WO2023159628A1 - 机壳及供水设备 - Google Patents

机壳及供水设备 Download PDF

Info

Publication number
WO2023159628A1
WO2023159628A1 PCT/CN2022/078464 CN2022078464W WO2023159628A1 WO 2023159628 A1 WO2023159628 A1 WO 2023159628A1 CN 2022078464 W CN2022078464 W CN 2022078464W WO 2023159628 A1 WO2023159628 A1 WO 2023159628A1
Authority
WO
WIPO (PCT)
Prior art keywords
water
casing
waterway
faucet
assembly
Prior art date
Application number
PCT/CN2022/078464
Other languages
English (en)
French (fr)
Inventor
张棋荣
覃生浩
Original Assignee
佛山市顺德区美的饮水机制造有限公司
美的集团股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 佛山市顺德区美的饮水机制造有限公司, 美的集团股份有限公司 filed Critical 佛山市顺德区美的饮水机制造有限公司
Priority to PCT/CN2022/078464 priority Critical patent/WO2023159628A1/zh
Publication of WO2023159628A1 publication Critical patent/WO2023159628A1/zh

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47JKITCHEN EQUIPMENT; COFFEE MILLS; SPICE MILLS; APPARATUS FOR MAKING BEVERAGES
    • A47J31/00Apparatus for making beverages
    • A47J31/44Parts or details or accessories of beverage-making apparatus
    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47JKITCHEN EQUIPMENT; COFFEE MILLS; SPICE MILLS; APPARATUS FOR MAKING BEVERAGES
    • A47J31/00Apparatus for making beverages
    • A47J31/44Parts or details or accessories of beverage-making apparatus
    • A47J31/46Dispensing spouts, pumps, drain valves or like liquid transporting devices

