sorte que le crochet de grue puisse lever la dalle de béton. Selon un mode de réalisation de la présente invention, un connecteur de bras d'ancrage de levage, de préférence mis en œuvre sous la forme d’une douille filetée, est prévu à l’intérieur de la portion supérieure de la dalle de béton et de manière à être accessible depuis le côté extérieur de la dalle de béton, c’est-à-dire que le connecteur de bras d'ancrage de levage s'ouvre au niveau de la surface extérieure de la dalle de béton. Le connecteur de bras d'ancrage de levage est configuré pour se connecter de manière amovible à un bras d'ancrage de levage comprenant un ancrage de levage supplémentaire. La fourniture d’ancrages de levage des deux côtés de la dalle de béton permet de porter la dalle de béton dans une position verticale. Le bras d'ancrage de levage n’est pas directement prévu à l'intérieur de la dalle de béton, comme le sont les ancrages de levage décrits précédemment, car la surface extérieure de la dalle de béton est de préférence peu perturbée par des éléments permanents, de manière à améliorer l’esthétique de la surface extérieure de la dalle de béton. De préférence,According to one embodiment, at least two lifting anchors are provided inside the upper portion of the concrete slab. The lifting anchors are provided so as to be accessible from the interior side of the concrete slab, i.e. the lifting anchors penetrate the interior surface of the concrete slab. The lifting anchor preferably comprises a loop, preferably a metal loop, which extends out from the interior surface of the concrete slab. Lifting anchors are configured to removably connect to a crane hook so that the crane hook can lift the concrete slab. According to one embodiment of the present invention, a lifting anchor arm connector, preferably implemented as a threaded bushing, is provided within the upper portion of the concrete slab and so as to be accessible from the exterior side of the concrete slab, i.e. the lifting anchor arm connector opens at the exterior surface of the concrete slab. The lifting anchor arm connector is configured to removably connect to a lifting anchor arm including a supplemental lifting anchor. The provision of lifting anchors on both sides of the concrete slab allows the concrete slab to be carried in an upright position. The lifting anchor arm is not provided directly inside the concrete slab, as are the lifting anchors described above, because the outer surface of the concrete slab is preferably little disturbed by elements. permanent, so as to improve the aesthetics of the exterior surface of the concrete slab. Preferably,

Pun des connecteurs de goujons, en particulier Pun des connecteurs de goujons prévus dans la portion supérieure de la dalle de béton, est simultanément le connecteur de bras d'ancrage de levage. Après avoir levé la dalle de béton en position adjacente au mur existant, le bras d’ancrage de levage peut être dégagé du connecteur de bras d’ancrage de levage, libérant ainsi le connecteur de bras d'ancrage de levage pour la connexion à un goujon.One of the stud connectors, in particular one of the stud connectors provided in the upper portion of the concrete slab, is simultaneously the lifting anchor arm connector. After lifting the concrete slab into position adjacent to the existing wall, the lift anchor arm can be disengaged from the lift anchor arm connector, thereby freeing the lift anchor arm connector for connection to a stud.

Selon un mode de réalisation de la présente invention, l’uniwall comprend en outre une grille d'interruption d'écoulement de béton telle qu’une grille de type « Stremaform ». La grille d'interruption d'écoulement de béton est connectée à la dalle de béton par exemple au moyen de bras de connecteur encastrés dans la dalle de béton. La grille est positionnée du côté intérieur de la dalle de béton. Les bras de connecteur pénètrent par exemple la surface intérieure de la dalle de béton. La grille permet de remplir par étapes les parties adjacentes du coffrage.According to one embodiment of the present invention, the uniwall further comprises a concrete flow interruption grid such as a "Stremaform" type grid. The concrete flow interruption grid is connected to the concrete slab, for example by means of connector arms embedded in the concrete slab. The grid is positioned on the interior side of the concrete slab. The connector arms penetrate, for example, the interior surface of the concrete slab. The grid makes it possible to fill adjacent parts of the formwork in stages.

Selon un mode de réalisation de la présente invention, un renfort de poinçonnement est prévu à l’intérieur de la dalle de béton aux positions des connecteurs de goujons. Le renfort de poinçonnement est de préférence un ensemble de tiges métalliques s'étendant de préférence sensiblement selon la seconde direction. Le renfort de poinçonnement est prévu sensiblement uniquement aux positions des connecteurs de goujons. Par exemple, l'ensemble de tiges métalliques s'étendant sensiblement selon la seconde direction n’est pas prévu avec un espacement continu selon la première direction, l’espacement est plutôt plus petit autour de la position dans la première direction où les connecteurs de goujon sont prévus. De préférence, des renforts supplémentaires sont prévus à l’intérieur de la dalle de béton, c'est-à-dire des renforts supplémentaires autres que les renforts de poinçonnement. Les renforts supplémentaires comprennent de préférence un premier ensemble de tiges métalliques s'étendant sensiblement selon la première direction, un deuxième ensemble de tiges métalliques s'étendant sensiblement selon la seconde direction, un troisième ensemble de tiges métalliques s'étendant sensiblement selon la première direction, dans lequel les premier, deuxième et troisième ensembles se trouvent dans des plans différents.According to one embodiment of the present invention, a punching reinforcement is provided inside the concrete slab at the positions of the stud connectors. The punching reinforcement is preferably a set of metal rods extending preferably substantially along the second direction. The punching reinforcement is provided substantially only at the positions of the stud connectors. For example, the set of metal rods extending substantially along the second direction is not provided with a continuous spacing along the first direction, rather the spacing is smaller around the position in the first direction where the connectors of stud are provided. Preferably, additional reinforcements are provided inside the concrete slab, i.e. additional reinforcements other than punching reinforcements. The additional reinforcements preferably comprise a first set of metal rods extending substantially along the first direction, a second set of metal rods extending substantially along the second direction, a third set of metal rods extending substantially along the first direction , wherein the first, second and third sets are in different planes.

Ces renforts supplémentaires sont de préférence prévus sur toute la première et la seconde direction de la dalle de béton, c'est-à-dire qu’ils ne sont pas concentrés autour des connecteurs de goujons. Ces renforts supplémentaires présentent de préférence un espacement sensiblement constant entre les tiges métalliques de chaque ensemble.These additional reinforcements are preferably provided along the entire first and second direction of the concrete slab, i.e. they are not concentrated around the stud connectors. These additional reinforcements preferably have a substantially constant spacing between the metal rods of each set.

Un autre objet de la présente invention est de proposer un coffrage pour construire un mur en béton contre un mur existant, le coffrage comprenantAnother object of the present invention is to provide a formwork for constructing a concrete wall against an existing wall, the formwork comprising

Puniwall tel que décrit précédemment. Les propriétés/modes de réalisation décrits précédemment concernant l’uniwall s'appliquent mutatis mutandis à l’uniwall incorporé dans le coffrage.Puniwall as previously described. The properties/implementations described above concerning the uniwall apply mutatis mutandis to the uniwall incorporated in the formwork.

Selon un mode de réalisation de la présente invention, le coffrage comprend en outre le mur existant. Sur le lieu de construction, l’uniwall préfabriqué est de préférence placé sur une dalle de plancher de béton préalablement construite, parallèle et adjacente au mur existant. De préférence, le mur existant constitue la fondation ou le sous-sol de la construction à construire. De préférence, le mur existant est un mur existant à base de béton, par exemple formé comme un mur de soutènement de terre. Différents procédés peuvent être employés pour construire ces murs de soutènement de terre, tels que les murs à mélange de sol par coupeuse, les murs de type « berlinois » ou les murs de type « pieux ». La société « Franki Foundations » est réputée pour la construction de tels murs de soutènement de terre. En utilisation, après avoir construit le coffrage, l’espace entreAccording to an embodiment of the present invention, the formwork further comprises the existing wall. At the construction site, the precast uniwall is preferably placed on a previously constructed concrete floor slab, parallel and adjacent to the existing wall. Preferably, the existing wall constitutes the foundation or the basement of the construction to be built. Preferably, the existing wall is an existing concrete-based wall, for example formed as an earth retaining wall. Different methods can be used to build these earth retaining walls, such as cutter-mixed soil walls, "Berlin" type walls or "pile" type walls. The company "Franki Foundations" is renowned for the construction of such earth retaining walls. In use, after constructing the formwork, the space between

Puniwall et le mur existant est rempli de béton liquide frais et laissé durcir. Ce béton liquide frais enrobe les barres métalliques allongées supérieures de la poutre en treillis, de sorte que ces barres ne sont plus « librement accessibles ».Puniwall and existing wall is filled with fresh liquid concrete and allowed to harden. This fresh liquid concrete coats the upper elongated metal bars of the truss, so that these bars are no longer "freely accessible".

