WO2022113345A1 PCT/JP2020/044516 JP2020044516W WO2022113345A1 WO 2022113345 A1 WO2022113345 A1 WO 2022113345A1 JP 2020044516 W JP2020044516 W JP 2020044516W WO 2022113345 A1 WO2022113345 A1 WO 2022113345A1
Authority
WO
WIPO (PCT)
Prior art keywords
button
input
control device
output
received
Prior art date
Application number
PCT/JP2020/044516
Other languages
English (en)
French (fr)
Inventor
陽一郎 ▲濱▼谷
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to PCT/JP2020/044516 priority Critical patent/WO2022113345A1/ja
Priority to US18/245,007 priority patent/US20230352200A1/en
Priority to JP2022565000A priority patent/JP7391244B2/ja
Priority to CA3194191A priority patent/CA3194191A1/en
Publication of WO2022113345A1 publication Critical patent/WO2022113345A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21DNUCLEAR POWER PLANT
    • G21D3/00Control of nuclear power plant
    • G21D3/04Safety arrangements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin

Definitions

  • This application relates to a control switching device.
  • the control switching device (hereinafter referred to simply as the control switching device) from the central control room to the remote shutdown facility (reactor shutdown device outside the reactor control room) in the conventional nuclear power plant is immediately used by the central control room due to a fire or the like. Assuming that it will not be possible, the main control room and the fire protection section are installed in different places. When there is only one control switching device installed in a place other than the central control room, unnecessary control from the central control room to the remote stop equipment due to an erroneous operation by a person or an erroneous signal due to a short circuit of the operation button of the control switching device. Switching may occur.
  • a countermeasure a countermeasure in which control switching devices are provided at two locations has been proposed (see, for example, Patent Document 1).
  • the conventional control switching device is designed to switch the control by operating one button of the switching operation, and the multiplicity is ensured. do not have. Therefore, there is a problem that the control switching device may malfunction or not operate due to a failure due to a single factor.
  • the present application discloses a technique for solving the above-mentioned problems, and provides a control switching device capable of preventing inadvertent (malicious) switching of a monitoring control function from a first place to a second place.
  • the purpose is to provide.
  • the control switching device disclosed in the present application is It is a control switching device that switches the input / output to and from the duplicated control device from the input / output device arranged in the first place to the input / output device arranged in the second place. It has an A1 button and an A2 button connected to the first control device as the control device, and a B1 button and a B2 button connected to the second control device as the control device, and is provided in the first place.
  • the first operation panel and A second operation panel having an a1 button and an a2 button connected to the first control device, a b1 button and a b2 button connected to the second control device, and provided in the second place.
  • a network for exchanging operation signals of the buttons between the first control device and the second control device is provided.
  • the first control device enters from each operation signal of the A1 button, the A2 button, the B1 button, and the B2 button from the first operation panel to the input / output device arranged at the first place.
  • An input / output device arranged at the second place from the operation signals of the a1 button, the a2 button, the b1 button, and the b2 button from the second operation panel while determining whether to stop the output. Equipped with a first judgment device that determines whether to start input / output with The second control device enters from each operation signal of the A1 button, the A2 button, the B1 button, and the B2 button from the first operation panel to the input / output device arranged at the first place.
  • An input / output device arranged at the second place from the operation signals of the a1 button, the a2 button, the b1 button, and the b2 button from the second operation panel while determining whether to stop the output. It is provided with a second determination device for determining whether or not to start input / output between and.
  • control switching device disclosed in the present application. It is possible to prevent inadvertent (malicious) switching of the monitoring control function from the first place to the second place.
  • FIG. 1 It is a conceptual diagram which shows the structure of the control device for a nuclear power plant which incorporated the control switching device according to Embodiment 1.
  • FIG. 2 is a conceptual diagram which shows the structure of the control device for a nuclear power plant which incorporated the control switching device according to Embodiment 1.
  • FIG. It is a circuit diagram which shows the connection state of each button of the 1st operation panel by Embodiment 1.
  • FIG. 2 is a circuit diagram which shows the connection state of each button of the 2nd operation panel by Embodiment 1.
  • FIG. It is a circuit diagram which shows the connection state of each button of the 1st operation panel by Embodiment 2.
  • FIG. 2 It is a circuit diagram which shows the connection state of each button of the 2nd operation panel by Embodiment 2.
  • FIG. 1 It is a circuit diagram which shows the connection state of each button of the 1st operation panel by Embodiment 3.
  • FIG. 2nd operation panel It is a circuit diagram which shows the connection state of each button of the 2nd operation panel by Embodiment 3.
  • FIG. It is a circuit diagram which shows the connection state of each button of the 1st operation panel by Embodiment 4.
  • FIG. It is a circuit diagram which shows the connection state of each button of the 1st operation panel by Embodiment 5. It is a figure which shows the structure of each control device.
  • Embodiment 1 the control switching device according to the first embodiment (hereinafter, simply referred to as a control switching device) will be described with reference to the drawings.
  • a control switching device an example of switching the control of a plant such as a nuclear reactor from the central control room (first place) to the reactor shutdown facility (second place) located outside the central control room (first place) will be described in an emergency. do.
  • FIG. 1 is a conceptual diagram showing a configuration of a control device for a nuclear power plant 100, which incorporates a control switching device for redundant equipment.
  • the wiring of the remote stop equipment 20 is omitted.
  • FIG. 2 is a conceptual diagram showing a configuration of a control device for a nuclear power plant 100, which incorporates a control switching device for redundant equipment.
  • the wiring of the main control room 10 is omitted. Therefore, in reality, there is a wiring that combines FIGS. 1 and 2.
  • FIG. 3 is a circuit diagram showing a connection state of each button of the operation panel 11 (first operation panel).
  • FIG. 4 is a circuit diagram showing a connection state of each button of the operation panel 21 (second operation panel). As shown in FIGS.
  • the nuclear power plant 100 includes a central control room 10 (MCR: Main Control Room), a remote stop facility 20, a safety system control panel room 30A, and a safety system control panel room 30B.
  • a regular system control panel room 40 is provided.
  • the central control room 10 is a control room used to control the operation of the reactor and surrounding plants in normal times.
  • the remote stop facility 20 is a facility used to switch the function of controlling the devices for performing an emergency stop of the reactor from the central control room 10 in an emergency and control them.
  • devices for monitoring and controlling the soundness of the nuclear power plant 100 are installed in the safety system control panel room 30A and the safety system control panel room 30B.
  • the safety system control device 31A (first control device) that controls the safety system of the nuclear power plant 100, and a safety system monitoring operation that monitors and operates the safety system control device 31A.
  • a device 32A is provided.
  • the safety system control device 31A includes a determination device J1 (first determination device) whose details will be described later.
  • the safety system control device 31B that controls the safety system of the nuclear power plant 100 and the safety system control device 31B (second control device) are monitored and operated. It is equipped with a system monitoring operation device 32B.
  • the safety system control device 31B includes a determination device J2 (second determination device) whose details will be described later.
  • the safety system control device 31A and the safety system control device 31B are redundant, that is, duplicated, and even if an abnormality occurs in one of the devices, the soundness of the nuclear power plant 100 can be ensured.
