WO2022198848A1 - Construction method of pre-laid waterproof roll lap joint edge of bottom plate and bottom plate side formwork supporting structure - Google Patents

Construction method of pre-laid waterproof roll lap joint edge of bottom plate and bottom plate side formwork supporting structure Download PDF

Info

Publication number
WO2022198848A1
WO2022198848A1 PCT/CN2021/106455 CN2021106455W WO2022198848A1 WO 2022198848 A1 WO2022198848 A1 WO 2022198848A1 CN 2021106455 W CN2021106455 W CN 2021106455W WO 2022198848 A1 WO2022198848 A1 WO 2022198848A1
Authority
WO
WIPO (PCT)
Prior art keywords
bottom plate
formwork
laid
layer
lap joint
Prior art date
Application number
PCT/CN2021/106455
Other languages
French (fr)
Chinese (zh)
Inventor
卓杨
黄亮
况彬彬
Original Assignee
江苏凯伦建材股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 江苏凯伦建材股份有限公司 filed Critical 江苏凯伦建材股份有限公司
Publication of WO2022198848A1 publication Critical patent/WO2022198848A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • E02D31/025Draining membranes, sheets or fabric specially adapted therefor, e.g. with dimples

Definitions

  • the invention belongs to the technical field of structural waterproofing, and in particular relates to a construction method for lap joint edges of pre-laid waterproof coiled materials on a floor and a supporting structure for a side form of the floor.
  • groundwater Because the underground engineering is deeply buried in the ground, it is always subject to the infiltration of groundwater. If the waterproof problem is not handled properly, the groundwater will leak into the building or inside the building, which will bring a series of problems: affecting the work and life of the people; Accelerates the rate at which buildings are corroded and shortens their service life.
  • a fully enclosed and partially enclosed waterproof and drainage design should be adopted for single-built underground projects. Forms a closed waterproof layer.
  • the lap length of the coils should be 150mm for high polymer modified asphalt coils and 100mm for synthetic polymer coils; when two layers of coils are used, the joints of the coils should be staggered and the upper layer of coils Should cover the underlying coil.
  • the common practice for the overlapping parts of different waterproof materials is to build brick molds or use wooden formwork.
  • the masonry brick mold usually has the following defects: long construction period and relatively high engineering cost; uneven settlement of the bottom plate and the brick mold, which leads to easy damage to the waterproof lap joint and water leakage.
  • the overlapping edge of the pre-laid waterproofing membrane is turned over and fixed on the wooden formwork, and then the bottom plate is constructed.
  • the reserved lapped parts of the waterproofing membrane are easily contaminated, and cannot overlap with the side wall waterproofing material to form a closed waterproof layer; or the contaminated parts need to be eradicated and cleaned up, which complicates the construction process; especially in the rush period
  • the facade coil fixed on the wooden formwork is easily torn off and polluted by the bottom plate and later construction;
  • the overlapping edge of the waterproofing membrane is susceptible to the pollution of the later construction or the waterproofing membrane is slipped by its own weight, which causes the waterproofing membrane to be polluted by the bottom plate or other construction processes.
  • the present invention provides a pre-laid waterproofing membrane whose lapped edge is free from pollution from the bottom plate or construction, the construction is simple and convenient, and the waterproofing effect is good. construction method.
  • the invention also provides a support structure for the side mold of the bottom plate.
  • the pre-laid waterproofing membrane is laid within the boundary line of the bottom plate and a part of the pre-laid waterproofing membrane is reserved as a lap joint, and the lap joint extends out of the boundary line of the bottom plate and is laid on the cushion layer.
  • the method also includes the following steps:
  • the subsequent construction includes:
  • step S32 the isolation plate is removed in the process of constructing the waterproof material.
  • the isolation plate is an isolation plate with a certain hardness, which completely covers the overlapped edge, and isolates the overlapped edge, which has a better isolation effect and can effectively avoid the overlapped edge. If it is damaged by sharp objects on the construction site, it can also effectively avoid the influence of the climatic environment (such as sunlight) on the overlapping edge, thereby affecting the formation of a closed waterproof layer with the side wall waterproof material.
  • the isolation board is a waste wood formwork on a construction site. The use of waste wood formwork as the isolation board not only wastes the use of waste, but also does not increase other additional costs. Preferably, clean waste wood formwork, no sharp protrusions on the laying surface, etc.
  • the pre-applied waterproof roll material is a polymer self-adhesive film pre-applied waterproof roll material, which includes a polymer sheet layer, a self-adhesive layer and an anti-adhesive layer arranged in sequence.
  • the polymer sheet layer is the lower surface
  • the release layer is the upper surface.
  • the anti-sticking layer is an anti-sticking particle layer, and before applying the waterproof material on the overlapping edge, the surface floating sand on the anti-sticking layer is removed first.
  • a transition material is firstly coated on the upper surface of the overlapping edge to form a transition layer, and then a waterproof material is applied on the transition layer.
  • a waterproof material is applied on the transition layer.
  • the waterproof material covers the transition layer; when the transition layer is not constructed on the overlapping edge, the waterproof material directly covers the overlapping on the edge.
  • the transition material is selected to construct or not construct the transition material according to the specific type of waterproof material selected for the sidewall of the floor, so that an excellent closed waterproof layer is formed between the waterproof material and the overlapping edge.
  • the transition material for construction can be an adhesive that can be combined with the waterproof coating, such as water-based epoxy resin; when the waterproof material is a waterproof membrane, it can be selected Then the transition material is applied or not. When the transition material is not applied, the waterproof material is directly applied and extended to cover the overlapping edge.
  • step S2 when building the bottom plate side formwork, the isolation board is pressed under the wooden formwork, and the inner side of the wooden formwork is beyond the proximity of the isolation board.
  • the end faces of the ends of the wood formwork may be flush with the end faces.
  • step S2 square wood and steel pipes are used to reinforce the wood formwork.
  • the method includes the steps of:
  • a support structure for the bottom plate side formwork adopts a wooden formwork
  • the support structure includes a cushion layer, and a bottom plate boundary line is bounced on the cushion layer.
  • a pre-laid waterproofing membrane is laid in the boundary line of the bottom plate and a part of the pre-laid waterproofing membrane is reserved as a lap edge, and the lap edge extends out of the boundary line of the bottom plate and is laid on the cushion layer
  • the support structure further includes an isolation board laid on the overlapping edge, a wooden formwork built along the boundary line of the bottom plate and pressed on the isolation board, and a bracket for reinforcing the wooden formwork.
  • the bracket includes a plurality of wooden supports arranged laterally on the side of the wooden formwork, a plurality of wooden supports vertically arranged on the side of the wooden support and used for supporting the wooden support
  • the longitudinal support and the inclined support are arranged outside the longitudinal support and are used to support the longitudinal support.
  • One end of the inclined support is connected with the longitudinal support, and the other end is pressed against the cushion or the ground.
  • the longitudinal support, the inclined support and the wooden support reinforce the wooden formwork.
  • the longitudinal struts and the inclined struts are steel pipes respectively.
  • the wooden support is square wood.
  • the present invention has the following advantages compared with the prior art:
  • the construction method of the invention effectively solves the pollution problem of the overlapped edges of the pre-laid waterproofing membrane during the construction process, so that the overlapped edges are protected from the pollution of the bottom plate and the pollution of the later construction, and the overlapped edges and the waterproof materials of the later construction can be It forms an excellent closed waterproof layer, and also greatly simplifies the construction process.
  • it is not necessary to turn over the overlapping edge of the pre-laid waterproofing membrane and fix it on the wooden formwork. Detach the lap edge from the wooden formwork and clean up the pollution source on the lap edge, and it is not necessary to turn the lap edge over to overlap with the side wall waterproof material when it is later overlapped with the waterproof material.
  • the construction method of the invention solves the problems that the lap joint edge of the pre-laid waterproofing membrane fixed on the wooden formwork is easily torn off and is polluted by the bottom plate and later construction pollution due to the early demolding during the construction period.
  • the wooden formwork of the side wall of the bottom plate can be removed when the concrete of the bottom plate reaches the formwork removal strength, and at the same time, the pollution problem of the overlapping edge of the waterproofing membrane of the bottom plate can be avoided, and it is especially suitable for the temporary wooden formwork used in the construction period. happening.
  • the construction method of the invention solves the problem that if the side wall waterproof material is not constructed for a long time, the overlapped edge of the floor waterproofing membrane is easily polluted by the later construction or the waterproofing membrane is slipped by its own weight, which causes the waterproofing membrane to be polluted by the floor and other construction processes. pollution problem.
  • the construction method of the present invention solves the problem that the overlapping edge of the pre-laid waterproofing membrane cannot form a closed waterproof layer with the waterproofing material of the side wall of the bottom plate due to the influence of the environmental climate.
  • the construction method of the invention effectively solves the problems of water leakage due to damage to the waterproof lap joint caused by uneven settlement due to the use of brick tire molds; and the problems of long construction period and high cost.
  • Example 1 is a schematic diagram of a bottom plate side mold support structure with an overhang structure bottom plate built in Example 1;
  • Example 2 is a schematic diagram of a waterproof structure with an overhang structure bottom plate obtained in Example 1;
  • Example 3 is a schematic diagram of a bottom plate side mold support structure without an overhang structure bottom plate built in Example 2;
  • FIG. 4 is a schematic diagram of the waterproof structure of the bottom plate without an overhang structure obtained in Example 2.
  • FIG. 4 is a schematic diagram of the waterproof structure of the bottom plate without an overhang structure obtained in Example 2.
  • This embodiment provides a construction method for the overlapping edge of the pre-laid waterproofing membrane on the bottom plate with the overhang structure.
  • the polymer sheet layer is the lower surface
  • the anti-adhesive particle layer is the upper surface.
  • the built-up base plate side formwork support structure includes a cushion layer 1, the cushion layer 1 has a bottom plate boundary line, and the bottom plate boundary line on the cushion layer 1 is laid
  • the pre-laid waterproofing membrane 3 and a part of the pre-spreading waterproofing membrane are reserved as the lap edge 3a, and the lap edge 3a extends beyond the boundary line of the bottom plate and is laid on the cushion layer 1, and the support mechanism also includes laying on the lap edge 3a.
  • the bracket includes a plurality of wooden braces arranged laterally on the outer side of the wooden formwork 4 8, a plurality of longitudinal struts 9 vertically arranged on the outer side of the wooden strut 8 and used to support the wooden strut 8, and an inclined strut 10 arranged obliquely outside the longitudinal strut 9 and used to support the longitudinal strut 9
  • One end of the inclined support 10 is connected with the longitudinal support 9, and the other end is pressed against the cushion 1 or the ground, and the wooden formwork 4 is reinforced by the longitudinal support 9, the inclined support 10 and the wooden support 8.
  • step S6 binding the reinforcing bars of the bottom plate in the bottom plate side mold built in step S5, and pouring the bottom plate concrete;
  • the waterproof structure of the bottom plate constructed by the above-mentioned construction method is shown in FIG. 2 , including a cushion layer 1 and a pre-laid waterproofing membrane 3 arranged on the cushion layer 1, and a portion is reserved on the side of the pre-laid waterproofing membrane 3
  • the pre-laid waterproofing membrane 3 is used as the overlapping edge 3a, and the overlapping edge 3a is laid on the cushion layer 1.
  • the bottom plate waterproof structure also includes a bottom plate 2 arranged on the pre-laid waterproof membrane 3 and a side wall arranged on the bottom plate 2. And the side wall of the bottom plate 2 extends to the waterproof coating 7 formed by curing the waterproof coating on the overlapping edge 3a, and a transition layer 6 is also arranged between the waterproof coating 7 and the overlapping edge 3a.
  • This embodiment provides a construction method for the lap joint edge of pre-laid waterproof coiled material on the base plate without overhanging structure.
  • the construction of the bottom plate is carried out in the same way, as shown in Figure 3, and the obtained waterproof structure of the bottom plate is shown in Figure 4.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Road Paving Structures (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to a construction method of a pre-laid waterproof roll lap joint edge of a bottom plate and a bottom plate side formwork supporting structure. A bottom plate side formwork uses a wood formwork. The method comprises construction of a cushion layer; snapping a bottom plate boundary line on the cushion layer; laying a pre-laid waterproof roll in the bottom plate boundary line on the cushion layer and reserving a part of the pre-laid waterproof roll as a lap joint edge, the lap joint edge extending out of the boundary line and being laid on the cushion layer; laying an isolation plate on the lap joint edge to isolate the lap joint edge; building a bottom plate side formwork by using the wood formwork, and reinforcing the wood formwork; and performing subsequent construction. The present invention effectively solves the pollution problem of the lap joint edge of the pre-laid waterproof roll in the construction process; the lap joint edge and a later-stage construction waterproof material can form an excellent closed waterproof layer; moreover, a construction procedure is greatly simplified, and the lap joint edge does not need to be folded, fixed or dismounted whether in the laying stage or in the later-stage lap joint stage.

