WO2024071214A1 - 冷凍サイクル装置 - Google Patents

冷凍サイクル装置 Download PDF

Info

Publication number
WO2024071214A1
WO2024071214A1 PCT/JP2023/035187 JP2023035187W WO2024071214A1 WO 2024071214 A1 WO2024071214 A1 WO 2024071214A1 JP 2023035187 W JP2023035187 W JP 2023035187W WO 2024071214 A1 WO2024071214 A1 WO 2024071214A1
Authority
WO
WIPO (PCT)
Prior art keywords
refrigerant
circuit
carbon dioxide
valve
pipe
Prior art date
Application number
PCT/JP2023/035187
Other languages
English (en)
French (fr)
Inventor
悠太 井吉
喜記 山野井
Original Assignee
ダイキン工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ダイキン工業株式会社 filed Critical ダイキン工業株式会社
Publication of WO2024071214A1 publication Critical patent/WO2024071214A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B1/00Compression machines, plants or systems with non-reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B7/00Compression machines, plants or systems, with cascade operation, i.e. with two or more circuits, the heat from the condenser of one circuit being absorbed by the evaporator of the next circuit

Definitions

  • Patent Document 1 JP Patent No. 5425221 discloses a refrigeration cycle device including a refrigerant circuit in which a refrigerant circulates, connecting an outdoor unit and an indoor unit with gas piping and liquid piping.
  • Carbon dioxide (CO 2 ) is sealed inside the refrigerant circuit as a refrigerant
  • polyalkylene glycol (PAG) oil that is incompatible with carbon dioxide is sealed inside the refrigerant circuit as a refrigerant.
  • the refrigeration cycle device of the first aspect includes a first circuit, a second circuit, a cascade heat exchanger, and a control unit.
  • a first refrigerant circulates in the first circuit.
  • a carbon dioxide refrigerant and a refrigeration oil circulate in the second circuit.
  • the cascade heat exchanger heats the carbon dioxide refrigerant with the first refrigerant.
  • the second circuit has a second compressor, a container, an intake pipe, an oil return passage, and a valve.
  • the container is provided on the intake side of the second compressor and stores the carbon dioxide refrigerant and the refrigeration oil.
  • the intake pipe connects the intake side of the second compressor to the container.
  • the oil return passage returns the refrigeration oil from the bottom of the container to the intake pipe.
  • the valve is provided in the oil return passage.
  • the control unit performs start-up control to open the valve after starting to circulate the first refrigerant in the first circuit.
  • the temperature of the carbon dioxide refrigerant in the container may be low due to the low outside air temperature.
  • the first refrigerant begins to circulate in the first circuit, and the temperature of the carbon dioxide refrigerant in the container of the second circuit can be raised via the cascade heat exchanger. Therefore, even if the outside air temperature is low, a normal state can be achieved in which the density of the carbon dioxide refrigerant in the container is lower than the density of the refrigeration oil.
  • liquid refrigerant liquid carbon dioxide refrigerant
  • the refrigeration cycle device of the second aspect is the refrigeration cycle device of the first aspect, in which the control unit opens the valve when the temperature or pressure of the carbon dioxide refrigerant and the refrigeration oil in the container reaches or exceeds a predetermined temperature or pressure that corresponds to the boundary temperature at which the density of the carbon dioxide refrigerant and the density of the refrigeration oil in the container become equal.
  • the temperature or pressure of the carbon dioxide refrigerant and refrigeration oil in the container reaches or exceeds a predetermined temperature or pressure corresponding to the boundary temperature at which the density of the carbon dioxide refrigerant and the density of the refrigeration oil in the container become equal, it can be determined that the density of the refrigerant and the density of the refrigeration oil in the container have become normal. This makes it possible to further suppress the flow of liquid refrigerant into the second compressor.
  • the refrigeration cycle device of the third aspect is the refrigeration cycle device of the first or second aspect, in which the control unit starts circulating the carbon dioxide refrigerant in the second circuit after starting to circulate the first refrigerant in the first circuit.
  • the temperature of the refrigerant in the container of the second circuit is raised via the cascade heat exchanger, and then carbon dioxide refrigerant begins to circulate in the second circuit. This improves the efficiency of operation of the second circuit.
  • the refrigeration cycle device of the fourth aspect is the refrigeration cycle device of the third aspect, in which the control unit opens the valve after starting to circulate the carbon dioxide refrigerant in the second circuit.
  • the first refrigerant circulates in the first circuit
  • the carbon dioxide refrigerant circulates in the second circuit, so that the temperature of the carbon dioxide refrigerant in the container can be efficiently raised. This makes it easy to bring the refrigerant density and the refrigeration oil density in the container to normal. After the normal state is reached, the valve of the oil return passage is opened, so that the flow of liquid refrigerant into the second compressor can be easily prevented.
  • the refrigeration cycle device of the fifth aspect is the refrigeration cycle device of the first or second aspect, in which the control unit simultaneously starts the operation of the first circuit and the operation of the second circuit.
  • the circulation of the first refrigerant in the first circuit and the circulation of the carbon dioxide refrigerant in the second circuit may be performed simultaneously.
  • the refrigeration cycle device of the sixth aspect is any one of the refrigeration cycle devices of the first aspect to the fifth aspect, in which the control unit performs start-up control when the outside air temperature is equal to or lower than a first temperature, and does not perform start-up control when the outside air temperature exceeds the first temperature.
  • the seventh aspect of the refrigeration cycle device is the sixth aspect of the refrigeration cycle device, in which the control unit simultaneously starts the operation of the first circuit, the operation of the second circuit, and the opening operation of the valve when the outside air temperature exceeds the first temperature.
  • the valve when the density of the refrigerant and the density of the refrigeration oil in the container are not normal because the outside air temperature is equal to or lower than the first temperature, the valve is opened after the first circuit is started to operate, thereby preventing liquid refrigerant from flowing into the second compressor.
  • the operation of the first circuit, the operation of the second circuit, and the opening of the valve of the oil return passage may be performed simultaneously.
  • the refrigeration cycle device of the eighth aspect is any one of the refrigeration cycle devices of the first aspect to the seventh aspect, in which the first refrigerant includes R32, R454C, propane, R1234yf, R1234ze, or ammonia.
  • a first refrigerant containing R32, R454C, propane, R1234yf, R1234ze or ammonia circulates in the first circuit, allowing efficient heat exchange with the carbon dioxide refrigerant in the cascade heat exchanger.
  • FIG. 1 is a schematic diagram of a refrigeration cycle device.
  • FIG. 2 is a schematic functional block diagram of the refrigeration cycle device.
  • FIG. 4 is a diagram showing the operation (flow of refrigerant) of the refrigeration cycle device in a full cooling operation.
  • FIG. 4 is a diagram showing the operation (flow of refrigerant) in a full heating operation of the refrigeration cycle device.
  • FIG. 4 is a diagram showing the operation (flow of refrigerant) of the refrigeration cycle device in cooling-dominated operation.
  • FIG. 4 is a diagram showing the operation (flow of refrigerant) in a heating-dominated operation of the refrigeration cycle device.
  • FIG. 4 is a diagram showing a control flow at the start of a full heating operation and a heating main operation of the refrigeration cycle device.
  • FIG. 13 is a diagram showing a control flow at the start of a full heating operation and a heating main operation of a refrigeration cycle device of a modified example.
  • FIG. 13 is a diagram showing a control flow at the start of a full heating operation and a heating main operation of a refrigeration cycle device of a modified example.
  • FIG. 13 is a diagram showing a control flow at the start of a full heating operation and a heating main operation of a refrigeration cycle device of a modified example.
  • FIG. 13 is a diagram showing a control flow at the start of a full heating operation and a heating main operation of a refrigeration cycle device of a modified example.
  • a refrigeration cycle device 1 shown in Figs. 1 and 2 is used for cooling and heating the inside of a building or the like by performing a vapor compression refrigeration cycle operation.
  • the refrigeration cycle device 1 has a first circuit (primary side circuit) 5a, a second circuit (secondary side circuit) 10, and a cascade heat exchanger 35.
  • the refrigeration cycle device 1 of this embodiment has a binary refrigerant circuit consisting of a vapor compression type first circuit 5a and a vapor compression type second circuit 10, and performs a binary refrigeration cycle.
  • the first circuit 5a circulates a first refrigerant and a first refrigeration oil.
  • the first refrigerant includes, for example, at least one of an HFC refrigerant and an HFO refrigerant.
  • the first refrigerant is R32.
  • the first refrigeration oil is, for example, polyvinyl ether oil.
  • the second circuit 10 circulates carbon dioxide refrigerant and a second refrigeration oil.
  • the second refrigeration oil is, for example, incompatible with carbon dioxide.
  • the second refrigeration oil is polyalkylene glycol oil.
  • the first circuit 5a and the second circuit 10 are thermally connected via a cascade heat exchanger 35.
  • the refrigeration cycle device 1 is configured by connecting a first unit 5, a cascade unit 2, and second units 4a, 4b, and 4c to each other via piping.
  • the first unit 5 and the cascade unit 2 are connected by a first connecting pipe 112 and a second connecting pipe 111.
  • the cascade unit 2 and the multiple branch units 6a, 6b, and 6c are connected by three connecting pipes: a third connecting pipe 7, a fourth connecting pipe 8, and a fifth connecting pipe 9.
  • the multiple branch units 6a, 6b, and 6c are connected to the multiple utilization units 3a, 3b, and 3c by first connecting pipes 15a, 15b, and 15c and second connecting pipes 16a, 16b, and 16c.
  • first unit 5 there is one cascade unit 2.
  • second units 4a, 4b, 4c there are three second units 4a, 4b, 4c.
  • the second units 4a, 4b, 4c include branching units 6a, 6b, 6c and usage units 3a, 3b, 3c.
  • the multiple usage units 3a, 3b, 3c of the second units 4a, 4b, 4c are three units, namely, the first usage unit 3a, the second usage unit 3b, and the third usage unit 3c.
  • the multiple branching units 6a, 6b, 6c of the second units 4a, 4b, 4c are three units, namely, the first branching unit 6a, the second branching unit 6b, and the third branching unit 6c.
  • the refrigeration cycle device 1 is configured so that each utilization unit 3a, 3b, 3c can individually perform cooling or heating operation, and can recover heat between utilization units by sending refrigerant from a utilization unit performing heating operation to a utilization unit performing cooling operation. Specifically, in this embodiment, heat recovery is performed by performing cooling-dominated operation or heating-dominated operation, which simultaneously performs cooling operation and heating operation.
  • the refrigeration cycle device 1 is also configured to balance the heat load of the cascade unit 2 according to the overall heat load of the multiple utilization units 3a, 3b, 3c, which also takes into account the above-mentioned heat recovery (cooling-dominated operation or heating-dominated operation).
  • the first circuit 5a includes a first compressor 71, a first switching mechanism 72, a first heat exchanger 74, a first expansion valve 76, a first subcooling heat exchanger 103, a first subcooling circuit 104, a first subcooling expansion valve 104a, a second shutoff valve 108, a second expansion valve 102, a cascade heat exchanger 35 shared with the second circuit 10, a first shutoff valve 109, and a first accumulator 105.
  • the first circuit 5a also includes a first flow path 35b of the cascade heat exchanger 35.
  • the first compressor 71 is a device for compressing the first refrigerant, and is, for example, a volumetric compressor such as a scroll type whose operating capacity can be varied by inverter controlling the compressor motor 71a.
  • the first accumulator 105 is provided midway through the intake passage that connects the first switching mechanism 72 and the intake side of the first compressor 71.
  • the first switching mechanism 72 When the cascade heat exchanger 35 functions as an evaporator of the first refrigerant, the first switching mechanism 72 is in a fourth connection state connecting the suction side of the first compressor 71 and the gas side of the first flow path 35b of the cascade heat exchanger 35 (see the solid line of the first switching mechanism 72 in FIG. 1). When the cascade heat exchanger 35 functions as a radiator of the first refrigerant, the first switching mechanism 72 is in a fifth connection state connecting the discharge side of the first compressor 71 and the gas side of the first flow path 35b of the cascade heat exchanger 35 (see the dashed line of the first switching mechanism 72 in FIG. 1).
  • the first switching mechanism 72 is a device that can switch the flow path of the refrigerant in the first circuit 5a, and is, for example, a four-way switching valve. And, by changing the switching state of the first switching mechanism 72, it is possible to make the cascade heat exchanger 35 function as an evaporator or a radiator of the first refrigerant.
  • the cascade heat exchanger 35 is a device for performing heat exchange between the first refrigerant, such as R32, and the carbon dioxide refrigerant without mixing them.
  • the cascade heat exchanger 35 is, for example, a plate-type heat exchanger.
  • the cascade heat exchanger 35 has a second flow path 35a belonging to the second circuit 10 and a first flow path 35b belonging to the first circuit 5a.
  • the second flow path 35a has a gas side connected to the second switching mechanism 22 via the third heat source piping 25, and a liquid side connected to the heat source side expansion valve 36 via the fourth heat source piping 26.
  • the first flow path 35b has a gas side connected to the first compressor 71 via the first refrigerant piping 113, the first connection piping 112, the first shutoff valve 109, and the first switching mechanism 72, and a liquid side connected to the second refrigerant piping 114 in which the second expansion valve 102 is provided.
  • the first heat exchanger 74 is a device for exchanging heat between the first refrigerant and the outdoor air.
  • the first refrigerant obtains cold or hot heat from the outdoor air, which serves as a heat source.
  • the gas side of the first heat exchanger 74 is connected to a pipe extending from the first switching mechanism 72.
  • the first heat exchanger 74 is, for example, a fin-and-tube type heat exchanger made up of a large number of heat transfer tubes and fins.
  • the first expansion valve 76 is provided in a pipe extending from the liquid side of the first heat exchanger 74 to the first subcooling heat exchanger 103.
  • the first expansion valve 76 is an electrically operated expansion valve with adjustable opening that adjusts the flow rate of the first refrigerant flowing through the liquid side of the first circuit 5a.
  • the first subcooling circuit 104 branches off between the first expansion valve 76 and the first subcooling heat exchanger 103, and is connected to a portion of the intake passage between the first switching mechanism 72 and the first accumulator 105.
  • the first subcooling expansion valve 104a is provided upstream of the first subcooling heat exchanger 103 in the first subcooling circuit 104, and is an electrically operated expansion valve with adjustable opening that adjusts the flow rate of the first refrigerant, etc.
  • the first subcooling heat exchanger 103 is a heat exchanger that exchanges heat between the refrigerant flowing from the first expansion valve 76 toward the second shutoff valve 108 and the refrigerant that has been depressurized in the first subcooling expansion valve 104a in the first subcooling circuit 104.
  • the first connecting pipe 112 is a pipe that connects the first unit 5 and the cascade unit 2.
  • the second connecting pipe 111 is a pipe that connects the first unit 5 and the cascade unit 2.
  • the second expansion valve 102 is provided in the second refrigerant pipe 114.
  • the second expansion valve 102 is an electrically operated expansion valve with adjustable opening that adjusts the flow rate of the first refrigerant flowing through the first flow path 35b of the cascade heat exchanger 35, etc.
  • the first shutoff valve 109 is provided between the first connecting pipe 112 and the first switching mechanism 72.
  • the second shutoff valve 108 is provided between the second connecting pipe 111 and the first subcooling heat exchanger 103.
  • the second circuit 10 is configured by connecting a plurality of utilization units 3a, 3b, 3c, a plurality of branch units 6a, 6b, 6c, and a cascade unit 2 to each other.
  • Each utilization unit 3a, 3b, 3c is connected to the corresponding branch unit 6a, 6b, 6c in a one-to-one relationship.
  • each branch unit 6a, 6b, 6c is connected to the cascade unit 2 via three connection pipes, that is, a third connection pipe 7, a fourth connection pipe 8, and a fifth connection pipe 9.
  • a third connection pipe 7, a fourth connection pipe 8, and a fifth connection pipe 9 extending from the cascade unit 2 each branch into a plurality of pipes, which are connected to the respective branch units 6a, 6b, and 6c.
  • the third connecting pipe 7 carries either a gas-liquid two-phase refrigerant or a liquid refrigerant depending on the operating state.
  • the fourth connecting pipe 8 carries either a gas-liquid refrigerant or a supercritical refrigerant depending on the operating state.
  • the fifth connecting pipe 9 carries either a gas-liquid two-phase refrigerant or a gas-liquid refrigerant depending on the operating state.
  • the second circuit 10 is configured by interconnecting a heat source circuit 12, branch circuits 14a, 14b, and 14c, and utilization circuits 13a, 13b, and 13c.
  • the heat source circuit 12 mainly includes a second compressor 21, a second switching mechanism 22, a first heat source piping 28, a second heat source piping 29, an intake passage 23, a discharge passage 24, a third heat source piping 25, a fourth heat source piping 26, a fifth heat source piping 27, a cascade heat exchanger 35, a heat source side expansion valve 36, a third shut-off valve 32, a fourth shut-off valve 33, a fifth shut-off valve 31, a second accumulator 30, an oil separator 34, an oil return circuit 40, a second receiver 45, a bypass circuit 46, a bypass expansion valve 46a, a second subcooling heat exchanger 47, a second subcooling circuit 48, a second subcooling expansion valve 48a, an oil return passage 23b, and an oil return valve 23c.
  • the heat source circuit 12 of the second circuit 10 has a second flow path 35 a of the cascade heat exchanger 35 .
  • the second compressor 21 is a device for compressing the carbon dioxide refrigerant in the heat source circuit 12 of the second circuit, and is, for example, a scroll type or other volumetric compressor whose operating capacity can be varied by inverter controlling the compressor motor 21a.
  • the second compressor 21 is controlled according to the load during operation so that the greater the load, the greater the operating capacity.
  • the second switching mechanism 22 is a mechanism capable of switching the connection state of the second circuit 10, in particular the flow path of the refrigerant in the heat source circuit 12.
  • the second switching mechanism 22 has a discharge side communication section 22x, a suction side communication section 22y, a first switching valve 22a, and a second switching valve 22b.
  • the discharge side communication section 22x is connected to the end of the discharge flow path 24 opposite the second compressor 21 side.
  • the suction side communication section 22y is connected to the end of the suction flow path 23 opposite the second compressor 21 side.
  • the first switching valve 22a and the second switching valve 22b are arranged in parallel with each other between the discharge flow path 24 and the suction flow path 23 of the second compressor 21.
  • the first switching valve 22a is connected to one end of the discharge side communication section 22x and one end of the suction side communication section 22y.
  • the second switching valve 22b is connected to the other end of the discharge side communication part 22x and the other end of the suction side communication part 22y.
  • the first switching valve 22a and the second switching valve 22b are both configured as four-way switching valves.
  • the first switching valve 22a and the second switching valve 22b each have four connection ports, namely, a first connection port, a second connection port, a third connection port, and a fourth connection port.
  • each fourth port is closed and is a connection port that is not connected to the flow path of the second circuit 10.
  • the first switching valve 22a has a first connection port connected to one end of the discharge side communication part 22x, a second connection port connected to the third heat source pipe 25 extending from the second flow path 35a of the cascade heat exchanger 35, and a third connection port connected to one end of the suction side communication part 22y.
  • the first switching valve 22a switches between a switching state in which the first connection port and the second connection port are connected, and the third connection port and the fourth connection port are connected, and a switching state in which the third connection port and the second connection port are connected, and the first connection port and the fourth connection port are connected.
  • the second switching valve 22b switches between a switching state in which the first connection port and the second connection port are connected, and the third connection port and the fourth connection port are connected, and a switching state in which the third connection port and the second connection port are connected, and the first connection port and the fourth connection port are connected.
  • the second switching mechanism 22 When the second switching mechanism 22 is to suppress the carbon dioxide refrigerant discharged from the second compressor 21 from being sent to the fourth connecting pipe 8 while the cascade heat exchanger 35 is functioning as a radiator for the carbon dioxide refrigerant, the second switching mechanism 22 is switched to a first connection state in which the discharge flow path 24 and the third heat source pipe 25 are connected by the first switching valve 22a and the first heat source pipe 28 and the suction flow path 23 are connected by the second switching valve 22b.
  • the first connection state of the second switching mechanism 22 is a connection state that is adopted during full cooling operation, which will be described later.
  • the second switching mechanism 22 is switched to a second connection state in which the discharge flow path 24 and the first heat source pipe 28 are connected by the second switching valve 22b and the third heat source pipe 25 and the suction flow path 23 are connected by the first switching valve 22a.
  • the second connection state of the second switching mechanism 22 is a connection state adopted during full heating operation and heating-dominated operation, which will be described later.
  • the second switching mechanism 22 is switched to a third connection state in which the discharge flow path 24 is connected to the third heat source pipe 25 by the first switching valve 22a and the discharge flow path 24 is connected to the first heat source pipe 28 by the second switching valve 22b.
  • the third connection state of the second switching mechanism 22 is a connection state adopted during cooling-dominated operation, which will be described later.
  • the cascade heat exchanger 35 is a device for performing heat exchange between the first refrigerant, such as R32, flowing through the first circuit 5a and the carbon dioxide refrigerant flowing through the second circuit 10 without mixing them.
  • the cascade heat exchanger 35 is shared by the first unit 5 and the cascade unit 2 by having a second flow path 35a through which the carbon dioxide refrigerant of the second circuit 10 flows and a first flow path 35b through which the first refrigerant of the first circuit 5a flows.
  • the cascade heat exchanger 35 is disposed inside the cascade casing of the cascade unit 2.
  • the gas side of the first flow path 35b of the cascade heat exchanger 35 extends through the first refrigerant piping 113 to the first connection piping 112 outside the cascade casing.
  • the liquid side of the first flow path 35b of the cascade heat exchanger 35 passes through a second refrigerant pipe 114 in which a second expansion valve 102 is provided, and extends to a second connection pipe 111 outside the cascade casing.
  • the heat source side expansion valve 36 is an electrically operated expansion valve with adjustable opening that is connected to the liquid side of the cascade heat exchanger 35 to adjust the flow rate of the carbon dioxide refrigerant flowing through the cascade heat exchanger 35.
  • the heat source side expansion valve 36 is provided in the fourth heat source piping 26.
  • the third shut-off valve 32, the fourth shut-off valve 33, and the fifth shut-off valve 31 are valves provided at the connection ports to external equipment and piping (specifically, the connecting piping 7, 8, and 9). Specifically, the third shut-off valve 32 is connected to the fourth connecting piping 8 that is drawn out from the cascade unit 2. The fourth shut-off valve 33 is connected to the fifth connecting piping 9 that is drawn out from the cascade unit 2. The fifth shut-off valve 31 is connected to the third connecting piping 7 that is drawn out from the cascade unit 2.
  • the first heat source pipe 28 is a refrigerant pipe that connects the third shutoff valve 32 and the second switching mechanism 22. Specifically, the first heat source pipe 28 connects the third shutoff valve 32 and the second connection port of the second switching valve 22b of the second switching mechanism 22.
  • the intake passage 23 is a passage that connects the second switching mechanism 22 and the intake side of the second compressor 21. Specifically, the intake passage 23 connects the intake side connection part 22y of the second switching mechanism 22 and the intake side of the second compressor 21.
  • a second accumulator 30 is provided in the middle of the intake passage 23.
  • the intake passage 23 includes an intake pipe 23a.
  • the intake pipe 23a connects the intake side of the second compressor 21 to the second accumulator 30.
  • one end of the intake pipe 23a is connected to the intake side of the second compressor 21, and the other end of the intake pipe 23a is connected to the upper part of the second accumulator 30.
  • the second heat source pipe 29 is a refrigerant pipe that connects the fourth shutoff valve 33 to the middle of the suction passage 23.
  • the second heat source pipe 29 is connected to the suction passage 23 at a connection point between the suction side communication part 22y of the second switching mechanism 22 and the second accumulator 30.
  • the discharge flow path 24 is a refrigerant pipe that connects the discharge side of the second compressor 21 to the second switching mechanism 22. Specifically, the discharge flow path 24 connects the discharge side of the second compressor 21 to the discharge side communication section 22x of the second switching mechanism 22.
  • the third heat source pipe 25 is a refrigerant pipe that connects the second switching mechanism 22 and the gas side of the cascade heat exchanger 35. Specifically, the third heat source pipe 25 connects the second connection port of the first switching valve 22a of the second switching mechanism 22 and the gas side end of the second flow path 35a in the cascade heat exchanger 35.
  • the fourth heat source pipe 26 is a refrigerant pipe that connects the liquid side (the side opposite the gas side, the side opposite the side where the second switching mechanism 22 is provided) of the cascade heat exchanger 35 to the second receiver 45. Specifically, the fourth heat source pipe 26 connects the liquid side end (the end opposite the gas side) of the second flow path 35a in the cascade heat exchanger 35 to the second receiver 45.
  • the second receiver 45 stores the carbon dioxide refrigerant.
  • the second receiver 45 is provided between the liquid side of the cascade heat exchanger 35 and the second heat exchangers 52a, 52b, and 52c.
  • the fourth heat source pipe 26, the fifth heat source pipe 27, and the bypass circuit 46 extend from the second receiver 45.
  • the bypass circuit 46 connects the second heat exchangers 52a, 52b, 52c and the cascade heat exchanger 35 with the suction pipe 23a, which will be described later.
  • the bypass circuit 46 is a refrigerant pipe that connects the gas phase region, which is the upper region inside the second receiver 45, with the suction passage 23.
  • the bypass circuit 46 is connected in the suction passage 23 between the second switching mechanism 22 and the second accumulator 30.
  • the bypass circuit 46 is provided with a bypass expansion valve 46a.
  • the bypass expansion valve 46a is an electric expansion valve that can adjust the amount of refrigerant guided from the second receiver 45 to the suction side of the second compressor 21 by adjusting the opening degree.
  • the fifth heat source pipe 27 is a refrigerant pipe that connects the second receiver 45 and the fifth shutoff valve 31.
  • the second supercooling circuit 48 is a refrigerant pipe that connects a part of the fifth heat source pipe 27 to the intake passage 23. Specifically, the second supercooling circuit 48 is connected to the intake passage 23 between the second switching mechanism 22 and the second accumulator 30. In this embodiment, the second supercooling circuit 48 extends so as to branch off from between the second receiver 45 and the second supercooling heat exchanger 47.
  • the second supercooling heat exchanger 47 is a heat exchanger that performs heat exchange between refrigerant flowing through a flow path belonging to the fifth heat source piping 27 and refrigerant flowing through a flow path belonging to the second supercooling circuit 48. In this embodiment, it is provided between the fifth heat source piping 27, where the second supercooling circuit 48 branches off, and the fifth shut-off valve 31.
  • the second supercooling expansion valve 48a is provided between the branching point of the second supercooling circuit 48 from the fifth heat source piping 27, and the second supercooling heat exchanger 47.
  • the second supercooling expansion valve 48a supplies decompressed refrigerant to the second supercooling heat exchanger 47, and is an electrically-operated expansion valve with an adjustable opening.
  • the second accumulator 30 is provided on the suction side of the second compressor 21.
  • the second accumulator 30 is a container that stores carbon dioxide refrigerant and second refrigeration oil.
  • the second accumulator 30 is a gas-liquid separator that separates the inflowing fluid into a liquid phase and a gas phase. Extending from the second accumulator 30 are the suction pipe 23a, the oil return passage 23b described below, and a portion of the suction flow passage 23 that is connected to the second switching mechanism 22.
  • the second accumulator 30 includes a main body 30a, an inlet 30b, a refrigerant outlet 30c, and an oil outlet 30d.
  • the main body 30a has a shape that can be sealed.
  • the main body 30a is not particularly limited, but may be, for example, cylindrical or U-shaped.
  • the inlet 30b allows the mixture of carbon dioxide refrigerant and the second refrigeration oil to flow into the main body 30a.
  • the inlet 30b allows the carbon dioxide refrigerant to flow into the main body 30a from the portion of the intake passage 23 that is connected to the second switching mechanism 22.
  • the inlet 30b is provided at the top of the main body 30a.
  • the refrigerant outlet 30c discharges the carbon dioxide refrigerant stored in the main body 30a.
  • the refrigerant outlet 30c is provided at the top of the main body 30a.
  • the refrigerant outlet 30c returns the carbon dioxide refrigerant to the suction pipe 23a.
  • the oil outlet 30d discharges the refrigerant oil stored in the main body 30a.
  • the oil outlet 30d is provided at the bottom of the main body 30a.
  • the oil outlet 30d sends the second refrigerant oil to the oil return passage 23b.
  • the oil return passage 23b is provided to connect the lower part of the second accumulator 30 to the suction pipe 23a.
  • the oil return passage 23b returns the second refrigeration oil from the lower part of the second accumulator 30 to the suction pipe 23a.
  • the "lower part of the second accumulator 30" is the bottom surface of the main body 30a serving as a container.
  • one end of the oil return passage 23b is connected to the bottom surface of the main body 30a of the second accumulator 30.
  • the bottom surface of the main body 30a may have a structure that is curved downward, a structure that is curved upward, a flat structure, etc.
  • An oil return valve 23c is provided in the oil return passage 23b. By controlling the oil return valve 23c to an open state, the second refrigeration oil separated in the second accumulator 30 passes through the oil return passage 23b and then through the suction pipe 23a, and is returned to the suction side of the second compressor 21.
  • the oil return valve 23c may be a solenoid valve that is controlled to open and close, or it may be an electrically operated valve whose opening degree is adjustable.
  • the oil return valve 23c is a solenoid valve that opens or closes the oil return passage 23b.
  • the oil separator 34 is provided midway along the discharge flow path 24.
  • the oil separator 34 is a device for separating the second refrigeration oil discharged from the second compressor 21 along with the carbon dioxide refrigerant from the carbon dioxide refrigerant and returning it to the second compressor 21.
  • the oil return circuit 40 is provided to connect the oil separator 34 and the intake passage 23.
  • the oil return circuit 40 has an oil return passage 41 that extends from the oil separator 34 to join the intake passage 23 between the second accumulator 30 and the intake side of the second compressor 21.
  • An oil return opening/closing valve 44 is provided in the middle of the oil return passage 41. By controlling the oil return opening/closing valve 44 to an open state, the second refrigeration oil separated in the oil separator 34 passes through the oil return passage 41 and is returned to the intake side of the second compressor 21.
  • the oil return opening/closing valve 44 when the second compressor 21 is in an operating state in the second circuit 10, the oil return opening/closing valve 44 repeatedly maintains an open state for a predetermined time and a closed state for a predetermined time, thereby controlling the return amount of the second refrigeration oil through the oil return circuit 40.
  • the oil return opening/closing valve 44 is an electromagnetic valve that is controlled to open and close, but it may be an electric expansion valve whose opening degree can be adjusted.
  • the heat source circuit 12 constituting the second circuit 10 further has a sensor that measures at least one of the temperature and pressure of the carbon dioxide refrigerant and the second refrigeration oil on the suction side of the second compressor 21.
  • a second suction temperature sensor 88 is provided as a sensor that measures the temperature of the carbon dioxide refrigerant and the second refrigeration oil on the suction side of the second compressor 21
  • a second suction pressure sensor 37 is provided as a sensor that measures the pressure of the carbon dioxide refrigerant and the second refrigeration oil on the suction side of the second compressor 21.
  • the utilization circuit 13a mainly includes a second heat exchanger 52a, a first utilization pipe 57a, a second utilization pipe 56a, and a utilization side expansion valve 51a.
  • the second heat exchanger 52a is a device for exchanging heat between the refrigerant and the indoor air, and is, for example, a fin-and-tube type heat exchanger composed of a large number of heat transfer tubes and fins.
  • the multiple second heat exchangers 52a, 52b, and 52c are connected in parallel to the second switching mechanism 22, the intake passage 23, and the cascade heat exchanger 35.
  • One end of the second utilization pipe 56a is connected to the liquid side (opposite the gas side) of the second heat exchanger 52a of the first utilization unit 3a.
  • the other end of the second utilization pipe 56a is connected to the second connection pipe 16a.
  • the above-mentioned utilization side expansion valve 51a is provided midway along the second utilization pipe 56a.
  • the utilization side expansion valve 51a is an electrically operated expansion valve with adjustable opening that adjusts the flow rate of the refrigerant flowing through the second heat exchanger 52a.
  • the utilization side expansion valve 51a is provided in the second utilization pipe 56a.
  • One end of the first utilization pipe 57a is connected to the gas side of the second heat exchanger 52a of the first utilization unit 3a.
  • the first utilization pipe 57a is connected to the side opposite the utilization side expansion valve 51a of the second heat exchanger 52a.
  • the other end of the first utilization pipe 57a is connected to the first connection pipe 15a.
  • branch circuits 14a, 14b, and 14c will be described below. However, since the branch circuits 14b and 14c have the same configuration as the branch circuit 14a, the explanation of each part of the branch circuits 14b and 14c will be omitted by adding the suffix "b" or "c" instead of the suffix "a" to the reference numerals indicating each part of the branch circuit 14a.
  • the branch circuit 14a mainly includes a junction pipe 62a, a first branch pipe 63a, a second branch pipe 64a, a first control valve 66a, a second control valve 67a, a bypass pipe 69a, a check valve 68a, and a third branch pipe 61a.
  • junction pipe 62a One end of the junction pipe 62a is connected to the first connection pipe 15a.
  • the other end of the junction pipe 62a is connected to a first branch pipe 63a and a second branch pipe 64a.
  • the first branch pipe 63a is connected to the fourth connection pipe 8 on the side opposite the junction pipe 62a.
  • the first branch pipe 63a is provided with a first control valve 66a that can be opened and closed.
  • the second branch pipe 64a is connected to the fifth connecting pipe 9 on the side opposite the junction pipe 62a.
  • the second branch pipe 64a is provided with a second control valve 67a that can be opened and closed.
  • the bypass pipe 69a is a refrigerant pipe that connects the portion of the first branch pipe 63a that is closer to the fourth connecting pipe 8 than the first control valve 66a and the portion of the second branch pipe 64a that is closer to the fifth connecting pipe 9 than the second control valve 67a.
