WO2020183690A1 - プラント監視制御装置およびプラント監視制御方法 - Google Patents

プラント監視制御装置およびプラント監視制御方法 Download PDF

Info

Publication number
WO2020183690A1
WO2020183690A1 PCT/JP2019/010490 JP2019010490W WO2020183690A1 WO 2020183690 A1 WO2020183690 A1 WO 2020183690A1 JP 2019010490 W JP2019010490 W JP 2019010490W WO 2020183690 A1 WO2020183690 A1 WO 2020183690A1
Authority
WO
WIPO (PCT)
Prior art keywords
work
data
procedure
plant
support
Prior art date
Application number
PCT/JP2019/010490
Other languages
English (en)
French (fr)
Inventor
健太 深見
麻美 成瀬
光伸 吉永
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to UAA202105060A priority Critical patent/UA127878C2/uk
Priority to US17/424,514 priority patent/US20220128974A1/en
Priority to JP2021504743A priority patent/JP7066044B2/ja
Priority to PCT/JP2019/010490 priority patent/WO2020183690A1/ja
Publication of WO2020183690A1 publication Critical patent/WO2020183690A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/4183Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by data acquisition, e.g. workpiece identification
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/31From computer integrated manufacturing till monitoring
    • G05B2219/31323Database for CIM
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/31From computer integrated manufacturing till monitoring
    • G05B2219/31449Monitor workflow, to optimize business, industrial processes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Definitions

  • This application relates to a plant monitoring control device and a plant monitoring control method.
  • GUI graphical user interface
  • Japanese Unexamined Patent Publication No. 1-12304 (upper left column on page 4, upper right column on page 5, Fig. 1)
  • Japanese Unexamined Patent Publication No. 11-39032 (paragraphs 0008 to 0023, FIGS. 1 to 3)
  • the present application discloses a technique for solving the above-mentioned problems, and an object of the present application is to provide a plant monitoring control device or a plant monitoring control method capable of performing optimum monitoring control by cooperation.
  • the plant monitoring and control device disclosed in the present application is a plant monitoring and control device for monitoring and controlling a plant in cooperation with a plurality of members, and is provided corresponding to each of the plurality of members and said monitoring and control.
  • the input / output unit that accepts the input / output operation for the purpose, the work content for each of the plurality of operations for each procedure in the monitoring control procedure predetermined according to the event that may occur in the plant, and the work contents of the plurality of members.
  • a monitoring and control procedure database recorded in association with the identification information of a member who has the operation authority of the work, the input / output operation, and a plurality of operations for each procedure corresponding to the occurrence of the event.
  • the procedure progress database in which the record in which the progress status and the identification information of the member who is executing or will be in charge of the work are linked is updated, and the plurality of configurations according to the record update of the procedure progress database.
  • the situation of each member it is determined whether or not there is a member who needs work support in the monitoring control, and the situation evaluation unit which performs the identification, and the member who needs the support is specified, the procedure progresses. From the information recorded in the database, the work to be assigned by the specified member is extracted, and from the information recorded in the monitoring control procedure database, the member who has the operation authority for the extracted work may act on behalf of the member.
  • the support content is specified as the presentation target from the plurality of members. It is characterized by having a presentation information generation unit that selects a plurality of people including members and generates presentation information according to each of the selected multiple people.
  • the plant monitoring and control method disclosed in the present application is a plant monitoring and control method for monitoring and controlling a plant in cooperation with a plurality of members, and is a predetermined monitoring and control procedure according to an event that may occur in the plant.
  • the step of recording the work content and the identification information of the member who has the operation authority of the work among the plurality of members in the monitoring control procedure database for each of the plurality of operations for each procedure.
  • the progress status of each of the plurality of tasks for each procedure and the identification information of the member who is executing or will be in charge of the task are displayed.
  • the identified member extracts the work to be in charge from the information recorded in the procedure progress database.
  • the support content determination step of determining the possibility of substitution by the member having the operation authority for the extracted work and determining the information on the substitution of the extracted work as the support content, Based on the determined support content, a plurality of people including the specified member are selected as the presentation target of the support content from the plurality of members, and presentations are made according to each of the selected members. It is characterized by including a presentation information display step for generating and displaying information.
  • a plurality of configurations including a person requiring support are provided with the result of examining the possibility of work agency from among those who have the operation authority. Since it is presented to the staff, optimal monitoring and control can be performed by cooperation.
  • FIG. It is a block diagram for demonstrating the configuration of the plant monitoring control apparatus which concerns on Embodiment 1.
  • FIG. It is a flowchart for demonstrating operation of the plant monitoring control method which concerns on Embodiment 1.
  • FIG. It is a figure which shows the first half part of the example of the registration of the data for each item in the monitoring control procedure database in the plant monitoring control apparatus which concerns on Embodiment 1.
  • FIG. It is a figure which shows the latter half part of the example of the registration of the data for each item in the monitoring control procedure database in the plant monitoring control apparatus which concerns on embodiment 1.
  • FIG. 7A to 7C is a diagram showing a display example for a person who has a different position in the work when the operation support information regarding the work sharing is displayed on the screen in the plant monitoring control device according to the first embodiment.
  • FIG. 8A and 8B are diagrams showing different display examples when the operation support information when a certain work is performed on behalf of the plant monitoring control device according to the first embodiment is displayed on the screen. It is a block diagram which shows the structural example of the part which executes the arithmetic processing of the plant monitoring control apparatus which concerns on Embodiment 1. It is a block diagram for demonstrating the configuration of the plant monitoring control apparatus which concerns on Embodiment 2. FIG. It is a figure which shows the example of the performance situation data in a team generated by the team situation evaluation processing part of the plant monitoring control apparatus which concerns on Embodiment 2. FIG.
  • Embodiment 1. 1 to 9 are for explaining the plant monitoring control device or the plant monitoring control method according to the first embodiment, and FIG. 1 shows the configuration of a part mainly related to the presentation of information of the plant monitoring control device.
  • FIG. 2 is a flowchart for explaining the operation of the plant monitoring and control device, that is, the plant monitoring and control method.
  • FIGS. 3A and 3B are views in which an example of registering data for each item related to the operation procedure in the monitoring control procedure database in the plant monitoring control device is displayed separately in the first half part and the second half part, respectively, and FIGS. 4A and 4B.
  • FIG. 6 is a flowchart for explaining the operation of the process of determining the operation support content in the plant monitoring and control method
  • FIGS. 7A to 7C show the operation when the operation support information related to the work sharing is displayed on the screen.
  • Figures 8A and 8B show examples of display for each of the supervisor, the operator receiving support, and the operator requested for support as persons in different positions
  • FIGS. 8A and 8B provide driving support information when a certain task is performed on behalf of the driver. It is a figure which shows different display examples at the time of screen display.
  • FIG. 9 is a block diagram showing a configuration example in which a portion of the monitoring control unit and the operation support processing unit of the plant monitoring control device that performs arithmetic processing is executed using a certain hardware. ..
  • plant monitoring and control is performed by an operating team consisting of a plurality of people who monitor and operate the central control panel of the monitoring and control room.
  • the team consists of multiple operators who monitor and operate, and supervisors who monitor the work instructions and actions of the operators. Operators and supervisors are provided with their own input / output devices and output devices (input / output devices) for monitoring and control, and use the input / output devices given to them to monitor and control the plant. carry out.
  • the supervisor first instructs the operator on the work content.
  • the operator carries out the work using the given input / output device.
  • the operator reports the completion to the supervisor, and the supervisor uses his / her own input / output device to confirm the work carried out by the operator.
  • the monitoring and control form of the plant in addition to the case where all the members of the operation team are in the monitoring and control room and the operation is performed while performing oral communication, the operator of the monitoring and control room and the supervisor in a remote place are used. It is also assumed that communication will be performed remotely.
  • the instructed work may be repeated in a certain pattern, but it changes according to the situation of the plant.
  • the work instructed by each operator is not limited to the work instructed by the operator next, but is the work actually being performed by another operator or the work scheduled to be instructed next. It may be relevant.
  • the work instructed at one time or related work is not always instructed to the same worker next time.
  • the plant monitoring and control device 1 controls a plurality of plant equipment 900 in the plant, and also generates monitoring and control unit 2 that provides plant information to the user and information on operation support. It is provided with a driving support processing unit 3 that outputs to the monitoring and control unit 2.
  • plant equipment 900 including the case where one plant equipment is shown and the case where a plurality of plant equipments are shown.
  • the monitoring control unit 2 is presented by an input device 21 and an output device 24 for data input / output, a data processing unit 22 that processes data received from the input device 21 and the plant, and an output device 24 such as a plant status and support contents. It is provided with a presentation information generation processing unit 23 that generates information to be generated. Then, the plant equipment 900 is controlled based on the operation input of the operator using the input device 21 or the operation by automatic control, and the plant information which is the information of the plant equipment 900 is transmitted to the user via the output device 24. It is configured as follows to provide.
  • the input device 21 and the output device 24 are monitoring and control interfaces used by a plurality of operators and supervisors (hereinafter, users) constituting the driving team, and one or more are assigned to each user.
  • the input device 21 performs a display control input of the output device 24 by the user, an operation input for the plant equipment 900 by the user, and a confirmation input for the value of the plant equipment 900 by the user.
  • the confirmation input signal or the operation input signal (hereinafter referred to as the confirmation / operation input signal) input for confirmation is transmitted to the data processing unit 22.
  • the confirmation / operation input signal includes time data at which the signal was generated, data for distinguishing the user who handles the input device 21 (user ID), and data for uniquely distinguishing the contents of confirmation / operation (work ID). Is done.
  • the user ID distinguishes the members of the team (supervisor and all operators), and each user uses an input device 21 to which his / her own user ID is assigned and an output device 24 described later.
  • An example of the input device 21 is a touch panel in which a mouse and an output device 24 are integrated. Display control input, operation input, and confirmation input are performed, for example, through mouse click or touch operation. In addition, a line-of-sight sensor or the like may be used as the input device 21 for confirmation input.
  • the output device 24 is a display terminal such as a monitor that displays a monitoring screen showing the operating status of the plant equipment or operation support information described later.
  • the data processing unit 22 receives the plant information from the plant equipment 900 and the confirmation / operation input signal from the input device 21, and transmits various signals to the plant equipment 900, the presentation information generation processing unit 23, and the operation support processing unit 3. Generate. Specifically, the plant equipment 900 receives the measurement signal and transmits the control signal. The presentation information generation processing unit 23 generates and transmits a presentation information generation signal for generating / updating the monitoring screen based on the plant information or the input signal from the plant equipment 900. It also generates information for the driving support processing unit 3 and writes it to the database.
  • the presentation information generation processing unit 23 generates screen drawing data corresponding to the user to be output to the output device 24.
  • the screen drawing data follows the presentation information generation signal for generating / updating the monitoring screen output from the data processing unit 22 described above, or the presentation information generation signal of the driving support information obtained from the driving support processing unit 3 described later. Will be generated.
  • the monitoring drawing data exemplifies the visual display as in the screen display example described later, but the present invention is not limited to this, and the audio data to be displayed by hearing, Data transmitted by touch may be included.
  • the operation support processing unit 3 evaluates the plant operation status of each user and the status as a team based on the plant information transmitted from the monitoring control unit 2 and the user confirmation / operation input signal. Then, since it is responsible for determining the driving support content according to the situation and transmitting the presentation information generation signal related to the driving support information to the presentation information generation processing unit 23 of the monitoring control unit 2, the work associated with the user is performed. It has multiple databases containing relevance data. Then, it is provided with a plurality of processing units that generate information necessary for driving support, including information for smoothly accommodating work within the team based on these data.
  • the database (denoted as DB in the figure) includes a plant information database 31, a work history database 33, a monitoring control procedure database 34, and a procedure progress database 36.
  • the processing unit includes a plant status diagnosis processing unit 32, a user work status estimation processing unit 35, a team status evaluation processing unit 37, and an operation support content determination processing unit 38.
  • the plant information database 31 stores the plant information of the plant equipment 900 via the data processing unit 22.
  • the plant status diagnosis processing unit 32 estimates the occurrence event in the plant based on the time-series plant information accumulated in the plant information database 31.