Description

底板预铺防水卷材搭接边的施工方法及底板侧模支撑结构The construction method of the lap joint edge of the pre-laid waterproofing membrane of the floor and the supporting structure of the side form of the floor 技术领域technical field
本发明属于构造防水技术领域,具体涉及一种底板预铺防水卷材搭接边的施工方法及底板侧模支撑结构。The invention belongs to the technical field of structural waterproofing, and in particular relates to a construction method for lap joint edges of pre-laid waterproof coiled materials on a floor and a supporting structure for a side form of the floor.
背景技术Background technique
地下工程由于深埋在地下,时刻受到地下水的渗透作用,如防水问题处理不好,导致地下水渗漏到建筑物内部或者建筑物体内,将会带来一系列问题:影响人员的工作和生活;加快建筑物被腐蚀的速度,缩短使用寿命。Because the underground engineering is deeply buried in the ground, it is always subject to the infiltration of groundwater. If the waterproof problem is not handled properly, the groundwater will leak into the building or inside the building, which will bring a series of problems: affecting the work and life of the people; Accelerates the rate at which buildings are corroded and shortens their service life.
根据国家规范《地下工程防水技术规范》GB50108-2008中描述对于单建式地下工程应采用全封闭、部分封闭的防排水设计,防水材料应从结构底板垫层铺设至顶板基面,并应在外围形成封闭的防水层。卷材接槎的搭接长度,高聚物改性沥青类卷材应为150mm,合成高分子类卷材应为100mm;当使用两层卷材时,卷材接缝应错开,上层卷材应盖过下层卷材。现有地下工程不同防水材料搭接部位通常采用的做法是砌筑砖胎模或者采用木模板。According to the national standard "Technical Specification for Waterproofing of Underground Engineering" GB50108-2008, a fully enclosed and partially enclosed waterproof and drainage design should be adopted for single-built underground projects. Forms a closed waterproof layer. The lap length of the coils should be 150mm for high polymer modified asphalt coils and 100mm for synthetic polymer coils; when two layers of coils are used, the joints of the coils should be staggered and the upper layer of coils Should cover the underlying coil. In the existing underground engineering, the common practice for the overlapping parts of different waterproof materials is to build brick molds or use wooden formwork.
砌筑砖胎模通常存在如下缺陷:工期长,工程成本相对较高;底板和砖胎模的不均匀沉降,导致防水搭接部位易损坏,出现渗漏水等。The masonry brick mold usually has the following defects: long construction period and relatively high engineering cost; uneven settlement of the bottom plate and the brick mold, which leads to easy damage to the waterproof lap joint and water leakage.
而现有的搭建木模板的施工方法,是在搭建木模板时将预铺防水卷材的搭接边翻转后固定在木模板上,然后施工底板。通常存在防水卷材的预留搭接部位易受污染,而无法与侧墙防水材料搭接形成封闭防水层;或需对污染部位进行铲除、清理,导致施工工序复杂化;特别是在赶工期使用临时木模板时,由于拆模较早,固定在木模板上的立面卷材容易被撕扯下来而受到底板的污染及后期施工的污染;或者时间长不施工侧墙防水材料,底板立面防水卷材搭接边易受后期施工的污染或防水卷材受自重下滑,导致防水卷材受底板污染或其他施工工序的污染。In the existing construction method for building a wooden formwork, when the wooden formwork is built, the overlapping edge of the pre-laid waterproofing membrane is turned over and fixed on the wooden formwork, and then the bottom plate is constructed. Usually, the reserved lapped parts of the waterproofing membrane are easily contaminated, and cannot overlap with the side wall waterproofing material to form a closed waterproof layer; or the contaminated parts need to be eradicated and cleaned up, which complicates the construction process; especially in the rush period When using temporary wooden formwork, due to the early demoulding, the facade coil fixed on the wooden formwork is easily torn off and polluted by the bottom plate and later construction; The overlapping edge of the waterproofing membrane is susceptible to the pollution of the later construction or the waterproofing membrane is slipped by its own weight, which causes the waterproofing membrane to be polluted by the bottom plate or other construction processes.
发明内容SUMMARY OF THE INVENTION
发明目的:为了解决现有技术存在的问题,本发明提供一种预铺防水卷材的搭接边不受底板或施工污染、施工简单便捷、防水效果好的底板预铺防水卷材搭接边的施工方法。Purpose of the invention: In order to solve the problems existing in the prior art, the present invention provides a pre-laid waterproofing membrane whose lapped edge is free from pollution from the bottom plate or construction, the construction is simple and convenient, and the waterproofing effect is good. construction method.
本发明还提供一种底板侧模的支撑结构。The invention also provides a support structure for the side mold of the bottom plate.
技术方案:为了解决上述技术问题,本发明采用如下技术方案:Technical scheme: in order to solve the above-mentioned technical problems, the present invention adopts the following technical scheme:
一种底板预铺防水卷材搭接边的施工方法,底板侧模采用木模板,所述方法包括施工垫层、在所述垫层上弹底板边界线和在所述垫层上的所述底板边界线内铺设预铺防水卷材并预留部分所述预铺防水卷材作为搭接边,所述搭接边延伸出所述底板边界线外且铺设于所述垫层上,所述方法还包括以下步骤:A construction method for the lap joint edge of pre-laid waterproof coiled material on the bottom plate, the side formwork of the bottom plate adopts a wooden formwork, and the method includes constructing a cushion layer, bouncing the boundary line of the bottom plate on the cushion layer, and the said cushion layer on the cushion layer. The pre-laid waterproofing membrane is laid within the boundary line of the bottom plate and a part of the pre-laid waterproofing membrane is reserved as a lap joint, and the lap joint extends out of the boundary line of the bottom plate and is laid on the cushion layer. The method also includes the following steps:
S1、在所述搭接边上铺设隔离板以对所述搭接边进行隔离;S1, laying an isolation plate on the overlapping edge to isolate the overlapping edge;
S2、采用所述木模板沿所述底板边界线搭建底板侧模并对所述木模板进行加固;S2, using the wooden formwork to build the side formwork of the bottom plate along the boundary line of the bottom plate and reinforce the wooden formwork;
S3、后续施工。S3. Subsequent construction.
在本发明的一些实施方式中,所述后续施工包括:In some embodiments of the present invention, the subsequent construction includes:
S30、在步骤S2搭建成的底板侧模内施工底板;S30, constructing the bottom plate in the bottom plate side mold built in step S2;
S31、拆除所述木模板;S31, removing the wooden formwork;
S32、移除所述隔离板,然后在底板的侧墙上施工防水材料,并使得所述防水材料由所述底板的侧墙延伸至所述搭接边上。S32 , removing the isolation board, and then constructing a waterproof material on the side wall of the bottom plate, so that the waterproof material extends from the side wall of the bottom plate to the overlapping edge.
在本发明的一些优选且具体实施方式中,步骤S32中,所述隔离板在施工防水材料工序阶段移除。In some preferred and specific embodiments of the present invention, in step S32, the isolation plate is removed in the process of constructing the waterproof material.
