WO2021229664A1 - 回路基板に部品を実装する実装プログラムの最適化装置 - Google Patents

回路基板に部品を実装する実装プログラムの最適化装置 Download PDF

Info

Publication number
WO2021229664A1
WO2021229664A1 PCT/JP2020/018890 JP2020018890W WO2021229664A1 WO 2021229664 A1 WO2021229664 A1 WO 2021229664A1 JP 2020018890 W JP2020018890 W JP 2020018890W WO 2021229664 A1 WO2021229664 A1 WO 2021229664A1
Authority
WO
WIPO (PCT)
Prior art keywords
optimization
component mounting
circuit board
mounting
program
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2020/018890
Other languages
English (en)
French (fr)
Inventor
輝之 大橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuji Corp
Original Assignee
Fuji Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuji Corp filed Critical Fuji Corp
Priority to JP2022522122A priority Critical patent/JP7525600B2/ja
Priority to CN202080100209.9A priority patent/CN115461687A/zh
Priority to PCT/JP2020/018890 priority patent/WO2021229664A1/ja
Priority to DE112020007169.3T priority patent/DE112020007169T5/de
Publication of WO2021229664A1 publication Critical patent/WO2021229664A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Program-control systems
    • G05B19/02Program-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/08Monitoring manufacture of assemblages
    • H05K13/085Production planning, e.g. of allocation of products to machines, of mounting sequences at machine or facility level
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32015Optimize, process management, optimize production line
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Definitions