  • the work history database 33 stores time-series confirmation / operation history data (work history data) generated based on the confirmation / operation input signal by the input device 21 via the data processing unit 22.
  • the user work status estimation processing unit 35 is based on the output of the plant status diagnosis processing unit 32, the work history data (user action (confirmation / operation) result) of the work history database 33, and the monitoring control procedure database 34. Estimate the work progress status (procedure progress status) of.
  • the procedure progress database 36 stores information on the procedure progress status generated by the user work status estimation processing unit 35.
  • the team status evaluation processing unit 37 evaluates the team status based on the information on the procedure progress status of each user stored in the procedure progress database 36 to determine whether or not there is a user in the team who has a problem in performing the work.
  • the driving support content determination processing unit 38 proposes work sharing within the team or deteriorates the performance of the operator when there is an operator who has a problem in performing the work. Determine the content of driving support such as alerting the supervisor regarding. Then, a presentation information generation signal is generated to present the determined driving support content, and is transmitted to the presentation information generation processing unit 23 of the monitoring control unit 2.
  • the operation will be explained based on the above configuration.
  • the plant information of the plant equipment 900 is accumulated in the plant information database 31 together with the time data in chronological order via the data processing unit 22.
  • Examples of plant information include plant values, which are values indicating the states of various plant equipment, and alarm information such as abnormal signals.
  • Each user's confirmation / operation input signal input from the input device 21 is interpreted by the data processing unit 22 and stored as work history data in the work history database 33.
  • Examples of work history data include time data, user ID data, work ID data, work-related information (for example, ID data to be confirmed / operated, plant value of confirmation / operation result) and the like.
  • the operation includes one that is completed by one operation and one that continuously performs one operation (for example, an operation that continues a button pressing operation for manually opening the valve opening). In the latter case, a plurality of operation input signals are generated and sequentially stored in the work history database 33. The operation up to this point is the same as that of a general plant monitoring and control device.
  • step ST101 the plant status is diagnosed.
  • the plant status diagnosis processing unit 32 has an internal knowledge base for storing data necessary for event diagnosis, such as the relationship between the cause of a failure and event ripple, and acquires alarm information and plant values from the plant information database 31. Perform event diagnosis using the knowledge base. As a result of the diagnosis, one or more events that have occurred are identified, and event ID data that distinguishes the events is transmitted to the user work status estimation processing unit 35. Step ST101 is periodically executed at a predetermined cycle, and event ID data is transmitted every time a new event occurs.
  • the method of event diagnosis is an example, and is not limited to this.
  • step ST102 the user work status is estimated.
  • the flow of the entire operation executed by the user work status estimation processing unit 35 is shown.
  • the procedure associated with the event ID is specified by referring to the data stored in the monitoring control procedure database 34 (the data structure will be described later).
  • the procedure is composed of one or more work steps (confirmation work or operation), and new procedure progress data based on the procedure structure is generated in the procedure progress database 36 (data structure will be described later).
  • the unconfirmed ones are referred to one by one in chronological order.
  • the progress status of the work step of the corresponding procedure is estimated, and the estimation result is stored in the procedure progress data portion of the work step of the procedure progress database 36.
  • the progress status estimated here is the progress of the work step.
  • the remaining time (time allowance) with respect to the time limit for completing each work step is used as an index, and as a result of estimation, the work step having a low time allowance is set to the work progress in the later step ST103. Treat as having issues.
  • IDs, conditions, and the like are sequentially registered in the monitoring control procedure database 34 for a plurality of data items.
  • the data items are, in order from the left, event ID data D340, procedure ID data D341, sequence data D342 for each work step execution, condition data D343 (AND / OR condition) for work step execution, and work ID data for distinguishing work steps.
  • D344 There is D344.
  • work content data D345 work completion condition data D346, authority user ID data D347 capable of executing the work step, and work required time data D348 which is a standard time required to execute the work step.
  • work completion constraint condition data D349 which is a constraint condition required for the completion of the work step, the event ID data D340 and the procedure ID data D341 are systematically aligned and registered in this order.
  • procedure ID data D360 As data items, in order from the left, procedure ID data D360, order data D361, condition data D362, work ID data D363, and work state data D364 of work steps (not started / in progress / completed) are included. .. Further, there are work user ID data D365 that has performed or is performing the work step, work actual time data D366, time limit data D367 that indicates the time limit until the work step is completed, and margin time data D368 that reaches the time limit. ..
  • the time margin data D369 (for example, low / high) calculated from the margin time, the sharing candidate user ID data D36a (details will be described later), and the procedure ID data D360 and the order data D361 are systematically arranged in this order. It is stored.
  • step ST102 The operation (step ST102) of the user work status estimation processing unit 35 will be described in detail using the data examples in each database shown in FIGS. 3A, 3B, 4A, and 4B.
  • the process of the user work status estimation processing unit 35 is composed of three types of processes: an event determination process, a procedure completion confirmation process, and a time monitoring process for unfinished work (unstarted / in progress work).
  • the monitoring control procedure database 34 After receiving the event ID data from the plant status diagnosis processing unit 32, one or more procedures for the event are specified by referring to the monitoring control procedure database 34. After that, the monitoring control procedure database 34 is referred to, and new procedure progress data is created in the procedure progress database 36. If the data stored in the work status data D364 is new, "not started” is input.
  • the work user ID data D365 is stored after the user starts the work (confirmation / operation), and the work actual time data D366 is stored after the work is completed.
  • the procedure completion confirmation process is executed at regular intervals after the event judgment process is executed until the work steps of all the procedures are completed.
  • the user work status estimation processing unit 35 refers to the work history database 33 at regular intervals, confirms whether or not there is unconfirmed work history data, and if so, displays the work ID data in the work history data in the monitoring control procedure database. Match with 34 to identify applicable procedures and work steps. After that, whether or not the work step is completed by the work is determined with reference to the work completion condition data D346.
  • the condition is "operate until the valve opening reaches 100%"
  • the determination result is stored in the work status data D364 of the procedure progress database 36. If the completion condition is not satisfied, it is updated to "in progress" and the user ID in the work history data is stored in the work user ID data D365.
  • the completion condition is satisfied, it is stored as "completed”, the user ID is stored in the work user ID data D365, the time required for the work is calculated from the time data in the work history database 33, and stored in the work actual time data D366. To do.
  • the difference between the work required time data D348 of the monitoring control procedure database 34 and the work actual time data D366 of the procedure progress database 36 is calculated.
  • the margin time data D368 and the time margin data D369 are updated by adding the calculated difference to the margin time data D368 described later. For example, when the work actual time data D366 is smaller than the work required time data D348 which is the standard work time, the margin time will increase. If there is data in the assignment candidate user ID data D36a of the procedure progress database 36, the processing related to the assignment of work, which will be described later, is performed. Every time this process is executed up to this point, an update signal is transmitted to the team status evaluation processing unit 37.
  • the work state data D364 performs a process of calculating the margin time data D368 and the time margin data D369 for each of the work steps being executed or not started.
  • the time limit data D367 which is the time limit required to complete the corresponding work step, is calculated using the work completion constraint condition data D349 registered in the monitoring control procedure database 34.
  • the work completion constraint condition data D349 is a condition that the work step in which it is set needs to be completed (for example, execution is completed within 10 minutes after the completion of another work step).
  • the time limit data D367 of the work step in which the work completion constraint condition data D349 is set is referred to. From the referenced time limit data D367, the work required time data D348 of the previous work step is subtracted and back-calculated in order to calculate and store the time limit data D367 of each work step.
  • the work completion constraint condition data D349 is set in the final work step of each procedure. After that, the spare time data D368 of each work step being executed or not started is calculated and stored by subtracting the work required time data D348 from the time limit data D367.
  • the time margin data D369 is calculated from the margin time data D368 according to a predetermined threshold value.
  • the time allowance is set by a two-step evaluation of "low” or "high”, but the setting of the number of steps is not limited to this.
  • the margin time data D368 and the time margin data D369 are updated according to the result of the procedure completion confirmation process.
  • the time limit data D367, the margin time data D368, and the time margin data D369 are updated by the user work status estimation processing unit 35 at a predetermined cycle with the passage of time.
  • step ST103 the team status evaluation processing unit 37 receives an update signal from the user work status estimation processing unit 35 and performs a process of evaluating the team status.
  • the procedure progress database 36 is referred to, and the in-team work status data D37 as shown in FIG. 5 is generated.
  • the work status data D37 in the team the work user ID data D371, the work ID data D372, and the work status data D373 for the current work are generated for the procedure ID data 370.
  • work ID data D374, margin time data D375, and time margin data D376 (for example, low / high) are generated for the next work, which is the work to be performed next to the current work.
  • next work if there is a work in which the work status data D364 of the procedure progress database 36 is "in progress”, the next work is performed, and if all the work in the procedure is "not started", the first of the steps.
  • the work is applicable and is determined according to the condition data D362.
  • step ST104 determines whether or not driving support is required.
  • the time allowance data D376 of the next work being “low”
  • it is determined that there is an operator (supporter required) who needs driving support and the team described in FIG. 5 is used to move to step ST105.
  • the internal work status data D37 is transmitted to the driving support content determination processing unit 38.
  • the presentation information generation signal indicating that there is no problem in the work progress is generated and transmitted to the presentation information generation processing unit 23, and the process proceeds to step ST106. To do.
  • step ST104 When there is a user who has a problem in step ST104, that is, when it is determined that driving support is necessary (Yes), what kind of work such as the driving support content determination processing unit 38 submitting work sharing within the team in step ST105? Decide whether to provide driving assistance.
  • step ST105 executed by the driving support content determination processing unit 38 will be described with reference to the flowchart shown in FIG.
  • the work step in which the time allowance data D376 of the next work is "low” is extracted. Then, among the work steps in which the time margin data D376 is "low", the work step having the smallest value of the margin time data D375 of the next work (the margin time is small) is selected as the work division to be examined (step ST201). ).
  • the driving support content determination processing unit 38 may perform the processing from this step ST201 again after the work is divided. If a shared user has already been assigned to the selected work step, another work step is selected. Refer to the procedure progress database 36, check whether the data is stored in the shared candidate user ID data D36a of the selected work step, and if it is stored, the work step with the next smallest margin time data D375. To be elected.
  • Step ST202 If the work status data D373 of the selected work step is "in progress", it is determined that the user described in the work user ID data performing the procedure may have a high load, and that user is required to support. Identify as. Then, the person requiring support confirms the next work to be performed (the next work with the smallest margin time data D375 value, or the work that has not been started in another procedure), and determines whether there is any work that can be shared. (Step ST202).
  • the work user ID data D365 that is executing the work step of interest is confirmed. Then, among the other procedures (procedure ID data D360 is different) in the procedure progress database 36, the next work step in which the support-requiring person is "in progress” or the work step in the middle is completed, but after that. Gets a work step that is "not started”. For example, the work ID data of FIG. 4B acquires the work step of “S022”, and determines that there is a work step that can be shared (“Yes” in step ST202).
  • step ST202 If there is no work step corresponding to the above (“No” in step ST202), it is assumed that there is no work that can be shared, and the processing described later, for example, notifying the supervisor that the situation is presented and measures are urged.
  • a process for presenting information is performed (step ST205). If the work state data D373 of the work step having the smallest margin time data D375 is "not started”, it is determined that there is a work step that can be shared ("Yes" in step ST202), and the step described next. Move to ST203.
  • step ST203 it is confirmed whether or not there is a user who has the authority to execute the work step of the next work acquired as a work step that can be shared (step ST203).
  • the work state data D373 of the work step selected in step ST201 is "in progress"
  • it is determined that the user of the user ID data D371 of the work step has a high load. Therefore, with reference to the monitoring control procedure database 34, it is confirmed whether or not a user ID other than the person requiring support is registered as the assignment candidate in the authority user ID data D347 of the next work step of the work step.
  • step ST203 If there is registration, refer to the procedure progress database 36 and check if there is a user who is a sharing candidate whose time margin data D369 of the work step currently being executed is only "high".
  • step ST203 it is decided to provide driving support that proposes work sharing to the person requiring support, and the process proceeds to step ST204.
  • step ST205 it is determined that the current situation cannot be shared and driving support is provided to prompt measures, and the process proceeds to step ST205.