  • a check valve 68a is provided midway along this bypass pipe 69a. The check valve 68a only allows refrigerant to flow from the second branch pipe 64a side to the first branch pipe 63a side, and does not allow refrigerant to flow from the first branch pipe 63a side to the second branch pipe 64a side.
  • the third branch pipe 61a has one end connected to the second connection pipe 16a. The other end of the third branch pipe 61a is connected to the third connection pipe 7.
  • the first branch unit 6a can function as follows when performing the full cooling operation described below by closing the first control valve 66a and opening the second control valve 67a.
  • the first branch unit 6a sends the refrigerant flowing into the third branch pipe 61a through the third connection pipe 7 to the second connection pipe 16a.
  • the refrigerant flowing through the second usage pipe 56a of the first usage unit 3a through the second connection pipe 16a is sent to the second heat exchanger 52a of the first usage unit 3a through the usage side expansion valve 51a.
  • the refrigerant sent to the second heat exchanger 52a evaporates through heat exchange with the indoor air, and then flows through the first connection pipe 15a via the first usage pipe 57a.
  • the refrigerant that has flowed through the first connection pipe 15a is sent to the junction pipe 62a of the first branch unit 6a.
  • the refrigerant that has flowed through the junction pipe 62a does not flow to the first branch pipe 63a side, but flows to the second branch pipe 64a side.
  • the refrigerant flowing through the second branch pipe 64a passes through the second control valve 67a.
  • a portion of the refrigerant that has passed through the second control valve 67a is sent to the fifth connection pipe 9.
  • the remainder of the refrigerant that has passed through the second control valve 67a flows to branch off into a bypass pipe 69a provided with a check valve 68a, passes through a portion of the first branch pipe 63a, and is then sent to the fourth connection pipe 8. This allows the total flow cross-sectional area to be increased when the carbon dioxide refrigerant in a gaseous state evaporated in the second heat exchanger 52a is sent to the second compressor 21, thereby reducing pressure loss.
  • the first branch unit 6a can function as follows when cooling the room in the first utilization unit 3a by closing the first control valve 66a and opening the second control valve 67a.
  • the first branch unit 6a sends the refrigerant flowing into the third branch pipe 61a through the third communication pipe 7 to the second connection pipe 16a.
  • the refrigerant flowing through the second utilization pipe 56a of the first utilization unit 3a through the second connection pipe 16a is sent to the second heat exchanger 52a of the first utilization unit 3a through the utilization side expansion valve 51a.
  • the refrigerant sent to the second heat exchanger 52a evaporates through heat exchange with the indoor air, and then flows through the first connection pipe 15a via the first utilization pipe 57a.
  • the refrigerant that has flowed through the first connection pipe 15a is sent to the junction pipe 62a of the first branch unit 6a.
  • the refrigerant that flows through the junction pipe 62a flows into the second branch pipe 64a, passes through the second control valve 67a, and is then sent to the fifth connection pipe 9.
  • the first branch unit 6a can function as follows by closing the second control valve 67a and opening the first control valve 66a.
  • the refrigerant flowing into the first branch pipe 63a through the fourth connection pipe 8 passes through the first control valve 66a and is sent to the junction pipe 62a.
  • the refrigerant that has flowed through the junction pipe 62a flows through the first utilization pipe 57a of the utilization unit 3a via the first connection pipe 15a and is sent to the second heat exchanger 52a.
  • the refrigerant sent to the second heat exchanger 52a dissipates heat by heat exchange with the indoor air, and then passes through the utilization side expansion valve 51a provided in the second utilization pipe 56a.
  • the refrigerant that has passed through the second utilization pipe 56a flows through the third branch pipe 61a of the first branch unit 6a via the second connection pipe 16a, and is then sent to the third connection pipe 7.
  • the first branch unit 6a can function as follows by closing the second control valve 67a and opening the first control valve 66a.
  • the refrigerant flowing into the first branch pipe 63a through the fourth connection pipe 8 passes through the first control valve 66a and is sent to the junction pipe 62a.
  • the refrigerant that has flowed through the junction pipe 62a flows through the first utilization pipe 57a of the utilization unit 3a via the first connection pipe 15a and is sent to the second heat exchanger 52a.
  • the refrigerant sent to the second heat exchanger 52a dissipates heat by heat exchange with the indoor air, and then passes through the utilization side expansion valve 51a provided in the second utilization pipe 56a.
  • the refrigerant that passes through the second utilization pipe 56a flows through the third branch pipe 61a of the first branch unit 6a via the second connection pipe 16a, and is then sent to the third connection pipe 7.
  • first branching unit 6a is not only possessed by the first branching unit 6a, but also by the second branching unit 6b and the third branching unit 6c. Therefore, the first branching unit 6a, the second branching unit 6b and the third branching unit 6c are capable of individually switching between functioning as a refrigerant evaporator or a refrigerant radiator for each of the second heat exchangers 52a, 52b and 52c.
  • the first unit 5 is arranged in a space different from the space in which the second units 4a, 4b, and 4c (specifically, the utilization units 3a, 3b, and 3c and the branching units 6a, 6b, and 6c) are arranged.
  • the first unit 5 is arranged on the rooftop of a building.
  • the first unit 5 is configured to include a portion of the first circuit 5a described above, a first fan 75, various sensors, and a first control unit 70, all housed within a first casing (not shown).
  • the first unit 5 has, as part of the first circuit 5a, a first compressor 71, a first switching mechanism 72, a first heat exchanger 74, a first expansion valve 76, a first subcooling heat exchanger 103, a first subcooling circuit 104, a first subcooling expansion valve 104a, a second shutoff valve 108, a first shutoff valve 109, and a first accumulator 105.
  • the first fan 75 is provided in the first unit 5 and generates an air flow in which the outdoor air is guided to the first heat exchanger 74, where it exchanges heat with the first refrigerant flowing through the first heat exchanger 74, and then discharged outside.
  • the first fan 75 is driven by a first fan motor 75a.
  • the first unit 5 is provided with various sensors. Specifically, the first unit 5 is provided with an outside air temperature sensor 77, a first discharge pressure sensor 78, a first suction pressure sensor 79, a first suction temperature sensor 81, and a first heat exchange temperature sensor 82.
  • the outside air temperature sensor 77 detects the temperature of the outside air before passing through the first heat exchanger 74.
  • the first discharge pressure sensor 78 detects the pressure of the first refrigerant discharged from the first compressor 71.
  • the first suction pressure sensor 79 detects the pressure of the first refrigerant sucked into the first compressor 71.
  • the first suction temperature sensor 81 detects the temperature of the first refrigerant sucked into the first compressor 71.
  • the first heat exchange temperature sensor 82 detects the temperature of the refrigerant flowing through the first heat exchanger 74.
  • the first control unit 70 controls the operation of each of the components 71 (71a), 72, 75 (75a), 76, and 104a provided within the first unit 5.
  • the first control unit 70 has a processor and memory, such as a CPU or microcomputer, provided to control the first unit 5, and is capable of exchanging control signals and the like with a remote control (not shown), as well as with the heat source side control unit 20 of the cascade unit 2, the branch unit control units 60a, 60b, and 60c, and the user side control units 50a, 50b, and 50c.
  • the cascade unit 2 is arranged in a space different from the space in which the second units 4a, 4b, and 4c (specifically, the utilization units 3a, 3b, and 3c and the branching units 6a, 6b, and 6c) are arranged.
  • the cascade unit 2 is arranged on the rooftop of a building.
  • the cascade unit 2 is connected to the branch units 6a, 6b, and 6c via the connecting pipes 7, 8, and 9, and constitutes part of the second circuit 10.
  • the cascade unit 2 is also connected to the first unit 5 via the connecting pipes 111 and 112, and constitutes part of the first circuit 5a.
  • the cascade unit 2 is configured to have the above-mentioned heat source circuit 12, various sensors, the heat source side control unit 20, and the second expansion valve 102, first refrigerant pipe 113, and second refrigerant pipe 114 that constitute part of the first circuit 5a, all housed within a cascade casing (not shown).
  • the cascade unit 2 is provided with various sensors. Specifically, the cascade unit 2 is provided with the second suction pressure sensor 37, the second discharge pressure sensor 38, the second discharge temperature sensor 39, the second suction temperature sensor 88, the cascade temperature sensor 83, the receiver outlet temperature sensor 84, the bypass circuit temperature sensor 85, the subcooling outlet temperature sensor 86, and the subcooling circuit temperature sensor 87.
  • the second suction pressure sensor 37 detects the pressure of the carbon dioxide refrigerant on the suction side of the second compressor 21.
  • the second discharge pressure sensor 38 detects the pressure of the carbon dioxide refrigerant on the discharge side of the second compressor 21.
  • the second discharge temperature sensor 39 detects the temperature of the carbon dioxide refrigerant on the discharge side of the second compressor 21.
  • the second suction temperature sensor 88 detects the temperature of the carbon dioxide refrigerant on the suction side of the second compressor 21.
  • the cascade temperature sensor 83 detects the temperature of the carbon dioxide refrigerant flowing between the second flow path 35a of the cascade heat exchanger 35 and the heat source side expansion valve 36.
  • the receiver outlet temperature sensor 84 detects the temperature of the carbon dioxide refrigerant flowing between the second receiver 45 and the second subcooling heat exchanger 47.
  • the bypass circuit temperature sensor 85 detects the temperature of the carbon dioxide refrigerant flowing downstream of the bypass expansion valve 46a in the bypass circuit 46.
  • the subcooling outlet temperature sensor 86 detects the temperature of the carbon dioxide refrigerant flowing between the second subcooling heat exchanger 47 and the fifth stop valve 31.
  • the subcooling circuit temperature sensor 87 detects the temperature of the carbon dioxide refrigerant flowing at the outlet of the second subcooling heat exchanger 47 in the second subcooling circuit 48.
  • the heat source side control unit 20 controls the operation of each of the members 21 (21a), 22, 23c, 36, 44, 46a, 48a, 102 provided inside the cascade casing (not shown) of the cascade unit 2.
  • the heat source side control unit 20 has a processor such as a CPU or a microcomputer and memory provided to control the cascade unit 2, and is capable of exchanging control signals and the like with the first control unit 70 of the first unit 5, the utilization side control units 50a, 50b, 50c of the utilization units 3a, 3b, 3c, and the branch unit control units 60a, 60b, 60c.
  • the heat source side control unit 20 can control not only the components constituting the heat source circuit 12 of the second circuit 10, but also the second expansion valve 102 constituting part of the first circuit 5a. Therefore, the heat source side control unit 20 can control the valve opening degree of the second expansion valve 102 itself based on the status of the heat source circuit 12 that it controls, thereby making it possible to bring the status of the heat source circuit 12 closer to a desired status. Specifically, it becomes possible to control the amount of heat that the carbon dioxide refrigerant flowing through the second flow path 35a of the cascade heat exchanger 35 in the heat source circuit 12 receives from the first refrigerant flowing through the first flow path 35b of the cascade heat exchanger 35 or the amount of heat that it gives to the first refrigerant.
  • the second units 4a, 4b, and 4c include utilization units 3a, 3b, and 3c, branching units 6a, 6b, and 6c, first connecting pipes 15a, 15b, and 15c, and second connecting pipes 16a, 16b, and 16c.
  • the utilization units 3a, 3b, and 3c are installed in a room of a building or the like by being embedded in or suspended from the ceiling, or by being hung on a wall surface of the room.
  • the utilization units 3a, 3b, and 3c are connected to the cascade unit 2 via connecting pipes 7, 8, and 9.
  • the utilization units 3a, 3b, and 3c have utilization circuits 13a, 13b, and 13c that form part of the second circuit 10.
  • the configuration of the usage units 3a, 3b, and 3c will be described below. Note that the second usage unit 3b and the third usage unit 3c have the same configuration as the first usage unit 3a, so only the configuration of the first usage unit 3a will be described here.
  • the suffix "b” or “c” will be added instead of the suffix "a" of the reference numerals indicating each part of the first usage unit 3a, and the description of each part will be omitted.
  • the first usage unit 3a mainly includes the above-mentioned usage circuit 13a, a second fan 53a, a usage-side control unit 50a, and various sensors.
  • the second fan 53a includes a second fan motor 54a.
  • the second fan 53a draws indoor air into the utilization unit 3a, exchanges heat with the refrigerant flowing through the second heat exchanger 52a, and then generates an air flow that is supplied to the room as supply air.
  • the second fan 53a is driven by a second fan motor 54a.
  • the utilization unit 3a is provided with a liquid side temperature sensor 58a that detects the temperature of the refrigerant on the liquid side of the second heat exchanger 52a.
  • the utilization unit 3a is also provided with an indoor temperature sensor 55a that detects the indoor temperature, which is the temperature of the air taken in from inside the room before it passes through the second heat exchanger 52a.
  • the usage-side control unit 50a controls the operation of each of the components 51a, 53a (54a) that make up the usage unit 3a.
  • the usage-side control unit 50a has a processor and memory, such as a CPU or microcomputer, that are provided to control the usage unit 3a, and is capable of exchanging control signals with a remote control (not shown), as well as with the heat source-side control unit 20 of the cascade unit 2, the branch unit control units 60a, 60b, 60c, and the first control unit 70 of the first unit 5.
  • the second usage unit 3b has a usage circuit 13b, a second fan 53b, a usage side control unit 50b, and a second fan motor 54b.
  • the third usage unit 3c has a usage circuit 13c, a second fan 53c, a usage side control unit 50c, and a second fan motor 54c.
  • Branching Unit 6a, 6b, and 6c are installed in a space above the ceiling in a room of a building or the like.
  • the branching units 6a, 6b, and 6c are connected to the utilization units 3a, 3b, and 3c in a one-to-one correspondence.
  • the branching units 6a, 6b, and 6c are connected to the cascade unit 2 via the connection pipes 7, 8, and 9.
  • the configuration of the branching units 6a, 6b, and 6c will be described.
  • the second branching unit 6b and the third branching unit 6c have the same configuration as the first branching unit 6a, so only the configuration of the first branching unit 6a will be described here.
  • the suffix "b" or "c” will be added instead of the suffix "a" of the reference numerals indicating each part of the first branching unit 6a, and the description of each part will be omitted.
  • the first branching unit 6a mainly includes the above-mentioned branching circuit 14a and a branching unit control unit 60a.
  • the branching unit control section 60a controls the operation of each of the components 66a, 67a that make up the branching unit 6a.
  • the branching unit control section 60a has a processor, such as a CPU or a microcomputer, and memory that are provided to control the branching unit 6a, and is capable of exchanging control signals with a remote control (not shown), as well as with the heat source side control section 20 of the cascade unit 2, the utilization units 3a, 3b, 3c, and the first control section 70 of the first unit 5.
  • the second branching unit 6b has a branching circuit 14b and a branching unit control unit 60b.
  • the third branching unit 6c has a branching circuit 14c and a branching unit control unit 60c.
  • the heat source side control unit 20, the usage side control units 50a, 50b, and 50c, the branching unit control units 60a, 60b, and 60c, and the first control unit 70 are connected to each other via wired or wireless communication to configure a control unit 80. Therefore, this control unit 80 controls the operation of each member 21 (21a), 22, 23c, 36, 44, 46a, 48a, 51a, 51b, 51c, 53a, 53b, 53c (54a, 54b, 54c), 66a, 66b, 66c, 67a, 67b, 67c, 71 (71a), 72, 75 (75a), 76, 104a, etc.
  • control unit 80 switches between an operation in which the carbon dioxide refrigerant is heated by the first refrigerant in the cascade heat exchanger 35 (in this embodiment, full heating operation or heating-dominated operation) and an operation in which the carbon dioxide refrigerant is cooled by the first refrigerant (in this embodiment, full cooling operation or cooling-dominated operation).
  • the heat source side control unit 20 of the control unit 80 controls the second switching mechanism 22.
  • control unit 80 controls the second switching mechanism 22 to switch between a first state in which the cascade heat exchanger 35 functions as a radiator for the carbon dioxide refrigerant, and a second state in which the cascade heat exchanger 35 functions as an evaporator for the carbon dioxide refrigerant.
  • the control unit 80 performs start-up control to open the oil return valve 23c after starting to circulate the first refrigerant in the first circuit 5a. Specifically, when the control unit 80 receives a command for heating operation or heating-dominant operation from a remote control or the like, it starts the first compressor 71, circulates the first refrigerant in the first circuit 5a, and then performs control to increase the opening of the oil return valve 23c.
  • the density of the second refrigeration oil may be lower than that of the carbon dioxide refrigerant.
  • the second refrigeration oil is located above the carbon dioxide refrigerant in the second accumulator 30, which is an abnormal state.
  • the control unit 80 controls the oil return valve 23c to close, thereby preventing the carbon dioxide refrigerant from flowing out to the oil return passage 23b in which the oil return valve 23c is provided.
  • the control unit 80 controls the second refrigeration oil to be located below the carbon dioxide refrigerant in the second accumulator 30. In other words, the control unit 80 prevents the second refrigeration oil from reversing from below to above the carbon dioxide refrigerant in the second accumulator 30. Then, after the normal state is reached, the control unit 80 controls the oil return valve 23c to open, thereby causing the second refrigeration oil to flow out of the oil return valve 23c into the oil return passage 23b and preventing the carbon dioxide refrigerant from flowing out.
  • control unit 80 when starting full heating operation or heating-dominant operation, the control unit 80 first circulates the first refrigerant in the first circuit 5a, then circulates the carbon dioxide refrigerant in the second circuit 10, and then opens the oil return valve 23c.
  • control unit 80 starts circulating the first refrigerant in the first circuit 5a, and then starts circulating the carbon dioxide refrigerant in the second circuit 10.
  • control unit 80 circulates the first refrigerant in the first circuit 5a, and when the condensation temperature of the first refrigerant in the cascade heat exchanger 35 rises to a predetermined value or higher, starts the second compressor 21 and starts circulating the carbon dioxide refrigerant in the second circuit 10.
  • control unit 80 opens the oil return valve 23c after starting to circulate the carbon dioxide refrigerant in the second circuit 10.
  • the control unit 80 opens the oil return valve 23c when the temperature or pressure of the carbon dioxide refrigerant and the second refrigeration oil in the second accumulator 30 reaches or exceeds a predetermined temperature or a predetermined pressure that corresponds to the boundary temperature at which the density of the carbon dioxide refrigerant in the second accumulator 30 becomes equal to the density of the second refrigeration oil.
  • the "predetermined temperature or pressure” is a temperature or pressure equal to or higher than the boundary temperature, and preferably exceeds the boundary temperature.
  • the boundary temperature is -15°C when the second refrigeration oil is polyalkylene glycol.
  • the control unit 80 obtains the temperature or pressure of the carbon dioxide refrigerant and the second refrigeration oil flowing through the suction pipe 23a from a sensor that measures at least one of the temperature and pressure of the carbon dioxide refrigerant and the second refrigeration oil on the suction side of the second compressor 21.
  • the control unit 80 obtains the temperature or pressure of the carbon dioxide refrigerant and the second refrigeration oil flowing through the suction pipe 23a from at least one of the second suction temperature sensor 88 and the second suction pressure sensor 37.
  • the control unit 80 determines whether the obtained temperature or pressure is equal to or exceeds a predetermined temperature or pressure that corresponds to a boundary temperature at which the density of the carbon dioxide refrigerant and the density of the second refrigeration oil in the second accumulator 30 are equal to each other.
  • the control unit 80 performs start-up control when the outside air temperature is equal to or lower than a first temperature, and does not perform start-up control when the outside air temperature exceeds the first temperature.
  • the control unit 80 has a first temperature related to start-up control.
  • the first temperature is a temperature at which the density of the carbon dioxide refrigerant becomes higher than the density of the refrigeration oil due to the low temperature of the carbon dioxide refrigerant in the second accumulator 30.
  • the first temperature is, for example, -20°C.
  • the control unit 80 acquires the outside air temperature from the outside air temperature sensor 77 and determines whether the acquired outside air temperature is equal to or lower than the first temperature. If the control unit 80 determines that the outside air temperature is equal to or lower than the first temperature, it performs start-up control, and if it determines that the outside air temperature exceeds the first temperature, it does not perform start-up control.
  • the control unit 80 when the outside air temperature exceeds the first temperature, the control unit 80 simultaneously starts the operation of the first circuit 5a, the operation of the second circuit 10, and the opening operation of the oil return valve 23c.
  • "simultaneously" means, for example, that the control unit 80 issues a command to start the first compressor 71, a command to start the second compressor 21, and a command to open the oil return valve 23c at the same timing. Therefore, this includes a case where the circulation of the first refrigerant in the first circuit 5a, the circulation of the carbon dioxide refrigerant in the second circuit 10, and the opening operation of the oil return valve 23c start at exactly the same time, and a case where one of them starts slightly earlier.
  • the refrigeration cycle operation of the refrigeration cycle device 1 can be mainly divided into full cooling operation, full heating operation, cooling-dominated operation, and heating-dominated operation.
  • the full cooling operation is a refrigeration cycle operation in which only the utilization units in which the second heat exchangers 52a, 52b, and 52c function as evaporators for the carbon dioxide refrigerant are present, and the cascade heat exchanger 35 functions as a radiator for the carbon dioxide refrigerant for the evaporation load of the entire utilization units.
  • Cooling-dominated operation is an operation that mixes utilization units in which the second heat exchangers 52a, 52b, 52c function as evaporators of carbon dioxide refrigerant, and utilization units in which the second heat exchangers 52a, 52b, 52c function as radiators of the refrigerant.
  • Cooling-dominated operation is a refrigeration cycle operation in which, when the evaporative load is the main component of the heat load of the entire utilization units, the cascade heat exchanger 35 is made to function as a radiator of carbon dioxide refrigerant to process the evaporative load of the entire utilization units.
  • Heating-dominated operation is an operation that mixes utilization units in which the second heat exchangers 52a, 52b, 52c function as refrigerant evaporators and utilization units in which the second heat exchangers 52a, 52b, 52c function as refrigerant radiators.
  • Heating-dominated operation is a refrigeration cycle operation in which, when the heat radiation load is the main component of the overall heat load of the utilization units, the cascade heat exchanger 35 is made to function as an evaporator for carbon dioxide refrigerant to process the heat radiation load of the entire utilization units.
  • the operation of the refrigeration cycle device 1, including these refrigeration cycle operations, is performed by the control unit 80.
  • Cooling only operation for example, the second heat exchangers 52a, 52b, and 52c of the utilization units 3a, 3b, and 3c all function as evaporators of the refrigerant.
  • the cascade heat exchanger 35 functions as a radiator of the carbon dioxide refrigerant.
  • the first circuit 5a and the second circuit 10 of the refrigeration cycle device 1 are configured as shown in Figure 3. Note that the arrows attached to the first circuit 5a and the second circuit 10 in Figure 3 indicate the flow of the refrigerant during cooling only operation.
  • the first switching mechanism 72 is switched to the fourth connection state to cause the cascade heat exchanger 35 to function as an evaporator for the first refrigerant.
  • the fourth connection state of the first switching mechanism 72 is the connection state shown by the solid line in the first switching mechanism 72 in FIG. 3.
  • the first refrigerant that has dissipated heat in the first heat exchanger 74 passes through the first expansion valve 76 controlled to a fully open state, and a portion of the refrigerant flows toward the second stop valve 108 through the first supercooling heat exchanger 103, and the other portion of the refrigerant branches off and flows into the first supercooling circuit 104.
  • the refrigerant flowing through the first supercooling circuit 104 is decompressed when passing through the first supercooling expansion valve 104a.
  • the refrigerant flowing from the first expansion valve 76 toward the second shutoff valve 108 exchanges heat with the refrigerant decompressed by the first subcooling expansion valve 104a and flowing through the first subcooling circuit 104 in the first subcooling heat exchanger 103, and is cooled until it is in a subcooled state.
  • the first refrigerant in the subcooled state is decompressed when passing through the second expansion valve 102 through the second communication pipe 111.
  • the valve opening degree of the second expansion valve 102 is controlled so that the superheat degree of the first refrigerant sucked into the first compressor 71 satisfies a predetermined condition.
  • the first refrigerant decompressed by the second expansion valve 102 evaporates by heat exchange with the carbon dioxide refrigerant flowing through the second passage 35a when flowing through the first passage 35b of the cascade heat exchanger 35, and flows toward the first communication pipe 112.
  • This first refrigerant passes through the first communication pipe 112 and the first shutoff valve 109, and then reaches the first switching mechanism 72.
  • the refrigerant that passes through the first switching mechanism 72 merges with the refrigerant that flows through the first subcooling circuit 104, and is then sucked into the first compressor 71 via the first accumulator 105.
  • the second switching mechanism 22 is switched to the first connection state to cause the cascade heat exchanger 35 to function as a radiator for the carbon dioxide refrigerant.
  • the first switching valve 22a connects the discharge flow path 24 to the third heat source pipe 25, and the second switching valve 22b connects the first heat source pipe 28 to the suction flow path 23.
  • the opening degree of the heat source side expansion valve 36 is adjusted.
  • the second adjustment valves 67a, 67b, and 67c are controlled to the open state.
  • all of the second heat exchangers 52a, 52b, and 52c of the utilization units 3a, 3b, and 3c function as refrigerant evaporators.
  • all of the second heat exchangers 52a, 52b, 52c of the utilization units 3a, 3b, 3c and the suction side of the second compressor 21 of the cascade unit 2 are connected via the first utilization pipes 57a, 57b, 57c, the first connection pipes 15a, 15b, 15c, the junction pipes 62a, 62b, 62c, the second branch pipes 64a, 64b, 64c, the bypass pipes 69a, 69b, 69c, a part of the first branch pipes 63a, 63b, 63c, the fourth connection pipe 8 and the fifth connection pipe 9.
  • the second supercooling expansion valve 48a is controlled to an opening degree such that the degree of supercooling of the carbon dioxide refrigerant flowing from the outlet of the second supercooling heat exchanger 47 toward the third connection pipe 7 satisfies a predetermined condition.
  • the bypass expansion valve 46a is controlled to a closed state.
  • the opening degree of the utilization side expansion valves 51a, 51b, and 51c is adjusted.
  • the high-pressure carbon dioxide refrigerant compressed and discharged by the second compressor 21 is sent to the second flow path 35a of the cascade heat exchanger 35 through the first switching valve 22a of the second switching mechanism 22.
  • the high-pressure carbon dioxide refrigerant flowing through the second flow path 35a dissipates heat
  • the first refrigerant flowing through the first flow path 35b of the cascade heat exchanger 35 evaporates.
  • the carbon dioxide refrigerant that has dissipated heat in the cascade heat exchanger 35 passes through the heat source side expansion valve 36, the opening of which is adjusted, and then flows into the second receiver 45.
  • a portion of the carbon dioxide refrigerant flowing out of the second receiver 45 branches off and flows into the second supercooling circuit 48, where it is depressurized in the second supercooling expansion valve 48a, and then merges with the suction flow path 23.
  • the second subcooling heat exchanger 47 another portion of the refrigerant flowing out of the second receiver 45 is cooled by the refrigerant flowing through the second subcooling circuit 48, and then sent to the third connecting pipe 7 through the fifth shutoff valve 31.
  • the refrigerant sent to the third connection pipe 7 is branched into three and passes through the third branch pipes 61a, 61b, 61c of the first to third branch units 6a, 6b, 6c.
  • the refrigerant that flows through the second connection pipes 16a, 16b, 16c is then sent to the second utilization pipes 56a, 56b, 56c of the first to third utilization units 3a, 3b, 3c.
  • the refrigerant sent to the second utilization pipes 56a, 56b, 56c is sent to the utilization side expansion valves 51a, 51b, 51c of the utilization units 3a, 3b, 3c.
  • the carbon dioxide refrigerant that has passed through the utilization side expansion valves 51a, 51b, 51c, the opening of which has been adjusted exchanges heat with the indoor air supplied by the second fans 53a, 53b, 53c in the second heat exchangers 52a, 52b, 52c.
  • the carbon dioxide refrigerant flowing through the second heat exchangers 52a, 52b, 52c evaporates and becomes a low-pressure gas refrigerant.
  • the indoor air is cooled and supplied to the room. This cools the indoor space.
  • the low-pressure gas refrigerant that has evaporated in the second heat exchangers 52a, 52b, 52c flows through the first utilization pipes 57a, 57b, 57c, and the first connecting pipes 15a, 15b, 15c, and is then sent to the junction pipes 62a, 62b, 62c of the first to third branch units 6a, 6b, 6c.
  • the low-pressure gas refrigerant sent to the junction pipes 62a, 62b, 62c flows to the second branch pipes 64a, 64b, 64c.
  • a portion of the carbon dioxide refrigerant that has passed through the second control valves 67a, 67b, 67c in the second branch pipes 64a, 64b, 64c is sent to the fifth connection pipe 9.
  • the remaining refrigerant that has passed through the second control valves 67a, 67b, 67c passes through bypass pipes 69a, 69b, 69c, flows through a portion of the first branch pipes 63a, 63b, 63c, and is then sent to the fourth connection pipe 8.
  • the low-pressure gas refrigerant sent to the fourth connecting pipe 8 and the fifth connecting pipe 9 is returned to the suction side of the second compressor 21 via the third shutoff valve 32, the fourth shutoff valve 33, the first heat source pipe 28, the second heat source pipe 29, the second switching valve 22b of the second switching mechanism 22, the suction flow path 23, the second accumulator 30 and the suction pipe 23a.
  • the second refrigeration oil circulating through the second circuit 10 is returned from the bottom of the second accumulator 30 through the oil return passage 23b, the oil return valve 23c, and the suction pipe 23a to the suction side of the second compressor 21.
  • control unit 80 controls the opening degree of the oil return valve 23c based on the degree of superheat (discharge superheat) of the carbon dioxide refrigerant discharged from the second compressor 21 so that liquid refrigerant does not flow into the second compressor 21.
  • the second heat exchangers 52a, 52b, and 52c of the utilization units 3a, 3b, and 3c all function as radiators of the refrigerant.
  • the cascade heat exchanger 35 functions as an evaporator of the carbon dioxide refrigerant.
  • the first circuit 5a and the second circuit 10 of the refrigeration cycle apparatus 1 are configured as shown in Fig. 4.
  • the arrows attached to the first circuit 5a and the second circuit 10 in Fig. 4 indicate the flow of the refrigerant during the full heating operation.
  • the first switching mechanism 72 is switched to the fifth connection state to cause the cascade heat exchanger 35 to function as a radiator for the first refrigerant.
  • the fifth connection state of the first switching mechanism 72 is the connection state shown by the dashed line in the first switching mechanism 72 in FIG. 4.
  • the first refrigerant discharged from the first compressor 71 and passing through the first switching mechanism 72 passes further through the first connecting pipe 112 and is sent to the first flow path 35b of the cascade heat exchanger 35.
  • the refrigerant flowing through the first flow path 35b of the cascade heat exchanger 35 is condensed by heat exchange with the carbon dioxide refrigerant flowing through the second flow path 35a.
  • the first refrigerant condensed in the cascade heat exchanger 35 passes through the second expansion valve 102, which is controlled to a fully open state, as it flows through the second refrigerant pipe 114.
  • the refrigerant that has passed through the second expansion valve 102 flows through the second connecting pipe 111, the second closing valve 108, and the first subcooling heat exchanger 103 in that order, and is depressurized in the first expansion valve 76.
  • the first subcooling expansion valve 104a is controlled to a closed state, so that no refrigerant flows through the first subcooling circuit 104, and no heat exchange is performed in the first subcooling heat exchanger 103.
  • the first expansion valve 76 is controlled, for example, so that the degree of superheat of the first refrigerant sucked into the first compressor 71 satisfies a predetermined condition.
  • the refrigerant that has been depressurized in the first expansion valve 76 evaporates by exchanging heat with outside air supplied from the first fan 75 in the first heat exchanger 74, passes through the first switching mechanism 72 and the first accumulator 105, and is sucked into the first compressor 71.
  • the second switching mechanism 22 is switched to the second connection state.
  • This causes the cascade heat exchanger 35 to function as an evaporator for the carbon dioxide refrigerant.
  • the discharge flow path 24 and the first heat source pipe 28 are connected by the second switching valve 22b, and the third heat source pipe 25 and the suction flow path 23 are connected by the first switching valve 22a.
  • the opening degree of the heat source side expansion valve 36 is adjusted.
  • the first adjustment valves 66a, 66b, and 66c are controlled to the open state
  • the second adjustment valves 67a, 67b, and 67c are controlled to the closed state.
  • the second heat exchangers 52a, 52b, and 52c of the utilization units 3a, 3b, and 3c function as radiators for the refrigerant.
  • the second heat exchangers 52a, 52b, and 52c of the utilization units 3a, 3b, and 3c are connected to the discharge side of the second compressor 21 of the cascade unit 2 via the discharge flow path 24, the first heat source pipe 28, the fourth connecting pipe 8, the first branch pipes 63a, 63b, and 63c, the junction pipes 62a, 62b, and 62c, the first connecting pipes 15a, 15b, and 15c, and the first utilization pipes 57a, 57b, and 57c.
  • the second subcooling expansion valve 48a and the bypass expansion valve 46a are controlled to a closed state.
  • the utilization side expansion valves 51a, 51b, and 51c are adjusted in opening degree.
  • the high-pressure carbon dioxide refrigerant compressed and discharged by the second compressor 21 is sent to the first heat source pipe 28 through the second switching valve 22b of the second switching mechanism 22.
  • the refrigerant sent to the first heat source pipe 28 is sent to the fourth connection pipe 8 through the third shutoff valve 32.
  • the high-pressure refrigerant sent to the fourth connecting pipe 8 is then branched into three and sent to the first branch pipes 63a, 63b, 63c of the operating utilization units 3a, 3b, 3c.
  • the high-pressure carbon dioxide refrigerant sent to the first branch pipes 63a, 63b, 63c passes through the first control valves 66a, 66b, 66c and flows through the junction pipes 62a, 62b, 62c.
  • the refrigerant then flows through the first connecting pipes 15a, 15b, 15c and the first utilization pipes 57a, 57b, 57c and is sent to the second heat exchangers 52a, 52b, 52c.
  • the high-pressure carbon dioxide refrigerant sent to the second heat exchangers 52a, 52b, 52c then exchanges heat with the indoor air supplied by the second fans 53a, 53b, 53c in the second heat exchangers 52a, 52b, 52c.
  • the carbon dioxide refrigerant flowing through the second heat exchangers 52a, 52b, 52c dissipates heat.