本发明中,所述隔离板是具有一定硬度的隔离板,完全覆盖在所述搭接边上,对所述搭接边进行隔离,具有更优异的隔离效果,能够有效避免所述搭接边被施工现场的尖锐物件损坏,还能有效避免气候环境(如日晒等)对所述搭接边的影响从而影响与侧墙防水材料形成封闭的防水层。在本发明的一些实施方式中,所述隔离板为建筑施工工地上的废旧木模板。选用废旧木模板作为隔离板,不仅废物利用,并且无需增加其他额外成本。优选,干净的废旧木模板、铺设面没有尖锐凸起等。In the present invention, the isolation plate is an isolation plate with a certain hardness, which completely covers the overlapped edge, and isolates the overlapped edge, which has a better isolation effect and can effectively avoid the overlapped edge. If it is damaged by sharp objects on the construction site, it can also effectively avoid the influence of the climatic environment (such as sunlight) on the overlapping edge, thereby affecting the formation of a closed waterproof layer with the side wall waterproof material. In some embodiments of the present invention, the isolation board is a waste wood formwork on a construction site. The use of waste wood formwork as the isolation board not only wastes the use of waste, but also does not increase other additional costs. Preferably, clean waste wood formwork, no sharp protrusions on the laying surface, etc.
在本发明的一些实施方式中,所述预铺防水卷材为高分子自粘胶膜预铺防水卷材,其包括依次设置的高分子片材层、自粘胶层和防粘层,铺设时,所述高分子片材层为下表面,所述防粘层为上表面。优选地,所述防粘层为防粘颗粒层,在所述搭接边上施工所述防水材料之前,先去除所述防粘层上的表面浮砂。In some embodiments of the present invention, the pre-applied waterproof roll material is a polymer self-adhesive film pre-applied waterproof roll material, which includes a polymer sheet layer, a self-adhesive layer and an anti-adhesive layer arranged in sequence. When the polymer sheet layer is the lower surface, the release layer is the upper surface. Preferably, the anti-sticking layer is an anti-sticking particle layer, and before applying the waterproof material on the overlapping edge, the surface floating sand on the anti-sticking layer is removed first.
在一些优选且具体实施方式中,移除所述隔离板后,可选择地先在所述搭接边的上表面涂覆过渡材料形成过渡层,再在所述过渡层上施工防水材料。以使所述防水材料与搭接边之间形成优异的封闭防水层。当所述搭接边上施工有过渡层时,所述防水材料覆盖在所述过渡层上;当所述搭接边上不施工所述过渡层时,所述防水材料直接 覆盖在所述搭接边上。In some preferred and specific embodiments, after removing the isolation plate, optionally, a transition material is firstly coated on the upper surface of the overlapping edge to form a transition layer, and then a waterproof material is applied on the transition layer. In order to form an excellent closed waterproof layer between the waterproof material and the overlapping edge. When a transition layer is constructed on the overlapping edge, the waterproof material covers the transition layer; when the transition layer is not constructed on the overlapping edge, the waterproof material directly covers the overlapping on the edge.
在一些实施例中,所述过渡材料根据底板侧墙防水材料选择的具体种类进行选择施工或不施工过渡材料,以使所述防水材料与搭接边之间形成优异的封闭防水层。如当所述防水材料选择防水涂料时,施工的过渡材料可以是能够与防水涂料结合粘接的胶粘剂类等,如可以是水性环氧树脂;当所述防水材料选择防水卷材时,可以选择则施工或不施工过渡材料,当不施工所述过渡材料时,所述防水材料直接施工延伸至覆盖在所述搭接边上。In some embodiments, the transition material is selected to construct or not construct the transition material according to the specific type of waterproof material selected for the sidewall of the floor, so that an excellent closed waterproof layer is formed between the waterproof material and the overlapping edge. For example, when a waterproof coating is selected for the waterproof material, the transition material for construction can be an adhesive that can be combined with the waterproof coating, such as water-based epoxy resin; when the waterproof material is a waterproof membrane, it can be selected Then the transition material is applied or not. When the transition material is not applied, the waterproof material is directly applied and extended to cover the overlapping edge.
在本发明的一些实施方式中,步骤S2中,搭建所述底板侧模时将所述隔离板压设在所述木模板下,且使得所述木模板的内侧面超出所述隔离板的靠近所述木模板的端部的端面或与所述端面齐平。In some embodiments of the present invention, in step S2, when building the bottom plate side formwork, the isolation board is pressed under the wooden formwork, and the inner side of the wooden formwork is beyond the proximity of the isolation board. The end faces of the ends of the wood formwork may be flush with the end faces.
在本发明的一些实施方式中,步骤S2中,采用方木和钢管对所述木模板进行加固。In some embodiments of the present invention, in step S2, square wood and steel pipes are used to reinforce the wood formwork.
在本发明的一些实施例中,所述方法包括以下步骤:In some embodiments of the present invention, the method includes the steps of:
(1)浇注垫层混凝土;(1) Pouring the cushion concrete;
(2)待所述垫层混凝土干燥形成垫层后,在所述垫层上弹底板边界线;(2) after the concrete of the cushion layer is dried to form the cushion layer, the boundary line of the bottom plate is bounced on the cushion layer;
(3)在所述垫层上的所述底板边界线内铺设预铺防水卷材并延伸至所述底板边界线外使得延伸出的部分宽度大于等于150mm,所述延伸出的部分作为所述搭接边;(3) Lay a pre-laid waterproof membrane within the boundary line of the bottom plate on the cushion layer and extend it to the outside of the boundary line of the bottom plate, so that the width of the extended part is greater than or equal to 150mm, and the extended part is used as the lap edge;
(4)在所述搭接边上铺设隔离板以对所述搭接边进行隔离;(4) laying an isolation plate on the overlapping edge to isolate the overlapping edge;
(5)采用木模板沿所述底板边界线搭建底板侧模且将所述隔离板压设在所述木模板下,并对所述木模板进行加固;(5) using a wooden formwork to build a bottom plate side form along the bottom plate boundary line and press the isolation plate under the wooden formwork, and reinforce the wooden formwork;
(6)在步骤(5)搭建的底板侧模内施工底板;(6) constructing the bottom plate in the bottom plate side mold set up in step (5);
(7)待所述底板达到拆模强度时,拆除所述木模板;(7) when the base plate reaches the formwork removal strength, remove the wooden formwork;
(8)移除所述隔离板,在底板侧墙上施工防水材料且所述防水材料延伸至覆盖在所述搭接边上。(8) Remove the insulation board, construct waterproof material on the side walls of the bottom plate and extend the waterproof material to cover the overlapping edge.
本发明采取的又另一技术方案:一种底板侧模支撑结构,底板侧模采用木模板,所述支撑结构包括垫层,所述垫层上弹有底板边界线,所述垫层上的所述底板边界线内铺设预铺防水卷材并预留部分所述预铺防水卷材作为搭接边,所述搭接边延伸出所述底板边界线外且铺设于所述垫层上,所述支撑结构还包括铺设在所述搭接边上的隔离板、沿所述底板边界线搭建且压设在所述隔离板上的木模板及用于对所述木模板进 行加固的支架。Yet another technical solution adopted by the present invention: a support structure for the bottom plate side formwork, the bottom plate side formwork adopts a wooden formwork, the support structure includes a cushion layer, and a bottom plate boundary line is bounced on the cushion layer. A pre-laid waterproofing membrane is laid in the boundary line of the bottom plate and a part of the pre-laid waterproofing membrane is reserved as a lap edge, and the lap edge extends out of the boundary line of the bottom plate and is laid on the cushion layer, The support structure further includes an isolation board laid on the overlapping edge, a wooden formwork built along the boundary line of the bottom plate and pressed on the isolation board, and a bracket for reinforcing the wooden formwork.