  • the technology disclosed in this specification relates to an optimization device for a mounting program for mounting a component on a circuit board in a component mounting line.
  • Japanese Patent Application Laid-Open No. 2015-05408 discloses a production optimization device for a component mounting line that mounts components on a circuit board with a component mounting machine.
  • the selection range of parts used for production (for example, the type, number of parts mounting machines that make up the parts mounting line, etc.) is limited to the range of parts (existing assets) actually owned by the user.
  • the production optimization process of the component mounting line is executed based on the condition that the limitation on the selection range of the parts used for production is removed (that is, the condition including the parts not owned by the user).
  • the optimization device disclosed in the present specification optimizes a mounting program for mounting a component on a circuit board in a component mounting line including at least one component mounting machine.
  • This optimization device includes a mounting program input unit, an execution unit, a display unit, a selection unit, and a mounting program update unit.
  • the mounting program input unit inputs a mounting program before optimization used for the at least one component mounting machine.
  • the execution unit executes the optimization process under a plurality of conditions for the input implementation program before optimization.
  • the display unit compares and displays a plurality of optimization results obtained by each of the optimization processes.
  • the selection unit selects one from the plurality of optimization results.
  • the implementation program update unit updates the implementation program before optimization based on the selected optimization result.
  • optimization processing is executed for the mounting program under a plurality of conditions. Then, a plurality of optimization results obtained by the optimization process are compared and displayed. That is, in this optimization device, a plurality of optimization results different from each other are output for one certain implementation program according to a plurality of given conditions. Further, in this optimization device, the input pre-optimization implementation program is updated based on one optimization result selected from a plurality of optimization results. For example, when the user selects one of a plurality of optimization results, the implementation program is updated based on the optimization results.
  • the optimization process is executed under a plurality of conditions. Therefore, when the user tries to optimize a certain implementation program, the user searches for appropriate conditions for the optimization process many times. There is no need to perform optimization processing. Further, since the implementation program is automatically updated based on a desired optimization result selected from a plurality of optimization results for a certain implementation program, it is highly convenient.
  • the block diagram which shows an example of the structure of the component mounting line before the optimization which concerns on an Example.
  • the block diagram which shows the structure of the optimization apparatus which concerns on Example.
  • the flowchart which shows the optimization process which concerns on Example.
  • the condition may be the configuration of the at least one component mounting machine included in the component mounting line
  • the execution unit may be based on the plurality of configurations different from each other.
  • the optimization process may be executed and the plurality of optimization results may be obtained.
  • a circuit board is produced by mounting multiple types of components with one or more component mounting machines.
  • the optimization process is executed by adopting the configurations of a plurality of component mounting machines different from each other as a plurality of conditions. This makes it possible to obtain the optimum configuration of a component mounting machine for the production of circuit boards.
  • a configuration input unit for inputting the configuration of at least one component mounting machine may be provided, and the configuration includes the number of component mounting machines constituting the component mounting line and the above. At least the type of component mounting machine may be included.
  • the optimization process can be efficiently executed based on the input contents (for example, the production equipment that the user plans to use).
  • the condition may be a limiting condition when the optimization processing is executed, and the execution unit executes the optimization processing based on a plurality of different limiting conditions. , The plurality of optimization results may be obtained.
  • the restriction condition may be a restriction matter regarding a setup change condition in the at least one component mounting machine when the type of the circuit board to be produced is changed.
  • the setup is changed.
  • the setup change takes a relatively large amount of time. Therefore, in such a configuration, it is possible to obtain an optimization result capable of efficiently producing a plurality of types of circuit boards.
  • the condition may be an evaluation criterion for evaluating the optimization result
  • the execution unit executes the optimization process based on a plurality of evaluation criteria different from each other.
  • the plurality of optimization results may be obtained.
  • the optimization process is executed based on a plurality of evaluation criteria different from each other (for example, criteria related to the operating time of the component mounting line, criteria related to setup change by the user, etc.). Therefore, it is possible to obtain an optimization result that can efficiently produce a circuit board.
  • the evaluation criteria are the total production time for producing a circuit board, the number of setup changes when the type of circuit board to be produced is changed, and the type of circuit board to be produced is changed.
  • the item to be prioritized may be specified from the total replacement time of the time.
  • Each of the above items is an index for evaluating the productivity of the circuit board.
  • items that the user should prioritize can be used as evaluation criteria.
  • the types of circuit boards produced in the component mounting line, the types and mounting positions of a plurality of components mounted on the circuit board for each type of the circuit board, and the circuit board It may have a production plan input unit for inputting a production quantity including a production quantity produced for each type, and the execution unit may execute the optimization process based on the input production plan. good.
  • a circuit board is produced by mounting multiple types of components with one or more component mounting machines.
  • each of the above items is input as a production plan. This makes it easy to obtain a plurality of optimization results that can suitably produce the circuit board to be produced.
  • the component mounting line may produce a plurality of types of circuit boards
  • the display unit is a total production for producing a circuit board as a result of the plurality of optimizations.
  • at least one of the number of setup changes and the total setup change time when the type of circuit board to be produced may be changed may be displayed.
  • each of the above items is an important factor in determining the optimization result to be selected from a plurality of optimization results.
  • the optimization result to be selected by the user can be visually determined.
  • the production of the circuit board 11 includes a plurality of component mounting machines 18 arranged in a transport path 12 for transporting the circuit board 11, and a plurality of mounting-related machines 13 for performing work related to component mounting. 14 and 15 and so on.
  • the component mounting line 10 shown in FIG. 1 is an example of the configuration of the component mounting line 10 constructed based on a mounting program before optimization (in other words, an existing mounting program).
  • the plurality of mounting-related machines are, for example, a solder printing machine 13, an inspection device 14, a reflow device 15, an adhesive coating device, and the like.
  • each component mounting machine 18 a feeder 16 such as a tape feeder or a tray feeder that supplies components is set in the feeder support portion 17 so as to be replaceable.
