WO2021038940A1 - 電池管理装置、学習モデル、コンピュータプログラム、電池管理方法、及び情報提供装置 - Google Patents

電池管理装置、学習モデル、コンピュータプログラム、電池管理方法、及び情報提供装置 Download PDF

Info

Publication number
WO2021038940A1
WO2021038940A1 PCT/JP2020/012779 JP2020012779W WO2021038940A1 WO 2021038940 A1 WO2021038940 A1 WO 2021038940A1 JP 2020012779 W JP2020012779 W JP 2020012779W WO 2021038940 A1 WO2021038940 A1 WO 2021038940A1
Authority
WO
WIPO (PCT)
Prior art keywords
power consumption
power
storage element
electric
charge rate
Prior art date
Application number
PCT/JP2020/012779
Other languages
English (en)
French (fr)
Inventor
聡 奥田
Original Assignee
株式会社Gsユアサ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社Gsユアサ filed Critical 株式会社Gsユアサ
Priority to JP2021541988A priority Critical patent/JP7298698B2/ja
Priority to US17/638,466 priority patent/US20220357162A1/en
Priority to CN202080068021.0A priority patent/CN114450738A/zh
Publication of WO2021038940A1 publication Critical patent/WO2021038940A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C21/00Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00
    • G01C21/26Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00 specially adapted for navigation in a road network
    • G01C21/28Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00 specially adapted for navigation in a road network with correlation of data from several navigational instruments
    • G01C21/30Map- or contour-matching
    • G01C21/32Structuring or formatting of map data
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C21/00Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00
    • G01C21/26Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00 specially adapted for navigation in a road network
    • G01C21/34Route searching; Route guidance
    • G01C21/3453Special cost functions, i.e. other than distance or default speed limit of road segments
    • G01C21/3469Fuel consumption; Energy use; Emission aspects
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C21/00Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00
    • G01C21/26Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00 specially adapted for navigation in a road network
    • G01C21/34Route searching; Route guidance
    • G01C21/36Input/output arrangements for on-board computers
    • G01C21/3667Display of a road map
    • G01C21/367Details, e.g. road map scale, orientation, zooming, illumination, level of detail, scrolling of road map or positioning of current position marker
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/09Arrangements for giving variable traffic instructions
    • G08G1/0962Arrangements for giving variable traffic instructions having an indicator mounted inside the vehicle, e.g. giving voice messages
    • G08G1/0968Systems involving transmission of navigation instructions to the vehicle
    • G08G1/0969Systems involving transmission of navigation instructions to the vehicle having a display in the form of a map
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B29/00Maps; Plans; Charts; Diagrams, e.g. route diagram
    • G09B29/10Map spot or coordinate position indicators; Map reading aids
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries

Definitions

  • the present invention relates to a battery management device, a learning model, a computer program, a battery management method, and an information providing device capable of presenting an accurate movable distance.
  • the mileage is calculated based on the stored amount of the storage battery mounted on the electric vehicle and the road traffic information, and it is determined whether or not the set final destination can be reached.
  • a charging station management system is disclosed that searches for and presents a rechargeable charging station if it cannot.
  • An object of the present invention is to provide a battery management device, a learning model, a computer program, a battery management method, and an information providing device that accurately present a movable distance according to the situation of a planned movement route of an electric moving body. ..
  • the battery management device includes a calculation unit that calculates the movable distance based on the charge rate of the power storage element of the power source of the electric mobile body.
  • the calculation unit acquires the charge rate of the power storage element, acquires environmental information on the planned route of the electric moving body, and from the acquired charging rate and environmental information, the electric moving body moves on the planned route.
  • the estimated power consumption is calculated based on the amount of power required for the electric vehicle and the prediction of the power consumption of the equipment mounted on the electric moving body, and based on the calculated predicted power consumption and the charge rate. ,
  • the movable distance due to the remaining power of the power storage element is calculated.
  • the charge rate (SOC) of the power storage element which is the power source of the electric mobile body, is calculated accurately, and the power consumption status of the equipment provided in the mobile body is also dealt with, such as traffic jam or accident, the influence of the weather, and the power consumption status of the equipment provided in the mobile body. It is possible to accurately present the movable distance.
  • the battery management device includes a calculation unit that calculates the movable distance based on the charge rate of the power storage element of the power source of the electric mobile body.
  • the calculation unit acquires the charge rate of the power storage element and acquires environmental information in the planned route of the electric mobile body. From the acquired charge rate and environmental information, the calculation unit determines the amount of power required for the electric moving body to move along the planned route and the power consumption of the equipment mounted on the electric moving body. Calculate the estimated power consumption based on the forecast.
  • the calculation unit calculates the movable distance due to the remaining power of the power storage element based on the calculated predicted power consumption and the charge rate.
  • the power consumption on the planned route is calculated based on the prediction of the equipment usage status according to the planned travel route status and environmental conditions.
  • a situation may occur that is different from the state in which the moving object is moving at that time.
  • Forecasting power consumption on the planned route is necessary for the average travel time using environmental information such as congestion information and environmental information such as outside temperature, wind speed, and wave height that affect movement, and the movement of the electric moving object itself based on the average speed. Prediction of electric energy and prediction of power consumption of equipment required according to environmental information are added.
  • An “electric mobile body” is a vehicle such as an electric vehicle, an airplane, or a ship equipped with a power storage element.
  • the electric moving body may be manned or unmanned.
  • at least a part of the power source for driving is the power storage element, and the power source may include a part of other power such as an engine.
  • the electric moving body When the electric moving body is an electric airplane, the sound generated from the motor or propeller is loud. When outside air is introduced to control the temperature, the noise enters, so air conditioning equipment may be used for manned vehicles. When flying at a high altitude, since the outside air temperature is low, air conditioning is required to prevent the temperature of the cabin and the power storage element from dropping. If the window becomes cloudy due to humidity or temperature, it is necessary to prevent the cloudiness by air conditioning or heating wire. In this way, in the electric mobile body, the power consumption in the equipment changes depending on the location of the movement route or the time. Therefore, not only the amount of electric power required for the movement of the electric moving body itself but also the amount of electric power consumed in the equipment is taken into consideration.
  • the movable distance is calculated from the calculated predicted power consumption. Since the battery management device connected to the power storage element can accurately predict the power consumption based on the characteristics of the power storage element, the movable distance is calculated.
  • the calculation unit divides the planned route of the electric moving body, predicts the required electric energy and the electric power consumption in the equipment for each divided section based on the environmental information, and for each section, the said The electric moving body may determine whether or not the section can be moved based on the charge rate, and calculate the distance to the section determined to be non-movable as the movable distance.
  • Environmental information may include traffic jam information.
  • Congestion information may be provided as information such as the congestion length for each section of the route, the average travel time for each time in the section, and the average speed.
  • the calculation unit uses the power storage element of the charge rate as a power source according to the input of the charge rate of the power storage element, the congestion information in the planned route, and the predicted power consumption calculated for the planned route.
  • the movable distance may be calculated using a learning model trained to output the movable distance as.
  • the movable distance is compared with each threshold such as individual characteristics of the power storage element, moving speed, driving characteristics of the driver, set temperature of air conditioning equipment, outside air temperature, humidity, wind speed, wave height, characteristics of moving body, etc. It is affected by conditions that are difficult to calculate based on the judgment based on. By using a learning model based on deep learning that inputs these information, it is possible to accurately calculate the movable distance in consideration of the characteristics of the power storage element.
  • the calculation unit responds to the time change of the charge rate of the power storage element up to the calculation time, the congestion time distribution predicted for the planned route, and the input of the predicted distribution of the outside temperature in the planned route. Even if the movable distance is calculated using the storage element of the charge rate as a power source, or the movable distance is calculated using a learning model learned to output the time change of the charge rate after the calculation time of the power storage element. Good.
  • the travelable distance is affected by the conditions inside and outside the vehicle, such as the congestion status of the travel route, changes in temperature, and changes in humidity, which change over time. It is difficult to simulate the situation inside and outside the mobile body based on the situation at each time point.
  • the time-varying data can be imaged and input to the learning model, and the actual movable distance or the time-varying charge rate can be trained to be output as teacher data. With the above configuration, it is possible to accurately obtain the time change prediction of the movable distance or the charge rate by inputting the time change, the time distribution of the congestion prediction, and the prediction distribution of the change of the outside air temperature.
  • the learning model may input the scheduled passage time of the scheduled route.
  • the travelable distance is affected by the conditions inside and outside the vehicle, such as congestion of the travel route, changes in temperature, and changes in humidity, which change over time.
  • congestion of the travel route changes in temperature
  • changes in humidity which change over time.
  • the power consumption of air conditioning is large, and if the power consumption is estimated only by the amount of power required for movement, there is a possibility that the power will be insufficient during the process. Therefore, accurate calculation can be expected by inputting the time information of the target for which the movable distance is calculated.
  • the battery management device may determine whether or not it is possible to travel the entire route of the planned route based on the calculated movable distance. If it is determined that a part of the planned travel route cannot be traveled, a message prompting charging may be output in advance.
  • the output unit may include a speaker and output a message by voice, or may output a message by characters or images on a display mounted on the electric mobile body.
  • the user or operator of the mobile body can grasp the power required at least to the destination, not to fully charge, in advance, not after the power is low.
  • the user or the operator can charge the required electric power by selecting one from a group of charging stations provided in various places.
  • the battery management device calculates the predicted power consumption in a part of the battery based on the predicted power consumption required for movement on the planned route and the charge rate, and charges the power corresponding to the calculated predicted power consumption. In order to do so, a message including the charging time or the charging amount of the pre-charging may be output.
  • Charging time or charging amount for charging the shortage from the current charging rate is output in order to travel the entire route of the planned route without charging in the middle.
  • the user or operator of the mobile body should at least at home or at a charging station managed by the owner of the mobile body in advance in order to move the planned route, not after the power of the power storage element of the mobile body is low. You can know how much you should charge.
  • the charging rate of the power storage element is acquired at a predetermined timing while the own device is running, and each time the charging rate is acquired, it is determined whether or not the charging rate is equal to or less than the predetermined value.
  • the calculation unit starts to calculate the movable distance.
  • the timing of the request for calculating the movable distance may be the timing when the driver or the owner of the moving object operates, but it may also be the timing when the charging rate drops below a predetermined value.
  • the driver or the owner is not aware of the decrease in the charge rate, it is possible to notify that the movable distance is shortened.
  • the battery management device may be requested at the timing when the destination is set by the navigation device.
  • the electric mobile body may be a manned vehicle.
  • air conditioning equipment is required to control the temperature in the driver's cab or cabin and to prevent fogging of windows.
  • the effect of equipment power consumption is greater than when it is an unmanned aerial vehicle.
  • the power source of the electric moving body does not have to include an engine.
  • the environmental information includes at least one of information on traffic conditions, congestion, congestion conditions, temperature, atmospheric pressure, altitude, humidity, wind speed, wave height, and tidal current on the planned route.
  • the estimated power consumption may change because the time required for movement varies depending on traffic information such as accidents and non-navigation, traffic congestion, or congestion.
  • the power consumption of the power storage element, the driver's cab, or the air-conditioning equipment in the passenger cabin differs depending on the temperature or humidity. Since the time required for movement and the power required for movement differ depending on the wind speed or the height of the wave, the predicted power consumption may change.
  • the movable distance is calculated accurately using this information.
  • the battery management device acquires environmental information on the planned movement route of the electric moving body, and from the acquired charge rate and environmental information, the amount of power required for the electric moving body to move on the planned route and the said. It is equipped with a calculation unit that calculates the predicted power consumption based on the prediction of the power consumption in the equipment mounted on the electric moving body, and is based on the calculated predicted power consumption and the charge rate of the power storage element. , The charge amount to the power storage element may be determined, and the power storage element may be charged with the determined charge amount.
  • the ionization management device not only calculates the movable distance, but also calculates the amount of electric power required to move the planned route, and charges the required amount of electric power at the timing of moving to the rechargeable charging device. You may.
  • the learning model outputs the charge rate of the power storage element of the power source of the electric mobile body, the environmental information in the planned route of the electric mobile body, the input layer for inputting the predicted power consumption in the planned route, and the movable distance.
  • a teacher including the output layer, the charge rate of the power storage element of the electric mobile body, environmental information in the path to which the electric mobile body has moved, the actual power consumption of the power storage element, and the corresponding actual travel distance. It includes an intermediate layer learned based on the data, and is used to calculate the movable distance of the electric moving body.
  • a teacher in which the learning model includes the charge rate of the power storage element of the actual electric moving body, the environmental information in the path to which the electric moving body has moved, the actual power consumption of the power storage element, and the corresponding actual moving distance.
  • the above-mentioned characteristics of the learning model may be realized as a method of generating the learning model.
  • the computer program causes a computer that manages the state of the power storage element of the power source of the electric mobile body to execute the process.
  • the computer program acquires the charge rate of the power storage element from the computer, acquires the environmental information in the planned route of the electric moving body, and from the acquired charging rate and the environmental information, the electric moving body uses the planned route.
  • the estimated power consumption is calculated based on the amount of power required to move and the power consumption of the equipment mounted on the electric moving body, and the calculated predicted power consumption and the charging rate are calculated.
  • the process of calculating the movable distance is executed based on.
  • the battery management method outputs the movable distance due to the remaining power in the power storage element based on the charge rate of the power storage element of the power source of the electric mobile body.
  • the charge rate of the power storage element is acquired, the environmental information in the planned route of the electric moving body is acquired, and the electric moving body moves along the planned route from the acquired charging rate and the environmental information.
  • the estimated power consumption is calculated based on the amount of power required for the electric vehicle and the prediction of the power consumption of the equipment mounted on the electric moving body, and based on the calculated predicted power consumption and charge rate. Includes processing to calculate the travelable distance.
  • the information providing device can send and receive information by communicating with the electric mobile body, and provides information for calculating the movable distance of the power storage element of the power source of the electric mobile body.
  • the information providing device receives information on the charge rate, the planned route, and the power consumption of the power storage element, and acquires the environmental information in the planned route of the electric mobile body. Based on the acquired charge rate and environmental information, the information providing device determines the amount of power required for the electric moving body to move along the planned route and the amount of power consumed by the equipment mounted on the electric moving body. Calculate the power consumption in the planned route predicted based on this.
  • the information providing device transmits the calculated predicted power consumption to the electric mobile body.
  • an electric vehicle will be described as an example of the electric moving body
  • an electric airplane and a type of eVTOL electric Vertical Take-Off and Landing Aircraft
  • FIG. 1 is a block diagram of an information providing system 100 including a battery management device 1.
  • the information providing system 100 includes a power storage element 10 mounted on a vehicle V which is an electric vehicle, a battery management device 1 of the power storage element 10, and an information providing server 2.
  • the information providing server 2 is a server computer.
  • the information providing server 2 is managed by the manufacturer of the power storage element 10, and the information providing server 2 is based on map information, VICS (registered trademark), traffic information provided by each vehicle, and weather information at each point. Outputs information on the estimated power consumption from the starting point to the target point.
  • the battery management device 1 is connected to the power storage element 10.
  • the battery management device 1 may have a mode built in the power storage element 10 which is a module including a plurality of power storage cells.
  • the battery management device 1 can be connected to a device that can acquire the position information of the vehicle V and the route information of the planned travel.
  • the battery management device 1 acquires the position information of the vehicle V and the route information of the planned travel from, for example, the navigation device 31 mounted on the vehicle V.
  • the battery management device 1 may acquire position information from a GPS (Global Positioning System) function mounted on a communication terminal device possessed by a passenger.
  • the battery management device 1 may acquire a route to be traveled from the communication terminal device.
  • the battery management device 1 itself may be included in the navigation device 31.
  • the battery management device 1 may communicate with another vehicle and acquire position information.
  • the battery management device 1 can communicate with the information providing server 2 outside the vehicle.
  • the battery management device 1 communicates with the information providing server 2 via an external communication device 32 connected to the vehicle-mounted network VN.
  • the battery management device 1 can communicate with the air conditioner 33 and the output device 34 via the vehicle-mounted network VN.
  • the output device 34 is a device capable of outputting sound or light to the passenger including a speaker and a display.
  • the output device 34 may be integrated with the navigation device 31.