Selon un mode de réalisation de la présente invention, en particulier lorsque le mur existant est un mur de soutènement en béton de type « berlinois », une couche d'amortissement de vibrations est fixée au mur existant dans l’espace entre l’uniwall et le mur existant. La couche d'amortissement de vibrations est de préférence une feuille à double paroi telle qu’une feuille « Biplex ». La couche est de préférence une couche en plastique telle qu’une couche de polypropylène ou une couche de polycarbonate. Cette couche d’amortissement de vibrations permet de détruire le mur existant après la construction du mur en béton définitif, en faisant vibrer le mur existant, sans détruire simultanément l’uniwall et le mur en béton.According to one embodiment of the present invention, in particular when the existing wall is a "Berlin" type concrete retaining wall, a vibration damping layer is attached to the existing wall in the space between the uniwall and the existing wall. The vibration dampening layer is preferably a double-walled sheet such as a "Biplex" sheet. The layer is preferably a plastic layer such as a polypropylene layer or a polycarbonate layer. This vibration damping layer makes it possible to destroy the existing wall after the construction of the final concrete wall, by making the existing wall vibrate, without simultaneously destroying the uniwall and the concrete wall.

Selon un mode de réalisation de la présente invention, le coffrage comprend en outre un bras d’ancrage de levage connecté de manière amovible au connecteur de bras d'ancrage de levage mentionné précédemment. Comme décrit précédemment, dans la construction du coffrage, de préférence l’uniwall est positionné en place sur la dalle de plancher en fournissant le bras d’ancrage de levage au connecteur de bras d'ancrage de levage. Après avoir positionné l’uniwall sur la dalle de plancher, le bras d’ancrage de levage peut être retiré du connecteur de bras d'ancrage et fait office de connecteur de goujon. En effet, après avoir positionné l’uniwall sur la dalle de plancher, les goujons sont après tous connectés aux connecteurs de goujons qui doivent donc être librement accessibles. Cette action est nécessaire lorsque le connecteur de bras d'ancrage de levage est également accessible.According to one embodiment of the present invention, the formwork further comprises a lifting anchor arm removably connected to the previously mentioned lifting anchor arm connector. As previously described, in formwork construction, preferably the uniwall is positioned in place on the floor slab providing the lifting anchor arm to the lifting anchor arm connector. After positioning the uniwall on the floor slab, the lift anchor arm can be removed from the anchor arm connector and acts as a stud connector. Indeed, after having positioned the uniwall on the floor slab, the dowels are after all connected to the dowel connectors which must therefore be freely accessible. This action is necessary when the lift anchor arm connector is also accessible.

Selon un mode de réalisation de la présente invention, le coffrage comprend en outre des goujons connectés de manière amovible aux connecteurs de goujons. Les goujons relient la dalle de béton à la dalle de plancher.According to one embodiment of the present invention, the form further includes studs removably connected to the stud connectors. The dowels connect the concrete slab to the floor slab.

Selon un mode de réalisation de la présente invention, le coffrage comprend en outre un ou plusieurs profilés en L, chacun étant connecté de manière amovible à l’un des connecteurs de profilés en L.According to an embodiment of the present invention, the formwork further comprises one or more L-sections, each of which is removably connected to one of the L-section connectors.

Un autre objet de la présente invention est de proposer un procédé de construction d’un coffrage. Le procédé comprend les étapes consistant à : e fournir l’uniwall tel que décrit précédemment, et e créer le coffrage tel que décrit précédemment en plaçant l’uniwall de manière adjacente, et de préférence sensiblement parallèle, à un mur existant, de sorte que le mur existant se trouve sur le côté intérieur de la dalle de béton. Dans cette configuration, la poutre en treillis, en particulier sa barre métallique allongée supérieure, est placée dans l’espace entre l’uniwall et le mur existant. De préférence, la poutre en treillis comble sensiblement la totalité de l'intervalle entre l’uniwall et le mur existant.Another object of the present invention is to provide a method of constructing a formwork. The method comprises the steps of: e providing the uniwall as previously described, and e creating the formwork as previously described by placing the uniwall adjacent, and preferably substantially parallel, to an existing wall, so that the existing wall is on the interior side of the concrete slab. In this configuration, the truss, specifically its upper elongated metal bar, is placed in the space between the uniwall and the existing wall. Preferably, the truss bridges substantially the entire gap between the uniwall and the existing wall.

Un autre objet de la présente invention est de proposer un procédé de construction d’un mur en béton contre un mur existant, le procédé comprenant les étapes consistant à : e fournir le coffrage en exécutant le procédé de construction d’un coffrage tel que décrit précédemment, et e remplir espace entre l’uniwall et le mur existant avec du béton. Le béton est un béton liquide qui va durcir dans l’espace entre l’uniwall et le Mur existant.Another object of the present invention is to provide a method of constructing a concrete wall against an existing wall, the method comprising the steps of: providing the formwork by carrying out the method of constructing a formwork as described previously, and fill the space between the uniwall and the existing wall with concrete. Concrete is a liquid concrete that will harden in the space between the uniwall and the existing wall.

Selon un mode de réalisation de la présente invention, l'étape de remplissage de l'espace entre l’uniwall et le mur existant avec du béton comprend le remplissage de l’espace par étapes. De préférence, chaque étape comprend le remplissage de l’espace sur une hauteur prédéterminée et l’attente pendant une durée prédéterminée pour laisser le béton coulé à ladite étape durcir. Ce mode de réalisation préféré diminue la pression horizontale exercée par le béton sur Puniwall.According to an embodiment of the present invention, the step of filling the space between the uniwall and the existing wall with concrete comprises filling the space in stages. Preferably, each step includes filling the space to a predetermined height and waiting for a predetermined time to allow the concrete poured at said step to harden. This preferred embodiment decreases the horizontal pressure exerted by the concrete on Puniwall.

De préférence, la hauteur et la durée prédéterminées sont telles que la pression horizontale maximale exercée par le béton sur l’uniwall pendant chaque étape est inférieure à 50 kN/m2, de préférence inférieure à 30 kN/m2. De préférence, la hauteur prédéterminée est inférieure à 1,5 m, de préférence inférieure à 1 m, par exemple d’environ 0,8 m pendant une durée prédéterminée d’une heure.Preferably, the predetermined height and duration are such that the maximum horizontal pressure exerted by the concrete on the uniwall during each stage is less than 50 kN/m2, preferably less than 30 kN/m2. Preferably, the predetermined height is less than 1.5 m, preferably less than 1 m, for example approximately 0.8 m for a predetermined period of one hour.

Selon un mode de réalisation de la présente invention, le béton est un béton de type CEM | lorsque la température extérieure sur le lieu d'installation est inférieure à 15 °C, tandis que le béton est un béton de type CEM III lorsque la température extérieure sur le lieu d’installation est supérieure à 15 °C.According to one embodiment of the present invention, the concrete is a CEM type concrete | when the outside temperature at the place of installation is below 15°C, while the concrete is CEM III type concrete when the outside temperature at the place of installation is above 15°C.

Figurestricks

La figure 1 montre une vue latérale en coupe d’un « double mur » connu dans la technique antérieure.Figure 1 shows a cross-sectional side view of a "double wall" known in the prior art.

La figure 2 montre une vue latérale en coupe d'un « élément de coffrage réutilisable » connu dans la technique antérieure.Figure 2 shows a cross-sectional side view of a "reusable formwork element" known in the prior art.

La figure 3a montre une vue latérale en coupe d’un coffrage à base d’uniwall selon un mode de réalisation de la présente invention.Figure 3a shows a cross-sectional side view of a uniwall-based formwork according to one embodiment of the present invention.