  • step ST201 when the work status data D373 of the work step selected in step ST201 is "not started", the work status data D37 in the team is referred to instead of the procedure progress database 36. Then, a user whose time margin data D376 for the next work is all "high” is selected, the authority user ID data D347 of the monitoring control procedure database 34 is confirmed, and if the authority user ID is registered, the user is registered. Decide to provide driving support that raises the division (shift to step ST204). If there is no registration, it is assumed that sharing is not possible, and the process proceeds to step ST205.
  • the process proceeds to step ST204, and a signal indicating information to encourage the sharing of work to other users is transmitted to the presentation information generation processing unit 23.
  • the information for promoting the division of work includes information on the person requiring support and candidates for division, information on the work to be shared, information on the supervisor regarding the work, and the like, and is extracted with reference to the work status data D37 in the team. Specifically, the work user ID data D371 of the person requiring support and the candidate to be shared, the procedure ID data D370 of the work step to be shared, the next work ID data D374 to be shared, and the user ID of the supervisor are extracted to share the work. It is transmitted with a signal indicating the implementation of support by.
  • the driving support content determination processing unit 38 that receives the above-mentioned signal stores the information of the user ID of the sharing candidate in the sharing candidate user ID data D36a of the sharing work step of the procedure progress database 36. After that, it is determined whether or not there is a user (operator) to whom the assignment has not been assigned in addition to the relevant assignment candidate user (step ST206), and if there is, the process returns to step ST201 and the process is performed again. If not, the process is performed. finish.
  • step ST205 a signal indicating information indicating that work sharing is not possible is transmitted to the presentation information generation processing unit 23.
  • the procedure ID data D370 and work ID data D372, the next work ID data D374, and the user ID of the supervisor of the work step having the smallest margin time data D375 for the next work are extracted, and support is provided for the impossibility of sharing. Is transmitted with a signal indicating.
  • step ST105 after each operation (ST201 to ST206 (FIG. 6)) in step ST105, the process proceeds to step ST106, and the presentation information generation processing unit 23 moves based on the data transmitted by the driving support content determination processing unit 38. Generates screen drawing data to be output to the output device 24. The presentation information generation processing unit 23 generates the driving support information to be output according to the user to be presented.
  • a signal to perform support by work sharing is received, for example, for the supervisor user, the status of the operator identified as the person requiring support and a message screen recommending that the work be shared by the candidate users. Generate drawing data. Then, on the output device 24 associated with the user ID of the supervisor, for example, as shown in FIG. 7A, the work of the person requiring support (operator A in the figure) is tight in the monitoring screen G24. A message Gm24 is displayed to the effect that the user is a candidate for sharing (same as the operator B) and recommends that the user be substituted.
  • the person requiring support who wants to receive support has a message notifying that the candidate user will share (substitute) the next work, and the candidate user who may support has a substitute instruction for the work. Generate screen drawing data for a message that warns that there is a possibility.
  • the output device 24 associated with the user ID of the person requiring support who is desirable to receive support, performs a certain task specified on the monitoring screen G24 on behalf of the candidate user.
  • a message Gm24 is displayed informing that there is a possibility of causing the error.
  • a certain work specified by the person requiring support is performed on the monitoring screen G24. Display the message Gm24 notifying that there is a possibility of requesting a proxy.
  • a dedicated area may be provided in a part of the monitoring screen G24 to output a message, or a message may be output only for a certain period of time. If the division is not possible, for example, a message prompting the supervisor user to support the operation is output after describing the operator having a heavy workload and the monitoring control procedure and work being performed. Examples of support information may include recommendations for driving advice, recommendations for considering increasing the number of drivers, and so on.
  • screen drawing data for presenting the message Gm24 indicating that there is no problem may be generated. , It is not necessary to execute the screen drawing data generation process.
  • step ST106 the processing when the operator (substitute user) who has shared the work performs the work to be shared will be described below.
  • the confirmation / operation signal by the substitute user input via the input device 21 is stored in the work history database 33 by the data processing unit 22.
  • the procedure completion confirmation process of the user work status estimation processing unit 35 the work execution status of the work history data is determined, and data such as work status data D364 and user ID data D365 are stored in the procedure progress database 36, and then the procedure is performed. Check the progress database 36.
  • the user work status estimation processing unit 35 sends an update signal and a signal indicating the execution of the assigned work including the substitute user ID, the procedure ID, the work ID, and the user ID that executed the procedure before the substitute. It is transmitted to the status evaluation processing unit 37.
  • the team status evaluation processing unit 37 transmits a signal indicating the implementation of the sharing work to the driving support content determination processing unit 38.
  • the driving support content determination processing unit 38 receives the execution signal of the shared work, the driving support content determination processing unit 38 performs the above-mentioned driving support content determination process, and at the same time, presents information for presenting the shared implementation status based on the shared work implementation signal.
  • the generated signal is generated and transmitted to the presentation information generation processing unit 23.
  • the presentation information generation processing unit 23 When the presentation information generation processing unit 23 receives the presentation information generation signal, it generates screen drawing data for the supervisor and the operator A who receives (represents) the driving support. For example, as shown in FIG. 8A, drawing data for presenting a message Gm24 indicating that another operator B is acting on behalf of the operation in the monitoring screen G24 is generated, and the supervisor and the substitute operator are generated. Output to the output device 24 of A. In addition, in order to show that the work is being performed on behalf of the user, drawing data indicating that the work is being performed on behalf of the confirmation / operation target (pump, valve, plant value, etc.) on the monitoring screen G24 may be generated. ..
  • the presentation information generation processing unit 23 has a screen database in which the screen symbol components constituting the monitoring screen G24 and the drawing position data and the confirmation / operation target ID data are associated with each other in order to draw the monitoring screen. There is. Therefore, by acquiring the confirmation / operation target ID associated with the work ID from the work-related information in the work history database 33, a message regarding the support for the work is displayed near the screen symbol component of the confirmation / operation target ID. Is also possible. For example, as shown in FIG. 8B, the screen symbol component Gs1 indicating the work target is visually assisted by displaying the annotation sentence Gr24 indicating that the operator B is performing the proxy execution. Can be recognized. As a result, it is possible to reduce the possibility that the operator A, who was originally scheduled to work, mistakenly performs the work.
  • the work in charge may be replaced by another member.
  • the examined information was presented in a form suitable for each of a plurality of people (for example, a supervisor and a member scheduled to act on behalf of the team) including a person requiring support.
  • a plurality of people for example, a supervisor and a member scheduled to act on behalf of the team
  • optimal monitoring and control can be performed by cooperation with the cooperation of the team.
  • plant monitoring and control there are many matters that require specialization, and it is not easy to request support from others, but since we select candidates to act on behalf of those with operational authority, we support smoothly. You can make a request.
  • the person requiring support may not even be able to grasp that the situation is such, but since the information is also presented to other members, the work can be performed smoothly and optimal monitoring and control is performed by cooperation. be able to.
  • an example of generating a message for the supervisor and the operator related to the work substitute is shown, but the work is changed between the operators for other team members as well. Message may be generated and presented. Further, in the first embodiment, as described with reference to FIGS. 7 and 8, an example is shown in which the operation support information (for example, the message Gm24) is output to the same screen as the plant monitoring screen G24, but the operation support information is It may be displayed on another output device 24. Further, the presentation form of the driving support information is not limited to the screen display, and may be individually presented to the user by voice or the like.
  • the driving support information for proposing work sharing or calling the attention of a specific operator is presented as an example, but the content of the driving support information is not limited to this.
  • the supervisor after presenting a message to the supervisor user recommending that the work of a specific operator be shared with other operators, the supervisor directly performs the substitute work to the operator.
  • An example of giving instructions is shown, but it is not limited to this.
  • a button for example, approval / denial
  • a message for instructing the substitute driver B is output, and a message for the substitute driver A is output as a substitute notice message. You may do it.
  • a screen for listing the operator status may be separately provided for the supervisor, and screen drawing data indicating the procedure progress status of all operators may be generated and output based on the work status data D37 in the team.
  • the contents of the monitoring and control procedure are described in the procedure of the supervisor (confirmation / operation instruction to the operator, confirmation of the work result of the operator, etc.).
  • the workload of the supervisor may be evaluated.
  • the portion that performs arithmetic processing is divided by one hardware 10 including a processor 11 and a storage device 12, as shown in FIG. It is also possible to configure it.
  • the storage device 12 includes a volatile storage device such as a random access memory and a non-volatile auxiliary storage device such as a flash memory. Further, an auxiliary storage device of a hard disk may be provided instead of the flash memory.
  • the processor 11 executes the program input from the storage device 12. In this case, the program is input from the auxiliary storage device to the processor 11 via the volatile storage device. Further, the processor 11 may output data such as a calculation result to the volatile storage device of the storage device 12, or may store the data in the auxiliary storage device via the volatile storage device. This also applies to the plant monitoring control device 1 according to the next embodiment 2.
  • Embodiment 2 In the first embodiment, attention is paid to the progress of actions such as confirmation and operation of the operator, the workload of the operator is estimated based on the spare time of the work, and the work of the operator having a large work load is shared. An example of providing driving support such as is shown.
  • the factors that affect the work execution such as the urgency of the operator's work are not only due to the nature of the work itself such as the amount of work and the time required for the work, but also the time pressure when carrying out the work and the difficulty of the work.
  • FIG. 10 to 13 are for explaining the plant monitoring control device or the plant monitoring control method according to the second embodiment, and FIG. 10 shows the configuration of a part mainly related to the presentation of information of the plant monitoring control device.
  • FIG. 11 is a diagram showing an example of data for each item of the in-team performance status data, which shows the performance status of the operators in the team from the mental aspect generated by the team status evaluation processing unit. is there.
  • FIG. 12 is a flowchart for explaining the operation of the process of determining the operation support content based on the user's performance in the plant monitoring and control method
  • FIG. 13 is a work from the viewpoint of the user's performance level. It is a figure which shows the screen display example of the driving support information at the time of proposing on behalf of. In the same part as in the first embodiment, the figure used in the first embodiment is appropriately used to evaluate the driving situation as a team according to the performance situation of the operator in the second embodiment. , An example of determining the driving support content and presenting information will be described.
  • the plant monitoring control device 1 has a biological data acquisition device 41 and a user performance evaluation processing unit 42 added to FIG. 1 described in the first embodiment. ..
  • the biological data acquisition device 41 is a device that acquires biological data such as a user's heartbeat or voice.
  • the user performance evaluation processing unit 42 evaluates the psychological workload and situational awareness of each user by using the biometric data obtained from the biometric data acquisition device 41 and the data stored in the procedure progress database 36. Then, the process of estimating the performance status of each user based on the evaluation result is performed.
  • the same processing as in the first embodiment is executed for the processing (step ST102) of the user work status estimation processing unit 35 described with reference to FIG. 2 of the first embodiment.
  • the biological data acquisition device 41 acquires the biological data
  • the user performance evaluation processing unit 42 also evaluates the performance of each user (operator).
  • the team status evaluation processing unit 37B of the second embodiment evaluates the team status of the team status evaluation processing unit 37 described in the first embodiment based on the output from the user performance evaluation processing unit 42. I do. Further, up to the process of generating the in-team work status data D37 described in FIG. 5 in step ST103 is the same as in the first embodiment.
  • step ST104 of the second embodiment if it is determined that there is a work step that is urgent in time in the work status data D37 in the team, the subsequent processing up to step ST106 is the same as that of the first embodiment. It is the same process.
  • the necessity of driving support is also determined based on the mental state of the user based on the output from the user performance evaluation processing unit 42.
  • the team status evaluation processing unit 37B generates in-team performance status data D43 (details will be described later) having a performance level that comprehensively represents the mental state, and transmits the data to the driving support content determination processing unit 38B.
  • the processing unit that executes the processing newly added in the second embodiment with respect to the processing described in the first embodiment is different from the "processing unit" described in the first embodiment. In order to indicate, "B" is added at the end of the code to distinguish them.
  • the driving support content determination processing unit 38B of the second embodiment determines driving support information according to the user performance in addition to the processing by the driving support content determination processing unit 38 described in the first embodiment.
