WO2022264898A1 - 二次電池管理装置 - Google Patents

二次電池管理装置 Download PDF

Info

Publication number
WO2022264898A1
WO2022264898A1 PCT/JP2022/023123 JP2022023123W WO2022264898A1 WO 2022264898 A1 WO2022264898 A1 WO 2022264898A1 JP 2022023123 W JP2022023123 W JP 2022023123W WO 2022264898 A1 WO2022264898 A1 WO 2022264898A1
Authority
WO
WIPO (PCT)
Prior art keywords
secondary battery
user
unit
investor
battery
Prior art date
Application number
PCT/JP2022/023123
Other languages
English (en)
French (fr)
Inventor
昭彦 松村
克彦 近藤
Original Assignee
株式会社スリーダムアライアンス
Tesnology株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社スリーダムアライアンス, Tesnology株式会社 filed Critical 株式会社スリーダムアライアンス
Priority to CN202280006026.XA priority Critical patent/CN116075844A/zh
Priority to EP22785679.6A priority patent/EP4131123A4/en
Priority to KR1020227044503A priority patent/KR20230004936A/ko
Priority to JP2022551631A priority patent/JP7361323B2/ja
Priority to TW111122437A priority patent/TW202307772A/zh
Publication of WO2022264898A1 publication Critical patent/WO2022264898A1/ja
Priority to JP2023115063A priority patent/JP2023134643A/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/06Asset management; Financial planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/08Payment architectures
    • G06Q20/14Payment architectures specially adapted for billing systems
    • G06Q20/145Payments according to the detected use or quantity
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/66Data transfer between charging stations and vehicles
    • B60L53/665Methods related to measuring, billing or payment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/68Off-site monitoring or control, e.g. remote control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/12Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/16Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to battery ageing, e.g. to the number of charging cycles or the state of health [SoH]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0283Price estimation or determination
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0645Rental transactions; Leasing transactions
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/04Trading; Exchange, e.g. stocks, commodities, derivatives or currency exchange
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/14Energy storage units

