WO2020217644A1 - 学習済みモデルの生成方法、保全表示装置、及びプログラム - Google Patents

学習済みモデルの生成方法、保全表示装置、及びプログラム Download PDF

Info

Publication number
WO2020217644A1
WO2020217644A1 PCT/JP2020/004605 JP2020004605W WO2020217644A1 WO 2020217644 A1 WO2020217644 A1 WO 2020217644A1 JP 2020004605 W JP2020004605 W JP 2020004605W WO 2020217644 A1 WO2020217644 A1 WO 2020217644A1
Authority
WO
WIPO (PCT)
Prior art keywords
data
electrode sheet
maintenance
supply reel
trained model
Prior art date
Application number
PCT/JP2020/004605
Other languages
English (en)
French (fr)
Inventor
伸也 畠中
Original Assignee
パナソニックIpマネジメント株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニックIpマネジメント株式会社 filed Critical パナソニックIpマネジメント株式会社
Priority to CN202080030074.3A priority Critical patent/CN113711149B/zh
Priority to JP2021515807A priority patent/JP7437784B2/ja
Publication of WO2020217644A1 publication Critical patent/WO2020217644A1/ja
Priority to US17/506,295 priority patent/US11782433B2/en

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0259Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
    • G05B23/0283Predictive maintenance, e.g. involving the monitoring of a system and, based on the monitoring results, taking decisions on the maintenance schedule of the monitored system; Estimating remaining useful life [RUL]
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/4183Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by data acquisition, e.g. workpiece identification
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N20/00Machine learning
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/04Construction or manufacture in general
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/05Accumulators with non-aqueous electrolyte
    • H01M10/058Construction or manufacture
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Definitions