  • the mounting head of each component mounting machine 18 is held interchangeably, and one or more suctions that suck the components supplied from the feeder 16 and mount them on the circuit board 11 are sucked on the mounting head.
  • the nozzle is held replaceable.
  • the suction nozzle held by the mounting head of each component mounting machine 18 can be replaced according to the size and type of the component supplied by the feeder 16 from among a plurality of types of suction nozzles having different nozzle diameters, suction pad shapes, and the like. ..
  • a production job is executed to produce the circuit board 11 on which the components are mounted.
  • the optimization device 20 includes an input unit 22, a display unit 23, a storage unit 24, a control unit 25, and the like.
  • the input unit 22 includes a plurality of keys, and the user can input various instructions and information via the input unit 22.
  • the display unit 23 is a display for displaying various information and optimization results described later.
  • the display unit 23 may function as a so-called touch panel integrally with the input unit 22.
  • the storage unit 24 stores various programs and data such as an optimization processing program.
  • the control unit 25 executes various processes according to various programs stored in the storage unit 24. In this embodiment, the control unit 25 executes the optimization processing program stored in the storage unit 24 to optimize the implementation program before optimization input by the user according to various conditions described later. Execute the process.
  • the control unit 25 receives the input of the implementation program before optimization. Specifically, the user inputs the number of component mounting machines 18 constituting the existing component mounting line 10 described above and the type (for example, model) of the component mounting machine 18. Further, depending on the user, the type of the circuit board 11 produced on the component mounting line 10, the type and mounting position of a plurality of components mounted on the circuit board 11 for each type of the circuit board 11, and each circuit board 11 produced. A production plan including the production quantity of is entered.
  • the mounting program before optimization may be input from an external device (not shown) or may be a mounting program stored in advance in the storage unit 24.
  • control unit 25 stores the input mounting program in the storage unit 24.
  • control unit 25 receives an input for selecting an item to be prioritized in the optimization process of the implementation program. Specifically, for example, the total production time for producing the circuit board indicated by the production plan, the number of setup changes when the type of the circuit board to be produced is changed, and the type of the circuit board to be produced are changed. Accepts the input of the user operation that specifies the priority item from the total setup replacement time at the time.
  • the control unit 25 executes the optimization process based on the input configuration of the component mounting line 10. do. Specifically, for example, the control unit 25 may change the number and types of component mounting machines 18 constituting the component mounting line 10 or change the arrangement order of the component mounting machines 18 to obtain a plurality of new lines. Generate a configuration. Then, the optimization process is executed for each line configuration. Further, for example, the control unit 25 optimizes each generated line configuration by changing the module configuration of the component mounting machine 18 (that is, the type of the component supply unit (feeder support unit 17), the type of the mounting head, etc.). Execute the process.
  • the control unit 25 may change the number and types of component mounting machines 18 constituting the component mounting line 10 or change the arrangement order of the component mounting machines 18 to obtain a plurality of new lines. Generate a configuration. Then, the optimization process is executed for each line configuration. Further, for example, the control unit 25 optimizes each generated line configuration by changing the module configuration of the component mounting machine 18 (that is, the type of the component supply unit (feeder
  • the control unit 25 compares and displays a plurality of optimization results obtained based on each of the generated plurality of line configurations on the display unit 23. Specifically, the control unit 25 displays the optimized total production time, the number of setup changes, and the total setup replacement time for each line configuration.
  • the control unit 25 accepts input of a user operation for designating a priority item in S14. Therefore, in S20, some of the obtained optimization results are compared and displayed on the display unit 23 in the order in which the results for the specified items (total production time in FIG. 4) are in good order. do.
  • control unit 25 accepts the input of the user operation to select one from the plurality of optimization results displayed in comparison. Then, in S24, the control unit 25 updates the mounting program stored in S12 (that is, the mounting program input in S10) with the mounting program constructed by the selected optimization result, and stores the mounting program in the storage unit 24.
  • the control unit 25 updates the mounting program stored in S12 (that is, the mounting program input in S10) with the mounting program constructed by the selected optimization result, and stores the mounting program in the storage unit 24.
  • the optimization device 20 generates a plurality of line configurations based on the implementation program before optimization input by the user, and executes the optimization process for the plurality of line configurations. That is, the optimization process is executed for the input of one implementation program under a plurality of conditions different from each other (a plurality of line configurations in this embodiment). Then, the optimization device 20 compares and displays the obtained plurality of optimization results. After that, when one of the plurality of optimization results is selected by the user, the implementation program is updated based on the selected optimization result. As described above, in the optimization device 20 of the present embodiment, the optimization process is executed under a plurality of conditions, so that the user searches for appropriate conditions for the optimization process when attempting the optimization process of the implementation program. However, it is not necessary to execute the optimization process many times. In addition, the implementation program is automatically updated based on a desired optimization result selected from a plurality of optimization results, which is highly convenient.
  • the control unit 25 employs a plurality of line configurations as a condition applied to the optimization process of the mounting program.
  • the condition applied to the optimization process may be a limiting condition when the optimization process is executed. Specifically, for example, a condition in which the entire or part of the arrangement of the feeder 16 in the mounting program before optimization is fixed, a condition in which the arrangement of the suction nozzle held in the mounting head is fixed, and the setup change of the feeder 16 are collectively performed.
  • the optimization process may be executed by applying a plurality of conditions fixed by (so-called outer setup) or individually (so-called inner setup).
  • condition applied to the optimization process may be an evaluation standard for evaluating the optimization result. Specifically, for example, in the optimization process, a plurality of conditions such as a condition for giving priority to the total production time, a condition for giving priority to reducing the number of setup changes, a condition for specifying a target takt time, a condition for cost balance, etc. are applied. And the optimization process may be executed.
  • the optimization process was executed for a single component mounting line 10.
  • the technique disclosed herein may be applied to a plurality of component mounting lines, or may be applied only to one or a plurality of component mounting machines 18 constituting the component mounting line 10. May be good.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Manufacturing & Machinery (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Automation & Control Theory (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Supply And Installment Of Electrical Components (AREA)
  • General Factory Administration (AREA)