  • the presentation information generation processing unit 23B Upon receiving the result, the presentation information generation processing unit 23B generates screen drawing data of driving support information for each user and outputs a device so that it can be determined whether the support is determined based on the working time or the user performance. Output to 24.
  • the biometric data acquisition device 41 acquires biometric data such as the heartbeat or voice of each user, and is assigned to each user.
  • the biological data acquisition device 41 individually acquires heartbeats and voices, and is given an ID for distinguishing each of them and is associated with a user ID.
  • a wearable heartbeat sensor or the like is used to acquire heartbeat variability data.
  • voice the voice data acquired from the microphone is recognized in real time, and the text data is obtained.
  • the acquired data is transmitted to the user performance evaluation processing unit 42.
  • the user performance evaluation processing unit 42 evaluates the psychological workload and situational awareness of the user using the acquired data.
  • heart rate variability data is used to evaluate the psychological workload.
  • the heart rate variability data is continuously transmitted from the biological data acquisition device 41 in time series.
  • a method for evaluating a psychological workload for example, a method using heart rate variability analysis is known. Frequency analysis is performed on the time series data of heart rate variability, high frequency components (HF) and low frequency components (LF) are extracted, and the ratio of them, LF / HF, is above a certain value (for example, 1.5 or above). If there is, the psychological workload is judged to be high level, otherwise it is judged to be low level.
  • LF / HF may be used for the determination of all users by setting a threshold value in advance in this way, or may be set for each user.
  • this method of evaluating the psychological workload is an example, and is not limited to this method.
  • the situation recognition ability is evaluated according to the time from, for example, the instruction given by the supervisor user to the start of the work by the operator user. If there is an utterance of the supervisor user, it is converted into voice text by the biometric data acquisition device 41 and sent to the user performance evaluation processing unit 42. If the data is stored in the procedure progress database 36 (after one or more events have been identified), the voice text data is collated with the data in the procedure progress database 36, and the work instructed by the supervisor's utterance. The ID is specified and the time (instruction start time) is stored.
  • the user performance evaluation processing unit 42 refers to the procedure progress database 36 at a predetermined cycle, and confirms whether or not there is work ID data D363 of the work step that matches the work ID instructed in the utterance. If they match, the difference time is calculated by subtracting the memorized instruction start time from that time (work start time). If the calculated difference time is shorter than the predetermined threshold time, it is judged that the situational awareness is at a high level, assuming that the operator appropriately recognizes the supervisor's instruction and acts. On the other hand, when the difference time is longer than the threshold time, it is judged that the situation recognition ability is low or the situation recognition ability is low because it cannot be recognized correctly.
  • the user's performance which is influenced by the mental load, is evaluated by integrating them. For example, using the performance evaluation table shown in Table 1, the type of performance state is determined according to the combination of psychological workload and situation recognition ability.
  • the team status evaluation processing unit 37B generates the in-team work status data D37 shown in FIG. 5 as in the first embodiment, and determines whether or not driving support in consideration of the team status is required. When there is an operation in which the time margin data D376 of the next operation is “low”, the processes of steps ST201 to ST206 are performed in the same manner as in the first embodiment.
  • the second embodiment it is determined whether or not driving support is necessary from the viewpoint of the mental load of the user. If the performance level is "low” such as “low-1”, “low-2”, or “low-3”, it is judged that driving assistance is necessary, and the team as shown in FIG. 11
  • the internal performance status data D43 is generated and transmitted to the driving support content determination processing unit 38B.
  • the user's performance level is only "high"
  • a presentation information generation signal indicating that there is no problem in the work is generated and transmitted to the presentation information generation processing unit 23.
  • the driving support content determination processing unit 38B When the driving support content determination processing unit 38B receives the work status data D37 in the team, it performs the same processing as in the first embodiment.
  • the in-team performance status data D43 when the in-team performance status data D43 is received, as shown in FIG. 12, driving support information according to the performance status of the user is generated.
  • the performance level data D435 of the in-team performance status data D43 is referred to, and the user with the lowest performance level among the users having a “low” performance level is extracted as a support candidate user (step ST301).
  • step ST302 If the performance level of the extracted candidate users requiring support is "Low-1” or “Low-2”, work sharing is required, and if it is low-3 ", work sharing is not required and work sharing is not required or required. That is, it is determined whether or not the performance level is "low-3" (step ST302). When the performance level is "low-1” or “low-2” ("No” in step ST302), that is, the level. When the level of the support-requiring candidate user extracted as the lowest is “Low-1” or “Low-2", the work-sharing is examined as a support-requiring person who needs work-sharing.
  • step ST303 it is determined whether or not there is work that can be shared. If there is work in which the work status data D433 is “in progress”, the next work ID data D434 carried out by the person requiring support is referred to. From the procedure progress database 36, the condition data D362 of the same work ID data D363 as the referenced next work ID data D434 is referred to. If there is an "AND" work (parallel work) in the condition data D362, the work ID data D363 in which the work state data D364 is "not started” among the work steps to which the same "AND” condition is given. To get.
  • the procedure progress database 36 determines whether or not the person requiring support can share the work in other procedures. That is, using the same work user ID data D365 as the work user ID data D431 of the person requiring support, confirmation is made as follows from among other procedures (procedures in which the procedure ID data D360 is different). Acquires the next work step in which the work status data D364 of the person requiring support is "in progress", or the work step in which the work step is completed but is "not started” after that. For example, the work ID data of FIG. 4B acquires the work step of “S022”, and determines that there is work that can be shared (“Yes” in step ST303).
  • step ST303 If the work step corresponding to the above is not found in step ST303 (“No” in step ST303), sharing is not possible. Therefore, for example, although it is impossible to divide the work to the supervisor, a process for presenting information such as presenting a situation such as the existence of a user having a low performance level and prompting countermeasures is performed (step ST306). .. Even if there is no "in progress" work in the work status data D433 of the person requiring support, the user is not currently performing the work, but there is a performance problem, and the process of step ST306 is also performed.
  • step ST304 When it is determined in step ST303 that there is work that can be shared, it is determined whether or not there is a user (candidate for sharing) who can share the work (step ST304).
  • the monitoring control procedure database 34 is referred to, and it is confirmed whether or not a user ID other than the person requiring support is registered in the acquired authority user ID data D347 of the work step. If there is registration, the performance status data D43 in the team is referred to, and it is confirmed whether or not there is a user whose performance level data D435 is “high”.
  • it is decided to provide driving support that proposes the division of work of the person requiring support as a candidate user for sharing and the process proceeds to step ST305. In other cases (“No” in step ST304), it is assumed that sharing is not possible, and the process proceeds to step ST306 described above.
  • the performance status data D43 within the team When providing driving support that encourages work sharing, refer to the performance status data D43 within the team, and collect the following data, for example. Work user ID data D431 of each support-requiring person and sharing candidate user, work user ID data D431 of support-requiring person, procedure ID data D430 of sharing work step, current work ID data D432, next work ID data D434, and supervisor. User ID data. Along with the collected data, for example, a specific performance level (“Low-1” or “Low-2”) is presented, and the presentation information generation signal indicating the support implementation by the division of work by the level is presented. It is transmitted to the generation processing unit 23 (step ST305).
  • a specific performance level (“Low-1” or “Low-2”) is presented, and the presentation information generation signal indicating the support implementation by the division of work by the level is presented. It is transmitted to the generation processing unit 23 (step ST305).
  • step ST302 when the performance level of the extracted candidate users requiring support is "low-3" ("Yes” in step ST302), it is judged that support such as alerting is necessary, but it is not necessary to present the work sharing. To do. Then, the supervisor is presented with a situation in which the level of the candidate user requiring support is "low-3", and a process for presenting information such as prompting measures such as calling attention is performed (step ST307). Specifically, the work user ID data D431 of the support candidate user, the procedure ID data D430, the work ID data D432, the next work ID data D434, and the supervisor user ID data performed by the support candidate user are collected. Then, together with the collected data, a presentation information generation signal indicating support implementation for promoting countermeasures for the performance level "low-3" is transmitted to the presentation information generation processing unit 23.
  • the presentation information generation processing unit 23B When it is determined that sharing is possible and the processing of step ST305 is performed, the presentation information generation processing unit 23B outputs the screen drawing data to the output device 24 based on the data transmitted by the driving support content determination processing unit 38. Generate for each. For example, if the performance level is "Low-1" or "Low-2", for the supervisor, screen drawing of the situation of the operator and a message recommending that the work be shared by other operators. Generate data.
  • the monitoring screen G24 of the output device 24 linked to the user ID of the supervisor displays the recommended message Gm24.
  • the screen drawing data of the sharing notice message Gm24 similar to that of FIGS. 7B and 7C of the first embodiment is generated for the support-requiring person and the sharing candidate user, respectively, and output to the monitoring screen G24.
  • step ST306 when it is determined that sharing is not possible and the process of step ST306 is performed, information is presented as a reminder.
  • the supervisor describe the situation of the operator identified as a person requiring support with performance deterioration (performance deterioration factors such as increased psychological workload and decreased situational awareness), monitoring and control procedures and work being performed. After that, a message prompting for support for driving is output.
  • the performance level is "Low-3"
  • a message is output to the supervisor to call attention to the operator specified as the support candidate user.
  • the processing when the operator who has shared the work (candidate user for sharing) performs the work to be shared is the same as the case described in the first embodiment.
  • a certain member needs support because the performance level is lowered due to the mental load (psychological work load, decrease in situational awareness) (identified as a person requiring support).
  • the examined information is presented in a form suitable for each of a plurality of people (for example, a supervisor and a member scheduled to act on behalf of the team) including a person requiring support.
  • an example of estimating the user's performance status due to the mental load is shown using the psychological workload and the situation recognition ability as indexes, but only one of the mental load indexes is used. It doesn't matter. Furthermore, different indicators may be combined. Further, when the user performance evaluation processing unit 42 evaluates the psychological workload or the situation recognition ability, it is evaluated that the performance is deteriorated when a certain threshold value is exceeded, but it is not immediately determined and it is not determined immediately, but for a certain period of time or If the determination of the state continues for a certain number of times, it may be evaluated that the performance has deteriorated.
  • the evaluation of the psychological workload has shown an example of using heart rate variability data, but the present invention is not limited to this, and for example, voice frequency, tremor, etc. may be used as an index.
  • the timing of utterance of the situation recognition ability is not necessarily limited to voice data, and may be specified by, for example, the timing when an instruction is displayed on the output device or the timing when a voice signal is output from the output device. Good.
  • the state of the performance level may be prioritized over the driving situation of the user, or each may be evaluated independently. Furthermore, for example, even if a person who sees the situation of a certain operator intuitively feels that support is necessary, by inputting that fact into the input device 21, the user can be evaluated separately as a candidate user requiring support. You may be able to be elected. At that time, if the supervisor really needs support, the candidate user requiring support may be registered as the person requiring support, and the support content described with reference to FIG. 6 may be determined. Even in this case, the performance of the team can be improved by substituting the work of the person requiring support by a person with extra capacity in the team.
  • a message for the supervisor and the operator related to the work substitute is shown, but the work is changed between the operators for other team members as well.
  • Message may be generated and presented.
  • driving support information that raises work sharing and calls attention to specific operators, but the content of driving support information is not limited to this.
  • a screen that can list the performance status of the operators may be separately provided for the supervisor, and screen drawing data indicating the performance status of all the operators may be generated and output based on the performance status data D43 in the team. Further, based on the work status data D37 in the team, screen drawing data showing the work progress status and the performance status of all the operators may be generated and output.
  • the second embodiment an example of evaluating the performance based on the mental load of the operator is shown, but the content of the monitoring control procedure is expanded to the procedure of the supervisor and the user data of the supervisor is acquired.
  • the supervisor's performance may be evaluated accordingly.
  • information such as the supervisor's workload status and mental load status is presented to the output device 24 of the organization outside the plant operation team so that measures can be taken to improve the team performance including the supervisor. May be good.
  • plant monitoring control for monitoring and controlling a plant (having a plurality of plant equipment 900) in which a plurality of members (users) cooperate with each other.
  • the device 1 is an input / output unit (input device 21, output device 24) that is provided corresponding to each of a plurality of members and receives input / output operations for monitoring and control, and in advance according to an event that may occur in the plant.