  • This disclosure relates to a trained model generation method, a maintenance display device, and a program used to display information on maintenance of production equipment.
  • An object of the present disclosure is to provide a learning model generation method, a maintenance display device, and a program for detecting a sign of abnormality.
  • the learned model generation method of the present disclosure includes a first supply reel that supplies the first electrode sheet, a second supply reel that supplies the second electrode sheet, and a first attachment provided on the first electrode sheet side.
  • a second bonding roller provided on the side of the second electrode sheet and paired with the first bonding roller to bond the first electrode sheet and the second electrode sheet, and the bonding roller.
  • the first A method of generating a trained model for the maintenance of a production apparatus including a sensor that reads the first end face of one electrode sheet and the second end face of the second electrode sheet, and is read along the radial direction.
  • the first data representing the position of the first end face and the second data representing the position of the second end face read along the radial direction are acquired from the sensor and used in the first data and the second data. Based on this, when it is determined that the continuity of the positions of the first end surface indicated by the first data intersects the continuity of the positions of the second end surface indicated by the second data, the winding body is defective. Yes, the information that the cause of the defect lies in the first supply reel or the first laminating roller is output to the display device for maintenance, and the first data before and after the maintenance of the first supply reel and the first data Based on the second data, the first defect rate of the winding body before the maintenance of the first supply reel and the second defect rate of the winding body after the maintenance of the first supply reel are first.
  • the first data and the second data read before the first supply reel is maintained are not used to generate the trained model, while the said.
  • the trained model is generated using the first data and the second data read before the first supply reel is maintained.
  • the learned model generation method of the present disclosure includes a first supply reel that supplies the first electrode sheet, a second supply reel that supplies the second electrode sheet, and a first attachment provided on the first electrode sheet side.
  • a second bonding roller provided on the side of the second electrode sheet and paired with the first bonding roller to bond the first electrode sheet and the second electrode sheet, and the bonding roller.
  • the first A method of generating a trained model for the maintenance of a production apparatus including a sensor that reads the first end face of one electrode sheet and the second end face of the second electrode sheet, and is read along the radial direction.
  • the first data representing the position of the first end face and the second data representing the position of the second end face read along the radial direction are acquired from the sensor and used in the first data and the second data. Based on this, when it is determined that the continuity of the positions of the first end surface indicated by the first data intersects the continuity of the positions of the second end surface indicated by the second data, the winding body is defective.
  • the information that the cause of the defect lies in the first supply reel or the first laminating roller is output to the display device for maintenance, and the first data before and after the maintenance of the first supply reel and the first data
  • the reading is performed before the first supply reel is maintained.
  • the first data and the second data are not used to generate the trained model, while when the fifth defect rate is determined to be less than the predetermined value, before the first supply reel is maintained.
  • the trained model is generated using the read first data and the second data.
  • the learned model generation method of the present disclosure includes a first supply reel that supplies the first electrode sheet, a second supply reel that supplies the second electrode sheet, and a first attachment provided on the first electrode sheet side.
  • a second bonding roller provided on the side of the second electrode sheet and paired with the first bonding roller to bond the first electrode sheet and the second electrode sheet, and the bonding roller.
  • the first A method of generating a trained model for the maintenance of a production apparatus including a sensor that reads the first end face of one electrode sheet and the second end face of the second electrode sheet, and is read along the radial direction.
  • the first data representing the position of the first end face and the second data representing the position of the second end face read along the radial direction are acquired from the sensor and used in the first data and the second data. Based on this, when it is determined that the continuity of the positions of the first end surface indicated by the first data intersects the continuity of the positions of the second end surface indicated by the second data, the cause of failure of the wound body is determined. Generates a trained model for determining that it is in the first supply reel or the first laminating roller, and based on the determination using the trained model, the cause of the defect is the first supply reel or the said.
  • Information indicating that it is in the first bonding roller is output to the display device for maintenance, and the first data and the second data before the maintenance of the first supply reel are input to the trained model.
  • the first probability that the defect of the winding body is improved and the first data and the second data after maintaining the first supply reel are input to the trained model to obtain the winding body.
  • the first data and the second data read before the first supply reel is maintained are the trained model.
  • the learning is performed using the first data and the second data before the first supply reel is maintained. Update the completed model.
  • the learned model generation method of the present disclosure includes a first supply reel for supplying the first electrode sheet, a second supply reel for supplying the second electrode sheet, and a first attachment provided on the first electrode sheet side.
  • a second bonding roller provided on the side of the second electrode sheet and paired with the first bonding roller to bond the first electrode sheet and the second electrode sheet, and the bonding roller.
  • a method for generating a trained model for maintenance of a production apparatus including a sensor for reading the first end surface of one electrode sheet and the second end surface of the second electrode sheet, which is read along the radial direction.
  • the first data representing the position of the first end face and the second data representing the position of the second end face read along the radial direction are acquired from the sensor and used in the first data and the second data. Based on this, when it is determined that the continuity of the positions of the first end surface indicated by the first data intersects the continuity of the positions of the second end surface indicated by the second data, the cause of the defect of the wound body is determined. Generates a trained model for determining that it is in the first supply reel or the first bonding roller, and based on the determination using the trained model, the cause of the defect is the first supply reel or the said.
  • the information to the effect that it is on the first bonding roller is output to the display device for maintenance, and It is determined that the fifth probability of improving the defect of the winding body obtained by inputting the first data and the second data after maintaining the first supply reel into the trained model is a predetermined value or more. If, the first data and the second data read before the first supply reel is maintained are not used to update the trained model, while the fifth probability is less than the predetermined value. If it is determined, the trained model is updated using the first data and the second data before the first supply reel is maintained.
  • the maintenance display device of the present disclosure includes a first supply reel that supplies a first electrode sheet, a second supply reel that supplies a second electrode sheet, and a first bonding roller provided on the first electrode sheet side.
  • a second bonding roller provided on the second electrode sheet side and paired with the first bonding roller to bond the first electrode sheet and the second electrode sheet, and the bonded roller.
  • the first electrode sheet along the radial direction of the winding core around which the first electrode sheet and the second electrode sheet are wound, and the winding body of the first electrode sheet and the second electrode sheet wound around the winding core.
  • a maintenance display device for displaying information on maintenance of a production device including a sensor for reading the first end surface of the second electrode sheet and the second end surface of the second electrode sheet, and the first one read along the radial direction.
  • the first data representing the position of the end face and the second data representing the position of the second end face read along the radial direction are acquired from the sensor, and the second data is based on the first data and the second data. Whether or not the wound body is defective based on whether or not the continuity of the positions of the first end surface indicated by the 1 data intersects the continuity of the positions of the second end surface indicated by the second data.
  • the notification determination unit that outputs information that the cause of the defect is to the first supply reel or the first bonding roller to the display device for maintenance, and the first Based on the first data and the second data before and after the supply reel is maintained, the first defect rate of the winding body before the first supply reel is maintained and after the first supply reel is maintained.
  • the first data and the second data read before the first supply reel is maintained are used.
  • a trained model using the first data and the second data read before the first supply reel is maintained when it is determined that the first difference is equal to or more than the predetermined value without using it. It is provided with a model generation unit for generating the above.
  • the maintenance display device of the present disclosure includes a first supply reel that supplies a first electrode sheet, a second supply reel that supplies a second electrode sheet, and a first bonding roller provided on the first electrode sheet side.
  • a second bonding roller provided on the second electrode sheet side and paired with the first bonding roller to bond the first electrode sheet and the second electrode sheet, and the bonded roller.
  • the first electrode sheet along the radial direction of the winding core around which the first electrode sheet and the second electrode sheet are wound, and the winding body of the first electrode sheet and the second electrode sheet wound around the winding core.
  • a maintenance display device for displaying information on maintenance of a production device including a sensor for reading the first end surface of the second electrode sheet and the second end surface of the second electrode sheet, and the first one read along the radial direction.
  • the first data representing the position of the end face and the second data representing the position of the second end face read along the radial direction are acquired from the sensor, and the second data is based on the first data and the second data. Whether or not the wound body is defective based on whether or not the continuity of the positions of the first end surface indicated by the 1 data intersects the continuity of the positions of the second end surface indicated by the second data.
  • the notification determination unit that outputs information to the effect that the cause of the defect is in the first supply reel or the first bonding roller to the display device for maintenance, and the first
  • the notification determination unit that outputs information to the effect that the cause of the defect is in the first supply reel or the first bonding roller to the display device for maintenance, and the first
  • the notification determination unit that outputs information to the effect that the cause of the defect is in the first supply reel or the first bonding roller to the display device for maintenance, and the first
  • the first includes a model generation unit that generates a trained model using the first data and the second data read before the supply reel is maintained.
  • the maintenance display device of the present disclosure includes a first supply reel that supplies a first electrode sheet, a second supply reel that supplies a second electrode sheet, and a first bonding roller provided on the first electrode sheet side.
  • a second bonding roller provided on the second electrode sheet side and paired with the first bonding roller to bond the first electrode sheet and the second electrode sheet, and the bonded roller.
  • the first electrode sheet along the radial direction of the winding core around which the first electrode sheet and the second electrode sheet are wound, and the winding body of the first electrode sheet and the second electrode sheet wound around the winding core.
  • a maintenance display device for displaying information on maintenance of a production device including a sensor for reading the first end surface of the second electrode sheet and the second end surface of the second electrode sheet, and the first one read along the radial direction.
  • the first data representing the position of the end face and the second data representing the position of the second end face read along the radial direction are acquired from the sensor, and the second data is based on the first data and the second data.
  • Whether or not the wound body is defective based on whether or not the continuity of the positions of the first end surface indicated by the 1 data intersects the continuity of the positions of the second end surface indicated by the second data.
  • a model generation unit that generates a trained model for determining that the cause of the defect lies in the first supply reel or the first bonding roller, and the trained model are used.
  • the model is provided with a notification determination unit that identifies that the cause of the defect is in the first supply reel or the first bonding roller and outputs information including a specific result to a display device for maintenance.
  • the generation unit has the first probability that the defect of the winding body obtained by inputting the first data and the second data before the first supply reel is maintained into the trained model and the defect of the winding body are improved.
  • a first difference from the second probability that the defect of the winding body obtained by inputting the first data and the second data after the first supply reel is maintained into the trained model is predetermined. If it is determined to be less than the value, the first and second data read before the first supply reel is preserved are not used to update the trained model, while the first. When it is determined that the difference is equal to or greater than the predetermined value, the trained model is updated using the first data and the second data before the first supply reel is maintained.
  • the maintenance display device of the present disclosure includes a first supply reel that supplies a first electrode sheet, a second supply reel that supplies a second electrode sheet, and a first bonding roller provided on the first electrode sheet side.
  • a second bonding roller provided on the second electrode sheet side and paired with the first bonding roller to bond the first electrode sheet and the second electrode sheet, and the bonded roller.
  • the first electrode sheet along the radial direction of the winding core around which the first electrode sheet and the second electrode sheet are wound, and the winding body of the first electrode sheet and the second electrode sheet wound around the winding core.
  • a maintenance display device for displaying information on maintenance of a production device including a sensor for reading the first end surface of the second electrode sheet and the second end surface of the second electrode sheet, and the first one read along the radial direction.
  • the first data representing the position of the end face and the second data representing the position of the second end face read along the radial direction are acquired from the sensor, and the second data is based on the first data and the second data.
  • Whether or not the wound body is defective based on whether or not the continuity of the positions of the first end surface indicated by the 1 data intersects the continuity of the positions of the second end surface indicated by the second data.
  • a model generation unit that generates a trained model for determining that the cause of the defect lies in the first supply reel or the first bonding roller, and the trained model are used.
  • the model is provided with a notification determination unit that identifies that the cause of the defect is in the first supply reel or the first bonding roller and outputs information including a specific result to a display device for maintenance.
  • the generation unit has a predetermined value of a fifth probability that the defect of the winding body obtained by inputting the first data and the second data after maintaining the first supply reel into the trained model is improved.
  • the first data and the second data read before the first supply reel is maintained are not used for updating the trained model, while the fifth probability is determined.
  • the trained model is updated by using the first data and the second data before maintaining the first supply reel.
  • the program of the present disclosure includes a first supply reel for supplying a first electrode sheet, a second supply reel for supplying a second electrode sheet, a first bonding roller provided on the first electrode sheet side, and the above.
  • a second bonding roller provided on the side of the second electrode sheet and paired with the first bonding roller to bond the first electrode sheet and the second electrode sheet, and the first bonded roller.
  • the winding body It is a defect, and the procedure for outputting information to the display device for maintenance that the cause of the defect lies in the first supply reel or the first bonding roller, and the procedure before and after maintaining the first supply reel.
  • the first defective rate of the wound body before the maintenance of the first supply reel and the second defective rate of the wound body after the maintenance of the first supply reel are not used to generate the trained model.
  • the trained model is generated using the first data and the second data read before the first supply reel is maintained. Have the computer perform the procedure.
  • the program of the present disclosure includes a first supply reel for supplying a first electrode sheet, a second supply reel for supplying a second electrode sheet, a first bonding roller provided on the first electrode sheet side, and the above.
  • a second bonding roller provided on the side of the second electrode sheet and paired with the first bonding roller to bond the first electrode sheet and the second electrode sheet, and the first bonded roller.
  • the winding body It is a defect, and the procedure for outputting information to the display device for maintenance that the cause of the defect lies in the first supply reel or the first bonding roller, and the procedure before and after maintaining the first supply reel.
  • the fifth defect rate of the wound body after maintaining the first supply reel is equal to or higher than a predetermined value based on the first data and the second data, before the first supply reel is maintained.
  • the read first data and the second data are not used to generate the trained model, while the first supply reel is used when the fifth defect rate is determined to be less than the predetermined value.
  • the computer is made to execute the procedure of generating the trained model using the first data and the second data read before the preservation.
  • the program of the present disclosure includes a first supply reel for supplying a first electrode sheet, a second supply reel for supplying a second electrode sheet, a first bonding roller provided on the first electrode sheet side, and the above.
  • a second bonding roller provided on the side of the second electrode sheet and paired with the first bonding roller to bond the first electrode sheet and the second electrode sheet, and the first bonded roller.
  • the winding body Based on the procedure for generating a trained model for determining that the cause of the defect is in the first supply reel or the first bonding roller, and the determination using the trained model, the cause of the defect is the first.
  • the procedure for outputting information to the effect that the supply reel or the first bonding roller is present to the display device for maintenance, and the first data and the second data before the maintenance of the first supply reel have been learned. Obtained by inputting the first probability that the defect of the winding body obtained by inputting to the model is improved and the first data and the second data after maintaining the first supply reel into the trained model.
  • the first data and the second data read before the first supply reel is maintained.
  • the data is not used to update the trained model, while the first data and the second before preserving the first supply reel when the first difference is determined to be greater than or equal to the predetermined value.
  • the program of the present disclosure includes a first supply reel for supplying a first electrode sheet, a second supply reel for supplying a second electrode sheet, a first bonding roller provided on the first electrode sheet side, and the above.
  • a second bonding roller provided on the side of the second electrode sheet and paired with the first bonding roller to bond the first electrode sheet and the second electrode sheet, and the first bonded roller.
  • the winding body Based on the procedure for generating a trained model for determining that the cause of the defect is in the first supply reel or the first bonding roller, and the determination using the trained model, the cause of the defect is the first.
  • the procedure for outputting information to the effect that the supply reel or the first bonding roller is present to the display device for maintenance, and the first data and the second data after the maintenance of the first supply reel have been learned.
  • the first data and the first data read before the first supply reel is maintained.
  • Flow chart for explaining the entire processing process of the maintenance display device The figure which illustrated the structure of the winding part which produces a winding body in a production apparatus Perspective view illustrating the winding body produced in the winding part Schematic diagram illustrating how the inspection machine inspects the wound body
  • Schematic diagram illustrating the cross-sectional shape of the wound body along the radial direction The figure which illustrated the image generated by scanning the cross section of the winding body shown in FIG. 4B by an inspection machine.
  • Schematic diagram showing the correspondence between the cross-sectional shape of the wound body and the shape data A block diagram illustrating the functional configuration of the maintenance display device according to the first embodiment.
  • Diagram exemplifying production performance data Diagram exemplifying production performance data Diagram exemplifying maintenance record data Sequence diagram illustrating the overall flow of processing in the maintenance display device Sequence diagram illustrating the overall flow of processing in the maintenance display device Flow chart for explaining the process executed by the maintenance effect determination unit in the learning process Conceptual diagram for explaining how to judge the effect of maintenance work in the learning process Conceptual diagram for explaining how to judge the effect of maintenance work in the learning process Flow chart for explaining the process executed by the equipment state diagnosis model generator in the learning process Flow chart for explaining the process executed by the equipment status diagnosis unit in the identification process A flowchart for explaining the process executed by the notification determination unit in the identification process.
  • the figure for demonstrating the modification of the method of judging whether or not the maintenance work is effective by the maintenance effect judgment part in the learning process The figure for demonstrating the modification of the method of judging whether or not the maintenance work is effective by the maintenance effect judgment part in the learning process.
  • the figure for demonstrating the modification of the method of judging whether or not the maintenance work is effective by the maintenance effect judgment part in the update process.
  • the figure for demonstrating the modification of the method of judging whether or not the maintenance work is effective by the maintenance effect judgment part in the update process.
  • the maintenance display device 100 includes a server 10 having a storage unit 110 and a control unit 120, and a notification unit 130.
  • the server 10 is communicably connected to the production apparatus 200 via the network NT.
  • the network NT is, for example, a public network such as the Internet, or a local network such as an in-house LAN (Local Area Network).
  • the server 10 is, for example, a general-purpose computer, and has a storage unit 110 and a control unit 120 as shown in FIG.
  • the storage unit 110 includes, for example, a main storage device (not shown) such as ROM (Read Only Memory) or RAM (Random Access Memory), and / or, for example, HDD (Hard Disk Drive), SSD (Solid State Drive), or flash memory. Etc. (not shown).
  • ROM Read Only Memory
  • RAM Random Access Memory
  • HDD Hard Disk Drive
  • SSD Solid State Drive
  • flash memory Etc. (not shown).
  • the control unit 120 is, for example, a hardware processor (not shown) such as a CPU (Central Processing Unit), and controls the entire maintenance display device 100 by expanding and executing a program stored in the storage unit 110. Do.
  • a hardware processor such as a CPU (Central Processing Unit)
  • CPU Central Processing Unit
  • the storage unit 110 and the control unit 120 do not have to be configured as an integrated computer. That is, the storage unit 110 and the control unit 120 may be separately configured from each other and arranged at distant positions as long as they are configured to be able to communicate with each other. Further, the maintenance display device 100 may have an operation unit (not shown in FIG. 1) and accept an operation input from the outside. Details of the storage unit 110 and the control unit 120 will be described later.
  • the notification unit 130 is included in the production device 200, and is connected to the server 10 via the network NT.
  • the notification unit 130 notifies the user of the maintenance display device 100 based on the control of the control unit 120.
  • the user of the maintenance display device 100 is an administrator of the maintenance display device 100 or a worker who produces a wound body (see FIG. 3B described later) using the production device 200. Etc. are included.
  • the notification unit 130 has an alarm unit 131 and a display unit 132.
  • the alarm unit 131 is configured to issue an alarm to the user by sound, light, or the like, such as a buzzer or a lamp.
  • the display unit 132 is a display device such as a liquid crystal display or an organic EL display, and has a configuration for displaying the content of a warning.
  • the notification unit 130 may include, for example, a transmission unit that transmits an email including the content of the warning to the email address of the user registered in advance.
  • the production device 200 is, in the present embodiment, a production device for a lithium ion secondary battery. As shown in FIG. 1, the production apparatus 200 has a winding unit 201 and an inspection machine 207. Although the details will be described later, the winding unit 201 winds the positive electrode sheet and the negative electrode sheet to produce a wound body. The inspection machine 207 inspects the wound body produced by the winding unit 201.
  • the notification unit 130 is included in the production device 200, but the present invention is not limited to this, and the notification unit 130 may be installed outside the production device 200. Further, in the example shown in FIG. 1, the notification unit 130 is connected to the server 10 via the network NT, but the present invention is not limited to this, and the server 10 and the notification unit 130 do not go through the network NT. It may be directly connected.
  • the production apparatus 200 is a production apparatus for a lithium ion secondary battery
  • the present invention is not limited to this.
  • the maintenance display device of the present invention may be applied to a production facility other than the production device of the lithium ion secondary battery. Further, the maintenance display device of the present invention may be applied to various equipment other than the production equipment.
  • FIG. 2 is a flowchart for explaining the entire processing process of the maintenance display device 100.
  • step S1 the control unit 120 causes the winding unit 201 of the production device 200 to produce the wound body.
  • step S2 the control unit 120 causes the inspection machine 207 to inspect the produced wound body. Details of the inspection of the wound body by the inspection machine 207 will be described later.
  • step S3 the control unit 120 stores the inspection result by the inspection machine 207 in the storage unit 110.
  • step S4 the control unit 120 determines whether or not the wound body is a defective product as a result of the inspection by the inspection machine 207. If it is determined that the product is not defective (step S4: NO), the control unit 120 proceeds to step S5, and if it is determined that the product is defective (step S4: YES), the control unit 120 proceeds to step S6.
  • step S5 the control unit 120 causes the production device 200 to supply the wound body to the next process.
  • step S6 the control unit 120 notifies the notification unit 130 that the defective product has been detected. Details of the notification by the notification unit 130 will be described later.
  • step S7 the control unit 120 causes the production device 200 to discard the wound body determined to be defective.
  • the control unit 120 causes the production apparatus 200 to supply the wound body to the next process or dispose of the wound body. Is not limited to this.
  • the user of the maintenance display device 100 is notified via the notification unit 130 so that the winding body is supplied to the next process or the winding body is discarded, so that the user is supplied or discarded. May be made to do.
  • FIG. 3A is a diagram illustrating the configuration of the winding unit 201 that produces the wound body in the production apparatus 200.
  • the first sheet material 202 is an example of the first electrode sheet of the present invention
  • the second sheet material 203 is an example of the second electrode sheet of the present invention.
  • the first sheet material 202 is the positive electrode sheet material and the second sheet material 203 is the negative electrode sheet material, but the present invention is not limited to this, and the first sheet material 202 is the negative electrode sheet.
  • the material and the second sheet material 203 may be a positive electrode sheet material.
  • FIG. 4B is a schematic view illustrating the cross-sectional shape of the winding body 204 along the radial direction.
  • FIG. 4C is a diagram illustrating an image I generated by scanning the cross section of the winding body 204 shown in FIG. 4B by the inspection machine 207.
  • the vertical direction corresponds to the axial direction of the winding body 204
  • the horizontal direction corresponds to the radial direction of the winding body 204.
  • the first sheet material 202 and the second sheet material 203 having a width larger than that of the first sheet material 202 are alternately laminated. ..
  • the inspection machine 207 extracts and images the positions of both ends of the first sheet material 202 along the axial direction and both ends of the second sheet material 203 along the axial direction in the radial direction of the wound body. ..
  • diamonds ( ⁇ ) indicate the positions of both ends of the first sheet material 202
  • black circles ( ⁇ ) indicate the positions of both ends of the second sheet material 203. It corresponds to each of the second data.
  • Defective products may occur during the production of the winding body 204 in the winding unit 201. Defective products can be caused, for example, by defects in each configuration of the winding portion 201 described above, particularly the first supply reel 50 and the first laminating roll 205A.
  • the inspection machine 207 generates an image showing the cross-sectional shape of the winding body 204 along the radial direction, and stores it in the storage unit 110 as shape data.
  • the result of the determination of whether or not the wound body 204 is defective which is performed based on the shape data, is also stored in the storage unit 110.
  • the determination of whether or not the product is defective based on the shape data may be performed by the control unit 120 shown in FIG. 1, the inspection machine 207, or not shown in FIG. 1 or 3A. Other configurations may be made.
  • the control unit 120 determines whether or not the product is defective will be described based on the shape data.
  • FIG. 5 is a schematic view showing the correspondence between the cross-sectional shape of the wound body 204 and the shape data.
  • the upper part of FIG. 5 illustrates cross-sectional views of the winding body 204 in various states.
  • the deviation between the first sheet material 202 and the second sheet material 203 becomes smaller toward the left side, and the deviation between the first sheet material 202 becomes larger toward the right side.
  • images I1 to I6 generated based on each of the cross-sectional shapes of the winding body 204 illustrated in the upper part of FIG. 5 are exemplified.
  • the continuous position of the upper end surface (first end surface of the present invention) of the first sheet material 202 indicated by the first data is above the second sheet material 203 indicated by the second data. It may intersect with the continuation of the positions of the end faces (second end faces of the present invention).
  • the first virtual line connecting a plurality of positions of the upper end surface (first end surface of the present invention) of the first sheet material 202 indicated by the first data is a second virtual line indicated by the second data as shown in images I5 and I6.
  • the upper end surface (second end surface of the present invention) of the sheet material 203 may intersect with a second virtual line connecting a plurality of positions. Since the first virtual line and the second virtual line should not intersect with the winding body 204 other than the defective product, the inspection result of the winding body 204 having such a cross-sectional shape is "defective".