在本发明的一些实施方式中,所述支架包括横向设置在所述木模板侧面的多个木撑件、竖直设置在所述木撑件侧面且用于支撑所述木撑件的多个纵向撑件及倾斜设置在纵向撑件外侧且用于支撑所述纵向撑件的倾斜撑件,倾斜撑件的一端与纵向撑件连接、另一端抵在所述垫层或地面上,通过所述纵向撑件、倾斜撑件和木撑件对所述木模板进行加固。In some embodiments of the present invention, the bracket includes a plurality of wooden supports arranged laterally on the side of the wooden formwork, a plurality of wooden supports vertically arranged on the side of the wooden support and used for supporting the wooden support The longitudinal support and the inclined support are arranged outside the longitudinal support and are used to support the longitudinal support. One end of the inclined support is connected with the longitudinal support, and the other end is pressed against the cushion or the ground. The longitudinal support, the inclined support and the wooden support reinforce the wooden formwork.
在一些优选且具体实施方式中,所述纵向撑件、倾斜撑件分别为钢管。所述木撑件为方木。In some preferred and specific embodiments, the longitudinal struts and the inclined struts are steel pipes respectively. The wooden support is square wood.
由于上述技术方案运用,本发明与现有技术相比具有下列优点:Due to the application of the above-mentioned technical solutions, the present invention has the following advantages compared with the prior art:
本发明的施工方法有效解决了预铺防水卷材的搭接边在施工过程中的污染问题,使搭接边免受底板的污染和后期施工的污染,搭接边与后期施工的防水材料能够形成优异的封闭防水层,还大大简化施工工序,铺设预铺防水卷材时无需将预铺防水卷材的搭接边翻转并将其固定在木模板上,无需对预铺防水卷材的搭接边从木模板上拆离及对搭接边进行污染源的铲除清扫,后期与防水材料搭接时也无需将搭接边翻转以与侧墙防水材料搭接。The construction method of the invention effectively solves the pollution problem of the overlapped edges of the pre-laid waterproofing membrane during the construction process, so that the overlapped edges are protected from the pollution of the bottom plate and the pollution of the later construction, and the overlapped edges and the waterproof materials of the later construction can be It forms an excellent closed waterproof layer, and also greatly simplifies the construction process. When laying the pre-laid waterproofing membrane, it is not necessary to turn over the overlapping edge of the pre-laid waterproofing membrane and fix it on the wooden formwork. Detach the lap edge from the wooden formwork and clean up the pollution source on the lap edge, and it is not necessary to turn the lap edge over to overlap with the side wall waterproof material when it is later overlapped with the waterproof material.
本发明的施工方法解决了在赶工期时,由于拆模较早,导致固定在木模板上的预铺防水卷材的搭接边易被撕扯而受底板的污染及后期施工污染问题。同时采用本发明的施工方法在底板混凝土达到拆模强度时即可拆除底板侧墙木模板,同时还能够避免底板防水卷材的搭接边的污染问题,尤其适用于赶工期使用临时木模板的情况。The construction method of the invention solves the problems that the lap joint edge of the pre-laid waterproofing membrane fixed on the wooden formwork is easily torn off and is polluted by the bottom plate and later construction pollution due to the early demolding during the construction period. At the same time, by adopting the construction method of the present invention, the wooden formwork of the side wall of the bottom plate can be removed when the concrete of the bottom plate reaches the formwork removal strength, and at the same time, the pollution problem of the overlapping edge of the waterproofing membrane of the bottom plate can be avoided, and it is especially suitable for the temporary wooden formwork used in the construction period. Happening.
本发明的施工方法解决了时间久不施工侧墙防水材料,导致底板防水卷材搭接边易受后期施工的污染或防水卷材受自重下滑,导致防水卷材受底板污染和其他施工工序的污染问题。The construction method of the invention solves the problem that if the side wall waterproof material is not constructed for a long time, the overlapped edge of the floor waterproofing membrane is easily polluted by the later construction or the waterproofing membrane is slipped by its own weight, which causes the waterproofing membrane to be polluted by the floor and other construction processes. pollution problem.
本发明的施工方法解决了预铺防水卷材的搭接边由于环境气候的影响导致无法与底板侧墙防水材料形成封闭防水层的问题。The construction method of the present invention solves the problem that the overlapping edge of the pre-laid waterproofing membrane cannot form a closed waterproof layer with the waterproofing material of the side wall of the bottom plate due to the influence of the environmental climate.
本发明施工方法有效解决了由于采用砖胎模,存在的不均匀沉降导致的防水搭接部位的损坏而出现渗漏水的问题;以及工期长,成本高的问题。The construction method of the invention effectively solves the problems of water leakage due to damage to the waterproof lap joint caused by uneven settlement due to the use of brick tire molds; and the problems of long construction period and high cost.
附图说明Description of drawings
图1为实施例1中搭建的具有外挑结构底板的底板侧模支撑结构示意图;1 is a schematic diagram of a bottom plate side mold support structure with an overhang structure bottom plate built in Example 1;
图2为实施例1中得到的具有外挑结构底板的防水结构示意图;2 is a schematic diagram of a waterproof structure with an overhang structure bottom plate obtained in Example 1;
图3为实施例2中搭建的无外挑结构底板的底板侧模支撑结构示意图;3 is a schematic diagram of a bottom plate side mold support structure without an overhang structure bottom plate built in Example 2;
图4为实施例2中得到的无外挑结构底板的防水结构示意图。FIG. 4 is a schematic diagram of the waterproof structure of the bottom plate without an overhang structure obtained in Example 2. FIG.
图中,1、垫层;2、底板;3、预铺防水卷材;3a、搭接边;4、木模板;5、隔离板;6、过渡层;7、防水涂层;8、木撑件;9、纵向撑件;10、倾斜撑件。In the figure, 1, cushion; 2, bottom plate; 3, pre-laid waterproof membrane; 3a, lap joint; 4, wooden formwork; 5, isolation board; 6, transition layer; 7, waterproof coating; 8, wood Support; 9. Longitudinal support; 10. Inclined support.
具体实施方式Detailed ways
下面结合说明书附图及具体实施例详细说明本发明的技术方案,以便本领域技术人员更好理解和实施本发明的技术方案,但并不因此将本发明限制在所述的实例范围之中。The technical solutions of the present invention are described in detail below in conjunction with the accompanying drawings and specific embodiments of the description, so that those skilled in the art can better understand and implement the technical solutions of the present invention, but the invention is not limited to the scope of the examples.
实施例1Example 1
本实施例提供具有外挑结构底板预铺防水卷材搭接边的施工方法,本实施例的底板侧墙防水材料选用防水涂料,预铺防水卷材包括依次设置的高分子片材层、胶粘层和防粘颗粒层,铺设时,高分子片材层为下表面,防粘颗粒层为上表面,具体施工方法包括以下步骤:This embodiment provides a construction method for the overlapping edge of the pre-laid waterproofing membrane on the bottom plate with the overhang structure. When laying the adhesive layer and the anti-adhesive particle layer, the polymer sheet layer is the lower surface, and the anti-adhesive particle layer is the upper surface. The specific construction method includes the following steps:
S1、浇注垫层混凝土;S1, pour the cushion concrete;
S2、待垫层混凝土干燥形成垫层1后,在垫层1上弹底板边界线;S2. After the concrete of the cushion layer is dried to form the cushion layer 1, the boundary line of the bottom plate is stretched on the cushion layer 1;
S3、在垫层1上的底板边界线内铺设1.2mm厚的高分子自粘胶膜预铺防水卷材3并延伸出底板边界线外使得延伸出的部分的宽度不小于150mm,该延伸出的部分作为预铺防水卷材3的搭接边3a;S3. Lay a 1.2mm thick polymer self-adhesive film pre-laid waterproofing membrane 3 in the boundary line of the bottom plate on the cushion layer 1 and extend beyond the boundary line of the bottom plate so that the width of the extended part is not less than 150mm. The part is used as the lap edge 3a of the pre-laid waterproofing membrane 3;
S4、在搭接边3a上铺设隔离板5以对搭接边3a进行隔离;S4, laying an isolation plate 5 on the overlapping edge 3a to isolate the overlapping edge 3a;
S5、采用木模板4沿底板边界线搭建底板侧模且将隔离板5压设在木模板4下,尽量使得木模板4的内侧面与隔离板5的靠近木模板4的端部的端面齐平,用支架对木模板4进行加固,如图1所示,搭建后的底板侧模支撑结构包括垫层1,垫层1上弹有底板边界线,垫层1上的底板边界线内铺设预铺防水卷材3并预留部分预铺防水卷材作为搭接边3a,搭接边3a延伸出底板边界线外且铺设于垫层1上,该支撑机构还包括铺设在搭接边3a上的隔离板5、沿底板边界线搭建且压设在隔离板5上的木模板4及用于对木模板4进行加固的支架,支架包括横向设置在木模板4外侧面的多个木撑件8、竖直设置在木撑件8外侧面且用于支撑木撑件8的多个纵向撑件9及倾斜设置在纵向撑件9外侧且用于支撑纵向撑件9的倾斜撑件10,倾斜撑件10的一端与纵向撑件9连接、另一端抵在垫层1或地面上,通过纵向撑件9、倾斜撑件10和木 撑件8对木模板4进行加固。S5, use the wooden formwork 4 to build the side formwork of the bottom plate along the boundary line of the bottom plate and press the isolation plate 5 under the wooden formwork 4, so as to make the inner side of the wooden formwork 4 and the end face of the isolation plate 5 close to the end of the wooden formwork 4 as much as possible The wooden formwork 4 is reinforced with brackets. As shown in Figure 1, the built-up base plate side formwork support structure includes a cushion layer 1, the cushion layer 1 has a bottom plate boundary line, and the bottom plate boundary line on the cushion layer 1 is laid The pre-laid waterproofing membrane 3 and a part of the pre-spreading waterproofing membrane are reserved as the lap edge 3a, and the lap edge 3a extends beyond the boundary line of the bottom plate and is laid on the cushion layer 1, and the support mechanism also includes laying on the lap edge 3a. The isolation board 5, the wooden formwork 4 built along the boundary line of the bottom plate and pressed on the isolation board 5 and the bracket for reinforcing the wooden formwork 4, the bracket includes a plurality of wooden braces arranged laterally on the outer side of the wooden formwork 4 8, a plurality of longitudinal struts 9 vertically arranged on the outer side of the wooden strut 8 and used to support the wooden strut 8, and an inclined strut 10 arranged obliquely outside the longitudinal strut 9 and used to support the longitudinal strut 9 One end of the inclined support 10 is connected with the longitudinal support 9, and the other end is pressed against the cushion 1 or the ground, and the wooden formwork 4 is reinforced by the longitudinal support 9, the inclined support 10 and the wooden support 8.
S6、在步骤S5搭建的底板侧模内绑扎底板钢筋,浇注底板混凝土;S6, binding the reinforcing bars of the bottom plate in the bottom plate side mold built in step S5, and pouring the bottom plate concrete;
S7、待底板达到拆模强度时,拆除木模板4;S7. When the bottom plate reaches the formwork removal strength, remove the wooden formwork 4;
S8、待需要施工底板2侧墙的防水涂料时,将隔离板5移除,钢丝刷刷除防粘颗粒层上的表面浮砂,然后在搭接边3a的防粘颗粒层上施工水性环氧树脂形成过渡层,待水性环氧树脂固化至指触不粘时,在底板侧墙上施工MPU聚氨酯防水涂料且使防水涂料涂刷延伸至过渡层6上并完全覆盖过渡层6。S8. When the waterproof coating of the side wall of the base plate 2 needs to be constructed, the isolation plate 5 is removed, the surface floating sand on the anti-stick particle layer is removed by wire brushing, and then a water-based ring is constructed on the anti-stick particle layer of the overlapping edge 3a. Oxygen resin forms a transition layer. When the water-based epoxy resin is cured to the point that it is not sticky to the touch, MPU polyurethane waterproof coating is applied on the side wall of the bottom plate and the waterproof coating is brushed to extend to the transition layer 6 and completely cover the transition layer 6 .
通过上述施工方法施工得到的底板的防水结构如图2所示,包括垫层1及设置在垫层1上的预铺防水卷材3,在预铺防水卷材3的侧边预留有部分预铺防水卷材3作为搭接边3a,搭接边3a铺设在垫层1上,该底板防水结构还包括设置在预铺防水卷材3上的底板2及设置在底板2的侧墙上且由底板2的侧墙延伸至覆盖在搭接边3a上的由防水涂料固化形成的防水涂层7,防水涂层7和搭接边3a之间还设置过渡层6。The waterproof structure of the bottom plate constructed by the above-mentioned construction method is shown in FIG. 2 , including a cushion layer 1 and a pre-laid waterproofing membrane 3 arranged on the cushion layer 1, and a portion is reserved on the side of the pre-laid waterproofing membrane 3 The pre-laid waterproofing membrane 3 is used as the overlapping edge 3a, and the overlapping edge 3a is laid on the cushion layer 1. The bottom plate waterproof structure also includes a bottom plate 2 arranged on the pre-laid waterproof membrane 3 and a side wall arranged on the bottom plate 2. And the side wall of the bottom plate 2 extends to the waterproof coating 7 formed by curing the waterproof coating on the overlapping edge 3a, and a transition layer 6 is also arranged between the waterproof coating 7 and the overlapping edge 3a.
实施例2Example 2
本实施例提供无外挑结构底板预铺防水卷材搭接边的施工方法,本实施例的施工方法大致同实施例1,不同之处在于,底板的施工,根据无外挑结构底板的施工方式进行底板的施工,如图3所示,得到的底板防水结构如图4所示。This embodiment provides a construction method for the lap joint edge of pre-laid waterproof coiled material on the base plate without overhanging structure. The construction of the bottom plate is carried out in the same way, as shown in Figure 3, and the obtained waterproof structure of the bottom plate is shown in Figure 4.
上述实施例只为说明本发明的技术构思及特点,其目的在于让熟悉此项技术的人士能够了解本发明的内容并据以实施,并不能以此限制本发明的保护范围。凡根据本发明精神实质所作的等效变化或修饰,都应涵盖在本发明的保护范围之内。The above-mentioned embodiments are only intended to illustrate the technical concept and characteristics of the present invention, and the purpose thereof is to enable those who are familiar with the art to understand the content of the present invention and implement them accordingly, and cannot limit the protection scope of the present invention. All equivalent changes or modifications made according to the spirit of the present invention should be included within the protection scope of the present invention.