Definitions

  • the present invention relates to technology for managing distribution of secondary batteries.
  • secondary batteries The market for secondary batteries continues to expand steadily. There are a wide range of products that use secondary batteries, such as electric vehicles (EVs), mobile terminals, power-assisted bicycles, and uninterruptible power supplies.
  • EVs electric vehicles
  • mobile terminals mobile terminals
  • power-assisted bicycles power-assisted bicycles
  • uninterruptible power supplies A feature of a secondary battery is that it can be used for a long period of time by repeating charging and discharging.
  • secondary batteries are said to emit a large amount of carbon dioxide in processes such as excavation of resources used as materials, manufacturing, and recycling. Therefore, from the viewpoint of environmental protection, it is desirable to extend the life of the secondary battery.
  • a secondary battery is used primarily in a commercial EV for public transportation, and when the SOH (State of Health) of the secondary battery drops to some extent, another user uses this secondary battery as a domestic storage battery. It is also possible. When the original energy density of the secondary battery is high, even if the SOH is slightly lowered, it may be sufficiently usable as a domestic storage battery. By extending the life of the secondary battery, not only the primary use of the secondary battery but also the secondary use and tertiary use can be realized (see Patent Documents 1 and 2).
  • the purchase burden (initial cost) of the secondary battery is large.
  • users may hesitate to purchase even a high-performance secondary battery that is economically efficient in the long run if the initial cost is high.
  • the primary user does not intend to use up the secondary battery until the end of its life, but eventually sells it to a secondary user, it is difficult to bear the initial cost unless the resale price is forecast.
  • the present invention is an invention completed based on the recognition of the above problems, and its main purpose is to provide a technique for promoting the distribution of secondary batteries.
  • a secondary battery management device includes a securities management unit that associates a secondary battery with one or more securities, an investor management unit that associates securities with an investor who purchased the securities, and a secondary battery. and a user to whom the secondary battery is to be lent, a collection unit to collect the usage fee of the secondary battery from the user to whom the secondary battery is lent, and a certificate of the secondary battery to be purchased. a distribution unit that instructs the investor to remit distribution money based on the securities; and a transmission unit that transmits investment information to an external terminal.
  • the securities management unit manages the securities and the investment information in association with each other, and when the installation position of the secondary battery is changed from the first installation position to the second installation position, the securities investment corresponding to the secondary battery is managed. In the information, the installation position of the secondary battery is changed from the first installation position to the second installation position, and the transmission unit transmits the investment information after the registration change to the external terminal.
  • a secondary battery management device includes a securities management unit that associates a secondary battery with one or more securities; an investor management unit that associates securities with investors who have purchased the securities; A user management unit that associates a battery with a user to whom the secondary battery is lent, a collecting unit that collects the usage fee of the secondary battery from the user to whom the secondary battery is lent, and purchases a certificate of the secondary battery. and a distribution unit that directs remittance of distributions based on the securities to investors who have purchased the securities.
  • the distribution section changes the remittance destination of the distribution money of the secondary battery from the first investor to the second investor. Change to investor.
  • a secondary battery management device includes a securities management unit that associates a secondary battery with one or more securities; an investor management unit that associates securities with investors who have purchased the securities; A user management unit that associates a battery with a user to whom the secondary battery is lent, a collecting unit that collects the usage fee of the secondary battery from the user to whom the secondary battery is lent, and purchases a certificate of the secondary battery. and a distribution unit that directs remittance of distributions based on the securities to investors who have purchased the securities.
  • the collection unit changes the destination of the usage fee of the secondary battery from the first user to the second user when the destination of the secondary battery is changed from the first user to the second user.
  • a secondary battery management apparatus includes a collection unit that collects a usage fee for the secondary battery from a user to whom the secondary battery is lent, and an investment unit that purchases securities associated with the secondary battery. a distribution unit that remits distributions based on the securities to homes.
  • the distribution section changes the remittance destination of the distribution money of the secondary battery from the first investor to the second investor. Change to investor.
  • FIG. 2 is a schematic diagram showing the relationship between a user of a secondary battery and an investor; 1 is a conceptual diagram of a secondary battery management system; FIG. 2 is a hardware configuration diagram of a secondary battery management system; FIG. 3 is a hardware configuration diagram of a secondary battery management server; FIG. 3 is a functional block diagram of a secondary battery management server, investment terminal, and user terminal; FIG. 4 is a data structure diagram of secondary battery information; FIG. 4 is a data structure diagram of battery holding information; FIG. 4 is a data structure diagram of user information; FIG. 4 is a data structure diagram of securities information; FIG. It is a data structure diagram of investor information. It is a data structure diagram of investment information. FIG.
  • FIG. 3 is a schematic diagram for explaining how to determine the selling price of a battery certificate
  • FIG. 10 is a sequence diagram showing the process of issuing a battery certificate
  • FIG. 10 is a sequence diagram showing a distribution payment processing process
  • FIG. 15 is a flow chart showing in detail the process in S48 of FIG. 14
  • FIG. 10 is a sequence diagram showing the process of buying and selling battery securities
  • FIG. 10 is a sequence diagram showing a process when changing a lending destination of a secondary battery; It is a screen figure of an investment screen. It is a schematic diagram for demonstrating the determination method of the usage fee in a modification. It is a schematic diagram of the security block chain in a modification.
  • the management company which is the owner of the secondary battery, purchases the secondary battery from the manufacturer.
  • a secondary battery is lent to a user.
  • the user pays the charge for using the secondary battery.
  • Rechargeable batteries are assets that generate continuous income in the form of usage fees.
  • the management company associates one or more securities with the secondary battery. Securities are sold to private or institutional investors. The investor who purchased the securities obtains a distribution (income gain) based on the usage fee of the secondary battery paid by the user.
  • Rechargeable batteries can be used not only for primary use, but also for secondary and tertiary use. For example, assume that the user A1 uses the secondary battery B1, the secondary battery B1 deteriorates by 20%, and the lending destination of the secondary battery B1 is changed to the user A2. After that, user A2 pays the usage fee.
  • the secondary battery B1 deteriorates further by 40 (%), and the lending destination of the secondary battery B1 is changed to user A3. After that, user A3 pays the usage fee. Investors can continuously obtain distributions based on usage fees of users A1, A2, A3, etc. at that time.
  • EVs Compared to gasoline vehicles, EVs have fewer parts, and vehicle prices are expected to drop significantly. When the vehicle price drops, the ratio of the secondary battery price to the vehicle price (secondary battery/whole vehicle price ratio) increases. If a method of renting a secondary battery and paying a usage fee instead of purchasing a secondary battery is adopted, it will be easier for users to use EVs.
  • FIG. 1 is a schematic diagram showing the relationship between secondary battery users and investors.
  • secondary batteries are expected to be used by multiple users such as primary users and secondary users.
  • the usage history of the secondary battery is managed by a DI engine, which will be described later.
  • the usage history may be managed using a distributed ledger such as blockchain.
  • the secondary battery is equipped with a computer for battery management (hereinafter referred to as "DI engine").
  • DI engine registers and holds various data such as a user ID, discharge date and time, charge date and time, state of health (SOH), state of charge (SOC), discharge voltage, and temperature. By checking these data, the usage history of the secondary battery can be traced.
  • the purchase price of the secondary battery is M (yen).
  • a secondary battery is associated with n bills.
  • the selling price of the securities is D (yen) and n securities are sold out.
  • the management company which is the owner of the secondary battery, can raise funds of D ⁇ n (yen). If D ⁇ n>M, the management company can obtain profits by securitizing after purchasing the secondary battery.
  • the management company associates and registers users and investors for each secondary battery. In this way, the user, management company and investors are connected through the secondary battery.
  • the user pays the usage fee for the secondary battery. Specifically, F (yen) is paid each time the degree of deterioration of the secondary battery increases by 1 (%), that is, each time the SOH decreases by 1 (%). In addition, G (yen) is paid as a usage fee for each charge. Let F>G. The number of times of charging and the degree of deterioration are periodically measured by the DI engine and recorded in the usage history of the DI engine or blockchain.
  • the usage fee will be distributed to the investors who purchased the securities. This mechanism is similar in some respects to the mechanism of distributing usage fees paid by real estate lessees to real estate securitized REIT (Real Estate Investment Trust) investors. Investors can buy securities of secondary batteries (hereinafter also referred to as "battery securities") in the same way as they buy REITs.
  • REIT Real Estate Investment Trust
  • FIG. 2 is a conceptual diagram of a secondary battery management system 200.
  • the secondary battery management system 200 includes users, management companies, securities companies, investors, and stock exchanges.
  • a management company has a secondary battery management server 100 .
  • the management company purchases the secondary battery from the manufacturer and consigns it to a securities company to securitize the secondary battery.
  • the battery securities will be sold to investors through stock exchanges. Investors buy securities of secondary batteries.
  • the management company can immediately pass on the cost of purchasing secondary batteries to investors.
  • the management company may purchase the secondary battery not only with its own funds but also with bank loans.
  • a secondary battery is used primarily in a commercial EV.
  • the value of securities changes depending on where the secondary battery is used and who uses it.
  • the securities company determines the sales price of the securities according to the usage status of the secondary battery. This method is somewhat similar to the pricing of newly listed stocks. If it is a popular battery certificate, the sales price will be high, and if the battery certificate is not popular, it will not be possible to sell out unless the selling price is lowered.
  • the secondary battery is used primarily until the SOH reaches 80 (%) (the degree of deterioration is 20 (%)).
  • the usage fee is F1 (yen) per degree of deterioration of 1 (%)
  • the primary usage fee based on the degree of deterioration is F1 ⁇ 20 (yen).
  • the usage fee is H1 (yen) per charged amount of 1 (kW)
  • the total usage fee based on charging is H1 ⁇ m1 (yen).
  • m1 is the charge amount.
  • the primary user carefully uses the secondary battery, it can be used for a long period of time until it deteriorates by 20%, so the total amount of charge will increase. In other words, the primary charge H1 ⁇ m1 based on charging increases.
  • Primary users can use secondary batteries for a long time without losing their value, and investors can receive distributions over a long period of time. In the case of a secondary battery that is expected to be used by such excellent users, the price of the battery certificate is high.
  • the primary user does not use the secondary battery carefully, it can only be used for a short period of time until it deteriorates by 20%, so the primary usage fee H1 ⁇ m1 based on charging will be small.
  • Primary users lose the value of secondary batteries and can only use them for a short period of time, and investors can only receive distributions for a short period of time. If usage by such primary users is assumed, the price of the battery certificate will be low.
  • the primary user transfers the used secondary battery to the secondary user.
  • the lending destination of the secondary battery is changed from the primary user to the secondary user.
  • the secondary battery management server 100 changes the registration of the lending destination of the secondary battery.
  • the secondary battery management server 100 rewrites the name of the battery certificate owner (investor) each time the battery certificate is sold.
  • the investor may temporarily sell the battery certificate on the securities market or may continue to hold it.
  • the primary user may transfer the secondary battery as is to the secondary user.
  • the user ID is changed in the blockchain.
  • the DI engine of the secondary battery notifies the secondary battery management server 100 of the change made by the user.
  • the secondary user may offer to transfer the secondary battery to the primary user, or the primary user may offer to transfer the secondary battery to the secondary user.
  • the management company may set the lending destination, lending period, and lending conditions of the secondary battery.
  • the secondary battery In the case of a domestic storage battery, the secondary battery is used for secondary use until the SOH reaches 80(%) to 40(%) (the degree of deterioration is 20(%) to 60(%)). If the usage fee is F2 (yen) per degree of deterioration of 1 (%), the total usage fee of F2 x 40 (yen) is paid as the primary usage fee based on the degree of deterioration. Assuming that the usage fee is G2 (yen) per charge, the total primary usage fee based on charging is G2 ⁇ n2 (yen). n2 is the number of charging times.
  • the distribution amount per unit period of the battery certificate is likely to be lower in the case of secondary use than in the case of primary use.
  • the usage period of the secondary battery change period corresponding to the degree of deterioration of 40(%)
  • the period of receiving distribution money from the battery certificate becomes longer.
  • the value of the battery certificate increases.
  • the value of a battery certificate also changes depending on the environment in which the secondary battery is used. For example, secondary batteries placed in direct sunlight are likely to deteriorate. It is advantageous for the user because the usage period can be extended simply by protecting the secondary battery from direct sunlight.
  • the value of the battery certificate also changes when it changes from primary use to secondary use.
  • the value of the battery certificate becomes lower than that at the start of primary use because the secondary battery is second-hand.
  • the user can use even an expensive and high-performance secondary battery by paying a usage fee without needing to purchase or take out a loan.
  • the user can check the usage history (characteristics) of the secondary battery using the DI engine or blockchain, making it easier to install even used secondary batteries with peace of mind.
  • the user can use the secondary battery for a long time, so the cost burden per unit period can be suppressed.
  • the secondary battery becomes a "box of energy that generates money.”
  • the management company purchases secondary batteries and securitizes them to convert them into assets.
  • the management company may collect a portion of the usage fee as operating expenses.
  • the management company wants to lend the secondary battery to good users in order to increase the price of the battery certificate. To that end, it is conceivable that the management company may provide incentives such as a reduction in usage fees to excellent users.
  • incentives such as a reduction in usage fees to excellent users.
  • it is necessary to compete with other management companies in terms of lending so we can expect the effect of encouraging the management company to devise ways to secure excellent users.
  • the management company can increase the price of the battery certificate for a secondary battery with a long life and high versatility that can meet the needs of various users. For this reason, it is thought that the purchase of secondary batteries from excellent manufacturers will be promoted, contributing to sound development competition. Users of secondary batteries are managed by the DI engine or blockchain, so even if secondary batteries are distributed among users, the management company can always know who should be billed for usage. The management company may flexibly change the usage fee according to the user of the secondary battery.
  • a portfolio can be formed by combining battery securities in which stable income gains are expected and battery securities in which capital gains are expected.
  • Battery securities may be divided into tranches according to risk or yield. By dividing battery securities into tranches, it is believed that institutional investors will be able to invest in battery securities with peace of mind.
  • the secondary battery management system 200 can significantly reduce the environmental load by distributing secondary batteries according to various user needs.
  • the management company may set a high usage fee for bad users and a low usage fee for good users. A portion of the bad user's high usage fee may be used to compensate for the good user's usage fee. Alternatively, the government may collect taxes from a portion of the usage fees for secondary batteries and pay incentives to good users.
  • the securitization method by the secondary battery management system 200 can be applied to other than secondary batteries.
  • an EV itself may be securitized and lent, or a part constituting an EV, such as a motor, may be securitized and lent to a user.
  • a DI engine attached to the secondary battery may record the history of use and exchange information between DI chains.
  • the DI engine may periodically report the usage history to the secondary battery management server 100.
  • the secondary battery management server 100 may collectively manage the usage histories of a plurality of secondary batteries.
  • a communication fee may be incurred when the DI engine and the DI engine communicate, or when the DI engine and the secondary battery management server 100 communicate.
  • a communication fee may be paid from the user to the management company, and all or part of the communication fee may be paid as a distribution to investors.
  • the management company may pay a communication fee (information fee) to the user.
  • the management company will purchase the secondary battery, and the investor will bear the purchase cost of the secondary battery.
  • the battery certificate at this time may be a financial product having the property of a debt (instrument of debt) of the management company to investors.
  • the distribution money of the battery security has the meaning of repayment including interest by the management company.
  • the DI engine can also grasp the power source when charging the secondary battery.
  • the DI engine grasps which of the multiple power sources, such as nuclear power, thermal power, and solar power, is used to charge the secondary battery at what rate, and records this as the usage history. may be recorded.
  • the DI engine may record usage conditions of the secondary battery, such as who is using it (user type) and what it is being used for (application type) as a usage history.
  • usage conditions of the secondary battery such as who is using it (user type) and what it is being used for (application type) as a usage history.
  • decarbonized electric energy such as solar power generation
  • the attribute of "deoxygenation” may be given to the battery certificate (hereinafter referred to as "environmentally friendly battery certificate”).
  • the government may also apply preferential tax treatment to eco-friendly battery certificates to promote decarbonization. It is believed that the preferential tax system will increase the value of eco-friendly battery certificates.
  • the management company can increase the amount of the usage fee for the user who cannot expect a stable usage fee income as described above or the bad user who uses the battery easily to deteriorate. By setting, you can control the value of the battery certificate.
  • the management device may sell usage history statistical information collected from the DI engine of the secondary battery. For example, if you sell some of the statistical information to investors, the investors can use the statistical information in their investment decisions. Alternatively, if a part of the statistical information is sold to companies that develop secondary batteries, the companies can obtain useful guidelines for planning and developing secondary batteries.
  • the battery certificate includes the value of the secondary battery itself and the value of the battery used in the secondary battery.
  • the value of the secondary battery body includes the value when the secondary battery is recycled.
  • secondary batteries containing many rare metals are highly valuable.
  • secondary batteries that are designed to be easily recycled are also considered to have a high residual value at the time of recycling.
  • Such secondary battery specifications are also considered to be important information for investment decisions.
  • FIG. 3 is a hardware configuration diagram of the secondary battery management system 200.
  • a secondary battery management server 100 secondary battery management device operated by a management company 102, a settlement system 104, an electronic device 106 and a user terminal 108 owned by a user, an investment terminal owned by an investor. 110 , a securities company 112 and a logistics company 114 are interconnected via the Internet 116 .
  • the management company 102 is connected to the secondary battery manufacturer 118 by a dedicated line.
  • Securities company 112 is connected to stock exchange 120 via a dedicated line.
  • a secondary battery manufacturer 118 manufactures secondary batteries 122 .
  • Management company 102 purchases secondary battery 122 from secondary battery manufacturer 118 .
  • the management company 102 orders the secondary battery 122 to manufacture the secondary batteries 122 , and the secondary battery manufacturer 118 manufactures the secondary batteries 122 in the number ordered and delivers them to the management company 102 . Therefore, the secondary battery manufacturer 118 is freed from inventory risk of the secondary battery 122 .
  • the management company 102 lends secondary batteries 122 purchased from a secondary battery manufacturer 118 to various users.
  • the secondary battery 122 is equipped with the DI engine described above.
  • the DI engine consists of an IC (Integrated Circuit) chip with communication functions and lightweight software.
  • the electronic device 106 owned by the user is driven by the lent secondary battery 122 .
  • As the electronic device 106 an EV, an ESS (Energy Storage System), a home appliance, a ship, a laptop PC, a portable power source, etc. are assumed.
  • the electronic device 106 may be any device that is driven by the secondary battery 122 .
  • the management company 102 requests the securities company 112 to issue a battery certificate for the purchased secondary battery 122 (described later).
  • the settlement system 104 is a system operated by a financial institution, and executes settlement among users, the management company 102, and investors.
  • a user terminal 108 is a communication terminal used by a user.
  • the user terminal 108 may be any communication terminal such as a smart phone, a laptop PC, etc., but the user terminal 108 in this embodiment is assumed to be a smart phone.
  • the user requests the secondary battery management server 100 to lend and return the secondary battery 122 from the user terminal 108 .
  • a user registers in advance with the secondary battery management server 100 . When registering a user, the secondary battery management server 100 gives the user a user ID (hereinafter referred to as "PID").
  • PID user ID
  • the investment terminal 110 is a communication terminal used by investors.
  • the investment terminal 110 may also be any communication terminal, but the description assumes that the investment terminal 110 in this embodiment is a laptop PC.
  • Investors place purchase orders and sale orders of battery securities from the investment terminal 110 to the securities company 112 .
  • An investor is identified by an investor ID (hereinafter referred to as "IID").
  • Securities company 112 issues a battery certificate to stock exchange 120 based on a request from management company 102 . It also buys and sells battery securities in response to orders from investors.
  • the stock exchange 120 may be a general financial instruments exchange or a proprietary trading system (PTS).
  • the distribution company 114 delivers the secondary battery 122 to the user according to instructions from the management company 102 .
  • FIG. 4 is a hardware configuration diagram of the secondary battery management server 100.
  • the secondary battery management server 100 incorporates a storage 312 as a nonvolatile memory for storing computer programs, a volatile memory 304 for developing programs and data, a register, an arithmetic unit, an instruction decoder, etc., and reads a program from the memory 304.
  • a processor 300 (CPU: Central Processing Unit) for reading and executing data is included.
  • Processor 300 is connected to a relatively fast first bus 302 .
  • NIC Network Interface Card
  • Other devices such as a GPU (Graphics Processing Unit) may also be connected to the first bus 302 .
  • GPU Graphics Processing Unit
  • a first bus 302 is connected via a bridge 308 to a relatively slow second bus 310 .
  • a storage 312 and an output device 316 such as a monitor or speaker are connected to the second bus 310 .
  • an input device 314 such as a mouse and a keyboard, and a peripheral device 318 such as a printer may be connected to the second bus 310 .
  • the hardware configurations of the user terminal 108 and the investment terminal 110 are basically the same.
  • FIG. 5 is a functional block diagram of the secondary battery management server 100, the investment terminal 110 and the user terminal 108.
  • Each component of the secondary battery management server 100, the investment terminal 110, and the user terminal 108 includes computing units such as a CPU and various co-processors, storage devices such as memory and storage, and a wired or wireless connection that connects them. It is realized by hardware including a communication line and software stored in a storage device and supplying processing instructions to a computing unit.