  • the work content work content data D345
  • the identification information (authority user) of the member who has the operation authority of the work among the plurality of members.
  • the ID data D347) corresponds to the monitoring control procedure database 34, the input / output operation, and the occurrence of an event recorded in association with each other, and the progress status (work status data D364) for each of the plurality of tasks for each procedure.
  • a plurality of records are updated according to the record update of the procedure progress database 36 and the procedure progress database 36 in which the record associated with the identification information (work user ID data D365) of the member who is executing the work or is scheduled to be in charge is updated.
  • Situation evaluation unit (team situation evaluation processing unit 37) that evaluates the situation (work load, mental load, etc.) of each member, determines whether or not there is a member who needs work support in monitoring and control, and identifies it.
  • the identified member extracts the work scheduled to be in charge from the information recorded in the procedure progress database 36, and the monitoring control procedure database 34 From the information recorded in, determine the possibility of substitution by a member who has the operation authority for the extracted work, and determine the information related to the substitution of the extracted work (including alerting that does not require substitution) as the support content.
  • the specified member was included as the presentation target of the support content from among a plurality of members.
  • a presentation information generation unit (presentation information generation processing units 23, 23B), which selects a plurality of persons and generates presentation information according to each of the selected plurality of persons. Therefore, when a certain member falls into a situation in which the work is hindered, the work in charge of the member can be smoothly performed by another member having the operation authority. It is even more effective if the situation is at a level that cannot be resolved by individual efforts or ingenuity alone. In particular, in plant monitoring and control, there are many matters that require specialization, and the scope of work is also limited, so it is not easy to request support from others, but it is smooth because you can select a substitute. You can request support from. In addition, the person requiring support may not even be able to grasp that the situation is such, but since the information is also presented to other members, the work can be performed smoothly and optimal monitoring and control is performed by cooperation. be able to.
  • presentation information generation processing units 23, 23B presentation information generation processing units
  • the situation evaluation unit calculates the time allowance (margin time data D368, time margin data D369) in the work being executed and scheduled to be in charge of each of the plurality of members. If a member whose time allowance is calculated to be lower than the standard is specified as a member who needs support, the member who needs support can be accurately identified.
  • the mental load evaluation unit (user performance evaluation processing unit 42) for evaluating the magnitude of the mental load of each of the plurality of members is provided, and the situation evaluation unit (team situation evaluation processing unit 37B) has a mental load.
  • the biometric data acquisition device 41 for acquiring the biometric data of each of the plurality of members is provided, and the mental load evaluation unit (user performance evaluation processing unit 42) is based on the biometric data acquired by the biometric data acquisition device 41. Since the mental load of each of the plurality of members is evaluated, the mental load can be evaluated quantitatively.
  • the support content determination unit (driving support content determination processing units 38 and 38B) has a time allowance (margin time data D368, time) for the members who have the operation authority for the extracted work during the execution and in the work scheduled to be in charge. Since the margin data D369) is estimated and the member whose estimated time margin is higher than the standard is selected as the agent for the extracted work, the optimum agent can be selected.
  • the plant monitoring and control method is for a plurality of members (users) to cooperate to monitor and control a plant (having a plurality of plant equipment 900).
  • the step of updating the record of the procedure progress database 36 by associating the progress status (work status data D364) with the identification information (work user ID data D365) of the member who is executing or will be in charge of the work.
  • Steps ST101 and ST102 In response to the record update of the procedure progress database 36, the status (work load, mental load, etc.) of each of the plurality of members is evaluated, and is there a member who needs work support in monitoring and control?
  • the situation evaluation step for determining whether or not to perform the determination and the member requiring support are specified, the specified member (support required person) is identified from the information recorded in the procedure progress database 36.
  • step ST105 determines the information as the support content, and the determined support content
  • the one specified as the presentation target of the support content from among multiple members is selected. It is configured to include a presentation information display step (step ST106) in which a plurality of people including the user are selected and presentation information is generated and displayed according to each of the selected plurality of people. Therefore, when a certain member falls into a situation in which the work is hindered, the work in charge of the member can be smoothly performed by another member having the operation authority.

Abstract

プラント監視制御での手順について、作業ごとの操作権限を有する構成員の識別情報が記録された監視制御手順データベース(34)、作業ごとの、進捗状況と、関連する構成員の識別情報とが記録される手順進捗データベース(36)、チーム内の監視制御における作業上の支援を要する構成員を特定するチーム状況評価部(37)、特定された構成員が担当予定の作業に対する操作権限を有する構成員による代行の可能性に関する情報を支援内容として決定する運転支援内容決定処理部(38)、および、決定した支援内容の提示対象として、特定された構成員を含めた複数人を選定し、選定した者それぞれに応じた提示情報を生成する提示情報生成処理部(23)、を備える。

Description

プラント監視制御装置およびプラント監視制御方法
 本願は、プラント監視制御装置およびプラント監視制御方法に関するものである。
 近年、電力分野などの大規模プラントの監視制御装置は、従来のハードウェア型のアナログ監視制御盤に変わり、ソフトウェア型のデジタル監視制御盤(デジタル盤)の導入が進んでいる。デジタル盤では、監視制御の機能が集約されたグラフィカルユーザインタフェース(GUI)を用いて作業を行うため、装置の小型化、および運転員の操作負荷を軽減することができる。
 さらに、情報の内容と提示に関し、運転員の操作の頻度および声の周波数のデータから、負荷の状況および心理状況を判定し、運転員へ提示する情報の量と形態を最適化して提示する技術が開示されている(例えば、特許文献1参照。)。また、個々の運転員におけるプラント状態と操作内容との関連性を学習し、運転員の習熟度およびプラント状態に応じて適切な情報を提示する技術が開示されている(例えば、特許文献2参照。)。
特開平1-123304号公報(第4頁左上欄~第5頁右上欄、第一図) 特開平11-39032号公報(段落0008~0023、図1~図3)
 一方、実際の大規模プラントでの運転管理においては、運転員個々がバラバラに操作を行うのではなく、複数人が連携してチームとして操作を実行している。他方、上述した技術には、チームによる作業という視点はなく、個々の運転員に対しての情報提示を最適化し、個々の運転員の作業効率化を図れたとしても、チームとしてのパフォーマンスの向上には必ずしもつながらなかった。つまり、連携作業としての最適なプラント監視制御を行うための情報を提示することまでは、できていなかった。
 本願は、上記のような課題を解決するための技術を開示するものであり、連携による最適な監視制御を行うことができるプラント監視制御装置あるいはプラント監視制御方法を提供することを目的とする。
 本願に開示されるプラント監視制御装置は、複数の構成員が連携してプラントを監視制御するためのプラント監視制御装置であって、前記複数の構成員それぞれに対応して設けられ、前記監視制御のための入出力操作を受け付ける入出力部、前記プラントで生じうる事象に応じて予め定められた監視制御手順における、手順ごとの複数の作業それぞれについての、作業内容と、前記複数の構成員のなかの当該作業の操作権限を有する構成員の識別情報とが紐づけて記録された監視制御手順データベース、前記入出力操作、および前記事象の発生に対応し、前記手順ごとの複数の作業それぞれについての、進捗状況と、当該作業を実行中または担当予定の構成員の識別情報とが紐づけられた記録が更新される手順進捗データベース、前記手順進捗データベースの記録更新に応じ、前記複数の構成員それぞれの状況を評価し、前記監視制御における作業上の支援を要する構成員がいるか否かの判断、および特定を行う状況評価部、前記支援を要する構成員が特定されると、前記手順進捗データベースに記録された情報から、特定された構成員が担当予定の作業を抽出し、前記監視制御手順データベースに記録された情報から、抽出した作業に対する前記操作権限を有する構成員による代行の可能性を判断し、抽出した作業の代行に関する情報を支援内容として決定する支援内容決定部、および決定した支援内容に基づき、前記複数の構成員のなかから当該支援内容の提示対象として、前記特定された構成員を含めた複数人を選定し、選定された複数人のそれぞれに応じた提示情報を生成する提示情報生成部、を備えたことを特徴とする。
 本願に開示されるプラント監視制御方法は、複数の構成員が連携してプラントを監視制御するためのプラント監視制御方法であって、前記プラントで生じうる事象に応じて予め定められた監視制御手順における、手順ごとの複数の作業それぞれについて、作業内容と、前記複数の構成員のなかの当該作業の操作権限を有する構成員の識別情報とを紐づけて監視制御手順データベースに記録するステップ、前記監視制御のための入出力操作、および前記事象の発生に対応し、前記手順ごとの複数の作業それぞれについての、進捗状況と、当該作業を実行中または担当予定の構成員の識別情報とを紐づけて、手順進捗データベースの記録を更新するステップ、前記手順進捗データベースの記録更新に応じ、前記複数の構成員それぞれの状況を評価し、前記監視制御における作業上の支援を要する構成員がいるか否かの判断、および特定を行う状況評価ステップ、前記支援を要する構成員が特定されると、前記手順進捗データベースに記録された情報から、特定された構成員が担当予定の作業を抽出し、前記監視制御手順データベースに記録された情報から、抽出した作業に対する前記操作権限を有する構成員による代行の可能性を判断し、抽出した作業の代行に関する情報を支援内容として決定する支援内容決定ステップ、および決定した支援内容に基づき、前記複数の構成員のなかから当該支援内容の提示対象として、前記特定された構成員を含めた複数人を選定し、選定された複数人のそれぞれに応じた提示情報を生成・表示する提示情報表示ステップ、を含むことを特徴とする。
 本願に開示されるプラント監視制御装置、あるいはプラント監視制御方法によれば、操作権限を有する者の中から、作業代行の可能性を検討した結果を支援内容として、要支援者を含む複数の構成員に提示するようにしたので、連携による最適な監視制御を行うことができる。
実施の形態1にかかるプラント監視制御装置の構成を説明するためのブロック図である。 実施の形態1にかかるプラント監視制御方法の動作について説明するためのフローチャートである。 実施の形態1にかかるプラント監視制御装置における監視制御手順データベースへの項目ごとのデータの登録例の前半部分を示す図である。 実施の形態1にかかるプラント監視制御装置における監視制御手順データベースへの項目ごとのデータの登録例の後半部分を示す図である。 実施の形態1にかかるプラント監視制御装置における手順進捗データベースへの項目ごとのデータの格納例の前半部分を示す図である。 実施の形態1にかかるプラント監視制御装置における手順進捗データベースへの項目ごとのデータの格納例の後半部分を示す図である。 実施の形態1にかかるプラント監視制御装置のチーム状況評価処理部が生成したチーム内作業状況データの例を示す図である。 実施の形態1にかかるプラント監視制御方法において、運転支援内容を決定する工程の動作について説明するためのフローチャートである。 図7A~図7Cのそれぞれは、実施の形態1にかかるプラント監視制御装置において、作業分担に関する運転支援情報を画面表示する際、作業における立場が異なる者に対する表示例を示す図である。 図8Aと図8Bは、実施の形態1にかかるプラント監視制御装置において、ある作業を代行させた際の運転支援情報を画面表示する際の、異なる表示例を示す図である。 本実施の形態1にかかるプラント監視制御装置の演算処理を実行する部分の構成例を示すブロック図である。 実施の形態2にかかるプラント監視制御装置の構成を説明するためのブロック図である。 実施の形態2にかかるプラント監視制御装置のチーム状況評価処理部が生成したチーム内パフォーマンス状況データの例を示す図である。 実施の形態2にかかるプラント監視制御方法において、ユーザのパフォーマンスレベルの観点で運転支援内容を決定する工程の動作について説明するためのフローチャートである。 実施の形態2にかかるプラント監視制御装置において、ユーザのパフォーマンスレベルの観点で、ある作業を代行提案する際の運転支援情報の画面表示例を示す図である。
実施の形態1.
