WO2022185381A1 - 回転機の制御装置 - Google Patents

回転機の制御装置 Download PDF

Info

Publication number
WO2022185381A1
WO2022185381A1 PCT/JP2021/007718 JP2021007718W WO2022185381A1 WO 2022185381 A1 WO2022185381 A1 WO 2022185381A1 JP 2021007718 W JP2021007718 W JP 2021007718W WO 2022185381 A1 WO2022185381 A1 WO 2022185381A1
Authority
WO
WIPO (PCT)
Prior art keywords
voltage
utilization rate
command values
value
current command
Prior art date
Application number
PCT/JP2021/007718
Other languages
English (en)
French (fr)
Inventor
辰也 森
晃 古川
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to CN202180093492.1A priority Critical patent/CN116918237A/zh
Priority to US18/270,054 priority patent/US20240063746A1/en
Priority to JP2023503546A priority patent/JP7378662B2/ja
Priority to EP21928959.2A priority patent/EP4304078A4/en
Priority to PCT/JP2021/007718 priority patent/WO2022185381A1/ja
Publication of WO2022185381A1 publication Critical patent/WO2022185381A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P25/00Arrangements or methods for the control of AC motors characterised by the kind of AC motor or by structural details
    • H02P25/16Arrangements or methods for the control of AC motors characterised by the kind of AC motor or by structural details characterised by the circuit arrangement or by the kind of wiring
    • H02P25/22Multiple windings; Windings for more than three phases
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P27/00Arrangements or methods for the control of AC motors characterised by the kind of supply voltage
    • H02P27/04Arrangements or methods for the control of AC motors characterised by the kind of supply voltage using variable-frequency supply voltage, e.g. inverter or converter supply voltage
    • H02P27/06Arrangements or methods for the control of AC motors characterised by the kind of supply voltage using variable-frequency supply voltage, e.g. inverter or converter supply voltage using dc to ac converters or inverters
    • H02P27/08Arrangements or methods for the control of AC motors characterised by the kind of supply voltage using variable-frequency supply voltage, e.g. inverter or converter supply voltage using dc to ac converters or inverters with pulse width modulation
    • H02P27/12Arrangements or methods for the control of AC motors characterised by the kind of supply voltage using variable-frequency supply voltage, e.g. inverter or converter supply voltage using dc to ac converters or inverters with pulse width modulation pulsing by guiding the flux vector, current vector or voltage vector on a circle or a closed curve, e.g. for direct torque control
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P29/00Arrangements for regulating or controlling electric motors, appropriate for both AC and DC motors
    • H02P29/50Reduction of harmonics
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62DMOTOR VEHICLES; TRAILERS
    • B62D5/00Power-assisted or power-driven steering
    • B62D5/04Power-assisted or power-driven steering electrical, e.g. using an electric servo-motor connected to, or forming part of, the steering gear
    • B62D5/0457Power-assisted or power-driven steering electrical, e.g. using an electric servo-motor connected to, or forming part of, the steering gear characterised by control features of the drive means as such
    • B62D5/046Controlling the motor
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P21/00Arrangements or methods for the control of electric machines by vector control, e.g. by control of field orientation
    • H02P21/0003Control strategies in general, e.g. linear type, e.g. P, PI, PID, using robust control
    • H02P21/0025Control strategies in general, e.g. linear type, e.g. P, PI, PID, using robust control implementing a off line learning phase to determine and store useful data for on-line control