  • the amount of displacement of the position of the first sheet material 202 is smaller than that in the images I3 to I6.
  • the inspection result of the wound body 204 having such a cross-sectional shape is "good".
  • step S4 of the flowchart shown in FIG. 2 the winding body 204 whose inspection result is “good” or “possible” is determined not to be a defective product, and the winding body 204 whose inspection result is “defective” is , It is judged that it is a defective product.
  • the winding body 204 is defective.
  • a defect in which the continuous position of the upper end surface indicated by the first data intersects the continuous position of the upper end surface indicated by the second data is caused by the first supply reel 50, the second supply reel 51, the first bonding roll 205A, or It is known that the second laminating roll 205B can be the cause.
  • the position of the first sheet material 202 supplied by the first supply reel 50 and bonded by the first bonding roll 205A is displaced, so that the continuous position of the upper end surface indicated by the first data is continuous.
  • the cause of the defect shown in FIG. 5 is the first supply reel 50 or the first laminating roll 205A.
  • the maintenance work in the present embodiment means that the production apparatus 200 is appropriately adjusted in each configuration, parts are replaced, and the like so that the winding body 204 produced from the production apparatus 200 does not have a defect. Means the work to do.
  • the maintenance work is a work for maintaining the defects of the first supply reel 50 and the first laminating roll 205A of the production apparatus 200 described above. The maintenance work is performed by a worker or the like who actually handles the production device 200.
  • FIG. 6 is a block diagram illustrating the functional configuration of the maintenance display device 100 according to the first embodiment.
  • the maintenance display device 100 includes a storage unit 110, a control unit 120, and a notification unit 130 (see FIG. 1).
  • the storage unit 110 has a production record database 111, an equipment status diagnosis model database 112, and a maintenance record database 113.
  • the production record database 111 is a database in which production record data related to the production record of the production apparatus 200 is registered.
  • the production record data includes the production date and time of the wound body 204 produced and the shape data of the wound body 204.
  • FIG. 7A and 7B are diagrams illustrating the production record data PD.
  • a part of the production record data PD is shown in a table format.
  • the production record data PD includes data such as "production date and time”, “equipment”, “inspection result”, “first sheet material”, “second sheet material”, and “shape data ID”. including.
  • the "production date and time” data is data related to the production date and time when the winding body 204 was produced.
  • the “equipment” data is data for identifying equipment that has achieved production results when a plurality of production devices 200 exist. In FIG. 7A, as an example, identifiers "A", "B", and "C" of different production devices 200 are shown.
  • the “inspection result” data is data showing the inspection result (see FIG. 5) of the wound body 204 produced in the production apparatus 200.
  • FIG. 7A as an example, three stages of inspection results of "good”, “OK”, and “bad” are shown.
  • the "first sheet material” data and the “second sheet material” data are data related to the material used for producing the wound body 204.
  • An identifier for identifying each material is stored in the "first sheet material” data and the "second sheet material” data.
  • the "shape data ID” is an identification number associated with shape data (see FIG. 5) indicating the cross-sectional shape of the wound body 204.
  • FIG. 7B illustrates the correspondence between the shape data ID and the shape data.
  • each data excluding shape data is automatically or manually input every time the winding body 204 is produced in the production apparatus 200, for example, and is input in the production record database 111.
  • the shape data is generated when the produced winding body 204 is inspected by the inspection machine 207 (see FIG. 1 or FIG. 4A), and is registered in association with the shape data ID. That is, the production record data PD substantially includes the shape data of the wound body 204.
  • the production record data PD of the produced winding body 204 is registered in the production record database 111.
  • the equipment condition diagnosis model database 112 is a database in which a plurality of equipment condition diagnosis models M are registered.
  • the equipment condition diagnosis model M is a learned model that serves as a diagnostic reference and is used for diagnosing whether or not maintenance work is required for the production apparatus 200.
  • the equipment condition diagnosis model M when the production device 200 in which defective products are produced is improved by maintenance work (the production ratio of defective products is reduced), what kind of maintenance work is performed for what kind of defects. Is a trained model that has been trained to see if is valid. More specifically, the equipment condition diagnosis model M contains data including shape data of the wound body including a plurality of defective products and the contents of maintenance work performed to improve the defects of the defective products. It is an aggregate.
  • the equipment condition diagnosis model M is generated by the equipment condition diagnosis model generation unit 124 described later.
  • the equipment condition diagnosis model M is generated for each maintenance work in which the production ratio of defective products is reduced during the subsequent production of the wound body due to the maintenance work. That is, for example, the equipment condition diagnosis model M related to the maintenance work performed yesterday and the equipment condition diagnosis model M related to the maintenance work performed today are independently generated.
  • the format of the equipment state diagnosis model M is not particularly limited, but it is preferable that a machine learning model such as a neural network model is adopted in order to further improve the diagnosis accuracy.
  • the model adopted in the equipment condition diagnosis model M may be selected by the user of the maintenance display device 100 via an operation unit or the like (not shown), or may be selected by the equipment condition diagnosis model generation unit 124.
  • the maintenance record database 113 is a database in which the maintenance record data MD related to the maintenance work actually performed on the production device 200 is registered.
  • the maintenance record data MD includes, for example, equipment data for identifying the production apparatus 200, data regarding the date and time when the maintenance work was performed (maintenance date and time), data indicating the content of the maintenance work performed, and the like.
  • the maintenance date and time may be the start time or the end time of the maintenance work.
  • the maintenance date and time is preferably the central time of the maintenance work.
  • FIG. 8 is a diagram illustrating the maintenance record data MD. Immediately after the maintenance work is executed, the maintenance record data MD is transmitted to the maintenance display device 100 via, for example, an operation unit (not shown in FIG. 1) by a worker or the like who actually performed the maintenance work of the production device 200. Entered.
  • control unit 120 includes an equipment condition diagnosis unit 121, a notification determination unit 122, a maintenance effect determination unit 123, and an equipment condition diagnosis model generation unit 124.
  • the equipment condition diagnosis unit 121 diagnoses the condition of the production equipment 200 by using the shape data of the winding body 204 newly produced in the production equipment 200 and the equipment condition diagnosis model M.
  • the diagnosis result is calculated as a degree of coincidence C indicating the degree of coincidence between the shape data of the newly produced wound body 204 and the past shape data included in the equipment state diagnosis model M.
  • the equipment state diagnosis model M includes the contents of the maintenance work and the shape data before the time when the maintenance work is performed. This is because when the winding body 204 having the shape data included in the equipment condition diagnosis model M is defective in the past, the maintenance work included in the equipment diagnosis model M is performed, so that the winding body 204 It means that the defects have been reduced. That is, the degree of agreement C between the shape data of the newly produced winding body 204 and the shape data included in the equipment diagnosis model M is a defect of the winding body 204 due to the maintenance included in the equipment state diagnosis model M. Shows the probability of improvement.
  • the notification determination unit 122 determines whether or not to notify the maintenance work of the production device 200 based on the degree of coincidence C.
  • the notification determination unit 122 determines that the maintenance work should be performed when the degree of coincidence C is equal to or higher than a predetermined threshold value, and notifies the degree of coincidence C when the degree of coincidence C is less than the predetermined threshold value.
  • the notification regarding the maintenance work includes an alarm for attracting the user's attention, a display notifying the content of the maintenance work that can be expected to be effective by performing the warning, and the like.
  • the maintenance effect determination unit 123 determines whether or not there is an effect of the maintenance work on the production device 200.
  • the maintenance effect determination unit 123 is based on, for example, the defect rate between before and after the maintenance work (ratio of defective products to the total number of production) or the shape data of the wound body 204 before and after the maintenance work (see FIG. 5). Then, the presence or absence of the effect of the maintenance work is judged.
  • the equipment condition diagnosis model generation unit 124 generates the equipment condition diagnosis model M based on the maintenance record data MD determined to be effective and the shape data of the defective product produced before the maintenance work is performed. To do.
  • the equipment condition diagnosis model M generated by the equipment condition diagnosis model generation unit 124 is registered in the above-mentioned equipment condition diagnosis model database 112.
  • FIGS. 9 and 10 are sequence diagrams schematically illustrating the overall flow of processing in the maintenance display device 100.
  • FIG. 9 shows an outline of the learning process in the maintenance display device 100 and the identification process using the learned model generated by the learning process.
  • the learning process in the maintenance display device 100 is a learned model in which, when a defective product is produced by the production device 200, what kind of shape data of the defective product is improved by what kind of maintenance work is learned ( This is a process for generating the equipment condition diagnosis model M). Therefore, the learning process is premised on the maintenance work being performed before the start of the learning process.
  • the maintenance effect determination unit 123 includes shape data included in the production record data PD (see FIG. 7A) of the plurality of winding bodies 204 produced even before the maintenance work performed before the start of the learning process. (See FIG. 5) is acquired, and based on this, the defect rate Nf before before maintenance work is calculated.
  • the defect rate Nf before is calculated by dividing, for example, the number of winding bodies 204 determined to be defective among the winding bodies 204 manufactured before the maintenance work by the total number of winding bodies produced before the maintenance work.
  • step S12 the maintenance effect determination unit 123 acquires the shape data included in the production record data PD of the plurality of winding bodies 204 produced after the maintenance work, and based on this, the defect rate Nf after after the maintenance work. Is calculated.
  • the defect rate Nf after is calculated by dividing, for example, the number of winding bodies 204 determined to be defective among the winding bodies 204 manufactured after the maintenance work by the total number of winding bodies produced after the maintenance work.
  • step S13 the maintenance effect determination unit 123 compares the defect rate Nf before and Nf before before and after the maintenance work with Nf after, and determines whether or not the maintenance work is effective.
  • the details of the learning process for determining the effect of the maintenance work by the maintenance effect determination unit 123 will be described later.
  • the maintenance effect determination unit 123 collects the maintenance record data MD (see FIG. 8) indicating the contents of the maintenance work performed before the start of the learning process in step S14. Output to the diagnostic model generation unit 124.
  • step S15 the equipment condition diagnosis model generation unit 124 generates the equipment condition diagnosis model M by using the maintenance record data MD determined to be effective.
  • the details of the equipment condition diagnosis model M will be described later.
  • step S16 the equipment condition diagnosis model generation unit 124 registers the generated equipment condition diagnosis model M in the equipment condition diagnosis model database 112 (see FIG. 6).
  • step S11 to step S16 described above is the learning process of the maintenance display device 100.
  • the identification process described below is a learning process for determining whether or not an abnormality or a sign of an abnormality has occurred in the production apparatus 200 based on the shape data indicating the cross-sectional shape of the newly produced plurality of wound bodies 204. This is a process of identifying using the generated equipment condition diagnosis model M.
  • step S17 the equipment condition diagnosis unit 121 acquires shape data (hereinafter, new shape data) of the newly produced plurality of wound bodies.
  • step S18 the equipment condition diagnosis unit 121 calculates the degree of coincidence C using the new shape data and the equipment condition diagnosis model M.
  • the degree of agreement C is a value indicating the degree of agreement between the new shape data and the past shape data included in the equipment condition diagnosis model M. That is, the larger the degree of coincidence C, the higher the probability that the production apparatus 200 has an abnormality or a sign of an abnormality, and the newly produced wound body 204 becomes a defective product.
  • step S19 the notification determination unit 122 determines that notification is required for the user of the maintenance display device 100 when the degree of coincidence C is equal to or greater than a predetermined threshold value.
  • the case where the degree of coincidence C is equal to or higher than a predetermined threshold value is a case where an abnormality or a sign of an abnormality has occurred in the production apparatus 200 and maintenance work is required again.
  • step S110 the notification determination unit 122 outputs the content of the maintenance work to be notified to the user to the notification unit 130.
  • the content of the maintenance work to be notified to the user is determined based on the equipment condition diagnosis model M in which the degree of agreement C is equal to or higher than a predetermined threshold value.
  • the notification unit 130 notifies the user that maintenance work should be performed.
  • the alarm unit 131 issues an alarm.
  • the display unit 132 displays the content of the maintenance work to be notified to the user.
  • FIG. 9 shows an example in which both the alarm in step S111 and the content display of the maintenance work in step S112 are performed, but for example, even if the alarm is not issued and only the content display of the maintenance work is performed. Good.
  • the worker who received the notification by the notification in steps S111 and S112 executes the maintenance work for the production device 200 based on the content of the notified maintenance work.
  • step S17 to step S112 is the identification process of the maintenance display device 100 using the learned model generated in the learning process.
  • FIG. 10 shows an outline of the update process in the maintenance display device 100 and the identification process using the learned model updated in the update process.
  • the maintenance effect determination unit 123 includes shape data (see FIG. 5) included in the production record data PD (see FIG. 7A) of the plurality of winding bodies 204 produced before the maintenance work, and equipment state diagnosis. Using the equipment condition diagnosis model M registered in the model database 112, the degree of coincidence C before before the maintenance work is calculated.
  • the maintenance effect determination unit 123 includes the shape data included in the production record data of the plurality of winding bodies 204 produced after the maintenance work, and the equipment condition diagnosis model registered in the equipment condition diagnosis model database 112. using historical shape data included in the M, and calculates the matching degree C after after maintenance work.
  • step S23 the maintenance effect determination unit 123 compares the degree of coincidence C before and after the maintenance work with the cafe, and determines whether or not the maintenance work is effective.
  • the details of the maintenance effect determination process by the maintenance effect determination unit 123 in the update process will be described later.
  • the maintenance effect determination unit 123 converts the maintenance record data MD indicating the contents of the maintenance work performed before the start of the update process in the equipment state diagnosis model generation unit 124 in step S24. Output to.
  • step S25 the equipment condition diagnosis model generation unit 124 updates the equipment condition diagnosis model M by using the maintenance record data MD determined to be effective.
  • the details of the update process of the equipment state diagnosis model M will be described later.
  • step S26 the equipment condition diagnosis model generation unit 124 updates the equipment condition diagnosis model database 112 (see FIG. 6) by using the generated equipment condition diagnosis model M.
  • step S21 to step S26 described above is the update process of the maintenance display device 100.
  • the identification process described below is an update process for determining whether or not an abnormality or a sign of an abnormality has occurred in the production apparatus 200 based on the shape data indicating the cross-sectional shape of the newly produced plurality of winding bodies 204. This is a process of identifying using the updated equipment condition diagnosis model M.
  • step S27 the equipment condition diagnosis unit 121 acquires shape data (hereinafter, new shape data) of the newly produced plurality of wound bodies.
  • step S28 the equipment condition diagnosis unit 121 calculates the degree of agreement C by using the new shape data and the equipment condition diagnosis model M.
  • the degree of agreement C is a value indicating the degree of agreement between the new shape data and the past shape data included in the equipment condition diagnosis model M.
  • step S29 the notification determination unit 122 determines that notification is required for the user of the maintenance display device 100 when the degree of coincidence C is equal to or greater than a predetermined threshold value.
  • the case where the degree of coincidence C is equal to or higher than a predetermined threshold value is a case where an abnormality or a sign of an abnormality has occurred in the production apparatus 200 and maintenance work is required again.
  • step S210 the notification determination unit 122 outputs the content of the maintenance work to be notified to the user to the notification unit 130.
  • the content of the maintenance work to be notified to the user is determined based on the equipment condition diagnosis model M in which the degree of agreement C is equal to or higher than a predetermined threshold value.
  • the notification unit 130 notifies the user that maintenance work should be performed.
  • the alarm unit 131 issues an alarm.
  • the display unit 132 displays the content of the maintenance work to be notified to the user.
  • FIG. 10 shows an example in which both the alarm in step S211 and the content display of the maintenance work in step S212 are performed, but for example, even if the alarm is not issued and only the content display of the maintenance work is performed. Good.
  • the worker who received the notification in steps S211 and S212 executes the maintenance work for the production device 200 based on the content of the notified maintenance work.
  • step S27 to step S212 described above is the identification process of the maintenance display device 100.
  • the identification process from step S27 to step S212 shown in FIG. 10 is substantially the same as the identification process from step S17 to step S112 shown in FIG.
  • FIG. 11 is a flowchart for explaining the process executed by the maintenance effect determination unit 123 in the learning process.
  • step S31 the maintenance effect determination unit 123 winds the production record data registered in the production record database 111, which is produced from the time when the maintenance work is performed before the learning process to a predetermined time before.
  • the production record data list PL before including all the production record data of the body 204 is read from the production record database 111.
  • the predetermined time is a preset length of time, which is a time required for manufacturing a certain number or more of the wound bodies 204.
  • step S32 the maintenance effect determination unit 123 calculates the pre-maintenance defect rate Nf before based on the production record data included in the production record data list PL before .
  • the pre-maintenance defect rate Nf before maintains the number of wound bodies 204 determined to be defective based on the shape data and inspection results of the production record data included in the production record data list PL before. Calculated by dividing by the previous total production.
  • step S33 the maintenance effect determination unit 123 reads the production record data list PL after including all the production record data of the winding body 204 produced from the time when the maintenance was performed to a predetermined time later from the production record database 111. ..
  • step S34 the maintenance effect determination unit 123 calculates the post-maintenance defect rate Nf after based on the production record data included in the production record data list PL after .
  • the post-maintenance defect rate Nf after maintains the number of wound bodies 204 determined to be defective based on the shape data and inspection results of the production record data included in the production record data list PL after. It is calculated by dividing by the total number of production later.
  • step S35 the maintenance effect determination unit 123 takes a difference between the pre-maintenance defect rate Nf before and the post-maintenance defect rate Nf after, and determines whether or not this difference is larger than a predetermined threshold value Th N. If the difference is greater than the threshold Th N (step S35: YES), the maintenance effect determination unit 123 advances the process to step S36, and if not (step S35: NO), advances the process to step S37.
  • step S36 the maintenance effect determination unit 123 determines that the maintenance work is effective because the post-maintenance defect rate Nf after is smaller than the pre-maintenance defect rate Nf before .
  • the maintenance work referred to here is a maintenance work performed before the learning process, that is, before step S11 in FIG.
  • step S37 the maintenance effect determination unit 123 determines that the maintenance work has no effect or the effect is very small because the post-maintenance defect rate Nf after is not smaller than the pre-maintenance defect rate Nf before. To do.
  • the maintenance effect determination unit 123 determines whether or not the maintenance work performed before the learning process was effective in the learning process.
  • FIG. 12A and 12B are conceptual diagrams for explaining how to determine the effect of maintenance work in the learning process.
  • FIG. 12A shows an example when it is determined that the maintenance work is effective
  • FIG. 12B shows an example when it is determined that the maintenance work is not effective.
  • the pre-maintenance defect rate Nf before 40%.
  • the difference between the pre-maintenance defect rate Nf before and the post-maintenance defect rate Nf after is 40%.
  • the difference between the pre-maintenance defect rate Nf before and the post-maintenance defect rate Nf after is 0. Therefore, for example, when the threshold value Th N for determining the presence or absence of the maintenance effect is, for example, 20%, it is determined that the maintenance work is effective in the example shown in FIG. 12A, and it is determined that the maintenance work is not effective in the example shown in FIG. 12B.
  • the threshold value Th N for determining the presence or absence of the maintenance effect is, for example, 20%, it is determined that the maintenance work is effective in the example shown in FIG. 12A, and it is determined that the maintenance work is not effective in the example shown in FIG. 12B.
  • FIG. 13 is a flowchart for explaining the process executed by the equipment state diagnosis model generation unit 124 in the learning process.
  • step S41 the equipment state diagnosis model generation unit 124 reads out the maintenance record data MD of the maintenance work determined to be effective by the maintenance effect determination unit 123.
  • step S42 the equipment state diagnosis model generation unit 124 reads the pre-maintenance production record data list PL before from the production record database 111.
  • the equipment state diagnosis model integrity before actual production is read by generating unit 124 data list PL before is the same as the production result data list PL before before conservation to be read in the process of conservation effect determination unit 123 (FIG. 11).
  • step S43 the equipment condition diagnosis model generation unit 124 generates the equipment condition diagnosis model M new by using the read maintenance record data MD and the production record data PD included in the production record data list PL before .
  • step S44 the equipment condition diagnosis model generation unit 124 registers the newly generated equipment condition diagnosis model Mnew in the equipment condition diagnosis model database 112.
  • the equipment condition diagnosis model Mnew is newly generated in which what kind of shape data defective product is improved by what kind of maintenance work is learned, and the equipment condition diagnosis model database is generated. It is registered in 112.
  • FIG. 14 is a flowchart for explaining the process executed by the equipment state diagnosis unit 121 in the identification process.
  • step S51 the equipment state diagnosis unit 121 determines whether or not new production record data PD new is registered in the production record database 111. When the new production record data PD new is not registered (step S51: NO), the equipment condition diagnosis unit 121 repeats step S51. When the new production record data PD new is registered (step S51: YES), the equipment condition diagnosis unit 121 proceeds to the process in step S52.
  • the equipment state diagnosis unit 121 extracts the production record data list PL from the production record database 111 based on the newly registered production record data PD new .
  • the production record data list PL is a winding body 204 produced within a predetermined time from the production date and time of the newly registered production record data PD new among the production record data PDs registered in the production record database 111. This is a list of production record data PDs extracted. That is, at least the newly registered production record data PD new is included in the production record data list PL.
  • step S53 the equipment condition diagnosis unit 121 matches the shape data included in the production record data list PL with the past shape data included in the equipment condition diagnosis model M read from the equipment condition diagnosis model database 112. Generate degree C.
  • the equipment condition diagnosis unit 121 extracts shape data (see FIG. 5) from one or more production record data included in the production record data list PL.
  • the equipment condition diagnosis unit 121 extracts a plurality of equipment condition diagnosis models M registered in the equipment condition diagnosis model database 112.
  • the plurality of equipment condition diagnosis models M correspond to different maintenance operations.
  • the equipment condition diagnosis unit 121 calculates a plurality of matching degrees C in all combinations of the shape data extracted from one or more production record data and the plurality of equipment condition diagnosis models M.
  • FIG. 15 is a flowchart for explaining the process executed by the notification determination unit 122 in the identification process.
  • step S61 the notification determination unit 122 aggregates the agreement degree C for each maintenance group based on the plurality of agreement degree Cs generated by the equipment condition diagnosis unit 121.
  • a maintenance group is a group that corresponds to the content of maintenance work.
  • the groups divided according to the content of the maintenance work have been described as the maintenance group, but the present invention is not limited to this, and the maintenance group is, for example, for each part number of the part to be replaced in the maintenance work. It may be a divided group.
  • the result of totaling the degree of agreement C for each maintenance group is defined as the total value A.
  • the method for generating the aggregated value A may be appropriately determined from a plurality of types of aggregated methods.
  • Specific examples of a plurality of types of aggregation methods include, for example, a method of simply summing the matching degree C, a method of averaging the matching degree C, a method of selecting the maximum value from the matching degree C, and a method of selecting a higher predetermined number of matching degree C.
  • step S62 the notification determination unit 122 generates the maintenance plan list ML.
  • the maintenance plan list ML is a list of maintenance groups. For example, the maintenance groups are arranged in descending order of the aggregated value A.
  • FIG. 16 is a diagram showing a specific example of the maintenance plan list ML.
  • the maintenance plan list ML includes each data such as "maintenance plan ID", "equipment”, “maintenance plan”, and "aggregated value”.
  • the "maintenance plan ID” data is an identifier given for each maintenance group sorted according to the size of the aggregated value. As the “maintenance plan ID” data, for example, the larger the aggregated value, the younger the number is given.
  • "Maintenance plan” data is data showing the contents of maintenance corresponding to the maintenance group.
  • the “aggregated value” data is data indicating the value of the aggregated value A aggregated for each maintenance group.
  • the cause of the defect is the first supply reel. It is known to be on 50 or the first laminating roll 205A. Therefore, in the "maintenance plan" data, data indicating the contents related to the maintenance of the first supply reel 50 or the first bonding roll 205A are listed.
  • the aggregated value A is the aggregated value of the degree of coincidence C, it has the same properties as the degree of coincidence C. Therefore, the larger the aggregated value A, the higher the need for the maintenance content of the maintenance group to be performed on the target production device 200. Further, since the maintenance plan list ML is a list of maintenance groups arranged in descending order of the aggregated value A, the maintenance group at the higher level of the maintenance plan list ML has a higher need for maintenance of the target production device 200. ..
  • the notification determination unit 122 determines whether or not the aggregated value A is larger than the predetermined predictive threshold value Th f for each maintenance group.
  • the predetermined sign threshold value Th f is the minimum value of the aggregated value in which it is assumed that a sign that an abnormality has occurred in the production apparatus 200 has occurred.
  • the abnormality of the production apparatus 200 means that, for example, the production apparatus 200 produces the wound body 204 having the inspection result “defective” at a predetermined ratio or more.
  • the sign of abnormality of the production apparatus 200 means that, for example, the production apparatus 200 produces a predetermined number or more of the wound bodies 204 having an inspection result of "OK".
  • the predetermined predictive threshold value Th f may be empirically determined based on, for example, the past maintenance record data MD or the like.
  • step S63: YES When at least one maintenance group whose aggregated value A is larger than the predictive threshold threshold Th f is included in the maintenance plan list ML (step S63: YES), the notification determination unit 122 advances the process to step S64. When no maintenance group whose aggregated value A is larger than the predictive threshold value Th f is included in the maintenance plan list ML (step S63: NO), the notification determination unit 122 terminates the process, assuming that it is not necessary to perform notification.
  • step S64 the notification determination unit 122 determines whether or not there is a maintenance group whose aggregated value A is larger than the predetermined abnormal threshold Th a among the maintenance groups included in the maintenance plan list ML.
  • the predetermined abnormality threshold value Th a past the stage of sign, which is the minimum value of the aggregate values it is assumed that abnormal production device 200 has occurred. Therefore, the abnormal threshold value Th a is empirically determined to a value larger than the predictive threshold value Th f , for example, based on the past maintenance record data MD or the like.
  • the notification determination unit 122 advances the process to step S66.
  • the notification determination unit 122 advances the process to step S65.
  • the notification determination unit 122 causes the display unit 132 of the notification unit 130 to notify the maintenance content corresponding to the maintenance group for which the aggregated value A is determined to be larger than the predictive threshold value Th f in step S63. More specifically, the notification determination unit 122 causes the display unit 132 to display the content of the maintenance work recommended to be executed together with a message such as "Please execute the following maintenance contents." The content of the maintenance work recommended to be executed corresponds to the "maintenance plan" data included in the maintenance plan list ML shown in FIG.