  • the regular system control panel room 40 includes a regular system control device 41 that performs normal control other than the safety system of the nuclear power plant 100, and a regular system monitoring operation device 42 that monitors and operates the regular system control device 41. To prepare for.
  • a touch panel 10T, a touch panel 10TA, and a touch panel 10TB are installed in the central control room 10.
  • the touch panel 10T is connected to the normal system monitoring operation device 42 installed in the normal system control panel room 40
  • the touch panel 10TA is connected to the safety system monitoring operation device 32A installed in the safety system control panel room 30A
  • the touch panel 10TB is connected to the safety system monitoring operation device 32A.
  • an operation panel for switching the connection between the safety system monitoring operation device 32A, the safety system monitoring operation device 32B, and the regular system monitoring operation device 42 from the central control room 10 to the remote stop equipment 20. 11 is installed.
  • the remote stop facility 20 is equipped with a touch panel 20T, a touch panel 20TA, and a touch panel 20TB (input / output device). Further, the remote stop equipment 20 includes an operation panel 21 for switching the connection between the safety system monitoring operation device 32A, the safety system monitoring operation device 32B, and the regular system monitoring operation device 42 from the central control room 10 to the remote stop equipment 20. Is installed.
  • the touch panel 20T is connected to the normal system monitoring operation device 42 installed in the normal system control panel room 40, and the touch panel 20TA is connected to the safety system monitoring operation device 42 installed in the safety system control panel room 30A. It is connected to 32A, and the touch panel 20TB is connected to the safety system monitoring operation device 32B installed in the safety system control panel room 30B.
  • the regular system control device 41, the safety system control device 31A, and the safety system control device 31B are connected by the network N1 for data communication.
  • the safety system control device 31A and the safety system control device 31B are connected by a network N2 for carrying out dedicated data communication between the safety system trains (device groups related to the safety system).
  • the network N2 is composed of two communication cables (from the safety system control device 31A to the safety system control device 31B and from the safety system control device 31B to the safety system control device 31A) for one-way communication.
  • the safety system control device and the safety system monitoring operation device in the same train that is, the safety system control device 31A and the safety system monitoring operation device 32A are connected by the network N30A, and the safety system control device 31B and the safety system monitoring operation device 32B are connected. Is connected by network N30B.
  • the safety system control device of the nuclear power plant 100 is composed of two or more independent facilities that are physically, electrically, and functionally separated in order to satisfy the single failure standard that is a regulatory requirement.
  • two systems are assumed, and each system is called A train and B train).
  • Each of these two systems has the same function, and the measurement equipment such as sensors and auxiliary equipment such as pumps are all duplicated and connected to the safety system control devices 31A and 32B of each system. Has been done.
  • the operation panel 11 and the operation panel 21 are two independent devices that are physically, electrically, and functionally separated. Further, the operation panel 11 includes two buttons for switching the connection of the A train and two buttons for switching the connection of the B train. Similarly, the operation panel 21 includes two buttons for switching the connection of the A train and two buttons for switching the connection of the B train.
  • the operation panel 11 includes A1 and A2 buttons for the A train, B1 and B2 buttons for the B train, and the operation panel 21 includes the a1 and a2 buttons for the A train. It includes a b1 button and a b2 button for the B train.
  • the operation signal is input to the digital input card of the safety system control device 31A, and when the B1 button and the B2 button of the operation panel 11 are operated respectively, the safety system control device 31B The operation signal is input to the digital input card.
  • the operation signal is input to the digital input card of the safety system control device 31A, and when the b1 button and the b2 button of the operation panel 11 are operated, respectively, the safety system control device.
  • the operation signal is input to the digital input card of 31B.
  • the control switching operation using the operation panel 11 and the operation panel 21 will be described.
  • the procedure for switching the monitoring control function from the central control room 10 to the remote stop facility 20 while using the central control room 10, that is, the input / output to the touch panel 10T, the touch panel 10TA, and the touch panel 10TB is stopped, and the touch panel 20T and the touch panel are touch-panel.
  • a method of starting input / output to the 20TA and the touch panel 20TB will be described.
  • the safety system control device 31A transmits the two input operation signals to the safety system control device 31B via the network N2.
  • the safety system control device 31B transmits the two input operation signals to the safety system control device 31A via the network N2.
  • buttons on the operation panel 11 are pressed on the determination device J1 of the safety system control device 31A and the determination device J2 of the safety system control device 31B, respectively.
  • the four operation signals shown will be input. On the contrary, if any of the buttons is out of order, the operation signal from the button does not reach. Further, if any of the buttons is malfunctioning, only the operation signal of the malfunctioning button is input.
  • the determination device J1 of the safety system control device 31A receives a two-quarter voting operation (2 out of 4 operation, hereinafter 2oo operation) for the operation signal that arrives within a predetermined time after receiving the first operation signal. If the condition for inputting two or more operation signals is satisfied, it is determined that the operator has operated the switch.
  • the safety system control device 31A transmits a stop signal for stopping the monitoring control to the regular system control device 41, the regular system monitoring operation device 42, the safety system control device 31A (own device), and the safety system monitoring operation device 32A. Since the safety system control device 31B is functionally independent of the safety system control device 31A, the stop signal is not transmitted to the safety system control device 31B.
  • the determination device J2 of the safety system control device 31B also performs a two-quarter voting operation (2oo4 operation) for the operation signal that arrives within a predetermined time after receiving the first operation signal, and two or more. If the condition for inputting the operation signal of is satisfied, it is determined that the operator has operated the switch.
  • the safety system control device 31B transmits a stop signal for stopping the monitoring control to the regular system control device 41, the regular system monitoring operation device 42, the safety system control device 31B (own device), and the safety system monitoring operation device 32B. Since the safety system control device 31A is functionally independent of the safety system control device 31B, the stop signal is not transmitted to the safety system control device 31A.
  • the regular system monitoring operation device 42 stops the monitoring operation function of the touch panel 10T, and the monitoring operation function from the central control room 10 becomes impossible, but the switching of the remote stop equipment 20 to the touch panel 20T is performed. Not implemented at this stage.
  • the safety system monitoring operation device 32A and the safety system monitoring operation device 32B also stop the monitoring operation function of the touch panel 10TA and the touch panel 10TB, but the switching of the remote stop equipment 20 to the touch panel 20TA and the touch panel 20TB is performed. Not implemented at this stage.
  • the operation panel 21 installed in the remote stop equipment 20 can be operated only when the conditions are satisfied. If the regular system control device 41, the safety system control device 31A, and the safety system control device 31B have other operation inputs, the operation inputs are invalidated.
  • the operator presses the a1, a2, b1, and b2 buttons on the operation panel 21.
  • the button operations of the a1 button and the a2 button of the operation panel 21 are performed by the determination device J1 of the safety system control device 31A
  • the button operations of the b1 button and the b2 button are performed by the safety system control device 31B. It is input to the judgment device J2.