 図1~図9は、実施の形態1にかかるプラント監視制御装置あるいはプラント監視制御方法について説明するためのものであり、図1はプラント監視制御装置の主に情報の提示に関わる部分の構成を説明するためのブロック図、図2はプラント監視制御装置の動作、つまりプラント監視制御方法について説明するためのフローチャートである。また、図3Aと図3Bはプラント監視制御装置における監視制御手順データベースへの運転手順に関する項目ごとのデータの登録例をそれぞれ前半部分と後半部分に分けて表示した図であり、図4Aと図4Bはプラント監視制御装置における手順進捗データベースへの進捗状況に関する項目ごとのデータの格納例をそれぞれ前半部分と後半部分に分けて表示した図、図5はチーム状況評価処理部が生成したチーム内作業状況データの項目ごとのデータの例を示す図である。
 そして、図6はプラント監視制御方法において、運転支援内容を決定する工程の動作について説明するためのフローチャートであり、図7A~図7Cは、作業分担に関する運転支援情報を画面表示する際、作業における立場が異なる者として、監督者、支援を受ける運転員、支援を依頼される運転員のそれぞれに対する表示例を示す図、図8Aと図8Bは、ある作業を代行させた際の運転支援情報を画面表示する際の、それぞれ異なる表示例を示す図である。そして、図9は、プラント監視制御装置の監視制御部と運転支援処理部のうち、演算処理を行う部分を、あるハードウェアを用いて実行するようにした場合の構成例を示すブロック図である。
 本願の各実施の形態にかかるプラント監視制御装置、およびプラント監視制御方法についての詳細な説明の前に、前提となるプラントの監視制御の実態について説明する。
 一般的に、プラントの監視制御は監視制御室の中央制御盤を監視・操作する複数名からなる運転チームにより行われる。チームは、監視・操作を実行する複数名の運転員と、運転員への作業指示およびその行動の監視を行う監督者から構成される。運転員と監督者には、それぞれ専用の監視制御用の入力装置および出力装置(入出力装置)が用意されており、各自に与えられた入出力装置を利用して、プラントの監視と制御を実施する。
 プラントの典型的な監視制御手順としては、まず監督者が運転員に作業内容を指示する。運転員は、与えられた入出力装置を利用して作業を実施する。作業の実施後、運転員は監督者に完了報告を行い、監督者は自身の入出力装置を利用して、運転員が実施した作業内容を確認する。なお、プラントの監視制御形態としては、監視制御室内に運転チーム構成員が全員揃った状態で口頭によるコミュニケーションを行いながら運転する場合のほか、監視制御室の運転員と遠隔地にいる監督者が遠隔でコミュニケーションする場合も想定される。
 指示される作業は、一定のパターンで繰り返されることもあるが、プラントの状況に応じて変化する。また、各運転員に指示される作業は、その運転員が次に指示される作業に限らず、他の運転員が、現に実行している作業、あるいは、次に指示される予定の作業に関連する場合もある。さらには、あるとき指示された作業、あるいはその関連作業が、次回も同じ作業員に指示されるとは限らない。
 そのような中で、限られた時間内でのタスク実施が求められる状況など、運転員にとって作業負荷が高い状況下では、作業効率の低下、操作誤り、および状況認識誤りなどのヒューマンエラーが発生する可能性がある。その際、背景技術で説明したように、監視制御の根幹であるチームでの作業という視点を欠いた、従来のプラント状況、あるいは運転員個人の状況に応じた情報の提示だけでは、連携による最適な監視制御を行うための情報が提示されたとは言えない。これは、チーム構成員が目の届く範囲で作業できる場合にも当てはまるが、監督者など一部のチーム構成員が遠隔地にいる場合は、チーム状況を把握するための情報量はコミュニケーション用のシステムを介すことにより制限されるため、一層顕著なものとなる。
 そこで、チーム全体での作業効率(パフォーマンス)向上を目的として、プラント状況とチームを構成する複数の運転員の状況、および運転員と紐づけた作業の関連性に基づき、運転員間で適切な作業融通を行うための情報を提示できるように構成した。これを前提として、実施の形態1にかかるプラント監視制御装置、およびプラント監視制御方法について説明する。
 プラント監視制御装置1は、図1に示すように、プラント内の複数のプラント機器900の制御を行うとともに、プラント情報をユーザに提供する監視制御部2と、運転支援に関する情報を生成して、監視制御部2に出力する運転支援処理部3とを備えている。なお、以降、ひとつのプラント機器を示す場合、複数のプラント機器を示す場合も含めて、単にプラント機器900として説明する。
<監視制御部>
 監視制御部2は、データ入出力のための入力装置21と出力装置24、入力装置21とプラントから受信したデータ処理をするデータ処理部22、プラントの状態、支援内容等の出力装置24で提示する情報を生成する提示情報生成処理部23とを備えている。そして、入力装置21を用いた運転員の操作入力、あるいは自動制御による操作に基づき、プラント機器900の制御を行うとともに、出力装置24を介して、プラント機器900の情報であるプラント情報をユーザに提供するように以下のように構成している。
 入力装置21および出力装置24は、運転チームを構成する複数の運転員および監督者(以下、ユーザ)がそれぞれ使用する監視制御インタフェースであり、各ユーザにそれぞれ1つ以上割り当てられる。入力装置21は、ユーザによる出力装置24の表示制御入力、ユーザによるプラント機器900に対する操作入力、ならびにユーザによるプラント機器900の値に対する確認入力を行うものである。確認入力された確認入力信号または操作入力された操作入力信号(以下、確認・操作入力信号)をデータ処理部22に送信する。
 なお確認・操作入力信号には、当該信号が生成された時刻データ、入力装置21を扱うユーザを区別するデータ(ユーザID)、確認・操作の内容を一意に区別するデータ(作業ID)が含まれる。ユーザIDは、チームの構成員(監督者および運転員全員)を区別するものであり、各ユーザは各自のユーザIDが割り当てられた入力装置21と後述の出力装置24を使用する。
 なお、入力装置21の例としては、マウスと出力装置24が一体となったタッチパネルが挙げられる。表示制御入力、操作入力、確認入力は、例えばマウスクリック、あるいはタッチ操作を通じて行う。その他、確認入力には入力装置21として視線センサなどを用いてもよい。出力装置24は、プラント機器の動作状況を示す監視画面、あるいは後述する運転支援情報を表示する、モニタなどの表示端末である。
 データ処理部22は、プラント機器900からのプラント情報、および入力装置21からの確認・操作入力信号を受け取り、プラント機器900、提示情報生成処理部23、運転支援処理部3に伝送する各種信号の生成を行う。具体的には、プラント機器900に対しては、計測信号の受信と制御信号の伝送を行う。提示情報生成処理部23に対しては、プラント機器900からの、プラント情報、または入力信号を元に、監視画面を生成・更新するための提示情報生成信号の生成と伝送を行う。また、運転支援処理部3に対する情報の生成およびデータベースへの書き込みを行うものである。
 提示情報生成処理部23は、出力装置24に出力するユーザに対応した画面描画データを生成する。画面描画データは、上述のデータ処理部22から出力される監視画面を生成・更新するための提示情報生成信号、または、後述の運転支援処理部3から得られる運転支援情報の提示情報生成信号に従って生成される。なお、本願では、説明を簡略化するため、監視描画データは、後述する画面表示例のような視覚での表示を例示しているが、これに限ることはなく、聴覚で表示する音声データ、触覚で伝達するデータ等が含まれていてもよい。
<運転支援処理部>
 運転支援処理部3は、監視制御部2から伝送されるプラント情報およびユーザの確認・操作入力信号を元に、各ユーザのプラント運転状況およびチームとしての状況を評価する。そして、状況に応じた運転支援内容を決定し、監視制御部2の提示情報生成処理部23に対して運転支援情報に関する提示情報生成信号を送信する役割を担うため、ユーザと紐づけた作業の関連性のデータを含む複数のデータベースを備えている。そして、これらのデータを基にチーム内で作業を円滑に融通するための情報を含む運転支援に必要な情報を生成する複数の処理部を備えている。
 データベース(図中、DBと表記)としては、プラント情報データベース31、作業履歴データベース33、監視制御手順データベース34、手順進捗データベース36を備えている。処理部としては、プラント状況診断処理部32、ユーザ作業状況推定処理部35、チーム状況評価処理部37、運転支援内容決定処理部38を備えている。
 プラント情報データベース31は、プラント機器900のプラント情報を、データ処理部22を介して蓄積する。プラント状況診断処理部32は、プラント情報データベース31に蓄積された時系列のプラント情報を元に、プラント内での発生事象を推定する。作業履歴データベース33は、データ処理部22を介し、入力装置21による確認・操作入力信号を元に生成された時系列の確認・操作履歴データ(作業履歴データ)を格納する。
 上述したように、実際のプラントの運転管理では、複数のユーザと複数の作業とが、時系列を含めて関連しており、そのすべてについて説明すると、煩雑化して収集が困難になる。そこで、本実施の形態1では、ユーザ(運転員、監督者)のうち、本願の技術思想を明らかにするのに必要な2名の運転員の作業に注目するとともに、監督者を含めた3名のユーザに情報提示を行う例について説明する。そのため、各データベース、あるいは処理部で扱うデータは、User-AとUser-Bの2名が担当する作業、および2名による確認・操作履歴データに基づいて説明する。
 監視制御手順データベース34には、各事象に対する監視制御手順、および監視制御手順を構成する確認・操作の実施に関して規定された情報が登録されている。ユーザ作業状況推定処理部35は、プラント状況診断処理部32の出力と作業履歴データベース33の作業履歴データ(ユーザの行動(確認・操作)結果)、および監視制御手順データベース34をもとに、ユーザの作業進捗状況(手順進捗状況)を推定する。
 手順進捗データベース36には、ユーザ作業状況推定処理部35で生成された手順進捗状況に関する情報が格納される。チーム状況評価処理部37は、手順進捗データベース36に格納された、各ユーザの手順進捗状況の情報を元に、作業実施に課題のあるユーザがチーム内にいるかどうか、チーム状況を評価する。
 運転支援内容決定処理部38は、チーム状況評価処理部37の評価結果を元に、作業実施に課題のある運転員がいる場合に、チーム内での作業分担の提起、あるいは運転員のパフォーマンス低下に関する監督者への注意喚起などの運転支援内容を決定する。そして、決定した運転支援内容を提示するため提示情報生成信号を生成し、監視制御部2の提示情報生成処理部23に送信するよう構成している。
 上述した構成を踏まえ、動作について説明する。プラント機器900のプラント情報は、データ処理部22を介してプラント情報データベース31に時刻データと共に時系列に蓄積される。プラント情報の例としては、各種プラント機器の状態を示す値であるプラント値、異常信号などのアラーム情報などである。入力装置21から入力された各ユーザの確認・操作入力信号は、データ処理部22により解釈され、作業履歴データベース33に作業履歴データとして格納される。
 作業履歴データとしては、例えば、時刻データ、ユーザIDデータ、作業IDデータ、作業関連情報(例えば確認・操作対象のIDデータ、確認・操作結果のプラント値)等があげられる。操作には、1回の操作で完結するもの、1つの操作を連続して行うもの(例えば、弁の開度を手動で開けるためのボタン押下動作を継続する操作など)がある。後者の場合、複数の操作入力信号が発生し、逐次、作業履歴データベース33に格納される。ここまでの動作は、一般的なプラント監視制御装置と同様である。
 つぎに、本願の特徴部分を含む、運転支援処理部3の動作、および、その処理結果をもとに運転支援情報を出力装置24に出力するまでの動作について、図2のフローチャートに基づき、説明する。
 ステップST101では、プラント状況の診断を行う。プラント状況診断処理部32は、不具合原因と事象波及の関係など、事象診断に必要なデータを格納する知識ベースを内部に有しており、プラント情報データベース31からアラーム情報およびプラント値を取得し、知識ベースを用いて事象診断を実施する。診断の結果、発生している1つ以上の事象を特定し、当該事象を区別する事象IDデータをユーザ作業状況推定処理部35に送信する。ステップST101は、あらかじめ定められた周期で定期的に実行され、新規の事象が発生するごとに事象IDデータを送信する。なお事象診断の方法は一例であり、この限りではない。