  • the battery management device 1 includes a control unit 11, a storage unit 12, a connection unit 13, and a communication unit 14.
  • the control unit 11 is a processor that uses a CPU (Central Processing Unit) or a GPU (Graphics Processing Unit).
  • the control unit 11 may be a combination of a CPU and a GPU.
  • the control unit 11 uses the built-in memory such as ROM and RAM to control each component unit to execute processing.
  • the control unit 11 executes a process based on the control program 1P stored in the storage unit 12.
  • the storage unit 12 is, for example, a hard disk or a non-volatile memory such as an SSD (Solid State Drive).
  • the control program 1P described above is stored in the storage unit 12.
  • the control program 1P stored in the storage unit 12 may be a control program 6P stored in the recording medium 6 read by the control unit 11 and duplicated in the storage unit 12.
  • the storage unit 12 stores the data created by the processing of the control unit 11.
  • the storage unit 12 stores the SOC (State Of Charge: charge rate) of the power storage element 10.
  • the storage unit 12 may store data on voltage, current, internal resistance, and temperature.
  • the storage unit 12 stores the power consumption predicted by the processing of the control unit 11.
  • the connection unit 13 is connected to the power storage element 10.
  • the control unit 11 acquires measurement data including at least a voltage value among the voltage, current, internal resistance, and temperature of the power storage element 10 via the connection unit 13 and calculates the SOC.
  • the control unit 11 may acquire the SOC calculated by the calculation unit built in the power storage element 10.
  • the communication unit 14 is a communication device that realizes a communication connection with the information providing server 2 via the in-vehicle network VN and the network N outside the vehicle.
  • the information providing server 2 includes a control unit 20, a storage unit 21, and a communication unit 22.
  • the control unit 20 is a processor using a CPU or GPU.
  • the control unit 20 may be a combination of a CPU and a GPU.
  • the control unit 20 uses a built-in memory such as a ROM and a RAM to control each component unit to execute processing.
  • the control unit 20 executes a process based on the information providing program 2P stored in the storage unit 21.
  • the storage unit 21 is, for example, a non-volatile memory such as a hard disk or SSD.
  • the above-mentioned information providing program 2P is stored in the storage unit 21.
  • the information providing program 2P stored in the storage unit 21 may be a program in which the control unit 20 reads out the information providing program 7P stored in the recording medium 7 and duplicates it in the storage unit 21.
  • the storage unit 21 stores the data created by the processing of the control unit 20.
  • the control unit 20 uses the communication unit 22 to provide information on factors that affect the power consumption of the vehicle V, such as map information on the public communication network, VICS (registered trademark), weather information including temperature and humidity, and the like via the network N. It can be acquired and stored in the storage unit 21.
  • the storage unit 21 associates with identification information for identifying at least one of the battery management device 1, the power storage element 10, the vehicle V, and the passenger of the vehicle V, and information on the predicted power consumption amount. May be memorized.
  • the communication unit 22 is a communication device that realizes communication via the network N.
  • the communication unit 22 is, for example, a network card corresponding to the network N.
  • Network N includes a public communication network.
  • the information providing server 2 can acquire map information, traffic information, weather information, and location information of the charging station from other service providers via the network N by the communication unit 22.
  • the network N includes a carrier network and an optical beacon, and the vehicle outside communication device 32 of the moving vehicle V can communicate with the information providing server 2.
  • the battery management device 1 mounted on the vehicle V determines the position information of the vehicle V, the position information of the charging station, and the estimated power consumption in the traveling path of the vehicle V. Based on the charge rate of the power storage element 10, the mileage is estimated in consideration of the estimated power consumption inside and outside the vehicle. A part of the estimated power consumption is provided by the information providing server 2.
  • FIG. 2 is a flowchart showing an example of a processing procedure executed by the battery management device 1.
  • the control unit 11 receives a request for calculating the mileage (step S101).
  • the request for calculating the mileage is received from the driver by the button provided in the vehicle V that can be operated by the driver.
  • the request for calculating the mileage may be output from the navigation device 31 when the destination is set in the navigation device 31.
  • the request for calculating the mileage may be output by the control unit 11 itself when the SOC becomes equal to or less than a predetermined value.
  • control unit 11 When the control unit 11 receives the request, the control unit 11 acquires measurement data from the power storage element 10 via the connection unit 13 and calculates the SOC (step S102). In step S102, the control unit 11 may acquire the calculated SOC via the connection unit 13 as described above.
  • the control unit 11 calculates the power consumption of the in-vehicle equipment including the air conditioner 33 (step S103). In step S103, the control unit 11 may acquire the power consumption periodically (for example, every 10 minutes), and may calculate the power consumption per unit time (for example, 1 hour) in step S103.
  • step S103 the control unit 11 acquires the outside air temperature from the vehicle-mounted temperature sensor, acquires the room temperature from the air conditioner 33, and predicts the power consumption based on the temperature difference, or the power consumption in step S103 from the temperature difference. May be corrected.
  • the control unit 11 acquires position information indicating the current position of the vehicle V via the communication unit 14 (step S104).
  • the control unit 11 acquires road traffic information regarding the current position from the information providing server 2 via the communication unit 14 (step S105).
  • the road traffic information includes traffic congestion information on the traveling road based on the current position information of the vehicle V.
  • the traffic congestion information on the road may be information indicating a congestion point, a degree of congestion, and a congestion length, or may be an average estimated travel time.
  • Road traffic information may be obtained directly from VICS (registered trademark) or the traffic information center, not from the information providing server 2.
  • the control unit 11 determines whether or not the vehicle is currently traveling on a congested road (step S106). In step S106, the control unit 11 may determine whether or not the average speed in the past predetermined time is equal to or less than the predetermined speed (for example, 10 km / h), or the traffic congestion information included in the road traffic information acquired in step S105. It may be judged from the information of the traffic jam point in the above and the current position of the vehicle V.
  • the predetermined speed for example, 10 km / h
  • the control unit 11 calculates the estimated traveling speed during the congestion via the communication unit 14 (step S107), and proceeds to step S109. Proceed.
  • the average per unit time (for example, 10 minutes) may be calculated, or the average traveling speed may be determined based on the degree of congestion acquired in step S105.
  • the control unit 11 estimates the average speed depending on the degree, such as 10 km / h when the traffic jam is long and 20 km / h when the traffic jam is short.
  • the control unit 11 may acquire the average traveling speed of the actual vehicle group in the congested section via the communication unit 14.
  • step S108 the control unit 11 may acquire a speed considering stopping at a signal based on the legal speed of the traveling road corresponding to the current position of the vehicle V.
  • the control unit 11 calculates the standard power consumption rate from the accumulated mileage of the vehicle V and the power consumption (step S109). In step S109, the control unit 11 calculates the actual fuel efficiency of the power storage element 10 of the vehicle V. In step S109, the control unit 11 may calculate the power consumption per unit distance from the relationship between the SOC calculated periodically and the mileage, or the power consumption per unit time from the history of the SOC calculated periodically. Consumption may be calculated. In step S109, the control unit 11 may acquire the standard power consumption rate calculated periodically.
  • the control unit 11 calculates the estimated power consumption amount based on the information calculated and acquired in steps S103 to S109 (step S110).
  • step S110 the control unit 11 divides the current power consumption of the in-vehicle equipment calculated in step S103 by the current speed or the estimated traveling speed to obtain the current power consumption per distance (consumption rate) in step S109. Add to the standard power consumption rate calculated in step 1 to calculate the estimated power consumption per distance.
  • the power consumption per hour is calculated in step S109, it may be divided by the current speed or the estimated running speed.
  • the control unit 11 divides the total electric energy based on the SOC acquired in step S102 by the estimated power consumption per distance calculated in step S110 to calculate the estimated mileage (step S111), and the output device 34, Alternatively, the output is output to the navigation device 31 (step S112), and the process ends.
  • the power consumption is predicted on the assumption that there is no sudden change from the current power consumption rate.
  • the mileage in a state where the destination is not set is calculated.
  • the user of the vehicle V can refer to the mileage based on the SOC of the in-vehicle power storage element 10.
  • the navigation device 31 exists within the travelable distance when it can be determined that the travelable distance that can be acquired from the battery management device 1 as described above is less than or equal to the distance of the entire route with respect to the set planned route distance. It will be possible to search for a charging station and reset the route.
  • FIG. 3 is a flowchart showing another example of the processing procedure executed by the battery management device 1. Among the processing procedures shown in the flowchart of FIG. 3, the procedures common to the procedures shown in the flowchart of FIG. 2 are given the same step numbers and detailed description thereof will be omitted.
  • the control unit 11 of the battery management device 1 receives a request for calculating the mileage (S101) and calculates the SOC of the power storage element 10 (S102).
  • the control unit 11 acquires information on the route to be traveled (step S121).
  • the control unit 11 acquires road traffic information regarding the route to be traveled via the communication unit 14 (step S122).
  • the route information in step S121 is the position information of the route set by the navigation device 31.
  • the road traffic information in step S122 is congestion information at the time of acquisition and can be acquired from the information providing server 2.
  • the traffic jam information may be replaced with the traffic jam prediction information.
  • the road traffic information regarding the route to be traveled may be information on the undulations of the road.
  • the information acquired in step S122 includes information that affects power consumption such as outside air temperature.
  • the control unit 11 classifies the route to be traveled based on the presence or absence of traffic congestion based on the acquired road traffic information (step S123).
  • the control unit 11 selects the divided sections in the order of travel (step S124), and sets the estimated power consumption in the selected section as traffic information (average travel time) in the section, outside air temperature in the section, humidity in the section, and the like. Calculate based on the information (step S125).
  • the control unit 11 determines whether or not the selected section can travel in the section with the remaining power amount in the power storage element 10 based on the power consumption prediction amount calculated in step S125 (step S126).
  • control unit 11 When it is determined that the vehicle can travel (S126: YES), the control unit 11 subtracts the predicted power consumption amount from the remaining power (step S127), and determines whether or not the entire section has been processed (step S128). When it is determined that the entire section has been processed (S128: YES), the control unit 11 responds to the request with the result of determining that the entire section can be traveled (step S129), and ends the process.
  • step S128 If it is determined in step S128 that the entire section has not been processed (S128: NO), the control unit 11 returns the processing to step S124.
  • step S126 When it is determined in step S126 that the vehicle cannot travel in any section (S126: NO), the control unit 11 includes information for identifying the section determined to be unable to travel, and the section determined to be able to travel. The integrated distance is responded to the request (step S130), and the process ends.
  • FIG. 4 is a block diagram showing the configuration of the battery management device 1 according to the second embodiment.
  • the learned learning model 1M is stored in the storage unit 12 of the battery management device 1 according to the second embodiment. Since the configurations of the battery management device 1 and the information providing system 100 are the same as those of the first embodiment except for the processing procedure based on the learning model 1M, detailed description thereof will be omitted.
  • FIG. 5 is a schematic diagram of the learning model 1M in the battery management device 1.
  • the learning model 1M is learned to output the travelable distance according to the input of the SOC of the power storage element 10 at the time of input, the power consumption in the in-vehicle equipment, and the expected average speed in the planned travel route.
  • the learning model 1M outputs the mileage by a supervised deep learning algorithm using a neural network (Neural Network) as shown in FIG.
  • the learning algorithm of the learning model 1M may be an unsupervised learning algorithm or a recurrent neural network.
  • the neural network of the learning model 1M includes a multi-stage convolutional layer, a pooling layer, and a fully connected layer defined by the definition data, and the travelable distance is based on the information including the input SOC. Is output.
  • the learning model 1M may output the estimated power consumption per hour or distance without directly outputting the mileage.
  • the learning model 1M may be learned to output the mileage by inputting other data that affects the mileage of the vehicle V using the power storage element 10 as a power source.
  • a vehicle type may be input.
  • the learning model 1M may input the identification information of the traveling road.
  • the learning model 1M may input the traveling time.
  • the learning model 1M uses a model creation device managed by the manufacturer of the power storage element 10 or the manufacturer of the vehicle V to determine the SOC of the power storage element 10 in the actual vehicle V, the power consumption, and the speed in the traveling path. It is learned by teacher data including the corresponding actual mileage. Data is collected and learned from a large number of vehicles V that are actually running. In the learning model 1M, re-learning may be repeated for each vehicle V according to the actual SOC of the power storage element 10, the power consumption, the speed in the traveling path, and the corresponding actual traveling distance.
  • the learning model 1M has been learned for each vehicle type, and may be stored in the storage unit 12 according to the vehicle type.
  • the learning model 1M has been learned for each region and may be stored in the storage unit 12 according to the region.
  • FIG. 6 is a flowchart showing an example of a procedure for calculating the mileage based on the learning model 1M.
  • the procedures common to the procedures shown in the flowchart of FIG. 2 of the first embodiment are designated by the same step numbers and detailed description thereof will be omitted.
  • the control unit 11 receives the request for calculating the mileage (S101), calculates the SOC (S102), calculates the current power consumption (S103), and acquires the position information (S104).
  • the control unit 11 calculates the speed according to whether or not the road is congested (S107, S108).
  • the SOC, power consumption, and expected speed in the traveling route calculated in steps S102-S104, S107, and S108 are input to the learning model 1M (step S131).
  • the learning model 1M outputs the travelable distance according to the input SOC, power consumption, and expected speed in the travel route.
  • the control unit 11 acquires the mileage output from the learning model 1M (step S132).
  • the control unit 11 outputs the mileage acquired in step S132 to the output device 34 or the navigation device 31 (S112), and ends the process.
  • FIG. 7 is a schematic diagram of another example of the learning model 1M.
  • the learning model 1M shown in FIG. 7 determines the time change of SOC up to the calculation time, the time distribution of the degree of congestion expected in the route to the destination set by the navigation device 31, the time distribution of the outside air temperature, and the set temperature. It is learned to input and output what percentage of the route can be reached.
  • the learning model 1M may output a time change prediction of the continuation of the time change of the SOC.
  • the learning model 1M in the other example is trained by a supervised deep learning algorithm using a neural network as in the example shown in FIG.
  • FIG. 8 is a flowchart showing another example of the procedure for calculating the mileage using the learning model 1M.
  • the processing procedure shown in the flowchart of FIG. 8 corresponds to the processing procedure when the learning model 1M of FIG. 7 is used.
  • the procedures common to the procedures shown in the flowchart of FIG. 2 of the first embodiment are designated by the same step numbers and detailed description thereof will be omitted.
  • control unit 11 When the control unit 11 receives the request for calculating the mileage (S101), the control unit 11 creates a graph image showing the time change of the SOC up to the calculation time point (step S141).
  • the control unit 11 acquires road traffic information regarding the route to be traveled via the communication unit 14 (step S142).
  • the road traffic information in step S142 is information on traffic congestion prediction at the estimated arrival time.
  • the control unit 11 creates a graph image showing the time distribution of congestion based on the acquired road traffic information (step S143).
  • step S143 the control unit 11 acquires information on the degree of congestion (congestion length) from the congestion prediction information for each time at each point and creates a congestion distribution for each estimated arrival time.
  • the control unit 11 acquires the predicted value of the outside air temperature on the route to be traveled (step S144). In step S144, information that affects power consumption, such as humidity and road undulations, may be acquired. The control unit 11 creates a graph image showing the time distribution of the acquired predicted value (step S145).