La figure 3b montre une poutre en treillis utilisée dans l’uniwall de la figure 3a.Figure 3b shows a truss used in the uniwall of Figure 3a.

La figure 4a montre une vue latérale en coupe de l’uniwall de la figure 3 selon un plan perpendiculaire à la seconde direction, dans laquelle des éléments supplémentaires ont été ajoutés à l’uniwall.Figure 4a shows a cross-sectional side view of the uniwall of Figure 3 along a plane perpendicular to the second direction, in which additional elements have been added to the uniwall.

La figure 4b montre quatre vues en coupe |, Il, Ill et IV de l’uniwall de la figure 4a selon un plan comprenant les première et seconde directions, dans lesquelles les vues |, Il, III, IV sont des sections le long des flèches indiquées sur la figure 4a.Figure 4b shows four cross-sectional views |, II, III and IV of the uniwall of Figure 4a according to a plane including the first and second directions, in which the views |, II, III, IV are sections along the arrows indicated in Figure 4a.

La figure 4c montre une vue de dessus des poutres en treillis et des ancrages de levage tels que montrés dans la section V de l’uniwall de la figure 4a,Figure 4c shows a top view of the trusses and lifting anchors as shown in section V of the uniwall in Figure 4a,

dans laquelle la vue de dessus est prise dans un plan comprenant les première et seconde directions.wherein the top view is taken in a plane including the first and second directions.

La figure 5 montre une vue latérale en coupe du coffrage à base d’uniwall de la figure 3, dans laquelle des éléments supplémentaires ont été ajoutés à l’uniwall et dans laquelle le coulage du béton a été effectué en trois phases.Figure 5 shows a cross-sectional side view of the uniwall-based formwork of Figure 3, in which additional elements have been added to the uniwall and in which the pouring of concrete has been carried out in three phases.

Les figures 6, 7 et 8 montrent les étapes d’un procédé de création du coffrage de la figure 3 ou 5.Figures 6, 7 and 8 show the steps of a process for creating the formwork of figure 3 or 5.

La figure 9 montre une vue en perspective de l’uniwall de la figure 3 présentant sa surface intérieure, dans laquelle des éléments supplémentaires ont été ajoutés à l’uniwall.Figure 9 shows a perspective view of the uniwall in Figure 3 showing its interior surface, in which additional elements have been added to the uniwall.

La figure 10 montre une vue en perspective de l’uniwall de la figure 3 présentant sa surface extérieure, dans laquelle des éléments supplémentaires ont été ajoutés à l’uniwall.Figure 10 shows a perspective view of the uniwall in Figure 3 showing its exterior surface, in which additional elements have been added to the uniwall.

Description des figuresDescription of figures

Les figures sont décrites ci-dessous. Les mêmes numéros de référence désignent les mêmes particularités techniques.The figures are described below. The same reference numerals designate the same technical particulars.

La présente invention propose une paroi préfabriquée en béton armé, appelé « uniwall », configurée pour être utilisé dans un coffrage pour construire un mur en béton contre un mur existant 10, dans lequel le mur existant fait partie du coffrage et dans lequel la paroi préfabriquée en béton fait partie du mur en béton, c'est-à-dire qu’elle fait partie du mur en béton définitif, c'est-à-dire qu’elle n’est pas retirée après avoir formé le mur en béton.The present invention provides a precast reinforced concrete wall, referred to as a "uniwall", configured for use in a formwork to construct a concrete wall against an existing wall 10, wherein the existing wall forms part of the formwork and wherein the precast wall concrete is part of the concrete wall, i.e. it is part of the final concrete wall, i.e. it is not removed after forming the concrete wall.

Comme le montre la figure 3a, l’uniwall comprend une seule dalle plate de béton 18 s'étendant sur une « hauteur de dalle » donnée dans une première direction indiquée par la flèche « x », en utilisation sensiblement parallèle à la direction gravitationnelle, depuis une portion inférieure 19, en particulier depuis un bord inférieur 20, jusqu'à une portion supérieure 21, en particulier jusqu’à un bord supérieur 22. La dalle a une épaisseur s'étendant entre une surface principale intérieure 43 et une surface principale extérieure 44. La dalle 18 se trouve adjacente et sensiblement parallèle au mur existant 10. L’uniwall comprend en outre de multiples poutres en treillis 23 comprenant une barre métallique allongée inférieure 24, une barre métallique allongée supérieure 25 sensiblement parallèle à la barre métallique allongée inférieure et un treillis métallique 26, formé comme une barre métallique continue, reliant la barre métallique allongée inférieure 24 à la barre métallique allongée supérieure 25. Le treillis métallique 26 a une forme sensiblement sinusoïdale dans laquelle les sommets sont connectés à la barre métallique allongée supérieure 25 et dans laquelle les creux sont connectés à la barre métallique allongée inférieure 24. Comme le montre la figure 3b, la poutre en treillis 23 de la figure 3a comprend une seconde barre inférieure 24 supplémentaire sensiblement parallèle à la première barre inférieure 24, dans laquelle la barre inférieure supplémentaire est également reliée à la barre supérieure 25 au moyen d’un treillis 26 supplémentaire. Sur la figure 3 ainsi que dans le mode de réalisation montré à la figure 5, une seule poutre en treillis verticale 23, c’est-à-dire une poutre en treillis s'étendant sensiblement dans la première direction, est montrée.As shown in Figure 3a, the uniwall comprises a single flat slab of concrete 18 extending over a given "slab height" in a first direction indicated by the arrow "x", in use substantially parallel to the gravitational direction, from a lower portion 19, in particular from a lower edge 20, to an upper portion 21, in particular to an upper edge 22. The slab has a thickness extending between an interior main surface 43 and a main surface 44. The slab 18 sits adjacent and substantially parallel to the existing wall 10. The uniwall further includes multiple lattice beams 23 comprising a lower elongated metal bar 24, an upper elongated metal bar 25 substantially parallel to the elongated metal bar lower and a wire mesh 26, formed as a continuous metal bar, connecting the lower elongated metal bar 24 to the upper elongated metal bar 25. The wire mesh 26 has a substantially sinusoidal shape in which the vertices are connected to the upper elongated metal bar 25 and in which the depressions are connected to the lower elongated metal bar 24. As shown in Figure 3b, the truss 23 of Figure 3a comprises an additional second lower bar 24 substantially parallel to the first lower bar 24, in which the additional lower bar is also connected to the upper bar 25 by means of an additional trellis 26. In Figure 3 as well as in the embodiment shown in Figure 5, a single vertical truss 23, i.e. a truss extending substantially in the first direction, is shown.

Toutefois, l’uniwall comporte de préférence plusieurs poutres en treillis verticales, comme le montrent par exemple les autres modes de réalisation de l’uniwall montrés aux figures 4 et 9. En particulier, dans le mode de réalisation de la figure 4, cinq poutres en treillis verticales 23 sont montrées. Sur la figure 3 ainsi que dans le mode de réalisation montré à la figure 5, aucune poutre en treillis horizontale 27, c'est-à-dire une poutre en treillis s'étendant sensiblement dans une seconde direction sensiblement perpendiculaire à la première direction, n’est montrée.However, the uniwall preferably comprises several vertical lattice beams, as shown for example by the other embodiments of the uniwall shown in figures 4 and 9. In particular, in the embodiment of figure 4, five beams vertical lattices 23 are shown. In Figure 3 as well as in the embodiment shown in Figure 5, no horizontal lattice beam 27, that is to say a lattice beam extending substantially in a second direction substantially perpendicular to the first direction, is not shown.

