WO2022123653A1 - 電力変換ユニット及び電力変換装置 - Google Patents

電力変換ユニット及び電力変換装置 Download PDF

Info

Publication number
WO2022123653A1
WO2022123653A1 PCT/JP2020/045675 JP2020045675W WO2022123653A1 WO 2022123653 A1 WO2022123653 A1 WO 2022123653A1 JP 2020045675 W JP2020045675 W JP 2020045675W WO 2022123653 A1 WO2022123653 A1 WO 2022123653A1
Authority
WO
WIPO (PCT)
Prior art keywords
voltage
power conversion
power
conversion unit
voltage end
Prior art date
Application number
PCT/JP2020/045675
Other languages
English (en)
French (fr)
Inventor
由宇 川井
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to US18/036,415 priority Critical patent/US20230402927A1/en
Priority to PCT/JP2020/045675 priority patent/WO2022123653A1/ja
Priority to JP2021522105A priority patent/JP6964825B1/ja
Publication of WO2022123653A1 publication Critical patent/WO2022123653A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M1/00Details of apparatus for conversion
    • H02M1/0067Converter structures employing plural converter units, other than for parallel operation of the units on a single load
    • H02M1/008Plural converter units for generating at two or more independent and non-parallel outputs, e.g. systems with plural point of load switching regulators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M3/00Conversion of dc power input into dc power output
    • H02M3/22Conversion of dc power input into dc power output with intermediate conversion into ac
    • H02M3/24Conversion of dc power input into dc power output with intermediate conversion into ac by static converters
    • H02M3/28Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac
    • H02M3/325Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal
    • H02M3/335Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only
    • H02M3/3353Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only having at least two simultaneously operating switches on the input side, e.g. "double forward" or "double (switched) flyback" converter
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M1/00Details of apparatus for conversion
    • H02M1/0067Converter structures employing plural converter units, other than for parallel operation of the units on a single load
    • H02M1/007Plural converter units in cascade
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M1/00Details of apparatus for conversion
    • H02M1/0067Converter structures employing plural converter units, other than for parallel operation of the units on a single load
    • H02M1/0077Plural converter units whose outputs are connected in series
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M3/00Conversion of dc power input into dc power output
    • H02M3/22Conversion of dc power input into dc power output with intermediate conversion into ac
    • H02M3/24Conversion of dc power input into dc power output with intermediate conversion into ac by static converters
    • H02M3/28Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac
    • H02M3/325Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal
    • H02M3/335Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only
    • H02M3/33561Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only having more than one ouput with independent control
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M3/00Conversion of dc power input into dc power output
    • H02M3/22Conversion of dc power input into dc power output with intermediate conversion into ac
    • H02M3/24Conversion of dc power input into dc power output with intermediate conversion into ac by static converters
    • H02M3/28Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac
    • H02M3/325Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal
    • H02M3/335Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only
    • H02M3/33569Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only having several active switching elements
    • H02M3/33573Full-bridge at primary side of an isolation transformer
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M3/00Conversion of dc power input into dc power output
    • H02M3/22Conversion of dc power input into dc power output with intermediate conversion into ac
    • H02M3/24Conversion of dc power input into dc power output with intermediate conversion into ac by static converters
    • H02M3/28Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac
    • H02M3/325Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal
    • H02M3/335Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only
    • H02M3/33569Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only having several active switching elements
    • H02M3/33576Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only having several active switching elements having at least one active switching element at the secondary side of an isolation transformer
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M7/00Conversion of ac power input into dc power output; Conversion of dc power input into ac power output
    • H02M7/42Conversion of dc power input into ac power output without possibility of reversal
    • H02M7/44Conversion of dc power input into ac power output without possibility of reversal by static converters
    • H02M7/48Conversion of dc power input into ac power output without possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
    • H02M7/483Converters with outputs that each can have more than two voltages levels
    • H02M7/487Neutral point clamped inverters
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M7/00Conversion of ac power input into dc power output; Conversion of dc power input into ac power output
    • H02M7/42Conversion of dc power input into ac power output without possibility of reversal
    • H02M7/44Conversion of dc power input into ac power output without possibility of reversal by static converters
    • H02M7/48Conversion of dc power input into ac power output without possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
    • H02M7/53Conversion of dc power input into ac power output without possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal
    • H02M7/537Conversion of dc power input into ac power output without possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only, e.g. single switched pulse inverters
    • H02M7/5387Conversion of dc power input into ac power output without possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only, e.g. single switched pulse inverters in a bridge configuration