  • the safety system control device 31A transmits the two input operation signals to the safety system control device 31B via the network N2.
  • the safety system control device 31B transmits the two input operation signals to the safety system control device 31A via the network N2.
  • buttons on the operation panel 11 are pressed on the determination device J1 of the safety system control device 31A and the determination device J2 of the safety system control device 31B, respectively.
  • the four operation signals shown will be input. On the contrary, if any of the buttons is out of order, the operation signal from the button does not reach. Further, if any of the buttons is malfunctioning, only the operation signal of the malfunctioning button is input.
  • the determination device J1 of the safety system control device 31A performs a two-quarter voting operation (2oo4 operation) for the operation signal that arrives within a predetermined time after receiving the first operation signal, and two. If the condition for inputting the above operation signal is satisfied, it is determined that the operator has operated the switch.
  • the safety system control device 31A transmits a start signal for starting the monitoring control to the regular system control device 41, the regular system monitoring operation device 42, the safety system control device 31A (own device), and the safety system monitoring operation device 32A. Since the safety system control device 31B is functionally independent of the safety system control device 31A, the start signal is not transmitted to the safety system control device 31B.
  • the determination device J2 of the safety system control device 31B also performs a two-quarter voting operation (2oo4 operation) for the operation signal that arrives within a predetermined time after receiving the first operation signal, and two or more. If the condition for inputting the operation signal of is satisfied, it is determined that the operator has operated the switch.
  • the safety system control device 31B transmits a start signal for starting the monitoring control to the regular system control device 41, the regular system monitoring operation device 42, the safety system control device 31B (own device), and the safety system monitoring operation device 32B. Since the safety system control device 31A is functionally independent of the safety system control device 31B, the start signal is not transmitted to the safety system control device 31A.
  • the normal system monitoring operation device 42 When the regular system monitoring operation device 42 receives the start signal from either the safety system control device 31A or the safety system control device 31B, the normal system monitoring operation device 42 starts the monitoring operation function of the touch panel 10T.
  • the safety system monitoring operation device 32A and the safety system monitoring operation device 32B for which the conditions are satisfied also start the monitoring operation function of the touch panel 10TA and the touch panel 10TB.
  • the safety system control device 31A and the safety system monitoring operation device 32A are separately installed, and the safety system control device 31B and the safety system monitoring operation device 32B are separately installed, and the regular system is used.
  • the control device 41 and the regular system monitoring operation device 42 are separately installed has been described, they may be integrated into one unit.
  • each touch panel provided in the central control room 10 is invalidated by operating the A1, A2, B1 and B2 buttons of the operation panel 11, and the remote stop equipment 20 is operated.
  • the panel 21 By activating the panel 21 and subsequently operating the buttons a1, a2, b1, and b2 of the operation panel 21, the activation of each touch panel of the remote stop equipment 20 becomes possible for the first time.
  • control can be switched to the remote stop equipment 20 arranged outside the main control room 10 without losing the control switching function.
  • Embodiment 2 the control switching device according to the second embodiment will be described focusing on the parts different from the first embodiment.
  • FIG. 5 is a circuit diagram showing a connection state of each button of the operation panel 11 of the second embodiment.
  • FIG. 6 is a circuit diagram showing a connection state of each button of the operation panel 21 of the second embodiment.
  • the stop signal and the start signal of the central control room 10 and the remote stop facility 20 are generated by the 2oo4 calculation, but the operation panel is not electrically and physically independent.
  • unnecessary control switching is performed by the 2oo4 calculation being established in the A train and the B train via the communication of the network N2. Operation may occur.
  • the determination devices J1 and J2 carry out an OR operation of the two operation signals of the own train and an AND operation of the 2oo4 operation described so far (2oo4 + 1oo2 operation).
  • the determination device J1 of the safety system control device 231A in addition to the 2oo4 calculation result of the input of the A1 button, the A2 button, the B1 button, and the B2 button, the OR calculation of the input of the A1 button and the A2 button is performed. An AND operation is performed on each result, and a stop signal is transmitted when all the conditions are satisfied.
  • the determination device J2 is stopped as a result of the AND calculation of the 2oo4 calculation result of the input of the A1 button, the A2 button, the B1 button, and the B2 button and the OR calculation result of the input of the B1 button and the B2 button. It will send a signal.
  • the one safety system control device ensures the soundness of the nuclear power plant 100. Can be maintained.
  • FIG. 7 is a circuit diagram showing a connection state of each button of the operation panel 11 of the third embodiment.
  • FIG. 8 is a circuit diagram showing a connection state of each button of the operation panel 21 of the third embodiment.
  • buttons of the operation panels 11 and 12 are physically, electrically, and functionally separated and independently configured, and the determination device J1, which is performed in the first embodiment, is configured. It is determined that the 2oo4 operation by J2 is the 3oo4 operation, that is, the operation by the operator is performed when the pressing of three of the four buttons is detected. As a result, it is possible to eliminate the malfunction or non-operation of the two buttons due to a single factor, and even if one button malfunctions or malfunctions, the control of both trains can be appropriately switched. Can be done.
  • FIG. 9 is a circuit diagram showing a connection state of each button of the operation panel 11 of the fourth embodiment.
  • buttons for each system are arranged on the operation panel 11 for each system, two for each system, and two buttons for each system are arranged on the operation panel 21, for a total of four buttons.
  • the determination devices J1 and J2 of 31A and 31B each performed 2oo4 calculation, and the control was switched from the central control room 10 to the remote stop facility 20.
  • the switching operation based on the 2oo4 calculation by each of the four buttons can be applied to other functions that require prevention of malfunction and prevention of loss of function. For example, if the fuel rods in a nuclear power plant reactor are damaged and there is a possibility of radioactive material being released, prevent or control them and ensure the safety of the general public and power plant employees around the power plant. It can be used as a manual operation switch for engineering safety facilities.
  • the determination devices J1 and J2 are not used by adding the OR calculation (1oo2 calculation) of the own train in addition to the 2oo4 calculation, a malfunction may occur due to a failure of another train, but engineering.
  • the operation of the safety facility is useful for the protection of the plant and does not need to be applied.
  • FIG. 10 is a circuit diagram showing a connection state of each button of the operation panel 11 of the fifth embodiment.
  • buttons for each system are arranged on the operation panel 11 for each system, two for each system, and two buttons for each system are arranged on the operation panel 21, for a total of four buttons.
  • the safety system control devices 31A and 31B, the safety system monitoring and operation devices 32A and 32B, the regular system control device 41, and the regular system monitoring and operation device 42 are a processor 60 and a storage device as shown in FIG. 11 as an example of hardware. It is composed of 61.
  • the storage device 61 includes a volatile storage device such as a random access memory and a non-volatile auxiliary storage device such as a flash memory.
  • an auxiliary storage device for a hard disk may be provided instead of the flash memory.
  • the processor 60 executes the program input from the storage device 61.
  • the program is input to the processor 60 from the auxiliary storage measure via the volatile storage device.
  • the processor 60 may output data such as a calculation result to the volatile storage device of the storage device 61, or may store the data in the auxiliary storage device via the volatile storage device.