Toutefois, l’uniwall comporte de préférence une ou plusieurs poutres en treillis horizontales 27, comme le montrent par exemple les autres modes de réalisation de l’uniwall montrés sur les figures 4 et 9. En particulier, dans le mode de réalisation des figures 4 et 9, quatre poutres en treillis horizontales 27 sont montrées. Dans tous les cas, les barres métalliques allongées inférieures 24 se trouvent à l’intérieur de la dalle de béton 18 tandis que la barre métallique allongée supérieure 25 se trouve à l’extérieur de la dalle de béton 18. Cela rend la barre métallique allongée supérieure 25 accessible par un utilisateur, avant le coulage du béton 11 dans l'espace 5 entre l’uniwall et le mur existant, depuis un premier côté de la dalle de béton 18, ledit côté étant appelé le côté intérieur par opposition au côté opposé de la dalle de béton qui est appelé le côté extérieur.However, the uniwall preferably includes one or more horizontal lattice girders 27, as shown for example by the other embodiments of the uniwall shown in Figures 4 and 9. In particular, in the embodiment of Figures 4 and 9, four horizontal trusses 27 are shown. In all cases, the lower elongated metal bars 24 are inside the concrete slab 18 while the upper elongated metal bar 25 is outside the concrete slab 18. This makes the elongated metal bar upper 25 accessible by a user, before pouring the concrete 11 in the space 5 between the uniwall and the existing wall, from a first side of the concrete slab 18, said side being called the inner side as opposed to the opposite side of the concrete slab which is called the exterior side.

Afin de former le mur en béton, l'espace vide 5 entre la dalle de béton 18 de l’uniwall et le mur existant 10 est rempli de béton 11. Après durcissement du béton 11, on obtient le mur en béton définitif. La surface extérieure 44 de la dalle de béton 18 fait maintenant office maintenant de mur intérieur du bâtiment.In order to form the concrete wall, the empty space 5 between the concrete slab 18 of the uniwall and the existing wall 10 is filled with concrete 11. After hardening of the concrete 11, the final concrete wall is obtained. The exterior surface 44 of the concrete slab 18 now acts as the interior wall of the building.

Comme le montrent clairement les figures 4 et 6, une première rangée de connecteurs de goujons 31 et une seconde rangée de connecteurs de goujons 28, tous mis en œuvre sous forme de douilles filetées, sont prévus à l’intérieur de la dalle de béton 18. La première rangée de connecteurs de goujons 31 et la seconde rangée de connecteurs de goujons 28 sont prévues de sorte que les connecteurs de goujons sont accessibles pour connecter de manière amovible respectivement les goujons 32 et les goujons 29 à la dalle de béton 18 depuis le côté extérieur de la dalle de béton 18. Les goujons comprennent une partie filetée qui peut être vissée de manière amovible dans les douilles filetées des connecteurs de goujons. Les goujons 29, 32, lorsqu'ils sont connectés aux connecteurs de goujons, relient l’uniwall à la dalle de plancher 9 et soutiennent l’uniwall pendant le remplissage du coffrage avec du béton 11. Les goujons 29, 32 sont des goujons réglables qui peuvent être mis plus ou moins en tension entre la dalle de plancher 9 et l’'uniwall au moyen d’une poignée 30, 33. En effet, étant donné que les goujons 29 sont connectés aux connecteurs de goujons 28 dans la portion supérieure 21 de la dalle de béton 18, les goujons 29 sont de préférence mis en tension, tandis que, étant donné que les goujons 32 sont connectés aux connecteurs de goujons 31 dans la portion inférieure 19 de la dalle de béton 18, les goujons 32 sont de préférence mis en compression. Les deux rangées de connecteurs de goujons 28, 31 s'étendent sensiblement dans une seconde direction sensiblement perpendiculaire à la première direction, c'est-à-dire selon la largeur de la dalle de béton. La seconde rangée de connecteurs de goujons 28 est positionnée dans la portion supérieure 21 de la dalle de béton approximativement à 70 % de la hauteurAs clearly shown in Figures 4 and 6, a first row of stud connectors 31 and a second row of stud connectors 28, all implemented as threaded sockets, are provided within the concrete slab 18 The first row of stud connectors 31 and the second row of stud connectors 28 are provided such that the stud connectors are accessible to removably connect the studs 32 and the studs 29 respectively to the concrete slab 18 from the outer side of the concrete slab 18. The studs comprise a threaded part which can be releasably screwed into the threaded sockets of the stud connectors. Studs 29, 32, when connected to stud connectors, connect the uniwall to the floor slab 9 and support the uniwall while the formwork is filled with concrete 11. Studs 29, 32 are adjustable studs which can be more or less tensioned between the floor slab 9 and the uniwall by means of a handle 30, 33. Indeed, since the dowels 29 are connected to the dowel connectors 28 in the upper portion 21 of the concrete slab 18, the studs 29 are preferably tensioned, whereas, since the studs 32 are connected to the stud connectors 31 in the lower portion 19 of the concrete slab 18, the studs 32 are preferably compressed. The two rows of stud connectors 28, 31 extend substantially in a second direction substantially perpendicular to the first direction, that is to say along the width of the concrete slab. The second row of stud connectors 28 are positioned in the upper portion 21 of the concrete slab at approximately 70% of the height

H de la dalle de béton 18. La hauteur H est la distance entre le bord inférieur 20 et le bord supérieur 22 de la dalle de béton 18 selon la première direction X. La première rangée de connecteurs de goujons 31 est positionnée dans la portion inférieure 19 de la dalle de béton approximativement à 30 % de la hauteur H de la dalle de béton 18. Les figures 3, 5 et 8 montrent en détail les goujons connectés aux connecteurs de goujons.H of the concrete slab 18. The height H is the distance between the lower edge 20 and the upper edge 22 of the concrete slab 18 along the first direction X. The first row of stud connectors 31 is positioned in the lower portion 19 of the concrete slab approximately 30% of the height H of the concrete slab 18. Figures 3, 5 and 8 show in detail the dowels connected to the dowel connectors.

Comme le montrent clairement les figures 4 et 6, trois connecteurs de profilés en L 34, mis en œuvre sous forme de douilles filetées, sont prévus dans la portion inférieure 19 de la dalle de béton 18, de manière adjacente à un bord inférieur 20 de la dalle de béton. Les connecteurs de profilés en L 34 sont positionnés plus près du bord inférieur 20 de la dalle de béton 18 que les connecteurs de goujons 31 prévus dans la portion inférieure 19 de la dalle de béton 18. Les connecteurs de profilés en L 24 sont positionnés de manière à être accessibles depuis le côté extérieur de la dalle de béton 18. Les connecteurs de profilés en L 34 sont configurés pour se connecter de manière amovible à un profilé en L 35 au moyen d'un boulon 38. Cela est montré clairement sur les figures 7 et 8. Le profilé en L 35 est agencé pour relier la dalle de béton 18 avec le sol 9 de manière à empêcher la translation de la dalle de béton 18 lors du remplissage du coffrage avec le béton 11. Lors de la création du coffrage, la dalle de béton 18 est positionnée au moyen d’une grue et des ancrages de levage connectés à la dalle de béton (comme cela est visible sur la figure 6 et comme cela sera décrit ci-après), à proximité immédiate de la dalle de plancher 9 comme le montre la figure 7. Un intervalle est typiquement laissé entre le bord inférieur 20 de la dalle de béton 18 et la dalle de plancher 9 en raison de l’irrégularité de la dalle de plancher 9. Afin d'éviter que le béton liquide 11 ne s'échappe de cet intervalle, l'intervalle est scellé au moyen de barrières en bois 36 et de mousse d'isolation 37. Les barrières en bois 36 sont boulonnées dans la dalle de plancher 9. Après avoir formé le mur en béton définitif, les profilés en L 35 peuvent être retirés des connecteurs de profilés en L 24 de manière à peu perturber l'esthétique de la surface extérieure de l’uniwall.As clearly shown in Figures 4 and 6, three L-section connectors 34, embodied as threaded bushings, are provided in the lower portion 19 of the concrete slab 18, adjacent a lower edge 20 of the concrete slab. The L-channel connectors 34 are positioned closer to the lower edge 20 of the concrete slab 18 than the stud connectors 31 provided in the lower portion 19 of the concrete slab 18. The L-channel connectors 24 are positioned so as to be accessible from the exterior side of the concrete slab 18. The L-channel connectors 34 are configured to removably connect to an L-channel 35 by means of a bolt 38. This is clearly shown in the Figures 7 and 8. The L-section 35 is arranged to connect the concrete slab 18 with the ground 9 so as to prevent the translation of the concrete slab 18 when filling the formwork with the concrete 11. When creating the formwork, the concrete slab 18 is positioned by means of a crane and lifting anchors connected to the concrete slab (as seen in Figure 6 and as will be described below), in the immediate vicinity of the floor slab 9 as shown in Figure 7. A gap is typically left between the lower edge 20 of the concrete slab 18 and the floor slab 9 due to the unevenness of the floor slab 9. In order to avoid liquid concrete 11 does not escape from this gap, the gap is sealed by means of wooden barriers 36 and insulation foam 37. The wooden barriers 36 are bolted into the floor slab 9. After forming the final concrete wall, the L-profiles 35 can be removed from the L-profile connectors 24 so as to little disturb the aesthetics of the exterior surface of the uniwall.