Definitions

  • This application relates to a control device for rotating machines.
  • a system has been proposed in which a rotating machine having two sets of multi-phase armature windings is driven by two sets of inverters, and is used in elevators, electric power steering, etc.
  • a rotating machine is provided with two sets of three-phase armature windings, and a voltage command value for one set of three-phase armature windings is set to a potential higher than the central value of the applicable range. side, and the voltage command value for the other set of three-phase armature windings is shifted to the lower potential side than the center value.
  • the on/off pattern (voltage vector) for turning on/off the switching elements of the first set of inverters and the on/off pattern (voltage vector) for turning on/off the switching elements of the second set of inverters are effective vectors at the same time. This reduces the zero vector and reduces the effective value of the bus AC component superimposed on the bus current.
  • Patent Document 2 a rotating machine is provided with two sets of three-phase armature windings, and currents of 5th and 7th harmonic components in opposite phases are superimposed on the two sets of 3-phase armature windings.
  • a rotating machine is provided with a set of three-phase armature windings, and in three-phase carrier wave comparison PWM, a carrier wave to be compared with a two-phase voltage command value and a one-phase voltage command value.
  • the effective value of the bus AC component is reduced by making the phases of the carriers to be compared mutually opposite.
  • Patent Document 3 is a technique in which one set of three-phase armature windings is provided, and does not disclose a case in which two sets of three-phase armature windings are provided.
  • two sets of armature windings and two sets of inverters are provided without the need to synchronize the timing of on/off control of the first set of switching elements and the timing of on/off control of the second set of switching elements. It is an object of the present invention to provide a control device for a rotating machine that can reduce the effective value of a bus AC component by making use of the degree of freedom that is provided.
  • a control device for a rotating machine is a control device for a rotating machine that controls a rotating machine having two sets of multi-phase armature windings via two sets of inverters connected to the same DC power supply.
  • a first set of voltage utilization factors which is a ratio of the amplitude of the fundamental wave component of the line voltage of the first set of multi-phase armature winding voltages to the power supply voltage of the DC power supply, and the second set to the power supply voltage
  • a distribution unit that calculates a utilization factor setting command related to setting a second group of voltage utilization factors, which is the amplitude ratio of the fundamental wave component of the line voltage of the voltage applied to the group of multi-phase armature windings; a first set voltage command calculation unit that calculates a first set of multi-phase voltage command values based on the utilization rate setting command; a second set voltage command calculation unit that calculates a second set of multi-phase voltage command values based on the utilization rate setting command; Based on the first set of multi-phase voltage command values,
  • a set of switching control units Based on the second set of multi-phase voltage command values, a plurality of switching elements included in the second set of inverters are turned on and off to apply a voltage to the second set of multi-phase armature windings.
  • 2 sets of switching control units In the distribution unit, the effective value of the bus line AC component, which is the AC component superimposed on the bus line current flowing through the bus line connecting the DC power supply and the two sets of inverters, is equal to the voltage utilization factor of the first set and the The utilization setting command is calculated to change the utilization ratio from 1:1 so that the utilization ratio with the second set of voltage utilization ratios is lower than when it is 1:1. .
  • the voltage utilization factor of the first set and the voltage utilization factor of the second set can be adjusted from 1:1 to By changing, the bus line AC component generated from the first set of inverters and the bus line AC component generated from the second set of inverters are changed more than the one-to-one case, and the total bus line of the first set and the second set is changed. It is possible to reduce the effective value of the AC component.
  • the bus AC component can be reduced without synchronizing the timing of the ON/OFF control of the switching elements of the first group and the timing of the ON/OFF control of the switching elements of the second group. can be simplified.
  • FIG. 1 is a schematic configuration diagram of a rotating machine and a control device for the rotating machine according to Embodiment 1.
  • FIG. 2 is a hardware configuration diagram of a control device according to Embodiment 1;
  • FIG. FIG. 4 is a diagram illustrating phases of each set of armature windings according to the first embodiment;
  • 1 is a schematic block diagram of a control device according to Embodiment 1;
  • FIG. 1 is a schematic configuration diagram of a rotating machine and a control device for the rotating machine according to Embodiment 1.
  • FIG. 2 is a hardware configuration diagram of a control device according to Embodiment 1;
  • FIG. FIG. 4 is a diagram illustrating phases of each set of armature windings according to the first embodiment;
  • 1 is a schematic block diagram of a control
  • FIG. 10 is a diagram for explaining the setting of the effective value of the bus line AC component and the voltage utilization factor with respect to the average voltage utilization factor when the utilization factor ratio is not changed from 1:1 and when it is changed according to the first embodiment;
  • FIG. 10 is a diagram for explaining setting of the effective value of the bus line AC component and the voltage utilization factor with respect to the average voltage utilization factor when the utilization factor ratio is not changed from 1:1 and when it is changed according to the second embodiment;
  • FIG. 11 is a diagram for explaining setting of the effective value of the bus AC component and the voltage utilization factor with respect to the average voltage utilization factor when the utilization ratio is not changed from 1:1 and when it is changed according to another example of the second embodiment;
  • FIG. 12 is a flowchart for explaining processing of a distribution unit according to Embodiment 3;
  • FIG. 11 is a flowchart for explaining iterative calculation processing of a distribution unit according to Embodiment 3;
  • FIG. FIG. 11 is a schematic configuration diagram of a rotating machine and a control device for the rotating machine according to Embodiment 4;
  • FIG. 11 is a schematic block diagram of a control device according to Embodiment 4;
  • FIG. 14 is a flowchart for explaining processing of a distribution unit according to Embodiment 5;
  • FIG. FIG. 15 is a flowchart for explaining iterative calculation processing of a distribution unit according to Embodiment 5.
  • FIG. FIG. 11 is a time chart for explaining carrier comparison PWM control according to Embodiment 6.
  • FIG. 12 is a diagram for explaining setting of the effective value of the bus line AC component and the voltage utilization factor with respect to the average voltage utilization factor when the utilization ratio is not changed from 1:1 and when it is changed according to Embodiment 6;
  • FIG. 14 is a flowchart for explaining processing of a distribution unit according to Embodiment 6;
  • FIG. 12 is a diagram for explaining setting of the effective value of the bus AC component and the voltage utilization factor with respect to the average voltage utilization factor when the utilization ratio is not changed from 1:1 and when it is changed according to another example of the sixth embodiment;
  • FIG. 12 is a diagram for explaining setting of the effective value of the bus AC component and the voltage utilization factor with respect to the average voltage utilization factor when the utilization ratio is not changed from 1:1 and when it is changed according to another example of the sixth embodiment;
  • FIG. 3 is a schematic configuration diagram of an electric power steering device according to another embodiment;
  • FIG. 1 is a schematic configuration diagram of a rotating machine 1 and a control device 30 for the rotating machine (hereinafter simply referred to as control device 30) according to the present embodiment.
  • the rotating machine 1 has two sets of multi-phase (three-phase in this example) armature windings.
  • the control device 30 controls the rotating machine 1 via two sets of inverters 6 a and 6 b connected to the same DC power supply 5 . As shown in FIG.
  • the control device 30 includes a first set of controllers 30a that control a first set of three-phase armature windings, and a first set of controllers 30a that control a second set of three-phase armature windings. and two sets of controllers 30b.
  • the rotating machine 1 includes a cylindrical stator 18 and a rotor 14 arranged radially inside the stator 18 .
  • the stator 18 is wound with two sets of three-phase armature windings. That is, the stator 18 is provided with a first set of three-phase armature windings Cu1, Cv1, and Cw1 and a second set of three-phase armature windings Cu2, Cv2, and Cw2.
  • Each set of three-phase armature windings may be star-connected or delta-connected.
  • the first set of three phases is assumed to be U1 phase, V1 phase, and W1 phase.
  • the second set of three phases is called U2 phase, V2 phase, and W2 phase.
  • the second set of three-phase armature windings Cu2, Cv2 The phase difference in electrical angle at the position of Cw2 is set to 0 degrees.
  • the electrical angle is an angle obtained by multiplying the mechanical angle of the rotor 14 by the number of pole pairs of the magnet. Note that the phase difference may be set to a value other than 0 degrees (for example, ⁇ /6 (30 degrees)).
  • a permanent magnet is provided in the rotor 14, and the rotating machine 1 is a permanent magnet type synchronous rotating machine. It is a surface magnet type synchronous rotating machine in which permanent magnets are provided on the outer peripheral surface of the rotor 14, and is a non salient pole machine in which the d-axis inductance Ld and the q-axis inductance Lq are equal.
  • the rotor 14 may be an embedded magnet type synchronous rotating machine in which a permanent magnet is provided inside, and a salient pole machine in which the q-axis inductance Lq is larger than the d-axis inductance Ld.
  • the rotor 14 is provided with a rotation sensor 15 for detecting the rotation angle of the rotor 14 .
  • the rotation sensor 15 is of a redundant type, and outputs a first output signal related to a first rotation angle ⁇ 1 for controlling a first set of three-phase armature windings and a second set of three-phase armature windings. and a second output signal related to a second rotation angle ⁇ 2 for controlling the armature winding.
  • a first output signal related to the first rotation angle ⁇ 1 is input to the first set of controllers 30a, and a second output signal related to the second rotation angle ⁇ 2 is input to the second set of controllers 30b. be done.
  • Rotation sensor 15 is not provided, and the rotation angle of each set (magnetic pole position of each set) is determined based on current information of each set obtained by superimposing a harmonic component on each set of current command values to be described later. It may be configured to estimate (so-called sensorless method).
  • the DC power supply 5 outputs a DC voltage Vdc to the first set of inverters 6a and the second set of inverters 6b.
  • any device that outputs a power supply voltage such as a battery, a DC-DC converter, a diode rectifier, a PWM rectifier, etc., is used.
  • the DC power supply 5 and the two sets of inverters 6a and 6b are connected via a common bus line 7.
  • the bus line 7 has a high potential side bus line 7P and a low potential side bus line 7N.
  • One end of the high potential side bus 7P is connected to the high potential side of the DC power supply 5 and one end of the low potential side bus 7N is connected to the low potential side of the DC power supply 5 .
  • the other end of the high potential side bus 7P is branched and connected to the high potential side wire 8aP of the first set of inverters 6a and the high potential side wire 8bP of the second set of inverters 6b.
  • the other end is branched and connected to the low potential side wire 8aN of the first set of inverters 6a and the low potential side wire 8bN of the second set of inverters 6b.
  • a smoothing capacitor 12 is connected between the high potential side bus 7P and the low potential side bus 7N.
  • the smoothing capacitor 12 suppresses and stabilizes fluctuations in the DC voltage Vdc supplied to the first set of inverters 6a and the second set of inverters 6b.
  • a power supply voltage sensor 13 is provided to detect the DC voltage Vdc supplied from the DC power supply 5 to each pair of inverters 6a and 6b.
  • the power supply voltage sensor 13 is connected between the high potential side bus line 7P and the low potential side bus line 7N.
  • the output signal of the power supply voltage sensor 13 is input to the first set of controllers 30a and the second set of controllers 30b.
  • a first set of DC voltage Vdc1 input to the first set of inverters 6a and a second set of DC voltages Vdc2 input to the second set of inverters 6b are connected to the first set of power source voltage sensors and the second set of voltage sensors. It may be individually detected by two sets of power supply voltage sensors and individually input to the first set of controllers 30a and the second set of controllers 30b.
  • Inverter The first set of inverters 6a performs power conversion between the DC power supply 5 and the first set of three-phase armature windings.
  • the second set of inverters 6b performs power conversion between the DC power supply 5 and the second set of three-phase armature windings.
  • a high-potential-side switching element SP connected to the high-potential side of the DC power supply 5 and a low-potential-side switching element SN connected to the low-potential side of the DC power supply 5 are connected in series.
  • Three connected series circuits are provided corresponding to the armature windings of each of the three phases of the first set. A connection point of two switching elements in each series circuit is connected to a first set of corresponding phase armature windings.
  • a high potential side switching element SP connected to the high potential side of the DC power supply 5 and a low potential side switching element SN connected to the low potential side of the DC power supply 5 are connected in series.
  • Three connected series circuits are provided corresponding to the armature windings of each of the three phases of the second set. A connection point of two switching elements in each series circuit is connected to a second set of corresponding phase armature windings.
  • the collector terminal of the high potential side switching element SP is connected to the high potential side wire 8aP, and the emitter terminal of the high potential side switching element SP is connected to the high potential side wire 8aP.
  • the collector terminal of the switching element SN on the low potential side is connected to the low potential side wire 8aN.
  • a connection point between the switching element SP on the high potential side and the switching element SN on the low potential side is connected to the armature winding of the corresponding phase of the first set.
  • the collector terminal of the high potential side switching element SP is connected to the high potential side wire 8bP, and the emitter terminal of the high potential side switching element SP is connected to the low potential side.
  • the emitter terminal of the switching element SN on the low potential side is connected to the low potential side wire 8bN.
  • a connection point between the switching element SP on the high potential side and the switching element SN on the low potential side is connected to the armature winding of the corresponding phase of the second set.
  • each set of inverters include an IGBT (Insulated Gate Bipolar Transistor) with diodes connected in anti-parallel, a bipolar transistor with diodes connected in anti-parallel, and a MOSFET with a diode function connected in anti-parallel ( Metal Oxide Semiconductor Field Effect Transistor, etc. are used.
  • IGBT Insulated Gate Bipolar Transistor
  • bipolar transistor with diodes connected in anti-parallel
  • MOSFET Metal Oxide Semiconductor Field Effect Transistor, etc.
  • a gate terminal of each switching element of the inverter 6a of the first set is connected to the controller 30a of the first set via a gate drive circuit or the like. Therefore, each switching element of the first set is turned on or off by the switching signal output from the controller 30a of the first set.
  • a gate terminal of each switching element of the second set of inverters 6b is connected to a second set of controllers 30b via a gate drive circuit or the like. Therefore, each switching element of the second set is turned on or off by the switching signal output from the controller 30b of the second set.
  • a first group current sensor 9a for detecting current flowing through the first group of three-phase armature windings, and a second group current sensor 9a for detecting current flowing through the second group of three-phase armature windings.
  • a sensor 9b is provided.
  • Each set of current sensors 9a and 9b is a current sensor such as a Hall element or a shunt resistor.
  • the output signal of the first set of current sensors 9a is input to the first set of controllers 30a.
  • the output signal of the second set of current sensors 9b is input to the second set of controllers 30b.
  • the first set current sensor 9a is provided on each phase wire connecting the series circuit of each phase switching element of the first set inverter 6a and each phase armature winding.
  • the second set of current sensors 9b is provided on each phase wire that connects the series circuit of the phase switching elements of the second set of inverters 6b and the armature windings of each phase.
  • Each set of current sensors 9a and 9b may be provided in a series circuit of each phase of each set of inverters.
  • each set of current sensors 9a, 9b is provided on a wire connecting each set of inverters 6a, 6b and the DC power supply 5, and each set is connected to each phase by a known "bus 1 shunt method". Current in the line may be detected.
  • control device 30 The control device 30 controls the rotating machine 1 via two sets of inverters 6a and 6b. As shown in FIG. 4, the control device 30 includes a distribution section 31, a first group rotation detection section 32, a first group current detection section 33, a first group voltage detection section 34, a first group voltage command calculation section 35, a first group 1st set switching control unit 36, 2nd set rotation detection unit 37, 2nd set current detection unit 38, 2nd set voltage detection unit 39, 2nd set voltage command calculation unit 40, 2nd set switching control unit 41, etc. It has a functional part. Each function of the control device 30 is implemented by a processing circuit provided in the control device 30 .
  • the control device 30 includes a first set of controllers 30a and a second set of controllers 30b.
  • the distribution unit 31, the first group rotation detection unit 32, the first group current detection unit 33, the first group voltage detection unit 34, the first group voltage command calculation unit 35, and the first group switching control unit 36 is provided in the controller 30a.
  • the second group rotation detection unit 37, the second group current detection unit 38, the second group voltage detection unit 39, the second group voltage command calculation unit 40, and the second group switching control unit 41 are connected to the second group controller 30b. provided for.
  • the distribution unit 31 may be provided in the second set of controllers 30b.
  • the distribution unit 31 is provided in both controllers, and when the operation of both controllers is normal, the predetermined distribution unit 31 of one of the controllers operates, and either one of the controllers
  • the distribution unit 31 of the other controller may be configured to operate when there is an abnormality in operation.
  • the distribution unit 31 may be provided in a third controller, and the third controller and the first and second sets of controllers 30a and 30b may be connected by communication.
  • each set of controllers 30a and 30b includes, as a processing circuit, an arithmetic processing unit 90 (computer) such as a CPU (Central Processing Unit), a storage device 91 that exchanges data with the arithmetic processing unit 90, An input circuit 92 for inputting an external signal to the arithmetic processing unit 90, an output circuit 93 for outputting a signal from the arithmetic processing unit 90 to the outside, a communication circuit 94, and the like are provided.
  • the storage device 91, the input circuit 92, the output circuit 93, the communication circuit 94, and the like are connected to the arithmetic processing device 90 via signal lines such as buses.
  • ASIC Application Specific Integrated Circuit
  • IC Integrated Circuit
  • DSP Digital Signal Processor
  • FPGA Field Programmable Gate Array
  • various logic circuits various signal processing circuits, etc.
  • storage device 91 volatile and non-volatile storage devices such as RAM (Random Access Memory), ROM (Read Only Memory), EEPROM (Electrically Erasable Programmable ROM) are provided.
  • the input circuit 92 is connected with various sensors such as the power supply voltage sensor 13, the rotation sensor 15, and the current sensors 9a and 9b of each pair, and an A/D converter or the like for inputting the output signals of these sensors to the arithmetic processing unit 90. It has The output circuit 93 is connected to an electric load such as a gate drive circuit that turns on and off the switching element, and includes a drive circuit that outputs a control signal from the arithmetic processing unit 90 to these electric loads. Each set of communication circuits 94 is connected to each other for communication, and also communicates with an external device.
  • Each function of the control units 31 to 41 provided in the control device 30 is implemented by software (program) stored in a storage device 91 such as ROM, EEPROM, etc. and cooperate with other hardware of each set of controllers 30a, 30b, such as memory device 91, input circuit 92, output circuit 93, and communication circuit 94.
  • Various setting data such as the threshold value Mth, the target voltage utilization rate MoH, the electrical constants, and the map data used by the control units 31 to 41 are stored in a storage device 91 such as a ROM as part of software (program). remembered.
  • the first set of basic control The first set of rotation detectors 32 detects a first rotation angle ⁇ 1 (first magnetic pole position ⁇ 1) and a first rotation angle ⁇ 1 (first magnetic pole position ⁇ 1) in the electrical angle of the rotor based on the first output signal of the rotation sensor 15 .
  • a rotational angular velocity ⁇ 1 of 1 is detected.
  • the first rotation angle ⁇ 1 is the angle of the N pole of the rotor with reference to the armature winding position of the U1 phase of the first set.
  • the first set of rotation detection unit 32 detects the first rotation angle ⁇ 1 without using a rotation sensor based on current information or the like obtained by superimposing a harmonic component on the first set of current command values. It may be configured to estimate (so-called sensorless method).
  • the first group voltage detection unit 34 detects the first DC voltage Vdc1 based on the output signal of the power supply voltage sensor 13.
  • the first group current detection unit 33 detects the first group of three-phase currents Iu1s, Iv1s, and Iw1s flowing through the first group of three-phase armature windings based on the output signal of the first group of current sensors 9a. do. Then, the first group current detection unit 33 converts the first group of three-phase current detection values Iu1s, Iv1s, and Iw1s into three-phase-to-two-phase conversion based on the first rotation angle ⁇ 1, as shown in the following equation. and rotational coordinate transformation to calculate a first set of d-axis current detection values Id1s and a first set of q-axis current detection values Iq1s.
  • a coordinate system of the d-axis and the q-axis (hereinafter referred to as a coordinate system of the dq-axis) is two axes that rotate in synchronization with a first rotation angle ⁇ 1 (first magnetic pole position ⁇ 1) of an AC rotating machine (rotor).
  • a first rotation angle ⁇ 1 first magnetic pole position ⁇ 1
  • the dq-axis coordinate system includes the d-axis defined at the first magnetic pole position ⁇ 1 of the rotor (the direction of the north pole of the magnet) and the q consists of an axis.
  • the first set of voltage command calculation unit 35 calculates the first set of Three-phase voltage command values Vu1o, Vv1o, and Vw1o are calculated.
  • the first group voltage command calculator 35 includes a first group dq-axis voltage command calculator 351 and a first group voltage coordinate converter 352 .
  • the first set of dq-axis voltage command calculator 351 performs PI control or the like so that the first set of dq-axis current detection values Id1s and 1q1s approaches the first set of dq-axis current command values Id1o and Iq1o, respectively. to change the first set of dq-axis voltage command values Vd1o and Vq1o.
  • the first set of voltage coordinate conversion unit 352 converts the first set of dq-axis voltage command values Vd1o and Vq1o to fixed coordinate conversion and two-phase three-phase conversion based on the first rotation angle ⁇ 1 as shown in the following equation. Conversion is performed to convert to the first set of three-phase voltage command values Vu1o, Vv1o, and Vw1o.
  • amplitude reduction modulation such as third harmonic superposition, space vector modulation
  • two-phase modulation is added to the first set of three-phase voltage command values Vu1o, Vv1o, and Vw1o. be done.
  • Amplitude reduction modulation reduces the amplitude of the three-phase voltage command value to ⁇ 3/2 times (approximately 0.866 times) while maintaining the line voltage of the three-phase voltage command value.
  • the three-phase voltage command value before width reduction modulation such that the final three-phase voltage command value does not exceed the DC voltage range (-Vdc / 2 to +Vdc / 2) (does not cause voltage saturation) can be increased by a factor of 2/ ⁇ 3 (approximately 1.15 times) by amplitude reduction modulation.
  • the value obtained by multiplying the amplitude of the fundamental wave component of the first set of three-phase voltage command values Vu1o, Vv1o, and Vw1o by ⁇ 3 is the line voltage of the first set of three-phase voltage command values Vu1o, Vv1o, and Vw1o. It becomes the amplitude of the fundamental wave component. Note that amplitude reduction modulation may not be performed.
  • the first set of dq-axis voltage command calculator 351 determines that the final first set of three-phase voltage command values exceeds the DC voltage range ( ⁇ Vdc/2 to +Vdc/2), A first set of dq-axis voltage command values and a first set of three-phase voltage command values are calculated so as not to cause a modulation state and a voltage saturation state.
  • the voltage utilization rate of the voltage command value of the first set of dq-axes is the maximum voltage utilization rate within the set voltage utilization rate range (100% when amplitude reduction modulation is performed, and 100% when amplitude reduction modulation is not performed).
  • the first set of dq-axis voltage command values is limited so as to be 86.6% or less.
  • the first set switching control unit 36 Based on the first set of three-phase voltage command values Vu1o, Vv1o, and Vw1o, the first set switching control unit 36 turns on and off the plurality of switching elements included in the first set of inverters 6a to Apply a voltage to the armature winding of the phase.
  • the first set of switching controls 36 uses known carrier-comparison PWM or space-vector PWM.
  • the first group switching control unit 36 compares each of the first group of three-phase voltage command values Vu1o, Vv1o, and Vw1o with the first group of carrier waves CA1, and the comparison result is Based on this, a plurality of switching elements are turned on and off.
  • the first set of carrier waves CA1 to be compared with each of the first set of three-phase voltage command values Vu1o, Vv1o, and Vw1o are the same carrier wave.
  • the first set of carrier waves CA1 is a triangular wave that oscillates with an amplitude of half the value Vdc1/2 of the DC voltage around 0 in the PWM period Tc. Any waveform other than the triangular wave, such as a sawtooth wave, may be used.
  • the first group switching control unit 36 For each phase, when the carrier wave CA1 of the first group falls below the voltage command value, the first group switching control unit 36 turns on (1 in this example) the switching signal GP1 of the switching element on the high potential side. , the switching element on the high potential side is turned on, and when the first set of carrier waves CA1 exceeds the voltage command value, the switching signal GP1 for the switching element on the high potential side is turned off (0 in this example), and the high potential side switching element is turned on. The switching element on the potential side is turned off. On the other hand, for each phase, when the carrier wave CA1 of the first group falls below the voltage command value, the first group switching control unit 36 turns off the switching signal GN1 of the switching element on the low potential side (0 in this example).
  • the switching element on the low potential side is turned off, and when the first set of carrier waves CA1 exceeds the voltage command value, the switching signal GN1 for the switching element on the low potential side is turned on (in this example, 1). , turns on the switching element on the low potential side.
  • the on period of the switching element on the high potential side and the on period of the switching element on the low potential side there is a short-circuit prevention period in which both the switching elements on the high potential side and the low potential side are turned off. (dead time) may be provided.
  • the first set of switching control unit 36 When the space vector PWM is used, the first set of switching control unit 36 generates a first set of voltage command vectors from the first set of three-phase voltage command values Vu1o, Vv1o, and Vw1o, and converts the first set of voltages Based on the command vector, the set time allocation of the seven basic voltage vectors in the PWM period is determined, and based on the set time allocation of the seven basic voltage vectors, the switching signal for turning on and off each switching element in the PWM period is generated.
  • the second set of basic control The second set of rotation detectors 37 detects a second rotation angle ⁇ 2 (second magnetic pole position ⁇ 2) and a second rotation angle ⁇ 2 (second magnetic pole position ⁇ 2) in the electrical angle of the rotor based on the second output signal of the rotation sensor 15 . 2 is detected.
  • the second rotation angle ⁇ 2 is the angle of the N pole of the rotor with reference to the armature winding position of the U2 phase of the second set.
  • the second set of rotation detector 37 detects the second rotation angle ⁇ 2 without using a rotation sensor based on the current information obtained by superimposing the harmonic component on the second set of current command values. It may be configured to estimate (so-called sensorless method).
  • the second group voltage detection unit 39 detects the second DC voltage Vdc2 based on the output signal of the power supply voltage sensor 13.
  • the second group current detection unit 38 detects the second group of three-phase currents Iu2s, Iv2s, and Iw2s flowing through the second group of three-phase armature windings based on the output signal of the second group of current sensors 9b. do. Then, the second group current detection unit 38 calculates the second group of three-phase current detection values Iu2s, Iv2s, and Iw2s based on the second rotation angle ⁇ 2 in the same manner as in Equation (1).
  • a second set of d-axis current detection values Id2s and a second set of q-axis current detection values Iq2s are calculated by performing transformation and rotational coordinate transformation.
  • a coordinate system of the d-axis and the q-axis (hereinafter referred to as a coordinate system of the dq-axis) is two axes that rotate in synchronization with the second rotation angle ⁇ 2 (second magnetic pole position ⁇ 2) of the AC rotating machine (rotor).
  • ⁇ 2 second magnetic pole position ⁇ 2
  • rotor AC rotating machine
  • the dq-axis coordinate system includes the d-axis defined at the second magnetic pole position ⁇ 2 of the rotor (the direction of the north pole of the magnet) and the q consists of an axis.
  • the second set of voltage command calculation unit 40 calculates the second set of Three-phase voltage command values Vu2o, Vv2o, and Vw2o are calculated.
  • the second group voltage command calculator 40 includes a second group dq-axis voltage command calculator 401 and a second group voltage coordinate converter 402 .
  • the second set of dq-axis voltage command calculation unit 401 performs the PI control or the like so that the second set of dq-axis current detection values Id2s and 1q2s approaches the second set of dq-axis current command values Id2o and Iq2o. Two sets of dq-axis voltage command values Vd2o and Vq2o are changed.
  • the second set of voltage coordinate transformation unit 402 converts the second set of dq-axis voltage command values Vd2o and Vq2o to the fixed coordinate transformation and the two-phase 3 Phase conversion is performed to convert to a second set of three-phase voltage command values Vu2o, Vv2o, and Vw2o.
  • three-phase voltage command values Vu2o, Vv2o, and Vw2o in the second group are subjected to third harmonic superimposition, space vector modulation, two-phase modulation, and the like.
  • a known amplitude reduction modulation is applied.
  • the second set dq-axis voltage command calculation unit 401 determines that the final second set of three-phase voltage command values exceeds the DC voltage range ( ⁇ Vdc/2 to +Vdc/2), and the overmodulation state and the voltage
  • a second set of dq-axis voltage command values and a second set of three-phase voltage command values that do not cause saturation are calculated.
  • the voltage utilization rate of the voltage command values of the second set of dq-axes is the maximum voltage utilization rate within the set voltage utilization rate range (100% when amplitude reduction modulation is performed, and 100% when amplitude reduction modulation is not performed). 86.6% in the case), the voltage command values of the second set of dq axes are limited.
  • the second set switching control unit 41 Based on the second set of three-phase voltage command values Vu2o, Vv2o, and Vw2o, the second set switching control unit 41 turns on and off the plurality of switching elements included in the second set of inverters 6b to Apply a voltage to the armature winding of the phase.
  • the second set of switching controls 41 uses known carrier-comparison PWM or space-vector PWM.
  • the second set switching control unit 41 compares each of the second set of three-phase voltage command values Vu2o, Vv2o, and Vw2o with the second set of carrier wave CA2, and the comparison result is Based on this, a plurality of switching elements are turned on and off.
  • the second set of carrier waves CA2 to be compared with the second set of three-phase voltage command values Vu2o, Vv2o, and Vw2o are the same carrier waves.
  • the second set of carrier waves CA2 is a triangular wave that oscillates with an amplitude of half the value Vdc2/2 of the DC voltage around 0 in the PWM period Tc.
  • the processing of the second set of switching control units 41 is the same as the processing of the first set of switching control units 36, so description thereof will be omitted.
  • the distribution unit 31 calculates a utilization rate setting command related to setting the voltage utilization rate M1 of the first set and the voltage utilization rate M1 of the second set.