Definitions

  • the present disclosure relates to a power conversion unit and a power conversion device including a plurality of the power converter units.
  • a universal charging device for charging an electric vehicle including an electric vehicle, an electric cart, an electric two-wheeled vehicle, and the like is described in Japanese Patent Application Laid-Open No. 2012-518987 (Patent Document 1).
  • the power conversion device needs to take different measures depending on the number of connected electric cars, the charging speed of the electric cars, and the conditions of the power system of the connection destination.
  • Patent Document 1 is limited to charging, a plurality of converters (charging packs or charging modules) are commonly used as a configuration capable of connecting a plurality of electric vehicles and various conditions of charging speed of the electric vehicles.
  • a device configuration for connecting to a plurality of electric vehicles via a mesh portion of the above is described. Further, the mesh portion switches the connection destination of the electric vehicle and the converter according to the charging state of the plurality of electric vehicles, so that the current and the voltage can be adjusted for each electric vehicle.
  • Non-Patent Document 1 describes phase shift control in a converter having a DAB (Double Active Bridge) configuration as a bidirectional isolated DC / DC converter for charging and discharging an electric vehicle in which invalid power is suppressed.
  • DAB Double Active Bridge
  • the present disclosure has been made to solve the above-mentioned problems, and an object thereof is a power conversion unit used in a power conversion system between a DC power source and a power system represented by an in-vehicle battery. And for the power conversion device, it is to improve the expandability and versatility to the difference in the specifications of the power system.
  • the power conversion unit includes an input terminal for connecting to a DC power supply, a first DC voltage end composed of a first terminal and a second terminal, and a third terminal and a fourth terminal. It includes a second DC voltage end configured by the converter, a converter, and a controller for controlling the converter.
  • the converter performs DC / DC power conversion with power transmission between the input end and the first DC voltage end and the second DC voltage end.
  • the controller generates a control command of the converter for controlling the first voltage at the first DC voltage end and the second voltage at the second DC voltage end to the voltage target value.
  • the power conversion device includes a plurality of the above power conversion units and also includes an output connection unit.
  • the output connection unit interconnects the first DC voltage end and the second DC voltage end of a plurality of power conversion units using the first to fourth terminals of each power conversion unit.
  • the present disclosure is controlled to the voltage target value generated at both the first and second DC voltage ends by DC / DC power conversion with the input end (DC power supply side) of the power conversion unit.
  • a DC voltage can be used to configure a connection side with a power system opposite to the connection side with a DC power supply.
  • FIG. It is an operation waveform diagram of the converter at the time of control by a phase shift pattern 1A. It is a conceptual diagram explaining the operation of the phase shift amount control part in the phase shift pattern 1A. It is an operation waveform diagram of the converter at the time of control by a phase shift pattern 1B. It is a conceptual diagram explaining the operation of the phase shift amount control part in the phase shift pattern 1B. It is operation waveform diagram of the converter at the time of control by a phase shift pattern 1C. It is a flowchart explaining the switching stop control in a phase shift pattern 1C. It is a conceptual diagram explaining the operation of the phase shift amount control part in the phase shift pattern 1C.
  • FIG. 1 It is a circuit diagram explaining the structure of the power conversion unit which concerns on the modification 1 of Embodiment 1.
  • FIG. It is a circuit diagram explaining the structure of the power conversion unit which concerns on the modification 2 of Embodiment 1.
  • FIG. 2 It is a conceptual diagram explaining the operation of the phase shift amount control part in the phase shift pattern 2A.
  • FIG. 1 It is a circuit diagram explaining the structure of the power conversion unit which concerns on the modification 1 of Embodiment 1.
  • FIG. 2A It is a circuit diagram explaining the operation of the phase shift amount control part in the phase shift pattern 2B.
  • FIG. It is a block diagram explaining the 3rd configuration example of the power conversion apparatus which concerns on Embodiment 3.
  • FIG. 22 It is operation waveform diagram of the converter in the power conversion unit shown in FIG. 22. It is a conceptual diagram explaining the operation of the phase shift amount control unit shown in FIG. 22. It is a flowchart for demonstrating the switching function of the control operation by the controller of the power conversion unit which concerns on Embodiment 4.
  • FIG. It is a block diagram explaining the 1st configuration example of the power conversion apparatus which concerns on the modification of Embodiment 4. It is a block diagram explaining the 2nd configuration example of the power conversion apparatus which concerns on the modification of Embodiment 4. It is a block diagram explaining the 3rd configuration example of the power conversion apparatus which concerns on the modification of Embodiment 4. It is a block diagram explaining the 4th configuration example of the power conversion apparatus which concerns on the modification of Embodiment 4.
  • Embodiment 1 a configuration example and a control example of a power conversion unit, which is a basic component of the power conversion device according to the present embodiment, will be mainly described.
  • FIG. 1 shows a schematic circuit diagram of the power conversion unit 100 according to the first embodiment.
  • the power conversion unit 100 includes a converter 10, a controller 50, an input terminal Ni for connecting a DC power supply BAT, a first terminal P1 and a second terminal P2. It includes one DC voltage end VE1, a second DC voltage end VE2 composed of a third terminal P3 and a fourth terminal P4, a first capacitor C1, and a second capacitor C2.
  • the converter 10 performs DC / DC power conversion between the input voltage Vin from the DC power supply BAT, the first voltage Vo1 of the first DC voltage end VE1, and the second voltage Vo2 of the first DC voltage end VE1. Run.
  • the first capacitor C1 and the second capacitor C2 may be connected to the first terminal P1 to the fourth terminal P4 as an external element of the power conversion unit 100.
  • the DC power supply BAT is assumed to be a battery, particularly an in-vehicle secondary battery. Therefore, in the following, the DC power supply BAT is also simply referred to as a battery BAT.
  • the input end Ni can be configured by, for example, a connector cable connection port that complies with the charging standard of an electric vehicle such as CHAdeMO (registered trademark), and basically connects a single battery BAT (direct current power supply). It is for doing.
  • the first terminal P1 to the fourth terminal P4 can be connected to an AC power system (typically, a commercial system) via an inverter (DC / AC conversion device), as will be described later. That is, the power conversion unit 100 can be used in the connection path between the DC power supply BAT and the AC power system (not shown).
  • the converter 10 includes a first bridge 11, a second bridge 12, a third bridge 13, and a transformer 15.
  • the transformer 15 has a primary winding 16 and secondary windings 17 and 18.
  • the primary winding 16, the secondary winding 17, and the secondary winding 18 are magnetically coupled to each other via the core 19.
  • the first bridge 11 has semiconductor switching elements SAP, Sbp, Scp, and Sdp (Sap to Sdp) that are fully bridge-connected between the power lines PL1 and NL1 and the primary winding 16.
  • the power lines PL1 and NL1 are connected to the positive electrode side and the negative electrode side of the DC power supply BAT, respectively, via the input end Ni.
  • the first bridge 11 converts the input voltage Vin between the power lines PL1 and NL1 into an AC voltage Vinvp by on / off control of the semiconductor switching elements SAP to Sdp.
  • the AC voltage Vinbp is transmitted to the primary winding 16 via the reactor Lp.
  • the current from the power line PL1 to the first bridge 11 is also referred to as an input current Iin, and the current from the first bridge 11 to the primary winding 16 is also referred to as an alternating current ITrp.
  • the second bridge 12 has semiconductor switching elements Sas, Sbs, Scs, Sds (Sas to Sds) that are fully bridge-connected between the secondary winding 17 and the power lines PL2 and NL2.
  • the power lines PL2 and NL2 are connected to the first terminal P1 and the second terminal P2, respectively.
  • the first capacitor C1 is connected between the first terminal P1 (power line PL2) and the second terminal P2 (power line NL2), and the high voltage side and the low voltage side of the first capacitor C1 are the first terminal P1 and the second terminal. It is connected to each terminal P2.
  • a voltage detector 81a for detecting the first voltage Vo1 is arranged corresponding to the first DC voltage end VE1 (first capacitor C1).
  • the second bridge 12 converts the AC voltage Vinvs into the first voltage Vo1, which is a DC voltage between the power lines PL2 and NL2, by on / off control of the semiconductor switching elements Sas to Sds.
  • the AC voltage Vinvs is transmitted from the secondary winding 17 to the second bridge 12 via the reactor Ls. Further, in the following, the current from the secondary winding 17 to the second bridge 12 is also referred to as an alternating current Itrs.
  • the third bridge 13 has semiconductor switching elements Sat, Sbt, Sct, Sdt (Sat to Sdt) fully bridge-connected between the secondary winding 18 and the power lines PL3 and NL3.
  • the power lines PL3 and NL3 are connected to the third terminal P3 and the fourth terminal P4, respectively.
  • the second capacitor C2 is connected between the third terminal P3 (power line PL3) and the fourth terminal P4 (power line NL3), and the high voltage side and the low voltage side of the second capacitor C2 are the third terminal P3 and the fourth terminal. It is connected to each terminal P4.
  • a voltage detector 81b for detecting the second voltage Vo2 is arranged corresponding to the second DC voltage end VE2 (second capacitor C2).
  • the third bridge 13 converts the AC voltage Vinvt into the second voltage Vo2, which is a DC voltage between the power lines PL3 and NL3, by on / off control of the semiconductor switching elements Sat to Sdt.
  • the AC voltage Vinvt is transmitted from the secondary winding 17 to the second bridge 12 via the reactor Lt.
  • the current from the secondary winding 18 to the third bridge 13 is also referred to as an alternating current Itrt.
  • Each of the first bridge 11 to the third bridge 13 has two “legs” in parallel, which are composed of two semiconductor switching elements connected in series between the power lines PL1 to PL3 and the power lines NL1 to NL3. There is.
  • the semiconductor switching element connected to the power lines PL1 to PL3 is also referred to as an "upper arm element”
  • the semiconductor switching element connected to the power lines NL1 to NL3 is referred to as “upper arm element”.
  • lower arm element also referred to as "lower arm element”.
  • each of the reactors Lp, Ls, and Lt may be configured by connecting the reactor elements, or may be configured by the leakage inductances of the primary winding 16 and the secondary windings 17, 18 respectively.
  • the converter 10 has a DAB configuration. Further, the AC output ends of the first bridge 11, the second bridge 12, and the third bridge 13 are electrically isolated and interconnected by the transformer 15. As a result, between the battery BAT (input voltage Vin) connected to the input end Ni, the first DC voltage end VE1 (first voltage Vo1), and the second DC voltage end VE2 (second voltage Vo2). Power transmission can be performed with insulation via the transformer 15. Power transmission from the battery BAT (DC power supply) to the first DC voltage end VE1 and the second DC voltage end VE2 (BAT discharge operation) by the converter 10 and the battery from the first DC voltage end VE1 and the second DC voltage end VE2. Both power transmission to BAT (direct current power supply) (BAT charging operation), that is, bidirectional power conversion is possible.
  • BAT direct current power supply
  • Each of the semiconductor switching elements constituting the first bridge 11 to the third bridge 13 can be configured by, for example, an IGBT (Insulated Gate Bipolar Transistor), a MOSFET (Metal-oxide-Semiconductor Field-effect Transistor), or the like. ..
  • the semiconductor switching element is also simply referred to as a “switching element”.
  • the controller 50 controls the first voltage Vo1 and the second voltage Vo2 by using the detection values of the voltage detectors 81a and 81b. In the configuration example of FIG. 1, the controller 50 controls the converter 10 so that the first voltage Vo1 and the second voltage Vo2 approach a common voltage target value Vo *.
  • the controller 50 has subtraction units 61a and 61b, gain multiplication units 62a and 62b, and a phase shift amount control unit 70.
  • the gain multiplying unit 62a generates a command value REF1 for bringing the first voltage Vo1 closer to the voltage target value Vo * by multiplying the voltage deviation ⁇ Vo1 from the subtracting unit 61a by a predetermined proportional gain.
  • the gain multiplying unit 62b generates a command value REF2 for bringing the second voltage Vo2 closer to the voltage target value Vo * by multiplying the voltage deviation ⁇ Vo2 from the subtracting unit 61b by a predetermined proportional gain. ..
  • the phase shift amount control unit 70 controls the on / off of each of the semiconductor switching elements Sap to Sdp (first bridge 11) based on the command values REF1 and REF2, and the gate signals GSap to GSdp and the semiconductor switching elements Sas to Sds ( The gate signals GSas to GSds that control the on / off of the second bridge 12) and the gate signals GSat to GSdt that control the on / off of the semiconductor switching elements Sat to Sdt (third bridge 13) are generated.
  • the command value REF1 corresponds to one embodiment of the "first command value”
  • the command value REF2 corresponds to one embodiment of the "second command value”.
  • the voltage detector 81a corresponds to one embodiment of the "first voltage detector”
  • the voltage detector 81b corresponds to one embodiment of the "second voltage detector”.
  • the first bridge 11 to the third bridge 13 can be operated according to any known control method, but in the present embodiment, as an example, the controller 50 is the first as described below.
  • the above power is controlled by PWM (Pulse Width Modulation) control that adjusts the phase shift amount between the AC voltages Vinvp, Vinvs, and Vinvt generated at the AC output ends of the bridge 11, the second bridge 12, and the third bridge 13, respectively.
  • PWM Pulse Width Modulation
  • the above-mentioned gate signals GSap to GSdp, GSas to GSds, and GSat to GSdt are generated according to a switching pattern for generating a phase shift amount calculated from the command values REF1 and REF2.
  • the gate signals GSap to GSdp, GSas to GSds, and GSat to GSdt correspond to one embodiment of the "converter control command".
  • phase shift patterns 1A to 1C will be described as an example of controlling the phase shift amount.
  • the phase shift amount and the phase are shown with the switching period of each switching element as 360 °.
  • FIG. 2 shows an example of an operating waveform of the converter 10 controlled according to the phase shift pattern 1A, which is the first control example.
  • FIG. 2 shows a case where a load of Pb [W] (not shown) is connected to the first DC voltage end VE1 and a load of Pa [W] (not shown) is connected to the second DC voltage end VE2.
  • a simulation waveform is shown.
  • FIG. 2 shows the input voltage Vin from the battery BAT, the AC voltage Vinvp and the AC current ITrp of the first bridge 11, the AC voltage Vinvs and the AC current Itrs of the second bridge 12, and the AC voltage Vinvt and the AC current Itrt of the third bridge.
  • First voltage Vo1 and second voltage Vo2 as output voltage
  • AC power PTrp (active power) from the first bridge 11 to the transformer 15 as input / output power
  • the power PTrs (active power) and the AC power PTrs (active power) PTrt from the transformer 15 to the third bridge 13 are shown.
  • the two switching elements connected in series constituting the same leg are alternately turned on and off for the same period length.
  • the upper arm element and the lower arm element for example, SAP and Sdp, or Sbp and Scp in the first inverter
  • the AC voltages Vinvp, Vinvs, and Vinv show AC waveforms having no zero voltage period, and the period of Vin or ⁇ Vin is 180 ° each.
  • the controller 50 has a phase shift amount ⁇ 12 of the AC voltage Vinvs of the second bridge 12 with respect to the AC voltage Vinvp of the first bridge 11 and an AC voltage of the first bridge 11.
  • the phase shift amount ⁇ 13 of the AC voltage Vinvt of the third bridge 13 with respect to Vinvp is controlled according to the command values REF1 and REF2.
  • the state of ⁇ 12> ⁇ 13 (PTrs> PTrt) is shown.
  • FIG. 3 shows a conceptual diagram illustrating the operation of the phase shift amount control unit 70 in the phase shift pattern 1A.
  • the phase shift amount control unit 70 has a calculation unit 73a for calculating the phase shift amount ⁇ 12 from the command value REF1 and a calculation unit 73b for calculating the phase shift amount ⁇ 13 from the command value REF2.
  • ⁇ 12> when the phase of the AC voltage Vinvs (second bridge 12) and the phase of the AC voltage Vinvt (third bridge 13) are advanced with respect to the phase of the AC voltage Vinvp (first bridge 11), ⁇ 12>. It is defined as 0 and ⁇ 13> 0.
  • the calculation units 73a and 73b may be configured to execute a numerical calculation according to the linear function shown in FIG. 3, and set the phase shift amounts ⁇ 12 and ⁇ 13 from the command values REF1 and REF2 according to the correspondence by the linear function. It may be configured as a lookup table.
  • phase shift amount control unit 70 performs the switching elements Sap to Sdp of the first bridge 11, the switching elements Sas to Sds of the second bridge 12, and the first so that the calculated phase shift amounts ⁇ 12 and ⁇ 13 are realized.
  • 3 Gate signals GSat to GSdt for turning on / off the switching elements Sat to Sdt of the third bridge 13 are generated.
  • the 1st voltage Vo1 and the 2nd voltage Vo2 are controlled to Vo *.
  • FIG. 4 shows an example of an operating waveform of the converter 10 controlled according to the phase shift pattern 1B, which is a second control example. Also in FIG. 4, similarly to FIG. 2, a load of Pb [W] (not shown) is connected to the first DC voltage end VE1 and a load of Pa [W] is connected to the second DC voltage end VE2 (not shown). ) Is connected, and the simulation waveform is shown.
  • FIG. 4 the same as in FIG. 2, the input voltage Vin, the AC voltage Vinvp, Vinvs, Vinvt, the AC current Itrp, Itrs, Itrt, the first voltage Vo1 and the second voltage Vo2 as the output voltage, and the transformer 15
  • the AC powers PTrp, PTrs, and PTrt which are input / output powers, are shown.
  • the switching element SAP of the first bridge 11 is turned on and off at the reference phase according to the switching cycle.
  • the on / off timing of the switching element Scp of the first bridge 11 is controlled so as to have a phase shift amount ⁇ 1 with respect to the on / off timing (reference phase) of the switching element SAP.
  • the switching element Sbp turns on and off alternately with the switching element SAP of the same leg, and the switching element Sdp turns on and off alternately with the switching element Scp of the same leg.
  • the AC voltage Vinbp of the first bridge 11 has a zero voltage period according to the phase shift amount ⁇ 1. That is, each period in which the AC voltage Vinbp becomes Vin or ⁇ Vin is (180 ⁇ 1) °.
  • the switching element Sas is turned on and off in the same phase as the on / off timing (reference phase) of the switching element Sap of the first bridge 11, while the switching element Scs has a phase shift amount with respect to the reference phase. It is turned on and off so as to have ⁇ 2.
  • the switching elements Sbs and Sds are alternately turned on and off with the switching elements Sas and Scs of the same leg, respectively.
  • the AC voltage Vinvs of the second bridge 12 has a zero voltage period according to the phase shift amount ⁇ 2. That is, each period in which the AC voltage Vinvs becomes Vin or ⁇ Vin is (180 ⁇ 2) °.
  • the switching element Sat is turned on and off in the same phase as the on / off timing (reference phase) of the switching element Sap of the first bridge 11, while the switching element Sct has a phase shift amount with respect to the reference phase. It is turned on and off so as to have ⁇ 3.
  • the switching elements Sbt and Sdt are alternately turned on and off with the switching elements Sat and Sct of the same leg, respectively.
  • the AC voltage Vinvt of the third bridge 13 has a zero voltage period according to the phase shift amount ⁇ 3. That is, each period in which the AC voltage Vinvt becomes Vin or ⁇ Vin is (180 ⁇ 3) °.
  • FIG. 5 shows a conceptual diagram illustrating the operation of the phase shift amount control unit 70 in the phase shift pattern 1B.
  • the phase shift amount control unit 70 includes a calculation unit 74a that calculates the phase shift amounts ⁇ 1a and ⁇ 2 from the command value REF1, and a calculation unit 74b that calculates the phase shift amounts ⁇ 1b and ⁇ 3 from the command value REF2. And an average value calculation unit 76.
  • the phase shift amounts ⁇ 1a and ⁇ 2 are obtained within the range of °.
  • the phase shift amounts ⁇ 1b and ⁇ 3 are obtained within the range of °.
  • the average value calculation unit 76 outputs the average value of the phase shift amount ⁇ 1a from the calculation unit 74a and the phase shift amount ⁇ 1b from the calculation unit 74b as the phase shift amount ⁇ 1.
  • the arithmetic units 74a and 74b can also be configured as a numerical arithmetic unit or a look-up table according to the linear function shown in FIG.
  • phase shift amount control unit 70 has the switching elements Sap to Sdp of the first bridge 11 and the switching elements Sas to Sds of the second bridge 12 so that the phase shift amounts ⁇ 1 to ⁇ 3 calculated in FIG. 5 are realized. , And the gate signals GSap to GSdp, GSas to GSds, and GSat to GSdt for turning on and off the switching elements Sat to Sdt of the third and third bridges 13 are generated.
  • the second voltage Vo2 can be controlled to the voltage target value Vo *. That is, even under the control according to the phase shift pattern 1B, the power Pb [W] supplied to the first DC voltage end VE1 and the power Pa [W] supplied to the second DC voltage end VE2 are different. It is understood that the power transmission operation of the converter 10 in which the 1st voltage Vo1 and the 2nd voltage Vo2 are controlled according to the voltage target value is established.
  • phase shift pattern 1B the zero voltage periods of the AC voltages Vinvp, Vinvs, and Vinvt applied to the transformer 15 are larger than those in FIG. 2 (phase shift pattern 1A). Therefore, the efficiency of power transmission can be improved by the effect of reducing the iron loss due to the decrease in the magnetic flux density caused by the transformer 15.
  • FIG. 6 shows an example of an operating waveform of the converter 10 controlled according to the phase shift pattern 1C, which is a third control example. Also in FIG. 6, similarly to FIGS. 2 and 4, a load of Pb [W] (not shown) is connected to the first DC voltage end VE1 and a load of Pa [W] is connected to the second DC voltage end VE2 (not shown). The simulation waveform when (not shown) is connected is shown.
  • FIG. 6 the same as in FIGS. 2 and 4, the input voltage Vin, the AC voltage Vinvp, Vinvs, Vinvt, the AC current Itrp, Itrs, Itrt, the first voltage Vo1 and the second voltage Vo2 as the output voltage, and
  • the AC powers PTrp, PTrs, and PTrt, which are the input / output powers of the transformer 15, are shown.
  • the switching elements Scp, Sdt of the first bridge 11 and the switching elements Scs, Sds of the second bridge 12 adjust the phase shift amounts ⁇ 1 to ⁇ 3 with respect to the reference phase similar to the phase shift pattern 1B.
  • the on / off timing (phase) of the switching elements Sct and Sdt of the third bridge 13 is controlled.
  • phase shift pattern 1C the on / off (switching) of some switching elements is stopped by the switching stop control described with reference to FIG. 7.
  • the phase shift amount control unit 70 switches from the command values REF1 and REF2 depending on whether the converter 10 performs a discharge operation or a charge operation of the battery BAT (direct current power supply). Select a switching element to be stopped.
  • the phase shift amount control unit 70 determines whether or not REF1 + REF2 ⁇ 0 in the step (hereinafter, simply referred to as “S”) 110. Then, when REF1 + REF2 ⁇ 0 (when YES is determined in S110), that is, during the discharge operation of the battery BAT in which power is transmitted from the first bridge 11 to the second bridge 12 and the third bridge 13, the phase shift amount control unit 70 Fixes the switching elements Sas, Sbs and Sat, Sbt off, which constitute the leg on the left side (reference phase side) of the second bridge 12 and the third bridge 13 on the power receiving side, by S120.
  • the phase shift amount The control unit 70 fixes off the switching elements Sap and Sbp constituting the leg on the left side (reference phase side) of the first bridge 11 on the power receiving side by S130.
  • the switching elements constituting the left (reference phase side) leg are fixed off (switching is stopped). Will be done. Then, the switching elements constituting the right leg of the first bridge 11 to the third bridge 13 are turned on and off according to the phase shift amounts ⁇ 1 to ⁇ 3, so that the AC voltages Vinvp, Vinvs, and Vinvt shown in FIG. 6 are generated. ..
  • FIG. 8 shows a conceptual diagram illustrating the operation of the phase shift amount control unit 70 in the phase shift pattern 1C.
  • the phase shift amount control unit 70 includes a calculation unit 75a that calculates the phase shift amounts ⁇ 1a and ⁇ 2 from the command value REF1, and a calculation unit 75b that calculates the phase shift amounts ⁇ 1b and ⁇ 3 from the command value REF2. And an average value calculation unit 76.
  • the calculation unit 75a calculates the phase shift amounts ⁇ 1a and ⁇ 2 from the command value REF1, and the calculation unit 75b calculates the phase shift amounts ⁇ 1b and ⁇ 3 from the command value REF2.
  • is larger than the value of REF1 where ⁇ 1a 90 °, ⁇ 1a is set to increase at a constant rate up to 180 ° as
  • the calculation unit 75b sets the phase shift amounts ⁇ 1b and ⁇ 3 with respect to the command value REF2 according to the same characteristics as the phase shift amounts ⁇ 1a and ⁇ 2 with respect to the command value REF1 in the calculation unit 75a.
  • the average value calculation unit 76 outputs the average value of the phase shift amount ⁇ 1a from the calculation unit 75a and the phase shift amount ⁇ 1b from the calculation unit 75b as the phase shift amount ⁇ 1.
  • the arithmetic units 75a and 75b can also be configured as a numerical arithmetic unit or a look-up table according to the characteristics of the line graph shown in FIG.
  • phase shift amount control unit 70 has the switching elements Sap to Sdp of the first bridge 11 so as to realize the switching stop control of FIG. 7 and the phase shift amounts ⁇ 1 to ⁇ 3 calculated in FIG. Gate signals for turning on / off the switching elements Sas to Sds of the two bridges 12 and the switching elements Sat to Sdt of the third and third bridges 13 are generated.
  • phase shift pattern 1C a zero current period is provided for the AC currents ITrp, ITrs, and Itrt input / output to / from the transformer 15. Therefore, as described in Non-Patent Document 1, power loss can be reduced by suppressing AC reactive power according to the switching frequency. Further, by preventing the generation of DC deviation of the transformer 15, it is possible to prevent heat generation due to magnetic saturation in the transformer 15.
  • the first bridge 11 connected to the DC power supply (battery BAT) is connected via the transformer 15.
  • the output voltage (first voltage Vo1 and second voltage Vo2) is controlled to the target voltage, and the DC power supply (battery BAT) of the input voltage Vin is used.
  • the first DC voltage end VE1 and the second DC voltage end VE2 on the load side it is possible to perform power transmission in both directions.
  • the input end Ni is used for connecting a single battery BAT (direct current power supply), so that the device can be downsized as compared with the universal charging device described in Patent Document 1.
  • one converter charging pack or charging module
  • a plurality of electric vehicles vehicle-mounted batteries
  • FIG. 9 shows a circuit diagram illustrating the configuration of the power conversion unit 101 according to the first modification of the first embodiment.
  • the power conversion unit 101 according to the first modification of the first embodiment is compared with the power conversion unit 100 (FIG. 1) according to the first embodiment, instead of the controller 50. It differs in that it includes a controller 51.
  • the converter 10 has a DAB configuration similar to that in FIG.
  • the current detection for detecting the output current (first current Io1 and second current Io2).
  • the vessels 82a and 82b are further arranged.
  • the first current Io1 is a current supplied from the second bridge 12 to a load (not shown) connected to the first DC voltage end VE1.