  • a computer program may consist of a device driver, an operating system, various application programs located in their higher layers, and a library that provides common functions to these programs.
  • Each block described below represents a functional block rather than a hardware configuration.
  • Secondary battery management server 100 includes communication unit 130 , data processing unit 132 and data storage unit 134 .
  • the communication unit 130 is in charge of communication processing with an external device such as the investment terminal 110 or the like.
  • the data storage unit 134 stores various information.
  • the data processing unit 132 executes various processes based on data acquired by the communication unit 130 and data stored in the data storage unit 134 .
  • Data processing unit 132 also functions as an interface for communication unit 130 and data storage unit 134 .
  • Communication unit 130 includes a transmitting unit 136 and a receiving unit 138 .
  • the transmission unit 136 transmits various data to the external device.
  • the receiving unit 138 receives various data from an external device.
  • Reception unit 138 includes performance information acquisition unit 140 .
  • the performance information acquisition unit 140 acquires “performance information” of the secondary battery 122 from the DI engine mounted on the secondary battery 122 .
  • the performance information is information indicating the performance or usage state of the secondary battery 122, such as nominal voltage, internal resistance value, capacity, number of charging times, charging rate, temperature, type of secondary battery 122, and the like.
  • Data processing unit 132 includes securities management unit 142 , investor management unit 144 , user management unit 146 , collection unit 148 , distribution unit 150 , deterioration measurement unit 152 and fee setting unit 154 .
  • the certificate management unit 142 manages battery certificates.
  • the investor management unit 144 manages information about investors.
  • the user management unit 146 manages information about users.
  • the collection unit 148 collects usage fees for the secondary battery 122 from the user. In this embodiment, usage fees are incurred when the user charges the secondary battery 122 .
  • the distribution unit 150 pays distributions to investors. Also, a part of the usage fee becomes the operation cost of the management company 102 . In this embodiment, 5 (%) of the usage fee is the operating cost, and the remaining 95 (%) is the distribution money.
  • the deterioration measuring unit 152 calculates the "deterioration degree" of the secondary battery 122 based on the performance information.
  • the degree of deterioration (%) is defined as 100 ⁇ (initial capacity ⁇ measured capacity)/initial capacity.
  • the measured capacity is the discharge capacity of the secondary battery at the time of measurement.
  • the progression of deterioration of the secondary battery 122 is indexed by the SOH. SOH indicates a capacity retention rate, but is sometimes defined based on the retention rate of internal resistance value.
  • the degree of deterioration means "100-SOH (%)".
  • the fee setting unit 154 sets the usage fee to be collected when the user charges the secondary battery 122 .
  • Investment terminal 110 includes user interface processing unit 160 , communication unit 162 , data processing unit 164 and data storage unit 166 .
  • the user interface processing unit 160 receives operations from investors via input devices such as keyboards, mice, joysticks, and touch panels, and is in charge of user interface processing such as image display and voice output.
  • the communication unit 162 is in charge of communication processing with the securities company 112 and the like.
  • the data storage unit 166 stores various data.
  • the data processing unit 164 executes various processes based on the input from the user interface processing unit 160 , data received by the communication unit 162 and data stored in the data storage unit 166 .
  • Data processing unit 164 also functions as an interface for communication unit 162 , user interface processing unit 160 and data storage unit 166 .
  • User interface processing section 160 includes an input section 168 and an output section 170 .
  • the input unit 168 receives various inputs from investors.
  • the output unit 170 outputs various information to investors.
  • the user terminal 108 includes a user interface processing section 180 , a communication section 182 , a data processing section 184 and a data storage section 186 .
  • the user interface processing unit 180 also receives operations from the user via an input device, and is in charge of user interface processing such as image display and audio output.
  • the communication unit 182 is in charge of communication processing with the secondary battery management server 100 and the like.
  • the data storage unit 186 stores various data.
  • the data processing unit 184 executes various processes based on the input from the user interface processing unit 180 , the data received by the communication unit 182 and the data stored in the data storage unit 186 .
  • Data processing unit 184 also functions as an interface for communication unit 182 , user interface processing unit 180 and data storage unit 186 .
  • User interface processing section 180 includes an input section 188 and an output section 190 .
  • the input unit 188 receives various inputs from the user.
  • the output unit 190 outputs various information to the user.
  • FIG. 6 is a data structure diagram of the secondary battery information 210.
  • the secondary battery information 210 is stored in the internal memory of the DI engine.
  • the secondary battery 122 is identified by a battery ID (hereinafter referred to as "BID”).
  • the electronic device 106 is identified by a device ID (hereinafter referred to as “MID”).
  • the device ID indicates the installation position of the secondary battery.
  • the "installation position" of the secondary battery 122 may be information indicating the type of the electronic device 106 in which the secondary battery 122 is mounted, in other words, the application of the secondary battery 122.
  • the type of the electronic device 106 such as EV or ESS, in other words, the intended use of the secondary battery 122 may be regarded as the “installation position” of the secondary battery 122 .
  • the “installation position” is different when the machine body is different.
  • the installation position of the secondary battery (B01) may be considered changed.
  • the device ID is information indicating the "installation position" of the secondary battery.
  • Performance information is associated with the secondary battery 122 .
  • the performance information includes various kinds of information indicating the performance or usage state of the secondary battery 122, such as SOH, number of times of charging, and discharge voltage.
  • the secondary battery 122 (B01) is a lithium-ion secondary battery (Li-ion) with an SOH of 98(%). That is, the degree of deterioration of the secondary battery 122 (B01) is 2 (%).
  • the DI engine acquires various performance information about the secondary battery 122 periodically or during charging.
  • Other performance information includes energy density, charge/discharge efficiency, self-discharge rate, weight, number of charge/discharge cycles, service life, name of secondary battery manufacturer 118, and various other data based on specifications or measured values. may be included.
  • Performance information is important information for investors to decide whether to invest in battery securities.
  • the DI engine automatically transmits these performance information to the secondary battery management server 100 .
  • the secondary battery 122 (B01) is installed in the electronic device 106 (M01), but the secondary battery 122 (B05) is not installed in any electronic device 106. That is, the secondary battery 122 (B06) is idle.
  • FIG. 7 is a data structure diagram of the battery holding information 220.
  • Battery holding information 220 is stored in data storage unit 134 of secondary battery management server 100 .
  • the user management unit 146 associates the BID of the lent secondary battery 122 with the PID of the user who received the lent in the battery holding information 220 .
  • the secondary battery 122 (B01) is lent to the user (P01). Also, the secondary battery 122 (B05) in the idle state is not associated with any user.
  • a user may be an individual or a corporation. For example, a logistics company that uses EVs, an electric power company that operates power plants using ESS, and the like can also be corporate users.
  • FIG. 8 is a data structure diagram of the user information 230.
  • User information 230 is stored in data storage unit 134 of secondary battery management server 100 .
  • the user information 230 is information indicating user attributes. A utilization rank, a consideration rank, and an overall rank are set for the user.
  • the DI engine of the secondary battery 122 notifies the secondary battery management server 100 that charging has been performed. At this time, the user is charged a usage fee.
  • G yen
  • other factors such as the charge amount are not taken into consideration when determining the usage fee.
  • the usage rank indicates the degree to which the user actively uses the secondary battery 122 .
  • the user management unit 146 aggregates the number of charging times of the secondary battery 122 per month (unit period) for many users.
  • the user management unit 146 calculates the standard deviation of each user based on the average value and variance of the number of charging times.
  • the user management unit 146 designates a utilization rank of 5 (%) or more from the top as “5”, a utilization rank of 5 to 20 (%) as “4”, a utilization rank of 20 to 50 (%) as “3”, and 50.
  • a utilization rank of ⁇ 70(%) is defined as "2”
  • a utilization rank of less than 70(%) is defined as "1”.
  • the user (P01) has a high number of charging times of the secondary battery 122, which is in the top 5 (%), so the usage rank is "5".
  • the user (P03) has a usage rank of "1" because the number of times the secondary battery 122 has been charged is not even in the top 70 (%).
  • the consideration rank indicates how carefully the user uses the secondary battery 122.
  • the user management unit 146 collects statistics on the amount of change in the degree of deterioration of the secondary battery 122 per month (unit period) (hereinafter referred to as "degree of deterioration progress") for a large number of users. keep it The user management unit 146 assigns a consideration rank of 5 (%) or higher to "5", a consideration rank of 5 to 20 (%) to "4", and a consideration rank of 5 to 20 (%).
  • a consideration rank of up to 50 (%) is "3"
  • a consideration rank of 50 to 70 (%) is "2”
  • a consideration rank of less than 70 (%) is "1".
  • the user (P01) is in the zone of the top 20 to 50 (%) in the degree of progress of deterioration of the secondary battery 122 in the last month, so the consideration rank is "3".
  • the overall rank is determined based on the utilization rank and consideration rank.
  • the user management unit 146 determines the total rank by an arbitrary monotonically increasing function with the utilization rank and consideration rank as variables. In this embodiment, the user management unit 146 calculates the average value of the utilization rank and consideration rank as the total rank.
  • the user information 230 may also include various user attributes such as the user's name, age, gender, place of residence, account number, and email address.
  • FIG. 9 is a data structure diagram of the security information 240.
  • Securities information 240 is stored in data storage unit 134 of secondary battery management server 100 .
  • a battery certificate is identified by a certificate ID (hereinafter referred to as "SID").
  • SID certificate ID
  • One or more battery certificates are associated with the secondary battery 122 .
  • 10 battery certificates (S01) have been issued for the secondary battery 122 (B01).
  • the selling price (selling price) of the battery certificate (S01) is 100 (yen), and the current price is 110 (yen). Therefore, the investor who purchased the battery security (S01) at the selling price has an unrealized gain of 10 (yen).
  • they are described as battery certificate (S01:1) to battery certificate (S01:10). How to determine the sales price and current price of the battery security will be described later.
  • FIG. 10 is a data structure diagram of the investor information 250.
  • Investor information 250 is stored in data storage unit 134 of secondary battery management server 100 .
  • the investor information 250 is information indicating the holding status of battery securities.
  • the investor (I01) is company X1. That is, the investor (I01) is an institutional investor. Institutional investors include insurance companies, pension management companies, financial institutions such as investment banks, educational institutions such as universities, and general business companies.
  • the investor (I02) is an individual investor.
  • the investor (I01) holds one battery certificate (S01), ten battery certificates (S03), two battery certificates (S04), and five battery certificates (S08). Also, the investor (I01) acquires the battery certificate (S03) for an average of 102 (yen). According to the security information 240 shown in FIG. 9, the current price of the battery security (S03) is 130 (yen), so the investor (I01) has unrealized gains on the battery security (S03).
  • FIG. 11 is a data structure diagram of the investment information 260. As shown in FIG. Investment information 260 is stored in data storage unit 134 of secondary battery management server 100 . Securities management unit 142 generates investment information 260 based on secondary battery information 210 , battery holding information 220 , user information 230 , and securities information 240 . FIG. 11 shows investment information 260 of the battery certificate (S01:1) associated with the secondary battery 122 (B01).
  • the investment information 260 includes a current price column 261 , a performance information column 262 , an investor information column 264 , a user information column 266 and an expected profit column 268 .
  • the security management unit 142 records the current price of the battery security (S01) in the current price column 261.
  • FIG. The securities management unit 142 stores all or part of the secondary battery information 210 (see FIG. 6) of the secondary battery 122 in the performance information column 262 and part of the investor information 250 (FIG. 10) in the investor information column 264.
  • all or part of the user information 230 is recorded in the user information column 266 .
  • the investment information 260 may include information indicating the installation position (device ID) of the secondary battery 122 (B01).
  • the security management unit 142 calculates the expected earnings per month of the battery security (S01) based on the distribution income record of the secondary battery 122 (B01) for a certain period in the past, and records it in the expected earnings field 268. do. For example, when the secondary battery 122 (B01) has generated an average distribution of 1.5 (yen) per month over the past year, the securities management unit 142 sets the expected profit to 1.5 (yen). may be calculated as
  • the securities management unit 142 may calculate the future expected earnings from the distribution income record for a certain period in the past, and calculate the present value of the battery securities by the DCF method.
  • the secondary battery 122 registers in the investment information 260 whether the battery security (S01) is undervalued, appropriate, or overpriced by comparing the present value calculated by the DCF method and the present price (trading price). may
  • the investment information 260 is generated for each battery security.
  • the transmission unit 136 of the secondary battery management server 100 appropriately transmits the investment information 260 to the securities company 112 .
  • the securities firm 112 provides investors with opportunities to buy and sell battery securities, and at this time also provides investment information 260 on battery securities to the investors.
  • some information such as the investor information column 264 may be excluded from the provision target.
  • the transmission unit 136 of the secondary battery management server 100 transmits the changed investment information 260 to the securities company 112, and the securities company 112 sends the latest investment information 260 to the investors.
  • the securities management unit 142 changes the registration of the device ID (installation position) included in the investment information 260.
  • FIG. The transmission unit 136 transmits the changed investment information to the securities company 112 .
  • FIG. 12 is a schematic diagram for explaining how to determine the selling price of a battery certificate.
  • the management company 102 After purchasing the secondary battery 122 from the secondary battery manufacturer 118, the management company 102 requests the securities company 112 to issue a battery certificate. When issuing a new battery certificate, the management company 102 determines the selling price of the battery certificate. Any method can be used to determine the selling price of the battery certificate, but in this embodiment, the secondary battery management server 100 determines the selling price based on the following algorithm.
  • the horizontal axis indicates time
  • the vertical axis indicates the revenue of the management company 102.
  • the secondary battery 122 is purchased at the point indicated by the origin and that the secondary battery 122 is immediately lent to some user.
  • idle periods are not considered in FIG.
  • M (yen) be the purchase price when the management company 102 purchases the secondary battery 122 from the secondary battery manufacturer 118 .
  • n battery certificates are issued for the secondary battery 122 .
  • the selling price per sheet at this time is assumed to be D (yen). Therefore, the management company 102 purchases the secondary battery 122 for M (yen) and issues n battery certificates for D (yen), thereby obtaining income of D ⁇ n (yen) from the securities company 112. can be done.
  • the management company 102 aims to recover the shortfall U (yen) as operating expenses v months after the battery certificate is issued.
  • G (yen) be the usage fee obtained when the secondary battery 122 is charged once.
  • k ⁇ G (yen) is the operating cost of the management company 102, and the remaining (1 ⁇ k) ⁇ G (yen) is paid to investors. (0 ⁇ k ⁇ 1).
  • k in this embodiment is 5(%).
  • the secondary battery 122 can provide an operating cost of k ⁇ G ⁇ c (yen) per month.
  • M is a known value
  • G, n, v, and k are arbitrary set values.
  • the management company 102 can expect to recover the initial cost in v months while issuing battery certificates at a low price. If it is as expected, the management company 102 can post all operating expenses after v month as profit.
  • the secondary battery manufacturer 118 is freed from inventory risk because it manufactures the secondary battery 122 to order from the management company 102 . If the lender of the secondary battery 122 is not found, the secondary battery 122 becomes the inventory of the management company 102, so the management company 102 bears the inventory risk. On the other hand, after purchasing the secondary battery 122 from the secondary battery manufacturer 118, the management company 102 can recover part or all of the purchase cost in a short period of time by issuing a battery certificate. Can be distributed at home. Moreover, if the secondary battery 122 can be rented out for a long period of time, the management company 102 can continuously obtain profits from the usage fee of the secondary battery 122 .
  • FIG. 13 is a sequence diagram showing the process of issuing a battery certificate.
  • the management company 102 first purchases the secondary battery 122 from the secondary battery manufacturer 118 .
  • the security management unit 142 calculates the selling price based on the purchase price by the method described with reference to FIG. 12 (S10).
  • the transmission unit 136 transmits a battery certificate issuance request to the securities company 112 (S12).
  • the issuance request includes the investment information 260 on the battery certificate, as well as the selling price and the number of battery certificates to be issued.
  • the securities company 112 newly issues a specified number of battery certificates on the stock exchange 120 according to the instruction from the secondary battery management server 100 (S14). At this time, the securities company 112 instructs the management company 102 to pay the issuance fee indicated by the sales price times the designated number (S16). More specifically, the securities company 112 instructs the secondary battery management server 100 to pay the issuance fee, and the secondary battery management server 100 withdraws the issuance fee from the account of the securities company 112. (S18). After issuing the battery certificate, the certificate management unit 142 updates various data such as the secondary battery information 210 and the certificate information 240 (S20).
  • the investor sends a purchase instruction from the investment terminal 110 to the securities company 112 (S22).
  • the securities company 112 instructs the settlement system 104 to execute settlement processing (S24). Specifically, the settlement system 104 withdraws the purchase price from the account of the investor and transfers the purchase price to the account of the securities company 112 .
  • the securities company 112 transmits a purchase notification to the secondary battery management server 100 (S26).
  • the purchase notification includes the SID of the battery security, the IID of the investor who made the purchase, the transaction price, and the like.
  • the security management unit 142 updates various data such as the security information 240 and the investor information 250 (S28).
  • the transmission unit 136 of the secondary battery management server 100 instructs the distribution company 114 to deliver the secondary battery 122. do.
  • the delivery instruction at this time includes the user's address, the BID of the secondary battery 122 to be rented, and the like.
  • the distribution company 114 delivers the secondary battery 122 owned by the management company 102 to the user according to the delivery instruction.
  • the user management unit 146 updates various data such as the battery holding information 220 and associates the secondary battery 122 with the borrowing user.
  • the DI engine installed in the secondary battery 122 appropriately measures the state of the secondary battery 122 and transmits performance information to the secondary battery management server 100 .
  • the DI engine also reads the MID from the electronic device 106 to which the secondary battery 122 is attached, and transmits the MID together with the BID to the secondary battery management server 100 .
  • the user management unit 146 updates the secondary battery information 210 upon receiving the MID.
  • FIG. 14 is a sequence diagram showing the distribution payment processing process.
  • the user (P01) charges the secondary battery 122 (B01).
  • the user (P01) charges the secondary battery 122 (B01) at the charging station (S30).
  • the DI engine of the secondary battery 122 (B01) transmits a charge notification to the secondary battery management server 100 (S32).
  • the charge notification includes BID, PID, and the like.
  • the collection unit 148 of the secondary battery management server 100 manages charging record information (not shown) indicating when each secondary battery 122 was charged. In the charging performance information, the BID and the charging date and time are associated with each other. When the charge notification is received, the collection unit 148 updates the charge performance information (S34). The collection unit 148 updates the charging performance information each time the charging notification is received.
  • the DI engine transmits the latest performance information of the secondary battery 122 to the secondary battery management server 100 (S36). ).
  • the collection unit 148 calculates the usage fee based on the number of charging times from the previous settlement date to the current settlement date. For example, the number of charging times is n, and the usage fee per charge (hereinafter, the usage fee for one time is called a "unit usage fee” to distinguish it from the total usage fee per month). If it is G (yen), the usage fee for one month is G ⁇ n (yen).
  • a unit charge G (yen) is predetermined for each secondary battery 122 .
  • the transmission unit 136 notifies the user terminal 108 of the total usage fee G ⁇ n (S38). The user can check the usage fee per month on the user terminal 108 at any time.
  • the collection unit 148 instructs the settlement system 104 to settle the usage fee G ⁇ n (yen) (S40).
  • the usage fee is withdrawn from the account of the user (P01) and transferred to the account of the management company 102.
  • the secondary battery management server 100 notifies the usage fee to the securities company 112 (S42).
  • the securities company 112 notifies the investment terminal 110 of (1 ⁇ k) ⁇ G ⁇ n of the usage fee as distribution money (S44).
  • the securities company 112 instructs the settlement system 104 to transfer part of the usage fee transferred to the management company 102 to the investor's account as distribution money, thereby executing the settlement process (S46).
  • part of the usage fee paid by the user (P01) becomes the operating expenses of the management company 102, and the rest becomes distribution money to investors.
  • the secondary battery management server 100 After collecting the usage fee, the secondary battery management server 100 further revises the unit usage fee as necessary (S48). The revision of the unit fee will be described in detail in connection with FIG. 15 below.
  • FIG. 15 is a flow chart showing in detail the process in S48 of FIG.
  • the deterioration measuring unit 152 calculates the SOH of the secondary battery 122 based on the performance information acquired on the settlement date (S50).
  • the deterioration measuring unit 152 also calculates the degree of progress of deterioration in the unit period from the previous settlement date to the current settlement date.
  • the user management unit 146 updates the consideration rank based on the degree of progress of deterioration (S52).
  • the user management unit 146 updates the utilization rank based on the charging performance information (S54).
  • the user management unit 146 updates the overall rank based on the consideration rank and utilization rank (S56). If there is no change in the overall rank from the previous time (N of S58), subsequent processing is skipped. If there is a change in the total rank (Y of S58), the charge setting unit 154 changes the unit charge (S60).
  • the charge setting unit 154 increases the unit charge by 50(%) from the basic set value.
  • the charge setting unit 154 increases the unit charge by 10(%) from the basic set value.
  • the charge setting unit 154 sets the unit usage charge as the basic set value.
  • the charge setting unit 154 reduces the unit usage charge from the basic set value by 10(%).
  • the charge setting unit 154 reduces the unit charge by 50(%) from the basic set value.
  • the user (P01) has a basic set value for the unit charge of the secondary battery 122 (B01) of 20 (yen), and the user (P01) charges the secondary battery 122 (B01) 20 times per month. do.
  • the standard usage fee at this time is 400 (yen).
  • the unit usage fee is 30 (yen), so the usage fee per month is 600 (yen).
  • the unit usage fee is 10 (yen), so the one-month usage fee is 200 (yen).
  • the user (P01) actively uses the secondary battery 122 (B01), and the more carefully the user (P01) uses the secondary battery 122 (B01) so that it does not deteriorate, the more preferential treatment the usage fee will be. can.
  • the user management unit 146 may calculate the user's consideration rank, utilization rank, and overall rank for each secondary battery 122 .