  • the notification determination unit 122 notifies the maintenance work content as well as the maintenance proposal ID associated with the maintenance group of the maintenance content.
  • the worker who performed the maintenance work inputs the maintenance record data MD
  • the maintenance record data MD and the maintenance plan ID that triggered the maintenance are input in association with each other, so that the input maintenance record is input. It is possible to easily determine whether or not the data MD is data corresponding to the maintenance work executed by the notification of the maintenance display device 100.
  • step S66 the notification determination unit 122 causes the display unit 132 to display the content of the maintenance work and notifies the alarm unit 131 that an abnormality has occurred in the target production device 200, as in step S65. Alarm is issued. If the target production device 200 is not a sign of abnormality but an abnormality has occurred, urgent maintenance work is required. Therefore, the notification determination unit 122 not only displays the contents of the maintenance work by the display unit 132, but also issues an alarm by the alarm unit 131 to promptly notify the user of the maintenance display device 100 of the occurrence of an abnormality.
  • the production apparatus 200 is abnormal (defective product is predetermined) by using the production record data PD (particularly shape data) of 204 of the newly produced wound body and the equipment condition diagnosis model M. It is determined whether or not there is a sign of an abnormality (a situation in which more than the ratio is produced). Then, when it is determined that an abnormality or a sign of an abnormality has occurred, the user is notified. As a result, when an abnormality has occurred in the production apparatus 200, the user can quickly know the abnormality and can know the content of the maintenance work to be performed in order to improve the abnormality.
  • FIG. 17 is a flowchart for explaining the process executed by the maintenance effect determination unit 123 in the update process.
  • step S71 the maintenance effect determination unit 123 determines whether or not new maintenance record data MD new is registered in the maintenance record database 113 of the storage unit 110. When it is determined that the new maintenance record data MD new is not registered (step S71: NO), the maintenance effect determination unit 123 repeats step S71. When it is determined that the new maintenance record data MD new has been registered (step S71: YES), the maintenance effect determination unit 123 proceeds to the process in step S72.
  • step S72 the maintenance effect determination unit 123 is added to the newly registered maintenance record data MD new based on the "maintenance date and time" data (see FIG. 8) included in the newly registered maintenance record data MD new . It is determined whether or not a predetermined time has elapsed since the corresponding maintenance was performed.
  • step S72 When it is determined that a predetermined time has elapsed from the execution time of the maintenance work (step S72: YES), the maintenance effect determination unit 123 proceeds to the process in step S73. When it is determined that the predetermined time has not yet elapsed from the execution time of the maintenance work (step S72: NO), the maintenance effect determination unit 123 repeats the process of step S72.
  • step S73 the maintenance effect determination unit 123 reads the pre-maintenance production record data list PL before including all the production record data PDs of the winding body 204 produced up to a predetermined time before the maintenance work from the production record database 111.
  • step S74 the maintenance effect determination unit 123 reads the equipment state diagnosis model M belonging to the maintenance group of the maintenance content corresponding to the new maintenance record data MD new from the equipment state diagnosis model database 112, and reads the equipment state diagnosis model M. And, based on the production record data list PL before , the pre-maintenance matching degree C before is generated.
  • the method of generating the concordance degree C before maintenance is the same as the method of generating the concordance degree C by the equipment condition diagnosis unit 121 in step S53 of FIG.
  • step S75 the maintenance effect determination unit 123 reads out the production record data list PL after including all the production record data PDs of the winding body 204 produced within a predetermined time from the maintenance work from the production record database 111.
  • step S76 the maintenance effect determination unit 123 newly reads the equipment state diagnosis model M belonging to the maintenance group of the maintenance content corresponding to the maintenance record data MD new from the equipment state diagnosis model database 112, and reads the equipment state diagnosis model M. If, on the basis of the production result data list PL after, to produce a matching degree C after after preservation.
  • the method of generating the degree of coincidence C after is the same as the method of generating the degree of coincidence C by the equipment state diagnosis unit 121 in step S53 of FIG.
  • step S77 the maintenance effect determination unit 123 takes a difference between the degree of coincidence C before maintenance and the degree of coincidence C after maintenance, and determines whether or not this difference is larger than the predetermined threshold value Th D. If the difference is larger than the threshold Th D (step S77: YES), the maintenance effect determination unit 123 proceeds to step S78, and if not (step S77: NO), the process proceeds to step S79.
  • the predetermined threshold value Th D may be appropriately determined based on the results of past maintenance work and the like.
  • step S79 the maintenance effect determination unit 123 is performed based on the maintenance content notified by the notification determination unit 122 because the matching degree C after after maintenance is not smaller than the matching degree C before before maintenance. Judge that the maintenance work is ineffective or very small.
  • FIG. 18A and 18B are conceptual diagrams for explaining how to determine the effect of maintenance work in the update process.
  • FIG. 18A shows an example when it is determined that the maintenance work is effective
  • FIG. 18B shows an example when it is determined that the maintenance work is not effective.
  • FIG. 19 is a flowchart for explaining the process executed by the equipment state diagnosis model generation unit 124 in the update process.
  • step S81 the equipment state diagnosis model generation unit 124 reads out the maintenance record data MD new of the maintenance work determined to be effective by the maintenance effect determination unit 123.
  • step S82 the equipment state diagnosis model generation unit 124 reads the pre-maintenance production record data list PL before from the production record database 111.
  • the equipment state diagnosis model integrity before actual production is read by generating unit 124 data list PL before is the same as the production result data list PL before before conservation to be read in the process of conservation effect determination unit 123 (FIG. 11).
  • step S84 the equipment condition diagnosis model generation unit 124 updates the equipment condition diagnosis model M already registered in the equipment condition diagnosis model database 112 by using the new equipment condition diagnosis model M new .
  • the maintenance display device 100 has a notification determination unit 122 and an equipment state diagnosis model generation unit 124, which is an example of the model generation unit.
  • the notification determination unit 122 acquires the first data representing the position of the first end face and the second data representing the position of the second end face read along the radial direction of the winding body 204 from the inspection machine 207 as a sensor. .. Then, in the notification determination unit 122, the winding body 204 is defective based on whether or not the continuity of the positions of the first end surface indicated by the first data intersects the continuity of the positions of the second end surface indicated by the second data. It is determined whether or not it is.
  • the notification determination unit 122 outputs information to the display unit 132 that the cause of the defect is the first supply reel 50 or the first bonding roll 205A for maintenance.
  • the equipment condition diagnosis model generation unit 124 sets the first defect rate of the winding body 204 before the first supply reel 50 is maintained, based on the first data and the second data before and after the maintenance of the first supply reel 50.
  • the first difference from the second defect rate of the winding body 204 after maintaining the first supply reel 50 is calculated.
  • the equipment state diagnosis model generation unit 124 determines that the first difference is less than a predetermined value
  • the first data and the second data read before the first supply reel 50 is maintained generate a trained model. Or do not use it to update.
  • a trained model (equipment state diagnosis model M) is used using the first data and the second data read before the first supply reel 50 is maintained. Generate or update.
  • the equipment condition diagnosis model generation unit 124 improves the defect of the winding body 204 obtained by inputting the first data and the second data before the first bonding roll 205A is maintained into the trained model. Calculate the third probability. Further, the equipment condition diagnosis model generation unit 124 improves the defect of the winding body 204 obtained by inputting the first data and the second data after maintaining the first bonding roll 205A into the trained model. Calculate the probability. Then, the equipment state diagnosis model generation unit 124 calculates the second difference between the third probability and the fourth probability. If it is determined that the second difference is less than the predetermined value, the first data and the second data read before the first bonding roll 205A is maintained are not used to create or update the trained model. On the other hand, when it is determined that the second difference is equal to or more than a predetermined value, the trained model is created or updated using the first data and the second data before the first bonding roll 205A is maintained.
  • the maintenance display device 100 calculates the degree of coincidence C between the shape data of the wound body 204 produced after the maintenance work and the equipment condition diagnosis model M for each maintenance group, and the degree of coincidence C is large. Based on the above, it is determined whether to issue an alarm and notify the content of the maintenance work, only notify the content of the maintenance work, or not perform the notification itself.
  • the maintenance display device 100 is based on the newly registered maintenance record data MD and the shape data included in the production record data PD of the winding body 204 produced before and after the maintenance work.
  • the presence or absence of the effect of the maintenance work is judged, and a new equipment state diagnosis model Mnew is generated using the maintenance record data MD and the shape data corresponding to the maintenance work judged to be effective, and a new equipment state is created.
  • the equipment condition diagnosis model M is updated using the diagnosis model M new .
  • the production apparatus 200 uses the learned model (equipment condition diagnosis model M) generated based on the effective maintenance work (the defect rate is reduced).
  • the condition can be diagnosed appropriately.
  • the trained model is updated at any time, the accuracy of diagnosis can be improved.
  • an alarm can be issued to let the user take an emergency response, and when it is diagnosed that a sign of an abnormality has occurred, maintenance can be expected to be improved. Since the content of the work is notified to the user, the maintenance work can be executed while the occurrence rate of defective products in the production apparatus 200 is low.
  • the maintenance display device has a notification unit, a maintenance effect determination unit, and an equipment condition diagnosis model generation unit.
  • the notification unit has a facility status diagnosis model registered in the database in which the content of the maintenance work and the production record data prior to the maintenance work are associated with each other, and the newly input production. Notify the contents of maintenance work based on the actual data.
  • the maintenance effect determination unit determines whether or not the maintenance work is effective based on the production record data before the time when the maintenance work is performed and the production record data after the time when the maintenance work is performed. ..
  • the equipment condition diagnosis model generation unit is based on the production record data before the time when the maintenance work determined to be effective is performed and the content of the maintenance work determined to be effective, and the new equipment condition is newly installed. Generate a diagnostic model.
  • the maintenance display device generates an equipment condition diagnosis index to which the newly registered production performance data and the production performance data before maintenance work included in the equipment condition diagnosis model match. It also has an equipment condition diagnosis unit. Then, the notification unit notifies the contents of the maintenance work based on the equipment state diagnosis index.
  • the equipment condition diagnosis model generation unit includes production record data before the time when the maintenance work determined to be effective is performed, maintenance record data related to the maintenance work, and maintenance record data. To generate a facility condition diagnosis model by machine learning.
  • the maintenance display device is included in the production record data when the maintenance work not based on the content of the maintenance work notified by the notification unit is executed and the maintenance record data related to the maintenance work is newly input.
  • the inspection result is defective among the production record data from the time when the maintenance work of the newly input maintenance record data is performed to the predetermined time before, based on the data related to the inspection result of the product of the production equipment. Calculate the defective rate. Further, among the production record data from the time when the maintenance work of the newly input maintenance record data is performed to the time after the predetermined time, the defect rate in which the inspection result is defective is calculated. Then, the maintenance effect determination unit calculates the difference between the defect rate before the maintenance work and the defect rate after the maintenance work, and determines whether or not the maintenance work is effective based on the magnitude of the difference.
  • FIG. 20 is a diagram illustrating the configuration of the maintenance display device 100A according to the second embodiment.
  • the processing performed by the maintenance effect determination unit 123A included in the control unit 120A of the server 10A is different from the maintenance effect determination unit 123 according to the first embodiment described above. There is.
  • the maintenance display device 100 In the first embodiment, it was not assumed that the user of the maintenance display device 100 would perform maintenance work other than the contents notified by the maintenance display device 100. However, in reality, in the operation of the production apparatus 200, maintenance work (maintenance work other than the maintenance content notified by the maintenance display device 100) may be performed at any time depending on the judgment of the site or the like. In the second embodiment, the maintenance display device 100A that can handle the case where the maintenance work other than the maintenance contents notified by the maintenance display device 100A is performed will be described.
  • FIG. 21 is a flowchart for explaining the process executed by the maintenance effect determination unit 123A in the second embodiment.
  • step S91 of FIG. 21 the maintenance effect determination unit 123A determines whether or not the maintenance record data MD new is newly registered in the maintenance record database 113 of the storage unit 110. When it is determined that the new maintenance record data MD new is not registered (step S91: NO), the maintenance effect determination unit 123A repeats step S91. When it is determined that the new maintenance record data MD new has been registered (step S91: YES), the maintenance effect determination unit 123A advances the process to step S92.
  • step S92 protection effects determination unit 123A on the basis of the conservation time data included in the newly registered integrity actual data MD new new, a predetermined time after maintenance work corresponding conservation actual data MD new new newly registered Determine if it has passed.
  • the predetermined time is the same as the predetermined time described in the first embodiment, for example, it is necessary for the target production apparatus 200 to manufacture a certain number or more of the wound bodies 204 after the maintenance work is performed. It's time.
  • step S92: YES When it is determined that the predetermined time has elapsed from the maintenance work (step S92: YES), the maintenance effect determination unit 123A proceeds to the process in step S93. When it is determined that the predetermined time has not elapsed from the maintenance work (step S92: NO), the maintenance effect determination unit 123A repeats the process of step S92.
  • step S93 the maintenance effect determination unit 123A determines whether or not there is a maintenance plan ID associated with the newly registered maintenance record data MD new .
  • the notification determination unit 122 notifies the maintenance work content and the maintenance plan ID associated with the maintenance group of the maintenance content.
  • the maintenance record data MD and the maintenance plan ID that triggered the maintenance are associated with each other.
  • it is determined whether or not the newly registered maintenance record data MD new is the maintenance performed by the notification by the maintenance display device 100A.
  • step S93 a new If registered integrity actual data MD new new and integrity plan ID associated exists, the maintenance work corresponding to the integrity performance data MD new new, notification of maintenance contents by the integrity indicating device 100A It is judged that it was an opportunity. Further, when the maintenance plan ID associated with the newly registered maintenance record data MD new does not exist, the maintenance work corresponding to the maintenance record data MD new is triggered by the notification of the maintenance content by the maintenance display device 100A. It is judged that it was not done.
  • step S93 If it is determined in step S93 that the newly registered maintenance record data MD new includes the maintenance proposal ID (step S93: YES), the maintenance effect determination unit 123A proceeds to the process in step S94. On the other hand, when it is determined that the maintenance plan ID is not included in the maintenance record data MD new (step S93: NO), the maintenance effect determination unit 123A proceeds to the process in step S95.
  • Step S94 is a process when the maintenance work corresponding to the newly registered maintenance record data MD new is triggered by the notification of the maintenance content by the maintenance display device 100A. Therefore, in step S94, the maintenance effect determination unit 123A shifts to the process of determining the presence or absence of the effect of the maintenance work triggered by the notification of the maintenance content by the maintenance display device 100A.
  • the maintenance effect determination process for maintenance triggered by the notification of the maintenance content by the maintenance display device 100A is almost the same as the process described with reference to FIG. 17 in the first embodiment described above. Omit.
  • step S95 is a process when the maintenance work corresponding to the maintenance record data MD new is not triggered by the notification of the maintenance content by the maintenance display device 100A. Therefore, the maintenance effect determination unit 123A shifts to the process of determining the presence or absence of the effect of the maintenance work not triggered by the maintenance display device 100A. It should be noted that the maintenance effect determination process for maintenance triggered by the notification of the maintenance content by the maintenance display device 100A is almost the same as the process described with reference to FIG. 11 in the first embodiment described above. Omit.
  • maintenance record data is performed even when maintenance work is performed that is not triggered by the notification of the maintenance content by the maintenance display device 100A.
  • MD new can be suitably registered.
  • the process of the maintenance effect determination unit 123A described with reference to FIG. 21 can be executed in either the learning process or the update process described above.
  • the maintenance display device maintains the production record data from the time when the maintenance work of the newly registered maintenance record data is performed to the predetermined time before, and the maintenance of the newly input maintenance record data.
  • the equipment condition diagnosis index before the maintenance work is generated based on the equipment condition diagnosis model in which the contents of the maintenance work in the notification that triggered the work are related.
  • An equipment condition diagnosis index after maintenance work is generated based on the equipment condition diagnosis model to which the work contents are related.
  • the maintenance effect determination unit calculates the difference between the equipment condition diagnosis index before the maintenance work and the equipment condition diagnosis index after the maintenance work, and determines whether or not the maintenance work is effective based on the magnitude of the difference. ..
  • FIG. 22 is a diagram illustrating the configuration of the maintenance display device 100B according to the third embodiment.
  • the storage unit 110B of the server 10B further has the ineffective equipment state diagnosis model database 114
  • the control unit 120B has the notification determination unit 122B, the maintenance effect determination unit 123B, and the maintenance effect determination unit 123B. It differs from the maintenance display device 100 according to the first embodiment described above in that it has the equipment state diagnosis model generation unit 124B.
  • the equipment condition diagnosis model generation unit 124 generated a new equipment condition diagnosis model M new using the maintenance record data MD determined to be effective (see FIG. 13). ).
  • the equipment condition diagnosis model generation unit 124B generates a new equipment condition diagnosis model M new by using the maintenance record data MD determined to have no maintenance effect.
  • FIG. 23 is a flowchart for explaining the process performed by the equipment state diagnosis model generation unit 124B in the third embodiment. The process described with reference to FIG. 23 can be executed in either the learning process or the update process.
  • step S101 the equipment state diagnosis model generation unit 124B reads the newly registered maintenance record data MD new from the maintenance record database 113.
  • the equipment state diagnosis model generation unit 124B reads out the maintenance record data MD new regardless of the effect determination result by the maintenance effect determination unit 123B.
  • step S102 the equipment state diagnosis model generation unit 124B reads out the production record data list PL before before the maintenance work from the production record database 111.
  • step S103 the equipment condition diagnosis model generating unit 124B uses the read integrity performance data MD new new, and actual production data PD included in the production result data list PL before, and generates an equipment condition diagnosis model M new new ..
  • step S104 the equipment condition diagnosis model generating unit 124B is newly among the generated equipment condition diagnosis model M new new, a model generated based on the conservation performance data MD it is determined that there is no effect, effect without equipment state Register in the diagnostic model database 114.
  • the equipment condition diagnosis model generation unit 124B not only generates the equipment condition diagnosis model M using the maintenance performance data MD of the maintenance determined to be effective, but also performs the maintenance determined to be ineffective.
  • a facility condition diagnosis model M using the maintenance record data MD is generated.
  • the identification process by the equipment condition diagnosis unit 121 and the notification determination unit 122B is executed.
  • the process executed by the equipment state diagnosis unit 121 is almost the same as the process described with reference to FIG. 14 in the first embodiment described above, and thus the description thereof will be omitted.
  • FIG. 24 is a flowchart for explaining the process performed by the notification determination unit 122B in the third embodiment.
  • step S111 the notification determination unit 122B aggregates the agreement degree C for each maintenance group using the agreement degree C generated by the equipment condition diagnosis unit 121, and generates the aggregated value A.
  • information (flag) indicating whether or not the maintenance work is determined to be effective is associated with each maintenance group by the maintenance effect determination unit 123B.
  • step S112 the notification determination unit 122B generates a maintenance plan list ML which is a list of maintenance groups arranged in descending order of the aggregated value A.
  • step S113 the notification determination unit 122B determines whether or not it is determined to be effective for each maintenance group included in the maintenance plan list ML. As described above, in the third embodiment, since the equipment condition diagnosis unit 121 associates a flag indicating whether or not it is effective for each maintenance group, the notification determination unit 122B refers to this flag. As a result, the process of this step S113 is performed. The notification determination unit 122B advances the process to step S114 with respect to the maintenance group of the maintenance work determined to be effective. On the other hand, the notification determination unit 122B advances the process to step S117 for the maintenance group of the maintenance work determined to have no effect.
  • step S114 the notification determination unit 122B determines whether or not the aggregated value A is larger than the predetermined predictive threshold value Th f for each maintenance group determined to be effective.
  • the notification determination unit 122B advances the process to step S115.
  • the notification determination unit 122B ends the process.
  • step S115 the notification determination unit 122B determines whether or not there is a maintenance group whose aggregated value A is larger than the predetermined abnormality threshold value Th a among the maintenance groups determined to be effective.
  • the notification determination unit 122B advances the process to step S116.
  • the notification determination unit 122B advances the process to step S118.
  • step S116 the notification determination unit 122B notifies the maintenance content corresponding to the maintenance group determined in step S114 that the aggregated value A is larger than the predictive threshold threshold Th f , and an abnormality has occurred in the target production device 200. An alarm is issued to notify that.
  • step S117 the notification determining unit 122B, for each conservation groups conservation it is determined that there is no effect, total value A is equal to or greater than no desired effect threshold Th ie.
  • the no-effect threshold Th ee is the minimum value of the aggregated value that is supposed to notify that there is no effect. If total value A is present No effect threshold Th ie greater protection group (step S117: YES), the notification determining unit 122B advances the process to step S118. When there is no maintenance group in which the aggregated value A is larger than the ineffective threshold value Thie (step S117: NO), the notification determination unit 122B ends the process.
  • step S118 the notification determination unit 122B notifies the maintenance content corresponding to the maintenance group determined in step S114 that the aggregated value A is larger than the predictive threshold threshold Th f .
  • the notification determining unit 122B informs the integrity content corresponding to conservation groups aggregate value A is determined to effect greater than without the threshold Th ie in step S117.
  • the maintenance display device 100B According to the maintenance display device 100B according to the third embodiment with such a configuration, not only the maintenance content that is assumed to be able to improve the production device 200, but also the maintenance contents that have been carried out in the past but have no effect. It is possible to notify the user about the contents of the maintenance work. As a result, the user can avoid a situation in which ineffective maintenance work is repeatedly performed, so that the time required for maintenance can be shortened and the labor required for maintenance can be reduced.
  • the equipment condition diagnosis model generation unit includes production record data before the time when the maintenance work determined to be ineffective is performed, maintenance record data related to the maintenance work, and maintenance result data. To generate a new equipment condition diagnosis model based on.
  • the notification unit notifies the contents of the maintenance work determined to be effective as effective maintenance work, and also uses the equipment condition diagnosis model generated based on the maintenance record data related to the maintenance work determined to be ineffective. Notify the contents of the associated maintenance work as ineffective maintenance work.
  • the presence or absence of the effect is determined by whether or not the difference in the defect rate before and after the maintenance work is larger than a predetermined threshold value. It was determined (see FIGS. 12A and 12B).
  • the maintenance effect determination unit 123 may determine the presence or absence of the effect of the maintenance work by using another method.
  • 25A and 25B are diagrams for explaining a modified example of the method of determining the presence or absence of the effect of the maintenance work by the maintenance effect determination unit 123 in the learning process.
  • the presence or absence of the effect is determined based on whether or not the post-maintenance defect rate Nf after is larger than a predetermined threshold value (for example, 20%) without referring to the pre-maintenance defect rate. ..
  • a predetermined threshold value for example, 20%
  • Nf after 0%, which is smaller than the predetermined threshold value of 20%, so that it is determined to be effective.
  • Nf after 40%, which is larger than the predetermined threshold value of 20%, so that it is determined that there is no effect.
  • the maintenance effect determination unit 123 may determine the presence or absence of the effect of the maintenance work by using a method different from the above-described embodiment.
  • the effect is determined by whether or not the difference in the degree of coincidence before and after the maintenance work is larger than a predetermined threshold value. The presence or absence was determined (see FIGS. 18A and 18B).
  • 26A and 26B are diagrams for explaining a modified example of the method of determining whether or not the maintenance work is effective by the maintenance effect determination unit 123 in the update process.
  • the presence or absence of the effect is determined based on whether or not the pre-maintenance match degree Cafter is larger than a predetermined threshold value (for example, 0.30) without referring to the pre-maintenance match degree.
  • a predetermined threshold value for example, 0.30
  • the pre-maintenance match degree Cafter is larger than a predetermined threshold value (for example, 0.30) without referring to the pre-maintenance match degree.
  • the maintenance display device 100 (100A, 100B) includes the storage unit 110 (110B), the control unit 120 (120A, 120B), and the notification unit 130 has been described.
  • the invention is not limited to this.
  • the storage unit and the control unit are configured to communicate with each other, they may be configured separately from each other and arranged at distant positions.
  • the notification unit may be included in the production apparatus or may be installed outside the production apparatus. Further, the notification unit may be connected to the storage unit and the control unit via a network, or may be directly connected.
  • the storage unit, the control unit, and the notification unit may be separate devices that are independent of each other, and may be devices that operate independently of each other. Further, as long as each of the storage unit, the control unit, and the notification unit can communicate with each other, the place where they are arranged is not particularly limited.
  • the notification device may be arranged in a factory or the like where a production device is arranged, and the storage unit and the control unit may be included in a cloud server provided on the cloud, for example.
  • the control unit 120 (120A, 120B) has performed all the learning process, the update process, and the identification process. Then, in the identification process, the control unit 120 (120A, 120B) controls the notification unit 130 to perform the notification processing.
  • the learning process is a process for generating the equipment state diagnosis model M
  • the update process is a process for updating the equipment state diagnosis model M.
  • the identification process uses the equipment condition diagnosis model M to identify whether or not an abnormality or a sign of an abnormality has occurred in the plurality of winding bodies 204 newly produced using the equipment condition diagnosis model M. It is a process.
  • the present invention is not limited to this.
  • control unit may perform only learning processing or update processing
  • notification unit may receive an equipment state diagnosis model from the control unit and perform identification processing using the received equipment state diagnosis model.
  • This disclosure is useful for maintenance display devices that display information related to the maintenance of production equipment.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Software Systems (AREA)
  • Theoretical Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Computing Systems (AREA)
  • Artificial Intelligence (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Data Mining & Analysis (AREA)
  • Evolutionary Computation (AREA)
  • Medical Informatics (AREA)
  • Mathematical Physics (AREA)
  • Electrochemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Quality & Reliability (AREA)
  • Secondary Cells (AREA)
  • General Factory Administration (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