  • the control unit 11 acquires the set temperature of the air conditioner 33 (step S146).
  • the control unit 11 sets the SOC time change graph image created in step S141, the congestion time distribution graph image created in step S143, the outside air temperature time distribution graph image created in step S145, and the set temperature. Input to the learning model 1M (step S147).
  • the control unit 11 acquires the ratio indicating reachability output from the learning model 1M or the SOC time change prediction (step S148), and calculates the mileage based on the acquired ratio or the time change prediction. (Step S149).
  • the control unit 11 outputs the calculated mileage to the output device 34 or the navigation device 31 (step S112), and ends the process.
  • the information providing server 2 provides information necessary for calculating the temperature, humidity, and mileage. Since the hardware configuration of the information providing system 100 in the third embodiment is the same as that in the first embodiment, the same reference numerals are given and detailed description thereof will be omitted.
  • FIG. 9 is a flowchart showing an example of the procedure for calculating the mileage in the third embodiment.
  • the navigation device 31 When the destination and the route are set by the navigation device 31, when the navigation device 31 outputs a request for calculating the mileage by electric power from the power storage element 10 to the battery management device 1, the following processing is performed. Is started.
  • control unit 11 of the battery management device 1 receives the request for calculating the mileage (step S301), the control unit 11 calculates the SOC of the power storage element 10 (step S302). In step S302, as described above, the control unit 11 may acquire the SOC calculated by the power storage element 10 via the connection unit 13.
  • the control unit 11 calculates the power consumption of the in-vehicle equipment including the air conditioner 33 (step S303). In step S303, the control unit 11 may acquire the power consumption periodically (for example, every 10 minutes) and calculate the power consumption per unit time (for example, 1 hour) in step S303.
  • the control unit 11 acquires information on the route to be traveled (step S304). In step S304, the control unit 11 acquires the position information of the route set by the navigation device 31.
  • the control unit 11 requests information provision for calculating the mileage, including the calculated SOC, power consumption, and planned travel route information, identification information of the power storage element 10, and vehicle model information. It is transmitted to the information providing server 2 (step S305).
  • the control unit 11 may control so that the information is directly transmitted from the navigation device 31 to the information providing server 2 without acquiring the route information in step S304.
  • the control unit 20 of the information providing server 2 receives the information providing request by the communication unit 22 (step S201).
  • the control unit 20 acquires road traffic information including congestion information on the planned travel route via the network N based on the information on the planned travel route included in the information provision request (step S202).
  • the control unit 20 acquires the weather information on the planned travel route via the network N based on the information on the planned travel route included in the information provision request (step S203).
  • the control unit 20 not only acquires road traffic information from VICS (registered trademark) or the like via the network N, but also from a plurality of electric vehicles equipped with the same battery management device 1. Information can also be collected. Information may be obtained from a vehicle actually traveling on the planned travel route. In this case, it is advisable to obtain the power consumption from vehicles of the same or similar vehicle type.
  • VICS registered trademark
  • Information can also be collected. Information may be obtained from a vehicle actually traveling on the planned travel route. In this case, it is advisable to obtain the power consumption from vehicles of the same or similar vehicle type.
  • the control unit 20 calculates the estimated power consumption of the planned travel route based on the road traffic information acquired in step S202, the SOC included in the information provision request, and the power consumption (step S204). Based on the weather information acquired in step S203, the control unit 20 corrects the power consumption forecast amount in consideration of the operation of the air conditioner 33 (step S205).
  • the predicted output consumption amount obtained in step S205 may be calculated as the power consumption amount per distance.
  • control unit 20 may calculate the estimated power consumption amount from the standard power consumption rate for each vehicle type.
  • the control unit 20 responds to the battery management device 1 with the corrected power consumption forecast amount (step S206).
  • the control unit 11 of the battery management device 1 receives the estimated power consumption amount as a response to the information provision request (step S306).
  • the control unit 11 calculates the estimated mileage based on the received power consumption prediction amount (step S307), outputs the estimated mileage to the output device 34 or the navigation device 31 (step S308), and ends the process.
  • the calculation of the estimated mileage based on the processing procedure shown in the flowchart of FIG. 3 may be executed, and the control unit 20 may respond in step S206 with the estimated mileage.
  • the information providing server 2 may use the learning model 1M as disclosed in the second embodiment.
  • a learning model 1M for each vehicle type is created in advance, and by calculating using the created learning model 1M, the power consumption of the power storage element 10 according to the vehicle type can be accurately predicted, and the mileage in the vehicle V can be predicted. Can be calculated accurately.
  • the required charging time or charging amount is output based on the predicted power consumption amount of the shortage. Since the hardware configuration of the information providing system 100 in the fourth embodiment is the same as that in the first embodiment, the same reference numerals are given and detailed description thereof will be omitted.
  • FIG. 10 is a flowchart showing an example of the procedure for calculating the mileage in the fourth embodiment.
  • a request for calculating the mileage from the navigation device 31 is received when the destination is set or searched by the navigation device 31.
  • the procedures common to the processing procedures shown in the flowchart of FIG. 3 of the first embodiment are assigned the same step numbers and detailed description thereof will be omitted.
  • the control unit 11 of the battery management device 1 receives a request for calculating the mileage from the navigation device 31 (S101), and acquires information on the route to be traveled (S121).
  • the control unit 11 calculates the SOC of the power storage element 10 (S102).
  • the control unit 11 acquires road traffic information regarding the acquired route (S122). Based on the acquired road traffic information, the control unit 11 classifies the route to be traveled based on the presence or absence of traffic congestion and the degree of traffic congestion (S123).
  • the control unit 11 selects the divided sections in the order of travel (S124), calculates the estimated power consumption in the selected section (S125), and executes whether or not the vehicle can travel (S126).
  • step S126 when it is determined in step S126 that the vehicle cannot travel in any section (S126: NO), the control unit 11 corresponds to the current SOC of the vehicle V calculated in step S102 being fully charged. Whether or not it is determined (step S151). In step S151, even if the calculated SOC does not reach full charge, the control unit 11 corresponds to full charge when it is determined that the higher SOC is such that the vehicle V side is stopped. Then judge.
  • control unit 11 determines that the vehicle is fully charged (S151: YES)
  • the control unit 11 includes information for identifying a section determined to be unable to travel in step S126, and a section determined to be able to travel. Responds to the request with the integrated distance of (S130), and ends the process.
  • control unit 11 calculates the estimated power consumption amount required from the section determined to be unable to travel to the destination (route end) (step S152).
  • the control unit 11 calculates a required charge amount that is slightly larger than the calculated power consumption predicted amount, or a charging time required to charge the required charge amount (step S153).
  • the control unit 11 responds to the request with the information for identifying the section determined to be unable to travel and the required charge amount or charge time calculated in step S153 (step S154), and ends the process.
  • control unit 11 calculates the predicted power consumption amount and the required charge amount or charge time (S153), and determines the required charge time in the middle. It may be added to the response as information.
  • the navigation device 31 When the navigation device 31 that has received the response to the request receives the response including the required charge amount or the charging time from the battery management device 1, it outputs a message prompting advance charging to the output device 34.
  • the control unit 11 of the battery management device 1 may directly output a message prompting charging from the output device 34.
  • FIG. 11 is a diagram showing an example of an output charging message.
  • FIG. 11 shows a navigation screen by the navigation device 31. On the navigation screen, the route set by the navigation device 31 is displayed on the map, and the section where the power is insufficient in the current SOC of the vehicle V is highlighted on the map.
  • the power storage element 10 of the vehicle V does not correspond to a full charge, and the required electric energy and the charging time are presented. Even if the vehicle is not fully charged in this way, if the vehicle V can travel the entire stroke by charging it even a little, the user can recognize this and prepare for charging appropriately in advance to drive with peace of mind. it can.
  • a charging stand is added to the planned travel route and the figure is shown again.
  • the processing procedure shown in the flowchart of 11 may be executed to present the required charge amount or charge time at the charging station at the waypoint.
  • the processing procedure shown in the fourth embodiment is not limited to being realized in cooperation with the navigation device 31 mounted on the vehicle V.
  • the driver's information terminal device may acquire the SOC of the power storage element 10 of the vehicle V, and the information terminal device may calculate the mileage.
  • the information terminal device may calculate the travelable distance by the same function as the battery management device 1, and when it is determined that the entire stroke cannot be traveled, the information terminal device can prompt charging in advance. In this case, the driver can know how much the vehicle should be charged before departure and does not have to worry about the destination.
  • the vehicle V may be an industrial vehicle such as an AGV (Automated Guided Vehicle) or a truck that carries luggage on the premises, and is not limited to an electric vehicle as long as it is an electric vehicle that uses electric power as a driving force.
  • the target of the battery management device 1 can be a device that moves by using a power storage element as a power source, such as an airplane, a ship, or a spaceship, instead of a vehicle, as described in the next embodiment 5. Is.
  • FIG. 12 is a schematic diagram of the information providing system 100 according to the fifth embodiment. Since the configuration of the information providing system 100 in the fifth embodiment is the same as that of the first embodiment except that the process for the flying object V2 is executed, detailed description of the hardware configuration will be omitted.
  • the battery management device 1 in the fifth embodiment is mounted on the flying object V2 flying in the route as shown in FIG.
  • the battery management device 1 is connected to the power storage element 10 of the flying object V2.
  • the battery management device 1 can be communicated with a device that acquires the position information of the flying object V2 and the route information of the planned movement.
  • the battery management device 1 acquires position information from a GPS receiver mounted on the aircraft V2, and acquires route information from a navigation control device (not shown).
  • the navigation control device is a device that controls flight based on a route instructed by the driver or an external instruction system and latitude / longitude altitude.
  • the battery management device 1 can communicate with the information providing server 2.
  • the battery management device 1 can transmit and receive data by communication with the information providing server 2 via a communication device with the outside mounted on the flying object V2.
  • the battery management device 1 can be connected to the air conditioner mounted on the flying object V2 via communication.
  • the battery management device 1 may be capable of communication connection with the air pressure adjusting device mounted on the flying object V2.
  • the battery management device 1 may be connected to an output device that outputs information to the driver of the flying object V2.
  • the control unit 20 of the information providing server 2 of the fifth embodiment can be used for power consumption of the aircraft V2 such as map information, outside temperature data for each altitude, wind speed data, congestion status for each takeoff and landing point, and the like.
  • Information about the influencing element can be acquired and stored in the storage unit 21.
  • the control unit 20 can acquire information on the measured value or the predicted value of the atmospheric pressure distribution for each altitude associated with the position information and store it in the storage unit 21.
  • the battery management device 1 mounted on the flying object V2 consumes the position information of the flying object V2, the position information of the charging stand ES, and the power consumption in the movement path of the flying object V2. Based on the predicted amount and the charge rate of the power storage element 10, the mileage is estimated in consideration of the prediction of the power consumption inside and outside the flying object V2. A part of the predicted power consumption is provided by the information providing server 2.
  • FIG. 13 is a flowchart showing an example of a processing procedure executed by the battery management device 1 of the fifth embodiment.
  • the control unit 11 receives a request for a movable distance (step S161).
  • the control unit 11 acquires measurement data from the power storage element 10 and calculates the SOC (step S162). In step S162, the control unit 11 may acquire the calculated SOC.
  • the control unit 11 calculates the power consumption per hour in the equipment mounted on the aircraft V2 including the air conditioner (step S163). In step S163, the control unit 11 periodically (for example, every 10 minutes) acquires the power consumption, and in step S163, the power consumption per the most recent unit time (for example, 15 minutes, 30 minutes, 1 hour, etc.). May be calculated.
  • step S163 the control unit 11 acquires the outside air temperature, the outside air humidity, the room temperature and the humidity from a temperature / humidity sensor (not shown), and predicts the power consumption by the air conditioner based on the temperature difference and the humidity difference, or the temperature.
  • the power consumption in step S163 is corrected from the difference.
  • the control unit 11 may acquire altitude and external pressure from an altitude sensor and a barometric pressure sensor (not shown), and predict or correct the power consumption in consideration of the power consumption by the barometric pressure adjusting device.
  • the control unit 11 acquires position information indicating the current position of the flying object V2 (step S164).
  • the control unit 11 acquires information indicating the congestion status of takeoff and landing at the set destination from the information providing server 2 via the communication unit 14 (step S165). In step S165, the control unit 11 acquires the average time required for takeoff and landing of the destination.
  • the control unit 11 acquires the distribution information of the wind speed from the current position to the set destination from the information providing server 2 via the communication unit 14 (step S166).
  • the control unit 11 calculates the time required to move to the destination based on the environmental information including the acquired information indicating the congestion status and the wind speed information and the distance from the current location to the destination (step S167), and moves. Predict the amount of power required for (step S168).
  • the control unit 11 calculates the amount of power consumed by the equipment to the destination based on the amount of power consumed per hour calculated in step S163 (step S169), and the amount of power required for movement calculated in step S168. In addition, the predicted power consumption is calculated (step S170).
  • the control unit 11 determines whether or not the distance to the destination can be moved based on the remaining power amount based on the SOC calculated in step S162 and the predicted power consumption calculated in step S170 (step S171). ).
  • the control unit 11 may compare the magnitude of the remaining power amount and the predicted power consumption, and determine that the control unit 11 can move when the remaining power amount is larger.
  • the control unit 11 may calculate the power consumption per unit time, calculate the distance, and then compare it with the distance to the destination.
  • control unit 11 If it is determined that the vehicle can be moved (S171: YES), the control unit 11 outputs the remaining power amount and the predicted power consumption (step S172), and ends the process.
  • step S171 When it is determined in step S171 that the vehicle cannot be moved (S171: NO), the movable distance is calculated based on the predicted power consumption and the ratio to the remaining power amount (step S173), output (step S174), and processed. finish.
  • the control unit 11 may send a search request for a takeoff / landing location where a charging station ES within a movable distance from the current location is provided to the information providing server 2.
  • the control unit 11 also outputs candidates for takeoff and landing locations that have been responded to the request.
  • the control unit 11 calculates the amount of power to be charged at the charging station ES when arriving at a candidate for takeoff / landing location, using the remaining power amount and the predicted power consumption.
  • the control unit 11 may redetermine the charging power amount at the timing of being connected to the charging stand ES and execute charging.
  • the target of calculation of the movable distance by the battery management device 1 is not limited to the electric vehicle.
  • the processing by the battery management device 1 can be applied to an unmanned aerial vehicle called a drone.
  • the processing by the battery management device 1 can also be applied to battery management in an electric ship equipped with a power storage element and navigating by electric power.
  • the control unit 11 predicts and corrects the power consumption in consideration of the information on the tidal current in addition to the temperature, the wind speed, and the height of the wave.
  • the processing by the battery management device 1 can also be applied to battery management in an air vehicle such as a spacecraft or a satellite that navigates using electric power and requires more precise management.