Definitions

  • the present application relates to the technical field of domestic water supply, in particular to a casing and water supply equipment.
  • the basic functions of the water supply device include the functions of cooling, heating and water outlet. Since there is no clear and strong connection between different components, the water system can only be connected through hoses during the production process of the product.
  • the faucet of the water supply equipment and the water supply port of the waterway component are connected through a hose, which is prone to missing connections, wrong connections, discounts, high-temperature odors, etc., and the two ends of the hose need to be fastened separately. Water leakage is serious and assembly efficiency is low.
  • this application aims to solve at least one of the technical problems existing in the related art. For this reason, this application proposes a casing, the casing includes a faucet and an adapter waterway plate, the adapter waterway plate is connected to the water supply port and the faucet of the waterway assembly, and there is no need to use a hose to connect the waterway system, which can avoid water leakage. There will be no missed connections, wrong connections, discounted hoses, and high temperature odors.
  • the embodiment of the present application also provides a water supply device.
  • the first shell is formed with a positioning hole
  • a water faucet is formed with a first water inlet and a first water outlet, the water faucet is connected to the positioning hole, the first water inlet and the first water outlet are located on different sides of the first housing;
  • the transfer waterway plate is formed with a waterway inside, and the waterway is formed with a second water inlet and a second water outlet, the second water outlet is connected to the first water inlet, and the second water inlet is suitable for connecting to The water supply port of the waterway assembly.
  • it also includes:
  • the second housing forms an accommodating cavity with an opening, the first housing is detachably connected to the opening, and the first water outlet is located on a side of the first housing facing away from the second housing. .
  • the transfer water circuit board is fixedly connected to the first casing.
  • the second housing is provided with an end plate along the edge of the opening, and the edge of the first housing is snap-connected with the end plate.
  • the first casing is formed with a receiving groove
  • the receiving groove includes a top and a bottom that are oppositely arranged
  • the positioning hole is formed on the top, and the first water outlet faces toward the The direction in which the bottom is extended.
  • it also includes:
  • a water receiving part is connected to the bottom.
  • an avoidance groove is formed on the top of the first casing, and the casing further includes:
  • the pressing part is arranged in the escape groove, and the pressing part is connected to the faucet through a pressing rod.
  • a positioning groove is formed on the first housing, and the transfer water circuit board is inserted into the positioning groove.
  • the water supply equipment provided according to the embodiment of the second aspect of the present application includes a water circuit assembly having a water supply port and the casing provided according to the embodiment of the first aspect of the application, and the water circuit assembly is disposed in the casing.
  • it also includes:
  • a first sealing ring arranged between the first water inlet and the second water outlet;
  • the second sealing ring is arranged between the water supply port and the second water inlet.
  • the casing provided by the embodiment includes a first casing, a faucet, and an adapter waterway plate.
  • a positioning hole is formed on the first casing, and the faucet is installed in the positioning hole.
  • the faucet is formed with a first water inlet and a first water outlet, and the first water inlet and the first water outlet are located on both sides of the first housing.
  • a waterway is formed inside the transfer waterway plate, and the waterway is formed with a second water inlet and a second water outlet.
  • the second water inlet is suitable for connecting to the water supply port of the waterway assembly, and the second water outlet is connected to the first water inlet.
  • the plate is used to transport the drinking water of different temperatures in the waterway assembly to the faucet.
  • the transfer waterway board does not require manual binding or fastening, and has better sealing performance and higher assembly efficiency during use.
  • Fig. 1 is an exploded view 1 of the casing provided by the embodiment of the present application;
  • Figure 2 is the second exploded view of the housing provided by the embodiment of the present application.
  • Fig. 3 is an exploded schematic view of the faucet, the transfer waterway plate and the waterway assembly provided by the embodiment of the present application;
  • Fig. 4 is a schematic diagram of the connection of the faucet, the transfer waterway board and the waterway assembly provided by the embodiment of the present application;
  • Fig. 5 is a perspective view 1 of the water supply equipment provided by the embodiment of the present application.
  • Fig. 6 is a second perspective view of the water supply equipment provided by the embodiment of the present application.
  • Fig. 7 is a perspective view 1 of the waterway assembly provided by the embodiment of the present application.
  • Figure 8 is the second perspective view of the waterway assembly provided by the embodiment of the present application.
  • Fig. 9 is a perspective view of the middle bracket and support provided by the embodiment of the present application.
  • Fig. 10 is a top view of the middle bracket and support provided by the embodiment of the present application.
  • Fig. 11 is a side view of the middle holder and support provided by the embodiment of the present application.
  • Fig. 12 is a perspective view 1 of the waterway plate provided by the embodiment of the present application.
  • Figure 13 is the second perspective view of the waterway plate provided by the embodiment of the present application.
  • Fig. 14 is a side view of the waterway plate provided by the embodiment of the present application.
  • Figure 15 is an A-A cross-sectional view of the waterway plate provided by the embodiment of the present application.
  • Fig. 16 is a first schematic diagram of the angle setting of the anti-crossover waterway of the water trap provided by the embodiment of the present application;
  • Figure 17 is a second schematic diagram of the angle setting of the anti-crossover waterway of the water trap provided by the embodiment of the present application.
  • Fig. 18 is the third schematic diagram of the angle setting of the anti-crossover water channel of the water trap provided by the embodiment of the present application.
  • 120 transfer waterway plate; 122, waterway; 1222, water inlet pipe section; 1224, water outlet pipe section; 124, second water inlet; 126, second water outlet;
  • Second housing 140. Second housing; 142. Accommodating cavity; 144. End plate; 146. Buckle position;
  • 0100 middle support
  • 0102 first top surface
  • 0110 support piece; 0112, accommodation area; 0114, second top surface; 0116, top plate; 01162, through hole; 01164, avoidance gap; 01166, reserved buckle for electric control box; 0118, side plate; ;
  • 0120 water board; 0122, third waterway; 01222, third water inlet; 01224, fourth water outlet; 0124, fourth waterway; 01244, fourth water inlet; 01242, fourth water outlet; 0126, fifth waterway ;01262, the fifth water inlet; 01264, the fifth water outlet; 0128, the sixth waterway; 01282, the sixth water inlet; 01284, the sixth water outlet;
  • 0150 trap; 0152, the first branch; 0154, the second branch; 0156, the third branch;
  • connection and “connected” should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection, Or integrated connection; it can be mechanical connection or electrical connection; it can be direct connection or indirect connection through an intermediary.
  • connection should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection, Or integrated connection; it can be mechanical connection or electrical connection; it can be direct connection or indirect connection through an intermediary.
  • the first feature may be in direct contact with the first feature or the first feature and the second feature may pass through the middle of the second feature.
  • Media indirect contact Moreover, “above”, “above” and “above” the first feature on the second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature.
  • “Below”, “beneath” and “beneath” the first feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is less horizontally than the second feature.
  • the faucet of the water supply equipment and the water supply port of the waterway component are connected through a hose, which is prone to missing connections, wrong connections, discounts, high-temperature odors, etc., and the two ends of the hose need to be fastened separately. Water leakage is serious and assembly efficiency is low.
  • the cabinet provided according to the embodiment of the first aspect of the present application, please refer to FIG. 1 to FIG. 18 , includes a first casing 100 , a faucet 110 and an adapter water circuit board 120 .
  • the water supply equipment includes a casing, a waterway assembly 130 and the like, and the waterway assembly 130 is arranged inside the casing.
  • the casing adopts a detachable structure
  • the first casing 100 may be the main structure of the casing, or a partial structure of the casing, such as a partial side casing.
  • a positioning hole 102 is formed on the first housing 100, and the positioning hole 102 is used for installing the water faucet 110.
  • the shape, size and quantity of the positioning hole 102 are consistent with the water faucet 110.
  • the number of positioning holes 102 is one. At this time, only one faucet 110 is installed on the first housing 100. By designing the transfer water circuit board 120, the user can be provided with drinking water of one or more temperatures. water.
  • the number of positioning holes 102 is at least two, and a plurality of faucets 110 are installed on the first housing 100 , and different faucets 110 can release drinking water with different temperatures.
  • the faucet 110 is formed with a first water inlet 112 and a first water outlet 114 , the first water outlet 114 is a water intake, and a user can receive drinking water at the first water outlet 114 .
  • the faucet 110 is installed in the positioning hole 102, the first water inlet 112 and the first water outlet 114 are located on different sides of the first housing 100, the first water inlet 112 receives drinking water from the transfer waterway plate 120, and then along the The first water outlet 114 is released.
  • the water faucet 110 may be a water faucet that is pressed to discharge water, rotates to discharge water, or is electrically controlled to discharge water.
  • a waterway 122 is formed inside the transfer waterway plate 120.
  • the waterway 122 is formed with a second water inlet 124 and a second water outlet 126.
  • the second water outlet 126 is connected to the first water inlet 112 of the faucet 110.
  • the second water inlet 124 is suitable for It is connected to the water supply port of the waterway assembly 130 .
  • the first water inlet 112 of the faucet 110 is connected to the water supply port 132 of the water circuit assembly 130 through a hose.
  • the waterway assembly 130 may have multiple water supply ports 132, and different water supply ports 132 are suitable for providing drinking water of different temperatures.
  • When there is an error between the length and design of the hose it will also cause the hose to bend, twist, etc., which will affect the water outlet efficiency of the faucet 110 .
  • the hose is exposed to high-temperature hot water for a long time, it may also cause peculiar smell in the hose and affect the taste of drinking water.
  • the transfer waterway plate 120 When assembling the casing, the transfer waterway plate 120 is connected to the water supply port 132 of the waterway assembly 130 and the first water inlet 112 of the faucet 110.
  • the waterway system does not need to be connected by a hose, and the dimensions of each component are strictly designed. 1. After splicing the transfer waterway plate 120 and the waterway assembly 130, the airtightness is better, no manual binding and fastening is required, and the leakproof performance is better.
  • the second water outlet 126 of the transfer water circuit board 120 is connected to the faucet 110 , and drinking water can be provided to the user through the faucet 110 .
  • drinking water can be provided to users.
  • the waterway assembly 130 is formed with three water supply ports 132, and the transfer waterway plate 120 is formed with three waterways 122, and the three waterways 122 are respectively connected with faucets 110, which can provide hot water, warm water and cold water to users.
  • the transfer water channel plate 120 is connected with the faucet 110 and the water channel assembly 130 by plugging, threaded connection, etc., and the multiple water supply ports 132 on the water channel assembly 130 are arranged side by side with the same opening direction.
  • a plurality of second water inlets 124 are arranged side by side and have the same opening.
  • multiple second water inlets 124 and multiple water supply ports can also play a position-limiting role, avoiding looseness between the transfer waterway plate 120 and the waterway assembly 130, and improving the leak-proof and anti-seepage performance of the waterway system.
  • the transfer water channel plate 120 may be a special-shaped structure, wherein the water channels 122 may be arranged in sections.
  • the waterway 122 includes a water inlet pipe section 1222 and a water outlet pipe section 1224 , and the water inlet pipe section 1222 and the water outlet pipe section 1224 communicate with each other.
  • the end of the water inlet pipe section 1222 far away from the water outlet pipe section 1224 is formed with a second water inlet 124
  • the end of the water outlet pipe section 1224 away from the water inlet pipe section 1222 is formed with a second water outlet 126 .
  • the included angle can facilitate the assembly of the transfer water channel plate 120 and the water channel assembly 130 , and can also prevent the size of the transfer water channel plate 120 from being too large in a single direction.
  • the first housing 100 is the front shell of the cabinet.
  • the first housing 100 is equipped with a faucet 110 and an adapter water circuit board 120.
  • the first housing 100, the faucet 110 and the adapter water circuit board 120 form a water outlet module.
  • the process can be used as an independent component and applied to different types of water supply equipment.