本発明の学習済みモデルの生成方法は、第1シート材(202)の第1端面の位置を表す第1データ、第2シート材(203)の第2端面の位置を表す第2データを検査機(207)から取得し、第1データが示す第1端面の位置の連続が、第2データが示す第2端面の位置の連続に交差していると判断された場合、巻回体(204)が不良であり、不良の原因は第1供給リール又は第1貼合ローラにある旨の情報を保全のために表示部(132)に出力し、第1供給リールを保全した前の巻回体の第1不良率と第1供給リールを保全した後の巻回体の第2不良率との第1差分が所定値以上と判断された場合の第1供給リールを保全した前に読み取られた第1データ及び第2データを用いて設備状態診断モデル(M)を生成する方法である。

Description

学習済みモデルの生成方法、保全表示装置、及びプログラム
 本開示は、生産設備の保全に関する情報を表示するために用いられる学習済みモデルの生成方法、保全表示装置、及びプログラムに関する。
 ある設備について、劣化や故障等を予防し、正常な運転を維持するために保全システムを設けることが一般的に行われている。特許文献1には、変電所における排水ポンプ故障や配電盤地絡等の異常の発生を監視し、異常が発生した場合には設備関係者に対して報知を行い、報知を受けた設備関係者が行った、異常に対する保守保全業務に関する情報を記憶する保全システムが開示されている。
特開2017-167708号公報
 特許文献1に開示された技術では、設備に異常が発生してから設備関係者に対する報知が行われる。このため、設備関係者による保全が実施されるのは、異常が発生した後となる。異常の発生後に保全が行われる場合、設備の運転を停止する必要が生じてしまうので、異常の発生前に保全の必要が生じたと判断された時点で報知が行われることが所望されている。このため、設備に生じる異常の予兆を検知することが要望されている。
 本開示の目的は、異常の予兆を検知するための学習済みモデルの生成方法、保全表示装置、及びプログラムを提供することである。
 本開示の学習済みモデルの生成方法は、第1電極シートを供給する第1供給リールと、第2電極シートを供給する第2供給リールと、前記第1電極シート側に設けられた第1貼合ローラと、前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全のための学習済みモデルの生成方法であって、前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得し、前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差していると判断された場合、前記巻回体が不良であり、前記不良の原因は前記第1供給リール又は前記第1貼合ローラにある旨の情報を保全のために表示装置に出力し、前記第1供給リールを保全する前後の前記第1データ及び前記第2データに基づき、前記第1供給リールを保全した前の前記巻回体の第1不良率と前記第1供給リールを保全した後の前記巻回体の第2不良率との第1差分が所定値未満と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを生成するためには用いず、一方、前記第1差分が前記所定値以上と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データを用いて前記学習済みモデルを生成する。
 本開示の学習済みモデルの生成方法は、第1電極シートを供給する第1供給リールと、第2電極シートを供給する第2供給リールと、前記第1電極シート側に設けられた第1貼合ローラと、前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全のための学習済みモデルの生成方法であって、前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得し、前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差していると判断された場合、前記巻回体が不良であり、前記不良の原因は前記第1供給リール又は前記第1貼合ローラにある旨の情報を保全のために表示装置に出力し、前記第1供給リールを保全する前後の前記第1データ及び前記第2データに基づき、前記第1供給リールを保全した後の前記巻回体の第5不良率が所定値以上と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを生成するためには用いず、一方、前記第5不良率が前記所定値未満と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データを用いて前記学習済みモデルを生成する。
 本開示の学習済みモデルの生成方法は、第1電極シートを供給する第1供給リールと、第2電極シートを供給する第2供給リールと、前記第1電極シート側に設けられた第1貼合ローラと、前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全のための学習済みモデルの生成方法であって、前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得し、前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差していると判断された場合、前記巻回体の不良原因は前記第1供給リール又は前記第1貼合ローラにある旨を判断するための学習済みモデルを生成し、前記学習済みモデルを用いた判断に基づき、前記不良原因が前記第1供給リール又は前記第1貼合ローラにある旨の情報を保全のために表示装置に出力し、前記第1供給リールを保全した前の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第1確率と前記第1供給リールを保全した後の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第2確率との第1差分が所定値未満と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを更新するためには用いず、一方、前記第1差分が前記所定値以上と判断された場合、前記第1供給リールを保全した前の前記第1データ及び前記第2データを用いて前記学習済みモデルを更新する。
 本開示の学習済みモデルの生成方法は、第1電極シートを供給する第1供給リールと、第2電極シートを供給する第2供給リールと、前記第1電極シート側に設けられた第1貼合ローラと、前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全のための学習済みモデルの生成方法であって、前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得し、前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差していると判断された場合、前記巻回体の不良原因は前記第1供給リール又は前記第1貼合ローラにある旨を判断するための学習済みモデルを生成し、前記学習済みモデルを用いた判断に基づき、前記不良原因が前記第1供給リール又は前記第1貼合ローラにある旨の情報を保全のために表示装置に出力し、
 前記第1供給リールを保全した後の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第5確率が所定値以上と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを更新するためには用いず、一方、前記第5確率が前記所定値未満と判断された場合、前記第1供給リールを保全した前の前記第1データ及び前記第2データを用いて前記学習済みモデルを更新する。
 本開示の保全表示装置は、第1電極シートを供給する第1供給リールと、第2電極シートを供給する第2供給リールと、前記第1電極シート側に設けられた第1貼合ローラと、前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全に関する情報を表示する保全表示装置であって、前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得し、前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差しているか否かに基づいて、前記巻回体が不良であるか否かを判定し、不良である場合には前記不良の原因は前記第1供給リール又は前記第1貼合ローラにある旨の情報を保全のために表示装置に出力する報知判定部と、前記第1供給リールを保全する前後の前記第1データ及び前記第2データに基づき、前記第1供給リールが保全された前の前記巻回体の第1不良率と前記第1供給リールが保全された後の前記巻回体の第2不良率との第1差分が所定値未満と判断された場合の、前記第1供給リールが保全された前に読み取られた前記第1データ及び前記第2データを用いず、一方、前記第1差分が前記所定値以上と判断された場合の、前記第1供給リールが保全された前に読み取られた前記第1データ及び前記第2データを用いて学習済みモデルを生成するモデル生成部と、を備える。
 本開示の保全表示装置は、第1電極シートを供給する第1供給リールと、第2電極シートを供給する第2供給リールと、前記第1電極シート側に設けられた第1貼合ローラと、前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全に関する情報を表示する保全表示装置であって、前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得し、前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差しているか否かに基づいて、前記巻回体が不良であるか否かを判定し、不良である場合には前記不良の原因は前記第1供給リール又は前記第1貼合ローラにある旨の情報を保全のために表示装置に出力する報知判定部と、前記第1供給リールが保全された後の前記第1データ及び前記第2データに基づき、前記第1供給リールが保全された後の前記巻回体の第5不良率が所定値以上と判断された場合の、前記第1供給リールが保全された前に読み取られた前記第1データ及び前記第2データを用いず、一方、前記第5不良率が前記所定値未満と判断された場合の、前記第1供給リールが保全された前に読み取られた前記第1データ及び前記第2データを用いて学習済みモデルを生成するモデル生成部と、を備える。
 本開示の保全表示装置は、第1電極シートを供給する第1供給リールと、第2電極シートを供給する第2供給リールと、前記第1電極シート側に設けられた第1貼合ローラと、前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全に関する情報を表示する保全表示装置であって、前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得し、前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差しているか否かに基づいて、前記巻回体が不良であるか否かを判定し、不良である場合には不良原因が前記第1供給リール又は前記第1貼合ローラにある旨を判断するための学習済みモデルを生成するモデル生成部と、前記学習済みモデルを用いて、前記不良原因が前記第1供給リール又は前記第1貼合ローラにあることを特定して特定結果を含む情報を保全のために表示装置に出力する報知判定部と、を備え、前記モデル生成部は、前記第1供給リールが保全された前の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第1確率と前記第1供給リールが保全された後の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第2確率との第1差分が所定値未満と判断された場合、前記第1供給リールが保全された前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを更新するためには用いず、一方、前記第1差分が前記所定値以上と判断された場合、前記第1供給リールが保全された前の前記第1データ及び前記第2データを用いて前記学習済みモデルを更新する。
 本開示の保全表示装置は、第1電極シートを供給する第1供給リールと、第2電極シートを供給する第2供給リールと、前記第1電極シート側に設けられた第1貼合ローラと、前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全に関する情報を表示する保全表示装置であって、前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得し、前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差しているか否かに基づいて、前記巻回体が不良であるか否かを判定し、不良である場合には不良原因が前記第1供給リール又は前記第1貼合ローラにある旨を判断するための学習済みモデルを生成するモデル生成部と、前記学習済みモデルを用いて、前記不良原因が前記第1供給リール又は前記第1貼合ローラにあることを特定して特定結果を含む情報を保全のために表示装置に出力する報知判定部と、を備え、前記モデル生成部は、前記第1供給リールを保全した後の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第5確率が所定値以上と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを更新するためには用いず、一方、前記第5確率が前記所定値未満と判断された場合、前記第1供給リールを保全した前の前記第1データ及び前記第2データを用いて前記学習済みモデルを更新する。
 本開示のプログラムは、第1電極シートを供給する第1供給リールと、第2電極シートを供給する第2供給リールと、前記第1電極シート側に設けられた第1貼合ローラと、前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全のための学習済みモデルを生成するコンピュータが実行するプログラムであって、前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得する手順と、前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差していると判断された場合、前記巻回体が不良であり、前記不良の原因は前記第1供給リール又は前記第1貼合ローラにある旨の情報を保全のために表示装置に出力する手順と、前記第1供給リールを保全する前後の前記第1データ及び前記第2データに基づき、前記第1供給リールを保全した前の前記巻回体の第1不良率と前記第1供給リールを保全した後の前記巻回体の第2不良率との第1差分が所定値未満と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを生成するためには用いず、一方、前記第1差分が前記所定値以上と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データを用いて前記学習済みモデルを生成する手順と、を前記コンピュータに実行させる。
 本開示のプログラムは、第1電極シートを供給する第1供給リールと、第2電極シートを供給する第2供給リールと、前記第1電極シート側に設けられた第1貼合ローラと、前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全のための学習済みモデルを生成するコンピュータが実行するプログラムであって、前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得する手順と、前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差していると判断された場合、前記巻回体が不良であり、前記不良の原因は前記第1供給リール又は前記第1貼合ローラにある旨の情報を保全のために表示装置に出力する手順と、前記第1供給リールを保全する前後の前記第1データ及び前記第2データに基づき、前記第1供給リールを保全した後の前記巻回体の第5不良率が所定値以上と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを生成するためには用いず、一方、前記第5不良率が前記所定値未満と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データを用いて前記学習済みモデルを生成する手順と、を前記コンピュータに実行させる。
 本開示のプログラムは、第1電極シートを供給する第1供給リールと、第2電極シートを供給する第2供給リールと、前記第1電極シート側に設けられた第1貼合ローラと、前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全のための学習済みモデルを生成するコンピュータが実行するプログラムであって、前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得する手順と、前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差していると判断された場合、前記巻回体の不良原因は前記第1供給リール又は前記第1貼合ローラにある旨を判断するための学習済みモデルを生成する手順と、前記学習済みモデルを用いた判断に基づき、前記不良原因が前記第1供給リール又は前記第1貼合ローラにある旨の情報を保全のために表示装置に出力する手順と、前記第1供給リールを保全した前の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第1確率と前記第1供給リールを保全した後の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第2確率との第1差分が所定値未満と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを更新するためには用いず、一方、前記第1差分が前記所定値以上と判断された場合、前記第1供給リールを保全した前の前記第1データ及び前記第2データを用いて前記学習済みモデルを更新する手順と、を前記コンピュータに実行させる。
 本開示のプログラムは、第1電極シートを供給する第1供給リールと、第2電極シートを供給する第2供給リールと、前記第1電極シート側に設けられた第1貼合ローラと、前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全のための学習済みモデルを生成するコンピュータが実行するプログラムであって、前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得する手順と、前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差していると判断された場合、前記巻回体の不良原因は前記第1供給リール又は前記第1貼合ローラにある旨を判断するための学習済みモデルを生成する手順と、前記学習済みモデルを用いた判断に基づき、前記不良原因が前記第1供給リール又は前記第1貼合ローラにある旨の情報を保全のために表示装置に出力する手順と、前記第1供給リールを保全した後の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第5確率が所定値以上と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを更新するためには用いず、一方、前記第5確率が前記所定値未満と判断された場合、前記第1供給リールを保全した前の前記第1データ及び前記第2データを用いて前記学習済みモデルを更新する手順と、を前記コンピュータに実行させる。
 本開示によれば、設備において、異常の予兆を検知することができる。
保全表示装置と、保全表示装置が適用される生産装置と、を含むネットワーク図 保全表示装置の全体の処理工程について説明するためのフローチャート 生産装置において巻回体を生産する巻回部の構成を例示した図 巻回部において生産される巻回体を例示した斜視図 検査機が巻回体を検査する様子を例示した模式図 巻回体の半径方向に沿った断面形状を例示した模式図 図4Bに示す巻回体の断面を検査機が走査して生成した画像を例示した図 巻回体の断面形状と、形状データとの対応を示した模式図 第1の実施の形態に係る保全表示装置の機能構成を例示したブロック図 生産実績データについて例示した図 生産実績データについて例示した図 保全実績データについて例示した図 保全表示装置における処理の全体の流れを概略的に説明するシーケンス図 保全表示装置における処理の全体の流れを概略的に説明するシーケンス図 学習処理において、保全効果判定部が実行する処理について説明するためのフローチャート 学習処理における保全作業の効果を判定する様子を説明するための概念図 学習処理における保全作業の効果を判定する様子を説明するための概念図 学習処理において、設備状態診断モデル生成部が実行する処理について説明するためのフローチャート 識別処理において、設備状態診断部が実行する処理について説明するためのフローチャート 識別処理において、報知判定部が実行する処理を説明するためのフローチャート 保全案リストの具体例を示す図 更新処理において、保全効果判定部が実行する処理について説明するためのフローチャート 更新処理における保全作業の効果を判定する様子を説明するための概念図 更新処理における保全作業の効果を判定する様子を説明するための概念図 更新処理において、設備状態診断モデル生成部が実行する処理について説明するためのフローチャート 第2の実施の形態に係る保全表示装置の構成を例示した図 第2の実施の形態において、保全効果判定部が実行する処理について説明するためのフローチャート 第3の実施の形態に係る保全表示装置の構成を例示した図 第3の実施の形態において、設備状態診断モデル生成部が行う処理について説明するためのフローチャート 第3の実施の形態における、報知判定部が行う処理について説明するためのフローチャート 学習処理における、保全効果判定部による保全作業の効果の有無の判定方法の変形例を説明するための図 学習処理における、保全効果判定部による保全作業の効果の有無の判定方法の変形例を説明するための図 更新処理における、保全効果判定部による保全作業の効果の有無の判定方法の変形例を説明するための図 更新処理における、保全効果判定部による保全作業の効果の有無の判定方法の変形例を説明するための図
 以下、本開示の各実施の形態について図面を参照して詳細に説明する。ただし、必要以上に詳細な説明、例えば、既によく知られた事項の詳細説明や実質的に同一の構成に対する重複説明等は省略する場合がある。
 なお、以下の説明及び参照される図面は、当業者が本開示を理解するために提供されるものであって、本開示の請求の範囲を限定するためのものではない。
 (第1の実施の形態)
 <保全表示装置100及び生産装置200>
 図1は、本発明の第1の実施の形態に係る保全表示装置100と、保全表示装置100が適用される生産装置200と、を含むネットワーク図である。本実施の形態において説明する保全表示装置100は、リチウムイオン二次電池を生産するための生産装置200の保全表示を行う装置である。図1に示す例では、保全表示装置100は1つの生産装置200に対して適用されているが、本発明はこれに限定されず、1つの保全表示装置が複数の生産装置に対して適用されてもよい。また、本実施の形態において、保全表示装置100は装置として説明されるが、本発明はこれに限定されず、個々の構成がネットワークを介して接続された保全表示システムであってもよい。
 保全表示装置100は、記憶部110及び制御部120を有するサーバ10、及び、報知部130を備える。サーバ10は、ネットワークNTを介して生産装置200と通信可能に接続されている。ネットワークNTは、例えばインターネット等の公衆ネットワーク、または、例えば社内LAN(Local Area Network)等のローカルなネットワークである。
 サーバ10は、例えば汎用のコンピュータであり、図1に示すように記憶部110及び制御部120を有する。
 記憶部110は、例えばROM(Read Only Memory)やRAM(Random Access Memory)等の主記憶装置(図示せず)、及び/または例えばHDD(Hard Disk Drive)、SSD(Solid State Drive)、フラッシュメモリ等の補助記憶装置(図示せず)を含む。
 制御部120は、例えばCPU(Central Processing Unit)等のハードウェアプロセッサ(図示せず)であり、記憶部110に記憶されたプログラムを展開して実行することで、保全表示装置100全体の制御を行う。
 記憶部110及び制御部120は一体のコンピュータとして構成されていなくともよい。すなわち、記憶部110及び制御部120は、互いに通信可能に構成されていれば、互いに別体に構成され、離れた位置に配置されていてもよい。また、保全表示装置100は、図1に図示しない操作部を有し、外部からの操作入力を受け付けてもよい。記憶部110及び制御部120の詳細については後述する。
 報知部130は、図1に示す例では、生産装置200に含まれており、サーバ10とネットワークNTを介して接続されている。報知部130は、制御部120の制御に基づいて、保全表示装置100のユーザに対する報知を行う。なお、本実施の形態において、保全表示装置100のユーザとは、保全表示装置100の管理者、または、生産装置200を用いて巻回体(後述の図3Bを参照)の生産を行う作業者等を含む。
 図1に示すように、報知部130は、警報部131、及び表示部132を有する。警報部131は、例えばブザーやランプ等、音や光等によりユーザに対して警報を発する構成である。表示部132は、例えば液晶ディスプレイや有機ELディスプレイ等の表示デバイスであり、警告の内容を表示する構成である。なお、報知部130は、警報部131及び表示部132以外にも、例えばあらかじめ登録されたユーザのメールアドレスに対して警告の内容を含むメールを送信する送信部等を含んでいてもよい。
 生産装置200は、本実施の形態においては、リチウムイオン二次電池の生産装置である。図1に示すように、生産装置200は、巻回部201及び検査機207を有する。巻回部201は、詳細は後述するが、正極シート及び負極シートを巻き取って巻回体を生産する。検査機207は、巻回部201が生産した巻回体の検査を行う。
 なお、図1に示す例では、報知部130は生産装置200に含まれているが、本発明はこれに限定されず、報知部130は生産装置200の外部に設置されてもよい。また、図1に示す例では、報知部130はネットワークNTを介してサーバ10に接続されているが、本発明はこれに限定されず、サーバ10と報知部130とはネットワークNTを介さずに直接接続されていてもよい。
 また、本実施の形態では、生産装置200がリチウムイオン二次電池の生産装置である場合について説明を行うが、本発明はこれに限定されない。本発明の保全表示装置はリチウムイオン二次電池の生産装置以外の生産設備に適用されてもよい。さらに、本発明の保全表示装置は生産設備以外の種々の設備に適用されてもよい。
 図2は、保全表示装置100の全体の処理工程について説明するためのフローチャートである。
 ステップS1において、制御部120は、生産装置200の巻回部201に巻回体を生産させる。
 ステップS2において、制御部120は、検査機207に、生産された巻回体の検査を行わせる。検査機207による巻回体の検査の詳細については後述する。
 ステップS3において、制御部120は、検査機207による検査結果を記憶部110に記憶させる。これとともに、ステップS4において、制御部120は、検査機207による検査の結果、巻回体が不良品であるか否かを判定する。不良品ではないと判定した場合(ステップS4:NO)、制御部120は、処理をステップS5に進め、不良品であると判定した場合(ステップS4:YES)、処理をステップS6に進める。
 不良品ではないと判定された場合、ステップS5において、制御部120は、生産装置200に、当該巻回体を次工程へと供給させる。
 不良品であると判定された場合、ステップS6において、制御部120は、報知部130により、不良品を検知したことを報知する。報知部130による報知についての詳細は、後述する。
 ステップS7において、制御部120は、生産装置200に、不良品と判定された巻回体を廃棄させる。
 なお、図2に示すフローチャートのステップS5及びステップS7において、制御部120は、巻回体の次工程への供給、または巻回体の廃棄を、生産装置200に実行させているが、本発明はこれに限定されない。例えば報知部130を介して、保全表示装置100のユーザに対して、巻回体の次工程への供給、または巻回体の廃棄を行わせるような報知を行うことで、ユーザに供給または廃棄を行わせるようにしてもよい。
 次に、生産装置200について詳細に説明する。
 <巻回部201>
 図3Aは、生産装置200において巻回体を生産する巻回部201の構成を例示した図である。
 図3Aに示すように、巻回部201は、第1供給リール50、第2供給リール51、第1シート材202、第2シート材203、第1貼合ロール205A、第2貼合ロール205B、巻芯206、巻芯回転駆動部206M、及び検査機207を有する。巻回部201は、第1供給リール50から供給される第1シート材202と第2供給リール51から供給される第2シート材203とを第1貼合ロール205A及び第2貼合ロール205Bによって貼り合わせ、巻芯206に巻き取ることで、巻回体204を生産する装置である。巻芯回転駆動部206Mは、巻芯206を所望の回転速度で駆動させる。
 図3Bは、巻回部201において生産される巻回体204を例示した斜視図である。図3Bでは、巻回体204を構成する第1シート材202及び第2シート材203の端部が巻き取られていない様子が示されている。図3Bに示すように、第1シート材202よりも第2シート材203の方が、幅(巻回体204の軸方向に沿った長さ)が大きく形成されている。第1シート材202は、例えば正極材料が塗布されたシート状の部材(正極シート)であり、第2シート材203は、例えば負極材料が塗布されたシート状の部材(負極シート)である。第1シート材202は、本発明の第1電極シートの一例であり、第2シート材203は、本発明の第2電極シートの一例である。なお、上述した例では、第1シート材202が正極シート材であり、第2シート材203が負極シート材であったが、本発明はこれに限定されず、第1シート材202が負極シート材、第2シート材203が正極シート材であってもよい。
 <検査機207>
 検査機207は、生産された巻回体204の検査を行う。検査機207は、例えばSS-OCT(Swept Source-Optical Coherence Tomography)装置である。検査機207は、本発明のセンサの一例である。
 図4Aは、検査機207が巻回体204を検査する様子を例示した模式図である。図4Aに示すように、検査機207は、検査対象の巻回体204に照射する光Lを巻回体204の径方向内側から外側に向かって移動させて走査し、光Lの干渉性を利用して巻回体204の内部構造の形状を示す画像を生成する。
 図4Bは、巻回体204の半径方向に沿った断面形状を例示した模式図である。また、図4Cは、図4Bに示す巻回体204の断面を検査機207が走査して生成した画像Iを例示した図である。図4B及び図4Cにおいて、上下方向が巻回体204の軸方向に、左右方向が巻回体204の半径方向に、それぞれ対応している。
 図4Bに示すように、巻回体204の半径方向に沿った断面では、第1シート材202と、第1シート材202より幅が大きい第2シート材203と、が交互に積層されている。検査機207は、巻回体の半径方向における、第1シート材202の軸方向に沿った両端部、及び第2シート材203の軸方向に沿った両端部の位置を抽出して画像化する。図4Cに示す例(画像I)では、菱形(◆)が第1シート材202の両端部の位置を示す第1データに、黒丸(●)が第2シート材203の両端部の位置を示す第2データに、それぞれ対応している。
 巻回部201における巻回体204の生産時に、不良品が発生することがある。不良品は、例えば上述した巻回部201の各構成、特に第1供給リール50及び第1貼合ロール205Aの不具合によって生じうる。検査機207は、上述したように巻回体204の半径方向に沿った断面形状を示す画像を生成し、形状データとして記憶部110に記憶させる。形状データに基づいて行われる、巻回体204が不良であるか否かの判定の結果も、同様に記憶部110に記憶される。なお、形状データに基づく、不良品であるか否かの判定は、図1に示す制御部120が行ってもよいし、検査機207が行ってもよいし、図1または図3Aに図示しない他の構成が行ってもよい。以下では、制御部120が、形状データに基づいて、不良品であるか否かの判定を行う場合について説明する。
 図5は、巻回体204の断面形状と、形状データとの対応を示した模式図である。図5の上段には、様々な状態の巻回体204の断面図が例示されている。図5に示す例では、左側へ行くほど第1シート材202と第2シート材203とのずれが小さく、右側へ行くほど第1シート材202のずれが大きくなっている。
 図5の下段には、図5の上段に例示した巻回体204の断面形状のそれぞれに基づいて生成される画像I1~I6が例示されている。第1シート材202のずれが大きくなると、第1データが示す第1シート材202の上端面(本発明の第1端面)の位置の連続が、第2データが示す第2シート材203の上端面(本発明の第2端面)の位置の連続と交差してしまうことがある。いいかえると、第1データが示す第1シート材202の上端面(本発明の第1端面)の複数の位置を結ぶ第1仮想線が、画像I5及びI6のように、第2データが示す第2シート材203の上端面(本発明の第2端面)の複数の位置を結ぶ第2仮想線と交差してしまうことがある。第1仮想線と第2仮想線とは、不良品以外の巻回体204では交差しないはずであるため、このような断面形状を有する巻回体204の検査結果は、「不良」となる。