Landscapes

  • Engineering & Computer Science (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Theoretical Computer Science (AREA)
  • Mathematical Physics (AREA)
  • Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Navigation (AREA)

Abstract

電動移動体の移動予定経路の状況に応じて精度よく移動可能距離を提示する電池管理装置、学習モデル、コンピュータプログラム、電池管理方法、及び情報提供装置を提供する。電池管理装置は、電動移動体の動力源の蓄電素子の充電率に基づいて移動可能距離を算出する算出部を備える。電池管理装置の前記算出部は、前記蓄電素子の充電率を取得し、前記電動移動体の予定経路における環境情報を取得し、取得した充電率及び環境情報から、前記予定経路を前記電動移動体が移動するために必要な電力量と、前記電動移動体に搭載されている設備での電力消費量の予測とに基づき予測される電力消費量を算出し、算出された予測電力消費量並びに前記充電率に基づき、前記蓄電素子の残電力による移動可能距離を算出する。

Description

電池管理装置、学習モデル、コンピュータプログラム、電池管理方法、及び情報提供装置
 本発明は、精度のよい移動可能距離を提示できる電池管理装置、学習モデル、コンピュータプログラム、電池管理方法、及び情報提供装置に関する。
 電気自動車、所謂ドローンと呼ばれる無人航空機の普及、電動有人航空機、電動船舶の実用化等の電動移動体の増加によって、充電スタンドの需要も増している。充電スタンドの数は都市部では充分と言えるが、都市部以外における充電スタンドの設置密度は十分であるとは言えず、電動移動体のユーザは、充電スタンドの位置を把握しながら運転する必要がある。
 特許文献1には、電気自動車に搭載される蓄電池の蓄電量と道路交通情報とに基づき、走行可能距離を算出し、設定されている最終目的地までに到達できるか否かを判断し、到達できない場合には充電可能な充電スタンドを検索して提示する充電スタンド管理システムが開示されている。
特開2012-160022号公報
 都市部で充電スタンドの設置密度も十分ではあるものの、自動車の場合は渋滞、飛行機の場合は発着待機又は天候不良等の予期せぬ電力消費を要する事態が発生する場合もある。エンジンを有さない電気自動車では、特に暖房を使用する時期、都市部以外における充電スタンドへ向かう行程でも、渋滞等の想定外の事象が発生した場合、提案された充電スタンドまでの走行が可能であるか否か、ユーザに不安を感じさせる可能性がある。電動飛行機の場合も、人の乗降の際の待機時間が長かったり、風速が想定外であったりした場合、予定する経路での移動が可能であるか、乗客に不安を感じさせる可能性がある。
 本発明は、電動移動体の移動予定経路の状況に応じて精度よく移動可能距離を提示する電池管理装置、学習モデル、コンピュータプログラム、電池管理方法、及び情報提供装置を提供することを目的とする。
 本発明に一態様に係る電池管理装置は、電動移動体の動力源の蓄電素子の充電率に基づいて移動可能距離を算出する算出部を備える。前記算出部は、前記蓄電素子の充電率を取得し、前記電動移動体の予定経路における環境情報を取得し、取得した充電率及び環境情報から、前記予定経路を前記電動移動体が移動するために必要な電力量と、前記電動移動体に搭載されている設備での電力消費量の予測とに基づき予測される電力消費量を算出し、算出された予測電力消費量並びに前記充電率に基づき、前記蓄電素子の残電力による移動可能距離を算出する。
 本開示によれば、電動移動体の動力源である蓄電素子の充電率(SOC)を精度よく算出すると共に、渋滞又は事故、天候の影響、移動体に備えられる設備の電力消費状況にも対応して精度よく移動可能距離を提示できる。
電池管理装置を含む情報提供システムのブロック図である。 電池管理装置により実行される処理手順の一例を示すフローチャートである。 電池管理装置により実行される処理手順の他の一例を示すフローチャートである。 実施の形態2における電池管理装置の構成を示すブロック図である。 電池管理装置における学習モデルの概要図である。 学習モデルに基づく走行可能距離の算出手順の一例を示すフローチャートである。 学習モデルの他の例の概要図である。 学習モデルを用いた走行可能距離の算出手順の他の一例を示すフローチャートである。 実施の形態3における走行可能距離の算出手順の一例を示すフローチャートである。 実施の形態4における走行可能距離の算出手順の一例を示すフローチャートである。 出力される充電メッセージの例を示す図である。 実施の形態5における情報提供システムの概要図である。 実施の形態5の電池管理装置により実行される処理手順の一例を示すフローチャートである。
 電池管理装置は、電動移動体の動力源の蓄電素子の充電率に基づいて移動可能距離を算出する算出部を備える。前記算出部は、前記蓄電素子の充電率を取得し、前記電動移動体の予定経路における環境情報を取得する。前記算出部は、取得した充電率及び環境情報から、前記予定経路を前記電動移動体が移動するために必要な必要電力量と、前記電動移動体に搭載されている設備での電力消費量の予測とに基づき予測される電力消費量を算出する。前記算出部は、算出された予測電力消費量並びに前記充電率に基づき、前記蓄電素子の残電力による移動可能距離を算出する。
 上記構成により、移動の予定経路の状況、環境状況に応じた設備の利用状況の予測に基づき、予定経路における電力消費量が算出される。予定経路では、移動体がその時点で移動している場所での状態とは異なる事態が発生する可能性がある。予定経路における電力消費量の予測には、混雑情報や移動に影響する外気温、風速、波の高さ等の環境情報を用いた平均旅行時間、平均速度に基づく電動移動体の移動自体に必要な電力量の予測と、環境情報に応じて求められる設備の電力消費量の予測とが加味される。
 「電動移動体」は蓄電素子を搭載した電気自動車、飛行機、船舶等の乗り物である。電動移動体は、有人であっても無人であってもよい。「電動移動体」は、駆動の動力源の少なくとも一部が前記蓄電素子であり、動力源は一部エンジン等の他の動力を含んでもよい。
 電動移動体が電動飛行機である場合、モータ又はプロペラ等から発生する音が大きい。温度調整のために外気を導入するとその騒音が進入するから、有人機である場合は空調設備が使われることがある。高高度で飛行する場合、外気温が低いため、客室内及び蓄電素子の温度低下を防止するために空調が必要になる。湿度又は温度によって窓が曇る場合、空調又は電熱線によって曇りを防止する必要がある。このように、電動移動体は、設備での電力消費量が移動の経路の場所、又は時間の影響を受けて変化する。したがって、電動移動体の移動自体に必要な電力量のみならず、設備における電力消費量が加味される。
 算出時点までの電力消費量の経過のみではなく、その時点以降に移動する予定の経路における蓄電素子の電力消費量を算出し、算出した予測電力消費量から移動可能距離が算出される。蓄電素子と接続される電池管理装置が、蓄電素子の特性に基づいて精度よく電力消費量を予測できるから、移動可能距離が算出される。
 前記算出部は、前記電動移動体の予定経路を区分けし、区分けした区間毎に、前記環境情報に基づいて前記必要電力量、及び前記設備での電力消費量を予測し、区間毎に、前記電動移動体が、充電率に基づいて前記区間を移動可能であるか否を判断し、移動可能でないと判断される区間までの距離を移動可能距離として算出してもよい。
 環境情報には、渋滞情報が含まれてよい。渋滞情報は、経路の区間毎の渋滞長、区間における時刻毎の平均旅行時間、平均速度等の情報で提供されることがある。提供される情報を有効的に用いるべく、提供される情報に合わせた区間毎の電力消費量を予測することにより、精度よく走行予定経路における予測電力消費量を算出できる。精度よく予測電力消費量を算出することで、精度よく移動可能距離が算出される。
 前記算出部は、前記蓄電素子の充電率、前記予定経路における混雑情報、及び、前記予定経路に対して算出される前記予測電力消費量の入力に応じて、前記充電率の蓄電素子を動力源として移動可能な距離を出力するように学習されている学習モデルを用いて移動可能距離を算出してもよい。
 移動可能距離は、蓄電素子の個体特性、移動速度、運転者の運転特性、空調設備の設定温度、外気温、湿度、風速、波の高さ、移動体の特性等、各々の閾値との比較に基づく判断によって算出するには困難な条件に影響される。これらの情報を入力する深層学習に基づく学習モデルを使用することによって、蓄電素子の特性を考慮した移動可能距離の精度良い算出が可能になる。
 前記算出部は、算出時点までの前記蓄電素子の充電率の時間変化、前記予定経路に対し予測されている混雑時間分布、及び、前記予定経路における外気温の予想分布の入力に応じて、前記充電率の蓄電素子を動力源として移動可能な距離、又は前記蓄電素子の算出時点以降の充電率の時間変化を出力するように学習されている学習モデルを用いて移動可能距離を算出してもよい。
 移動可能距離は、時間の経過と共に変化する移動経路の混雑状況、気温の変化、湿度変化等の移動体内外の状況によって影響される。移動体内外の状況を各時点での状況に基づいてシミュレートすることは困難である。時間変化するデータについては画像化して学習モデルに入力して、実際の移動可能距離、又は充電率の時間変化を教師データとしてそれらが出力されるように学習することができる。上記構成により、時間変化、混雑予測の時間分布、外気温の変化の予想分布の入力によって移動可能距離、又は充電率の時間変化予測を精度よく得られる。
 前記学習モデルは、前記予定経路の通過予定時刻を入力してもよい。
 移動可能距離は、時間の経過と共に変化する移動経路の混雑状況、気温の変化、湿度変化等の移動体内外の状況によって影響される。特に、冬季夜間、夏季昼間、高高度では、空調の消費電力が大きく、電力の消費を移動に必要な電力量のみで見積もった場合に、行程中に電力が不足してしまう可能性がある。したがって、移動可能距離を算出する対象の時刻情報が入力されることで、精度のよい算出が期待できる。
 電池管理装置は、算出された移動可能距離に基づき、予定経路の全行程を走行することが可能か否かを判断してもよい。走行予定経路の一部を走行できないと判断された場合、事前に充電を促すメッセージを出力してもよい。
 精度よく移動可能距離が予測されることから、途中で充電することなく走行するために必要な充電を促すことができる。出力部はスピーカを含んで音声によってメッセージを出力してもよいし、電動移動体に搭載されたディスプレイでメッセージを文字又は画像によって出力してもよい。移動体のユーザ又はオペレータは、電力が少なくなってからではなく事前に、満充電でなく少なくとも行き先までに必要な電力を把握することができる。ユーザ又はオペレータは、必要な電力を、各所に備えられている充電スタンド群からいずれかを選択して充電することが可能である。
 電池管理装置は、前記予定経路上の移動に必要な予測電力消費量及び前記充電率に基づき、前記一部における予測電力消費量を算出し、算出された予測電力消費量に対応する電力を充電するために前記事前充電の充電時間又は充電量を含むメッセージを出力してもよい。
 予定経路の全行程を、途中で充電することなく走行するために、現状の充電率からの不足分を充電するための情報(充電時間又は充電量)が出力される。移動体のユーザ又はオペレータは、移動体の蓄電素子の電力が少なくなってからではなく事前に、予定経路を移動させるために事前に、自宅又は移動体の所有者が管理する充電スタンド等で少なくともどれだけ充電すべきかを把握することができる。
 自装置が起動中に、前記蓄電素子の充電率を所定のタイミングで取得するようにしてあり、前記充電率を取得する都度に、前記充電率が所定値以下となったか否かを判断し、前記充電率が前記所定値以下となったと判断された場合に、前記算出部による移動可能距離の算出を開始する。
 移動可能距離の算出のリクエストのタイミングは、移動体の運転者又は所有者の操作があったタイミングであってもよいが、充電率が所定値以下に低下したタイミングであってもよい。運転者又は所有者が充電率の低下を認識していない場合に、移動可能距離が短くなっていることを知らしめることが可能である。ナビゲーション装置と接続される場合に、ナビゲーション装置にて行き先が設定されたタイミングで電池管理装置へリクエストされてもよい。
 前記電動移動体は、有人機であってもよい。有人機である場合は特に、運転室又は客室内の温度調整や、窓の曇りを防止するために空調設備が必要である。無人機である場合よりも設備の電力消費量の影響が大きい。
 前記電動移動体の動力源はエンジンを含まなくてよい。
 エンジンを有するハイブリッド電動車両に対して、上述の電池管理装置のいずれかを使用することで走行可能距離を提示することも可能であるが、エンジンを有さない電気自動車の場合、電力消費予測量の精度が求められる。特に冬季夜間、夏季昼間では、車内の空調の消費電力が大きく、この場合にエンジンの稼働によって発電ができない電気自動車では、エンジンを有しているハイブリッド車よりも、行程中に電力が不足し停止してしまう可能性が高い。
 前記環境情報は、予定経路における交通状況、渋滞、混雑状況、気温、気圧、高度、湿度、風速、波の高さ、及び、潮流に関する情報の内の少なくとも1つを含む。
 事故発生、航行不可といった交通情報、渋滞又は混雑状況によって、移動に要する時間が異なるから、予測される電力消費量が変わり得る。気温又は湿度によって、蓄電素子、運転室又は客室の空調設備における電力消費量は異なる。風速又は波の高さによって、移動に要する時間、移動に要する電力が異なるから、予測される電力消費量が変わり得る。これらの情報を用いて精度よく移動可能距離が算出される。
 電池管理装置は、前記電動移動体の移動の予定経路における環境情報を取得し、取得した充電率及び環境情報から、前記予定経路を前記電動移動体が移動するために必要な電力量と、前記電動移動体に搭載されている設備での電力消費量の予測とに基づき予測される電力消費量を算出する算出部を備え、算出された予測電力消費量と、前記蓄電素子の充電率に基づき、前記蓄電素子への充電量を決定し、決定した充電量で前記蓄電素子を充電してもよい。
 電離管理装置は、移動可能距離を算出するのみならず、予定経路を移動するために必要な電力量を算出し、充電可能な充電装置まで移動したタイミングでその必要な電力量の分、充電してもよい。
 学習モデルは、電動移動体の動力源の蓄電素子の充電率、前記電動移動体の予定経路における環境情報、及び、前記予定経路における予測電力消費量を入力する入力層と、移動可能距離を出力する出力層と、前記電動移動体の蓄電素子の充電率、前記電動移動体が移動した経路における環境情報、及び前記蓄電素子の実際の電力消費量と、対応する実際の移動距離とを含む教師データに基づき学習された中間層とを含み、前記電動移動体の移動可能距離を算出するために用いられる。
 学習モデルが、実際の電動移動体の蓄電素子の充電率、前記電動移動体が移動した経路における環境情報、及び前記蓄電素子の実際の電力消費量と、対応する実際の移動距離とを含む教師データに基づき学習されることで、精度よく移動可能距離を算出することができる。
 上述の学習モデルの特徴は、学習モデルの生成方法として実現されてもよい。
 コンピュータプログラムは、電動移動体の動力源の蓄電素子の状態を管理するコンピュータに処理を実行させる。該コンピュータプログラムは、コンピュータに、前記蓄電素子の充電率を取得し、前記電動移動体の予定経路における環境情報を取得し、取得した充電率及び環境情報から、前記予定経路を前記電動移動体が移動するために必要な電力量と、前記電動移動体に搭載されている設備での電力消費量とに基づいて予測される電力消費量を算出し、算出された予測電力消費量及び前記充電率に基づき移動可能距離を算出する処理を実行させる。
 電池管理方法は、電動移動体の動力源の蓄電素子の充電率に基づき、前記蓄電素子における残電力による移動可能距離を出力する。電池管理方法は、前記蓄電素子の充電率を取得し、前記電動移動体の予定経路における環境情報を取得し、取得した充電率及び環境情報から、前記予定経路を前記電動移動体が移動するために必要な電力量と、前記電動移動体に搭載されている設備での電力消費量の予測とに基づいて予測される電力消費量を算出し、算出された予測電力消費量及び充電率に基づき移動可能距離を算出する処理を含む。
 情報提供装置は、電動移動体と通信によって情報を送受信可能であって、前記電動移動体の動力源の蓄電素子の残電力での移動可能距離を算出するための情報を提供する。情報提供装置は、前記蓄電素子の充電率、予定経路、電力消費量の情報を受信し、前記電動移動体の予定経路における環境情報を取得する。情報提供装置は、取得した充電率及び環境情報から、前記予定経路を前記電動移動体が移動するために必要な電力量と、前記電動移動体に搭載されている設備での電力消費量とに基づいて予測される記予定経路における電力消費量を算出する。情報提供装置は、算出された予測電力消費量を前記電動移動体に向けて送信する。
 上記構成により、複数の電動移動体から得られる予定経路における混雑情報、外気温、実際の電力消費量等の情報を加味した移動可能距離の提示サービスが実現できる。複数の電動移動体から情報を収集することで、精度を上げたり、移動体の種別毎の情報として提供したりすることも可能である。
 本発明をその実施の形態を示す図面を参照して具体的に説明する。実施の形態1から4では、電動移動体として電気自動車を例に挙げて説明し、実施の形態5では、電動移動体として電動飛行機、 eVTOL(electric Vertical Take-Off and Landing Aircraft )の一種を例に挙げて説明する。
 (実施の形態1)
 図1は、電池管理装置1を含む情報提供システム100のブロック図である。情報提供システム100は、電気自動車である車両Vに搭載されている蓄電素子10、蓄電素子10の電池管理装置1、及び情報提供サーバ2を含む。
 情報提供サーバ2は、サーバコンピュータである。情報提供サーバ2は、蓄電素子10の製造者によって管理され、情報提供サーバ2は、地図情報、VICS(登録商標)、各車両から提供される交通情報、各地点の天候情報に基づいて、行程の出発地点から目標地点までの電力消費予測量に関する情報を出力する。
 電池管理装置1は、蓄電素子10と接続されている。電池管理装置1は、複数の蓄電セルを含むモジュールである蓄電素子10に内蔵された態様であってもよい。