  • the user management unit 146 may calculate an average value of the consideration ranks calculated for each of the plurality of secondary batteries 122 as the consideration rank of the user.
  • the user (P01) has a secondary battery 122 (B01), a secondary battery 122 (B21), and a secondary battery 122 (B22).
  • the user management unit 146 calculates the consideration rank of the user (P01) for the secondary battery 122 (B01) as "3".
  • the consideration ranks for the secondary battery 122 (B21) and the secondary battery 122 (B22) are calculated as "4" and "5", respectively.
  • the user management unit 146 may calculate the utilization rank and overall rank of this user (P01).
  • the usage rank is calculated according to the number of charging times from the previous settlement date to the current settlement date, and the unit usage fee changes according to the usage rank.
  • the user management unit 146 may update the utilization rank according to the total charge amount from the previous settlement date to the current settlement date.
  • the user management unit 146 may set a higher utilization rank as the total charge amount increases.
  • the fee setting unit 154 may change the unit usage fee according to the utilization rank calculated based on the total charge amount.
  • FIG. 16 is a sequence diagram showing the process of buying and selling battery securities.
  • the securities company 112 determines whether the transaction is successful or not in the same manner as in ordinary stock trading.
  • the securities company 112 changes the name of the holder of the battery security from the investor (I01) to the investor (I02) (S72).
  • the securities company 112 transmits to the secondary battery management server 100 a change notification including the SID of the battery security subject to trading and the IID of the investor involved in the trading. (S74).
  • the investor management unit 144 updates the data such as the securities information 240 according to the change notification (S76).
  • FIG. 17 is a sequence diagram showing the process of changing the lending destination of the secondary battery 122.
  • the user (P01) returns the secondary battery 122 (B01) and the secondary battery 122 (B01) is newly lent to the user (P10).
  • the user (P01) instructs the user terminal 108 to return the secondary battery 122 (B01).
  • the input unit 188 of the user terminal 108 receives the return instruction, and the communication unit 182 transmits the return instruction to the secondary battery management server 100 (S80).
  • the transmission unit 136 of the secondary battery management server 100 transmits an instruction to collect the secondary battery 122 to the distribution company 114 (S82).
  • the collection instruction includes the PID and address of the user (P01) to be collected, and the BID of the secondary battery 122 (B01).
  • the distribution company 114 collects the secondary battery 122 (B01) from the user (P01) and transports it to the warehouse owned by the management company . That is, the secondary battery 122 (B01) temporarily becomes an inventory of the management company 102 .
  • the user management unit 146 updates data such as the secondary battery information 210 and the battery holding information 220 (S84).
  • the input unit 188 of the user terminal 108 accepts the lending request, and the communication unit 182 transmits the lending request to the secondary battery management server 100 (S86).
  • the secondary battery management server 100 transmits a delivery instruction to the distribution company 114 (S88).
  • the delivery instruction includes the BID of the secondary battery 122 (B01) to be lent, the PID of the user (P01), and the address of the user (P01).
  • the distribution company 114 collects the secondary battery 122 (B01) from the management company 102 and transports the secondary battery 122 (B01) to the user (P10).
  • the user management unit 146 updates data such as the secondary battery information 210 and the battery holding information 220 (S90).
  • the secondary battery 122 (B01) becomes inventory of the management company 102.
  • the battery certificate (S01:B01) associated with the secondary battery 122 (B01) no longer generates revenue. It is a risk for investors that the secondary battery 122 (B01) becomes idle, in other words, the secondary battery 122 (B01) becomes inventory and is not lent to new users.
  • the battery certificate (S01:B01) carries the risk that the secondary battery 122 (B01) will become an inventory item. can. Since it becomes easier for the management company 102 to suppress the inventory risk, it becomes easier for the management company 102 to proactively purchase the secondary battery 122 .
  • the user (P01) who is the primary user P01) may once return the secondary battery 122 (B01) and then borrow the same secondary battery 122 (B01) again as a secondary user.
  • the user (P01) may borrow the secondary battery 122 (B01) for the EV, install the secondary battery 122 (B01), and then install the same secondary battery 122 (B01) for the ESS. Conceivable.
  • the primary and secondary users need not be different persons.
  • the collection destination of the secondary battery 122 (B01) does not change.
  • the fee may be different for primary use and secondary use.
  • FIG. 18 is a screen diagram of the investment screen 270.
  • Investor management unit 144 provides investment screen 270 to investment terminal 110 .
  • the output unit 170 of the investment terminal 110 displays an investment screen 270 showing the holding status of battery securities.
  • FIG. 18 shows the investment screen 270 of the investor (I01).
  • the investment screen 270 displays the brand of the battery security held by the investor (I01), the current price, the number of holdings, the valuation profit and loss, and the like.
  • the investor (I01) holds one battery security (B01) and has an unrealized gain of "10 (yen)" as displayed in the "appraisal gain/loss”. .
  • the investor (I01) can display a purchase screen (not shown) by touching the purchase (BUY) button 274 when the investor (I01) wishes to additionally purchase the battery certificate (B01).
  • the investor (I01) instructs additional purchase of the battery certificate (B01) on the purchase screen of the battery certificate (B01).
  • the investor (I01) touches the sell (SELL) button 272 when he wants to sell the battery security (B01).
  • the output unit 170 displays a sell screen (not shown).
  • the investor (I01) instructs to sell the battery security (B01) on the screen for selling the battery security (B01).
  • the securities company 112 collects sales orders and purchase orders for battery securities and completes transactions.
  • the output unit 170 grays out the sell button 272 or the buy button 274 for the battery certificate that cannot be purchased or sold. For example, in FIG. 18, no investor has issued a sale order for the battery certificate (B04), so the output unit 170 grays out the purchase button 274 for the battery certificate (B04). Therefore, the investor (I01) cannot newly purchase the battery certificate (B04).
  • the securities company 112 notifies each investment terminal 110 that the battery security (B04) can be purchased. At this time, the output unit 170 cancels the grayed out display of the purchase button 274 .
  • an investment information screen By touching the investor (I01) and brand name, an investment information screen (not shown) can be displayed. On the investment information screen, a chart (price transition) of transaction prices of battery securities is displayed. Part of the investment information 260 (see FIG. 11) is also displayed. In addition, the security management unit 142 may display information indicating the degree of discount of the battery security on the investment information screen.
  • the secondary battery management system 200 has been described above based on the embodiment.
  • the user can reduce the burden associated with the initial introduction of the secondary battery 122 .
  • the user pays a usage fee according to the number of times the secondary battery 122 has been charged. Since the introduction cost of the secondary battery 122 can be suppressed, the user can easily replace the old secondary battery 122 with the new secondary battery 122 .
  • the user does not have to dispose of the secondary battery 122 after use, and can return it to the management company 102 . Since the management company 102 is responsible for the life cycle of the secondary battery 122, illegal dumping and improper disposal of the secondary battery 122 can be reduced.
  • the management company 102 purchases the secondary battery 122
  • the purchase cost of the secondary battery 122 can be covered by securitization.
  • the management company 102 can obtain continuous income from the secondary battery 122 .
  • Management company 102 can stabilize its management through securitization and collection of operating expenses.
  • the management company 102 may recover the initial cost of the secondary battery 122 through the primary use of the secondary battery 122, and may set the usage fee so that profits can be made through secondary and tertiary uses.
  • the management company 102 can meet the needs of various users. By promoting distribution of the secondary battery 122, one secondary battery 122 can be used for a long period of time by a plurality of users such as primary users and secondary users. Long-term use of the secondary battery 122 is also important from the viewpoint of environmental protection. Users, the management company 102, and investors are concerned not only with the performance of a new battery, but also whether it can withstand long-term use. can.
  • the battery certificate in the present embodiment may be a certificate of debt indicating a claim on the secondary battery 122 .
  • the secondary battery manufacturer 118 can expect a large production volume from the management company 102, it is easy to stably produce the secondary battery 122.
  • the secondary battery 122 for EV can be used until the SOH reaches 80(%), and the secondary battery 122 for ESS can be used until the SOH reaches 30(%).
  • the secondary battery 122 is primarily used for EVs until the SOH drops from 100(%) to 80(%), and the ESS is used until the SOH drops from 80(%) to 30(%).
  • the same secondary battery 122 may be used for secondary purposes. That is, one secondary battery 122 can be distributed from a primary user who desires an EV to a secondary user who desires an ESS.
  • the usage fee for the secondary battery 122 may be set high in EV, and set low in ESS, which has less stringent usage conditions.
  • SOH degree of deterioration
  • the degree of deterioration of the secondary battery 122 for EVs tends to change depending on how the user uses it. Therefore, the EV secondary battery 122 is required to have a high SOH. On the other hand, since the secondary battery 122 for ESS is used in a stable manner, it deteriorates slowly, and SOH as high as EV is not required. If the management company 102 can collect the purchase cost of the secondary battery 122 at the time of primary use, it will be easier to lend the secondary battery 122 at a low price. Ultimately, it is desirable that the management company 102 collects the unusable secondary battery 122, disassembles it, and reuses its parts.
  • the character of the battery certificate as a financial product also changes according to the scene in which the secondary battery 122 is used.
  • charging is likely to be performed stably, so income is likely to be stable even if the usage fee is low.
  • a battery certificate associated with a secondary battery 122 that is secondary used in ESS or the like may be an attractive investment target.
  • the transaction price of the battery certificate tends to be high.
  • the secondary battery 122 since such a secondary battery 122 can be used for a long period of time, it is preferable from the viewpoint of long-term investment.
  • the user can get the usage fee reduced by using the secondary battery 122 carefully.
  • a user who uses the secondary battery 122 for a long time is also desirable for investors.
  • the management company 102 also wants to actively lend the secondary battery 122 to excellent users. Such a mechanism makes it possible to promote the development of a superior secondary battery 122 and encourage users to use the secondary battery 122 with care.
  • the investment attractiveness increases when the user of the secondary battery 122 changes.
  • the value of the battery certificate changes depending on the user of the secondary battery 122 .
  • the secondary battery 122 When a user returns the secondary battery 122, or when the management company 102 securitizes the secondary battery 122, the secondary battery 122 becomes idle until a new user of the secondary battery 122 is determined. Since the secondary battery 122 in the idle state does not generate usage fees, it may not be possible to obtain income gain from the battery certificate.
  • the risk for the investor that the secondary battery 122 becomes idle and the investor cannot obtain an income gain until the secondary battery 122 is newly rented is referred to as "idle risk”.
  • the idle risk is low when the demand for the secondary battery 122 is high. On the other hand, when the secondary battery 122 is oversupplied, the idle risk increases. When the idle risk is high, the trading price of battery securities is considered to be low. Conversely, when the demand for secondary use of the secondary battery 122 is high in ESS or the like, the transaction price of the battery security may become higher than the security price at the time of primary use. Investors can enjoy investment specific to the secondary battery 122 by buying and selling battery securities based on an outlook on the magnitude of demand, a consensus on idle risk, and an original market view.
  • the secondary battery management system 200 has been described as including a plurality of investment terminals 110, a plurality of user terminals 108, and one secondary battery management server 100.
  • the unit may be realized by the secondary battery management server 100 , or part of the functions of the secondary battery management server 100 may be assigned to the investment terminal 110 or the user terminal 108 .
  • a third device other than the investment terminal 110 , the user terminal 108 , or the secondary battery management server 100 may take part of the functions of the secondary battery management server 100 , the investment terminal 110 , or the user terminal 108 .
  • the aggregation of the functions of the investment terminal 110 and the user terminal 108 and the functions of the secondary battery management server 100 described with reference to FIG. is also possible. How to distribute a plurality of functions necessary for realizing the present invention to one or more pieces of hardware depends on the processing capability of each piece of hardware and the specifications required for the secondary battery management system 200. It should be determined in view of.
  • the secondary battery 122 is equipped with a DI engine having a communication function.
  • the electronic device 106 may be equipped with the DI engine instead of the secondary battery 122 .
  • the DI engine may be any device that has at least a communication function and a function of measuring the performance of the secondary battery 122 .
  • the DI engine may be configured as an IC chip that provides functions necessary for the electronic device 106 to function as an IoT device.
  • the secondary battery information 210 may be stored in the secondary battery 122 or may be stored in the electronic device 106 .
  • the secondary battery information 210 may be stored in the secondary battery management server 100 .
  • the DI engine of the secondary battery 122 periodically transmits the performance/state of the secondary battery 122 to the secondary battery management server 100, and the performance information acquisition unit 140 of the secondary battery management server 100 transmits the performance information as data. It may be stored in the storage unit 134 .
  • a portion of the user's usage fee may be paid to the securities company 112.
  • Brokerage firm 112 may generate revenue from commissions on the sale of battery securities.
  • the management company 102 may purchase carbon credits. Then, the purchase cost of this carbon credit may be added to the selling price of the battery certificate. For example, assume that the price of carbon credits that can offset the amount of carbon emissions required to manufacture the secondary battery 122 is Q (yen). When n battery certificates are issued for this secondary battery 122, the management company 102 may add Q/n (yen) to the selling price D (yen). The management company 102 may recover the cost share of the carbon credits by adding an additional amount to the operating expenses obtained from the usage fee of the secondary battery 122 .
  • the secondary battery management server 100 may assume all or part of the transaction brokerage function of the securities company 112 .
  • the secondary battery management server 100 may include a trading processor (not shown).
  • the trading processing unit may accept and match purchase orders and sales orders from investors to mediate the trading of battery securities.
  • the user may pay a usage fee according to the degree of progress of deterioration.
  • a usage fee of F (yen) may be paid each time the degree of deterioration increases by 1 (%), in other words, each time the SOH decreases by 1 (%).
  • the variable J is the assumed degree of progress of deterioration per month.
  • the sales price may be determined by the securities company 112 instead of the secondary battery management server 100 .
  • the secondary battery management server 100 settles the usage fee and instructs the securities company 112 to distribute the distribution amount obtained by deducting the management fee from the usage fee to the investors.
  • the secondary battery management server 100 and the securities company 112 each execute settlement.
  • the secondary battery management server 100 may collect the usage fee from the user, transfer a portion of the fee to the account of the management company 102 as a management fee, and transfer the remainder to the investor's account as distribution money. That is, the secondary battery management server 100 may collectively execute the settlement of the management fee and the distribution money.
  • the investor management unit 144 of the secondary battery management server 100 may notify the user of the investor name.
  • the user can know who has invested in the secondary battery 122 that he or she is using. For example, by knowing that a famous investor has invested in him/herself through a battery security, the user can feel the expectation and trust of the famous investor, so that the user will be motivated to use the secondary battery 122 with care. can be further enhanced. Also, a user who attracts a large number of investors can establish a status as a user who attracts the attention of investors. In this way, investment can increase motivation to become a good user.
  • Financial support via the secondary battery 122 is also conceivable. For example, when investor B invests in a battery certificate corresponding to user A's secondary battery 122, user A's usage fee is paid to investor B as a distribution. If user A is the son of investor B, user A can use the secondary battery 122 to provide financial assistance to investor B (parent).
  • Company Y has a good reputation as a company that uses the secondary battery 122 with care, investors will be more likely to actively invest in the secondary battery 122 used by Company Y. In addition, it is thought that Company Y will use the secondary battery 122 more carefully in order to protect such a reputation. Such actions by Company Y contribute not only to the reduction of usage fees and the improvement of corporate image, but also to environmental protection. In addition, since the battery certificate for the secondary battery 122 used by Company Y is easy to sell, the management company 102 also prefers good users such as Company Y.
  • Company Y may become an investor in the secondary battery 122 used by Company Y. By carefully using the secondary battery 122 by the employees of Company Y, the employees themselves can obtain profits in the form of distributions.
  • Company Y may collectively purchase battery certificates for the secondary batteries it uses from the securities company 112 and sell the purchased secondary batteries to its employees.
  • the user pays the usage fee according to the number of charging times.
  • the user may pay usage fees according to the amount of charge.
  • the user may pay a usage fee according to the length of the usage period of the secondary battery 122 .
  • the charge setting unit 154 may change the unit charge according to the SOH at the time of charging.
  • the SOH of the secondary battery 122 (BX) from May 10th to 15th is 100(%) and the user (P01) fully charges it once a day.
  • the SOH of the secondary battery 122 (BX) was 99(%) from May 16th to May 22nd, and that the secondary battery 122 (BX) was fully charged once a day at this time as well.
  • the charge setting unit 154 may correct the charge required for each charge based on the SOH at the time of charge.
  • the integrated value of the charge per charge is the total charge for the secondary battery 122 (BX).
  • the secondary battery 122 (BX) When the secondary battery 122 (BX) deteriorates, the charge per charge is small, so the usage fee per charge is also reduced. On the other hand, since the number of times of charging increases, the investor can easily secure a profit even if the secondary battery 122 (BX) deteriorates. However, if the secondary battery 122 (BX) deteriorates in a short period of time, as described above, the number of charging times increases. more likely to be replaced. As a result, the profit period of the battery security is shortened for the investor. For this reason, the investor needs to consider the timing of releasing the battery certificate (BX) while observing the deterioration state of the secondary battery 122 (BX).
  • the value of the battery certificate is affected not only by the difficulty of deterioration of the secondary battery 122, but also by individual differences (variation in quality) of the secondary battery 122.
  • the secondary battery 122 manufactured by the secondary battery manufacturer 118 (M2) has less variation in manufacturing quality.
  • a secondary battery 122 having a large internal resistance value due to manufacturing defects takes a longer charging time than a normal secondary battery 122 . Therefore, when a user has borrowed a defective secondary battery 122, he/she returns it and tries to borrow a new secondary battery 122 again. As a result, the investor who purchased the battery certificate associated with the defective secondary battery 122 is at a disadvantage.
  • the secondary battery maker 118 can easily be evaluated not only for the performance but also for the stability of the manufacturing quality.
  • the certificate management unit 142 may package a plurality of battery certificates according to a theme. For example, the certificate management unit 142 may collectively sell battery certificates for the secondary batteries 122 of which Company Z is the user, and sell them as a package as "a battery certificate for the secondary batteries 122 used by Company Z.” Investors who trust Company Z may purchase such battery certificates in bulk.
  • battery certificate of the secondary battery 122 manufactured by company S "battery certificate of the secondary battery 122 made in Japan”, “battery certificate of the secondary battery 122 used for secondary use”, "overall rank A battery certificate for the secondary battery 122 intended only for four or more users, a battery certificate for the secondary battery 122 used in the Tohoku region (predetermined region), and the like are conceivable.
  • SDGs Stustainable Development Goals
  • the secondary battery management server 100 may include a rating processing unit (not shown) that rates battery certificates.
  • the rating processing unit may calculate the rating of the battery certificate using an arbitrary multivariate function whose variables are numerical values representing the performance of the secondary battery 122, such as the overall rank of the user and the number of durable charge/discharge cycles. Including ratings in investment information 260 may aid in investment decisions.
  • a user may set a deterioration threshold for the secondary battery 122 .
  • the secondary battery management server 100 may automatically collect the secondary battery 122 when the degree of deterioration of the secondary battery 122 reaches the deterioration threshold. For example, assume that the degree of deterioration of the secondary battery used by user A has exceeded a deterioration threshold (eg, 20 (%)).
  • a deterioration threshold eg, 20 (%).
  • the replacement processing unit (not shown) of the secondary battery management server 100 notifies the user A of the replacement of the secondary battery, and instructs the distribution company 114 to collect the secondary battery 122 from the user A. instruct.
  • the secondary battery management server 100 automatically collects the secondary battery 122 when the secondary battery 122 reaches a predetermined deterioration threshold, so that the desired performance can be achieved. It is possible to effectively avoid the situation of continuing to use the secondary battery 122 that has become unable to perform. Also, the replacement processing unit may instruct the distribution company 114 to deliver a new secondary battery 122 to user A.
  • FIG. 19 is a schematic diagram for explaining a method of determining usage fees in a modification.
  • the usage fee is described as "G (yen)*number of times of charging".
  • the fixed charge (basic usage fee) is set to W (yen) up to L times (e.g. 10 times) of charging per month, and once from L+1 times (e.g. 11 times) of charging.
  • a usage fee may be added by GQ (yen) per charge. In other words, only the fixed charge is charged when the usage condition that the number of charging times per month is L or less is satisfied.
  • the operation cost of the management company 102 may be W (yen) for the basic fee portion, and additional usage fees exceeding W (yen) may be paid to investors as distributions. According to such fee setting, it is possible to stabilize the income of the management company 102 and allow investors to bear the risk. On the other hand, it is also conceivable to lower the selling price of battery securities so as to match the investment risk.
  • the fee setting unit 154 may discount the usage fee for this user. For example, when the degree of progress of deterioration per month is within 1(%), the fee setting unit 154 may deduct 10(%) from the original usage fee. By setting the usage fee in consideration of the degree of progress of deterioration in this way, it becomes easier to induce the user to use the secondary battery 122 carefully.
  • FIG. 20 is a schematic diagram of a security blockchain 280 in a modified example.
  • the secondary battery management server 100 manages information about the secondary battery 122 and the battery certificate.
  • information on battery certificates and the like may be distributed and managed by a blockchain.
  • block 280a is a block relating to the battery certificate (S01:1).
  • battery certificate (S01:1) is associated with secondary battery 122 (B01) and has been purchased by investor (I01).
  • the secondary battery 122 (B01) is used by the user (P01).
  • block 280b When block 280b is authenticated by a method similar to a general blockchain, block 280b is connected to block 280a. After the block 280b is connected to the securities blockchain 280, the collection unit 148 collects the usage fee from the user (P02) instead of the user (P01). The block 280b may be generated not by the user (P02) but by the securities management unit 142 of the secondary battery management server 100. FIG.
  • Block 280c is connected to block 280b after authentication. After the block 280c is connected to the securities blockchain 280, the distribution unit 150 sends distribution money to the investor (I02).
  • Information about the secondary battery 122 is not limited to the battery certificate, and may be managed by a blockchain.