  • the second current Io2 is a current supplied from the third bridge 13 to a load (not shown) connected to the second DC voltage end VE2. That is, during the charging operation of the battery BAT, the first current Io1 and the second current Io2 become negative values.
  • the controller 51 uses the detection values of both the output voltage (first voltage Vo1 and second voltage Vo2) and the output current (first current Io1 and second current Io2) to output the output voltage (first voltage Vo1). And the second voltage Vo2) is controlled to the voltage target value Vo *.
  • the current detector 82a corresponds to one embodiment of the "first current detector”
  • the current detector 82b corresponds to one embodiment of the "second current detector”.
  • the controller 51 further includes subtraction units 63a, 63b and gain calculation units 64a, 64b in addition to the subtraction units 61a, 61b and the gain multiplication units 62a, 62b similar to those of the controller 50 (FIG. 1).
  • the output values (the product of the voltage deviations ⁇ Vo1 and ⁇ Vo2 and the proportional gain) of the gain multiplying units 62a and 62b are positioned as the target values of the output currents (first current Io1 and second current Io2).
  • the subtraction unit 63a calculates the current deviation ⁇ Io1 with respect to the target value of the first current Io1 by subtracting the detection value of the current detector 82a from the output value of the gain multiplication unit 62a.
  • the subtraction unit 63b calculates the current deviation ⁇ Io2 with respect to the target value of the second current Io2 by subtracting the detection value of the current detector 82b from the output value of the gain multiplication unit 62b.
  • the gain calculation unit 64a generates a command value REF1 by proportional integration (PI) control with respect to the current deviation ⁇ Io1.
  • the gain calculation unit 64b generates a command value REF2 by proportional integration (PI) control with respect to the current deviation ⁇ Io2.
  • the controller 51 further includes a phase shift amount control unit 70 that receives command values REF1 and REF2.
  • the phase shift amount control unit 70 controls the phase shift amount between the first bridge 11 and the second bridge 12 and the third bridge 13 according to any one of the phase shift patterns 1A to 1C described in the first embodiment. As such, the gate signals GSap to GSdp, GSas to GSds, and GSat to GSdt are generated.
  • the power conversion unit 101 according to the first modification of the first embodiment can also execute the same power transmission operation and output voltage (first voltage Vo1 and second voltage Vo2) control as the power conversion unit 100. can. Further, the power conversion unit 101 realizes control that avoids a large change in the output currents (first current Io1 and second current Io2).
  • the first voltage Vo1 and the second voltage Vo2 are controlled by a common voltage target value Vo *, but the first voltage Vo1 and the second voltage Vo1 and the second voltage Vo1 are controlled. It is also possible to set the voltage target value Vo individually between the voltages Vo2.
  • FIG. 10 shows a circuit diagram illustrating the configuration of the power conversion unit 102 according to the second modification of the first embodiment.
  • the power conversion unit 102 according to the second modification of the first embodiment is compared with the power conversion unit 100 (FIG. 1) according to the first embodiment, instead of the controller 50. It differs in that it includes a controller 52.
  • the converter 10 has a DAB configuration similar to that in FIG.
  • the controller 52 controls the output voltage (first voltage Vo1 and second voltage Vo2) to the voltage target value Vo * by using the detection values of the voltage detectors 81a and 82a. Is different from the controller 50.
  • the controller 52 has a subtraction unit 61, 66, a gain multiplication unit 62, 67, an average value calculation unit 65, and a phase shift amount control unit 71.
  • the subtraction unit 61 calculates the voltage deviation ⁇ V by subtracting the average voltage Vav from the voltage target value Vo *.
  • the gain multiplying unit 62 generates a command value REF for bringing the average voltage Vav closer to the voltage target value Vo * by multiplying the voltage deviation ⁇ V from the subtracting unit 61 by a predetermined proportional gain.
  • the gain multiplying unit 67 balances the first voltage Vo1 and the second voltage Vo2 in order to bring the voltage difference VDIF closer to zero by multiplying the voltage difference VDIF from the subtracting unit 66 by a predetermined proportional gain. Generate a command value BAL to do so.
  • the phase shift amount control unit 71 generates the gate signals GSap to GSdp, GSas to GSdsp, and GSat to GSdt described in the first embodiment based on the command values REF and BAL.
  • the first bridge 11 to the third bridge 13 can be operated according to any known control method.
  • the power conversion unit 102 can be controlled in the same manner as the power conversion unit 100 by adjusting the phase shift amount similar to each of the phase shift patterns 1A to 1C described in the first embodiment.
  • the command value REF corresponds to one embodiment of the "first command value”
  • the command value BAL corresponds to one embodiment of the "second command value”.
  • FIG. 11 shows a conceptual diagram illustrating the operation of the phase shift amount control unit in the phase shift pattern 2A that controls the phase shift amount in the same manner as the phase shift pattern 1A.
  • the phase shift amount control unit 71 has a calculation unit 73 and subtraction units 77 and 78.
  • the calculation unit 73 calculates the phase shift amount ⁇ from the command value REF according to the same linear function as the calculation units 73a and 73b shown in FIG.
  • the subtraction unit 77 calculates the phase shift amount ⁇ 12 by subtracting the command value BAL from the phase shift amount ⁇ calculated by the calculation unit 73.
  • the subtraction unit 78 calculates the phase shift amount ⁇ 13 by subtracting the command value BAL from the phase shift amount ⁇ calculated by the calculation unit 73.
  • phase shift amount control unit 71 further increases the switching elements Sap to Sdp of the first bridge 11 and the switching elements Sas to Sds of the second bridge 12 so that the phase shift amounts ⁇ 12 and ⁇ 13 calculated in FIG. 11 are realized.
  • the gate signals GSap to GSdp, GSas to GSds, and GSat to GSdt for turning on and off the switching elements Sat to Sdt of the third and third bridges 13 are generated.
  • FIG. 12 shows a conceptual diagram illustrating the operation of the phase shift amount control unit in the phase shift pattern 2B that controls the phase shift amount in the same manner as the phase shift pattern 1B.
  • the phase shift amount control unit 71 has a calculation unit 74 and subtraction units 77 and 78.
  • the calculation unit 74 calculates the phase shift amount ⁇ 23 from the command value REF according to the same characteristics as the linear function for calculating the phase shift amounts ⁇ 2 and ⁇ 3 in the calculation units 74a and 74b shown in FIG. Further, the calculation unit 74 calculates the phase shift amount ⁇ 1 from the command value REF according to the same characteristics as the linear function for calculating the phase shift amounts ⁇ 1a and ⁇ 1b in the calculation units 74a and 74b (FIG. 5).
  • the subtraction unit 77 calculates the phase shift amount ⁇ 2 by subtracting the command value BAL from the phase shift amount ⁇ 23 calculated by the calculation unit 74.
  • the subtraction unit 78 calculates the phase shift amount ⁇ 3 by subtracting the command value BAL from the phase shift amount ⁇ 23 calculated by the calculation unit 74.
  • phase shift amount control unit 71 further comprises switching elements Sap to Sdp of the first bridge 11 and switching elements Sas to Sds of the second bridge 12 so that the phase shift amounts ⁇ 1 to ⁇ 3 calculated in FIG. 12 are realized. Further, the gate signals GSap to GSdp, GSas to GSds, and GSat to GSdt for turning on and off the switching elements Sat to Sdt of the third and third bridge 13 are generated.
  • FIG. 13 shows a conceptual diagram illustrating the operation of the phase shift amount control unit in the phase shift pattern 2C that controls the phase shift amount in the same manner as the phase shift pattern 1C.
  • the phase shift amount control unit 71 has a calculation unit 75 and subtraction units 77 and 78.
  • the calculation unit 75 calculates the phase shift amount ⁇ 23 from the command value REF according to the same characteristics (solid line) as the polygonal line shape for calculating the phase shift amounts ⁇ 2 and ⁇ 3 in the calculation units 75a and 75b shown in FIG. do. Further, the calculation unit 75 calculates the phase shift amount ⁇ 1 from the command value REF according to the same characteristics (dotted line) as the polygonal line shape for calculating the phase shift amounts ⁇ 1a and ⁇ 1b in the calculation units 75a and 75b (FIG. 8). do.
  • the subtraction unit 77 calculates the phase shift amount ⁇ 2 by subtracting the command value BAL from the phase shift amount ⁇ 23 calculated by the calculation unit 75.
  • the subtraction unit 78 calculates the phase shift amount ⁇ 3 by subtracting the command value BAL from the phase shift amount ⁇ 23 calculated by the calculation unit 75.
  • FIG. 14 shows a flowchart illustrating switching stop control in the phase shift pattern 2C.
  • the phase shift amount control unit 71 is subjected to either the discharge operation or the charge operation of the battery BAT by the converter 10 based on the command value REF by S105. To determine whether to do.
  • REF ⁇ 0 when YES is determined in S105, it is determined that the battery BAT is in discharge operation, and the left side (reference phase side) of the second bridge 12 and the third bridge 13 is determined by S120 similar to FIG.
  • the switching elements Sas, Sbs and Sat, Sbt constituting the leg of the above are fixed to off.
  • phase shift amount control unit 71 further realizes the switching stop control of FIG. 14 and the phase shift amounts ⁇ 1 to ⁇ 3 calculated in FIG. 13, so that the first bridge 11, the second bridge 12, and the phase shift amount control unit 71 are realized.
  • GSap to GSdp, GSas to GSds, and GSat to GSdt for switching control of the third bridge 13 are generated.
  • the power conversion unit 102 according to the second modification of the first embodiment also has the same phase shift patterns 2A to 2C as those of the phase shift patterns 1A to 1C described in the first embodiment. 100 power transmission operations and output voltage (first voltage Vo1 and second voltage Vo2) control can be performed.
  • FIG. 15 shows a circuit diagram illustrating the configuration of the power conversion unit 103 according to the third modification of the first embodiment.
  • the power conversion unit 103 according to the modification 3 of the first embodiment is compared with the power conversion unit 102 (FIG. 10) according to the modification 1 of the first embodiment, and the controller 52.
  • the difference is that the controller 53 is provided instead of the controller 53.
  • the converter 10 has a DAB configuration similar to that in FIG.
  • a current detector 82 for detecting the input current Iin is further arranged.
  • the input current Iin is a current supplied from the battery BAT (direct current power supply) to the first bridge 11.
  • the current detector 82 corresponds to one embodiment of the "input current detector”.
  • the controller 53 further includes a subtraction unit 63 and a gain calculation unit 64 in addition to the subtraction units 61 and 66 and the gain multiplication units 62 and 67 similar to the controller 52 (FIG. 10).
  • the output value of the gain multiplying unit 62 (the product of the voltage deviation ⁇ V and the proportional gain) is positioned as the target value of the input current Iin.
  • the subtraction unit 63 calculates the current deviation ⁇ Iin with respect to the target value of the input current Iin by subtracting the detection value of the current detector 82 from the output value of the gain multiplication unit 62.
  • the gain calculation unit 64 generates a command value REF by proportional integration (PI) control with respect to the current deviation ⁇ Iin.
  • PI proportional integration
  • the command value BAL for bringing the voltage difference VDIF close to zero is obtained by the subtraction unit 66 and the gain multiplication unit 67, similarly to the controller 52.
  • the controller 53 further has a phase shift amount control unit 71 that receives command values REF and BAL.
  • the phase shift amount control unit 71 describes the phase between the first bridge 11 and the second bridge 12 and the third bridge 13 according to any one of the phase shift patterns 2A to 2C described in the second modification of the first embodiment.
  • Gate signals GSap to GSdp, GSas to GSds, and GSat to GSdt are generated so as to control the shift amount.
  • the power conversion unit 103 according to the third modification of the first embodiment can also execute the same power transmission operation and output voltage (first voltage Vo1 and second voltage Vo2) control as the power conversion unit 100. can. Further, the power conversion unit 103 realizes control that avoids a large change in the input current Iin.
  • Embodiment 2 In the second embodiment, the configuration of the power conversion device using the power conversion unit according to the first embodiment and its modified example will be described.
  • FIG. 16 shows a first configuration example of the power conversion device according to the first configuration example of the second embodiment.
  • the power conversion system 200 is connected between a DC power supply (battery BAT) and an AC power system 300.
  • the power conversion system 200 includes a power conversion device 500a according to the first configuration example of the second embodiment and an inverter (DC / AC converter) 150.
  • the power conversion device 500a corresponds to a DC / DC converter configured to include the power conversion unit 100X according to the first embodiment and its modification.
  • the power conversion unit 100X includes the power conversion units 100 to 103 according to the first embodiment and its modifications.
  • the power conversion device 500a executes DC / DC power conversion accompanied by bidirectional power transmission between the input voltage Vin of the DC power supply (battery BAT) and the DC side voltage Vdc of the inverter 150.
  • the inverter 150 performs DC / AC power conversion with bidirectional power transmission between the DC side voltage Vdc and the three-phase voltages Vuv, Vvw, Vw of the AC power system 300.
  • the power conversion device 500a is a unit in which the first DC voltage end VE1 (first and second terminals P1, P2) and the second DC voltage end VE2 (third and fourth terminals P3, P4) are connected in parallel. It has a power conversion unit 100X.
  • the power conversion device 500a can control the DC side voltage Vdc of the inverter 150 to correspond to the voltage target value Vo *.
  • FIG. 17 shows a second configuration example of the power conversion device according to the second embodiment.
  • the power conversion system 201 is connected between the battery BAT (direct current power supply) and the AC power system 301.
  • the power conversion system 201 includes a power conversion device 500b according to the second configuration example of the second embodiment and an inverter (DC / AC converter) 151.
  • the power conversion device 500a has a first DC voltage end VE1 (first and second terminals P1 and P2) and a second DC voltage end VE2 (third) of one power conversion unit 100X as compared with the power conversion device 500b. And the fourth terminal P3, P4) are connected in series.
  • the DC side voltage Vdc of the inverter 151 is controlled to be twice the voltage target value Vo *. That is, in the power conversion unit 100X, by changing the connection between the first terminal P1 to the fourth terminal P4, the input voltage (DC) for a DC load such as an inverter having a different voltage rating is set to a voltage that is one times the voltage target value Vo *. It can be adjusted in two steps of double voltage.
  • the AC power system 300 of FIG. 16 is an AC200 (V) (effective value) power system
  • the inverter 150 uses a DC400 (V) Vdc and an AC200 (V) (effective value) three-phase AC. It shall have a rating to convert to voltage.
  • the AC power system 301 in FIG. 17 is a power system of AC400 (V) (effective value)
  • the inverter 151 uses Vdc of DC800 (V) and AC400 (V) (effective value). It shall have a rating to convert to phase AC voltage.
  • the power conversion unit 100X whose voltage target value Vo * is set corresponding to AC200V (effective value) is applied to both the power conversion device 500a of FIG. 16 and the power conversion device 500b of FIG. It is understood that it is applicable.
  • the power conversion unit 100X can be commonly applied to a power conversion device connected to a power system having different specifications, so that it can be expanded and versatile with respect to the difference in the specifications of the power system. Can be enhanced.
  • Embodiment 3 a configuration example will be described in which a power conversion device (DC / DC converter) is configured by a plurality of power conversion units 100X to further enhance versatility for differences in power system specifications.
  • a power conversion device DC / DC converter
  • FIG. 18 shows a first configuration example of the power conversion device according to the third embodiment.
  • the power conversion device 501 shown in FIG. 18 includes N units (N: an integer of N ⁇ 2) power conversion units 100X1 to 100XN and an output connection unit 511.
  • N batteries (DC power supply) BAT1 to BATN are connected to each of the N power conversion units 100X1 to 100XN with respect to the input terminal Ni.
  • the output connection unit 511 connects the first DC voltage end VE1 (first and second terminals P1, P2) and the second DC voltage end VE2 (third and fourth terminals P3, P4) of each power conversion unit 100X. , Connects to the first DC voltage end VE1 and the second DC voltage end VE2 of another power conversion unit 100X.
  • the output connection unit 511 of FIG. 18 circulates and expands the output side (first DC voltage end VE1 and second DC voltage end VE2) of the power conversion unit 100X. Specifically, the first DC voltage end VE11 of the first power conversion unit 100X1 is connected in parallel with the second DC voltage end VE2N of the final stage power conversion unit 100XN.
  • the first DC voltage end VE1i is the second DC voltage end VE2i of the power conversion unit 100X (i-1) in the previous stage.
  • the second DC voltage end VE2i is connected in parallel with the first DC voltage end VE1 (i + 1) of the next-stage power conversion unit 100X (i + 1).
  • the first DC voltage end VE12 is connected in parallel with the second DC voltage end VE21 of the power conversion unit 100X1, and the second DC voltage end VE22 is not shown. It is connected in parallel with the first DC voltage end power of the power conversion unit 100X3 of the stage. Further, the first DC voltage end VE1N of the power conversion unit 100XN in the final stage is connected in parallel with the second DC voltage end of the power conversion unit 100X (N-1) (not shown).
  • each power conversion unit 100X Under the circulation expansion connection by the output connection unit 511, each power conversion unit 100X performs output voltage control accompanied by power transmission, so that the first voltage Vo11 to Vo1N and the second voltage Vo21 to Vo2N of the power conversion units 100X1 to 100XN are performed. Each of the above is controlled by the voltage target value Vo *.
  • the power of the batteries BAT1 to BATN is shared, and the first DC voltage end VE1 (first and second terminals P1, P2) and the first of each power conversion unit 100X. 2
  • the DC voltage end VE2 (third and fourth terminals P3, P4) can be operated as a constant voltage source.
  • the proportional gain in the output voltage control in each power conversion unit 100X specifically, the gain multiplying units 62a and 62b (FIGS. 1 and 9) and the gain multiplying units 62 and 67 (FIGS. 10 and 15).
  • the gain value multiplied by the above can be adjusted according to the power capacity of the power conversion unit 100X to optimize the power sharing balance. Specifically, it is possible to set a large proportional gain in the power conversion unit 100X having a large power capacity.
  • the proportional gain is adjusted according to the SOC (State of Charge) or charging energy of the battery BAT connected to the input end Ni to control the SOC balance between the N batteries BAT1 to BATN. It is also possible. Specifically, the proportional gain in the power conversion unit 100X to which the SOC or the battery BAT having a large charging energy is connected can be set high.
  • FIG. 19 shows a second configuration example of the power conversion device according to the third embodiment.
  • the power conversion device 502 shown in FIG. 19 includes N power conversion units 100X1 to 100XN and an output connection unit 512. Similar to FIG. 17, N batteries BAT1 to BATN are connected to the N power conversion units 100X1 to 100XN with respect to the input terminal Ni, respectively.
  • the output connection unit 512 is connected to the output side of the power conversion unit 100X (first terminal P1 to fourth terminal P4) so as to connect the first DC voltage end VE1 and the second DC voltage end VE2 of each power conversion unit 100X in parallel. ) To interconnect. Specifically, the first terminal P1 is connected to each other, the second terminal P2 is connected to each other, the third terminal P3 is connected to each other, and the fourth terminal P4 is connected to each other between the power conversion units 100X1 to 100XN.
  • the DC voltage ends VE1 are connected in parallel, and the second DC voltage ends VE2 are connected in parallel.
  • each power conversion unit 100X Under the parallel expansion connection by the output connection unit 512, each power conversion unit 100X performs output voltage control accompanied by power transmission, so that the first voltage Vo11 to Vo1N and the second voltage Vo21 to Vo2N of the power conversion units 100X1 to 100XN are performed. Each of the above is controlled by the voltage target value Vo *.
  • the power conversion device 502 can share the power of the batteries BAT1 to BATN and generate the output voltage Vout1 controlled to the voltage target value Vo *. Since the power rating of the power conversion device 502 that outputs the output voltage Vout1 corresponds to the total power capacity of the power conversion units 100X1 to 100XN, the power conversion device 502 is advantageous for application to high power.
  • FIG. 20 shows a third configuration example of the power conversion device according to the third embodiment.
  • the power conversion device 503 shown in FIG. 20 includes N units (an integer of N: N ⁇ 2) of power conversion units 100X1 to 100XN and an output connection unit 513. Similar to FIGS. 17 and 18, N batteries BAT1 to BATN are connected to N power conversion units 100X1 to 100XN with respect to the input terminal Ni, respectively.
  • the output connection unit 513 is the output side (first terminal P1 to fourth terminal) of the power conversion unit 100X so as to connect the first DC voltage end VE1 and the second DC voltage end VE2 of the power conversion units 100X1 to 100XN in series. Interconnect P4). In the series expansion connection, the pair of the first DC voltage end VE1 and the second DC voltage end VE2 connected in parallel by each power conversion unit 100X is connected in series.
  • the first DC voltage end VE11 is connected in parallel with the second DC voltage end VE2N of the final stage power conversion unit 100XN.
  • the second DC voltage end VE21 is connected to the first DC voltage end VE1 of the second stage power conversion unit 100X2.
  • the first DC voltage end VE1 and the second DC voltage end VE2 are connected in series, and the first DC voltage end VE1 is the power conversion unit 100X1 to 100X in the previous stage. It is connected in parallel with the second DC voltage end VE2 of (N-1).
  • the first DC voltage end VE12 and the second DC voltage end VE22 are connected in series, and the first DC voltage end VE21 is the second DC of the previous stage power conversion unit 100X1. It is connected in parallel with the voltage end VE21.
  • the first DC voltage end VE1N and the second DC voltage end VE2N are connected in series, and the first DC voltage end VE1N is a power conversion unit 100X (N-1) (not shown). It is connected in parallel with the second DC voltage end VE2 of.
  • the second DC voltage end VE2N is connected in parallel with the first DC voltage end VE11 of the power conversion unit 100X1.
  • each power conversion unit 100X Under the series expansion connection by the output connection unit 513, each power conversion unit 100X performs output voltage control accompanied by power transmission, so that the first voltage Vo11 to Vo1N and the second voltage Vo21 to Vo2N of the power conversion units 100X1 to 100XN are performed. Each of the above is controlled by the voltage target value Vo *.
  • the power rating of the power conversion device 503 corresponds to the minimum value among the power capacities of the power conversion units 100X1 to 100XN, but the power conversion device 502 can be applied to a high voltage.
  • FIG. 21 shows a fourth configuration example of the power conversion device according to the third embodiment.
  • the power conversion device 504 shown in FIG. 21 includes four power conversion units 100X1 to 100X4 and an output connection unit 514. Batteries BAT1 to BAT4 are connected to each of the four power conversion units 100X1 to 100X4 with respect to the input terminal Ni.
  • the output connection unit 514 is the output side (first terminal P1 to 1) of the power conversion units 100X1 to 100X4 so as to make a series-parallel expansion connection of the first DC voltage end VE1 and the second DC voltage end VE2 of the power conversion units 100X1 to 100X4.
  • the fourth terminal P4) is interconnected.
  • the first DC voltage end VE11 of the power conversion unit 100X1 and the second DC voltage end VE2N of the power conversion unit 100XN are connected in parallel to generate the output voltage Vout1.
  • the first DC voltage end VE12 and the second DC voltage end VE22 are connected in series, and the first DC voltage end VE13 and the second.
  • the DC voltage end VE23 is connected in series. Further, between the power conversion units 100X1 to 100X3, the second DC voltage end VE21, the first DC voltage end V12, and the first DC voltage end VE13 are connected in parallel. Further, between the power conversion units 100X2 to 100X4, the second DC voltage end VE22, the second DC voltage end V23, and the first DC voltage end VE14 are connected in parallel.
  • the power conversion device 504 can generate a plurality of output voltages Vout1 and Vout2 by using a plurality of power conversion units 100X connected in series-parallel expansion.
  • the connection mode by the output connection unit 514 is not limited to the example of FIG. 21, and an output voltage M times (an integer of M: M ⁇ N) of the voltage target value Vo * can be appropriately generated. ..
  • the output sides (first DC voltage end VE1 and second DC voltage end VE2) of a plurality of power conversion units 100X are connected in parallel and expanded in series. Or, by making a series-parallel expansion connection, the voltage target value Vo * can be multiplied by an integral multiple of the output voltage (first voltage Vo1 or second voltage Vo2) of each power conversion unit 100X within a range of 1 to N times. It is possible to generate one or more controlled output voltages.
  • the outputs obtained by the parallel expansion connection, the series expansion connection, or the series-parallel expansion connection by the output connection units 512 to 514 are supplied to the load (inverter or the like).
  • the output connection portions 511 to 514 shown in FIGS. 18 to 21 can be configured by fixedly connecting the terminals with a bus bar or the like (not shown).
  • the output connection portion can be configured so that the connection mode can be changed at any time by an aggregate of bus bars and relays (not shown). For example, by changing the on / off of the relay, the connection relationship between the circular expansion connection (FIG. 18), the parallel expansion connection (FIG. 19), the series expansion connection (FIG. 20), and the series-parallel expansion connection (FIG. 21). Can be configured to be switchable.
  • Embodiment 4 In the third embodiment, it is assumed that the battery BAT (direct current power supply) is connected to the input terminal Ni of all the power conversion units 100X. However, assuming an in-vehicle battery, there is a need to operate the entire power converter even if the battery BAT (direct current power supply) is not connected to the input end Ni in some of the power conversion units that make up the power converter. It is understood that there is.
  • FIG. 22 shows a circuit diagram illustrating the configuration of the power conversion unit 105 according to the fourth embodiment.
  • the power conversion unit 105 has a controller 55 instead of the controller 50 as compared with the power conversion unit 100 (FIG. 1) according to the first embodiment. It differs in that it prepares.
  • the converter 10 has a DAB configuration similar to that in FIG.
  • the controller 55 has a control function when the battery BAT is not connected to the input end Ni.
  • the controller 55 performs the control for balancing the first voltage Vo1 and the second voltage Vo2 described in the controller 53 without using the voltage target value Vo *.
  • the controller 55 has a subtraction unit 66, a gain multiplication unit 67, and a phase shift amount control unit 72.
  • the gain multiplying unit 67 generates a command value REF for bringing the voltage difference VDIF close to zero by multiplying the voltage difference VDIF from the subtracting unit 66 by a predetermined proportional gain. That is, the command value REF in FIG. 22 is a command value for balancing the first voltage Vo1 and the second voltage Vo2, similarly to the command value BAL in FIGS. 10 and 15.
  • FIG. 23 shows an example of the operating waveform of the converter 10 in the power conversion unit 105 of FIG. 22. Also in FIG. 23, the same as in FIG. 2, the input voltage Vin, the AC voltage Vinvs, Vinvt, the AC current Itrp, Itrs, Itrt, the first voltage Vo1 and the second voltage Vo2 as the output voltage, and the transformer 15 are input.