 電池管理装置1は、車両Vの位置情報及び走行予定の経路情報を取得できる装置と通信接続が可能である。実施の形態1において電池管理装置1は、例えば車両Vに搭載されているナビゲーション装置31から、車両Vの位置情報及び走行予定の経路情報を取得する。電池管理装置1は他の例では、搭乗者が所持する通信端末装置に搭載されているGPS(Global Positioning System )機能から位置情報を取得してもよい。電池管理装置1は、通信端末装置から走行予定の経路を取得してもよい。電池管理装置1自体がナビゲーション装置31に含まれてもよい。電池管理装置1は、他の車両と通信を行ない、位置情報を取得してもよい。
 電池管理装置1は、車外の情報提供サーバ2と通信接続が可能である。実施の形態1において電池管理装置1は、車載ネットワークVNに接続されている車外通信装置32を介して情報提供サーバ2と通信接続する。
 電池管理装置1は、車載ネットワークVNを介して、空調装置33、出力装置34と通信接続可能である。出力装置34は、スピーカ、ディスプレイを含み搭乗者に音又は光を出力可能な装置である。出力装置34は、ナビゲーション装置31と一体であってもよい。
 電池管理装置1は、制御部11、記憶部12、接続部13、及び通信部14を備える。
 制御部11は、CPU(Central Processing Unit)又はGPU(Graphics Processing Unit)を用いたプロセッサである。制御部11は、CPUおよびGPUを組み合わせたものであってもよい。制御部11は、内蔵するROM及びRAM等のメモリを用い、各構成部を制御して処理を実行する。制御部11は、記憶部12に記憶されている制御プログラム1Pに基づく処理を実行する。
 記憶部12は、例えばハードディスク又はSSD(Solid State Drive)等の不揮発性メモリである。記憶部12には、上述した制御プログラム1Pが記憶されている。記憶部12に記憶される制御プログラム1Pは、記録媒体6に記憶してある制御プログラム6Pを制御部11が読み出して記憶部12に複製したものであってもよい。
 記憶部12は、制御部11の処理によって作成されたデータを記憶する。記憶部12は、蓄電素子10のSOC(State Of Charge:充電率)を記憶する。記憶部12は、電圧、電流、内部抵抗、及び温度に関するデータを記憶してもよい。記憶部12は、制御部11の処理によって予測される電力消費量を記憶する。
 接続部13は、蓄電素子10と接続されている。制御部11は、蓄電素子10における電圧、電流、内部抵抗、及び温度の内、少なくとも電圧値を含む測定データを、接続部13を介して取得し、SOCを算出する。制御部11は、蓄電素子10内蔵の演算部によって算出されるSOCを取得してもよい。
 通信部14は、車載ネットワークVN及び車外のネットワークNを介した情報提供サーバ2との通信接続を実現する通信デバイスである。
 情報提供サーバ2は、制御部20、記憶部21及び通信部22を備える。
 制御部20は、CPU又はGPUを用いたプロセッサである。制御部20は、CPUおよびGPUを組み合わせたものであってもよい。制御部20は、内蔵するROM及びRAM等のメモリを用い、各構成部を制御して処理を実行する。制御部20は、記憶部21に記憶してある情報提供プログラム2Pに基づく処理を実行する。
 記憶部21は、例えばハードディスク又はSSD等の不揮発性メモリである。記憶部21には、上述した情報提供プログラム2Pが記憶されている。記憶部21に記憶される情報提供プログラム2Pは、記録媒体7に記憶してある情報提供プログラム7Pを制御部20が読み出して記憶部21に複製したものであってもよい。
 記憶部21は、制御部20の処理によって作成されたデータを記憶する。制御部20は、通信部22によってネットワークNを介し、公衆通信網上の地図情報、VICS(登録商標)、気温、湿度等を含む天候情報等、車両Vの電力消費に影響する要素に関する情報を取得し、記憶部21に記憶できる。
 記憶部21は、電池管理装置1、蓄電素子10、車両V、及び、車両Vの搭乗者、の内の少なくともいずれか1つを識別するための識別情報と対応付け、電力消費予測量に関する情報を記憶してもよい。
 通信部22は、ネットワークNを介した通信を実現する通信デバイスである。通信部22は例えば、ネットワークNに対応するネットワークカードである。
 ネットワークNは、公衆通信網を含む。情報提供サーバ2は、通信部22によってネットワークNを介し、他のサービス提供者から地図情報、交通情報、天候情報、充電スタンドの位置情報を取得することができる。ネットワークNは、キャリアネットワーク、光ビーコンを含み、走行中の車両Vの車外通信装置32は、情報提供サーバ2と通信接続が可能である。
 このように構成される情報提供システム100では、車両Vに搭載されている電池管理装置1が、車両Vの位置情報と、充電スタンドの位置情報と、車両Vの走行経路における電力消費予測量と、蓄電素子10の充電率とに基づいて、車内外における電力消費予測量を加味した走行可能距離を推定する。電力消費予測量の一部については、情報提供サーバ2から提供される。
 図2は、電池管理装置1により実行される処理手順の一例を示すフローチャートである。制御部11は、走行可能距離算出のリクエストを受け付ける(ステップS101)。
 走行可能距離の算出のリクエストは、車両V内に設けられた運転者が操作可能なボタンによって運転者から受け付ける。走行可能距離の算出のリクエストは、ナビゲーション装置31において行き先が設定された際に、ナビゲーション装置31から出力されてもよい。走行可能距離の算出のリクエストは、制御部11自身によって、SOCが所定値以下となったことを契機に出力されてもよい。
 制御部11は、リクエストを受け付けると、接続部13を介して蓄電素子10から測定データを取得し、SOCを算出する(ステップS102)。ステップS102において制御部11は上述したように、接続部13を介して算出済みのSOCを取得してもよい。
 制御部11は、空調装置33を含む車内設備における電力消費量を算出する(ステップS103)。ステップS103において制御部11は、定期的(例えば10分毎)に電力消費量を取得しておき、ステップS103で直近の単位時間(例えば1時間)当たりの電力消費量を算出してもよい。
 ステップS103において制御部11は、車載温度センサから外気温を取得し、空調装置33から室内温度を取得し、温度差によって電力消費量を予測するか、又は、温度差からステップS103の電力消費量を補正してもよい。
 制御部11は、通信部14を介して車両Vの現在位置を示す位置情報を取得する(ステップS104)。
 制御部11は、通信部14を介し、現在位置に関する道路交通情報を情報提供サーバ2から取得する(ステップS105)。道路交通情報には、車両Vの現時点における位置情報に基づく走行中の道路の渋滞情報が含まれる。道路の渋滞情報は、渋滞地点、渋滞の程度及び渋滞長を表す情報であってもよいし、平均予想旅行時間であってもよい。道路交通情報は、情報提供サーバ2からでなく、VICS(登録商標)、交通情報センターから直接的に取得されてもよい。
 制御部11は、現在渋滞中の道路を走行中であるか否かを判断する(ステップS106)。ステップS106において制御部11は、過去所定時間における平均速度が所定速度(例えば10km/h)以下であるか否かで判断してもよいし、ステップS105で取得した道路交通情報に含まれる渋滞情報における渋滞地点の情報と車両Vの現在位置から判断してもよい。
 渋滞中の道路を走行中であると判断された場合(S106:YES)、制御部11は、通信部14を介して渋滞中の推定走行速度を算出し(ステップS107)、処理をステップS109へ進める。ステップS107において直近の単位時間(例えば10分)当たりの平均を算出してもよいし、ステップS105で取得した渋滞の程度によって平均走行速度を決定してもよい。例えば制御部11は、渋滞が長い場合には10km/h、渋滞が短い場合には20km/hと、程度によって平均速度を推定する。制御部11は、通信部14を介して、渋滞区間における実際の車両群の平均走行速度を取得してもよい。
 渋滞中の道路を走行中でないと判断された場合(S106:NO)、走行中の道路の進行先における推定走行速度を取得し(ステップS108)、処理をステップS109へ進める。ステップS108において制御部11は、車両Vの現在位置に対応する走行中の道路の法定速度に基づき、信号で停止することを考慮した速度を取得するとよい。
 制御部11は、車両Vの累積された走行距離と電力消費量とから標準電力消費率を算出する(ステップS109)。ステップS109において制御部11は、車両Vの蓄電素子10における実際の燃費効率を算出する。ステップS109において制御部11は、定期的に算出するSOCと走行距離との関係から単位距離当たりの電力消費量を算出してもよいし、定期的に算出するSOCの履歴から単位時間当たりの電力消費量を算出してもよい。ステップS109において制御部11は、定期的に算出されてある標準電力消費率を取得してもよい。
 制御部11は、ステップS103からステップS109で算出・取得した情報に基づいて、電力消費予測量を算出する(ステップS110)。ステップS110において制御部11は、ステップS103で算出した現状における車内設備の電力消費量を、現状速度、又は推定走行速度で除算して現状の距離当たりの電力消費量(消費率)とし、ステップS109で算出した標準電力消費率と加算し、距離当たりの電力消費予測量を算出する。ステップS109で時間当たりの電力消費量を算出している場合、現状速度、又は推定走行速度で除算するとよい。
 制御部11は、ステップS102で取得したSOCに基づく総電力量を、ステップS110で算出した距離当たりの電力消費予測量で除算し、推定走行可能距離を算出し(ステップS111)、出力装置34、又はナビゲーション装置31へ出力し(ステップS112)、処理を終了する。
 図2のフローチャートに示す処理手順では、現状の電力の消費率から急激な変化がないとした前提での電力消費量が予測される。図2のフローチャートに示す処理手順では、行き先が設定されていない状態における走行可能距離が算出される。
 このように算出される走行可能距離が提示されることにより、車両Vのユーザは車載の蓄電素子10のSOCに基づく走行可能距離を参考にすることができる。ナビゲーション装置31は、設定された予定の経路の距離に対し、電池管理装置1から上述のようにして取得できる走行可能距離が経路全体の距離以下であると判断できる場合、走行可能距離以内に存在する充電スタンドを探索して経路を再設定することが可能になる。
 ナビゲーション装置31にて行き先及び経路が設定された場合に、設定された経路に関する走行可能距離の算出について説明する。図3は、電池管理装置1により実行される処理手順の他の一例を示すフローチャートである。図3のフローチャートに示す処理手順の内、図2のフローチャートに示した手順と共通する手順には、同一のステップ番号を付して詳細な説明を省略する。
 電池管理装置1の制御部11は、走行可能距離算出のリクエストを受け付け(S101)、蓄電素子10のSOCを算出する(S102)。
 制御部11は、走行予定の経路の情報を取得する(ステップS121)。制御部11は、通信部14を介し、走行予定の経路に関する道路交通情報を取得する(ステップS122)。ステップS121における経路の情報は、ナビゲーション装置31にて設定された経路の位置情報である。ステップS122における道路交通情報は、取得時点における渋滞情報であって情報提供サーバ2から取得できる。渋滞情報は、渋滞予測の情報に代替されてよい。走行予定の経路に関する道路交通情報は、道路の起伏の情報であってもよい。ステップS122で取得される情報には外気温等の電力消費に影響する情報を含む。
 制御部11は、取得した道路交通情報に基づき、走行予定の経路を渋滞の有無に基づいて区分けする(ステップS123)。
 制御部11は、区分けされた区間を走行順に選択し(ステップS124)、選択された区間における電力消費予測量を、区間における交通情報(平均旅行時間)、区間における外気温、区間における湿度等の情報に基づいて算出する(ステップS125)。
 制御部11は、選択された区間を、蓄電素子10における残電力量で区間を走行できるか否かを、ステップS125で算出した電力消費予測量に基づいて判断する(ステップS126)。
 走行できると判断された場合(S126:YES)、制御部11は、電力消費予測量を残電力から減算し(ステップS127)、全区間について処理したか否か判断する(ステップS128)。全区間について処理したと判断された場合(S128:YES)、制御部11は、全区間について走行可能と判断した結果をリクエストに対して応答し(ステップS129)、処理を終了する。
 ステップS128で全区間について処理していないと判断された場合(S128:NO)、制御部11は処理をステップS124へ戻す。
 ステップS126にていずれかの区間において走行できないと判断された場合(S126:NO)、制御部11は、走行できないと判断された区間を識別するための情報と共に、走行可能と判断された区間の積算距離を、リクエストに対して応答し(ステップS130)、処理を終了する。
 このように、走行予定の経路においてどれほどの電力を消費するのかを、行程全体における平均値ではなく、区間に分けて渋滞情報及び車内設備における電力消費から推定することで精度よく算出することで、走行可能距離を精度良く求めることができる。
 (実施の形態2)
 実施の形態2では、電池管理装置1は、深層学習によって学習される学習モデルから走行可能距離を特定する。図4は、実施の形態2における電池管理装置1の構成を示すブロック図である。実施の形態2における電池管理装置1の記憶部12には、制御プログラム1Pの他に、学習済みの学習モデル1Mが記憶されている。電池管理装置1及び情報提供システム100の構成は、学習モデル1Mに基づく処理手順以外は実施の形態1と同様であるので詳細な説明を省略する。
 図5は、電池管理装置1における学習モデル1Mの概要図である。学習モデル1Mは、入力時点における蓄電素子10のSOC、車内設備における電力消費量、及び、走行予定の経路における予想平均速度の入力に応じて、走行可能距離を出力するように学習されている。学習モデル1Mは、学習モデル1Mは、図5に示すようにニューラルネットワーク(Neural Network)を用いた教師ありの深層学習アルゴリズムによって走行可能距離を出力する。学習モデル1Mの学習アルゴリズムは教師なしの学習アルゴリズムでもよいし、リカレントニューラルネットワーク(Recurrent Neural Network)でもよい。
 学習モデル1Mのニューラルネットワークは、図5に示すように、定義データによって定義される複数段の畳み込み層、プーリング層および全結合層を含み、入力されるSOCを含む情報に基づいて、走行可能距離を出力する。
 学習モデル1Mは、走行可能距離を直接的に出力せずに、推定される時間当たり又は距離当たりの電力消費予測量を出力してもよい。
 学習モデル1Mは、蓄電素子10を電力源とする車両Vの走行可能距離に影響する他のデータを入力することによって走行可能距離を出力するように学習されてもよい。例えば学習モデル1Mは、車種を入力してもよい。学習モデル1Mは、走行する道路の識別情報を入力してもよい。学習モデル1Mは、走行する時刻を入力してもよい。
 学習モデル1Mは、蓄電素子10の製造者、又は車両Vの製造者によって管理されるモデル作成装置によって、実際の車両Vにおける蓄電素子10のSOC、電力消費量、及び、走行経路における速度と、対応する実際の走行距離とを含む教師データによって学習されている。多数の実際に走行している車両Vにおけるデータを収集して学習されている。学習モデル1Mは、各車両Vについて、蓄電素子10の実際のSOC、電力消費量、及び、走行経路における速度と、対応する実際の走行距離とによって再学習が繰り返されていってもよい。
 学習モデル1Mは、車種毎に学習されてあり、車種に応じて記憶部12に記憶されていてもよい。学習モデル1Mは、地域別に学習されてあり、地域に応じて記憶部12に記憶されていてもよい。
 図6は、学習モデル1Mに基づく走行可能距離の算出手順の一例を示すフローチャートである。図6のフローチャートに示す処理手順の内、実施の形態1の図2のフローチャートに示した手順と共通する手順には、同一のステップ番号を付して詳細な説明を省略する。
 制御部11は、走行可能距離算出のリクエストを受け付けて(S101)、SOCの算出(S102)、現状の電力消費量の算出(S103)、位置情報の取得(S104)を実行する。制御部11は、渋滞中の道路であるか否かに応じて速度を算出する(S107,S108)。
 ステップS102-S104,S107,S108で算出したSOC、電力消費量、走行経路における予想速度を、学習モデル1Mに入力する(ステップS131)。学習モデル1Mは、入力されたSOC、電力消費量、走行経路における予想速度に応じて走行可能距離を出力する。制御部11は、学習モデル1Mから出力された走行可能距離を取得する(ステップS132)。
 制御部11は、ステップS132で取得した走行可能距離を、出力装置34、又はナビゲーション装置31へ出力し(S112)、処理を終了する。
 図7は、学習モデル1Mの他の例の概要図である。図7に示す学習モデル1Mは、算出時点までのSOCの時間変化、ナビゲーション装置31にて設定された行き先までの経路において予想される渋滞の程度の時間分布、外気温の時間分布及び設定温度を入力し、経路の何%まで到達できるかを出力するように学習される。学習モデル1Mは、SOCの時間変化のその続きの時間変化予測を出力してもよい。
 図7に示すように他の例における学習モデル1Mは、図5に示した例と同様にニューラルネットワークを用いた教師ありの深層学習アルゴリズムによって学習される。
 図8は、学習モデル1Mを用いた走行可能距離の算出手順の他の一例を示すフローチャートである。図8のフローチャートに示した処理手順は、図7の学習モデル1Mを用いた場合の処理手順に対応する。図8のフローチャートに示す処理手順の内、実施の形態1の図2のフローチャートに示した手順と共通する手順には、同一のステップ番号を付して詳細な説明を省略する。
 制御部11は、走行可能距離算出のリクエストを受け付けると(S101)、算出時点までのSOCの時間変化を示すグラフ画像を作成する(ステップS141)。
 制御部11は、通信部14を介し、走行予定の経路に関する道路交通情報を取得する(ステップS142)。ステップS142における道路交通情報は、到着予想時刻における渋滞予測の情報である。制御部11は、取得した道路交通情報に基づいて混雑の時間分布を示すグラフ画像を作成する(ステップS143)。ステップS143において制御部11は、各地点の時刻毎の渋滞予測情報から混雑の程度(渋滞長)の情報を取得して到着予想時刻毎の混雑の分布を作成する。