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Plasma & Fusion (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Safety Devices In Control Systems (AREA)

Abstract

制御切替装置は、第一制御装置(31A)に接続されたA1、A2ボタンと、第二制御装置(31B)に接続されたB1、B2ボタンとを有し第一場所(10)に備えられた第一操作盤(11)と、第一制御装置(31A)に接続されたa1、a2ボタンと、第二制御装置(31B)に接続されたb1、b2ボタンとを有し第二場所(20)に備えられた第二操作盤(21)とを備え、第一制御装置(31A)は、第一操作盤(11)からのA1、A2、B1、B2ボタンの操作信号から第一場所(10)に配置された入出力装置(10TA)との間の入出力を停止するか否かを判断する第一判定器(J1)を備え、第二制御装置(31B)も第一判定器(J1)と同様の第二判定器(J2)を備える。

Description

制御切替装置
 本願は、制御切替装置に関するものである。
 従来の原子力発電所における中央制御室から遠隔停止設備(原子炉制御室外の原子炉停止装置)への制御切替装置(以下、単に制御切替装置という)は、中央制御室が火災等によって即座に利用できなくなる事態を想定し、中央制御室と防火区画が異なる場所に設置されている。一つしかない制御切替装置の設置場所が中央制御室以外の場合、人による誤操作、或いは制御切替装置の操作ボタンの短絡等による誤信号によって、不必要な中央制御室から遠隔停止設備への制御の切替が発生する可能性がある。その対策として、制御切替装置を2か所に設ける対策が提案されている(例えば、特許文献1参照)。
特開2012-83232号公報
 制御切替装置を2か所に設ける上述の対策案を含めて、従来の制御切替装置は、切替操作の1つのボタンを操作することによって制御を切替えるようになっており、多重性が確保されていない。そのため、単一の要因による故障によって、制御切替装置が誤動作する、又は動作しない可能性があるという課題があった。
 本願は、上記のような課題を解決するための技術を開示するものであり、不用意な(悪意のある)第一場所から第二場所への監視制御機能の切替を防止できる制御切替装置を提供することを目的とする。
 本願に開示される制御切替装置は、
2重化された制御装置への入出力を、それぞれ第一場所に配置された入出力装置から、第二場所に配置された入出力装置に切り替える制御切替装置であって、
前記制御装置としての第一制御装置に接続されたA1ボタンとA2ボタンと、前記制御装置としての第二制御装置に接続されたB1ボタンとB2ボタンとを有し、前記第一場所に備えられた第一操作盤と、
前記第一制御装置に接続されたa1ボタンとa2ボタンと、前記第二制御装置に接続されたb1ボタンとb2ボタンとを有し、前記第二場所に備えられた第二操作盤と、
前記第一制御装置と前記第二制御装置との間で、各前記ボタンの操作信号を授受するネットワークとを備え、
前記第一制御装置は、前記第一操作盤からの前記A1ボタン、前記A2ボタン、前記B1ボタン、前記B2ボタンの各操作信号から前記第一場所に配置された入出力装置との間の入出力を停止するか否かを判断すると共に、前記第二操作盤からの前記a1ボタン、前記a2ボタン、前記b1ボタン、前記b2ボタンの各操作信号から前記第二場所に配置された入出力装置との間の入出力を開始するか否かを判断する第一判定器を備え、
前記第二制御装置は、前記第一操作盤からの前記A1ボタン、前記A2ボタン、前記B1ボタン、前記B2ボタンの各操作信号から前記第一場所に配置された入出力装置との間の入出力を停止するか否かを判断すると共に、前記第二操作盤からの前記a1ボタン、前記a2ボタン、前記b1ボタン、前記b2ボタンの各操作信号から前記第二場所に配置された入出力装置との間の入出力を開始するか否かを判断する第二判定器を備えるものである。
 本願に開示される制御切替装置によれば、
不用意な(悪意のある)第一場所から第二場所への監視制御機能の切替を防止できる。
実施の形態1による制御切替装置を組み込んだ、原子力発電プラント用の制御装置の構成を示す概念図である。 実施の形態1による制御切替装置を組み込んだ、原子力発電プラント用の制御装置の構成を示す概念図である。 実施の形態1による第一操作盤の各ボタンの接続状態を示す回路図である。 実施の形態1による第二操作盤の各ボタンの接続状態を示す回路図である。 実施の形態2による第一操作盤の各ボタンの接続状態を示す回路図である。 実施の形態2による第二操作盤の各ボタンの接続状態を示す回路図である。 実施の形態3による第一操作盤の各ボタンの接続状態を示す回路図である。 実施の形態3による第二操作盤の各ボタンの接続状態を示す回路図である。 実施の形態4による第一操作盤の各ボタンの接続状態を示す回路図である。 実施の形態5による第一操作盤の各ボタンの接続状態を示す回路図である。 各制御装置の構成を示す図である。
実施の形態1.
 以下、実施の形態1による制御切替装置(以下、単に制御切替装置という)を図を用いて説明する。本実施の形態では、非常時において、原子炉等のプラントの制御を、中央制御室(第一場所)からその外部に配置された原子炉停止設備(第二場所)へ切り替える例を用いて説明する。
 図1は、冗長化された設備の制御切替装置を組み込んだ、原子力発電プラント100用の制御装置の構成を示す概念図である。説明の都合上、遠隔停止設備20の配線は省略している。
図2は、冗長化された設備の制御切替装置を組み込んだ、原子力発電プラント100用の制御装置の構成を示す概念図である。説明の都合上、中央制御室10の配線は省略している。したがって、実際には、図1と図2を合わせた配線が存在する。
図3は、操作盤11(第一操作盤)の各ボタンの接続状態を示す回路図である。
図4は、操作盤21(第二操作盤)の各ボタンの接続状態を示す回路図である。
図1、図2に示すように、原子力発電プラント100は、中央制御室10(MCR: Main Control Room)と、遠隔停止設備20と、安全系制御盤室30Aと、安全系制御盤室30Bと、常用系制御盤室40とを備える。中央制御室10は、通常時において原子炉および周辺プラントの運転を制御するために使用する制御室である。遠隔停止設備20は、非常時において、原子炉の緊急停止を行う装置類を制御する機能を中央制御室10から切り替えてこれらを制御するために使用する設備である。安全系制御盤室30Aおよび安全系制御盤室30Bは、原子力発電プラント100の健全性に関する監視制御を行う装置が設置されている。
 安全系制御盤室30Aには、原子力発電プラント100の安全系に関する制御を行う安全系制御装置31A(第一制御装置)と、安全系制御装置31Aに対して監視および操作を行う安全系監視操作装置32Aとを備える。また、安全系制御装置31Aは、詳細を後述する判定器J1(第一判定器)を備える。同様に、安全系制御盤室30Bには、原子力発電プラント100の安全系に関する制御を行う安全系制御装置31Bと、安全系制御装置31B(第二制御装置)に対して監視および操作を行う安全系監視操作装置32Bとを備える。また、安全系制御装置31Bは、詳細を後述する判定器J2(第二判定器)を備える。安全系制御装置31Aと安全系制御装置31Bとは、冗長化、すなわち2重化されており、一方の装置に異常が発生した場合であっても、原子力発電プラント100の健全性が確保できる。
 常用系制御盤室40には、原子力発電プラント100の安全系以外の通常の制御を行う常用系制御装置41と、常用系制御装置41に対して監視および操作を行う常用系監視操作装置42とを備える。
 中央制御室10には、タッチパネル10T、タッチパネル10TAおよびタッチパネル10TB(入出力装置)が設置されている。タッチパネル10Tは、常用系制御盤室40に設置された常用系監視操作装置42に接続され、タッチパネル10TAは、安全系制御盤室30Aに設置された安全系監視操作装置32Aに接続され、タッチパネル10TBは、安全系制御盤室30Bに設置された安全系監視操作装置32Bに接続されている。さらに中央制御室10には、中央制御室10から遠隔停止設備20へ、安全系監視操作装置32Aと、安全系監視操作装置32Bと、常用系監視操作装置42との接続を切り替えるための操作盤11が設置されている。
 遠隔停止設備20には、中央制御室10と同様に、タッチパネル20T、タッチパネル20TAおよびタッチパネル20TB(入出力装置)が設置されている。さらに遠隔停止設備20には、中央制御室10から遠隔停止設備20へ安全系監視操作装置32Aと、安全系監視操作装置32Bと、常用系監視操作装置42との接続を切り替えるための操作盤21が設置されている。
 上記接続が切り替えられると、タッチパネル20Tは、常用系制御盤室40に設置された常用系監視操作装置42に接続され、タッチパネル20TAは、安全系制御盤室30Aに設置された安全系監視操作装置32Aに接続され、タッチパネル20TBは、安全系制御盤室30Bに設置された安全系監視操作装置32Bに接続されることになる。