Abstract

二次電池管理システムは、二次電池と1以上の証券を対応づけ、証券と投資家を対応づけ、二次電池とユーザを対応づけ、二次電池の貸与先となるユーザから、二次電池の使用料を取得する。二次電池の証券を購入した投資家に対して、二次電池の使用料に基づく分配金を送金する。二次電池管理システムは、二次電池の貸与先が第1のユーザから第2のユーザに変更されたとき二次電池の使用料を第2のユーザから取得する。

Description

二次電池管理装置
 本発明は、二次電池の流通を管理するための技術、に関する。
 二次電池の市場は順調に拡大を続けている。電気自動車(EV:Electric Vehicle)、モバイル端末、電動アシスト自転車、無停電電源装置など、二次電池を利用する製品は幅広い。二次電池の特徴は、充放電を繰り返すことにより長期間にわたって使用できることである。
 二次電池の開発競争は活発化しており、二次電池の劣化の抑制、いいかえれば、二次電池の長寿命化が今後いっそう進むと考えられる。また、二次電池は材料として用いる資源の発掘、製造、リサイクルなどの過程における二酸化炭素排出量が多いといわれる。このため環境保護の観点からも二次電池の長寿命化は望ましい。
 二次電池が長寿命化していくと、二次電池の流通が本格化すると考えられる。たとえば、公共交通機関の業務用EVで二次電池を一次利用し、二次電池のSOH(State of Health)がある程度下がったところでこの二次電池を別のユーザが家庭用蓄電池として二次利用することも考えられる。二次電池のもともとのエネルギー密度が高い場合には、そのSOHが多少下がったとしても家庭用蓄電池として十分に使えることがある。二次電池が長寿命化することにより、二次電池の一次利用だけでなく二次利用、三次利用も実現可能となる(特許文献1,2参照)。
国際公開第2019/131824号 特開2020-126305号公報
 一方、二次電池の流通にはいくつかの障害が考えられる。まず、二次電池を最初に導入するユーザにとって、二次電池の購入負担(初期コスト)は大きい。たとえば、長期的に見れば経済効率のよい高性能な二次電池であっても、初期コストが大きい場合にはユーザは購入をためらうかもしれない。特に、一次ユーザが二次電池をその寿命が尽きるまで使い切るのではなく、いずれ二次ユーザへの売却を考えているときには、転売価格の見通しが立たなければ初期コストを負担しづらい。
 また、一次ユーザから中古の二次電池を購入したい二次ユーザにとっても、二次電池をいくらで購入するのが適切なのか、どの一次ユーザのどの二次電池を購入すべきかを判断するのが難しく、この判断の難しさも二次電池の流通を妨げる要因となる。
 本発明は、上記課題認識に基づいて完成された発明であり、その主たる目的は、二次電池の流通を促進するための技術、を提供することにある。
 本発明のある態様における二次電池管理装置は、二次電池と1以上の証券を対応づける証券管理部と、証券と、証券を購入した投資家を対応づける投資家管理部と、二次電池と二次電池の貸与先となるユーザを対応づけるユーザ管理部と、二次電池の貸与先となるユーザから、前記二次電池の使用料を徴収する徴収部と、二次電池の証券を購入した投資家に対して、前記証券に基づく分配金の送金を指示する分配部と、投資情報を外部端末に送信する送信部と、を備える。
 証券管理部は、証券と投資情報を対応づけて管理し、二次電池の設置位置が第1の設置位置から第2の設置位置に変更されたときには、二次電池に対応づけられる証券の投資情報において二次電池の設置位置を第1の設置位置から第2の設置位置に登録変更し、送信部は、登録変更後の投資情報を前記外部端末に送信する。
 本発明の別の態様における二次電池管理装置は、二次電池と1以上の証券を対応づける証券管理部と、証券と、証券を購入した投資家を対応づける投資家管理部と、二次電池と二次電池の貸与先となるユーザを対応づけるユーザ管理部と、二次電池の貸与先となるユーザから、二次電池の使用料を徴収する徴収部と、二次電池の証券を購入した投資家に対して、証券に基づく分配金の送金を指示する分配部と、を備える。
 分配部は、二次電池の証券を保有する第1の投資家が、証券を第2の投資家に譲渡したとき、二次電池の分配金の送金先を第1の投資家から第2の投資家に変更する。
 本発明の別の態様における二次電池管理装置は、二次電池と1以上の証券を対応づける証券管理部と、証券と、証券を購入した投資家を対応づける投資家管理部と、二次電池と二次電池の貸与先となるユーザを対応づけるユーザ管理部と、二次電池の貸与先となるユーザから、二次電池の使用料を徴収する徴収部と、二次電池の証券を購入した投資家に対して、証券に基づく分配金の送金を指示する分配部と、を備える。
 徴収部は、二次電池の貸与先が第1のユーザから第2のユーザに変更されたとき、二次電池の使用料の徴収先を第1のユーザから第2のユーザに変更する。
 本発明の別の態様における二次電池管理装置は、二次電池の貸与先となるユーザから、二次電池の使用料を徴収する徴収部と、二次電池に対応づけられる証券を購入した投資家に対して、証券に基づく分配金を送金する分配部と、を備える。
 分配部は、二次電池の証券を保有する第1の投資家が、証券を第2の投資家に譲渡したとき、二次電池の分配金の送金先を第1の投資家から第2の投資家に変更する。
 本発明によれば、二次電池の流通を促進しやすくなる。
二次電池のユーザと投資家の関係を示す模式図である。 二次電池管理システムの概念図である。 二次電池管理システムのハードウェア構成図である。 二次電池管理サーバのハードウェア構成図である。 二次電池管理サーバ、投資端末およびユーザ端末の機能ブロック図である。 二次電池情報のデータ構造図である。 電池保有情報のデータ構造図である。 ユーザ情報のデータ構造図である。 証券情報のデータ構造図である。 投資家情報のデータ構造図である。 投資情報のデータ構造図である。 電池証券の販売価格の決め方を説明するための模式図である。 電池証券の発行時の処理過程を示すシーケンス図である。 分配金の支払い処理過程を示すシーケンス図である。 図14のS48における処理過程を詳細に示すフローチャートである。 電池証券の売買の処理過程を示すシーケンス図である。 二次電池の貸出先を変更するときの処理過程を示すシーケンス図である。 投資画面の画面図である。 変形例における使用料の決定方法を説明するための模式図である。 変形例における証券ブロックチェーンの模式図である。
 二次電池のオーナーである管理会社は、メーカーから二次電池を購入する。二次電池はユーザに貸与される。ユーザは二次電池の使用料を支払う。二次電池は使用料という継続収入を生み出す資産となる。
 管理会社は、二次電池に対して1以上の証券を対応づける。証券は一般投資家または機関投資家に販売される。証券を購入した投資家は、ユーザが支払う二次電池の使用料に基づいて分配金(インカムゲイン)を得る。
 二次電池の導入費用は、証券化(Securitization)を通して、多数の投資家により薄く広く負担される。二次電池の使用料は、証券化を通して、多数の投資家に分配される。
 二次電池は、一次利用だけでなく、二次利用、三次利用も可能である。たとえば、ユーザA1が二次電池B1を使用し、二次電池B1が20(%)劣化し、この二次電池B1の貸与先をユーザA2に変更したとする。以後は、ユーザA2が使用料を支払うことになる。
 ユーザA2が二次電池B1を使用し、二次電池B1が更に40(%)劣化し、この二次電池B1の貸与先をユーザA3に変更したとする。以後は、ユーザA3が使用料を払うことになる。投資家は、ユーザA1,A2,A3などそのときのユーザの使用料に基づいて分配金を継続的に得ることができる。
 ガソリン自動車に比べるとEVは部品点数が少なく、車両価格は大きく下がると考えられる。車両価格が低下すると、車両価格に占める二次電池の価格の割合(二次電池/車両全体の価格比)が高くなる。二次電池を購入するのではなく、二次電池を借りて使用料を支払う方式であれば、ユーザはEVをいっそう利用しやすくなる。
 図1は、二次電池のユーザと投資家の関係を示す模式図である。
 上述したように、二次電池は、一次ユーザ、二次ユーザのように複数のユーザに使用されることが想定される。二次電池の使用歴は、後述するDIエンジンにより管理される。もしくはブロックチェーンなどの分散台帳を用いて使用歴を管理してもよい。二次電池にはバッテリーマネジメントのためのコンピュータ(以下、「DIエンジン」とよぶ)が搭載される。DIエンジンは、ユーザID、放電日時、充電日時、劣化度(SOH:State of Heath)、SOC(State Of Charge)、放電電圧、気温などのさまざまなデータを登録して保持する。これらのデータを確認することにより、二次電池の使用歴をトレースできる。
 二次電池の購入価格がM(円)であるとする。二次電池に対してはn枚の証券が対応づけられる。たとえば、証券の販売価格がD(円)であり、n枚の証券が完売したとする。このとき、二次電池のオーナーである管理会社は、D×n(円)の資金調達が可能となる。D×n>Mであれば、管理会社は二次電池を購入したあと、証券化をおこなうことで、収益を得ることができる。
 管理会社は、二次電池ごとにユーザと投資家を対応づけて登録する。このようにして、ユーザ、管理会社および投資家は二次電池を介して結びつく。
 ユーザは、二次電池の使用料を支払う。具体的には二次電池の劣化度が1(%)上昇するごとに、すなわち、SOHが1(%)低下するごとにF(円)を支払う。また、充電1回につき使用料としてG(円)を支払う。F>Gであるとする。充電回数および劣化度はDIエンジンにより定期的に計測され、DIエンジンもしくはブロックチェーンの使用歴に記録される。
 使用料は、証券を購入した投資家に分配される。この仕組みは、不動産の貸借人が支払う使用料を、不動産を証券化したREIT(Real Estate Investment Trust)の投資家に分配する仕組みに似ている面がある。投資家はREITを買うのと同じように、二次電池の証券(以下、「電池証券」ともよぶ)を買うことができる。
 図2は、二次電池管理システム200の概念図である。
 二次電池管理システム200は、ユーザと、管理会社と、証券会社、投資家、証券取引所を含む。管理会社は二次電池管理サーバ100を保有する。管理会社はメーカーから二次電池を購入し、証券会社に委託して二次電池を証券化する。電池証券は証券取引所を通じて投資家に売り出される。投資家は二次電池の証券を購入する。
 管理会社は、二次電池の購入費用をすぐに投資家に転嫁できる。管理会社は自己資金に限らず、銀行からの借入金で二次電池を購入してもよい。
 二次電池を業務用EVで一次利用するとする。二次電池がどこで使われるか、誰に使われるかによって証券の価値は変化する。証券会社は、二次電池の使用状況に応じて証券の販売価格を決める。この方式は新規上場株のプライシングに似ている面がある。人気のある電池証券であれば販売価格は高くなるし、人気のない電池証券であれば販売価格を低くしなければ売り切ることはできなくなる。
 業務用EVの場合、SOHが80(%)(劣化度が20(%))になるまで二次電池を一次利用するとする。劣化度1(%)につきF1(円)の使用料とすれば、劣化度に基づく一次使用料としてF1×20(円)が支払われる。充電量1(kW)あたりH1(円)の使用料とすれば、充電に基づく使用料は合計でH1×m1(円)となる。m1は充電量である。
 一次ユーザが二次電池を大切に使う場合には、20(%)劣化まで長期間に渡って使用が可能となるため、トータルの充電量は多くなる。いいかえれば、充電に基づく一次使用料H1×m1は大きくなる。一次ユーザは二次電池の価値を落とさずに二次電池を長く使えるし、投資家は長期間に渡って分配金をもらうことができる。このような優良なユーザによる使用が想定される二次電池の場合、電池証券の価格は高くなる。
 一次ユーザが二次電池を大切に使わない場合には、20(%)劣化まで短期間しか使用ができなくなるため、充電に基づく一次使用料H1×m1は小さくなる。一次ユーザは二次電池の価値を落とし、二次電池を短期間しか使うことができず、投資家も短期間しか分配金をもらうことができない。このような一次ユーザによる使用が想定される場合、電池証券の価格は低くなる。
 長寿命の二次電池の場合、20(%)の劣化後であっても家庭用蓄電池として十分に使用できる。一次ユーザは、使用済みの二次電池を二次ユーザに譲渡する。二次電池の貸与先は一次ユーザから二次ユーザに変更される。二次電池管理サーバ100は、二次電池の貸与先を登録変更する。
 なお、投資家は、電池証券を証券市場において自由に売買できる。二次電池管理サーバ100は、電池証券の売買が成立するごとに電池証券の所有者(投資家)の名義の書き換えを行う。二次電池が一次ユーザから二次ユーザに譲渡されたときには、投資家はいったん電池証券を証券市場で売却してもいいし、継続保有してもよい。
 一次ユーザは、二次ユーザに二次電池をそのまま譲渡してもよい。譲渡したときには、ブロックチェーンにおいてユーザIDが変更される。また、二次電池のDIエンジンは、ユーザが変更したことを二次電池管理サーバ100に通知する。二次ユーザが一次ユーザに二次電池の譲渡を申し出てもよいし、一次ユーザが二次ユーザに二次電池の譲渡を申し出てもよい。あるいは、管理会社が二次電池の貸出先、貸出期間、貸出条件を設定してもよい。
 家庭用蓄電池の場合、SOHが80(%)から40(%)(劣化度が20(%)から60(%))になるまで二次電池を二次利用するとする。劣化度1(%)につきF2(円)の使用料とすれば、劣化度に基づく一次使用料は合計でF2×40(円)の使用料が支払われる。充電1回につきG2(円)の使用料とすれば、充電に基づく一次使用料は合計でG2×n2(円)となる。n2は充電回数である。
 F2<F1、G2<G1であってもよい。この場合、一次利用のときよりも二次利用のときの方が電池証券の単位期間あたりの分配金が低くなりやすい。一方、二次電池の使用期間(劣化度40(%)分の変化期間)は長くなるので電池証券から分配金を受ける期間は長くなる。
 一次ユーザと同様、二次ユーザが二次電池を大切かつ活発に使用する場合には、電池証券の価値は高くなる。また、電池証券の価値は二次電池の使用環境によっても変化する。たとえば、直射日光が当たるところに設置されている二次電池は劣化が進みやすい。ユーザは二次電池を直射日光から守るだけでも使用期間を延ばすことができるので有利となる。
 一次利用から二次利用に変化するときにも電池証券の価値は変化する。二次利用においては二次電池が中古になっているため電池証券の価値は一次利用開始時よりも低くなる。一方、二次利用の二次電池からも継続的に分配金を得ることができる。電池証券の価値が大きく下がっているときに電池証券を購入すればキャピタルゲインを受けることも可能である。このように電池証券は債券のように安定したインカムゲインをもたらすという側面だけでなく、キャピタルゲインを狙えるという投資妙味も併せ持つ。
 三次利用、四次利用まで想定すると、電池証券の価値は徐々に下落していく。一方、劣化度が進んだ二次電池であってももともとのエネルギー密度が大きい場合には長期間にわたる利用が可能であるため、結果的に電池証券の現在価値が想定よりも高くなる可能性もある。電池証券にこのような投機性をもたせることで、投機家を市場に呼び込み、電池証券取引が活性化されることが期待される。また、二次電池の使用ペースは予測しやすいため、DCF(Discounted Cash Flow)法による現在価値計算にも馴染みやすいと考えられる。
 以下、ユーザ、管理会社、投資家および社会それぞれの観点から二次電池の証券化によって得られるメリットをまとめる。
1.ユーザ
 ユーザは、高額・高性能な二次電池であっても、購入する必要もローンを組む必要もなく、使用料を支払うことで利用できる。ユーザは、DIエンジンもしくはブロックチェーンにより二次電池の使用歴(素性)を確認できるので、中古二次電池でも安心して導入しやすくなる。
 ユーザは、貸与された二次電池を大切に使用することで二次電池を長く使うことができるので単位期間あたりの費用負担を抑制できる。
2.管理会社
 管理会社にとって、二次電池は「お金を生み出すエネルギーの箱」になる。管理会社は二次電池を購入し、証券化を行うことで二次電池を資産化できる。管理会社は、使用料の一部を運営費として徴収してもよい。管理会社は、電池証券の価格を高めるためには優良ユーザに二次電池を貸し出したい。そのためには、管理会社が優良ユーザに使用料の値下げなどのインセンティブを提供することも考えられる。管理会社としても、他の管理会社との貸し出し競争をする必要があるため、優良ユーザを確保するための工夫を管理会社に促す効果も期待できる。
 また、管理会社は、長寿命でいろいろなユーザのニーズに応えられる汎用性の高い二次電池ほど電池証券の価格を高くできると考えられる。このため、優良メーカーの二次電池の購入が促進されることになり健全な開発競争にも寄与すると考えられる。二次電池のユーザはDIエンジンもしくはブロックチェーンにより管理されるため、管理会社はユーザ間で二次電池が流通しても、使用料を誰に請求すればいいのかを常時把握できる。管理会社は、二次電池のユーザに応じて使用料を機動的に変更してもよい。
3.投資家
 投資家は、電池証券を購入することでインカムゲインを得ることができる。電気は毎日使わざるを得ないものであるため、インカムゲインが安定しやすい。また、二次電池の使用状況やそれにからむ思惑によって電池証券の取引価格が変動するため投資妙味を楽しむこともできる。
 投資家は、複数種類の電池証券を購入してもよい。たとえば、安定したインカムゲインを期待する電池証券とキャピタルゲインを期待する電池証券を組み合わせることによりポートフォリオを組むこともできる。
 電池証券は、リスクあるいは利回りに応じてトランシェに分けられてもよい。電池証券をトランシェに分けることで機関投資家も安心して電池証券に投資しやすくなると考えられる。
 一般的には、機関投資家は複数の金融商品に分散投資をすることによりリスク管理することが多い。しかし、金融商品Aの価格変動と金融商品Bの価格変動にある程度の相関性が生じる場合、金融商品Aと金融商品Bに分散投資する効果は減殺されてしまうことが知られている。電池証券は、株式、債券、不動産とはまったく異なる新しいタイプの資産であるため、分散投資のポートフォリオに組み入れることで分散効果を発揮しやすくなると考えられる。このため、大口投資家にとってもポートフォリオの一部に組み入れることを検討しやすくなる。
4.社会
 投資行動を通して、二次電池を大事に使うユーザは市場に高く評価されることになる。市場が優良な二次電池の適切な使用を促すことになる。
 EV1台が搭載する二次電池の容量を50(kWH)とすると、100万台のEVだけでも50(GWH)という巨大な電力市場が生まれる。このような巨大電力を担う大量の二次電池は廃棄あるいはリサイクルされるときに膨大な二酸化炭素を排出することになる。したがって「長寿命の二次電池をできる限り使い切る」ことが今後は大切になる。二次電池管理システム200により二次電池をさまざまなユーザニーズに応じて流通させることで環境負荷を大きく下げることができると考えられる。
 管理会社は、不良ユーザには高い使用料を設定し、優良ユーザには低い使用料を設定してもよい。不良ユーザの高い使用料の一部は優良ユーザの使用料の補填として使われてもよい。あるいは、政府は二次電池の使用料の一部から税金を徴収し、優良ユーザにはそこから奨励金を支払ってもよい。
 二次電池以外にも二次電池管理システム200による証券化手法は応用可能である。たとえば、EVそのものを証券化し貸し出してもよいし、EVを構成する部品、たとえば、モーターを証券化しユーザへ貸し出してもよい。
 二次電池の使用歴をブロックチェーンで管理することは必須ではない。二次電池に付属するDIエンジンが使用歴を記録し、DIチェーン同士で情報交換してもよい。
 DIエンジンは、二次電池管理サーバ100に定期的に使用歴を報告してもよい。この場合、二次電池管理サーバ100は複数の二次電池の使用歴をまとめて管理してもよい。
 DIエンジンとDIエンジンが通信するとき、あるいは、DIエンジンと二次電池管理サーバ100が通信するときに通信料を発生させてもよい。ユーザから管理会社に通信料が支払われ、通信料の全部または一部は投資家への分配金として支払われてもよい。あるいは、管理会社からユーザに対して通信料(情報料)が支払われてもよい。
 二次電池のユーザから管理会社を経由して投資家に通信料(分配金)が支払われる方式を採用する場合、あまり使用されていない二次電池であっても通信料が定期的に発生するため、投資家はいっそう安定的にインカムゲインを得ることができる。
 管理会社は、二次電池を購入し、投資家は二次電池の購入費を負担する。このときの電池証券は、管理会社の投資家に対する債務(借用証書)としての性質を有する金融商品であってもよい。この場合、電池証券の分配金には、管理会社による金利を含めた返済金としての意味をもつことになる。
 DIエンジンは、二次電池を充電するときの電力源を把握することもできる。たとえば、DIエンジンは、原子力発電、火力発電、太陽光発電など複数の発電源のうち、どの発電源をどのくらいの割合で使って二次電池を充電しているかを把握し、これを使用歴として記録してもよい。
 DIエンジンは、二次電池の使用条件、たとえば、誰が使っているか(ユーザの種別)、何に使っているか(用途の種別)を使用歴として記録してもよい。太陽光発電など脱炭素型の電気エネルギーを使っているときには、電池証券に「脱酸素」という属性を付与してもよい(以下、「環境配慮型電池証券」とよぶ)。脱炭素社会を応援したい投資家は、環境配慮型電池証券に積極的に投資してもよい。また、政府も脱炭素促進のために環境配慮型電池証券に優遇税制を適用してもよい。優遇税制により、環境配慮型電池証券の価値を高めることができると考えられる。
 業務用EVは常時運行されるため二次電池を継続的に使用することになる。このため、業務用EVに使われる二次電池からは継続的な使用料収入を期待できる。一方、都市部における個人用EVは週末にしか使用されないことも多く、その二次電池からは安定した使用料収入を期待できない可能性もある。また、急加速・急減速を繰り返すことで二次電池の劣化は進みやすい。このように、二次電池のユーザによって電池証券の価値も変化する。投資家は、電池証券を購入するとき、二次電池のユーザに関する情報を参照することにより投資判断をしてもよい。管理会社は二次電池のユーザに関する情報を参照することで、前述のように安定した使用料収入を期待できないユーザや劣化を進めやすい使い方をしている不良ユーザに対し、使用料の金額を高く設定することで電池証券の価値を制御できる。
 管理装置は、二次電池のDIエンジンから収集した使用歴の統計情報を販売してもよい。たとえば、統計情報の一部を投資家に販売すれば、投資家は投資判断に統計情報を活用できる。あるいは、統計情報の一部を、二次電池を開発する企業に販売すれば、企業は二次電池の企画・開発をする上で有用な指針を得ることができる。
 電池証券には、二次電池本体の価値と、二次電池において使われる電池の価値が含まれる。二次電池本体の価値には、二次電池がリサイクルされるときの価値も含まれる。たとえば、稀少金属を多く含む二次電池は価値が高い。また、リサイクルしやすく設計となっている二次電池もリサイクル時における残存価値が高くなると考えられる。このような二次電池の仕様も、投資判断にとって重要な情報になると考えられる。
 以下においては、本実施形態における二次電池管理システム200の機能および構成について詳細に説明する。
 図3は、二次電池管理システム200のハードウェア構成図である。
 二次電池管理システム200においては、管理会社102が運営する二次電池管理サーバ100(二次電池管理装置)、決済システム104、ユーザが有する電子機器106とユーザ端末108、投資家が有する投資端末110、証券会社112および物流会社114が、インターネット116を介して相互に接続される。管理会社102は二次電池メーカー118と専用回線により接続される。証券会社112は証券取引所120と専用回線にて接続される。
 二次電池メーカー118は、二次電池122を製造する。管理会社102は、二次電池メーカー118から二次電池122を購入する。管理会社102は、二次電池122に二次電池122の製造を発注し、二次電池メーカー118は二次電池122を発注数だけ製造して管理会社102に納品する。このため、二次電池メーカー118は二次電池122の在庫リスクから解放される。
 管理会社102は、二次電池メーカー118から購入した二次電池122をさまざまなユーザに貸与する。二次電池122には上述したDIエンジンが搭載される。DIエンジンは通信機能を有するIC(Integrated Circuit)チップおよび軽量のソフトウェアにより構成される。ユーザが保有する電子機器106は、貸与された二次電池122によって駆動される。電子機器106としては、EV、ESS(Energy Storage System)、家電製品、船、ラップトップPC、ポータブル電源などが想定される。電子機器106は、二次電池122によって駆動される装置であればよい。管理会社102は、証券会社112に対して、購入した二次電池122についての電池証券の発行を依頼する(後述)。
 決済システム104は、金融機関が運営するシステムであり、ユーザ、管理会社102、投資家の間での決済を実行する。
 ユーザ端末108は、ユーザによって使用される通信端末である。ユーザ端末108はスマートフォン、ラップトップPCなど任意の通信端末であってよいが、本実施形態におけるユーザ端末108はスマートフォンであると想定して説明する。ユーザは、ユーザ端末108から二次電池管理サーバ100に対して、二次電池122の貸し出しおよび返却を要求する。ユーザは、あらかじめ、二次電池管理サーバ100に対してユーザ登録をしておく。ユーザ登録に際しては、二次電池管理サーバ100はユーザにユーザID(以下、「PID」と表記する)を付与する。
 投資端末110は、投資家によって使用される通信端末である。投資端末110も任意の通信端末であってよいが、本実施形態における投資端末110はラップトップPCであると想定して説明する。投資家は、投資端末110から証券会社112に対して、電池証券の購買注文と売却注文を出す。投資家は、投資家ID(以下、「IID」と表記する)により識別される。
 証券会社112は、管理会社102からの依頼に基づいて電池証券を証券取引所120に発行する。また、投資家からの注文に応じて、電池証券の売買を行う。証券取引所120は、一般的な金融商品取引所であってもよいし、私設取引システム(PTS: Proprietary Trading System)であってもよい。
 物流会社114は、管理会社102からの指示にしたがって、二次電池122をユーザのもとに配送する。
 図4は、二次電池管理サーバ100のハードウェア構成図である。
 二次電池管理サーバ100は、コンピュータプログラムを格納する不揮発性メモリとしてのストレージ312、プログラムおよびデータを展開する揮発性のメモリ304、レジスタ、演算器、命令デコーダ等を内蔵し、メモリ304からプログラムを読み出して実行するプロセッサ300(CPU:Central Processing Unit)等を含む。プロセッサ300は、比較的高速な第1バス302と接続される。第1バス302には、メモリ304のほかNIC(Network Interface Card)が接続される。第1バス302には、このほか、GPU(Graphics Processing Unit)等の他のデバイスが接続されてもよい。
 第1バス302は、ブリッジ308を介して比較的低速な第2バス310と接続される。第2バス310には、ストレージ312のほか、モニタあるいはスピーカなどの出力デバイス316が接続される。また、第2バス310には、マウスやキーボードなどの入力デバイス314、プリンタなどの周辺機器318が接続されてもよい。
 なお、ユーザ端末108および投資端末110のハードウェア構成についても、基本的には同様である。
 図5は、二次電池管理サーバ100、投資端末110およびユーザ端末108の機能ブロック図である。
 二次電池管理サーバ100、投資端末110およびユーザ端末108の各構成要素は、CPUおよび各種コプロセッサ(co-processor)などの演算器、メモリやストレージといった記憶装置、それらを連結する有線または無線の通信線を含むハードウェアと、記憶装置に格納され、演算器に処理命令を供給するソフトウェアによって実現される。コンピュータプログラムは、デバイスドライバ、オペレーティングシステム、それらの上位層に位置する各種アプリケーションプログラム、また、これらのプログラムに共通機能を提供するライブラリによって構成されてもよい。
 以下に説明する各ブロックは、ハードウェア単位の構成ではなく、機能単位のブロックを示している。
(二次電池管理サーバ100)
 二次電池管理サーバ100は、通信部130、データ処理部132およびデータ格納部134を含む。
 通信部130は、投資端末110等の外部装置との通信処理を担当する。データ格納部134は各種情報を格納する。データ処理部132は、通信部130により取得されたデータおよびデータ格納部134に格納されているデータに基づいて各種処理を実行する。データ処理部132は、通信部130およびデータ格納部134のインタフェースとしても機能する。