 制御部11は、走行予定の経路における外気温の予測値を取得する(ステップS144)。ステップS144にて湿度、道路の起伏など、電力消費量に影響する情報を取得してもよい。制御部11は取得した予測値の時間分布を示すグラフ画像を作成する(ステップS145)。
 制御部11は、空調装置33の設定温度を取得する(ステップS146)。
 制御部11は、ステップS141で作成したSOCの時間変化のグラフ画像、ステップS143で作成した混雑の時間分布のグラフ画像、ステップS145で作成した外気温の時間分布のグラフ画像と、設定温度とを学習モデル1Mに入力する(ステップS147)。
 制御部11は、学習モデル1Mから出力される到達可能性を示す割合、又は、SOCの時間変化予測を取得し(ステップS148)、取得した割合、又は時間変化予測に基づき、走行可能距離を算出する(ステップS149)。
 制御部11は、算出された走行可能距離を、出力装置34、又はナビゲーション装置31へ出力し(ステップS112)、処理を終了する。
 このように、学習モデル1Mを用いることによって、予測が困難であった正確な走行可能距離の算出の精度が向上することが期待される。
 (実施の形態3)
 実施の形態3では、情報提供サーバ2が、気温、湿度、走行可能距離を算出するために必要な情報を提供する。実施の形態3における情報提供システム100のハードウェア構成は、実施の形態1と同様であるから同一の符号を付して詳細な説明を省略する。
 図9は、実施の形態3における走行可能距離の算出手順の一例を示すフローチャートである。ナビゲーション装置31にて行き先及び経路が設定された場合に、ナビゲーション装置31が、設定された経路に対する蓄電素子10からの電力による走行可能距離の算出のリクエストを電池管理装置1へ出力すると以下の処理が開始される。
 電池管理装置1の制御部11は、走行可能距離算出のリクエストを受け付けると(ステップS301)、蓄電素子10のSOCを算出する(ステップS302)。ステップS302において制御部11は上述したように、接続部13を介して蓄電素子10で算出済みのSOCを取得してもよい。
 制御部11は、空調装置33を含む車内設備における電力消費量を算出する(ステップS303)。ステップS303において制御部11は、定期的(例えば10分毎)に電力消費量を取得しておき、ステップS303で直近の単位時間(例えば1時間)当たりの電力消費量を算出してもよい。
 制御部11は、走行予定の経路の情報を取得する(ステップS304)。ステップS304において制御部11は、ナビゲーション装置31にて設定された経路の位置情報を取得する。
 制御部11は、算出したSOC、電力消費量、及び走行予定経路の情報と、蓄電素子10の識別情報、及び車両の車種の情報とを含む、走行可能距離を算出するための情報提供リクエストを情報提供サーバ2へ送信する(ステップS305)。制御部11は、ステップS304で経路の情報を取得せずに、ナビゲーション装置31から情報提供サーバ2へ直接的に情報が送信されるように制御してもよい。
 情報提供サーバ2の制御部20は、情報提供リクエストを通信部22によって受信する(ステップS201)。制御部20は、情報提供リクエストに含まれる走行予定経路の情報に基づいて、走行予定経路における渋滞情報を含む道路交通情報を、ネットワークNを介して取得する(ステップS202)。制御部20は、情報提供リクエストに含まれる走行予定経路の情報に基づいて、走行予定経路における天候情報を、ネットワークNを介して取得する(ステップS203)。
 制御部20は、ステップS202及びステップS203において、ネットワークNを介してVICS(登録商標)等から道路交通情報を取得するのみならず、同様の電池管理装置1を搭載している複数の電動車両から情報を収集することもできる。走行予定経路を実際に走行している車両から情報を取得してもよい。この場合、同一又は類似の車種の車両から電力消費量を取得するとよい。
 制御部20は、ステップS202で取得した道路交通情報と、情報提供リクエストに含まれるSOC及び電力消費量に基づいて、走行予定経路における電力消費予測量を算出する(ステップS204)。制御部20は、ステップS203で取得した天候情報に基づいて、空調装置33の稼働を加味した電力消費予測量へ修正する(ステップS205)。ステップS205で得られる出力消費予測量は、距離当たりの電力消費量として算出されるとよい。
 制御部20はステップS204及びステップS205において、情報提供リクエストに車種の情報が含まれる場合、車種ごとの標準電力消費率から、電力消費予測量を算出するとよい。
 制御部20は、修正後の電力消費予測量を電池管理装置1宛てに応答する(ステップS206)。
 電池管理装置1の制御部11は、情報提供リクエストに対する応答として電力消費予測量を受信する(ステップS306)。制御部11は、受信した電力消費予測量によって、推定走行可能距離を算出し(ステップS307)、出力装置34、又はナビゲーション装置31へ出力し(ステップS308)、処理を終了する。
 情報提供サーバ2側で、図3のフローチャートに示した処理手順に基づく推定走行可能距離の算出まで実行し、ステップS206で制御部20は推定走行可能距離を応答してもよい。
 このように、蓄電素子10の製造者が管理する情報提供サーバ2側で、車両Vにおける蓄電素子10の特性に適した情報によって、電力消費予測量、又は、電力消費に影響する情報が提供される。これにより、車内外の状況に影響される走行可能距離の算出精度が向上する。
 情報提供サーバ2にて走行可能距離、又は電力消費予測量を算出する場合、情報提供サーバ2は、実施の形態2で開示したような学習モデル1Mを用いてもよい。車種毎の学習モデル1Mを予め作成しておき、作成された学習モデル1Mを用いて算出することで車種に応じた蓄電素子10の電力消費量を精度よく予測し、車両V内で走行可能距離を精度よく算出することを可能とする。
 (実施の形態4)
 実施の形態4では、不足分の電力消費予測量に基づいて必要な充電時間又は充電量を出力する。実施の形態4における情報提供システム100のハードウェア構成は、実施の形態1と同様であるから同一の符号を付して詳細な説明を省略する。
 図10は、実施の形態4における走行可能距離の算出手順の一例を示すフローチャートである。実施の形態4では、ナビゲーション装置31において行き先が設定又は検索されたことを契機に、ナビゲーション装置31からの走行可能距離算出のリクエストを受け付ける。図10のフローチャートに示す処理手順の内、実施の形態1の図3のフローチャートに示した処理手順と共通する手順については同一のステップ番号を付して詳細な説明を省略する。
 電池管理装置1の制御部11は、走行可能距離算出のリクエストをナビゲーション装置31から受け付け(S101)、走行予定の経路の情報を取得する(S121)。
 制御部11は、蓄電素子10のSOCを算出する(S102)。
 制御部11は、取得した経路に関する道路交通情報を取得する(S122)。制御部11は、取得した道路交通情報に基づき、走行予定の経路を渋滞の有無、渋滞の程度に基づいて区分けする(S123)。
 制御部11は、区分けされた区間を走行順に選択し(S124)、選択された区間における電力消費予測量の算出(S125)、走行の可否(S126)を実行する。
 実施の形態4では、ステップS126にていずれかの区間において走行できないと判断された場合(S126:NO)、制御部11は、ステップS102で算出した車両Vの現状のSOCが満充電に相当するか否かを判断する(ステップS151)。ステップS151において制御部11は、算出したSOCが満充電に至らなくとも、それ以上の充電は、車両V側で停止されるような高いSOCであると判断される場合には、満充電に相当すると判断する。
 制御部11は、満充電に相当すると判断された場合(S151:YES)、制御部11は、ステップS126で走行できないと判断された区間を識別するための情報と共に、走行可能と判断された区間の積算距離とをリクエストに対して応答し(S130)、処理を終了する。
 満充電に相当しないと判断された場合(S151:NO)、制御部11は、走行できないと判断された区間から行き先(経路終端)までに必要な電力消費予測量を算出する(ステップS152)。制御部11は、算出した電力消費予測量よりも少し多い必要充電量又は、必要充電量を充電するために要する充電時間を算出する(ステップS153)。
 制御部11は、走行できないと判断された区間を識別するための情報と、ステップS153で算出した必要充電量又は充電時間とをリクエストに対して応答し(ステップS154)、処理を終了する。
 ステップS151で満充電に相当すると判断された場合であっても、制御部11は、電力消費予測量、及び、必要充電量又は充電時間を算出し(S153)、途中での必要な充電時間の情報として応答に加えてもよい。
 リクエストに対する応答を受け取ったナビゲーション装置31は、必要充電量又は充電時間を含む応答を電池管理装置1から受信した場合、事前の充電を促すメッセージを、出力装置34に出力する。電池管理装置1の制御部11が直接的に、出力装置34から充電を促すメッセージを出力させてもよい。
 図11は、出力される充電メッセージの例を示す図である。図11は、ナビゲーション装置31によるナビゲーション画面を示している。ナビゲーション画面には、ナビゲーション装置31にて設定された経路が地図上に表示されていると共に、車両Vの現状のSOCでは電力が不足する区間が地図上で強調表示されている。図11の例では、車両Vの蓄電素子10は、満充電に相当しないと判断され、必要な電力量と、充電時間とが提示されている。このようにして満充電とせずとも、少しでも充電しておくことで車両Vが全行程を走行できる場合には、ユーザはこれを認識して事前に適宜充電準備し、安心して走行することができる。
 電池管理装置1及びナビゲーション装置31との協働により、走行予定経路における行き先(経路終端)までに充電が必要であることが予想される場合には、走行予定経路に充電スタンドを加えて再度図11のフローチャートに示した処理手順を実行し、経由地の充電スタンドにおける必要充電量又は充電時間を提示するようにしてもよい。
 実施の形態4に示した処理手順は、車両Vに搭載されたナビゲーション装置31との連携で実現されることに限られない。例えば、運転者の情報端末装置(スマートフォン等)にて車両Vの蓄電素子10のSOCを取得し、情報端末装置にて走行可能距離の算出を実行してもよい。この場合、自宅に充電設備を有するユーザは、翌日の行き先を情報端末装置で検索した際に、蓄電素子10のSOCに基づいてその行き先への行程及び帰宅するまでの行程を含む全行程を走行することが可能か否かを情報端末装置にて調べる。情報端末装置は、電池管理装置1と同様の機能によって、走行可能距離を算出し、全行程を走行できないと判断した場合には、事前の充電を促すことができる。この場合、運転者は、出発までにどの程度充電すべきかを把握することができ、目的地まで不安にならなくて済む。
 車両Vは、敷地内において荷物を運搬するAGV(Automated Guided Vehicle)、トラック等の産業用車両であってもよく、電力を駆動力とする電動車両であれば電気自動車に限らない。更には、電池管理装置1の対象は、次の実施の形態5で説明するように、車両ではなく飛行機、船舶、宇宙船等、蓄電素子を動力源として移動するものを対象とすることが可能である。
 (実施の形態5)
 実施の形態5では、電池管理装置1の対象を、有人のeVTOLである飛行体V2とする。図12は、実施の形態5における情報提供システム100の概要図である。実施の形態5における情報提供システム100の構成は、飛行体V2を対象とする処理を実行すること以外は、実施の形態1と同様であるからハードウェア構成についての詳細な説明は省略する。
 実施の形態5における電池管理装置1は、図1に示すような経路で飛行する飛行体V2に搭載されている。電池管理装置1は、飛行体V2の蓄電素子10と接続されている。電池管理装置1は、飛行体V2の位置情報及び移動予定の経路情報を取得する装置と通信接続が可能である。例えば電池管理装置1は、飛行体V2に搭載されているGPS受信機から位置情報を取得し、図示しない航行制御装置から経路情報を取得する。ここで航行制御装置は、運転者又は外部の指示系統から指示された経路と、緯度経度高度とに基づき飛行を制御する装置である。
 電池管理装置1は、情報提供サーバ2と通信接続が可能である。実施の形態5において電池管理装置1は、飛行体V2に搭載されている外部との通信装置を介して情報提供サーバ2と通信によるデータ送受信が可能である。
 電池管理装置1は、飛行体V2に搭載されている空調装置と通信接続が可能である。電池管理装置1は、飛行体V2に搭載されている気圧調整装置と通信接続が可能でもよい。電池管理装置1は、飛行体V2の運転者に対し情報を出力する出力装置と接続されていてもよい。
 実施の形態5の情報提供サーバ2の制御部20は、情報提供プログラム2Pに基づき、地図情報、高度別の外気温データ、風速データ、離発着ポイントごとの混雑状況等、飛行体V2の電力消費に影響する要素に関する情報を取得し、記憶部21に記憶できる。制御部20は、情報提供プログラム2Pに基づき、位置情報に対応付けられる高度別の気圧分布の実測値又は予測値の情報を取得し、記憶部21に記憶できる。
 実施の形態5における情報提供システム100では、飛行体V2に搭載されている電池管理装置1が、飛行体V2の位置情報と、充電スタンドESの位置情報と、飛行体V2の移動経路における電力消費予測量と、蓄電素子10の充電率とに基づいて、飛行体V2内外における電力消費量の予測を加味した走行可能距離を推定する。予測される電力消費量の一部については、情報提供サーバ2から提供される。
 図13は、実施の形態5の電池管理装置1により実行される処理手順の一例を示すフローチャートである。制御部11は、移動可能距離のリクエストを受け付ける(ステップS161)。
 制御部11は、蓄電素子10から測定データを取得し、SOCを算出する(ステップS162)。ステップS162において制御部11は算出済みのSOCを取得してもよい。
 制御部11は、空調装置を含む飛行体V2に搭載されている設備における時間当たりの電力消費量を算出する(ステップS163)。ステップS163において制御部11は、定期的(例えば10分毎)に電力消費量を取得しておき、ステップS163で直近の単位時間(例えば15分、30分、1時間等)当たりの電力消費量を算出してもよい。
 ステップS163において制御部11は、図示しない温度・湿度センサから外気温、外気湿度、室内温度及び湿度を取得し、温度差及び湿度差によって、空調装置による電力消費量を予測するか、又は、温度差からステップS163の電力消費量を補正する。制御部11は、図示しない高度センサ及び気圧センサから、高度、外気圧を取得し、気圧調整装置による電力消費を鑑み、電力消費量を予測するか、又は補正してもよい。
 制御部11は、飛行体V2の現在位置を示す位置情報を取得する(ステップS164)。
 制御部11は、通信部14を介し、設定されている目的地における離発着の混雑状況を示す情報を情報提供サーバ2から取得する(ステップS165)。ステップS165において制御部11は、目的地の離発着に要する平均時間を取得する。
 制御部11は、通信部14を介して、現在位置から設定されている目的地までの間の風速の分布情報を情報提供サーバ2から取得する(ステップS166)。
 制御部11は、取得した混雑状況を示す情報及び風速の情報を含む環境情報と、現在地から目的地までの距離に基づいて、目的地までの移動に要する時間を算出し(ステップS167)、移動に要する電力量を予測する(ステップS168)。
 制御部11は、ステップS163にて算出した時間当たりの電力消費量に基づいて目的地までに設備で消費される電力量を算出し(ステップS169)、ステップS168で算出した移動に要する電力量と合わせて予測電力消費量を算出する(ステップS170)。
 制御部11は、ステップS162で算出したSOCに基づく残電力量と、ステップS170で算出した予測電力消費量とに基づいて、目的地までの距離を、移動可能か否かを判断する(ステップS171)。ステップS171で制御部11は一例として、残電力量と予測電力消費量の大小を比較し、残電力量の方が多い場合に移動可能と判断すればよい。制御部11は、単位時間当たりの電力消費量を算出して距離を算出してから目的地までの距離と比較してもよい。
 移動可能であると判断された場合(S171:YES)、制御部11は、残電力量及び予測電力消費量を出力し(ステップS172)、処理を終了する。
 ステップS171で移動可能でないと判断された場合(S171:NO)、予測電力消費量と残電力量に対する割合に基づいて移動可能距離を算出し(ステップS173)、出力し(ステップS174)、処理を終了する。
 ステップS174において制御部11は、情報提供サーバ2へ、現在地から移動可能距離以内にある充電スタンドESが設けられている離発着場所の検索リクエストを送信してもよい。制御部11は、リクエストに対して応答された離発着場所の候補を共に出力する。制御部11は、離発着場所の候補に到着した場合に充電スタンドESで充電すべき電力量を、残電力量、予測電力消費量を用いて算出する。候補から選択された離発着場所に到着した場合、制御部11は、充電スタンドESと接続されたタイミングで充電電力量を再度決定して充電を実行してよい。
 実施の形態5に示したように、電池管理装置1による移動可能距離の算出の対象は、電気自動車に限られない。同様にして電池管理装置1による処理は、ドローンと呼ばれる無人飛行機についても適用できる。電池管理装置1による処理はほかに、蓄電素子を搭載し、電力で航行する電動船舶における電池管理に適用することも可能である。電池管理装置1による処理を電動船舶に適用する場合、制御部11は気温、風速、及び波の高さに加え、潮流に関する情報を鑑みて電力消費量を予測、補正する。電池管理装置1による処理はほかに、電力を用いて航行しより緻密な管理が必要な宇宙船、衛星等の飛行体における電池管理にも適用が可能である。
 上述のように開示された実施の形態は全ての点で例示であって、制限的なものではない。本発明の範囲は、請求の範囲によって示され、請求の範囲と均等の意味及び範囲内での全ての変更が含まれる。
 1 電池管理装置
 10 蓄電素子
 11 制御部
 12 記憶部
 14 通信部
 1P 制御プログラム
 2 情報提供サーバ
 20 制御部
 21 記憶部
 22 通信部
 31 ナビゲーション装置
 33 空調装置
 