 次に、図1、図2における各装置間の通信ネットワークについて述べる。常用系制御装置41、安全系制御装置31Aおよび安全系制御装置31Bはデータ通信を行うためネットワークN1によって接続されている。安全系制御装置31Aと安全系制御装置31Bとは、安全系トレイン(安全系に関する装置群)間で専用データ通信を実施するためのネットワークN2によって接続されている。ネットワークN2は、片方向通信のため、2つの通信ケーブル(安全系制御装置31Aから安全系制御装置31Bへ、および安全系制御装置31Bから安全系制御装置31Aへ)によって構成されている。同じトレイン内の安全系制御装置と安全系監視操作装置、すなわち安全系制御装置31Aと安全系監視操作装置32Aとは、ネットワークN30Aによって接続され、安全系制御装置31Bと安全系監視操作装置32Bとは、ネットワークN30Bによって接続されている。
 次に、操作盤11と操作盤21の構成について説明する。
原子力発電プラント100の安全系制御装置は、規制要求である単一故障基準を満足するために、物理的、電気的、機能的に分離された独立した2系統以上の設備で構成されている(ここでは2系統を想定し、それぞれの系統をAトレイン、Bトレインという)。
 これらの2系統の各設備は、同一の機能を有しており、センサ等の計測設備、ポンプ等の補機等も全て2重化され、それぞれの系統の安全系制御装置31A、32Bと接続されている。
 操作盤11および操作盤21も同様に、物理的、電気的、機能的に分離された独立した2系統の装置である。さらに操作盤11は、Aトレインの接続を切り替えるボタンを2個備え、Bトレインの接続を切り替えるボタンも2個備える。同様に、操作盤21は、Aトレインの接続を切り替えるボタンを2個備え、Bトレインの接続を切り替えるボタンも2個備える。
 具体的には、操作盤11は、Aトレイン用のA1ボタンおよびA2ボタンと、Bトレイン用のB1ボタンおよびB2ボタンとを備え、操作盤21は、Aトレイン用のa1ボタンおよびa2ボタンと、Bトレイン用のb1ボタンおよびb2ボタンとを備える。
 操作盤11のA1ボタンとA2ボタンをそれぞれ操作すると、安全系制御装置31Aのデジタル入力カードに操作信号が入力され、操作盤11のB1ボタンとB2ボタンをそれぞれ操作すると、安全系制御装置31Bのデジタル入力カードに操作信号が入力される。
 同様に操作盤21のa1ボタンとa2ボタンをそれぞれ操作すると、安全系制御装置31Aのデジタル入力カードに操作信号が入力され、操作盤11のb1ボタンとb2ボタンをそれぞれ操作すると、安全系制御装置31Bのデジタル入力カードに操作信号が入力される。
 次に、操作盤11および操作盤21を用いた制御の切替動作について説明する。
初めに、中央制御室10を利用中に中央制御室10から遠隔停止設備20に監視制御機能を切り替える手順、すなわち、タッチパネル10T、タッチパネル10TA、タッチパネル10TBへの入出力を停止し、タッチパネル20T、タッチパネル20TA、タッチパネル20TBへの入出力を開始する方法を説明する。
 中央制御室10から遠隔停止設備20に監視制御機能を切り替えるには、まず、中央制御室10の操作盤11のA1、A2、B1、B2ボタンを押下する。上記のとおり操作盤11のA1ボタンとA2ボタンの操作信号は、安全系制御装置31Aの判定器J1に、B1ボタンとB2ボタンの操作信号は、安全系制御装置31Bの判定器J2に入力される。安全系制御装置31Aは、入力された2つの操作信号を、安全系制御装置31BにネットワークN2経由で送信する。同様に、安全系制御装置31Bは、入力された2つの操作信号を、安全系制御装置31AにネットワークN2経由で送信する。よって、4つのボタンが全て正常に動作していれば、安全系制御装置31Aの判定器J1および安全系制御装置31Bの判定器J2にはそれぞれ操作盤11の4つボタンが押下された事を示す4つの操作信号が入力されることになる。反対に、いずれかのボタンが故障していれば、当該ボタンからの操作信号は届かない。また、いずれかのボタンが誤動作していれば、誤動作したボタンの操作信号だけ入力されることになる。
 次に、安全系制御装置31Aの判定器J1は、最初の操作信号を受信してから所定の時間内に届いた操作信号について4分の2の投票演算(2 out of 4演算、以下2oo演算という)を実施し、2つ以上の操作信号が入力される条件が成立すれば、操作員がスイッチ操作を行ったと判断する。
 そして、安全系制御装置31Aは、監視制御を停止させる停止信号を常用系制御装置41、常用系監視操作装置42、安全系制御装置31A(自装置)、安全系監視操作装置32Aに送信する。安全系制御装置31Bは、安全系制御装置31Aとは機能的に独立しているため、安全系制御装置31Bには停止信号を送信しない。
 安全系制御装置31Bの判定器J2も同様に、最初の操作信号を受信してから所定の時間内に届いた操作信号について4分の2の投票演算(2oo4演算)を実施し、2つ以上の操作信号が入力される条件が成立すれば、操作員がスイッチ操作を行ったと判断する。
 そして、安全系制御装置31Bは、監視制御を停止させる停止信号を常用系制御装置41、常用系監視操作装置42、安全系制御装置31B(自装置)、安全系監視操作装置32Bに送信する。安全系制御装置31Aは、安全系制御装置31Bとは機能的に独立しているため、安全系制御装置31Aには停止信号を送信しない。
 条件が成立すると、常用系監視操作装置42は、タッチパネル10Tの監視操作機能を停止し、中央制御室10からの監視操作機能が不可となるが、遠隔停止設備20のタッチパネル20Tへの切替は、この段階では実施しない。
 同様に、条件が成立すると、安全系監視操作装置32Aおよび安全系監視操作装置32Bもタッチパネル10TA、タッチパネル10TBの監視操作機能を停止するが遠隔停止設備20のタッチパネル20TA、タッチパネル20TBヘの切替は、この段階では実施しない。
 また、条件が成立する場合に限り遠隔停止設備20に設置されている操作盤21が操作可能となる。なお、常用系制御装置41、安全系制御装置31A、安全系制御装置31Bは、他の操作入力がある場合はその操作入力を無効化する。
 操作員は、遠隔停止設備20へ移動後、操作盤21のa1、a2、b1、b2ボタンを押下する。操作盤11の場合と同様に、操作盤21のa1ボタンとa2ボタンのボタン操作は、安全系制御装置31Aの判定器J1に、b1ボタンとb2ボタンのボタン操作は、安全系制御装置31Bの判定器J2に入力される。安全系制御装置31Aは、入力された2つの操作信号を、安全系制御装置31BにネットワークN2経由で送信する。同様に、安全系制御装置31Bは、入力された2つの操作信号を、安全系制御装置31AにネットワークN2経由で送信する。よって、4つのボタンが全て正常に動作していれば、安全系制御装置31Aの判定器J1および安全系制御装置31Bの判定器J2にはそれぞれ操作盤11の4つボタンが押下された事を示す4つの操作信号が入力されることになる。反対に、いずれかのボタンが故障していれば、当該ボタンからの操作信号は届かない。また、いずれかのボタンが誤動作していれば、誤動作したボタンの操作信号だけ入力されることになる。
 次に、安全系制御装置31Aの判定器J1は、最初の操作信号を受信してから所定の時間内に届いた操作信号について4分の2の投票演算(2oo4演算)を実施し、2つ以上の操作信号が入力される条件が成立すれば、操作員がスイッチ操作を行ったと判断する。
 そして、安全系制御装置31Aは、監視制御を開始させる開始信号を常用系制御装置41、常用系監視操作装置42、安全系制御装置31A(自装置)、安全系監視操作装置32Aに送信する。安全系制御装置31Bは、安全系制御装置31Aとは機能的に独立しているため、安全系制御装置31Bには開始信号を送信しない。
 安全系制御装置31Bの判定器J2も同様に、最初の操作信号を受信してから所定の時間内に届いた操作信号について4分の2の投票演算(2oo4演算)を実施し、2つ以上の操作信号が入力される条件が成立すれば、操作員がスイッチ操作を行ったと判断する。
 そして、安全系制御装置31Bは、監視制御を開始させる開始信号を常用系制御装置41、常用系監視操作装置42、安全系制御装置31B(自装置)、安全系監視操作装置32Bに送信する。安全系制御装置31Aは、安全系制御装置31Bとは機能的に独立しているため、安全系制御装置31Aには開始信号を送信しない。
 常用系監視操作装置42は、安全系制御装置31Aまたは安全系制御装置31Bの一方から開始信号を受信すると、タッチパネル10Tの監視操作機能を開始する。
 同様に、条件が成立した安全系監視操作装置32A、安全系監視操作装置32Bもタッチパネル10TA、タッチパネル10TBの監視操作機能を開始する。
 次に、2oo4演算による誤動作防止と、故障による機能喪失防止の方法について説明する。もし、AトレインとBトレイン用に、それぞれ1つのボタンしか有しない制御盤を用いるとすると、単一の故障によって1つのトレインの切替機能喪失が発生する。この場合に、ネットワークN2を適用し、2つの操作信号でAND演算を実施する場合は、上記と同様に機能喪失となる。
 2つの操作信号に対してOR演算を実施した場合には、1つのトレインに故障(不動作)が発生した場合には問題ないが、故障(誤動作)が発生した場合、AトレインおよびBトレインが不必要に切り替わってしまう。一方、実施の形態1で説明したとおり、AトレインおよびBトレインにそれぞれ2つのボタンを設置し、安全系制御装置31A、31B間のネットワークN2を利用した2oo4演算を実施した場合、A1ボタン、A2ボタン、B1ボタン、B2ボタンのいずれかで単一の故障(誤動作)が発生した場合は、AトレインおよびBトレインの両方とも2oo4演算が成立することはなく切替信号の誤動作を防ぐことができる。