Abstract

最適化装置は、少なくとも1台の部品実装機を含む部品実装ラインにおいて、回路基板に部品を実装する実装プログラムを最適化する。最適化装置は、実装プログラム入力部と、実行部と、表示部と、選択部と、実装プログラム更新部と、を備える。実装プログラム入力部は、少なくとも1台の部品実装機に用いる最適化前の実装プログラムを入力する。実行部は、入力された最適化前の実装プログラムに対して、複数の条件で最適化処理を実行する。表示部は、最適化処理のそれぞれによって求められた複数の最適化結果を比較表示する。選択部は、複数の最適化結果の中から1つを選択する。実装プログラム更新部は、最適化前の実装プログラムを、選択された最適化結果に基づいて更新する。

Description

回路基板に部品を実装する実装プログラムの最適化装置
 本明細書に開示の技術は、部品実装ラインにおいて、回路基板に部品を実装する実装プログラムの最適化装置に関する。
 特表2015-025408号公報には、部品実装機で回路基板に部品を実装する部品実装ラインの生産最適化装置が開示されている。この装置では、生産に使用する部材の選択範囲(例えば、部品実装ラインを構成する部品実装機の種類、台数等)を実際にユーザが所有する部材(現有資産)の範囲内に制限した条件と、生産に使用する部材の選択範囲の制限を撤廃した条件(すなわち、ユーザが所有していない部材を含む条件)とに基づいて、部品実装ラインの生産の最適化処理を実行する。
 特表2015-025408号公報の技術では、ユーザが所有していない仮想の部材を使用する条件で部品実装ラインの最適化処理を実行することにより、投資コストと生産性のバランスを評価するものであった。しかしながら、部品実装ラインの最適化処理は与えられた条件に基づいて実行され、最適化処理の前提となる条件は1つではなく種々の条件が考えられる。このため、1つの条件で最適化処理をしたとしても、その最適化された実装プログラムより適切な実装プログラムが存在する可能性がある。したがって、適切な実装プログラムを得るためには、試行錯誤しながら種々の条件について最適化処理を実行しなければならなかった。本明細書では、回路基板に部品を実装する実装プログラムを少ない労力で最適化する技術を提供する。
 本明細書に開示する最適化装置は、少なくとも1台の部品実装機を含む部品実装ラインにおいて、回路基板に部品を実装する実装プログラムを最適化する。この最適化装置は、実装プログラム入力部と、実行部と、表示部と、選択部と、実装プログラム更新部を備える。前記実装プログラム入力部は、前記少なくとも1台の部品実装機に用いる最適化前の実装プログラムを入力する。前記実行部は、入力された前記最適化前の実装プログラムに対して、複数の条件で最適化処理を実行する。前記表示部は、前記最適化処理のそれぞれによって求められた複数の最適化結果を比較表示する。前記選択部は、前記複数の最適化結果の中から1つを選択する。前記実装プログラム更新部は、前記最適化前の実装プログラムを、選択された最適化結果に基づいて更新する。
 上記の最適化装置では、部品実装機に用いる最適化前の実装プログラム(例えば、既存の実装プログラム)を入力すると、当該実装プログラムに対して、複数の条件で最適化処理を実行する。そして、最適化処理によって求められた複数の最適化結果を比較表示する。すなわち、この最適化装置では、1つの或る実装プログラムに対して、与えられた複数の条件に応じて、互いに異なる複数の最適化結果が出力される。また、この最適化装置では、複数の最適化結果の中から選択された1つの最適化結果に基づいて、入力された最適化前の実装プログラムを更新する。例えば、ユーザが複数の最適化結果のうちの1つを選択した場合、当該最適化結果に基づいて実装プログラムが更新される。このように、上記の最適化装置では、複数の条件で最適化処理が実行されるため、ユーザは、或る実装プログラムの最適化を試みる際に、最適化処理の適切な条件を探りながら幾度も最適化処理を実行する必要がない。また、或る実装プログラムに対して、複数の最適化結果の中から選択した所望の最適化結果に基づいて実装プログラムが自動で更新されるので、利便性が高い。
実施例に係る最適化前の部品実装ラインの構成の一例を示すブロック図。 実施例に係る最適化装置の構成を示すブロック図。 実施例に係る最適化処理を示すフローチャート。 実施例に係る複数の最適化結果の表示例を示す図。
 本技術の一実施形態では、前記条件は、前記部品実装ラインに含まれる前記少なくとも1台の部品実装機の構成であってもよく、前記実行部は、互いに異なる複数の前記構成に基づいて前記最適化処理を実行し、前記複数の最適化結果を求めてもよい。
 部品実装ラインでは、1又は複数の部品実装機によって複数種類の部品を実装することにより回路基板が生産される。上記の構成では、複数の条件として、互いに異なる複数の部品実装機の構成を採用して最適化処理を実行する。これにより、回路基板の生産に最適な部品実装機の構成を求めることができる。
 本技術の一実施形態では、前記少なくとも1台の部品実装機の構成を入力する構成入力部を有してもよく、前記構成は、前記部品実装ラインを構成する部品実装機の数と、前記部品実装機の種類を少なくとも含んでもよい。
 このような構成では、部品実装ラインを構成する部品実装機の数と、その種類とが入力される。このため、入力された内容(例えば、ユーザが使用を予定している生産設備)に基づいて、最適化処理を効率良く実行することができる。
 本技術の一実施形態では、前記条件は、前記最適化処理を実行するときの制限条件であってもよく、前記実行部は、互いに異なる複数の前記制限条件に基づいて最適化処理を実行し、前記複数の最適化結果を求めてもよい。