Claims (16)

  1.  電動移動体の動力源の蓄電素子の充電率に基づいて移動可能距離を算出する算出部を備える電池管理装置であって、
     前記算出部は、
     前記蓄電素子の充電率を取得し、
     前記電動移動体の予定経路における環境情報を取得し、
     取得した充電率及び環境情報から、前記予定経路を前記電動移動体が移動するために必要な必要電力量と、前記電動移動体に搭載されている設備での電力消費量の予測とに基づき予測される電力消費量を算出し、
     算出された予測電力消費量並びに前記充電率に基づき、前記蓄電素子の残電力による移動可能距離を算出する
     電池管理装置。
  2.  前記電動移動体の予定経路を区分けし、
     区分けした区間毎に、前記環境情報に基づいて前記必要電力量、及び前記設備での電力消費量を予測し、
     区間毎に、前記電動移動体が、充電率に基づいて前記区間を移動可能であるか否を判断し、
     移動可能でないと判断される区間までの距離を移動可能距離として算出する
     請求項1に記載の電池管理装置。
  3.  前記算出部は、
     前記蓄電素子の充電率、前記予定経路における混雑情報、及び、前記予定経路に対して算出される前記予測電力消費量の入力に応じて、前記充電率の蓄電素子を動力源として移動可能な距離を出力するように学習されている学習モデルを用いて移動可能距離を算出する
     請求項1に記載の電池管理装置。
  4.  前記算出部は、
     算出時点までの前記蓄電素子の充電率の時間変化、前記予定経路に対し予測されている混雑時間分布、及び、前記予定経路における外気温の予想分布の入力に応じて、前記充電率の蓄電素子を動力源として移動可能な距離、又は前記蓄電素子の算出時点以降の充電率の時間変化を出力するように学習されている学習モデルを用いて移動可能距離を算出する
     請求項1に記載の電池管理装置。
  5.  前記学習モデルは、前記予定経路の通過予定時刻を入力する、請求項3又は4に記載の電池管理装置。
  6.  算出された移動可能距離に基づいて前記予定経路の全行程を移動することが可能か否かを判断し、
     前記予定経路の一部を移動できないと判断された場合、前記蓄電素子への事前充電を促すメッセージを出力する
     請求項1から5のいずれか1項に記載の電池管理装置。
  7.  前記予定経路上の移動に必要な予測電力消費量及び前記充電率に基づき、前記一部における予測電力消費量を算出し、
     算出された予測電力消費量に対応する電力を充電するために前記事前充電の充電時間又は充電量を含むメッセージを出力する
     請求項6に記載の電池管理装置。
  8.  自装置が起動中に、前記蓄電素子の充電率を所定のタイミングで取得するようにしてあり、
     前記充電率を取得する都度に、前記充電率が所定値以下となったか否かを判断し、
     前記充電率が前記所定値以下となったと判断された場合に、前記算出部による移動可能距離の算出を開始する
     請求項1から7のいずれか1項に記載の電池管理装置。
  9.  前記電動移動体は、有人機である、請求項1から8のいずれか1項に記載の電池管理装置。
  10.  前記電動移動体の動力源はエンジンを含まない、請求項1から9のいずれか1項に記載の電池管理装置。
  11.  前記環境情報は、予定経路における交通状況、渋滞、混雑状況、気温、気圧、高度、湿度、風速、波の高さ、及び、潮流に関する情報の内の少なくとも1つを含む、請求項1から10のいずれか1項に記載の電池管理装置。
  12.  電動移動体の動力源の蓄電素子の充電率、前記電動移動体の予定経路における環境情報、及び、前記予定経路における予測電力消費量を入力する入力層と、
     移動可能距離を出力する出力層と、
     前記電動移動体の蓄電素子の充電率、前記電動移動体が移動した経路における環境情報、及び前記蓄電素子の実際の電力消費量と、対応する実際の移動距離とを含む教師データに基づき学習された中間層とを含み、
     前記電動移動体の移動可能距離を算出するために用いられる、学習モデル。
  13.  電動移動体の動力源の蓄電素子の状態を管理するコンピュータに、
     前記蓄電素子の充電率を取得し、
     前記電動移動体の予定経路における環境情報を取得し、
     取得した充電率及び環境情報から、前記予定経路を前記電動移動体が移動するために必要な電力量と、前記電動移動体に搭載されている設備での電力消費量とに基づいて予測される電力消費量を算出し、
     算出された予測電力消費量及び前記充電率に基づき移動可能距離を算出する
     処理を実行させるコンピュータプログラム。
  14.  電動移動体の動力源の蓄電素子の充電率に基づき、前記蓄電素子における残電力による移動可能距離を出力する電池管理方法であって、
     前記蓄電素子の充電率を取得し、
     前記電動移動体の予定経路における環境情報を取得し、
     取得した充電率及び環境情報から、前記予定経路を前記電動移動体が移動するために必要な電力量と、前記電動移動体に搭載されている設備での電力消費量の予測とに基づいて予測される電力消費量を算出し、
     算出された予測電力消費量及び充電率に基づき移動可能距離を算出する
     電池管理方法。
  15.  電動移動体と通信によって情報を送受信可能であって、前記電動移動体の動力源の蓄電素子の残電力での移動可能距離を算出するための情報を提供する情報提供装置であって、
     前記蓄電素子の充電率、予定経路、電力消費量の情報を受信し、
     前記電動移動体の予定経路における環境情報を取得し、
     取得した充電率及び環境情報から、前記予定経路を前記電動移動体が移動するために必要な電力量と、前記電動移動体に搭載されている設備での電力消費量とに基づいて予測される記予定経路における電力消費量を算出し、
     算出された予測電力消費量を前記電動移動体に向けて送信する
     情報提供装置。
  16.  電動移動体の動力源の蓄電素子の充放電を管理する電池管理装置であって、
     前記電動移動体の移動の予定経路における環境情報を取得し、取得した充電率及び環境情報から、前記予定経路を前記電動移動体が移動するために必要な電力量と、前記電動移動体に搭載されている設備での電力消費量の予測とに基づき予測される電力消費量を算出する算出部を備え、
     算出された予測電力消費量と、前記蓄電素子の充電率に基づき、前記蓄電素子への充電量を決定し、決定した充電量で前記蓄電素子を充電する
     電池管理装置。
     
PCT/JP2020/012779 2019-08-28 2020-03-23 電池管理装置、学習モデル、コンピュータプログラム、電池管理方法、及び情報提供装置 WO2021038940A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2021541988A JP7298698B2 (ja) 2019-08-28 2020-03-23 電池管理装置、学習モデル、コンピュータプログラム、電池管理方法、及び情報提供装置
US17/638,466 US20220357162A1 (en) 2019-08-28 2020-03-23 Battery management device, learning model, computer program, battery management method, and information providing device
CN202080068021.0A CN114450738A (zh) 2019-08-28 2020-03-23 电池管理装置、学习模型、计算机程序、电池管理方法以及信息提供装置

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019-156000 2019-08-28
JP2019156000 2019-08-28

Publications (1)

Publication Number Publication Date
WO2021038940A1 true WO2021038940A1 (ja) 2021-03-04

Family

ID=74685377

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/012779 WO2021038940A1 (ja) 2019-08-28 2020-03-23 電池管理装置、学習モデル、コンピュータプログラム、電池管理方法、及び情報提供装置

Country Status (4)

Country Link
US (1) US20220357162A1 (ja)
JP (1) JP7298698B2 (ja)
CN (1) CN114450738A (ja)
WO (1) WO2021038940A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023286625A1 (ja) * 2021-07-13 2023-01-19 パナソニック インテレクチュアル プロパティ コーポレーション オブ アメリカ 情報処理方法、情報処理装置、情報処理プログラム、及び学習済みモデルの製造方法
WO2023119559A1 (ja) * 2021-12-23 2023-06-29 日本電気株式会社 充電設備決定装置、充電設備決定方法、及び記録媒体
WO2024095853A1 (ja) * 2022-11-04 2024-05-10 株式会社デンソー 空調装置、空調制御装置及び空調制御プログラム

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2022139826A (ja) * 2021-03-12 2022-09-26 本田技研工業株式会社 車両の制御装置、車両の制御方法およびプログラム

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006115623A (ja) * 2004-10-15 2006-04-27 Fuji Heavy Ind Ltd 走行可能距離推定システム
JP2009137456A (ja) * 2007-12-06 2009-06-25 Toyota Motor Corp 充電制御装置
JP2017125825A (ja) * 2016-01-15 2017-07-20 株式会社東芝 電気自動車の走行支援装置、車載装置及び走行支援方法

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5656736B2 (ja) * 2011-05-16 2015-01-21 トヨタ自動車株式会社 車両および車両の制御方法
JP6021776B2 (ja) * 2013-09-30 2016-11-09 ダイムラー・アクチェンゲゼルシャフトDaimler AG 電気自動車のバッテリ冷却装置
JP6436071B2 (ja) * 2015-12-07 2018-12-12 株式会社デンソー 車両の制御装置
WO2018204818A1 (en) * 2017-05-04 2018-11-08 Iotecha Corp. Method and apparatus for charging a battery using local power grid topology information
JP6812903B2 (ja) * 2017-05-26 2021-01-13 トヨタ自動車株式会社 ハイブリッド車両
CN110341546B (zh) * 2019-05-31 2021-03-02 浙江合众新能源汽车有限公司 一种纯电动车续航里程估算方法
KR102602227B1 (ko) * 2019-06-14 2023-11-15 현대자동차주식회사 친환경 자동차 및 그를 위한 충전량 안내 방법

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006115623A (ja) * 2004-10-15 2006-04-27 Fuji Heavy Ind Ltd 走行可能距離推定システム
JP2009137456A (ja) * 2007-12-06 2009-06-25 Toyota Motor Corp 充電制御装置
JP2017125825A (ja) * 2016-01-15 2017-07-20 株式会社東芝 電気自動車の走行支援装置、車載装置及び走行支援方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023286625A1 (ja) * 2021-07-13 2023-01-19 パナソニック インテレクチュアル プロパティ コーポレーション オブ アメリカ 情報処理方法、情報処理装置、情報処理プログラム、及び学習済みモデルの製造方法
WO2023119559A1 (ja) * 2021-12-23 2023-06-29 日本電気株式会社 充電設備決定装置、充電設備決定方法、及び記録媒体
WO2024095853A1 (ja) * 2022-11-04 2024-05-10 株式会社デンソー 空調装置、空調制御装置及び空調制御プログラム

Also Published As

Publication number Publication date
CN114450738A (zh) 2022-05-06
US20220357162A1 (en) 2022-11-10
JP7298698B2 (ja) 2023-06-27
JPWO2021038940A1 (ja) 2021-03-04

Similar Documents

Publication Publication Date Title
WO2021038940A1 (ja) 電池管理装置、学習モデル、コンピュータプログラム、電池管理方法、及び情報提供装置
US11880206B2 (en) Power management, dynamic routing and memory management for autonomous driving vehicles
US9587954B2 (en) System and method for vehicle routing using stochastic optimization
EP3307596B1 (en) Adapting a vehicle control strategy based on historical data related to a geographical zone
US10832498B1 (en) Vehicle telemetry device for inferring driver identity and building a vehicle history
US11443563B2 (en) Driving range based on past and future data
US9476721B2 (en) Travel support device, travel support method, and drive support system
WO2015094807A1 (en) System and method for control of an electric vehicle
JP2013070515A (ja) 電動車両の充電制御システム
CN102867430A (zh) 电动汽车用的信息终端以及巡航控制装置
Ferreira et al. Data mining approach for range prediction of electric vehicle
CN114604250A (zh) 对动态基于路段的剩余能量可行驶距离的电动化车辆控制
CN114103671A (zh) 电动车辆的充电系统和方法
US11325601B2 (en) Method for producing a passing probability collection, method for operating a control device of a motor vehicle, passing probability collecting device and control device
US11608081B2 (en) Autonomous vehicle low battery management
US20200355516A1 (en) Information providing device and information providing program
US20240077322A1 (en) Vehicle-specific route planning
US20240078911A1 (en) Vehicle convoy formation
US20240083297A1 (en) Information processing apparatus
US11648938B2 (en) Braking data mapping
US20230415785A1 (en) Delivery Hand Off Procedure When Electric Vehicle (EV) is About to Lose Power
WO2024023997A1 (ja) 電子制御装置
CN116358579A (zh) 基于基线和动态驾驶员模型的电动汽车行程能量预测
CN116861758A (zh) 用于ev行程能量预测的结合交通信息的nnt驾驶员模型
CN117280595A (zh) 管理电能的存储

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20856541

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021541988

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20856541

Country of ref document: EP

Kind code of ref document: A1