 また、A1ボタン、A2ボタン、B1ボタン、B2ボタンのいずれのボタンに単一の故障(不動作)が発生した場合にも、残りの3つのボタンの操作信号にて2oo4演算が、AトレインおよびBトレインで成立することから、切替機能を喪失することを防止できる。
 なお、本実施の形態では、安全系制御装置31Aと、安全系監視操作装置32Aとを個別に設置し、安全系制御装置31Bと、安全系監視操作装置32Bとを個別に設置し、常用系制御装置41と、常用系監視操作装置42とを個別に設置した例を用いて説明したが、それぞれ1台に集約してもよい。
 実施の形態1による制御切替装置によれば、上述のとおり、操作盤11のA1、A2、B1、B2ボタンのボタン操作によって中央制御室10に備える各タッチパネルを無効化し、遠隔停止設備20の操作盤21を有効化し、それに続く操作盤21のa1、a2、b1、b2ボタンのボタン操作によって、遠隔停止設備20の各タッチパネルの有効化がはじめて可能となる。このような構成にすることによって不用意な(悪意のある)中央制御室10から遠隔停止設備20への原子力発電プラント100の監視操作機能の切替を防止することができる。
 また、各操作ボタンに単一の故障が発生した場合においても、制御の切替機能を喪失することなく、中央制御室10外に配置された遠隔停止設備20への制御の切り替えができる。
実施の形態2.
 以下、実施の形態2による制御切替装置について、実施の形態1と異なる部分を中心に説明する。
 本実施の形態2では、冗長化された安全系制御装置231Aと安全系制御装置231Bとの機能的独立性を強化するための方法について図5、図6を用いて説明する。
図5は、本実施の形態2の操作盤11の各ボタンの接続状態を示す回路図である。
図6は、本実施の形態2の操作盤21の各ボタンの接続状態を示す回路図である。
実施の形態1と同様に、本実施の形態2でも、2oo4演算によって中央制御室10と遠隔停止設備20の停止信号、開始信号を生成しているが、電気的、物理的に独立でない操作盤11のBトレインのB1ボタンとB2ボタンが単一の要因によって故障(誤動作)した場合、ネットワークN2の通信を介して2oo4演算がAトレイン及びBトレインで成立することによって、不必要な制御の切替操作が発生する可能性がある。
 そこで、これを防止するための手段として、判定器J1、J2は、自トレインの2つの操作信号のOR演算と、これまで説明した2oo4演算とのAND演算を実施する(2oo4 + 1oo2 演算)。具体的には、安全系制御装置231Aの判定器J1では、A1ボタン、A2ボタン、B1ボタン、B2ボタンの入力の2oo4演算結果に加えて、A1ボタンとA2ボタンの入力のOR演算を行い、それぞれの結果に対するAND演算を行い、いずれも条件を満たす場合に停止信号を送信することにする。
 これにより、Bトレインの操作盤11のボタンが2つとも単一の要因によって故障(誤動作)した場合に、2oo4演算がAトレインおよびBトレインの両方で成立するが、Aトレインでは、A1ボタンとA2ボタンのOR演算が成立しないことから、Aトレインの不必要な切替を防ぐことができる(故障したBトレインの誤動作は防ぐことができない)。
 これにより、Aトレインのタッチパネル10TAによる監視操作機能を中央制御室10に維持することが可能となり、最低限のプラント監視操作機能が中央制御室10に残り、原子力発電プラント100の運転を継続することができる。安全系制御装置231Bについては、判定器J2は、A1ボタン、A2ボタン、B1ボタン、B2ボタンの入力の2oo4演算結果と、B1ボタンとB2ボタンの入力のOR演算結果のAND演算の結果、停止信号を送信することになる。
 上記の2oo4 + 1oo2 演算を適用すると、一つのトレイン(AトレインもしくはBトレイン)の操作盤11のボタンが2つとも単一の要因によって故障(不動作)となった場合、故障となったトレインの切替が不可能となるが、多重化された残りのトレインの機能が維持されることから健全性の問題はない。
 実施の形態2による制御切替装置によれば、一方のトレイン用の2つのボタンが単一の要因によって故障した場合であっても、一方の安全系制御装置によって、原子力発電プラント100の健全性を維持できる。
実施の形態3.
 以下、実施の形態3による制御切替装置について、実施の形態1、2と異なる部分を中心に説明する。
図7は、本実施の形態3の操作盤11の各ボタンの接続状態を示す回路図である。
図8は、本実施の形態3の操作盤21の各ボタンの接続状態を示す回路図である。
実施の形態2による制御切替装置では、Bトレインの操作盤11のボタンが2つとも単一の要因によって故障(誤動作)した場合に、Bトレインの誤切替を防ぐことができないという問題があった。
そこで、実施の形態3では、操作盤11、12のそれぞれ4つのボタンを全て、物理的、電気的、機能的に分離、独立して構成し、実施の形態1で行っていた判定器J1、J2による2oo4演算を、3oo4演算、すなわち、それぞれ4つのボタンの内の、3つのボタンの押下を検知した時点で、操作員による操作と判断することとする。これにより、2つのボタンが単一の要因によって誤動作、不動作となる自体を排除できるとともに、万一、1つのボタンに誤動作、不動作が発生したとしても、適切に両トレインの制御を切り替えることができる。
実施の形態4.
 以下、実施の形態4による制御切替装置について、実施の形態1と異なる部分を中心に説明する。
図9は、本実施の形態4の操作盤11の各ボタンの接続状態を示す回路図である。
 実施の形態1では、操作盤11に各系統用に2個ずつ、計4つのボタンを配置し、操作盤21に各系統用に2個ずつ、計4つのボタンを配置し、安全系制御装置31A、31Bの判定器J1、J2でそれぞれ2oo4演算を実施し、中央制御室10から遠隔停止設備20への制御の切り替えを実施した。それぞれ4つのボタンによる2oo4演算に基づく切替操作は、誤動作防止と機能喪失防止が必要な他の機能にも適用可能である。例えば、原子力発電所の原子炉内の燃料棒が破損し、放射性物質の放散の可能性がある場合に、これらを防止または抑制し、発電所周辺の一般公衆および発電所従業員の安全を確保する工学的安全施設の手動操作スイッチとして利用できる。
 実施の形態2で説明したとおり、判定器J1、J2で2oo4演算に加え自トレインのOR演算(1oo2 演算)を加えて用いない場合、他トレインの故障によって誤動作を引き起こす可能性があるが、工学的安全施設の動作は、プラントの保護に対して有用であり、これを適用する必要はない。
実施の形態5.
 以下、実施の形態5による制御切替装置について、実施の形態1と異なる部分を中心に説明する。
図10は、本実施の形態5の操作盤11の各ボタンの接続状態を示す回路図である。
 実施の形態2では、操作盤11に各系統用に2個ずつ、計4つのボタンを配置し、操作盤21に各系統用に2個ずつ、計4つのボタンを配置し、安全系制御装置31A、31Bの判定器J1、J2でそれぞれ2oo4演算を実施し、自トレインの2つの操作信号のOR演算と、上記2oo4演算とのAND演算を実施する(2oo4 + 1oo2 演算)することによって、中央制御室10から遠隔停止設備20への制御の切り替えを実施した。このような演算に基づく切替操作は、誤動作防止と機能喪失防止が必要な他の機能にも適用可能である。
 例えば、運転状態によって不要となる原子炉トリップ操作信号をブロックするための手動パーミッシブに適用可能である。手動パーミッシブは、安全系機能を意図的にブロックするためのものであり、他トレインの故障によって両方のトレインのパーミッシブが誤動作することは、安全上不適切であるため、実施の形態2述べた2oo4 + 1oo2 演算を適用すると良い。
 なお、安全系制御装置31A、31B、安全系監視操作装置32A、32B、常用系制御装置41、常用系監視操作装置42は、ハードウエアの一例を図11に示すように、プロセッサ60と記憶装置61とから構成される。記憶装置61は、図示していないが、ランダムアクセスメモリ等の揮発性記憶装置と、フラッシュメモリ等の不揮発性の補助記憶装置とを備える。
 また、フラッシュメモリの代わりにハードディスクの補助記憶装置を備えてもよい。プロセッサ60は、記憶装置61から入力されたプログラムを実行する。この場合、補助記憶措置から揮発性記憶装置を介してプロセッサ60にプログラムが入力される。また、プロセッサ60は、演算結果等のデータを記憶装置61の揮発性記憶装置に出力してもよいし、揮発性記憶装置を介して補助記憶装置にデータを保存してもよい。
 本願は、様々な例示的な実施の形態及び実施例が記載されているが、1つ、または複数の実施の形態に記載された様々な特徴、態様、及び機能は特定の実施の形態の適用に限られるのではなく、単独で、または様々な組み合わせで実施の形態に適用可能である。
従って、例示されていない無数の変形例が、本願に開示される技術の範囲内において想定される。例えば、少なくとも1つの構成要素を変形する場合、追加する場合または省略する場合、さらには、少なくとも1つの構成要素を抽出し、他の実施の形態の構成要素と組み合わせる場合が含まれるものとする。
 100 原子力発電プラント、10 中央制御室、10T,10TA,10TB,20T,20TA,20TB タッチパネル、11,21 操作盤、A1,A2,B1,B2,a1,a2,b1,b2 ボタン、J1,J2 判定器、20 遠隔停止設備、30A,30B 安全系制御盤室、31A,31B,231A,231B 安全系制御装置、32A,32B 安全系監視操作装置、40 常用系制御盤室、41 常用系制御装置、42 常用系監視操作装置、N1,N2,N30A,N30B ネットワーク、60 プロセッサ、61 記憶装置。