  • the AC powers PTrp, PTrs, and PTrt, which are the output powers, are shown.
  • the battery BAT is not connected to the first bridge 11 (input end Ni), while the voltage source (not shown) is connected to the second bridge 12 (first DC voltage end VE1).
  • a simulated waveform is shown when a load (not shown) is connected to the third bridge 13 (second DC voltage end VE2).
  • the controller 55 in FIG. 22 controls the phase shift amount ⁇ between the AC voltage Vinvs of the second bridge 12 and the AC voltage Vinvt of the third bridge 13 according to the command value REF.
  • the phase shift amount ⁇ is defined as ⁇ > 0 when the phase of the AC voltage Vinvs (second bridge 12) is ahead of the phase of the AC voltage Vinvt (third bridge 13).
  • FIG. 24 shows a conceptual diagram illustrating the operation of the phase shift amount control unit 72 of FIG. 21.
  • the phase shift amount control unit 72 has a calculation unit 73.
  • the switching of the second bridge 12 and the third bridge 13 is controlled so that the phase of the third bridge 13 is ahead of the phase of the AC voltage Vinvt of the third bridge 13.
  • the arithmetic unit 73 can also be configured as a numerical arithmetic unit or a look-up table according to the linear function shown in FIG. 24.
  • phase shift amount control unit 70 turns on / off the switching elements Sas to Sds of the second bridge 12 and the switching elements Sat to Sdt of the third bridge 13 so that the calculated phase shift amount ⁇ is realized. Gate signals GSas to GSds and GSat to GSdt are generated. On the other hand, the phase shift amount control unit 70 generates gate signals GSap to GSdp so as to turn off the switching elements Sap to Sdp of the first bridge 11.
  • the electric power from the voltage source described above is input from the second bridge 12 to the transformer 15, output from the transformer 15 to the third bridge 13, and transmitted to the load described above. Therefore, the AC power PTrs (effective value) input from the transformer 15 to the second bridge 12 are negative values, and the AC power PTrt (effective value) input from the transformer 15 to the third bridge 13 and the AC are said.
  • the output voltage control can be executed so as to balance the first voltage Vo1 and the second voltage Vo2.
  • the power conversion unit 105 having the controller 55 it is possible to execute the control operation of the output voltage (first voltage Vo1 and second voltage Vo2) even when the battery BAT is not connected.
  • the power conversion units 101 to 103 described in the first embodiment and its modification and the power conversion unit 105 according to the third embodiment differ only in the controllers 51 to 53 and the converter 55.
  • the basic configuration of 10 is the same. Therefore, by providing the control operation switching function by the controller, it is possible to realize a configuration for a power conversion unit that can support both connection / non-connection of the battery BAT (direct current power supply).
  • FIG. 25 shows a flowchart for explaining a control operation switching function by the controller of the power conversion unit according to the fourth embodiment.
  • the controller executes an input side power supply connection determination for determining connection / non-connection of the battery BAT (direct current power supply) to the input terminal Ni of the power conversion unit by S210.
  • the input side power supply connection determination can be executed based on the presence or absence of the connection signal.
  • a signal notifying the connection of the in-vehicle battery is transmitted from the vehicle side to the charger side by CAN (Controller Area Network) communication. Can be used to perform an input side power connection determination.
  • the input side power supply connection determination of S210 is executed by determining whether or not the voltage or current associated with the connection of the battery BAT (direct current power supply) is generated based on the detected value of the voltage or current of the input terminal Ni. Is also possible.
  • the controller executes the control operation of the connection mode by S230.
  • the gate signals GSap to GSdp, GSas to GSds, and GSat to GSdt for controlling the converter 10 are generated in the same manner as any of the controllers 50 to 53 described in the first embodiment and the modified examples thereof. ..
  • the control operation of the non-connection mode is executed by S240. Specifically, the gate signals GSap to GSdp, GSas to GSds, and GSat to GSdt for controlling the converter 10 are generated in the same manner as the controller 55. As described above, in the non-connection mode, the gate signals GSap to GSdp are generated so as to off-fix the switching elements Sap to Sdp of the first bridge 11.
  • the gate signals GSap to GSdp are used.
  • the switching elements SAP to Sdp first bridge 11
  • the second bridge 12 and the third bridge 13 can control the first voltage Vo1 and the second voltage Vo2 according to the voltage target value Vo * in response to the gate signals GSas to GSds and GSat to GSdt.
  • connection mode corresponds to one embodiment of the "first mode”
  • non-connection mode corresponds to one embodiment of the "second mode”.
  • FIG. 26 shows a first configuration example of the power conversion device according to the modified example of the fourth embodiment.
  • the power conversion device 501 # shown in FIG. 26 includes N power conversion units (N: an integer of N ⁇ 2) 100Y1 to 100YN and an output connection unit 511 similar to the power conversion device 501 (FIG. 18). ..
  • Each of the N power conversion units 100Y1 to 100YN (hereinafter, also referred to as a power conversion unit 100Y) is a power conversion unit according to the fourth embodiment described with reference to FIGS. 22 to 25, and is a connection mode described with reference to FIG. 25. And has a function to switch the non-connection mode.
  • the battery BAT is not connected at the input end Ni.
  • the battery BAT1 is connected to the power conversion unit 100Y1, while the battery BAT is not connected to the input terminal Ni of the power conversion units 100Y2 to 100YN.
  • the output sides (first DC voltage end VE1 and second DC voltage end VE2) of the power conversion units 100Y1 to 100YN are circulated and expanded by the output connection unit 511 in the same manner as in FIG.
  • the power conversion unit 100Y1 is operated in the connection mode, and each of the power conversion units 100Y2 to 100YN is operated in the non-connection mode.
  • the power of the battery BAT1 is used to control the first voltage Vo11 and the second voltage Vo21 to the voltage target value Vo * in the power conversion unit 100Y1, and the first voltage Vo1 and the power conversion unit 100Y2 to 100YN. Control is performed to bring the voltage difference of the second voltage Vo2 close to zero.
  • the first voltage Vo11 and the second voltage Vo21 are controlled to the voltage target values in the power conversion unit 100Y1. Further, in each of the power conversion units 100Y2 to 100YN, the output voltage is controlled so as to be equivalent to the first voltage Vo1 and the second voltage Vo2.
  • the first DC voltage end VE11 is connected to the second DC voltage end VE2N of the power conversion unit 100YN
  • the second DC voltage end VE21 is connected to the first DC voltage end VE12 of the power conversion unit 100Y2. Is connected to.
  • the first DC voltage end VE1 and the second DC voltage end VE2 are the second DC voltage ends VE2 and the first DC voltage end VE2 of the adjacent power conversion unit. It is connected to the DC voltage end VE1 respectively.
  • the first voltage Vo1 and the second voltage Vo2 can be controlled to the same voltage as the first voltage Vo11 and the second voltage Vo21 of the power conversion unit 100Y1.
  • the first DC voltage end of each power conversion unit 100Y is similar to the power conversion device 501. It can operate with the VE1 and the second DC voltage end VE2 as a constant voltage source.
  • FIG. 27 shows a second configuration example of the power conversion device according to the modified example of the fourth embodiment.
  • the power conversion device 502 # shown in FIG. 27 includes N power conversion units 100Y1 to 100YN and an output connection unit 512 similar to the power conversion device 502 (FIG. 19).
  • the battery BAT1 is connected to the power conversion unit 100Y1, while the battery BAT is not connected to the input terminal Ni of the power conversion units 100Y2 to 100YN.
  • the output sides (first DC voltage end VE1 and second DC voltage end VE2) of the power conversion units 100Y1 to 100YN are extended and connected in parallel by the output connection unit 512 as in FIG. Also in the power conversion device 502 #, the power conversion unit 100Y1 is operated in the connection mode, and each of the power conversion units 100Y2 to 100YN is operated in the non-connection mode.
  • the power of the battery BAT1 is used to control the first voltage Vo11 and the second voltage Vo21 to the voltage target value Vo * in the power conversion unit 100Y1. Further, in the power conversion units 100Y2 to 100YN, control is executed to bring the voltage difference between the first voltage Vo1 and the second voltage Vo2 close to zero.
  • the first DC voltage ends VE12 to VE1N and the second DC voltage ends VE21 to VE2N of the power conversion units 100Y2 to 100YN are the first DC voltage end VE11 and the second DC voltage end of the power conversion unit 100Y1. They are connected in parallel with VE21.
  • the first voltage Vo1 and the second voltage Vo2 can be controlled to the same voltage as the first voltage Vo11 and the second voltage Vo21 of the power conversion unit 100Y1.
  • the power conversion device 502 # generates an output voltage Vout1 controlled to the voltage target value Vo *, which is the same as the power conversion device 502, even if the battery BAT is not connected to some of the power conversion units 100Y. be able to.
  • FIG. 28 shows a third configuration example of the power conversion device according to the modified example of the fourth embodiment.
  • the power conversion device 503 # shown in FIG. 28 includes N power conversion units 100Y1 to 100YN and an output connection unit 513 similar to the power conversion device 503 (FIG. 20).
  • the battery BAT1 is connected to the power conversion unit 100Y1, while the battery BAT is not connected to the input terminal Ni of the power conversion units 100Y2 to 100YN.
  • the output sides (first DC voltage end VE1 and second DC voltage end VE2) of the power conversion units 100Y1 to 100YN are connected in series by the output connection unit 513 as in FIG. 20. Also in the power conversion device 503 #, the power conversion unit 100Y1 is operated in the connection mode, and each of the power conversion units 100Y2 to 100YN is operated in the non-connection mode.
  • the power of the battery BAT1 is used to control the first voltage Vo11 and the second voltage Vo21 to the voltage target value Vo * in the power conversion unit 100Y1, and the first voltage Vo1 and the power conversion unit 100Y2 to 100YN. Control is performed to bring the voltage difference of the second voltage Vo2 close to zero.
  • the first voltage Vo1 and the second voltage Vo2 are equivalent to the first voltage Vo11 and the second voltage Vo21 of the power conversion unit 100Y1. Can be controlled to the voltage of.
  • the power conversion device 503 # is controlled to N times the voltage target value Vo *, which is the same as the power conversion device 503, even if the battery BAT (DC power supply) is not connected to some of the power conversion units 100Y.
  • FIG. 29 shows a fourth configuration example of the power conversion device according to the modified example of the fourth embodiment.
  • the power conversion device 504 # shown in FIG. 29 includes four power conversion units 100Y1 to 100Y4 and an output connection unit 514 similar to the power conversion device 504 (FIG. 21).
  • the battery BAT1 is connected to the input end Ni of the power conversion unit 100Y1, while the battery BAT is connected to the input end Ni of the power conversion units 100Y2 to 100Y4. Not.
  • the output sides (first DC voltage end VE1 and second DC voltage end VE2) of the power conversion units 100Y1 to 100Y4 are connected in series-parallel expansion by the output connection unit 514 as in FIG. 21. Also in the power conversion device 503 #, the power conversion unit 100Y1 is operated in the connection mode, and each of the power conversion units 100Y2 to 100Y4 is operated in the non-connection mode.
  • the power of the battery BAT1 is used to control the first voltage Vo11 and the second voltage Vo21 to the voltage target value Vo * in the power conversion unit 100Y1, and the first voltage Vo1 and 1004 in the power conversion units 100Y2 to 1004. Control is performed to bring the voltage difference of the second voltage Vo2 close to zero.
  • the first voltage Vo1 and the second voltage Vo2 are equivalent to the first voltage Vo11 and the second voltage Vo21 of the power conversion unit 100Y1. Can be controlled to the voltage of.
  • the power conversion device 504 # generates a plurality of output voltages Vout1 and Vout2 similar to the power conversion device 504 even if the battery BAT (DC power supply) is not connected to some of the power conversion units 100Y. can do.
  • the output connection unit It is possible to execute the same operation as the power conversion devices 501 to 504 described in the third embodiment without changing the connection configuration in 511 to 514. That is, even if the connection / disconnection of the battery BAT (direct current power supply) in each power conversion unit 100Y is switched, the power conversion devices 501 # to 504 # can be switched by switching the connection mode / non-connection mode in the power conversion unit. Can maintain its operation.
  • the second embodiment shown in FIGS. 16 and 17 uses one power conversion unit 100Y to which a DC power supply (battery BAT) is connected and operates in the connection mode. It is possible to configure the power conversion devices 500a and 500b according to the above.
  • the state in which the DC power supply (battery BAT) is "non-connected” means that the input terminal Ni of the power conversion units 100X and 100Y and the DC power supply (battery) BAT are electrically separated from each other.
  • the state in which the electrically connected DC power supply (battery BAT) cannot be used due to a decrease in SOC or an abnormality is also included.
  • Embodiment 5 a configuration example of a power conversion system using the power conversion device according to the present embodiment will be further described.
  • the power conversion system in the present embodiment means a system connected between a DC power supply (battery BAT) and an AC power system.
  • the power conversion system 202 As shown in FIG. 30, the power conversion system 202 according to the first configuration example of the fifth embodiment is connected between the batteries BAT1 to BAT4 and the AC power system 301.
  • the power conversion system 202 includes a power conversion device 505 including four power conversion units 100X1 to 100X4, and an inverter (DC / AC converter) 152.
  • the output side of the power conversion units 100X1 to 100X4 is connected in series-parallel expansion, and the output voltages Vout1 to Vout4 are generated as shown in the figure.
  • Each of the output voltages Vout1 to Vout4 is controlled to a voltage corresponding to the voltage target value Vo * by connecting the first DC voltage end VE1 and the second DC voltage end VE2 of different power conversion units 100X in parallel.
  • the inverter 152 has a general 5-level three-phase inverter configuration.
  • the AC side of each phase of the three-phase inverter is connected to each phase of the AC power system 301.
  • the output voltage Vout1 of the power conversion device 505 is given as the input voltage Vin between the input nodes N1 and N2.
  • the output voltages Vout2, Vout3, and Vout4 of the power converter 505 have an input voltage Vin2. , Vin3, and Vin4.
  • the inverter 152 composed of a 5-level three-phase inverter uses the input voltages Vin1 to Vin4 to set the output end voltage of each phase on the AC side to 2.
  • DC / AC conversion can be performed so as to be set to any of the five levels of, -2 and Vo *.
  • the input voltages Vin1 to Vin4 to the inverter 152 are controlled to be constant by the output voltage control, and then connected to the power conversion units 100X1 to 100X4. Power can be transmitted between the batteries BAT1 to BAT4 and the AC power system 301.
  • the power conversion system 202 it is possible to reduce the size of the device by effectively utilizing the output side of the power conversion unit 100X.
  • the power conversion system 203 As shown in FIG. 31, the power conversion system 203 according to the second configuration example of the fifth embodiment is connected between the batteries BAT1 to BAT4 and the AC power system 301.
  • the power conversion system 202 includes a power conversion device 505 similar to that in FIG. 30 and an inverter (DC / AC converter) 153.
  • the power conversion device 505 generates output voltages Vout1 to Vout4, each of which is controlled to correspond to the voltage target value Vo *.
  • the voltage ends that output the output voltages Vout1 to Vout4 are connected in series.
  • the inverter 153 has a general three-level three-phase inverter configuration.
  • the AC side of each phase of the three-phase inverter is connected to each phase of the AC power system 301.
  • On the other hand, on the DC side of the three-phase inverter it is generated by connecting two DC voltage ends in series from the power conversion device 505 between the input nodes N6 and N7 and between the input nodes N7 and N8.
  • the inverter 153 composed of a three-level three-phase inverter uses the input voltages Vin1 and Vin2 to set the voltage on the AC side of each phase to three levels of 2.Vo *, 0, and -2.Vo *.
  • DC / AC conversion can be performed so that it is set to any of the above.
  • the input voltages Vin1 and Vin2 to the inverter 153 are controlled to be constant by the output voltage control, and then connected to the power conversion units 100X1 to 100X4. Power can be transmitted between the batteries BAT1 to BAT4 and the AC power system 301. Also in the power conversion system 203, it is possible to reduce the size of the device by effectively utilizing the output side of the power conversion unit 100X.
  • the power conversion system 204 according to the third configuration example of the fifth embodiment shown in FIG. 32 includes a power conversion device 505 and an inverter (DC / AC converter) 153 similar to the power conversion system 203 of FIG. Be prepared.
  • the power conversion system 204 is connected between the batteries BAT1 to BAT4 and the AC power system 300.
  • the AC power system 300 has an AC voltage (amplitude or effective value) halved as compared with the AC power system 301 of FIGS. 30 and 31.
  • the inverter 153 composed of a three-level three-phase inverter sets the voltage on the AC side of each phase to one of the three levels of Vo *, 0, and Vo * by using the input voltages Vin1 and Vin2.
  • DC / AC conversion can be performed as such.
  • the input voltages Vin1 and Vin2 to the inverter 153 are controlled to be constant by the output voltage control, and then connected to the power conversion units 100X1 to 100X4. Power can be transmitted between the batteries BAT1 to BAT4 and the AC power system 300.
  • the power conversion device 505 according to the present embodiment can be applied to an AC power system having a different AC voltage only by switching the connection point with the inverter in the subsequent stage. It is possible. That is, it is understood that the expandability and versatility are enhanced with respect to the difference in the specifications of the power system.
  • the power conversion system 205 according to the fourth configuration example of the fifth embodiment shown in FIG. 33 is connected between the batteries BAT1 to BAT4 and the AC power system 302.
  • the AC power system 302 is a single-phase AC system.
  • the power conversion system 205 includes a power conversion device 506 including four power conversion units 100X1 to 100X4, and an inverter (DC / AC converter) 154-1 to 154-4.
  • a power conversion device 506 including four power conversion units 100X1 to 100X4, and an inverter (DC / AC converter) 154-1 to 154-4.
  • the output sides of the power conversion units 100X1 to 100X4 are cyclically expanded and connected in the same manner as the power conversion device 501 of FIG. 18, and voltage targets are applied from the first DC voltage end VE1 and the second DC voltage end VE2 of each power conversion unit 100Y. It is possible to take out a DC voltage equivalent to the value Vo *.
  • Each of the inverters 154-1 to 154-4 has a general single-phase inverter configuration.
  • a DC voltage corresponding to the voltage target value Vo * is input to each of the DC sides of the inverters 154-1 to 154-4.
  • Each of the inverters 154-1 to 154-4 outputs a two-level voltage (single-phase AC voltage) of Vo * and -Vo *.
  • the AC output ends of the inverters 154-1 to 154-4 are connected in series and connected to the AC power system 302.
  • the inverters 154-1 to 154-4 are controlled by a host controller (not shown) to generate AC voltage of the same phase, so that the AC voltage is 4 Vo * with respect to the AC power system 302. Can be entered.
  • the input voltage to the inverters 151-1 to 151-4 is controlled to be constant by the output voltage control, and then connected to the power conversion units 100X1 to 100X4.
  • Power can be transmitted between the batteries BAT1 to BAT4 and the AC power system 302 (single phase).
  • the power conversion device 506 it is understood that it is possible to correspond to an AC power system (single-phase) having different voltages by changing the number of inverters connected in series.
  • the power conversion system 206 includes a power conversion device 506 and an inverter (DC / AC converter) 154-1 to the same as the power conversion system 205. It is equipped with 154-4.
  • the power conversion system 206 has a different connection relationship between the AC side of the inverters 151-1 to 151-4 and the power system. Similar to FIG. 33, each of the inverters 151-1 to 151-4 converts a DC voltage corresponding to the voltage target value Vo * into an AC voltage and generates it at the AC output terminal.
  • the AC output end of the inverter 151-1 is connected to the AC power system 303.
  • the AC power system 303 is single-phase like the AC power system 302 (FIG. 33), but differs from the AC power system 302 in that the amplitude of the AC voltage is equivalent to Vo *.
  • the AC output of the inverters 151-2 to 151-4 is output to each phase of the three-phase AC power system 300 as in FIG. 32.
  • an AC voltage having an AC amplitude of Vo * can be input to each phase of the AC power system 300.
  • the input voltage to the inverters 151-1 to 151-4 is controlled to be constant by the output voltage control, and then connected to the power conversion units 100X1 to 100X4.
  • Power can be transmitted between the batteries BAT1 to BAT4 and both the AC power systems 302 (single phase) and 300 (three phases).
  • the power conversion device according to the present embodiment can be applied to the connection with a plurality of AC power systems.
  • the power conversion systems 202 to 205 configured by using the power conversion unit 100X according to the present embodiment may be used for single-phase and three-phase power systems and power systems having different AC voltages.
  • it is commonly applicable, and it is understood that it is highly expandable and versatile with respect to differences in power system specifications.
  • each power conversion unit 100X with the power conversion unit 100Y described in the third embodiment for each of the power conversion systems 202 to 205 described in the fifth embodiment.
  • each power conversion system 202 can be switched between the connection mode / non-connection mode in the power conversion unit 100Y.
  • ⁇ 205 can continue to operate continuously. Therefore, it is possible to increase the expandability of the number of DC power supplies (vehicle-mounted batteries) connected to the power conversion device.
  • the configuration of the converter 10 in the power conversion units 100X and 100Y is not limited to the example shown in FIG. 1, and the input end Ni and the first DC voltage end VE1 (first and second terminals P1 and P2). And, if power transmission accompanied by output voltage control (Vo1, Vo2) is possible between the second DC voltage end VE2 (third and fourth terminals P3, P4), it can be appropriately modified.
  • FIG. 35 shows a modified example of the configuration of the converter in the power conversion unit.
  • the power conversion unit 100 # shown in FIG. 35 includes a converter 10 # instead of the converter 10 and a controller 50 # instead of the controller 50 as compared with the power conversion unit 100 shown in FIG. Be prepared.
  • the converter 10 # corresponds to the second bridge 12 and the third bridge 13, and the first bridge 11a and 11b are separately provided, respectively, and the first bridge 11 corresponds to the second bridge 12 and the third bridge 13. Is different from the converter 10 that is commonly provided.
  • the first bridges 11a and 11b are connected in parallel to the input terminal Ni. Further, the first bridge 11a is connected to the second bridge 12 via the transformer 15a, and the first bridge 11b is connected to the third bridge 13 via the transformer 15b. Similar to the converter 10, the second bridge 12 outputs the first voltage Vo1 to the first DC voltage end VE1 configured by the first and second terminals P1 and P2, and the third bridge 13 outputs the first voltage Vo1 to the third and third terminals. The second voltage Vo2 is output to the second DC voltage end VE2 composed of the four terminals P3 and P4.
  • the controller 55 # has subtraction units 61a and 61b, gain multiplication units 62a and 62b, and phase shift amount control units 70a and 70b.
  • the subtraction unit 61a and the gain multiplication unit 62a generate a command value REF1 for bringing the first voltage Vo1 closer to the voltage target value Vo *, similarly to the controller 50.
  • the subtraction unit 61b and the gain multiplication unit 62b generate a command value REF2 for bringing the second voltage Vo2 closer to the voltage target value Vo *, similarly to the controller 50.
  • the phase shift amount control unit 70a calculates the phase shift amount ⁇ 12 from the command value REF1 and calculates the phase shift amount ⁇ 13 from the command value REF2, similarly to the calculation units 73a and 73b in FIG.
  • the phase shift amount ⁇ 12 can be defined by the phase shift amount between the AC voltage of the first bridge 11a and the AC voltage (Vinvs) of the second bridge 12.
  • the phase shift amount ⁇ 13 can be defined by the phase shift amount between the AC voltage of the first bridge 11b and the AC voltage (Vinvt) of the third bridge 13.
  • the phase shift amount control unit 70a generates gate signals of a plurality of switching elements constituting the first bridge 11a and the second bridge 12 so as to generate the phase shift amount ⁇ 12.
  • the phase shift amount control unit 70b generates gate signals of a plurality of switching elements constituting the first bridge 11b and the third bridge 13 so as to generate the phase shift amount ⁇ 13.
  • the first voltage Vo1 and the second voltage are the same as in the phase shift pattern 1A by the controller 50 in the power conversion unit 100.
  • Vo2 can be brought closer to the voltage target value Vo *. It is also possible to apply the above-mentioned phase shift patterns 1B, 1C, 2A to 2C to the switching control of the converter 10 #.
  • the first voltage Vo1 is accompanied by the power transmission between the battery BAT connected to the input end Ni and the first DC voltage end VE1 and the second DC voltage end VE2. And the output voltage control of the second voltage Vo2 can be performed.
  • power transmission with output voltage control (Vo1, Vo2) is possible between the input end Ni and the first DC voltage end VE1 and the second DC voltage end VE2.
  • the circuit configuration (converter 10, 10 # portion) of the power conversion units 100X and 100Y is arbitrary.
  • the output voltage control by the converter is not limited to the control related to the phase shift pattern illustrated, and any control method can be applied.
  • the "DC power supply” can be charged, but the DC power supply that only discharges (power supply) the power generation element or the like is connected to the input end Ni of the power conversion units 100X and 100Y. It may be connected.
  • the first bridge 11 to the third bridge 13 are limited so as to limit the power transmission direction in the converter 10 (only the power transmission from the first bridge 11 to the second bridge 12 and the third bridge 13). Switching is controlled.
  • the mode of interconnection of the output sides (first DC voltage end VE1 and second DC voltage end VE2) of the power conversion units 100X and 100Y is the illustrated output connection unit 511. It will be confirmed and described that the connection mode is not limited to 516. That is, each of the first DC voltage end VE1 and the second DC voltage end VE2 of each of the power conversion units 100X and 100Y is connected to the other first DC voltage end VE1 or the second DC voltage end VE2 in an arbitrary manner. Is possible. Further, the number of power conversion units 100X and 100Y constituting the power conversion device can be any number.
  • each of the controllers 50 to 53, 55, 50 # can be configured by a microcomputer or the like that executes the above-mentioned predetermined control calculation by software processing. It is also possible to configure at least a part of the controllers 50 to 53, 55, 50 # by using circuits such as FPGA (Field Programmable Gate Array) and ASIC (Application Specific Integrated Circuit). That is, each function of the controllers 50 to 53, 55, 50 # can be configured based on a computer, or at least a part thereof can be configured by using circuits such as FPGA and ASIC. Further, at least a part of the functions of each functional block can be configured by an analog circuit.
  • FPGA Field Programmable Gate Array
  • ASIC Application Specific Integrated Circuit