 図5に示す画像I3及びI4は、第1シート材202の位置がずれてはいるものの、第1シート材202の第1仮想線が第2シート材203の第2仮想線と交差していない。このような形状を有する巻回体204の検査結果は、「可」となる。
 図5に示す画像I1及びI2は、画像I3~I6と比較して第1シート材202の位置のずれ量が小さい。このような断面形状を有する巻回体204の検査結果は、「良」となる。
 図2に示すフローチャートのステップS4において、検査結果が「良」、または「可」である巻回体204は、不良品ではないと判定され、検査結果が「不良」である巻回体204は、不良品であると判定される。
 このように、第1データが示す上端面の位置の連続が、第2データが示す上端面の位置の連続に交差している場合、巻回体204は不良である。第1データが示す上端面の位置の連続が、第2データが示す上端面の位置の連続に交差する不良は、第1供給リール50、第2供給リール51、第1貼合ロール205A、又は第2貼合ロール205Bが原因となって生じうることが分かっている。図5に示す例では、第1供給リール50によって供給され、第1貼合ロール205Aによって貼り合わせられる第1シート材202の位置がずれることによって、第1データが示す上端面の位置の連続が、第2データが示す上端面の位置の連続に交差する不良が生じている。このため、図5に示す不良の原因は、第1供給リール50又は第1貼合ロール205Aであるということができる。
 なお、図5に示す例では、第1シート材202と第2シート材203のそれぞれ上端面の位置の連続により形成される線(第1仮想線及び第2仮想線)が交差するか否かによって「良」、「可」、「不良」が判定されていた。しかしながら本発明はこれに限定されず、例えば下端面の位置の連続が交差するか否かによって「良」、「可」、「不良」が判定されてもよい。
 <保全表示装置100>
 次に、上述した生産装置200の保全作業を表示する保全表示装置100の機能構成と動作について詳細に説明する。なお、本実施の形態における保全作業とは、生産装置200に対して、各構成の調整や部品交換等を適宜行うことで、生産装置200から生産される巻回体204に不良が生じないようにする作業を意味する。本発明では、保全作業は、特に上述した生産装置200の第1供給リール50及び第1貼合ロール205Aの不具合を保全するための作業である。保全作業は、生産装置200を実地で取り扱う作業員等によって行われる。
 <記憶部110>
 図6は、第1の実施の形態に係る保全表示装置100の機能構成を例示したブロック図である。上述したように、保全表示装置100は、記憶部110、制御部120及び報知部130を有する(図1参照)。
 図6に示すように、記憶部110は、生産実績データベース111、設備状態診断モデルデータベース112、及び保全実績データベース113を有する。
 生産実績データベース111は、生産装置200の生産実績に関する生産実績データが登録されたデータベースである。生産実績データには、生産された巻回体204の生産日時と、巻回体204の形状データとが含まれる。
 図7A及び図7Bは、生産実績データPDについて例示した図である。図7Aには、生産実績データPDの一部がテーブル形式で示されている。図7Aに示すように、生産実績データPDは、「生産日時」、「設備」、「検査結果」、「第1シート材」、「第2シート材」、「形状データID」等の各データを含む。
 「生産日時」データは、巻回体204が生産された生産日時に関するデータである。「設備」データは、生産装置200が複数存在する場合に、生産実績をあげた設備を識別するためのデータである。図7Aでは例として、互いに異なる生産装置200の識別子である「A」、「B」、「C」が示されている。
 「検査結果」データは、生産装置200において生産された巻回体204の検査結果(図5参照)を示すデータである。図7Aでは、例として「良」、「可」、「不良」の3段階の検査結果が示されている。
 「第1シート材」データ及び「第2シート材」データは、巻回体204を生産するために使用される材料に関するデータである。「第1シート材」データ及び「第2シート材」データとしては、それぞれの材料を識別するための識別子が記憶されている。
 「形状データID」は、巻回体204の断面形状を示す形状データ(図5参照)に対応付けられた識別番号である。図7Bには、形状データIDと形状データとの対応関係が例示されている。
 このような生産実績データPDのうち、形状データを除く各データは、例えば生産装置200において巻回体204が生産される度に、自動で、もしくは作業員の手によって入力され、生産実績データベース111に登録される。形状データは、生産された巻回体204が検査機207(図1または図4Aを参照)によって検査された際に生成され、形状データIDと対応付けられて登録される。すなわち、生産実績データPDには、巻回体204の形状データが実質的に含まれる。これにより、生産実績データベース111には、巻回体204が生産される度に、生産された巻回体204の生産実績データPDが登録される。
 設備状態診断モデルデータベース112は、複数の設備状態診断モデルMが登録されたデータベースである。設備状態診断モデルMとは、生産装置200に対して保全作業が必要であるか否かを診断するために使用される、診断の基準となる学習済みモデルである。設備状態診断モデルMは、不良品が生産されていた生産装置200が、保全作業により改善された(不良品の生産割合が下がった)場合に、どのような不良に対してどのような保全作業が有効であるかが学習された学習済みモデルである。より具体的には、設備状態診断モデルMは、複数の不良品を含む巻回体の形状データと、その不良品の不良を改善するために行われた保全作業の内容と、を含むデータの集合体である。設備状態診断モデルMは、後述の設備状態診断モデル生成部124により生成される。
 設備状態診断モデルMは、その保全作業によってそれ以後の巻回体の生産時に不良品の生産割合が下がった保全作業毎に生成される。すなわち、例えば、昨日行われた保全作業に係る設備状態診断モデルMと、本日行われた保全作業に係る設備状態診断モデルMとは、それぞれ独立に生成される。
 また、設備状態診断モデルMの形式は、特に限定されないが、より診断精度を向上させるために、ニューラルネットワークモデル等の機械学習モデルが採用されることが好ましい。設備状態診断モデルMに採用されるモデルの選択は、保全表示装置100のユーザにより図示しない操作部等を介して行われてもよいし、設備状態診断モデル生成部124によりおこなわれてもよい。
 保全実績データベース113は、生産装置200に対して実際に行われた保全作業に関する保全実績データMDが登録されたデータベースである。保全実績データMDには、例えば生産装置200を識別するための設備データ、保全作業が行われた日時(保全日時)に関するデータ、行われた保全作業の内容を示すデータ等が含まれる。例えば数分の短い時間で終了する保全作業の場合、保全日時は保全作業の開始時刻でも終了時刻でもよい。また保全作業が例えば数時間と長くかかる場合、保全日時は保全作業の中央時刻とすることが好ましい。図8は、保全実績データMDについて例示した図である。保全実績データMDは、保全作業が実行された直後に、例えば生産装置200の保全作業を実際に行った作業員等の手によって、図1に図示しない操作部等を介して保全表示装置100に入力される。
 <制御部120>
 図6に示すように、制御部120は、設備状態診断部121、報知判定部122、保全効果判定部123、設備状態診断モデル生成部124、を有する。
 設備状態診断部121は、生産装置200において新たに生産された巻回体204の形状データ、及び設備状態診断モデルMを用いて、生産装置200の状態を診断する。診断結果は、新たに生産された巻回体204の形状データと、設備状態診断モデルMに含まれる過去の形状データと、が一致する度合いを示す一致度Cとして算出される。ここで、設備状態診断モデルMには、保全作業の内容とその保全作業が行われた時点より前の形状データとが含まれる。このことは、過去に設備状態診断モデルMに含まれる形状データを有する巻回体204の不良が発生した場合に、設備診断モデルMに含まれる保全作業を行ったことにより、巻回体204の不良が低減したことを意味する。すなわち、新たに生産された巻回体204の形状データと設備診断モデルMに含まれる形状データとの一致度Cは、設備状態診断モデルMに含まれる保全を行うことにより巻回体204の不良が改善される確率を示す。
 報知判定部122は、一致度Cに基づいて、生産装置200の保全作業に関する報知を行うか否かを判定する。報知判定部122は、一致度Cが所定の閾値以上である場合に、保全作業を行うべき旨の報知を行うと判定し、一致度Cが所定の閾値未満である場合には、報知を行わないと判定する。保全作業に関する報知には、ユーザの注意を引くための警報や、行うことにより効果が見込める保全作業の内容を知らせる表示等が含まれる。
 保全効果判定部123は、生産装置200に対する保全作業による効果の有無を判定する。保全効果判定部123は、例えば保全作業前と後との不良率(生産総数に対する不良品の割合)、もしくは、保全作業前と後との巻回体204の形状データ(図5参照)に基づいて、保全作業による効果の有無を判定する。
 設備状態診断モデル生成部124は、効果ありと判定された保全実績データMDと、当該保全作業が行われる前に生産された不良品の形状データと、に基づいて、設備状態診断モデルMを生成する。設備状態診断モデル生成部124が生成した設備状態診断モデルMは、上述の設備状態診断モデルデータベース112に登録される。
 <保全表示装置100における処理の全体の流れ>
 次に、図9及び図10を参照して、図6に示す機能構成を有する保全表示装置100における処理の全体の流れについて説明する。図9及び図10は、保全表示装置100における処理の全体の流れを概略的に説明するシーケンス図である。
 図9には、保全表示装置100における学習処理、及び学習処理で生成された学習済みモデルを用いた識別処理の概略が示されている。
 [学習処理]
 保全表示装置100における学習処理は、生産装置200によって不良品が生産された場合に、どのような形状データの不良品が、どのような保全作業によって改善されたか、が学習された学習済みモデル(設備状態診断モデルM)を生成するための処理である。従って、学習処理は、その開始前に保全作業が行われていることが前提となっている。
 ステップS11において、保全効果判定部123は、学習処理の開始前に行われた保全作業よりさらに前に生産された複数の巻回体204の生産実績データPD(図7A参照)に含まれる形状データ(図5参照)を取得し、これに基づいて保全作業前の不良率Nfbeforeを算出する。不良率Nfbeforeは、例えば保全作業前に製造された巻回体204のうち、不良と判定された巻回体204の数を、保全作業前の生産総数で除して算出される。
 ステップS12において、保全効果判定部123は、保全作業より後に生産された複数の巻回体204の生産実績データPDに含まれる形状データを取得し、これに基づいて保全作業後の不良率Nfafterを算出する。不良率Nfafterは、例えば保全作業後に製造された巻回体204のうち、不良と判定された巻回体204の数を、保全作業後の生産総数で除して算出される。
 ステップS13において、保全効果判定部123は、保全作業前後の不良率NfbeforeとNfafterとを比較し、保全作業の効果の有無を判定する。学習処理における、保全効果判定部123による保全作業の効果の判定処理についての詳細は後述する。
 ステップS13で保全作業の効果ありと判定した場合、保全効果判定部123は、ステップS14において、学習処理開始前に行われた保全作業の内容を示す保全実績データMD(図8参照)を設備状態診断モデル生成部124に出力する。
 ステップS15において、設備状態診断モデル生成部124は、効果ありと判定された保全実績データMDを用いて、設備状態診断モデルMを生成する。設備状態診断モデルMの詳細については後述する。
 ステップS16において、設備状態診断モデル生成部124は、生成した設備状態診断モデルMを設備状態診断モデルデータベース112(図6参照)に登録する。
 以上説明したステップS11からステップS16までの処理が、保全表示装置100の学習処理である。
 [識別処理]
 以下説明する識別処理は、新たに生産された複数の巻回体204の断面形状を示す形状データに基づいて、生産装置200に異常、または異常の予兆が生じているか否かを、学習処理で生成された設備状態診断モデルMを用いて識別する処理である。
 ステップS17において、設備状態診断部121は、新たに生産された複数の巻回体の形状データ(以後、新たな形状データ)を取得する。
 ステップS18において、設備状態診断部121は、新たな形状データ及び設備状態診断モデルMを用いて、一致度Cを算出する。一致度Cは、新たな形状データと、設備状態診断モデルMに含まれる過去の形状データとが一致する度合いを示す値である。すなわち、一致度Cが大きいほど、生産装置200に異常または異常の予兆が生じており、新たに生産された巻回体204が不良品となる確率が高くなっていることになる。
 ステップS19において、報知判定部122は、一致度Cが所定の閾値以上である場合に、保全表示装置100のユーザに対して報知が必要であると判定する。一致度Cが所定の閾値以上である場合とは、生産装置200に異常、または異常の予兆が発生しており、改めて保全作業が必要である場合である。
 ステップS110において、報知判定部122は、ユーザに報知すべき保全作業の内容を報知部130に対して出力する。ユーザに報知すべき保全作業の内容は、一致度Cが所定の閾値以上であった設備状態診断モデルMに基づいて決定される。
 ステップS111及びS112において、報知部130はユーザに対して保全作業を行うべき旨の報知を行う。ステップS111では、警報部131が警報を発する。また、ステップS112では、表示部132が、ユーザに対して報知すべき保全作業の内容等を表示する。なお、図9では、ステップS111における警報、及びステップS112における保全作業の内容表示が両方行われる例が示されているが、例えば警報は発令されず、保全作業の内容表示のみが行われてもよい。
 このように、ステップS111及びS112における報知によって、報知を受けた作業者は、報知された保全作業の内容に基づいて、生産装置200に対する保全作業を実行することになる。
 以上説明したステップS17からステップS112までの処理が、学習処理で生成された学習済みモデルを用いた保全表示装置100の識別処理である。
 図10には、保全表示装置100における更新処理、及び更新処理で更新された学習済みモデルを用いた識別処理の概略が示されている。
 [更新処理]
 保全表示装置100における更新処理は、上述した学習処理より後に、新たに保全作業が行われた場合、当該保全作業による保全作業の結果に基づいて、学習済みモデル(設備状態診断モデルM)を更新する処理である。すなわち、更新処理は、その開始前に保全作業が行われていることが前提となっている。
 ステップS21において、保全効果判定部123は、保全作業前に生産された複数の巻回体204の生産実績データPD(図7A参照)に含まれる形状データ(図5参照)、及び、設備状態診断モデルデータベース112に登録された設備状態診断モデルMを用いて、保全作業前の一致度Cbeforeを算出する。
 ステップS22において、保全効果判定部123は、保全作業より後に生産された複数の巻回体204の生産実績データに含まれる形状データ、及び、設備状態診断モデルデータベース112に登録された設備状態診断モデルMに含まれる過去の形状データを用いて、保全作業後の一致度Cafterを算出する。
 ステップS23において、保全効果判定部123は、保全作業前後の一致度CbeforeとCafterとを比較し、保全作業の効果の有無を判定する。更新処理における、保全効果判定部123による保全作業の効果の判定処理についての詳細は後述する。
 ステップS23で保全作業の効果ありと判定した場合、保全効果判定部123は、ステップS24において、更新処理開始前に行われた保全作業の内容を示す保全実績データMDを設備状態診断モデル生成部124に出力する。
 ステップS25において、設備状態診断モデル生成部124は、効果ありと判定された保全実績データMDを用いて、設備状態診断モデルMを更新する。設備状態診断モデルMの更新処理の詳細については後述する。
 ステップS26において、設備状態診断モデル生成部124は、生成した設備状態診断モデルMを用いて、設備状態診断モデルデータベース112(図6参照)を更新する。
 以上説明したステップS21からステップS26までの処理が、保全表示装置100の更新処理である。
 [識別処理]
 以下説明する識別処理は、新たに生産された複数の巻回体204の断面形状を示す形状データに基づいて、生産装置200に異常、または異常の予兆が生じているか否かを、更新処理で更新された設備状態診断モデルMを用いて識別する処理である。
 ステップS27において、設備状態診断部121は、新たに生産された複数の巻回体の形状データ(以後、新たな形状データ)を取得する。
 ステップS28において、設備状態診断部121は、新たな形状データ及び設備状態診断モデルMを用いて、一致度Cを算出する。一致度Cは、新たな形状データと、設備状態診断モデルMに含まれる過去の形状データとが一致する度合いを示す値である。
 ステップS29において、報知判定部122は、一致度Cが所定の閾値以上である場合に、保全表示装置100のユーザに対して報知が必要であると判定する。一致度Cが所定の閾値以上である場合とは、生産装置200に異常、または異常の予兆が発生しており、改めて保全作業が必要である場合である。
 ステップS210において、報知判定部122は、ユーザに報知すべき保全作業の内容を報知部130に対して出力する。ユーザに報知すべき保全作業の内容は、一致度Cが所定の閾値以上であった設備状態診断モデルMに基づいて決定される。
 ステップS211及びS212において、報知部130はユーザに対して保全作業を行うべき旨の報知を行う。ステップS211では、警報部131が警報を発する。また、ステップS212では、表示部132が、ユーザに対して報知すべき保全作業の内容等を表示する。なお、図10では、ステップS211における警報、及びステップS212における保全作業の内容表示が両方行われる例が示されているが、例えば警報は発令されず、保全作業の内容表示のみが行われてもよい。
 ステップS211及びS212における報知を受けた作業者は、報知された保全作業の内容に基づいて、生産装置200に対する保全作業を実行する。
 以上説明したステップS27からステップS212までの処理が、保全表示装置100の識別処理である。なお、図10に示すステップS27からステップS212までの識別処理は、図9に示すステップS17からステップS112までの識別処理と実質的に同じ処理である。
 <各処理の詳細>
 以下では、図9及び図10に示す学習処理、識別処理、及び更新処理のそれぞれについて詳細に説明する。
 [学習処理]
 まず、保全効果判定部123及び設備状態診断モデル生成部124による学習処理について説明する。
 (保全効果判定部123の処理)
 以下では、学習処理における、保全効果判定部123が実行する処理(図9のステップS11からステップS14の処理)について説明する。図11は、学習処理において、保全効果判定部123が実行する処理について説明するためのフローチャートである。
 ステップS31において、保全効果判定部123は、生産実績データベース111に登録されている生産実績データのうち、学習処理の前に保全作業が行われた時刻から、所定時間前までに生産された巻回体204の生産実績データをすべて含む生産実績データリストPLbeforeを生産実績データベース111から読み出す。所定時間は、あらかじめ設定された長さの時間であり、ある程度以上の数の巻回体204が製造されるために必要な時間である。
 ステップS32において、保全効果判定部123は、生産実績データリストPLbeforeに含まれる生産実績データに基づいて、保全前不良率Nfbeforeを算出する。上述したように、保全前不良率Nfbeforeは、生産実績データリストPLbeforeに含まれる生産実績データの形状データ及び検査結果に基づいて、不良と判定された巻回体204の数を、保全作業前の生産総数で除して算出される。
 ステップS33において、保全効果判定部123は、保全が行われた時刻から所定時間後までに生産された巻回体204の生産実績データをすべて含む生産実績データリストPLafterを生産実績データベース111から読み出す。
 ステップS34において、保全効果判定部123は、生産実績データリストPLafterに含まれる生産実績データに基づいて、保全後不良率Nfafterを算出する。上述したように、保全後不良率Nfafterは、生産実績データリストPLafterに含まれる生産実績データの形状データ及び検査結果に基づいて、不良と判定された巻回体204の数を、保全作業後の生産総数で除して算出される。
 ステップS35において、保全効果判定部123は、保全前不良率Nfbeforeと保全後不良率Nfafterとの差分を取り、この差分が所定の閾値Thより大きいか否かを判定する。差分が閾値Thより大きい場合(ステップS35:YES)、保全効果判定部123は処理をステップS36に進め、そうでない場合(ステップS35:NO)、処理をステップS37に進める。
 ステップS36において、保全効果判定部123は、保全前不良率Nfbeforeより保全後不良率Nfafterの方が小さくなっていることから、保全作業の効果ありと判定する。ここで言う保全作業とは、学習処理の前、すなわち図9のステップS11より前に行われた保全作業である。
 一方、ステップS37において、保全効果判定部123は、保全前不良率Nfbeforeより保全後不良率Nfafterの方が小さくなっていないことから、保全作業の効果なし、あるいは効果が非常に小さいと判定する。
 このように、保全効果判定部123は、学習処理において、学習処理より前に行われた保全作業の効果があったか否かを判定する。
 図12A及び図12Bは、学習処理における保全作業の効果を判定する様子を説明するための概念図である。図12Aは、保全作業の効果ありと判定される場合の例を、図12Bは、保全作業の効果なしと判定される場合の例を、それぞれ示している。
 図12A及び図12Bに示す例では、保全前に生産された5つの巻回体のうち、2つが不良と判定されている。すなわち、保全前不良率Nfbeforeは40%である。図12Aに示す例では、保全後に生産された5つの巻回体のうち、不良と判定される巻回体は0となっている(保全後不良率Nfafter=0)。一方、図12Bに示す例では、保全後に生産された5つの巻回体のうち、不良と判定される巻回体は保全前と変わらず、2つとなっている(保全後不良率Nfafter=40%)。
 従って、図12Aに示す例では、保全前不良率Nfbeforeと保全後不良率Nfafterとの差分は40%である。一方、図12Bに示す例では、保全前不良率Nfbeforeと保全後不良率Nfafterとの差分は0である。従って、例えば保全効果の有無を判定する閾値Thが例えば20%である場合、図12Aに示す例では保全作業の効果ありと判定され、図12Bに示す例では保全作業の効果なしと判定される。
 (設備状態診断モデル生成部124の処理)
 次に、学習処理における、設備状態診断モデル生成部124が実行する処理(図9のステップS15及びS16の処理)について説明する。図13は、学習処理において、設備状態診断モデル生成部124が実行する処理について説明するためのフローチャートである。
 ステップS41において、設備状態診断モデル生成部124は、保全効果判定部123において効果があると判定された保全作業の保全実績データMDを読み出す。
 ステップS42において、設備状態診断モデル生成部124は、生産実績データベース111から、保全前生産実績データリストPLbeforeを読み出す。なお、ここで設備状態診断モデル生成部124によって読み出される保全前生産実績データリストPLbeforeは、保全効果判定部123の処理において読み出される保全前の生産実績データリストPLbeforeと同じものである(図11のステップS31参照)。
 ステップS43において、設備状態診断モデル生成部124は、読み出した保全実績データMDと、生産実績データリストPLbeforeに含まれる生産実績データPDと、を用いて設備状態診断モデルMnewを生成する。
 ステップS44において、設備状態診断モデル生成部124は、新たに生成した設備状態診断モデルMnewを設備状態診断モデルデータベース112に登録する。
 このように、学習処理においては、どのような形状データの不良品が、どのような保全作業によって改善されたか、が学習された設備状態診断モデルMnewが新たに生成され、設備状態診断モデルデータベース112に登録される。
 [識別処理]
 次に、設備状態診断部121及び報知判定部122による識別処理について説明する。
 (設備状態診断部121の処理)
 以下では、識別処理における、設備状態診断部121が実行する処理(図9のステップS17及びステップS18の処理)について説明する。図14は、識別処理において、設備状態診断部121が実行する処理について説明するためのフローチャートである。
 ステップS51において、設備状態診断部121は、生産実績データベース111に新たな生産実績データPDnewが登録されたか否かを判定する。新たな生産実績データPDnewが登録されていない場合(ステップS51:NO)、設備状態診断部121は、ステップS51を繰り返す。新たな生産実績データPDnewが登録されていた場合(ステップS51:YES)、設備状態診断部121は、処理をステップS52に進める。
 ステップS52において、設備状態診断部121は、新たに登録された生産実績データPDnewに基づいて、生産実績データベース111から生産実績データリストPLを抽出する。生産実績データリストPLは、生産実績データベース111に登録されている生産実績データPDのうち、新たに登録された生産実績データPDnewの生産日時から所定時間前までに生産された巻回体204の生産実績データPDを抽出してリスト化したものである。すなわち、生産実績データリストPLには、少なくとも新たに登録された生産実績データPDnewが含まれている。
 ステップS53において、設備状態診断部121は、生産実績データリストPLに含まれる形状データと、設備状態診断モデルデータベース112から読み出した設備状態診断モデルMに含まれる過去の形状データとを用いて、一致度Cを生成する。
 より詳細には、設備状態診断部121は、生産実績データリストPLに含まれる1以上の生産実績データから、それぞれ形状データ(図5参照)を抽出する。一方、設備状態診断部121は、設備状態診断モデルデータベース112に登録されている、複数の設備状態診断モデルMを抽出する。複数の設備状態診断モデルMは、それぞれ異なる保全作業に対応している。
 設備状態診断部121は、1以上の生産実績データから抽出された形状データと、複数の設備状態診断モデルMとの全ての組み合わせにおいて、複数の一致度Cを算出する。
 (報知判定部122の処理)
 以下では、識別処理における、報知判定部122の実行する処理(図9のステップS19からステップS112の処理)について説明する。図15は、識別処理において、報知判定部122が実行する処理を説明するためのフローチャートである。
 ステップS61において、報知判定部122は、設備状態診断部121の生成した複数の一致度Cに基づいて、保全グループ毎に一致度Cを集計する。保全グループとは、保全作業の内容に対応するグループである。なお、本実施の形態では保全作業の内容毎に分けられたグループを保全グループとして説明したが、本発明はこれに限定されず、保全グループは例えば保全作業において交換される部品の品番等毎に分けられたグループであってもよい。
 以下の説明において、保全グループ毎に一致度Cを集計した結果を集計値Aとする。集計値Aを生成する方法は、複数種類の集計方法の中から適宜決定されればよい。複数種類の集計方法の具体例としては、例えば単に一致度Cを合計する方法、一致度Cの平均を取る方法、一致度Cの中から最大値を選択する方法、上位所定数の一致度Cを抽出して平均を取る方法等が挙げられる。
 ステップS62において、報知判定部122は、保全案リストMLを生成する。保全案リストMLとは、保全グループのリストであり、例えば保全グループは集計値Aが大きい順に並べられている。図16は、保全案リストMLの具体例を示す図である。
 図16に示すように、保全案リストMLには、「保全案ID」、「設備」、「保全案」、及び「集計値」等の各データが含まれる。「保全案ID」データは、集計値の大きさによって並べ替えられた保全グループ毎に与えられた識別子である。「保全案ID」データとしては、例えば集計値が大きいほど若い番号が与えられる。「保全案」データは、保全グループに対応する保全の内容を示すデータである。「集計値」データは、保全グループ毎に集計された集計値Aの値を示すデータである。
 図5を参照して説明したように、第1データが示す上端面の位置の連続が、第2データが示す上端面の位置の連続に交差している場合、不良の原因は第1供給リール50又は第1貼合ロール205Aにあることが分かっている。そのため、「保全案」データには、第1供給リール50又は第1貼合ロール205Aの保全に関する内容を示すデータが列挙されている。
 集計値Aは一致度Cを集計した値であるため、一致度Cと同様の性質を有する。このため、集計値Aが大きいほど、その保全グループの保全内容が、対象の生産装置200に対して行われる必要性が高いことになる。また、保全案リストMLは集計値Aの大きい順に並べられた保全グループのリストであるため、保全案リストMLの上位にある保全グループほど対象の生産装置200に対する保全の必要性が高いことになる。
 ステップS63において、報知判定部122は、保全グループ毎に集計値Aが所定の予兆閾値Thより大きいか否かを判定する。所定の予兆閾値Thとは、生産装置200に異常が発生する予兆が生じていることが想定される集計値の最小値である。なお、本実施の形態において、生産装置200の異常とは、例えば生産装置200が検査結果「不良」の巻回体204を所定割合以上生産することを意味する。また、生産装置200の異常の予兆とは、例えば生産装置200が検査結果「可」の巻回体204を所定数以上生産することを意味する。所定の予兆閾値Thは、例えば過去の保全実績データMD等に基づいて経験的に決定されればよい。
 集計値Aが予兆閾値Thより大きい保全グループが保全案リストMLに1つでも含まれる場合(ステップS63:YES)、報知判定部122は、処理をステップS64に進める。集計値Aが予兆閾値Thより大きい保全グループが保全案リストMLに1つも含まれない場合(ステップS63:NO)、報知判定部122は、報知を行う必要がないとして、処理を終了する。
 ステップS64において、報知判定部122は、保全案リストMLに含まれる保全グループのうち、集計値Aが所定の異常閾値Thより大きい保全グループがあるか否かを判定する。所定の異常閾値Thとは、予兆の段階を通り過ぎて、生産装置200に異常が生じていることが想定される集計値の最小値である。このため、異常閾値Thは予兆閾値Thより大きな値に、例えば過去の保全実績データMD等に基づいて経験的に決定される。集計値Aが異常閾値Thより大きい保全グループが保全案リストMLに含まれる場合(ステップS64:YES)、報知判定部122は、処理をステップS66に進める。集計値Aが異常閾値Thより大きい保全グループが保全案リストMLに含まれない場合(ステップS64:NO)、報知判定部122は、処理をステップS65に進める。
 ステップS65において、報知判定部122は、ステップS63において集計値Aが予兆閾値Thより大きいと判定された保全グループに対応する保全内容を、報知部130の表示部132に報知させる。より詳細には、報知判定部122は、例えば表示部132に「以下の保全内容を実行して下さい。」等のメッセージとともに、実行が推奨される保全作業の内容を表示させる。なお、実行が推奨される保全作業の内容は、図16に示した保全案リストMLに含まれる「保全案」データに対応した内容である。
 また、報知判定部122は、保全作業内容とともに、当該保全内容の保全グループに対応づけられた保全案IDを報知する。保全作業を行った作業員が保全実績データMDを入力するときに、保全実績データMDと、保全を行う契機となった保全案IDと、を対応付けて入力することで、入力された保全実績データMDが、保全表示装置100の報知を契機として実行された保全作業に対応するデータであるか否かが容易に判別可能となる。
 ステップS66において、報知判定部122は、ステップS65と同様に、表示部132に保全作業の内容を表示させるとともに、警報部131に、対象の生産装置200に異常が生じていることを報知するための警報を発させる。対象の生産装置200に異常の予兆ではなく、異常が生じている場合、緊急の保全作業が必要な事態である。このため、報知判定部122は、表示部132による保全作業の内容表示だけでなく、警報部131によって警報を発させ、保全表示装置100のユーザに対して速やかに異常の発生を通知する。