 通信部130は、送信部136と受信部138を含む。
 送信部136は、外部装置に各種データを送信する。受信部138は、外部装置から各種データを受信する。
 受信部138は、性能情報取得部140を含む。
 性能情報取得部140は、二次電池122に搭載されるDIエンジンから二次電池122の「性能情報」を取得する。性能情報とは、二次電池122の性能または使用状態を示す情報であり、たとえば、公称電圧、内部抵抗値、容量、充電回数、充電率、温度、二次電池122の種別などである。
 データ処理部132は、証券管理部142、投資家管理部144、ユーザ管理部146、徴収部148、分配部150、劣化測定部152および料金設定部154を含む。
 証券管理部142は、電池証券を管理する。投資家管理部144は、投資家に関する情報を管理する。ユーザ管理部146は、ユーザに関する情報を管理する。徴収部148は、ユーザから二次電池122の使用料を徴収する。本実施形態においては、ユーザが二次電池122を充電するときに使用料が発生する。分配部150は、投資家に分配金を支払う。また、使用料の一部は、管理会社102の運営費となる。本実施形態においては使用料の5(%)が運営費となり、残りの95(%)が分配金となる。
 劣化測定部152は、性能情報に基づいて二次電池122の「劣化度」を計算する。本実施形態においては、劣化度(%)=100×(初期容量-計測容量)/初期容量、として定義する。計測容量とは、計測時点における二次電池の放電容量である。二次電池122の劣化の進み方はSOHによって指標化される。SOHは容量維持率を示すが、内部抵抗値の維持率に基づいて定義されることもある。劣化度は「100-SOH(%)」を意味する。
 料金設定部154は、ユーザが二次電池122を充電するときに徴収すべき使用料を設定する。
(投資端末110)
 投資端末110は、ユーザインタフェース処理部160、通信部162、データ処理部164およびデータ格納部166を含む。
 ユーザインタフェース処理部160は、キーボード、マウス、ジョイスティック、タッチパネル等の入力デバイスを介して投資家からの操作を受け付けるほか、画像表示や音声出力など、ユーザインタフェースに関する処理を担当する。通信部162は、証券会社112等との通信処理を担当する。データ格納部166は各種データを格納する。データ処理部164は、ユーザインタフェース処理部160からの入力、通信部162の受信データおよびデータ格納部166に格納されているデータに基づいて各種処理を実行する。データ処理部164は、通信部162、ユーザインタフェース処理部160およびデータ格納部166のインタフェースとしても機能する。
 ユーザインタフェース処理部160は、入力部168および出力部170を含む。
 入力部168は、投資家からの各種入力を受け付ける。出力部170は、投資家に対して各種情報を出力する。
(ユーザ端末108)
 ユーザ端末108は、ユーザインタフェース処理部180、通信部182、データ処理部184およびデータ格納部186を含む。
 ユーザインタフェース処理部180も、入力デバイスを介してユーザからの操作を受け付けるほか、画像表示や音声出力など、ユーザインタフェースに関する処理を担当する。通信部182は、二次電池管理サーバ100等との通信処理を担当する。データ格納部186は各種データを格納する。データ処理部184は、ユーザインタフェース処理部180からの入力、通信部182の受信データおよびデータ格納部186に格納されているデータに基づいて各種処理を実行する。データ処理部184は、通信部182、ユーザインタフェース処理部180およびデータ格納部186のインタフェースとしても機能する。
 ユーザインタフェース処理部180は、入力部188および出力部190を含む。
 入力部188は、ユーザからの各種入力を受け付ける。出力部190は、ユーザに対して各種情報を出力する。
 図6は、二次電池情報210のデータ構造図である。
 二次電池情報210は、DIエンジンの内蔵メモリに格納される。二次電池122は、電池ID(以下、「BID」と表記する)により識別される。電子機器106は、機器ID(以下、「MID」と表記する)により識別される。BID=B01の二次電池122(以下、「二次電池122(B01)」のように表記する)は、電子機器106(M01)に搭載されている。機器IDは、二次電池の設置位置を示す。
 二次電池122の「設置位置」は、二次電池122が搭載される電子機器106の種類、いいかえれば、二次電池122の用途を示す情報であってもよい。たとえば、二次電池122がEVにおいて一次利用され、そのあとESSにおいて二次利用されるとする。この場合、EV、ESSなどの電子機器106の種類、いいかえれば、二次電池122の使用用途を二次電池122の「設置位置」とみなしてもよい。
 同一種類の電子機器106であっても、機体が異なるときには「設置位置」は異なるとみなしてもよい。たとえば、二次電池(B01)があるEV(電子機器106)で使用されたあと、別のEVで使用されるとき、この二次電池(B01)の設置位置は変更されたとみなしてもよい。
 上述したように、本実施形態においては、機器IDが二次電池の「設置位置」を示す情報であるとして説明する。
 二次電池122に対しては性能情報が対応づけられる。性能情報としては、SOH、充電回数、放電電圧など、二次電池122の性能または使用状態を示す各種の情報が含まれる。たとえば、二次電池122(B01)は、リチウムイオン二次電池(Li-ion)であり、SOHは98(%)である。すなわち、二次電池122(B01)の劣化度は2(%)である。
 DIエンジンは、定期的、または、充電時において二次電池122についての各種の性能情報を取得する。性能情報としては、このほかには、エネルギー密度、充放電効率、自己放電率、重量、耐用充放電サイクル数、耐用年数、二次電池メーカー118の名称など、仕様または計測値に基づくさまざまなデータが含まれてもよい。性能情報は、投資家にとって電池証券への投資可否を判断するための重要な情報となる。DIエンジンはこれらの性能情報を二次電池管理サーバ100に自動的に送信する。
 二次電池情報210によれば、二次電池122(B01)は電子機器106(M01)に搭載されているが、二次電池122(B05)はいずれの電子機器106にも搭載されていない。すなわち、二次電池122(B06)は、遊休状態にある。
 図7は、電池保有情報220のデータ構造図である。
 電池保有情報220は、二次電池管理サーバ100のデータ格納部134に格納される。二次電池122がユーザに貸し出されたとき、ユーザ管理部146は、貸出しの対象となった二次電池122のBIDと貸出しを受けたユーザのPIDを電池保有情報220において対応づける。
 電池保有情報220によれば、二次電池122(B01)はユーザ(P01)に貸し出されている。また、遊休状態にある二次電池122(B05)はいずれのユーザにも対応づけられていない。ユーザは、個人でもよいし、法人であってもよい。たとえば、EVを使用する物流企業、ESSを使って発電所を運営する電力会社なども法人ユーザとなることができる。
 図8は、ユーザ情報230のデータ構造図である。
 ユーザ情報230は、二次電池管理サーバ100のデータ格納部134に格納される。ユーザ情報230は、ユーザの属性を示す情報である。ユーザには、活用ランク、配慮ランクおよび総合ランクが設定される。ユーザが二次電池122を充電するとき、二次電池122のDIエンジンは充電が行われたことを二次電池管理サーバ100に通知する。このとき、ユーザには使用料が発生する。以下においては、ユーザは充電1回についてG(円)を支払うものと想定して説明する。また、説明を簡単にするため、使用料を決めるとき、充電量など他の要素は考慮しないものとする。
 ユーザが二次電池122を活発に利用するほど、いいかえれば、充電回数が多くなるほど、管理会社102はこのユーザから多くの使用料を徴収できる。多くの使用料を支払ってくれるユーザは、投資家にとって好ましい。
 活用ランクは、ユーザが二次電池122を活発に利用する度合いを示す。本実施形態においては、ユーザ管理部146は多数のユーザを対象として、1ヶ月(単位期間)あたりの二次電池122の充電回数を集計する。ユーザ管理部146は、充電回数の平均値および分散値に基づいて、各ユーザの標準偏差を計算する。
 ユーザ管理部146は、上位から5(%)以上の活用ランクを「5」、5~20(%)の活用ランクを「4」、20~50(%)の活用ランクを「3」、50~70(%)の活用ランクを「2」、70(%)未満の活用ランクを「1」とする。たとえば、ユーザ(P01)は、二次電池122の充電回数が上位5(%)に入るほど多いため、その活用ランクは「5」となっている。一方、ユーザ(P03)は、二次電池122の充電回数が上位70(%)にも入っていないので、その活用ランクは「1」となっている。
 ユーザが二次電池122を大事に利用するほど、いいかえれば、二次電池122の劣化が遅いほど、管理会社102はこのユーザから長期間にわたって使用料を徴収できる。使用料を長期間に渡って支払ってくれるユーザも投資家にとっては好ましい。
 配慮ランクは、ユーザが二次電池122をどのくらい大切に使っているかを示す。本実施形態においては、ユーザ管理部146は多数のユーザを対象として、1ヶ月(単位期間)あたりの二次電池122の劣化度の変化量(以下、「劣化進行度」とよぶ)について統計をとっておく。ユーザ管理部146は、この劣化進行度の小ささ(劣化しにくさ)について上位から5(%)以上の配慮ランクを「5」、5~20(%)の配慮ランクを「4」、20~50(%)の配慮ランクを「3」、50~70(%)の配慮ランクを「2」、70(%)未満の配慮ランクを「1」とする。
 たとえば、ユーザ(P01)は、二次電池122の先月の劣化進行度が上位20~50(%)のゾーンに入るため、その配慮ランクは「3」となっている。
 総合ランクは、活用ランクと配慮ランクに基づいて決定される。ユーザ管理部146は、活用ランクおよび配慮ランクを変数とする任意の単調増加関数により総合ランクを決定する。本実施形態においては、ユーザ管理部146は活用ランクと配慮ランクの平均値を総合ランクとして算出する。
 ユーザ情報230には、このほかにも、ユーザの名前、年齢、性別、居住地、口座番号、メールアドレスなど、さまざまなユーザ属性が含まれてもよい。
 図9は、証券情報240のデータ構造図である。
 証券情報240は、二次電池管理サーバ100のデータ格納部134に格納される。電池証券は、証券ID(以下、「SID」と表記する)により識別される。二次電池122には1以上の電池証券が対応づけられる。図9に示す証券情報240によれば、二次電池122(B01)については10枚の電池証券(S01)が発行されている。電池証券(S01)の販売価格(売出価格)は100(円)であり、現在価格は110(円)である。したがって、販売価格で電池証券(S01)を購入した投資家には、10(円)の含み益が出ていることになる。10枚の電池証券(S01)を区別するときには、電池証券(S01:1)~電池証券(S01:10)のように表記する。
 電池証券の販売価格および現在価格の決め方については後述する。
 図10は、投資家情報250のデータ構造図である。
 投資家情報250は、二次電池管理サーバ100のデータ格納部134に格納される。投資家情報250は、電池証券の保有状況を示す情報である。投資家情報250によれば、投資家(I01)は企業X1である。すなわち、投資家(I01)は機関投資家である。機関投資家としては、保険会社、年金運用会社、投資銀行などの金融機関、大学などの教育機関、一般の事業会社などが考えられる。一方、投資家(I02)は個人投資家である。
 投資家(I01)は、電池証券(S01)を1枚、電池証券(S03)を10枚、電池証券(S04)を2枚、電池証券(S08)を5枚保有している。また、投資家(I01)は電池証券(S03)を平均して102(円)で取得している。図9に示した証券情報240によれば、電池証券(S03)の現在価格は130(円)であるため、投資家(I01)は電池証券(S03)については含み益を抱えている。
 図11は、投資情報260のデータ構造図である。
 投資情報260は、二次電池管理サーバ100のデータ格納部134に格納される。証券管理部142は、二次電池情報210、電池保有情報220、ユーザ情報230、証券情報240に基づいて投資情報260を生成する。図11は、二次電池122(B01)に対応づけられる電池証券(S01:1)の投資情報260を示す。
 投資情報260は、現在価格欄261、性能情報欄262、投資家情報欄264、ユーザ情報欄266、予想収益欄268を含む。
 証券管理部142は、現在価格欄261に電池証券(S01)の現在価格を記録する。証券管理部142は、二次電池122の二次電池情報210(図6参照)の全部または一部を性能情報欄262に、投資家情報250(図10)の一部を投資家情報欄264に、ユーザ情報230(図8参照)の全部または一部をユーザ情報欄266に記録する。このほか、図示はしていないが、投資情報260には二次電池122(B01)の設置位置(機器ID)を示す情報が含まれてもよい。
 証券管理部142は、二次電池122(B01)の過去の一定期間における分配金の収入実績に基づいて、電池証券(S01)の1ヶ月あたりの予想収益を算出して予想収益欄268に記録する。たとえば、二次電池122(B01)が過去1年間に平均して1ヶ月あたり1.5(円)の分配金を発生させているときには、証券管理部142は予想収益を1.5(円)として算出してもよい。
 このほか、証券管理部142は、過去の一定期間における分配金の収入実績から将来の期待収益を計算し、DCF法により電池証券の現在価値を算出してもよい。二次電池122は、DCF法により計算された現在価値と現在価格(取引価格)を比較することにより、電池証券(S01)が割安・適正・割高のいずれであるかを投資情報260に登録してもよい。
 投資情報260は、電池証券ごとに生成される。二次電池管理サーバ100の送信部136は、証券会社112に対して投資情報260を適宜送信する。証券会社112は、電池証券の売買機会を投資家に提供するが、このとき電池証券の投資情報260も投資家に提供する。なお、投資家への情報提供に際しては、投資家情報欄264など一部の情報を提供対象外としてもよい。
 二次電池管理サーバ100の送信部136は、投資情報260に変更があったときには、証券会社112に対して変更後の投資情報260を送信し、証券会社112は最新の投資情報260を投資家に提供する。たとえば、二次電池(B01)を搭載する電子機器106が変更になったとき、証券管理部142は投資情報260に含まれる機器ID(設置位置)を登録変更する。送信部136は、変更後の投資情報を証券会社112に送信する。
 図12は、電池証券の販売価格の決め方を説明するための模式図である。
 管理会社102は、二次電池122を二次電池メーカー118から購入したあと、電池証券の発行を証券会社112に依頼する。電池証券を新規発行するとき、管理会社102は電池証券の販売価格を決定する。電池証券の販売価格の決定方法は任意であるが、本実施形態においては、二次電池管理サーバ100は以下のアルゴリズムに基づいて販売価格を決定する。
 図12において横軸は時間を示し、縦軸は管理会社102の収益を示す。ここでは原点に示す時点において二次電池122が購入され、かつ、二次電池122はすぐにいずれかのユーザに貸し出されるものと想定して説明する。説明をわかりやすくするため、図12においては遊休期間を考慮していない。
 管理会社102が二次電池メーカー118から二次電池122を購入したときの購入価格をM(円)とする。二次電池122に対してn枚の電池証券が発行されるとする。このときの1枚あたりの販売価格をD(円)とする。したがって、管理会社102は二次電池122をM(円)で購入し、n枚の電池証券をD(円)で発行することで、証券会社112からD×n(円)の収入を得ることができる。ここでは、M>D×nとする。この場合、電池証券の発行段階では、管理会社102はU=M-D×n(円)だけ損をしていることになるが、管理会社102は二次電池122の使用料の一部を運営費として回収できる。販売価格が低い方が投資を集めやすい。そこで、管理会社102は販売価格を抑制しつつ、不足分は二次電池122の使用料の一部から回収する。
 ここでは、管理会社102は、電池証券を発行してからv月後に不足分であるU(円)を運営費として回収することを目標とする。二次電池122を1回充電したときに得られる使用料をG(円)とする。本実施形態においては、G(円)の使用料が発生するときに、k×G(円)が管理会社102の運営費となり、残りの(1-k)×G(円)が投資家への分配金となる(0≦k≦1)。上述したように、本実施形態におけるkは5(%)である。
 1ヶ月あたり想定される充電回数をc(回)とすると、この二次電池122からは1ヶ月あたりk×G×c(円)の運営費が得られると考えられる。v月で不足金額U(円)を回収するためには、M-D×n=k×G×c×vが成立するように販売価格D(円)を決定する。
 この方程式において、Mは既知、G、n、v、kは任意の設定値である。証券管理部142は、二次電池122についての過去の充電実績に基づいてc(1ヶ月あたりの想定充電回数)を決定する。たとえば、電池証券の新規発行対象となる二次電池122aと同タイプかつ同じ充電容量の二次電池122bについて、1ヶ月あたりの充電回数の平均値が30(回)であれば、証券管理部142はc=30に設定してもよい。
 管理会社102は、上記方程式に基づいて販売価格D(円)を定めることにより、低価格にて電池証券を発行しつつ、v月で初期コストを回収することを期待できる。想定通りであれば、v月以降の運営費を管理会社102はすべて利益として計上できる。
 実際には、1ヶ月あたりの充電回数は、二次電池122の使用状況に応じて大きくばらつきが生じると考えられる。したがって、充電回数の不確実性、いいかえれば、分配金の不確実性が電池証券の投資妙味を生み出す。
 二次電池メーカー118は、管理会社102から二次電池122を受注生産するため在庫リスクから解放される。二次電池122の貸出先が見つからなければ、二次電池122は管理会社102の在庫になるので、管理会社102は在庫リスクを負担することになる。その一方、管理会社102は、二次電池メーカー118から二次電池122を購入したあと、電池証券を発行することにより購入費の一部または全部を短期間で回収できるため、リスクを多くの投資家に分散させることができる。また、長期間に渡って二次電池122を貸し出すことができれば、管理会社102は、二次電池122の使用料から継続的に収益を得ることができる。
 図13は、電池証券の発行時の処理過程を示すシーケンス図である。
 管理会社102は、まず、二次電池メーカー118から二次電池122を購入する。このとき、証券管理部142は購入価格に基づいて、図12に関連して説明した方法により販売価格を計算する(S10)。送信部136は、証券会社112に対して電池証券の発行依頼を送信する(S12)。発行依頼には、電池証券についての投資情報260のほか、販売価格と電池証券の発行数が含まれる。
 証券会社112は、二次電池管理サーバ100からの指示にしたがって指定枚数の電池証券を証券取引所120において新規発行する(S14)。このとき、証券会社112は販売価格×指定枚数により示される発行料金を管理会社102に対して支払うように指示を出す(S16)。より具体的には、証券会社112は、二次電池管理サーバ100に対して発行料金の支払いを指示し、二次電池管理サーバ100は、証券会社112の口座から発行料金を引き落とし、管理会社102の口座に発行料金を振込むように決済システム104に指示する(S18)。証券管理部142は、電池証券の発行後、二次電池情報210、証券情報240等の各種データを更新する(S20)。
 新規発行された電池証券に対して、投資家は投資端末110から購入指示を証券会社112に送信する(S22)。証券会社112は決済システム104に指示して決済処理を実行させる(S24)。具体的には、決済システム104は投資家の口座から購入代金を引き落とし、証券会社112の口座に購入代金を振込む。決済後、証券会社112は購入通知を二次電池管理サーバ100に送信する(S26)。購入通知には、電池証券のSID、購入した投資家のIID、取引価格等が含まれる。購入通知の受信後、証券管理部142は、証券情報240、投資家情報250等の各種データを更新する(S28)。
 このあと、ユーザが二次電池122の貸出しを二次電池管理サーバ100に要求したときには、二次電池管理サーバ100の送信部136は、物流会社114に指示して二次電池122の配送を指示する。このときの配送指示には、ユーザの住所、貸出対象となる二次電池122のBIDなどが含まれる。
 物流会社114は、配送指示にしたがって、管理会社102が保有する二次電池122をユーザのもとに配送する。二次電池122の配送時においては、ユーザ管理部146は、電池保有情報220等の各種データを更新し、二次電池122と貸出先のユーザを対応づける。
 二次電池122が搭載するDIエンジンは、適宜、二次電池122の状態を計測し、性能情報を二次電池管理サーバ100に送信する。また、DIエンジンは二次電池122が装着される電子機器106からMIDを読取り、BIDとともにMIDも二次電池管理サーバ100に送信する。ユーザ管理部146は、MIDを受信したときには二次電池情報210を更新する。
 図14は、分配金の支払い処理過程を示すシーケンス図である。
 ここでは、ユーザ(P01)が二次電池122(B01)を充電する場合を想定して説明する。ユーザ(P01)は二次電池122(B01)を充電ステーションで充電する(S30)。二次電池122(B01)のDIエンジンは、充電通知を二次電池管理サーバ100に送信する(S32)。充電通知には、BID、PID等が含まれる。
 二次電池管理サーバ100の徴収部148は、各二次電池122についていつ充電されたかを示す充電実績情報(不図示)を管理している。充電実績情報においては、BIDと充電日時が対応づけられる。充電通知が受信されたとき、徴収部148は充電実績情報を更新する(S34)。徴収部148は、充電通知を受信するごとに充電実績情報を更新する。
 貸与期間中の所定期日、たとえば、毎月25日になると(以下、「精算日」とよぶ)、DIエンジンは二次電池122の最新の性能情報を二次電池管理サーバ100に送信する(S36)。徴収部148は、前回の精算日から今回の精算日までの充電回数に基づいて使用料を計算する。たとえば、充電回数がn回で、1回の充電あたりの使用料(以下、1ヶ月あたりの合計の使用料と区別するために1回分の使用料のことを「単位使用料」とよぶ)がG(円)であれば、1ヶ月の使用料はG×n(円)となる。単位使用料G(円)は、二次電池122ごとにあらかじめ決められている。送信部136は、合計の使用料G×nをユーザ端末108に通知する(S38)。ユーザはユーザ端末108において、1ヶ月あたりの使用料をいつでも確認できる。
 徴収部148は、使用料G×n(円)の決済を決済システム104に指示する(S40)。ユーザ(P01)の口座からは使用料が引き落とされ、管理会社102の口座に振込まれる。二次電池管理サーバ100は、使用料を証券会社112に通知する(S42)。証券会社112は、使用料のうち(1-k)×G×nを分配金として投資端末110に通知する(S44)。証券会社112は、管理会社102に振込まれた使用料の一部を分配金として投資家の口座に振込むよう決済システム104に指示することで、決済処理を実行させる(S46)。以上により、ユーザ(P01)が支払った使用料のうちの一部は管理会社102の運営費となり、残りは投資家への分配金となる。
 二次電池管理サーバ100は、使用料の徴収後、更に、必要に応じて単位使用料の改定を行う(S48)。単位使用料の改定については次の図15に関連して詳述する。
 図15は、図14のS48における処理過程を詳細に示すフローチャートである。
 劣化測定部152は、精算日に取得された性能情報に基づいて、二次電池122のSOHを計算する(S50)。また、劣化測定部152は、前回の精算日から今回の精算日までの単位期間における劣化進行度も計算する。ユーザ管理部146は、劣化進行度に基づいて配慮ランクを更新する(S52)。
 続いて、ユーザ管理部146は、充電実績情報に基づいて活用ランクを更新する(S54)。ユーザ管理部146は、配慮ランクおよび活用ランクに基づいて総合ランクを更新する(S56)。前回から総合ランクに変化がなければ(S58のN)、以降の処理はスキップされる。総合ランクに変化があれば(S58のY)、料金設定部154は単位使用料を変更する(S60)。
 具体的には、総合ランクが1以下のときには、料金設定部154は単位使用料を基本設値から50(%)分だけ増加させる。総合ランクが1~2のときには、料金設定部154は単位使用料を基本設定値から10(%)分だけ増加させる。総合ランクが2~3のときには、料金設定部154は単位使用料を基本設定値に設定する。総合ランクが3~4のときには、料金設定部154は単位使用料を基本設定値から10(%)分だけ減少させる。総合ランクが4よりも大きいときには、料金設定部154は単位使用料を基本設定値から50(%)分だけ減少させる。
 たとえば、ユーザ(P01)について二次電池122(B01)の単位使用料の基本設定値が20(円)で、ユーザ(P01)は二次電池122(B01)を1ヶ月あたり20回充電したとする。このときの基準となる使用料は400(円)となる。ユーザ(P01)の総合ランクが「1」のときには単位使用料は30(円)となるので、1ヶ月あたりの使用料は600(円)となる。ユーザ(P01)の総合ランクが「4.5」のときには単位使用料は10(円)となるので、1ヶ月の使用料は200(円)となる。このように、ユーザ(P01)は二次電池122(B01)を積極的に使い、かつ、二次電池122(B01)が劣化しないように大事に使うほど、使用料についての優遇を受けることができる。
 なお、一人のユーザが複数の二次電池122を使用する場合もある。この場合には、ユーザ管理部146は、二次電池122ごとにユーザの配慮ランク、活用ランクおよび総合ランクを計算してもよい。あるいは、ユーザ管理部146は、複数の二次電池122それぞれについて計算された配慮ランクの平均値を、このユーザの配慮ランクとして算出してもよい。
 たとえば、ユーザ(P01)が二次電池122(B01)、二次電池122(B21)、二次電池122(B22)を保有しているとする。ユーザ管理部146は、二次電池122(B01)に対するユーザ(P01)の配慮ランクを「3」と算出する。同様にして、二次電池122(B21)、二次電池122(B22)についての配慮ランクをそれぞれ「4」「5」と算出したとする。この場合、ユーザ管理部146は、ユーザ(P01)の配慮ランクをその平均値である「4(=(3+4+5)/3)」として算出してもよい。同様にして、ユーザ管理部146は、このユーザ(P01)の活用ランク、総合ランクを算出してもよい。
 上述の例では、前回の精算日から今回の精算日までの充電回数に応じて活用ランクを計算し、活用ランクに応じて単位使用料が変化するとして説明した。このほかには、たとえば、前回の精算日から今回の精算日までの総充電量に応じて、ユーザ管理部146は活用ランクを更新してもよい。ユーザ管理部146は、総充電量が多いほど活用ランクを高く設定してもよい。料金設定部154は、総充電量に基づいて算出された活用ランクに応じて、単位使用料を変化させてもよい。
 図16は、電池証券の売買の処理過程を示すシーケンス図である。
 投資家(I01)が電池証券の売却注文を出し、投資家(I02)が電池証券の購買注文を出したとき、証券会社112は通常の株式売買と同様にして売買成否を判定する。売買が成立すると(S70)、証券会社112は電池証券の保有者を投資家(I01)から投資家(I02)に名義変更する(S72)。
 名義変更の完了後、証券会社112は二次電池管理サーバ100に売買対象となった電池証券のSIDとともに、売買に関わった投資家のIIDを含む変更通知を二次電池管理サーバ100に送信する(S74)。投資家管理部144は、変更通知にしたがって証券情報240等のデータを更新する(S76)。
 図17は、二次電池122の貸出先を変更するときの処理過程を示すシーケンス図である。
 ここでは、ユーザ(P01)が二次電池122(B01)を返却し、この二次電池122(B01)が新たにユーザ(P10)に貸し出される場合を想定して説明する。ユーザ(P01)は、ユーザ端末108において二次電池122(B01)の返却を指示する。このとき、ユーザ端末108の入力部188は返却指示を受け付け、通信部182は返却指示を二次電池管理サーバ100に送信する(S80)。返却指示には、BID(=B01)およびPID(=P01)が含まれる。
 二次電池管理サーバ100の送信部136は、物流会社114に二次電池122の回収指示を送信する(S82)。回収指示には、回収対象となるユーザ(P01)のPIDと住所、二次電池122(B01)のBIDが含まれる。物流会社114は、ユーザ(P01)から二次電池122(B01)を回収し、管理会社102の有する倉庫に運ぶ。すなわち、二次電池122(B01)はいったん管理会社102の在庫品となる。ユーザ管理部146は、二次電池情報210、電池保有情報220等のデータを更新する(S84)。