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Dc-Dc Converters (AREA)
  • Inverter Devices (AREA)

Abstract

電力変換ユニット(100)は、直流電源(BAT)と接続するための入力端(Ni)と、第1端子(P1)及び第2端子(P2)によって構成される第1直流電圧端(VE1)と、第3端子(P3)及び第4端子(P4)によって構成される第2直流電圧端(VE2)と、コンバータ(10)と、コンバータ(10)を制御する制御器(50)とを備える。コンバータ(10)は、入力端(Ni)と第1及び第2直流電圧端(VE1,VE2)との間での電力伝送を伴うDC/DC変換を実行する。制御器(50)は、第1直流電圧端(VE1)の第1電圧(Vo1)及び第2直流電圧端(VE2)の第2電圧(Vo2)を電圧目標値(Vo*)に制御するためのコンバータ(10)の制御指令(GSap~GSdp,GSas~GSds,GSat~GSdt)を生成する。

Description

電力変換ユニット及び電力変換装置
 本開示は、電力変換ユニット、及び、当該電力変換器ユニットを複数個備える電力変換装置に関する。
 電気自動車、電気カート、及び、電動二輪車等を含む電気車を充電するためのユニバーサル充電装置が、特表2012―518987号公報(特許文献1)に記載されている。この様な用途では、電力変換装置において、電気車の接続台数、電気車の充電速度、及び、接続先の電力系統の条件に応じて異なる対応が必要である。
 特許文献1では、充電に限定されるが、複数台の電気自動車接続と、電気自動車の充電速度の様々な条件とに対応可能な構成として、複数台のコンバータ(充電パック又は充電モジュール)を共通のメッシュ部を介して複数の電気自動車に接続する装置構成が記載される。更に、当該メッシュ部が複数台の電気自動車の充電状態に応じて、電気自動車及びコンバータの接続先を切り替えることで、電気自動車毎に電流及び電圧が調整可能となる。
 又、下記の非特許文献1には、無効電力を抑制した電気自動車充放電用双方向絶縁型DC/DCコンバータとして、DAB(Double Active Bridge)構成のコンバータにおける位相シフト制御が記載されている。
特表2012―518987号公報
近藤亮太他著、「無効電力を抑制した電気自動車充放電用双方向絶縁型DC/DCコンバータの損失低減効果実証」、2017年8月1日、電気学会論文誌D(産業応用部門)、IEEE Transactions on Industry Applications Vol.137 No.8 pp 673-680。
 特許文献1に記載されたユニバーサル充電装置では、図18に示される様に、電力系統(AC)に対する接続側では、電力系統及び複数台のコンバータ(充電パック又は充電モジュール)の間にDC/AC変換器が接続される。しかしながら、接続先の電力系統には、単相200V、中性点接地三相200V,V相接地200V、中性点接地400V等の複数の仕様が存在する一方で、各コンバータ及びDC/AC変換器の間は単純な接続関係しか記載されていない。このため、接続先の電力系統の仕様に従って、DC/AC変換器及び複数台のコンバータの間で授受される直流電圧が異なる場合には、各コンバータの仕様を変更する必要が生じることが懸念される。これにより、接続先の交流電力系統に対して共通のコンバータで対応することが困難になり、電力系統の仕様の違いに対する拡張性及び汎用性が低下することが懸念される。
 本開示は、上記のような問題点を解決するためになされたものであり、その目的は、車載バッテリに代表される直流電源と電力系統との間の電力変換システムに用いられる、電力変換ユニット及び電力変換装置について、電力系統の仕様の違いに対する拡張性及び汎用性を高めることである。
 本発明のある局面によれば、電力変換ユニットは、直流電源と接続するための入力端と、第1端子及び第2端子によって構成される第1直流電圧端と、第3端子及び第4端子によって構成される第2直流電圧端と、コンバータと、コンバータを制御する制御器とを備える。コンバータは、入力端と第1直流電圧端及び第2直流電圧端と間での電力伝送を伴うDC/DC電力変換を実行する。制御器は、第1直流電圧端の第1電圧及び第2直流電圧端の第2電圧を電圧目標値に制御するためのコンバータの制御指令を生成する。
 本発明の他のある局面によれば、電力変換装置は、上記電力変換ユニットを複数台備えるとともに、出力接続部を備える。出力接続部は、各電力変換ユニットの第1から第4の端子を用いて複数台の電力変換ユニットの第1直流電圧端及び第2直流電圧端を相互接続する。
 本開示によれば、電力変換ユニットの入力端(直流電源側)との間でのDC/DC電力変換によって第1及び第2直流電圧端の両方に生成された、電圧目標値に制御された直流電圧を用いて、直流電源との接続側とは反対側の電力系統との接続側を構成することができる。この結果、当該電力変換ユニット、及び、複数台の当該電力変換ユニットを備える電力変換装置において、電力系統の仕様の違いに対する拡張性及び汎用性を高めることができる。
実施の形態1に係る電力変換ユニットの構成を説明する回路図である。 位相シフトパターン1Aによる制御時のコンバータの動作波形図である。 位相シフトパターン1Aにおける位相シフト量制御部の動作を説明する概念図である。 位相シフトパターン1Bによる制御時のコンバータの動作波形図である。 位相シフトパターン1Bにおける位相シフト量制御部の動作を説明する概念図である。 位相シフトパターン1Cによる制御時のコンバータの動作波形図である。 位相シフトパターン1Cにおけるスイッチング停止制御を説明するフローチャートである。 位相シフトパターン1Cにおける位相シフト量制御部の動作を説明する概念図である。 実施の形態1の変形例1に係る電力変換ユニットの構成を説明する回路図である。 実施の形態1の変形例2に係る電力変換ユニットの構成を説明する回路図である。 位相シフトパターン2Aにおける位相シフト量制御部の動作を説明する概念図である。 位相シフトパターン2Bにおける位相シフト量制御部の動作を説明する概念図である。 位相シフトパターン2Cにおける従う位相シフト量制御部の動作を説明する概念図である。 位相シフトパターン2Cにおけるスイッチング停止制御を説明するフローチャートである。 実施の形態1の変形例3に係る電力変換ユニットの構成を説明する回路図である。 実施の形態2に係る電力変換装置の第1の構成例を説明するブロック図である。 実施の形態2に係る電力変換装置の第2の構成例を説明するブロック図である。 実施の形態3に係る電力変換装置の第1の構成例を説明するブロック図である。 実施の形態3に係る電力変換装置の第2の構成例を説明するブロック図である。 実施の形態3に係る電力変換装置の第3の構成例を説明するブロック図である。 実施の形態3に係る電力変換装置の第4の構成例を説明するブロック図である。 実施の形態4に係る電力変換ユニットの構成を説明する回路図である。 図22に示された電力変換ユニットにおけるコンバータの動作波形図である。 図22に示される位相シフト量制御部の動作を説明する概念図である。 実施の形態4に係る電力変換ユニットの制御器による制御動作の切替機能を説明するためのフローチャートである。 実施の形態4の変形例に係る電力変換装置の第1の構成例を説明するブロック図である。 実施の形態4の変形例に係る電力変換装置の第2の構成例を説明するブロック図である。 実施の形態4の変形例に係る電力変換装置の第3の構成例を説明するブロック図である。 実施の形態4の変形例に係る電力変換装置の第4の構成例を説明するブロック図である。 実施の形態5に係る電力変換システムの第1の構成例を説明する概略図である。 実施の形態5に係る電力変換システムの第2の構成例を説明する概略図である。 実施の形態5に係る電力変換システムの第3の構成例を説明する概略図である。 実施の形態5に係る電力変換システムの第4の構成例を説明する概略図である。 実施の形態5に係る電力変換システムの第5の構成例を説明する概略図である。 電力変換ユニットにおけるコンバータの構成の変形例を説明する回路図である。
 以下に、本開示の実施の形態について、図面を参照して詳細に説明する。なお、以下では、図中の同一又は相当部分には同一符号を付して、その説明は原則的に繰返さないものとする。
 実施の形態1.
 実施の形態1では、本実施の形態に係る電力変換装置の基本構成要素となる電力変換ユニットの構成例及び制御例を主に説明する。
 (回路構成)
 図1には、実施の形態1に係る電力変換ユニット100の概略的な回路図が示される。
 図1に示される様に、電力変換ユニット100は、コンバータ10と、制御器50と、直流電源BATを接続するための入力端Niと、第1端子P1及び第2端子P2で構成される第1直流電圧端VE1と、第3端子P3及び第4端子P4で構成される第2直流電圧端VE2と、第1コンデンサC1と、第2コンデンサC2とを備える。コンバータ10は、直流電源BATからの入力電圧Vinと、第1直流電圧端VE1の第1電圧Vo1、及び、第1直流電圧端VE1の第2電圧Vo2との間で、DC/DC電力変換を実行する。尚、第1コンデンサC1及び第2コンデンサC2は、電力変換ユニット100の外部要素として、第1端子P1~第4端子P4と接続されてもよい。
 尚、本実施の形態では、直流電源BATとしては、バッテリ、特に、車載二次電池の適用が想定されているため、以下では、直流電源BATを単に、電池BATとも称する。入力端Niは、例えば、CHAdeMO(登録商標)等の電気自動車の充電規格に従うコネクタケーブルの接続口によって構成することが可能であり、基本的には、単一の電池BAT(直流電源)を接続するためのものである。又、第1端子P1~第4端子P4は、後程説明する様に、インバータ(DC/AC変換装置)を介して、交流電力系統(代表的には、商用系統)と接続することができる。即ち、電力変換ユニット100は、直流電源BATと図示しない交流電力系統との接続経路内で用いることができる。
 コンバータ10は、第1ブリッジ11、第2ブリッジ12、第3ブリッジ13、及び、トランス15を含む。トランス15は、一次巻線16と、二次巻線17,18とを有する。一次巻線16、二次巻線17、及び、二次巻線18は、コア19を介して互いに磁気結合される。
 第1ブリッジ11は、電力線PL1,NL1と一次巻線16との間にフルブリッジ接続された半導体スイッチング素子Sap,Sbp,Scp,Sdp(Sap~Sdp)を有する。電力線PL1及びNL1は、入力端Niを介して、直流電源BATの正極側及び負極側とそれぞれ接続される。
 第1ブリッジ11は、半導体スイッチング素子Sap~Sdpのオンオフ制御により、電力線PL1及びNL1の間の入力電圧Vinを交流電圧Vinvpに変換する。交流電圧Vinvpは、リアクトルLpを介して、一次巻線16へ伝達される。
 以下では、電力線PL1から第1ブリッジ11への電流を、入力電流Iinとも称し、第1ブリッジ11から一次巻線16への電流を、交流電流ITrpとも称する。
 第2ブリッジ12は、二次巻線17と電力線PL2,NL2との間にフルブリッジ接続された半導体スイッチング素子Sas,Sbs,Scs,Sds(Sas~Sds)を有する。電力線PL2及びNL2は、第1端子P1及び第2端子P2とそれぞれ接続される。第1コンデンサC1は、第1端子P1(電力線PL2)及び第2端子P2(電力線NL2)の間に接続されており、第1コンデンサC1の高圧側及び低圧側は、第1端子P1及び第2端子P2とそれぞれ接続される。第1直流電圧端VE1(第1コンデンサC1)に対応して、第1電圧Vo1を検出するための電圧検出器81aが配置される。
 第2ブリッジ12は、半導体スイッチング素子Sas~Sdsのオンオフ制御により、交流電圧Vinvsを電力線PL2及びNL2の間の直流電圧である第1電圧Vo1に変換する。交流電圧Vinvsは、リアクトルLsを介して、二次巻線17から第2ブリッジ12へ伝達される。又、以下では、二次巻線17から第2ブリッジ12への電流を交流電流ITrsとも称する。
 同様に、第3ブリッジ13は、二次巻線18と電力線PL3,NL3との間にフルブリッジ接続された半導体スイッチング素子Sat,Sbt,Sct,Sdt(Sat~Sdt)を有する。電力線PL3及びNL3は、第3端子P3及び第4端子P4とそれぞれ接続される。第2コンデンサC2は、第3端子P3(電力線PL3)及び第4端子P4(電力線NL3)の間に接続されており、第2コンデンサC2の高圧側及び低圧側は、第3端子P3及び第4端子P4とそれぞれ接続される。第2直流電圧端VE2(第2コンデンサC2)に対応して、第2電圧Vo2を検出するための電圧検出器81bが配置される。
 第3ブリッジ13は、半導体スイッチング素子Sat~Sdtのオンオフ制御により、交流電圧Vinvtを電力線PL3及びNL3の間の直流電圧である第2電圧Vo2に変換する。交流電圧Vinvtは、リアクトルLtを介して、二次巻線17から第2ブリッジ12へ伝達される。以下では、二次巻線18から第3ブリッジ13への電流を交流電流ITrtとも称する。
 第1ブリッジ11~第3ブリッジ13の各々は、電力線PL1~PL3及び電力線NL1~NL3の間に直列接続された2個の半導体スイッチング素子で構成される「レグ」を2個並列に有している。以下では、各レグを構成する2個の半導体スイッチング素子のうち、電力線PL1~PL3と接続される半導体スイッチング素子を「上アーム素子」とも称し、電力線NL1~NL3と接続される半導体スイッチング素子を「下アーム素子」とも称する。
 尚、リアクトルLp,Ls,Ltの各々は、リアクトル素子の接続によって構成されてもよく、一次巻線16及び二次巻線17,18の各々の漏れインダクタンスによって構成することも可能である。
 この様に、コンバータ10は、DAB構成を有している。更に、第1ブリッジ11、第2ブリッジ12、及び、第3ブリッジ13の交流出力端は、トランス15によって電気的に絶縁されて相互接続される。この結果、入力端Niに接続された電池BAT(入力電圧Vin)と、第1直流電圧端VE1(第1電圧Vo1)と、第2直流電圧端VE2(第2電圧Vo2)との間では、トランス15を介した絶縁を伴って電力伝送を行うことができる。コンバータ10により、電池BAT(直流電源)から第1直流電圧端VE1及び第2直流電圧端VE2への電力伝送(BAT放電動作)と、第1直流電圧端VE1及び第2直流電圧端VE2から電池BAT(直流電源)への電力伝送(BAT充電動作)との両方、即ち、双方向の電力変換が可能である。
 尚、第1ブリッジ11~第3ブリッジ13を構成する半導体スイッチング素子の各々は、例えば、IGBT(Insulated Gate Bipolar Transistor)及びMOSFET(Metal-oxide-Semiconductor Field-effect Transistor)等によって構成することができる。以下では、半導体スイッチング素子を、単に「スイッチング素子」とも称する。
 制御器50は、電圧検出器81a及び81bの検出値を用いて、第1電圧Vo1及び第2電圧Vo2を制御する。図1の構成例では、制御器50は、第1電圧Vo1及び第2電圧Vo2が共通の電圧目標値Vo*に近づくように、コンバータ10を制御する。
 具体的には、制御器50は、減算部61a,61bと、ゲイン乗算部62a,62bと、位相シフト量制御部70とを有する。減算部61aは、電圧目標値Vo*から電圧検出器81aの検出値を減算することで、電圧偏差ΔVo1=Vo*-Vo1を算出する。減算部61bは、電圧目標値Vo*から電圧検出器81bの検出値を減算することで、電圧偏差ΔVo2=Vo*-Vo2を算出する。
 ゲイン乗算部62aは、減算部61aからの電圧偏差ΔVo1に予め定められた比例ゲインを乗算することによって、第1電圧Vo1を電圧目標値Vo*に近づけるための指令値REF1を生成する。同様に、ゲイン乗算部62bは、減算部61bからの電圧偏差ΔVo2に予め定められた比例ゲインを乗算することによって、第2電圧Vo2を電圧目標値Vo*に近づけるための指令値REF2を生成する。
 位相シフト量制御部70は、指令値REF1,REF2に基づいて、半導体スイッチング素子Sap~Sdp(第1ブリッジ11)のそれぞれのオンオフを制御するゲート信号GSap~GSdpと、半導体スイッチング素子Sas~Sds(第2ブリッジ12)のそれぞれのオンオフを制御するゲート信号GSas~GSdsと、半導体スイッチング素子Sat~Sdt(第3ブリッジ13)のそれぞれのオンオフを制御するゲート信号GSat~GSdtとを生成する。指令値REF1は「第1指令値」の一実施例に対応し,指令値REF2は「第2指令値」の一実施例に対応する。又、電圧検出器81aは「第1電圧検出器」の一実施例に対応し、電圧検出器81bは「第2電圧検出器」の一実施例に対応する。
 第1ブリッジ11~第3ブリッジ13は、公知の任意の制御方式に従って動作させることが可能であるが、本実施の形態では、一例として、制御器50が、以下に説明する様に、第1ブリッジ11、第2ブリッジ12、及び、第3ブリッジ13の交流出力端にそれぞれ生じる交流電圧Vinvp、Vinvs、及び、Vinvtの間の位相シフト量を調節するPWM(Pulse Width Modulation)制御により、上記電力伝送を伴って第1電圧Vo1及び第2電圧Vo2が制御されるものとする。従って、上述のゲート信号GSap~GSdp,GSas~GSds,GSat~GSdtは、指令値REF1,REF2から算出された位相シフト量を生じさせるためのスイッチングパターンに従って生成される。ゲート信号GSap~GSdp,GSas~GSds,GSat~GSdtは「コンバータの制御指令」の一実施例に対応する。
 以下では、位相シフト量の制御の例として、位相シフトパターン1A~1Cについて説明する。尚、本明細書中では、位相シフト量及び位相は、各スイッチング素子のスイッチング周期を360°として示されるものとする。
 (位相シフトパターン1Aによる制御)
 図2には、第1の制御例である位相シフトパターン1Aに従って制御されたコンバータ10の動作波形例が示される。図2には、第1直流電圧端VE1にPb[W]の負荷(図示せず)を接続し、第2直流電圧端VE2にPa[W]の負荷(図示せず)を接続したときのシミュレーション波形が示される。
 図2には、電池BATからの入力電圧Vin、第1ブリッジ11の交流電圧Vinvp及び交流電流ITrp、第2ブリッジ12の交流電圧Vinvs及び交流電流ITrs、第3ブリッジの交流電圧Vinvt及び交流電流ITrt、出力電圧としての第1電圧Vo1及び第2電圧Vo2、並びに、入出力電力としての、第1ブリッジ11からトランス15への交流電力PTrp(有効電力)、トランス15から第2ブリッジ12への交流電力PTrs(有効電力)、及び、トランス15から第3ブリッジ13への交流電力PTrs(有効電力)PTrtが示される。
 基本的な制御として、第1ブリッジ11から第3ブリッジの各々において、同一レグを構成する、直列接続された2個のスイッチング素子は、交互に同期間長ずつオンオフされる。更に、位相シフトパターン1Aでは、同一ブリッジ内の隣接するレグの上アーム素子及び下アーム素子(例えば、第1インバータにおける、Sap及びSdp、或いは、Sbp及びScp)は、それぞれ交互にオンオフされる。この結果、交流電圧Vinvp,Vinvs,Vinvtは、ゼロ電圧期間を有さない交流波形を示しており、Vin又は-Vinとなる期間は、180°ずつである。
 図2に示される様に、位相シフトパターン1Aでは、制御器50は、第1ブリッジ11の交流電圧Vinvpに対する第2ブリッジ12の交流電圧Vinvsの位相シフト量θ12と、第1ブリッジ11の交流電圧Vinvpに対する第3ブリッジ13の交流電圧Vinvtの位相シフト量θ13が、指令値REF1,REF2に従って制御される。図2の波形例では、θ12>θ13の状態(PTrs>PTrt)が示されている。
 図3には、位相シフトパターン1Aにおける位相シフト量制御部70の動作を説明する概念図が示される。
 図3に示される様に、位相シフト量制御部70は、指令値REF1から位相シフト量θ12を算出する演算部73aと、指令値REF2から位相シフト量θ13を算出する演算部73bとを有する。
 位相シフト量θ12=0は、交流電圧Vinvp(第1ブリッジ11)及び交流電圧Vinvs(第2ブリッジ12)が同位相である状態を示し、位相シフト量θ13=0は、交流電圧Vinvp(第1ブリッジ11)及び交流電圧Vinvt(第3ブリッジ13)が同位相である状態を示している。これに対して、交流電圧Vinvp(第1ブリッジ11)の位相に対して、交流電圧Vinvs(第2ブリッジ12)及び交流電圧Vinvt(第3ブリッジ13)の位相が進んでいる状態が、θ12>0及びθ13>0と定義される。
 演算部73aは、REF1=0(即ち、ΔVo1=0)のときにθ12=0とする一次関数に従って、指令値REF1から-180°~180°の範囲内で位相シフト量θ12を求める。同様に、演算部73bは、REF2=0(即ち、ΔVo2=0)のときにθ13=0とする一次関数に従って、指令値REF1から-180°~180°の範囲内で位相シフト量θ13を求める。
 演算部73a,73bは、図3に示される一次関数に従う数値演算を実行するように構成されてもよく、当該一次関数による対応関係に従って指令値REF1,REF2から位相シフト量θ12,θ13を設定するルックアップテーブルとして構成されてもよい。
 更に、位相シフト量制御部70は、算出した位相シフト量θ12,θ13が実現されるように、第1ブリッジ11のスイッチング素子Sap~Sdp、第2ブリッジ12のスイッチング素子Sas~Sds、及び、第3第3ブリッジ13のスイッチング素子Sat~Sdtをオンオフするためのゲート信号GSat~GSdtを生成する。
 再び図2を参照して、コンバータ10は、交流電力PTrs=Pb[W]、即ち、第1直流電圧端VE1(第1及び第2端子P1,P2)から負荷へPb[W]が出力されるとともに、交流電力PTrt=Pa[W]、即ち、第2直流電圧端VE2(第3及び第4端子P3,P4)から負荷へPa[W]が出力される下で、出力電圧である第1電圧Vo1及び第2電圧Vo2をVo*に制御する。このとき、電池BATからコンバータ10(第1ブリッジ11)には、交流電力PTrp=Pc[W](Pc=Pa+Pb)相当の直流電力が入力される。
 この様に、位相シフトパターン1Aに従う制御によって、第1直流電圧端VE1に供給される電力と、第2直流電圧端VE2に供給される電力とが異なる下で、第1電圧Vo1及び第2電圧Vo2が電圧目標値に従って制御される、コンバータ10の電力伝送動作が成立することが理解される。
 (位相シフトパターン1Bによる制御)
 図4には、第2の制御例である位相シフトパターン1Bに従って制御されたコンバータ10の動作波形例が示される。図4においても、図2と同様に、第1直流電圧端VE1にPb[W]の負荷(図示せず)を接続し、第2直流電圧端VE2にPa[W]の負荷(図示せず)を接続したときのシミュレーション波形が示される。
 図4においても、図2と同様の、入力電圧Vin、交流電圧Vinvp,Vinvs,Vinvt、交流電流ITrp,ITrs,ITrt、出力電圧としての第1電圧Vo1及び第2電圧Vo2、並びに、トランス15の入出力電力である交流電力PTrp,PTrs,PTrtが示される。
 図4に示される様に、位相シフトパターン1Bでは、第1ブリッジ11のスイッチング素子Sapは、スイッチング周期に従って基準位相でオンオフする。
 一方で、第1ブリッジ11のスイッチング素子Scpのオンオフタイミングは、スイッチング素子Sapのオンオフタイミング(基準位相)に対して位相シフト量θ1を有する様に制御される。尚、スイッチング素子Sbpは、同一レグのスイッチング素子Sapと交互にオンオフし、スイッチング素子Sdpは、同一レグのスイッチング素子Scpと交互にオンオフする。この結果、第1ブリッジ11の交流電圧Vinvpには、位相シフト量θ1に従うゼロ電圧期間が生じる。即ち、交流電圧VinvpがVin又は-Vinとなる各期間は、(180-θ1)°である。
 第2ブリッジ12において、スイッチング素子Sasは、第1ブリッジ11のスイッチング素子Sapのオンオフタイミング(基準位相)と同位相でオンオフされる一方で、スイッチング素子Scsは、当該基準位相に対して位相シフト量θ2を有する様にオンオフされる。スイッチング素子Sbs及びSdsは、同一レグのスイッチング素子Sas及びScsとそれぞれ交互にオンオフされる。この結果、第2ブリッジ12の交流電圧Vinvsには、位相シフト量θ2に従うゼロ電圧期間が生じる。即ち、交流電圧VinvsがVin又は-Vinとなる各期間は、(180-θ2)°である。
 第3ブリッジ13において、スイッチング素子Satは、第1ブリッジ11のスイッチング素子Sapのオンオフタイミング(基準位相)と同位相でオンオフされる一方で、スイッチング素子Sctは、当該基準位相に対して位相シフト量θ3を有する様にオンオフされる。スイッチング素子Sbt及びSdtは、同一レグのスイッチング素子Sat及びSctとそれぞれ交互にオンオフされる。この結果、第3ブリッジ13の交流電圧Vinvtには、位相シフト量θ3に従うゼロ電圧期間が生じる。即ち、交流電圧VinvtがVin又は-Vinとなる各期間は、(180-θ3)°である。
 図5には、位相シフトパターン1Bにおける位相シフト量制御部70の動作を説明する概念図が示される。
 図5に示される様に、位相シフト量制御部70は、指令値REF1から位相シフト量θ1a,θ2を算出する演算部74aと、指令値REF2から位相シフト量θ1b,θ3を算出する演算部74bと、平均値算出部76とを有する。
 演算部74aは、REF1=0(即ち、ΔVo1=0)のときにθ2=90°とする一次関数、及び、θ1a=180°-θ2とする一次関数に従って、指令値REF1から-180°~180°の範囲内で位相シフト量θ1a及びθ2を求める。
 演算部74bは、REF2=0(即ち、ΔVo2=0)のときにθ3=90°とする一次関数、及び、θ1b=180°-θ3とする一次関数に従って、指令値REF2から-180°~180°の範囲内で位相シフト量θ1b及びθ3を求める。
 平均値算出部76は、演算部74aからの位相シフト量θ1aと、演算部74bからの位相シフト量θ1bとの平均値を、位相シフト量θ1として出力する。演算部74a,74bについても、図4に示される一次関数に従う数値演算器、又は、ルックアップテーブルとして構成することができる。
 更に、位相シフト量制御部70は、図5で算出された位相シフト量θ1~θ3が実現されるように、第1ブリッジ11のスイッチング素子Sap~Sdp、第2ブリッジ12のスイッチング素子Sas~Sds、及び、第3第3ブリッジ13のスイッチング素子Sat~Sdtをオンオフするためのゲート信号GSap~GSdp,GSas~GSds,GSat~GSdtを生成する。
 再び図4を参照して、コンバータ10では、位相シフトパターン1Bに従う制御によって、交流電力PTrs=Pb[W]、かつ、交流電力PTrt=Pa[W]の下、出力電圧である第1電圧Vo1及び第2電圧Vo2を電圧目標値Vo*に制御することができる。即ち、位相シフトパターン1Bに従う制御によっても、第1直流電圧端VE1に供給される電力Pb[W]と、第2直流電圧端VE2に供給される電力Pa[W]とが異なる下で、第1電圧Vo1及び第2電圧Vo2が電圧目標値に従って制御される、コンバータ10の電力伝送動作が成立することが理解される。
 尚、図4(位相シフトパターン1B)では、図2(位相シフトパターン1A)と比較して、トランス15に印加される交流電圧Vinvp,Vinvs,Vinvtのゼロ電圧期間が大きくなっている。このため、トランス15で生じる磁束密度低下に伴う鉄損低減の効果により、電力伝送の効率を高めることができる。
 (位相シフトパターン1Cによる制御)
 図6には、第3の制御例である位相シフトパターン1Cに従って制御されたコンバータ10の動作波形例が示される。図6においても、図2及び図4と同様に、第1直流電圧端VE1にPb[W]の負荷(図示せず)を接続し、第2直流電圧端VE2にPa[W]の負荷(図示せず)を接続したときのシミュレーション波形が示される。
 図6においても、図2及び図4と同様の、入力電圧Vin、交流電圧Vinvp,Vinvs,Vinvt、交流電流ITrp,ITrs,ITrt、出力電圧としての第1電圧Vo1及び第2電圧Vo2、並びに、トランス15の入出力電力である交流電力PTrp,PTrs,PTrtが示される。
 位相シフトパターン1Cにおいても、位相シフトパターン1Bと同様の基準位相に対する位相シフト量θ1~θ3を調節するように、第1ブリッジ11のスイッチング素子Scp,Sdt、第2ブリッジ12のスイッチング素子Scs,Sds、及び、第3ブリッジ13のスイッチング素子Sct,Sdtのオンオフタイミング(位相)が制御される。
 更に、位相シフトパターン1Cでは、図7で説明するスイッチング停止制御によって、一部のスイッチング素子のオンオフ(スイッチング)が停止される。
 図7のフローチャートに示される様に、位相シフト量制御部70は、指令値REF1及びREF2から、コンバータ10が電池BAT(直流電源)の放電動作及び充電動作のいずれを行うかに応じて、スイッチングが停止されるスイッチング素子を選定する。
 具体的には、位相シフト量制御部70は、ステップ(以下、単に「S」と表記する)110において、REF1+REF2≧0であるか否かを判定する。そして、REF1+REF2≧0のとき(S110のYES判定時)、即ち、第1ブリッジ11から第2ブリッジ12及び第3ブリッジ13へ電力が伝送される電池BATの放電動作時には、位相シフト量制御部70は、S120により、受電側の第2ブリッジ12及び第3ブリッジ13の左側(基準位相側)のレグを構成するスイッチング素子Sas,Sbs及びSat,Sbtをオフに固定する。
 これに対して、REF1+REF2<0のとき(S110のNO判定時)、即ち、第2ブリッジ12及び第3ブリッジ13から第1ブリッジ11へ電力が伝送される電池BATの充電動作時には、位相シフト量制御部70は、S130により、受電側の第1ブリッジ11の左側(基準位相側)のレグを構成するスイッチング素子Sap,Sbpをオフに固定する。
 この様に、位相シフトパターン1Cでは、第1ブリッジ11、又は、第2ブリッジ12及び第3ブリッジ13において、左側(基準位相側)のレグを構成するスイッチング素子がオフに固定(スイッチングを停止)される。そして、第1ブリッジ11~第3ブリッジ13の右側レグを構成するスイッチング素子が位相シフト量θ1~θ3に従ってオンオフされることで、図6に示された交流電圧Vinvp,Vinvs,Vinvtが生成される。
 図8には、位相シフトパターン1Cにおける位相シフト量制御部70の動作を説明する概念図が示される。
 図8に示される様に、位相シフト量制御部70は、指令値REF1から位相シフト量θ1a,θ2を算出する演算部75aと、指令値REF2から位相シフト量θ1b,θ3を算出する演算部75bと、平均値算出部76とを有する。
 演算部75aは、指令値REF1から位相シフト量θ1a及びθ2を算出し、演算部75bは、指令値REF2から位相シフト量θ1b及びθ3を算出する。
 演算部75aにおいて、位相シフト量θ2は、図示される折れ線状(実線)の特性に従って設定される。具体的には、REF1≧0の領域では、90°~180°の範囲内に設定される。具体的には、REF1=0のときθ2=180°に設定されるとともに、REF1が増加するに従ってθ2は、90°に向けて一定レートで減少する様に設定される。更に、θ2=90°となるREF1の値よりもREF1が大きい領域では、|REF1|の増加に従って、θ2は180°まで一定レートで増加するように設定される。又、REF1<0の領域では、位相シフト量θ2は、|REF1|が増加するに従って0°に向けて一定レートで減少する様に設定される。
 一方で、位相シフト量θ1aは、図示される折れ線状(点線)の特性に従って設定される。具体的には、REF1≧0の領域では、REF1が増加するのに従って0°に向けて一定レートで減少する様に設定される。又、REF1<0の領域では、REF1=0のときθ1a=180°に設定されるとともに、|REF1|が増加するに従ってθ1aは、90°に向けて一定レートで減少する様に設定される。更に、θ1a=90°となるREF1の値よりも|REF1|が大きい領域では、|REF1|の増加に従って、θ1aは180°まで一定レートで増加するように設定される。
 演算部75bでは、図示される様に、演算部75aでの指令値REF1に対する位相シフト量θ1a及びθ2と同じ特性に従って、指令値REF2に対して位相シフト量θ1b及びθ3が設定される。
 平均値算出部76は、演算部75aからの位相シフト量θ1aと、演算部75bからの位相シフト量θ1bとの平均値を、位相シフト量θ1として出力する。演算部75a,75bについても、図8中に示される折れ線グラフ状の特性に従う数値演算器、又は、ルックアップテーブルとして構成することができる。
 更に、位相シフト量制御部70は、図7のスイッチング停止制御、及び、図8で算出された位相シフト量θ1~θ3が実現されるように、第1ブリッジ11のスイッチング素子Sap~Sdp、第2ブリッジ12のスイッチング素子Sas~Sds、及び、第3第3ブリッジ13のスイッチング素子Sat~Sdtをオンオフするためのゲート信号GSap~GSdp,GSas~GSds,GSat~GSdtを生成する。
 再び図6を参照して、コンバータ10では、位相シフトパターン1Cに従う制御によって、交流電力PTrs=Pb[W]、かつ、交流電力PTrt=Pa[W]の下、出力電圧であるVo1,Vo2を電圧目標値Vo*に制御することができる。即ち、位相シフトパターン1Cに従う制御によっても、第1直流電圧端VE1に供給される電力Pb[W]と、第2直流電圧端VE2に供給される電力Pa[W]とが異なる下で、第1電圧Vo1及び第2電圧Vo2が電圧目標値に従って制御される、コンバータ10の電力伝送動作が成立することが理解される。
 尚、図6(位相シフトパターン1C)では、トランス15に入出力される交流電流ITrp,ITrs,ITrtにゼロ電流期間が設けられる。このため、非特許文献1にも記載される様に、スイッチング周波数に従う交流無効電力を抑制することによって電力損失を低減することができる。又、トランス15の直流偏磁の発生を防止することで、トランス15での磁気飽和による発熱を防止することができる。