 このように、識別処理においては、新たに生産された巻回体の204の生産実績データPD(特に形状データ)、及び設備状態診断モデルMを用いて、生産装置200に異常(不良品が所定割合以上生産される事態)や異常の予兆が発生しているか否かが判定される。そして、異常または異常の予兆が発生していると判定された場合、ユーザに対して報知が行われる。これにより、ユーザは生産装置200に異常が発生している場合には異常を速やかに知ることができるとともに、異常を改善するために行うべき保全作業の内容を知ることができる。
 [更新処理]
 次に、保全効果判定部123及び設備状態診断モデル生成部124による更新処理について説明する。
 (保全効果判定部123の処理)
 以下では、更新処理における、保全効果判定部123が実行する処理(図10のステップS21からステップS24の処理)について説明する。図17は、更新処理において、保全効果判定部123が実行する処理について説明するためのフローチャートである。
 ステップS71において、保全効果判定部123は、記憶部110の保全実績データベース113に新たな保全実績データMDnewが登録されたか否かを判定する。新たな保全実績データMDnewが登録されていないと判定した場合(ステップS71:NO)、保全効果判定部123は、ステップS71を繰り返す。新たな保全実績データMDnewが登録されたと判定した場合(ステップS71:YES)、保全効果判定部123は、処理をステップS72に進める。
 ステップS72において、保全効果判定部123は、新たに登録された保全実績データMDnewに含まれる、「保全日時」データ(図8参照)に基づいて、新たに登録された保全実績データMDnewに対応する保全が行われてから現在までに所定時間が経過したか否かを判定する。
 保全作業の実行時刻から所定時間が経過したと判定した場合(ステップS72:YES)、保全効果判定部123は、処理をステップS73に進める。保全作業の実行時刻からまだ所定時間が経過していないと判定した場合(ステップS72:NO)、保全効果判定部123は、ステップS72の処理を繰り返す。
 ステップS73において、保全効果判定部123は、保全作業から所定時間前までに生産された巻回体204の生産実績データPDをすべて含む保全前生産実績データリストPLbeforeを生産実績データベース111から読み出す。
 ステップS74において、保全効果判定部123は、新たな保全実績データMDnewに対応する保全内容の保全グループに属する設備状態診断モデルMを設備状態診断モデルデータベース112から読み出し、読み出した設備状態診断モデルMと、生産実績データリストPLbeforeとに基づいて、保全前一致度Cbeforeを生成する。保全前一致度Cbeforeの生成方法については、図14のステップS53における、設備状態診断部121による一致度Cの生成方法と同様である。
 ステップS75において、保全効果判定部123は、保全作業から所定時間後までに生産された巻回体204の生産実績データPDをすべて含む生産実績データリストPLafterを生産実績データベース111から読み出す。
 ステップS76において、保全効果判定部123は、新たに保全実績データMDnewに対応する保全内容の保全グループに属する設備状態診断モデルMを設備状態診断モデルデータベース112から読み出し、読み出した設備状態診断モデルMと、生産実績データリストPLafterとに基づいて、保全後の一致度Cafterを生成する。一致度Cafterの生成方法については、図14のステップS53における設備状態診断部121による一致度Cの生成方法と同様である。
 ステップS77において、保全効果判定部123は、保全前の一致度Cbeforeと保全後の一致度Cafterとの差分を取り、この差分が所定の閾値Thより大きいか否かを判定する。差分が閾値Thより大きい場合(ステップS77:YES)、保全効果判定部123は処理をステップS78に進め、そうでない場合(ステップS77:NO)、処理をステップS79に進める。所定の閾値Thは、過去の保全作業の実績等に基づいて、適宜決定されればよい。
 ステップS78において、保全効果判定部123は、保全前の一致度Cbeforeより保全後の一致度Cafterの方が小さくなっていることから、報知判定部122により報知された保全内容に基づいて行われた保全作業の効果ありと判定する。
 ステップS79において、保全効果判定部123は、保全前の一致度Cbeforeより保全後の一致度Cafterの方が小さくなっていないことから、報知判定部122により報知された保全内容に基づいて行われた保全作業の効果がない、あるいは非常に小さいと判定する。
 図18A及び図18Bは、更新処理における保全作業の効果を判定する様子を説明するための概念図である。図18Aは、保全作業の効果ありと判定される場合の例を、図18Bは、保全作業の効果なしと判定される場合の例を、それぞれ示している。
 図18A及び図18Bに示す例では、保全前に生産された巻回体204の形状データ、及び設備状態診断モデルMにより、保全前一致度Cbefore=0.90が算出されている。
 そして、図18Aに示す例では、保全後に生産された巻回体204の形状データ、及び設備状態診断モデルMにより、保全後一致度Cafter=0.20が算出されている。一方、図18Bに示す例では、保全後に生産された巻回体204の形状データ、及び設備状態診断モデルMにより、保全後一致度Cafter=0.90が算出されている。
 従って、図18Aに示す例では、保全前一致度Cbeforeと保全後一致度Cafterとの差分は0.70となっている。一方、図18Bに示す例では、保全前一致度Cbeforeと保全後一致度Cafterとの差分は0となっている。従って、例えば保全効果の有無を判定する閾値Thが0.30である場合、図18Aに示す例では保全作業の効果ありと判定され、図18Bに示す例では保全作業の効果なしと判定される。
 (設備状態診断モデル生成部124の処理)
 次に、更新処理における、設備状態診断モデル生成部124が実行する処理(図10のステップS25及びS26の処理)について説明する。図19は、更新処理において、設備状態診断モデル生成部124が実行する処理について説明するためのフローチャートである。
 ステップS81において、設備状態診断モデル生成部124は、保全効果判定部123において効果があると判定された保全作業の保全実績データMDnewを読み出す。
 ステップS82において、設備状態診断モデル生成部124は、生産実績データベース111から、保全前生産実績データリストPLbeforeを読み出す。なお、ここで設備状態診断モデル生成部124によって読み出される保全前生産実績データリストPLbeforeは、保全効果判定部123の処理において読み出される保全前の生産実績データリストPLbeforeと同じものである(図11のステップS31参照)。
 ステップS83において、設備状態診断モデル生成部124は、読み出した保全実績データMDと、生産実績データリストPLbeforeに含まれる生産実績データPDと、を用いて新たな設備状態診断モデルMnewを生成する。
 ステップS84において、設備状態診断モデル生成部124は、新たな設備状態診断モデルMnewを用いて、設備状態診断モデルデータベース112に既に登録されている設備状態診断モデルMを更新する。
 このように、更新処理においては、学習処理において生成された設備状態診断モデルMを用いて新たな設備状態診断モデルMnewが生成され、新たな設備状態診断モデルMnewを用いて設備状態診断モデルデータベース112に既に登録されている設備状態診断モデルMが更新される。このように、効果があった保全作業に基づいて新たな設備状態診断モデルMnewを用いて設備状態診断モデルデータベース112の設備状態診断モデルMが更新されることにより、設備状態診断部121における生産装置200の設備状態の診断精度が次第に向上する。
 <第1の実施の形態の保全表示装置100の作用・効果>
 以上説明したように、保全表示装置100は、報知判定部122と、モデル生成部の一例である設備状態診断モデル生成部124とを有する。報知判定部122は、巻回体204の半径方向に沿って読み取られた第1端面の位置を表す第1データ、第2端面の位置を表す第2データをセンサとしての検査機207から取得する。そして報知判定部122は、第1データが示す第1端面の位置の連続が、第2データが示す第2端面の位置の連続に交差しているか否かに基づいて、巻回体204が不良であるか否かを判定する。巻回体204が不良である場合、報知判定部122は、不良の原因は第1供給リール50又は第1貼合ロール205Aにある旨の情報を保全のために表示部132に出力する。設備状態診断モデル生成部124は、第1供給リール50を保全する前後の第1データ及び第2データに基づき、第1供給リール50が保全される前の巻回体204の第1不良率と第1供給リール50を保全した後の巻回体204の第2不良率との第1差分を算出する。そして設備状態診断モデル生成部124は、第1差分が所定値未満と判断された場合、第1供給リール50が保全される前に読み取られた第1データ及び第2データは学習済みモデルを生成または更新するためには用いない。一方、第1差分が所定値以上と判断された場合、第1供給リール50が保全される前に読み取られた第1データ及び第2データを用いて学習済みモデル(設備状態診断モデルM)を生成または更新する。
 一方、設備状態診断モデル生成部124は、第1貼合ロール205Aが保全される前の第1データ及び第2データを学習済みモデルに入力して得られる巻回体204の不良が改善される第3確率を算出する。また設備状態診断モデル生成部124は、第1貼合ロール205Aを保全した後の第1データ及び第2データを学習済みモデルに入力して得られる巻回体204の不良が改善される第4確率を算出する。そして設備状態診断モデル生成部124は、第3確率と第4確率との第2差分を算出する。第2差分が所定値未満と判断された場合、第1貼合ロール205Aが保全される前に読み取られた第1データ及び第2データは学習済みモデルを作成または更新するためには用いない。一方、第2差分が所定値以上と判断された場合、第1貼合ロール205Aが保全される前の第1データ及び第2データを用いて学習済みモデルを作成または更新する。
 以上のように、第1の実施の形態に係る保全表示装置100によれば、生産装置200の設備状態を診断するための設備状態診断モデルMを学習により生成する学習処理と、設備状態診断モデルMを用いて、生産装置200に異常または異常の予兆が発生しているか否かを識別し、異常または異常の予兆が発生している場合にはこれを報知する識別処理と、報知に基づいて行われた保全作業に対応する保全実績データMDに基づいて設備状態診断モデルMを更新する更新処理と、を実行することができる。
 より詳細には、学習処理においては、保全表示装置100は、新たに登録された保全実績データMDと、保全作業の前後に生産された巻回体204の生産実績データPDに含まれる形状データと、に基づいて保全作業の効果の有無を判定し、効果があると判定された保全作業に対応する保全実績データMDと形状データとを用いて設備状態診断モデルMを生成する。
 また、識別処理においては、保全表示装置100は、保全作業後に生産された巻回体204の形状データと設備状態診断モデルMとの一致度Cを保全グループ毎に算出し、一致度Cの大きさに基づいて、警報の発令と保全作業の内容の報知とを行うか、保全作業の内容の報知のみ行うか、報知自体を行わないか、を判定する。
 また、更新処理においては、保全表示装置100は、新たに登録された保全実績データMDと、保全作業の前後に生産された巻回体204の生産実績データPDに含まれる形状データと、に基づいて保全作業の効果の有無を判定し、効果があると判定された保全作業に対応する保全実績データMDと形状データとを用いて新たな設備状態診断モデルMnewを生成し、新たな設備状態診断モデルMnewを用いて設備状態診断モデルMを更新する。
 このような構成により、実際に行われた保全作業のうち、効果がある(不良率が下がった)保全作業に基づいて生成した学習済みモデル(設備状態診断モデルM)を用いて生産装置200の状態を適切に診断することができる。また、学習済みモデルを随時更新するため、診断の精度を向上させることができる。さらに、生産装置200に異常が発生したと診断した場合には警報を発して緊急の対応をユーザに行わせることができるとともに、異常の予兆が発生したと診断した場合には、改善を見込める保全作業の内容をユーザに報知するので、生産装置200における不良品の発生率が低い内に保全作業が実行されうる。
 本実施の形態に係る保全表示装置は、報知部と、保全効果判定部と、設備状態診断モデル生成部と、を有する。報知部は、過去に行われた保全作業毎に、保全作業の内容とその保全作業より前の生産実績データとが関連づけられてデータベースに登録された設備状態診断モデルと、新たに入力された生産実績データとに基づいて、保全作業の内容を報知する。保全効果判定部は、保全作業が行われた時点より前の生産実績データと、保全作業が行われた時点より後の生産実績データとに基づいて、保全作業の効果があったか否かを判定する。設備状態診断モデル生成部は、効果があったと判定された保全作業が行われた時点より前の生産実績データと、効果があったと判定された保全作業の内容とに基づいて、新たな設備状態診断モデルを生成する。
 本実施の形態に係る保全表示装置は、新たに登録された生産実績データと、設備状態診断モデルに含まれる保全作業前の生産実績データと、が一致する度合いである設備状態診断指標を生成する設備状態診断部をさらに有する。そして、報知部は、設備状態診断指標に基づいて保全作業の内容の報知を行う。
 本実施の形態に係る保全表示装置において、設備状態診断モデル生成部は、効果があると判定された保全作業が行われた時点より前の生産実績データと、その保全作業に関する保全実績データと、を用いて、機械学習により設備状態診断モデルを生成する。
 本実施の形態に係る保全表示装置は、報知部が報知した保全作業の内容に基づかない保全作業が実行され、その保全作業に関する保全実績データが新たに入力された場合に、生産実績データに含まれる生産設備の生産物の検査結果に関するデータに基づいて、新たに入力された保全実績データの保全作業が行われた時点から所定時間前までの間の生産実績データのうち検査結果が不良である不良率を算出する。さらに、新たに入力された保全実績データの保全作業が行われた時点から所定時間後までの間の生産実績データのうち検査結果が不良である不良率を算出する。そして、保全効果判定部は、保全作業前の不良率と保全作業後の不良率との差分を算出し、差分の大きさに基づいて保全作業の効果があったか否かを判定する。
 (第2の実施の形態)
 以下では、本発明の第2の実施の形態について説明する。図20は、第2の実施の形態に係る保全表示装置100Aの構成を例示した図である。第2の実施の形態に係る保全表示装置100Aは、サーバ10Aの制御部120Aが有する保全効果判定部123Aの行う処理が上記説明した第1の実施の形態に係る保全効果判定部123と異なっている。
 以下では、第1の実施の形態との相違点について説明を行う。第1の実施の形態と同様の構成については、第1の実施の形態と同様の符号を付して説明し、第1の実施の形態と異なる構成については符号に「A」を付して説明する。
 第1の実施の形態では、保全表示装置100のユーザが、保全表示装置100により報知された内容以外の保全作業を行うことについては想定していなかった。しかしながら、実際には、生産装置200の運用上、現場の判断等によって適宜必要な保全作業(保全表示装置100の報知した保全内容以外の保全作業)が随時行われうる。本第2の実施の形態では、このように保全表示装置100Aが報知した保全内容以外の保全作業が行われる場合にも対応できる保全表示装置100Aについて説明する。
 図21は、第2の実施の形態において、保全効果判定部123Aが実行する処理について説明するためのフローチャートである。
 図21のステップS91において、保全効果判定部123Aは、記憶部110の保全実績データベース113に新たに保全実績データMDnewが登録されたか否かを判定する。新たな保全実績データMDnewが登録されていないと判定した場合(ステップS91:NO)、保全効果判定部123Aは、ステップS91を繰り返す。新たな保全実績データMDnewが登録されていたと判定した場合(ステップS91:YES)、保全効果判定部123Aは、処理をステップS92に進める。
 ステップS92において、保全効果判定部123Aは、新たに登録された保全実績データMDnewに含まれる保全日時データに基づいて、新たに登録された保全実績データMDnewに対応する保全作業から所定時間が経過したか否かを判定する。所定時間は、第1の実施の形態にて説明した所定時間と同様、例えば保全作業が行われてから対象の生産装置200において、ある程度以上の数の巻回体204が製造されるために必要な時間である。
 保全作業から所定時間が経過したと判定した場合(ステップS92:YES)、保全効果判定部123Aは、処理をステップS93に進める。保全作業から所定時間が経過していないと判定した場合(ステップS92:NO)、保全効果判定部123Aは、ステップS92の処理を繰り返す。
 ステップS93において、保全効果判定部123Aは、新たに登録された保全実績データMDnewと対応付けられた保全案IDが存在するか否かを判定する。第1の実施の形態にて説明したように、報知判定部122は、保全作業内容とともに、当該保全内容の保全グループに対応づけられた保全案IDを報知する。これにより、保全作業を行った作業員が保全実績データMDを入力するときに、保全実績データMDと、保全を行う契機となった保全案IDと、が対応付けられる。本ステップS93では、このようにして、新たに登録された保全実績データMDnewが保全表示装置100Aによる報知を契機として行われた保全であるか否かを判定している。
 ステップS93において、新たに登録された保全実績データMDnewと対応付けられた保全案IDが存在する場合、その保全実績データMDnewに対応する保全作業は、保全表示装置100Aによる保全内容の報知を契機としたものであると判断される。また、新たに登録された保全実績データMDnewと対応付けられた保全案IDが存在しない場合、その保全実績データMDnewに対応する保全作業は、保全表示装置100Aによる保全内容の報知を契機としたものではないと判断される。
 ステップS93において、新たに登録された保全実績データMDnewに保全案IDが含まれていると判定された場合(ステップS93:YES)、保全効果判定部123Aは、処理をステップS94に進める。一方、保全実績データMDnewに保全案IDが含まれていないと判定した場合(ステップS93:NO)、保全効果判定部123Aは、処理をステップS95に進める。
 ステップS94は、新たに登録された保全実績データMDnewに対応する保全作業が保全表示装置100Aによる保全内容の報知を契機とした場合の処理である。このためステップS94において、保全効果判定部123Aは、保全表示装置100Aによる保全内容の報知を契機とした保全作業の効果の有無を判定する処理へと移行する。なお、保全表示装置100Aによる保全内容の報知を契機とした保全に対する保全効果判定処理は、上述した第1の実施の形態において図17を参照して説明した処理とほぼ同様であるため、説明を省略する。
 一方、ステップS95は、保全実績データMDnewに対応する保全作業が保全表示装置100Aによる保全内容の報知を契機としたものではない場合の処理である。このため、保全効果判定部123Aは、保全表示装置100Aを契機としない保全作業の効果の有無を判定する処理へと移行する。なお、保全表示装置100Aによる保全内容の報知を契機とした保全に対する保全効果判定処理は、上述した第1の実施の形態において図11を参照して説明した処理とほぼ同様であるため、説明を省略する。
 以上説明したように、第2の実施の形態に係る保全表示装置100Aによれば、保全表示装置100Aによる保全内容の報知を契機としたものではない保全作業が行われた場合でも、保全実績データMDnewを好適に登録することができる。なお、図21にて説明した保全効果判定部123Aの処理は、上述した学習処理または更新処理のいずれにおいても実行されうる。
 本実施の形態に係る保全表示装置は、新たに登録された保全実績データの保全作業が行われた時点から所定時間前までの間の生産実績データと、新たに入力された保全実績データの保全作業の契機となった報知における保全作業の内容が関連づけられた設備状態診断モデルと、に基づいて保全作業前の設備状態診断指標を生成する。そして、新たに入力された保全実績データの保全作業が行われた時点から所定時間後までの間の生産実績データと、新たに入力された保全実績データの保全作業の契機となった報知における保全作業の内容が関連づけられた設備状態診断モデルと、に基づいて保全作業後の設備状態診断指標を生成する。そして、保全効果判定部は、保全作業前の設備状態診断指標と保全作業後の設備状態診断指標との差分を算出し、差分の大きさに基づいて保全作業の効果があったか否かを判定する。
 (第3の実施の形態)
 以下、本発明の第3の実施の形態について説明する。図22は、第3の実施の形態に係る保全表示装置100Bの構成を例示した図である。第3の実施の形態に係る保全表示装置100Bは、サーバ10Bの記憶部110Bが効果なし設備状態診断モデルデータベース114をさらに有し、制御部120Bが報知判定部122B、保全効果判定部123B、及び設備状態診断モデル生成部124Bを有する点で上記説明した第1の実施の形態に係る保全表示装置100と異なっている。
 上述した第1の実施の形態において、設備状態診断モデル生成部124は、効果があると判定された保全実績データMDを用いて新たな設備状態診断モデルMnewを生成していた(図13参照)。第3の実施の形態においては、設備状態診断モデル生成部124Bは、保全の効果がないと判定された保全実績データMDも用いて、新たな設備状態診断モデルMnewを生成する。
 図23は、第3の実施の形態において、設備状態診断モデル生成部124Bが行う処理について説明するためのフローチャートである。なお、図23にて説明する処理は、学習処理または更新処理のいずれにおいても実行されうる。
 ステップS101において、設備状態診断モデル生成部124Bは、新たに登録された保全実績データMDnewを保全実績データベース113から読み出す。ここで、設備状態診断モデル生成部124Bは、保全効果判定部123Bによる効果の判定結果にかかわらず、保全実績データMDnewを読み出す。
 ステップS102において、設備状態診断モデル生成部124Bは、生産実績データベース111から、保全作業前の生産実績データリストPLbeforeを読み出す。
 ステップS103において、設備状態診断モデル生成部124Bは、読み出した保全実績データMDnewと、生産実績データリストPLbeforeに含まれる生産実績データPDと、を用いて、設備状態診断モデルMnewを生成する。
 ステップS104において、設備状態診断モデル生成部124Bは、新たに生成された設備状態診断モデルMnewのうち、効果なしと判定された保全実績データMDに基づいて生成されたモデルを、効果なし設備状態診断モデルデータベース114に登録する。一方、設備状態診断モデル生成部124Bは、新たに生成された設備状態診断モデルMnewのうち、効果ありと判定された保全実績データMDに基づいて生成されたモデルを、設備状態診断モデルデータベース112に登録する。
 このように、設備状態診断モデル生成部124Bは、効果があると判定された保全の保全実績データMDを用いた設備状態診断モデルMを生成するだけでなく、効果がないと判定された保全の保全実績データMDを用いた設備状態診断モデルMを生成する。
 このように生成された設備状態診断モデルMを用いて、設備状態診断部121及び報知判定部122Bによる識別処理が実行される。設備状態診断部121が実行する処理については、上述した第1の実施の形態において図14を参照して説明した処理とほぼ同様であるため、説明を省略する。
 以下では、第3の実施の形態の識別処理において、報知判定部122Bが実行する処理について説明する。図24は、第3の実施の形態において、報知判定部122Bが行う処理について説明するためのフローチャートである。
 ステップS111において、報知判定部122Bは、設備状態診断部121の生成した一致度Cを用いて、保全グループ毎に一致度Cを集計し、集計値Aを生成する。なお、第3の実施の形態において、各保全グループには、効果があると判定された保全作業か否かを示す情報(フラグ)が、保全効果判定部123Bによって関連づけられている。
 ステップS112において、報知判定部122Bは、集計値Aの大きい順に並べられた保全グループのリストである保全案リストMLを生成する。
 ステップS113において、報知判定部122Bは、保全案リストMLに含まれる保全グループ毎に、効果ありと判定されたか否かを判定する。上記したように、第3の実施の形態においては、設備状態診断部121によって保全グループ毎に効果があるか否かを示すフラグが関連づけられているので、報知判定部122Bはこのフラグを参照することで本ステップS113の処理を行う。報知判定部122Bは、効果ありと判定された保全作業の保全グループに関しては、処理をステップS114に進める。一方、報知判定部122Bは、効果なしと判定された保全作業の保全グループに関しては、処理をステップS117に進める。
 ステップS114において、報知判定部122Bは、効果ありと判定された保全グループ毎に、集計値Aが所定の予兆閾値Thより大きいか否かを判定する。集計値Aが予兆閾値Thより大きい保全グループが1つでも存在する場合(ステップS114:YES)、報知判定部122Bは、処理をステップS115に進める。集計値Aが予兆閾値Thより大きい保全グループが存在しない場合(ステップS115:NO)、報知判定部122Bは、処理を終了する。
 ステップS115において、報知判定部122Bは、効果ありと判定された保全グループのうち、集計値Aが所定の異常閾値Thより大きい保全グループがあるか否かを判定する。集計値Aが異常閾値Thより大きい保全グループが存在する場合(ステップS115:YES)、報知判定部122Bは、処理をステップS116に進める。集計値Aが異常閾値Thより大きい保全グループが存在しない場合(ステップS115:NO)、報知判定部122Bは、処理をステップS118に進める。
 ステップS116において、報知判定部122Bは、ステップS114において集計値Aが予兆閾値Thより大きいと判定された保全グループに対応する保全内容を報知するとともに、対象の生産装置200に異常が生じていることを報知するための警報を発報する。
 ステップS117において、報知判定部122Bは、効果なしと判定された保全の保全グループ毎に、集計値Aが所定の効果なし閾値Thieより大きいか否かを判定する。効果なし閾値Thieは、効果がないことを報知するべきと想定される集計値の最小値である。集計値Aが効果なし閾値Thieより大きい保全グループが存在する場合(ステップS117:YES)、報知判定部122Bは、処理をステップS118に進める。集計値Aが効果なし閾値Thieより大きい保全グループが存在しない場合(ステップS117:NO)、報知判定部122Bは、処理を終了する。
 ステップS118において、報知判定部122Bは、ステップS114において集計値Aが予兆閾値Thより大きいと判定された保全グループに対応する保全内容を報知する。同時に、報知判定部122Bは、ステップS117において集計値Aが効果なし閾値Thieより大きいと判定された保全グループに対応する保全内容を報知する。
 このような構成により、第3の実施の形態に係る保全表示装置100Bによれば、生産装置200を改善することができると想定される保全内容だけでなく、過去に実施されたが効果がなかった保全作業の内容についてユーザに報知することができる。これにより、ユーザは、効果がない保全作業を繰り返し行う事態を回避することができるので、保全に要する時間を短縮するとともに、保全に要する労力を軽減することができる。
 本実施の形態に係る保全表示装置において、設備状態診断モデル生成部は、効果がないと判定された保全作業が行われた時点より前の生産実績データと、その保全作業に関する保全実績データと、に基づいて、新たな設備状態診断モデルを生成する。報知部は、効果があると判定された保全作業の内容を効果がある保全作業として報知するとともに、効果がないと判定された保全作業に関する保全実績データに基づいて生成された設備状態診断モデルに関連づけられた保全作業の内容を、効果がない保全作業として報知する。
 (変形例)
 以上、図面を参照しながら本開示に係る実施の形態について説明したが、本開示はかかる例に限定されない。当業者であれば、特許請求の範囲に記載された範囲内において、各種の変更例または修正例に想到しうることは明らかであり、それらについても当然に本開示の技術的範囲に属するものと了解される。また、開示の趣旨を逸脱しない範囲において、上記実施の形態における各構成要素は任意に組み合わせてられてもよい。
 上述した実施の形態では、学習処理において、保全効果判定部123による保全作業の効果の有無の判定処理では、保全作業前後の不良率の差分が所定の閾値より大きいか否かによって効果の有無を判定していた(図12A及び図12Bを参照)。
 しかしながら、保全効果判定部123は、他の方法を用いて保全作業の効果の有無を判定してもよい。図25A及び図25Bは、学習処理における、保全効果判定部123による保全作業の効果の有無の判定方法の変形例を説明するための図である。
 図25A及び図25Bに示す例では、保全前不良率は参照せず、保全後不良率Nfafterが所定閾値(例えば20%)より大きいか否かに基づいて、効果の有無を判定している。図25Aに示す例ではNfafter=0%であり、所定閾値20%より小さいため、効果ありと判定される。一方、図25Bに示す例ではNfafter=40%であり、所定閾値20%より大きいため、効果なしと判定される。
 同様に、更新処理においても、保全効果判定部123は、上述した実施の形態とは異なる方法を用いて保全作業の効果の有無を判定してもよい。
 また、上述した実施の形態では、更新処理において、保全効果判定部123による保全作業の効果の有無の判定処理では、保全作業前後の一致度の差分が所定の閾値より大きいか否かによって効果の有無を判定していた(図18A及び図18Bを参照)。
 図26A及び図26Bは、更新処理における、保全効果判定部123による保全作業の効果の有無の判定方法の変形例を説明するための図である。
 図26A及び図26Bに示す例では、保全前一致度は参照せず、保全後一致度Cafterが所定閾値(例えば0.30)より大きいか否かに基づいて、効果の有無を判定している。図26Aに示す例ではCafter=0.20であり、所定閾値0.30より小さいため、効果ありと判定される。一方、図26Bに示す例ではCfafter=0.90であり、所定閾値0.30より大きいため、効果なしと判定される。
 上述した実施の形態では、説明のため、保全表示装置100(100A,100B)が記憶部110(110B)、制御部120(120A,120B)、及び報知部130を備える構成について説明したが、本発明はこれに限定されない。上述した実施の形態でも説明したが、本発明では、記憶部及び制御部が、互いに通信可能に構成されていれば、互いに別体に構成され、離れた位置に配置されていてもよい。また、報知部は生産装置に含まれていても、生産装置の外部に設置されていてもよい。また、報知部は記憶部及び制御部とネットワークを介して接続されていても、直接接続されていてもよい。
 このように、本発明に係る保全表示装置において、記憶部、制御部、及び報知部のそれぞれは互いに独立した別体の装置であって、かつ互いに独立して動作する装置であってもよい。また、記憶部、制御部、及び報知部のそれぞれは互いに通信可能であれば、配置される場所については特に限定されない。報知装置は例えば生産装置が配置される工場等に配置され、記憶部及び制御部は例えばクラウド上に設けられたクラウドサーバに含まれる構成であってもよい。
 また、上述した実施の形態では、制御部120(120A,120B)が、学習処理、更新処理、及び識別処理を全て行っていた。そして、識別処理において、制御部120(120A,120B)が報知部130を制御して報知処理を行っていた。なお、学習処理とは設備状態診断モデルMを生成する処理であり、更新処理とは設備状態診断モデルMを更新する処理である。また、識別処理とは設備状態診断モデルMを用いて新たに生産された複数の巻回体204に異常、または異常の予兆が生じているか否かを、設備状態診断モデルMを用いて識別する処理である。しかしながら、本発明はこれに限定されない。
 例えば、制御部は学習処理または更新処理のみを行い、報知部が制御部から設備状態診断モデルを受信して、受信した設備状態診断モデルを用いて識別処理を行うようにしてもよい。このような構成により、制御部と報知部との通信量の増大を抑えることができるとともに、複数の報知部が制御部に接続されている場合でも、識別処理の負荷を各報知部に分散できるので、制御部に処理が集中することによる処理の遅延を防止できる。
 本開示は、生産設備の保全に関する情報を表示する保全表示装置に有用である。
 10,10A,10B サーバ
 50 第1供給リール
 51 第2供給リール
 100,100A,100B 保全表示装置
 110,110B 記憶部
 111 生産実績データベース
 112 設備状態診断モデルデータベース
 113 保全実績データベース
 114 効果なし設備状態診断モデルデータベース
 120,120A,120B 制御部
 121 設備状態診断部
 122,122B 報知判定部
 123,123A,123B 保全効果判定部
 124,124B 設備状態診断モデル生成部
 130 報知部
 131 警報部
 132 表示部
 200 生産装置
 201 巻回部
 202 第1シート材
 203 第2シート材
 204 巻回体
 205A 第1貼合ロール
 205B 第2貼合ロール
 206 巻芯
 206M 巻芯回転駆動部
 207 検査機
 