 実装プログラムの最適化にあたって、制限条件(例えば、部品実装ラインにおいて部材の配置を変更すべきでない箇所、ユーザが部材の配置を固定しておきたい箇所、段取替えの実行態様等)が存在する場合がある。上記の構成では、互いに異なる複数の制限条件に基づいて最適化処理を実行するため、ユーザの製造環境に応じたより有用な最適化結果を求めることができる。
 本技術の一実施形態では、前記制限条件は、生産する回路基板の種類が変更されるときの前記少なくとも1台の部品実装機における段取替え条件に関する制限事項であってもよい。
 一般的に、生産する回路基板の種類を変更する際には段取替えが行われる。段取替えは、比較的多くの時間を要する。したがって、このような構成では、効率良く複数種類の回路基板を生産し得る最適化結果を求めることができる。
 本技術の一実施形態では、前記条件は、前記最適化結果を評価する評価基準であってもよく、前記実行部は、互いに異なる複数の前記評価基準に基づいて前記最適化処理を実行し、前記複数の最適化結果を求めてもよい。
 このような構成では、互いに異なる複数の評価基準(例えば、部品実装ラインの稼働時間に関する基準やユーザによる段取替えに関する基準等)に基づいて最適化処理が実行される。したがって、効率良く回路基板を生産し得る最適化結果を求めることができる。
 本技術の一実施形態では、前記評価基準は、回路基板を生産するための総生産時間、生産する回路基板の種類が変更されるときの段取替え回数、生産する回路基板の種類が変更されるときの総段取替え時間の中から、優先する項目を指定したものであってもよい。
 上記の各項目は、回路基板の生産性を評価する指標となる。このような構成では、ユーザが優先すべき項目を評価基準として用いることができる。
 本技術の一実施形態では、前記部品実装ラインで生産される回路基板の種類と、前記回路基板の種類毎に当該回路基板に実装される複数の部品の種類及び実装位置と、前記回路基板の種類毎に生産される生産数量と、を含む生産計画を入力する生産計画入力部を有してもよく、前記実行部は入力された前記生産計画に基づいて前記最適化処理を実行してもよい。
 部品実装ラインでは、1又は複数の部品実装機によって複数種類の部品を実装することにより回路基板が生産される。上記の構成では、上記した各項目を生産計画として入力する。これにより、生産を予定している回路基板を好適に生産することができる、複数の最適化結果を求めることが容易となる。
 本技術の一実施形態では、前記部品実装ラインは、複数種類の回路基板を生産してもよく、前記表示部は、前記複数の最適化結果として、それぞれ、回路基板を生産するための総生産時間を表示するとともに、生産する回路基板の種類が変更されるときの段取替え回数と総段取替え時間のうちの少なくとも一方を表示してもよい。
 回路基板の生産において、上記の各項目(総生産時間や段取替え時間及び回数)は、複数の最適化結果のうちから選択すべき最適化結果を判断する際に重要な要素となる。このような構成では、表示部に当該項目が比較表示されるため、ユーザが選択すべき最適化結果を視覚的に判断することができる。
(実施例)
 以下、図面を参照して、本実施例における実装プログラムの最適化処理について説明する。回路基板11の生産は、図1に示すように、回路基板11を搬送する搬送経路12に配列された複数の部品実装機18と、部品実装に関連する作業を行う複数の実装関連機13,14,15とにより行われる。図1に示す部品実装ライン10は、最適化前の実装プログラム(換言すると、既存の実装プログラム)に基づいて構築された部品実装ライン10の構成の一例である。複数の実装関連機は、例えば、はんだ印刷機13、検査装置14、リフロー装置15、接着剤塗布装置等である。
 各部品実装機18には、それぞれ部品を供給するテープフィーダやトレイフィーダ等のフィーダ16がフィーダ支持部17に交換可能にセットされている。図示はしていないが、各部品実装機18の実装ヘッドは交換可能に保持され、当該実装ヘッドには、フィーダ16から供給される部品を吸着して回路基板11に実装する1又は複数の吸着ノズルが交換可能に保持されている。各部品実装機18の実装ヘッドに保持させる吸着ノズルは、ノズル径や吸着パッド形状等が異なる複数種類の吸着ノズルの中から、フィーダ16により供給される部品のサイズや種類等に応じて付け替えられる。このように構成された部品実装ライン10では、生産ジョブを実行して部品が実装された回路基板11を生産する。
 次に、最適化装置20について説明する。図2に示すように、最適化装置20は、入力部22、表示部23、記憶部24、制御部25等を備える。入力部22は、複数のキーを備えており、ユーザは、入力部22を介して様々な指示や情報を入力することができる。表示部23は、各種情報や後述する最適化結果を表示するためのディスプレイである。表示部23は、いわゆるタッチパネルとして、入力部22と一体となって機能してもよい。記憶部24は、最適化処理プログラム等の各種プログラムやデータを記憶する。制御部25は、記憶部24に記憶されている各種プログラムに従って、様々な処理を実行する。本実施例では、制御部25は、記憶部24に記憶されている最適化処理プログラムを実行することで、後述する各種条件に従って、ユーザによって入力された最適化前の実装プログラムに対して最適化処理を実行する。
 続いて、図3を用いて、最適化装置20によって実装プログラムを最適化する処理について説明する。図3の処理は、最適化処理を開始するための操作がユーザによって入力されると開始される。