 この様に、図1に示されたDAB構成のコンバータ10を有する電力変換ユニット100によれば、直流電源(電池BAT)と接続される第1ブリッジ11に対して、トランス15を介して接続された第2ブリッジ12及び第3ブリッジ13を用いたDC/DC電力変換によって、出力電圧(第1電圧Vo1及び第2電圧Vo2)を目標電圧に制御するとともに、入力電圧Vinの直流電源(電池BAT)と、負荷側の第1直流電圧端VE1及び第2直流電圧端VE2との間で、双方向に電力伝送を行うことが可能である。これにより、後程説明するように、直流電源と電力系統との間を接続する構成への適用において、汎用性及び拡張性の高い電力変換ユニット100の構成を実現することができる。
 尚、上述した様に、入力端Niについては、単一の電池BAT(直流電源)の接続用とすることによって、特許文献1に記載されたユニバーサル充電装置と比較して、装置の小型化を図ることができる。具体的には、特許文献1では、1台のコンバータ(充電パック又は充電モジュール)がメッシュ部によって、複数の電気自動車(車載バッテリ)と接続される構成であるため、一度充電が開始された後では、電流の分配先の切り替えが難しいことが懸念される。例えば、コンバータの出力電流が分配切り替え前後で一定とすると、当該切り替前後の電気自動車のバッテリ電圧が異なる場合には、電力が急変してしまう。これに伴う電圧変動を抑制するためには、コンバータの入力側及び出力側に接続されるコンデンサ容量を大きくする必要がある。これに対して、単一の電池BAT(直流電源)が接続される入力端Niを有する電力変換ユニット100では、第1コンデンサC1及び第2コンデンサC2の容量を抑制することができる。
 実施の形態1の変形例1.
 図9には、実施の形態1の変形例1に係る電力変換ユニット101の構成を説明する回路図が示される。
 図9に示される様に、実施の形態1の変形例1に係る電力変換ユニット101は、実施の形態1に係る電力変換ユニット100(図1)と比較して、制御器50に代えて、制御器51を備える点で異なる。コンバータ10は、図1と同様のDAB構成を有している。
 電力変換ユニット101では、出力電圧(第1電圧Vo1及び第2電圧Vo2)を検出する電圧検出器81a及び81bに加えて、出力電流(第1電流Io1及び第2電流Io2)を検出する電流検出器82a及び82bが更に配置される。第1電流Io1は、第2ブリッジ12から第1直流電圧端VE1に接続された負荷(図示せず)に供給される電流である。同様に、第2電流Io2は、第3ブリッジ13から第2直流電圧端VE2に接続された負荷(図示せず)に供給される電流である。即ち、電池BATの充電動作時には、第1電流Io1及び第2電流Io2は負値となる。
 制御器51は、出力電圧(第1電圧Vo1及び第2電圧Vo2)と、出力電流(第1電流Io1及び第2電流Io2)との両方の検出値を用いて、出力電圧(第1電圧Vo1及び第2電圧Vo2)を電圧目標値Vo*に制御する。電流検出器82aは「第1電流検出器」の一実施例に対応し、電流検出器82bは「第2電流検出器」の一実施例に対応する。
 制御器51は、制御器50(図1)と同様の減算部61a,61b及びゲイン乗算部62a,62bに加えて、減算部63a,63b及びゲイン演算部64a,64bを更に有する。制御器51では、ゲイン乗算部62a,62bの出力値(電圧偏差ΔVo1,ΔVo2と比例ゲインとの積)は、出力電流(第1電流Io1及び第2電流Io2)の目標値と位置付けられる。
 減算部63aは、ゲイン乗算部62aの出力値から電流検出器82aの検出値を減算することで、第1電流Io1の目標値に対する電流偏差ΔIo1を算出する。同様に、減算部63bは、ゲイン乗算部62bの出力値から電流検出器82bの検出値を減算することで、第2電流Io2の目標値に対する電流偏差ΔIo2を算出する。ゲイン演算部64aは、電流偏差ΔIo1に対する比例積分(PI)制御によって、指令値REF1を生成する。ゲイン演算部64bは、電流偏差ΔIo2に対する比例積分(PI)制御によって、指令値REF2を生成する。
 制御器51は、指令値REF1,REF2を受ける位相シフト量制御部70を更に有する。位相シフト量制御部70は、実施の形態1で説明した位相シフトパターン1A~1Cのいずれかに従って、第1ブリッジ11と、第2ブリッジ12及び第3ブリッジ13との間の位相シフト量を制御する様に、ゲート信号GSap~GSdp,GSas~GSds,GSat~GSdtを生成する。
 これにより、実施の形態1の変形例1に係る電力変換ユニット101においても、電力変換ユニット100と同様の電力伝送動作及び出力電圧(第1電圧Vo1及び第2電圧Vo2)制御を実行することができる。更に、電力変換ユニット101では、出力電流(第1電流Io1及び第2電流Io2)の大きな変化を回避した制御が実現される。
 尚、実施の形態1及びその変形例1で説明した制御器51,52では、第1電圧Vo1及び第2電圧Vo2を共通の電圧目標値Vo*で制御したが、第1電圧Vo1及び第2電圧Vo2の間で個別に電圧目標値Voを設定することも可能である。
 実施の形態1の変形例2.
 図10には、実施の形態1の変形例2に係る電力変換ユニット102の構成を説明する回路図が示される。
 図10に示される様に、実施の形態1の変形例2に係る電力変換ユニット102は、実施の形態1に係る電力変換ユニット100(図1)と比較して、制御器50に代えて、制御器52を備える点で異なる。コンバータ10は、図1と同様のDAB構成を有している。
 制御器52は、制御器50と同様に、電圧検出器81a,82aの検出値を用いて出力電圧(第1電圧Vo1及び第2電圧Vo2)を電圧目標値Vo*に制御するが、制御内容が制御器50と異なる。
 制御器52は、減算部61,66と、ゲイン乗算部62,67と、平均値算出部65と、位相シフト量制御部71と有する。平均値算出部65は、電圧検出器81aの検出値及び電圧検出器81bの検出値を平均した平均電圧Vav(Vav=(Vo1+Vo2)/2)を算出する。減算部61は、電圧目標値Vo*から平均電圧Vavを減算することによって電圧偏差ΔVを算出する。減算部66は、第1電圧Vo1及び第2電圧Vo2の電圧差VDIF(VDIF=Vo1-Vo2)を算出する。
 ゲイン乗算部62は、減算部61からの電圧偏差ΔVに予め定められた比例ゲインを乗算することによって、平均電圧Vavを電圧目標値Vo*に近づけるための指令値REFを生成する。
 ゲイン乗算部67は、減算部66からの電圧差VDIFに予め定められた比例ゲインを乗算することによって、電圧差VDIFをゼロに近づけるため、即ち、第1電圧Vo1及び第2電圧Vo2を均衡化するための指令値BALを生成する。
 位相シフト量制御部71は、指令値REF,BALに基づいて、実施の形態1で説明したゲート信号GSap~GSdp,GSas~GSdsp,GSat~GSdtを生成する。電力変換ユニット102においても、第1ブリッジ11~第3ブリッジ13は、公知の任意の制御方式に従って動作させることが可能である。例えば、電力変換ユニット102は、実施の形態1で説明した位相シフトパターン1A~1Cのそれぞれと同様の位相シフト量の調節によって、電力変換ユニット100と同様に制御することができる。尚、指令値REFは「第1指令値」の一実施例に対応し,指令値BALは「第2指令値」の一実施例に対応する。
 図11には、位相シフトパターン1Aと同様に位相シフト量を制御する位相シフトパターン2Aにおける位相シフト量制御部の動作を説明する概念図が示される。
 図11に示される様に、位相シフト量制御部71は、演算部73と、減算部77,78とを有する。演算部73は、図3に示された演算部73a,73bと同様の一次関数に従って、指令値REFから位相シフト量θを算出する。減算部77は、演算部73によって算出された位相シフト量θから指令値BALを減算することによって、位相シフト量θ12を算出する。同様に、減算部78は、演算部73によって算出された位相シフト量θから指令値BALを減算することによって、位相シフト量θ13を算出する。
 位相シフトパターン2Aにおいても、位相シフト量θ12,θ13の定義は、位相シフトパターン1A(図2)と同様である。位相シフト量制御部71は、更に、図11で算出された位相シフト量θ12,θ13が実現されるように、第1ブリッジ11のスイッチング素子Sap~Sdp、第2ブリッジ12のスイッチング素子Sas~Sds、及び、第3第3ブリッジ13のスイッチング素子Sat~Sdtをオンオフするためのゲート信号GSap~GSdp,GSas~GSds,GSat~GSdtを生成する。
 図12には、位相シフトパターン1Bと同様に位相シフト量を制御する位相シフトパターン2Bにおける位相シフト量制御部の動作を説明する概念図が示される。
 図12に示される様に、位相シフト量制御部71は、演算部74と、減算部77,78とを有する。演算部74は、図5に示された演算部74a,74bでの位相シフト量θ2,θ3を算出するための一次関数と同様の特性に従って、指令値REFから位相シフト量θ23を算出する。更に、演算部74は、演算部74a,74b(図5)での位相シフト量θ1a,θ1bを算出するための一次関数と同様の特性に従って、指令値REFから位相シフト量θ1を算出する。
 減算部77は、演算部74によって算出された位相シフト量θ23から指令値BALを減算することによって、位相シフト量θ2を算出する。同様に、減算部78は、演算部74によって算出された位相シフト量θ23から指令値BALを減算することによって、位相シフト量θ3を算出する。
 位相シフトパターン2Bにおいても、位相シフト量θ1~θ3の定義は、位相シフトパターン2A(図4)と同様である。位相シフト量制御部71は、更に、図12で算出した位相シフト量θ1~θ3が実現されるように、第1ブリッジ11のスイッチング素子Sap~Sdp、第2ブリッジ12のスイッチング素子Sas~Sds、及び、第3第3ブリッジ13のスイッチング素子Sat~Sdtをオンオフするためのゲート信号GSap~GSdp,GSas~GSds,GSat~GSdtを生成する。
 図13には、位相シフトパターン1Cと同様に位相シフト量を制御する位相シフトパターン2Cにおける位相シフト量制御部の動作を説明する概念図が示される。
 図13に示される様に、位相シフト量制御部71は、演算部75と、減算部77,78とを有する。演算部75は、図8に示された演算部75a,75bでの位相シフト量θ2,θ3を算出するための折れ線形状と同様の特性(実線)に従って、指令値REFから位相シフト量θ23を算出する。更に、演算部75は、演算部75a,75b(図8)での位相シフト量θ1a,θ1bを算出するための折れ線形状と同様の特性(点線)に従って、指令値REFから位相シフト量θ1を算出する。
 減算部77は、演算部75によって算出された位相シフト量θ23から指令値BALを減算することによって、位相シフト量θ2を算出する。同様に、減算部78は、演算部75によって算出された位相シフト量θ23から指令値BALを減算することによって、位相シフト量θ3を算出する。
 図14には、位相シフトパターン2Cにおけるスイッチング停止制御を説明するフローチャートが示される。図14及び図7の比較から理解される通り、位相シフトパターン2Cでは、位相シフト量制御部71は、S105により、指令値REFに基づいて、コンバータ10が電池BATの放電動作及び充電動作のいずれを行うかを判定する。REF≧0のときには(S105のYES判定時)には、電池BATの放電動作時と判定して、図7と同様のS120により、第2ブリッジ12及び第3ブリッジ13の左側(基準位相側)のレグを構成するスイッチング素子Sas,Sbs及びSat,Sbtがオフに固定される。
 これに対して、REF<0のときには(S105のNO判定時)には、電池BATの充電動作時と判定して、図7と同様のS130により、第1ブリッジ11の左側(基準位相側)のレグを構成するスイッチング素子Sap,Sbpがオフに固定される。
 位相シフトパターン2Cにおいても、位相シフト量θ1~θ3の定義は、位相シフトパターン2C(図6)と同様である。位相シフト量制御部71は、更に、図14のスイッチング停止制御、及び、図13で算出された位相シフト量θ1~θ3が実現されるように、第1ブリッジ11、第2ブリッジ12、及び、第3ブリッジ13をスイッチング制御するためのGSap~GSdp,GSas~GSds,GSat~GSdtを生成する。
 この様に、実施の形態1の変形例2に係る電力変換ユニット102についても、実施の形態1で説明した位相シフトパターン1A~1Cのそれぞれと同様の位相シフトパターン2A~2Cによって、電力変換ユニット100の電力伝送動作及び出力電圧(第1電圧Vo1及び第2電圧Vo2)制御を実行することができる。
 実施の形態1の変形例3.
 図15には、実施の形態1の変形例3に係る電力変換ユニット103の構成を説明する回路図が示される。
 図15に示される様に、実施の形態1の変形例3に係る電力変換ユニット103は、実施の形態1の変形例1に係る電力変換ユニット102(図10)と比較して、制御器52に代えて、制御器53を備える点で異なる。コンバータ10は、図1と同様のDAB構成を有している。
 電力変換ユニット103では、出力電圧(第1電圧Vo1及び第2電圧Vo2)を検出する電圧検出器81a及び81bに加えて、入力電流Iinを検出する電流検出器82が更に配置される。入力電流Iinは、電池BAT(直流電源)から第1ブリッジ11に供給される電流である。電流検出器82は「入力電流検出器」の一実施例に対応する。
 制御器53は、制御器52(図10)と同様の減算部61,66及びゲイン乗算部62,67に加えて、減算部63及びゲイン演算部64を更に有する。制御器53では、ゲイン乗算部62の出力値(電圧偏差ΔVと比例ゲインとの積)は、入力電流Iinの目標値と位置付けられる。
 減算部63は、ゲイン乗算部62の出力値から電流検出器82の検出値を減算することで、入力電流Iinの目標値に対する電流偏差ΔIinを算出する。ゲイン演算部64は、電流偏差ΔIinに対する比例積分(PI)制御によって、指令値REFを生成する。一方で、電圧差VDIFをゼロに近づけるための指令値BALは、制御器52と同様に、減算部66及びゲイン乗算部67によって求められる。
 制御器53は、指令値REF,BALを受ける位相シフト量制御部71を更に有する。位相シフト量制御部71は、実施の形態1の変形例2で説明した位相シフトパターン2A~2Cのいずれかに従って、第1ブリッジ11と、第2ブリッジ12及び第3ブリッジ13との間の位相シフト量を制御する様に、ゲート信号GSap~GSdp,GSas~GSds,GSat~GSdtを生成する。
 これにより、実施の形態1の変形例3に係る電力変換ユニット103においても、電力変換ユニット100と同様の電力伝送動作及び出力電圧(第1電圧Vo1及び第2電圧Vo2)制御を実行することができる。更に、電力変換ユニット103では、入力電流Iinの大きな変化を回避した制御が実現される。
 実施の形態2.
 実施の形態2では、実施の形態1及びその変形例に係る電力変換ユニットを用いた電力変換装置の構成について説明する。
 図16には、実施の形態2の第1の構成例に係る電力変換装置の第1の構成例が示される。
 図16に示される様に、電力変換システム200は、直流電源(電池BAT)及び交流電力系統300との間に接続される。電力変換システム200は、実施の形態2の第1の構成例に係る電力変換装置500aと、インバータ(DC/AC変換器)150とを備える。電力変換装置500aは、実施の形態1及びその変形例に係る電力変換ユニット100Xを含んで構成されたDC/DC変換器に相当する。尚、電力変換ユニット100Xは、実施の形態1及びその変形例に係る電力変換ユニット100~103を包括するものである。
 電力変換装置500aは、直流電源(電池BAT)の入力電圧Vinと、インバータ150のDC側電圧Vdcとの間で、双方向の電力伝送を伴うDC/DC電力変換を実行する。インバータ150は、DC側電圧Vdcと、交流電力系統300の三相電圧Vuv,Vvw,Vwuとの間で双方向の電力伝送を伴う、DC/AC電力変換を実行する。
 電力変換装置500aは、第1直流電圧端VE1(第1及び第2端子P1,P2)と第2直流電圧端VE2(第3及び第4端子P3,P4)とが並列接続された、1台の電力変換ユニット100Xを有する。
 電力変換ユニット100Xでは、実施の形態1及びその変形例で説明した様に、第1電圧Vo1及び第2電圧Vo2が電圧目標値Vo*に制御される。従って、電力変換装置500aは、インバータ150のDC側電圧Vdcを、電圧目標値Vo*相当に制御することができる。
 図17には、実施の形態2に係る電力変換装置の第2の構成例が示される。
 図17に示される様に、電力変換システム201は、電池BAT(直流電源)及び交流電力系統301の間に接続される。電力変換システム201は、実施の形態2の第2の構成例に係る電力変換装置500bと、インバータ(DC/AC変換器)151とを備える。
 電力変換装置500aは、電力変換装置500bと比較して、1台の電力変換ユニット100Xの第1直流電圧端VE1(第1及び第2端子P1,P2)と第2直流電圧端VE2(第3及び第4端子P3,P4)とが直列接続される点で異なる。
 従って、電力変換ユニット100XにおいてVo1=Vo2=Vo*に制御されると、インバータ151のDC側電圧Vdcは、電圧目標値Vo*の2倍相当に制御される。即ち、電力変換ユニット100Xでは、第1端子P1~第4端子P4の接続変更によって、異なる電圧定格のインバータ等の直流負荷に対する入力電圧(DC)を、電圧目標値Vo*の1倍の電圧及び2倍の電圧の2段階で調整可能である。
 ここで、図16の交流電力系統300は、AC200(V)(実効値)の電力系統であり、インバータ150は、DC400(V)のVdcを、AC200(V)(実効値)の三相交流電圧に変換する定格を有するものとする。これに対して、図17の交流電力系統301は、AC400(V)(実効値)の電力系統であり、インバータ151は、DC800(V)のVdcを、AC400(V)(実効値)の三相交流電圧に変換する定格を有するものとする。
 この様な場合において、電圧目標値Vo*がAC200V(実効値)に対応して設定された電力変換ユニット100Xを、図16の電力変換装置500a、及び、図17の電力変換装置500bの両方に適用可能であることが理解される。
 即ち、本実施の形態に係る電力変換ユニット100Xによれば、仕様が異なる電力系統と接続される電力変換装置に共通に適用可能となることで、電力系統の仕様の違いに対する拡張性及び汎用性を高めることができる。
 実施の形態3.
 実施の形態3では、複数台の電力変換ユニット100Xによって電力変換装置(DC/DC変換器)を構成することで、電力系統の仕様の違いに対する汎用性を更に高める構成例を説明する。
 図18には、実施の形態3に係る電力変換装置の第1の構成例が示される。
 図18に示される電力変換装置501は、N台(N:N≧2の整数)の電力変換ユニット100X1~100XNと、出力接続部511とを備える。
 N台の電力変換ユニット100X1~100XNには、入力端Niに対してN個の電池(直流電源)BAT1~BATNがそれぞれ接続される。出力接続部511は、各電力変換ユニット100Xの第1直流電圧端VE1(第1及び第2端子P1,P2)、並びに、第2直流電圧端VE2(第3及び第4端子P3,P4)を、他の電力変換ユニット100Xの第1直流電圧端VE1及び第2直流電圧端VE2と接続する。
 図18の出力接続部511は、電力変換ユニット100Xの出力側(第1直流電圧端VE1及び第2直流電圧端VE2)を循環拡張接続する。具体的には、先頭の電力変換ユニット100X1の第1直流電圧端VE11は、最終段の電力変換ユニット100XNの第2直流電圧端VE2Nと並列接続される。
 中間段の電力変換ユニット100Xi(i:2以上(N-1)以下の整数)において、第1直流電圧端VE1iは、前段の電力変換ユニット100X(i-1)の第2直流電圧端VE2iと並列接続されるとともに、第2直流電圧端VE2iは、次段の電力変換ユニット100X(i+1)の第1直流電圧端VE1(i+1)と並列接続される。
 例えば、第2段の電力変換ユニット100X2において、第1直流電圧端VE12は、電力変換ユニット100X1の第2直流電圧端VE21と並列接続されるとともに、第2直流電圧端VE22は、図示しない第3段の電力変換ユニット100X3の第1直流電圧端電力と並列接続される。又、最終段の電力変換ユニット100XNの第1直流電圧端VE1Nは、図示しない電力変換ユニット100X(N-1)の第2直流電圧端と並列接続される。
 出力接続部511による循環拡張接続の下で、各電力変換ユニット100Xが電力伝送を伴う出力電圧制御を行うことにより、電力変換ユニット100X1~100XNの第1電圧Vo11~Vo1N及び第2電圧Vo21~Vo2Nの各々は、電圧目標値Vo*に制御される。
 これにより、循環拡張接続された電力変換装置501では、電池BAT1~BATNの電力を共有して、各電力変換ユニット100Xの第1直流電圧端VE1(第1及び第2端子P1,P2)並びに第2直流電圧端VE2(第3及び第4端子P3,P4)を定電圧源として動作させることができる。
 この際に、各電力変換ユニット100Xでの出力電圧制御における比例ゲイン、具体的には、ゲイン乗算部62a,62b(図1,図9)及びゲイン乗算部62,67(図10,図15)によって乗算されるゲイン値については、当該電力変換ユニット100Xの電力容量に応じて調整することで、電力分担バランスを適切化することができる。具体的には、電力容量が大きい電力変換ユニット100Xでの比例ゲインを大きく設定することができる。或いは、当該比例ゲインについては、入力端Niに接続された電池BATのSOC(State of Charge)又は充電エネルギに応じて調整することにより、N個の電池BAT1~BATNの間でSOCバランスを制御することも可能である。具体的には、SOC又は充電エネルギが大きい電池BATが接続されている電力変換ユニット100Xでの比例ゲインを高く設定することができる。
 図19には、実施の形態3に係る電力変換装置の第2の構成例が示される。
 図19に示される電力変換装置502は、N台の電力変換ユニット100X1~100XNと、出力接続部512とを備える。図17と同様に、N台の電力変換ユニット100X1~100XNには、入力端Niに対してN個の電池BAT1~BATNがそれぞれ接続される。
 出力接続部512は、各電力変換ユニット100Xの第1直流電圧端VE1及び第2直流電圧端VE2を並列拡張接続するように、電力変換ユニット100Xの出力側(第1端子P1~第4端子P4)を相互接続する。具体的には、電力変換ユニット100X1~100XNの間で、第1端子P1同士、第2端子P2同士、第3端子P3同士、及び、第4端子P4同士のそれぞれを接続することにより、第1直流電圧端VE1同士が並列接続され、かつ、第2直流電圧端VE2同士が並列接続される。
 出力接続部512による並列拡張接続の下で、各電力変換ユニット100Xが電力伝送を伴う出力電圧制御を行うことにより、電力変換ユニット100X1~100XNの第1電圧Vo11~Vo1N及び第2電圧Vo21~Vo2Nの各々は、電圧目標値Vo*に制御される。
 これにより、電力変換装置502は、電池BAT1~BATNの電力を共有して、電圧目標値Vo*に制御された出力電圧Vout1を生成することができる。当該出力電圧Vout1を出力する電力変換装置502の電力定格は、電力変換ユニット100X1~100XNの電力容量の総和に相当するので、電力変換装置502は、大電力への適用に有利である。
 図20には、実施の形態3に係る電力変換装置の第3の構成例が示される。
 図20に示される電力変換装置503は、N台(N:N≧2の整数)の電力変換ユニット100X1~100XNと、出力接続部513とを備える。図17及び図18と同様に、N台の電力変換ユニット100X1~100XNには、入力端Niに対してN個の電池BAT1~BATNがそれぞれ接続される。
 出力接続部513は、電力変換ユニット100X1~100XNの第1直流電圧端VE1及び第2直流電圧端VE2を直列拡張接続するように、電力変換ユニット100Xの出力側(第1端子P1~第4端子P4)を相互接続する。直列拡張接続では、各電力変換ユニット100Xで並列接続された第1直流電圧端VE1及び第2直流電圧端VE2のペアが、直列接続される。
 具体的には、先頭の電力変換ユニット100X1において、第1直流電圧端VE11は、最終段の電力変換ユニット100XNの第2直流電圧端VE2Nと並列接続される。第2直流電圧端VE21は、第2段の電力変換ユニット100X2の第1直流電圧端VE1と接続される。
 第2段以降の電力変換ユニット100X2~100XNでは、第1直流電圧端VE1及び第2直流電圧端VE2が直列接続されるとともに、第1直流電圧端VE1は、その前段の電力変換ユニット100X1~100X(N-1)の第2直流電圧端VE2と並列接続される。
 例えば、第2段の電力変換ユニット100X2において、第1直流電圧端VE12及び第2直流電圧端VE22が直列接続されるとともに、第1直流電圧端VE21は、前段の電力変換ユニット100X1の第2直流電圧端VE21と並列接続される。又、最終段の電力変換ユニット100XNにおいて、第1直流電圧端VE1N及び第2直流電圧端VE2Nが直列接続されるとともに、第1直流電圧端VE1Nは、図示しない電力変換ユニット100X(N-1)の第2直流電圧端VE2と並列接続される。尚、上述の様に、第2直流電圧端VE2Nは、電力変換ユニット100X1の第1直流電圧端VE11と並列接続される。
 出力接続部513による直列拡張接続の下で、各電力変換ユニット100Xが電力伝送を伴う出力電圧制御を行うことにより、電力変換ユニット100X1~100XNの第1電圧Vo11~Vo1N及び第2電圧Vo21~Vo2Nの各々は、電圧目標値Vo*に制御される。
 これにより、電力変換装置503は、電力変換ユニット100X1の第3端子P3及び電力変換ユニット100XNの第4端子P4の間に、電圧目標値Vo*のN倍に制御された出力電圧Vout1を生成することができる(Vout1=N・Vo*)。尚、電力変換装置503の電力定格は、電力変換ユニット100X1~100XNの電力容量のうちの最小値に相当するが、電力変換装置502は、高電圧への適用に対応することができる。
 図21は、実施の形態3に係る電力変換装置の第4構成例が示される。
 図21に示される電力変換装置504は、4台の電力変換ユニット100X1~100X4と、出力接続部514を備える。4台の電力変換ユニット100X1~100X4には、入力端Niに対して電池BAT1~BAT4がそれぞれ接続される。
 出力接続部514は、電力変換ユニット100X1~100X4の第1直流電圧端VE1及び第2直流電圧端VE2を直並列拡張接続するように、電力変換ユニット100X1~100X4の出力側(第1端子P1~第4端子P4)を相互接続する。
 図21の例では、電力変換ユニット100X1の第1直流電圧端VE11と、電力変換ユニット100XNの第2直流電圧端VE2Nとが並列接続されて、出力電圧Vout1が生成される。
 これに対して、2段目及び3段目の電力変換ユニット100X2及び100X3では、第1直流電圧端VE12及び第2直流電圧端VE22が直列接続されるとともに、第1直流電圧端VE13及び第2直流電圧端VE23が直列接続される。更に、電力変換ユニット100X1~100X3の間では、第2直流電圧端VE21、第1直流電圧端V12,及び、第1直流電圧端VE13が並列接続される。又、電力変換ユニット100X2~100X4の間では、第2直流電圧端VE22、第2直流電圧端V23,及び、第1直流電圧端VE14が並列接続される。
 これにより、電力変換ユニット100X2~100X4の各々では、第1直流電圧端VE1及び第2直流電圧端VE2が直列接続されることになり、かつ、直列接続された第1直流電圧端VE1及び第2直流電圧端VE2は、互いに並列接続される。従って、4台の電力変換ユニット100X1~100X4が直並列拡張接続された電力変換装置504は、電圧目標値Vo*の2倍に制御された出力電圧Vout2を生成することができる(Vout2=N・Vo*)。
 この様に、電力変換装置504は、直並列拡張接続された複数の電力変換ユニット100Xを用いて、複数の出力電圧Vout1,Vout2を生成することができる。尚、出力接続部514による接続態様は、図21の例示に限定されるものではなく、電圧目標値Vo*のM倍(M:M≦Nの整数)の出力電圧を適宜生成することができる。
 この様に、実施の形態3に係る電力変換装置によれば、複数台の電力変換ユニット100Xの出力側(第1直流電圧端VE1及び第2直流電圧端VE2)を並列拡張接続、直列拡張接続、又は、直並列拡張接続することで、各電力変換ユニット100Xの出力電圧(第1電圧Vo1又は第2電圧Vo2)の1倍~N倍の範囲内で、電圧目標値Vo*の整数倍に制御された、1又は複数の出力電圧を生成することができる。
 又、図18に示した循環拡張接続を用いることで、各電力変換ユニット100Xの出力電圧(第1電圧Vo1又は第2電圧Vo2)を正確に電圧目標値Vo*に制御した後に、上述の並列拡張接続、直列拡張接続、又は、直並列拡張接続を介して、電力変換器(DC/DC変換器)を負荷(インバータ等)に接続することが可能となる。或いは、循環拡張接続が適用された電力変換装置501(図18)については、定電圧源(第1電圧Vo1又は第2電圧Vo2)毎に異なる負荷に直流電圧を供給することも可能である。これに対して、図19~図21に示された電力変換装置502~504では、出力接続部512~514による、並列拡張接続、直列拡張接続、又は、直並列拡張接続で得られた、出力電圧Vout1、又は、出力電圧Vout1,Vout2が、負荷(インバータ等)に供給される。
 尚、図18~図21に示される出力接続部511~514は、図示しないバスバー等によって端子間を固定的に接続することで構成することができる。或いは、当該出力接続部については、特許文献1の様に、図示しないバスバー及びリレーの集合体によって、接続態様を随時変更できるように構成することも可能である。例えば、当該リレーのオンオフの変更によって、循環拡張接続(図18)、並列拡張接続(図19)、直列拡張接続(図20)、及び、直並列拡張接続(図21)の間で、接続関係を切替可能な構成とすることができる。
 実施の形態4.
 実施の形態3では、全ての電力変換ユニット100Xの入力端Niに電池BAT(直流電源)が接続されるケースを想定した。しかしながら、車載バッテリを想定すると、電力変換装置を構成する電力変換ユニットの一部では、入力端Niに電池BAT(直流電源)が非接続となっていても、電力変換器全体を動作させるニーズがあることが理解される。
 このため、実施の形態4では、電池BATの非接続時に対応するための電力変換ユニットの制御を説明する。
 図22には、実施の形態4に係る電力変換ユニット105の構成を説明する回路図が示される。
 図22に示される様に、実施の形態4に係る電力変換ユニット105は、実施の形態1に係る電力変換ユニット100(図1)と比較して、制御器50に代えて、制御器55を備える点で異なる。コンバータ10は、図1と同様のDAB構成を有している。
 制御器55は、図22の様に、入力端Niに電池BATが非接続とされた時の制御機能を有する。制御器55は、電圧目標値Vo*用いることなく、制御器53で説明した、第1電圧Vo1及び第2電圧Vo2を均衡化する制御を行う。
 制御器55は、減算部66と、ゲイン乗算部67と、位相シフト量制御部72と有する。減算部66は、第1電圧Vo1及び第2電圧Vo2の電圧差VDIF(VDIF=Vo2-Vo1)を算出する。ゲイン乗算部67は、減算部66からの電圧差VDIFに予め定められた比例ゲインを乗算することによって、電圧差VDIFをゼロに近づけるための指令値REFを生成する。即ち、図22での指令値REFは、図10,図15での指令値BALと同様に、第1電圧Vo1及び第2電圧Vo2を均衡化するための指令値である。
 図23には、図22の電力変換ユニット105におけるコンバータ10の動作波形例が示される。図23においても、図2等と同様の、入力電圧Vin、交流電圧Vinvs,Vinvt、交流電流ITrp,ITrs,ITrt、出力電圧としての第1電圧Vo1及び第2電圧Vo2、並びに、トランス15の入出力電力である交流電力PTrp,PTrs,PTrtが示される。
 図23には、第1ブリッジ11(入力端Ni)には電池BATが接続されていない一方で、第2ブリッジ12(第1直流電圧端VE1)には電圧源(図示せず)が接続されており、第3ブリッジ13(第2直流電圧端VE2)には負荷(図示せず)が接続されているときのシミュレーション波形が示されている。
 コンバータ10の第1ブリッジ11には電池BATから電力が入力されない。この結果、第1ブリッジ11では、スイッチング素子Sap~Sdpはオフに固定されて、スイッチングが停止される。従って、トランス15の一次巻線16には交流電圧Vinvpは出力されず、第1ブリッジ11から一次巻線16への電流ITrp=0に固定される。
 図22の制御器55は、指令値REFに従って、第2ブリッジ12の交流電圧Vinvs及び第3ブリッジ13の交流電圧Vinvtの間の位相シフト量θを制御する。当該位相シフト量θは、交流電圧Vinvs(第2ブリッジ12)の位相が、交流電圧Vinvt(第3ブリッジ13)の位相よりも進んでいる状態が、θ>0と定義される。
 図24には、図21の位相シフト量制御部72の動作を説明する概念図が示される。
 図24に示される様に、位相シフト量制御部72は、演算部73を有する。演算部73は、図3に示された演算部73a,73bと同様の一次関数に従って、指令値REFから位相シフト量θを算出する。即ち、REF=0(Vo1=Vo2)のときには、位相シフト量θ=0に設定する一方で、REF<0(Vo2<Vo1)のときには、θ0>0、即ち、第2ブリッジ12の交流電圧Vinvsの位相が、第3ブリッジ13の交流電圧Vinvtの位相よりも進む様に、第2ブリッジ12及び第3ブリッジ13のスイッチングが制御される。反対に、REF>0(Vo2>Vo1)のときには、θ0>0、即ち、第2ブリッジ12の交流電圧Vinvsの位相が、第3ブリッジ13の交流電圧Vinvtの位相よりも遅れる様に、第2ブリッジ12及び第3ブリッジ13のスイッチングが制御される。演算部73についても、図24に示される一次関数に従う数値演算器、又は、ルックアップテーブルとして構成することができる。