  • the indoor air is heated and supplied to the room. This heats the indoor space.
  • the carbon dioxide refrigerant that dissipates heat in the second heat exchangers 52a, 52b, 52c flows through the second utilization pipes 56a, 56b, 56c and passes through the utilization side expansion valves 51a, 51b, 51c, the opening of which is adjusted.
  • the refrigerant that flows through the second connection pipes 16a, 16b, 16c flows through the third branch pipes 61a, 61b, 61c of each branch unit 6a, 6b, 6c.
  • the carbon dioxide refrigerant sent to the third branch pipes 61a, 61b, and 61c is then sent to the third connecting pipe 7 where they join together.
  • the carbon dioxide refrigerant sent to the third connecting pipe 7 is then sent to the heat source side expansion valve 36 through the fifth shutoff valve 31.
  • the refrigerant sent to the heat source side expansion valve 36 has its flow rate adjusted in the heat source side expansion valve 36, and is then sent to the cascade heat exchanger 35.
  • the carbon dioxide refrigerant flowing through the second flow path 35a evaporates into low-pressure gas refrigerant and is sent to the second switching mechanism 22, and the first refrigerant flowing through the first flow path 35b of the cascade heat exchanger 35 condenses.
  • the low-pressure gas refrigerant sent to the first switching valve 22a of the second switching mechanism 22 is then returned to the suction side of the second compressor 21 through the suction flow path 23, the second accumulator 30, and the suction pipe 23a.
  • the second refrigeration oil circulating through the second circuit 10 is returned from the bottom of the second accumulator 30 through the oil return passage 23b, the oil return valve 23c, and the suction pipe 23a to the suction side of the second compressor 21.
  • the second heat exchangers 52a, 52b of the utilization units 3a, 3b function as refrigerant evaporators, and the second heat exchanger 52c of the utilization unit 3c functions as a refrigerant radiator.
  • the cascade heat exchanger 35 functions as a radiator for the carbon dioxide refrigerant.
  • the first circuit 5a and the second circuit 10 of the refrigeration cycle device 1 are configured as shown in Fig. 5.
  • the arrows attached to the first circuit 5a and the second circuit 10 in Fig. 5 indicate the flow of the refrigerant during cooling-dominated operation.
  • the first switching mechanism 72 is switched to the fourth connection state (the state shown by the solid line of the first switching mechanism 72 in FIG. 5 ) to make the cascade heat exchanger 35 function as an evaporator of the first refrigerant.
  • the first refrigerant discharged from the first compressor 71 passes through the first switching mechanism 72 and is condensed in the first heat exchanger 74 by heat exchange with outside air supplied from the first fan 75.
  • the first refrigerant condensed in the first heat exchanger 74 passes through the first expansion valve 76 controlled to a fully open state, and a portion of the refrigerant flows toward the second stop valve 108 through the first supercooling heat exchanger 103, and the other portion of the refrigerant branches off and flows into the first supercooling circuit 104.
  • the refrigerant flowing through the first supercooling circuit 104 is decompressed when passing through the first supercooling expansion valve 104a.
  • the refrigerant flowing from the first expansion valve 76 toward the second shutoff valve 108 exchanges heat with the refrigerant decompressed by the first subcooling expansion valve 104a and flowing through the first subcooling circuit 104 in the first subcooling heat exchanger 103, and is cooled until it is in a subcooled state.
  • the refrigerant in the subcooled state flows through the second communication pipe 111 and is decompressed by the second expansion valve 102.
  • the valve opening degree of the second expansion valve 102 is controlled so that the degree of superheat of the refrigerant sucked into the first compressor 71 satisfies a predetermined condition, for example.
  • the first refrigerant decompressed by the second expansion valve 102 flows through the first flow path 35b of the cascade heat exchanger 35, it evaporates by exchanging heat with the carbon dioxide refrigerant flowing through the second flow path 35a, and flows toward the first communication pipe 112. After passing through the first communication pipe 112 and the first shutoff valve 109, the first refrigerant reaches the first switching mechanism 72. The refrigerant that passes through the first switching mechanism 72 merges with the refrigerant that flows through the first subcooling circuit 104, and is then sucked into the first compressor 71 via the first accumulator 105.
  • the second switching mechanism 22 is switched to a third connection state in which the discharge flow path 24 and the third heat source pipe 25 are connected by the first switching valve 22a, and the discharge flow path 24 and the first heat source pipe 28 are connected by the second switching valve 22b, so that the cascade heat exchanger 35 functions as a radiator for the carbon dioxide refrigerant.
  • the opening degree of the heat source side expansion valve 36 is adjusted.
  • the first adjustment valve 66c and the second adjustment valves 67a and 67b are controlled to an open state, and the first adjustment valves 66a, 66b, and the second adjustment valve 67c are controlled to a closed state.
  • the second heat exchangers 52a and 52b of the utilization units 3a and 3b function as refrigerant evaporators
  • the second heat exchanger 52c of the utilization unit 3c functions as a refrigerant radiator.
  • the second heat exchangers 52a and 52b of the utilization units 3a and 3b are connected to the suction side of the second compressor 21 of the cascade unit 2 via the fifth interconnection pipe 9
  • the second heat exchanger 52c of the utilization unit 3c is connected to the discharge side of the second compressor 21 of the cascade unit 2 via the fourth interconnection pipe 8.
  • the second supercooling expansion valve 48a is controlled to open so that the degree of supercooling of the carbon dioxide refrigerant flowing from the outlet of the second supercooling heat exchanger 47 toward the third interconnection pipe 7 satisfies a predetermined condition.
  • the bypass expansion valve 46a is controlled to a closed state.
  • the utilization side expansion valves 51a, 51b, and 51c are adjusted in opening.
  • a portion of the high-pressure carbon dioxide refrigerant compressed and discharged by the second compressor 21 is sent to the fourth connection pipe 8 through the second switching valve 22b of the second switching mechanism 22, the first heat source pipe 28, and the third shutoff valve 32, and the remainder is sent to the second flow path 35a of the cascade heat exchanger 35 through the first switching valve 22a of the second switching mechanism 22 and the third heat source pipe 25.
  • the high-pressure refrigerant sent to the fourth connecting pipe 8 is then sent to the first branch pipe 63c.
  • the high-pressure refrigerant sent to the first branch pipe 63c is sent to the second heat exchanger 52c of the utilization unit 3c through the first control valve 66c and the junction pipe 62c.
  • the high-pressure refrigerant sent to the second heat exchanger 52c then exchanges heat with the indoor air supplied by the second fan 53c in the second heat exchanger 52c.
  • the carbon dioxide refrigerant flowing through the second heat exchanger 52c dissipates heat.
  • the indoor air is heated and supplied to the room, and the heating operation of the utilization unit 3c is performed.
  • the carbon dioxide refrigerant that has dissipated heat in the second heat exchanger 52c flows through the second utilization pipe 56c, and the flow rate is adjusted in the utilization side expansion valve 51c. After that, the carbon dioxide refrigerant that has flowed through the second connecting pipe 16c is sent to the third branch pipe 61c of the branch unit 6c.
  • the carbon dioxide refrigerant sent to the third branch pipe 61c is then sent to the third connecting pipe 7.
  • the high-pressure refrigerant sent to the second flow path 35a of the cascade heat exchanger 35 dissipates heat by exchanging heat with the first refrigerant flowing through the first flow path 35b in the cascade heat exchanger 35.
  • the carbon dioxide refrigerant that has dissipated heat in the cascade heat exchanger 35 flows into the second receiver 45 after the flow rate is adjusted in the heat source side expansion valve 36.
  • a part of the carbon dioxide refrigerant that flows out of the second receiver 45 branches off and flows into the second supercooling circuit 48, and after being depressurized in the second supercooling expansion valve 48a, it merges with the suction flow path 23.
  • the second supercooling heat exchanger 47 another part of the refrigerant that has flowed out of the second receiver 45 is cooled by the refrigerant flowing through the second supercooling circuit 48, and is sent to the third connection pipe 7 through the fifth shutoff valve 31 and merges with the refrigerant that has dissipated heat in the second heat exchanger 52c.
  • the refrigerant that joins in the third connection pipe 7 branches into two and is sent to the third branch pipes 61a, 61b of the branch units 6a, 6b.
  • the refrigerant that flows through the second connection pipes 16a, 16b is then sent to the second utilization pipes 56a, 56b of the first to second utilization units 3a, 3b.
  • the refrigerant that flows through the second utilization pipes 56a, 56b passes through the utilization side expansion valves 51a, 51b of the utilization units 3a, 3b.
  • the refrigerant that has passed through the utilization side expansion valves 51a, 51b, the opening of which has been adjusted exchanges heat with the indoor air supplied by the second fans 53a, 53b in the second heat exchangers 52a, 52b.
  • the refrigerant flowing through the second heat exchangers 52a, 52b evaporates and becomes a low-pressure gas refrigerant.
  • the indoor air is cooled and supplied to the room. This cools the indoor space.
  • the low-pressure gas refrigerant that has evaporated in the second heat exchangers 52a, 52b is sent to the junction pipes 62a, 62b of the first and second branch units 6a, 6b.
  • the low-pressure gas refrigerant sent to the junction pipes 62a, 62b is then sent to the fifth connecting pipe 9 via the second control valves 67a, 67b and the second branch pipes 64a, 64b, where it is joined.
  • the low-pressure gas refrigerant sent to the fifth connecting pipe 9 is returned to the suction side of the second compressor 21 via the fourth shutoff valve 33, the second heat source pipe 29, the suction passage 23, the second accumulator 30 and the suction pipe 23a.
  • the second refrigeration oil circulating through the second circuit 10 is returned from the bottom of the second accumulator 30 through the oil return passage 23b, the oil return valve 23c, and the suction pipe 23a to the suction side of the second compressor 21.
  • heating-dominated operation for example, the second heat exchangers 52a, 52b of the utilization units 3a, 3b function as radiators of the refrigerant, and the second heat exchanger 52c functions as an evaporator of the refrigerant.
  • the cascade heat exchanger 35 functions as an evaporator of the carbon dioxide refrigerant.
  • the first circuit 5a and the second circuit 10 of the refrigeration cycle apparatus 1 are configured as shown in Fig. 6.
  • the arrows attached to the first circuit 5a and the second circuit 10 in Fig. 6 indicate the flow of the refrigerant during heating-dominated operation.
  • the first switching mechanism 72 is switched to the fifth connection state to cause the cascade heat exchanger 35 to function as a radiator for the first refrigerant.
  • the fifth connection state of the first switching mechanism 72 is the connection state shown by the dashed line in the first switching mechanism 72 in FIG. 6.
  • the first refrigerant discharged from the first compressor 71, passing through the first switching mechanism 72 and the first shut-off valve 109 passes through the first connecting pipe 112 and is sent to the first flow path 35b of the cascade heat exchanger 35.
  • the refrigerant flowing through the first flow path 35b of the cascade heat exchanger 35 condenses by exchanging heat with the carbon dioxide refrigerant flowing through the second flow path 35a.
  • the first refrigerant condensed in the cascade heat exchanger 35 passes through the second expansion valve 102 controlled to a fully open state, and then flows through the second connecting pipe 111, the second closing valve 108, and the first subcooling heat exchanger 103 in that order, and is decompressed in the first expansion valve 76.
  • the first subcooling expansion valve 104a is controlled to a closed state, so that no refrigerant flows through the first subcooling circuit 104, and no heat exchange is performed in the first subcooling heat exchanger 103.
  • the first expansion valve 76 is controlled to have a valve opening such that the degree of superheat of the refrigerant drawn into the first compressor 71 satisfies a predetermined condition.
  • the refrigerant decompressed in the first expansion valve 76 evaporates by exchanging heat with outside air supplied from the first fan 75 in the first heat exchanger 74, passes through the first switching mechanism 72 and the first accumulator 105, and is drawn into the first compressor 71.
  • the second switching mechanism 22 is switched to the second connection state.
  • the second switching valve 22b connects the discharge flow path 24 to the first heat source piping 28, and the first switching valve 22a connects the third heat source piping 25 to the suction flow path 23.
  • This allows the cascade heat exchanger 35 to function as an evaporator for carbon dioxide refrigerant.
  • the opening degree of the heat source side expansion valve 36 is adjusted.
  • the first adjustment valves 66a, 66b and the second adjustment valve 67c are controlled to the open state, and the first adjustment valve 66c and the second adjustment valves 67a, 67b are controlled to the closed state.
  • the second heat exchangers 52a and 52b of the utilization units 3a and 3b function as radiators of the refrigerant
  • the second heat exchanger 52c of the utilization unit 3c functions as an evaporator of the refrigerant.
  • the second heat exchanger 52c of the utilization unit 3c and the suction side of the second compressor 21 of the cascade unit 2 are connected via the first utilization pipe 57c, the first connecting pipe 15c, the junction pipe 62c, the second branch pipe 64c, and the fifth connecting pipe 9.
  • the second heat exchangers 52a and 52b of the utilization units 3a and 3b and the discharge side of the second compressor 21 of the cascade unit 2 are connected via the discharge flow path 24, the first heat source pipe 28, the fourth connecting pipe 8, the first branch pipes 63a and 63b, the junction pipes 62a and 62b, the first connecting pipes 15a and 15b, and the first utilization pipes 57a and 57b.
  • the second subcooling expansion valve 48a and the bypass expansion valve 46a are controlled to a closed state.
  • the utilization side expansion valves 51a, 51b, and 51c have their openings adjusted.
  • the high-pressure carbon dioxide refrigerant compressed and discharged by the second compressor 21 is sent to the fourth connection pipe 8 through the second switching valve 22b of the second switching mechanism 22, the first heat source pipe 28, and the third shutoff valve 32.
  • the high-pressure refrigerant sent to the fourth connection pipe 8 is then branched into two and sent to the first branch pipes 63a and 63b of the first branch unit 6a and the second branch unit 6b, which are connected to the first and second usage units 3a and 3b, respectively, which are the usage units in operation.
  • the high-pressure refrigerant sent to the first branch pipes 63a and 63b is sent to the second heat exchangers 52a and 52b of the first and second usage units 3a and 3b through the first control valves 66a and 66b, the junction pipes 62a and 62b, and the first connection pipes 15a and 15b.
  • the high-pressure carbon dioxide refrigerant sent to the second heat exchangers 52a, 52b then exchanges heat with the indoor air supplied by the second fans 53a, 53b in the second heat exchangers 52a, 52b.
  • the refrigerant flowing through the second heat exchangers 52a, 52b dissipates heat.
  • the indoor air is heated and supplied to the room. This heats the indoor space.
  • the refrigerant that has dissipated heat in the second heat exchangers 52a, 52b flows through the second utilization pipes 56a, 56b and passes through the utilization side expansion valves 51a, 51b, the opening of which is adjusted.
  • the refrigerant that has flowed through the second connection pipes 16a, 16b is then sent to the third connection pipe 7 via the third branch pipes 61a, 61b of the branch units 6a, 6b.
  • part of the refrigerant sent to the third connecting pipe 7 is sent to the third branch pipe 61c of the branch unit 6c, and the remainder is sent to the heat source side expansion valve 36 through the fifth shutoff valve 31.
  • the refrigerant sent to the third branch pipe 61c flows through the second utilization pipe 56c of the utilization unit 3c via the second connection pipe 16c, and is sent to the utilization side expansion valve 51c.
  • the refrigerant that has passed through the utilization side expansion valve 51c, the opening of which has been adjusted exchanges heat with the indoor air supplied by the second fan 53c in the second heat exchanger 52c.
  • the refrigerant flowing through the second heat exchanger 52c evaporates and becomes a low-pressure gas refrigerant.
  • the indoor air is cooled and supplied to the room. This cools the indoor space.
  • the low-pressure gas refrigerant that has evaporated in the second heat exchanger 52c passes through the first utilization pipe 57c and the first connecting pipe 15c, and is sent to the junction pipe 62c.
  • the low-pressure gas refrigerant sent to the junction pipe 62c is sent to the fifth connection pipe 9 through the second control valve 67c and the second branch pipe 64c.
  • the low-pressure gas refrigerant sent to the fifth connecting pipe 9 is returned to the suction side of the second compressor 21 via the fourth shutoff valve 33, the second heat source pipe 29, the suction passage 23, the second accumulator 30 and the suction pipe 23a.
  • the carbon dioxide refrigerant sent to the heat source side expansion valve 36 passes through the heat source side expansion valve 36, the opening of which is adjusted, and then exchanges heat with the first refrigerant flowing through the first flow path 35b in the second flow path 35a of the cascade heat exchanger 35.
  • the refrigerant flowing through the second flow path 35a of the cascade heat exchanger 35 evaporates and becomes a low-pressure gas refrigerant, which is sent to the first switching valve 22a of the second switching mechanism 22.
  • the low-pressure gas refrigerant sent to the first switching valve 22a of the second switching mechanism 22 merges with the low-pressure gas refrigerant evaporated in the second heat exchanger 52c in the suction flow path 23.
  • the merged refrigerant is returned to the suction side of the second compressor 21 via the second accumulator 30 and the suction piping 23a.
  • control unit 80 controls the opening degree of the oil return valve 23c based on the degree of superheat (discharge superheat) of the carbon dioxide refrigerant discharged from the second compressor 21 so that liquid refrigerant does not flow into the second compressor 21.
  • control unit 80 when the control unit 80 receives a command for heating operation or heating-dominant operation from a remote control or the like, it determines whether the outside air temperature is equal to or lower than a first temperature (step S1). In step S1, if the control unit 80 determines that the outside air temperature exceeds the first temperature, the density of the carbon dioxide refrigerant and the density of the refrigeration oil are normal, so it does not perform startup control and proceeds to step S7.
  • step S7 the control unit 80 starts circulating the first refrigerant in the first circuit 5a, starts circulating carbon dioxide in the second circuit 10, and opens the oil return valve 23c.
  • the control unit 80 starts the first compressor 71 and the second compressor 21 at the same timing, and opens the oil return valve 23c.
  • control unit 80 determines that the outside air temperature is equal to or lower than the first temperature, it performs start-up control. Specifically, the control unit 80 starts circulating the first refrigerant in the first circuit 5a (step S2). In this step S2, the control unit 80 starts the first compressor 71.
  • Step S3 in this embodiment is performed when the condensation temperature of the first refrigerant in the cascade heat exchanger 35 rises to a predetermined value or higher by circulating the first refrigerant in the first circuit 5a. Specifically, the control unit 80 determines whether the condensation temperature of the first refrigerant has risen to a predetermined value or higher. If the control unit 80 determines that the condensation temperature of the first refrigerant is below the predetermined value, it does not circulate carbon dioxide in the second circuit 10. On the other hand, if the control unit 80 determines that the condensation temperature of the first refrigerant is above the predetermined value, it starts the second compressor 21 and starts circulating the carbon dioxide refrigerant in the second circuit 10.
  • the control unit 80 determines whether the temperature or pressure of the carbon dioxide refrigerant and refrigeration oil in the second accumulator 30 is equal to or higher than a predetermined temperature or pressure that corresponds to the boundary temperature at which the density of the carbon dioxide refrigerant and the density of the refrigeration oil in the second accumulator 30 become equal (step S4).
  • the control unit 80 obtains the temperature or pressure of the carbon dioxide refrigerant and the second refrigeration oil flowing through the suction pipe 23a from at least one of the second suction temperature sensor 88 and the second suction pressure sensor 37, and makes the above determination.
  • step S4 if the control unit 80 determines that the temperature or pressure of the carbon dioxide refrigerant and the second refrigeration oil in the second accumulator 30 is equal to or higher than the predetermined temperature or pressure, the density of the carbon dioxide refrigerant and the density of the refrigeration oil are normal, so the oil return valve 23c is opened (step S5).
  • step S4 if the control unit 80 determines that the temperature or pressure of the carbon dioxide refrigerant and the second refrigeration oil in the second accumulator 30 is below the predetermined temperature or pressure, the control unit 80 maintains the oil return valve 23c in a closed state (step S6) because the density of the carbon dioxide refrigerant is inverted from the density of the refrigeration oil in the second accumulator 30. Then, the process returns to the step of determining that the temperature or pressure of the carbon dioxide refrigerant and the second refrigeration oil in the second accumulator 30 is equal to or higher than the predetermined temperature or pressure (step S4).
  • the refrigeration cycle device 1 of this embodiment includes a first circuit 5a, a second circuit 10, a cascade heat exchanger 35, and a control unit 80.
  • the first circuit 5a circulates a first refrigerant.
  • the second circuit 10 circulates a carbon dioxide refrigerant and a refrigerating machine oil (a second refrigerating machine oil in this embodiment).
  • the cascade heat exchanger 35 heats the carbon dioxide refrigerant with the first refrigerant.
  • the second circuit 10 has a second compressor 21, a container (a second accumulator 30 in this embodiment), an intake pipe 23a, an oil return passage 23b, and a valve (an oil return valve 23c in this embodiment).
  • the second accumulator 30 is provided on the intake side of the second compressor 21 and stores the carbon dioxide refrigerant and the refrigerating machine oil.
  • the intake pipe 23a connects the intake side of the second compressor 21 and the second accumulator 30.
  • the oil return passage 23b returns the second refrigeration oil to the suction pipe 23a from a lower portion of the second accumulator 30.
  • the oil return valve 23c is provided in the oil return passage 23b.
  • the control unit 80 performs start-up control to open the oil return valve 23c after starting to circulate the first refrigerant in the first circuit 5a.
  • the temperature of the carbon dioxide refrigerant in the second accumulator 30 may be low due to the low outdoor air temperature.
  • the first refrigerant starts to circulate in the first circuit 5a, and the temperature of the carbon dioxide refrigerant in the container of the second circuit 10 can be raised through the cascade heat exchanger 35. Therefore, even if the outdoor air temperature is low, a normal state can be achieved in which the density of the carbon dioxide refrigerant is lower than the density of the refrigeration oil in the second accumulator 30.
  • the oil return valve 23c of the oil return passage 23b extending from the lower part of the second accumulator 30 is opened, so that the flow of liquid carbon dioxide refrigerant into the oil return passage 23b can be suppressed. Therefore, the inflow of liquid refrigerant into the second compressor 21 can be suppressed.
  • the refrigeration cycle apparatus 1 of this embodiment is the refrigeration cycle apparatus 1 of (10-1) above, and in startup control, the control unit 80 opens the oil return valve 23c when the temperature or pressure of the carbon dioxide refrigerant and the refrigeration oil in the second accumulator 30 becomes equal to or higher than a predetermined temperature or predetermined pressure corresponding to the boundary temperature at which the density of the carbon dioxide refrigerant and the density of the refrigeration oil in the second accumulator 30 become equal to each other.
  • the temperature or pressure of the carbon dioxide refrigerant and refrigeration oil in the second accumulator 30 reaches or exceeds a predetermined temperature or pressure corresponding to the boundary temperature at which the density of the carbon dioxide refrigerant and the density of the refrigeration oil in the second accumulator 30 become equal, it can be determined that the density of the refrigerant and the density of the refrigeration oil in the second accumulator 30 have become normal. This makes it possible to further prevent liquid refrigerant from flowing into the second compressor 21.
  • the refrigeration cycle apparatus 1 of this embodiment is the refrigeration cycle apparatus 1 of (10-1) or (10-2) described above, and in the startup control, the control unit 80 starts circulating the first refrigerant in the first circuit 5a and then starts circulating the carbon dioxide refrigerant in the second circuit 10.
  • the temperature of the carbon dioxide refrigerant in the second accumulator 30 of the second circuit 10 is raised via the cascade heat exchanger 35, and then the carbon dioxide refrigerant starts to circulate in the second circuit 10. This improves the efficiency of the operation of the second circuit 10.
  • the refrigeration cycle apparatus 1 of the present embodiment is the refrigeration cycle apparatus 1 of (10-3) above, and the control unit 80 opens the oil return valve 23c after starting to circulate the carbon dioxide refrigerant in the second circuit 10 during startup control.
  • the first refrigerant circulates in the first circuit 5a, and the carbon dioxide refrigerant circulates in the second circuit 10, so that the temperature of the carbon dioxide refrigerant in the second accumulator 30 can be efficiently raised.
  • the refrigeration cycle apparatus 1 of this embodiment is any one of the refrigeration cycle apparatuses 1 (10-1) to (10-4) described above, and the control unit 80 performs startup control when the outside air temperature is equal to or lower than a first temperature, and does not perform startup control when the outside air temperature exceeds the first temperature.
  • the refrigeration cycle apparatus 1 of this embodiment is the refrigeration cycle apparatus 1 of (10-5) described above, and when the outside air temperature exceeds the first temperature, the control unit 80 simultaneously starts operation of the first circuit 5a, operation of the second circuit 10, and opening of the oil return valve 23c.
  • the start-up control opens the oil return valve 23c after the operation of the first circuit 5a is started, thereby preventing liquid refrigerant from flowing into the second compressor 21.
  • the density of the refrigerant and the density of the refrigeration oil in the second accumulator 30 are normal because the outside air temperature is higher than the first temperature, the operation of the first circuit 5a, the operation of the second circuit 10, and the opening of the oil return valve 23c in the oil return passage 23b can be performed simultaneously.
  • the refrigeration cycle apparatus 1 of this embodiment is any one of the refrigeration cycle apparatuses 1 of (10-1) to (10-6) above, and the first refrigerant is R32.
  • control unit 80 performs startup control to circulate the first refrigerant in the first circuit 5a, then circulate the carbon dioxide refrigerant in the second circuit 10, and then open the oil return valve 23c when starting up the heating only operation or the heating main operation, but is not limited to this.
  • control unit 80 performs startup control to circulate the first refrigerant in the first circuit 5a, then open the oil return valve 23c, and then circulate the carbon dioxide refrigerant in the second circuit 10 when starting up the heating only operation or the heating main operation.
  • step S1 the control unit 80 determines whether the outside air temperature is equal to or lower than the first temperature (step S1). In step S1, if the control unit 80 determines that the outside air temperature exceeds the first temperature, the density of the carbon dioxide refrigerant and the density of the refrigeration oil are normal, and therefore, the operation of the first circuit 5a, the operation of the second circuit 10, and the opening operation of the oil return valve 23c are simultaneously started (step S7).
  • step S1 if the control unit 80 determines that the outside air temperature is equal to or lower than the first temperature, it performs start-up control. Specifically, the control unit 80 starts circulating the first refrigerant in the first circuit 5a (step S2).
  • control unit 80 determines whether the temperature or pressure of the carbon dioxide refrigerant and refrigeration oil in the second accumulator 30 is equal to or higher than a predetermined temperature or pressure corresponding to the boundary temperature at which the density of the carbon dioxide refrigerant and the density of the refrigeration oil in the second accumulator 30 become equal (step S4).
  • step S4 if the control unit 80 determines that the temperature or pressure of the carbon dioxide refrigerant and the second refrigeration oil in the second accumulator 30 is below the predetermined temperature or pressure, the control unit 80 maintains the oil return valve 23c in a closed state (step S6) because the density of the carbon dioxide refrigerant is inverted from the density of the refrigeration oil in the second accumulator 30. Then, the process returns to the step of determining that the temperature or pressure of the carbon dioxide refrigerant and the second refrigeration oil in the second accumulator 30 is equal to or higher than the predetermined temperature or pressure (step S4).
  • step S4 if the control unit 80 determines that the temperature or pressure of the carbon dioxide refrigerant and the second refrigeration oil in the second accumulator 30 is equal to or higher than the predetermined temperature or pressure, the density of the carbon dioxide refrigerant and the density of the refrigeration oil are normal, so the oil return valve 23c is opened (step S5).
  • control unit 80 starts circulating the carbon dioxide refrigerant in the second circuit 10 (step S3).
  • control unit 80 performs startup control to circulate the first refrigerant in the first circuit 5a, then circulate the carbon dioxide refrigerant in the second circuit 10, and then open the oil return valve 23c when starting up the heating only operation or the heating main operation, but is not limited to this.
  • control unit 80 performs startup control to operate the first circuit 5a and the second circuit 10 simultaneously when starting up the heating only operation or the heating main operation.
  • step S1 the control unit 80 determines whether the outside air temperature is equal to or lower than the first temperature (step S1). In step S1, if the control unit 80 determines that the outside air temperature exceeds the first temperature, the density of the carbon dioxide refrigerant and the density of the refrigeration oil are normal, and therefore the operation of the first circuit 5a, the operation of the second circuit 10, and the opening operation of the oil return valve 23c are simultaneously started (step S7).
  • step S1 the control unit 80 determines that the outside air temperature is equal to or lower than the first temperature, it proceeds to step S11 to perform startup control.
  • step S11 the first refrigerant starts circulating in the first circuit 5a, and carbon dioxide starts circulating in the second circuit 10.
  • the first compressor 71 and the second compressor 21 are started simultaneously.
  • control unit 80 determines whether the temperature or pressure of the carbon dioxide refrigerant and refrigeration oil in the second accumulator 30 is equal to or higher than a predetermined temperature or pressure corresponding to the boundary temperature at which the density of the carbon dioxide refrigerant and the density of the refrigeration oil in the second accumulator 30 become equal (step S4).
  • step S4 if the control unit 80 determines that the temperature or pressure of the carbon dioxide refrigerant and the second refrigeration oil in the second accumulator 30 is below the predetermined temperature or pressure, the control unit 80 maintains the oil return valve 23c in a closed state (step S6) because the density of the carbon dioxide refrigerant is inverted from the density of the refrigeration oil in the second accumulator 30. Then, the process returns to the step of determining that the temperature or pressure of the carbon dioxide refrigerant and the second refrigeration oil in the second accumulator 30 is equal to or higher than the predetermined temperature or pressure (step S4).
  • step S4 if the control unit 80 determines that the temperature or pressure of the carbon dioxide refrigerant and the second refrigeration oil in the second accumulator 30 is equal to or higher than the predetermined temperature or pressure, the density of the carbon dioxide refrigerant and the density of the refrigeration oil are normal, so the oil return valve 23c is opened (step S5).
  • the refrigeration cycle device 1 of this modified example is the refrigeration cycle device 1 of (10-1) or (10-2) above, and the control unit 80 simultaneously starts the operation of the first circuit 5a and the operation of the second circuit 10 during startup control.
  • circulation of the first refrigerant in the first circuit 5a and circulation of the carbon dioxide refrigerant in the second circuit 10 may be performed simultaneously.
  • control unit 80 commands the start of the first compressor 71 and the second compressor 21 at the same timing. This includes cases where the circulation of the first refrigerant in the first circuit 5a and the circulation of the carbon dioxide refrigerant in the second circuit 10 start at exactly the same time, and cases where one of them starts slightly earlier.
  • the control unit 80 closes the oil return valve 23c before starting the heating only operation and the heating main operation, but is not limited to this.
  • the oil return valve 23c may be opened before starting the heating only operation and the heating main operation.
  • the oil return valve 23c is opened before the carbon dioxide refrigerant circulates in the second circuit 10.
  • control unit 80 performs start-up control when the outside air temperature is equal to or lower than the first temperature, but is not limited to this.
  • the control unit 80 performs start-up control regardless of the outside air temperature when starting the full heating operation or the heating-dominant operation.
  • the step (step S1) of determining whether the outside air temperature is equal to or lower than the first temperature in Figs. 7 to 10 is omitted.
  • the control unit 80 opens the oil return valve 23c when the temperature or pressure of the carbon dioxide refrigerant and the refrigeration oil in the second accumulator 30 reaches or exceeds a predetermined temperature or a predetermined pressure corresponding to a boundary temperature at which the density of the carbon dioxide refrigerant and the density of the refrigeration oil in the second accumulator 30 become equal to each other, but is not limited to this.
  • the control unit 80 opens the oil return valve 23c after a predetermined time has elapsed after starting to circulate the first refrigerant in the first circuit 5a.
  • the predetermined time is a time for raising the temperature of the carbon dioxide refrigerant so that the inside of the second accumulator 30 is in a normal state by circulating the first refrigerant.
  • control unit 80 performs startup control at the start of the heating only operation and the heating main operation, but is not limited thereto.
  • the control unit 80 may perform startup control at the start of the heating only operation or the heating main operation.
  • the control unit 80 may further perform startup control at the start of at least one of the cooling only operation and the cooling main operation.
  • polyalkylene glycol has been described as an example of the second refrigeration oil used in the second circuit 10, but the present disclosure is not limited thereto.
  • the second refrigeration oil of the present disclosure may be incompatible with the carbon dioxide refrigerant, in which it is completely incompatible with the carbon dioxide refrigerant, or may be slightly compatible with the carbon dioxide refrigerant but only to a small extent.
  • the first refrigerant used in the first circuit 5a is R32, but is not limited thereto.
  • the first refrigerant used in the first circuit 5a may be, for example, R32, R454C, propane, R1234yf, R1234ze, ammonia, or a refrigerant containing any of them.
  • the second circuit 10 has three interconnecting pipes 7, 8, and 9, but is not limited to this.
  • the refrigeration cycle device of this modification has two interconnecting pipes. This modification is applied to, for example, a configuration in which the multiple utilization units 3a, 3b, and 3c cannot individually perform cooling or heating operations, a configuration in which there is only one second unit, and the like.
  • the first unit 5 is described as an outdoor unit having the first fan 75 for supplying outdoor air to the first heat exchanger 74 for heat exchange with the first refrigerant, but is not limited to this.
  • the first unit does not have the first fan 75, and exchanges heat between the first refrigerant and water as a heat source in the first heat exchanger 74.
  • Refrigeration cycle device 5a First circuit 10: Second circuit 21: Second compressor 23a: Suction pipe 23b: Oil return passage 23c: Oil return valve (valve) 30: Second accumulator (container) 35: Cascade heat exchangers 52a, 52b, 52c: Second heat exchanger 71: First compressor 74: First heat exchanger 80: Control unit