 S10において、制御部25は、最適化前の実装プログラムの入力を受け付ける。具体的には、ユーザにより、上述した既存の部品実装ライン10を構成する部品実装機18の数と、当該部品実装機18の種類(例えば、機種)が入力される。また、ユーザにより、当該部品実装ライン10で生産する回路基板11の種類、回路基板11の種類毎の当該回路基板11に実装する複数の部品の種類及び実装位置、及び、生産する回路基板11毎の生産数量を含む生産計画が入力される。なお、最適化前の実装プログラムは、外部装置(不図示)から入力されてもよいし、記憶部24に予め記憶されている実装プログラムであってもよい。
 S12において、制御部25は、入力された実装プログラムを記憶部24に記憶させる。次いで、S14において、制御部25は、実装プログラムの最適化処理にあたって優先すべき項目の選択の入力を受け付ける。具体的には、例えば、生産計画が示す回路基板を生産するための総生産時間、生産する回路基板の種類が変更されるときの段取替え回数、及び、生産する回路基板の種類が変更されるときの総段取替え時間の中から、優先する項目を指定するユーザ操作の入力を受け付ける。
 その後、S16において、実装プログラムの最適化処理を実行させるための操作がユーザによって入力されると、S18において、制御部25は、入力された部品実装ライン10の構成に基づいて最適化処理を実行する。具体的には、例えば、制御部25は、部品実装ライン10を構成する部品実装機18の数や種類を変更したり、部品実装機18の配列順序を入れ替えたりして、複数の新たなライン構成を生成する。そして、各ライン構成について最適化処理を実行する。また例えば、制御部25は、生成した各ライン構成について、部品実装機18のモジュール構成(すなわち、部品供給ユニット(フィーダ支持部17)の種類、実装ヘッドの種類等)を変更して、最適化処理を実行する。
 S20において、制御部25は、図4に示すように、生成した複数のライン構成のそれぞれに基づいて求めた複数の最適化結果を表示部23に比較表示する。具体的には、制御部25は、各ライン構成について、最適化した総生産時間、段取替え回数、及び、総段取替え時間を表示する。制御部25は、S14において、優先項目を指定するユーザ操作の入力を受け付けている。このため、S20では、指定された項目(図4では、総生産時間)に対する結果が良好な順序で、求めた複数の最適化結果のうち、いくつかの最適化結果を表示部23に比較表示する。
 S22において、制御部25は、比較表示した複数の最適化結果の中から、1つを選択するユーザ操作の入力を受け付ける。そして、S24において、制御部25は、S12において記憶させた実装プログラム(すなわち、S10で入力された実装プログラム)を、選択された最適化結果により構築される実装プログラムに更新して記憶部24に記憶させる。
 上述した実施例では、最適化装置20が、ユーザにより入力された最適化前の実装プログラムに基づいて複数のライン構成を生成し、当該複数のライン構成について最適化処理を実行する。すなわち、1つの実装プログラムの入力に対して、互いに異なる複数の条件(本実施例では複数のライン構成)で最適化処理が実行される。そして、最適化装置20が、求めた複数の最適化結果を比較表示する。その後、ユーザにより複数の最適化結果のうちから1つの最適化結果が選択されると、選択された最適化結果に基づいて、実装プログラムが更新される。このように、本実施例の最適化装置20では、複数の条件で最適化処理が実行されるため、ユーザは、実装プログラムの最適化処理を試みる際に、最適化処理の適切な条件を探りながら幾度も最適化処理を実行する必要がない。また、複数の最適化結果の中から選択した所望の最適化結果に基づいて実装プログラムが自動で更新されるので、利便性が高い。
 上述した実施例では、制御部25が、実装プログラムの最適化処理に適用する条件として、複数のライン構成を採用した。しかしながら、最適化処理に適用する条件は、最適化処理を実行するときの制限条件であってもよい。具体的には、例えば、最適化前の実装プログラムにおけるフィーダ16の配置の全体又は一部を固定した条件や、実装ヘッドに保持する吸着ノズルの配置を固定した条件、フィーダ16の段取替えを一括(いわゆる外段取り)又は個別(いわゆる内段取り)で固定した条件等のうちの複数を適用して最適化処理を実行してもよい。
 また、最適化処理に適用する条件は、最適化結果を評価する評価基準であってもよい。具体的には、例えば、最適化処理において、総生産時間を優先する条件、段取替え回数の低減を優先する条件、目標タクトタイムを指定する条件、又はコストバランスの条件等のうちの複数を適用して最適化処理を実行してもよい。
 また、上述した実施例では、単一の部品実装ライン10について最適化処理を実行した。しかしながら、本明細書に開示の技術は、複数の部品実装ラインに対して適用してもよいし、部品実装ライン10を構成する1台又は複数台の部品実装機18のみに対して適用してもよい。
(対応関係)
 図3のS10、S18、S20、S22、S24の処理が、それぞれ「実装プログラム入力部」、「実行部」、「表示部」、「選択部」、「実装プログラム更新部」によって実行される処理の一例である。
 以上、本明細書に開示の技術の具体例を詳細に説明したが、これらは例示に過ぎず、請求の範囲を限定するものではない。請求の範囲に記載の技術には、以上に例示した具体例を様々に変形、変更したものが含まれる。また、本明細書または図面に説明した技術要素は、単独であるいは各種の組合せによって技術的有用性を発揮するものであり、出願時請求項記載の組合せに限定されるものではない。