 更に、位相シフト量制御部70は、算出した位相シフト量θが実現されるように、第2ブリッジ12のスイッチング素子Sas~Sds、及び、第3ブリッジ13のスイッチング素子Sat~Sdtをオンオフするためのゲート信号GSas~GSds,GSat~GSdtを生成する。一方で、位相シフト量制御部70は、第1ブリッジ11のスイッチング素子Sap~Sdpをオフ固定する様に、ゲート信号GSap~GSdpを生成する。
 図23では、第1電圧Vo1及び第2電圧Vo2が均衡した状態で、第2ブリッジ12に接続された電圧源(図示せず)から第3ブリッジ13に接続された負荷(図示せず)に電力が伝送されている。このため、位相シフト量θ=0であり、第2ブリッジ12の交流電流ITrtと、第3ブリッジ13の交流電流ITrsとは逆位相となっている。
 又、入力端Niに電池BATが接続されていないため、スイッチングが停止される第1ブリッジ11がトランス15に入力する電力は0であり(PTrp=0)。上述した電圧源からの電力は、第2ブリッジ12からトランス15へ入力され、トランス15から第3ブリッジ13へ出力されて、上述の負荷へ伝送される。従って、トランス15から第2ブリッジ12へ入力される交流電力PTrs(実効値)は負値であり、かつ、トランス15から第3ブリッジ13へ入力される交流電力PTrt(実効値)と、当該交流電力PTrs(実効値)との間には、PTrs=-PTrtの関係が成立する。
 即ち、入力端Niへの電池BATの非接続時には、第2ブリッジ12及び第3ブリッジ13を介した、第1直流電圧端VE1(第1コンデンサC1)及び第2直流電圧端VE2(第2コンデンサC2)の間での電力伝送によって、第1電圧Vo1及び第2電圧Vo2を均衡化する様に出力電圧制御を実行することができる。この様に、制御器55を有する電力変換ユニット105によれば、電池BATの非接続時も、出力電圧(第1電圧Vo1及び第2電圧Vo2)の制御動作を実行することが可能である。
 実施の形態1及びその変形例で説明した電力変換ユニット101~103と、実施の形態3に係る電力変換ユニット105とは、制御器51~53と、制御器55とが異なるのみであり、コンバータ10の基本的な構成は同一である。この為、制御器による制御動作の切替機能を持たせることによって、電池BAT(直流電源)の接続/非接続の両方に対応可能な電力変換ユニットに対する構成を実現することができる。
 図25には、実施の形態4に係る電力変換ユニットの制御器による制御動作の切替機能を説明するためのフローチャートが示される。
 図25に示される様に、制御器は、S210により、電力変換ユニットの入力端Niに対する電池BAT(直流電源)の接続/非接続を判別するための入力側電源接続判定を実行する。例えば、電力変換ユニットの外部から、当該直流電源の接続信号が入力される場合には、当該接続信号の有無に基づいて、入力側電源接続判定を実行することができる。通常、上述したCHAdeMO(登録商標)等の電気自動車の充電規格では、CAN(Controller Area Network)通信によって、自動車側から充電器側に車載バッテリの接続を通知する信号が伝送されるので、当該信号を用いて入力側電源接続判定を実行することができる。
 或いは、入力端Niの電圧又は電流の検出値に基づいて、電池BAT(直流電源)の接続に伴う電圧又は電流が生じているか否かの判別によって、S210の入力側電源接続判定を実行することも可能である。
 制御器は、電池BATの接続時(S220のYES判定時)には、S230により、接続モードの制御動作を実行する。具体的には、実施の形態1及びその変形例で説明した制御器50~53のいずれかと同様にコンバータ10を制御するための、ゲート信号GSap~GSdp,GSas~GSds,GSat~GSdtを生成する。
 これに対して、電池BATの非接続時(S220のNO判定時)には、S240により、非接続モードの制御動作が実行される。具体的には、制御器55と同様にコンバータ10を制御するためのゲート信号GSap~GSdp,GSas~GSds,GSat~GSdtを生成する。上述の様に、非接続モードでは、ゲート信号GSap~GSdpは、第1ブリッジ11のスイッチング素子Sap~Sdpをオフ固定するように生成される。
 或いは、非接続モードでは、接続モードと同様の制御器50~53によって生成されたゲート信号GSap~GSdp,GSas~GSds,GSat~GSdtのうち、第1ブリッジ11に対応するゲート信号GSap~GSdpをマスクして、スイッチング素子Sap~Sdp(第1ブリッジ11)をオフ固定してもよい。一方で、第2ブリッジ12及び第3ブリッジ13は、ゲート信号GSas~GSds,GSat~GSdtに応答して、第1電圧Vo1及び第2電圧Vo2を電圧目標値Vo*に従って制御することができる。
 この結果、実施の形態4に係る電力変換ユニットでは、電池BAT(直流電源)の接続時/非接続時の両方に対応した出力電圧制御を実行することが可能である。尚、接続モードは「第1モード」の一実施例に対応し、非接続モードは「第2モード」の一実施例に対応する。
 実施の形態4の変形例.
 実施の形態4の変形例では、図22~図25で説明した実施の形態4に係る電力変換ユニットを用いた、実施の形態3と同等の電力変換装置(DC/DC変換器)の構成について説明する。
 図26には、実施の形態4の変形例に係る電力変換装置の第1の構成例が示される。
 図26に示される電力変換装置501♯は、N台(N:N≧2の整数)の電力変換ユニット100Y1~100YNと、電力変換装置501(図18)と同様の出力接続部511とを備える。
 N台の電力変換ユニット100Y1~100YNの各々(以下、電力変換ユニット100Yとも称する)は、図22~図25で説明した実施の形態4に係る電力変換ユニットであり、図25で説明した接続モード及び非接続モードの切替機能を有する。
 N台の電力変換ユニット100Y1~100YNの一部では、入力端Niにおいて電池BATが非接続とされる。図25では、電力変換ユニット100Y1に電池BAT1が接続される一方で、電力変換ユニット100Y2~100YNの入力端Niには、電池BATは接続されていない。
 電力変換ユニット100Y1~100YNの出力側(第1直流電圧端VE1及び第2直流電圧端VE2)は、出力接続部511によって、図18と同様に循環拡張接続される。
 電力変換装置501♯では、電力変換ユニット100Y1を接続モードで動作させるとともに、電力変換ユニット100Y2~100YNの各々を非接続モードで動作させる。これにより、電池BAT1の電力を用いて、電力変換ユニット100Y1において、第1電圧Vo11及び第2電圧Vo21を電圧目標値Vo*に制御するとともに、電力変換ユニット100Y2~100YNでは、第1電圧Vo1及び第2電圧Vo2の電圧差をゼロに近づける制御が実行される。
 電力変換装置501♯では、電力変換ユニット100Y1において、第1電圧Vo11及び第2電圧Vo21が電圧目標値に制御される。更に、電力変換ユニット100Y2~100YNの各々では、第1電圧Vo1及び第2電圧Vo2と同等になる様に出力電圧が制御される。
 更に、電力変換ユニット100Y1では、第1直流電圧端VE11が電力変換ユニット100YNの第2直流電圧端VE2Nと接続されるとともに、第2直流電圧端VE21が電力変換ユニット100Y2の第1直流電圧端VE12と接続される。又、電力変換ユニット100Y2~100Y(N-1)(図示せず)では、第1直流電圧端VE1及び第2直流電圧端VE2は、隣の電力変換ユニットの第2直流電圧端VE2及び第1直流電圧端VE1とそれぞれ接続されている。
 この結果、電力変換ユニット100Y2~100YNの各々においても、第1電圧Vo1及び第2電圧Vo2を、電力変換ユニット100Y1の第1電圧Vo11及び第2電圧Vo21と同等の電圧に制御することができる。
 従って、電力変換装置501♯は、一部の電力変換ユニット100Yに電池BAT(直流電源)が非接続であっても、電力変換装置501と同様に、各電力変換ユニット100Yの第1直流電圧端VE1及び第2直流電圧端VE2を定電圧源として動作することができる。
 図27には、実施の形態4の変形例に係る電力変換装置の第2の構成例が示される。
 図27に示される電力変換装置502♯は、N台の電力変換ユニット100Y1~100YNと、電力変換装置502(図19)と同様の出力接続部512とを備える。
 図27においても、図26と同様に、電力変換ユニット100Y1に電池BAT1が接続される一方で、電力変換ユニット100Y2~100YNの入力端Niには、電池BATは接続されていない。
 電力変換ユニット100Y1~100YNの出力側(第1直流電圧端VE1及び第2直流電圧端VE2)は、出力接続部512によって、図19と同様に並列拡張接続される。電力変換装置502♯においても、電力変換ユニット100Y1を接続モードで動作させるとともに、電力変換ユニット100Y2~100YNの各々を非接続モードで動作させる。
 これにより、電池BAT1の電力を用いて、電力変換ユニット100Y1において、第1電圧Vo11及び第2電圧Vo21を電圧目標値Vo*に制御する。更に、電力変換ユニット100Y2~100YNでは、第1電圧Vo1及び第2電圧Vo2の電圧差をゼロに近づける制御が実行される。
 電力変換装置502♯では、電力変換ユニット100Y2~100YNの第1直流電圧端VE12~VE1N及び第2直流電圧端VE21~VE2Nは、電力変換ユニット100Y1の第1直流電圧端VE11及び第2直流電圧端VE21とそれぞれ並列に接続されている。
 この結果、電力変換ユニット100Y2~100YNの各々においても、第1電圧Vo1及び第2電圧Vo2を、電力変換ユニット100Y1の第1電圧Vo11及び第2電圧Vo21と同等の電圧に制御することができる。
 従って、電力変換装置502♯は、一部の電力変換ユニット100Yに電池BATが非接続であっても、電力変換装置502と同様の、電圧目標値Vo*に制御された出力電圧Vout1を生成することができる。
 図28には、実施の形態4の変形例に係る電力変換装置の第3の構成例が示される。
 図28に示される電力変換装置503♯は、N台の電力変換ユニット100Y1~100YNと、電力変換装置503(図20)と同様の出力接続部513とを備える。
 図27においても、図26及び図27と同様に、電力変換ユニット100Y1に電池BAT1が接続される一方で、電力変換ユニット100Y2~100YNの入力端Niには、電池BATは接続されていない。
 電力変換ユニット100Y1~100YNの出力側(第1直流電圧端VE1及び第2直流電圧端VE2)は、出力接続部513によって、図20と同様に直列拡張接続される。電力変換装置503♯においても、電力変換ユニット100Y1を接続モードで動作させるとともに、電力変換ユニット100Y2~100YNの各々を非接続モードで動作させる。
 これにより、電池BAT1の電力を用いて、電力変換ユニット100Y1において、第1電圧Vo11及び第2電圧Vo21を電圧目標値Vo*に制御するとともに、電力変換ユニット100Y2~100YNでは、第1電圧Vo1及び第2電圧Vo2の電圧差をゼロに近づける制御が実行される。この結果、図26及び図27と同様に、電力変換ユニット100Y2~100YNの各々においても、第1電圧Vo1及び第2電圧Vo2を、電力変換ユニット100Y1の第1電圧Vo11及び第2電圧Vo21と同等の電圧に制御することができる。
 従って、電力変換装置503♯は、一部の電力変換ユニット100Yに電池BAT(直流電源)が非接続であっても、電力変換装置503と同様の、電圧目標値Vo*のN倍に制御された出力電圧Vout1を生成することができる(Vout1=N・Vo*)。
 図29には、実施の形態4の変形例に係る電力変換装置の第4の構成例が示される。
 図29に示される電力変換装置504♯は、4台の電力変換ユニット100Y1~100Y4と、電力変換装置504(図21)と同様の出力接続部514とを備える。
 図29においても、図26~図28と同様に、電力変換ユニット100Y1の入力端Niに電池BAT1が接続される一方で、電力変換ユニット100Y2~100Y4の入力端Niには、電池BATは接続されていない。
 電力変換ユニット100Y1~100Y4の出力側(第1直流電圧端VE1及び第2直流電圧端VE2)は、出力接続部514によって、図21と同様に直並列拡張接続される。電力変換装置503♯においても、電力変換ユニット100Y1を接続モードで動作させるとともに、電力変換ユニット100Y2~100Y4の各々を非接続モードで動作させる。
 これにより、電池BAT1の電力を用いて、電力変換ユニット100Y1において、第1電圧Vo11及び第2電圧Vo21を電圧目標値Vo*に制御するとともに、電力変換ユニット100Y2~1004では、第1電圧Vo1及び第2電圧Vo2の電圧差をゼロに近づける制御が実行される。この結果、図26~図28と同様に、電力変換ユニット100Y2~100Y4の各々においても、第1電圧Vo1及び第2電圧Vo2を、電力変換ユニット100Y1の第1電圧Vo11及び第2電圧Vo21と同等の電圧に制御することができる。
 この結果、電力変換装置504♯は、一部の電力変換ユニット100Yに対して電池BAT(直流電源)が非接続であっても、電力変換装置504と同様の複数の出力電圧Vout1,Vout2を生成することができる。
 この様に、実施の形態4の変形例に係る電力変換装置501♯~504♯によれば、一部の電力変換ユニット100Yに電池BAT(直流電源)が非接続であっても、出力接続部511~514での接続構成を変更することなく実施の形態3で説明した電力変換装置501~504と同等の動作を実行することができる。即ち、各電力変換ユニット100Yにおける電池BAT(直流電源)の接続/非接続が切り換えられても、当該電力変換ユニットでの接続モード/非接続モードを切替えることによって、電力変換装置501♯~504♯の動作を維持することができる。
 尚、図示は省略しているが、直流電源(電池BAT)が接続されて接続モードで動作する、1台の電力変換ユニット100Yを用いて、図16及び図17に示された実施の形態2に係る電力変換装置500a,500bを構成することが可能である。
 又、本実施の形態において、直流電源(電池BAT)が「非接続」である状態とは、電力変換ユニット100X,100Yの入力端Niと直流電源(電池)BATとの間が電気的に切り離されている状態に加えて、電気的に接続された直流電源(電池BAT)がSOC低下又は異常等により使用不能である状態も含むものとする。
 実施の形態5.
 実施の形態5では、本実施の形態に係る電力変換装置を用いた電力変換システムの構成例を更に説明する。実施の形態2で説明した様に、本実施の形態での電力変換システムは、直流電源(電池BAT)及び交流電力系統との間に接続されるものを意味している。
 図30~図34には、実施の形態5に係る電力変換システムの第1~第4の構成例が示される。
 図30に示される様に、実施の形態5の第1の構成例に係る電力変換システム202は、電池BAT1~BAT4と、交流電力系統301との間に接続される。電力変換システム202は、4台の電力変換ユニット100X1~100X4を含む電力変換装置505と、インバータ(DC/AC変換器)152とを備える。
 電力変換ユニット100X1~100X4の出力側は直並列拡張接続されており、図示する様に出力電圧Vout1~Vout4を生成する。出力電圧Vout1~Vout4の各々は、異なる電力変換ユニット100Xの第1直流電圧端VE1及び第2直流電圧端VE2が並列接続されることで、電圧目標値Vo*相当の電圧に制御される。
 出力電圧Vout1~Vout4を出力する電圧端は直列接続されているので、電力変換装置505の出力側では、0、Vo*、2・Vo*、3・Vo*、4・Vo*の5段階の直流電圧を取り出すことができる。
 インバータ152は、一般的な5レベルの三相インバータの構成を有する。当該三相インバータの各相の交流側は、交流電力系統301の各相と接続される。一方で、三相インバータの直流側では、入力ノードN1及びN2の間には、電力変換装置505の出力電圧Vout1が入力電圧Vinとして与えられる。同様に、入力ノードN2及びN3の間、入力ノードN3及びN4の間、並びに、入力ノードN4及びN5の間には、電力変換装置505の出力電圧Vout2、Vout3、及び、Vout4が、入力電圧Vin2、Vin3、及び、Vin4として与えられる。
 従って、インバータ152の直流側には、Vo*の4倍相当の直流電圧を入力することができる。これにより、5レベルの三相インバータで構成されたインバータ152は、入力電圧Vin1~Vin4を用いて、各相の交流側の出力端電圧を、2・Vo*、Vo*、0、-Vo*、-2・Vo*の5レベルのいずれかに設定する様に、DC/AC変換を実行することができる。
 この結果、電力変換システム202によれば、出力電圧制御によってインバータ152(5レベルの三相インバータ)への入力電圧Vin1~Vin4を一定に制御した上で、電力変換ユニット100X1~100X4に接続された電池BAT1~BAT4と、交流電力系統301との間で電力伝送を行うことができる。電力変換システム202では、電力変換ユニット100Xの出力側を有効活用することで、装置の小型化を図ることが可能である。
 図31に示される様に、実施の形態5の第2の構成例に係る電力変換システム203は、電池BAT1~BAT4と、交流電力系統301との間に接続される。電力変換システム202は、図30と同様の電力変換装置505と、インバータ(DC/AC変換器)153とを備える。
 電力変換装置505は、図30と同様に、各々が電圧目標値Vo*相当に制御された出力電圧Vout1~Vout4を生成する。出力電圧Vout1~Vout4を出力する電圧端は直列接続されている。
 インバータ153は、一般的な3レベルの三相インバータの構成を有する。当該三相インバータの各相の交流側は、交流電力系統301の各相と接続される。一方で、三相インバータの直流側において、入力ノードN6及びN7の間、並びに、入力ノードN7及びN8の間には、電力変換装置505から2個の直流電圧端が直列接続されることによって生成された、電圧目標値Vo*の2倍相当の直流電圧が、入力電圧Vin1,Vin2としてそれぞれ与えられる(Vin1=Vin2=2・Vo*)。
 従って、インバータ153の直流側には、Vo*の4倍相当の直流電圧を入力することができる。これにより、3レベルの三相インバータで構成されたインバータ153は、入力電圧Vin1,Vin2を用いて、各相の交流側の電圧を、2・Vo*、0、-2・Vo*の3レベルのいずれかに設定する様に、DC/AC変換を実行することができる。
 この結果、電力変換システム203によれば、出力電圧制御によってインバータ153(3レベルの三相インバータ)への入力電圧Vin1,Vin2を一定に制御した上で、電力変換ユニット100X1~100X4に接続された電池BAT1~BAT4と、交流電力系統301との間で電力伝送を行うことができる。電力変換システム203においても、電力変換ユニット100Xの出力側を有効活用することで、装置の小型化を図ることが可能である。
 図32に示される、実施の形態5の第3の構成例に係る電力変換システム204は、図31の電力変換システム203と同様の、電力変換装置505及びインバータ(DC/AC変換器)153を備える。電力変換システム204は、電池BAT1~BAT4と、交流電力系統300との間に接続される。交流電力系統300は、図30及び図31の交流電力系統301と比較して、交流電圧(振幅又は実効値)が1/2である。
 電力変換システム204は、電力変換システム203と比較して、電力変換装置505の出力側と、インバータ153の直流側との接続が異なる。即ち、電力変換装置500の直列接続された4個の直流電圧端のうちの1個ずつの直流電圧端が、インバータ153(3レベルの三相インバータ)の入力ノードN6及びN7の間、並びに、入力ノードN7及びN8の間にそれぞれ接続される。従って、インバータ153の入力電圧Vin1及びVin2の各々は、電圧目標値Vo*相当である(Vin1=Vin2=Vo*)。
 従って、インバータ153の直流側には、Vo*の2倍相当の直流電圧を入力することができる。これにより、3レベルの三相インバータで構成されたインバータ153は、入力電圧Vin1,Vin2を用いて、各相の交流側の電圧を、Vo*、0、Vo*の3レベルのいずれかに設定する様に、DC/AC変換を実行することができる。
 この結果、電力変換システム204によれば、出力電圧制御によってインバータ153(3レベルの三相インバータ)への入力電圧Vin1,Vin2を一定に制御した上で、電力変換ユニット100X1~100X4に接続された電池BAT1~BAT4と、交流電力系統300との間で電力伝送を行うことができる。
 図31及び図32から理解される様に、本実施の形態に係る電力変換装置505により、後段のインバータとの接続点を切替えるだけで、AC電圧が異なる交流電力系統に対して適用することが可能である。即ち、電力系統の仕様の違いに対して拡張性及び汎用性が高められることが理解される。
 図33に示される、実施の形態5の第4の構成例に係る電力変換システム205は、電池BAT1~BAT4と、交流電力系統302との間に接続される。交流電力系統302は、単相の交流系統である。
 電力変換システム205は、4台の電力変換ユニット100X1~100X4を含む電力変換装置506と、インバータ(DC/AC変換器)154-1~154-4とを備える。
 電力変換ユニット100X1~100X4の出力側は、図18の電力変換装置501と同様に循環拡張接続されており、各電力変換ユニット100Yの第1直流電圧端VE1及び第2直流電圧端VE2から電圧目標値Vo*相当の直流電圧を取り出し可能である。
 インバータ154-1~154-4の各々は、一般的な単相インバータの構成を有する。インバータ154-1~154-4の各々の直流側には、電圧目標値Vo*相当の直流電圧が入力される。
 インバータ154-1~154-4の各々は、Vo*,-Vo*の2レベル電圧(単相交流電圧)を出力する。インバータ154-1~154-4の交流出力端は直列接続されて、交流電力系統302と接続される。インバータ154-1~154-4が、図示しない上位コントローラによって、同位相の交流電圧を生成する様に制御されることにより、交流電力系統302に対して、AC振幅が4・Vo*の交流電圧を入力することができる。
 この結果、電力変換システム205によれば、出力電圧制御によってインバータ151-1~151-4(単相インバータ)への入力電圧を一定に制御した上で、電力変換ユニット100X1~100X4に接続された電池BAT1~BAT4と、交流電力系統302(単相)との間で電力伝送を行うことができる。尚、電力変換装置506によれば、直列接続されるインバータの個数を変えることで、異なる電圧の交流電力系統(単相)に対応可能であることが理解される。
 図34に示される、実施の形態5の第5の構成例に係る電力変換システム206は、電力変換システム205と同様の、電力変換装置506と、インバータ(DC/AC変換器)154-1~154-4とを備える。
 電力変換システム206は、電力変換システム205と比較して、インバータ151-1~151-4の交流側と、電力系統との接続関係が異なる。インバータ151-1~151-4の各々は、図33と同様に、電圧目標値Vo*相当の直流電圧を、交流電圧に変換して交流出力端に生成する。
 インバータ151-1の交流出力端は、交流電力系統303と接続される。交流電力系統303は、交流電力系統302(図33)と同様に単相であるが、交流電圧の振幅がVo*相当である点が交流電力系統302と異なる。
 インバータ151-2~151-4の交流出力は、図32と同様の三相の交流電力系統300の各相に出力される。これにより、交流電力系統300の各相に、AC振幅がVo*の交流電圧を入力することができる。
 この結果、電力変換システム206によれば、出力電圧制御によってインバータ151-1~151-4(単相インバータ)への入力電圧を一定に制御した上で、電力変換ユニット100X1~100X4に接続された電池BAT1~BAT4と、交流電力系統302(単相)及び300(三相)の両方との間で電力伝送を行うことができる。この様に、本実施の形態に係る電力変換装置は、複数の交流電力系統との接続に適用することも可能である。
 実施の形態5を通じて理解される様に、本実施の形態に係る電力変換ユニット100Xを用いて構成された電力変換システム202~205は、単相及び三相、並びに、異なる交流電圧の電力系統に対して共通に適用可能であり、電力系統の仕様の違いに対する拡張性及び汎用性が高いことが理解される。
 尚、実施の形態5で説明した各電力変換システム202~205について、各電力変換ユニット100Xを、実施の形態3で説明した電力変換ユニット100Yに置換することも可能である。このようにすると、各電力変換ユニット100Yに対する電池BAT(直流電源)の接続/非接続が変化しても、当該電力変換ユニット100Yでの接続モード/非接続モードの切替によって、各電力変換システム202~205が連続的に動作を継続することが可能である。従って、電力変換装置に対する直流電源(車載バッテリ)の接続台数の拡張性を高めることが可能である。
 又、電力変換ユニット100X,100Yにおけるコンバータ10の構成は、図1等の例に限定されることはなく、入力端Niと、第1直流電圧端VE1(第1及び第2端子P1,P2)及び第2直流電圧端VE2(第3及び第4端子P3,P4)との間で、出力電圧制御(Vo1,Vo2)を伴った電力伝送が可能であれば適宜変形することが可能である。
 図35には、電力変換ユニットにおけるコンバータの構成の変形例が示される。
 図35に示される電力変換ユニット100♯は、図1に示された電力変換ユニット100と比較して、コンバータ10に代えてコンバータ10♯を備えるとともに、制御器50に代えて制御器50♯を備える。
 コンバータ10♯は、第2ブリッジ12及び第3ブリッジ13にそれぞれ対応して第1ブリッジ11a及び11bが別個に設けられる点で、第2ブリッジ12及び第3ブリッジ13に対応して第1ブリッジ11が共通に設けられていたコンバータ10と異なる。
 第1ブリッジ11a及び11bは、入力端Niに対して並列接続される。更に、第1ブリッジ11aはトランス15aを介して第2ブリッジ12と接続され、第1ブリッジ11bはトランス15bを介して第3ブリッジ13と接続される。コンバータ10と同様に、第2ブリッジ12は、第1及び第2端子P1,P2によって構成される第1直流電圧端VE1に第1電圧Vo1を出力し、第3ブリッジ13は、第3及び第4端子P3,P4によって構成される第2直流電圧端VE2に第2電圧Vo2を出力する。
 コンバータ10♯では、第1ブリッジ11a及び第2ブリッジ12による電池BAT及び第1直流電圧端VE1との間の電力伝送と、第1ブリッジ11b及び第3ブリッジ13による電池BATと第2直流電圧端VE2との間の電力伝送とは、並列に実行される。
 制御器55♯は、減算部61a,61bと、ゲイン乗算部62a,62bと、位相シフト量制御部70a,70bとを有する。減算部61a及びゲイン乗算部62aは、制御器50と同様に、第1電圧Vo1を電圧目標値Vo*に第近づけるための指令値REF1を生成する。同様に、減算部61b及びゲイン乗算部62bは、制御器50と同様に、第2電圧Vo2を電圧目標値Vo*に第近づけるための指令値REF2を生成する。制御器55♯においても、第1電圧Vo1及び第2電圧Vo2の間で、電圧目標値Vo*を個別に設定することが可能である。
 位相シフト量制御部70aは、図3での演算部73a,73bと同様に、指令値REF1から位相シフト量θ12を算出するとともに、指令値REF2から位相シフト量θ13を算出する。コンバータ10♯では、位相シフト量θ12は、第1ブリッジ11aの交流電圧と、第2ブリッジ12の交流電圧(Vinvs)との位相シフト量で定義することができる。同様に、位相シフト量θ13は、第1ブリッジ11bの交流電圧と、第3ブリッジ13の交流電圧(Vinvt)との位相シフト量で定義することができる。
 位相シフト量制御部70aは、位相シフト量θ12を生じさせるように、第1ブリッジ11a及び第2ブリッジ12を構成する複数のスイッチング素子のゲート信号を生成する。同様に、位相シフト量制御部70bは、位相シフト量θ13を生じさせるように、第1ブリッジ11b及び第3ブリッジ13を構成する複数のスイッチング素子のゲート信号を生成する。
 これにより、電力変換ユニット100♯においても、制御器50♯によってコンバータ10♯を制御することで、電力変換ユニット100における制御器50による位相シフトパターン1Aと同様に、第1電圧Vo1及び第2電圧Vo2を電圧目標値Vo*に近づけることができる。尚、コンバータ10♯のスイッチング制御についても、上述の位相シフトパターン1B,1C,2A~2Cを適用することが可能である。
 この様に、電力変換ユニット100♯においても、入力端Niに接続された電池BATと、第1直流電圧端VE1及び第2直流電圧端VE2との間の電力伝送を伴って、第1電圧Vo1及び第2電圧Vo2の出力電圧制御を行うことができる。
 又、入力端Niに電池BATが非接続である場合には、第1ブリッジ11a,11bのスイッチングを停止して、第2ブリッジ12及び第3ブリッジ13により、実施の形態3で説明した非接続モードの制御を実行することができる。即ち、電力変換ユニット100Yにおいて、コンバータ10♯を用いることも可能である。
 以上で説明した本実施の形態では、入力端Niと、第1直流電圧端VE1及び第2直流電圧端VE2との間で、出力電圧制御(Vo1,Vo2)を伴った電力伝送が可能であれば、電力変換ユニット100X及び100Yの回路構成(コンバータ10,10♯部分)は任意である。又、当該コンバータによる出力電圧制御についても、例示した、位相シフトパターンに係る制御に限定されることなく、任意の制御方式を適用することができる。
 尚、本実施の形態では、「直流電源」は充電可能であることを想定したが、発電要素等の放電(電力供給)のみを行う直流電源が、電力変換ユニット100X,100Yの入力端Niに接続されてもよい。この場合には、コンバータ10での電力伝送方向を制限(第1ブリッジ11から第2ブリッジ12及び第3ブリッジ13への電力伝送のみ)に制限する様に、第1ブリッジ11~第3ブリッジ13のスイッチングが制御される。
 又、本実施の形態に係る電力変換装置において、電力変換ユニット100X,100Yの出力側(第1直流電圧端VE1及び第2直流電圧端VE2)の相互接続の態様は、例示した出力接続部511~516による接続態様に限定されるものではないことについて、確認的に記載する。即ち、各電力変換ユニット100X,100Yの第1直流電圧端VE1及び第2直流電圧端VE2の各々は、任意の態様で他の第1直流電圧端VE1又は第2直流電圧端VE2と接続することが可能である。又、電力変換装置を構成する電力変換ユニット100X,100Yの個数についても任意の個数とすることができる。
 又、制御器50~53,55,50♯の各々は、予め定められた上述の制御演算をソフトウェア処理によって実行するマイクロコンピュータ等によって構成することができる。尚、制御器50~53,55,50♯の少なくとも一部をFGPA(Field Programmable Gate Array)及び、ASIC(Application Specific Integrated Circuit)等の回路を用いて構成することも可能である。即ち、制御器50~53,55,50♯の各機能は、コンピュータをベースに構成することもできるし、その少なくとも一部をFPGA及びASICなどの回路を用いて構成することができる。又、各機能ブロックの機能の少なくとも一部は、アナログ回路によって構成することも可能である。
 本開示では、様々な例示的な実施の形態及び実施例が記載されているが、1つ、または複数の実施の形態に記載された様々な特徴、態様、及び機能は特定の実施の形態の適用に限られるのではなく、単独で、または様々な組合せで実施の形態に適用可能である。
 従って、例示されていない無数の変形例が、本開示の技術の範囲内において想定される。例えば、少なくとも1つの構成要素を変形する場合、追加する場合または省略する場合、さらには、少なくとも1つの構成要素を抽出し、他の実施の形態の構成要素と組合せる場合が含まれるものとする。
 今回開示された実施の形態はすべての点で例示であって制限的なものではないと考えられるべきである。本開示による技術的範囲は上記した説明ではなくて請求の範囲によって示され、請求の範囲と均等の意味及び範囲内でのすべての変更が含まれることが意図される。
 10 コンバータ、11,11a,11b 第1ブリッジ、12 第2ブリッジ、13 第3ブリッジ、15,15a,15b トランス、16 一次巻線、17,18 二次巻線、19 コア、50,50♯,51~53,55 制御器、65,76 平均値算出部、70,70a,70b,71,72 位相シフト量制御部、81a,81b 電圧検出器、82,82a,82b 電流検出器、100,100X,100X1~100XN,100Y,100Y1~100YN,100♯,101~105 電力変換ユニット、150~154 インバータ、200~206 電力変換システム、300~303 交流電力系統、500,500a,500b,501~506 電力変換装置、511~514 出力接続部、BAL,REF,REF1,REF2 指令値、BAT,BAT1~BATN 電池(直流電源)、C1 第1コンデンサ、C2 第2コンデンサ、GSap,GSas,GSat,GSbp,GSbs,GSbt,GScp,GScs,GSct,GSdp,GSds,GSdsp,GSdt ゲート信号、Io1 第1電流、Io2 第2電流、NL1~NL3,PL1~PL3 電力線、Ni 入力端、P1 第1端子、P2 第2端子、P3 第3端子、P4 第4端子、VDIF 電圧差、VE1,VE11~VE1N 第1直流電圧端、VE2,VE21~VE2N 第2直流電圧端、Vav 平均電圧、Vin 入力電圧(電力変換ユニット)、Vin1~Vin4 入力電圧(DC/AC変換器)、Vo* 電圧目標値、Vo1,Vo11~Vo1N 第1電圧、Vo2,Vo21~Vo2N 第2電圧、Vout1~Vout4 出力電圧(電力変換装置)。