  • the case further includes a second housing 140 , the second housing 140 is formed with an accommodating chamber 142 having an opening, and the first housing 100 is detachably connected to the opening for sealing the accommodating chamber 142 .
  • first housing 100 and the second housing 140 constitute the overall structure of the casing, the first housing 100 is detachably connected to the opening of the second housing 140, and the accommodating cavity 142 is suitable for placing waterway components 130 and water storage parts etc.
  • a reinforcing part 101 is formed on the first shell 100, and the reinforcing part 101 can be a strip-shaped rib, or a partition, etc., which can increase the bending resistance of the first shell 100.
  • the faucet 110 is installed on the first housing 100 , and when the first housing 100 is connected to the second housing 140 , the first water outlet 114 is located at a side of the first housing 100 facing away from the second housing 140 . On the side, the first water outlet 114 provides drinking water of different temperatures to the user.
  • the first casing 100 is detachably connected to the second casing 140, and the first casing 100 is connected to the second casing 140 by using a buckle structure to speed up the assembly efficiency of the casing Or the production efficiency of water supply equipment.
  • the transfer water circuit board 120 is fixedly connected to the first casing 100 .
  • the transfer water channel plate 120 is fixedly connected to the first housing 100, not only can the faucet 110 be stably connected to the transfer water channel plate 120, but also can increase the assembly efficiency of the casing.
  • the positional relationship between the transfer water circuit board 120 and the first casing 100 is determined.
  • the casing is assembled, only the first casing 100 needs to be assembled on the second casing 140, and the connection between the water circuit board 120 and the water circuit assembly 130 is sufficient. Realize automatic alignment and assembly, and improve the production efficiency of the casing and water supply equipment.
  • the second housing 140 is provided with an end plate 144 along the edge of the opening, and the edge of the first housing 100 is snap-connected with the end plate 144 .
  • a buckle 104 is disposed on an edge of the first housing 100 , and a buckle 146 is formed on the end plate 144 , and the buckle 104 is assembled and connected with the buckle 146 .
  • the water supply port 132 is set upwards
  • the second water inlet 124 is set downwards
  • the first shell 100 and the second shell 140 are fastened together from top to bottom
  • the buckle 146 is formed with a vertical limiting groove
  • the buckle 104 protrudes outwards, and is assembled and connected to the buckle 146 .
  • buckle parts 104 and buckle positions 146 there are multiple buckle parts 104 and buckle positions 146 , and the buckle parts 104 and buckle positions 146 are provided in one-to-one correspondence to ensure a stable connection between the first housing 100 and the second housing 140 .
  • the faucet 110 is installed on the first casing 100, and the first water outlet 114 is used to provide drinking water of different temperatures.
  • a receiving groove 106 is formed on the side of the first housing 100 facing away from the transfer waterway plate 120, the receiving groove 106 includes a top 1062 and a bottom 1064 oppositely arranged, the top 1062 is formed with a positioning hole 102, and the faucet 110 Installed at the top 1062 , the first water outlet 114 extends toward the bottom 1064 .
  • the bottom 1064 forms a supporting platform, and the user puts the water cup on the bottom 1064 when taking water, and the faucet 110 at the top 1062 releases drinking water of different temperatures, and the drinking water pours into the water cup along the first water outlet 114.
  • the water cup is placed at the bottom 1064, and the user does not need to hold the water cup all the time when taking water, which improves the comfort during use.
  • the water supply port 132 can provide hot water to the faucet 110, and there is a certain danger when the user obtains the hot water.
  • the water cup is placed at the bottom 1064, so that you don't need to hold it with your hands when getting hot water, which improves the safety during use.
  • the bottom 1064 is also formed with a groove, the groove is used to accommodate the bottom of the water cup, which can form a limit effect on the bottom of the cup, thereby preventing the water cup from sliding during the water receiving process, and improving the adaptability of the cabinet. sex.
  • a water receiving member 1066 is disposed at the bottom of the receiving tank 106 , and the water receiving member 1066 is disposed on a side of the bottom 1064 close to the top 1062 .
  • a water receiving tank is formed on the top of the water receiving member 1066, and the water receiving tank is used to receive the splashed or overflowed drinking water in the water cup, so as to prevent the drinking water from directly spilling into the room, and improve the cleanliness and sanitation of the cabinet and the water supply equipment. .
  • water receiving groove of the water receiving member 1066 and the groove mentioned above can be set at the same time, and the two are compatible.
  • the first housing 100 is equipped with a faucet 110 , and when the faucet 110 is pressed or turned, the first water outlet 114 can provide drinking water to the user.
  • an avoidance groove 108 is formed on the top of the first housing 100 , and the housing further includes a pressing member 1082 , which is disposed in the avoiding groove 108 , and the water faucet 110 can be controlled by the pressing member 1082 . opening and closing.
  • the first water outlet 114 of the faucet 110 is set downwards or inclined downwards.
  • the user needs to bend down to open and close the faucet 110, and the body burden is relatively large when taking water.
  • a touch-press member 1082 On the top of the first housing 100 is provided a touch-press member 1082 , the user can operate the touch-press member 1082 while standing normally, which is more convenient to use.
  • the pressure contact piece 1082 is arranged on the top of the first housing 100 , and there is a distance between the pressure contact piece 1082 and the faucet 110 .
  • Set pressure bar 1084 The number of pressure rods 1084 is the same as the number of water faucets 110 , and each pressure rod 1084 controls one water faucet 110 .
  • multiple pressing rods 1084 are arranged side by side to reduce space occupation as much as possible and help reduce the volume of the casing.
  • the first casing 100 is formed with a positioning hole 102 , the water faucet 110 is installed in the positioning hole 102 , and the transfer water circuit board 120 is connected to the water faucet 110 .
  • a positioning groove 109 is formed on the first housing 100 , and the transfer water circuit board 120 is inserted into the positioning groove 109 .
  • the adapter waterway plate 120 When assembling the faucet 110 and the adapter waterway plate 120 , the adapter waterway plate 120 is plugged into the first housing 100 along the positioning groove 109 , and the positioning hole 102 is disposed at the end of the positioning groove 109 . When the transfer water circuit board 120 is fully inserted into the positioning groove 109 , the second water outlet 126 is connected to the first water inlet 112 .
  • the positioning groove 109 improves the positional stability of the transfer water circuit board 120 and also improves the assembly efficiency of the transfer water circuit board 120 and the faucet 110 .
  • the water supply equipment provided according to the embodiment of the second aspect of the application includes a waterway assembly 130 and the casing provided according to the embodiment of the first aspect of the application.
  • the waterway assembly 130 has at least one water supply port 132, and the water supply port 132 is connected to the transfer water circuit board The second water inlet 124 of 120.
  • the water supply equipment also includes a water storage component, etc., and the water circuit assembly 130 and the water storage component are both disposed in the casing.
  • the water storage component and the water circuit assembly 130 can provide drinking water of different temperatures at the water supply port 132 .
  • the transfer water circuit board 120 is connected to the faucet 110 and the water supply port 132 of the water circuit assembly 130. It does not need to install multiple hoses, which can avoid missing connections, wrong connections, discounts and high temperature odors, and the transfer water circuit board 120 does not require Manual binding or fastening, better sealing performance and higher assembly efficiency during use.
  • the transfer water channel plate 120 is assembled and connected with the faucet 110 and the water channel assembly 130, so that the production efficiency is high and the sealing performance is good.
  • the water supply device further includes a first sealing ring 150 and a second sealing ring 152 .
  • the second water inlet 124 is plugged into the water supply port 132
  • the first water inlet 112 is plugged into the second water outlet 126
  • the first sealing ring 150 is disposed between the first water inlet 112 and the second water outlet 126
  • the second sealing ring 152 is disposed between the water supply port 132 and the second water inlet 124 .
  • the first sealing ring 150 and the second sealing ring 152 increase the sealing performance of both ends of the transfer water channel plate 120, which can effectively prevent water leakage or water seepage in the water supply equipment, and improve the service life of the water supply equipment.
  • the casing includes a first casing 100 , a faucet 110 and an adapter waterway plate 120 , the first casing 100 is formed with a positioning hole 102 , and the faucet 110 Installed in the positioning hole 102.
  • the faucet 110 is formed with a first water inlet 112 and a first water outlet 114 , and the first water inlet 112 and the first water outlet 114 are located at two sides of the first housing 100 .
  • a waterway 122 is formed inside the transfer waterway plate 120, and the waterway 122 is formed with a second water inlet 124 and a second water outlet 126, the second water inlet 124 is suitable for connecting to the water supply port 132 of the waterway assembly 130, and the second water outlet 126 is connected to At the first water inlet 112 , the waterway board 120 is connected to deliver drinking water of different temperatures in the waterway assembly 130 to the faucet 110 .
  • the water supply port 132 of the faucet 110 and the waterway assembly 130 is connected through the transfer waterway plate 120, without the need to install multiple hoses, which can avoid missing connections, wrong connections, discounts, and high-temperature odors
  • the transfer waterway plate 120 does not need to be manually tied or fastened, and the sealing performance is better when used, and the assembly efficiency is higher.
  • the waterway assembly 130 provided according to the embodiment of the present application includes a center support 0100 , a support 0110 , a waterway plate 0120 , a cold tank 0130 and a hot tank 0140 .
  • the vertical direction is defined as the direction between the bottom and the top of the waterway assembly 130
  • the transverse direction is the direction between the left side and the right side of the waterway assembly 130
  • the longitudinal direction is the direction between the waterway assembly 130. Direction from front to back.
  • the middle support 0100 is formed with a first top surface 0102 , and the first top surface 0102 is relatively flat or has an installation position for fixing structures such as the heat tank 0140 .
  • the middle holder 0100 is a plate-shaped structure or other special-shaped structures with at least a flat top.
  • the supporting piece 0110 is disposed above the middle holder 0100 and connected to the first top surface 0102 , and a receiving area 0112 is formed between the supporting piece 0110 and the first top surface 0102 .
  • a second top surface 0114 is formed on the side of the support member 0110 facing away from the center holder 0100, and other structures such as a cold tank 0130 can be installed on the second top surface 0114.
  • the cold tank 0130 is connected to the second top surface 0114 , the hot tank 0140 is disposed in the accommodation area 0112 , and the cold tank 0130 and the hot tank 0140 are disposed on different sides of the supporting member 0110 .
  • a plurality of waterways are formed inside the waterway plate 0120, and the cold tank 0130 and the hot tank 0140 are connected through waterways, so that water can enter and exit the cold tank 0130 and the hot tank 0140.
  • the cold tank 0130 is arranged at the second top surface 0114, and the support member 0110 can ensure that there is a height difference between the cold tank 0130 and the hot tank 0140, thereby ensuring that the water in the cold tank 0130 has enough water under its own weight. Water output.
  • the center support 0100 and the support 0110 form the main frame structure, and the support 0110 can determine the positional relationship between the cold tank 0130 and the hot tank 0140, which is helpful for the modular assembly of the waterway assembly 130.
  • the middle holder 0100 and the support member 0110 help to increase the volume of the waterway assembly 130 and can reserve more installation positions for components.
  • the cold tank 0130 and the hot tank 0140 are connected through the water circuit board 0120, which reduces the setting of water pipes, not only improves the sealing performance of the water circuit assembly 130, but also improves the convenience of the assembly process.
  • the support member 0110 is arranged above the middle support 0100 and connected to the first top surface 0102, and the accommodation area 0112 formed between the support member 0110 and the first top surface 0102, the accommodation area 0112 Can be used to place heat tank 0140 and other components.
  • the supporting member 0110 includes a top board 0116 and side boards 0118 , the number of the side boards 0118 is at least two, and the side boards 0118 are connected to the edge of the top board 0116 .
  • top plate 0116 and the two side plates 0118 form an arched structure, and the position between the two side plates 0118 and the top plate 0116 forms a storage area 0112, and the heat tank 0140 and the compressor 0170 mentioned below are arranged in the storage area.
  • the heat tank 0140 and the compressor 0170 mentioned below are arranged in the storage area.
  • the side of the top plate 0116 away from the first top surface 0102 forms a second top surface 0114 , and the cold tank 0130 is installed above the top plate 0116 .
  • the supporting member 0110 includes a top plate 0116 and a side plate 0118, which can fix the cold tank 0130 and the hot tank 0140 in relative positions, which is convenient for assembly.