Claims (9)

  1.  少なくとも1台の部品実装機を含む部品実装ラインにおいて、回路基板に部品を実装する実装プログラムを最適化する装置であって、
     前記少なくとも1台の部品実装機に用いる最適化前の実装プログラムを入力する実装プログラム入力部と、
     入力された前記最適化前の実装プログラムに対して、複数の条件で最適化処理を実行する実行部と、
     前記最適化処理のそれぞれによって求められた複数の最適化結果を比較表示する表示部と、
     前記複数の最適化結果の中から1つを選択する選択部と、
     前記最適化前の実装プログラムを、選択された最適化結果に基づいて更新する実装プログラム更新部と、
     を備える、最適化装置。
  2.  前記条件は、前記部品実装ラインに含まれる前記少なくとも1台の部品実装機の構成であり、
     前記実行部は、互いに異なる複数の前記構成に基づいて前記最適化処理を実行し、前記複数の最適化結果を求める、請求項1に記載の最適化装置。
  3.  前記少なくとも1台の部品実装機の構成を入力する構成入力部を有し、
     前記構成は、前記部品実装ラインを構成する部品実装機の数と、前記部品実装機の種類を少なくとも含む、請求項2に記載の最適化装置。
  4.  前記条件は、前記最適化処理を実行するときの制限条件であり、
     前記実行部は、互いに異なる複数の前記制限条件に基づいて最適化処理を実行し、前記複数の最適化結果を求める、請求項1に記載の最適化装置。
  5.  前記制限条件は、生産する回路基板の種類が変更されるときの前記少なくとも1台の部品実装機における段取替え条件に関する制限事項である、請求項1に記載の最適化装置。
  6.  前記条件は、前記最適化結果を評価する評価基準であり、
     前記実行部は、互いに異なる複数の前記評価基準に基づいて前記最適化処理を実行し、前記複数の最適化結果を求める、請求項1に記載の最適化装置。
  7.  前記評価基準は、回路基板を生産するための総生産時間、生産する回路基板の種類が変更されるときの段取替え回数、生産する回路基板の種類が変更されるときの総段取替え時間の中から、優先する項目を指定したものである、請求項6に記載の最適化装置。
  8.  前記部品実装ラインで生産される回路基板の種類と、前記回路基板の種類毎に当該回路基板に実装される複数の部品の種類及び実装位置と、前記回路基板の種類毎に生産される生産数量と、を含む生産計画を入力する生産計画入力部を有し、
     前記実行部は入力された前記生産計画に基づいて前記最適化処理を実行する、請求項1ないし7のいずれか一項に記載の最適化装置。
  9.  前記部品実装ラインは、複数種類の回路基板を生産し、
     前記表示部は、前記複数の最適化結果として、それぞれ、回路基板を生産するための総生産時間を表示するとともに、生産する回路基板の種類が変更されるときの段取替え回数と総段取替え時間のうちの少なくとも一方を表示する、請求項1ないし8のいずれか一項に記載の最適化装置。
PCT/JP2020/018890 2020-05-11 2020-05-11 回路基板に部品を実装する実装プログラムの最適化装置 Ceased WO2021229664A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP2022522122A JP7525600B2 (ja) 2020-05-11 2020-05-11 回路基板に部品を実装する実装プログラムの最適化装置
CN202080100209.9A CN115461687A (zh) 2020-05-11 2020-05-11 向电路基板安装元件的安装程序的优化装置
PCT/JP2020/018890 WO2021229664A1 (ja) 2020-05-11 2020-05-11 回路基板に部品を実装する実装プログラムの最適化装置
DE112020007169.3T DE112020007169T5 (de) 2020-05-11 2020-05-11 Optimierungsvorrichtung für Montageprogramm für die Montage einer Komponente an einer Schaltplatine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2020/018890 WO2021229664A1 (ja) 2020-05-11 2020-05-11 回路基板に部品を実装する実装プログラムの最適化装置

Publications (1)

Publication Number Publication Date
WO2021229664A1 true WO2021229664A1 (ja) 2021-11-18

Family

ID=78525456

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/018890 Ceased WO2021229664A1 (ja) 2020-05-11 2020-05-11 回路基板に部品を実装する実装プログラムの最適化装置