  • the voltage utilization factor M1 of the first group is the amplitude V1amp of the fundamental wave component of the line voltage of the voltage applied to the three-phase armature winding of the first group with respect to the power supply voltage Vdc of the DC power supply.
  • the voltage utilization factor M2 of the second set is the ratio of the amplitude V2amp of the fundamental wave component of the line voltage of the voltage applied to the three-phase armature winding of the second set to the power supply voltage Vdc of the DC power supply.
  • the square root of the sum of the squares of the first set of dq-axis voltage command values Vd1o and Vq1o (the magnitude
  • the second set of dq-axis voltage command values Vd2o and the square root of the sum of squares of Vq2o is the second set of three-phase armature windings is equal to the value obtained by dividing the amplitude V2amp of the fundamental wave component of the line voltage of the applied voltage by ⁇ 2, and the second set of voltage utilization factors M2 can be calculated from the square root of the sum of squares.
  • the line voltage of the applied voltage (or voltage command value) of the U-phase armature winding is changed from the applied voltage (or voltage command value) of the U-phase armature winding to the V-phase armature It becomes a voltage obtained by subtracting the applied voltage (or voltage command value) of the winding.
  • the line voltage of the applied voltage (or voltage command value) of the V-phase armature winding is changed from the applied voltage (or voltage command value) of the V-phase armature winding to the applied voltage (or voltage command value) of the W-phase armature winding ( or voltage command value).
  • the line voltage of the applied voltage (or voltage command value) of the W-phase armature winding is the applied voltage (or voltage command value) of the W-phase armature winding to the applied voltage (or voltage command value) of the U-phase armature winding ( or voltage command value).
  • the distribution unit 31 determines that the effective value of the bus line AC component, which is the AC component superimposed on the bus line current flowing through the bus line 7 connecting the DC power supply Vdc and the two sets of inverters 6a and 6b, is the voltage of the first set.
  • the voltage utilization factor M1 of the first group and the voltage utilization factor M2 of the second group are combined into one pair by taking advantage of the degree of freedom provided by the two sets of armature windings and the two sets of inverters.
  • the bus line AC component generated from the first set of inverters and the bus line AC component generated from the second set of inverters are changed more than the one-to-one case, and the sum of the first set and the second set can reduce the effective value of the bus line AC component.
  • the smoothing capacitor 12 connected to the DC power supply, and other devices. For example, if the effective value of the bus line AC component is large, the smoothing capacitor 12 needs to have a large capacity, heat generation of the smoothing capacitor 12 increases, or the service life of the smoothing capacitor 12 shortens. do.
  • the distribution unit 31 calculates a utilization setting command for changing the utilization ratio R12 from 1:1 so that the effective value of the bus AC component is minimized. Good. According to this configuration, it is possible to maximize the effect of reducing the effective value of the bus AC component.
  • the distribution unit 31 distributes the first set of torque and the second set of three-phase armature windings by the magnetic flux of the first set of three-phase armature windings.
  • a utilization rate setting command is calculated so that the total torque of the second set of torques due to the magnetic flux of is equal to the total torque command value. According to this configuration, even if the utilization ratio R12 is changed from 1:1, the total torque can be matched with the total torque command value.
  • the distribution unit 31 issues a utilization rate setting command to change the utilization rate ratio R12 from 1:1 when the average voltage utilization rate of the voltage utilization rate of the first set and the voltage utilization rate of the second set is equal to or greater than the threshold value Mth. is calculated, and when the average voltage utilization rate is less than the threshold value Mth, a utilization rate setting command that makes the utilization rate ratio R12 1:1 is calculated.
  • the utilization rate ratio R12 is changed from 1:1, the voltage utilization rate of one set cannot be changed to be greater than 100% of the maximum voltage utilization rate, and the voltage of the other set cannot be changed.
  • the utilization cannot be changed below 0%. Therefore, when the average voltage utilization factor is low, the amount of change that can change the utilization factor ratio R12 from 1:1 becomes small, and the effective value of the bus AC component cannot be sufficiently reduced. Further, when the average voltage utilization factor is small, the effective value of the bus AC component becomes small, so there is little need to change the utilization factor ratio R12 from 1:1.
  • the utilization factor ratio R12 is changed from 1:1, so that the effective value of the bus AC component can be effectively reduced. .
  • the distribution unit 31 uses the first set of current command values for the first set of three-phase armature windings (in this example, the first set of dq-axis current command values Id1o, Iq1o) and a second set of current command values for the second set of three-phase armature windings (in this example, a second set of dq-axis current command values Id2o, Iq2o). . Then, when changing the utilization rate ratio R12 from 1:1, the distribution unit 31 sets the first set of current command values and the second set of current command values so that the utilization rate ratio R12 changes from 1:1. Calculate
  • the current command value for each group is calculated as the utilization rate setting command, and the command is given to each group. can be precisely controlled.
  • the distribution unit 31 changes the voltage utilization rate of one of the voltage utilization rate M1 of the first set and the voltage utilization rate M2 of the second set to that of the other set.
  • One set of target voltage utilization MoH is set to be higher than the voltage utilization. Then, based on one set of target voltage utilization factor MoH and rotor rotation angular velocity ⁇ ( ⁇ 1 in this example), distribution unit 31 determines that the voltage utilization factor of one set of applied voltages is equal to the one set of target voltages.
  • One set of current command values is calculated so as to match the utilization rate MoH.
  • the distribution unit 31 outputs the total torque of the first set of torque due to the magnetic flux of the first set of three-phase armature windings and the second set of torque due to the magnetic flux of the second set of three-phase armature windings. calculates the current command value of the other set based on the current command value of the other set so as to match the total torque command value.
  • the three-phase voltage command value is in the range of the DC voltage Vdc (Vdc1 in this example) (-Vdc/2 to +Vdc/2). , resulting in overmodulation and voltage saturation, superimposing harmonic components on the line voltage and winding current, and superimposing harmonic components on the torque.
  • the current command value of one set is calculated such that the voltage utilization rate of the applied voltage of one set whose voltage utilization rate is increased matches the target voltage utilization rate MoH of the one set. Therefore, it is possible to accurately change the voltage utilization factor of one set to the target voltage utilization factor MoH.
  • the current command value of the other set is calculated based on the current command value of the one set so that the total torque matches the total torque command value. Therefore, the total torque can be matched with the total torque command value. Therefore, even when the utilization rate ratio R12 is changed from 1:1, the voltage utilization rate of one set can be increased with high accuracy, preventing overmodulation and voltage saturation, and reducing the total torque. It can match the target with high accuracy.
  • one group for which the voltage utilization rate is increased is the first group
  • the other group for which the voltage utilization rate is decreased is the second group.
  • the first set and the second set may be interchanged.
  • one set may be periodically switched between the first set and the second set so that heat generation is not uneven.
  • the distribution unit 31 sets the reference value of the first set of current command values and the reference value of the second set of current command values, which are set when it is assumed that the utilization rate ratio R12 is set to 1:1.
  • the distribution unit 31 calculates the average voltage utilization rate Mave0 of the voltage utilization rate of the first set and the voltage utilization rate of the second set corresponding to the reference value of the first set of current command values and the reference value of the second set of current command values. (hereinafter referred to as the average voltage utilization factor Mave0 in the reference state) is calculated.
  • the distribution unit 31 sets one set of target voltage utilization ratios MoH based on the average voltage utilization ratio Mave0 in the reference state.
  • the average voltage utilization becomes the same.
  • the target voltage utilization rate MoH can be accurately set based on the average voltage utilization rate Mave0 in the reference state because it is the reference state.
  • Distribution Unit 31 Detailed Processing of Distribution Unit 31 Detailed processing of the distribution unit 31 will be described with reference to the flowchart of FIG.
  • step S01 the distribution unit 31 sets the first set of dq-axis current command value reference values Id1o0 and Iq1o0 and the second set of dq Set the reference values Id2o0 and Iq2o0 of the current command values for the axes.
  • the distribution unit 31 distributes the total torque command value to be output to the rotating machine 1 to the first group and the second group at the distribution ratio of the reference state, and divides the torque command value into the first group and the torque command value into the second group. set.
  • the standard distribution ratio is set to 50%.
  • the total torque command value may be calculated inside control device 30 or may be transmitted from a device external to control device 30 .
  • the rotating machine 1 is a non-salient pole machine
  • the torque is proportional to the q-axis current
  • the distribution unit 31 sets the reference value Iqallo0 of the total q-axis current command value, and sets the reference value Iqallo0 of the total q-axis current command value to the distribution ratio of the reference state ( 50% in this example) to the first set of q-axis current command value reference values Iq1o0 and the second set of q-axis current command value reference values Iq2o0.
  • a first set of d-axis current command value reference values Id1o0 and a second set of d-axis current command value reference values Id2o0 are set to zero.
  • the distribution unit 31 will set the total of The torque command value Tallo is distributed to the first set of torque command values To1 and the second set of torque command values To2 at the reference state distribution rate (50% in this example). Then, based on the first set of torque command values To1, rotational angular velocity ⁇ , and DC voltage Vdc, the distribution unit 31 performs maximum torque current control, flux-weakening control, or the like to reduce the first set of dq-axis current command values.
  • the distribution unit 31 Based on the torque command value To2, the rotational angular velocity ⁇ , and the DC voltage Vdc of the second set, the distribution unit 31 adjusts the reference value of the second set of dq-axis current command values by maximum torque current control, flux-weakening control, or the like. Set Id2o0 and Iq2o0.
  • step S02 the distribution unit 31 generates a first set of voltages corresponding to the first set of dq-axis current command value reference values Id1o0 and Iq1o0 and the second set of dq-axis current command value reference values Id2o0 and Iq2o0. Calculate the average voltage utilization rate Mave0 in the reference state of the utilization rate and the voltage utilization rate of the second set.
  • the electric constants such as the winding resistance and inductance of each set are equal to each other, so the voltage utilization factor of the first set and the voltage utilization factor of the second set in the reference state are equal to each other.
  • the first set of voltage utilization rates in the reference state (or the second set of voltage utilization rates in the reference state) is calculated as the average voltage utilization rate Mave0 in the reference state. If the voltage utilization factors of the first set and the second set of the reference conditions are not equal to each other, the voltage utilization factors of the first set and the second set of the reference conditions are calculated and averaged to obtain the average of the reference conditions.
  • the voltage utilization rate Mave0 may be calculated.
  • the distribution unit 31 uses the voltage equation to determine the first set of dq Axis voltages Vd10 and Vq10 are calculated. Note that the voltage equation assumes a steady state and omits the differential term. Then, based on the first set of dq-axis voltages Vd10 and Vq10 in the reference state, the distribution unit 31 calculates the first set of voltage utilization factors M10 in the reference state, and calculates the first set of voltage utilization factors in the reference state. M10 is calculated as the average voltage utilization factor Mave0 in the reference state.
  • Ld is the d-axis inductance
  • Lq is the q-axis inductance
  • R is the resistance value of the armature winding
  • ⁇ a is the magnetic flux linkage of the rotor magnet.
  • step S03 the distribution unit 31 determines whether or not the average voltage utilization rate Mave0 in the reference state is equal to or greater than the threshold value Mth. If it is changed from 1 and is less than the threshold Mth, the process proceeds to step S07 to set the utilization ratio R12 to 1:1.
  • the threshold value Mth is set to 1:1 under the condition that the utilization factor ratio R12 is set to 1:1. It is set in correspondence with the average voltage utilization factor that maximizes the value (50% in this example). For example, the threshold Mth may be set within a range of +10% to -10% of the maximum average voltage utilization rate.
  • the threshold Mth is set to 50% of the maximum voltage utilization rate (100% in this example) within the set voltage utilization rate range. If the average voltage utilization rate Mave0 in the reference state is 50% or higher, even if the voltage utilization rate of one group is set to 100%, the voltage utilization rate of the other group can be set to 0% or higher. Both sets of voltage utilization can be set appropriately.
  • step S04 when changing the utilization rate ratio R12 from 1:1, the distribution unit 31 sets the voltage utilization rate M1 in the first set to be higher than the voltage utilization rate M2 in the second set.
  • a first set of target voltage utilization factors MoH is set based on the average voltage utilization factor Mave0 of .
  • the distribution unit 31 refers to the target utilization setting map data in which the relationship between the average voltage utilization Mave and the first set of target voltage utilization MoH is preset, and corresponds to the average voltage utilization Mave0 in the reference state. refer to the first set of target voltage utilization factors MoH.
  • the distribution unit 31 sets the first target voltage utilization rate MoH to the maximum voltage utilization rate (In this example, it is set to 100%).
  • the dashed line shows the characteristic of the change in the effective value of the bus AC component with respect to the change in the average voltage utilization factor Mave when the utilization ratio R12 is set to 1:1.
  • the voltage utilization rates M1 and M2 of each pair with respect to the average voltage utilization rate Mave in this case are indicated by dashed lines.
  • the upper graph in FIG. 7 shows the effective value of the bus line AC component when the target voltage utilization factor MoH of the first set is set to 100% by a solid line
  • the lower graph in FIG. 7 shows the average voltage utilization factor Mave in this case.
  • the voltage utilization rates M1 and M2 of each pair are indicated by solid lines.
  • the distribution unit 31 distributes the voltage utilization factor of the first set and the voltage utilization factor of the second set so that the effective value of the bus AC component is minimized. is changing.
  • Step S05 based on the first set of the target voltage utilization factor MoH and the rotational angular velocity ⁇ of the rotor, the distribution unit 31 sets the voltage utilization factor M1 of the applied voltage of the first set to the target voltage utilization factor of the first set.
  • a first set of dq-axis current command values Id1o and Iq1o are calculated so as to match MoH.
  • Equation (7) using the steady-state voltage equation, the following equation exists between the first set of voltage utilization factor M1 and the first set of dq-axis current command values Id1o and Iq1o: holds, and the first set of dq-axis current command values Id1o and Iq1o are calculated such that the first set of voltage utilization factors M1 matches the first set of target voltage utilization factors MoH.
  • Solving equation (9) for Iq1o gives: Based on the first set of target voltage utilization factor MoH, rotational angular velocity ⁇ , and DC voltage Vdc, the distribution unit 31 uses the calculation formula for the coefficients a, b, and c of each order in Formula (9) and the following formula: A first set of q-axis current command values Iq1o is calculated. Electrical constants such as the winding resistance value R, the inductance, and the flux linkage ⁇ a of the magnet of the rotor are set in advance. Also, the DC voltage Vdc may be a preset fixed value. When outputting negative torque, the sign of the square root term in equation (10) becomes negative.
  • the distribution unit 31 uses the calculation formulas for the coefficients a, b, and c of each order and the formula (10) to calculate the third A set of q-axis current command values Iq1o is calculated. Then, the distribution unit 31 calculates the first set of d-axis current command values Id1o based on the calculated first set of q-axis current command values Iq1o using Equation (11).
  • the distribution unit 31 uses the calculation formulas for the coefficients a, b, and c of each order and the formula (10) to calculate the third A set of q-axis current command values Iq1o is calculated. Then, the distribution unit 31 calculates the first set of d-axis current command values Id1o based on the calculated first set of q-axis current command values Iq1o using Equation (12).
  • the distribution unit 31 calculates the target voltage utilization factor MoH, the rotation angular velocity ⁇ , the DC voltage Vdc, and the first set of q-axis using equations (8) to (12).
  • q-axis current setting map data MAPiq in which the relationship between the current command value Iq1o and the current command value Iq1o is set in advance, and the first set of q-axis current setting map data MAPiq corresponding to the actual target voltage utilization factor MoH, the rotation angular velocity ⁇ , and the DC voltage Vdc
  • the current command value Iq1o may be calculated.
  • the distribution unit 31 uses equations (8) to (12), etc., to obtain the target voltage utilization factor MoH, the rotational angular velocity ⁇ , And the d-axis current setting map data MAPid in which the relationship between the DC voltage Vdc and the first set of d-axis current command values Id1o is preset, and the actual target voltage utilization factor MoH, the rotation angular velocity ⁇ , and the DC A first set of d-axis current command values Id1o corresponding to the voltage Vdc may be calculated.
  • Step S06 the distribution unit 31 divides the first set of torque by the magnetic flux of the first set of three-phase armature windings and the second set of torque by the magnetic flux of the second set of three-phase armature windings.
  • a second set of dq-axis current command values Id2o and Iq2o are calculated based on the first set of dq-axis current command values Id1o and Iq1o such that the total torque matches the total torque command value.
  • the distribution unit 31 determines that the sum of the first set of q-axis current command values Iq1o and the second set of q-axis current command values Iq2o is equal to the first set of q-axis current command value reference values Iq1o0 and the second set of q-axis current command values.
  • a second set of q-axis current command values Iq2o is calculated based on the first set of q-axis current command values Iq1o so as to match the sum of the reference values Iq2o0 of the set of q-axis current command values.
  • the distribution unit 31 subtracts the first set of q-axis current command values Iq1o from the reference value Iqallo0 of the total q-axis current command value to q-axis current command value Iq2o is set.
  • the distribution unit 31 sets the first set of dq-axis current command values Id1o , Iq1o, a first set of torque T1 due to the magnetic flux of the first set of three-phase armature windings is calculated.
  • Pn is the number of pole pairs.
  • the distribution unit 31 subtracts the first set of torque T1 from the total torque command value Tallo to calculate the second set of torque T2.
  • distribution unit 31 performs maximum torque current control or flux-weakening control to set the second set of dq-axis current command values Id2o and Iq2o to calculate.
  • the distribution unit 31 when the utilization rate ratio R12 is changed from 1:1, the distribution unit 31 performs a limiting process of limiting the current command value of the first set by the limit value, and The current command value of the second set is changed so that the torque of the second set increases by the amount of the decrease in torque.
  • the distribution unit 31 limits the first set of q-axis current command value Iq1o with the q-axis limit value, and the first set of q-axis current command value The decrease in the command value is added to the second set of q-axis current command values Iq2o.
  • the distribution unit 31 limits the magnitude of the vector of the first set of dq-axis current command values Id1o and Iq1o with a limit value.
  • the first set of torque T1 is calculated using the first formula of formula (15), and the second and third formulas of formula (15) are calculated.
  • the second set of dq-axis current command values Id2o and Iq2o may be calculated by equations.
  • the utilization ratio R12 When the utilization ratio R12 is changed from 1:1, the current in the first set increases and the heat generation of the armature winding in the first set and the inverter increases compared to when it is not changed.
  • the torque of the second set is increased by the amount of the decrease in the torque of the first set that is lower than the current limit of the first set. By increasing it, it is possible to suppress the change in the total torque.
  • step S ⁇ b>07 the distribution unit 31 calculates the dq-axis current command values for each set with the utilization rate ratio R ⁇ b>12 of 1:1.
  • the distribution unit 31 converts the reference values Id1o0 and Iq1o0 of the first set of dq-axis current command values to the first set of dq-axis current command values Id1o and Iq1o.
  • the reference values Id2o0 and Iq2o0 of the second set of dq-axis current command values are set to the second set of dq-axis current command values Id2o and Iq2o.
  • Embodiment 2 A control device 30 for a rotating machine according to Embodiment 2 will be described with reference to the drawings. Descriptions of the same components as in the first embodiment are omitted.
  • the basic configuration of the rotating machine 1 and the rotating machine control device 30 according to the present embodiment is the same as that of the first embodiment, but the range of the average voltage utilization rate Mave in which the utilization rate ratio R12 is changed from 1:1 is different from the first embodiment.
  • the threshold Mth is set to 50%, and when the average voltage utilization rate Mave is 50% or more, the distribution unit 31 changes the utilization rate ratio R12 from 1:1 to reduce the average voltage When the utilization rate Mave is less than 50%, the utilization rate ratio R12 is set to 1:1. In the present embodiment, the distribution unit 31 is configured to change the utilization rate ratio R12 from 1:1 even when the average voltage utilization rate Mave is less than 50%.
  • the solid line indicates the voltage utilization rate of each group with respect to the average voltage utilization rate Mave according to the present embodiment.
  • the solid line indicates the effective value of the bus AC component with respect to the average voltage utilization factor Mave in this case.
  • the dashed line indicates the effective value of the bus line AC component and the voltage utilization rate of each set when the utilization rate ratio R12 is set to 1:1.
  • the distribution unit 31 makes the effective value of the bus line AC component A first set of current command values and a second set of current command values that change the utilization rate ratio R12 from 1:1 are calculated so as to decrease. Even in a region where the average voltage utilization factor Mave is 50% or less, the distribution unit 31 changes the voltage utilization factor of the first set and the voltage utilization factor of the second set so that the effective value of the bus AC component is minimized. ing.
  • the target voltage utilization rate of the first set decreases as the average voltage utilization rate Mave decreases so that the voltage utilization rate of the second set becomes 0%.
  • MoH is gradually lowered from 100%.
  • This range is such that a decrease in the effective value of the bus line AC component of the second set by setting the voltage utilization rate of the second set to 0% reduces the voltage utilization rate of the first set by reducing the first voltage utilization rate from 100%. It outweighs the increase in the effective value of the bus AC component, and the overall effective value of the bus AC component can be minimized.
  • the voltage utilization factor of the second set is increased from 0% so that the effective value of the overall bus AC component is minimized, and the first set is increased by that amount. It lowers the voltage utilization rate of the set.
  • the relationship between the average voltage utilization factor Mave and the first set of target voltage utilization factors MoH that minimizes the effective value of the overall bus AC component is determined in advance by numerical calculation or experiment, and the solid line in the lower graph of FIG. Target utilization setting map data such as is set in advance.
  • the first set of target voltage utilization factor MoH that minimizes the effective value of the bus AC component is not necessarily set, other factors, such as the set of armature windings and inverters for which the voltage utilization factor is increased, may be set. Considering the suppression of heat generation and the ease of control, etc., the first set of target voltage utilization rates MoH is set that can reduce the effective value of the bus line AC component more than when the utilization rate ratio R12 is 1:1. All you have to do is
  • step S03 and S07 which are the processes for setting the utilization rate ratio R12 to 1:1, are not executed.
  • step S05, and step S06 are executed in this order.
  • the phase difference in electrical angle between the position of the second set of three-phase armature windings and the position of the first set of three-phase armature windings is was set to 0 degrees.
  • the phase difference may be set to other than 0 degrees (eg, 30 degrees).
  • the solid line indicates the setting value of the voltage utilization rate and the effective value of the AC component of the bus for each set that minimizes the effective value of the AC component of the bus.
  • the dashed line indicates the effective value of the bus line AC component and the voltage utilization rate of each set when the utilization rate ratio R12 is set to 1:1. Even if the phase difference is other than 0 degrees, the effective value of the bus AC component can be reduced by changing the utilization ratio R12 from 1:1. The same applies to the following embodiments.
  • the control device 30 includes a first set of controllers 30a and a second set of controllers 30b, and each set of controls is individually executed by each set of controllers.
  • the controller 30 may comprise one controller and each set of controls may be performed by one controller.
  • the control device 30 may comprise three or more controllers and the distributor 31 may be executed by the third controller. The same applies to the following embodiments.
  • the first set of controllers 30a and the second set of controllers 30b are provided, the first set of carriers and the second set of carriers may be synchronized between the two controllers.
  • the utilization factor ratio R12 By changing the utilization factor ratio R12 from 1:1, there is an effect of lowering the effective value of the bus line AC component without taking .
  • the technique of Patent Document 1 it is necessary to synchronize between sets in order to distribute effective vectors on the time axis. can be suppressed.
  • the PWM period of the first set may be different from the PWM period of the second set. The same applies to the following embodiments.
  • Embodiment 3 A control device 30 for a rotating machine according to Embodiment 3 will be described with reference to the drawings. Descriptions of the same components as in the first embodiment are omitted.
  • the basic configurations of the rotating machine 1 and the rotating machine control device 30 according to the present embodiment are the same as those of the first embodiment, except that the magnetic flux is strengthened in order to increase the voltage utilization rate. different from 1.
  • Embodiments 1 and 2 as shown in FIGS. 7 and 8, when the average voltage utilization factor is 50% or more, the voltage utilization factor of one set is increased to 100%, and the effective bus AC component is increased. had lowered its value.
  • the average voltage utilization factor is less than 50%, the voltage utilization factor of the other group cannot be set negative, so the voltage utilization factor of one group cannot be increased to 100%.
  • the distribution unit 31 when the average voltage utilization factor without correction using the current correction value is less than the threshold value Mth, the distribution unit 31 reduces the average voltage utilization factor with correction using the current correction value to A current correction value that strengthens the magnetic flux of the rotor is calculated so as to become equal to or greater than the threshold value Mth. Then, the distribution unit 31 calculates a first set of current command values and a second set of current command values corrected by the current correction value to change the utilization ratio R12 from 1:1. On the other hand, when the average voltage utilization rate when the correction using the current correction value is not performed is equal to or greater than the threshold value Mth, the distribution unit 31 changes the utilization rate ratio R12 from 1:1, as in the first embodiment. A first set of current command values and a second set of current command values not corrected by the current correction value are calculated.
  • the average voltage utilization factor is less than the threshold value Mth when current correction is not performed, the average voltage utilization factor is increased to the threshold value Mth or more by the current correction that strengthens the magnetic flux of the rotor, and the voltage of one set is The utilization factor can be increased compared to when current correction is not performed, and the effective value of the bus AC component can be reduced.
  • step S11 similarly to step S01 of the first embodiment, the distribution unit 31 sets the utilization rate ratio R12 to 1:1, and when it is assumed that correction by the d-axis current correction value ⁇ Id is not performed, A first set of dq-axis current command values Id1o0 and Iq1o0 and a second set of dq-axis current command values Id2o0 and Iq2o0 are set.
  • step S12 similarly to step S02 of the first embodiment, the distribution unit 31 sets the first set of dq-axis current command value reference values Id1o0 and Iq1o0 and the second set of dq-axis current command value reference values An average voltage utilization factor Mave0 in the reference state of the first set of voltage utilization factors and the second set of voltage utilization factors corresponding to Id2o0 and Iq2o0 is calculated.
  • step S13 similarly to step S03 of the first embodiment, the distribution unit 31 determines whether the average voltage utilization factor Mave0 in the reference state in which correction by the d-axis current correction value ⁇ Id is not performed is equal to or greater than the threshold value Mth. is determined, and if it is equal to or greater than the threshold value Mth, the process proceeds to step S14, and if it is less than the threshold value Mth, the process proceeds to step S17.
  • the threshold Mth is set to 50% of the maximum voltage utilization rate (100% in this example) within the set voltage utilization rate range.
  • step S14 similarly to step S04 of the first embodiment, distribution unit 31 divides the average voltage in the reference state so that the voltage utilization rate M1 of the first set is higher than the voltage utilization rate M2 of the second set.
  • a first set of target voltage utilization rates MoH is set based on the utilization rate Mave0.
  • the distribution unit 31 sets the first set of target voltage utilization rates MoH to the maximum voltage utilization rate (100% in this example) within the set voltage utilization rate range.
  • step S15 similarly to step S05 of the first embodiment, the distribution unit 31 determines the voltage utilization factor M1 of the first set of applied voltages based on the first set of target voltage utilization factors MoH and the rotational angular velocity ⁇ of the rotor.
  • the first set of dq-axis current command values Id1o and Iq1o are calculated so that the values of the first set of dq-axis current command values Id1o and Iq1o match the first set of target voltage utilization factor MoH.
  • step S16 similarly to step S06 of the first embodiment, the distribution unit 31 adjusts the first A second set of dq-axis current command values Id2o and Iq2o are calculated based on the set of dq-axis current command values Id1o and Iq1o.
  • step S17 the distribution unit 31 sets the d-axis current correction value ⁇ Id that strengthens the rotor magnetic flux such that the average voltage utilization factor Mavecr when correction is performed using the d-axis current correction value ⁇ Id becomes equal to or greater than the threshold value Mth.
  • the distribution unit 31 calculates the d-axis current command value after current correction by adding the d-axis current correction value ⁇ Id to the first set of d-axis current command value reference values Id1o0.
  • a first set of voltage utilization factor reference values M10cr after current correction which is calculated based on the reference value Id1o0+ ⁇ Id and the first set of q-axis current command value reference values Iq1o0, is equal to the threshold value Mth.
  • a d-axis current correction value ⁇ Id is calculated. For example, by iterative calculation, the d-axis current correction value ⁇ Id that satisfies Equation (17) is searched for. Alternatively, the d-axis current correction value ⁇ Id is calculated using an algebraic equation or map data having as arguments the first set of dq-axis current command value reference values Id1o0 and Iq1o0, rotational angular velocity ⁇ , and DC voltage Vdc. good too. The d-axis current correction value ⁇ Id becomes a positive value. The d-axis current correction value ⁇ Id is upper-limited by an upper limit value.
  • a second set of reference values may be used instead of the first set of reference values
  • step S171 the distribution unit 31 sets an initial value (0 in this example) of the d-axis current correction value ⁇ Id. Then, in step S172, the distribution unit 31 adds the current d-axis current correction value ⁇ Id to the reference value Id1o0 of the first set of d-axis current command values to obtain the d-axis current command after the current correction. A reference value Id1o0+ ⁇ Id of the value is calculated.
  • step S173 the distributing unit 31 uses Equation (17) to calculate the current value based on the corrected d-axis current command value reference value Id1o0+ ⁇ Id and the first set of q-axis current command value reference value Iq1o0. Then, the reference value M10cr of the first set of voltage utilization factors after the current correction is calculated.
  • step S174 the distribution unit 31 determines whether or not the reference value M10cr of the first set of voltage utilization factors after the current correction is sufficiently close to the threshold value Mth (for example, the absolute value of the deviation is equal to or less than the determination value). If it is determined that the object has sufficiently approached, the process proceeds to step S175, and if it is determined that the object has not sufficiently approached, the process proceeds to step S176.
  • step S176 distribution unit 31 changes d-axis current correction value ⁇ Id so that reference value M10cr of the first group of voltage utilization factors after current correction approaches threshold value Mth, and then returns to step S172. , continue the iteration.
  • step S175 the distribution unit 31 sets the current d-axis current correction value ⁇ Id as the final d-axis current correction value ⁇ Id, and ends the iterative calculation.
  • step S18 the distribution unit 31, based on the average voltage utilization rate Mave0 in the reference state, makes the voltage utilization rate M1 of the first set higher than the voltage utilization rate M2 of the second set. , to set a first set of target voltage utilization factors MoH.
  • the distribution unit 31 sets the first set of target voltage utilization rates MoH to twice the threshold value Mth (100% in this example).
  • step S19 based on the target voltage utilization factor MoH of the first set and the rotational angular velocity ⁇ of the rotor, the distribution unit 31 adjusts the voltage utilization factor M1cr of the applied voltage of the first set after the current correction to the target voltage of the first set.
  • a first set of dq-axis current command values Id1o+ ⁇ Id, Iq1o corrected by the d-axis current correction value ⁇ Id is calculated so as to match the utilization rate MoH.
  • the distribution unit 31 uses the calculation formulas for the coefficients a, b, and c of each order and the formula (10) to calculate the first set of target voltage utilization factor MoH, the d-axis current correction, Based on the value ⁇ Id, the rotational angular velocity ⁇ , and the DC voltage Vdc, a first set of q-axis current command values Iq1o after current correction is calculated. Then, the distribution unit 31 calculates the d-axis current correction value ⁇ Id as the first set of d-axis current command values Id1o after the current correction.
  • the first set of d-axis current command value Id1o in formula (18) is replaced by formula (11) or formula
  • a quadratic function of Iq1o is similarly obtained, and a calculation formula for the coefficients a, b, and c of each order is obtained.
  • the distribution unit 31 calculates the first set of target voltage utilization factor MoH, the d-axis current correction value ⁇ Id, the rotation angular velocity ⁇ , A first set of q-axis current command values Iq1o after current correction is calculated based on the DC voltage Vdc.
  • the distribution unit 31 calculates the first set of d-axis current command values Iq1o based on the first set of current-corrected q-axis current command values Iq1o using Equation (11) or Equation (12).
  • Id1o is calculated, and the d-axis current correction value ⁇ Id is added to the first set of d-axis current command values Id1o to calculate the first set of d-axis current command values Id1o+ ⁇ Id after current correction.
  • the distribution unit 31 calculates the target voltage utilization factor MoH, the d-axis current correction value ⁇ Id, the rotational angular velocity ⁇ , and the DC voltage Vdc, and the first set of With reference to the q-axis current setting map data MAPiq in which the relationship with the q-axis current command value Iq1o is preset, the actual target voltage utilization factor MoH, the d-axis current correction value ⁇ Id, the rotational angular velocity ⁇ , and the DC voltage Vdc A first set of q-axis current command values Iq1o after current correction corresponding to .
  • the distribution unit 31 distributes the d-axis current in which the relationship between the target voltage utilization factor MoH, the d-axis current correction value ⁇ Id, the rotation angular velocity ⁇ , the DC voltage Vdc, and the first set of d-axis current command values Id1o is set in advance.
  • the first set of d-axis current command values Id1o+ ⁇ Id after current correction corresponding to the actual target voltage utilization factor MoH, the d-axis current correction value ⁇ Id, the rotational angular velocity ⁇ , and the DC voltage Vdc may be calculated.
  • step S20 the distribution unit 31 generates the current-corrected first set of dq-axis current commands such that the total torque of the first set of torques and the second set of torques matches the total torque command value.
  • a second set of dq-axis current command values Id2o and Iq2o after current correction is calculated based on the values Id1o+ ⁇ Id and Iq1o.
  • the distributing unit 31 calculates the first set q The current command value Iq1o for the axis is subtracted to set the second set of current command values Iq2o for the q-axis after the current correction. Further, the distribution unit 31 calculates the d-axis current correction value ⁇ Id as the second set of d-axis current command values Id2o+ ⁇ Id after the current correction.
  • the second set of d-axis current command values Id2o+ ⁇ Id after current correction is A second set of dq-axis current command values Id2o+ ⁇ Id, Iq2o after current correction is calculated such that the current correction value ⁇ Id for the d-axis also increases and the total torque matches the total torque command value Tallo. be.
  • the d-axis current command value Id2o of the second set does not need to be corrected by the d-axis current correction value ⁇ Id.
  • the second set of dq-axis current command values Id2o and Iq2o are calculated by the same method as in step S06 of the first embodiment.
  • the d-axis current correction value ⁇ Id becomes too large, so the average voltage utilization factor before current correction is reduced to a predetermined value (for example, in the region below 20%), the current correction may not be performed and the utilization rate ratio R12 may be set to 1:1.
  • Embodiment 4 A control device 30 for a rotating machine according to Embodiment 4 will be described with reference to the drawings. Descriptions of the same components as in the first embodiment are omitted.
  • the basic configuration of the rotating machine 1 and the control device 30 for the rotating machine according to the present embodiment is the same as that of the first embodiment, but the field winding 20 that magnetizes the rotor is provided, and the control device 30 includes a field winding controller 42 that applies voltage to the field winding 20 .
  • 12 and 13 show schematic configuration diagrams of the rotating machine 1 and the control device 30.
  • the field winding controller 42 is provided in the first set of controllers 30a. Alternatively, the field winding controller 42 may be provided in the second set of controllers 30b or the third controller.
  • the field winding 20 may be provided other than the rotor, for example, in the stator or in the vicinity of the rotor.
  • the converter 21 has a switching element and performs power conversion between the DC power supply 5 and the field winding 20 .
  • the converter 21 has a high potential side switching element SP connected to the high potential side of the DC power supply 5 and a low potential side switching element SN connected to the low potential side of the DC power supply 5 in series. It is an H-bridge circuit in which two connected series circuits are provided. Note that the converter 21 may have a circuit configuration of arbitrary switching elements capable of performing power conversion.
  • a current sensor 22 is provided to detect the current flowing through the field winding 20 , and the output signal of the current sensor 22 is input to the control device 30 .
  • the field winding control unit 42 calculates the field current command value based on the total torque command value and the like, and adjusts the field voltage so that the detected value of the field winding current approaches the field current command value. Change the command value. Then, based on the field voltage command value, field winding control unit 42 performs ON/OFF control of the plurality of switching elements of converter 21 by PWM control.
  • Embodiment 5 A control device 30 for a rotating machine according to Embodiment 5 will be described with reference to the drawings. Descriptions of the same components as in the fourth embodiment are omitted.
  • the basic configuration of the rotating machine 1 and the controller 30 for the rotating machine according to the present embodiment is the same as that of the fourth embodiment.
  • a field winding control unit 42 is provided.
  • the present embodiment differs from the fourth embodiment in that the magnetic field of the field winding 20 is strengthened in order to increase the voltage utilization factor.
  • the distribution unit 31 when the average voltage utilization factor when the field winding correction value is not corrected is less than the threshold value Mth, the distribution unit 31 performs correction using the field winding correction value. A field winding correction value that strengthens the rotor field such that the average voltage utilization factor of is equal to or greater than the threshold value Mth is calculated. Then, the distribution unit 31 corrects the field voltage command value using the field winding correction value, and calculates a utilization setting command that changes the utilization ratio R12 from 1:1. On the other hand, when the average voltage utilization factor when the field winding correction value is not corrected is equal to or greater than the threshold value Mth, the distribution unit 31 distributes the field winding correction value according to the field winding correction value as in the fourth embodiment. A utilization setting command for changing the utilization ratio from 1:1 is calculated without correcting the voltage command value.
  • the field winding correction that strengthens the magnetic field of the rotor increases the average voltage utilization factor to the threshold value Mth or more. can be increased compared to the case where the field winding correction is not performed, and the effective value of the bus AC component can be reduced.
  • step S31 similarly to step S01 of the first embodiment, the distribution unit 31 sets the utilization rate ratio R12 to 1:1, and sets it when it is assumed that correction by the field current correction value ⁇ If is not performed.
  • a first set of dq-axis current command value reference values Id1o0 and Iq1o0 and a second set of dq-axis current command value reference values Id2o0 and Iq2o0 are set.
  • step S32 as in step S02 of the first embodiment, the distribution unit 31 sets the first set of dq-axis current command value reference values Id1o0 and Iq1o0 and the second set of dq-axis current command value reference values An average voltage utilization factor Mave0 in the reference state of the first set of voltage utilization factors and the second set of voltage utilization factors corresponding to Id2o0 and Iq2o0 is calculated.
  • step S33 similarly to step S03 of the first embodiment, the distribution unit 31 determines whether or not the average voltage utilization factor Mave0 in the reference state in which correction by the field current correction value ⁇ If is not performed is equal to or greater than the threshold Mth. If it is equal to or greater than the threshold value Mth, the process proceeds to step S34, and if it is less than the threshold value Mth, the process proceeds to step S37.
  • the threshold Mth is set to 50% of the maximum voltage utilization rate (100% in this example) within the set voltage utilization rate range.
  • Steps S34 to S36 are the same as steps S04 to S06 in the first embodiment, so descriptions thereof will be omitted.
  • the magnetic flux ⁇ a of the rotor changes according to the field winding current If.
  • step S37 the distribution unit 31 calculates a field current correction value ⁇ If that strengthens the magnetic field of the rotor so that the average voltage utilization factor Mavecr when correction is performed using the field current correction value ⁇ If becomes equal to or greater than the threshold value Mth.
  • the distribution unit 31 provides a field current command value Ifo+ ⁇ If after correction of the field winding to which the field current correction value ⁇ If is added, and a reference value for the first set of dq-axis current command values.
  • a field current correction value ⁇ If is calculated such that the reference value M10cr of the first set of voltage utilization factors after field winding correction calculated based on the values Id1o0 and Iq1o0 matches the threshold value Mth.
  • the field current command value Ifo is a reference value calculated based on the total torque command value and the like. For example, by iterative calculation, a field current correction value ⁇ If that satisfies Equation (21) is searched for.
  • the rotor flux ⁇ a is a function of the field winding current.
  • the field current correction is performed using an algebraic equation or map data with arguments of the field current command value Ifo, the reference values Id1o0 and Iq1o0 of the first set of dq-axis current command values, the rotational angular velocity ⁇ , and the DC voltage Vdc.
  • a value ⁇ If may be calculated.
  • the field current correction value ⁇ If becomes a positive value.
  • the upper limit of the field current correction value ⁇ If is limited by the upper limit.
  • step S371 the distribution unit 31 sets the initial value (0 in this example) of the field current correction value ⁇ If. Then, in step S372, the distribution unit 31 adds the current field current correction value ⁇ If to the field current command value Ifo to calculate the field current command value Ifo+ ⁇ If after field winding correction.
  • step S373 the distribution unit 31 uses Equation (21) to set the corrected field current command value Ifo+ ⁇ If and the reference values Id1o0 and Iq1o0 of the first set of dq-axis current command values to Based on this, the reference value M10cr of the voltage utilization rate of the first set after field winding correction is calculated.
  • step S374 the distribution unit 31 determines whether or not the reference value M10cr of the first set of voltage utilization factors after field winding correction is sufficiently close to the threshold value Mth (for example, the absolute value of the deviation is determined). If it is determined that the object has sufficiently approached, the process proceeds to step S375, and if it is determined that the object has not sufficiently approached, the process proceeds to step S376. In step S376, the distribution unit 31 changes the field current correction value ⁇ If so that the reference value M10cr of the first set of voltage utilization factors after field winding correction approaches the threshold value Mth. to continue the iterative calculation.
  • step S375 the distribution unit 31 sets the current field current correction value ⁇ If as the final field current correction value ⁇ If, and terminates the iterative calculation.
  • the field winding control unit 42 changes the field voltage command value so that the detected value of the field winding current approaches the field current command value Ifo+ ⁇ If after addition of the field current correction value ⁇ If. .
  • step S38 the distribution unit 31, based on the average voltage utilization rate Mave0 in the reference state, makes the voltage utilization rate M1 of the first set higher than the voltage utilization rate M2 of the second set. , to set a first set of target voltage utilization factors MoH.
  • the distribution unit 31 sets the first set of target voltage utilization rates MoH to twice the threshold value Mth (100% in this example).
  • step S39 based on the field current command value Ifo+ ⁇ If after the field winding correction, the target voltage utilization factor MoH of the first set, and the rotational angular velocity ⁇ of the rotor, the distribution unit 31 generates the current-corrected first set of A first set of dq-axis current command values Id1o and Iq1o are calculated so that the voltage utilization factor M1cr of the applied voltage matches the first set of target voltage utilization factors MoH.
  • the distribution unit 31 uses the calculation formulas for the coefficients a, b, and c of each order and the formula (10) to calculate the field current command value Ifo+ ⁇ If after field winding correction, the field current command value Ifo+ ⁇ If, A first set of q-axis current command values Iq1o is calculated based on a set of target voltage utilization factor MoH, rotational angular velocity ⁇ , and DC voltage Vdc. The distribution unit 31 sets the first set of d-axis current command values Id1o to zero.
  • the first set of d-axis current command value Id1o in formula (22) is replaced by formula (11) or formula
  • a quadratic function of Iq1o is similarly obtained, and a calculation formula for the coefficients a, b, and c of each order is obtained.
  • the distribution unit 31 calculates the field current command value Ifo+ ⁇ If after correction of the field winding and the target voltage utilization factor MoH , the rotational angular velocity ⁇ , and the DC voltage Vdc, a first set of q-axis current command values Iq1o is calculated.
  • the distribution unit 31 calculates the first set of d-axis current command values Id1o using equation (11) or (12).
  • the distribution unit 31 calculates the corrected field current command value Ifo+ ⁇ If, the target voltage utilization factor MoH, the rotation angular velocity ⁇ , and the DC voltage Vdc after field winding correction.
  • the q-axis current setting map data MAPiq in which the relationship between the first set of q-axis current command values Iq1o and the actual field winding corrected field current command value Ifo+ ⁇ If, the target voltage
  • the q-axis current command values Iq1o after current correction corresponding to the utilization factor MoH, the rotational angular velocity ⁇ , and the DC voltage Vdc may be calculated.
  • the distribution unit 31 determines the relationship between the field current command value Ifo+ ⁇ If after field winding correction, the target voltage utilization factor MoH, the rotation angular velocity ⁇ , the DC voltage Vdc, and the first set of d-axis current command values Id1o. With reference to the preset d-axis current setting map data MAPid, the field current command value Ifo+ ⁇ If after the actual field winding correction, the target voltage utilization factor MoH, the rotational angular velocity ⁇ , and the DC voltage Vdc corresponding to the first A set of d-axis current command values Id1o may be calculated.
  • step S40 the distribution unit 31 generates the corrected field current command value Ifo+ ⁇ If so that the total torque of the first set of torques and the second set of torques matches the total torque command value. , and the first set of dq-axis current command values Id1o and Iq1o, a second set of current-corrected dq-axis current command values Id2o and Iq2o are calculated.
  • the steps other than the calculation of the rotor magnetic flux ⁇ a based on the corrected field current command value Ifo+ ⁇ If are the same as in step S06 of the first embodiment, so description thereof will be omitted.
  • the field current correction value ⁇ If will become too large.
  • the field winding correction may not be performed and the utilization ratio R12 may be set to 1:1.
  • the magnetic flux strengthening by the d-axis current correction value ⁇ Id of the third embodiment and the field strengthening by the field current correction value ⁇ If of the present embodiment may be performed at the same time.
  • the increase in the average voltage utilization rate due to the d-axis current correction value ⁇ Id and the increase in the average voltage utilization rate due to the field current correction value ⁇ If may be shared appropriately.
  • Embodiment 6 A control device 30 for a rotating machine according to Embodiment 6 will be described with reference to the drawings. Descriptions of the same components as in the first embodiment are omitted.
  • the basic configurations of the rotating machine 1 and the rotating machine control device 30 according to the present embodiment are the same as those of the first embodiment, but the setting of the phases of the first and second sets of carrier waves and the setting of the threshold Mth The setting is different from that of the first embodiment.
  • the first set switching control unit 36 compares each of the first set of three-phase voltage command values Vu1o, Vv1o, and Vw1o with the first set of carrier wave CA1, and based on the comparison result, to turn on and off a plurality of switching elements. Unlike the first embodiment, as shown in FIG.
  • one phase (U1 phase in this example) having the maximum current absolute value is A first set of carrier waves CA1a (referred to as a first set of first carrier waves CA1a) that stops switching and is compared with voltage command values of specific phases (U1 phase and V1 phase in this example);
  • the first set of carrier waves CA1b (referred to as the first set of second carrier waves CA1b) to be compared with the voltage command values of the phases other than the phase (W1 phase in this example) are in opposite phases to each other.
  • the first and second carrier waves CA1a and CA1b of the first set are triangular waves that are opposite in phase to each other and oscillate about 0 in the PWM period Tc with an amplitude of half the DC voltage Vdc1/2. Any waveform other than the triangular wave, such as a sawtooth wave, may be used.
  • the first group switching control unit 36 turns on the switching signal GP1 of the switching element on the high potential side when the first carrier wave CA1a of the first group falls below the voltage command value for the V1 phase, which is the specific phase. , when the first carrier wave CA1a of the first group exceeds the voltage command value, the switching signal GP1 of the switching element on the high potential side is turned off. On the other hand, when the first carrier wave CA1a of the first group falls below the voltage command value for each of the U1 phase and the V1 phase, the first group switching control unit 36 outputs the switching signal GN1 of the switching element on the low potential side. When it is turned off and the first carrier wave CA1a of the first group exceeds the voltage command value, the switching signal GN1 of the switching element on the low potential side is turned on.
  • the first set switching control unit 36 When the second carrier wave CA1b of the first set falls below the voltage command value for the W1 phase other than the specific phase, the first set switching control unit 36 outputs the switching signal GP1 for the switching element on the high potential side. is turned on, and when the first set of second carrier waves CA1b exceeds the voltage command value, the switching signal GP1 of the switching element on the high potential side is turned off.
  • the first group switching control unit 36 turns off the switching signal GN1 of the switching element on the low potential side.
  • the switching signal GN1 of the switching element on the low potential side is turned on.
  • the second group switching control unit 41 compares each of the second group of three-phase voltage command values Vu2o, Vv2o, and Vw2o with the second group of carrier wave CA2, and based on the comparison result, to turn on and off a plurality of switching elements.
  • the second set of three-phase voltage command values Vu2o, Vv2o, and Vw2o switching of one phase (U2 phase in this example) having the maximum current absolute value is stopped, and switching of a specific A second set of carrier waves CA2b (referred to as a second set of first carrier waves CA2a) that are compared with the voltage command values of the phases (U2 phase and V2 phase in this example), and a phase other than a specific phase (this example).
  • the second set of carrier waves CA2b (referred to as the second set of second carrier waves CA2b) to be compared with the voltage command value of the W2 phase) have opposite phases to each other.
  • the first and second carrier waves CA2a and CA2b of the second set are triangular waves that are opposite in phase to each other and oscillate around 0 in the PWM cycle Tc with an amplitude of half the DC voltage Vdc2/2.
  • the processing of the second set of switching control units 41 is the same as the processing of the first set of switching control units 36, so description thereof will be omitted.
  • the dashed line in the upper graph of FIG. 17 shows the characteristic of the change in the effective value of the bus AC component with respect to the change in the average voltage utilization factor Mave when the utilization ratio R12 is set to 1:1. Also, in the lower graph of FIG. 17, the voltage utilization rate of each group with respect to the average voltage utilization rate Mave in this case is indicated by a dashed line.
  • the average voltage utilization factor Mave is around 30%, the effective value of the bus AC component is the largest, and when the average voltage utilization factor Mave is around 70%, the effective value of the bus AC component is The value is the second largest local maximum.
  • the average voltage utilization factor Mave is around 60%, the effective value of the bus AC component is minimal.
  • the distribution unit 31 divides the utilization rate ratio R12 into 1:1.
  • a utilization setting command for changing from 1 is calculated, and when the average voltage utilization is less than the threshold value Mth, a utilization setting command that makes the utilization ratio 1:1 is calculated.
  • the threshold value Mth is set in accordance with the average voltage utilization ratio at which the change in the effective value of the bus AC component becomes maximum with respect to the change in the average voltage utilization ratio Mave under the condition that the utilization ratio R12 is set to 1:1. (30% in this example).
  • the threshold Mth may be set within a range of +10% to -10% of the maximum average voltage utilization rate.
  • step S51 similarly to step S01 of the first embodiment, the distribution unit 31 sets the utilization rate ratio R12 to 1:1, and sets the reference values Id1o0, Iq1o0, and The reference values Id2o0 and Iq2o0 of the second set of dq-axis current command values are set.
  • step S52 similarly to step S02 of the first embodiment, the distribution unit 31 sets the first set of dq-axis current command value reference values Id1o0 and Iq1o0 and the second set of dq-axis current command value reference values An average voltage utilization factor Mave0 in the reference state of the first set of voltage utilization factors and the second set of voltage utilization factors corresponding to Id2o0 and Iq2o0 is calculated.
  • step S53 similarly to step S03 of the first embodiment, the distribution unit 31 determines whether the average voltage utilization rate Mave0 in the reference state is equal to or greater than the threshold value Mth (30% in this example). If it is equal to or greater than Mth, the process proceeds to step S54, and if it is less than the threshold Mth, the process proceeds to step S57.
  • Mth the threshold value
  • step S54 as in step S04 of the first embodiment, distribution unit 31 divides the average voltage in the reference state so that the voltage utilization rate M1 of the first set is higher than the voltage utilization rate M2 of the second set.
  • a first set of target voltage utilization rates MoH is set based on the utilization rate Mave0.
  • the distribution unit 31 sets the average voltage utilization factor Mave0 in the reference state to the threshold value Mth (in this example, 30%) or more, and the maximum voltage utilization factor (in this example, 100%) is less than 50% (30% ⁇ Mave0 ⁇ 50%), the first target voltage utilization factor MoH is set to the average voltage utilization factor Mave under the condition that the utilization factor ratio R12 is set to 1:1.
  • the first set of target voltage utilization factors MoH may be set within a range of +10% to -10% of the minimum average voltage utilization factor.
  • the distribution unit 31 sets the target voltage utilization factor MoH of the first set to , is set to the maximum voltage utilization (100% in this example).
  • step S55 similarly to step S05 of the first embodiment, the distribution unit 31 determines the voltage utilization factor M1 of the first set of applied voltages based on the first set of target voltage utilization factors MoH and the rotational angular velocity ⁇ of the rotor.
  • the first set of dq-axis current command values Id1o and Iq1o are calculated so that the values of the first set of dq-axis current command values Id1o and Iq1o match the first set of target voltage utilization factor MoH.
  • step S56 similarly to step S06 of the first embodiment, the distribution unit 31 adjusts the first A second set of dq-axis current command values Id2o and Iq2o are calculated based on the set of dq-axis current command values Id1o and Iq1o.
  • step S57 similarly to step S07 of the first embodiment, the distribution unit 31 calculates the current command values of the dq-axes for each set in which the utilization rate ratio R12 is 1:1.
  • the distribution unit 31 sets the reference values Id1o0 and Iq1o0 of the first set of dq-axis current command values to the first set of dq-axis current command values Id1o and Iq1o,
  • the reference values Id2o0 and Iq2o0 of the second set of dq-axis current command values are set to the second set of dq-axis current command values Id2o and Iq2o.
  • the upper graph in FIG. 17 shows the effective value of the bus line AC component when the first group of target voltage utilization rates MoH is set to 60% or 100%
  • the lower graph in FIG. The solid line indicates the voltage utilization rate of each set with respect to the utilization rate Mave.
  • the target voltage utilization factor MoH of the first set cannot be increased to 100% at which the effective value of the bus AC component becomes the minimum.
  • the utilization factor MoH By setting the utilization factor MoH to 60% at which the effective value of the bus AC component is minimized, the effective value of the bus AC component generated by the first set can be reduced.
  • the target voltage utilization factor MoH of the first set is increased to 100% at which the effective value of the bus line AC component is minimized, and the bus line AC generated by the first set is increased.
  • the effective value of the component can be minimized. Therefore, compared to the case where the utilization rate ratio R12 is set to 1:1, the effective value of the total bus AC component can be significantly reduced.
  • the distribution unit 31, at each operating point of the average voltage utilization factor Mave divides the voltage utilization factor of the first set and the voltage utilization factor of the second set so that the effective value of the bus AC component is minimized.
  • a first set of target voltage utilization rates MoH for changing the voltage utilization rate may be set.
  • the relationship between the average voltage utilization factor Mave and the first set of target voltage utilization factors MoH that minimizes the effective value of the overall bus AC component is determined in advance by numerical calculation or experiment, and is shown in the lower graph of FIG. target utilization rate setting map data is set in advance. In this case, as shown in FIG. 19, even in the region where the average voltage utilization rate Mave is less than 30%, the utilization rate ratio R12 may be changed from 1:1.
  • FIG. 9 when the phase difference between the position of the second set of armature windings and the position of the first set of armature windings is set to 30 degrees, FIG.
  • the solid line indicates the setting value of the voltage utilization rate for each set that minimizes the effective value and the effective value of the bus AC component.
  • the dashed line indicates the effective value of the bus line AC component and the voltage utilization rate of each set when the utilization rate ratio R12 is set to 1:1. Even if a carrier wave with an opposite phase is used and the phase difference is other than 0 degrees, the effective value of the bus AC component can be reduced by changing the utilization ratio R12 from 1:1.
  • the rotating machine 1 may be used as a driving force source for the electric power steering device 100 .
  • the electric power steering device 100 includes a rotating machine 1, a rotating machine control device 30, two sets of inverters 6a and 6b, and a driving force for transmitting the driving force of the rotating machine 1 to a steering device 102 of the vehicle.
  • a force transmission mechanism 101 is provided.
  • the rotating shaft of the rotor of the rotating machine 1 is connected to the steering device 102 of the wheels 103 via the driving force transmission mechanism 101 .
  • the electric power steering device 100 includes a steering wheel 104 that a driver rotates left and right, a shaft 105 that is connected to the steering wheel 104 and transmits steering torque by the steering wheel 104 to the steering device 102 of the wheels 103, and a shaft 105 that is attached to the shaft 105. and a torque sensor 106 for detecting a steering torque Ts by the steering wheel 104 and a driving force transmission mechanism 101 such as a worm gear mechanism for connecting the rotating shaft of the rotating machine 1 to the shaft 105 .
  • the output signal of torque sensor 106 is input to control device 30 (input circuit 92).
  • the control device 30 (for example, the distribution unit 31) calculates a total torque command value or a total q-axis current command value based on the steering torque Ts detected based on the output signal of the torque sensor 106.
  • the rotating machine 1 may be used as a driving force source for various devices other than the electric power steering device 100 .
  • the rotating machine 1 may be used as a driving force source for wheels of a vehicle, a driving force source for an elevator, a driving force source for an aircraft, or the like.
  • the first and second sets of three-phase armature windings are provided.
  • armature windings of a plurality of phases for example, two phases and four phases
  • other than the first and second sets of three phases may be provided.
  • amplitude reduction modulation is performed, and the maximum voltage utilization rate within the set voltage utilization rate range is 100%.
  • amplitude reduction modulation may not be performed and the maximum voltage utilization may be 86.6%.
  • the maximum voltage utilization rate may be set between 100% and 110% and overmodulation may be performed.
  • the distribution unit 31 calculates the first set of current command values and the second set of current command values as the utilization rate setting command.
  • the distribution unit 31 may calculate any parameter related to the setting of the first set of voltage utilization rates and the second set of voltage utilization rates as the utilization rate setting command.
  • the distribution unit 31 calculates a first set of dq-axis pressure command value correction values and a second set of dq-axis voltage command value correction values as the utilization rate setting command, and calculates each set of dq-axis correction values. may be configured to correct the voltage command value of
  • the distribution unit 31 changes the utilization rate ratio R12 from 1:1 when the average voltage utilization rate is within a predetermined range.
  • the operating state of the rotating machine 1 such as the rotational angular velocity ⁇
  • the heat generation of the smoothing capacitor 5 becomes a problem, and it may be desirable to reduce the effective value of the bus AC component. Therefore, the distribution unit 31 may change the utilization ratio R12 from 1:1 when the operating state of the rotating machine 1 such as the rotational angular velocity ⁇ is within a predetermined range.
  • the distribution unit 31 does not have to change the voltage utilization factor of one set to the maximum voltage utilization factor (100%), and the voltage utilization factor of the one set is set to the allowable value when the effective value of the bus AC component is the allowable value.
  • the voltage utilization factor may be changed to less than the maximum voltage utilization factor.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Control Of Ac Motors In General (AREA)

Abstract

第1組のスイッチング素子のオンオフ制御のタイミングと第2組のスイッチング素子のオンオフ制御のタイミングの同期を取る必要なく、2組の電機子巻線及び2組のインバータが設けられている自由度を生かし、母線交流成分の実効値を低減させることができる回転機の制御装置を提供する。直流電源(5)と2組のインバータ(6a、6b)とを接続する母線(7)を流れる母線電流に重畳している母線交流成分の実効値が、第1組の電圧利用率と第2組の電圧利用率との間の利用率比率(R12)が1対1である場合よりも低下するように、利用率比率(R12)を1対1から変化させる利用率設定指令を算出する回転機の制御装置(30)。

Description

回転機の制御装置
 本願は、回転機の制御装置に関するものである。
 2組の複数相の電機子巻線を有する回転機を、2組のインバータで駆動するシステムが提案され、エレベータ、電動パワーステアリングなどに採用されている。
 特許文献1では、回転機に2組の3相の電機子巻線が設けられ、一方の組の3相の電機子巻線に対する電圧指令値を、印加可能な範囲の中心値よりも高電位側にシフトさせ、他方の組の3相の電機子巻線に対する電圧指令値を、中心値よりも低電位側にシフトさせている。これにより、第1組のインバータのスイッチング素子をオンオフするオンオフパターン(電圧ベクトル)と、第2組のインバータのスイッチング素子をオンオフするオンオフパターン(電圧ベクトル)とが同時に有効ベクトルになること、及び同時に零ベクトルになることを低減し、母線電流に重畳する母線交流成分の実効値を低減している。
 特許文献2では、回転機に2組の3相の電機子巻線が設けられ、2組の3相の電機子巻線に、互いに逆位相の5次、7次高調波成分の電流を重畳させる指令値を設定することで、モータのトルクリップルを抑えつつ、電機子巻線電流の瞬時値を低減することで、モータの発熱を低減している。
 特許文献3では、回転機に1組の3相の電機子巻線が設けられ、3相の搬送波比較PWMにおいて、2相の電圧指令値と比較される搬送波と、1相の電圧指令値と比較される搬送波とを互いに逆位相にすることで、母線交流成分の実効値を低減している。
特許4941686号 国際公開第2017/141593号 特開2020-137233号公報
 しかしながら、特許文献1の技術では、各組の3相の電圧指令値を、中心値よりも高電位側又は低電位側にシフトさせるので、各組のインバータにおいて、高電位側又は低電位側のスイッチング素子に発熱の偏りが生じる。また、一方の組のインバータから直流電源に充電されているときに、他方の組の直流電源からインバータに放電されるように、充放電のタイミングをずらしているため、2組のPWM制御の同期を取る必要がある。
 特許文献2の技術では、各組の電機子巻線電流に互いに逆位相の高調波成分を重畳させることで、電機子巻線電流の瞬時値は低下するものの、母線交流成分の実効値を低減させることは困難である。
 特許文献3の技術では、1組の3相の電機子巻線が設けられる場合の技術であり、2組の3相の電機子巻線が設けられる場合については開示されていない。
 そこで、本願は、第1組のスイッチング素子のオンオフ制御のタイミングと第2組のスイッチング素子のオンオフ制御のタイミングの同期を取る必要なく、2組の電機子巻線及び2組のインバータが設けられている自由度を生かし、母線交流成分の実効値を低減させることができる回転機の制御装置を提供することを目的とする。
 本願に係る回転機の制御装置は、2組の複数相の電機子巻線を有する回転機を、同一の直流電源に接続された2組のインバータを介して制御する回転機の制御装置であって、
 前記直流電源の電源電圧に対する第1組の複数相の電機子巻線の印加電圧の線間電圧の基本波成分の振幅の比率である第1組の電圧利用率、及び前記電源電圧に対する第2組の複数相の電機子巻線の印加電圧の線間電圧の基本波成分の振幅の比率である第2組の電圧利用率の設定に関わる利用率設定指令を算出する分配部と、
 前記利用率設定指令に基づいて、第1組の複数相の電圧指令値を算出する第1組電圧指令算出部と、
 前記利用率設定指令に基づいて、第2組の複数相の電圧指令値を算出する第2組電圧指令算出部と、
 前記第1組の複数相の電圧指令値に基づいて、第1組の前記インバータが有する複数のスイッチング素子をオンオフして、前記第1組の複数相の電機子巻線に電圧を印加する第1組スイッチング制御部と、
 前記第2組の複数相の電圧指令値に基づいて、第2組の前記インバータが有する複数のスイッチング素子をオンオフして、前記第2組の複数相の電機子巻線に電圧を印加する第2組スイッチング制御部と、を備え、
 前記分配部は、前記直流電源と前記2組のインバータとを接続する母線を流れる母線電流に重畳している交流成分である母線交流成分の実効値が、前記第1組の電圧利用率と前記第2組の電圧利用率との間の利用率比率が1対1である場合よりも低下するように、前記利用率比率を1対1から変化させる前記利用率設定指令を算出するものである。
 各組において、電圧利用率が変化すると、インバータの複数のスイッチング素子のオンオフパターン及び各パターンの頻度が変化し、スイッチング素子のオンオフにより生じる母線交流成分の実効値が増減する。上記の構成によれば、2組の電機子巻線及び2組のインバータが設けられている自由度を生かし、第1組の電圧利用率と第2組の電圧利用率とを1対1から変化させることにより、1対1の場合よりも、第1組のインバータから生じる母線交流成分と第2組のインバータから生じる母線交流成分とを変化させ、第1組及び第2組の合計の母線交流成分の実効値を低減させることができる。よって、直流電源、及び直流電源に接続された平滑コンデンサ及び他の装置に与える母線交流成分の悪影響を低減することができる。また、第1組のスイッチング素子のオンオフ制御のタイミングと第2組のスイッチング素子のオンオフ制御のタイミングの同期を取らなくても、母線交流成分の実効値を低減することができ、制御装置及び処理の簡素化を図ることができる。
実施の形態1に係る回転機及び回転機の制御装置の概略構成図である。 実施の形態1に係る制御装置のハードウェア構成図である。 実施の形態1に係る各組の電機子巻線の位相を説明する図である。 実施の形態1に係る制御装置の概略ブロック図である。 実施の形態1に係る搬送波比較PWM制御を説明するタイムチャートである。 実施の形態1に係る分配部の処理を説明するフローチャートである。 実施の形態1に係る利用率比率を1:1から変化させない場合と変化させる場合において、平均電圧利用率に対する母線交流成分の実効値及び電圧利用率の設定を説明する図である。 実施の形態2に係る利用率比率を1:1から変化させない場合と変化させる場合において、平均電圧利用率に対する母線交流成分の実効値及び電圧利用率の設定を説明する図である。 実施の形態2の別例に係る利用率比率を1:1から変化させない場合と変化させる場合において、平均電圧利用率に対する母線交流成分の実効値及び電圧利用率の設定を説明する図である。 実施の形態3に係る分配部の処理を説明するフローチャートである。 実施の形態3に係る分配部の反復計算の処理を説明するフローチャートである。 実施の形態4に係る回転機及び回転機の制御装置の概略構成図である。 実施の形態4に係る制御装置の概略ブロック図である。 実施の形態5に係る分配部の処理を説明するフローチャートである。 実施の形態5に係る分配部の反復計算の処理を説明するフローチャートである。 実施の形態6に係る搬送波比較PWM制御を説明するタイムチャートである。 実施の形態6に係る利用率比率を1:1から変化させない場合と変化させる場合において、平均電圧利用率に対する母線交流成分の実効値及び電圧利用率の設定を説明する図である。 実施の形態6に係る分配部の処理を説明するフローチャートである。 実施の形態6の別例に係る利用率比率を1:1から変化させない場合と変化させる場合において、平均電圧利用率に対する母線交流成分の実効値及び電圧利用率の設定を説明する図である。 実施の形態6の別例に係る利用率比率を1:1から変化させない場合と変化させる場合において、平均電圧利用率に対する母線交流成分の実効値及び電圧利用率の設定を説明する図である。 その他の実施の形態に係る電動パワーステアリング装置の概略構成図である。
1.実施の形態1
 実施の形態1に係る回転機の制御装置30について図面を参照して説明する。図1は、本実施の形態に係る回転機1及び回転機の制御装置30(以下、単に、制御装置30と称す)の概略構成図である。回転機1は、2組の複数相(本例では、3相)の電機子巻線を有している。制御装置30は、回転機1を、同一の直流電源5に接続された2組のインバータ6a、6bを介して制御する。図2に示すように、制御装置30は、第1組の3相の電機子巻線を制御する第1組の制御器30aと、第2組の3相の電機子巻線を制御する第2組の制御器30bと、を有している。
1-1.回転機1
 回転機1は、円筒状のステータ18と、ステータ18の径方向内側に配置されたロータ14と、を備えている。ステータ18に、2組の3相の電機子巻線が巻装されている。すなわち、ステータ18には、第1組の3相の電機子巻線Cu1、Cv1、Cw1と、第2組の3相の電機子巻線Cu2、Cv2、Cw2と、が設けられている。各組の3相の電機子巻線は、スター結線とされてもよいし、デルタ結線とされてもよい。第1組の3相を、U1相、V1相、W1相とする。第2組の3相を、U2相、V2相、W2相とする。
 本実施の形態では、図3に模式図を示すように、第1組の3相の電機子巻線Cu1、Cv1、Cw1の位置に対する第2組の3相の電機子巻線Cu2、Cv2、Cw2の位置の電気角での位相差は、0度に設定されている。なお、電気角は、ロータ14の機械角に磁石の極対数を乗算した角度になる。なお、位相差は、0度以外(例えば、π/6(30度))に設定されてもよい。
 ロータ14には、永久磁石が設けられており、回転機1は、永久磁石式の同期回転機とされている。ロータ14の外周面に永久磁石が設けられた表面磁石型の同期回転機とされており、d軸インダクタンスLdとq軸インダクタンスLqとが等しい非突極機とされている。なお、ロータ14の内部に永久磁石が設けられた埋込磁石型の同期回転機とされ、q軸インダクタンスLqがd軸インダクタンスLdより大きい突極機とされてもよい。
 ロータ14には、ロータ14の回転角度を検出するための回転センサ15が設けられている。回転センサ15は、冗長型とされており、第1組の3相の電機子巻線の制御のための第1の回転角度θ1に係る第1の出力信号と、第2組の3相の電機子巻線の制御のための第2の回転角度θ2に係る第2の出力信号と、を出力する。第1の回転角度θ1に係る第1の出力信号は、第1組の制御器30aに入力され、第2の回転角度θ2に係る第2の出力信号は、第2組の制御器30bに入力される。回転センサ15には、ホール素子、レゾルバ、又はエンコーダ等の各種のセンサが用いられる。回転センサ15が設けられず、後述する各組の電流指令値に高調波成分を重畳することによって得られる各組の電流情報等に基づいて、各組の回転角度(各組の磁極位置)を推定するように構成されてもよい(いわゆる、センサレス方式)。
1-2.直流電源5
 直流電源5は、第1組のインバータ6a、及び第2組のインバータ6bに直流電圧Vdcを出力する。直流電源5として、バッテリー、DC-DCコンバータ、ダイオード整流器、PWM整流器等、電源電圧を出力する任意の機器が用いられる。
 直流電源5と2組のインバータ6a、6bとは、共通の母線7を介して接続されている。母線7は、高電位側の母線7Pと低電位側の母線7Nとを有している。高電位側の母線7Pの一端が、直流電源5の高電位側に接続され、低電位側の母線7Nの一端が、直流電源5の低電位側に接続されている。高電位側の母線7Pの他端が、第1組のインバータ6aの高電位側電線8aP及び第2組のインバータ6bの高電位側電線8bPに分岐して接続され、低電位側の母線7Nの他端が、第1組のインバータ6aの低電位側電線8aN及び第2組のインバータ6bの低電位側電線8bNに分岐して接続されている。
 平滑コンデンサ12が、高電位側の母線7Pと低電位側の母線7Nとの間に接続されている。平滑コンデンサ12は、第1組のインバータ6a及び第2組のインバータ6bに供給される直流電圧Vdcの変動を抑制し、安定させる。
 直流電源5から各組のインバータ6a、6bに供給される直流電圧Vdcを検出する電源電圧センサ13が備えられている。電源電圧センサ13は、高電位側の母線7Pと低電位側の母線7Nとの間に接続されている。電源電圧センサ13の出力信号は、第1組の制御器30a及び第2組の制御器30bに入力される。なお、第1組のインバータ6aに入力される第1組の直流電圧Vdc1と、第2組のインバータ6bに入力される第2組の直流電圧Vdc2とが、第1組の電源電圧センサ及び第2組の電源電圧センサにより個別に検出され、第1組の制御器30a及び第2組の制御器30bに個別に入力されてもよい。
1-3.インバータ
 第1組のインバータ6aは、直流電源5と第1組の3相の電機子巻線との間で電力変換を行う。第2組のインバータ6bは、直流電源5と第2組の3相の電機子巻線との間で電力変換を行う。
 第1組のインバータ6aは、直流電源5の高電位側に接続される高電位側のスイッチング素子SPと、直流電源5の低電位側に接続される低電位側のスイッチング素子SNと、が直列接続された直列回路を、第1組の3相各相の電機子巻線に対応して3つ設けている。各直列回路における2つのスイッチング素子の接続点が、第1組の対応する相の電機子巻線に接続される。第2組のインバータ6bは、直流電源5の高電位側に接続される高電位側のスイッチング素子SPと、直流電源5の低電位側に接続される低電位側のスイッチング素子SNと、が直列接続された直列回路を、第2組の3相各相の電機子巻線に対応して3つ設けている。各直列回路における2つのスイッチング素子の接続点が、第2組の対応する相の電機子巻線に接続される。
 具体的には、第1組のインバータ6aにおける各相の直列回路において、高電位側のスイッチング素子SPのコレクタ端子は、高電位側電線8aPに接続され、高電位側のスイッチング素子SPのエミッタ端子は、低電位側のスイッチング素子SNのコレクタ端子に接続され、低電位側のスイッチング素子SNのエミッタ端子は、低電位側電線8aNに接続されている。高電位側のスイッチング素子SPと低電位側のスイッチング素子SNとの接続点は、第1組の対応する相の電機子巻線に接続されている。
 第2組のインバータ6bにおける各相の直列回路において、高電位側のスイッチング素子SPのコレクタ端子は、高電位側電線8bPに接続され、高電位側のスイッチング素子SPのエミッタ端子は、低電位側のスイッチング素子SNのコレクタ端子に接続され、低電位側のスイッチング素子SNのエミッタ端子は、低電位側電線8bNに接続されている。高電位側のスイッチング素子SPと低電位側のスイッチング素子SNとの接続点は、第2組の対応する相の電機子巻線に接続されている。
 各組のインバータのスイッチング素子には、ダイオードが逆並列に接続されたIGBT(Insulated Gate Bipolar Transistor)、ダイオードが逆並列に接続されたバイポーラトランジスタ、逆並列に接続されたダイオードの機能を有するMOSFET(Metal Oxide Semiconductor Field Effect Transistor)等が用いられる。
 第1組のインバータ6aの各スイッチング素子のゲート端子は、ゲート駆動回路等を介して、第1組の制御器30aに接続されている。よって、第1組の各スイッチング素子は、第1組の制御器30aから出力されるスイッチング信号によりオン又はオフされる。第2組のインバータ6bの各スイッチング素子のゲート端子は、ゲート駆動回路等を介して、第2組の制御器30bに接続されている。よって、第2組の各スイッチング素子は、第2組の制御器30bから出力されるスイッチング信号によりオン又はオフされる。
 第1組の3相の電機子巻線に流れる電流を検出するための第1組電流センサ9a、及び第2組の3相の電機子巻線に流れる電流を検出するための第2組電流センサ9bが設けられている。各組の電流センサ9a、9bは、ホール素子又はシャント抵抗等の電流センサとされる。第1組電流センサ9aの出力信号は、第1組の制御器30aに入力される。第2組電流センサ9bの出力信号は、第2組の制御器30bに入力される。
 本実施の形態では、第1組電流センサ9aは、第1組のインバータ6aの各相のスイッチング素子の直列回路と各相の電機子巻線とをつなぐ各相の電線上に備えられている。第2組電流センサ9bは、第2組のインバータ6bの各相のスイッチング素子の直列回路と各相の電機子巻線とをつなぐ各相の電線上に備えられている。なお、各組の電流センサ9a、9bは、各組のインバータの各相の直列回路に備えられてもよい。或いは、各組の電流センサ9a、9bは、各組のインバータ6a、6bと直流電源5と接続する電線上に設けられ、各組について、公知の「母線1シャント方式」により、各相の巻線の電流が検出されてもよい。
1-4.制御装置30
 制御装置30は、2組のインバータ6a、6bを介して回転機1を制御する。制御装置30は、図4に示すように、分配部31、第1組回転検出部32、第1組電流検出部33、第1組電圧検出部34、第1組電圧指令算出部35、第1組スイッチング制御部36、第2組回転検出部37、第2組電流検出部38、第2組電圧検出部39、第2組電圧指令算出部40、及び第2組スイッチング制御部41等の機能部を備えている。制御装置30の各機能は、制御装置30が備えた処理回路により実現される。
 本実施の形態では、制御装置30は、第1組の制御器30a及び第2組の制御器30bを備えている。分配部31、第1組回転検出部32、第1組電流検出部33、第1組電圧検出部34、第1組電圧指令算出部35、及び第1組スイッチング制御部36が、第1組の制御器30aに備えられている。第2組回転検出部37、第2組電流検出部38、第2組電圧検出部39、第2組電圧指令算出部40、及び第2組スイッチング制御部41が、第2組の制御器30bに備えられている。なお、分配部31は、第2組の制御器30bに備えられてもよい。或いは、分配部31は、双方の制御器に備えられ、双方の制御器の動作が正常な場合は、予め設定された一方の制御器の分配部31が動作し、いずれか一方の制御器の動作に異常があった場合は、他方の制御器の分配部31が動作するように構成されてもよい。或いは、分配部31は、第3の制御器に備えられ、第3の制御器と、第1組及び第2組の制御器30a、30bとが通信により接続されてもよい。
 図2に示すように、各組の制御器30a、30bは、処理回路として、CPU(Central Processing Unit)等の演算処理装置90(コンピュータ)、演算処理装置90とデータのやり取りする記憶装置91、演算処理装置90に外部の信号を入力する入力回路92、演算処理装置90から外部に信号を出力する出力回路93、及び通信回路94等を備えている。記憶装置91、入力回路92、出力回路93、及び通信回路94等は、バス等の信号線を介して演算処理装置90に接続されている。
 演算処理装置90として、ASIC(Application Specific Integrated Circuit)、IC(Integrated Circuit)、DSP(Digital Signal Processor)、FPGA(Field Programmable Gate Array)、各種の論理回路、及び各種の信号処理回路等が備えられてもよい。また、演算処理装置90として、同じ種類のもの又は異なる種類のものが複数備えられ、各処理が分担して実行されてもよい。記憶装置91として、RAM(Random Access Memory)、ROM(Read Only Memory)、EEPROM(Electrically Erasable Programmable ROM)等の揮発性及び不揮発性の記憶装置が備えられている。入力回路92は、電源電圧センサ13、回転センサ15、各組の電流センサ9a、9b等の各種のセンサが接続され、これらセンサの出力信号を演算処理装置90に入力するA/D変換器等を備えている。出力回路93は、スイッチング素子をオンオフ駆動するゲート駆動回路等の電気負荷が接続され、これら電気負荷に演算処理装置90から制御信号を出力する駆動回路等を備えている。各組の通信回路94は、相互に接続されて通信を行うと共に、外部装置と通信を行う。
 そして、制御装置30が備える各制御部31~41等の各機能は、各組の制御器30a、30bの演算処理装置90が、ROM、EEPROM等の記憶装置91に記憶されたソフトウェア(プログラム)を実行し、記憶装置91、入力回路92、出力回路93、及び通信回路94等の各組の制御器30a、30bの他のハードウェアと協働することにより実現される。なお、各制御部31~41等が用いる閾値Mth、目標電圧利用率MoH、電気定数、及びマップデータ等の各種の設定データは、ソフトウェア(プログラム)の一部として、ROM等の記憶装置91に記憶されている。以下、制御装置30の各機能について詳細に説明する。
1-4-1.第1組の基本制御
 第1組回転検出部32は、回転センサ15の第1の出力信号に基づいて、ロータの電気角での第1の回転角度θ1(第1の磁極位置θ1)及び第1の回転角速度ω1を検出する。第1の回転角度θ1は、第1組のU1相の電機子巻線位置を基準にしたロータのN極の角度とされる。なお、第1組回転検出部32は、第1組の電流指令値に高調波成分を重畳することによって得られる電流情報等に基づいて、回転センサを用いずに、第1の回転角度θ1を推定するように構成されてもよい(いわゆる、センサレス方式)。
 第1組電圧検出部34は、電源電圧センサ13の出力信号に基づいて、第1の直流電圧Vdc1を検出する。
 第1組電流検出部33は、第1組電流センサ9aの出力信号に基づいて、第1組の3相の電機子巻線を流れる第1組の3相の電流Iu1s、Iv1s、Iw1sを検出する。そして、第1組電流検出部33は、次式に示すように、第1組の3相の電流検出値Iu1s、Iv1s、Iw1sを、第1の回転角度θ1に基づいて、3相2相変換及び回転座標変換を行って、第1組のd軸の電流検出値Id1s及び第1組のq軸の電流検出値Iq1sを算出する。
Figure JPOXMLDOC01-appb-M000001
 d軸及びq軸の座標系(以下、dq軸の座標系と称す)は、交流回転機(ロータ)の第1の回転角度θ1(第1の磁極位置θ1)に同期して回転する2軸の回転座標系である。より詳細には、dq軸の座標系は、ロータの第1の磁極位置θ1(磁石のN極の向き)に定めたd軸、及びd軸より電気角で90度進んだ方向に定めたq軸からなる。
 第1組電圧指令算出部35は、後述する分配部31から指令された利用率設定指令(本例では、第1組のdq軸の電流指令値Id1o、Iq1o)に基づいて、第1組の3相の電圧指令値Vu1o、Vv1o、Vw1oを算出する。本実施の形態では、第1組電圧指令算出部35は、第1組dq軸電圧指令算出部351、及び第1組電圧座標変換部352を備えている。
 第1組dq軸電圧指令算出部351は、第1組のdq軸の電流検出値Id1s、1q1sが、それぞれ、第1組のdq軸の電流指令値Id1o、Iq1oに近づくように、PI制御等により第1組のdq軸の電圧指令値Vd1o、Vq1oを変化させる。第1組電圧座標変換部352は、第1組のdq軸の電圧指令値Vd1o、Vq1oを、次式に示すように、第1の回転角度θ1に基づいて、固定座標変換及び2相3相変換を行って、第1組の3相の電圧指令値Vu1o、Vv1o、Vw1oに変換する。
Figure JPOXMLDOC01-appb-M000002
 そして、電圧利用率を向上させるために、第1組の3相の電圧指令値Vu1o、Vv1o、Vw1oに、3次高調波重畳、空間ベクトル変調、二相変調などの公知の振幅低減変調が加えられる。振幅低減変調により、3相の電圧指令値の線間電圧が維持しされつつ、3相の電圧指令値の振幅が√3/2倍(約0.866倍)に低減される。よって、最終的な3相の電圧指令値が直流電圧の範囲(-Vdc/2~+Vdc/2)を超えない(電圧飽和を生じない)ような、幅低減変調前の3相の電圧指令値の最大振幅を、振幅低減変調により、2/√3倍(約1.15倍)に増加させることができる。第1組の3相の電圧指令値Vu1o、Vv1o、Vw1oの基本波成分の振幅に√3を乗算した値が、第1組の3相の電圧指令値Vu1o、Vv1o、Vw1oの線間電圧の基本波成分の振幅になる。なお、振幅低減変調が行われなくてもよい。
 本実施の形態では、第1組dq軸電圧指令算出部351は、最終的な第1組の3相の電圧指令値が直流電圧の範囲(-Vdc/2~+Vdc/2)を超え、過変調状態及び電圧飽和状態にならないような、第1組のdq軸の電圧指令値及び第1組の3相の電圧指令値を算出する。例えば、第1組のdq軸の電圧指令値の電圧利用率が、設定される電圧利用率の範囲の最大電圧利用率(振幅低減変調が行われる場合は100%、振幅低減変調が行われない場合は86.6%)以下になるように、第1組のdq軸の電圧指令値が制限される。
 第1組スイッチング制御部36は、第1組の3相の電圧指令値Vu1o、Vv1o、Vw1oに基づいて、第1組のインバータ6aが有する複数のスイッチング素子をオンオフして、第1組の3相の電機子巻線に電圧を印加する。第1組スイッチング制御部36は、公知の搬送波比較PWM又は空間ベクトルPWMを用いる。
 搬送波比較PWMが用いられる場合は、第1組スイッチング制御部36は、第1組の3相の電圧指令値Vu1o、Vv1o、Vw1oのそれぞれと第1組の搬送波CA1とを比較し、比較結果に基づいて、複数のスイッチング素子をオンオフする。本実施の形態では、図5に示すように、第1組の3相の電圧指令値Vu1o、Vv1o、Vw1oのそれぞれと比較される第1組の搬送波CA1は、同じ搬送波である。第1組の搬送波CA1は、PWM周期Tcで0を中心に直流電圧の半分値Vdc1/2の振幅で振動する三角波とされている。三角波以外に鋸波等の任意の波形が用いられてもよい。
 第1組スイッチング制御部36は、各相について、第1組の搬送波CA1が電圧指令値を下回った場合は、高電位側のスイッチング素子のスイッチング信号GP1をオン(本例では、1)して、高電位側のスイッチング素子をオンし、第1組の搬送波CA1が電圧指令値を上回った場合は、高電位側のスイッチング素子のスイッチング信号GP1をオフ(本例では、0)して、高電位側のスイッチング素子をオフする。一方、第1組スイッチング制御部36は、各相について、第1組の搬送波CA1が電圧指令値を下回った場合は、低電位側のスイッチング素子のスイッチング信号GN1をオフ(本例では、0)して、低電位側のスイッチング素子をオフし、第1組の搬送波CA1が電圧指令値を上回った場合は、低電位側のスイッチング素子のスイッチング信号GN1をオン(本例では、1)して、低電位側のスイッチング素子をオンする。なお、各相について、高電位側のスイッチング素子のオン期間と低電位側のスイッチング素子のオン期間との間には、高電位側及び低電位側のスイッチング素子の双方をオフにする短絡防止期間(デッドタイム)が設けられてもよい。
 空間ベクトルPWMが用いられる場合は、第1組スイッチング制御部36は、第1組の3相の電圧指令値Vu1o、Vv1o、Vw1oから第1組の電圧指令ベクトルを生成し、第1組の電圧指令ベクトルに基づいて、PWM周期における7つの基本電圧ベクトルの設定時間配分を決定し、7つの基本電圧ベクトルの設定時間配分に基づいて、PWM周期において各スイッチング素子をオンオフするスイッチング信号を生成する。
1-4-2.第2組の基本制御
 第2組回転検出部37は、回転センサ15の第2の出力信号に基づいて、ロータの電気角での第2の回転角度θ2(第2の磁極位置θ2)及び第2の回転角速度ω2を検出する。第2の回転角度θ2は、第2組のU2相の電機子巻線位置を基準にしたロータのN極の角度とされる。なお、第2組回転検出部37は、第2組の電流指令値に高調波成分を重畳することによって得られる電流情報等に基づいて、回転センサを用いずに、第2の回転角度θ2を推定するように構成されてもよい(いわゆる、センサレス方式)。
 第2組電圧検出部39は、電源電圧センサ13の出力信号に基づいて、第2の直流電圧Vdc2を検出する。
 第2組電流検出部38は、第2組電流センサ9bの出力信号に基づいて、第2組の3相の電機子巻線を流れる第2組の3相の電流Iu2s、Iv2s、Iw2sを検出する。そして、第2組電流検出部38は、式(1)と同様に、第2組の3相の電流検出値Iu2s、Iv2s、Iw2sを、第2の回転角度θ2に基づいて、3相2相変換及び回転座標変換を行って、第2組のd軸の電流検出値Id2s及び第2組のq軸の電流検出値Iq2sを算出する。
 d軸及びq軸の座標系(以下、dq軸の座標系と称す)は、交流回転機(ロータ)の第2の回転角度θ2(第2の磁極位置θ2)に同期して回転する2軸の回転座標系である。より詳細には、dq軸の座標系は、ロータの第2の磁極位置θ2(磁石のN極の向き)に定めたd軸、及びd軸より電気角で90度進んだ方向に定めたq軸からなる。
 第2組電圧指令算出部40は、後述する分配部31から指令された利用率設定指令(本例では、第2組のdq軸の電流指令値Id2o、Iq2o)に基づいて、第2組の3相の電圧指令値Vu2o、Vv2o、Vw2oを算出する。本実施の形態では、第2組電圧指令算出部40は、第2組dq軸電圧指令算出部401、及び第2組電圧座標変換部402を備えている。
 第2組dq軸電圧指令算出部401は、第2組のdq軸の電流検出値Id2s、1q2sが、第2組のdq軸の電流指令値Id2o、Iq2oに近づくように、PI制御等により第2組のdq軸の電圧指令値Vd2o、Vq2oを変化させる。第2組電圧座標変換部402は、式(2)と同様に、第2組のdq軸の電圧指令値Vd2o、Vq2oを、第2の回転角度θ2に基づいて、固定座標変換及び2相3相変換を行って、第2組の3相の電圧指令値Vu2o、Vv2o、Vw2oに変換する。
 そして、第1組と同様に、電圧利用率を向上させるために、第2組の3相の電圧指令値Vu2o、Vv2o、Vw2oに、3次高調波重畳、空間ベクトル変調、二相変調などの公知の振幅低減変調が加えられる。また、第2組dq軸電圧指令算出部401は、最終的な第2組の3相の電圧指令値が直流電圧の範囲(-Vdc/2~+Vdc/2)を超え、過変調状態及び電圧飽和状態にならないような、第2組のdq軸の電圧指令値及び第2組の3相の電圧指令値を算出する。例えば、第2組のdq軸の電圧指令値の電圧利用率が、設定される電圧利用率の範囲の最大電圧利用率(振幅低減変調が行われる場合は100%、振幅低減変調が行われない場合は86.6%)以下になるように、第2組のdq軸の電圧指令値が制限される。
 第2組スイッチング制御部41は、第2組の3相の電圧指令値Vu2o、Vv2o、Vw2oに基づいて、第2組のインバータ6bが有する複数のスイッチング素子をオンオフして、第2組の3相の電機子巻線に電圧を印加する。第2組スイッチング制御部41は、公知の搬送波比較PWM又は空間ベクトルPWMを用いる。
 搬送波比較PWMが用いられる場合は、第2組スイッチング制御部41は、第2組の3相の電圧指令値Vu2o、Vv2o、Vw2oのそれぞれと第2組の搬送波CA2とを比較し、比較結果に基づいて、複数のスイッチング素子をオンオフする。本実施の形態では、第1組の図5と同様に、第2組の3相の電圧指令値Vu2o、Vv2o、Vw2oのそれぞれと比較される第2組の搬送波CA2は、同じ搬送波である。第2組の搬送波CA2は、PWM周期Tcで0を中心に直流電圧の半分値Vdc2/2の振幅で振動する三角波とされている。第2組スイッチング制御部41の処理は、第1組スイッチング制御部36の処理と同様であるので、説明を省略する。
1-4-3.分配部31
<各組の電圧利用率の設定に係る利用率設定指令>
 分配部31は、第1組の電圧利用率M1及び第2組の電圧利用率M1の設定に関わる利用率設定指令を算出する。次式に示すように、第1組の電圧利用率M1は、直流電源の電源電圧Vdcに対する第1組の3相の電機子巻線の印加電圧の線間電圧の基本波成分の振幅V1ampの比率である。第2組の電圧利用率M2は、直流電源の電源電圧Vdcに対する第2組の3相の電機子巻線の印加電圧の線間電圧の基本波成分の振幅V2ampの比率である。
Figure JPOXMLDOC01-appb-M000003
 また、次式に示すように、第1組のdq軸の電圧指令値Vd1o、Vq1oの2乗和の平方根(第1組のdq軸の電圧ベクトルVdq1の大きさ|Vdq1|)は、第1組の3相の電機子巻線の印加電圧の線間電圧の基本波成分の振幅V1ampを、√2で除算した値に等しくなり、2乗和の平方根により第1組の電圧利用率M1を算出できる。第2組のdq軸の電圧指令値Vd2o、Vq2oの2乗和の平方根(第2組のdq軸の電圧ベクトルVdq2の大きさ|Vdq2|)は、第2組の3相の電機子巻線の印加電圧の線間電圧の基本波成分の振幅V2ampを、√2で除算した値に等しくなり、2乗和の平方根により第2組の電圧利用率M2を算出できる。
Figure JPOXMLDOC01-appb-M000004
 なお、各組について、U相の電機子巻線の印加電圧(又は電圧指令値)の線間電圧は、U相の電機子巻線の印加電圧(又は電圧指令値)からV相の電機子巻線の印加電圧(又は電圧指令値)を減算した電圧になる。V相の電機子巻線の印加電圧(又は電圧指令値)の線間電圧は、V相の電機子巻線の印加電圧(又は電圧指令値)からW相の電機子巻線の印加電圧(又は電圧指令値)を減算した電圧になる。W相の電機子巻線の印加電圧(又は電圧指令値)の線間電圧は、W相の電機子巻線の印加電圧(又は電圧指令値)からU相の電機子巻線の印加電圧(又は電圧指令値)を減算した電圧になる。
<利用率比率R12の変化>
 そして、分配部31は、直流電源Vdcと2組のインバータ6a、6bとを接続する母線7を流れる母線電流に重畳している交流成分である母線交流成分の実効値が、第1組の電圧利用率M1と第2組の電圧利用率M2との間の利用率比率R12が1対1である場合よりも低下するように、利用率比率R12を1対1から変化させる利用率設定指令を算出する。
 各組において、電圧利用率が変化すると、インバータの複数のスイッチング素子のオンオフパターン及び各パターンの頻度が変化し、スイッチング素子のオンオフにより生じる母線交流成分の実効値が増減する。上記の構成によれば、2組の電機子巻線及び2組のインバータが設けられている自由度を生かし、第1組の電圧利用率M1と第2組の電圧利用率M2とを1対1から変化させることにより、1対1の場合よりも、第1組のインバータから生じる母線交流成分と第2組のインバータから生じる母線交流成分とを変化させ、第1組及び第2組の合計の母線交流成分の実効値を低減させることができる。よって、直流電源、及び直流電源に接続された平滑コンデンサ12及び他の装置に与える母線交流成分の悪影響を低減することができる。例えば、母線交流成分の実効値が大きいと、平滑コンデンサ12の容量を大きくする必要が生じたり、平滑コンデンサ12の発熱が大きくなる問題が生じたり、平滑コンデンサ12の寿命が短くなる問題が生じたりする。
 分配部31は、利用率比率R12を1対1から変化させる場合に、母線交流成分の実効値が最小になるように、利用率比率R12を1対1から変化させる利用率設定指令を算出すとよい。この構成によれば、母線交流成分の実効値の低減効果を最大化させることができる。
 なお、必ずしも、母線交流成分の実効値が最小になる利用率設定指令が算出されなくてもよく、他の要因、例えば、電圧利用率が高くされる組の電機子巻線及びインバータの発熱の抑制、制御の容易さなども考慮して、利用率比率R12が1対1である場合よりも、母線交流成分の実効値を低減できる利用率設定指令が算出されればよい。
<合計トルク>
 分配部31は、利用率比率R12を1対1から変化させる場合に、第1組の3相の電機子巻線の磁束による第1組のトルクと第2組の3相の電機子巻線の磁束による第2組のトルクとの合計トルクが、合計のトルク指令値に一致するように、利用率設定指令を算出する。この構成によれば、利用率比率R12を1対1から変化させても、合計トルクを合計のトルク指令値に一致させることができる。
<平均電圧利用率による判定>
 分配部31は、第1組の電圧利用率と第2組の電圧利用率との平均電圧利用率が閾値Mth以上である場合に、利用率比率R12を1対1から変化させる利用率設定指令を算出し、平均電圧利用率が閾値Mth未満である場合に、利用率比率R12が1対1になる利用率設定指令を算出する。
 利用率比率R12を1対1から変化させる場合であっても、一方の組の電圧利用率を最大電圧利用率の100%よりも大きくなるように変化させることはできず、他方の組の電圧利用率を0%よりも小さくなるように変化させることはできない。よって、平均電圧利用率が低い場合は、利用率比率R12を1対1から変化させることができる変化量が小さくなり、母線交流成分の実効値を十分に低減させることができない。また、平均電圧利用率が小さい場合は、母線交流成分の実効値が小さくなるので、利用率比率R12を1対1から変化させる必要性が低い。上記の構成によれば、平均電圧利用率が閾値Mth以上である場合に、利用率比率R12が1対1から変化されるので、効果的に、母線交流成分の実効値を低減させることができる。
<各組の電流指令値の算出>
 本実施の形態では、分配部31は、利用率設定指令として、第1組の3相の電機子巻線についての第1組の電流指令値(本例では、第1組のdq軸の電流指令値Id1o、Iq1o)、及び第2組の3相の電機子巻線についての第2組の電流指令値(本例では、第2組のdq軸の電流指令値Id2o、Iq2o)を算出する。そして、分配部31は、利用率比率R12を1対1から変化させる場合に、利用率比率R12が1対1から変化するように、第1組の電流指令値及び第2組の電流指令値を算出する。
 この構成によれば、利用率設定指令として、各組の電流指令値を算出し、各組に指令しているので、各組の電圧利用率M1、M2を精度よく変化させ、利用率比率R12を精度よく制御できる。
 分配部31は、利用率比率R12を1対1から変化させる場合に、第1組の電圧利用率M1及び第2組の電圧利用率M2の一方の組の電圧利用率が、他方の組の電圧利用率よりも高くなるように、一方の組の目標電圧利用率MoHを設定する。そして、分配部31は、一方の組の目標電圧利用率MoH及びロータの回転角速度ω(本例では、ω1)に基づいて、一方の組の印加電圧の電圧利用率が一方の組の目標電圧利用率MoHに一致するように、一方の組の電流指令値を算出する。また、分配部31は、第1組の3相の電機子巻線の磁束による第1組のトルクと第2組の3相の電機子巻線の磁束による第2組のトルクとの合計トルクが、合計のトルク指令値に一致するように、一方の組の電流指令値に基づいて、他方の組の電流指令値を算出する。
 電圧利用率が高くされる一方の組は、電圧利用率が100%を超えると、3相の電圧指令値が直流電圧Vdc(本例では、Vdc1)の範囲(-Vdc/2~+Vdc/2)を超え、過変調状態及び電圧飽和状態になり、線間電圧及び巻線電流に高調波成分が重畳し、トルクに高調波成分が重畳する。一方、電圧利用率が低くされる他方の組は、このような懸念がない。上記の構成によれば、電圧利用率が高くされる一方の組の印加電圧の電圧利用率が一方の組の目標電圧利用率MoHに一致するように、一方の組の電流指令値を算出されるので、一方の組の電圧利用率を目標電圧利用率MoHに精度よく変化させることができる。よって、電圧利用率が高くされ過ぎ、過変調状態及び電圧飽和状態になり、トルクに高調波成分が重畳することを防止できる。一方、電圧利用率が低くされる他方の組は、合計トルクが、合計のトルク指令値に一致するように、一方の組の電流指令値に基づいて、他方の組の電流指令値が算出されるので、合計トルクを合計のトルク指令値に一致させることができる。従って、利用率比率R12を1対1から変化させる場合も、一方の組の電圧利用率を精度よく高くすることができ、過変調状態及び電圧飽和状態になることを防止できると共に、合計トルクを目標に精度よく一致させることができる。
 図6のフローチャートを用いて後述するように、本実施の形態では、電圧利用率が高くされる一方の組は、第1組とされており、電圧利用率が低くされる他方の組は、第2組とされている。第1組と第2組とが入れ替えられてもよい。或いは、発熱が偏らないように、一方の組が、定期的に第1組と第2組との間で入れ替えられてもよい。
<平均電圧利用率による目標電圧利用率MoHの設定>
 分配部31は、利用率比率R12を1対1に設定すると仮定した場合に設定される第1組の電流指令値の基準値及び第2組の電流指令値の基準値を設定する。分配部31は、第1組の電流指令値の基準値及び第2組の電流指令値の基準値に対応する第1組の電圧利用率及び第2組の電圧利用率の平均電圧利用率Mave0(以下、基準状態の平均電圧利用率Mave0と称す)を算出する。そして、分配部31は、利用率比率R12を1対1から変化させる場合に、基準状態の平均電圧利用率Mave0に基づいて一方の組の目標電圧利用率MoHを設定する。
 利用率比率R12の1対1からの変化の有無に関わらず、平均電圧利用率は同等になる。利用率比率R12を1対1から変化させない場合は、基準の状態であるので、基準状態の平均電圧利用率Mave0に基づいて、目標電圧利用率MoHを精度よく設定することができる。
1-4-3-1.分配部31の詳細処理
 図6のフローチャートを参照して、分配部31の詳細処理を説明する。
<ステップS01>
 ステップS01で、分配部31は、利用率比率R12を1対1に設定すると仮定した場合に設定される第1組のdq軸の電流指令値の基準値Id1o0、Iq1o0、及び第2組のdq軸の電流指令値の基準値Id2o0、Iq2o0を設定する。
 分配部31は、回転機1に出力させる合計のトルク指令値を、基準状態の分配率で第1組及び第2組に分配し、第1組のトルク指令値及び第2組のトルク指令値を設定する。基準状態の分配率は、50%に設定されている。合計のトルク指令値は、制御装置30の内部で演算されてもよいし、制御装置30の外部の装置から伝達されてもよい。
 本実施の形態では、回転機1は、非突極機であるので、トルクは、q軸電流に比例し、Id=0制御によりdq軸の電流指令値を設定するように構成されている。そのため、トルク指令値として、q軸電流指令値が直接用いられている。なお、トルク指令値を介してq軸電流指令値が設定されてもよい。
 そこで、次式に示すように、分配部31は、合計のq軸の電流指令値の基準値Iqallo0を設定し、合計のq軸の電流指令値の基準値Iqallo0を、基準状態の分配率(本例では、50%)で、第1組のq軸の電流指令値の基準値Iq1o0、及び第2組のq軸の電流指令値の基準値Iq2o0に分配する。第1組のd軸の電流指令値の基準値Id1o0、及び第2組のd軸の電流指令値の基準値Id2o0は、0に設定される。
Figure JPOXMLDOC01-appb-M000005
 或いは、回転機1が、突極機であり、最大トルク電流制御又は弱め磁束制御等によりdq軸の電流指令値が設定される場合は、次式に示すように、分配部31は、合計のトルク指令値Talloを、基準状態の分配率(本例では、50%)で、第1組のトルク指令値To1及び第2組のトルク指令値To2に分配する。そして、分配部31は、第1組のトルク指令値To1、回転角速度ω、及び直流電圧Vdcに基づいて、最大トルク電流制御又は弱め磁束制御等により、第1組のdq軸の電流指令値の基準値Id1o0、Iq1o0を設定する。分配部31は、第2組のトルク指令値To2、回転角速度ω、及び直流電圧Vdcに基づいて、最大トルク電流制御又は弱め磁束制御等により、第2組のdq軸の電流指令値の基準値Id2o0、Iq2o0を設定する。
Figure JPOXMLDOC01-appb-M000006
<ステップS02>
 ステップS02で、分配部31は、第1組のdq軸の電流指令値の基準値Id1o0、Iq1o0及び第2組のdq軸の電流指令値の基準値Id2o0、Iq2o0に対応する第1組の電圧利用率及び第2組の電圧利用率の基準状態の平均電圧利用率Mave0を算出する。本実施の形態では、各組の巻線抵抗及びインダクタンス等の電気定数が互いに等しいので、基準状態の第1組の電圧利用率及び第2組の電圧利用率が互いに等しくなる。よって、基準状態の第1組の電圧利用率(又は基準状態の第2組の電圧利用率)が、基準状態の平均電圧利用率Mave0として算出される。なお、基準状態の第1組及び第2組の電圧利用率が互いに等しくならない場合は、基準状態の第1組及び第2組の電圧利用率が算出され、それらを平均化して基準状態の平均電圧利用率Mave0が算出されてもよい。
 次式に示すように、分配部31は、電圧方程式を用い、第1組のdq軸の電流指令値の基準値Id1o0、Iq1o0、及び回転角速度ωに基づいて、基準状態の第1組のdq軸の電圧Vd10、Vq10を算出する。なお、電圧方程式において、定常状態であると仮定し、微分の項が省略されている。そして、分配部31は、基準状態の第1組のdq軸の電圧Vd10、Vq10に基づいて、基準状態の第1組の電圧利用率M10を算出し、基準状態の第1組の電圧利用率M10を基準状態の平均電圧利用率Mave0として算出する。
Figure JPOXMLDOC01-appb-M000007
 ここで、Ldは、d軸インダクタンスであり、Lqは、q軸インダクタンスであり、Rは、電機子巻線の抵抗値であり、Ψaは、ロータの磁石の鎖交磁束である。
<ステップS03>
 ステップS03で、分配部31は、基準状態の平均電圧利用率Mave0が閾値Mth以上であるか否かを判定し、閾値Mth以上である場合は、ステップS04に進み、利用率比率R12を1対1から変化させ、閾値Mth未満である場合は、ステップS07に進み、利用率比率R12を1対1に設定する。
 本実施の形態では、図7を用いて後述するように、閾値Mthは、利用率比率R12を1対1に設定する条件で、平均電圧利用率Maveの変化に対して、母線交流成分の実効値が極大になる平均電圧利用率に対応して設定されている(本例では、50%)。例えば、閾値Mthは、極大になる平均電圧利用率の+10%から-10%の範囲内に設定されればよい。
 また、閾値Mthは、設定される電圧利用率の範囲の最大電圧利用率(本例では、100%)の50%に設定されている。基準状態の平均電圧利用率Mave0が50%以上になれば、一方の組の電圧利用率を100%に設定しても、他方の組の電圧利用率を0%以上に設定することができ、双方の組の電圧利用率を適切に設定できる。
<ステップS04>
 ステップS04で、分配部31は、利用率比率R12を1対1から変化させる場合に、第1組の電圧利用率M1が、第2組の電圧利用率M2よりも高くなるように、基準状態の平均電圧利用率Mave0に基づいて、第1組の目標電圧利用率MoHを設定する。例えば、分配部31は、平均電圧利用率Maveと第1組の目標電圧利用率MoHとの関係が予め設定された目標利用率設定マップデータを参照し、基準状態の平均電圧利用率Mave0に対応する第1組の目標電圧利用率MoHを参照する。
 本実施の形態では、分配部31は、利用率比率R12を1対1から変化させる場合に、第1組の目標電圧利用率MoHを、設定される電圧利用率の範囲の最大電圧利用率(本例では、100%)に設定する。
 図7の上段グラフに、利用率比率R12を1対1に設定する場合の、平均電圧利用率Maveの変化に対する母線交流成分の実効値の変化の特性を破線で示す。また、図7の下段グラフに、この場合の平均電圧利用率Maveに対する、各組の電圧利用率M1、M2を破線で示す。平均電圧利用率Maveが、50%の場合に、母線交流成分の実効値が極大になっており、平均電圧利用率Maveが50%から増加又は減少するに従って、母線交流成分の実効値が減少していき、Mave=100%又は0%の場合に、最小になっている。これは、各組について、電圧利用率が50%である場合に、インバータの複数のスイッチング素子のオンオフパターン(電圧ベクトル)のうち、有効ベクトルの設定割合と零ベクトルの設定割合が50%で等しくなる。有効ベクトルでは、直流電源5からインバータに電流が流れ、零ベクトルでは、インバータから直流電源5に電流が流れ、有効ベクトルと零ベクトルとが交互に設定されることで、母線電流に交流成分が生じる。有効ベクトルの設定割合と零ベクトルの設定割合が等しいときに、母線交流成分の実効値が最大になる。そして、有効ベクトルの設定割合と零ベクトルの設定割合が50%からずれるに従って、母線交流成分の実効値が減少していき、有効ベクトル又は零ベクトルの設定割合が100%になる場合に、母線交流成分の実効値が最小になる。
 図7の上段グラフに、第1組の目標電圧利用率MoHを100%に設定する場合の母線交流成分の実効値を実線で示し、図7の下段グラフに、この場合の平均電圧利用率Maveに対する、各組の電圧利用率M1、M2を実線で示す。第1組の目標電圧利用率MoHを100%に設定することにより、第1組により生じる母線交流成分の実効値を最小化することができる。また、特に、母線交流成分の実効値が最大値になる50%の平均電圧利用率Mave付近で、第2組の電圧利用率を50%から低下させることができ、第2組により生じる母線交流成分の実効値を減少させることができる。よって、利用率比率R12を1対1に設定する場合よりも、合計の母線交流成分の実効値を大幅に低減することができる。このように、平均電圧利用率Maveが50%以上の領域で、分配部31は、母線交流成分の実効値が最小になるように、第1組の電圧利用率及び第2組の電圧利用率を変化させている。
<ステップS05>
 そして、ステップS05で、分配部31は、第1組の目標電圧利用率MoH及びロータの回転角速度ωに基づいて、第1組の印加電圧の電圧利用率M1が第1組の目標電圧利用率MoHに一致するように、第1組のdq軸の電流指令値Id1o、Iq1oを算出する。
 式(7)に示したように、定常状態の電圧方程式を用いると、第1組の電圧利用率M1と、第1組のdq軸の電流指令値Id1o、Iq1oとの間には、次式に示す関係が成り立ち、第1組の電圧利用率M1が、第1組の目標電圧利用率MoHに一致する、第1組のdq軸の電流指令値Id1o、Iq1oを算出すればよい。
Figure JPOXMLDOC01-appb-M000008
 本実施の形態では、Id=0制御が行われるので、式(8)に、Id1o=0を代入し、Iq1oについて整理すると、次式を得る。
Figure JPOXMLDOC01-appb-M000009
 式(9)をIq1oについて解くと、次式が得られる。分配部31は、式(9)の各次数の係数a、b、cの算出式及び次式を用い、第1組の目標電圧利用率MoH、回転角速度ω、及び直流電圧Vdcに基づいて、第1組のq軸の電流指令値Iq1oを算出する。巻線抵抗値R、インダクタンス、ロータの磁石の鎖交磁束Ψa等の電気定数は、予め設定される。また、直流電圧Vdcは、予め設定された固定値であってもよい。なお、負トルクを出力させる場合は、式(10)の平方根の項の符号がマイナスになる。
Figure JPOXMLDOC01-appb-M000010
 或いは、最大トルク電流制御によりdq軸の電流指令値が設定される場合は、式(8)のId1oに次式を代入し、Iq1oについて整理すれば、式(9)と同様に、Iq1oの2次関数が得られ、各次数の係数a、b、cの算出式が得られる(式導出は省略)。そして、分配部31は、各次数の係数a、b、cの算出式及び式(10)を用い、第1組の目標電圧利用率MoH、回転角速度ω、及び直流電圧Vdcに基づいて、第1組のq軸の電流指令値Iq1oを算出する。そして、分配部31は、式(11)を用い、算出した第1組のq軸の電流指令値Iq1oに基づいて、第1組のd軸の電流指令値Id1oを算出する。
Figure JPOXMLDOC01-appb-M000011
 或いは、弱め磁束制御によりdq軸の電流指令値が設定される場合は、式(8)のId1oに次式を代入し、Iq1oについて整理すれば、式(9)と同様に、Iq1oの2次関数が得られ、各次数の係数a、b、cの算出式が得られる(式導出は省略)。そして、分配部31は、各次数の係数a、b、cの算出式及び式(10)を用い、第1組の目標電圧利用率MoH、回転角速度ω、及び直流電圧Vdcに基づいて、第1組のq軸の電流指令値Iq1oを算出する。そして、分配部31は、式(12)を用い、算出した第1組のq軸の電流指令値Iq1oに基づいて、第1組のd軸の電流指令値Id1oを算出する。
Figure JPOXMLDOC01-appb-M000012
 或いは、次式に示すように、分配部31は、式(8)から式(12)などを用いて、目標電圧利用率MoH、回転角速度ω、及び直流電圧Vdcと、第1組のq軸の電流指令値Iq1oとの関係が予め設定されたq軸電流設定マップデータMAPiqを参照し、実際の目標電圧利用率MoH、回転角速度ω、及び直流電圧Vdcに対応する第1組のq軸の電流指令値Iq1oを算出してもよい。また、最大トルク電流制御又は弱め磁束制御の場合は、次式に示すように、分配部31は、式(8)から式(12)などを用いて、目標電圧利用率MoH、回転角速度ω、及び直流電圧Vdcと、第1組のd軸の電流指令値Id1oとの関係が予め設定されたd軸電流設定マップデータMAPidを参照し、実際の目標電圧利用率MoH、回転角速度ω、及び直流電圧Vdcに対応する第1組のd軸の電流指令値Id1oを算出してもよい。
Figure JPOXMLDOC01-appb-M000013
<ステップS06>
 ステップS06で、分配部31は、第1組の3相の電機子巻線の磁束による第1組のトルクと第2組の3相の電機子巻線の磁束による第2組のトルクとの合計トルクが、合計のトルク指令値に一致するように、第1組のdq軸の電流指令値Id1o、Iq1oに基づいて、第2組のdq軸の電流指令値Id2o、Iq2oを算出する。
 本実施の形態では、Id=0制御が行われ、トルクはq軸電流に比例する。分配部31は、第1組のq軸の電流指令値Iq1oと第2組のq軸の電流指令値Iq2oとの合計が、第1組のq軸の電流指令値の基準値Iq1o0及び第2組のq軸の電流指令値の基準値Iq2o0の合計に一致するように、第1組のq軸の電流指令値Iq1oに基づいて、第2組のq軸の電流指令値Iq2oを算出する。具体的には、次式に示すように、分配部31は、合計のq軸の電流指令値の基準値Iqallo0から、第1組のq軸の電流指令値Iq1oを減算して、第2組のq軸の電流指令値Iq2oを設定する。
Figure JPOXMLDOC01-appb-M000014
 或いは、回転機1が、突極機であり、最大トルク電流制御又は弱め磁束制御が行われる場合は、次式に示すように、分配部31は、第1組のdq軸の電流指令値Id1o、Iq1oに基づいて、第1組の3相の電機子巻線の磁束による第1組のトルクT1を算出する。ここで、Pnは、極対数である。そして、分配部31は、合計のトルク指令値Talloから、第1組のトルクT1を減算して、第2組のトルクT2を算出する。そして、分配部31は、第2組のトルクT2、回転角速度ω、及び直流電圧Vdcに基づいて、最大トルク電流制御又は弱め磁束制御により、第2組のdq軸の電流指令値Id2o、Iq2oを算出する。
Figure JPOXMLDOC01-appb-M000015
 本実施の形態では、分配部31は、利用率比率R12を1対1から変化させる場合に、第1組の電流指令値を制限値で制限する制限処理を行い、制限により低下した第1組のトルクの低下分だけ、第2組のトルクが増加するように、第2組の電流指令値を変化させる。
 例えば、非突極機の場合は、分配部31は、第1組のq軸の電流指令値Iq1oをq軸の制限値で上限制限し、上限制限により低下した第1組のq軸の電流指令値の低下分を、第2組のq軸の電流指令値Iq2oに加算する。或いは、突極機の場合は、分配部31は、第1組のdq軸の電流指令値Id1o、Iq1oのベクトルの大きさを制限値で上限制限し、上限制限された場合は、上限制限後の第1組のdq軸の電流指令値Id1o、Iq1oに基づいて、式(15)の第1式を用い、第1組のトルクT1を算出し、式(15)の第2式及び第3式により、第2組のdq軸の電流指令値Id2o、Iq2oを算出してもよい。
 利用率比率R12を1対1から変化させると、変化させない場合よりも、第1組の電流が増加し、第1組の電機子巻線及びインバータの発熱が増加する。上記の構成によれば、第1組の電流を制限することにより、第1組の過熱を防止しつつ、第1組の電流制限より低下した第1組トルクの低下分だけ第2組トルクを増加させて、合計トルクが変化することを抑制できる。
<ステップS07>
 ステップS07で、分配部31は、利用率比率R12が1対1になる各組のdq軸の電流指令値を算出する。本実施の形態では、次式に示すように、分配部31は、第1組のdq軸の電流指令値の基準値Id1o0、Iq1o0を、第1組のdq軸の電流指令値Id1o、Iq1oに設定し、第2組のdq軸の電流指令値の基準値Id2o0、Iq2o0を、第2組のdq軸の電流指令値Id2o、Iq2oに設定する。
Figure JPOXMLDOC01-appb-M000016
2.実施の形態2
 実施の形態2に係る回転機の制御装置30について図面を参照して説明する。上記の実施の形態1と同様の構成部分は説明を省略する。本実施の形態に係る回転機1及び回転機の制御装置30の基本的な構成は実施の形態1と同様であるが、利用率比率R12を1対1から変化させる平均電圧利用率Maveの範囲が実施の形態1と異なる。
 実施の形態1では、閾値Mthは50%に設定されており、分配部31は、平均電圧利用率Maveが50%以上である場合に、利用率比率R12を1対1から変化させ、平均電圧利用率Maveが50%未満である場合に、利用率比率R12を1対1に設定していた。本実施の形態では、分配部31は、平均電圧利用率Maveが50%未満の場合も、利用率比率R12を1対1から変化させるように構成されている。
 例えば、図8の下段グラフに、本実施の形態に係る平均電圧利用率Maveに対する、各組の電圧利用率を実線で示す。図8の上段グラフに、この場合の平均電圧利用率Maveに対する母線交流成分の実効値を実線で示す。なお、図7と同様に、比較のために、利用率比率R12を1対1に設定する場合の、母線交流成分の実効値及び各組の電圧利用率を破線で示している。
 本実施の形態では、平均電圧利用率Maveの全域(0%~100%)に亘って、分配部31は、母線交流成分の実効値が、利用率比率R12が1対1である場合よりも低下するように、利用率比率R12を1対1から変化させる第1組の電流指令値及び第2組の電流指令値を算出する。平均電圧利用率Maveが50%以下の領域でも、分配部31は、母線交流成分の実効値が、最小になるように、第1組の電圧利用率及び第2組の電圧利用率を変化させている。
 例えば、平均電圧利用率Maveが50%から40%の範囲は、第2組の電圧利用率が0%になるように、平均電圧利用率Maveが低下するに従って、第1組の目標電圧利用率MoHを100%から次第に低下させている。この範囲は、第2組の電圧利用率を0%にすることによる第2組の母線交流成分の実効値の減少が、第1の電圧利用率を100%から減少させることによる第1組の母線交流成分の実効値の増加を上回っており、全体の母線交流成分の実効値を最小にすることができる。
 平均電圧利用率Maveが40%から0%の範囲は、全体の母線交流成分の実効値が最小になるように、第2組の電圧利用率を0%よりも増加させ、その分、第1組の電圧利用率を低下させている。
 全体の母線交流成分の実効値が最小になるような、平均電圧利用率Maveと第1組の目標電圧利用率MoHとの関係が数値演算又は実験により予め決定され、図8の下段グラフの実線のような目標利用率設定マップデータが予め設定される。
 なお、必ずしも、母線交流成分の実効値が最小になる第1組の目標電圧利用率MoHが設定されなくても、他の要因、例えば、電圧利用率が高くされる組の電機子巻線及びインバータの発熱の抑制、制御の容易さなども考慮して、利用率比率R12が1対1である場合よりも、母線交流成分の実効値を低減できる第1組の目標電圧利用率MoHが設定されればよい。
 本実施の形態では、図6のフローチャートにおいて、利用率比率R12を1対1に設定する場合の処理であるステップS03及びステップS07の演算が実行されないように構成され、ステップS01、ステップS02、ステップS04、ステップS05、ステップS06の順で実行される。
 実施の形態1及び2では、図3に示したように、第1組の3相の電機子巻線の位置に対する第2組の3相の電機子巻線の位置の電気角での位相差は、0度に設定されていた。しかし、位相差は、0度以外(例えば、30度)に設定されてもよい。例えば、図9に、位相差=30度の場合において、母線交流成分の実効値が最小になる各組の電圧利用率の設定値、及び母線交流成分の実効値を実線で示す。なお、比較のために、利用率比率R12を1対1に設定する場合の、母線交流成分の実効値及び各組の電圧利用率を破線で示している。位相差が0度以外であっても、利用率比率R12を1対1から変化させることにより、母線交流成分の実効値を低下させることができる。以下の実施の形態でも同様である。
 実施の形態1及び2では、制御装置30は、第1組の制御器30a及び第2組の制御器30bを備えており、各組の制御が各組の制御器により個別に実行されていた。しかし、制御装置30は、1つの制御器を備えており、各組の制御が1つの制御器により実行されてもよい。或いは、制御装置30は、3つ以上の制御器を備えており、分配部31が第3の制御器により実行されてもよい。以下の実施の形態でも同様である。
 また、第1組の制御器30a及び第2組の制御器30bが設けられる場合、2つの制御器の間で、第1組の搬送波と第2組の搬送波との同期をとってもよいが、同期をとらなくても、利用率比率R12を1対1から変化させることにより、母線交流成分の実効値を低下させる効果がある。一方、特許文献1の技術では、有効ベクトルを時間軸で分散させるため、組間の同期をとる必要があるが、本願ではそのような必要がなく、同期をとるために、装置コストが増加することを抑制できる。また、第1組のPWM周期と、第2組のPWM周期とを異ならせてもよい。以下の実施の形態でも同様である。
3.実施の形態3
 実施の形態3に係る回転機の制御装置30について図面を参照して説明する。上記の実施の形態1と同様の構成部分は説明を省略する。本実施の形態に係る回転機1及び回転機の制御装置30の基本的な構成は実施の形態1と同様であるが、電圧利用率を増加させるために強め磁束が行われる点が実施の形態1と異なる。
 実施の形態1及び2では、図7及び図8に示したように、平均電圧利用率が50%以上の場合に、一方の組の電圧利用率を100%に増加させ、母線交流成分の実効値を低下させていた。一方、平均電圧利用率が50%未満の場合は、他方の組の電圧利用率を負に設定できないので、一方の組の電圧利用率を100%まで増加させることができなかった。ロータの磁束を強めるように電流指令値を補正すれば、トルクを変化させずに電圧利用率を増加させることができる。よって、平均電圧利用率が50%未満の場合でも、一方の組の電圧利用率を100%まで増加させることができる。
 そこで、本実施の形態では、分配部31は、電流補正値による補正を行わない場合の平均電圧利用率が閾値Mth未満である場合は、電流補正値による補正を行う場合の平均電圧利用率が閾値Mth以上になるような、ロータの磁束を強める電流補正値を算出する。そして、分配部31は、利用率比率R12を1対1から変化させる、電流補正値により補正された第1組の電流指令値及び第2組の電流指令値を算出する。一方、分配部31は、電流補正値による補正を行わない場合の平均電圧利用率が閾値Mth以上である場合は、実施の形態1と同様に、利用率比率R12を1対1から変化させる、電流補正値により補正されていない第1組の電流指令値及び第2組の電流指令値を算出する。
 この構成によれば、電流補正を行わない場合の平均電圧利用率が閾値Mth未満の場合でも、ロータの磁束を強める電流補正により平均電圧利用率を閾値Mth以上に増加させ、一方の組の電圧利用率を、電流補正を行わない場合よりも増加させることができ、母線交流成分の実効値を低下させることができる。
<フローチャート>
 図10のフローチャートを参照して、本実施の形態に係る分配部31の詳細処理を説明する。ステップS11で、実施の形態1のステップS01と同様に、分配部31は、利用率比率R12を1対1に設定し、d軸の電流補正値ΔIdによる補正が行われないと仮定した場合に設定される第1組のdq軸の電流指令値の基準値Id1o0、Iq1o0、及び第2組のdq軸の電流指令値の基準値Id2o0、Iq2o0を設定する。
 ステップS12で、実施の形態1のステップS02と同様に、分配部31は、第1組のdq軸の電流指令値の基準値Id1o0、Iq1o0及び第2組のdq軸の電流指令値の基準値Id2o0、Iq2o0に対応する第1組の電圧利用率及び第2組の電圧利用率の基準状態の平均電圧利用率Mave0を算出する。
 ステップS13で、実施の形態1のステップS03と同様に、分配部31は、d軸の電流補正値ΔIdによる補正が行われない基準状態の平均電圧利用率Mave0が閾値Mth以上であるか否かを判定し、閾値Mth以上である場合は、ステップS14に進み、閾値Mth未満である場合は、ステップS17に進む。本実施の形態では、閾値Mthは、設定される電圧利用率の範囲の最大電圧利用率(本例では、100%)の50%に設定されている。
 ステップS14で、実施の形態1のステップS04と同様に、分配部31は、第1組の電圧利用率M1が、第2組の電圧利用率M2よりも高くなるように、基準状態の平均電圧利用率Mave0に基づいて、第1組の目標電圧利用率MoHを設定する。本実施の形態では、分配部31は、第1組の目標電圧利用率MoHを、設定される電圧利用率の範囲の最大電圧利用率(本例では、100%)に設定する。
 ステップS15で、実施の形態1のステップS05と同様に、分配部31は、第1組の目標電圧利用率MoH及びロータの回転角速度ωに基づいて、第1組の印加電圧の電圧利用率M1が第1組の目標電圧利用率MoHに一致するように、第1組のdq軸の電流指令値Id1o、Iq1oを算出する。
 ステップS16で、実施の形態1のステップS06と同様に、分配部31は、第1組のトルクと第2組のトルクとの合計トルクが、合計のトルク指令値に一致するように、第1組のdq軸の電流指令値Id1o、Iq1oに基づいて、第2組のdq軸の電流指令値Id2o、Iq2oを算出する。
 一方、ステップS17で、分配部31は、d軸の電流補正値ΔIdによる補正を行う場合の平均電圧利用率Mavecrが閾値Mth以上になるような、ロータの磁束を強めるd軸の電流補正値ΔIdを算出する。例えば、分配部31は、次式に示すように、第1組のd軸の電流指令値の基準値Id1o0にd軸の電流補正値ΔIdを加算した電流補正後のd軸の電流指令値の基準値Id1o0+ΔId、及び第1組のq軸の電流指令値の基準値Iq1o0に基づいて算出される電流補正後の第1組の電圧利用率の基準値M10crが、閾値Mthに一致するような、d軸の電流補正値ΔIdを算出する。例えば、反復計算により、式(17)を満たすd軸の電流補正値ΔIdが探索される。或いは、第1組のdq軸の電流指令値の基準値Id1o0、Iq1o0、回転角速度ω、直流電圧Vdcを引数とする代数方程式又はマップデータを用いて、d軸の電流補正値ΔIdが算出されてもよい。d軸の電流補正値ΔIdは、正の値になる。d軸の電流補正値ΔIdは、上限値により、上限制限される。なお、第1組の基準値の代わりに第2組の基準値が用いられてもよい。
Figure JPOXMLDOC01-appb-M000017
 反復計算を行う場合の例を図11のフローチャートを参照して説明する。ステップS171で、分配部31は、d軸の電流補正値ΔIdの初期値(本例では、0)を設定する。そして、ステップS172で、分配部31は、現在のd軸の電流補正値ΔIdを、第1組のd軸の電流指令値の基準値Id1o0に加算して、電流補正後のd軸の電流指令値の基準値Id1o0+ΔIdを算出する。
 そして、ステップS173で、分配部31は、式(17)を用い、電流補正後のd軸の電流指令値の基準値Id1o0+ΔId、及び第1組のq軸の電流指令値の基準値Iq1o0に基づいて、電流補正後の第1組の電圧利用率の基準値M10crを算出する。
 ステップS174で、分配部31は、電流補正後の第1組の電圧利用率の基準値M10crが、閾値Mthに、十分近づいたか否かを判定し(例えば、偏差の絶対値が判定値以下になったか否かを判定する)、十分に近づいたと判定した場合は、ステップS175に進み、十分に近づいていないと判定した場合は、ステップS176に進む。ステップS176で、分配部31は、電流補正後の第1組の電圧利用率の基準値M10crが、閾値Mthに近づくように、d軸の電流補正値ΔIdを変化させた後、ステップS172に戻り、反復計算を継続する。一方、ステップS175で、分配部31は、現在のd軸の電流補正値ΔIdを、最終的なd軸の電流補正値ΔIdとして設定し、反復計算を終了する。
 図10に戻り、ステップS18で、分配部31は、第1組の電圧利用率M1が、第2組の電圧利用率M2よりも高くなるように、基準状態の平均電圧利用率Mave0に基づいて、第1組の目標電圧利用率MoHを設定する。本実施の形態では、分配部31は、第1組の目標電圧利用率MoHを、閾値Mthの2倍値(本例では、100%)に設定する。
 ステップS19で、分配部31は、第1組の目標電圧利用率MoH及びロータの回転角速度ωに基づいて、電流補正後の第1組の印加電圧の電圧利用率M1crが第1組の目標電圧利用率MoHに一致するように、d軸の電流補正値ΔIdにより補正された第1組のdq軸の電流指令値Id1o+ΔId、Iq1oを算出する。本実施の形態では、基準状態でId=0制御が行われるので、基準状態の第1組のd軸の電流指令値Id1oは0になる。
Figure JPOXMLDOC01-appb-M000018
 式導出は省略するが、式(18)をIq1oについて整理すると、式(9)と同様に、Iq1oの2次関数が得られ、各次数の係数a、b、cの算出式が得られる。そして、実施の形態1と同様に、分配部31は、各次数の係数a、b、cの算出式及び式(10)を用い、第1組の目標電圧利用率MoH、d軸の電流補正値ΔId、回転角速度ω、及び直流電圧Vdcに基づいて、電流補正後の第1組のq軸の電流指令値Iq1oを算出する。そして、分配部31は、d軸の電流補正値ΔIdを、電流補正後の第1組のd軸の電流指令値Id1oとして算出する。
 なお、回転機1が突極機であり、最大トルク電流制御又は弱め磁束制御が行われる場合は、式(18)の第1組のd軸の電流指令値Id1oに、式(11)又は式(12)を代入し、Iq1oについて整理すると、同様に、Iq1oの2次関数が得られ、各次数の係数a、b、cの算出式が得られる。そして、分配部31は、各次数の係数a、b、cの算出式及び式(10)を用い、第1組の目標電圧利用率MoH、d軸の電流補正値ΔId、回転角速度ω、及び直流電圧Vdcに基づいて、電流補正後の第1組のq軸の電流指令値Iq1oを算出する。そして、分配部31は、式(11)又は式(12)を用い、算出した電流補正後の第1組のq軸の電流指令値Iq1oに基づいて、第1組のd軸の電流指令値Id1oを算出し、第1組のd軸の電流指令値Id1oにd軸の電流補正値ΔIdを加算して、電流補正後の第1組のd軸の電流指令値Id1o+ΔIdを算出する。
 或いは、実施の形態1と同様に、次式に示すように、分配部31は、目標電圧利用率MoH、d軸の電流補正値ΔId、回転角速度ω、及び直流電圧Vdcと、第1組のq軸の電流指令値Iq1oとの関係が予め設定されたq軸電流設定マップデータMAPiqを参照し、実際の目標電圧利用率MoH、d軸の電流補正値ΔId、回転角速度ω、及び直流電圧Vdcに対応する電流補正後の第1組のq軸の電流指令値Iq1oを算出してもよい。分配部31は目標電圧利用率MoH、d軸の電流補正値ΔId、回転角速度ω、及び直流電圧Vdcと、第1組のd軸の電流指令値Id1oとの関係が予め設定されたd軸電流設定マップデータMAPidを参照し、実際の目標電圧利用率MoH、d軸の電流補正値ΔId、回転角速度ω、及び直流電圧Vdcに対応する電流補正後の第1組のd軸の電流指令値Id1o+ΔIdを算出してもよい。
Figure JPOXMLDOC01-appb-M000019
 ステップS20で、分配部31は、第1組のトルクと第2組のトルクとの合計トルクが、合計のトルク指令値に一致するように、電流補正後の第1組のdq軸の電流指令値Id1o+ΔId、Iq1oに基づいて、電流補正後の第2組のdq軸の電流指令値Id2o、Iq2oを算出する。
 本実施の形態では、Id=0制御が行われるので、次式に示すように、分配部31は、合計のq軸の電流指令値の基準値Iqallo0から、電流補正後の第1組のq軸の電流指令値Iq1oを減算して、電流補正後の第2組のq軸の電流指令値Iq2oを設定する。また、分配部31は、d軸の電流補正値ΔIdを、電流補正後の第2組のd軸の電流指令値Id2o+ΔIdとして算出する。
Figure JPOXMLDOC01-appb-M000020
 なお、回転機1が突極機であり、最大トルク電流制御又は弱め磁束制御が行われる場合は、電流補正後の第2組のd軸の電流指令値Id2o+ΔIdが、電流補正を行わない場合よりもd軸の電流補正値ΔIdだけ増加し、且つ、合計のトルクが合計のトルク指令値Talloに一致するように、電流補正後の第2組のdq軸の電流指令値Id2o+ΔId、Iq2oが算出される。
 なお、第2組の電圧利用率は低下される側であるので、第2組のd軸の電流指令値Id2oは、d軸の電流補正値ΔIdにより補正されなくてもよい。この場合は、実施の形態1のステップS06と同様の方法で、第2組のdq軸の電流指令値Id2o、Iq2oが算出される。
 電流補正前の平均電圧利用率が低い領域で、平均電圧利用率を増加させようとすると、d軸の電流補正値ΔIdが大きくなりすぎるので、電流補正前の平均電圧利用率が、所定値(例えば、20%)以下の領域では、電流補正が行われず、利用率比率R12が1対1に設定されるように構成されてもよい。
4.実施の形態4
 実施の形態4に係る回転機の制御装置30について図面を参照して説明する。上記の実施の形態1と同様の構成部分は説明を省略する。本実施の形態に係る回転機1及び回転機の制御装置30の基本的な構成は実施の形態1と同様であるが、ロータを界磁する界磁巻線20が設けられており、制御装置30は、界磁巻線20に電圧を印加する界磁巻線制御部42を備えている。図12及び図13に、回転機1及び制御装置30の概略構成図を示す。界磁巻線制御部42は、第1組の制御器30aに備えられている。或いは、界磁巻線制御部42は、第2組の制御器30b又は第3の制御器に備えられてもよい。界磁巻線20は、ロータ以外、例えば、ステータ、又はロータの近傍に設けられてもよい。
 コンバータ21は、スイッチング素子を有し、直流電源5と界磁巻線20との間で電力変換を行う。本実施の形態では、コンバータ21は、直流電源5の高電位側に接続される高電位側のスイッチング素子SPと直流電源5の低電位側に接続される低電位側のスイッチング素子SNとが直列接続された直列回路を2つ設けたHブリッジ回路とされている。なお、コンバータ21は、電力変換を行うことができる任意のスイッチング素子の回路構成とされてもよい。界磁巻線20に流れる電流を検出する電流センサ22が設けられており、電流センサ22の出力信号が、制御装置30に入力される。
 界磁巻線制御部42は、合計のトルク指令値等に基づいて、界磁電流指令値を算出し、界磁巻線電流の検出値が界磁電流指令値に近づくように、界磁電圧指令値を変化させる。そして、界磁巻線制御部42は、界磁電圧指令値に基づいて、PWM制御によりコンバータ21の複数のスイッチング素子をオンオフ制御する。
5.実施の形態5
 実施の形態5に係る回転機の制御装置30について図面を参照して説明する。上記の実施の形態4と同様の構成部分は説明を省略する。本実施の形態に係る回転機1及び回転機の制御装置30の基本的な構成は実施の形態4と同様であり、ロータには界磁巻線20が設けられており、制御装置30には、界磁巻線制御部42が設けられている。しかし、本実施の形態では、電圧利用率を増加させるために界磁巻線20の界磁が強められる点が実施の形態4と異なる。
 そこで、本実施の形態では、分配部31は、界磁巻線補正値による補正を行わない場合の平均電圧利用率が閾値Mth未満である場合は、界磁巻線補正値による補正を行う場合の平均電圧利用率が閾値Mth以上になるような、ロータの界磁を強める界磁巻線補正値を算出する。そして、分配部31は、界磁巻線補正値により界磁電圧指令値を補正し、利用率比率R12を1対1から変化させる利用率設定指令を算出する。一方、分配部31は、界磁巻線補正値による補正を行わない場合の平均電圧利用率が閾値Mth以上である場合は、実施の形態4と同様に、界磁巻線補正値による界磁電圧指令値の補正を行わず、利用率比率を1対1から変化させる利用率設定指令を算出する。
 この構成によれば、電流補正を行わない場合の平均電圧利用率が閾値Mth未満の場合でも、ロータの界磁を強める界磁巻線補正により平均電圧利用率を閾値Mth以上に増加させ、一方の組の電圧利用率を、界磁巻線補正を行わない場合よりも増加させることができ、母線交流成分の実効値を低下させることができる。
<フローチャート>
 図14のフローチャートを参照して、本実施の形態に係る分配部31の詳細処理を説明する。ステップS31で、実施の形態1のステップS01と同様に、分配部31は、利用率比率R12を1対1に設定し、界磁電流補正値ΔIfによる補正が行われないと仮定した場合に設定される第1組のdq軸の電流指令値の基準値Id1o0、Iq1o0、及び第2組のdq軸の電流指令値の基準値Id2o0、Iq2o0を設定する。
 ステップS32で、実施の形態1のステップS02と同様に、分配部31は、第1組のdq軸の電流指令値の基準値Id1o0、Iq1o0及び第2組のdq軸の電流指令値の基準値Id2o0、Iq2o0に対応する第1組の電圧利用率及び第2組の電圧利用率の基準状態の平均電圧利用率Mave0を算出する。
 ステップS33で、実施の形態1のステップS03と同様に、分配部31は、界磁電流補正値ΔIfによる補正が行われない基準状態の平均電圧利用率Mave0が閾値Mth以上であるか否かを判定し、閾値Mth以上である場合は、ステップS34に進み、閾値Mth未満である場合は、ステップS37に進む。本実施の形態では、閾値Mthは、設定される電圧利用率の範囲の最大電圧利用率(本例では、100%)の50%に設定されている。
 ステップS34からステップS36は、実施の形態1のステップS04からステップS06と同様であるので、説明を省略する。ただし、ロータの磁束Ψaが、界磁巻線電流Ifに応じて変化する。
 ステップS37で、分配部31は、界磁電流補正値ΔIfによる補正を行う場合の平均電圧利用率Mavecrが閾値Mth以上になるような、ロータの界磁を強める界磁電流補正値ΔIfを算出する。例えば、分配部31は、次式に示すように、界磁電流補正値ΔIfを加算した界磁巻線補正後の界磁電流指令値Ifo+ΔIf、及び第1組のdq軸の電流指令値の基準値Id1o0、Iq1o0に基づいて算出される界磁巻線補正後の第1組の電圧利用率の基準値M10crが、閾値Mthに一致するような、界磁電流補正値ΔIfを算出する。界磁電流指令値Ifoは、合計のトルク指令値等に基づいて算出される基準値である。例えば、反復計算により、式(21)を満たす界磁電流補正値ΔIfが探索される。ここで、ロータの磁束Ψaは、界磁巻線電流の関数になっている。或いは、界磁電流指令値Ifo、第1組のdq軸の電流指令値の基準値Id1o0、Iq1o0、回転角速度ω、直流電圧Vdcを引数とする代数方程式又はマップデータを用いて、界磁電流補正値ΔIfが算出されてもよい。界磁電流補正値ΔIfは、正の値になる。界磁電流補正値ΔIfは、上限値により、上限制限される。
Figure JPOXMLDOC01-appb-M000021
 反復計算を行う場合の例を図15のフローチャートを参照して説明する。ステップS371で、分配部31は、界磁電流補正値ΔIfの初期値(本例では、0)を設定する。そして、ステップS372で、分配部31は、現在の界磁電流補正値ΔIfを、界磁電流指令値Ifoに加算して、界磁巻線補正後の界磁電流指令値Ifo+ΔIfを算出する。
 そして、ステップS373で、分配部31は、式(21)を用い、界磁巻線補正後の界磁電流指令値Ifo+ΔIf、及び第1組のdq軸の電流指令値の基準値Id1o0、Iq1o0に基づいて、界磁巻線補正後の第1組の電圧利用率の基準値M10crを算出する。
 ステップS374で、分配部31は、界磁巻線補正後の第1組の電圧利用率の基準値M10crが、閾値Mthに、十分近づいたか否かを判定し(例えば、偏差の絶対値が判定値以下になったか否かを判定する)、十分に近づいたと判定した場合は、ステップS375に進み、十分に近づいていないと判定した場合は、ステップS376に進む。ステップS376で、分配部31は、界磁巻線補正後の第1組の電圧利用率の基準値M10crが、閾値Mthに近づくように、界磁電流補正値ΔIfを変化させた後、ステップS372に戻り、反復計算を継続する。一方、ステップS375で、分配部31は、現在の界磁電流補正値ΔIfを、最終的な界磁電流補正値ΔIfとして設定し、反復計算を終了する。なお、界磁巻線制御部42は、界磁電流補正値ΔIfの加算後の界磁電流指令値Ifo+ΔIfに、界磁巻線電流の検出値が近づくように、界磁電圧指令値を変化させる。
 図14に戻り、ステップS38で、分配部31は、第1組の電圧利用率M1が、第2組の電圧利用率M2よりも高くなるように、基準状態の平均電圧利用率Mave0に基づいて、第1組の目標電圧利用率MoHを設定する。本実施の形態では、分配部31は、第1組の目標電圧利用率MoHを、閾値Mthの2倍値(本例では、100%)に設定する。
 ステップS39で、分配部31は、界磁巻線補正後の界磁電流指令値Ifo+ΔIf、第1組の目標電圧利用率MoH及びロータの回転角速度ωに基づいて、電流補正後の第1組の印加電圧の電圧利用率M1crが第1組の目標電圧利用率MoHに一致するように、第1組のdq軸の電流指令値Id1o、Iq1oを算出する。
Figure JPOXMLDOC01-appb-M000022
 式導出は省略するが、式(22)をIq1oについて整理すると、式(9)と同様に、Iq1oの2次関数が得られ、各次数の係数a、b、cの算出式が得られる。そして、実施の形態1と同様に、分配部31は、各次数の係数a、b、cの算出式及び式(10)を用い、界磁巻線補正後の界磁電流指令値Ifo+ΔIf、第1組の目標電圧利用率MoH、回転角速度ω、及び直流電圧Vdcに基づいて、第1組のq軸の電流指令値Iq1oを算出する。分配部31は、第1組のd軸の電流指令値Id1oを0に設定する。
 なお、回転機1が突極機であり、最大トルク電流制御又は弱め磁束制御が行われる場合は、式(22)の第1組のd軸の電流指令値Id1oに、式(11)又は式(12)を代入し、Iq1oについて整理すると、同様に、Iq1oの2次関数が得られ、各次数の係数a、b、cの算出式が得られる。そして、分配部31は、各次数の係数a、b、cの算出式及び式(10)を用い、界磁巻線補正後の界磁電流指令値Ifo+ΔIf、第1組の目標電圧利用率MoH、回転角速度ω、及び直流電圧Vdcに基づいて、第1組のq軸の電流指令値Iq1oを算出する。そして、分配部31は、式(11)又は式(12)を用いて、第1組のd軸の電流指令値Id1oを算出する。
 或いは、実施の形態1と同様に、次式に示すように、分配部31は、界磁巻線補正後の界磁電流指令値Ifo+ΔIf、目標電圧利用率MoH、回転角速度ω、及び直流電圧Vdcと、第1組のq軸の電流指令値Iq1oとの関係が予め設定されたq軸電流設定マップデータMAPiqを参照し、実際の界磁巻線補正後の界磁電流指令値Ifo+ΔIf、目標電圧利用率MoH、回転角速度ω、及び直流電圧Vdcに対応する電流補正後の第1組のq軸の電流指令値Iq1oを算出してもよい。分配部31は、界磁巻線補正後の界磁電流指令値Ifo+ΔIf、目標電圧利用率MoH、回転角速度ω、及び直流電圧Vdcと、第1組のd軸の電流指令値Id1oとの関係が予め設定されたd軸電流設定マップデータMAPidを参照し、実際の界磁巻線補正後の界磁電流指令値Ifo+ΔIf、目標電圧利用率MoH、回転角速度ω、及び直流電圧Vdcに対応する第1組のd軸の電流指令値Id1oを算出してもよい。
Figure JPOXMLDOC01-appb-M000023
 ステップS40で、分配部31は、第1組のトルクと第2組のトルクとの合計トルクが、合計のトルク指令値に一致するように、界磁巻線補正後の界磁電流指令値Ifo+ΔIf、及び第1組のdq軸の電流指令値Id1o、Iq1oに基づいて、電流補正後の第2組のdq軸の電流指令値Id2o、Iq2oを算出する。界磁巻線補正後の界磁電流指令値Ifo+ΔIfに基づくロータの磁束Ψaの算出以外は、実施の形態1のステップS06と同様であるので、説明を省略する。
 界磁巻線補正前の平均電圧利用率が低い領域で、平均電圧利用率を増加させようとすると、界磁電流補正値ΔIfが大きくなりすぎるので、界磁巻線補正前の平均電圧利用率が、所定値(例えば、20%)以下の領域では、界磁巻線補正が行われず、利用率比率R12が1対1に設定されるように構成されてもよい。
 実施の形態3のd軸の電流補正値ΔIdによる強め磁束と、本実施の形態の界磁電流補正値ΔIfによる強め界磁が同時に行われてもよい。この場合は、d軸の電流補正値ΔIdによる平均電圧利用率の増加と、界磁電流補正値ΔIfによる平均電圧利用率の増加とが適切に分担されるとよい。
6.実施の形態6
 実施の形態6に係る回転機の制御装置30について図面を参照して説明する。上記の実施の形態1と同様の構成部分は説明を省略する。本実施の形態に係る回転機1及び回転機の制御装置30の基本的な構成は実施の形態1と同様であるが、第1組及び第2組の搬送波の位相の設定、及び閾値Mthの設定が実施の形態1と異なる。
<第1組のPWM制御>
 実施の形態1と同様に、第1組スイッチング制御部36は、第1組の3相の電圧指令値Vu1o、Vv1o、Vw1oのそれぞれと第1組の搬送波CA1とを比較し、比較結果に基づいて、複数のスイッチング素子をオンオフする。実施の形態1と異なり、図16に示すように、第1組の3相の電圧指令値Vu1o、Vv1o、Vw1oの内、電流絶対値が最大となる1相(本例では、U1相)のスイッチングを停止し、特定の相(本例では、U1相及びV1相)の電圧指令値と比較される第1組の搬送波CA1a(第1組の第1の搬送波CA1aと称す)と、特定の相以外の相(本例では、W1相)の電圧指令値と比較される第1組の搬送波CA1b(第1組の第2の搬送波CA1bと称す)とは、互いに逆位相である。第1組の第1及び第2の搬送波CA1a、CA1bは、互いに逆位相で、PWM周期Tcで0を中心に直流電圧の半分値Vdc1/2の振幅で振動する三角波とされている。三角波以外に鋸波等の任意の波形が用いられてもよい。
 第1組スイッチング制御部36は、特定の相であるV1相について、第1組の第1の搬送波CA1aが電圧指令値を下回った場合は、高電位側のスイッチング素子のスイッチング信号GP1をオンし、第1組の第1の搬送波CA1aが電圧指令値を上回った場合は、高電位側のスイッチング素子のスイッチング信号GP1をオフする。一方、第1組スイッチング制御部36は、U1相及びV1相のそれぞれについて、第1組の第1の搬送波CA1aが電圧指令値を下回った場合は、低電位側のスイッチング素子のスイッチング信号GN1をオフし、第1組の第1の搬送波CA1aが電圧指令値を上回った場合は、低電位側のスイッチング素子のスイッチング信号GN1をオンする。
 第1組スイッチング制御部36は、特定の相以外の相であるW1相について、第1組の第2の搬送波CA1bが電圧指令値を下回った場合は、高電位側のスイッチング素子のスイッチング信号GP1をオンし、第1組の第2の搬送波CA1bが電圧指令値を上回った場合は、高電位側のスイッチング素子のスイッチング信号GP1をオフする。一方、第1組スイッチング制御部36は、W1相について、第1組の第2の搬送波CA1bが電圧指令値を下回った場合は、低電位側のスイッチング素子のスイッチング信号GN1をオフし、第1組の第2の搬送波CA1bが電圧指令値を上回った場合は、低電位側のスイッチング素子のスイッチング信号GN1をオンする。ここでは、Vu1o>Vv1o>Vw1oとなる電流位相の場合について述べたが、電流位相に応じて公知の特許文献3の方法でスイッチング状態を制御すればよい。
<第2組のPWM制御>
 実施の形態1と同様に、第2組スイッチング制御部41は、第2組の3相の電圧指令値Vu2o、Vv2o、Vw2oのそれぞれと第2組の搬送波CA2とを比較し、比較結果に基づいて、複数のスイッチング素子をオンオフする。実施の形態1と異なり、第2組の3相の電圧指令値Vu2o、Vv2o、Vw2oの内、電流絶対値が最大となる1相(本例では、U2相)のスイッチングを停止し、特定の相(本例では、U2相及びV2相)の電圧指令値と比較される第2組の搬送波CA2b(第2組の第1の搬送波CA2aと称す)と、特定の相以外の相(本例では、W2相)の電圧指令値と比較される第2組の搬送波CA2b(第2組の第2の搬送波CA2bと称す)とは、互いに逆位相であり。第2組の第1及び第2の搬送波CA2a、CA2bは、互いに逆位相で、PWM周期Tcで0を中心に直流電圧の半分値Vdc2/2の振幅で振動する三角波とされている。第2組スイッチング制御部41の処理は、第1組スイッチング制御部36の処理と同様であるので、説明を省略する。
<利用率比率R12の変化>
 図17の上段グラフに、利用率比率R12を1対1に設定する場合の、平均電圧利用率Maveの変化に対する母線交流成分の実効値の変化の特性を破線で示す。また、図17の下段グラフに、この場合の平均電圧利用率Maveに対する、各組の電圧利用率を破線で示す。平均電圧利用率Maveが30%付近である場合に、母線交流成分の実効値が1番目に大きい極大になっており、平均電圧利用率Maveが70%付近である場合に、母線交流成分の実効値が2番目に大きい極大になっている。平均電圧利用率Maveが60%付近である場合に、母線交流成分の実効値が極小になっている。Mave=100%又は0%の場合に、母線交流成分の実効値が最小になっている。これは、本実施の形態では、各組について、特定の2相の搬送波と非特定の1相の搬送波とが互いに逆位相に設定されているためである。
 実施の形態1と同様に、分配部31は、第1組の電圧利用率と第2組の電圧利用率との平均電圧利用率が閾値Mth以上である場合に、利用率比率R12を1対1から変化させる利用率設定指令を算出し、平均電圧利用率が閾値Mth未満である場合に、利用率比率が1対1になる利用率設定指令を算出する。
 閾値Mthは、利用率比率R12を1対1に設定する条件で、平均電圧利用率Maveの変化に対して、母線交流成分の実効値の変化が極大になる平均電圧利用率に対応して設定されている(本例では、30%)。例えば、閾値Mthは、極大になる平均電圧利用率の+10%から-10%の範囲内に設定されればよい。
<フローチャート>
 図18のフローチャートを参照して、本実施の形態に係る分配部31の詳細処理を説明する。ステップS51で、実施の形態1のステップS01と同様に、分配部31は、利用率比率R12を1対1に設定し、第1組のdq軸の電流指令値の基準値Id1o0、Iq1o0、及び第2組のdq軸の電流指令値の基準値Id2o0、Iq2o0を設定する。
 ステップS52で、実施の形態1のステップS02と同様に、分配部31は、第1組のdq軸の電流指令値の基準値Id1o0、Iq1o0及び第2組のdq軸の電流指令値の基準値Id2o0、Iq2o0に対応する第1組の電圧利用率及び第2組の電圧利用率の基準状態の平均電圧利用率Mave0を算出する。
 ステップS53で、実施の形態1のステップS03と同様に、分配部31は、基準状態の平均電圧利用率Mave0が閾値Mth(本例では、30%)以上であるか否かを判定し、閾値Mth以上である場合は、ステップS54に進み、閾値Mth未満である場合は、ステップS57に進む。
 ステップS54で、実施の形態1のステップS04と同様に、分配部31は、第1組の電圧利用率M1が、第2組の電圧利用率M2よりも高くなるように、基準状態の平均電圧利用率Mave0に基づいて、第1組の目標電圧利用率MoHを設定する。本実施の形態では、図17の下段グラフに示すように、分配部31は、基準状態の平均電圧利用率Mave0が閾値Mth(本例では、30%)以上、最大電圧利用率(本例では100%)の50%未満である場合(30%≦Mave0<50%)は、第1組の目標電圧利用率MoHを、利用率比率R12を1対1に設定する条件で平均電圧利用率Maveの変化に対して母線交流成分の実効値の変化が極小になる平均電圧利用率に対応して設定する(本例では、60%)。例えば、第1組の目標電圧利用率MoHは、極小になる平均電圧利用率の+10%から-10%の範囲内に設定されればよい。分配部31は、基準状態の平均電圧利用率Mave0が最大電圧利用率(本例では100%)の50%以上である場合(50%≦Mave0)は、第1組の目標電圧利用率MoHを、最大電圧利用率(本例では100%)に設定する。
 ステップS55で、実施の形態1のステップS05と同様に、分配部31は、第1組の目標電圧利用率MoH及びロータの回転角速度ωに基づいて、第1組の印加電圧の電圧利用率M1が第1組の目標電圧利用率MoHに一致するように、第1組のdq軸の電流指令値Id1o、Iq1oを算出する。
 ステップS56で、実施の形態1のステップS06と同様に、分配部31は、第1組のトルクと第2組のトルクとの合計トルクが、合計のトルク指令値に一致するように、第1組のdq軸の電流指令値Id1o、Iq1oに基づいて、第2組のdq軸の電流指令値Id2o、Iq2oを算出する。
 一方、ステップS57で、実施の形態1のステップS07と同様に、分配部31は、利用率比率R12が1対1になる各組のdq軸の電流指令値を算出する。式(16)に示したように、分配部31は、第1組のdq軸の電流指令値の基準値Id1o0、Iq1o0を、第1組のdq軸の電流指令値Id1o、Iq1oに設定し、第2組のdq軸の電流指令値の基準値Id2o0、Iq2o0を、第2組のdq軸の電流指令値Id2o、Iq2oに設定する。
 図17の上段グラフに、第1組の目標電圧利用率MoHを60%又は100%に設定する場合の母線交流成分の実効値を実線で示し、図17の下段グラフに、この場合の平均電圧利用率Maveに対する、各組の電圧利用率を実線で示す。特定の2相の搬送波と非特定の1相の搬送波とが互いに逆位相に設定される場合において、母線交流成分の実効値が極大になる30%以上の平均電圧利用率Maveの領域で、利用率比率R12を1対1から変化させることにより、利用率比率R12が1対1である場合よりも、母線交流成分の実効値を低下させることができる。平均電圧利用率Maveが50%未満の場合は、第1組の目標電圧利用率MoHを、母線交流成分の実効値が最小になる100%まで増加させることができないので、第1組の目標電圧利用率MoHを、母線交流成分の実効値が極小になる60%に設定することで、第1組により生じる母線交流成分の実効値を低減することができる。また、平均電圧利用率Maveが50%以上の場合は、第1組の目標電圧利用率MoHを、母線交流成分の実効値が最小になる100%まで増加させて、第1組により生じる母線交流成分の実効値を最小化することができる。よって、利用率比率R12を1対1に設定する場合よりも、合計の母線交流成分の実効値を大幅に低減することができる。
 なお、図19に示すように、分配部31は、平均電圧利用率Maveの各動作点で、母線交流成分の実効値が最小になるように、第1組の電圧利用率及び第2組の電圧利用率を変化させる第1組の目標電圧利用率MoHを設定してもよい。全体の母線交流成分の実効値が最小になるような、平均電圧利用率Maveと第1組の目標電圧利用率MoHとの関係が数値演算又は実験により予め決定され、図19の下段グラフのような目標利用率設定マップデータが予め設定される。この場合は、図19に示すように、平均電圧利用率Maveが30%未満の領域でも、利用率比率R12が1対1から変化されてもよい。
 図9に示したように第1組の電機子巻線の位置に対する第2組の電機子巻線の位置の位相差が、30度に設定されている場合において、図20に母線交流成分の実効値が最小になる各組の電圧利用率の設定値、及び母線交流成分の実効値を実線で示す。なお、比較のために、利用率比率R12を1対1に設定する場合の、母線交流成分の実効値及び各組の電圧利用率を破線で示している。逆位相の搬送波が用いられ、位相差が0度以外であっても、利用率比率R12を1対1から変化させることにより、母線交流成分の実効値を低下させることができる。
7.その他の実施の形態
(1)上記の各実施の形態では、回転機の用途を特定してなかった。例えば、回転機1は、電動パワーステアリング装置100の駆動力源として用いられてもよい。図21に示すように、電動パワーステアリング装置100は、回転機1、回転機の制御装置30、2組のインバータ6a、6bと、回転機1の駆動力を車両の操舵装置102に伝達する駆動力伝達機構101と、を備えている。
 回転機1のロータの回転軸は、駆動力伝達機構101を介して車輪103の操舵装置102に連結される。例えば、電動パワーステアリング装置100は、運転者が左右に回転するハンドル104と、ハンドル104に連結されて、ハンドル104による操舵トルクを車輪103の操舵装置102に伝達するシャフト105と、シャフト105に取り付けられ、ハンドル104による操舵トルクTsを検出するトルクセンサ106と、回転機1の回転軸をシャフト105に連結するウォームギヤ機構等の駆動力伝達機構101と、を備えている。トルクセンサ106の出力信号は、制御装置30(入力回路92)に入力される。制御装置30(例えば、分配部31)は、トルクセンサ106の出力信号に基づいて検出した操舵トルクTsに基づいて、合計のトルク指令値、又は合計のq軸の電流指令値を算出する。
 或いは、回転機1は、電動パワーステアリング装置100以外の各種の装置の駆動力源とされてもよい。例えば、回転機1は、車両の車輪の駆動力源、エレベータの駆動力源、航空機の駆動力源等とされてもよい。
(2)上記の各実施の形態では、第1組及び第2組の3相の電機子巻線が設けられていた。しかし、第1組及び第2組の3相以外の複数相(例えば、2相、4相)の電機子巻線が設けられてもよい。
(3)上記の各実施の形態では、振幅低減変調が行われ、設定される電圧利用率の範囲の最大電圧利用率は、100%である場合を例に説明した。しかし、振幅低減変調が行われず、最大電圧利用率が86.6%であってもよい。或いは、最大電圧利用率が、100%から110%までの間に設定され、過変調が行われてもよい。
(4)上記の各実施の形態では、分配部31は、利用率設定指令として、第1組の電流指令値、及び第2組の電流指令値を算出していた。しかし、分配部31は、利用率設定指令として、第1組の電圧利用率及び第2組の電圧利用率の設定に関わる任意のパラメータを算出してもよい。例えば、分配部31は、利用率設定指令として、第1組のdq軸の圧指令値の補正値、及び第2組のdq軸の電圧指令値の補正値を算出し、各組のdq軸の電圧指令値を補正するように構成されてもよい。
(5)上記の各実施の形態では、分配部31は、平均電圧利用率が所定の範囲である場合に、利用率比率R12を1対1から変化させていた。しかし、回転角速度ω等の回転機1の運転状態が所定の範囲にある場合に、平滑コンデンサ5の発熱等が問題になり、母線交流成分の実効値を低減させたい場合がある。よって、分配部31は、回転角速度ω等の回転機1の運転状態が所定の範囲である場合に、利用率比率R12を1対1から変化させてもよい。また、分配部31は、一方の組の電圧利用率を、最大電圧利用率(100%)まで変化させなくてもよく、一方の組の電圧利用率を、母線交流成分の実効値が許容値以下になる最大電圧利用率未満の電圧利用率に変化させてもよい。
 本願は、様々な例示的な実施の形態及び実施例が記載されているが、1つ、または複数の実施の形態に記載された様々な特徴、態様、及び機能は特定の実施の形態の適用に限られるのではなく、単独で、または様々な組み合わせで実施の形態に適用可能である。従って、例示されていない無数の変形例が、本願明細書に開示される技術の範囲内において想定される。例えば、少なくとも1つの構成要素を変形する場合、追加する場合または省略する場合、さらには、少なくとも1つの構成要素を抽出し、他の実施の形態の構成要素と組み合わせる場合が含まれるものとする。
1 回転機、5 直流電源、6a 第1組のインバータ、6b 第2組のインバータ、7 母線、20 界磁巻線、30 回転機の制御装置、31 分配部、35 第1組電圧指令算出部、36 第1組スイッチング制御部、40 第2組電圧指令算出部、41 第2組スイッチング制御部、42 界磁巻線制御部、MoH 目標電圧利用率、Mth 閾値、R12 利用率比率

Claims (17)

  1.  2組の複数相の電機子巻線を有する回転機を、同一の直流電源に接続された2組のインバータを介して制御する回転機の制御装置であって、
     前記直流電源の電源電圧に対する第1組の複数相の電機子巻線の印加電圧の線間電圧の基本波成分の振幅の比率である第1組の電圧利用率、及び前記電源電圧に対する第2組の複数相の電機子巻線の印加電圧の線間電圧の基本波成分の振幅の比率である第2組の電圧利用率の設定に関わる利用率設定指令を算出する分配部と、
     前記利用率設定指令に基づいて、第1組の複数相の電圧指令値を算出する第1組電圧指令算出部と、
     前記利用率設定指令に基づいて、第2組の複数相の電圧指令値を算出する第2組電圧指令算出部と、
     前記第1組の複数相の電圧指令値に基づいて、第1組の前記インバータが有する複数のスイッチング素子をオンオフして、前記第1組の複数相の電機子巻線に電圧を印加する第1組スイッチング制御部と、
     前記第2組の複数相の電圧指令値に基づいて、第2組の前記インバータが有する複数のスイッチング素子をオンオフして、前記第2組の複数相の電機子巻線に電圧を印加する第2組スイッチング制御部と、を備え、
     前記分配部は、前記直流電源と前記2組のインバータとを接続する母線を流れる母線電流に重畳している交流成分である母線交流成分の実効値が、前記第1組の電圧利用率と前記第2組の電圧利用率との間の利用率比率が1対1である場合よりも低下するように、前記利用率比率を1対1から変化させる前記利用率設定指令を算出する回転機の制御装置。
  2.  前記分配部は、前記利用率比率を1対1から変化させる場合に、前記母線交流成分の実効値が最小になるように、前記利用率比率を1対1から変化させる前記利用率設定指令を算出する請求項1に記載の回転機の制御装置。
  3.  前記分配部は、前記第1組の電圧利用率と前記第2組の電圧利用率との平均電圧利用率が閾値以上である場合に、前記利用率比率を1対1から変化させる前記利用率設定指令を算出し、
     前記平均電圧利用率が前記閾値未満である場合に、前記利用率比率が1対1になる前記利用率設定指令を算出する請求項1又は2に記載の回転機の制御装置。
  4.  前記閾値は、前記利用率比率を1対1に設定する条件で、前記平均電圧利用率の変化に対して、前記母線交流成分の実効値が極大になる前記平均電圧利用率に対応して設定されている請求項3に記載の回転機の制御装置。
  5.  前記閾値は、設定される電圧利用率の範囲の最大電圧利用率の50%に設定されている請求項3に記載の回転機の制御装置。
  6.  前記第1組スイッチング制御部は、前記第1組の複数相の電圧指令値のそれぞれと第1組の搬送波とを比較し、比較結果に基づいて、第1組の前記インバータが有する複数のスイッチング素子をオンオフし、前記第1組の複数相の電圧指令値のそれぞれと比較される前記第1組の搬送波は、同じ搬送波であり、
     前記第2組スイッチング制御部は、前記第2組の複数相の電圧指令値のそれぞれと第2組の搬送波とを比較し、比較結果に基づいて、第2組の前記インバータが有する複数のスイッチング素子をオンオフし、前記第2組の複数相の電圧指令値のそれぞれと比較される前記第2組の搬送波は、同じ搬送波であり、
     前記閾値は、50%に設定されている請求項3又は4に記載の回転機の制御装置。
  7.  前記第1組スイッチング制御部は、前記第1組の複数相の電圧指令値のそれぞれと第1組の搬送波とを比較し、比較結果に基づいて、第1組の前記インバータが有する複数のスイッチング素子をオンオフし、前記第1組の複数相の電圧指令値の内、特定の相の電圧指令値と比較される前記第1組の搬送波と、前記特定の相以外の相の電圧指令値と比較される前記第1組の搬送波とは、互いに逆位相であり、
     前記第2組スイッチング制御部は、前記第2組の複数相の電圧指令値のそれぞれと第2組の搬送波とを比較し、比較結果に基づいて、第2組の前記インバータが有する複数のスイッチング素子をオンオフし、前記第2組の複数相の電圧指令値の内、特定の相の電圧指令値と比較される前記第2組の搬送波と、前記特定の相以外の相の電圧指令値と比較される前記第2組の搬送波とは、互いに逆位相であり、
     前記閾値は、30%に設定されている請求項3又は4に記載の回転機の制御装置。
  8.  前記分配部は、前記利用率比率を1対1から変化させる場合に、前記第1組の電圧利用率及び前記第2組の電圧利用率の一方の組の電圧利用率が、設定される電圧利用率の範囲の最大電圧利用率になるように、前記利用率設定指令を算出する請求項1から7のいずれか一項に記載の回転機の制御装置。
  9.  前記分配部は、前記利用率比率を1対1から変化させる場合に、前記第1組の複数相の電機子巻線の磁束による第1組のトルクと前記第2組の複数相の電機子巻線の磁束による第2組のトルクとの合計トルクが、目標の合計トルクに一致するように、前記利用率設定指令を算出する請求項1から8のいずれか一項に記載の回転機の制御装置。
  10.  前記分配部は、前記利用率設定指令として、前記第1組の複数相の電機子巻線についての第1組の電流指令値、及び前記第2組の複数相の電機子巻線についての第2組の電流指令値を算出し、前記利用率比率を1対1から変化させる場合に、前記利用率比率が1対1から変化するように、前記第1組の電流指令値及び前記第2組の電流指令値を算出し、
     前記第1組電圧指令算出部は、前記第1組の電流指令値に基づいて、前記第1組の複数相の電圧指令値を算出し、
     前記第2組電圧指令算出部は、前記第2組の電流指令値に基づいて、前記第2組の複数相の電圧指令値を算出する請求項1から9のいずれか一項に記載の回転機の制御装置。
  11.  前記分配部は、前記利用率比率を1対1から変化させる場合に、前記第1組の電圧利用率及び前記第2組の電圧利用率の一方の組の電圧利用率が、他方の組の電圧利用率よりも高くなるように、前記一方の組の目標電圧利用率を設定し、
     前記一方の組の目標電圧利用率及びロータの回転角速度に基づいて、前記一方の組の印加電圧の電圧利用率が前記一方の組の目標電圧利用率に一致するように、前記一方の組の電流指令値を算出し、
     前記第1組の複数相の電機子巻線の磁束による第1組のトルクと前記第2組の複数相の電機子巻線の磁束による第2組のトルクとの合計トルクが、目標の合計トルクに一致するように、前記一方の組の電流指令値に基づいて、前記他方の組の電流指令値を算出する請求項10に記載の回転機の制御装置。
  12.  前記分配部は、前記利用率比率を1対1に設定すると仮定した場合に設定される前記第1組の電流指令値の基準値及び前記第2組の電流指令値の基準値を設定し、
     前記第1組の電流指令値の基準値及び前記第2組の電流指令値の基準値に対応する前記第1組の電圧利用率及び前記第2組の電圧利用率の平均電圧利用率を算出し、
     前記利用率比率を1対1から変化させる場合に、前記平均電圧利用率に基づいて前記一方の組の目標電圧利用率を設定する請求項11に記載の回転機の制御装置。
  13.  前記分配部は、前記利用率比率を1対1に設定すると仮定した場合に設定される前記第1組の電流指令値の基準値及び前記第2組の電流指令値の基準値を設定し、
     前記第1組の電流指令値と前記第2組の電流指令値との合計が、前記第1組の電流指令値の基準値及び前記第2組の電流指令値の基準値の合計に一致するように、前記一方の組の電流指令値に基づいて、前記他方の組の電流指令値を算出する請求項11又は12に記載の回転機の制御装置。
  14.  前記分配部は、前記利用率比率を1対1から変化させる場合に、前記第1組の電流指令値及び前記第2組の電流指令値の一方の組の電流指令値を制限値で制限する制限処理を行い、制限により低下した前記一方の組のトルクの低下分だけ、他方の組のトルクが増加するように、前記他方の組の電流指令値を変化させる請求項10から13のいずれか一項に記載の回転機の制御装置。
  15.  前記分配部は、前記利用率設定指令として、前記第1組の複数相の電機子巻線についての第1組の電流指令値、及び前記第2組の複数相の電機子巻線についての第2組の電流指令値を算出し、
     前記第1組電圧指令算出部は、前記第1組の電流指令値に基づいて、前記第1組の複数相の電圧指令値を算出し、
     前記第2組電圧指令算出部は、前記第2組の電流指令値に基づいて、前記第2組の複数相の電圧指令値を算出し、
     前記分配部は、電流補正値による補正を行わない場合の前記第1組の電圧利用率と前記第2組の電圧利用率との平均電圧利用率が閾値未満である場合は、前記電流補正値による補正後の前記平均電圧利用率が前記閾値以上になるような、ロータの磁束を強める前記電流補正値を算出し、前記利用率比率を1対1から変化させる、前記電流補正値により補正された前記第1組の電流指令値及び前記第2組の電流指令値を算出し、
     前記電流補正値による補正を行わない場合の前記平均電圧利用率が前記閾値以上である場合は、前記利用率比率を1対1から変化させる、前記電流補正値により補正されていない前記第1組の電流指令値及び前記第2組の電流指令値を算出する請求項1から14のいずれか一項に記載の回転機の制御装置。
  16.  界磁電圧指令値に基づいて、スイッチング素子をオンオフして、ロータを界磁する界磁巻線に電圧を印加する界磁巻線制御部を備え、
     前記分配部は、界磁巻線補正値による補正を行わない場合の前記第1組の電圧利用率と前記第2組の電圧利用率との平均電圧利用率が閾値未満である場合は、前記界磁巻線補正値による補正後の前記平均電圧利用率が前記閾値以上になるような、ロータの界磁を強める前記界磁巻線補正値を算出し、前記界磁巻線補正値により前記界磁電圧指令値を補正し、前記利用率比率を1対1から変化させる前記利用率設定指令を算出し、
     前記界磁巻線補正値による補正を行わない場合の前記平均電圧利用率が前記閾値以上である場合は、前記界磁巻線補正値による前記界磁電圧指令値の補正を行わず、前記利用率比率を1対1から変化させる前記利用率設定指令を算出する請求項1から15のいずれか一項に記載の回転機の制御装置。
  17.  前記第1組スイッチング制御部と前記第2組スイッチング制御部との間で、同期をとらず、各組のスイッチング素子をオンオフする請求項1から16のいずれか一項に記載の回転機の制御装置。
PCT/JP2021/007718 2021-03-01 2021-03-01 回転機の制御装置 WO2022185381A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN202180093492.1A CN116918237A (zh) 2021-03-01 2021-03-01 旋转电机的控制装置
US18/270,054 US20240063746A1 (en) 2021-03-01 2021-03-01 Controller for rotary machine
JP2023503546A JP7378662B2 (ja) 2021-03-01 2021-03-01 回転機の制御装置
EP21928959.2A EP4304078A4 (en) 2021-03-01 2021-03-01 CONTROL DEVICE FOR A ROTARY MACHINE
PCT/JP2021/007718 WO2022185381A1 (ja) 2021-03-01 2021-03-01 回転機の制御装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2021/007718 WO2022185381A1 (ja) 2021-03-01 2021-03-01 回転機の制御装置

Publications (1)

Publication Number Publication Date
WO2022185381A1 true WO2022185381A1 (ja) 2022-09-09

Family

ID=83153990

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/007718 WO2022185381A1 (ja) 2021-03-01 2021-03-01 回転機の制御装置

Country Status (5)

Country Link
US (1) US20240063746A1 (ja)
EP (1) EP4304078A4 (ja)
JP (1) JP7378662B2 (ja)
CN (1) CN116918237A (ja)
WO (1) WO2022185381A1 (ja)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011061950A (ja) * 2009-09-09 2011-03-24 Denso Corp 電力変換装置
JP2011188674A (ja) * 2010-03-10 2011-09-22 Denso Corp 電力変換装置
JP2012161154A (ja) * 2011-01-31 2012-08-23 Denso Corp 電力変換装置
WO2017141593A1 (ja) 2016-02-17 2017-08-24 株式会社デンソー 3相回転機の制御装置、及び、電動パワーステアリング装置
JP2020137233A (ja) 2019-02-19 2020-08-31 三菱電機株式会社 電力変換装置、発電電動機の制御装置、および、電動パワーステアリング装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8373372B2 (en) * 2009-09-25 2013-02-12 Ut-Battelle, Llc Electrical motor/generator drive apparatus and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011061950A (ja) * 2009-09-09 2011-03-24 Denso Corp 電力変換装置
JP2011188674A (ja) * 2010-03-10 2011-09-22 Denso Corp 電力変換装置
JP4941686B2 (ja) 2010-03-10 2012-05-30 株式会社デンソー 電力変換装置
JP2012161154A (ja) * 2011-01-31 2012-08-23 Denso Corp 電力変換装置
WO2017141593A1 (ja) 2016-02-17 2017-08-24 株式会社デンソー 3相回転機の制御装置、及び、電動パワーステアリング装置
JP2020137233A (ja) 2019-02-19 2020-08-31 三菱電機株式会社 電力変換装置、発電電動機の制御装置、および、電動パワーステアリング装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP4304078A4

Also Published As

Publication number Publication date
EP4304078A1 (en) 2024-01-10
EP4304078A4 (en) 2024-05-01
JP7378662B2 (ja) 2023-11-13
US20240063746A1 (en) 2024-02-22
JPWO2022185381A1 (ja) 2022-09-09
CN116918237A (zh) 2023-10-20

Similar Documents

Publication Publication Date Title
US8232753B2 (en) Control device for electric motor drive apparatus
US7589486B2 (en) Control system for multiphase rotary electric machines
JP5471259B2 (ja) 制御装置
US9479106B2 (en) Apparatus for controlling rotary machine
JP5803559B2 (ja) 回転電機制御装置
JP6644172B2 (ja) モータ制御装置
JP6416414B2 (ja) 交流回転機の制御装置
US9935568B2 (en) Control apparatus of rotary electric machine
CN113422564A (zh) 交流旋转机控制装置
JP6685452B1 (ja) 回転電機の制御装置
US20200144948A1 (en) Control device for permanent magnet type rotating electrical machine
WO2019102539A1 (ja) 回転電機制御装置及び電動車両
JP7101904B2 (ja) モータ制御装置
WO2022185381A1 (ja) 回転機の制御装置
CN113078863B (zh) 交流旋转电机的控制装置
JP5473071B2 (ja) 負荷制御装置
WO2020105106A1 (ja) 交流回転電機の制御装置
WO2020262269A1 (ja) 電動機の制御装置
WO2022054232A1 (ja) 回転機の制御装置
JP7294982B2 (ja) 電動機制御装置
JP6305603B1 (ja) 回転電機の制御装置
JP2019140814A (ja) モータ制御装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21928959

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2023503546

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 18270054

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 202180093492.1

Country of ref document: CN

WWE Wipo information: entry into national phase

Ref document number: 2021928959

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2021928959

Country of ref document: EP

Effective date: 20231002