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Compression-Type Refrigeration Machines With Reversible Cycles (AREA)

Abstract

冷凍サイクル装置(1)は、第1冷媒が循環する第1回路(5a)と、二酸化炭素冷媒及び冷凍機油が循環する第2回路(10)と、二酸化炭素冷媒を第1冷媒によって加熱するカスケード熱交換器(35)と、制御部(80)と、を備える。第2回路は、第2圧縮機と、第2圧縮機の吸入側に設けられ、二酸化炭素冷媒及び冷凍機油を貯留する容器と、第2圧縮機の吸入側と容器とを接続する吸入配管(23a)と、容器の下部から吸入配管に冷凍機油を戻す油戻し通路(23b)と、油戻し通路に設けられる弁と、を有する。制御部は、第1回路において第1冷媒を循環させ始めた後に、油戻し弁を開ける起動制御を実施する。

Description

冷凍サイクル装置
 冷凍サイクル装置に関する。
 特許文献1(特許第5425221号)には、室外ユニットと室内ユニットとをガス配管及び液配管で接続し、冷媒が循環する冷媒回路を備える冷凍サイクル装置が開示されている。冷媒回路の内部には、冷媒として二酸化炭素(CO)と、冷凍機油として二酸化炭素と非相溶性を有するポリアルキレングリコール(PAG)油と、が封入されている。
 上記特許文献1に開示されているように、二酸化炭素冷媒を用いる冷凍サイクル装置では、二酸化炭素冷媒と非相溶性の冷凍機油を使用すると、二酸化炭素冷媒の低温領域において、冷凍機油の密度が冷媒の密度よりも小さくなる。この場合、アキュムレータの下部に液冷媒が滞留するので、液冷媒が圧縮機へ流入する。
 第1観点の冷凍サイクル装置は、第1回路と、第2回路と、カスケード熱交換器と、制御部と、を備える。第1回路は、第1冷媒が循環する。第2回路は、二酸化炭素冷媒及び冷凍機油が循環する。カスケード熱交換器は、二酸化炭素冷媒を第1冷媒によって加熱する。第2回路は、第2圧縮機と、容器と、吸入配管と、油戻し通路と、弁と、を有している。容器は、第2圧縮機の吸入側に設けられ、二酸化炭素冷媒及び冷凍機油を貯留する。吸入配管は、第2圧縮機の吸入側と容器とを接続する。油戻し通路は、容器の下部から吸入配管に冷凍機油を戻す。弁は、油戻し通路に設けられている。制御部は、第1回路において第1冷媒を循環させ始めた後に、弁を開ける起動制御を実施する。
 二酸化炭素冷媒を第1冷媒によって加熱する運転の起動時に、外気温が低いため、容器内の二酸化炭素冷媒の温度が低い場合がある。このような場合、第1観点の冷凍サイクル装置では、第1回路において第1冷媒を循環させ始めることにより、カスケード熱交換器を介して、第2回路の容器内の二酸化炭素冷媒の温度を上げることができる。このため、外気温が低かったとしても、容器内において、二酸化炭素冷媒の密度が冷凍機油の密度よりも低い、正常な状態にできる。正常な状態になった後に、容器の下部から延びる油戻し通路の弁を開けるので、油戻し通路に液相の二酸化炭素冷媒(以下、「液冷媒」とも言う)が流れることを抑制できる。したがって、第2圧縮機に液冷媒が流入することを抑制することができる。
 第2観点の冷凍サイクル装置は、第1観点の冷凍サイクル装置であって、制御部は、容器内の二酸化炭素冷媒及び冷凍機油の温度又は圧力が、容器内の二酸化炭素冷媒の密度と冷凍機油の密度とが等しくなる境界温度に対応する所定温度又は所定圧力以上になると、弁を開ける。
 第2観点の冷凍サイクル装置では、容器内の二酸化炭素冷媒及び冷凍機油の温度又は圧力が、容器内の二酸化炭素冷媒の密度と冷凍機油の密度とが等しくなる境界温度に対応する所定温度又は所定圧力以上になると、容器内における冷媒の密度と冷凍機油の密度とが正常な状態になったと判断できる。このため、第2圧縮機に液冷媒が流入することをより抑制することができる。
 第3観点の冷凍サイクル装置は、第1観点または第2観点の冷凍サイクル装置であって、制御部は、第1回路において第1冷媒を循環させ始めた後に、第2回路において二酸化炭素冷媒を循環させ始める。
 第3観点の冷凍サイクル装置では、第1回路の第1冷媒を循環させ始めることにより、カスケード熱交換器を介して、第2回路の容器内の冷媒の温度を上げてから、第2回路において二酸化炭素冷媒を循環させ始める。このため、第2回路の運転の効率を向上することができる。
 第4観点の冷凍サイクル装置は、第3観点の冷凍サイクル装置であって、制御部は、第2回路において二酸化炭素冷媒を循環させ始めた後に、弁を開ける。
 第4観点の冷凍サイクル装置では、第1回路において第1冷媒が循環し、さらに第2回路において二酸化炭素冷媒が循環することで、容器内の二酸化炭素冷媒の温度を効率的に上げることができる。これにより、容器内における冷媒の密度と冷凍機油の密度とを正常な状態にすることが容易である。正常な状態になった後に、油戻し通路の弁を開けるので、第2圧縮機に液冷媒が流入することを容易に抑制することができる。
 第5観点の冷凍サイクル装置は、第1観点または第2観点の冷凍サイクル装置であって、制御部は、第1回路の運転と、第2回路の運転と、を同時に開始する。
 第5観点の冷凍サイクル装置のように、第1回路における第1冷媒の循環と、第2回路における二酸化炭素冷媒の循環とを、同時に行ってもよい。
 第6観点の冷凍サイクル装置は、第1観点から第5観点の冷凍サイクル装置のいずれかであって、制御部は、外気温が第1温度以下の時に起動制御を実施し、外気温が第1温度を超える時には、起動制御を実施しない。
 第6観点の冷凍サイクル装置では、外気温が第1温度以下に起因して、容器内における冷媒の密度と冷凍機油の密度とが正常な状態でない場合に、起動制御を実施することによって、第2圧縮機に液冷媒が流入することを抑制できる。一方、外気温が第1温度を超えることに起因して、容器内における冷媒の密度と冷凍機油の密度とが正常な状態である場合には、油戻し通路の弁を閉めなくても、第2圧縮機に液冷媒が流入することを抑制できる。
 第7観点の冷凍サイクル装置は、第6観点の冷凍サイクル装置であって、制御部は、外気温が第1温度を超える時には、第1回路の運転と、第2回路の運転と、弁の開動作と、を同時に開始する。
 第7観点の冷凍サイクル装置では、外気温が第1温度以下に起因して、容器内における冷媒の密度と冷凍機油の密度とが正常な状態でない場合に、第1回路の運転を開始した後に、弁を開けることによって、第2圧縮機に液冷媒が流入することを抑制できる。一方、外気温が第1温度を超えることに起因して、容器内における冷媒の密度と冷凍機油の密度とが正常な状態である場合には、第1回路の運転開始と、第2回路の運転開始と、油戻し通路の弁を開けることと、を、同時に実施してもよい。
 第8観点の冷凍サイクル装置は、第1観点から第7観点の冷凍サイクル装置のいずれかであって、第1冷媒は、R32、R454C、プロパン、R1234yf、R1234zeまたはアンモニアを含む。
 第8観点の冷凍サイクル装置では、第1回路にR32、R454C、プロパン、R1234yf、R1234zeまたはアンモニアを含む第1冷媒が循環することによって、カスケード熱交換器において、二酸化炭素冷媒と効率的に熱交換を行うことができる。
冷凍サイクル装置の概略構成図である。 冷凍サイクル装置の概略機能ブロック構成図である。 冷凍サイクル装置の全冷房運転における動作(冷媒の流れ)を示す図である。 冷凍サイクル装置の全暖房運転における動作(冷媒の流れ)を示す図である。 冷凍サイクル装置の冷房主体運転における動作(冷媒の流れ)を示す図である。 冷凍サイクル装置の暖房主体運転における動作(冷媒の流れ)を示す図である。 冷凍サイクル装置の全暖房運転及び暖房主体運転の起動時の制御フローを示す図である。 変形例の冷凍サイクル装置の全暖房運転及び暖房主体運転の起動時の制御フローを示す図である。 変形例の冷凍サイクル装置の全暖房運転及び暖房主体運転の起動時の制御フローを示す図である。 変形例の冷凍サイクル装置の全暖房運転及び暖房主体運転の起動時の制御フローを示す図である。
 (1)冷凍システムの構成
 図1及び図2に示す冷凍サイクル装置1は、蒸気圧縮式の冷凍サイクル運転を行うことによって、ビル等の室内の冷暖房に使用される装置である。
 冷凍サイクル装置1は、第1回路(一次側回路)5aと、第2回路(二次側回路)10と、カスケード熱交換器35と、を有する。本実施形態の冷凍サイクル装置1は、蒸気圧縮式の第1回路5aと蒸気圧縮式の第2回路10とからなる二元冷媒回路を有しており、二元冷凍サイクルを行う。
 第1回路5aは、第1冷媒及び第1冷凍機油が循環する。第1冷媒は、例えば、HFC系冷媒及びHFO系冷媒の少なくとも一方を含む。本実施形態の第1冷媒は、R32である。第1冷凍機油は、例えばポリビニルエーテル油である。
 第2回路10は、二酸化炭素冷媒及び第2冷凍機油が循環する。第2冷凍機油は、例えば、二酸化炭素と非相溶性を有する。本実施形態の第2冷凍機油は、ポリアルキレングリコール油である。
 第1回路5aと第2回路10とは、カスケード熱交換器35を介して、熱的に接続されている。
 冷凍サイクル装置1は、第1ユニット5と、カスケードユニット2と、第2ユニット4a、4b、4cと、が互いに配管を介して接続されて構成されている。第1ユニット5とカスケードユニット2とは、第1連絡配管112及び第2連絡配管111により接続されている。カスケードユニット2と複数の分岐ユニット6a、6b、6cとは、第3連絡配管7と、第4連絡配管8と、第5連絡配管9との3つの連絡配管により接続されている。複数の分岐ユニット6a、6b、6cと複数の利用ユニット3a、3b、3cとは、第1接続管15a、15b、15c及び第2接続管16a、16b、16cにより接続されている。
 第1ユニット5は、本実施形態では、1台である。カスケードユニット2は、本実施形態では、1台である。第2ユニット4a、4b、4cは、本実施形態では、3台である。詳細には、第2ユニット4a、4b、4cは、分岐ユニット6a、6b、6cと、利用ユニット3a、3b、3cと、を含む。第2ユニット4a、4b、4cの複数の利用ユニット3a、3b、3cは、第1利用ユニット3aと、第2利用ユニット3bと、第3利用ユニット3cと、の3台である。第2ユニット4a、4b、4cの複数の分岐ユニット6a、6b、6cは、第1分岐ユニット6aと、第2分岐ユニット6bと、第3分岐ユニット6cと、の3台である。
 そして、冷凍サイクル装置1では、各利用ユニット3a、3b、3cが個別に冷房運転または暖房運転を行うことが可能になっており、暖房運転を行う利用ユニットから冷房運転を行う利用ユニットに冷媒を送ることで利用ユニット間において熱回収を行うことが可能になるように構成されている。具体的には、本実施形態では、冷房運転と暖房運転とを同時に行う冷房主体運転や暖房主体運転を行うことで、熱回収が行われる。また、冷凍サイクル装置1では、上記の熱回収(冷房主体運転や暖房主体運転)も考慮した複数の利用ユニット3a、3b、3c全体の熱負荷に応じて、カスケードユニット2の熱負荷をバランスさせるように構成されている。
 (2)第1回路
 第1回路5aは、第1圧縮機71と、第1切換機構72と、第1熱交換器74と、第1膨張弁76と、第1過冷却熱交換器103と、第1過冷却回路104と、第1過冷却膨張弁104aと、第2閉鎖弁108と、第2膨張弁102と、第2回路10と共有しているカスケード熱交換器35と、第1閉鎖弁109と、第1アキュムレータ105と、を有している。また、第1回路5aは、カスケード熱交換器35の第1流路35bを有している。
 第1圧縮機71は、第1冷媒を圧縮するための機器であり、例えば、圧縮機モータ71aをインバータ制御することで運転容量を可変することが可能なスクロール型等の容積式圧縮機からなる。
 第1アキュムレータ105は、第1切換機構72と第1圧縮機71の吸入側とを接続する吸入流路の途中に設けられている。
 カスケード熱交換器35を第1冷媒の蒸発器として機能させる場合には、第1切換機構72は、第1圧縮機71の吸入側とカスケード熱交換器35の第1流路35bのガス側とを接続する第4接続状態となる(図1の第1切換機構72の実線を参照)。また、第1切換機構72は、カスケード熱交換器35を第1冷媒の放熱器として機能させる場合には、第1圧縮機71の吐出側とカスケード熱交換器35の第1流路35bのガス側とを接続する第5接続状態となる(図1の第1切換機構72の破線を参照)。このように、第1切換機構72は、第1回路5a内における冷媒の流路を切り換えることが可能な機器であり、例えば、四路切換弁からなる。そして、第1切換機構72の切り換え状態を変更することによって、カスケード熱交換器35を第1冷媒の蒸発器または放熱器として機能させることが可能になっている。
 カスケード熱交換器35は、第1冷媒であるR32等の冷媒と、二酸化炭素冷媒と、の間で互いに混合させることなく熱交換を行わせるための機器である。カスケード熱交換器35は、例えば、プレート型熱交換器からなる。カスケード熱交換器35は、第2回路10に属する第2流路35aと、第1回路5aに属する第1流路35bと、を有している。第2流路35aは、そのガス側が第3熱源配管25を介して第2切換機構22に接続され、その液側が第4熱源配管26を介して熱源側膨張弁36に接続されている。第1流路35bは、そのガス側が、第1冷媒配管113、第1連絡配管112、第1閉鎖弁109、第1切換機構72を介して第1圧縮機71に接続され、その液側が、第2膨張弁102が設けられた第2冷媒配管114に接続されている。
 第1熱交換器74は、第1冷媒と室外空気との熱交換を行うための機器である。第1熱交換器74において、第1冷媒は、熱源としての室外空気から冷熱または温熱を取得する。第1熱交換器74のガス側は、第1切換機構72から延びる配管に接続されている。第1熱交換器74は、例えば、多数の伝熱管及びフィンによって構成されたフィン・アンド・チューブ型熱交換器からなる。
 第1膨張弁76は、第1熱交換器74の液側から第1過冷却熱交換器103まで延びる配管に設けられている。第1膨張弁76は、第1回路5aの液側の部分を流れる第1冷媒の流量の調節等を行う、開度調節が可能な電動膨張弁である。
 第1過冷却回路104は、第1膨張弁76と第1過冷却熱交換器103との間から分岐し、吸入流路のうち第1切換機構72と第1アキュムレータ105との間の部分に接続されている。第1過冷却膨張弁104aは、第1過冷却回路104のうち、第1過冷却熱交換器103より上流側に設けられており、第1冷媒の流量の調節等を行う、開度調節が可能な電動膨張弁である。
 第1過冷却熱交換器103は、第1膨張弁76から第2閉鎖弁108に向けて流れる冷媒と、第1過冷却回路104において第1過冷却膨張弁104aにおいて減圧された冷媒と、を熱交換させる熱交換器である。
 第1連絡配管112は、第1ユニット5とカスケードユニット2とを接続する配管である。第2連絡配管111は、第1ユニット5とカスケードユニット2とを接続する配管である。
 第2膨張弁102は、第2冷媒配管114に設けられている。第2膨張弁102は、カスケード熱交換器35の第1流路35bを流れる第1冷媒の流量の調節等を行う、開度調節が可能な電動膨張弁である。
 第1閉鎖弁109は、第1連絡配管112と第1切換機構72との間に設けられている。第2閉鎖弁108は、第2連絡配管111と第1過冷却熱交換器103との間に設けられている。
 (3)第2回路
 (3-1)第2回路の概要
 第2回路10は、複数の利用ユニット3a、3b、3cと、複数の分岐ユニット6a、6b、6cと、カスケードユニット2と、が互いに接続されて構成されている。各利用ユニット3a、3b、3cは、対応する分岐ユニット6a、6b、6cと、1対1に接続されている。具体的には、利用ユニット3aと分岐ユニット6aとは第1接続管15a及び第2接続管16aを介して接続され、利用ユニット3bと分岐ユニット6bとは第1接続管15b及び第2接続管16bを介して接続され、利用ユニット3cと分岐ユニット6cとは第1接続管15c及び第2接続管16cを介して接続されている。また、各分岐ユニット6a、6b、6cは、カスケードユニット2と、3つの連絡配管である第3連絡配管7と第4連絡配管8と第5連絡配管9とを介して接続されている。具体的には、カスケードユニット2から延び出した第3連絡配管7と第4連絡配管8と第5連絡配管9とは、それぞれ複数に分岐して、各分岐ユニット6a、6b、6cに接続されている。
 第3連絡配管7には、運転状態に応じて、気液二相状態の冷媒と液状態の冷媒とのいずれかの冷媒が流れる。第4連絡配管8には、運転状態に応じて、ガス状態の冷媒と超臨界状態の冷媒とのいずれかの冷媒が流れる。第5連絡配管9には、運転状態に応じて、気液二相状態の冷媒とガス状態の冷媒とのいずれかの冷媒が流れる。
 第2回路10は、熱源回路12と、分岐回路14a、14b、14cと、利用回路13a、13b、13cと、が互いに接続されて構成されている。
 (3-2)熱源回路
 熱源回路12は、主として、第2圧縮機21と、第2切換機構22と、第1熱源配管28と、第2熱源配管29と、吸入流路23と、吐出流路24と、第3熱源配管25と、第4熱源配管26と、第5熱源配管27と、カスケード熱交換器35と、熱源側膨張弁36と、第3閉鎖弁32と、第4閉鎖弁33と、第5閉鎖弁31と、第2アキュムレータ30と、油分離器34と、油戻し回路40と、第2レシーバ45と、バイパス回路46と、バイパス膨張弁46aと、第2過冷却熱交換器47と、第2過冷却回路48と、第2過冷却膨張弁48aと、油戻し通路23bと、油戻し弁23cと、を有している。また、第2回路10の熱源回路12は、カスケード熱交換器35の第2流路35aを有している。
 第2圧縮機21は、第2回路の熱源回路12の二酸化炭素冷媒を圧縮するための機器であり、例えば、圧縮機モータ21aをインバータ制御することで運転容量を可変することが可能なスクロール型等の容積式圧縮機からなる。なお、第2圧縮機21は、運転時の負荷に応じて、負荷が大きいほど運転容量が大きくなるように制御される。
 第2切換機構22は、第2回路10の接続状態、特に、熱源回路12内における冷媒の流路を切り換えることが可能な機構である。本実施形態では、第2切換機構22は、吐出側連絡部22xと、吸入側連絡部22yと、第1切換弁22aと、第2切換弁22bと、を有している。吐出側連絡部22xには、吐出流路24の第2圧縮機21側とは反対側の端部とが接続されている。吸入側連絡部22yには、吸入流路23の第2圧縮機21側とは反対側の端部とが接続されている。第1切換弁22aと第2切換弁22bとは、第2圧縮機21の吐出流路24と吸入流路23との間に互いに並列に設けられている。第1切換弁22aは、吐出側連絡部22xの一端部と、吸入側連絡部22yの一端部が接続されている。第2切換弁22bは、吐出側連絡部22xの他端部と、吸入側連絡部22yの他端部が接続されている。本実施形態において、第1切換弁22a及び第2切換弁22bは、いずれも四路切換弁により構成されている。第1切換弁22a及び第2切換弁22bは、それぞれ第1接続ポート、第2接続ポート、第3接続ポート、第4接続ポートの4つの接続ポートを有している。本実施形態の第1切換弁22a及び第2切換弁22bでは、各第4ポートが閉塞されており、第2回路10の流路接続されていない接続ポートである。第1切換弁22aは、第1接続ポートが吐出側連絡部22xの一端部と接続され、第2接続ポートがカスケード熱交換器35の第2流路35aから延びる第3熱源配管25に接続され、第3接続ポートが吸入側連絡部22yの一端部と接続されている。第1切換弁22aは、第1接続ポートと第2接続ポートが接続され、第3接続ポートと第4接続ポートが接続された切換状態と、第3接続ポートと第2接続ポートが接続され、第1接続ポートと第4接続ポートが接続された切換状態と、を切り換える。第2切換弁22bは、第1接続ポートが吐出側連絡部22xの他端部と接続され、第2接続ポートが第1熱源配管28に接続され、第3接続ポートが吸入側連絡部22yの他端部と接続されている。第2切換弁22bは、第1接続ポートと第2接続ポートが接続され、第3接続ポートと第4接続ポートが接続された切換状態と、第3接続ポートと第2接続ポートが接続され、第1接続ポートと第4接続ポートが接続された切換状態と、を切り換える。
 第2切換機構22は、カスケード熱交換器35を二酸化炭素冷媒の放熱器として機能させつつ、第2圧縮機21から吐出される二酸化炭素冷媒が第4連絡配管8に送られることを抑制する場合には、第1切換弁22aにより吐出流路24と第3熱源配管25とが接続され、第2切換弁22bにより第1熱源配管28と吸入流路23とが接続される第1接続状態に切り換えられる。第2切換機構22の第1接続状態は、後述する全冷房運転時に採用される接続状態である。また、第2切換機構22は、カスケード熱交換器35を二酸化炭素冷媒の蒸発器として機能させる場合には、第2切換弁22bにより吐出流路24と第1熱源配管28とが接続され、第1切換弁22aにより第3熱源配管25と吸入流路23とが接続される第2接続状態に切り換えられる。第2切換機構22の第2接続状態は、後述する全暖房運転時及び暖房主体運転時に採用される接続状態である。また、第2切換機構22は、カスケード熱交換器35を二酸化炭素冷媒の放熱器として機能させつつ、第2圧縮機21から吐出される二酸化炭素冷媒を第4連絡配管8に送る場合には、第1切換弁22aにより吐出流路24と第3熱源配管25とが接続され、第2切換弁22bにより吐出流路24と第1熱源配管28とが接続される第3接続状態に切り換えられる。第2切換機構22の第3接続状態は、後述する冷房主体運転時に採用される接続状態である。
 カスケード熱交換器35は、上述の通り、第1回路5aを流れる第1冷媒であるR32等の冷媒と、第2回路10を流れる二酸化炭素冷媒と、の間で互いに混合させることなく熱交換を行わせるための機器である。なお、カスケード熱交換器35は、第2回路10の二酸化炭素冷媒が流れる第2流路35aと、第1回路5aの第1冷媒が流れる第1流路35bと、を有することで、第1ユニット5とカスケードユニット2とで共有されている。なお、本実施形態では、カスケード熱交換器35は、カスケードユニット2のカスケードケーシングの内部に配置されている。カスケード熱交換器35の第1流路35bのガス側は、第1冷媒配管113を経て、カスケードケーシング外の第1連絡配管112まで延びている。カスケード熱交換器35の第1流路35bの液側は、第2膨張弁102が設けられた第2冷媒配管114を経て、カスケードケーシング外の第2連絡配管111まで延びている。
 熱源側膨張弁36は、カスケード熱交換器35を流れる二酸化炭素冷媒の流量の調節等を行うために、カスケード熱交換器35の液側に接続された開度調節が可能な電動膨張弁である。熱源側膨張弁36は、第4熱源配管26に設けられている。
 第3閉鎖弁32、第4閉鎖弁33及び第5閉鎖弁31は、外部の機器・配管(具体的には、連絡配管7、8及び9)との接続口に設けられた弁である。具体的には、第3閉鎖弁32は、カスケードユニット2から引き出される第4連絡配管8に接続されている。第4閉鎖弁33は、カスケードユニット2から引き出される第5連絡配管9に接続されている。第5閉鎖弁31は、カスケードユニット2から引き出される第3連絡配管7に接続されている。
 第1熱源配管28は、第3閉鎖弁32と第2切換機構22とを接続する冷媒配管である。具体的には、第1熱源配管28は、第3閉鎖弁32と、第2切換機構22のうちの第2切換弁22bの第2接続ポートと、を接続している。
 吸入流路23は、第2切換機構22と第2圧縮機21の吸入側とを連絡する流路である。具体的には、吸入流路23は、第2切換機構22のうちの吸入側連絡部22yと、第2圧縮機21の吸入側と、を接続している。吸入流路23の途中には、第2アキュムレータ30が設けられている。
 吸入流路23は、吸入配管23aを含む。吸入配管23aは、第2圧縮機21の吸入側と、第2アキュムレータ30と、を接続している。ここでは、吸入配管23aの一端は、第2圧縮機21の吸入側に接続され、吸入配管23aの他端は、第2アキュムレータ30の上部に接続される。
 第2熱源配管29は、第4閉鎖弁33と吸入流路23の途中とを接続する冷媒配管である。なお、本実施形態では、第2熱源配管29は、吸入流路23のうち、第2切換機構22における吸入側連絡部22yと、第2アキュムレータ30と、の間の部分である接続箇所において、吸入流路23に接続されている。
 吐出流路24は、第2圧縮機21の吐出側と第2切換機構22とを接続する冷媒配管である。具体的には、吐出流路24は、第2圧縮機21の吐出側と、第2切換機構22のうちの吐出側連絡部22xと、を接続している。
 第3熱源配管25は、第2切換機構22とカスケード熱交換器35のガス側とを接続する冷媒配管である。具体的には、第3熱源配管25は、第2切換機構22のうちの第1切換弁22aの第2接続ポートと、カスケード熱交換器35における第2流路35aのガス側端部とを接続している。
 第4熱源配管26は、カスケード熱交換器35の液側(ガス側とは反対側、第2切換機構22が設けられている側とは反対側)と、第2レシーバ45と、を接続する冷媒配管である。具体的には、第4熱源配管26は、カスケード熱交換器35における第2流路35aの液側端部(ガス側とは反対側の端部)と、第2レシーバ45とを接続している。
 第2レシーバ45は、二酸化炭素冷媒を貯留する。第2レシーバ45は、カスケード熱交換器35の液側と、第2熱交換器52a、52b、52cとの間に設けられる。第2レシーバ45からは、第4熱源配管26と、第5熱源配管27と、バイパス回路46と、が延び出している。
 バイパス回路46は、第2熱交換器52a、52b、52cとカスケード熱交換器35との間と、後述する吸入配管23aと、を接続する。ここでは、バイパス回路46は、第2レシーバ45内部の上方の領域である気相領域と、吸入流路23と、を接続する冷媒配管である。具体的には、バイパス回路46は、吸入流路23のうち第2切換機構22と第2アキュムレータ30との間に接続されている。
 バイパス回路46には、バイパス膨張弁46aが設けられている。バイパス膨張弁46aは、開度調節により第2レシーバ45内から第2圧縮機21の吸入側に導く冷媒の量を調節可能な電動膨張弁である。
 第5熱源配管27は、第2レシーバ45と第5閉鎖弁31とを接続する冷媒配管である。
 第2過冷却回路48は、第5熱源配管27の一部と、吸入流路23と、を接続する冷媒配管である。具体的には、第2過冷却回路48は、吸入流路23のうち第2切換機構22と第2アキュムレータ30との間に接続されている。なお、本実施形態においては、第2過冷却回路48は、第2レシーバ45と第2過冷却熱交換器47との間から分岐するように延びている。