Claims (14)

  1. 底板预铺防水卷材搭接边的施工方法,底板侧模采用木模板,其特征在于,所述方法包括以下步骤:The construction method of the lap joint edge of the pre-laid waterproofing membrane of the bottom plate, the side formwork of the bottom plate adopts a wooden formwork, and it is characterized in that, the method comprises the following steps:
    (1)浇注垫层混凝土;(1) Pouring the cushion concrete;
    (2)待所述垫层混凝土干燥形成垫层后,在所述垫层上弹底板边界线;(2) after the concrete of the cushion layer is dried to form the cushion layer, the boundary line of the bottom plate is bounced on the cushion layer;
    (3)在所述底板边界线内铺设预铺防水卷材并延伸至所述底板边界线外使得延伸出的部分宽度大于等于150mm,所述延伸出的部分作为搭接边,其中,所述预铺防水卷材为高分子自粘胶膜预铺防水卷材,其包括依次设置的高分子片材层、胶粘层和防粘层,铺设时,所述高分子片材层为下表面,所述防粘层为上表面;(3) Lay the pre-laid waterproof membrane within the boundary line of the bottom plate and extend it to the outside of the boundary line of the bottom plate so that the width of the extended part is greater than or equal to 150mm, and the extended part is used as a lap edge, wherein the The pre-laid waterproof membrane is a polymer self-adhesive film pre-laid waterproof membrane, which includes a polymer sheet layer, an adhesive layer and an anti-stick layer arranged in sequence. When laying, the polymer sheet layer is the lower surface. , the anti-stick layer is the upper surface;
    (4)在所述搭接边上铺设隔离板以对所述搭接边进行隔离,其中,所述隔离板为建筑施工工地上的废旧木模板;(4) laying an isolation board on the overlapped edge to isolate the overlapped edge, wherein the isolation board is a waste wood formwork on a construction site;
    (5)采用所述木模板沿所述底板边界线搭建底板侧模且将所述隔离板压设在所述木模板下,并对所述木模板进行加固;(5) using the wooden formwork to build the side formwork of the bottom plate along the boundary line of the bottom plate and press the isolation plate under the wooden formwork, and reinforce the wooden formwork;
    (6)在步骤(5)搭建的底板侧模内施工底板;(6) constructing the bottom plate in the bottom plate side mold set up in step (5);
    (7)待所述底板达到拆模强度时,拆除所述木模板;(7) when the base plate reaches the formwork removal strength, remove the wooden formwork;
    (8)移除所述隔离板,在底板侧墙上施工防水材料且所述防水材料延伸至覆盖在所述搭接边上。(8) Remove the insulation board, construct waterproof material on the side walls of the bottom plate and extend the waterproof material to cover the overlapping edge.
  2. 一种底板预铺防水卷材搭接边的施工方法,底板侧模采用木模板,所述方法包括施工垫层、在所述垫层上弹底板边界线和在所述垫层上的所述底板边界线内铺设预铺防水卷材并预留部分所述预铺防水卷材作为搭接边,其特征在于,所述搭接边延伸出所述底板边界线外且铺设于所述垫层上,所述方法还包括以下步骤:A construction method for the lap joint edge of pre-laid waterproof coiled material on the bottom plate, the side formwork of the bottom plate adopts a wooden formwork, and the method includes constructing a cushion layer, bouncing the boundary line of the bottom plate on the cushion layer, and the said cushion layer on the cushion layer. The pre-laid waterproofing membrane is laid within the boundary line of the bottom plate and a part of the pre-laid waterproofing membrane is reserved as a lap edge. It is characterized in that the lap edge extends beyond the boundary line of the bottom plate and is laid on the cushion layer Above, the method also includes the following steps:
    S1、在所述搭接边上铺设隔离板以对所述搭接边进行隔离;S1, laying an isolation plate on the overlapping edge to isolate the overlapping edge;
    S2、采用所述木模板沿所述底板边界线搭建底板侧模并对所述木模板进行加固;S2, using the wooden formwork to build the side formwork of the bottom plate along the boundary line of the bottom plate and reinforce the wooden formwork;
    S3、后续施工工序。S3. Subsequent construction procedures.
  3. 根据权利要求2所述的底板预铺防水卷材搭接边的施工方法,其特征在于,所述后续施工工序包括:The construction method for the lap joint edge of the base plate pre-laid waterproofing membrane according to claim 2, is characterized in that, described subsequent construction procedure comprises:
    S30、在步骤S2搭建成的底板侧模内施工底板;S30, constructing the bottom plate in the bottom plate side mold built in step S2;
    S31、拆除所述木模板;S31, removing the wooden formwork;
    S32、移除所述隔离板,然后在底板的侧墙上施工防水材料,并使得所述防水材 料由所述底板的侧墙延伸至所述搭接边上。S32, removing the isolation board, and then constructing a waterproof material on the side wall of the bottom plate, so that the waterproof material extends from the side wall of the bottom plate to the overlapping edge.
  4. 根据权利要求3所述的底板预铺防水卷材搭接边的施工方法,其特征在于:步骤S32中,所述隔离板在施工防水材料工序阶段移除。The construction method for the lap joint edge of the base plate pre-laid waterproofing membrane according to claim 3, characterized in that: in step S32, the isolation plate is removed in the process stage of constructing the waterproof material.
  5. 根据权利要求2所述的底板预铺防水卷材搭接边的施工方法,其特征在于:所述预铺防水卷材为高分子自粘胶膜预铺防水卷材,其包括依次设置的高分子片材层、胶粘层和防粘层,铺设时,所述高分子片材层为下表面,所述防粘层为上表面。The construction method for the lap joint edge of the bottom plate pre-laid waterproofing membrane according to claim 2, wherein the pre-laid waterproofing membrane is a polymer self-adhesive film pre-spreading waterproofing membrane, which comprises sequentially arranged high When laying the molecular sheet layer, the adhesive layer and the release layer, the polymer sheet layer is the lower surface, and the release layer is the upper surface.
  6. 根据权利要求5所述的底板预铺防水卷材搭接边的施工方法,其特征在于:移除所述隔离板后,可选择地先在所述搭接边的上表面涂覆过渡材料形成过渡层,再在所述过渡层上施工防水材料。The construction method of the lap joint edge of the bottom plate pre-laid waterproofing membrane according to claim 5, characterized in that: after removing the isolation board, optionally firstly coating the upper surface of the lap joint edge with a transition material to form transition layer, and then construct waterproof material on the transition layer.