  • the cold tank 0130 and the hot tank 0140 are connected through the water circuit board 0120, the assembly efficiency is high, and the water leakage performance of the water circuit components is improved.
  • a third waterway 0122 , a fourth waterway 0124 , a fifth waterway 0126 and a sixth waterway 0128 are formed in the waterway plate 0120 .
  • the third waterway 0122 is formed with a third water inlet 01222 and a third water outlet 01224 , and the third water outlet 01224 communicates with the water inlet of the hot tank 0140 for replenishing water to the hot tank 0140 .
  • the fourth waterway 0124 is formed with a fourth water inlet 01244 and a fourth water outlet 01242 , and the fourth water inlet 01244 is connected to the water outlet of the cold tank 0130 to receive drinking water in the cold tank 0130 .
  • the fifth waterway 0126 is formed with a fifth water inlet 01262 and a fifth water outlet 01264 , the fifth water inlet 01262 is connected to the water outlet of the hot tank 0140 , and hot water flows out along the fifth water outlet 01264 .
  • the sixth waterway 0128 is formed with a sixth water inlet 01282 and a sixth water outlet 01284, the sixth water inlet 01282 is connected to the water outlet of the cold tank 0130, and cold water flows out along the sixth water outlet 01284.
  • the cold tank 0130 has at least two water outlets, one of which is connected to the fourth water inlet 01244 for supplementing drinking water to the hot tank 0140, and the other water outlet is connected to the sixth water inlet 01282, Used to provide cold water to the sixth waterway 0128.
  • the water circuit board 0120 also includes other water channels to realize the flow and circulation of cold water and hot water.
  • the third water outlet 01224 is connected to the water inlet of the hot tank 0140
  • the fourth water inlet 01244 is connected to the water outlet of the cold tank 0130
  • the third water inlet 01222 is connected to the fourth water outlet 01242. Adjacent to and connected to the trap 0150.
  • the cold tank 0130 receives external drinking water, part of the drinking water stays in the ice bladder of the cold tank 0130 , and the other part flows into the trap 0150 along the fourth waterway 0124 .
  • the third water inlet 01222 is connected to the water trap 0150, and then supplies drinking water to the hot tank 0140.
  • the water trap 0150 can avoid the direct connection between the cold tank 0130 and the hot tank 0140 , thereby avoiding temperature crossover between the two, and helping to reduce the energy consumption of the water circuit assembly 130 .
  • the third water inlet 01222 and the fourth water outlet 01242 are arranged adjacent to each other, which can make the water supply pipeline of the waterway assembly 130 more streamlined, facilitate modular assembly and reduce volume.
  • the water trap 0150 is formed with a first branch port 0152, a second branch port 0154 and a third branch port 0156, and the first branch port 0152, the second branch port 0154 and the third branch port 0156 are connected to each other. connected.
  • the first branch 0152 is connected to the third water inlet 01222
  • the second branch 0154 is connected to the fourth water outlet 01242
  • the third branch 0156 is suitable for releasing warm water, formed between the first branch 0152 and the second branch 0154
  • drinking water is temporarily accumulated in the water passage 0158, which can prevent the heat in the hot tank 0140 from being transferred to the cold tank 0130, and prevent the temperature in the cold tank 0130 from rising, thereby reducing the temperature of the water circuit assembly 130. energy consumption.
  • the drinking water receives heat from the hot tank 0140 to form warm water, and the warm water can be released along the third branch 0156, which can provide users with more choices of water temperature.
  • the anti-crossover temperature waterway 0158 is a circuitous waterway, and the anti-crossover temperature waterway 0158 forms a U-shaped pipe structure between the first branch 0152 and the second branch 0154, and a U-shaped water column is formed in the U-shaped pipe, which can avoid Heat is transferred between the third water inlet 01222 and the fourth water outlet 01242, thereby preventing temperature crossover between the hot tank 0140 and the cold tank 0130.
  • the water trap 0150 is arranged on one side of the top plate 0116 , which does not increase the height of the support member 0110 and can keep the structure of the waterway assembly 130 compact.
  • the third waterway 0122 is formed with a third water inlet 01222 and a third water outlet 01224, and the third water outlet 01224 is connected to the water inlet of the hot tank 0140 for replenishing water to the hot tank 0140.
  • the volume of the hot water will expand, and when the temperature of the water is heated above 90 degrees Celsius, the expansion coefficient of the hot water will be between 5% and 10%.
  • the hot tank 0140 when the hot tank 0140 is filled with water, the expanded hot water after heating will flow backwards along the third waterway 0122, causing the temperature of the water in the third waterway 0122, the fourth waterway 0124, and the cold tank 0130 to rise, that is, a series of events will occur.
  • the overheating phenomenon seriously affects the user experience and increases unnecessary energy consumption.
  • the working principle of the water trap 0150 set the water trap 0150 with a certain volume on the water inlet of the hot tank 0140. After the hot water heats up and expands, the expanded part can enter the water trap 0150 for temporary storage, and the hot water will not Flow back along the water inlet channel of the hot tank 0140 to the cold tank 0130, which can avoid the phenomenon of cross temperature.
  • the capacity of the water trap 0150 is Q1
  • the capacity of the hot tank 0140 is Q2
  • the expansion coefficient of water after heating is K
  • the expansion coefficient K is between 5% and 10%.
  • the capacity Q1 of the trap 0150 can be larger, preferably:
  • the trap 0150 reserves 2 times the expansion capacity.
  • Angle setting of the water trap 0150 The test was carried out under the condition that the capacity of the hot tank 0140 is 1000ml, the capacity of the anti-overheating waterway 0158 is 80ml, and the inlet water temperature is 25 degrees Celsius, and the following results are obtained:
  • the anti-crossover temperature waterway 0158 is connected horizontally with the water inlet waterway of the hot tank 0140, that is, there is no anti-crossover temperature structure, and the inlet water temperature in the fourth waterway 0124 can reach 53 degrees Celsius. There is a serious cross temperature phenomenon.
  • the anti-crossover temperature waterway 0158 is connected to the water inlet waterway of the hot tank 0140 at 45°, that is, the anti-crossover temperature waterway 0158 is set obliquely, and the water inlet temperature in the fourth waterway 0124 can reach 35 degrees Celsius, there is a temperature phenomenon.
  • the anti-cross-warming waterway 0158 is connected to the water inlet of the hot tank 0140 at 90°, that is, when the anti-cross-warming waterway 0158 is a U-shaped waterway, the water in the fourth waterway 0124
  • the temperature is 26 degrees Celsius. Compared with the initial water inlet temperature of 25 degrees Celsius, there is basically no temperature crossover phenomenon. Therefore, a U-shaped anti-crossover temperature waterway with a vertical structure is preferred.
  • the water passage 0158 for preventing cross-warming is a water passage provided with a one-way valve, which can prevent the heat in the hot tank 0140 from being transferred to the cold tank 0130 .
  • the water circuit plate 0120 is connected to the second top surface 0114, the cold tank 0130 is connected to the side of the water circuit plate 0120 facing away from the second top surface 0114, and the hot tank 0140 is connected to the side of the water circuit plate 0120 facing away from the cold tank 0130, thereby realizing the water circuit Modular assembly of components.
  • the top plate 0116 When the water channel plate 0120 is connected to the second top surface 0114, the top plate 0116 is formed with a through hole 01162 and an avoidance gap 01164 at positions corresponding to the water inlet and the water outlet of the hot tank 0140.
  • the water inlet and the water outlet of the hot tank 0140 are formed with conduits, which are passed through the through holes 01162 or the avoidance gaps 01164, and then connected to the water circuit board 0120. At this time, redundant water supply lines do not need to be set.
  • an electric control box 0160 is also arranged on the water circuit assembly 130 , and the electric control box 0160 is used to control the water in and out of the water circuit assembly 130 and the temperature.
  • the top plate 0116 is formed with a reserved buckle 01166 for the electric control box, which can realize the assembly of the electric control box 0160.
  • the reserved buckle 01166 for the electric control box can make full use of the free area on the top plate 0116, and can make the waterway components more streamlined.
  • one side of the support 0110 is provided with a cable tie 01182.
  • the cable in the electric control box 0160 is inserted into the cable tie 01182, and the cable tie 01182 Can make waterway components more concise.
  • wire tie 01182 is set close to the position where the electric control box 0160 is located, so that the cables connected to the electric control box 0160 can be collectively arranged together, avoiding messy cables, and facilitating the modular assembly of waterway components.
  • the support member 0110 is used to maintain the relative positional relationship between the cold tank 0130 and the hot tank 0140 to ensure the water output of the cold tank 0130 .
  • the cold tank 0130 and the hot tank 0140 are connected through the water circuit board 0120, and pins or legs can be set under the hot tank 0140 to ensure the communication between the hot tank 0140 and the water circuit board 0120.
  • the total height of the support member 0110 and the middle holder 0100 is H1
  • the height of the heat tank is H2
  • the ratio of H1 to H2 is between 1-5.
  • the support member 0110 and the center bracket 0100 constitute the main frame of the waterway assembly 130, and when the height of the main frame is determined, standardized production and assembly of products can be realized.
  • the length of the center holder 0100 is L1
  • the length of the support member 0110 is L2
  • the ratio of L1 to L2 is between 1-5.
  • the main frame of the waterway assembly 130 is formed by fixing the side plates 0118 of the support 0110 and the two sides of the middle bracket 0100.
  • the support The overall length of the 0110 is smaller than the length of the middle support 0100.
  • a storage area 0112 for placing the hot pot 0140 is formed under the support 0110, and the overall length of the support 0110 must meet the size requirements of the storage area 0112, so the ratio of L1 to L2 is between 1-5.
  • the width of the middle support 0100 is W1
  • the two side panels 0118 include a first side panel and a second side panel oppositely arranged, the width of the first side panel is W2, and the second side panel
  • the width is W3, the ratio of W1 to W2 is between 1 and 10, and the ratio of W2 to W3 is between 1 and 5.
  • the cold tank 0130 is connected to the fourth water inlet 01244 for supplementing drinking water into the hot tank 0140 .
  • the cold tank 0130 is also connected to the sixth water inlet 01282 for discharging the cold water in the cold tank 0130 for use by users.
  • the hot tank 0140 is connected to the fifth water inlet 01262 on the water circuit board 0120 to discharge the hot water in the hot tank 0140 for use by users.
  • the hot tank 0140 is also connected to the third water outlet 01224 on the water circuit board 0120 for receiving external drinking water.
  • the middle support 0100 In order to improve the strength of the overall module of the waterway assembly and realize the connection between the cold tank 0130 and the hot tank 0140, the middle support 0100 needs to cover the holes where the water inlet and outlet are located, thereby improving the connection strength of the overall module of the waterway assembly.
  • the water passage 0158 for preventing crossover of temperature is a water passage arranged up and down in a detour, and the top plate 0116 needs to avoid this structure.
  • the width of one side of the support member 0110 is small. Therefore, the ratio of W1 to W2 is between 1-10, and the ratio of W2 to W3 is between 1-5.
  • the waterway assembly 130 provided according to the embodiment of the present application includes a cold tank 0130 and a hot tank 0140, the fifth water outlet 01264 forms the water supply port 132 for hot water, the sixth water outlet 01284 forms the water supply port 132 for cold water, and the third branch port 0156 A water supply port 132 for warm water is formed, and different water supply ports 132 are connected to the transfer water circuit board 120 to provide users with drinking water of different temperatures.
  • the water circuit assembly 130 includes a refrigeration cycle, and the refrigeration cycle includes a compressor 0170, an evaporator, a condenser, and the like.
  • the evaporator and the condenser are connected to the compressor 0170, and the compressor 0170 applies pressure to the air during operation, the temperature of the air rises after being squeezed, and the heat is radiated to the outside along the condenser.
  • the volume of the air after heat dissipation increases again, the temperature drops sharply, forming a low-temperature cycle at the evaporator.
  • the evaporator is arranged in the cold tank 0130, which can reduce the water temperature in the cold tank 0130.
  • the condenser includes condensing pipes arranged in a detour, and is arranged on one side of the support member 0110.
  • the compressor 0170 is arranged in the accommodation area 0112. Neither the condenser nor the compressor 0170 will increase the volume of the water circuit assembly 130. After modular assembly The structure is more compact and the layout is more reasonable.
  • the sixth water outlet 01284 is used to provide cold water to users
  • the fifth water outlet 01264 is used to provide hot water to users
  • the third branch port 0156 is used to provide warm water to users.
  • the modular assembly of components, the fifth water outlet 01264, the sixth water outlet 01284 and the third branch 0156 are arranged in the same direction, which facilitates the installation of the transfer waterway plate 120 and the faucet 110, and improves the assembly efficiency of the waterway assembly 130.
  • the fifth water outlet 01264, the sixth water outlet 01284, and the third branch port 0156 are all set to open upwards, and the transfer waterway plate is fastened to the fifth water outlet 01264 and the sixth water outlet 01284 from top to bottom. And on the third branch port 0156.