 第2過冷却熱交換器47は、第5熱源配管27に属する流路を流れる冷媒と、第2過冷却回路48に属する流路を流れる冷媒と、で熱交換を行わせる熱交換器である。本実施形態においては、第5熱源配管27のうち、第2過冷却回路48が分岐している箇所と、第5閉鎖弁31と、の間に設けられている。第2過冷却膨張弁48aは、第2過冷却回路48における第5熱源配管27からの分岐箇所と、第2過冷却熱交換器47と、の間に設けられている。第2過冷却膨張弁48aは、第2過冷却熱交換器47に対して減圧された冷媒を供給するものであり、開度調節可能な電動膨張弁である。
 第2アキュムレータ30は、第2圧縮機21の吸入側に設けられている。第2アキュムレータ30は、二酸化炭素冷媒及び第2冷凍機油を貯留する容器である。第2アキュムレータ30は、流入した流体を液相と気相とに分離する気液分離器である。第2アキュムレータ30からは、吸入配管23aと、後述する油戻し通路23bと、吸入流路23における第2切換機構22に繋がる部分と、が延び出している。
 第2アキュムレータ30は、本体部30aと、流入口30bと、冷媒流出口30cと、油流出口30dと、を含む。
 本体部30aは、密閉可能な形状を有する。本体部30aは、特に限定されないが、例えば、筒形状、U字形状などである。
 流入口30bは二酸化炭素冷媒及び第2冷凍機油の混合物を本体部30aに流入させる。流入口30bは、吸入流路23における第2切換機構22に繋がる部分から二酸化炭素冷媒を本体部30aに流入させる。流入口30bは、本体部30aの上部に設けられる。
 冷媒流出口30cは、本体部30aに貯留している二酸化炭素冷媒を排出させる。冷媒流出口30cは、本体部30aの上部に設けられる。冷媒流出口30cは、二酸化炭素冷媒を吸入配管23aに戻す。
 油流出口30dは、本体部30aに貯留している冷媒機油を排出させる。油流出口30dは、本体部30aの下部に設けられる。油流出口30dは、油戻し通路23bに第2冷凍機油を送る。
 油戻し通路23bは、第2アキュムレータ30の下部と、吸入配管23aとを接続するように設けられている。油戻し通路23bは、第2アキュムレータ30の下部から吸入配管23aに第2冷凍機油を戻す。
 上記「第2アキュムレータ30の下部」は、本実施形態では、容器としての本体部30aの底面である。換言すると、第2アキュムレータ30の本体部30aの底面に、油戻し通路23bの一端が接続されている。なお、本体部30aの底面は、下向きに湾曲している構造、上向きに湾曲している構造、平らな構造等を含む。
 油戻し通路23bの途中には、油戻し弁23cが設けられている。油戻し弁23cが開状態に制御されることで、第2アキュムレータ30において分離された第2冷凍機油は、油戻し通路23bを通過して、さらに吸入配管23aを通過することによって、第2圧縮機21の吸入側に戻される。
 油戻し弁23cは、油戻し通路23bを狭くする機構を有していれば、開閉制御される電磁弁であってもよく、開度調節可能な電動弁であってもよい。本実施形態では、油戻し弁23cは、油戻し通路23bを開ける、または閉める、電磁弁である。
 油分離器34は、吐出流路24の途中に設けられている。油分離器34は、二酸化炭素冷媒に伴って第2圧縮機21から吐出された第2冷凍機油を二酸化炭素冷媒から分離して、第2圧縮機21に戻すための機器である。
 油戻し回路40は、油分離器34と吸入流路23とを接続するように設けられている。油戻し回路40は、油分離器34から延び出た流路が、吸入流路23のうち第2アキュムレータ30と第2圧縮機21の吸入側との間の部分に合流するように延びた油戻し流路41を有している。油戻し流路41の途中には、油戻し開閉弁44が設けられている。油戻し開閉弁44が開状態に制御されることで、油分離器34において分離された第2冷凍機油は、油戻し流路41を通過して、第2圧縮機21の吸入側に戻される。ここで、本実施形態では、油戻し開閉弁44は、第2回路10において第2圧縮機21が運転状態の場合には、開状態を所定時間維持し閉状態を所定時間維持することを繰り返すことにより、油戻し回路40を通じた第2冷凍機油の返油量が制御される。なお、油戻し開閉弁44は、本実施形態では開閉制御される電磁弁であるが、開度調節が可能な電動膨張弁としてもよい。
 また、第2回路10を構成する熱源回路12は、第2圧縮機21の吸入側における二酸化炭素冷媒及び第2冷凍機油の温度及び圧力の少なくとも一方を測定するセンサをさらに有する。ここでは、第2圧縮機21の吸入側における二酸化炭素冷媒及び第2冷凍機油の温度を測定するセンサとしての第2吸入温度センサ88、及び、第2圧縮機21の吸入側における二酸化炭素冷媒及び第2冷凍機油の圧力を測定するセンサとしての第2吸入圧力センサ37が設けられている。
 (3-3)利用回路
 以下、利用回路13a、13b、13cについて説明するが、利用回路13b、13cは利用回路13aと同様の構成であるため、利用回路13b、13cについては、利用回路13aの各部を示す符号の添字「a」の代わりに、「b」または「c」の添字を付すものとして各部の説明を省略する。
 利用回路13aは、主として、第2熱交換器52aと、第1利用配管57aと、第2利用配管56aと、利用側膨張弁51aと、を有している。
 第2熱交換器52aは、冷媒と室内空気との熱交換を行うための機器であり、例えば、多数の伝熱管及びフィンによって構成されたフィン・アンド・チューブ型熱交換器からなる。なお、複数の第2熱交換器52a、52b、52cは、第2切換機構22と吸入流路23とカスケード熱交換器35に対して互いに並列に接続されている。
 第2利用配管56aは、その一端が第1利用ユニット3aの第2熱交換器52aの液側(ガス側とは反対側)に接続されている。第2利用配管56aの他端は、第2接続管16aに接続されている。第2利用配管56aの途中には、上述した利用側膨張弁51aが設けられている。
 利用側膨張弁51aは、第2熱交換器52aを流れる冷媒の流量の調節等を行う、開度調節が可能な電動膨張弁である。利用側膨張弁51aは、第2利用配管56aに設けられている。
 第1利用配管57aは、その一端が第1利用ユニット3aの第2熱交換器52aのガス側に接続されている。本実施形態では、第1利用配管57aは、第2熱交換器52aの利用側膨張弁51a側とは反対側に接続されている。第1利用配管57aは、その他端が、第1接続管15aに接続されている。
 (3-4)分岐回路
 以下、分岐回路14a、14b、14cについて説明するが、分岐回路14b、14cは分岐回路14aと同様の構成であるため、分岐回路14b、14cについては、分岐回路14aの各部を示す符号の添字「a」の代わりに、「b」または「c」の添字を付すものとして各部の説明を省略する。
 分岐回路14aは、主として、合流配管62aと、第1分岐配管63aと、第2分岐配管64aと、第1調節弁66aと、第2調節弁67aと、バイパス管69aと、逆止弁68aと、第3分岐配管61aと、を有している。
 合流配管62aは、その一端が第1接続管15aに接続されている。合流配管62aの他端には、第1分岐配管63aと第2分岐配管64aとが分岐して接続されている。
 第1分岐配管63aは、合流配管62a側とは反対側が、第4連絡配管8に接続されている。第1分岐配管63aには、開閉可能な第1調節弁66aが設けられている。
 第2分岐配管64aは、合流配管62a側とは反対側が、第5連絡配管9に接続されている。第2分岐配管64aには、開閉可能な第2調節弁67aが設けられている。
 バイパス管69aは、第1分岐配管63aのうちの第1調節弁66aよりも第4連絡配管8側の部分と、第2分岐配管64aのうちの第2調節弁67aよりも第5連絡配管9側の部分と、を接続する冷媒配管である。このバイパス管69aの途中には、逆止弁68aが設けられている。逆止弁68aは、第2分岐配管64a側から第1分岐配管63a側に向かう冷媒流れのみを許容し、第1分岐配管63a側から第2分岐配管64a側に向かう冷媒流れは許容しない。
 第3分岐配管61aは、その一端が第2接続管16aに接続されている。第3分岐配管61aは、その他端が第3連絡配管7に接続されている。
 そして、第1分岐ユニット6aは、後述の全冷房運転を行う際には、第1調節弁66aを閉状態とし、第2調節弁67aを開状態にすることで、以下のように機能することができる。第1分岐ユニット6aは、第3連絡配管7を通じて第3分岐配管61aに流入する冷媒を、第2接続管16aに送る。なお、第2接続管16aを通じて第1利用ユニット3aの第2利用配管56aを流れる冷媒は、利用側膨張弁51aを通じて、第1利用ユニット3aの第2熱交換器52aに送られる。そして、第2熱交換器52aに送られた冷媒は、室内空気との熱交換によって蒸発した後、第1利用配管57aを介して、第1接続管15aを流れる。第1接続管15aを流れた冷媒は、第1分岐ユニット6aの合流配管62aに送られる。合流配管62aを流れた冷媒は、第1分岐配管63a側には流れず、第2分岐配管64a側に流れる。第2分岐配管64aを流れる冷媒は、第2調節弁67aを通過する。第2調節弁67aを通過した冷媒の一部は、第5連絡配管9に送られる。また、第2調節弁67aを通過した冷媒の残りは、逆止弁68aが設けられたバイパス管69aに分岐するように流れ、第1分岐配管63aの一部を通過した後、第4連絡配管8に送られる。これにより、第2熱交換器52aで蒸発したガス状態の二酸化炭素冷媒を第2圧縮機21に送る際の合計の流路断面積を大きくすることができるため、圧力損失を低減させることができる。
 また、第1分岐ユニット6aは、後述の冷房主体運転を行う際と暖房主体運転を行う際に、第1利用ユニット3aにおいて室内を冷房する場合には、第1調節弁66aを閉状態にしつつ第2調節弁67aを開状態にすることで、以下のように機能することができる。第1分岐ユニット6aは、第3連絡配管7を通じて第3分岐配管61aに流入する冷媒を、第2接続管16aに送る。なお、第2接続管16aを通じて第1利用ユニット3aの第2利用配管56aを流れる冷媒は、利用側膨張弁51aを通じて、第1利用ユニット3aの第2熱交換器52aに送られる。そして、第2熱交換器52aに送られた冷媒は、室内空気との熱交換によって蒸発した後、第1利用配管57aを介して、第1接続管15aを流れる。第1接続管15aを流れた冷媒は、第1分岐ユニット6aの合流配管62aに送られる。合流配管62aを流れた冷媒は、第2分岐配管64aに流れて第2調節弁67aを通過した後、第5連絡配管9に送られる。
 また、第1分岐ユニット6aは、後述の全暖房運転を行う際には、第2調節弁67aを閉状態にし、かつ、第1調節弁66aを開状態にすることで、次のように機能することができる。第1分岐ユニット6aでは、第4連絡配管8を通じて第1分岐配管63aに流入する冷媒が、第1調節弁66aを通過して、合流配管62aに送られる。合流配管62aを流れた冷媒は、第1接続管15aを介して、利用ユニット3aの第1利用配管57aを流れて、第2熱交換器52aに送られる。そして、第2熱交換器52aに送られた冷媒は、室内空気との熱交換によって放熱した後、第2利用配管56aに設けられた利用側膨張弁51aを通過する。第2利用配管56aを通過した冷媒は、第2接続管16aを介して、第1分岐ユニット6aの第3分岐配管61aを流れた後、第3連絡配管7に送られる。
 また、第1分岐ユニット6aは、後述の冷房主体運転を行う際と暖房主体運転を行う際とに、第1利用ユニット3aにおいて室内を暖房する場合には、第2調節弁67aを閉状態にし、かつ、第1調節弁66aを開状態にすることで、次のように機能することができる。第1分岐ユニット6aでは、第4連絡配管8を通じて第1分岐配管63aに流入する冷媒が、第1調節弁66aを通過して、合流配管62aに送られる。合流配管62aを流れた冷媒は、第1接続管15aを介して、利用ユニット3aの第1利用配管57aを流れて、第2熱交換器52aに送られる。そして、第2熱交換器52aに送られた冷媒は、室内空気との熱交換によって放熱した後、第2利用配管56aに設けられた利用側膨張弁51aを通過する。第2利用配管56aを通過した冷媒は、第2接続管16aを介して、第1分岐ユニット6aの第3分岐配管61aを流れた後、第3連絡配管7に送られる。
 このような機能は、第1分岐ユニット6aだけでなく、第2分岐ユニット6b、第3分岐ユニット6cも同様に有している。このため、第1分岐ユニット6a、第2分岐ユニット6b、第3分岐ユニット6cは、ぞれぞれ、各第2熱交換器52a、52b、52cについて、冷媒の蒸発器として機能させるか、または、冷媒の放熱器として機能させるか、を個別に切り換えることが可能になっている。
 (4)第1ユニット
 第1ユニット5は、第2ユニット4a、4b、4c(詳細には、利用ユニット3a、3b、3c及び分岐ユニット6a、6b、6c)が配置された空間とは異なる空間に配置される。ここでは、第1ユニット5は、建物の屋上に配置されている。
 第1ユニット5は、上述の第1回路5aの一部と、第1ファン75と、各種センサと、第1制御部70と、を、第1ケーシング(図示せず)内に有して構成されている。
 第1ユニット5は、第1回路5aの一部として、第1圧縮機71と、第1切換機構72と、第1熱交換器74と、第1膨張弁76と、第1過冷却熱交換器103と、第1過冷却回路104と、第1過冷却膨張弁104aと、第2閉鎖弁108と、第1閉鎖弁109と、第1アキュムレータ105と、を有している。
 第1ファン75は、第1ユニット5内に設けられており、室外空気を第1熱交換器74に導いて、第1熱交換器74を流れる第1冷媒と熱交換させた後に、室外に排出させる、という空気流れを生じさせる。第1ファン75は、第1ファンモータ75aによって駆動される。
 また、第1ユニット5には、各種のセンサが設けられている。具体的には、第1ユニット5には、外気温度センサ77と、第1吐出圧力センサ78と、第1吸入圧力センサ79と、第1吸入温度センサ81と、第1熱交温度センサ82と、が設けられている。外気温度センサ77は、第1熱交換器74を通過する前の室外空気の温度を検出する。第1吐出圧力センサ78は、第1圧縮機71から吐出された第1冷媒の圧力を検出する。第1吸入圧力センサ79は、第1圧縮機71に吸入される第1冷媒の圧力を検出する。第1吸入温度センサ81は、第1圧縮機71に吸入される第1冷媒の温度を検出する。第1熱交温度センサ82は、第1熱交換器74を流れる冷媒の温度を検出する。
 第1制御部70は、第1ユニット5内に設けられている各部材71(71a)、72、75(75a)、76、104aの動作を制御する。そして、第1制御部70は、第1ユニット5の制御を行うために設けられたCPUやマイクロコンピュータ等のプロセッサとメモリを有しており、リモコン(図示せず)との間で制御信号等のやりとりを行うことや、カスケードユニット2の熱源側制御部20や分岐ユニット制御部60a、60b、60cや利用側制御部50a、50b、50cとの間で制御信号等のやりとりを行うことができるようになっている。
 (5)カスケードユニット
 カスケードユニット2は、第2ユニット4a、4b、4c(詳細には、利用ユニット3a、3b、3c及び分岐ユニット6a、6b、6c)が配置された空間とは異なる空間に配置される。ここでは、カスケードユニット2は、建物の屋上に配置されている。
 カスケードユニット2は、連絡配管7、8、9を介して分岐ユニット6a、6b、6cに接続されており、第2回路10の一部を構成している。また、カスケードユニット2は、連絡配管111、112を介して、第1ユニット5と接続されており、第1回路5aの一部を構成している。
 カスケードユニット2は、上述した熱源回路12と、各種センサと、熱源側制御部20と、第1回路5aの一部を構成する第2膨張弁102、第1冷媒配管113及び第2冷媒配管114と、を、カスケードケーシング(図示せず)内に有して構成されている。
 カスケードユニット2には、各種のセンサが設けられている。具体的には、カスケードユニット2には、上述した第2吸入圧力センサ37と、第2吐出圧力センサ38と、第2吐出温度センサ39と、上述した第2吸入温度センサ88と、カスケード温度センサ83と、レシーバ出口温度センサ84と、バイパス回路温度センサ85と、過冷却出口温度センサ86と、過冷却回路温度センサ87と、が設けられている。第2吸入圧力センサ37は、第2圧縮機21の吸入側における二酸化炭素冷媒の圧力を検出する。第2吐出圧力センサ38は、第2圧縮機21の吐出側における二酸化炭素冷媒の圧力を検出する。第2吐出温度センサ39は、第2圧縮機21の吐出側における二酸化炭素冷媒の温度を検出する。第2吸入温度センサ88は、第2圧縮機21の吸入側における二酸化炭素冷媒の温度を検出する。カスケード温度センサ83は、カスケード熱交換器35の第2流路35aと熱源側膨張弁36との間を流れる二酸化炭素冷媒の温度を検出する。レシーバ出口温度センサ84は、第2レシーバ45から第2過冷却熱交換器47との間を流れる二酸化炭素冷媒の温度を検出する。バイパス回路温度センサ85は、バイパス回路46におけるバイパス膨張弁46aの下流側を流れる二酸化炭素冷媒の温度を検出する。過冷却出口温度センサ86は、第2過冷却熱交換器47と第5閉鎖弁31との間を流れる二酸化炭素冷媒の温度を検出する。過冷却回路温度センサ87は、第2過冷却回路48における第2過冷却熱交換器47の出口を流れる二酸化炭素冷媒の温度を検出する。
 熱源側制御部20は、カスケードユニット2のカスケードケーシング(図示せず)の内部に設けられた各部材21(21a)、22、23c、36、44、46a、48a、102の動作を制御する。熱源側制御部20は、カスケードユニット2の制御を行うために設けられたCPUやマイクロコンピュータ等のプロセッサとメモリを有しており、第1ユニット5の第1制御部70や利用ユニット3a、3b、3cの利用側制御部50a、50b、50cや分岐ユニット制御部60a、60b、60cとの間で制御信号等のやりとりを行うことができるようになっている。
 なお、このように、熱源側制御部20は、第2回路10の熱源回路12を構成する各部材だけでなく、第1回路5aの一部を構成する第2膨張弁102の制御を行うことができる。このため、熱源側制御部20は、自身が制御する熱源回路12の状況に基づいて、自ら第2膨張弁102の弁開度を制御することにより、熱源回路12の状況を所望の状況に近づけることができる。具体的には、熱源回路12におけるカスケード熱交換器35の第2流路35aを流れる二酸化炭素冷媒が、カスケード熱交換器35の第1流路35bを流れる第1冷媒から受ける熱量または当該第1冷媒に与える熱量を制御することが可能になる。
 (6)第2ユニット
 第2ユニット4a、4b、4cは、利用ユニット3a、3b、3cと、分岐ユニット6a、6b、6cと、第1接続管15a、15b、15cと、第2接続管16a、16b、16cと、を含む。
 (6-1)利用ユニット
 利用ユニット3a、3b、3cは、ビル等の室内の天井に埋め込みや吊り下げ等、または、室内の壁面に壁掛け等により設置されている。
 利用ユニット3a、3b、3cは、連絡配管7、8、9を介してカスケードユニット2に接続されている。
 利用ユニット3a、3b、3cは、第2回路10の一部を構成する利用回路13a、13b、13cを有している。
 以下、利用ユニット3a、3b、3cの構成について説明する。なお、第2利用ユニット3b及び第3利用ユニット3cは、第1利用ユニット3aと同様の構成であるため、ここでは、第1利用ユニット3aの構成のみ説明し、第2利用ユニット3b及び第3利用ユニット3cの構成については、それぞれ、第1利用ユニット3aの各部を示す符号の添字「a」の代わりに、「b」または「c」の添字を付して、各部の説明を省略する。
 第1利用ユニット3aは、主として、上述の利用回路13aと、第2ファン53aと、利用側制御部50aと、各種センサと、を有している。なお、第2ファン53aは、第2ファンモータ54aを有している。
 第2ファン53aは、利用ユニット3a内に室内空気を吸入して、第2熱交換器52aを流れる冷媒と熱交換させた後に、供給空気として室内に供給する空気流れを生じさせる。第2ファン53aは、第2ファンモータ54aによって駆動される。
 利用ユニット3aには、第2熱交換器52aの液側における冷媒の温度を検出する液側温度センサ58aが設けられている。また、利用ユニット3aには、室内から取り込まれた空気であって、第2熱交換器52aを通過する前の空気の温度である室内温度を検出する室内温度センサ55aが設けられている。
 利用側制御部50aは、利用ユニット3aを構成する各部材51a、53a(54a)の動作を制御する。そして、利用側制御部50aは、利用ユニット3aの制御を行うために設けられたCPUやマイクロコンピュータ等のプロセッサとメモリを有しており、リモコン(図示せず)との間で制御信号等のやりとりを行うことや、カスケードユニット2の熱源側制御部20や分岐ユニット制御部60a、60b、60cや第1ユニット5の第1制御部70との間で制御信号等のやりとりを行うことができるようになっている。
 なお、第2利用ユニット3bは、利用回路13b、第2ファン53b、利用側制御部50b、第2ファンモータ54bを有している。第3利用ユニット3cは、利用回路13c、第2ファン53c、利用側制御部50c、第2ファンモータ54cを有している。
 (6-2)分岐ユニット
 分岐ユニット6a、6b、6cは、ビル等の室内の天井裏の空間等に設置されている。
 分岐ユニット6a、6b、6cは、利用ユニット3a、3b、3cと1対1に対応しつつ接続されている。分岐ユニット6a、6b、6cは、連絡配管7、8、9を介してカスケードユニット2に接続されている。
 次に、分岐ユニット6a、6b、6cの構成について説明する。なお、第2分岐ユニット6b及び第3分岐ユニット6cは、第1分岐ユニット6aと同様の構成であるため、ここでは、第1分岐ユニット6aの構成のみ説明し、第2分岐ユニット6b及び第3分岐ユニット6cの構成については、それぞれ、第1分岐ユニット6aの各部を示す符号の添字「a」の代わりに、「b」または「c」の添字を付して、各部の説明を省略する。
 第1分岐ユニット6aは、主として、上述の分岐回路14aと、分岐ユニット制御部60aと、を有している。
 分岐ユニット制御部60aは、分岐ユニット6aを構成する各部材66a、67aの動作を制御する。そして、分岐ユニット制御部60aは、分岐ユニット6aの制御を行うために設けられたCPUやマイクロコンピュータ等のプロセッサとメモリを有しており、リモコン(図示せず)との間で制御信号等のやりとりを行うことや、カスケードユニット2の熱源側制御部20や利用ユニット3a、3b、3cや第1ユニット5の第1制御部70との間で制御信号等のやりとりを行うことができるようになっている。
 なお、第2分岐ユニット6bは、分岐回路14bと分岐ユニット制御部60bを有している。第3分岐ユニット6cは、分岐回路14cと分岐ユニット制御部60cを有している。
 (7)制御部
 (7-1)概要
 冷凍サイクル装置1では、上述の熱源側制御部20、利用側制御部50a、50b、50c、分岐ユニット制御部60a、60b、60c、第1制御部70が、有線または無線を介して相互に通信可能に接続されることで、制御部80を構成している。したがって、この制御部80は、各種センサ37、38、39、83、84、85、86、87、88、77、78、79、81、82、58a、58b、58c、56a、56b、56c等の検出情報及び図示しないリモコン等から受け付けた指示情報等に基づいて、各部材21(21a)、22、23c、36、44、46a、48a、51a、51b、51c、53a、53b、53c(54a、54b、54c)、66a、66b、66c、67a、67b、67c、71(71a)、72、75(75a)、76、104a等の動作を制御する。
 ここでは、制御部80は、カスケード熱交換器35において、二酸化炭素冷媒を第1冷媒によって加熱する運転(本実施形態では、全暖房運転または暖房主体運転)と、二酸化炭素冷媒を第1冷媒によって冷却する運転(本実施形態では、全冷房運転または冷房主体運転)と、を切り換える。このように、カスケード熱交換器35による二酸化炭素冷媒の加熱及び冷却の切り換えを行うために、制御部80の熱源側制御部20は、第2切換機構22を制御する。具体的には、制御部80は、カスケード熱交換器35を二酸化炭素冷媒の放熱器として機能させる第1状態と、カスケード熱交換器35を二酸化炭素冷媒の蒸発器として機能させる第2状態とを切り換えるように、第2切換機構22を制御する。
 (7-2)起動時の制御
 以下、冷凍サイクル装置1の冷凍サイクル運転の起動時の制御部80による起動制御について説明する。なお、冷凍サイクル装置1の通常の冷凍サイクル運転は、全冷房運転と、全暖房運転と、冷房主体運転と、暖房主体運転と、を含む。本実施形態では、制御部80は、カスケード熱交換器35において、二酸化炭素冷媒を第1冷媒によって加熱する運転時に、起動制御を行う。ここでは、制御部80は、全暖房運転時及び暖房主体運転時に、起動制御を行う。
 制御部80は、第1回路5aにおいて第1冷媒を循環させ始めた後に、油戻し弁23cを開ける起動制御を実施する。具体的には、制御部80は、リモコン等から暖房運転または暖房主体運転の指令を受けると、第1圧縮機71を起動して、第1回路5aにおいて第1冷媒を循環させた後に、油戻し弁23cの開度を大きくする制御を行う。
 全暖房運転または暖房主体運転の起動時に外気温が低いため、室外に配置された第2アキュムレータ30内の二酸化炭素冷媒の温度が低い場合に、第2冷凍機油の密度が二酸化炭素冷媒の密度よりも小さいことがある。この場合、第2アキュムレータ30内において、第2冷凍機油が二酸化炭素冷媒の上方に位置する、正常でない状態となる。この正常でない状態では、制御部80は、油戻し弁23cを閉じるように制御することで、油戻し弁23cが設けられている油戻し通路23bに、二酸化炭素冷媒が流出することを防止できる。そして、起動制御を行うことによって、第1回路5aにおいて第1冷媒を循環させ始めることで、カスケード熱交換器35を介して、第2回路10の第2アキュムレータ30内の二酸化炭素冷媒の温度を上げることができる。これにより、二酸化炭素冷媒の密度が第2冷凍機油の密度よりも低い、正常な状態にすることができる。換言すると、制御部80は、第2アキュムレータ30内において、第2冷凍機油が二酸化炭素冷媒の下方に位置するように制御する。さらに換言すると、制御部80は、第2アキュムレータ30内において、第2冷凍機油が二酸化炭素冷媒の下方から上方に反転することを防止する。そして、制御部80は、正常な状態になった後に、油戻し弁23cを開けるように制御することで、油戻し弁23cから油戻し通路23bに、第2冷凍機油を流出させるとともに、二酸化炭素冷媒が流出することを防止する。
 本実施形態では、制御部80は、全暖房運転または暖房主体運転の起動時に、まず、第1回路5aにおいて第1冷媒を循環させ、次に、第2回路10において二酸化炭素冷媒を循環させ、次に、油戻し弁23cを開ける。