 次に、ユーザ(P10)が二次電池122(B01)の貸与を要求したとする。ユーザ端末108の入力部188は貸与要求を受け付け、通信部182は貸与要求を二次電池管理サーバ100に送信する(S86)。貸与指示には、BID(=B01)およびPID(=P10)が含まれる。
 二次電池管理サーバ100は、物流会社114に配送指示を送信する(S88)。配送指示には、貸出対象となる二次電池122(B01)のBID、ユーザ(P01)のPIDおよびユーザ(P01)の住所が含まれる。物流会社114は、管理会社102から二次電池122(B01)を回収し、ユーザ(P10)のもとに二次電池122(B01)を運ぶ。ユーザ管理部146は、二次電池情報210、電池保有情報220等のデータを更新する(S90)。
 以上のように、二次電池122(B01)が返却されたとき、二次電池122(B01)は管理会社102の在庫品となる。二次電池122(B01)が在庫品となっているとき、二次電池122(B01)に対応づけられる電池証券(S01:B01)は収益を生まなくなる。二次電池122(B01)の遊休化、いいかえれば、二次電池122(B01)が在庫化して新たなユーザに貸し出されないことは、投資家にとってリスクとなる。
 電池証券(S01:B01)は、二次電池122(B01)が在庫品となるリスクを抱えるが、上述した仕組みにより、管理会社102は、在庫リスクを多くの投資家に負担してもらうことができる。管理会社102は在庫リスクを抑制しやすくなるので、積極的に二次電池122を購入しやすくなる。
 なお、一次利用者であるユーザ(P01)から二次利用者である別のユーザ(P10)に二次電池122(B01)の貸与先を変更する場合だけでなく、一次利用者であるユーザ(P01)がいったん二次電池122(B01)を返却し、再び二次利用者として同じ二次電池122(B01)を借りる場合もありえる。たとえば、ユーザ(P01)は二次電池122(B01)をEV用に借りて二次電池122(B01)を設置したあと、同じ二次電池122(B01)を次にESS用に設置する場合も考えられる。このように、一次ユーザと二次ユーザは別人物である必要はない。この場合には、二次電池122(B01)の徴収先は変更にならない。ただし、一次利用と二次利用では使用料が異なるとしてもよい。
 図18は、投資画面270の画面図である。
 投資家管理部144は、投資端末110に対して投資画面270を提供する。投資端末110の出力部170は、電池証券の保有状況を示す投資画面270を表示させる。図18は、投資家(I01)の投資画面270を示す。投資画面270には、投資家(I01)が保有する電池証券の銘柄、現在価格、保有数、評価損益等が表示される。
 図18の投資画面270によれば、投資家(I01)は電池証券(B01)を1枚保有し、「評価損益」に表示されているように「10(円)」の含み益を得ている。投資家(I01)は電池証券(B01)を追加購入したいときには購買(BUY)ボタン274をタッチすることで、購買画面(不図示)を表示させることができる。投資家(I01)は電池証券(B01)の購買画面において、電池証券(B01)の追加購入を指示する。
 投資家(I01)は電池証券(B01)を売却したいときには売却(SELL)ボタン272をタッチする。売却ボタン272がタッチされたとき、出力部170は売却画面(不図示)を表示させる。投資家(I01)は電池証券(B01)の売却画面において、電池証券(B01)の売却を指示する。
 証券会社112は、電池証券の売却注文および購買注文を集めて取引を成立させる。出力部170は購買不可または売却不可となっている電池証券については、売却ボタン272または購買ボタン274をグレーアウト表示させる。たとえば、図18においては、電池証券(B04)についてはいずれの投資家からも売却注文が出ていないので、出力部170は電池証券(B04)の購買ボタン274をグレーアウト表示させている。したがって、投資家(I01)は電池証券(B04)を新たに購入することはできない。電池証券(B04)の売却注文が出たときには、証券会社112は各投資端末110に電池証券(B04)を購入可能である旨を通知する。このとき、出力部170は購買ボタン274のグレーアウト表示を解除する。
 投資家(I01)、銘柄名をタッチすることにより、投資情報画面(不図示)を表示させることができる。投資情報画面においては、電池証券の取引価格のチャート(価格遷移)が表示される。また、投資情報260(図11参照)の一部も表示される。このほか、証券管理部142は、電池証券の割安度を示す情報を投資情報画面に表示してもよい。
<総括>
 以上、実施形態に基づいて二次電池管理システム200を説明した。
 ユーザは、二次電池122を買うのではなく、二次電池122を借りることにより、二次電池122の初期導入にともなう負担を軽減できる。ユーザは、二次電池122の充電回数に応じて使用料を支払う。二次電池122の導入コストを抑えることができるので、ユーザは旧型の二次電池122から新型の二次電池122への交換をしやすくなる。ユーザは使い終わった二次電池122を処分する必要はなく、管理会社102に返却すればよい。管理会社102が二次電池122のライフサイクルに責任をもつので、二次電池122の不法投棄・不正処分を減らすことができる。
 管理会社102は、二次電池122を購入したとき、証券化により二次電池122の購入費を賄うことができる。また、二次電池122の使用料の一部を運営費として徴収することにより、管理会社102は二次電池122から継続的収入を得ることができる。証券化と運営費の徴収により、管理会社102の経営を安定させることができる。管理会社102は二次電池122の一次利用により二次電池122の初期コストを回収し、二次利用、三次利用により利益を上げられるように使用料を設定してもよい。
 ユーザの二次電池122に対するニーズはさまざまなである。少量かつ高性能の二次電池122を使いたいユーザもいれば、SOHが低くても大量の二次電池122を集めたいユーザもいる。管理会社102がユーザから返却された二次電池122を別のユーザに貸し出すことにより、さまざまなユーザのニーズに応えることができる。二次電池122の流通を促進することで、1つの二次電池122が一次ユーザ、二次ユーザなどの複数のユーザによって長期間にわたって使用されることになる。二次電池122の長期使用は環境保護の観点からも重要である。新品のときの性能だけでなく、長期使用に耐えられるか否かがユーザ、管理会社102および投資家にとって重要になるため、高価格であっても高品質の二次電池122に対する開発ニーズを喚起できる。
 投資家は、電池証券を購入することにより、安定したインカムゲインを得ることができる。また、電池証券の取引からキャピタルゲインを得ることもできる。更に、電池証券は、株式、債券、不動産、コモディティとはほとんど関連しない金融商品であるため、他の金融商品とポートフォリオを組むことで分散投資効果を高めることができると考えられる。なお、本実施形態における電池証券は、二次電池122に対する債権を示す債務証書とであってもよい。
 二次電池メーカー118は、管理会社102からまとまった生産数を期待できるので、二次電池122を安定生産しやすい。
 たとえば、EV用の二次電池122はSOHが80(%)に至るまで使用し、ESS用の二次電池122はSOHが30(%)に至るまで使用可能であるとする。この場合には、SOHが100(%)から80(%)に低下するまではEV用として二次電池122を一次利用し、SOHが80(%)から30(%)に低下するまではESS用として同じ二次電池122を二次利用すればよい。すなわち、1つの二次電池122をEV用を希望する一次ユーザから、ESS用を希望する二次ユーザに流通させることができる。EVにおいては二次電池122の使用料を高く設定し、使用条件がそれよりも緩いESSにおいては二次電池122の使用料を低く設定してもよい。
 料金設定部154は、二次電池122の貸し出し時点のSOH(劣化度)に応じて、二次電池122の使用料を設定してもよい。たとえば、ある二次電池122がSOH=100(%)で貸し出されるときの使用料をG(円)とする。この二次電池122のSOHが80(%)まで劣化したとする。料金設定部154は、次回の貸し出し時点でSOH=80(%)の二次電池122が二次利用されるときには、ユーザに対して、使用料G(円)に貸し出し時点のSOH=80%を乗じた0.8×G(円)の使用料を設定してもよい。このような制御方法によれば、二次ユーザは中古の二次電池122を導入しやすくなるため、二次電池122の流通をいっそう促しやすくなる。
 一般的には、EV用の二次電池122はユーザの使用方法によって劣化の進み度合いが変化しやすい。このため、EVの二次電池122には高いSOHが求められる。一方、ESS用の二次電池122は安定的な使われ方をするため、劣化はゆるやかであり、EVほど高いSOHは求められない。管理会社102も、一次利用時に二次電池122の購入費を回収できていれば、二次電池122を安価に貸し出しやすくなる。最終的には、使用不可となった二次電池122を管理会社102が回収し、分解および部品の再利用を行うことが望ましい。
 二次電池122が使用されるシーンに応じて、電池証券の金融商品としての性格も変化する。ESSの場合、安定的に充電が行われやすいので、使用料が安くても収入が安定しやすい。安全かつ安定した収入を求める投資家にとっては、ESSなどで二次利用される二次電池122に対応づけられる電池証券は魅力的な投資対象になるかもしれない。
 上述したように、二次電池122が高性能かつ高価である場合、電池証券の取引価格は高くなりやすい。その一方、このような二次電池122は長期間に渡って使用できるので長期投資の観点からは好ましい。また、ユーザは二次電池122を大事に使うことで、使用料を安くしてもらうことができる。投資家にとっても、二次電池122を長く使ってくれるユーザは望ましい。管理会社102としても優良ユーザに積極的に二次電池122を貸し出したい。このようなメカニズムにより、優良な二次電池122の開発を促し、ユーザに二次電池122を大切に使わせるように促すことが可能となる。
 二次電池122のユーザが変更となる機会には投資妙味が高まる。電池証券の価値は二次電池122のユーザによって変化する。ユーザが変更となるとき、電池証券への投資を続けるか、売却するか、あるいは、買い増しをするかという判断は投資家にとって重要となる。
 あるユーザが二次電池122を返却したとき、あるいは、管理会社102が二次電池122を証券化したときには、二次電池122の新たなユーザが決まるまで二次電池122は遊休状態となる。遊休状態にある二次電池122からは使用料が発生しないため、電池証券からインカムゲインを得られないかもしれない。以下、二次電池122が遊休状態となるために、この二次電池122が新たに貸し出されるまで投資家がインカムゲインを得られなくなる投資家にとってのリスクのことを「遊休リスク」とよぶ。
 二次電池122に対する需要が高いときには遊休リスクは低くなる。一方、二次電池122が供給過多となっているときには遊休リスクが高くなる。遊休リスクが高いときには電池証券の取引価格が低くなると考えられる。逆に、ESSなどにおいて二次電池122の二次利用に対する需要が大きいときには、電池証券の取引価格は一次利用時の証券価格以上になる可能性もある。投資家は、需要の大きさについての見通し、遊休リスクについてのコンセンサスと独自の相場観に基づいて電池証券を売買することで、二次電池122に特有の投資を楽しむことができる。
 なお、本発明は上記実施形態や変形例に限定されるものではなく、要旨を逸脱しない範囲で構成要素を変形して具体化することができる。上記実施形態や変形例に開示されている複数の構成要素を適宜組み合わせることにより種々の発明を形成してもよい。また、上記実施形態や変形例に示される全構成要素からいくつかの構成要素を削除してもよい。
 複数の投資端末110、複数のユーザ端末108および1つの二次電池管理サーバ100を含むことにより二次電池管理システム200が構成されるとして説明したが、投資端末110またはユーザ端末108の機能の一部は二次電池管理サーバ100により実現されてもよいし、二次電池管理サーバ100の機能の一部が投資端末110またはユーザ端末108に割り当てられてもよい。また、投資端末110、ユーザ端末108や二次電池管理サーバ100以外の第3の装置が、二次電池管理サーバ100、投資端末110またはユーザ端末108の機能の一部を担ってもよい。図5において説明した投資端末110およびユーザ端末108の各機能と二次電池管理サーバ100の各機能の集合体は大局的には1つの「情報処理装置(二次電池管理装置)」として把握することも可能である。1つまたは複数のハードウェアに対して、本発明を実現するために必要な複数の機能をどのように配分するかは、各ハードウェアの処理能力や二次電池管理システム200に求められる仕様等に鑑みて決定されればよい。
<変形例>
 本実施形態においては、二次電池122に対して、通信機能を有するDIエンジンを搭載するとして説明した。変形例として、二次電池122ではなく電子機器106がDIエンジンを搭載してもよい。DIエンジンは、少なくとも、通信機能と二次電池122の性能を計測する機能を備える装置であればよい。DIエンジンは、電子機器106をIoT機器として機能させるために必要な機能を提供するICチップとして構成されてもよい。
 二次電池情報210(図6)は、二次電池122に保存されてもよいし、電子機器106に保存されてもよい。あるいは、二次電池情報210は二次電池管理サーバ100に保存されてもよい。たとえば、二次電池122のDIエンジンは、二次電池122の性能・状態を定期的に二次電池管理サーバ100に送信し、二次電池管理サーバ100の性能情報取得部140は性能情報をデータ格納部134に保存してもよい。
 ユーザの使用料の一部は証券会社112に支払われてもよい。証券会社112は電池証券の売買手数料により収益を得てもよい。
 管理会社102はカーボンクレジットを購入してもよい。そして、このカーボンクレジットの購入費用を電池証券の販売価格に追加してもよい。たとえば、二次電池122の製造に要する炭素排出量を相殺可能な量のカーボンクレジットの価格がQ(円)であるとする。この二次電池122についてn枚の電池証券が発行されるときには、管理会社102は、販売価格D(円)にQ/n(円)を追加してもよい。管理会社102は、二次電池122の使用料から得られる運営費に追加分を設定することで、カーボンクレジットの費用負担分を回収してもよい。
 二次電池管理サーバ100は、証券会社112の取引仲介機能の全部または一部を担ってもよい。たとえば、二次電池管理サーバ100は、売買処理部(不図示)を備えてもよい。売買処理部は投資家からの購買注文と売却注文を受け付けてマッチングすることにより、電池証券の売買を仲介してもよい。
 ユーザは、劣化進行度に応じた使用料を支払うとしてもよい。たとえば、劣化度が1(%)増加するごとに、いいかえれば、SOHが1(%)低下するごとに、F(円)の使用料を支払うとしてもよい。この場合には、M-D×n=k×G×c×v+F×J×vが成立するように販売価格D(円)を決定する。ここで、変数Jは、1ヶ月あたりの想定劣化進行度である。なお、販売価格は、二次電池管理サーバ100ではなく証券会社112が決定してもよい。
 本実施形態においては、二次電池管理サーバ100は使用料を決済し、使用料から管理費を控除した分配金を投資家に分配するように証券会社112に指示するとして説明した。すなわち、二次電池管理サーバ100および証券会社112がそれぞれ決済を実行している。変形例として、二次電池管理サーバ100はユーザから使用料を徴収し、一部を管理会社102の口座に管理費として振込み、残りを投資家の口座に分配金として振込んでもよい。すなわち、管理費および分配金の決済は、二次電池管理サーバ100がまとめて実行してもよい。
 二次電池管理サーバ100の投資家管理部144は、ユーザに対して、投資家名を通知してもよい。この場合、ユーザは、自分が使用している二次電池122に対して、誰が投資しているかを知ることができる。たとえば、有名投資家が電池証券を介して自分に投資していると知ることにより、有名投資家の期待と信頼を感じることができるので、ユーザは二次電池122を大事に使おうとする意欲をいっそう高められる。また、たくさんの投資家が集まるユーザは、投資家の注目を集めるユーザとしてのステータスを確立することができる。このように、投資を通して、優良ユーザになろうとする動機を高めることができる。
 二次電池122を介した金銭的支援も考えられる。たとえば、ユーザAの二次電池122に対応する電池証券に対して、投資家Bが投資するとき、ユーザAの使用料は投資家Bに分配金として支払われる。ユーザAが投資家Bの息子である場合、ユーザAは二次電池122を使用することで投資家B(親)に金銭援助できる。
 Y社は二次電池122を大事に使う企業であるという良い評判がたてば、投資家はY社が使用する二次電池122に積極的に投資しやすくなる。また、Y社はこのような評判を守るためにいっそう二次電池122を大切に使うと考えられる。Y社のこのような行動は、使用料の削減や企業イメージの向上だけでなく、環境保護にも寄与する。また、Y社が使用する二次電池122についての電池証券は販売しやすくなるので、管理会社102にとってもY社のような優良ユーザは好ましい。
 Y社の従業員は、Y社が使用する二次電池122についての投資家となってもよい。Y社の従業員が二次電池122を大事に使うことで、従業員自身が分配金という利益を得ることができる。Y社は、自社が使っている二次電池についての電池証券をまとめて証券会社112から購入し、従業員に購入した二次電池を二次販売してもよい。
 本実施形態においては、ユーザは、充電回数に応じて使用料を支払うとして説明した。変形例として、ユーザは充電量に応じて使用料を支払うとしてもよい。あるいは、ユーザは二次電池122の使用期間の長さに応じて使用料を支払うとしてもよい。
 充電量に応じて使用料を支払う場合、SOHを考慮して使用料を変化させてもよい。たとえば、1(kWh)あたり30(円)の使用料を設定するとする。また、電気容量が1(kWh)の二次電池122(BX)をユーザ(P01)が1日1回充電する場合、5年間の合計使用料は37,500(円)(=30×250×5)となる。ここでは、1年あたりの稼働日数を250日と想定し、かつ、1日1回満充電を行うと想定している。
 SOHが低下するにしたがって、二次電池122(BX)の1回あたりの充電量は低下する。たとえば、二次電池122(BX)の電気容量が1(kWh)から0.9(kWh)に低下したときには、充電1回あたりの使用量を27(円)(=30×0.9)としてもよい。このように、充電時点におけるSOHに応じて、料金設定部154は単位使用料を変化させてもよい。
 一例として、5月10日から15日までの二次電池122(BX)のSOHは100(%)であり、ユーザ(P01)は1日に1回満充電を行ったとする。この場合には、この6日間の合計使用料は180(円)(=30×6×1.0)となる。次に、5月16日から22日までの二次電池122(BX)のSOHは99(%)であり、このときにも1日に1回満充電を行ったとする。この場合には、この7日間の合計使用料は208(円)(=30×7×0.99)となる。このように、充電時のSOHに基づいて、料金設定部154は1回あたりの充電に要する使用料を補正してもよい。充電1回あたりの使用料の積分値が、二次電池122(BX)の合計使用料となる。
 SOH=80(%)となった二次電池122(BX)がユーザ(P02)に貸与されたとする。二次利用のときの1(kWh)あたりの使用料を8(円)とする。二次電池(BX)を1年に365日間稼働させ、1日1回充電する場合、10年間の合計使用料は29,200(円)(=8×365×10)となる。上述したように、SOHの低下にともなって二次電池122(BX)の使用料を可変としてもよい。
 ユーザ(P02)が二次電池122(BX)を10年間使用し、SOHは80(%)から70(%)に低下したとする。別例として、料金設定部154は、上述した29,200(円)の10(%)(=80-70)にあたる2,920(円)をユーザ(P02)に払い戻してもよい。
 二次電池122(BX)の劣化が進むと、二次電池122(BX)を満充電するための電気エネルギーの一部が熱エネルギーに変換されやすくなる。いいかえれば、SOHの低下にともなって充電効率が悪くなる。たとえば、SOH=100(%)のときにはSOC=100(%)まで満充電するが、SOH=90(%)のときにはSOC=90(%)を上限として充電するように制御することで、充電効率の悪化を防ぐことができる。
 電気容量が1(kWh)の二次電池122(BX)は、SOH=100(%)のときには、1回充電したときの使用料は30(円)である。一方、この二次電池122(BX)のSOHが90(%)に劣化したときには、1回充電したときの使用料は24.3(円)(=30×0.9×0.9)となる。SOH=90(%)となったとき、二次電池122(BX)の1回あたりの充電量は0.81(kWh)(=1×0.9×0.9)となるためである。
 二次電池122(BX)が劣化したときには、1回あたりの充電量が少ないため、1回あたりの使用料も安くなる。その一方、充電回数は多くなるため、投資家は二次電池122(BX)の劣化が進んでも利益を確保しやすい。しかし、二次電池122(BX)が短期間に劣化すると、上述の通り、充電回数が多くなるため、煩わしさを感じたユーザが二次電池122(BX)を新しい二次電池(BX)に交換する可能性が高くなる。これにより、投資家にとっては、電池証券による収益期間が短くなってしまうこととなる。このため、投資家は二次電池122(BX)の劣化状況を見ながら、電池証券(BX)を手放す時期を検討する必要がある。
 電池証券の価値は、二次電池122の劣化しにくさだけでなく、二次電池122の個体差(品質のばらつき)にも影響を受ける。たとえば、二次電池メーカー118(M1)が製造する二次電池122に比べて、二次電池メーカー118(M2)が製造する二次電池122は製造品質のばらつきが少ないとする。製造不良により内部抵抗値の大きな二次電池122は、正常な二次電池122に比べて充電時間が長くなる。したがって、ユーザは不良の二次電池122を借りてしまったときには、これを返却して新しい二次電池122を改めて借りようとする。この結果、不良の二次電池122に対応づけられる電池証券を購入した投資家は不利となる。したがって、ユーザおよび投資家は二次電池メーカー118(M2)が製造する二次電池122を二次電池メーカー118(M1)が製造する二次電池122を好むようになる。また、二次電池メーカー118も、性能だけでなく、製造品質の安定性についても評価をしてもらいやすくなる。
 証券管理部142は、複数の電池証券をテーマに合わせてパッケージ化してもよい。たとえば、証券管理部142はZ社がユーザとなっている二次電池122についての電池証券をまとめて、「Z社が使用する二次電池122の電池証券」としてパッケージ販売してもよい。Z社を信頼する投資家は、このような電池証券をまとめて購入してもよい。
 このほかにも、「S社が製造した二次電池122の電池証券」「日本製の二次電池122の電池証券」「二次利用されている二次電池122の電池証券」「総合ランクが4以上のユーザのみを対象とした二次電池122の電池証券」「東北地方(所定地域)で使用されている二次電池122の電池証券」などが考えられる。テーマに合わせて電池証券をパッケージ化することにより、投資家の投資判断を支援しやすくなる。たとえば、SDGs(Sustainable Development Goals)を重視する投資家であれば「二次利用されている二次電池122の電池証券」に積極的に投資することで、投資活動を通して二次電池122の二次利用を応援できる。
 二次電池管理サーバ100は、電池証券の格付けを行う格付処理部(不図示)を備えてもよい。格付処理部は、ユーザの総合ランク、耐用充放電サイクル数などの二次電池122の性能を表す数値を変数とする任意の多変量関数により、電池証券の格付けを算出してもよい。投資情報260に格付けを含めることにより、投資判断を支援してもよい。
 ユーザは、二次電池122に対して劣化閾値を設定してもよい。二次電池122の劣化度が劣化閾値に到達したとき、二次電池管理サーバ100は二次電池122を自動的に回収するとしてもよい。たとえば、ユーザAが使用する二次電池の劣化度が劣化閾値(例:20(%))を超えたとする。このとき、二次電池管理サーバ100の交換処理部(不図示)は、ユーザAに二次電池の交換を通知するとともに、物流会社114に対して二次電池122をユーザAから回収するように指示する。このような制御方法によれば、ユーザは二次電池122があらかじめ定めた劣化閾値に到達したときに二次電池管理サーバ100が二次電池122を自動的に回収してくれるので、求める性能を発揮できなくなった二次電池122を使い続ける事態を効果的に回避できる。また、交換処理部は、ユーザAに新たな二次電池122を配達するように物流会社114に指示してもよい。
 図19は、変形例における使用料の決定方法を説明するための模式図である。
 本実施形態においては、使用料は「G(円)×充電回数」であるとして説明した。変形例として、1ヶ月あたりの充電回数がL回(例:10回)まではW(円)として固定料金(基本使用料)とし、充電回数がL+1回(例:11回)からは1回の充電当たりGQ(円)だけ使用料が加算されるとしてもよい。いいかえれば、1ヶ月あたりの充電回数がL回以内という使用条件が成立しているときには固定料金のみが請求される。
 ここで、W/L>GQであるとする。この場合には、L回目の充電までは、1回の充電あたり「W/L(円)」の使用料となるが、L+1回目の充電からは1回当たりの使用料は安くなる。二次電池122を積極的に使用するユーザにとっては有利な料金設定となる。また、二次電池122をあまり使用しない消極的なユーザであっても、W(円)の基本使用料は必ず発生するため、管理会社102および投資家は収入を確保しやすくなる。
 管理会社102の運営費を基本料部分のW(円)とし、W(円)を超えた追加の使用料は投資家に分配金として支払われるとしてもよい。このような料金設定によれば、管理会社102の収入を安定化させるとともに投資家にリスクを負担させることができる。その一方、投資リスクに見合うように電池証券の販売価格を下げるという方法も考えられる。
 1ヶ月あたりの劣化進行度が所定の閾値以下であるときには、料金設定部154はこのユーザの使用料を割り引いてもよい。たとえば、1ヶ月あたりの劣化進行度が1(%)以内であるときには、料金設定部154は本来の使用料から10(%)を控除するとしてもよい。このように劣化進行度を加味した上で使用料を設定することで、ユーザが二次電池122を大事に使うようにいっそう誘導しやすくなる。
 図20は、変形例における証券ブロックチェーン280の模式図である。
 本実施形態においては、二次電池122および電池証券に関する情報を二次電池管理サーバ100にて管理するとして説明した。変形例として、電池証券等に関する情報をブロックチェーンにより分散管理するとしてもよい。
 ここでは、電池証券を管理する証券ブロックチェーン280を想定して説明する。まず、ブロック280aは、電池証券(S01:1)に関するブロックである。ブロック280aによれば、電池証券(S01:1)は二次電池122(B01)に対応づけられており、投資家(I01)により購入されている。二次電池122(B01)はユーザ(P01)により使用されている。
 ユーザ(P01)が二次電池122(B01)を返却し、ユーザ(P02)が二次電池122(B01)を借りたとする。このとき、ユーザ(P02)は、ユーザ端末108においてブロック280bを生成する。ブロック280bにおいては、電池証券(S01:1)の所有者はユーザ(P02)に変更されている。
 ブロック280bが一般的なブロックチェーンと同様の方法により認証されると、ブロック280aにブロック280bが接続される。ブロック280bが証券ブロックチェーン280に接続されたあとは、徴収部148はユーザ(P01)ではなくユーザ(P02)から使用料を徴収する。なお、ユーザ(P02)ではなく、二次電池管理サーバ100の証券管理部142がブロック280bを生成するとしてもよい。
 次に、投資家(I01)が電池証券(S01:1)を売却し、これを投資家(I02)が購入したとする。このとき、投資家(I02)は、投資端末110においてブロック280cを生成する。ブロック280cにおいては、電池証券(S01:1)の保有者は投資家(I02)に変更されている。
 ブロック280cは、認証後にブロック280bに接続される。ブロック280cが証券ブロックチェーン280に接続されたあとは、分配部150は投資家(I02)に分配金を送る。
 証券ブロックチェーン280を参照することにより、投資家は、電池証券についての履歴を確認できる。電池証券に限らず、二次電池122についての情報をブロックチェーンにより管理してもよい。