Claims (15)

  1.  直流電源と接続するための入力端と、
     第1端子及び第2端子によって構成される第1直流電圧端と、
     第3端子及び第4端子によって構成される第2直流電圧端と、
     前記入力端と前記第1直流電圧端及び前記第2直流電圧端との間での電力伝送を伴うDC/DC電力変換を実行するコンバータと、
     前記コンバータを制御する制御器とを備え、
     前記制御器は、前記第1直流電圧端の第1電圧及び前記第2直流電圧端の第2電圧を電圧目標値に制御するための前記コンバータの制御指令を生成する、電力変換ユニット。
  2.  前記第1電圧を検出するための第1電圧検出器と、
     前記第2電圧を検出するための第2電圧検出器とを更に備え、
     前記制御器は、前記第1電圧検出器の検出電圧を前記電圧目標値に近づけるための第1指令値と、前記第2電圧検出器の検出電圧を前記電圧目標値に近づけるための第2指令値とを算出し、前記第1指令値及び前記第2指令値に基づいて前記制御指令を生成する、請求項1記載の電力変換ユニット。
  3.  前記第1直流電圧端に入出力される第1電流を検出するための第1電流検出器と、
     前記第2直流電圧端に入出力される第2電流を検出するための第2電流検出器とを更に備え、
     前記第1指令値は、前記第1電流検出器による検出電流を、前記電圧目標値に対する前記第1電圧検出器の検出電圧の電圧偏差に基づいて算出された前記第1電流の目標値に近づける様に算出され、
     前記第2指令値は、前記第2電流検出器による検出電流を、前記電圧目標値に対する前記第2電圧検出器の検出電圧の電圧偏差に基づいて算出された前記第2電流の目標値に近づける様に算出される、請求項2記載の電力変換ユニット。
  4.  前記第1電圧を検出するための第1電圧検出器と、
     前記第2電圧を検出するための第2電圧検出器とを更に備え、
     前記制御器は、前記第1電圧検出器及び前記第2電圧検出器の検出電圧の平均電圧を前記電圧目標値に近づけるための第1指令値と、前記第1電圧検出器の検出電圧及び前記第2電圧検出器の検出電圧の電圧差をゼロに近づけるための第2指令値とを算出し、前記第1指令値及び前記第2指令値に基づいて前記制御指令を生成する、請求項1記載の電力変換ユニット。
  5.  前記直流電源から前記入力端への入力電流を検出するための入力電流検出器を更に備え、
     前記第1指令値は、前記入力電流検出器による検出電流を、前記電圧目標値に対する前記平均電圧の電圧偏差に基づいて算出された前記入力電流の目標値に近づける様に算出される、請求項4記載の電力変換ユニット。
  6.  前記制御器は、
     前記入力端に前記直流電源が接続されているときには、前記入力端と前記第1直流電圧端及び前記第2直流電圧端との間の電力伝送を伴って前記第1電圧及び前記第2電圧を制御する第1モードで前記コンバータを動作させる一方で、
     前記入力端に前記直流電源が非接続であるときには、前記第1直流電圧端及び前記第2直流電圧端の間の電力伝送を伴って前記第1電圧及び前記第2電圧を制御する第2モードで前記コンバータを動作させる、請求項1~5のいずれか1項に記載の電力変換ユニット。
  7.  前記第1直流電圧端及び前記第2直流電圧端は、前記第1から第4の端子を用いて並列又は直列に接続される、請求項1~6のいずれか1項に記載の電力変換ユニット。
  8.  前記第1直流電圧端及び前記第2直流電圧端の少なくとも一方は、複数台の前記電力変換ユニットを含む電力変換装置において、前記第1から第4の端子の少なくとも一部を用いて他の前記電力変換ユニットの前記第1直流電圧端又は前記第2直流電圧端と接続される、請求項1~6のいずれか1項に記載の電力変換ユニット。
  9.  前記第1直流電圧端及び前記第2直流電圧端は、DC/AC変換器を経由して交流電力系統と電気的に更に接続される、請求項7又は8に記載の電力変換ユニット。
  10.  請求項1~6のいずれか1項に記載された前記電力変換ユニットを複数台備え、
     各前記電力変換ユニットの前記第1から第4の端子を用いて前記複数台の電力変換ユニットの前記第1直流電圧端及び前記第2直流電圧端を相互接続する出力接続部を更に備える、電力変換装置。
  11.  請求項6に記載された前記電力変換ユニットを複数台備え、
     各前記電力変換ユニットの前記第1から第4の端子を用いて前記複数台の電力変換ユニットの前記第1直流電圧端及び前記第2直流電圧端を相互接続する出力接続部を更に備え、
     前記複数台の電力変換ユニットの各々は、前記入力端に前記直流電源が接続されているときには前記第1モードで前記コンバータが動作する一方で、前記入力端に前記直流電源が非接続であるときには、前記第2モードで前記コンバータが動作する、電力変換装置。
  12.  前記出力接続部は、各前記電力変換ユニットの前記第1直流電圧端を、他の前記電力変換ユニットの前記第1直流電圧端又は前記第2直流電圧端と並列又は直列に接続し、かつ、各前記電力変換ユニットの前記第2直流電圧端を、他の前記電力変換ユニットの前記第1直流電圧端又は前記第2直流電圧端と並列又は直列に接続する、請求項10又は11に記載の電力変換装置。
  13.  前記出力接続部は、前記複数台の電力変換ユニットの少なくとも一部において、前記第1直流電圧端及び前記第2直流電圧端を直列に接続する、請求項12に記載の電力変換装置。
  14.  前記出力接続部は、相互接続した前記複数台の電力変換ユニットの前記第1直流電圧端及び前記第2直流電圧端の少なくとも一部を、DC/AC変換器を経由して交流電力系統と電気的に接続する、請求項10~13のいずれか1項に記載の電力変換装置。
  15.  前記出力接続部は、前記第1直流電圧端及び前記第2直流電圧端が相互接続されたN台(N:2以上の自然数)の前記電力変換ユニットから1又は複数の出力電圧を生成し、
     各前記出力電圧は、前記電圧目標値の前記N以下の整数倍に制御される、請求項10~14のいずれか1項に記載の電力変換装置。
PCT/JP2020/045675 2020-12-08 2020-12-08 電力変換ユニット及び電力変換装置 WO2022123653A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US18/036,415 US20230402927A1 (en) 2020-12-08 2020-12-08 Power conversion unit and power conversion device
PCT/JP2020/045675 WO2022123653A1 (ja) 2020-12-08 2020-12-08 電力変換ユニット及び電力変換装置
JP2021522105A JP6964825B1 (ja) 2020-12-08 2020-12-08 電力変換ユニット及び電力変換装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2020/045675 WO2022123653A1 (ja) 2020-12-08 2020-12-08 電力変換ユニット及び電力変換装置

Publications (1)

Publication Number Publication Date
WO2022123653A1 true WO2022123653A1 (ja) 2022-06-16

Family

ID=78466206

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/045675 WO2022123653A1 (ja) 2020-12-08 2020-12-08 電力変換ユニット及び電力変換装置

Country Status (3)

Country Link
US (1) US20230402927A1 (ja)
JP (1) JP6964825B1 (ja)
WO (1) WO2022123653A1 (ja)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4156490A4 (en) * 2020-05-21 2023-06-21 Mitsubishi Electric Corporation POWER CONVERTER
KR102592999B1 (ko) * 2022-02-10 2023-10-23 중앙대학교 산학협력단 다중 출력 절연형 컨버터 및 그의 제어방법
JP7412646B1 (ja) 2022-04-26 2024-01-12 三菱電機株式会社 電力変換装置
US20240055996A1 (en) * 2022-08-12 2024-02-15 Virginia Tech Intellectual Properties, Inc. Electronic transformer for current sharing and load-independent voltage gain
WO2024106323A1 (ja) * 2022-11-16 2024-05-23 株式会社アイシン 電源装置
CN117748963B (zh) * 2023-12-20 2024-07-19 深圳市优优绿能股份有限公司 双向直流串并联继电器控制装置、方法和双向直流串并联设备

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001211645A (ja) * 2000-01-25 2001-08-03 Hitachi Ltd 直流電源装置
JP6025885B2 (ja) * 2015-02-24 2016-11-16 三菱電機株式会社 電力変換装置
JP2019106839A (ja) * 2017-12-14 2019-06-27 シャープ株式会社 Dc/dcコンバータ
JP2019134665A (ja) * 2018-01-31 2019-08-08 サングロー パワー サプライ カンパニー リミテッド 光起電力ソリッドステート変圧器、光起電力インバータシステム及び双方向高電圧変流器
JP2020028216A (ja) * 2018-08-10 2020-02-20 シェンヂェン ヴイマックス ニュー エネルギー カンパニー リミテッドShenzhen VMAX New Energy Co.,Ltd. 充電回路の位相シフト制御方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001211645A (ja) * 2000-01-25 2001-08-03 Hitachi Ltd 直流電源装置
JP6025885B2 (ja) * 2015-02-24 2016-11-16 三菱電機株式会社 電力変換装置
JP2019106839A (ja) * 2017-12-14 2019-06-27 シャープ株式会社 Dc/dcコンバータ
JP2019134665A (ja) * 2018-01-31 2019-08-08 サングロー パワー サプライ カンパニー リミテッド 光起電力ソリッドステート変圧器、光起電力インバータシステム及び双方向高電圧変流器
JP2020028216A (ja) * 2018-08-10 2020-02-20 シェンヂェン ヴイマックス ニュー エネルギー カンパニー リミテッドShenzhen VMAX New Energy Co.,Ltd. 充電回路の位相シフト制御方法

Also Published As

Publication number Publication date
JP6964825B1 (ja) 2021-11-10
US20230402927A1 (en) 2023-12-14
JPWO2022123653A1 (ja) 2022-06-16

Similar Documents

Publication Publication Date Title
WO2022123653A1 (ja) 電力変換ユニット及び電力変換装置
US8547073B2 (en) Output side capacitor voltage balancing DC power supply system
KR20200068175A (ko) 모터 구동 시스템을 이용한 충전 시스템
JP6415539B2 (ja) 電力変換器
Chowdhury et al. A dual inverter for an open end winding induction motor drive without an isolation transformer
KR20200133884A (ko) 모터 구동 시스템을 이용한 충전 전력 공급 시스템
Rosekeit et al. Dynamic control of a dual active bridge for bidirectional ac charging
Naik et al. A new two-phase five-level converter for three-phase isolated grid-tied systems with inherent capacitor balancing and reduced component count
US20240258932A1 (en) Power conversion device, power conversion system, and method for controlling power conversion device
Budo et al. An Isolated Medium-Voltage AC-DC Converter Using Level-Shifted PWM Control of a Modular Matrix Converter
CN114884147A (zh) 电源系统
Fu et al. A high-efficiency SiC three-phase four-wire inverter with virtual resistor control strategy running at V2H mode
JP2002058257A (ja) 多重電力変換器の制御装置
Babalou et al. Dual-Transformer-Based DAB Converter with Asymmetrical Power Transmission and High-Power Density for Electric Vehicles
Woldegiorgis et al. A new DC-link capacitor voltage balancing method for three-level SVM strategies based on two-level space vector diagram
Mondal et al. Control of M2C direct converter for AC to AC conversion with wide frequency range
CN113748593A (zh) Dc/dc转换器以及电力变换装置
Liu et al. A vector control strategy for a multi-port bidirectional dc/ac converter with emphasis on power distribution between dc sources
JP2008104253A (ja) 電力変換装置
Oliveira et al. Load-sharing between two paralleled UPS systems using Model Predictive Control
Abarzadeh et al. An improved model predictive controller for five-level active-neutral-point-clamped converter
Zgheib et al. Adaptive control of a three-phase dual active bridge based for electric vehicles charging
Teja et al. Multi-level inverter with reduced switch count and DC source
Zarkab et al. A multiport ev-fleet charging station based on modular multilevel converter
JP7474276B2 (ja) 電源システム

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2021522105

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20965037

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20965037

Country of ref document: EP

Kind code of ref document: A1