 具体的には、制御部80は、第1回路5aにおいて第1冷媒を循環させ始めた後に、第2回路10において二酸化炭素冷媒を循環させ始める。ここでは、制御部80は、第1回路5aにおいて第1冷媒を循環させて、カスケード熱交換器35における第1冷媒の凝縮温度が所定値以上に上昇したときに、第2圧縮機21を起動して、第2回路10において二酸化炭素冷媒を循環させ始める。
 さらに、制御部80は、第2回路10において二酸化炭素冷媒を循環させ始めた後に、油戻し弁23cを開ける。ここでは、制御部80は、第2アキュムレータ30内の二酸化炭素冷媒及び第2冷凍機油の温度又は圧力が、第2アキュムレータ30内の二酸化炭素冷媒の密度と第2冷凍機油の密度とが等しくなる境界温度に対応する所定温度又は所定圧力以上になると、油戻し弁23cを開ける。
 なお、「所定温度又は所定圧力」は、境界温度以上の温度又は圧力であり、境界温度を超える温度又は圧力であることが好ましい。境界温度は、第2冷凍機油がポリアルキレングリコールの場合、-15℃である。
 制御部80は、第2アキュムレータ30内の二酸化炭素冷媒及び第2冷凍機油の温度又は圧力が、所定温度又は所定圧力以上になったか否かを判断するために、本実施形態では、第2圧縮機21の吸入側における二酸化炭素冷媒及び第2冷凍機油の温度及び圧力の少なくとも一方を測定するセンサから、吸入配管23aを流れる二酸化炭素冷媒及び第2冷凍機油の温度または圧力を取得する。ここでは、制御部80は、第2吸入温度センサ88及び第2吸入圧力センサ37の少なくとも一方から、吸入配管23aを流れる二酸化炭素冷媒及び第2冷凍機油の温度または圧力を取得する。そして、制御部80は、取得した温度または圧力が、第2アキュムレータ30内の二酸化炭素冷媒の密度と第2冷凍機油の密度とが等しくなる境界温度に対応する所定温度又は所定圧力以上であるかを判断する。
 また、本実施形態では、制御部80は、外気温が第1温度以下の時に起動制御を実施し、外気温が第1温度を超える時には、起動制御を実施しない。制御部80は、起動制御に関する第1温度を有している。第1温度は、第2アキュムレータ30内の二酸化炭素冷媒の温度が低いことに起因して、二酸化炭素冷媒の密度が冷凍機油の密度よりも高くなる温度である。第1温度は、例えば、-20℃である。そして、制御部80は、外気温度センサ77から外気温を取得して、取得した外気温が第1温度以下か否かを判断する。そして、制御部80は、外気温が第1温度以下であると判断すると、起動制御を実施するとともに、外気温が第1温度を超えると判断すると、起動制御を実施しない。
 ここでは、制御部80は、外気温が第1温度を超える時には、第1回路5aの運転と、第2回路10の運転と、油戻し弁23cの開動作と、を同時に開始する。なお、「同時」は、例えば、制御部80が、第1圧縮機71の起動の指令と、第2圧縮機21の起動の指令と、油戻し弁23cの開動作の指令と、を、同じタイミングで行う。このため、第1回路5aにおける第1冷媒の循環と、第2回路10における二酸化炭素冷媒の循環と、油戻し弁23cの開動作と、が、完全に同じ時刻に開始される場合と、いずれかがわずかに先に開始される場合とを含む。
 (8)冷凍サイクル装置の動作
 次に、冷凍サイクル装置1の動作について、図3~図6を用いて説明する。
 冷凍サイクル装置1の冷凍サイクル運転は、主として、全冷房運転と、全暖房運転と、冷房主体運転と、暖房主体運転と、に分けることができる。
 ここで、全冷房運転は、第2熱交換器52a、52b、52cが二酸化炭素冷媒の蒸発器として機能する運転を行う利用ユニットだけが存在し、利用ユニット全体の蒸発負荷に対してカスケード熱交換器35を二酸化炭素冷媒の放熱器として機能させる冷凍サイクル運転である。
 全暖房運転は、第2熱交換器52a、52b、52cが二酸化炭素冷媒の放熱器として機能する運転を行う利用ユニットだけが存在し、利用ユニット全体の放熱負荷に対してカスケード熱交換器35を二酸化炭素冷媒の蒸発器として機能させる冷凍サイクル運転である。
 冷房主体運転は、第2熱交換器52a、52b、52cが二酸化炭素冷媒の蒸発器として機能する運転を行う利用ユニットと、第2熱交換器52a、52b、52cが冷媒の放熱器として機能する運転を行う利用ユニットと、を混在させる運転である。冷房主体運転は、利用ユニット全体の熱負荷のうち蒸発負荷が主体である場合に、この利用ユニット全体の蒸発負荷を処理するためにカスケード熱交換器35を二酸化炭素冷媒の放熱器として機能させる冷凍サイクル運転である。
 暖房主体運転は、第2熱交換器52a、52b、52cが冷媒の蒸発器として機能する運転を行う利用ユニットと、第2熱交換器52a、52b、52cが冷媒の放熱器として機能する運転を行う利用ユニットと、を混在させる運転である。暖房主体運転は、利用ユニット全体の熱負荷のうち放熱負荷が主体である場合に、この利用ユニット全体の放熱負荷を処理するためにカスケード熱交換器35を二酸化炭素冷媒の蒸発器として機能させる冷凍サイクル運転である。
 なお、これらの冷凍サイクル運転を含む冷凍サイクル装置1の動作は、上記の制御部80によって行われる。
 (8-1)全冷房運転
 全冷房運転では、例えば、利用ユニット3a、3b、3cの第2熱交換器52a、52b、52cの全てが冷媒の蒸発器として機能する運転を行う。また、全冷房運転では、カスケード熱交換器35が二酸化炭素冷媒の放熱器として機能する運転を行う。この全冷房運転では、冷凍サイクル装置1の第1回路5a及び第2回路10は、図3に示すように構成される。なお、図3の第1回路5aに付された矢印及び第2回路10に付された矢印は、全冷房運転時の冷媒の流れを示している。
 具体的には、第1ユニット5においては、第1切換機構72を第4接続状態に切り換えることによって、カスケード熱交換器35を第1冷媒の蒸発器として機能させるようになっている。なお、第1切換機構72の第4接続状態は、図3の第1切換機構72において実線で示す接続状態である。これにより、第1ユニット5では、第1圧縮機71から吐出された第1冷媒は、第1切換機構72を通過して、第1熱交換器74において第1ファン75から供給される外気と熱交換を行うことで放熱する。第1熱交換器74において放熱した第1冷媒は、全開状態に制御された第1膨張弁76を通過し、一部の冷媒が、第1過冷却熱交換器103を通じて第2閉鎖弁108に向けて流れ、他の一部の冷媒が、第1過冷却回路104に分岐して流れる。第1過冷却回路104を流れる冷媒は、第1過冷却膨張弁104aを通過する際に減圧される。第1膨張弁76から第2閉鎖弁108に向けて流れる冷媒は、第1過冷却熱交換器103において、第1過冷却膨張弁104aで減圧されて第1過冷却回路104を流れる冷媒との間で熱交換を行い、過冷却状態となるまで冷却される。過冷却状態となった第1冷媒は、第2連絡配管111を通って、第2膨張弁102を通過する際に減圧される。ここで、第2膨張弁102は、第1圧縮機71に吸入される第1冷媒の過熱度が所定条件を満たすように弁開度が制御される。第2膨張弁102で減圧された第1冷媒は、カスケード熱交換器35の第1流路35bを流れる際に、第2流路35aを流れる二酸化炭素冷媒と熱交換することで蒸発し、第1連絡配管112に向けて流れる。この第1冷媒は、第1連絡配管112と第1閉鎖弁109を通過した後、第1切換機構72に至る。第1切換機構72を通過した冷媒は、第1過冷却回路104を流れた冷媒と合流した後、第1アキュムレータ105を介して、第1圧縮機71に吸入される。
 また、カスケードユニット2においては、第2切換機構22を第1接続状態に切り換えることによって、カスケード熱交換器35を二酸化炭素冷媒の放熱器として機能させるようになっている。なお、第2切換機構22の第1接続状態では、第1切換弁22aにより吐出流路24と第3熱源配管25とが接続され、第2切換弁22bにより第1熱源配管28と吸入流路23とが接続される。ここで、熱源側膨張弁36は、開度調節されている。第1~第3利用ユニット3a、3b、3cにおいては、第2調節弁67a、67b、67cは、開状態に制御される。これにより、利用ユニット3a、3b、3cの第2熱交換器52a、52b、52cの全てが、冷媒の蒸発器として機能する。また、利用ユニット3a、3b、3cの第2熱交換器52a、52b、52cの全てとカスケードユニット2の第2圧縮機21の吸入側とは、第1利用配管57a、57b、57c、第1接続管15a、15b、15c、合流配管62a、62b、62c、第2分岐配管64a、64b、64c、バイパス管69a、69b、69c、第1分岐配管63a、63b、63cの一部、第4連絡配管8及び第5連絡配管9を介して接続された状態になっている。また、第2過冷却膨張弁48aは、第2過冷却熱交換器47の出口を第3連絡配管7に向けて流れる二酸化炭素冷媒の過冷却度が所定条件を満たすように開度制御されている。バイパス膨張弁46aは、閉状態に制御される。利用ユニット3a、3b、3cにおいては、利用側膨張弁51a、51b、51cは、開度調節されている。
 このような第2回路10において、第2圧縮機21で圧縮され吐出された高圧の二酸化炭素冷媒は、第2切換機構22の第1切換弁22aを通じて、カスケード熱交換器35の第2流路35aに送られる。カスケード熱交換器35では、第2流路35aを流れる高圧の二酸化炭素冷媒は放熱し、カスケード熱交換器35の第1流路35bを流れる第1冷媒は蒸発する。カスケード熱交換器35において放熱した二酸化炭素冷媒は、開度調節されている熱源側膨張弁36を通過した後、第2レシーバ45に流入する。第2レシーバ45から流出した二酸化炭素冷媒の一部は、第2過冷却回路48に分岐して流れ、第2過冷却膨張弁48aにおいて減圧された後に、吸入流路23に合流する。第2過冷却熱交換器47では、第2レシーバ45から流出した冷媒の他の一部が、第2過冷却回路48を流れる冷媒によって冷却された後、第5閉鎖弁31を通じて、第3連絡配管7に送られる。
 そして、第3連絡配管7に送られた冷媒は、3つに分岐されて、各第1~第3分岐ユニット6a、6b、6cの第3分岐配管61a、61b、61cを通過する。その後、各第2接続管16a、16b、16cを流れた冷媒は、各第1~第3利用ユニット3a、3b、3cの第2利用配管56a、56b、56cに送られる。第2利用配管56a、56b、56cに送られた冷媒は、利用ユニット3a、3b、3cの利用側膨張弁51a、51b、51cに送られる。
 そして、開度調節されている利用側膨張弁51a、51b、51cを通過した二酸化炭素冷媒は、第2熱交換器52a、52b、52cにおいて、第2ファン53a、53b、53cによって供給される室内空気と熱交換を行う。これにより、第2熱交換器52a、52b、52cを流れる二酸化炭素冷媒は、蒸発し、低圧のガス冷媒となる。室内空気は、冷却されて室内に供給される。これにより、室内空間が冷房される。第2熱交換器52a、52b、52cにおいて蒸発した低圧のガス冷媒は、第1利用配管57a、57b、57cを流れ、第1接続管15a、15b、15cを流れた後、第1~第3分岐ユニット6a、6b、6cの合流配管62a、62b、62cに送られる。
 そして、合流配管62a、62b、62cに送られた低圧のガス冷媒は、第2分岐配管64a、64b、64cと、に流れる。第2分岐配管64a、64b、64cにおいて第2調節弁67a、67b、67cを通過した二酸化炭素冷媒は、一部が、第5連絡配管9に送られる。第2調節弁67a、67b、67cを通過した残りの冷媒は、バイパス管69a、69b、69cを通過して、第1分岐配管63a、63b、63cの一部を流れた後、第4連絡配管8に送られる。
 そして、第4連絡配管8及び第5連絡配管9に送られた低圧のガス冷媒は、第3閉鎖弁32、第4閉鎖弁33、第1熱源配管28、第2熱源配管29、第2切換機構22の第2切換弁22b、吸入流路23、第2アキュムレータ30及び吸入配管23aを通じて、第2圧縮機21の吸入側に戻される。
 また、第2回路10を循環する第2冷凍機油は、第2アキュムレータ30の下部から油戻し通路23b、油戻し弁23c、及び吸入配管23aを通じて、第2圧縮機21の吸入側に戻される。
 このようにして、全冷房運転における動作が行われる。
 なお、全暖房運転時には、制御部80によって、第2圧縮機21に液冷媒が流入しないために、第2圧縮機21から吐出される二酸化炭素冷媒の過熱度(吐出過熱度)に基づいて油戻し弁23cの開度を制御している。
 (8-2)全暖房運転
 全暖房運転では、例えば、利用ユニット3a、3b、3cの第2熱交換器52a、52b、52cの全てが冷媒の放熱器として機能する運転を行う。また、全暖房運転では、カスケード熱交換器35が二酸化炭素冷媒の蒸発器として機能する運転を行う。この全暖房運転では、冷凍サイクル装置1の第1回路5a及び第2回路10は、図4に示すように構成される。図4の第1回路5aに付された矢印及び第2回路10に付された矢印は、全暖房運転時の冷媒の流れを示している。
 具体的には、第1ユニット5においては、第1切換機構72を第5接続状態に切り換えることによって、カスケード熱交換器35を第1冷媒の放熱器として機能させるようになっている。第1切換機構72の第5接続状態は、図4の第1切換機構72において破線で示す接続状態である。これにより、第1ユニット5では、第1圧縮機71から吐出され、第1切換機構72を通過した第1冷媒は、第1連絡配管112をさらに通過して、カスケード熱交換器35の第1流路35bに送られる。カスケード熱交換器35の第1流路35bを流れる冷媒は、第2流路35aを流れる二酸化炭素冷媒と熱交換することで凝縮する。カスケード熱交換器35において凝縮した第1冷媒は、第2冷媒配管114を流れる際に、全開状態に制御された第2膨張弁102を通過する。第2膨張弁102を通過した冷媒は、第2連絡配管111、第2閉鎖弁108、第1過冷却熱交換器103の順に流れて、第1膨張弁76において減圧される。なお、全暖房運転時には、第1過冷却膨張弁104aは閉状態に制御されることで、第1過冷却回路104には冷媒は流れないため、第1過冷却熱交換器103における熱交換も行われない。なお、第1膨張弁76は、例えば、第1圧縮機71に吸入される第1冷媒の過熱度が所定条件を満たすように弁開度が制御される。第1膨張弁76において減圧された冷媒は、第1熱交換器74において第1ファン75から供給される外気と熱交換を行うことで蒸発し、第1切換機構72、第1アキュムレータ105を通過して、第1圧縮機71に吸入される。
 また、カスケードユニット2においては、第2切換機構22を第2接続状態に切り換える。これにより、カスケード熱交換器35を二酸化炭素冷媒の蒸発器として機能させるようになっている。第2切換機構22の第2接続状態では、第2切換弁22bにより吐出流路24と第1熱源配管28とが接続され、第1切換弁22aにより第3熱源配管25と吸入流路23とが接続される。また、熱源側膨張弁36は、開度調節されている。第1~第3分岐ユニット6a、6b、6cにおいては、第1調節弁66a、66b、66cが開状態に制御され、第2調節弁67a、67b、67cが閉状態に制御される。これにより、利用ユニット3a、3b、3cの第2熱交換器52a、52b、52cの全てが冷媒の放熱器として機能する。そして、利用ユニット3a、3b、3cの第2熱交換器52a、52b、52cとカスケードユニット2の第2圧縮機21の吐出側とは、吐出流路24、第1熱源配管28、第4連絡配管8、第1分岐配管63a、63b、63c、合流配管62a、62b、62c、第1接続管15a、15b、15c、第1利用配管57a、57b、57cを介して接続された状態になっている。また、第2過冷却膨張弁48a及びバイパス膨張弁46aは、閉状態に制御される。利用ユニット3a、3b、3cにおいては、利用側膨張弁51a、51b、51cは、開度調節されている。
 このような第2回路10において、第2圧縮機21で圧縮され吐出された高圧の二酸化炭素冷媒は、第2切換機構22の第2切換弁22bを通じて、第1熱源配管28に送られる。第1熱源配管28に送られた冷媒は、第3閉鎖弁32を通じて、第4連絡配管8に送られる。
 そして、第4連絡配管8に送られた高圧冷媒は、3つに分岐されて、運転中の利用ユニットである各利用ユニット3a、3b、3cの第1分岐配管63a、63b、63cに送られる。第1分岐配管63a、63b、63cに送られた高圧の二酸化炭素冷媒は、第1調節弁66a、66b、66cを通過し、合流配管62a、62b、62cを流れる。その後、第1接続管15a、15b、15c及び第1利用配管57a、57b、57cを流れた冷媒が、第2熱交換器52a、52b、52cに送られる。
 そして、第2熱交換器52a、52b、52cに送られた高圧の二酸化炭素冷媒は、第2熱交換器52a、52b、52cにおいて、第2ファン53a、53b、53cによって供給される室内空気と熱交換を行う。これにより、第2熱交換器52a、52b、52cを流れる二酸化炭素冷媒は、放熱する。室内空気は、加熱されて室内に供給される。これにより、室内空間が暖房される。第2熱交換器52a、52b、52cにおいて放熱した二酸化炭素冷媒は、第2利用配管56a、56b、56cを流れて、開度調節されている利用側膨張弁51a、51b、51cを通過する。その後、第2接続管16a、16b、16cを流れた冷媒は、各分岐ユニット6a、6b、6cの第3分岐配管61a、61b、61cを流れる。
 そして、第3分岐配管61a、61b、61cに送られた二酸化炭素冷媒は、第3連絡配管7に送られて合流する。
 そして、第3連絡配管7に送られた二酸化炭素冷媒は、第5閉鎖弁31を通じて、熱源側膨張弁36に送られる。熱源側膨張弁36に送られた冷媒は、熱源側膨張弁36において流量調節された後、カスケード熱交換器35に送られる。カスケード熱交換器35では、第2流路35aを流れる二酸化炭素冷媒は蒸発して低圧のガス冷媒となって第2切換機構22に送られ、カスケード熱交換器35の第1流路35bを流れる第1冷媒は凝縮する。そして、第2切換機構22の第1切換弁22aに送られた低圧のガス冷媒は、吸入流路23、第2アキュムレータ30、及び吸入配管23a通じて、第2圧縮機21の吸入側に戻される。
 また、第2回路10を循環する第2冷凍機油は、第2アキュムレータ30の下部から油戻し通路23b、油戻し弁23c、及び吸入配管23aを通じて、第2圧縮機21の吸入側に戻される。
 このようにして、全暖房運転における動作が行われる。
 (8-3)冷房主体運転
 冷房主体運転では、例えば、利用ユニット3a、3bの第2熱交換器52a、52bが冷媒の蒸発器として機能し、かつ、利用ユニット3cの第2熱交換器52cが冷媒の放熱器として機能する運転を行う。また、冷房主体運転では、カスケード熱交換器35は、二酸化炭素冷媒の放熱器として機能する。この冷房主体運転では、冷凍サイクル装置1の第1回路5a及び第2回路10は、図5に示されるように構成される。図5の第1回路5aに付された矢印及び第2回路10に付された矢印は、冷房主体運転時の冷媒の流れを示している。
 具体的には、第1ユニット5においては、第1切換機構72を第4接続状態(図5の第1切換機構72の実線で示された状態)に切り換えることによって、カスケード熱交換器35を第1冷媒の蒸発器として機能させるようになっている。これにより、第1ユニット5では、第1圧縮機71から吐出された第1冷媒は、第1切換機構72を通過して、第1熱交換器74において第1ファン75から供給される外気と熱交換を行うことで凝縮する。第1熱交換器74において凝縮した第1冷媒は、全開状態に制御された第1膨張弁76を通過し、一部の冷媒が、第1過冷却熱交換器103を通じて第2閉鎖弁108に向けて流れ、他の一部の冷媒が、第1過冷却回路104に分岐して流れる。第1過冷却回路104を流れる冷媒は、第1過冷却膨張弁104aを通過する際に減圧される。第1膨張弁76から第2閉鎖弁108に向けて流れる冷媒は、第1過冷却熱交換器103において、第1過冷却膨張弁104aで減圧されて第1過冷却回路104を流れる冷媒との間で熱交換を行い、過冷却状態となるまで冷却される。過冷却状態となった冷媒は、第2連絡配管111を流れ、第2膨張弁102において減圧される。なお、この際、第2膨張弁102は、例えば、第1圧縮機71に吸入される冷媒の過熱度が所定条件を満たすように弁開度が制御される。第2膨張弁102で減圧された第1冷媒は、カスケード熱交換器35の第1流路35bを流れる際に、第2流路35aを流れる二酸化炭素冷媒と熱交換することで蒸発し、第1連絡配管112に向けて流れる。この第1冷媒は、第1連絡配管112と第1閉鎖弁109を通過した後、第1切換機構72に至る。第1切換機構72を通過した冷媒は、第1過冷却回路104を流れた冷媒と合流した後、第1アキュムレータ105を介して、第1圧縮機71に吸入される。
 また、カスケードユニット2においては、第2切換機構22について、第1切換弁22aにより吐出流路24と第3熱源配管25とが接続され、第2切換弁22bにより吐出流路24と第1熱源配管28とが接続される第3接続状態に切り換えることによって、カスケード熱交換器35を二酸化炭素冷媒の放熱器として機能させるようになっている。また、熱源側膨張弁36は、開度調節されている。第1~第3分岐ユニット6a、6b、6cにおいては、第1調節弁66c、及び、第2調節弁67a、67bが開状態に制御され、かつ、第1調節弁66a、66b、及び、第2調節弁67cが閉状態に制御される。これにより、利用ユニット3a、3bの第2熱交換器52a、52bが冷媒の蒸発器として機能し、かつ、利用ユニット3cの第2熱交換器52cが冷媒の放熱器として機能する。また、利用ユニット3a、3bの第2熱交換器52a、52bとカスケードユニット2の第2圧縮機21の吸入側とが第5連絡配管9を介して接続された状態になり、かつ、利用ユニット3cの第2熱交換器52cとカスケードユニット2の第2圧縮機21の吐出側とが第4連絡配管8を介して接続された状態になっている。また、第2過冷却膨張弁48aは、第2過冷却熱交換器47の出口を第3連絡配管7に向けて流れる二酸化炭素冷媒の過冷却度が所定条件を満たすように開度制御されている。バイパス膨張弁46aは、閉状態に制御される。利用ユニット3a、3b、3cにおいては、利用側膨張弁51a、51b、51cは、開度調節されている。
 このような第2回路10において、第2圧縮機21で圧縮され吐出された高圧の二酸化炭素冷媒は、その一部が、第2切換機構22の第2切換弁22b、第1熱源配管28及び第3閉鎖弁32を通じて、第4連絡配管8に送られ、残りが、第2切換機構22の第1切換弁22a及び第3熱源配管25を通じて、カスケード熱交換器35の第2流路35aに送られる。
 そして、第4連絡配管8に送られた高圧冷媒は、第1分岐配管63cに送られる。第1分岐配管63cに送られた高圧冷媒は、第1調節弁66c及び合流配管62cを通じて、利用ユニット3cの第2熱交換器52cに送られる。
 そして、第2熱交換器52cに送られた高圧冷媒は、第2熱交換器52cにおいて、第2ファン53cによって供給される室内空気と熱交換を行う。これにより、第2熱交換器52cを流れる二酸化炭素冷媒は、放熱する。室内空気は、加熱されて室内に供給されて、利用ユニット3cの暖房運転が行われる。第2熱交換器52cにおいて放熱した二酸化炭素冷媒は、第2利用配管56cを流れ、利用側膨張弁51cにおいて流量調節される。その後、第2接続管16cを流れた二酸化炭素冷媒は、分岐ユニット6cの第3分岐配管61cに送られる。
 そして、第3分岐配管61cに送られた二酸化炭素冷媒は、第3連絡配管7に送られる。
 また、カスケード熱交換器35の第2流路35aに送られた高圧冷媒は、カスケード熱交換器35において、第1流路35bを流れる第1冷媒と熱交換を行うことによって放熱する。カスケード熱交換器35において放熱した二酸化炭素冷媒は、熱源側膨張弁36において流量調節された後、第2レシーバ45に流入する。第2レシーバ45から流出した二酸化炭素冷媒の一部は、第2過冷却回路48に分岐して流れ、第2過冷却膨張弁48aにおいて減圧された後に、吸入流路23に合流する。第2過冷却熱交換器47では、第2レシーバ45から流出した冷媒の他の一部が、第2過冷却回路48を流れる冷媒によって冷却された後、第5閉鎖弁31を通じて、第3連絡配管7に送られて、第2熱交換器52cにおいて放熱した冷媒と合流する。
 そして、第3連絡配管7において合流した冷媒は、2つに分岐して、分岐ユニット6a、6bの各第3分岐配管61a、61bに送られる。その後、第2接続管16a、16bを流れた冷媒は、各第1~第2利用ユニット3a、3bの第2利用配管56a、56bに送られる。第2利用配管56a、56bを流れる冷媒は、利用ユニット3a、3bの利用側膨張弁51a、51bを通過する。
 そして、開度調節されている利用側膨張弁51a、51bを通過した冷媒は、第2熱交換器52a、52bにおいて、第2ファン53a、53bによって供給される室内空気と熱交換を行う。これにより、第2熱交換器52a、52bを流れる冷媒は、蒸発し、低圧のガス冷媒となる。室内空気は、冷却されて室内に供給される。これにより、室内空間が冷房される。第2熱交換器52a、52bにおいて蒸発した低圧のガス冷媒は、第1~第2分岐ユニット6a、6bの合流配管62a、62bに送られる。
 そして、合流配管62a、62bに送られた低圧のガス冷媒は、第2調節弁67a、67b及び第2分岐配管64a、64bを通じて、第5連絡配管9に送られて合流する。
 そして、第5連絡配管9に送られた低圧のガス冷媒は、第4閉鎖弁33、第2熱源配管29、吸入流路23、第2アキュムレータ30及び吸入配管23aを通じて、第2圧縮機21の吸入側に戻される。
 また、第2回路10を循環する第2冷凍機油は、第2アキュムレータ30の下部から油戻し通路23b、油戻し弁23c、及び吸入配管23aを通じて、第2圧縮機21の吸入側に戻される。
 このようにして、冷房主体運転における動作が行われる。
 (8-4)暖房主体運転
 暖房主体運転では、例えば、利用ユニット3a、3bの第2熱交換器52a、52bが冷媒の放熱器として機能し、かつ、第2熱交換器52cが冷媒の蒸発器として機能する運転を行う。また、暖房主体運転では、カスケード熱交換器35は、二酸化炭素冷媒の蒸発器として機能する。この暖房主体運転では、冷凍サイクル装置1の第1回路5a及び第2回路10は、図6に示すように構成される。図6の第1回路5aに付された矢印及び第2回路10に付された矢印は、暖房主体運転時の冷媒の流れを示している。