Landscapes

  • Engineering & Computer Science (AREA)
  • Food Science & Technology (AREA)
  • Devices For Dispensing Beverages (AREA)

Abstract

一种机壳及供水设备,机壳包括第一壳体(100)、水龙头(110)和转接水路板(120),第一壳体(100)形成有定位孔(102);水龙头(110)形成有第一进水口(112)和第一出水口(114),该水龙头(110)连接于该定位孔(102),该第一进水口(112)和该第一出水口(114)位于该第一壳体(100)的不同侧;转接水路板(120)内部形成有水路,该水路形成有第二进水口(124)和第二出水口(126),该第二出水口(126)连接于该第一进水口(112),该第二进水口(124)适于连接至水路组件(130)的供水口(132)。在机壳的组装过程中,通过转接水路板(120)连接于水龙头(110)和水路组件(130)的供水口(132),不需要设置多根软管,可以避免出现漏接、错接、打折以及高温异味的情况,而且转接水路板(120)不需要人工绑扎或者紧固,使用时密封性较好,装配效率较高。

Description

机壳及供水设备 技术领域
本申请涉及生活用水供水技术领域,尤其是涉及一种机壳及供水设备。
背景技术
随着生活水平的不断提升,人们对饮用水的要求也越来越高,具有冷、热功能的供水装置也得以广泛地应用。供水装置的基础功能包括制冷、制热与出水的功能,由于不同组件之间没有明确的强连接关联性,在产品的生产过程中只能通过软管进行水路系统的连接。相关技术中,供水设备的水龙头与水路组件的供水口之间通过软管连接,容易发生漏接、错接、打折、高温异味等情况,而且软管的两端需要分别紧固,实际使用时漏水情况较为严重且装配效率较低。
发明内容
本申请旨在至少解决相关技术中存在的技术问题之一。为此,本申请提出一种机壳,机壳包括水龙头以及转接水路板,转接水路板连通于水路组件的供水口和水龙头,不需要使用软管连通水路系统,可以避免出现漏水现象,还不会出现漏接、错接、软管打折以及高温异味等情况。
本申请实施例还提供了一种供水设备。
根据本申请第一方面实施例提供的机壳,包括:
第一壳体,形成有定位孔;
水龙头,形成有第一进水口和第一出水口,所述水龙头连接于所述定位孔,所述第一进水口和所述第一出水口位于所述第一壳体的不同侧;
转接水路板,内部形成有水路,所述水路形成有第二进水口和第二出水口,所述第二出水口连接于所述第一进水口,所述第二进水口适于连接至水路组件的供水口。
根据本申请的一个实施例,还包括:
第二壳体,形成具有开口的容纳腔,所述第一壳体可拆卸连接于所述开口,所述第一出水口位于所述第一壳体背向所述第二壳体的一侧。
根据本申请的一个实施例,所述转接水路板固定连接于所述第一壳体。
根据本申请的一个实施例,所述第二壳体沿所述开口的边缘设有端板,所述第一壳体的边缘与所述端板卡扣连接。
根据本申请的一个实施例,所述第一壳体形成有容纳槽,所述容纳槽包括相对设置的顶部和底部,所述顶部形成有所述定位孔,所述第一出水口向所述底部所在的方向延伸。
根据本申请的一个实施例,还包括:
接水件,所述接水件连接于所述底部。
根据本申请的一个实施例,所述第一壳体的壳顶形成有避让槽,所述机壳还包括:
触压件,设置于所述避让槽内,所述触压件通过压杆连接于所述水龙头。
根据本申请的一个实施例,所述第一壳体上形成有定位槽,所述转接水路板插接于所述定位槽。
根据本申请第二方面实施例提供的供水设备,包括具有供水口的水路组件和根据本申请第一方面实施例提供的所述机壳,所述水路组件设置在所述机壳内。
根据本申请的一个实施例,还包括:
第一密封圈,设置在所述第一进水口和所述第二出水口之间;
第二密封圈,设置在所述供水口和所述第二进水口之间。
本申请实施例中的上述一个或多个技术方案,至少具有如下技术效果之一:
根据本申请第一方面实施例提供的机壳,包括第一壳体、水龙头以及转接水路板,第一壳体上形成有定位孔,水龙头安装在定位孔内。水龙头形成有第一进水口和第一出水口,第一进水口和第一出水口位于第一壳体的两侧。转接水路板内部形成有水路,水路形成有第二进水口和第二出水口,第二进水口适于连通至水路组件的供水口,第二出水口连通于第一进水口,转接水路板用以将水路组件内不同温度的饮用水输送至水龙头处。在机壳的组装以及生产过程中,通过转接水路板连接于水龙头和水路组件的供水口,不需要设置多根软管,可以避免出现漏接、错接、打折以及高温异味的情况,而且转接水路板不需要人工绑扎或者紧固,使用时密封性较好,装配效率较高。
本申请的附加方面和优点将在下面的描述中部分给出,部分将从下面的描述中变得明显,或通过本申请的实践了解到。
附图说明
为了更清楚地说明本申请实施例或相关技术中的技术方案,下面将对实施例或相关技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本申请的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1是本申请实施例提供的机壳的分解图一;
图2是本申请实施例提供的机壳的分解图二;
图3是本申请实施例提供的水龙头、转接水路板和水路组件的分解示意图;
图4是本申请实施例提供的水龙头、转接水路板和水路组件的连接示意图;
图5是本申请实施例提供的供水设备的立体图一;
图6是本申请实施例提供的供水设备的立体图二;
图7是本申请实施例提供的水路组件的立体图一;
图8是本申请实施例提供的水路组件的立体图二;
图9是本申请实施例提供的中托与支撑件的立体图;
图10是本申请实施例提供的中托和支撑件的俯视图;
图11是本申请实施例提供的中托和支撑件的侧视图;
图12是本申请实施例提供的水路板的立体图一;
图13是本申请实施例提供的水路板的立体图二;
图14是本申请实施例提供的水路板的侧视图;
图15是本申请实施例提供的水路板的A-A剖面图;
图16是本申请实施例提供的存水弯的防串温水路的角度设置示意图一;
图17是本申请实施例提供的存水弯的防串温水路的角度设置示意图二;
图18是本申请实施例提供的存水弯的防串温水路的角度设置示意图三。
附图标记:
100、第一壳体;101、加强部;102、定位孔;104、卡扣件;106、容纳槽; 1062、顶部;1064、底部;1066、接水件;108、避让槽;1082、触压件;1084、压杆;109、定位槽;
110、水龙头;112、第一进水口;114、第一出水口;
120、转接水路板;122、水路;1222、进水管段;1224、出水管段;124、第二进水口;126、第二出水口;
130、水路组件;132、供水口;
140、第二壳体;142、容纳腔;144、端板;146、扣位;
150、第一密封圈;152、第二密封圈;
0100、中托;0102、第一顶面;
0110、支撑件;0112、容纳区;0114、第二顶面;0116、顶板;01162、通孔;01164、避让缺口;01166、电控盒预留扣位;0118、侧板;01182、线扣;
0120、水路板;0122、第三水路;01222、第三进水口;01224、第四出水口;0124、第四水路;01244、第四进水口;01242、第四出水口;0126、第五水路;01262、第五进水口;01264、第五出水口;0128、第六水路;01282、第六进水口;01284、第六出水口;
0130、冷罐;
0140、热罐;
0150、存水弯;0152、第一支口;0154、第二支口;0156、第三支口;0158、防串温水路;
0160、电控盒;
0170、压缩机。
具体实施方式
下面结合附图和实施例对本申请的实施方式作进一步详细描述。以下实施例用于说明本申请,但不能用来限制本申请的范围。
在本申请实施例的描述中,需要说明的是,术语“中心”、“上”、“下”、“前”、“后”、“左”、“右”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本申请实施例和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作, 因此不能理解为对本申请实施例的限制。此外,术语“第一”、“第二”、“第三”仅用于描述目的,而不能理解为指示或暗示相对重要性。
在本申请实施例的描述中,需要说明的是,除非另有明确的规定和限定,术语“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本申请实施例中的具体含义。
在本申请实施例中,除非另有明确的规定和限定,第一特征在第二特征“上”或“下”可以是第一和第二特征直接接触,或第一和第二特征通过中间媒介间接接触。而且,第一特征在第二特征“之上”、“上方”和“上面”可是第一特征在第二特征正上方或斜上方,或仅仅表示第一特征水平高度高于第二特征。第一特征在第二特征“之下”、“下方”和“下面”可以是第一特征在第二特征正下方或斜下方,或仅仅表示第一特征水平高度小于第二特征。
在本说明书的描述中,参考术语“一个实施例”、“一些实施例”、“示例”、“具体示例”、或“一些示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本申请实施例的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不必须针对的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任一个或多个实施例或示例中以合适的方式结合。此外,在不相互矛盾的情况下,本领域的技术人员可以将本说明书中描述的不同实施例或示例以及不同实施例或示例的特征进行结合和组合。
相关技术中,供水设备的水龙头与水路组件的供水口之间通过软管连接,容易发生漏接、错接、打折、高温异味等情况,而且软管的两端需要分别紧固,实际使用时漏水情况较为严重且装配效率较低。
根据本申请第一方面实施例提供的机壳,请参阅图1至图18,包括第一壳体100、水龙头110以及转接水路板120。
供水设备包括机壳和水路组件130等,水路组件130设置在机壳内部。为了实现供水设备的快速组装以及生产,机壳采用可拆卸的结构,第一壳体100可以是机壳的主体结构,也可以是机壳的局部结构,例如部分侧壳。
第一壳体100上形成有定位孔102,定位孔102用于安装水龙头110,定位 孔102的形状、尺寸以及数量与水龙头110保持一致。
在一些实施例中,定位孔102的数量为一个,此时第一壳体100上仅安装一个水龙头110,通过对转接水路板120进行设计,可以向用户提供一种或者多种温度的饮用水。
在另一些实施例中,定位孔102的数量至少为两个,第一壳体100上安装有多个水龙头110,不同水龙头110可以释放不同水温的饮用水。
水龙头110形成有第一进水口112和第一出水口114,第一出水口114即取水口,用户可以在第一出水口114处接收饮用水。水龙头110安装在定位孔102内,第一进水口112和第一出水口114位于第一壳体100的不同侧,第一进水口112接收来自转接水路板120内的饮用水,然后沿着第一出水口114释放。
在一些实施例中,水龙头110可以是按压出水、旋转出水或者电控出水的水龙头。
转接水路板120内部形成有水路122,水路122形成有第二进水口124和第二出水口126,第二出水口126连通于水龙头110的第一进水口112,第二进水口124适于连通至水路组件130的供水口。
可以理解的是,在未设置转接水路板120的供水设备中,水龙头110的第一进水口112与水路组件130的供水口132之间通过软管连接。水路组件130可能具有多个供水口132,不同的供水口132适于提供不同温度的饮用水。通过多根软管连接供水口132与第一进水口112时,可能存在漏接、错接的情况,导致水龙头110出水异常。软管的长度与设计存在误差时,还会导致软管弯折、扭曲等情况,影响水龙头110的出水效率。软管长时间接触高温热水时,还可能导致软管出现异味,影响饮用水的口感。