Comme le montrent les figures 4 et 9, des ancrages de levage 41 sont prévus à l’intérieur de la portion supérieure 21 de la dalle de béton 18. Les ancrages de levage 41 sont prévus de manière à être accessibles depuis le côté intérieur de la dalle de béton 18 lorsque l’espace entre l’uniwall et le mur existant n’a pas encore été rempli de béton 11. L’ancrage de levage comprend une boucle métallique, s'étendant hors de la surface intérieure de la dalle de béton 18. Les ancrages de levage 41 sont configurés pour se connecter de manière amovible à un crochet de grue 40 de sorte que le crochet de grue puisse lever la dalle de béton et la placer sur la dalle de plancher 9, comme le montre la figure 6, où ensuite, comme le montrent les figures 7 et 8, la dalle de béton 18 est fixée à la dalle de plancher 9 au moyen des goujons 29, 32 et des profilés en L 35. Avant la fixation des goujons 29, 32 aux connecteurs de goujons 28, 31, les connecteurs de goujons sont donc libres d'être utilisés pour d’autres applications. L’une de ces applications est l’utilisation d’un connecteur de goujon 28 de la seconde rangée de connecteurs de goujons comme connecteur de bras d'ancrage de levage mis en œuvre sous forme de douille filetée. Le connecteur de bras d’ancrage de levage est configuré pour se connecter de manière amovible à un bras d’ancrage de levage 42 s'étendant depuis un côté proximal connecté à la dalle de béton 18 jusqu’à un côté distal plus éloigné de la dalle de béton 18. Le côté distal du bras d’ancrage de levage 42 comprend un ancrage de levage supplémentaire. La fourniture d’ancrages de levage des deux côtés de la dalle de béton 18 permet de porter la dalle de béton en position verticale. L’ancrage de levage supplémentaire est éloigné de la dalle de béton 18 d’une distance d’au moins 5 cm, de manière à créer un moment de flexion plus important pour maintenir la dalle de béton 18 en position verticale. Le bras d'ancrage de levage 42 n’est pas directement, c'est-à-dire de manière permanente, prévu à l’intérieur de la dalle de béton, comme le sont les ancrages de levage 41 décrits ci-dessus, car la surface extérieure de la dalle de béton 18 est de préférence peu perturbée par des éléments permanents de manière à améliorer l'esthétique de la surface extérieure de la dalle de béton.As shown in Figures 4 and 9, lifting anchors 41 are provided inside the upper portion 21 of the concrete slab 18. The lifting anchors 41 are provided so as to be accessible from the interior side of the concrete slab 18 when the space between the uniwall and the existing wall has not yet been filled with concrete 11. The lifting anchor comprises a metal loop, extending out from the interior surface of the concrete slab 18. The lifting anchors 41 are configured to removably connect to a crane hook 40 so that the crane hook can lift the concrete slab and place it on the floor slab 9, as shown in Figure 6 , where then, as shown in Figures 7 and 8, the concrete slab 18 is fixed to the floor slab 9 by means of the dowels 29, 32 and the L-sections 35. Prior to the fixing of the dowels 29, 32 to the connectors of studs 28, 31, the stud connectors are therefore free to be used for other applications. One such application is the use of a 28 stud connector from the second row of stud connectors as a lifting anchor arm connector implemented as a threaded bushing. The lifting anchor arm connector is configured to removably connect to a lifting anchor arm 42 extending from a proximal side connected to the concrete slab 18 to a distal side farther from the concrete slab 18. The distal side of lifting anchor arm 42 includes an additional lifting anchor. The provision of lifting anchors on both sides of the concrete slab 18 allows the concrete slab to be carried in an upright position. The additional lifting anchor is moved away from the concrete slab 18 by a distance of at least 5 cm, so as to create a greater bending moment to hold the concrete slab 18 in an upright position. The lifting anchor arm 42 is not directly, i.e. permanently, provided within the concrete slab, as are the lifting anchors 41 described above, because the exterior surface of the concrete slab 18 is preferably little disturbed by permanent elements so as to improve the aesthetics of the exterior surface of the concrete slab.

La figure 9 montre l’uniwall de la figure 3 comprenant en outre une grille d'interruption d'écoulement de béton 45 telle qu’une grille de type « Stremaform ». La grille 45 d’interruption d'écoulement de béton est connectée à la dalle de béton 18 par exemple au moyen de bras de connecteur 46 encastrés dans la dalle de béton 18. La grille 45 est positionnée du côté intérieur de la dalle de béton. Les bras de connecteur 46 pénètrent en particulier la surface intérieure de la dalle de béton. La grille 45 permet de remplir par étapes les parties adjacentes du coffrage. En outre, un arrêt-barrage à eau 47 est connecté à la grille d'interruption d’écoulement 45.Figure 9 shows the uniwall of Figure 3 further comprising a concrete flow interruption grid 45 such as a "Stremaform" type grid. The concrete flow interruption grid 45 is connected to the concrete slab 18 for example by means of connector arms 46 embedded in the concrete slab 18. The grid 45 is positioned on the inside of the concrete slab. The connector arms 46 particularly penetrate the interior surface of the concrete slab. The grid 45 makes it possible to fill the adjacent parts of the formwork in stages. Further, a water barrier 47 is connected to the flow interruption grid 45.

La figure 10 montre l’uniwall de la figure 3 dans lequel des ouvertures 48 sont préformées, par exemple lors de la formation de l’uniwall sur le lieu de production avant le transport de Puniwall vers le lieu de construction.Figure 10 shows the uniwall of figure 3 in which openings 48 are preformed, for example during the formation of the uniwall at the place of production before transporting the Puniwall to the place of construction.

Comme le montrent clairement les figures 4 et 5, un renfort de poinçonnement 49 est prévu à l’intérieur de la dalle de béton 18 aux positions des connecteurs de goujons 28, 31. Le renfort de poingonnement 49 est un ensemble de tiges métalliques s'étendant sensiblement selon la seconde direction. Les renforts de poinçonnement 49 sont prévus sensiblement uniquement aux positions des connecteurs de goujons, c’est-à-dire qu’ils sont concentrés autour des connecteurs de goujons 28, 31.As clearly shown in Figures 4 and 5, a punching reinforcement 49 is provided inside the concrete slab 18 at the positions of the stud connectors 28, 31. The punching reinforcement 49 is a set of metal rods extending substantially in the second direction. The punching reinforcements 49 are provided substantially only at the positions of the stud connectors, i.e. they are concentrated around the stud connectors 28, 31.

Comme le montre clairement la figure 4, des renforts supplémentaires sont prévus à l’intéreur de la dalle de béton, c'est-à-dire des renforts supplémentaires autres que les renforts de poinçonnement 49. Les renforts supplémentaires comprennent un premier ensemble de tiges métalliques 50 s'étendant sensiblement selon la première direction, un deuxième ensemble de tiges métalliques 51 s'étendant sensiblement selon la seconde direction, et un troisième ensemble de tiges métalliques 52 s'étendant sensiblement selon la première direction, les premier, deuxième et troisième ensembles se trouvant dans des plans différents. Ces renforts supplémentaires sont prévus sur toute la première et la seconde direction de la dalle de béton 18, c’est-à-dire qu'ils ne sont pas concentrés autour des connecteurs de goujons 28, 31. Ces renforts supplémentaires présentent chacun un espacement sensiblement constant entre les tiges métalliques de chaque ensemble.As clearly shown in Figure 4, additional reinforcements are provided inside the concrete slab, that is to say additional reinforcements other than the punching reinforcements 49. The additional reinforcements comprise a first set of rods metal rods 50 extending substantially along the first direction, a second set of metal rods 51 extending substantially along the second direction, and a third set of metal rods 52 extending substantially along the first direction, the first, second and third sets lying in different planes. These additional reinforcements are provided over the entire first and second direction of the concrete slab 18, that is to say they are not concentrated around the stud connectors 28, 31. These additional reinforcements each have a spacing substantially constant between the metal rods of each set.