Claims (24)

  1.  第1電極シートを供給する第1供給リールと、
     第2電極シートを供給する第2供給リールと、
     前記第1電極シート側に設けられた第1貼合ローラと、
     前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、
     前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、
     前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全のための学習済みモデルの生成方法であって、
     前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得し、
     前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差していると判断された場合、前記巻回体が不良であり、前記不良の原因は前記第1供給リール又は前記第1貼合ローラにある旨の情報を保全のために表示装置に出力し、
     前記第1供給リールを保全する前後の前記第1データ及び前記第2データに基づき、前記第1供給リールを保全した前の前記巻回体の第1不良率と前記第1供給リールを保全した後の前記巻回体の第2不良率との第1差分が所定値未満と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを生成するためには用いず、一方、前記第1差分が前記所定値以上と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データを用いて前記学習済みモデルを生成する、
     学習済みモデルの生成方法。
  2.  前記第1貼合ローラを保全する前後の前記第1データ及び前記第2データに基づき、前記第1貼合ローラを保全した前の前記巻回体の第3不良率と前記第1貼合ローラを保全した前の前記巻回体の第4不良率との第2差分が所定値未満と判断された場合、前記第1貼合ローラを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを生成するためには用いず、一方、前記第2差分が前記所定値以上と判断された場合、前記第1貼合ローラを保全した前に読み取られた前記第1データ及び前記第2データを用いて前記学習済みモデルを生成する、
      請求項1記載の学習済みモデルの生成方法。
  3.  前記第1電極シートは電池の正極シートであり、前記第2電極シートは電池の負極シートである、
     請求項1記載の学習済みモデルの生成方法。
  4.  前記第1電極シートは電池の負極シートであり、前記第2電極シートは電池の正極シートである、
     請求項1記載の学習済みモデルの生成方法。
  5.  第1電極シートを供給する第1供給リールと、
     第2電極シートを供給する第2供給リールと、
     前記第1電極シート側に設けられた第1貼合ローラと、
     前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、
     前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、
     前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全のための学習済みモデルの生成方法であって、
     前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得し、
     前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差していると判断された場合、前記巻回体が不良であり、前記不良の原因は前記第1供給リール又は前記第1貼合ローラにある旨の情報を保全のために表示装置に出力し、
     前記第1供給リールを保全する前後の前記第1データ及び前記第2データに基づき、前記第1供給リールを保全した後の前記巻回体の第5不良率が所定値以上と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを生成するためには用いず、一方、前記第5不良率が前記所定値未満と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データを用いて前記学習済みモデルを生成する、
     学習済みモデルの生成方法。
  6.  前記第1貼合ローラを保全した後の前記第1データ及び前記第2データに基づき、前記第1貼合ローラを保全した後の前記巻回体の第6不良率が所定値以上と判断された場合、前記第1貼合ローラを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを生成するためには用いず、一方、前記第6不良率が前記所定値未満と判断された場合、前記第1貼合ローラを保全した前に読み取られた前記第1データ及び前記第2データを用いて前記学習済みモデルを生成する、
     請求項5記載の学習済みモデルの生成方法。
  7.  前記第1電極シートは電池の正極シートであり、前記第2電極シートは電池の負極シートである、
     請求項5記載の学習済みモデルの生成方法。
  8.  前記第1電極シートは電池の負極シートであり、前記第2電極シートは電池の正極シートである、
     請求項5記載の学習済みモデルの生成方法。
  9.  第1電極シートを供給する第1供給リールと、
     第2電極シートを供給する第2供給リールと、
     前記第1電極シート側に設けられた第1貼合ローラと、
     前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、
     前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、
     前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全のための学習済みモデルの生成方法であって、
     前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得し、
     前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差していると判断された場合、前記巻回体の不良原因は前記第1供給リール又は前記第1貼合ローラにある旨を判断するための学習済みモデルを生成し、
     前記学習済みモデルを用いた判断に基づき、前記不良原因が前記第1供給リール又は前記第1貼合ローラにある旨の情報を保全のために表示装置に出力し、
     前記第1供給リールを保全した前の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第1確率と前記第1供給リールを保全した後の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第2確率との第1差分が所定値未満と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを更新するためには用いず、一方、前記第1差分が前記所定値以上と判断された場合、前記第1供給リールを保全した前の前記第1データ及び前記第2データを用いて前記学習済みモデルを更新する、
     学習済みモデルの生成方法。
  10.  前記第1貼合ローラを保全した前の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第3確率と前記第1貼合ローラを保全した後の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第4確率との第2差分が所定値未満と判断された場合、前記第1貼合ローラを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを更新するためには用いず、一方、前記第2差分が前記所定値以上と判断された場合、前記第1貼合ローラを保全した前の前記第1データ及び前記第2データを用いて前記学習済みモデルを更新する、
     請求項9記載の学習済みモデルの生成方法。
  11.  前記第1電極シートは電池の正極シートであり、前記第2電極シートは電池の負極シートである、
     請求項9記載の学習済みモデルの生成方法。
  12.  前記第1電極シートは電池の負極シートであり、前記第2電極シートは電池の正極シートである、
     請求項9記載の学習済みモデルの生成方法。
  13.  第1電極シートを供給する第1供給リールと、
     第2電極シートを供給する第2供給リールと、
     前記第1電極シート側に設けられた第1貼合ローラと、
     前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、
     前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、
     前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全のための学習済みモデルの生成方法であって、
     前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得し、
     前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差していると判断された場合、前記巻回体の不良原因は前記第1供給リール又は前記第1貼合ローラにある旨を判断するための学習済みモデルを生成し、
     前記学習済みモデルを用いた判断に基づき、前記不良原因が前記第1供給リール又は前記第1貼合ローラにある旨の情報を保全のために表示装置に出力し、
     前記第1供給リールを保全した後の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第5確率が所定値以上と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを更新するためには用いず、一方、前記第5確率が前記所定値未満と判断された場合、前記第1供給リールを保全した前の前記第1データ及び前記第2データを用いて前記学習済みモデルを更新する、
     学習済みモデルの生成方法。
  14.  前記第1貼合ローラを保全した後の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第6確率が所定値以上と判断された場合、前記第1貼合ローラを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを更新するためには用いず、一方、前記第6確率が前記所定値以上と判断された場合、前記第1貼合ローラを保全した前の前記第1データ及び前記第2データを用いて前記学習済みモデルを更新する、
     請求項13記載の学習済みモデルの生成方法。
  15.  前記第1電極シートは電池の正極シートであり、前記第2電極シートは電池の負極シートである、
     請求項13記載の学習済みモデルの生成方法。
  16.  前記第1電極シートは電池の負極シートであり、前記第2電極シートは電池の正極シートである、
     請求項13記載の学習済みモデルの生成方法。
  17.  第1電極シートを供給する第1供給リールと、
     第2電極シートを供給する第2供給リールと、
     前記第1電極シート側に設けられた第1貼合ローラと、
     前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、
     前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、
     前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全に関する情報を表示する保全表示装置であって、
     前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得し、
     前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差しているか否かに基づいて、前記巻回体が不良であるか否かを判定し、不良である場合には前記不良の原因は前記第1供給リール又は前記第1貼合ローラにある旨の情報を保全のために表示装置に出力する報知判定部と、
     前記第1供給リールを保全する前後の前記第1データ及び前記第2データに基づき、前記第1供給リールが保全された前の前記巻回体の第1不良率と前記第1供給リールが保全された後の前記巻回体の第2不良率との第1差分が所定値未満と判断された場合の、前記第1供給リールが保全された前に読み取られた前記第1データ及び前記第2データを用いず、一方、前記第1差分が前記所定値以上と判断された場合の、前記第1供給リールが保全された前に読み取られた前記第1データ及び前記第2データを用いて学習済みモデルを生成するモデル生成部と、
     を備える、保全表示装置。
  18.  第1電極シートを供給する第1供給リールと、
     第2電極シートを供給する第2供給リールと、
     前記第1電極シート側に設けられた第1貼合ローラと、
     前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、
     前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、
     前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全に関する情報を表示する保全表示装置であって、
     前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得し、
     前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差しているか否かに基づいて、前記巻回体が不良であるか否かを判定し、不良である場合には前記不良の原因は前記第1供給リール又は前記第1貼合ローラにある旨の情報を保全のために表示装置に出力する報知判定部と、
     前記第1供給リールが保全された後の前記第1データ及び前記第2データに基づき、前記第1供給リールが保全された後の前記巻回体の第5不良率が所定値以上と判断された場合の、前記第1供給リールが保全された前に読み取られた前記第1データ及び前記第2データを用いず、一方、前記第5不良率が前記所定値未満と判断された場合の、前記第1供給リールが保全された前に読み取られた前記第1データ及び前記第2データを用いて学習済みモデルを生成するモデル生成部と、
     を備える、保全表示装置。
  19.  第1電極シートを供給する第1供給リールと、
     第2電極シートを供給する第2供給リールと、
     前記第1電極シート側に設けられた第1貼合ローラと、
     前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、
     前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、
     前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全に関する情報を表示する保全表示装置であって、
     前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得し、
     前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差しているか否かに基づいて、前記巻回体が不良であるか否かを判定し、不良である場合には不良原因が前記第1供給リール又は前記第1貼合ローラにある旨を判断するための学習済みモデルを生成するモデル生成部と、
     前記学習済みモデルを用いて、前記不良原因が前記第1供給リール又は前記第1貼合ローラにあることを特定して特定結果を含む情報を保全のために表示装置に出力する報知判定部と、
     を備え、
     前記モデル生成部は、前記第1供給リールが保全された前の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第1確率と前記第1供給リールが保全された後の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第2確率との第1差分が所定値未満と判断された場合、前記第1供給リールが保全された前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを更新するためには用いず、一方、前記第1差分が前記所定値以上と判断された場合、前記第1供給リールが保全された前の前記第1データ及び前記第2データを用いて前記学習済みモデルを更新する、
     保全表示装置。
  20.  第1電極シートを供給する第1供給リールと、
     第2電極シートを供給する第2供給リールと、
     前記第1電極シート側に設けられた第1貼合ローラと、
     前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、
     前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、
     前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全に関する情報を表示する保全表示装置であって、
     前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得し、
     前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差しているか否かに基づいて、前記巻回体が不良であるか否かを判定し、不良である場合には不良原因が前記第1供給リール又は前記第1貼合ローラにある旨を判断するための学習済みモデルを生成するモデル生成部と、
     前記学習済みモデルを用いて、前記不良原因が前記第1供給リール又は前記第1貼合ローラにあることを特定して特定結果を含む情報を保全のために表示装置に出力する報知判定部と、
     を備え、
     前記モデル生成部は、前記第1供給リールを保全した後の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第5確率が所定値以上と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを更新するためには用いず、一方、前記第5確率が前記所定値未満と判断された場合、前記第1供給リールを保全した前の前記第1データ及び前記第2データを用いて前記学習済みモデルを更新する、
     保全表示装置。
  21.  第1電極シートを供給する第1供給リールと、
     第2電極シートを供給する第2供給リールと、
     前記第1電極シート側に設けられた第1貼合ローラと、
     前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、
     前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、
     前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全のための学習済みモデルを生成するコンピュータが実行するプログラムであって、
     前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得する手順と、
     前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差していると判断された場合、前記巻回体が不良であり、前記不良の原因は前記第1供給リール又は前記第1貼合ローラにある旨の情報を保全のために表示装置に出力する手順と、
     前記第1供給リールを保全する前後の前記第1データ及び前記第2データに基づき、前記第1供給リールを保全した前の前記巻回体の第1不良率と前記第1供給リールを保全した後の前記巻回体の第2不良率との第1差分が所定値未満と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを生成するためには用いず、一方、前記第1差分が前記所定値以上と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データを用いて前記学習済みモデルを生成する手順と、
     を前記コンピュータに実行させる、プログラム。
  22.  第1電極シートを供給する第1供給リールと、
     第2電極シートを供給する第2供給リールと、
     前記第1電極シート側に設けられた第1貼合ローラと、
     前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、
     前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、
     前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全のための学習済みモデルを生成するコンピュータが実行するプログラムであって、
     前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得する手順と、
     前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差していると判断された場合、前記巻回体が不良であり、前記不良の原因は前記第1供給リール又は前記第1貼合ローラにある旨の情報を保全のために表示装置に出力する手順と、
     前記第1供給リールを保全する前後の前記第1データ及び前記第2データに基づき、前記第1供給リールを保全した後の前記巻回体の第5不良率が所定値以上と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを生成するためには用いず、一方、前記第5不良率が前記所定値未満と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データを用いて前記学習済みモデルを生成する手順と、
     を前記コンピュータに実行させるプログラム。
  23.  第1電極シートを供給する第1供給リールと、
     第2電極シートを供給する第2供給リールと、
     前記第1電極シート側に設けられた第1貼合ローラと、
     前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、
     前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、
     前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全のための学習済みモデルを生成するコンピュータが実行するプログラムであって、
     前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得する手順と、
     前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差していると判断された場合、前記巻回体の不良原因は前記第1供給リール又は前記第1貼合ローラにある旨を判断するための学習済みモデルを生成する手順と、
     前記学習済みモデルを用いた判断に基づき、前記不良原因が前記第1供給リール又は前記第1貼合ローラにある旨の情報を保全のために表示装置に出力する手順と、
     前記第1供給リールを保全した前の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第1確率と前記第1供給リールを保全した後の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第2確率との第1差分が所定値未満と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを更新するためには用いず、一方、前記第1差分が前記所定値以上と判断された場合、前記第1供給リールを保全した前の前記第1データ及び前記第2データを用いて前記学習済みモデルを更新する手順と、
     を前記コンピュータに実行させるプログラム。
  24.  第1電極シートを供給する第1供給リールと、
     第2電極シートを供給する第2供給リールと、
     前記第1電極シート側に設けられた第1貼合ローラと、
     前記第2電極シート側に設けられ、前記第1貼合ローラと対となって前記第1電極シートと前記第2電極シートとを貼り合わせる第2貼合ローラと、
     前記貼り合わせられた前記第1電極シート及び前記第2電極シートが巻き付けられる巻芯と、
     前記巻芯に巻き付けられた前記第1電極シート及び前記第2電極シートの巻回体の半径方向に沿って前記第1電極シートの第1端面及び前記第2電極シートの第2端面を読み取るセンサと、を備えた生産装置の保全のための学習済みモデルを生成するコンピュータが実行するプログラムであって、
     前記半径方向に沿って読み取られた前記第1端面の位置を表す第1データ、前記半径方向に沿って読み取られた前記第2端面の位置を表す第2データを前記センサから取得する手順と、
     前記第1データ及び前記第2データに基づき、前記第1データが示す前記第1端面の位置の連続が、前記第2データが示す前記第2端面の位置の連続に交差していると判断された場合、前記巻回体の不良原因は前記第1供給リール又は前記第1貼合ローラにある旨を判断するための学習済みモデルを生成する手順と、
     前記学習済みモデルを用いた判断に基づき、前記不良原因が前記第1供給リール又は前記第1貼合ローラにある旨の情報を保全のために表示装置に出力する手順と、
     前記第1供給リールを保全した後の前記第1データ及び前記第2データを前記学習済みモデルに入力して得られる前記巻回体の不良が改善される第5確率が所定値以上と判断された場合、前記第1供給リールを保全した前に読み取られた前記第1データ及び前記第2データは前記学習済みモデルを更新するためには用いず、一方、前記第5確率が前記所定値未満と判断された場合、前記第1供給リールを保全した前の前記第1データ及び前記第2データを用いて前記学習済みモデルを更新する手順と、
     を前記コンピュータに実行させるプログラム。
     
PCT/JP2020/004605 2019-04-22 2020-02-06 学習済みモデルの生成方法、保全表示装置、及びプログラム WO2020217644A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN202080030074.3A CN113711149B (zh) 2019-04-22 2020-02-06 已学习模型的生成方法、维护显示装置及存储介质
JP2021515807A JP7437784B2 (ja) 2019-04-22 2020-02-06 学習済みモデルの生成方法、保全表示装置、及びプログラム
US17/506,295 US11782433B2 (en) 2019-04-22 2021-10-20 Learned model generation method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019081115 2019-04-22
JP2019-081115 2019-04-22

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US17/506,295 Continuation US11782433B2 (en) 2019-04-22 2021-10-20 Learned model generation method

Publications (1)

Publication Number Publication Date
WO2020217644A1 true WO2020217644A1 (ja) 2020-10-29

Family

ID=72942329

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/004605 WO2020217644A1 (ja) 2019-04-22 2020-02-06 学習済みモデルの生成方法、保全表示装置、及びプログラム

Country Status (4)

Country Link
US (1) US11782433B2 (ja)
JP (1) JP7437784B2 (ja)
CN (1) CN113711149B (ja)
WO (1) WO2020217644A1 (ja)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011070635A (ja) * 2009-08-28 2011-04-07 Hitachi Ltd 設備状態監視方法およびその装置
WO2017191428A1 (en) * 2016-05-04 2017-11-09 Interactive Coventry Limited A method for monitoring the operational state of a system

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3749028B2 (ja) * 1998-12-11 2006-02-22 株式会社デジタル 表示装置
KR100305350B1 (ko) * 1999-07-01 2001-11-01 이계안 Ni-MH 전지의 음극판 조립장치 및 그 공정
JP2003345188A (ja) * 2002-05-24 2003-12-03 Hitachi Printing Solutions Ltd 電子写真装置およびその制御方法
JP4443460B2 (ja) * 2005-04-18 2010-03-31 京セラミタ株式会社 温度管理システム及び温度管理システムを備えた機器
JP5780308B2 (ja) * 2011-09-27 2015-09-16 トヨタ自動車株式会社 電池
JP5492351B1 (ja) * 2012-05-11 2014-05-14 パナソニック株式会社 巻回装置、巻回方法、検査装置及び構造物製造方法
JP6264072B2 (ja) * 2014-02-10 2018-01-24 オムロン株式会社 品質管理装置及びその制御方法
CN106338935A (zh) * 2015-04-23 2017-01-18 恒爱高科(北京)科技有限公司 一种机器人情感识别方法和系统
JP2017167708A (ja) 2016-03-15 2017-09-21 三菱電機株式会社 保全システムおよび保全方法
JP6475181B2 (ja) * 2016-03-17 2019-02-27 富士フイルム株式会社 搬送装置、インクジェット記録装置、及びプログラム
JP2018077757A (ja) * 2016-11-11 2018-05-17 横河電機株式会社 情報処理装置、情報処理方法、情報処理プログラム及び記録媒体
JP6443461B2 (ja) * 2017-01-10 2018-12-26 トヨタ自動車株式会社 発電装置の異常検出装置
JP6670769B2 (ja) * 2017-01-13 2020-03-25 Ckd株式会社 検査装置及び巻回装置
JP7010641B2 (ja) * 2017-09-27 2022-01-26 パナソニック インテレクチュアル プロパティ コーポレーション オブ アメリカ 異常診断方法および異常診断装置
CN107703272B (zh) * 2017-11-09 2023-10-03 哈尔滨跃渊环保智能装备有限责任公司 一种污水池巡检机器人及其检测方法
JP6984370B2 (ja) * 2017-12-06 2021-12-17 横河電機株式会社 生産支援システム、生産支援方法及びプログラム

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011070635A (ja) * 2009-08-28 2011-04-07 Hitachi Ltd 設備状態監視方法およびその装置
WO2017191428A1 (en) * 2016-05-04 2017-11-09 Interactive Coventry Limited A method for monitoring the operational state of a system

Also Published As

Publication number Publication date
US20220035362A1 (en) 2022-02-03
JPWO2020217644A1 (ja) 2020-10-29
CN113711149B (zh) 2024-05-28
CN113711149A (zh) 2021-11-26
US11782433B2 (en) 2023-10-10
JP7437784B2 (ja) 2024-02-26

Similar Documents

Publication Publication Date Title
JP2021082384A (ja) 学習済みモデルの生成方法、装置、およびプログラム
JP7457968B2 (ja) 情報処理方法、学習済みモデルの生成方法、装置、及びプログラム
CN111209131B (zh) 一种基于机器学习确定异构系统的故障的方法和系统
JP2021082385A (ja) 表示方法、学習済みモデルの生成方法、装置、およびプログラム
JP7390617B2 (ja) 学習済みモデルの生成方法、装置、及びプログラム
JP2021141029A (ja) 学習済みモデルの生成方法、装置、及びプログラム
WO2022134495A1 (zh) 基于深度学习的设备异常检测方法、系统及计算机介质
TWI721358B (zh) 設備檢修裝置、方法及電腦可讀取存儲介質
KR20210085168A (ko) 머신러닝 기반 건축 구조물 고유 진동값 학습을 통한 안전 진단 시스템 및 방법
CN105531680A (zh) 远程监视系统、远程监视方法以及程序
WO2020217644A1 (ja) 学習済みモデルの生成方法、保全表示装置、及びプログラム
CN117391675B (zh) 一种数据中心基础设施运维管理方法
RU2687848C1 (ru) Способ и система вибромониторинга промышленной безопасности динамического оборудования опасных производственных объектов
TW202006536A (zh) 設備異常告警系統、方法及可讀存儲介質
CN117474357A (zh) 基于深度学习的配电房运维管理方法及系统
JPH0526784A (ja) 建設用作業機械の故障発生集中管理方法
CN117035432B (zh) 安全防护平台提升判定方法、装置和电子设备
CN114169169B (zh) 一种桥式起重机设备可靠性分析系统
CN104808652A (zh) 化工装置运行状态评分方法
JP2023023555A (ja) モデル生成装置、モデル生成方法、異常予兆検知装置、異常予兆検知方法及び異常予兆検知システム
TWM647975U (zh) 監測分析報告生成裝置
IT201900014922A1 (it) Metodo di rilevamento dello stato strutturale e di gestione di reti di ponti e viadotti
CN117623128A (zh) 一种起重机械安全监控管理系统
CN116664100A (zh) 基于bim+ai智慧运维管理系统
CN116484012A (zh) 轨道交通故障处理方案生成方法及装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20794395

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021515807

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20794395

Country of ref document: EP

Kind code of ref document: A1