Claims (8)

  1. 2重化された制御装置への入出力を、それぞれ第一場所に配置された入出力装置から、第二場所に配置された入出力装置に切り替える制御切替装置であって、
    前記制御装置としての第一制御装置に接続されたA1ボタンとA2ボタンと、前記制御装置としての第二制御装置に接続されたB1ボタンとB2ボタンとを有し、前記第一場所に備えられた第一操作盤と、
    前記第一制御装置に接続されたa1ボタンとa2ボタンと、前記第二制御装置に接続されたb1ボタンとb2ボタンとを有し、前記第二場所に備えられた第二操作盤と、
    前記第一制御装置と前記第二制御装置との間で、各前記ボタンの操作信号を授受するネットワークとを備え、
    前記第一制御装置は、前記第一操作盤からの前記A1ボタン、前記A2ボタン、前記B1ボタン、前記B2ボタンの各操作信号から前記第一場所に配置された入出力装置との間の入出力を停止するか否かを判断すると共に、前記第二操作盤からの前記a1ボタン、前記a2ボタン、前記b1ボタン、前記b2ボタンの各操作信号から前記第二場所に配置された入出力装置との間の入出力を開始するか否かを判断する第一判定器を備え、
    前記第二制御装置は、前記第一操作盤からの前記A1ボタン、前記A2ボタン、前記B1ボタン、前記B2ボタンの各操作信号から前記第一場所に配置された入出力装置との間の入出力を停止するか否かを判断すると共に、前記第二操作盤からの前記a1ボタン、前記a2ボタン、前記b1ボタン、前記b2ボタンの各操作信号から前記第二場所に配置された入出力装置との間の入出力を開始するか否かを判断する第二判定器を備える制御切替装置。
  2. 前記第一制御装置は、前記第一場所に配置された入出力装置との間の入出力を停止する場合に限り前記第二操作盤のボタン操作を可能とし、
    前記第二制御装置は、前記第一場所に配置された入出力装置との間の入出力を停止する場合に限り前記第二操作盤のボタン操作を可能とする請求項1に記載の制御切替装置。
  3. 前記第一判定器は、
    前記第一操作盤からの前記A1ボタン、前記A2ボタン、前記B1ボタン、前記B2ボタンの各操作信号の内、2以上の操作信号を受信した場合に、前記第一制御装置と、前記第一場所に配置された入出力装置との間の入出力を停止させると判断し、
    前記第二操作盤からの前記a1ボタン、前記a2ボタン、前記b1ボタン、前記b2ボタンの各操作信号の内、2以上の操作信号を受信した場合に、前記第一制御装置と、前記第二場所に配置された入出力装置との間の入出力を開始させると判断し、
    前記第二判定器は、
    前記第一操作盤からの前記A1ボタン、前記A2ボタン、前記B1ボタン、前記B2ボタンの各操作信号の内、2以上の操作信号を受信した場合に、前記第二制御装置と、前記第一場所に配置された入出力装置との間の入出力を停止させると判断し、
    前記第二操作盤からの前記a1ボタン、前記a2ボタン、前記b1ボタン、前記b2ボタンの各操作信号の内、2以上の操作信号を受信した場合に、前記第二制御装置と、前記第二場所に配置された入出力装置との間の入出力を開始させると判断する請求項1又は請求項2に記載の制御切替装置。
  4. 前記第一判定器は、
    前記第一操作盤からの前記A1ボタン、前記A2ボタン、前記B1ボタン、前記B2ボタンの各操作信号の内、2以上の操作信号を受信し、かつ、A1ボタンとA2ボタンのいずれか一方の操作信号を受信した場合に、前記第一制御装置と、前記第一場所に配置された入出力装置との間の入出力を停止させると判断し、
    前記第二操作盤からの前記a1ボタン、前記a2ボタン、前記b1ボタン、前記b2ボタンの各操作信号の内、2以上の操作信号を受信した場合に、前記第一制御装置と、前記第二場所に配置された入出力装置との間の入出力を開始させると判断し、
    前記第二判定器は、
    前記第一操作盤からの前記A1ボタン、前記A2ボタン、前記B1ボタン、前記B2ボタンの各操作信号の内、2以上の操作信号を受信し、かつ、B1ボタンとB2ボタンのいずれか一方の操作信号を受信した場合に、前記第二制御装置と、前記第一場所に配置された入出力装置との間の入出力を停止させると判断し、
    前記第二操作盤からの前記a1ボタン、前記a2ボタン、前記b1ボタン、前記b2ボタンの各操作信号の内、2以上の操作信号を受信した場合に、前記第二制御装置と、前記第二場所に配置された入出力装置との間の入出力を開始させると判断する請求項1又は請求項2に記載の制御切替装置。
  5. 全ての前記ボタンは、物理的、電気的、機能的に分離、独立して構成され、
    前記第一判定器は、
    前記第一操作盤からの前記A1ボタン、前記A2ボタン、前記B1ボタン、前記B2ボタンの各操作信号の内、3以上の操作信号を受信した場合に、前記第一制御装置と、前記第一場所に配置された入出力装置との間の入出力を停止させると判断し、
    前記第二操作盤からの前記a1ボタン、前記a2ボタン、前記b1ボタン、前記b2ボタンの各操作信号の内、3以上の操作信号を受信した場合に、前記第一制御装置と、前記第二場所に配置された入出力装置との間の入出力を開始させると判断し、
    前記第二判定器は、
    前記第一操作盤からの前記A1ボタン、前記A2ボタン、前記B1ボタン、前記B2ボタンの各操作信号の内、3以上の操作信号を受信した場合に、前記第二制御装置と、前記第一場所に配置された入出力装置との間の入出力を停止させると判断し、
    前記第二操作盤からの前記a1ボタン、前記a2ボタン、前記b1ボタン、前記b2ボタンの各操作信号の内、3以上の操作信号を受信した場合に、前記第二制御装置と、前記第二場所に配置された入出力装置との間の入出力を開始させると判断する請求項1又は請求項2に記載の制御切替装置。
  6. 前記第一場所は、原子力発電プラントの中央制御室であり、
    前記第二場所は、前記中央制御室外に配置された遠隔停止設備である請求項1から請求項5のいずれか1項に記載の制御切替装置。
  7. 前記第一制御装置および前記第二制御装置は、原子力発電プラントの安全施設の制御装置である請求項1から請求項3のいずれか1項に記載の制御切替装置。
  8. 前記第一操作盤および前記第二操作盤は、原子力発電プラントの原子炉トリップ機能のブロック操作を行うためのパーミッシブ手動操作を実施する操作パネルである請求項4に記載の制御切替装置。
PCT/JP2020/044516 2020-11-30 2020-11-30 制御切替装置 WO2022113345A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
PCT/JP2020/044516 WO2022113345A1 (ja) 2020-11-30 2020-11-30 制御切替装置
US18/245,007 US20230352200A1 (en) 2020-11-30 2020-11-30 Control switching device
JP2022565000A JP7391244B2 (ja) 2020-11-30 2020-11-30 制御切替装置
CA3194191A CA3194191A1 (en) 2020-11-30 2020-11-30 Control switching device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2020/044516 WO2022113345A1 (ja) 2020-11-30 2020-11-30 制御切替装置