Comme le montrent clairement les figures 3 et 5, le procédé de construction d’un mur en béton contre un mur existant, comprend les étapes consistant à : e fournir le coffrage, en particulier en levant l’uniwall au moyen d’une grue 40 comme montré en 6 et en plaçant la grue contre le mur existant 10, et en fixant ensuite l’'uniwall à la dalle de plancher 9 au moyen des connecteurs en L 35 et des goujons 29, 32 comme le montrent respectivement les figures 7 et 8,As clearly shown in figures 3 and 5, the process of building a concrete wall against an existing wall, includes the steps of: e providing the formwork, in particular by lifting the uniwall by means of a crane 40 as shown at 6 and placing the crane against the existing wall 10, and then fixing the uniwall to the floor slab 9 by means of the L-connectors 35 and studs 29, 32 as shown respectively in Figures 7 and 8,

e remplir l’espace entre l’uniwall et le mur existant 10 avec du béton 11.e fill the space between the uniwall and the existing wall 10 with concrete 11.

Le béton est un béton liquide qui va durcir dans l'espace entreConcrete is a liquid concrete that will harden in the space between

Puniwall et le mur existant 10.Puniwall and the existing wall 10.

Comme le montre clairement la figure 5, l’étape de remplissage de l’espace entre Vuniwall et le mur existant 10 avec du béton 11 comprend le remplissage de l’espace par étapes. Chaque étape comprend le remplissage de l’espace sur une hauteur prédéterminée et l’attente pendant une durée prédéterminée pour laisser le béton 11 coulé à ladite étape durcir. Cela est montré à la figure 5 au moyen des interfaces 53 qui sont formées entre les sections de béton coulées en différentes phases.As clearly shown in Figure 5, the step of filling the gap between Vuniwall and the existing wall 10 with concrete 11 includes filling the gap in stages. Each step includes filling the space to a predetermined height and waiting for a predetermined time to allow the concrete 11 poured at said step to harden. This is shown in Figure 5 by means of the interfaces 53 which are formed between the sections of concrete cast in different phases.

Claims (29)