需要说明的是,在图1至图6中,为了清楚显示转接水路板120与供水口132之间的连接关系,水路组件130仅显示水路板0120。
在组装机壳时,转接水路板120连通于水路组件130的供水口132以及水龙头110的第一进水口112,水路系统不需要通过软管连接,而且各部件的尺寸经过严格设计,水龙头110、转接水路板120以及水路组件130拼接之后密封性较 好,不需要人工绑扎以及紧固,防漏性能较好。
根据本申请实施例提供的机壳,转接水路板120的第二出水口126连通于水龙头110,可以通过水龙头110向用户提供饮用水。水路122的数量为多个时,能够为用户提供不同温度的饮用水。
在一些实施例中,水路组件130形成有三个供水口132,转接水路板120形成有三个水路122,三个水路122分别连接有水龙头110,可以向用户提供热水、温水以及冷水。
可以理解的是,转接水路板120采用插接、螺纹连接等形式与水龙头110以及水路组件130进行连接,水路组件130上的多个供水口132并列设置且开口方向相同,转接水路板120上的多个第二进水口124并列设置且开口相同。在装配转接水路板120以及水路组件130时,可以使多个第二进水口124与多个供水口132一一对应连接,组装效率较高,同时多个第二进水口124和多个供水口132之间还可以起到限位作用,避免转接水路板120与水路组件130之间出现松动,提升了水路系统的防漏和防渗性能。
考虑到转接水路板120与水路组件130拼接时的位置关系,转接水路板120可以是异形结构,其中水路122可以分段设置。
在一些实施例中,水路122包括进水管段1222和出水管段1224,进水管段1222与出水管段1224相互连通。进水管段1222远离出水管段1224的一端形成有第二进水口124,出水管段1224远离进水管段1222的一端形成有第二出水口126,进水管段1222和出水管段1224之间形成夹角,可以方便转接水路板120与水路组件130进行装配,还可以避免转接水路板120在单一方向的尺寸过大。
第一壳体100是机壳的前壳,第一壳体100上安装有水龙头110和转接水路板120,第一壳体100、水龙头110以及转接水路板120形成出水模块,在标准化生产过程中可以作为独立的部件,应用于不同型号的供水设备。
在一些实施例中,机壳还包括第二壳体140,第二壳体140形成有具有开口的容纳腔142,第一壳体100可拆卸连接于开口,用于封闭容纳腔142。
可以理解的是,第一壳体100和第二壳体140构成机壳的整体结构,第一壳 体100可拆卸连接于第二壳体140的开口位置,容纳腔142内适于放置水路组件130和储水件等。
在一些实施例中,第一壳体100上形成有加强部101,加强部101可以是条状的凸肋,也可以是隔板等,可以增加第一壳体100的抗弯折能力,在组装以及拆卸第一壳体100时,能够保障第一壳体100的稳定性,进而提升机壳的使用寿命。
需要说明的是,水龙头110安装在第一壳体100上,第一壳体100连接于第二壳体140时,第一出水口114位于第一壳体100背向第二壳体140的一侧,第一出水口114向用户提供不同温度的饮用水。
根据本申请实施例提供的机壳,第一壳体100可拆卸连接于第二壳体140,第一壳体100采用卡扣结构等连接于第二壳体140,以加快机壳的装配效率或者供水设备的生产效率。
在一些实施例中,转接水路板120固定连接于第一壳体100。转接水路板120固定连接于第一壳体100时,不仅可以使水龙头110与转接水路板120稳定连接,还可以增加机壳的装配效率。转接水路板120与第一壳体100的位置关系确定,机壳在装配时,只需要将第一壳体100装配在第二壳体140上,转接水路板120与水路组件130就可以实现自动对准并装配,提升了机壳以及供水设备的生产效率。
在一些实施例中,第二壳体140沿开口的边缘设有端板144,第一壳体100的边缘与端板144卡扣连接。在第一壳体100的边缘处设置有卡扣件104,端板144上形成有扣位146,卡扣件104与扣位146装配连接。
在一些实施例中,供水口132向上设置,第二进水口124向下设置,第一壳体100与第二壳体140自上至下扣合,扣位146形成有竖向的限位槽,卡扣件104向外伸出,装配连接于扣位146。
需要说明的是,卡扣件104以及扣位146的数量均为多个,卡扣件104与扣位146一一对应设置,以保证第一壳体100和第二壳体140的稳定连接。
根据本申请实施例提供的机壳,水龙头110安装在第一壳体100上,第一出 水口114用于提供不同温度的饮用水。
在一些实施例中,第一壳体100背向转接水路板120的一侧形成有容纳槽106,容纳槽106包括相对设置的顶部1062和底部1064,顶部1062形成有定位孔102,水龙头110安装在顶部1062处,第一出水口114向底部1064所在的方向延伸。
可以理解的是,底部1064形成支撑平台,用户在取水时将水杯放在底部1064处,顶部1062处的水龙头110释放不同温度的饮用水,饮用水沿着第一出水口114向水杯灌注。水杯放置在底部1064处,用户取水时不用时时刻刻握持水杯,提升了使用时的舒适性。与此同时,供水口132可以向水龙头110提供热水,用户在获取热水时存在一定的危险性。水杯放置在底部1064处,获取热水时不需要用手握持,提升了使用时的安全性。
在一些实施例中,底部1064还形成有凹槽,凹槽用于容纳水杯的杯底,可以对杯底形成限位作用,进而避免水杯在接水过程中出现滑动,提升了机壳的适应性。
在一些实施例中,容纳槽106的底部设置有接水件1066,接水件1066设置在底部1064靠近顶部1062的一侧。
可以理解的是,接水件1066的顶部形成有接水槽,接水槽用以接收水杯内溅出或者溢出的饮用水,避免饮用水直接洒落在室内,提升了机壳以及供水设备的干净与卫生。
需要说明的是,接水件1066的接水槽与上文提到的凹槽可以同时设置,两者具有兼容性。
根据本申请实施例提供的机壳,第一壳体100上安装有水龙头110,按压或者拨动水龙头110时,第一出水口114可以向用户提供饮用水。
在一些实施例中,第一壳体100的壳顶形成有避让槽108,机壳还包括触压件1082,触压件1082设置在避让槽108内,可以通过触压件1082控制水龙头110的启闭。
水龙头110的第一出水口114向下或者倾斜向下设置,水龙头110的位置较 低时,用户需要弯腰才能启闭水龙头110,取水时身体负担较大。在第一壳体100的壳顶设置有触压件1082,用户正常站立就可以对触压件1082进行操作,使用时较方便。
需要说明的是,触压件1082设置在第一壳体100的壳顶位置,触压件1082与水龙头110之间具有间距,在间距较大时,可以在触压件1082与水龙头110之间设置压杆1084。压杆1084的数量与水龙头110的数量相同,每一个压杆1084控制一个水龙头110。
在水龙头110的数量为多个时,多个压杆1084并列设置,尽可能减少空间占用,有助于缩小机壳的体积。
根据本申请实施例提供的机壳,第一壳体100上形成有定位孔102,水龙头110安装在定位孔102内,转接水路板120连接于水龙头110。
在一些实施例中,第一壳体100上形成有定位槽109,转接水路板120插接在定位槽109内。
在装配水龙头110以及转接水路板120时,转接水路板120沿着定位槽109插接于第一壳体100,定位孔102设置在定位槽109的尽头。在转接水路板120完全插接于定位槽109时,第二出水口126连接于第一进水口112。定位槽109提升了转接水路板120的位置稳定性,还提升了转接水路板120与水龙头110的装配效率。
根据本申请第二方面实施例提供的供水设备,包括水路组件130以及根据本申请第一方面实施例提供的机壳,水路组件130具有至少一个供水口132,供水口132连接于转接水路板120的第二进水口124。
可以理解的是,供水设备还包括储水件等,水路组件130和储水件均设置在机壳内,储水件以及水路组件130可以在供水口132处提供不同温度的饮用水。
转接水路板120连接于水龙头110和水路组件130的供水口132,不需要设置多根软管,可以避免出现漏接、错接、打折以及高温异味的情况,而且转接水路板120不需要人工绑扎或者紧固,使用时密封性较好,装配效率较高。
根据本申请实施例提供的供水设备,转接水路板120与水龙头110以及水路 组件130装配连接,生产效率较高,密封性较好。
在一些实施例中,供水设备还包括第一密封圈150和第二密封圈152。
可以理解的是,第二进水口124插接于供水口132,第一进水口112插接于第二出水口126,第一密封圈150设置在第一进水口112和第二出水口126之间,第二密封圈152设置在供水口132和第二进水口124之间。第一密封圈150和第二密封圈152增加了转接水路板120两端的密封性,可以有效避免供水设备出现漏水或者渗水现象,提升了供水设备的使用寿命。
综上所述,根据本申请实施例提供的机壳和供水设备,机壳包括第一壳体100、水龙头110以及转接水路板120,第一壳体100上形成有定位孔102,水龙头110安装在定位孔102内。水龙头110形成有第一进水口112和第一出水口114,第一进水口112和第一出水口114位于第一壳体100的两侧。转接水路板120内部形成有水路122,水路122形成有第二进水口124和第二出水口126,第二进水口124适于连通至水路组件130的供水口132,第二出水口126连通于第一进水口112,转接水路板120用以将水路组件130内不同温度的饮用水输送至水龙头110处。在机壳的组装以及生产过程中,通过转接水路板120连接于水龙头110和水路组件130的供水口132,不需要设置多根软管,可以避免出现漏接、错接、打折以及高温异味的情况,而且转接水路板120不需要人工绑扎或者紧固,使用时密封性较好,装配效率较高。
根据本申请实施例提供的水路组件130,请参阅图7至图18,包括中托0100、支撑件0110、水路板0120、冷罐0130以及热罐0140。
为了方便对技术方案的描述,本实施例中定义竖直方向为水路组件130底部至顶部之间的方向,横向方向为水路组件130左侧至右侧之间的方向,纵向方向为水路组件130前侧至后侧之间的方向。
中托0100形成有第一顶面0102,第一顶面0102相对平整或者具有安装位置,用于固定热罐0140等结构。中托0100为板状结构或者至少顶部平整的其它异形结构。
支撑件0110设置在中托0100的上方且连接于第一顶面0102,支撑件0110 和第一顶面0102之间形成有容纳区0112。支撑件0110背向中托0100的一侧形成有第二顶面0114,第二顶面0114处可以安装冷罐0130等其它结构。
冷罐0130连接于第二顶面0114,热罐0140设置在容纳区0112内,冷罐0130和热罐0140设置在支撑件0110的不同侧。同时,水路板0120内部形成有多条水路,冷罐0130和热罐0140之间通过水路连接,可以使水在冷罐0130以及热罐0140内出入。
可以理解的是,冷罐0130设置在第二顶面0114处,支撑件0110可以确保冷罐0130与热罐0140之间具有高度差,进而确保冷罐0130内的水在自重作用下具有足够的出水量。
在一些实施例中,冷罐0130与冷罐的出水口之间具有至少50cm的高度差,可以使冷罐0130的出水流量达到1.2L/min。
中托0100和支撑件0110组成主体框架结构,支撑件0110可以确定冷罐0130与热罐0140的位置关系,有助于水路组件130的模块化组装。同时,中托0100和支撑件0110有助于增加水路组件130的体积,可以预留更多部件的安装位置。
冷罐0130与热罐0140之间通过水路板0120连接,减少了水管的设置,不仅提升了水路组件130的密封性,还提升了组装过程的便捷性。
根据本申请实施例提供的水路组件130,支撑件0110设置在中托0100的上方且连接于第一顶面0102,支撑件0110与第一顶面0102之间形成的容纳区0112,容纳区0112可以用于放置热罐0140等部件。