Publications (1)

Publication Number Publication Date
WO2022113345A1 true WO2022113345A1 (ja) 2022-06-02

Family

ID=81754133

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/044516 WO2022113345A1 (ja) 2020-11-30 2020-11-30 制御切替装置

Country Status (4)

Country Link
US (1) US20230352200A1 (ja)
JP (1) JP7391244B2 (ja)
CA (1) CA3194191A1 (ja)
WO (1) WO2022113345A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024018578A1 (ja) * 2022-07-21 2024-01-25 三菱電機株式会社 安全保護システムおよび試験方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10268086A (ja) * 1997-03-21 1998-10-09 Mitsubishi Electric Corp 運転操作装置
WO2012049936A1 (ja) * 2010-10-12 2012-04-19 三菱重工業株式会社 原子力施設の制御システム
JP2012132839A (ja) * 2010-12-22 2012-07-12 Toshiba Corp 原子炉遠隔停止装置及びプログラム
JP2012233705A (ja) * 2011-04-28 2012-11-29 Hitachi-Ge Nuclear Energy Ltd 原子力プラントの監視制御システム
CN104252885A (zh) * 2013-06-28 2014-12-31 中广核工程有限公司 一种核电站双数字量输出卡配置系统和方法
WO2019167532A1 (ja) * 2018-02-28 2019-09-06 日立Geニュークリア・エナジー株式会社 中央制御室外原子炉停止装置
US20200082952A1 (en) * 2017-09-29 2020-03-12 Korea Hydro & Nuclear Power Co., Ltd Nuclear power plant defense-in-depth safety apparatus having diversity

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10268086A (ja) * 1997-03-21 1998-10-09 Mitsubishi Electric Corp 運転操作装置
WO2012049936A1 (ja) * 2010-10-12 2012-04-19 三菱重工業株式会社 原子力施設の制御システム
JP2012132839A (ja) * 2010-12-22 2012-07-12 Toshiba Corp 原子炉遠隔停止装置及びプログラム
JP2012233705A (ja) * 2011-04-28 2012-11-29 Hitachi-Ge Nuclear Energy Ltd 原子力プラントの監視制御システム
CN104252885A (zh) * 2013-06-28 2014-12-31 中广核工程有限公司 一种核电站双数字量输出卡配置系统和方法
US20200082952A1 (en) * 2017-09-29 2020-03-12 Korea Hydro & Nuclear Power Co., Ltd Nuclear power plant defense-in-depth safety apparatus having diversity
WO2019167532A1 (ja) * 2018-02-28 2019-09-06 日立Geニュークリア・エナジー株式会社 中央制御室外原子炉停止装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024018578A1 (ja) * 2022-07-21 2024-01-25 三菱電機株式会社 安全保護システムおよび試験方法

Also Published As

Publication number Publication date
US20230352200A1 (en) 2023-11-02
JP7391244B2 (ja) 2023-12-04
JPWO2022113345A1 (ja) 2022-06-02
CA3194191A1 (en) 2022-06-02

Similar Documents

Publication Publication Date Title
US3377623A (en) Process backup system
KR100980043B1 (ko) Fpga를 이용한 발전소 보호 시스템 및 보호 방법
US20180211734A1 (en) Reactor protection-processor-to-reactor-trip breaker interface and method for operating the same
ES2189620B2 (es) Sistema de proteccion para proceso.
CN106448777B (zh) 一种用于核电厂安全级仪控系统的传输站
WO2022113345A1 (ja) 制御切替装置
EP3690892A1 (en) Nuclear power plant defense-in-depth safety apparatus having diversity
CN101673936A (zh) 保护系统
CN110767338A (zh) 一种核动力堆dcs架构
KR100201404B1 (ko) 바이탈 전원차단 계전기를 이용한 페일세이프 구현장치 및 제어방법
KR101950695B1 (ko) 철도차량용 전기기계식 제동 시스템 및 이의 제어 방법
JP2907930B2 (ja) 原子力プラントの安全保護装置
JP5190032B2 (ja) 遮断器用操作器
WO2024018578A1 (ja) 安全保護システムおよび試験方法
JP3843388B2 (ja) プロセス制御装置
KR20220167541A (ko) 발전기차단기 차단실패 보호 계전기 및 이를 이용한 차단실패 보호 방법
JP2988476B2 (ja) 原子炉保護装置
JP2006268882A (ja) プロセス制御装置
KR20240081981A (ko) 복수의 모듈 운전을 위한 주제어실 설비 구성과 운전 방법
JPH0530927U (ja) ネツトワーク・システムにおけるコンピユータの停電保護装置
JPS6134171B2 (ja)
JPH04290332A (ja) 監視制御装置
JPH0281203A (ja) ロボット制御システム
JPS617901A (ja) デイジタル制御装置
JPH0916425A (ja) 情報処理システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20963609

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2022565000

Country of ref document: JP

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 3194191

Country of ref document: CA

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20963609

Country of ref document: EP

Kind code of ref document: A1