 具体的には、第1ユニット5においては、第1切換機構72を第5接続状態に切り換えることによって、カスケード熱交換器35を第1冷媒の放熱器として機能させるようになっている。第1切換機構72の第5接続状態は、図6の第1切換機構72において破線で示された接続状態である。これにより、第1ユニット5では、第1圧縮機71から吐出され、第1切換機構72を通過して、第1閉鎖弁109を通過した第1冷媒は、第1連絡配管112を通過して、カスケード熱交換器35の第1流路35bに送られる。カスケード熱交換器35の第1流路35bを流れる冷媒は、第2流路35aを流れる二酸化炭素冷媒と熱交換することで凝縮する。カスケード熱交換器35において凝縮した第1冷媒は、全開状態に制御された第2膨張弁102を通過した後、第2連絡配管111、第2閉鎖弁108、第1過冷却熱交換器103の順に流れて、第1膨張弁76において減圧される。なお、暖房主体運転時には、第1過冷却膨張弁104aは閉状態に制御されることで、第1過冷却回路104には冷媒は流れないため、第1過冷却熱交換器103における熱交換も行われない。なお、第1膨張弁76は、例えば、第1圧縮機71に吸入される冷媒の過熱度が所定条件を満たすように弁開度が制御される。第1膨張弁76において減圧された冷媒は、第1熱交換器74において第1ファン75から供給される外気と熱交換を行うことで蒸発し、第1切換機構72、第1アキュムレータ105を通過して、第1圧縮機71に吸入される。
 カスケードユニット2においては、第2切換機構22を第2接続状態に切り換える。第2切換機構22の第2接続状態では、第2切換弁22bにより吐出流路24と第1熱源配管28とが接続され、第1切換弁22aにより第3熱源配管25と吸入流路23とが接続される。これによって、カスケード熱交換器35を二酸化炭素冷媒の蒸発器として機能させるようになっている。また、熱源側膨張弁36は、開度調節されている。第1~第3分岐ユニット6a、6b、6cにおいては、第1調節弁66a、66b、及び、第2調節弁67cが開状態に制御され、かつ、第1調節弁66c、及び、第2調節弁67a、67bが閉状態に制御される。これによって、利用ユニット3a、3bの第2熱交換器52a、52bは冷媒の放熱器として機能し、利用ユニット3cの第2熱交換器52cは冷媒の蒸発器として機能する。そして、利用ユニット3cの第2熱交換器52cとカスケードユニット2の第2圧縮機21の吸入側とは、第1利用配管57c、第1接続管15c、合流配管62c、第2分岐配管64c、及び第5連絡配管9を介して接続された状態になる。また、利用ユニット3a、3bの第2熱交換器52a、52bとカスケードユニット2の第2圧縮機21の吐出側とは、吐出流路24、第1熱源配管28、第4連絡配管8、第1分岐配管63a、63b、合流配管62a、62b、第1接続管15a、15b、第1利用配管57a、57bを介して接続された状態になっている。また、第2過冷却膨張弁48a及びバイパス膨張弁46aは、閉状態に制御される。利用ユニット3a、3b、3cにおいては、利用側膨張弁51a、51b、51cは、開度調節されている。
 このような第2回路10において、第2圧縮機21で圧縮され吐出された高圧の二酸化炭素冷媒は、第2切換機構22の第2切換弁22b、第1熱源配管28及び第3閉鎖弁32を通じて、第4連絡配管8に送られる。
 そして、第4連絡配管8に送られた高圧冷媒は、2つに分岐されて、運転中の利用ユニットである各第1利用ユニット3aと第2利用ユニット3bにそれぞれ接続されている第1分岐ユニット6aと第2分岐ユニット6bの第1分岐配管63a、63bに送られる。第1分岐配管63a、63bに送られた高圧冷媒は、第1調節弁66a、66b、合流配管62a、62b、及び第1接続管15a、15bを通じて、第1利用ユニット3aと第2利用ユニット3bの第2熱交換器52a、52bに送られる。
 そして、第2熱交換器52a、52bに送られた高圧の二酸化炭素冷媒は、第2熱交換器52a、52bにおいて、第2ファン53a、53bによって供給される室内空気と熱交換を行う。これにより、第2熱交換器52a、52bを流れる冷媒は、放熱する。室内空気は、加熱されて室内に供給される。これにより、室内空間が暖房される。第2熱交換器52a、52bにおいて放熱した冷媒は、第2利用配管56a、56bを流れ、開度調節されている利用側膨張弁51a、51bを通過する。その後、第2接続管16a、16bを流れた冷媒は、分岐ユニット6a、6bの第3分岐配管61a、61bを介して、第3連絡配管7に送られる。
 そして、第3連絡配管7に送られた冷媒は、その一部が、分岐ユニット6cの第3分岐配管61cに送られ、残りが、第5閉鎖弁31を通じて、熱源側膨張弁36に送られる。
 そして、第3分岐配管61cに送られた冷媒は、第2接続管16cを介して、利用ユニット3cの第2利用配管56cを流れ、利用側膨張弁51cに送られる。
 そして、開度調節されている利用側膨張弁51cを通過した冷媒は、第2熱交換器52cにおいて、第2ファン53cによって供給される室内空気と熱交換を行う。これにより、第2熱交換器52cを流れる冷媒は、蒸発し、低圧のガス冷媒となる。室内空気は、冷却されて室内に供給される。これにより、室内空間が冷房される。第2熱交換器52cにおいて蒸発した低圧のガス冷媒は、第1利用配管57cと第1接続管15cを通過し、合流配管62cに送られる。
 そして、合流配管62cに送られた低圧のガス冷媒は、第2調節弁67c及び第2分岐配管64cを通じて、第5連絡配管9に送られる。
 そして、第5連絡配管9に送られた低圧のガス冷媒は、第4閉鎖弁33、第2熱源配管29、吸入流路23、第2アキュムレータ30及び吸入配管23aを通じて、第2圧縮機21の吸入側に戻される。
 また、熱源側膨張弁36に送られた二酸化炭素冷媒は、開度調節されている熱源側膨張弁36を通過した後、カスケード熱交換器35の第2流路35aにおいて、第1流路35bを流れる第1冷媒と熱交換を行う。これにより、カスケード熱交換器35の第2流路35aを流れる冷媒は、蒸発して低圧のガス冷媒になり、第2切換機構22の第1切換弁22aに送られる。第2切換機構22の第1切換弁22aに送られた低圧のガス冷媒は、吸入流路23において第2熱交換器52cにおいて蒸発した低圧のガス冷媒と合流する。合流した冷媒は、第2アキュムレータ30及び吸入配管23aを介して、第2圧縮機21の吸入側に戻される。
 このようにして、暖房主体運転における動作が行われる。
 なお、暖房主体運転時には、制御部80によって、第2圧縮機21に液冷媒が流入しないために、第2圧縮機21から吐出される二酸化炭素冷媒の過熱度(吐出過熱度)に基づいて油戻し弁23cの開度を制御している。
 (9)起動時の制御方法
 以下、図7を参照して、上述した全暖房運転及び暖房主体運転の起動時の制御方法について説明する。本実施形態では、制御部80は、全暖房運転及び暖房主体運転の起動前に、油戻し弁23cを閉状態にしておく。
 まず、制御部80は、リモコン等から暖房運転または暖房主体運転の指令を受けると、外気温が第1温度以下か否かを判断する(ステップS1)。ステップS1において、制御部80は、外気温が第1温度を超えていると判断すると、二酸化炭素冷媒の密度と冷凍機油の密度とが正常な状態であるため、起動制御を実施せず、ステップS7に移行する。
 ステップS7では、制御部80は、第1回路5aにおいて第1冷媒を循環させ始め、かつ第2回路10において二酸化炭素を循環させ始め、かつ油戻し弁23cを開ける。ここでは、制御部80は、同じタイミングで、第1圧縮機71と第2圧縮機21を起動するとともに、油戻し弁23cを開ける。
 一方、制御部80は、外気温が第1温度以下であると判断すると、起動制御を実施する。具体的には、制御部80は、第1回路5aにおいて第1冷媒を循環させ始める(ステップS2)。このステップS2では、制御部80は、第1圧縮機71を起動する。
 次に、制御部80は、第2回路10において二酸化炭素冷媒を循環させ始める(ステップS3)。本実施形態のステップS3は、第1回路5aにおいて第1冷媒を循環させることによって、カスケード熱交換器35における第1冷媒の凝縮温度が所定値以上に上昇したときに、実施される。具体的には、制御部80は、第1冷媒の凝縮温度が所定値以上に上昇したか否かを判断する。制御部80は、第1冷媒の凝縮温度が所定値未満であると判断すると、第2回路10において二酸化炭素を循環させない。一方、制御部80は、第1冷媒の凝縮温度が所定値以上と判断すると、第2圧縮機21を起動して、第2回路10において二酸化炭素冷媒を循環させ始める。
 次に、制御部80は、第2アキュムレータ30内の二酸化炭素冷媒及び冷凍機油の温度又は圧力が、第2アキュムレータ30内の二酸化炭素冷媒の密度と冷凍機油の密度とが等しくなる境界温度に対応する所定温度又は所定圧力以上か否かを判断する(ステップS4)。ここでは、制御部80は、第2吸入温度センサ88及び第2吸入圧力センサ37の少なくとも一方から、吸入配管23aを流れる二酸化炭素冷媒及び第2冷凍機油の温度または圧力を取得して、上記判断を行う。
 ステップS4において、制御部80は、第2アキュムレータ30内の二酸化炭素冷媒及び第2冷凍機油の温度又は圧力が所定温度又は所定圧力以上であると判断すると、二酸化炭素冷媒の密度と冷凍機油の密度とが正常な状態であるため、油戻し弁23cを開ける(ステップS5)。
 一方、ステップS4において、制御部80は、第2アキュムレータ30内の二酸化炭素冷媒及び第2冷凍機油の温度又は圧力が所定温度又は所定圧力未満であると判断すると、第2アキュムレータ30内において二酸化炭素冷媒の密度が冷凍機油の密度と反転しているため、油戻し弁23cの閉状態を維持する(ステップS6)。そして、第2アキュムレータ30内の二酸化炭素冷媒及び第2冷凍機油の温度又は圧力が所定温度又は所定圧力以上であると判断する工程(ステップS4)に戻る。
 (10)特徴
 (10-1)
 本実施の形態の冷凍サイクル装置1は、第1回路5aと、第2回路10と、カスケード熱交換器35と、制御部80と、を備える。第1回路5aは、第1冷媒が循環する。第2回路10は、二酸化炭素冷媒及び冷凍機油(本実施形態では第2冷凍機油)が循環する。カスケード熱交換器35は、二酸化炭素冷媒を第1冷媒によって加熱する。第2回路10は、第2圧縮機21と、容器(本実施形態では第2アキュムレータ30)と、吸入配管23aと、油戻し通路23bと、弁(本実施形態では油戻し弁23c)と、を有している。第2アキュムレータ30は、第2圧縮機21の吸入側に設けられ、二酸化炭素冷媒及び冷凍機油を貯留する。吸入配管23aは、第2圧縮機21の吸入側と第2アキュムレータ30とを接続する。油戻し通路23bは、第2アキュムレータ30の下部から吸入配管23aに第2冷凍機油を戻す。油戻し弁23cは、油戻し通路23bに設けられている。制御部80は、第1回路5aにおいて第1冷媒を循環させ始めた後に、油戻し弁23cを開ける起動制御を実施する。
 二酸化炭素冷媒を第1冷媒によって加熱する運転(本実施形態では全暖房運転及び暖房主体運転)の起動時に、外気温が低いため、第2アキュムレータ30内の二酸化炭素冷媒の温度が低い場合がある。このような場合、本実施形態の冷凍サイクル装置1では、第1回路5aにおいて第1冷媒を循環させ始めることにより、カスケード熱交換器35を介して、第2回路10の容器内の二酸化炭素冷媒の温度を上げることができる。このため、外気温が低かったとしても、第2アキュムレータ30内において、二酸化炭素冷媒の密度が冷凍機油の密度よりも低い、正常な状態にできる。正常な状態になった後に、第2アキュムレータ30の下部から延びる油戻し通路23bの油戻し弁23cを開けるので、油戻し通路23bに液相の二酸化炭素冷媒が流れることを抑制できる。したがって、第2圧縮機21に液冷媒が流入することを抑制することができる。
 このように、外気温が低かったとしても、起動制御を行うことによって、第2アキュムレータ30内において、二酸化炭素冷媒の密度が冷凍機油の密度よりも低い、正常な状態にできる。このため、本実施形態の冷凍サイクル装置1では、第2アキュムレータ30を加熱するための部材を省略しても、第2圧縮機21に液冷媒が流入することを抑制することができる。
 (10-2)
 本実施形態の冷凍サイクル装置1は、上記(10-1)の冷凍サイクル装置1であって、制御部80は、起動制御おいて、第2アキュムレータ30内の二酸化炭素冷媒及び冷凍機油の温度又は圧力が、第2アキュムレータ30内の二酸化炭素冷媒の密度と冷凍機油の密度とが等しくなる境界温度に対応する所定温度又は所定圧力以上になると、油戻し弁23cを開ける。
 ここでは、第2アキュムレータ30内の二酸化炭素冷媒及び冷凍機油の温度又は圧力が、第2アキュムレータ30内の二酸化炭素冷媒の密度と冷凍機油の密度とが等しくなる境界温度に対応する所定温度又は所定圧力以上になると、第2アキュムレータ30内における冷媒の密度と冷凍機油の密度とが正常な状態になったと判断できる。このため、第2圧縮機21に液冷媒が流入することをより抑制することができる。
 (10-3)
 本実施形態の冷凍サイクル装置1は、上記(10-1)または(10-2)の冷凍サイクル装置1であって、制御部80は、起動制御において、第1回路5aにおいて第1冷媒を循環させ始めた後に、第2回路10において二酸化炭素冷媒を循環させ始める。
 ここでは、第1回路5aの第1冷媒を循環させ始めることにより、カスケード熱交換器35を介して、第2回路10の第2アキュムレータ30内の二酸化炭素冷媒の温度を上げてから、第2回路10において二酸化炭素冷媒を循環させ始める。このため、第2回路10の運転の効率を向上することができる。
 (10-4)
 本実施形態の冷凍サイクル装置1は、上記(10-3)の冷凍サイクル装置1であって、制御部80は、起動制御において、第2回路10において二酸化炭素冷媒を循環させ始めた後に、油戻し弁23cを開ける。
 ここでは、第1回路5aにおいて第1冷媒が循環し、さらに第2回路10において二酸化炭素冷媒が循環することで、第2アキュムレータ30内の二酸化炭素冷媒の温度を効率的に上げることができる。これにより、第2アキュムレータ30内における冷媒の密度と冷凍機油の密度とを正常な状態にすることが容易である。正常な状態になった後に、油戻し通路23bの油戻し弁23cを開けるので、第2圧縮機21に液冷媒が流入することを容易に抑制することができる。
 (10-5)
 本実施形態の冷凍サイクル装置1は、上記(10-1)から(10-4)の冷凍サイクル装置1のいずれかであって、制御部80は、外気温が第1温度以下の時に起動制御を実施し、外気温が第1温度を超える時には、起動制御を実施しない。
 ここでは、外気温が第1温度以下に起因して、第2アキュムレータ30内における冷媒の密度と冷凍機油の密度とが正常な状態でない場合に、起動制御を実施することによって、第2圧縮機21に液冷媒が流入することを抑制できる。一方、外気温が第1温度を超えることに起因して、第2アキュムレータ30内における冷媒の密度と冷凍機油の密度とが正常な状態である場合には、油戻し通路23bの油戻し弁23cを閉めなくても、第2圧縮機21に液冷媒が流入することを抑制できる。
 (10-6)
 本実施形態の冷凍サイクル装置1は、上記(10-5)の冷凍サイクル装置1であって、制御部80は、外気温が第1温度を超える時には、第1回路5aの運転と、第2回路10の運転と、油戻し弁23cの開動作と、を同時に開始する。
 ここでは、外気温が第1温度以下に起因して、第2アキュムレータ30内における冷媒の密度と冷凍機油の密度とが正常な状態でない場合に、第1回路5aの運転を開始した後に、油戻し弁23cを開ける起動制御によって、第2圧縮機21に液冷媒が流入することを抑制できる。一方、外気温が第1温度を超えることに起因して、第2アキュムレータ30内における冷媒の密度と冷凍機油の密度とが正常な状態である場合には、第1回路5aの運転開始と、第2回路10の運転開始と、油戻し通路23bの油戻し弁23cを開けることと、を、同時に実施できる。
 (10-7)
 本実施形態の冷凍サイクル装置1は、上記(10-1)から(10-6)の冷凍サイクル装置1のいずれかであって、第1冷媒は、R32である。
 ここでは、第1回路5aにR32が循環することによって、カスケード熱交換器35において、二酸化炭素冷媒と効率的に熱交換を行うことができる。
 (11)変形例
 (11-1)変形例1
 上記実施形態では、制御部80は、全暖房運転または暖房主体運転の起動時に、第1回路5aにおいて第1冷媒を循環させ、次に、第2回路10において二酸化炭素冷媒を循環させ、次に、油戻し弁23cを開ける起動制御を行うが、これに限定されない。本変形例では、制御部80は、全暖房運転または暖房主体運転の起動時に、第1回路5aにおいて第1冷媒を循環させ、次に、油戻し弁23cを開け、次に、第2回路10において二酸化炭素冷媒を循環させる起動制御を実施する。
 具体的には、図8に示すように、まず、制御部80は、外気温が第1温度以下か否かを判断する(ステップS1)。ステップS1において、制御部80は、外気温が第1温度を超えていると判断すると、二酸化炭素冷媒の密度と冷凍機油の密度とが正常な状態であるため、第1回路5aの運転と、第2回路10の運転と、油戻し弁23cの開動作と、を同時に開始する(ステップS7)。
 一方、ステップS1において、制御部80は、外気温が第1温度以下であると判断すると、起動制御を実施する。具体的には、制御部80は、第1回路5aにおいて第1冷媒を循環させ始める(ステップS2)。
 次に、制御部80は、第2アキュムレータ30内の二酸化炭素冷媒及び冷凍機油の温度又は圧力が、第2アキュムレータ30内の二酸化炭素冷媒の密度と冷凍機油の密度とが等しくなる境界温度に対応する所定温度又は所定圧力以上か否かを判断する(ステップS4)。
 ステップS4において、制御部80は、第2アキュムレータ30内の二酸化炭素冷媒及び第2冷凍機油の温度又は圧力が所定温度又は所定圧力未満であると判断すると、第2アキュムレータ30内において二酸化炭素冷媒の密度が冷凍機油の密度と反転しているため、油戻し弁23cの閉状態を維持する(ステップS6)。そして、第2アキュムレータ30内の二酸化炭素冷媒及び第2冷凍機油の温度又は圧力が所定温度又は所定圧力以上であると判断する工程(ステップS4)に戻る。
 一方、ステップS4において、制御部80は、第2アキュムレータ30内の二酸化炭素冷媒及び第2冷凍機油の温度又は圧力が所定温度又は所定圧力以上であると判断すると、二酸化炭素冷媒の密度と冷凍機油の密度とが正常な状態であるため、油戻し弁23cを開ける(ステップS5)。
 次に、制御部80は、第2回路10において二酸化炭素冷媒を循環させ始める(ステップS3)。
 (11-2)変形例2
 上記実施形態では、制御部80は、全暖房運転または暖房主体運転の起動時に、第1回路5aにおいて第1冷媒を循環させ、次に、第2回路10において二酸化炭素冷媒を循環させ、次に、油戻し弁23cを開ける起動制御を行うが、これに限定されない。本変形例では、制御部80は、全暖房運転または暖房主体運転の起動時に、第1回路5aの運転と第2回路10の運転と、を同時に行う起動制御を実施する。
 具体的には、図9に示すように、まず、制御部80は、外気温が第1温度以下か否かを判断する(ステップS1)。ステップS1において、制御部80は、外気温が第1温度を超えていると判断すると、二酸化炭素冷媒の密度と冷凍機油の密度とが正常な状態であるため、第1回路5aの運転と、第2回路10の運転と、油戻し弁23cの開動作と、を同時に開始する(ステップS7)。
 一方、ステップS1において、制御部80は、外気温が第1温度以下であると判断すると、起動制御を実施するため、ステップS11に移行する。
 ステップS11では、第1回路5aにおいて第1冷媒を循環させ始めるとともに、第2回路10において二酸化炭素を循環させ始める。ここでは、第1圧縮機71と第2圧縮機21を同時に起動する。
 次に、制御部80は、第2アキュムレータ30内の二酸化炭素冷媒及び冷凍機油の温度又は圧力が、第2アキュムレータ30内の二酸化炭素冷媒の密度と冷凍機油の密度とが等しくなる境界温度に対応する所定温度又は所定圧力以上か否かを判断する(ステップS4)。
 ステップS4において、制御部80は、第2アキュムレータ30内の二酸化炭素冷媒及び第2冷凍機油の温度又は圧力が所定温度又は所定圧力未満であると判断すると、第2アキュムレータ30内において二酸化炭素冷媒の密度が冷凍機油の密度と反転しているため、油戻し弁23cの閉状態を維持する(ステップS6)。そして、第2アキュムレータ30内の二酸化炭素冷媒及び第2冷凍機油の温度又は圧力が所定温度又は所定圧力以上であると判断する工程(ステップS4)に戻る。
 一方、ステップS4において、制御部80は、第2アキュムレータ30内の二酸化炭素冷媒及び第2冷凍機油の温度又は圧力が所定温度又は所定圧力以上であると判断すると、二酸化炭素冷媒の密度と冷凍機油の密度とが正常な状態であるため、油戻し弁23cを開ける(ステップS5)。
 以上説明したように、本変形例の冷凍サイクル装置1は、上記(10-1)または(10-2)の冷凍サイクル装置1であって、制御部80は、起動制御において、第1回路5aの運転と、第2回路10の運転と、を同時に開始する。
 このように、第1回路5aにおける第1冷媒の循環と、第2回路10における二酸化炭素冷媒の循環とを、同時に行ってもよい。
 なお、「同時」とは、例えば、制御部80が、同じタイミングで、第1圧縮機71及び第2圧縮機21の起動を指令することである。このため、第1回路5aにおける第1冷媒の循環と、第2回路10における二酸化炭素冷媒の循環とが、完全に同じ時刻に開始される場合と、いずれか一方がわずかに先に開始される場合とを含む。
 (11-3)変形例3
 上記本実施形態では、制御部80は、全暖房運転及び暖房主体運転の起動前に、油戻し弁23cを閉状態にしているが、これに限定されない。全暖房運転及び暖房主体運転の起動前に、油戻し弁23cを開状態にしてもよい。本変形例では、カスケード熱交換器35における二酸化炭素冷媒の蒸発温度が所定値以上である場合には、第2回路10における二酸化炭素冷媒の循環前に、油戻し弁23cを開状態にする。
 (11-4)変形例4
 上記実施形態では、制御部80は、外気温が第1温度を超える時には、第1回路5aの運転と、第2回路10の運転と、油戻し弁23cの開動作と、を同時に開始するが、これに限定されない。本開示の冷凍サイクル装置では、制御部80は、外気温が第1温度を超える時には、第1回路5aの運転開始と、第2回路10の運転開始と、油戻し弁23cの開動作と、の順序を、任意に指令することができる。本変形例では、外気温が第1温度を超える時には、第1回路5aと第2回路10とを同時起動するとともに、油戻し弁23cの開動作を第1回路5a及び第2回路10の起動の前または後に行う。
 (11-5)変形例5
 上記実施形態及び変形例1~4では、制御部80は、外気温が第1温度以下の時に起動制御を実施するが、これに限定されない。本変形例では、制御部80は、全暖房運転または暖房主体運転の起動時に、外気温によらずに起動制御を実施する。換言すると、図10に示すように、図7~図10における外気温が第1温度以下か否かを判断する工程(ステップS1)は省略される。
 (11-6)変形例6
 上記実施形態及び変形例1~5では、制御部80は、第2アキュムレータ30内の二酸化炭素冷媒及び冷凍機油の温度又は圧力が、第2アキュムレータ30内の二酸化炭素冷媒の密度と冷凍機油の密度とが等しくなる境界温度に対応する所定温度又は所定圧力以上になると、油戻し弁23cを開けるが、これに限定されない。本変形例では、制御部80は、第1回路5aにおいて第1冷媒を循環させ始めた後に、所定時間経過後に、油戻し弁23cを開ける。なお、所定時間は、第1冷媒を循環させることによって、第2アキュムレータ30内が正常な状態になるように、二酸化炭素冷媒の温度を上げる時間である。
 (11-7)変形例7
 上記実施形態では、制御部80は、全暖房運転の起動時及び暖房主体運転の起動時に、起動制御を実施しているが、これに限定されない。本開示の冷凍サイクル装置では、制御部80は、全暖房運転の起動時または暖房主体運転の起動時に、起動制御を実施してもよい。また、本開示の冷凍サイクル装置では、制御部80は、全冷房運転時及び冷房主体運転時の少なくとも一方の起動時に、起動制御をさらに実施してもよい。
 (11-8)変形例8
 上記実施形態では、第2回路10において用いられる第2冷凍機油としてポリアルキレングリコールを例に挙げて説明したが、これに限定されない。本開示の第2冷凍機油は、二酸化炭素冷媒と全く溶け合わない非相溶性であってもよく、二酸化炭素冷媒と少しは溶け合うが溶け合う量が少ない弱相溶性であってもよい。
 (11-9)変形例9
 上記実施形態では、第1回路5aにおいて用いられる第1冷媒としてR32を例に挙げて説明したが、これに限定されない。第1回路5aにおいて用いられる第1冷媒としては、例えば、R32、R454C、プロパン、R1234yf、R1234ze、アンモニア、またはいずれかを含む冷媒を用いることができる。
 (11-10)変形例10
 上記実施形態では、第2回路10は、3つの連絡配管7、8、9を有しているが、これに限定されない。本変形例の冷凍サイクル装置は、2つの連絡配管を有している。本変形例は、例えば、複数の利用ユニット3a、3b、3cが個別に冷房運転または暖房運転を行うことが可能でない構成、第2ユニットが1つの構成などに適用される。
 (11-11)変形例11
 上記実施形態では、1つの第1ユニット5に対して1つのカスケードユニット2が接続された冷凍サイクル装置1を例に挙げて説明したが、これに限定されない。本変形例の冷凍サイクル装置1は、1つの第1ユニット5に対して複数のカスケードユニット2が互いに並列に接続される。
 (11-12)変形例12
 上記実施形態では、1つのカスケードユニット2に対して複数の第2ユニット4a、4b、4cが接続された冷凍サイクル装置1を例に挙げて説明したが、これに限定されない。本変形例の冷凍サイクル装置は、1つのカスケードユニット2に対して1つの第2ユニットが接続される。
 (11-13)変形例13
 上記実施形態では、第1ユニット5として、第1冷媒と熱交換する室外空気を第1熱交換器74に供給するための第1ファン75を有する室外ユニットを例に挙げて説明したが、これに限定されない。本変形例では、第1ユニットは、第1ファン75を有しておらず、第1熱交換器74において、第1冷媒と、熱源としての水とを熱交換させる。
 以上、本開示の実施形態を説明したが、特許請求の範囲に記載された本開示の趣旨及び範囲から逸脱することなく、形態や詳細の多様な変更が可能なことが理解されるであろう。
1     :冷凍サイクル装置
5a    :第1回路
10    :第2回路
21    :第2圧縮機
23a   :吸入配管
23b   :油戻し通路
23c   :油戻し弁(弁)
30    :第2アキュムレータ(容器)
35    :カスケード熱交換器
52a,52b,52c :第2熱交換器
71    :第1圧縮機
74    :第1熱交換器
80    :制御部
特許第5425221号