在一些实施例中,支撑件0110包括顶板0116和侧板0118,侧板0118的数量至少为两个,连接于顶板0116的边缘。
可以理解的是,顶板0116和两个侧板0118形成拱形的结构,两个侧板0118和顶板0116之间的位置形成容纳区0112,热罐0140以及下文提到的压缩机0170设置在容纳区0112内。顶板0116远离第一顶面0102的一侧形成第二顶面0114,冷罐0130安装在顶板0116的上方。
支撑件0110包括顶板0116以及侧板0118,可以将冷罐0130和热罐0140 按照相对位置进行固定,组装时较为方便。冷罐0130和热罐0140之间通过水路板0120连接,组装效率较高,提升了水路组件的防漏水性能。
在一些实施例中,水路板0120内形成有第三水路0122、第四水路0124、第五水路0126和第六水路0128。
第三水路0122形成有第三进水口01222和第三出水口01224,第三出水口01224连通于热罐0140的进水口,用于向热罐0140补充水源。
第四水路0124形成有第四进水口01244和第四出水口01242,第四进水口01244连通于冷罐0130的出水口,用以接收冷罐0130内的饮用水。
第五水路0126形成有第五进水口01262和第五出水口01264,第五进水口01262连通于热罐0140的出水口,热水沿着第五出水口01264流出。
第六水路0128形成有第六进水口01282和第六出水口01284,第六进水口01282连通于冷罐0130的出水口,冷水沿着第六出水口01284流出。
需要说明的是,冷罐0130具有至少两个出水口,其中一个出水口连通于第四进水口01244,用于向热罐0140补充饮用水,其中另一个出水口连通于第六进水口01282,用以向第六水路0128提供冷水。
在一些实施例中,水路板0120还包括其它水路,以实现冷水和热水的流动以及循环等。
根据本申请实施例提供的水路组件,第三出水口01224连通于热罐0140的进水口,第四进水口01244连通于冷罐0130的出水口,第三进水口01222和第四出水口01242相邻设置且连接于存水弯0150。
可以理解的是,冷罐0130接收外部饮用水,饮用水一部分留在冷罐0130的冰胆内,另一部分沿着第四水路0124流入存水弯0150内。第三进水口01222连通于存水弯0150,进而向热罐0140内补充饮用水。存水弯0150可以避免冷罐0130与热罐0140直接连接,进而避免两者之间出现串温,有助于降低水路组件130的能耗。同时,第三进水口01222和第四出水口01242相邻设置,可以使水路组件130的供水管线更加精简,有助于模块化组装以及缩小体积。
在一些实施例中,存水弯0150形成有第一支口0152、第二支口0154以及 第三支口0156,第一支口0152、第二支口0154和第三支口0156之间相互连通。第一支口0152连通于第三进水口01222,第二支口0154连通于第四出水口01242,第三支口0156适于释放温水,第一支口0152和第二支口0154之间形成有防串温水路0158。
可以理解的是,在防串温水路0158内,饮用水暂时蓄积,可以阻挡热罐0140内的热量向冷罐0130内传递,可以避免冷罐0130内的温度升高,进而降低了水路组件130的能耗。与此同时,在存水弯0150处,饮用水接收来自热罐0140内的热量形成温水,温水可以沿着第三支口0156释放,可以为用户提供更多的水温选择。
在一些实施例中,防串温水路0158为迂回水路,防串温水路0158在第一支口0152和第二支口0154之间形成U型管结构,U型管内形成U型水柱,可以避免热量在第三进水口01222和第四出水口01242之间传递,进而防止热罐0140和冷罐0130之间出现串温。
需要说明的是,存水弯0150设置在顶板0116的一侧,不会增加支撑件0110的高度,可以保持水路组件130的结构紧凑。
以下内容对存水弯0150设计的必要性、工作原理以及角度设置进行详细描述:
存水弯0150设计的必要性:第三水路0122形成有第三进水口01222和第三出水口01224,第三出水口01224连通于热罐0140的进水口,用于向热罐0140补充水源。热罐0140内的水温升高时,热水的体积会发生膨胀,水的温度加热到90摄氏度以上时,热水膨胀系数在5%至10%之间。因此,在热罐0140内注满水时,加热后膨胀的热水将会沿着第三水路0122倒流,导致第三水路0122、第四水路0124以及冷罐0130内的水温上升,即出现串温现象,严重影响用户的使用体验,同时增加了不必要的能耗。
存水弯0150的工作原理:在热罐0140的进水水路上设置具有一定容积的存水弯0150,热水升温膨胀后,膨胀的部分可以进入存水弯0150内暂存,热水不会沿着热罐0140的进水水路倒流至冷罐0130,可以避免出现串温现象。
假设存水弯0150的容量为Q1,热罐0140的容量为Q2,水加热后的膨胀系数为K,水的温度加热到90摄氏度以上时,膨胀系数K在5%至10%之间。热罐0140内的水加热升温时,为了避免热水倒流,则需要满足以下关系:
Q1≥K*Q2
在空间充足的情况下,存水弯0150的容量Q1可以更大一些,优选:
Q1≥2*K*Q2
即,存水弯0150预留2倍的膨胀容量。
存水弯0150的角度设置:在热罐0140的容量为1000ml,防串温水路0158的容量为80ml以及进水温度为25摄氏度的情况下进行试验,得出以下结果:
在第一种情况下,请参阅图16,防串温水路0158与热罐0140的进水水路水平连通,即不存在防串温结构,第四水路0124内的进水温度可以达到53摄氏度,存在严重的串温现象。
在第二种情况下,请参阅图17,防串温水路0158与热罐0140的进水水路呈45°连通,即防串温水路0158倾斜设置,第四水路0124内的进水温度可以达到35摄氏度,存在串温现象。
在第三种情况下,请参阅图18,防串温水路0158与热罐0140的进水水路呈90°连通,即防串温水路0158为U型水路时,第四水路0124内的进水温度为26摄氏度,与初始进水温度25摄氏度相比,基本不存在串温现象,因此优选具有竖直结构的U型防串温水路。
在另一些实施例中,防串温水路0158为设置有单向阀的水路,能够避免热罐0140内的热量传递至冷罐0130内。
水路板0120连接于第二顶面0114,冷罐0130连接于水路板0120背向第二顶面0114的一侧,热罐0140连接于水路板0120背向冷罐0130的一侧,进而实现水路组件的模块化组装。
在水路板0120连接于第二顶面0114的情况下,顶板0116对应于热罐0140的进水口和出水口的位置形成有通孔01162和避让缺口01164。热罐0140的进水口和出水口处形成有导管,导管穿设于通孔01162或者避让缺口01164,然后 连接于水路板0120,此时不需要设置多余的供水管线。
可以理解的是,在顶板0116上形成有通孔01162或者避让缺口01164的情况下,水路板0120、冷罐0130以及热罐0140之间的组装效率更高,结构更加紧凑,有利于水路组件130的自动化生产。
在一些实施例中,水路组件130上还设置有电控盒0160,电控盒0160用于对水路组件130的进出水以及温度进行控制。顶板0116上形成有电控盒预留扣位01166,可以实现电控盒0160的组装,电控盒预留扣位01166可以充分利用顶板0116上的空闲区域,可以使水路组件更加精简。
在另一些实施例中,支撑件0110的一侧设置有线扣01182,在顶板0116上安装有电控盒0160的情况下,电控盒0160内的排线插设在线扣01182内,线扣01182可以使水路组件更加简洁。
可以理解的是,线扣01182靠近电控盒0160所在的位置设置,能够使连接电控盒0160的排线集中布设在一起,避免排线凌乱,有助于水路组件的模块化组装。
支撑件0110用以维持冷罐0130和热罐0140之间的相对位置关系,保障冷罐0130的出水量。冷罐0130和热罐0140之间通过水路板0120连接,可以在热罐0140的下方设置引脚或者支腿等,确保热罐0140与水路板0120的连通。
在一些实施例中,沿竖直方向,支撑件0110与中托0100的总高度为H1,热罐的高度为H2,H1与H2的比值在1~5之间。
可以理解的是,支撑件0110与中托0100构成了水路组件130的主框架,在主框架的高度确定时,可以实现产品的标准化生产与组装。
在一些实施例中,沿横向方向,中托0100的长度为L1,支撑件0110的长度为L2,L1与L2的比值在1~5之间。
可以理解的是,水路组件130的主框架由支撑件0110的侧板0118与中托0100的两侧固定形成,为了方便中托0100与侧板0118的自动化装配,避免组装时产生干涉,支撑件0110的整体长度要小于中托0100的长度。同时,支撑件0110的下方形成有放置热罐0140的容纳区0112,支撑件0110的整体长度还要 满足容纳区0112的尺寸要求,因此L1与L2的比值在1~5之间。
在一些实施例中,沿纵向方向,中托0100的宽度为W1,两个侧板0118包括相对设置的第一侧板和第二侧板,第一侧板的宽度为W2,第二侧板的宽度为W3,W1与W2的比值在1~10之间,W2与W3的比值在1~5之间。
可以理解的是,冷罐0130连接于第四进水口01244,用于向热罐0140内补充饮用水。冷罐0130还连接于第六进水口01282,用于将冷罐0130内冷水排出,以供用户使用。热罐0140连接于水路板0120上的第五进水口01262,用以将热罐0140内的热水排出,以供用户使用。热罐0140还连接于水路板0120上的第三出水口01224,用以接收外部饮用水。
为了提高水路组件整体模块的强度以及实现冷罐0130与热罐0140之间的连接,中托0100需要覆盖上述进、出水口所处的孔位,进而提高水路组件整体模块的连接强度。
防串温水路0158是上下迂回设置的水路,顶板0116需要避开该结构。同时为了降低成本,避免不必要的材料浪费,支撑件0110的一侧宽度较小。因此,W1与W2的比值在1~10之间,W2与W3的比值在1~5之间。
根据本申请实施例提供的水路组件130,包括冷罐0130以及热罐0140,第五出水口01264形成热水的供水口132,第六出水口01284形成冷水的供水口132,第三支口0156形成温水的供水口132,不同的供水口132连接于转接水路板120,可以为用户提供不同温度的饮用水。
在一些实施例中,水路组件130包括制冷循环,制冷循环包括压缩机0170、蒸发器以及冷凝器等。蒸发器和冷凝器连接于压缩机0170,压缩机0170工作时对空气施加压力,空气受到挤压后温度上升,热量沿着冷凝器向外部辐射。散热后的空气体积再次增大时,温度急剧降低,在蒸发器处形成低温循环。蒸发器设置在冷罐0130内,可以降低冷罐0130内的水温。冷凝器包括迂回设置的冷凝管等,设置在支撑件0110的一侧,压缩机0170设置在容纳区0112内,冷凝器和压缩机0170均不会增加水路组件130的体积,在模块化组装后结构更加紧凑,布局更加合理。
根据本申请实施例提供的水路组件,第六出水口01284用于向用户提供冷水,第五出水口01264用于向用户提供热水,第三支口0156用于向用户提供温水,为了实现水路组件的模块化组装,第五出水口01264、第六出水口01284以及第三支口0156同向设置,方便了转接水路板120以及水龙头110的安装,提升了水路组件130的组装效率。
在一些实施例中,第五出水口01264、第六出水口01284以及第三支口0156均向上开口设置,转接水路板自上至下扣合在第五出水口01264、第六出水口01284以及第三支口0156上。
以上实施方式仅用于说明本申请,而非对本申请的限制。尽管参照实施例对本申请进行了详细说明,本领域的普通技术人员应当理解,对本申请的技术方案进行各种组合、修改或者等同替换,都不脱离本申请技术方案的精神和范围,均应涵盖在本申请的权利要求范围中。