  7. 根据权利要求5所述的底板预铺防水卷材搭接边的施工方法,其特征在于:所述防粘层为防粘颗粒层,在所述搭接边上施工所述防水材料之前,先去除所述防粘层上的表面浮砂。The construction method for the lap joint edge of the base plate pre-laid waterproofing membrane according to claim 5, wherein the anti-stick layer is an anti-stick particle layer, and before the waterproof material is constructed on the lap joint edge, a Remove surface sand from the release layer.
  8. 根据权利要求2所述的底板预铺防水卷材搭接边的施工方法,其特征在于:所述隔离板为建筑施工工地上的废旧木模板。The construction method for the lap joint edge of the base plate pre-laid waterproofing membrane according to claim 2, wherein the isolation board is a waste wood formwork on a construction site.
  9. 根据权利要求2所述的底板预铺防水卷材搭接边的施工方法,其特征在于:步骤S2中,搭建所述底板侧模时将所述隔离板压设在所述木模板下,且使得所述木模板的内侧面超出所述隔离板的靠近所述木模板的端部的端面或与所述端面齐平。The construction method for the lap joint edge of the base plate pre-laid waterproofing membrane according to claim 2, characterized in that: in step S2, when the base plate side formwork is built, the isolation plate is pressed under the wooden formwork, and The inner side of the wood formwork is made to protrude beyond the end face of the insulation board near the end of the wood formwork or to be flush with the end face.
  10. 根据权利要求2所述的底板预铺防水卷材搭接边的施工方法,其特征在于:步骤S2中,采用方木和钢管对所述木模板进行加固。The construction method for the lap joint edge of the pre-laid waterproof coiled material on the bottom plate according to claim 2, characterized in that: in step S2, square wood and steel pipe are used to reinforce the wood formwork.
  11. 根据权利要求2~10中任一项权利要求所述的底板预铺防水卷材搭接边的施工方法,其特征在于,所述方法包括以下步骤:According to the construction method of the lap joint edge of the base plate pre-laid waterproofing membrane according to any one of claims 2 to 10, it is characterized in that, the method comprises the following steps:
    (1)浇注垫层混凝土;(1) Pouring the cushion concrete;
    (2)待所述垫层混凝土干燥形成垫层后,在所述垫层上弹底板边界线;(2) after the concrete of the cushion layer is dried to form the cushion layer, the boundary line of the bottom plate is bounced on the cushion layer;
    (3)在所述垫层上的所述底板边界线内铺设预铺防水卷材并延伸至所述底板边界线外使得延伸出的部分宽度大于等于150mm,所述延伸出的部分作为所述搭接边;(3) Lay a pre-laid waterproof membrane within the boundary line of the bottom plate on the cushion layer and extend it to the outside of the boundary line of the bottom plate, so that the width of the extended part is greater than or equal to 150mm, and the extended part is used as the lap edge;
    (4)在所述搭接边上铺设隔离板以对所述搭接边进行隔离;(4) laying an isolation plate on the overlapping edge to isolate the overlapping edge;
    (5)采用木模板沿所述底板边界线搭建底板侧模且将所述隔离板压设在所述木模板下,并对所述木模板进行加固;(5) using a wooden formwork to build a bottom plate side form along the bottom plate boundary line and press the isolation plate under the wooden formwork, and reinforce the wooden formwork;
    (6)在步骤(5)搭建的底板侧模内施工底板;(6) constructing the bottom plate in the bottom plate side mold set up in step (5);
    (7)待所述底板达到拆模强度时,拆除所述木模板;(7) when the base plate reaches the formwork removal strength, remove the wooden formwork;
    (8)移除所述隔离板,在底板侧墙上施工防水材料且所述防水材料延伸至覆盖在所述搭接边上。(8) Remove the insulation board, construct waterproof material on the side walls of the bottom plate and extend the waterproof material to cover the overlapping edge.
  12. 一种底板侧模支撑结构,底板侧模采用木模板,所述支撑结构包括垫层,所述垫层上弹有底板边界线,所述垫层上的所述底板边界线内铺设预铺防水卷材并预留部分所述预铺防水卷材作为搭接边,其特征在于:所述搭接边延伸出所述底板边界线外且铺设于所述垫层上,所述支撑结构还包括铺设在所述搭接边上的隔离板、沿所述底板边界线搭建且压设在所述隔离板上的木模板及用于对所述木模板进行加固的支架。A base plate side formwork support structure, the base plate side formwork adopts a wooden formwork, the support structure comprises a cushion layer, a base plate boundary line is bounced on the cushion layer, and a pre-laid waterproof layer is laid in the base plate boundary line on the cushion layer. Coiled material and reserved a part of the pre-laid waterproofing material as the overlapping edge, characterized in that: the overlapping edge extends beyond the boundary line of the bottom plate and is laid on the cushion layer, and the support structure further includes An isolation board laid on the overlapping edge, a wooden formwork built along the boundary line of the bottom plate and pressed on the isolation board, and a bracket for reinforcing the wooden formwork.
  13. 根据权利要求12所述的底板侧模支撑结构,其特征在于:所述支架包括横向设置在所述木模板侧面的多个木撑件、竖直设置在所述木撑件侧面且用于支撑所述木撑件的多个纵向撑件及倾斜设置在纵向撑件外侧且用于支撑所述纵向撑件的倾斜撑件,倾斜撑件的一端与纵向撑件连接、另一端抵在所述垫层或地面上,通过所述纵向撑件、倾斜撑件和木撑件对所述木模板进行加固。The support structure for the side formwork of the bottom plate according to claim 12, wherein the bracket comprises a plurality of wooden supports arranged laterally on the sides of the wooden formwork, vertically arranged on the sides of the wooden supports and used for supporting A plurality of longitudinal struts of the wooden strut and an oblique strut that is inclined outside the longitudinal strut and used to support the longitudinal strut, one end of the oblique strut is connected to the longitudinal strut, and the other end abuts against the longitudinal strut. On the cushion layer or the ground, the wooden formwork is reinforced by the longitudinal struts, the inclined struts and the wooden struts.
  14. 根据权利要求13所述的底板侧模支撑结构,其特征在于:所述纵向撑件、倾斜撑件分别为钢管,和/或,所述木撑件为方木。The bottom plate side formwork support structure according to claim 13, wherein the longitudinal support and the inclined support are steel pipes respectively, and/or the wooden support is square wood.
PCT/CN2021/106455 2021-03-24 2021-07-15 Construction method of pre-laid waterproof roll lap joint edge of bottom plate and bottom plate side formwork supporting structure WO2022198848A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202110311819.XA CN112922030A (en) 2021-03-24 2021-03-24 Construction method for pre-laying waterproof coiled material overlap edge on bottom plate and bottom plate side mold supporting structure
CN202110311819.X 2021-03-24