Claims (8)

  1.  第1冷媒が循環する第1回路(5a)と、
     二酸化炭素冷媒及び冷凍機油が循環する第2回路(10)と、
     前記二酸化炭素冷媒を前記第1冷媒によって加熱するカスケード熱交換器(35)と、
     制御部(80)と、
    を備え、
     前記第2回路は、
      第2圧縮機(21)と、
      前記第2圧縮機の吸入側に設けられ、前記二酸化炭素冷媒及び前記冷凍機油を貯留する容器(30)と、
      前記第2圧縮機の吸入側と前記容器とを接続する吸入配管(23a)と、
      前記容器の下部から前記吸入配管に前記冷凍機油を戻す油戻し通路(23b)と、
      前記油戻し通路に設けられる弁(23c)と、
    を有し、
     前記制御部は、前記第1回路において前記第1冷媒を循環させ始めた後に、前記弁を開ける起動制御を実施する、
    冷凍サイクル装置(1)。
  2.  前記制御部は、前記容器内の前記二酸化炭素冷媒及び前記冷凍機油の温度又は圧力が、前記容器内の前記二酸化炭素冷媒の密度と前記冷凍機油の密度とが等しくなる境界温度に対応する所定温度又は所定圧力以上になると、前記弁を開ける、
    請求項1に記載の冷凍サイクル装置。
  3.  前記制御部は、前記第1回路において前記第1冷媒を循環させ始めた後に、前記第2回路において前記二酸化炭素冷媒を循環させ始める、
    請求項1または2に記載の冷凍サイクル装置。
  4.  前記制御部は、前記第2回路において前記二酸化炭素冷媒を循環させ始めた後に、前記弁を開ける、
    請求項3に記載の冷凍サイクル装置。
  5.  前記制御部は、前記第1回路の運転と、前記第2回路の運転と、を同時に開始する、
    請求項1または2に記載の冷凍サイクル装置。
  6.  前記制御部は、外気温が第1温度以下の時に前記起動制御を実施し、外気温が前記第1温度を超える時には、前記起動制御を実施しない、
    請求項1~5のいずれか1項に記載の冷凍サイクル装置。
  7.  前記制御部は、外気温が前記第1温度を超える時には、前記第1回路の運転と、前記第2回路の運転と、前記弁の開動作と、を同時に開始する、
    請求項6に記載の冷凍サイクル装置。
  8.  前記第1冷媒は、R32、R454C、プロパン、R1234yf、R1234zeまたはアンモニアを含む、
    請求項1~7のいずれか1項に記載の冷凍サイクル装置。
PCT/JP2023/035187 2022-09-30 2023-09-27 冷凍サイクル装置 WO2024071214A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2022-159012 2022-09-30
JP2022159012A JP2024052349A (ja) 2022-09-30 2022-09-30 冷凍サイクル装置

Publications (1)

Publication Number Publication Date
WO2024071214A1 true WO2024071214A1 (ja) 2024-04-04

Family

ID=90477950

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2023/035187 WO2024071214A1 (ja) 2022-09-30 2023-09-27 冷凍サイクル装置

Country Status (2)

Country Link
JP (1) JP2024052349A (ja)
WO (1) WO2024071214A1 (ja)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003262418A (ja) * 2002-03-06 2003-09-19 Mitsubishi Electric Corp 冷凍空調装置
WO2012128229A1 (ja) * 2011-03-18 2012-09-27 東芝キヤリア株式会社 二元冷凍サイクル装置
CN110608539A (zh) * 2019-11-05 2019-12-24 烟台欧森纳地源空调股份有限公司 一种复叠式高温热泵系统
WO2021225177A1 (ja) * 2020-05-08 2021-11-11 ダイキン工業株式会社 冷凍サイクル装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003262418A (ja) * 2002-03-06 2003-09-19 Mitsubishi Electric Corp 冷凍空調装置
WO2012128229A1 (ja) * 2011-03-18 2012-09-27 東芝キヤリア株式会社 二元冷凍サイクル装置
CN110608539A (zh) * 2019-11-05 2019-12-24 烟台欧森纳地源空调股份有限公司 一种复叠式高温热泵系统
WO2021225177A1 (ja) * 2020-05-08 2021-11-11 ダイキン工業株式会社 冷凍サイクル装置

Also Published As

Publication number Publication date
JP2024052349A (ja) 2024-04-11

Similar Documents

Publication Publication Date Title
JP5627606B2 (ja) ヒートポンプシステム
JP5806940B2 (ja) ヒートポンプシステム
JP4475278B2 (ja) 冷凍装置及び空気調和装置
EP1762796B1 (en) Air conditioner
AU2005268315B2 (en) Air conditioner
JP4804396B2 (ja) 冷凍空調装置
US9140459B2 (en) Heat pump device
WO2010098070A1 (ja) ヒートポンプシステム
US20230057478A1 (en) Refrigeration cycle apparatus
EP2378223B1 (en) Complex system for air conditioning and hot water supplying
CN114270113B (zh) 热源机组及制冷装置
JP5855284B2 (ja) 空気調和装置
JP5872052B2 (ja) 空気調和装置
WO2024071214A1 (ja) 冷凍サイクル装置
WO2024071215A1 (ja) 冷凍サイクル装置
WO2024071213A1 (ja) 冷凍サイクル装置
KR102482403B1 (ko) 공기 조화 시스템
WO2020208805A1 (ja) 空気調和装置
JP7473836B2 (ja) 冷凍サイクルシステム
JP7531721B2 (ja) 冷凍サイクル装置
JP7481658B2 (ja) 冷凍サイクルシステム
US20230065072A1 (en) Refrigeration cycle system, heat source unit, and refrigeration cycle apparatus
US20240027077A1 (en) Hybrid multi-air conditioning system and method for controlling a hybrid multi-air conditioning system
KR101640412B1 (ko) 공기조화기

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 23872436

Country of ref document: EP

Kind code of ref document: A1