Claims (10)

  1. 一种机壳,其特征在于,包括:
    第一壳体,形成有定位孔;
    水龙头,形成有第一进水口和第一出水口,所述水龙头连接于所述定位孔,所述第一进水口和所述第一出水口位于所述第一壳体的不同侧;
    转接水路板,内部形成有水路,所述水路形成有第二进水口和第二出水口,所述第二出水口连接于所述第一进水口,所述第二进水口适于连接至水路组件的供水口。
  2. 根据权利要求1所述的机壳,其特征在于,还包括:
    第二壳体,形成具有开口的容纳腔,所述第一壳体可拆卸连接于所述开口,所述第一出水口位于所述第一壳体背向所述第二壳体的一侧。
  3. 根据权利要求1所述的机壳,其特征在于,所述转接水路板固定连接于所述第一壳体。
  4. 根据权利要求2所述的机壳,其特征在于,所述第二壳体沿所述开口的边缘设有端板,所述第一壳体的边缘与所述端板卡扣连接。
  5. 根据权利要求1至4任一项所述的机壳,其特征在于,所述第一壳体形成有容纳槽,所述容纳槽包括相对设置的顶部和底部,所述顶部形成有所述定位孔,所述第一出水口向所述底部所在的方向延伸。
  6. 根据权利要求5所述的机壳,其特征在于,还包括:
    接水件,所述接水件连接于所述底部。
  7. 根据权利要求1至4任一项所述的机壳,其特征在于,所述第一壳体的壳顶形成有避让槽,所述机壳还包括:
    触压件,设置于所述避让槽内,所述触压件通过压杆连接于所述水龙头。
  8. 根据权利要求1至4任一项所述的机壳,其特征在于,所述第一壳体上形成有定位槽,所述转接水路板插接于所述定位槽。
  9. 一种供水设备,其特征在于,包括具有供水口的水路组件和如权利要求1至8任一项所述的机壳,所述水路组件设置在所述机壳内。
  10. 根据权利要求9所述的供水设备,其特征在于,还包括:
    第一密封圈,设置在所述第一进水口和所述第二出水口之间;
    第二密封圈,设置在所述供水口和所述第二进水口之间。
PCT/CN2022/078464 2022-02-28 2022-02-28 机壳及供水设备 WO2023159628A1 (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2022/078464 WO2023159628A1 (zh) 2022-02-28 2022-02-28 机壳及供水设备

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2022/078464 WO2023159628A1 (zh) 2022-02-28 2022-02-28 机壳及供水设备

Publications (1)

Publication Number Publication Date
WO2023159628A1 true WO2023159628A1 (zh) 2023-08-31

Family

ID=87764515

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2022/078464 WO2023159628A1 (zh) 2022-02-28 2022-02-28 机壳及供水设备

Country Status (1)

Country Link
WO (1) WO2023159628A1 (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2701372Y (zh) * 2004-05-28 2005-05-25 美的集团有限公司 一种方便更换面板的饮水机
CN210240840U (zh) * 2019-04-15 2020-04-03 佛山市美的清湖净水设备有限公司 供水装置
WO2022016794A1 (zh) * 2020-07-21 2022-01-27 莱克电气绿能科技(苏州)有限公司 饮品机
CN215686808U (zh) * 2021-04-20 2022-02-01 佛山市美的清湖净水设备有限公司 饮水机

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2701372Y (zh) * 2004-05-28 2005-05-25 美的集团有限公司 一种方便更换面板的饮水机
CN210240840U (zh) * 2019-04-15 2020-04-03 佛山市美的清湖净水设备有限公司 供水装置
WO2022016794A1 (zh) * 2020-07-21 2022-01-27 莱克电气绿能科技(苏州)有限公司 饮品机
CN215686808U (zh) * 2021-04-20 2022-02-01 佛山市美的清湖净水设备有限公司 饮水机

Similar Documents

Publication Publication Date Title
CN217013609U (zh) 供水组件及饮水机
CN217031686U (zh) 散热组件、水路组件及饮水机
CN217013607U (zh) 供水组件、机壳及饮水机
WO2023159628A1 (zh) 机壳及供水设备
CN110906589A (zh) 热泵用换热器及热泵热水器
CN114607011B (zh) 供水组件及供水设备
CN114561999B (zh) 机壳及供水设备
CN114601333B (zh) 饮水设备
CN210408115U (zh) 饮水机的冰胆组件和饮水机
CN114601336B (zh) 饮水设备
WO2023159626A1 (zh) 水路组件及供水装置
CN114562835B (zh) 冷凝器、水路组件及饮水设备
WO2023159632A1 (zh) 供水组件及供水设备
WO2023159629A1 (zh) 饮水设备
WO2023159623A1 (zh) 饮水设备
WO2023159600A1 (zh) 饮水设备
CN216347050U (zh) 横竖两用电热水器
WO2023159620A1 (zh) 饮水机
WO2023159630A1 (zh) 冷凝器、水路组件及饮水设备
CN217447412U (zh) 饮水机门体及饮水机
CN217013580U (zh) 饮水机
CN217243789U (zh) 饮水机
CN114557602B (zh) 水路组件及供水装置
CN217031691U (zh) 安装组件、水路组件及供水机
CN217013597U (zh) 饮水机

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22927909

Country of ref document: EP

Kind code of ref document: A1