 ステップST102では、ユーザ作業状況の推定処理を行う。ユーザ作業状況推定処理部35が実行する動作全体の流れを示す。まず、プラント状況診断処理部32から新規の事象IDデータを受信後、監視制御手順データベース34(データ構造は後述)に格納されたデータ参照して事象IDと紐づく手順を特定する。手順は1つ以上の作業ステップ(確認作業または操作)から構成されており、手順進捗データベース36(データ構造は後述)に、その手順構造を踏まえた新たな手順進捗データを生成する。
 その後、作業履歴データベース33に蓄積されている作業履歴データのうち、未確認のものを時刻の古い順に1つずつ参照する。そして、該当する手順の作業ステップの進捗状況を推定し、推定結果を手順進捗データベース36の当該作業ステップの手順進捗データ部分に格納する。ここで推定する進捗状況とは、作業ステップの進み具合の良し悪しである。本実施の形態1では、各作業ステップを完了すべき制限時間に対する残り時間(時間余裕度)を指標とし、推定の結果、時間余裕度の低い作業ステップは、後のステップST103にて作業進捗に課題があると扱う。
 監視制御手順データベース34には、図3A、図3Bに示すように、複数のデータ項目に対して、系列的にIDおよび条件等が登録されている。データ項目としては、左から順に、事象IDデータD340、手順IDデータD341、各作業ステップ実施の順序データD342、作業ステップ実施に関する条件データD343(AND/OR条件)、作業ステップを区別する作業IDデータD344がある。さらに、作業内容データD345、作業完了条件データD346、当該作業ステップを実施可能な権限ユーザIDデータD347、作業ステップの実施に標準的に要する時間である作業所要時間データD348がある。そして、作業ステップ完了に要求される制約条件である作業完了制約条件データD349と続き、事象IDデータD340、手順IDデータD341から順に、系統的に揃えて登録される。
 また、手順進捗データベース36にも、図4A、図4Bに示すように、監視制御手順データベース34と同様に、複数のデータ項目に対して、系列的にIDおよび条件等が登録されている。データ項目としては、左から順に、手順IDデータD360、順序データD361、条件データD362、作業IDデータD363が格納される他、作業ステップの作業状態データD364(未着手/実施中/完了)がある。さらに、作業ステップを実施した、または実施中の作業ユーザIDデータD365、作業実績時間データD366、作業ステップ完了までの制限時間を示す制限時間データD367、制限時間に達するまでの余裕時間データD368がある。そして、余裕時間から算出される時間余裕度データD369(例えば低/高)、分担候補ユーザIDデータD36a(詳細は後述)と続き、手順IDデータD360、順序データD361から順に、系統的に揃えて格納される。
 図3A、図3B、図4A、図4Bに示す各データベース内のデータ例を用い、ユーザ作業状況推定処理部35の動作(ステップST102)の詳細を説明する。ユーザ作業状況推定処理部35の処理は、事象判断プロセス、手順完了確認プロセス、未完了作業(未着手/実施中作業)の時間監視プロセスの3種類のプロセスから構成される。
 事象判断プロセスでは、プラント状況診断処理部32から事象IDデータを受信後、監視制御手順データベース34を参照して事象に対する1つ以上の手順を特定する。その後、監視制御手順データベース34を参照し、手順進捗データベース36に新規の手順進捗データを作成する。作業状態データD364に格納されるデータは、新規の場合は”未着手”が入力される。作業ユーザIDデータD365はユーザによる作業(確認/操作)着手後、作業実績時間データD366は作業完了後にそれぞれ格納される。
 手順完了確認プロセスは、事象判断プロセスの実行後、全ての手順の作業ステップが完了するまで、一定時間ごとに実行される。ユーザ作業状況推定処理部35は、作業履歴データベース33を一定時間ごとに参照し、未確認の作業履歴データがあるかどうかを確認し、あれば作業履歴データ内の作業IDデータを、監視制御手順データベース34と照合し、該当する手順および作業ステップを特定する。その後、当該作業により作業ステップが完了したか否かを、作業完了条件データD346を参照し判定する。
 例えば、”弁開度100%になるまで操作実施”という条件であれば、操作の結果得られるプラント値などから条件を満たしたか否か(完了したか否か)を判定する。判定結果は手順進捗データベース36の作業状態データD364に格納される。完了条件を満たしていない場合は”実施中”に更新し、作業履歴データ内のユーザIDを作業ユーザIDデータD365に格納する。完了条件を満たした場合は”完了”と格納し、作業ユーザIDデータD365にユーザIDを、また作業履歴データベース33の時刻データから作業実施にかかった時間を算出し、作業実績時間データD366に格納する。制限時間データD367、時間余裕度データD369、余裕時間データD368には、例えば、完了済みを示す”-”のデータを格納する。
 その後、監視制御手順データベース34の作業所要時間データD348と手順進捗データベース36の作業実績時間データD366との差を計算する。計算した差を、後に説明する余裕時間データD368に加算することで、余裕時間データD368および時間余裕度データD369を更新する。例えば、標準の作業時間である作業所要時間データD348よりも作業実績時間データD366が少ない場合は、余裕時間は増加することとなる。なお、ここで手順進捗データベース36の分担候補ユーザIDデータD36aにデータがある場合は、後に説明する作業分担に関する処理を実施する。本プロセスがここまで実行されるごとに、チーム状況評価処理部37に更新信号を送信する。
 未完了作業の時間監視プロセスでは、作業状態データD364が実施中または未着手の作業ステップのそれぞれに対して、余裕時間データD368および時間余裕度データD369を算出する処理を行う。まず、該当する作業ステップを完了する必要のある制限時間である制限時間データD367を、監視制御手順データベース34に登録された作業完了制約条件データD349を用いて算出する。作業完了制約条件データD349は、それが設定された作業ステップが完了している必要のある条件(例えば、他の作業ステップの完了から10分後までに実施完了など)である。
 作業完了制約条件データD349が設定されていない作業ステップがある場合は、その後の作業完了制約条件データD349が設定されている作業ステップの制限時間データD367を参照する。参照した制限時間データD367から、その前の作業ステップの作業所要時間データD348を減算して順に逆算していき、各作業ステップの制限時間データD367を算出し、格納する。なお、各手順の最後の作業ステップには作業完了制約条件データD349が設定されている。その後、実施中または未着手の各作業ステップの余裕時間データD368を、制限時間データD367から作業所要時間データD348を減算して算出し格納する。
 また、あらかじめ定められた閾値に従い、余裕時間データD368から時間余裕度データD369を算出する。本実施の形態1では、時間余裕度を”低”または”高”の2段階評価で設定しているが、段階数の設定はこの限りではない。なお、前述のように、これらの余裕時間データD368と時間余裕度データD369は、手順完了確認プロセスの結果に応じて更新される。また、制限時間データD367、余裕時間データD368、時間余裕度データD369は、ユーザ作業状況推定処理部35により、あらかじめ定められた周期で、時間経過に伴い更新される。
 ステップST103では、チーム状況評価処理部37は、ユーザ作業状況推定処理部35からの更新信号を受け取り、チーム状況を評価する処理を行う。その後、手順進捗データベース36を参照し、図5に示すようなチーム内作業状況データD37を生成する。チーム内作業状況データD37には、手順IDデータ370に対し、現作業についての、作業ユーザIDデータD371、作業IDデータD372、および作業状態データD373が生成される。さらに、現作業の次に行うべき作業である次作業についての、作業IDデータD374、余裕時間データD375、および時間余裕度データD376(例えば低/高)を生成する。次作業としては、手順進捗データベース36の作業状態データD364が”実施中”である作業がある場合はその次の作業が、手順内の作業がすべて”未着手”である場合は当該手順の最初の作業が該当し、条件データD362に従って決定する。
 ステップST103で評価したチーム状況に基づき、ステップST104として、運転支援が必要であるかどうかを判断する。次作業の時間余裕度データD376が”低”の作業がある場合、運転支援が必要な運転員(要支援者)がいると判断し、ステップST105に移行するために、図5で説明したチーム内作業状況データD37を運転支援内容決定処理部38に送信する。次作業の時間余裕度データD376がすべて”高”である場合は、提示情報生成処理部23に対し、作業進捗に問題がないことを示す提示情報生成信号を生成、送信し、ステップST106へ移行する。
 ステップST104にて課題のあるユーザがある、つまり運転支援が必要と判断された場合(Yes)、ステップST105にて運転支援内容決定処理部38がチーム内での作業分担の提起など、どのような運転支援を行うかを決定する。運転支援内容決定処理部38が実行するステップST105の詳細な動作について、図6に示すフローチャートに基づいて説明する。
 まず、チーム状況評価処理部37から受信したチーム内作業状況データD37から、次作業の時間余裕度データD376が”低”である作業ステップを抽出する。そして、時間余裕度データD376が”低”である作業ステップのうち、最も次作業の余裕時間データD375の値が小さい(余裕時間が少ない)作業ステップを作業分担の検討対象として選出する(ステップST201)。
 なお、詳細は後述するが、運転支援内容決定処理部38は作業分担を行ったのち、再度このステップST201から処理を行うことがある。選出した作業ステップにすでに分担ユーザが割り当てられていた場合は、別の作業ステップを選出する。手順進捗データベース36を参照し、選出した作業ステップの分担候補ユーザIDデータD36aにデータが格納されているかを確認し、格納されていた場合は、その次に余裕時間データD375の値が小さい作業ステップを選出する。
 選出した作業ステップの作業状態データD373が”実施中”であれば、当該手順を実施している作業ユーザIDデータ記載のユーザは負荷が高い可能性があると判断し、そのユーザを要支援者として特定する。そして、要支援者が次に実施すべき作業(最も余裕時間データD375の値が小さい次作業、または他の手順で未着手の作業)について確認し、分担できそうな作業があるかどうかを判定する(ステップST202)。
 まず、最も余裕時間データD375の値が小さい次作業の分担可否を判定する。当該作業IDデータD372と手順IDデータD360が同一の(同じ手順内の)作業IDデータD363の条件データD362を参照する。条件データD362に”AND”の作業(並行可能な作業)があれば、同じ”AND”条件が付与されている他の作業ステップのうち、作業状態データD364が”未着手”である作業ステップの作業IDデータD363(例えば、作業IDデータD363:“S003”)を取得する。そのような作業ステップがない場合は、その手順では現在実施中の作業が終了しない限り、次作業に着手できないため、他の手順での分担可能な作業ステップの有無を確認する。
 具体的には、着目している作業ステップを実施中の作業ユーザIDデータD365を確認する。そして、手順進捗データベース36内の他の(手順IDデータD360が異なる)手順のなかで、要支援者が“実施中”である次の作業ステップ、または途中の作業ステップまで完了しているがその後が“未着手”である作業ステップを取得する。例えば、図4Bの作業IDデータが“S022”の作業ステップを取得し、分担可能な作業ステップあり(ステップST202で「Yes」)と判定する。
 もし、上記に該当する作業ステップがない場合(ステップST202で「No」)は、分担可能作業なしとして、後述する処理、例えば監督者に対して状況を提示し対策を促す旨を通知するなどの情報提示を行うための処理を行う(ステップST205)。なお、最も余裕時間データD375の値が小さい作業ステップの作業状態データD373が”未着手”であれば、分担可能な作業ステップあり(ステップST202で「Yes」)と判定し、次に説明するステップST203に移行する。
 ステップST203では、分担可能な作業ステップとして取得した次作業の作業ステップの実施権限があるユーザの有無を確認する(ステップST203)。ステップST201で選出した作業ステップの作業状態データD373が”実施中”である場合、その作業ステップのユーザIDデータD371のユーザは高負荷であると判断する。そこで、監視制御手順データベース34を参照して、当該作業ステップの次作業ステップの権限ユーザIDデータD347に、分担候補者として要支援者以外のユーザIDが登録されているかを確認する。