Claims (14)

  1.  二次電池と1以上の証券を対応づける証券管理部と、
     証券と、前記証券を購入した投資家を対応づける投資家管理部と、
     二次電池と前記二次電池の貸与先となるユーザを対応づけるユーザ管理部と、
     二次電池の貸与先となるユーザから、前記二次電池の使用料を徴収する徴収部と、
     二次電池の証券を購入した投資家に対して、前記証券に基づく分配金の送金を指示する分配部と、
     投資情報を外部端末に送信する送信部と、を備え、
     前記証券管理部は、証券と投資情報を対応づけて管理し、二次電池の設置位置が第1の設置位置から第2の設置位置に変更されたときには、前記二次電池に対応づけられる証券の投資情報において前記二次電池の設置位置を前記第1の設置位置から前記第2の設置位置に登録変更し、
     前記送信部は、登録変更後の投資情報を前記外部端末に送信する、二次電池管理装置。
  2.  前記証券管理部は、二次電池の製造に要する炭素排出量を相殺可能なカーボンクレジットの価格に基づいて、前記二次電池の証券の販売価格を設定する、請求項1に記載の二次電池管理装置。
  3.  前記徴収部は、二次電池の貸与先が第1のユーザから第2のユーザに変更されたとき、前記二次電池の使用料の徴収先を前記第1のユーザから前記第2のユーザに変更する、請求項1に記載の二次電池管理装置。
  4.  前記分配部は、二次電池の証券を保有する第1の投資家が、前記証券を第2の投資家に譲渡したとき、前記二次電池の分配金の送金先を前記第1の投資家から前記第2の投資家に変更する、請求項1に記載の二次電池管理装置。
  5.  前記徴収部は、二次電池の設置位置が第1の設置位置から第2の設置位置に変更されるときには、前記二次電池の使用料を変更する、請求項1に記載の二次電池管理装置。
  6.  貸与期間中において、二次電池の性能情報を取得する性能情報取得部と、
     前記取得された性能情報に基づいて前記二次電池の劣化度を測定する劣化測定部と、を更に備え、
     前記送信部は、更に、二次電池の劣化度を投資情報に含めて送信する、請求項1に記載の二次電池管理装置。
  7.  前記ユーザ管理部は、前記取得された性能情報に基づいて、ユーザによる二次電池の使用能力を示すランクを設定し、
     前記証券管理部は、更に、二次電池のユーザに関するランクを投資情報の一部として管理し、
     前記送信部は、更に、ランクを含む投資情報を送信する、請求項6に記載の二次電池管理装置。
  8.  二次電池の使用料を管理する料金設定部、を更に備え、
     前記料金設定部は、ユーザのランクに応じて二次電池の使用料を設定する、請求項7に記載の二次電池管理装置。
  9.  前記証券管理部は、更に、二次電池のユーザの属性を示すユーザ情報を投資情報として管理し、
     前記送信部は、更に、ユーザ情報を含む投資情報を送信する、請求項1に記載の二次電池管理装置。
  10.  前記徴収部は、二次電池の充電回数に応じて使用料を取得する、請求項1に記載の二次電池管理装置。
  11.  前記徴収部は、所定の使用条件が成立しているときには所定の単位期間において二次電池の使用料として固定の第1料金を取得し、前記使用条件が成立しないときには追加の第2料金を取得する、請求項10に記載の二次電池管理装置。
  12.  二次電池と1以上の証券を対応づける証券管理部と、
     証券と、前記証券を購入した投資家を対応づける投資家管理部と、
     二次電池と前記二次電池の貸与先となるユーザを対応づけるユーザ管理部と、
     二次電池の貸与先となるユーザから、前記二次電池の使用料を徴収する徴収部と、
     二次電池の証券を購入した投資家に対して、前記証券に基づく分配金の送金を指示する分配部と、を備え、
     前記分配部は、二次電池の証券を保有する第1の投資家が、前記証券を第2の投資家に譲渡したとき、前記二次電池の分配金の送金先を前記第1の投資家から前記第2の投資家に変更する、二次電池管理装置。
  13.  二次電池と1以上の証券を対応づける証券管理部と、
     証券と、前記証券を購入した投資家を対応づける投資家管理部と、
     二次電池と前記二次電池の貸与先となるユーザを対応づけるユーザ管理部と、
     二次電池の貸与先となるユーザから、前記二次電池の使用料を徴収する徴収部と、
     二次電池の証券を購入した投資家に対して、前記証券に基づく分配金の送金を指示する分配部と、を備え、
     前記徴収部は、二次電池の貸与先が第1のユーザから第2のユーザに変更されたとき、前記二次電池の使用料の徴収先を前記第1のユーザから前記第2のユーザに変更する、二次電池管理装置。
  14.  二次電池の貸与先となるユーザから、前記二次電池の使用料を徴収する徴収部と、
     前記二次電池に対応づけられる証券を購入した投資家に対して、前記証券に基づく分配金を送金する分配部と、を備え、
     前記分配部は、二次電池の証券を保有する第1の投資家が、前記証券を第2の投資家に譲渡したとき、前記二次電池の分配金の送金先を前記第1の投資家から前記第2の投資家に変更する、二次電池管理装置。
PCT/JP2022/023123 2021-06-18 2022-06-08 二次電池管理装置 WO2022264898A1 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
CN202280006026.XA CN116075844A (zh) 2021-06-18 2022-06-08 充电电池管理装置
EP22785679.6A EP4131123A4 (en) 2021-06-18 2022-06-08 SECONDARY BATTERY MANAGEMENT DEVICE
KR1020227044503A KR20230004936A (ko) 2021-06-18 2022-06-08 이차전지 관리 장치
JP2022551631A JP7361323B2 (ja) 2021-06-18 2022-06-08 二次電池管理装置
TW111122437A TW202307772A (zh) 2021-06-18 2022-06-16 二次電池管理裝置
JP2023115063A JP2023134643A (ja) 2021-06-18 2023-07-13 二次電池管理装置

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2021-101757 2021-06-18
JP2021101757 2021-06-18

Publications (1)

Publication Number Publication Date
WO2022264898A1 true WO2022264898A1 (ja) 2022-12-22

Family

ID=84527470

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/023123 WO2022264898A1 (ja) 2021-06-18 2022-06-08 二次電池管理装置

Country Status (6)

Country Link
EP (1) EP4131123A4 (ja)
JP (2) JP7361323B2 (ja)
KR (1) KR20230004936A (ja)
CN (1) CN116075844A (ja)
TW (1) TW202307772A (ja)
WO (1) WO2022264898A1 (ja)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005346687A (ja) * 2004-06-07 2005-12-15 Maiku Watanabe 小口化マンション投資の販売手法
WO2019031423A1 (ja) * 2017-08-07 2019-02-14 功 比嘉 担保付暗号通貨発行・運用システム、暗号通貨の運用方法、情報処理方法、システムの構築方法およびプログラム
WO2019131824A1 (ja) 2017-12-27 2019-07-04 Future Science Research株式会社 二次電池管理装置および二次電池管理プログラム
JP2020126305A (ja) 2019-02-01 2020-08-20 本田技研工業株式会社 管理装置、管理方法、及びプログラム
JP2020149679A (ja) * 2019-03-11 2020-09-17 トヨタ自動車株式会社 電池貸出システム、車両、サーバおよび電池貸出方法
WO2021064818A1 (ja) * 2019-09-30 2021-04-08 本田技研工業株式会社 管理システム、交換バッテリシステム及びプログラム
JP2021086191A (ja) * 2019-11-25 2021-06-03 本田技研工業株式会社 貸出システム、貸出方法、およびプログラム

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111587510A (zh) * 2017-12-27 2020-08-25 F.S.R 株式会社 二次电池管理装置、二次电池以及二次电池管理程序
JP2020009121A (ja) * 2018-07-06 2020-01-16 浩明 仁科 バッテリー蓄電情報対応仮想通貨発行システム

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005346687A (ja) * 2004-06-07 2005-12-15 Maiku Watanabe 小口化マンション投資の販売手法
WO2019031423A1 (ja) * 2017-08-07 2019-02-14 功 比嘉 担保付暗号通貨発行・運用システム、暗号通貨の運用方法、情報処理方法、システムの構築方法およびプログラム
WO2019131824A1 (ja) 2017-12-27 2019-07-04 Future Science Research株式会社 二次電池管理装置および二次電池管理プログラム
JP2020126305A (ja) 2019-02-01 2020-08-20 本田技研工業株式会社 管理装置、管理方法、及びプログラム
JP2020149679A (ja) * 2019-03-11 2020-09-17 トヨタ自動車株式会社 電池貸出システム、車両、サーバおよび電池貸出方法
WO2021064818A1 (ja) * 2019-09-30 2021-04-08 本田技研工業株式会社 管理システム、交換バッテリシステム及びプログラム
JP2021086191A (ja) * 2019-11-25 2021-06-03 本田技研工業株式会社 貸出システム、貸出方法、およびプログラム

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP4131123A4

Also Published As

Publication number Publication date
TW202307772A (zh) 2023-02-16
EP4131123A1 (en) 2023-02-08
JPWO2022264898A1 (ja) 2022-12-22
JP7361323B2 (ja) 2023-10-16
KR20230004936A (ko) 2023-01-06
CN116075844A (zh) 2023-05-05
JP2023134643A (ja) 2023-09-27
EP4131123A4 (en) 2024-02-28

Similar Documents

Publication Publication Date Title
Bushnell et al. Improving private incentives for electric grid investment
US20070192221A1 (en) Present valuation of emission credit and allowance futures
JP2020074196A (ja) 複合トレーディングメカニズム
Wang et al. Credit guarantee types for financing retailers through online peer-to-peer lending: equilibrium and coordinating strategy
WO2019094828A1 (en) Digital crypto asset generation
JP7042637B2 (ja) プログラム、情報処理装置、情報処理方法及び仮想通貨取引システム
KR101856007B1 (ko) 자가발전에 의한 에너지 하베스팅 핀테크 서비스 시스템 및 방법
US20220222657A1 (en) Method and system for managing life cycle of a tokenized real asset in a blockchain-based ecosystem
US20100217702A1 (en) Electronic System for Coordinating Contracts Relating to Property
Chiu et al. On the welfare effects of credit arrangements
Wang et al. Land use reforms: Towards sustainable development in China
Loertscher et al. Entry-deterring agency
WO2022264898A1 (ja) 二次電池管理装置
US20220414780A1 (en) Secondary battery management device
CN114881639A (zh) 基于区块链的多阶段预付交易方法、系统及存储介质
Baisa et al. Discriminatory price auctions with resale and optimal quantity caps
EP1364325A2 (en) Systems and methods for trading electrical transmission rights
AU2008100795B4 (en) A Data Processing System and Method Incorporating Feedback and Principal Adjustment
Wang Analysis and design for multi-unit online auctions
KR20210061001A (ko) 블록 체인 기반 대출 금융 서비스 제공 장치
Eliaz et al. Optimal speculative trade among large traders
JP3662560B2 (ja) 受益権交換装置、受益権交換方法、及びプログラム
Matsushima Optimal Multiunit Exchange Design
KR20210118576A (ko) 디지털 화폐의 발행 및 사용 관리 서비스 제공장치 및 방법
Chen Three Essays on Price Determination with Search Frictions

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2022551631

Country of ref document: JP

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 2022785679

Country of ref document: EP

Effective date: 20221017

ENP Entry into the national phase

Ref document number: 20227044503

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE