WO2022127095A1 - Lapping method for different waterproof materials of pedestal foot base plate and sidewall - Google Patents

Lapping method for different waterproof materials of pedestal foot base plate and sidewall Download PDF

Info

Publication number
WO2022127095A1
WO2022127095A1 PCT/CN2021/106451 CN2021106451W WO2022127095A1 WO 2022127095 A1 WO2022127095 A1 WO 2022127095A1 CN 2021106451 W CN2021106451 W CN 2021106451W WO 2022127095 A1 WO2022127095 A1 WO 2022127095A1
Authority
WO
WIPO (PCT)
Prior art keywords
waterproof
double
bottom plate
adhesive
membrane
Prior art date
Application number
PCT/CN2021/106451
Other languages
French (fr)
Chinese (zh)
Inventor
卓杨
况彬彬
黄亮
邓居兵
Original Assignee
江苏凯伦建材股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 江苏凯伦建材股份有限公司 filed Critical 江苏凯伦建材股份有限公司
Publication of WO2022127095A1 publication Critical patent/WO2022127095A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Definitions

  • the invention belongs to the technical field of structural waterproofing, and in particular relates to a method for lap jointing a large foot soleplate and a side wall with different waterproof materials.
  • groundwater Because underground engineering is deeply buried in the ground, it is always subject to the infiltration of groundwater. If the waterproof problem is not handled properly, the groundwater will infiltrate into the interior of the building or inside the building, which will bring a series of problems: such as affecting the work and life of people; Accelerates the rate at which buildings are corroded and shortens their service life.
  • a fully enclosed and partially enclosed waterproof and drainage design should be adopted for single-built underground projects. Forms a closed waterproof layer.
  • the lap length of the coils should be 150mm for high polymer modified asphalt coils and 100mm for synthetic polymer coils; when two layers of coils are used, the joints of the coils should be staggered and the upper layer of coils Should cover the underlying coil.
  • the traditional method still has the following defects for the lap joint of the bottom plate waterproofing membrane and the side wall waterproof coating: 1.
  • the reserved overlapping part of the bottom plate waterproof layer cannot be connected to the joint due to the later construction pollution or the influence of the environmental climate.
  • the side wall waterproof layer is overlapped to form a closed waterproof layer; 2 the reserved overlapped part of the bottom plate waterproof layer is damaged without temporary protection, resulting in the inability to overlap with the side wall waterproof layer to form a closed waterproof layer.
  • the methods disclosed in the patent are: such as the Chinese patent CN109537636A, which is suitable for the cross-loop method of the bottom waterproof membrane of the large foot and the side wall waterproof coating.
  • the above method can improve the waterproof of the lap joint between the large foot and the side wall to a certain extent, it still has the following shortcomings: 1) The uneven settlement of the protective wall and the base plate leads to the damage of the lap joint of the waterproof material. In case of water leakage; 2) It is necessary to use nails to fix the coil and re-apply the isolation layer to build the temporary protective wall with low-grade mortar; 3) Although the bottom waterproofing membrane at the head-shake part is re-applied with the isolation layer However, the problem of on-site contamination of overlapping parts cannot be avoided, and the expected problem of forming a closed waterproof layer cannot be achieved.
  • the present invention provides a kind of different waterproof materials for the bottom plate and the side wall of the large foot, which has excellent waterproof performance, is easy to operate, and avoids the uneven settlement of the protective wall and the bottom plate to cause damage to the overlapping parts. the lap method.
  • a method for lap jointing different waterproof materials of a large foot bottom plate and a side wall comprising the following steps:
  • step (1) the overlapping edge of the side edge of the double-sided self-adhesive waterproofing membrane and the bottom plate waterproofing membrane is located at the between the protective wall and the bottom plate.
  • the width of the overlapping edge where the side edge of the double-sided self-adhesive waterproofing membrane and the bottom plate waterproofing membrane overlap each other is 150 ⁇ 10mm, and the width of the reserved overlapping portion of the double-sided self-adhesive waterproof membrane is greater than or equal to 200mm.
  • the separation distance is 500 ⁇ 100 mm
  • the part of the double-sided self-adhesive waterproof membrane that is bonded to the protective wall is located on the double-sided self-adhesive waterproof membrane. The end of the self-adhesive waterproofing membrane.
  • step (4) the waterproof coating is applied to the end of the large feet close to the protection wall.
  • step (5) the method for separating the double-sided self-adhesive waterproof membrane from the protective wall is as follows: along the length direction of the protective wall, the double-sided self-adhesive Cut off the part of the waterproofing membrane that is bonded to the protective wall.
  • the bonding width between the double-sided self-adhesive waterproof membrane and the waterproof coating film formed after curing of the waterproof coating is greater than or equal to 150 mm.
  • the lap jointing method further includes, after the double-sided self-adhesive waterproof membrane is bonded to the waterproof coating film, adding the double-sided self-adhesive waterproof membrane The step of applying sealant to the bonding edge of the waterproof coating film further enhances the waterproof effect.
  • the double-sided self-adhesive waterproof membrane has a thickness of 3 ⁇ 0.5 mm and a width of 350-400 mm. Specifically, the thickness of the double-sided self-adhesive waterproof membrane is 3 mm.
  • the bottom plate waterproofing membrane is an MBP waterproofing membrane
  • the thickness of the MBP waterproofing membrane is 1.2 ⁇ 0.5 mm.
  • the thickness of the MBP waterproof membrane is 1.2mm.
  • the waterproof coating is MPU polyurethane waterproof coating
  • the waterproof coating film has a thickness of 2.0 ⁇ 0.5 mm.
  • the thickness of the waterproof coating film is 2.0 mm.
  • the waterproof structure of the bottom plate and the side wall formed by the lap joint method of the present invention includes a bottom plate with large feet, a side wall connected above the bottom plate, a cushion layer arranged under the bottom plate, and The protective wall on the cushion layer and located on the side of the bottom plate, the bottom plate waterproof membrane is laid between the bottom plate and the protective wall and the cushion layer, and a waterproof coating film formed of waterproof paint is arranged on the outside of the side wall.
  • the waterproof coating film extends from the side wall to the large feet of the bottom plate, and the waterproof structure further includes a double-sided self-adhesive waterproof membrane, one side of the double-sided self-adhesive waterproof membrane is connected to the bottom plate. One side of the waterproof membrane is bonded, and the other side is bonded with the waterproof coating film.
  • the overlapping edge of the double-sided self-adhesive waterproof membrane and the bottom plate waterproof membrane is located between the protective wall and the bottom plate, and the double-sided self-adhesive waterproof membrane and the waterproof coating film are two.
  • the lap edges that are bonded to each other are located on the large feet.
  • the width of the overlapping edge between the double-sided self-adhesive waterproof membrane and the bottom plate waterproof membrane is 150 ⁇ 10 mm
  • the overlapping edge between the double-sided self-adhesive waterproof membrane and the waterproof coating film has a width of 150 ⁇ 10 mm.
  • the width is greater than or equal to 200mm.
  • the present invention has the following advantages compared with the prior art:
  • the lap joint method of the invention uses the double-sided self-adhesive waterproof membrane to effectively connect the bottom plate waterproof membrane and the side wall waterproof coating, and form a long-term effective closed waterproof layer between the three. And the overlapping part of the waterproof layer of the bottom plate and the overlapping part of the waterproof layer of the side wall are at the large foot part of the bottom plate, and the two waterproof materials will not be damaged at the overlapping part due to the uneven settlement of the protective wall and the base plate, so as to ensure A long-term and effective closed waterproof layer can be formed between the double-sided self-adhesive waterproof membrane, the bottom plate waterproof membrane and the side wall waterproof coating, thereby avoiding water leakage.
  • the lap joint method of the present invention adopts a double-sided self-adhesive waterproof membrane, which has a double-sided isolation film, so that it will not be polluted by mortar, oil stains, etc. in the later construction.
  • a double-sided self-adhesive waterproof membrane which has a double-sided isolation film, so that it will not be polluted by mortar, oil stains, etc. in the later construction.
  • Fig. 1 is the state schematic diagram of the temporary protection of the large-footed bottom plate and the side wall of the embodiment 1 before being overlapped by different waterproof materials;
  • Fig. 2 is the state schematic diagram of the large-footed bottom plate and the side wall of the embodiment 1 when the different waterproof materials are overlapped;
  • the double-sided self-adhesive waterproofing membrane 2 is made of double-sided self-adhesive with a thickness of 3mm and a total width of 400mm.
  • Ester tire waterproofing membrane, base plate waterproofing membrane 1 is pre-laid waterproofing membrane with MBP polymer self-adhesive film with a thickness of 1.2mm;
  • the waterproof structure of the base plate and the side wall formed by the lap joint method of the present embodiment as shown in FIG.
  • Film 5, the waterproof coating film 5 extends from the side wall 6 to the large feet of the bottom plate 7, and the waterproof structure also includes a double-sided self-adhesive waterproof membrane 2, one side of the double-sided self-adhesive waterproof membrane 2 and the bottom plate waterproof roll
  • the side edge of the material 1 is bonded, and the other side edge is bonded with the waterproof coating film 5 .
  • the overlapping edge of the double-sided self-adhesive waterproof membrane 2 and the bottom plate waterproof membrane 1 is located between the protective wall 4 and the bottom plate 7, and the double-sided self-adhesive waterproof membrane 2 and the waterproof coating film 5 are both adhered to each other.
  • the overlapping edge of the knot ie, the reserved overlapping portion 2a is located on the large foot.
  • the bonding strength between the waterproof coating film 5 of the side wall 6 and the double-sided self-adhesive waterproof membrane 2 reaches 2.3MPa, and the double-sided self-adhesive waterproof membrane 2 and the bottom plate are waterproof.
  • the bond strength between the coils 1 reached 2.2 MPa.
  • Example 2 The same method as in Example 1 was used to repeat the experiment respectively, and the experiment was repeated twice, namely Example 2 and Example 3.
  • the waterproof coating film 5 of the side wall 6 of Example 2 and the double-sided self-adhesive waterproof roll were tested.
  • the bonding strength between the materials 2 reaches 2.5 MPa, and the bonding strength between the double-sided self-adhesive waterproofing membrane 2 and the bottom waterproofing membrane 1 reaches 2.3 MPa;
  • the bonding strength between the surface self-adhesive waterproofing membrane 2 reaches 2.4MPa, and the bonding strength between the double-sided self-adhesive waterproofing membrane 2 and the bottom plate waterproofing membrane 1 reaches 2.3MPa.
  • the double-sided self-adhesive waterproof membrane has excellent bonding strength with the waterproof coating film and the bottom waterproof membrane, and has good airtightness, and a long-term effective closed waterproof layer can be formed between the three.
  • a long-term effective closed waterproof layer is formed between the waterproof coating film of the side wall, the double-sided self-adhesive waterproof membrane and the bottom waterproof membrane.
  • the overlapping part of the waterproof layer of the bottom plate and the overlapping part of the waterproof layer of the side wall are in the large foot part of the bottom plate, which is not affected by the uneven settlement, and will not cause different waterproof materials to overlap due to the uneven settlement of the protective wall and the base plate.
  • the joint is damaged, reducing the hidden danger of leakage.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

The present invention relates to a lapping method for different waterproof materials of a pedestal foot base plate and a sidewall. The method comprises: one side edge of a double-sided self-adhesive waterproof roll adhering to a base plate waterproof roll, and a lapping portion of the double-sided self-adhesive waterproof roll being reserved at the top of a protective wall; the reserved lapping portion adhering to the protective wall spaced apart in the length direction of the protective wall; laying protective bricks on the reserved lapping portion; constructing a waterproof coating on a sidewall, and extending the waterproof coating to a pedestal foot; removing the protective bricks and separating the double-sided waterproof roll from the protective wall; and then, tearing off a release film on the face of the double-sided self-adhesive waterproof roll facing the sidewall, and the double-sided self-adhesive waterproof roll adhering to a waterproof film formed by the cured waterproof coating. By means of the method of the present invention, two types of waterproof materials can be prevented from being damaged at a lapping portion due to uneven settlement of a base plate and a protective wall, thereby ensuring that a long-term effective sealed waterproof layer can be formed between a double-sided self-adhesive waterproof roll, a base plate waterproof roll and a sidewall waterproof coating.

Description

一种大放脚底板和侧墙不同防水材料的搭接方法A method for lap jointing of different waterproof materials of large foot bottom plate and side wall 技术领域technical field
本发明属于构造防水技术领域,具体涉及一种大放脚底板与侧墙不同防水材料的搭接方法。The invention belongs to the technical field of structural waterproofing, and in particular relates to a method for lap jointing a large foot soleplate and a side wall with different waterproof materials.
背景技术Background technique
地下工程由于深埋在地下,时刻受到地下水的渗透作用,如防水问题处理不好,导致地下水渗透到建筑物内部或者建筑物体内,将会带来一系列问题:如影响人员的工作和生活;加快建筑物被腐蚀的速度,缩短使用寿命。Because underground engineering is deeply buried in the ground, it is always subject to the infiltration of groundwater. If the waterproof problem is not handled properly, the groundwater will infiltrate into the interior of the building or inside the building, which will bring a series of problems: such as affecting the work and life of people; Accelerates the rate at which buildings are corroded and shortens their service life.
根据国家规范《地下工程防水技术规范》GB50108-2008中描述对于单建式地下工程应采用全封闭、部分封闭的防排水设计,防水材料应从结构底板垫层铺设至顶板基面,并应在外围形成封闭的防水层。卷材接槎的搭接长度,高聚物改性沥青类卷材应为150mm,合成高分子类卷材应为100mm;当使用两层卷材时,卷材接缝应错开,上层卷材应盖过下层卷材。According to the national standard "Technical Specification for Waterproofing of Underground Engineering" GB50108-2008, a fully enclosed and partially enclosed waterproof and drainage design should be adopted for single-built underground projects. Forms a closed waterproof layer. The lap length of the coils should be 150mm for high polymer modified asphalt coils and 100mm for synthetic polymer coils; when two layers of coils are used, the joints of the coils should be staggered and the upper layer of coils Should cover the underlying coil.
然而对于大放脚底板防水卷材与侧墙防水涂料的搭接,传统的方法还是存在如下缺陷:①底板防水层的预留搭接部位由于后期的施工污染或者环境气候的影响,导致无法与侧墙防水层搭接形成封闭防水层;②底板防水层的预留搭接部位未做临时保护而被破坏,导致无法与侧墙防水层搭接形成封闭防水层。However, the traditional method still has the following defects for the lap joint of the bottom plate waterproofing membrane and the side wall waterproof coating: 1. The reserved overlapping part of the bottom plate waterproof layer cannot be connected to the joint due to the later construction pollution or the influence of the environmental climate. The side wall waterproof layer is overlapped to form a closed waterproof layer; ② the reserved overlapped part of the bottom plate waterproof layer is damaged without temporary protection, resulting in the inability to overlap with the side wall waterproof layer to form a closed waterproof layer.
为了提升大放脚底板与侧墙处的搭接部位的防水性能,专利中公开的方法有:如中国专利CN109537636A适用于大放脚的底板防水卷材与侧墙防水涂料的交圈方法,其包括:A、在砖胎膜顶部的底板防水卷材预留甩头;B、在与底板防水卷材的端部相距的预设距离处临时打多个水泥钉固定;C、在甩头部位的底板防水卷材的表面铺贴隔离膜;D、利用低标号水泥砂浆在隔离膜上砌筑灰砂砖临时保护;E、侧墙防水涂料施工至交圈部位时,拆除临时保护的灰砂砖和隔离膜,割除水泥钉;F、将水性环氧封底涂料辊涂于底板防水卷材的甩头部位表面;G、将侧墙防水涂料直接延伸施工至交圈部位与底板防水卷材交圈搭接。In order to improve the waterproof performance of the lap joint between the bottom plate and the side wall of the large foot, the methods disclosed in the patent are: such as the Chinese patent CN109537636A, which is suitable for the cross-loop method of the bottom waterproof membrane of the large foot and the side wall waterproof coating. Including: A. Reserve the head shake of the bottom plate waterproofing membrane on the top of the brick tire membrane; B. Temporarily hit a plurality of cement nails at a preset distance from the end of the bottom plate waterproofing membrane to fix; C. Place an isolation film on the surface of the bottom floor waterproofing membrane; D. Use low-grade cement mortar to build lime-sand bricks on the isolation film for temporary protection; E. When the side wall waterproof coating is applied to the intersection, remove the temporarily protected lime-sand Bricks and isolation film, cut off the cement nails; F. Roll the water-based epoxy primer coating on the surface of the head-flushing part of the bottom plate waterproofing membrane; G. Extend the side wall waterproofing coating directly to the intersection part and the bottom plate waterproofing membrane. Circle lap.
上述方法虽然能一定程度上提升大放脚与侧墙搭接处的防水,但还是存在以下不足:1)保护墙和基础底板的不均匀沉降导致防水材料搭接部位的破坏解决不了,还是会发生渗漏水的情况;2)用低标号砂浆砌筑临时保护墙还需用钉子固定卷材和再 次铺贴隔离层;3)虽然在甩头部位的底板防水卷材再次铺贴隔离层,但还是避免不了现场污染搭接部位的问题,达不到预期的形成封闭防水层的问题。Although the above method can improve the waterproof of the lap joint between the large foot and the side wall to a certain extent, it still has the following shortcomings: 1) The uneven settlement of the protective wall and the base plate leads to the damage of the lap joint of the waterproof material. In case of water leakage; 2) It is necessary to use nails to fix the coil and re-apply the isolation layer to build the temporary protective wall with low-grade mortar; 3) Although the bottom waterproofing membrane at the head-shake part is re-applied with the isolation layer However, the problem of on-site contamination of overlapping parts cannot be avoided, and the expected problem of forming a closed waterproof layer cannot be achieved.
发明内容SUMMARY OF THE INVENTION
发明目的:为了解决现有技术存在的问题,本发明提供一种防水性能优异、操作简单、避免保护墙和底板的不均匀沉降导致搭接部位被损坏的大放脚底板和侧墙不同防水材料的搭接方法。Purpose of the invention: In order to solve the problems existing in the prior art, the present invention provides a kind of different waterproof materials for the bottom plate and the side wall of the large foot, which has excellent waterproof performance, is easy to operate, and avoids the uneven settlement of the protective wall and the bottom plate to cause damage to the overlapping parts. the lap method.
技术方案:为了解决上述技术问题,本发明采用如下技术方案:Technical scheme: in order to solve the above-mentioned technical problems, the present invention adopts the following technical scheme:
一种大放脚底板和侧墙不同防水材料的搭接方法,包括以下步骤:A method for lap jointing different waterproof materials of a large foot bottom plate and a side wall, comprising the following steps:
(1)将双面自粘防水卷材的一侧边与底板防水卷材粘结,且将所述双面自粘防水卷材在保护墙顶部预留搭接部位,其中,所述双面自粘防水卷材为双面自粘聚酯胎防水卷材;(1) Bond one side of the double-sided self-adhesive waterproofing membrane with the bottom plate waterproofing membrane, and reserve the overlapping part on the top of the protective wall with the double-sided self-adhesive waterproofing membrane, wherein the double-sided self-adhesive waterproofing membrane is Self-adhesive waterproof membrane is double-sided self-adhesive polyester tire waterproof membrane;
(2)将所述双面自粘防水卷材的预留搭接部位沿所述保护墙的长度方向间隔粘结在所述保护墙上;(2) the reserved overlapping parts of the double-sided self-adhesive waterproofing membrane are bonded to the protective wall at intervals along the length direction of the protective wall;
(3)在所述双面自粘防水卷材的预留搭接部位上砌筑用于临时保护的保护砖;(3) building protective bricks for temporary protection on the reserved lap joints of the double-sided self-adhesive waterproofing membrane;
(4)在侧墙上施工防水涂料,并将所述防水涂料延伸至底板大放脚处;(4) constructing waterproof coating on the side wall, and extending the waterproof coating to the foot of the bottom plate;
(5)拆除所述保护砖并将所述双面自粘防水卷材与保护墙分离,然后撕除所述双面自粘防水卷材的面向所述侧墙的一面上的隔离膜,并将所述双面自粘防水卷材粘结到所述防水涂料固化后形成的防水涂膜上。(5) Remove the protective brick and separate the double-sided self-adhesive waterproof membrane from the protective wall, then tear off the isolation film on the side of the double-sided self-adhesive waterproof membrane facing the side wall, and The double-sided self-adhesive waterproof membrane is bonded to the waterproof coating film formed after the waterproof coating is cured.
根据本发明的一些优选且具体实施方式,步骤(1)中,所述双面自粘防水卷材的所述一侧边与所述底板防水卷材二者相互搭接的搭接边位于所述保护墙和底板之间。According to some preferred and specific embodiments of the present invention, in step (1), the overlapping edge of the side edge of the double-sided self-adhesive waterproofing membrane and the bottom plate waterproofing membrane is located at the between the protective wall and the bottom plate.
根据本发明的一些优选且具体实施方式,步骤(1)中,所述双面自粘防水卷材的所述一侧边与所述底板防水卷材二者相互搭接的搭接边的宽度为150±10mm,所述双面自粘防水卷材的预留搭接部的宽度大于等于200mm。According to some preferred and specific embodiments of the present invention, in step (1), the width of the overlapping edge where the side edge of the double-sided self-adhesive waterproofing membrane and the bottom plate waterproofing membrane overlap each other is 150±10mm, and the width of the reserved overlapping portion of the double-sided self-adhesive waterproof membrane is greater than or equal to 200mm.
根据本发明的一些优选且具体实施方式,步骤(2)中,所述间隔距离为500±100mm,所述双面自粘防水卷材的与所述保护墙粘结的部位位于所述双面自粘防水卷材的端部。According to some preferred and specific embodiments of the present invention, in step (2), the separation distance is 500±100 mm, and the part of the double-sided self-adhesive waterproof membrane that is bonded to the protective wall is located on the double-sided self-adhesive waterproof membrane. The end of the self-adhesive waterproofing membrane.
根据本发明的一些优选且具体实施方式,步骤(4)中,所述防水涂料施工至所述大放脚的靠近所述保护墙的端部。According to some preferred and specific embodiments of the present invention, in step (4), the waterproof coating is applied to the end of the large feet close to the protection wall.
根据本发明的一些优选且具体实施方式,步骤(5)中,所述双面自粘防水卷材与保护墙的分离的方法为:沿所述保护墙的长度方向将所述双面自粘防水卷材的与保护墙粘结的部位割除。According to some preferred and specific embodiments of the present invention, in step (5), the method for separating the double-sided self-adhesive waterproof membrane from the protective wall is as follows: along the length direction of the protective wall, the double-sided self-adhesive Cut off the part of the waterproofing membrane that is bonded to the protective wall.
根据本发明的一些优选且具体实施方式,步骤(5)中,所述双面自粘防水卷材与所述防水涂料固化后形成的防水涂膜之间粘结的宽度为大于等于150mm。According to some preferred and specific embodiments of the present invention, in step (5), the bonding width between the double-sided self-adhesive waterproof membrane and the waterproof coating film formed after curing of the waterproof coating is greater than or equal to 150 mm.
根据本发明的一些优选且具体实施方式,所述搭接方法还包括在将所述双面自粘防水卷材粘结到所述防水涂膜上后,在所述双面自粘防水卷材和防水涂膜的粘结边缘处涂覆密封胶的步骤,进一步提升防水效果。According to some preferred and specific embodiments of the present invention, the lap jointing method further includes, after the double-sided self-adhesive waterproof membrane is bonded to the waterproof coating film, adding the double-sided self-adhesive waterproof membrane The step of applying sealant to the bonding edge of the waterproof coating film further enhances the waterproof effect.
根据本发明的一些优选且具体实施方式,所述双面自粘防水卷材的厚度为3±0.5mm,宽度为350~400mm。具体地,如所述双面自粘防水卷材的厚度为3mm。According to some preferred and specific embodiments of the present invention, the double-sided self-adhesive waterproof membrane has a thickness of 3±0.5 mm and a width of 350-400 mm. Specifically, the thickness of the double-sided self-adhesive waterproof membrane is 3 mm.
根据本发明的一些优选且具体实施方式,所述底板防水卷材为MBP防水卷材,所述MBP防水卷材的厚度为1.2±0.5mm。具体地,如所述MBP防水卷材的厚度为1.2mm。According to some preferred and specific embodiments of the present invention, the bottom plate waterproofing membrane is an MBP waterproofing membrane, and the thickness of the MBP waterproofing membrane is 1.2±0.5 mm. Specifically, the thickness of the MBP waterproof membrane is 1.2mm.
根据本发明的一些优选且具体实施方式,所述防水涂料为MPU聚氨酯防水涂料,所述防水涂膜厚度为2.0±0.5mm。具体地,如所述防水涂膜的厚度为2.0mm。According to some preferred and specific embodiments of the present invention, the waterproof coating is MPU polyurethane waterproof coating, and the waterproof coating film has a thickness of 2.0±0.5 mm. Specifically, the thickness of the waterproof coating film is 2.0 mm.
采用本发明的搭接方法形成的大放脚底板与侧墙的防水结构,包括具有大放脚的底板、连接在所述底板上方的侧墙、设置在所述底板下方的垫层及设置在所述垫层上且位于所述底板侧方的保护墙,所述底板与保护墙和垫层之间铺设底板防水卷材,所述侧墙外侧设置由防水涂料形成的防水涂膜,所述防水涂膜由所述侧墙延伸至所述底板的大放脚上,所述防水结构还包括双面自粘防水卷材,所述双面自粘防水卷材的一侧边与所述底板防水卷材的侧边粘结、另一侧边与所述防水涂膜粘结。The waterproof structure of the bottom plate and the side wall formed by the lap joint method of the present invention includes a bottom plate with large feet, a side wall connected above the bottom plate, a cushion layer arranged under the bottom plate, and The protective wall on the cushion layer and located on the side of the bottom plate, the bottom plate waterproof membrane is laid between the bottom plate and the protective wall and the cushion layer, and a waterproof coating film formed of waterproof paint is arranged on the outside of the side wall. The waterproof coating film extends from the side wall to the large feet of the bottom plate, and the waterproof structure further includes a double-sided self-adhesive waterproof membrane, one side of the double-sided self-adhesive waterproof membrane is connected to the bottom plate. One side of the waterproof membrane is bonded, and the other side is bonded with the waterproof coating film.
进一步地,所述双面自粘防水卷材与底板防水卷材二者相互粘结的搭接边位于所述保护墙和底板之间,所述双面自粘防水卷材与防水涂膜二者相互粘结的搭接边位于所述大放脚上。Further, the overlapping edge of the double-sided self-adhesive waterproof membrane and the bottom plate waterproof membrane is located between the protective wall and the bottom plate, and the double-sided self-adhesive waterproof membrane and the waterproof coating film are two. The lap edges that are bonded to each other are located on the large feet.
优选地,所述双面自粘防水卷材与底板防水卷材的所述搭接边的宽度为150±10mm,所述双面自粘防水卷材与防水涂膜的所述搭接边的宽度大于等于200mm。Preferably, the width of the overlapping edge between the double-sided self-adhesive waterproof membrane and the bottom plate waterproof membrane is 150±10 mm, and the overlapping edge between the double-sided self-adhesive waterproof membrane and the waterproof coating film has a width of 150±10 mm. The width is greater than or equal to 200mm.
由于上述技术方案运用,本发明与现有技术相比具有下列优点:Due to the application of the above-mentioned technical solutions, the present invention has the following advantages compared with the prior art:
本发明的搭接方法采用双面自粘防水卷材将底板防水卷材和侧墙防水涂料有效的连接在一起,三者之间形成长期有效的封闭防水层。且底板防水层的搭接部位与侧 墙防水层的搭接部位在底板大放脚部位,不会因保护墙和基础底板的不均匀沉降而导致两种防水材料在搭接部位破坏,从而保证双面自粘防水卷材、底板防水卷材与侧墙防水涂料之间可以形成长期有效的封闭防水层,进而避免发生渗漏水情况。The lap joint method of the invention uses the double-sided self-adhesive waterproof membrane to effectively connect the bottom plate waterproof membrane and the side wall waterproof coating, and form a long-term effective closed waterproof layer between the three. And the overlapping part of the waterproof layer of the bottom plate and the overlapping part of the waterproof layer of the side wall are at the large foot part of the bottom plate, and the two waterproof materials will not be damaged at the overlapping part due to the uneven settlement of the protective wall and the base plate, so as to ensure A long-term and effective closed waterproof layer can be formed between the double-sided self-adhesive waterproof membrane, the bottom plate waterproof membrane and the side wall waterproof coating, thereby avoiding water leakage.
本发明的搭接方法相比现有的方法,采用双面自粘防水卷材,自身带有双面隔离膜,不会被后期施工的砂浆、油污等污染,且在双面自粘防水卷材的预留搭接部上砌筑保护砖时,也不需钉子固定卷材,在保护砖与双面自粘防水卷材之间也无需再次铺设隔离膜,方法步骤简单,易操作。Compared with the existing method, the lap joint method of the present invention adopts a double-sided self-adhesive waterproof membrane, which has a double-sided isolation film, so that it will not be polluted by mortar, oil stains, etc. in the later construction. When laying protective bricks on the reserved overlapping part of the material, there is no need to fix the coil with nails, and there is no need to lay an isolation film again between the protective brick and the double-sided self-adhesive waterproof coil. The method is simple and easy to operate.
附图说明Description of drawings
图1为实施例1的大放脚底板和侧墙不同防水材料在搭接前的临时保护的状态示意图;Fig. 1 is the state schematic diagram of the temporary protection of the large-footed bottom plate and the side wall of the embodiment 1 before being overlapped by different waterproof materials;
图2为实施例1的大放脚底板和侧墙不同防水材料在搭接时的状态示意图;Fig. 2 is the state schematic diagram of the large-footed bottom plate and the side wall of the embodiment 1 when the different waterproof materials are overlapped;
图中:1、底板防水卷材;2、双面自粘防水卷材;2a、预留搭接部;3、保护砖;4、保护墙;5、防水涂膜;6、侧墙;7、底板。In the figure: 1. Base plate waterproofing membrane; 2. Double-sided self-adhesive waterproofing membrane; 2a. Reserved overlapping part; 3. Protective brick; 4. Protective wall; 5. Waterproof coating film; 6. Side wall; 7 , bottom plate.
具体实施方式Detailed ways
下面结合说明书附图及具体实施例详细说明本发明的技术方案,以便本领域技术人员更好理解和实施本发明的技术方案,但并不因此将本发明限制在所述的实例范围之中。The technical solutions of the present invention are described in detail below with reference to the accompanying drawings and specific embodiments of the description, so that those skilled in the art can better understand and implement the technical solutions of the present invention, but do not limit the present invention to the scope of the examples.
实施例1Example 1
本实施例提供的大放脚底板和侧墙不同防水材料的搭接方法,包括以下步骤:The method for lap jointing of different waterproof materials of the large foot bottom plate and the side wall provided by this embodiment includes the following steps:
1)浇筑底板混凝土前,将双面自粘防水卷材2的一侧边的一面撕掉隔离膜,然后与底板防水卷材1的侧边直接粘结搭接,搭接边宽度为150mm,双面自粘防水卷材2的另一侧边在保护墙4的砖胎膜顶部预留搭接部2a,预留搭接部2a宽度为大于等于200mm,且使得双面自粘防水卷材2与底板防水卷材1二者相互搭接的搭接边位于保护墙4和底板7之间,其中,双面自粘防水卷材2选用厚度为3mm、总宽度400mm的双面自粘聚酯胎防水卷材,底板防水卷材1选用厚度为1.2mm的MBP高分子自粘胶膜预铺防水卷材;1) Before pouring the bottom plate concrete, tear off the isolation film from one side of the double-sided self-adhesive waterproof membrane 2, and then directly bond and overlap with the side of the bottom plate waterproof membrane 1, and the width of the overlapped edge is 150mm. The other side of the double-sided self-adhesive waterproof membrane 2 reserves a lap portion 2a at the top of the brick tire film of the protective wall 4, and the width of the reserved overlap portion 2a is 200mm or more, and the double-sided self-adhesive waterproof membrane is made. 2. The overlapped edge with the bottom plate waterproofing membrane 1 is located between the protective wall 4 and the bottom plate 7. Among them, the double-sided self-adhesive waterproofing membrane 2 is made of double-sided self-adhesive with a thickness of 3mm and a total width of 400mm. Ester tire waterproofing membrane, base plate waterproofing membrane 1 is pre-laid waterproofing membrane with MBP polymer self-adhesive film with a thickness of 1.2mm;
2)将双面自粘防水卷材2的预留搭接部2a的端部沿保护墙4的长度方向间隔撕掉隔离膜,然后粘结在保护墙4上,间隔距离以500mm为宜;2) tear off the isolation film at intervals along the length direction of the protective wall 4 at the end of the reserved overlap portion 2a of the double-sided self-adhesive waterproof membrane 2, and then bond it on the protective wall 4, and the interval distance is preferably 500mm;
3)利用M2.5低标号水泥砂浆在双面自粘防水卷材2的预留搭接部2a上砌筑灰 砂砖作为临时保护砖3,参见图1所示;3) utilize M2.5 low-grade cement mortar to build lime-sand bricks as temporary protection bricks 3 on the reserved overlapping portion 2a of the double-sided self-adhesive waterproofing membrane 2, as shown in Figure 1;
4)选用MPU聚氨酯防水涂料在侧墙6上施工2.0mm厚的防水涂膜5,并将防水涂膜5延伸至底板7大放脚的靠近保护墙4的端部;4) select MPU polyurethane waterproof paint to construct 2.0mm thick waterproof coating film 5 on the side wall 6, and extend the waterproof coating film 5 to the end of the bottom plate 7 that is close to the protective wall 4;
5)拆除保护砖3,沿保护墙4的长度方向将双面自粘防水卷材2的与保护墙4粘结的部位割除使得双面自粘防水卷材2与保护墙4分离,清理干净双面自粘防水卷材2的预留搭接部2a的表面,然后撕除双面自粘防水卷材2的面向侧墙6的一面上的隔离膜,并将双面自粘防水卷材2反粘到防水涂膜5上即可,参见图2所示,双面自粘防水卷材2与防水涂膜5之间粘结的宽度为大于等于150mm;5) Remove the protective brick 3, and cut off the part where the double-sided self-adhesive waterproofing membrane 2 is bonded to the protective wall 4 along the length direction of the protective wall 4, so that the double-sided self-adhesive waterproofing membrane 2 is separated from the protective wall 4 and cleaned up The surface of the reserved overlap portion 2a of the double-sided self-adhesive waterproofing membrane 2 is then torn off the isolation film on the side of the double-sided self-adhesive waterproofing membrane 2 facing the side wall 6, and the double-sided self-adhesive waterproofing membrane is 2. Reverse stick to the waterproof coating film 5. Referring to Figure 2, the bonding width between the double-sided self-adhesive waterproof membrane 2 and the waterproof coating film 5 is greater than or equal to 150mm;
6)在双面自粘防水卷材2和防水涂膜5之间的粘结边缘处涂覆密封胶密封。6) Apply sealant to seal the bonding edge between the double-sided self-adhesive waterproof membrane 2 and the waterproof coating film 5 .
由本实施例的搭接方法形成的大放脚底板与侧墙的防水结构,参见图2所示,包括具有大放脚的底板7、连接在底板7上方的侧墙6、设置在底板7下方的垫层及设置在垫层上且位于底板7侧方的保护墙4,底板7与保护墙4和垫层之间铺设底板防水卷材1,侧墙6外侧设置由防水涂料形成的防水涂膜5,防水涂膜5由侧墙6延伸至底板7的大放脚上,防水结构还包括双面自粘防水卷材2,双面自粘防水卷材2的一侧边与底板防水卷材1的侧边粘结、另一侧边与防水涂膜5粘结。双面自粘防水卷材2与底板防水卷材1二者相互粘结的搭接边位于保护墙4和底板7之间,双面自粘防水卷材2与防水涂膜5二者相互粘结的搭接边(即预留搭接部2a)位于大放脚上。The waterproof structure of the base plate and the side wall formed by the lap joint method of the present embodiment, as shown in FIG. The cushion layer and the protective wall 4 arranged on the cushion layer and located on the side of the bottom plate 7, the bottom plate waterproof membrane 1 is laid between the bottom plate 7 and the protective wall 4 and the cushion layer, and the waterproof coating formed by the waterproof coating is provided on the outside of the side wall 6. Film 5, the waterproof coating film 5 extends from the side wall 6 to the large feet of the bottom plate 7, and the waterproof structure also includes a double-sided self-adhesive waterproof membrane 2, one side of the double-sided self-adhesive waterproof membrane 2 and the bottom plate waterproof roll The side edge of the material 1 is bonded, and the other side edge is bonded with the waterproof coating film 5 . The overlapping edge of the double-sided self-adhesive waterproof membrane 2 and the bottom plate waterproof membrane 1 is located between the protective wall 4 and the bottom plate 7, and the double-sided self-adhesive waterproof membrane 2 and the waterproof coating film 5 are both adhered to each other. The overlapping edge of the knot (ie, the reserved overlapping portion 2a) is located on the large foot.
经检测(参考GB23441-2009的测试方法),侧墙6的防水涂膜5与双面自粘防水卷材2之间的粘结强度达到2.3MPa,双面自粘防水卷材2与底板防水卷材1之间的粘结强度达到2.2MPa。After testing (refer to the test method of GB23441-2009), the bonding strength between the waterproof coating film 5 of the side wall 6 and the double-sided self-adhesive waterproof membrane 2 reaches 2.3MPa, and the double-sided self-adhesive waterproof membrane 2 and the bottom plate are waterproof. The bond strength between the coils 1 reached 2.2 MPa.
采用同实施例1的方法分别做重复实验,重复了2次试验,分别为实施例2和实施例3,经检测,实施例2的侧墙6的防水涂膜5与双面自粘防水卷材2之间的粘结强度达到2.5MPa,双面自粘防水卷材2与底板防水卷材1之间的粘结强度达到2.3MPa;实施例3的侧墙6的防水涂膜5与双面自粘防水卷材2之间的粘结强度达到2.4MPa,双面自粘防水卷材2与底板防水卷材1之间的粘结强度达到2.3MPa。可见,采用上述方法,双面自粘防水卷材与防水涂膜和底板防水卷材均具有优异的粘结强度,且密闭性好,三者之间可以形成长期有效的封闭防水层。The same method as in Example 1 was used to repeat the experiment respectively, and the experiment was repeated twice, namely Example 2 and Example 3. After testing, the waterproof coating film 5 of the side wall 6 of Example 2 and the double-sided self-adhesive waterproof roll were tested. The bonding strength between the materials 2 reaches 2.5 MPa, and the bonding strength between the double-sided self-adhesive waterproofing membrane 2 and the bottom waterproofing membrane 1 reaches 2.3 MPa; The bonding strength between the surface self-adhesive waterproofing membrane 2 reaches 2.4MPa, and the bonding strength between the double-sided self-adhesive waterproofing membrane 2 and the bottom plate waterproofing membrane 1 reaches 2.3MPa. It can be seen that using the above method, the double-sided self-adhesive waterproof membrane has excellent bonding strength with the waterproof coating film and the bottom waterproof membrane, and has good airtightness, and a long-term effective closed waterproof layer can be formed between the three.
采用本发明搭接方法使得侧墙的防水涂膜、双面自粘防水卷材、底板防水卷材三者之间形成长期有效的封闭防水层。且底板防水层的搭接部位与侧墙防水层的搭接部 位在底板大放脚部位,不受不均沉降的影响,不会因为保护墙和基础底板的不均匀沉降导致不同防水材料在搭接处的被破坏,降低渗漏的隐患。By adopting the lap joint method of the invention, a long-term effective closed waterproof layer is formed between the waterproof coating film of the side wall, the double-sided self-adhesive waterproof membrane and the bottom waterproof membrane. And the overlapping part of the waterproof layer of the bottom plate and the overlapping part of the waterproof layer of the side wall are in the large foot part of the bottom plate, which is not affected by the uneven settlement, and will not cause different waterproof materials to overlap due to the uneven settlement of the protective wall and the base plate. The joint is damaged, reducing the hidden danger of leakage.
上述实施例只为说明本发明的技术构思及特点,其目的在于让熟悉此项技术的人士能够了解本发明的内容并据以实施,并不能以此限制本发明的保护范围。凡根据本发明精神实质所作的等效变化或修饰,都应涵盖在本发明的保护范围之内。The above-mentioned embodiments are only intended to illustrate the technical concept and characteristics of the present invention, and the purpose is to enable those who are familiar with the art to understand the content of the present invention and implement accordingly, and cannot limit the protection scope of the present invention by this. All equivalent changes or modifications made according to the spirit of the present invention should be included within the protection scope of the present invention.
在本文中所披露的范围的端点和任何值都不限于该精确的范围或值,这些范围或值应当理解为包含接近这些范围或值的值。对于数值范围来说,各个范围的端点值之间、各个范围的端点值和单独的点值之间,以及单独的点值之间可以彼此组合而得到一个或多个新的数值范围,这些数值范围应被视为在本文中具体公开。The endpoints of ranges and any values disclosed herein are not limited to the precise ranges or values, which are to be understood to encompass values proximate to those ranges or values. For ranges of values, the endpoints of each range, the endpoints of each range and the individual point values, and the individual point values can be combined with each other to yield one or more new ranges of values that Ranges should be considered as specifically disclosed herein.

Claims (14)

  1. 一种大放脚底板和侧墙不同防水材料的搭接方法,其特征在于,包括以下步骤:A method for lap jointing different waterproof materials of a large foot bottom plate and a side wall, characterized in that it comprises the following steps:
    (1)将双面自粘防水卷材的一侧边与底板防水卷材粘结,且将所述防水卷材在保护墙顶部预留搭接部,其中,所述双面防水卷材为双面自粘聚酯胎防水卷材,所述底板防水卷材为MBP防水卷材;(1) one side of the double-sided self-adhesive waterproofing membrane is bonded to the bottom plate waterproofing membrane, and the overlapping part is reserved on the top of the protective wall, wherein the double-sided waterproofing membrane is Double-sided self-adhesive polyester tire waterproofing membrane, the bottom plate waterproofing membrane is MBP waterproofing membrane;
    (2)将所述双面自粘防水卷材的预留搭接部沿所述保护墙的长度方向间隔粘结在所述保护墙上;(2) bonding the reserved overlapping portion of the double-sided self-adhesive waterproofing membrane to the protective wall at intervals along the length direction of the protective wall;
    (3)在所述双面自粘防水卷材的预留搭接部位上砌筑用于临时保护的保护砖;(3) building protective bricks for temporary protection on the reserved lap joints of the double-sided self-adhesive waterproofing membrane;
    (4)在侧墙上施工防水涂料,并将所述防水涂料施工至所述大放脚的靠近所述保护墙的端部,其中,所述防水涂料为MPU聚氨酯防水涂料;(4) constructing a waterproof coating on the side wall, and applying the waterproof coating to the end of the large foot close to the protection wall, wherein the waterproof coating is MPU polyurethane waterproof coating;
    (5)拆除所述保护砖,沿所述保护墙的长度方向将所述双面自粘防水卷材的与保护墙粘结的部位割除使所述双面自粘防水卷材与保护墙分离,然后撕除所述双面防水卷材的面向所述侧墙的一面上的隔离膜,并将所述双面自粘防水卷材粘结到所述防水涂料固化后形成的防水涂膜上;(5) Remove the protective brick, and cut off the part of the double-sided self-adhesive waterproofing membrane that is bonded to the protective wall along the length direction of the protective wall to separate the double-sided self-adhesive waterproofing membrane from the protective wall , then tear off the isolation film on the side of the double-sided waterproof membrane facing the side wall, and bond the double-sided self-adhesive waterproof membrane to the waterproof coating film formed after the waterproof coating is cured ;
    (6)在所述双面自粘防水卷材和防水涂膜的粘结边缘处涂覆密封胶。(6) Coating sealant on the bonding edge of the double-sided self-adhesive waterproof membrane and the waterproof coating film.
  2. 一种大放脚底板和侧墙不同防水材料的搭接方法,其特征在于,包括以下步骤:A method for lap jointing different waterproof materials of a large foot bottom plate and a side wall, characterized in that it comprises the following steps:
    (1)将双面自粘防水卷材的一侧边与底板防水卷材粘结,且将所述防水卷材在保护墙顶部预留搭接部,其中,所述双面防水卷材为双面自粘聚酯胎防水卷材;(1) one side of the double-sided self-adhesive waterproofing membrane is bonded to the bottom plate waterproofing membrane, and the overlapping part is reserved on the top of the protective wall, wherein the double-sided waterproofing membrane is Double-sided self-adhesive polyester tire waterproof membrane;
    (2)将所述双面自粘防水卷材的预留搭接部沿所述保护墙的长度方向间隔粘结在所述保护墙上;(2) bonding the reserved overlapping portion of the double-sided self-adhesive waterproofing membrane to the protective wall at intervals along the length direction of the protective wall;
    (3)在所述双面自粘防水卷材的预留搭接部位上砌筑用于临时保护的保护砖;(3) building protective bricks for temporary protection on the reserved lap joints of the double-sided self-adhesive waterproofing membrane;
    (4)在侧墙上施工防水涂料,并将所述防水涂料延伸至底板大放脚处;(4) constructing waterproof coating on the side wall, and extending the waterproof coating to the foot of the bottom plate;
    (5)拆除所述保护砖并将所述双面自粘防水卷材与保护墙分离,然后撕除所述双面防水卷材的面向所述侧墙的一面上的隔离膜,并将所述双面自粘防水卷材粘结到所述防水涂料固化后形成的防水涂膜上。(5) Remove the protective brick and separate the double-sided self-adhesive waterproofing membrane from the protective wall, then tear off the isolation film on the side of the double-sided waterproofing membrane facing the side wall, and separate the double-sided waterproofing membrane from the side wall. The double-sided self-adhesive waterproof membrane is bonded to the waterproof coating film formed after the waterproof coating is cured.
  3. 根据权利要求2所述的大放脚底板和侧墙不同防水材料的搭接方法,其特征在于:步骤(1)中,所述双面自粘防水卷材的所述一侧边与所述底板防水卷材二者 相互搭接的搭接边位于所述保护墙和底板之间。The method for lap jointing of different waterproof materials between the bottom plate and the side wall according to claim 2, characterized in that: in step (1), the side edge of the double-sided self-adhesive waterproof membrane is connected to the The overlapping edges of the two bottom waterproofing membranes are located between the protective wall and the bottom plate.
  4. 根据权利要求2所述的大放脚底板和侧墙不同防水材料的搭接方法,其特征在于:步骤(1)中,所述双面自粘防水卷材的所述一侧边与所述底板防水卷材二者相互搭接的搭接边的宽度为150±10mm,所述双面自粘防水卷材的预留搭接部的宽度大于等于200mm。The method for lap jointing of different waterproof materials between the bottom plate and the side wall according to claim 2, characterized in that: in step (1), the side edge of the double-sided self-adhesive waterproof membrane is connected to the The width of the overlapping edge of the two-sided self-adhesive waterproof membrane is 150±10mm, and the width of the reserved overlapping part of the double-sided self-adhesive waterproof membrane is greater than or equal to 200mm.
  5. 根据权利要求2所述的大放脚底板和侧墙不同防水材料的搭接方法,其特征在于:步骤(2)中,所述间隔距离为500±100mm,所述双面自粘防水卷材与所述保护墙粘结的部位位于所述双面防水卷材的端部。The method for lap jointing of different waterproof materials between the bottom plate and the side wall according to claim 2, characterized in that: in step (2), the interval distance is 500±100mm, and the double-sided self-adhesive waterproof membrane The part bonded with the protective wall is located at the end of the double-sided waterproof membrane.
  6. 根据权利要求2所述的大放脚底板和侧墙不同防水材料的搭接方法,其特征在于:步骤(4)中,所述防水涂料施工至所述大放脚的靠近所述保护墙的端部。The method for lap jointing of different waterproof materials between the bottom plate and the side wall of the large feet according to claim 2, wherein: in step (4), the waterproof coating is applied to the large feet close to the protective wall. Ends.
  7. 根据权利要求2所述的大放脚底板和侧墙不同防水材料的搭接方法,其特征在于:步骤(5)中,所述双面自粘防水卷材与保护墙的分离的方法为:沿所述保护墙的长度方向将所述双面自粘防水卷材的与保护墙粘结的部位割除。The method for lap jointing of different waterproof materials between the bottom plate and the side wall according to claim 2, is characterized in that: in step (5), the method for separating the double-sided self-adhesive waterproofing membrane from the protective wall is: Cut off the part of the double-sided self-adhesive waterproof membrane that is bonded to the protective wall along the length direction of the protective wall.
  8. 根据权利要求2所述的大放脚底板和侧墙不同防水材料的搭接方法,其特征在于:步骤(5)中,所述双面自粘防水卷材与所述防水涂料固化后形成的防水涂膜之间粘结的宽度为大于等于150mm。The method for lap jointing of different waterproof materials between the bottom plate and the side wall according to claim 2, characterized in that: in step (5), the double-sided self-adhesive waterproof coiled material and the waterproof coating are formed after curing. The width of the bonding between the waterproof coating films is greater than or equal to 150mm.
  9. 根据权利要求2~8中任一项权利要求所述的大放脚底板和侧墙不同防水材料的搭接方法,其特征在于:所述搭接方法还包括在将所述双面自粘防水卷材粘结到所述防水涂膜上后,在所述双面自粘防水卷材和防水涂膜的粘结边缘处涂覆密封胶的步骤。The method for lap jointing of the bottom plate and the side wall of large feet with different waterproof materials according to any one of claims 2 to 8, characterized in that: the lap joint method further comprises: assembling the double-sided self-adhesive waterproof material The step of applying sealant at the bonding edge of the double-sided self-adhesive waterproof membrane and the waterproof coating film after the roll material is bonded to the waterproof coating film.
  10. 根据权利要求2~8中任一项权利要求所述的大放脚底板和侧墙不同防水材料的搭接方法,其特征在于:所述双面自粘防水卷材的厚度为3±0.5mm,宽度为350~400mm。The method for lap jointing of different waterproof materials between the bottom plate and the side wall according to any one of claims 2 to 8, wherein the thickness of the double-sided self-adhesive waterproof membrane is 3±0.5mm , the width is 350 ~ 400mm.
  11. 根据权利要求2~8中任一项权利要求所述的大放脚底板和侧墙不同防水材料的搭接方法,其特征在于:所述底板防水卷材为MBP防水卷材,所述MBP防水卷材的厚度为1.2±0.5mm;所述防水涂料为MPU聚氨酯防水涂料,所述防水涂膜厚度为2.0±0.5mm。The method for lap jointing different waterproof materials between the bottom plate and the side wall according to any one of claims 2 to 8, wherein the bottom plate waterproof membrane is an MBP waterproof membrane, and the MBP waterproof membrane The thickness of the coil material is 1.2±0.5mm; the waterproof coating is MPU polyurethane waterproof coating, and the thickness of the waterproof coating film is 2.0±0.5mm.
  12. 权利要求2~8中任一项权利要求所述的大放脚底板和侧墙不同防水材料的搭接方法得到的大放脚底板与侧墙的防水结构,其特征在于:所述防水结构包括具有大放 脚的底板、连接在所述底板上方的侧墙、设置在所述底板下方的垫层及设置在所述垫层上且位于所述底板侧方的保护墙,所述底板与保护墙和垫层之间铺设底板防水卷材,所述侧墙外侧设置由防水涂料形成的防水涂膜,所述防水涂膜由所述侧墙延伸至所述底板的大放脚上,所述防水结构还包括双面自粘防水卷材,所述双面自粘防水卷材的一侧边与所述底板防水卷材的侧边粘结、另一侧边与所述防水涂膜粘结。The waterproof structure of the large foot bottom plate and the side wall obtained by the overlapping method of the large foot bottom plate and the side wall of different waterproof materials according to any one of claims 2 to 8, characterized in that: the waterproof structure comprises: A bottom plate with large feet, a side wall connected above the bottom plate, a cushion layer disposed under the bottom plate, and a protective wall disposed on the cushion layer and located on the side of the bottom plate, the bottom plate and the protection The bottom plate waterproof membrane is laid between the wall and the cushion layer, the outside of the side wall is provided with a waterproof coating film formed of waterproof paint, and the waterproof coating film extends from the side wall to the large feet of the bottom plate. The waterproof structure also includes a double-sided self-adhesive waterproof membrane, one side of the double-sided self-adhesive waterproof membrane is bonded to the side of the bottom plate waterproof membrane, and the other side is bonded to the waterproof coating film. .
  13. 根据权利要求12所述的大放脚底板与侧墙的防水结构,其特征在于:所述双面自粘防水卷材与底板防水卷材二者相互粘结的搭接边位于所述保护墙和底板之间,所述双面自粘防水卷材与防水涂膜二者相互粘结的搭接边位于所述大放脚上。The waterproof structure of the bottom plate and the side wall of claim 12, wherein the overlapping edge of the double-sided self-adhesive waterproofing membrane and the bottom plate waterproofing membrane is located on the protective wall Between the two-sided self-adhesive waterproof membrane and the bottom plate, the overlapping edge where the double-sided self-adhesive waterproof membrane and the waterproof coating film are bonded to each other is located on the large foot.
  14. 根据权利要求12所述的大放脚底板与侧墙的防水结构,其特征在于:所述双面自粘防水卷材与底板防水卷材的所述搭接边的宽度为150±10mm,所述双面自粘防水卷材与防水涂膜的所述搭接边的宽度大于等于200mm。The waterproof structure of the bottom plate and the side wall of the large feet according to claim 12, wherein the width of the overlapping edge of the double-sided self-adhesive waterproof membrane and the bottom plate waterproof membrane is 150±10mm, so The width of the overlapping edge of the double-sided self-adhesive waterproof membrane and the waterproof coating film is greater than or equal to 200 mm.
PCT/CN2021/106451 2020-12-17 2021-07-15 Lapping method for different waterproof materials of pedestal foot base plate and sidewall WO2022127095A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202011493879.X 2020-12-17
CN202011493879.XA CN112663681B (en) 2020-12-17 2020-12-17 Lapping method for different waterproof materials of bottom plate and side wall of large foot

Publications (1)

Publication Number Publication Date
WO2022127095A1 true WO2022127095A1 (en) 2022-06-23

Family

ID=75404537

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/106451 WO2022127095A1 (en) 2020-12-17 2021-07-15 Lapping method for different waterproof materials of pedestal foot base plate and sidewall

Country Status (2)

Country Link
CN (1) CN112663681B (en)
WO (1) WO2022127095A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117684670A (en) * 2024-02-01 2024-03-12 天津市禹神建筑防水材料有限公司 Waterproof coiled material laying construction method and equipment

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112663681B (en) * 2020-12-17 2022-05-17 江苏凯伦建材股份有限公司 Lapping method for different waterproof materials of bottom plate and side wall of large foot
CN113431099B (en) * 2021-06-19 2022-09-30 北京冠翔时代防水工程有限公司 Clamp for laying waterproof coiled material and construction method of waterproof coiled material at brick bed die position

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005076438A (en) * 2003-08-31 2005-03-24 Eskandari M Moisture-proof structure of basement
CN109537636A (en) * 2018-10-30 2019-03-29 东莞市万科建筑技术研究有限公司 Suitable for the waterproof slab coiled material of pedestal foot and the friendship circle method of side wall water-repellent paint
CN208792380U (en) * 2018-09-07 2019-04-26 北京众泰云达科技发展有限公司 Drainage system internal corner structure
KR20190064049A (en) * 2017-11-30 2019-06-10 지에스건설 주식회사 Waterproofing structure for Tunnel Side
CN112663681A (en) * 2020-12-17 2021-04-16 江苏凯伦建材股份有限公司 Lapping method for different waterproof materials of bottom plate and side wall of large foot

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030163971A1 (en) * 2002-02-26 2003-09-04 Jiann-Min Chen Method of applying a self-adhesive waterproof membrane to an external wall and base slab of an underground construction
JP2016108815A (en) * 2014-12-05 2016-06-20 株式会社ダイフレックス Waterproof structure and waterproofing method
CN207775945U (en) * 2017-12-05 2018-08-28 北京东方雨虹防水技术股份有限公司 A kind of bridging arrangement of Novel underground room bottom plate and side wall difference waterproof material
CN109537637A (en) * 2018-10-30 2019-03-29 东莞市万科建筑技术研究有限公司 For the waterproof slab coiled material of no pedestal foot and the friendship circle method of side wall waterproof material
CN211547826U (en) * 2019-08-31 2020-09-22 北京东方雨虹防水工程有限公司 Waterproof lap joint structure for different waterproof materials at guide wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005076438A (en) * 2003-08-31 2005-03-24 Eskandari M Moisture-proof structure of basement
KR20190064049A (en) * 2017-11-30 2019-06-10 지에스건설 주식회사 Waterproofing structure for Tunnel Side
CN208792380U (en) * 2018-09-07 2019-04-26 北京众泰云达科技发展有限公司 Drainage system internal corner structure
CN109537636A (en) * 2018-10-30 2019-03-29 东莞市万科建筑技术研究有限公司 Suitable for the waterproof slab coiled material of pedestal foot and the friendship circle method of side wall water-repellent paint
CN112663681A (en) * 2020-12-17 2021-04-16 江苏凯伦建材股份有限公司 Lapping method for different waterproof materials of bottom plate and side wall of large foot

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117684670A (en) * 2024-02-01 2024-03-12 天津市禹神建筑防水材料有限公司 Waterproof coiled material laying construction method and equipment
CN117684670B (en) * 2024-02-01 2024-05-17 天津市禹神建筑防水材料有限公司 Waterproof coiled material laying construction method and equipment

Also Published As

Publication number Publication date
CN112663681B (en) 2022-05-17
CN112663681A (en) 2021-04-16

Similar Documents

Publication Publication Date Title
WO2022127095A1 (en) Lapping method for different waterproof materials of pedestal foot base plate and sidewall
CN110607809B (en) Waterproof construction method for basement of building engineering
CN106120873B (en) A kind of construction method of pile-raft foundation pre-installed and inverted adhered composite high-molecular waterproof roll
CN112081146A (en) Construction method of polymer self-adhesive film waterproof coiled material capable of being constructed in rainy season
CN101914927A (en) Waterproof system for basement bottom plate and wall surface and construction method thereof
CN206319910U (en) Infiltration disposal system is reinforced in a kind of tunnel-liner
CN109779162B (en) Passive building flat roof heat-insulating waterproof system and partition type dry operation construction method
CN110878700A (en) Tunnel waterproof structure and construction method thereof
CN106988440B (en) Waterproof structure for main body and auxiliary interface of subway station and construction method of waterproof structure
CN108643230A (en) A kind of outer waterproof construction of underground pipe gallery and construction method
CN201695411U (en) Waterproof system for basement bottom plate and wall surface
CN111350282A (en) Pre-laid waterproof coiled material construction process for welding and gluing combined construction
WO2022143062A1 (en) Waterproof treatment method for root of pipeline through wall or floor
KR20110079578A (en) Waterproof structure and waterproof method for the same
CN110735499A (en) parapet waterproof structure and construction method thereof
KR101902836B1 (en) Concrete repair and joint construction method using organic and inorganic hybrid water proofing material laminated self-adhesive seal reinforcing and waterproofing sheet
CN104762999A (en) Self-adhesion coiled material underground waterproof construction method
CN110541431A (en) waterproof structure of pipe gallery and construction method thereof
CN114197524A (en) Waterproof construction method for civil air defense basement
CN116411594A (en) Waterproof construction method
WO2019237908A1 (en) Blocking and drainage combined treatment method for water leakage at construction joint of secondary lining of tunnel
CN110485675A (en) A kind of self-adhesive coiled material builds vibration isolation sound insulationg board method is used in combination with floating
CN208309638U (en) A kind of outer waterproof construction of underground pipe gallery
WO2022127094A1 (en) Method for overlapping different waterproofing materials of side wall and roof
WO2022198848A1 (en) Construction method of pre-laid waterproof roll lap joint edge of bottom plate and bottom plate side formwork supporting structure

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21905028

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21905028

Country of ref document: EP

Kind code of ref document: A1