RevendicationsClaims 1. Paroi préfabriquée en béton armé, appelé « uniwall », configurée pour être utilisé dans un coffrage pour construire un mur en béton contre un mur existant, dans lequel le mur existant fait partie du coffrage et dans lequel la paroi préfabriquée en béton fait partie du mur en béton, dans lequel l’uniwall comprend une dalle de béton s'étendant sur une « hauteur de dalle » donnée dans une première direction, en utilisation sensiblement parallèle à la direction gravitationnelle, depuis une portion inférieure jusqu’à une portion supérieure, et dans lequel l’uniwall comprend en outre au moins une poutre en treillis, dans lequel la poutre en treillis comprend une barre métallique allongée inférieure, une barre métallique allongée supérieure sensiblement parallèle à la barre métallique allongée inférieure et un treillis métallique reliant la barre métallique allongée inférieure à la barre métallique allongée supérieure, et dans lequel la barre métallique allongée inférieure se trouve à l’intérieur de la dalle de béton tandis que la barre métallique allongée supérieure se trouve à l’extérieur de la dalle de béton de sorte que la barre métallique allongée supérieure est librement accessible par un utilisateur depuis un premier côté de la dalle de béton, ledit côté étant appelé le côté intérieur par opposition au côté opposé de la dalle de béton qui est appelé le côté extérieur.1. Precast reinforced concrete wall, called "uniwall", configured for use in a formwork to build a concrete wall against an existing wall, in which the existing wall is part of the formwork and in which the precast concrete wall is part the concrete wall, wherein the uniwall comprises a concrete slab extending over a given "slab height" in a first direction, in use substantially parallel to the gravitational direction, from a lower portion to an upper portion , and wherein the uniwall further comprises at least one lattice beam, wherein the lattice beam comprises a lower elongated metal bar, an upper elongated metal bar substantially parallel to the lower elongated metal bar, and a metal lattice connecting the bar lower elongated metal bar than the upper elongated metal bar, and wherein the lower elongated metal bar is inside the concrete slab while the upper elongated metal bar is outside the concrete slab such that the upper elongated metal bar is freely accessible by a user from a first side of the concrete slab, said side being called the inner side as opposed to the opposite side of the concrete slab which is called the outer side. 2. Uniwall selon la première revendication, dans lequel une première rangée de connecteurs de goujons est prévue à l’intérieur de la dalle de béton de sorte que les connecteurs de goujons sont accessibles pour connecter de manière amovible les goujons à la dalle de béton depuis le côté extérieur de la dalle de béton.2. A uniwall according to claim 1, wherein a first row of stud connectors is provided within the concrete slab such that the stud connectors are accessible to removably connect the studs to the concrete slab from the exterior side of the concrete slab. 3. Uniwall selon la revendication précédente, dans lequel les connecteurs de goujons sont des douilles filetées.3. Uniwall according to the preceding claim, in which the stud connectors are threaded sockets. 4. Uniwall selon l’une quelconque des revendications 2 à 3 précédentes, dans lequel la première rangée de connecteurs de goujons s'étend sensiblement dans une seconde direction sensiblement perpendiculaire à la première direction.4. Uniwall according to any one of the preceding claims 2 to 3, wherein the first row of stud connectors extends substantially in a second direction substantially perpendicular to the first direction. 5. Uniwall selon la revendication précédente, dans lequel la première rangée de connecteurs de goujons est positionnée dans la portion inférieure de la dalle de béton, de préférence en dessous de 50 % de la hauteur de la dalle de béton, de préférence en dessous de 40 % de la hauteur de la dalle de béton, et de préférence au-dessus de 10 % de la hauteur de la dalle de béton, de préférence au-dessus de 20% de la hauteur de la dalle de béton, de préférence approximativement à 30 % de la hauteur de la dalle de béton.5. Uniwall according to the preceding claim, wherein the first row of stud connectors is positioned in the lower portion of the concrete slab, preferably below 50% of the height of the concrete slab, preferably below 40% of the height of the concrete slab, and preferably above 10% of the height of the concrete slab, preferably above 20% of the height of the concrete slab, preferably approximately at 30% of the height of the concrete slab. 6. Uniwall selon l’une quelconque des revendications 1 à 4 précédentes, dans lequel la première rangée de connecteurs de goujons est positionnée dans la portion supérieure de la dalle de béton, de préférence au- dessus de 50 % de la hauteur de la dalle de béton, de préférence au-dessus de 60 % de la hauteur de la dalle de béton, et de préférence en dessous de 90 % de la hauteur de la dalle de béton, de préférence en dessous de 80 % de la hauteur de la dalle de béton, de préférence approximativement à 70 % de la hauteur de la dalle de béton.6. Uniwall according to any one of the preceding claims 1 to 4, in which the first row of dowel connectors is positioned in the upper portion of the concrete slab, preferably above 50% of the height of the slab of concrete, preferably above 60% of the height of the concrete slab, and preferably below 90% of the height of the concrete slab, preferably below 80% of the height of the slab of concrete, preferably approximately 70% of the height of the concrete slab. 7. Uniwall selon l’une quelconque des revendications 2 à 4 précédentes, dans lequel une seconde rangée de connecteurs de goujons est prévue à l’intérieur de la dalle de béton de sorte que les connecteurs de goujons sont accessibles pour connecter de manière amovible des goujons à la dalle de béton depuis le côté extérieur de la dalle de béton, dans lequel les connecteurs de goujons sont de préférence des douilles filetées, et dans lequel la seconde rangée de connecteurs de goujons s’étend de préférence sensiblement dans la seconde direction sensiblement perpendiculaire à la première direction.7. A uniwall according to any of the preceding claims 2 to 4, wherein a second row of stud connectors is provided within the concrete slab such that the stud connectors are accessible for removably connecting studs to the concrete slab from the exterior side of the concrete slab, wherein the stud connectors are preferably threaded sockets, and wherein the second row of stud connectors preferably extends substantially in the second direction substantially perpendicular to the first direction. 8. Uniwall selon la revendication précédente en combinaison avec la revendication 5, dans lequel la seconde rangée de connecteurs de goujons est positionnée dans la portion supérieure de la dalle de béton, de préférence au- dessus de 50 % de la hauteur de la dalle de béton, de préférence au-dessus de 60 % de la hauteur de la dalle de béton, et de préférence en dessous de 90 % de la hauteur de la dalle de béton, de préférence en dessous de 80 % de la hauteur de la dalle de béton, de préférence approximativement à 70 % de la hauteur de la dalle de béton.8. Uniwall according to the preceding claim in combination with claim 5, wherein the second row of stud connectors is positioned in the upper portion of the concrete slab, preferably above 50% of the height of the concrete slab. concrete, preferably above 60% of the concrete slab height, and preferably below 90% of the concrete slab height, preferably below 80% of the concrete slab height concrete, preferably approximately 70% of the height of the concrete slab. 9. Uniwall selon l’une quelconque des revendications précédentes, dans lequel au moins un connecteur de profilé en L, de préférence mis en œuvre sous forme de douille filetée, est prévu dans la portion inférieure de la dalle de béton adjacente à un bord inférieur de la dalle de béton et de manière à être accessible depuis le côté extérieur de la dalle de béton, dans lequel les connecteurs de profilés en L sont configurés pour se connecter de manière amovible à un profilé en L.9. Uniwall according to any of the preceding claims, wherein at least one L-profile connector, preferably implemented as a threaded sleeve, is provided in the lower portion of the concrete slab adjacent to a lower edge of the concrete slab and so as to be accessible from the outer side of the concrete slab, wherein the L-channel connectors are configured to removably connect to an L-channel. 10. Uniwall selon l’une quelconque des revendications précédentes, dans lequel au moins deux ancrages de levage sont prévus à l’intérieur de la portion supérieure de la dalle de béton de manière à être accessibles depuis le côté intérieur de la dalle de béton, dans lequel les ancrages de levage sont configurés pour se connecter de manière amovible à un crochet de grue de sorte que le crochet de grue puisse lever la dalle de béton.10. Uniwall according to any one of the preceding claims, in which at least two lifting anchors are provided inside the upper portion of the concrete slab so as to be accessible from the interior side of the concrete slab, wherein the lifting anchors are configured to removably connect to a crane hook so that the crane hook can lift the concrete slab. 11. Uniwall selon la revendication précédente, dans lequel un connecteur de bras d'ancrage de levage, de préférence mis en œuvre sous forme de douille filetée, est prévu à l'intérieur de la portion supérieure de la dalle de béton et de manière à être accessible depuis le côté extérieur de la dalle de béton, dans lequel la douille filetée est configurée pour se connecter de manière amovible à un bras d'ancrage de levage comprenant un ancrage de levage supplémentaire.11. Uniwall according to the preceding claim, wherein a lifting anchor arm connector, preferably implemented as a threaded sleeve, is provided within the upper portion of the concrete slab and so as to be accessible from the exterior side of the concrete slab, wherein the threaded bushing is configured to removably connect to a lifting anchor arm comprising a supplemental lifting anchor. 12. Uniwall selon la revendication précédente, dans lequel l’un des connecteurs de goujons est simultanément le connecteur de bras d'ancrage de levage.12. Uniwall according to the preceding claim, wherein one of the stud connectors is simultaneously the lifting anchor arm connector. 13. Uniwall selon l’une quelconque des revendications précédentes, dans lequel l’uniwall comprend en outre une grille d'interruption d'écoulement de béton telle qu'une grille de type « Stremaform » connectée à la dalle de béton.13. Uniwall according to any one of the preceding claims, in which the uniwall further comprises a concrete flow interruption grid such as a "Stremaform" type grid connected to the concrete slab. 14. Uniwall selon l’une quelconque des revendications précédentes en combinaison avec la revendication 2, dans lequel un renfort de poingonnement est prévu à l'intérieur de la dalle de béton aux positions des connecteurs de goujons, dans lequel le renfort de poinçonnement est de préférence un ensemble de tiges métalliques s'étendant de préférence sensiblement selon la seconde direction.14. Uniwall according to any one of the preceding claims in combination with claim 2, in which a punching reinforcement is provided inside the concrete slab at the positions of the dowel connectors, in which the punching reinforcement is of preferably a set of metal rods preferably extending substantially along the second direction. 15. Uniwall selon la revendication précédente, dans lequel des renforts supplémentaires sont prévus à l’intérieur de la dalle de béton, dans lequel les renforts supplémentaires comprennent de préférence un premier ensemble de tiges métalliques s'étendant sensiblement selon la première direction, un deuxième ensemble de tiges métalliques s'étendant sensiblement selon la seconde direction,15. Uniwall according to the preceding claim, in which additional reinforcements are provided inside the concrete slab, in which the additional reinforcements preferably comprise a first set of metal rods extending substantially along the first direction, a second set of metal rods extending substantially in the second direction, un troisième ensemble de tiges métalliques s'étendant sensiblement selon la première direction, dans lequel les premier, deuxième et troisième ensembles se trouvent dans des plans différents.a third set of metal rods extending substantially along the first direction, in which the first, second and third sets are in different planes. 16. Coffrage pour construire un mur en béton contre un mur existant, le coffrage comprenant l’uniwall selon l'une quelconque des revendications précédentes.16. Formwork for constructing a concrete wall against an existing wall, the formwork comprising the uniwall according to any preceding claim. 17. Coffrage selon la revendication précédente, comprenant en outre le mur existant.17. Formwork according to the preceding claim, further comprising the existing wall. 18. Coffrage selon la revendication précédente, dans lequel le mur existant est un mur existant à base de béton.18. Formwork according to the preceding claim, wherein the existing wall is an existing concrete-based wall. 19. Coffrage selon l’une quelconque des revendications 17 et 18 précédentes, dans lequel le mur existant est un mur de soutènement de terre, formant de préférence une fondation ou un sous-sol.19. Formwork according to any one of the preceding claims 17 and 18, in which the existing wall is an earth retaining wall, preferably forming a foundation or a basement. 20. Coffrage selon la revendication précédente, dans lequel le mur de soutènement de terre est un mur à mélange de sol par coupeuse, un mur de type « berlinois », ou un mur de type « pieu ».20. Formwork according to the preceding claim, wherein the earth retaining wall is a soil mixing wall by cutter, a “Berlin” type wall, or a “pile” type wall. 21. Coffrage selon l'une quelconque des revendications 18 à 20 précédentes, de préférence dans lequel le mur existant est un mur en béton de soutènement de terre de type «berlinois», dans lequel une couche d'amortissement de vibrations est fixée au mur existant dans l’espace entre l’uniwall et le mur existant, dans lequel la couche d'amortissement de vibrations est de préférence une feuille à double paroi telle qu’une feuille « Biplex ».21. Formwork according to any one of the preceding claims 18 to 20, preferably in which the existing wall is a "Berlin" type earth retaining concrete wall, in which a vibration damping layer is fixed to the wall. existing in the space between the uniwall and the existing wall, wherein the vibration damping layer is preferably a double wall sheet such as a "Biplex" sheet. 22. Coffrage selon l'une quelconque des revendications 16 à 21 précédentes en combinaison avec la revendication 2, dans lequel le coffrage comprend en outre des goujons connectés de manière amovible aux connecteurs de goujons.22. Formwork according to any one of the preceding claims 16 to 21 in combination with claim 2, wherein the formwork further comprises studs removably connected to the stud connectors. 23. Coffrage selon l’une quelconque des revendications précédentes en combinaison avec la revendication 9, dans lequel le coffrage comprend en outre un ou plusieurs profilés en L, chacun étant connecté de manière amovible à l’un des connecteurs de profilés en L.23. Formwork according to any one of the preceding claims in combination with claim 9, wherein the formwork further comprises one or more L-sections, each being removably connected to one of the L-section connectors. 24. Procédé de construction d’un coffrage, le procédé comprenant les étapes consistant à :24. A method of constructing formwork, the method comprising the steps of: e fournir l’uniwall selon l'une quelconque des revendications 1 à 15 précédentes, e créer le coffrage selon l’une quelconque des revendications 16 à 23 précédentes en plaçant l’uniwall de manière adjacente à un mur existant de sorte que le mur existant se trouve sur le côté intérieur de la dalle de béton.e providing the uniwall according to any of the preceding claims 1 to 15, e creating the formwork according to any of the preceding claims 16 to 23 by placing the uniwall adjacent to an existing wall such that the existing wall is on the interior side of the concrete slab. 25. Procédé de construction d’un mur en béton contre un mur existant, le procédé comprenant les étapes consistant à : e fournir le coffrage en exécutant le procédé de la revendication 24, e remplir l'espace entre l’uniwall et le mur existant avec du béton.25. A method of building a concrete wall against an existing wall, the method comprising the steps of: e providing the formwork by performing the method of claim 24, e filling the space between the uniwall and the existing wall with concrete. 26. Procédé selon la revendication précédente, dans lequel l'étape de remplissage de l'espace entre l’uniwall et le mur existant avec du béton comprend le remplissage de l’espace par étapes, dans lequel chaque étape comprend le remplissage de l’espace sur une hauteur prédéterminée et l’attente pendant une durée prédéterminée pour laisser le béton coulé à ladite étape durcir.26. A method according to the preceding claim, wherein the step of filling the space between the uniwall and the existing wall with concrete comprises filling the space in stages, wherein each step comprises filling the space over a predetermined height and waiting for a predetermined time to allow the concrete poured in said step to harden. 27. Procédé selon la revendication précédente, dans lequel la hauteur et la durée prédéterminées sont telles que la pression horizontale maximale exercée par le béton sur l’uniwall pendant chaque étape est inférieure à 50 kN/m2, de préférence inférieure à 30 kN/m2.27. Method according to the preceding claim, in which the predetermined height and duration are such that the maximum horizontal pressure exerted by the concrete on the uniwall during each stage is less than 50 kN/m2, preferably less than 30 kN/m2 . 28. Procédé selon l'une quelconque des revendications 26 et 27 précédentes, dans lequel la hauteur prédéterminée est inférieure à 1,5m, de préférence inférieure à 1m par exemple d'environ 0,8 m pendant une durée prédéterminée d’une heure.28. Method according to any one of the preceding claims 26 and 27, in which the predetermined height is less than 1.5 m, preferably less than 1 m, for example approximately 0.8 m for a predetermined duration of one hour. 29. Procédé selon l’une quelconque des revendications 26 à 28 précédentes, dans lequel le béton est un béton de type CEM | lorsque la température extérieure sur le lieu de installation est inférieure à 15 °C, et dans lequel le béton est un béton de type CEM III lorsque la température extérieure sur le lieu de l'installation est supérieure à 15 °C.29. Method according to any one of the preceding claims 26 to 28, in which the concrete is a CEM | when the outside temperature at the place of installation is below 15°C, and in which the concrete is CEM III type concrete when the outside temperature at the place of installation is above 15°C.
BE20225009A 2022-01-11 2022-01-11 A PREFABRICATED REINFORCED CONCRETE WALL FOR USE IN FORMWORK FOR THE CONSTRUCTION OF A CONCRETE WALL BE1030172B1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
BE20225009A BE1030172B1 (en) 2022-01-11 2022-01-11 A PREFABRICATED REINFORCED CONCRETE WALL FOR USE IN FORMWORK FOR THE CONSTRUCTION OF A CONCRETE WALL
FR2213435A FR3131750A1 (en) 2022-01-11 2022-12-15 A PREFABRICATED REINFORCED CONCRETE WALL FOR USE IN FORMWORK FOR THE CONSTRUCTION OF A CONCRETE WALL
NL2033942A NL2033942B1 (en) 2022-01-11 2023-01-11 A prefabricated reinforced concrete shell for use in a formwork for constructing a concrete wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
BE20225009A BE1030172B1 (en) 2022-01-11 2022-01-11 A PREFABRICATED REINFORCED CONCRETE WALL FOR USE IN FORMWORK FOR THE CONSTRUCTION OF A CONCRETE WALL