Country Status (4)

Country Link
JP (1) JP7525600B2 (ja)
CN (1) CN115461687A (ja)
DE (1) DE112020007169T5 (ja)
WO (1) WO2021229664A1 (ja)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002353699A (ja) * 2001-05-25 2002-12-06 Matsushita Electric Ind Co Ltd 電子部品実装装置における生産用データ作成装置および生産用データ作成方法
JP2003036296A (ja) * 2001-07-25 2003-02-07 Hitachi Ltd 製品製造プロセスの管理方法及び管理システム
JP2009129063A (ja) * 2007-11-21 2009-06-11 Panasonic Corp シミュレーション方法およびシミュレーション装置
JP2012094663A (ja) * 2010-10-27 2012-05-17 Hitachi High-Tech Instruments Co Ltd 部品装着システム、部品装着設定装置、部品装着設定プログラム、及び部品装着方法
WO2015025408A1 (ja) * 2013-08-22 2015-02-26 富士機械製造株式会社 部品実装ラインの生産最適化装置
JP2019516155A (ja) * 2016-03-10 2019-06-13 シーメンス アクチエンゲゼルシヤフトSiemens Aktiengesellschaft 構成グループを実装ラインへ割り当てるための方法および装置

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005032936A (ja) * 2003-07-11 2005-02-03 Juki Corp 部品実装方法
JP6223038B2 (ja) 2013-07-25 2017-11-01 ダイハツ工業株式会社 内燃機関の制御装置
WO2016151833A1 (ja) * 2015-03-26 2016-09-29 富士機械製造株式会社 部品実装ラインの最適化装置および部品実装ラインの最適化方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002353699A (ja) * 2001-05-25 2002-12-06 Matsushita Electric Ind Co Ltd 電子部品実装装置における生産用データ作成装置および生産用データ作成方法
JP2003036296A (ja) * 2001-07-25 2003-02-07 Hitachi Ltd 製品製造プロセスの管理方法及び管理システム
JP2009129063A (ja) * 2007-11-21 2009-06-11 Panasonic Corp シミュレーション方法およびシミュレーション装置
JP2012094663A (ja) * 2010-10-27 2012-05-17 Hitachi High-Tech Instruments Co Ltd 部品装着システム、部品装着設定装置、部品装着設定プログラム、及び部品装着方法
WO2015025408A1 (ja) * 2013-08-22 2015-02-26 富士機械製造株式会社 部品実装ラインの生産最適化装置
JP2019516155A (ja) * 2016-03-10 2019-06-13 シーメンス アクチエンゲゼルシヤフトSiemens Aktiengesellschaft 構成グループを実装ラインへ割り当てるための方法および装置

Also Published As

Publication number Publication date
JP7525600B2 (ja) 2024-07-30
CN115461687A (zh) 2022-12-09
JPWO2021229664A1 (ja) 2021-11-18
DE112020007169T5 (de) 2023-03-16

Similar Documents

Publication Publication Date Title
JP6270286B2 (ja) 部品実装ラインの生産最適化装置
US7738985B2 (en) Production condition determining method, production condition determining apparatus, mounter, and program
JP6816068B2 (ja) ロボットプログラム生成装置
JP2016025131A (ja) 部品実装方法および部品実装システム
JP5713443B2 (ja) 部品実装ラインの生産管理装置及び生産管理方法
US10521743B2 (en) Managing method and managing device of an electronic component mounting system having a plurality of production lines
JP6413071B2 (ja) 部品実装方法および部品実装システム
KR101641941B1 (ko) Smt 라인의 최적화 시스템 및 방법
US11140801B2 (en) Data input and control devices of an electronic component mounting machine
JP7525600B2 (ja) 回路基板に部品を実装する実装プログラムの最適化装置
CN113190970A (zh) 基于Modelica的混合流水车间系统模型库构建方法及装置
JP2016164721A (ja) 加工工程管理機能付き数値制御装置および加工工程管理プログラム
JP2012064964A (ja) 部品実装システム
US10750651B2 (en) Method of preparing a setup kit for a placement machine
JP6748718B2 (ja) 生産計画作成システム及び生産計画作成方法
JP2003283198A (ja) 実装工程最適化装置
JP7446952B2 (ja) 生産計画の作成方法、生産システム
US12498694B2 (en) Operating device and method
JP2023129769A (ja) 部品実装装置および部品実装方法
JP7653859B2 (ja) 生産管理装置
JP4897392B2 (ja) ライン選定方法、部品実装基板生産方法及びライン選定プログラム
JP6924929B2 (ja) 生産支援システムおよび生産支援方法
JP2007035892A (ja) データ管理方法
JP3117786B2 (ja) 生産機械の稼働予定管理装置
KR20030082801A (ko) Vin 플레이트 타각기의 타각방법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20934902

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2022522122

Country of ref document: JP

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 20934902

Country of ref document: EP

Kind code of ref document: A1