Publications (1)

Publication Number Publication Date
WO2022198848A1 true WO2022198848A1 (en) 2022-09-29

Family

ID=76175755

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/106455 WO2022198848A1 (en) 2021-03-24 2021-07-15 Construction method of pre-laid waterproof roll lap joint edge of bottom plate and bottom plate side formwork supporting structure

Country Status (2)

Country Link
CN (1) CN112922030A (en)
WO (1) WO2022198848A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112922030A (en) * 2021-03-24 2021-06-08 江苏凯伦建材股份有限公司 Construction method for pre-laying waterproof coiled material overlap edge on bottom plate and bottom plate side mold supporting structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09250144A (en) * 1996-03-15 1997-09-22 Mitsuo Nakayama Outside waterproof method of basement
CN203583507U (en) * 2013-11-29 2014-05-07 中国建筑一局(集团)有限公司 Raft foundation wood template system
CN203919903U (en) * 2014-06-11 2014-11-05 胜利油田大明新型建筑防水材料有限责任公司 A kind of macromolecule overlays waterproof roll
CN206220132U (en) * 2016-11-30 2017-06-06 中建八局第四建设有限公司 A kind of base plate and exterior wall junction construction typified form support
CN110761322A (en) * 2019-09-23 2020-02-07 中国一冶集团有限公司 Cast-in-place pipe gallery side wall horizontal construction joint reinforcing structure and construction method thereof
CN112922030A (en) * 2021-03-24 2021-06-08 江苏凯伦建材股份有限公司 Construction method for pre-laying waterproof coiled material overlap edge on bottom plate and bottom plate side mold supporting structure

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207775945U (en) * 2017-12-05 2018-08-28 北京东方雨虹防水技术股份有限公司 A kind of bridging arrangement of Novel underground room bottom plate and side wall difference waterproof material
CN109537636A (en) * 2018-10-30 2019-03-29 东莞市万科建筑技术研究有限公司 Suitable for the waterproof slab coiled material of pedestal foot and the friendship circle method of side wall water-repellent paint
CN110258656A (en) * 2019-05-29 2019-09-20 中国三冶集团有限公司 A kind of underground waterproof engineering pre-installed and inverted adhered construction method
CN110761422A (en) * 2019-10-09 2020-02-07 中国二十冶集团有限公司 Protection method for reserved lap joint after horizontal laying of waterproof coiled material
CN111173045A (en) * 2019-12-31 2020-05-19 上海东方雨虹防水技术有限责任公司 Construction method for pre-paving and reversely adhering TPO (thermoplastic polyolefin) waterproof coiled material of basement bottom plate

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09250144A (en) * 1996-03-15 1997-09-22 Mitsuo Nakayama Outside waterproof method of basement
CN203583507U (en) * 2013-11-29 2014-05-07 中国建筑一局(集团)有限公司 Raft foundation wood template system
CN203919903U (en) * 2014-06-11 2014-11-05 胜利油田大明新型建筑防水材料有限责任公司 A kind of macromolecule overlays waterproof roll
CN206220132U (en) * 2016-11-30 2017-06-06 中建八局第四建设有限公司 A kind of base plate and exterior wall junction construction typified form support
CN110761322A (en) * 2019-09-23 2020-02-07 中国一冶集团有限公司 Cast-in-place pipe gallery side wall horizontal construction joint reinforcing structure and construction method thereof
CN112922030A (en) * 2021-03-24 2021-06-08 江苏凯伦建材股份有限公司 Construction method for pre-laying waterproof coiled material overlap edge on bottom plate and bottom plate side mold supporting structure

Also Published As

Publication number Publication date
CN112922030A (en) 2021-06-08

Similar Documents

Publication Publication Date Title
CN110607809B (en) Waterproof construction method for basement of building engineering
CN110747899B (en) Basement waterproof construction method
CN105862873B (en) Deep basal pit narrow space underground waterproof and external wall structure construction method
WO2014139252A1 (en) Method for constructing large raft foundation in high-temperature environment
CN106930331A (en) The waterproof construction system and its construction method at underground pipe gallery expansion joint
CN109944314B (en) Rapid construction method for rainfall-free large-diameter wound pipe composite joint
WO2022127095A1 (en) Lapping method for different waterproof materials of pedestal foot base plate and sidewall
CN102767218B (en) Frame for bathroom caisson, bathroom caisson and construction method
WO2022198848A1 (en) Construction method of pre-laid waterproof roll lap joint edge of bottom plate and bottom plate side formwork supporting structure
CN112376610B (en) Waterproof construction method outside cross pipe gallery
CN110735499A (en) parapet waterproof structure and construction method thereof
CN206721936U (en) The waterproof construction system at underground pipe gallery expansion joint
CN111663559A (en) Construction method of connection node structure of stamping equipment foundation and terrace
CN110541431A (en) waterproof structure of pipe gallery and construction method thereof
CN104762999A (en) Self-adhesion coiled material underground waterproof construction method
CN111305399A (en) Basement outer wall post-cast strip system and construction method thereof
CN217352628U (en) Basement waterproof structure
CN115538625B (en) Waterproof structure construction method for basement exterior wall bottom
CN206916791U (en) A kind of basement waterproofing structure
CN215630186U (en) Basement high water level precast pile head waterproof construction
CN206607873U (en) A kind of pre-buried structure of anti-dropout
CN205743005U (en) Inflatable adjustable concrete structural slab hole to be provided construction mould
CN114960978A (en) Waterproof method for concrete abutted seam without reserved embedded structure in reconstruction and extension structure
CA2574892C (en) A method for the production of an infrastructure channel
CN112815153A (en) Waterproof treatment method for root of through-wall or floor pipeline

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21932462

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21932462