Publications (2)

Publication Number Publication Date
BE1030172A1 true BE1030172A1 (en) 2023-08-03
BE1030172B1 BE1030172B1 (en) 2023-08-10

Family

ID=81854528

Family Applications (1)

Application Number Title Priority Date Filing Date
BE20225009A BE1030172B1 (en) 2022-01-11 2022-01-11 A PREFABRICATED REINFORCED CONCRETE WALL FOR USE IN FORMWORK FOR THE CONSTRUCTION OF A CONCRETE WALL

Country Status (3)

Country Link
BE (1) BE1030172B1 (en)
FR (1) FR3131750A1 (en)
NL (1) NL2033942B1 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH610966A5 (en) * 1976-07-22 1979-05-15 Willi Steiner Rock or slope revetment and method of constructing it
DE102009058691A1 (en) * 2009-12-17 2011-06-22 Mading Bau GmbH, 07548 Thermally insulated building wall has supporting structure filled with filler and outer insulating cover, where supporting structure and cover are formed as factory-provided precast double-walled thermal composite

Also Published As

Publication number Publication date
NL2033942B1 (en) 2023-07-17
BE1030172B1 (en) 2023-08-10
FR3131750A1 (en) 2023-07-14

Similar Documents

Publication Publication Date Title
EP2582893B1 (en) Method for constructing a building using bricks connected using dry joints
EP0489054B1 (en) Cellular structures for sustaining walls
EP3310973A1 (en) Construction of the prefabricated column and beam type
FR2903437A1 (en) Prefabricated element for forming e.g. reinforced concrete wall e.g. bridge pillar, has metallic beam extending along longitudinal direction and comprising lower head beam drowned in plate extending between two spaced lateral sides
BE1030172B1 (en) A PREFABRICATED REINFORCED CONCRETE WALL FOR USE IN FORMWORK FOR THE CONSTRUCTION OF A CONCRETE WALL
FR2555630A1 (en) Method for producing insulating floors using elements, as well as the elements and floors produced by the said method
FR2818998A1 (en) PROCESS FOR THE PRODUCTION OF CIVIL ENGINEERING WORKS, AND PARTICULARLY POOLS OR WATER-RETAINING PONDS, AND MEANS FOR IMPLEMENTING SAME
EP3212862B1 (en) Method for manufacturing concrete construction blocks for a wind-turbine tower and associated system
FR2491977A1 (en) Joint connection for building frame in reinforced concrete - has open reinforcement column cage retaining angled beams with connecting bars
FR2973407A1 (en) Thin ultra-high performance fiber reinforced concrete plate for formwork for constructing slab in building, has ribs and grooves for rigid support of counterpart e.g. reinforced concrete beam, in contact with plate
FR2658228A1 (en) Method for constructing reinforced concrete reservoirs, prefabricated elements for implementing the said method and machine for producing the said elements
FR2939817A1 (en) Prefabricated elementary block for constructing e.g. outer insulating wall of building, has connection elements connecting reinforcement structures to fix inner bearing wall and outer protective shell to maintain constant transversal gap
BE1010092A6 (en) Method of manufacturing and assembly of an element construction concrete.
WO2015177465A1 (en) Crop storage silo and construction method
FR2938858A1 (en) Concrete floor framework for e.g. buried parking area, in building site, has posts surmounted by capital presenting variable inertia section maximal at right of posts, and beams whose ends are set with respect to each other in posts axis
FR2467923A2 (en) Tied industrialised building frame - is formed by slab edge grooves and ducts with column reinforcement in slab at duct
FR2812323A1 (en) Prefabricated concrete swimming pool is composed of two longitudinal elements forming vertical wall and bottom wall portion having longitudinal rabbet fitting rabbet in bottom slab forming pool bottom and two end elements
EP0784128A1 (en) Process for the manufacturing of a half timbered panel, panel obtained by the process and construction comprising at least one such panel
BE467681A (en)
OA18497A (en) Construction type prefabricated posts and beams.
EP3486405A1 (en) Pool and method for manufacturing same
BE485433A (en)
OA10230A (en) Method of constructing lightweight buildings using split bricks without formwork or clamps
FR2698898A1 (en) A method of constructing a building constructed according to this method.
BE474142A (en)

Legal Events

Date Code Title Description
FG Patent granted

Effective date: 20230810