 登録がある場合は、手順進捗データベース36を参照し、現在実施している作業ステップの時間余裕度データD369が”高”のみである分担候補者であるユーザがいるかを確認する。そのような分担候補者のユーザがいる場合(ステップST203で「Yes」)は、要支援者への作業分担を提起する運転支援を行うことを決定し、ステップST204へ移行する。それ以外の場合(ステップST203で「No」)は分担不可であるとして、現況を提示し対策を促す運転支援を行うと決定し、ステップST205に移行する。
 一方、ステップST201で選出した作業ステップの作業状態データD373が”未着手”である場合は、手順進捗データベース36ではなく、チーム内作業状況データD37を参照する。そして、次作業の時間余裕度データD376がすべて”高”であるユーザを選出し、監視制御手順データベース34の権限ユーザIDデータD347を確認して、権限ユーザIDの登録があればそのユーザへの分担を提起する運転支援を行うことを決定する(ステップST204へ移行)。登録がなければ分担不可であるとしてステップST205に移行する。
 分担可能な場合、ステップST204に進み、他のユーザへの作業分担を促す旨の情報を示す信号を提示情報生成処理部23に送信する。作業分担を促すための情報には、要支援者と分担候補者の情報、分担する作業の情報、その作業に関する監督者の情報等があり、チーム内作業状況データD37を参照して抽出する。具体的には、要支援者と、分担候補者の作業ユーザIDデータD371、分担する作業ステップの手順IDデータD370、分担する次作業IDデータD374、監督者のユーザIDを抽出して、作業分担による支援実施を示す信号とともに送信する。
 上述した信号を受けた運転支援内容決定処理部38は、手順進捗データベース36の分担する作業ステップの分担候補ユーザIDデータD36aに、分担候補者のユーザIDの情報を格納する。その後、当該分担候補ユーザの他に、分担が割り当たっていないユーザ(運転員)がいるか否かを判断し(ステップST206)、いる場合はステップST201に戻り再び処理を行い、いない場合は処理を終了する。
 分担不可であった場合、ステップST205に進み、作業分担が不可能である旨の情報を示す信号を提示情報生成処理部23に送信する。具体的には、最も次作業の余裕時間データD375の値が小さい作業ステップの手順IDデータD370と作業IDデータD372、次作業IDデータD374、監督者のユーザIDを抽出し、分担不可に対する支援実施を示す信号とともに送信する。
 図2に戻り、ステップST105内の各動作(ST201~ST206(図6))後、ステップST106に移行し、運転支援内容決定処理部38が送信したデータを元に、提示情報生成処理部23が出力装置24に出力する画面描画データを生成する。提示情報生成処理部23は、出力する運転支援情報を提示対象となるユーザに応じて生成する。
 作業分担による支援実施を行う信号を受信した場合、例えば、監督者ユーザ向けには、要支援者と特定した運転員の状況と、その作業を分担候補ユーザに分担させることを推奨するメッセージの画面描画データを生成する。そして、監督者のユーザIDに紐付けられた出力装置24には、例えば、図7Aに示すように、監視画面G24内に、要支援者(図中、運転員A)の作業が逼迫している旨と、分担候補ユーザ(同、運転員B)に代行させることを推奨するメッセージGm24を表示させる。
 支援を受けることが望ましい要支援者には、分担候補ユーザが次の作業を分担(代行)する旨を予告するメッセージ、支援する可能性のある分担候補ユーザには、当該作業の代行指示がある可能性がある旨を予告するメッセージの画面描画データを生成する。そして、支援を受けることが望ましい要支援者のユーザIDに紐付けられた出力装置24には、例えば、図7Bに示すように、監視画面G24内に、特定したある作業を分担候補ユーザに代行させる可能性があることを知らせるメッセージGm24を表示させる。そして、代行依頼する可能性のある分担候補ユーザのユーザIDに紐付けられた出力装置24には、例えば、図7Cに示すように、監視画面G24内に、要支援者の特定したある作業を代行依頼する可能性があることを知らせるメッセージGm24を表示させる。
 なお、情報提示の形態としては、監視画面G24の一部に専用のエリアを設けてメッセージを出力してもよいし、一定時間のみ出力してもよい。また、分担不可である場合は、例えば、監督者ユーザ向けに作業負荷が大きな運転員と実施中の監視制御手順および作業を記載した上で運転の支援を促すメッセージを出力する。支援情報の例としては、運転の助言の推奨、運転人員の増員の検討の推奨などを含めてもよい。なお、作業進捗に問題がない旨を示す提示情報生成信号を、チーム状況評価処理部37から受信した場合は、問題がない旨を示すメッセージGm24を提示する画面描画データを生成してもよいし、画面描画データ生成処理を実行しなくてもよい。
 ステップST106終了後、作業を分担した運転員(代理ユーザ)が分担対象の作業を実施した際の処理について以下説明する。入力装置21を介して入力された代理ユーザによる確認・操作信号は、データ処理部22によって作業履歴データベース33に格納される。ユーザ作業状況推定処理部35の手順完了確認プロセスにて、当該作業履歴データの作業実施状況を判別し、手順進捗データベース36に作業状態データD364、ユーザIDデータD365等のデータを格納した後、手順進捗データベース36を確認する。
 当該作業ステップの分担候補ユーザIDデータD36aにデータが格納されていた場合、本作業履歴データは代理ユーザにより実施されたものであると判定する。この後、ユーザ作業状況推定処理部35は、更新信号と、代理ユーザID、手順ID、作業ID、代理する前に手順を実行していたユーザIDを含む分担作業の実施を示す信号を、チーム状況評価処理部37に対して送信する。
 チーム状況評価処理部37は、前述した処理を行った後、運転支援内容決定処理部38に分担作業の実施を示す信号を送信する。運転支援内容決定処理部38は、当該分担作業の実施信号を受け取ると、前述した運転支援内容の決定処理を行うと同時に、分担作業の実施信号を元に分担実施状況を提示するための提示情報生成信号を生成し、提示情報生成処理部23に送信する。
 提示情報生成処理部23が当該提示情報生成信号を受信すると、監督者および運転支援を受ける(代理される)運転員Aに対する画面描画データを生成する。例えば、図8Aに示すように、作業を別の運転員Bが代行中である旨を示すメッセージGm24を監視画面G24内に提示するための描画データを生成し、監督者および代理される運転員Aの出力装置24に出力する。なお、作業代行中であることを示すために、監視画面G24上の確認・操作対象(ポンプ、弁、プラント値等)の近辺に代理実行中である旨を示す描画データを生成しても良い。
 提示情報生成処理部23は、監視画面を描画するために、監視画面G24を構成する画面シンボル部品、および描画位置のデータと、確認・操作対象IDのデータとを関連づけた画面データベースを有している。そのため、作業IDに紐づく確認・操作対象IDを作業履歴データベース33の作業関連情報から取得することで、当該確認・操作対象IDの画面シンボル部品付近に、その作業の支援に関するメッセージを表示することも可能である。例えば、図8Bに示すように、作業対象を示す画面シンボル部品Gs1に対して、運転員Bによる代理実行中である旨を示す注釈文Gr24を表示させるようにして、視覚的に支援対象の作業を認識させることができる。これにより、元々作業する予定であった運転員Aが誤って当該作業を実施する可能性を低減できる。
 つまり、本実施の形態1では、ある構成員が、作業負荷上、支援が必要となった(要支援者と特定できた)とき、担当する作業について、他の構成員による代行の可能性について検討する。そして検討した情報を、要支援者を含むチーム内の複数人(例えば、監督者、代行予定の構成員)のそれぞれに適した形態で提示するようにした。要支援の状態を、要支援者自身の努力、あるいは工夫だけでは解決できないレベルである場合でも、チーム内の協力を得られることで、連携による最適な監視制御が実行できる。とくに、プラントの監視制御においては、専門性を要する事項が多く、他者に支援を要請することは容易ではないが、操作権限のあるものから代行する候補を選定しているので、スムーズに応援要請ができる。また、要支援者は、そのような状況にあることすら把握できないこともあるが、他の構成員にも情報が提示されるので、スムーズに作業代行ができ、連携による最適な監視制御を行うことができる。
 また、チーム構成員が監視制御室にいる場合、あるいは遠隔地にいる場合に限らず、他者の作業負荷状況を把握できるようになる。そのため、作業代行できる候補者を選定できなかったとしても、要支援者は、苦しい状況を理解してもらえたと認識できたことで、冷静に対処でき、代行の必要性自体が解消されることもある。それに基づきチーム全体のパフォーマンスを向上させる対策を講じることができ、連携によるプラントの監視制御の正確性が向上する効果が得られる。
 なお、本実施の形態1では、監督者と作業代理に関係する運転員を対象にメッセージを生成する例を示したが、その他のチーム構成員に対しても運転員間で作業を交代する旨のメッセージを生成し提示するようにしてもよい。また、本実施の形態1では、図7、8で説明したように、運転支援情報(例えば、メッセージGm24)をプラントの監視画面G24と同画面に出力する例を示したが、運転支援情報は別の出力装置24に表示してもよい。さらに運転支援情報の提示形態は画面表示に限らず、例えば音声などでユーザに個別に提示してもよい。
 また、本実施の形態1では、例として作業分担の提起、あるいは特定運転員の注意喚起を促す運転支援情報を提示したが、運転支援情報の内容はこの限りではない。また、本実施の形態1では、監督者ユーザ向けに特定の運転員の作業を他の運転員に分担させることを推奨するメッセージを提示後、監督者が直接運転員に対して代理作業実施の指示を行う例を示したが、これに限るとこはない。例えば、当該メッセージとともに分担実施をするか否かを入力できるボタン(例えば、承認/否認)を、監督者の監視画面G24に先に表示する。そして、表示された内容に従って、提起された運転支援内容が承認されると、代行する運転員Bには代行指示するメッセージを、代行される運転員Aには代行予告のメッセージをそれぞれ出力するようにしてもよい。
 また、本実施の形態1では、監督者には作業進捗状況に課題のある運転員の状況をメッセージとして提示する例を示したが、これに限ることはない。例えば、別途監督者用に運転員状況を一覧できる画面を設け、チーム内作業状況データD37を元に全運転員の手順進捗状況を示す画面描画データを生成し出力してもよい。
 また、本実施の形態1では運転員の作業負荷を扱う例を説明したが、監視制御手順の内容を監督者の手順(運転員への確認・操作指示、運転員の作業結果の確認など)に広げ、監督者の作業負荷を評価してもよい。さらに、監督者の作業負荷状況などの情報をプラント運転チーム外の組織(例えば運転支援を行う組織など)の出力装置24に提示し、監督者を含めたチームパフォーマンスを向上させる対策を講じることができるようにしてもよい。
 なお、プラント監視制御装置1の監視制御部2と運転支援処理部3のうち、演算処理を行う部分を、図9に示すように、プロセッサ11と記憶装置12を備えたひとつのハードウェア10によって構成することも考えられる。記憶装置12は、図示していないが、ランダムアクセスメモリ等の揮発性記憶装置と、フラッシュメモリ等の不揮発性の補助記憶装置とを具備する。また、フラッシュメモリの代わりにハードディスクの補助記憶装置を具備してもよい。プロセッサ11は、記憶装置12から入力されたプログラムを実行する。この場合、補助記憶装置から揮発性記憶装置を介してプロセッサ11にプログラムが入力される。また、プロセッサ11は、演算結果等のデータを記憶装置12の揮発性記憶装置に出力してもよいし、揮発性記憶装置を介して補助記憶装置にデータを保存してもよい。これは、次の実施の形態2にかかるプラント監視制御装置1についても同様である。
実施の形態2.
 上記実施の形態1においては、運転員の確認・操作といった行動の進捗状況に着目し、作業の余裕時間を元に運転員の作業負荷を推定し、作業負荷が大きな運転員の作業を分担するなどの運転支援を行う例を示した。ここで、運転員の作業の切迫など作業実施に影響を及ぼす要因は、作業量、作業にかかる時間などの作業自体の性質によるものだけではなく、作業を実施する際の時間圧、作業の困難さなどから生まれる運転員の精神的負荷によるものも存在する。作業進捗の遅延などが行動に表れる前に、このような精神的負荷状態を推定してチーム内で共有できれば、作業が切迫して対策の打つ手が絞られてしまう前に、チームのパフォーマンスを向上させる多様な対策を講じることができる。
 このような点を鑑み、本実施の形態2では、運転員のパフォーマンス状況を心理的作業負荷および状況認識力を推定して支援の必要性を判断し、運転支援を行う例について説明する。図10~図13は、実施の形態2にかかるプラント監視制御装置あるいはプラント監視制御方法について説明するためのものであり、図10はプラント監視制御装置の主に情報の提示に関わる部分の構成を説明するためのブロック図、図11はチーム状況評価処理部が生成したチーム内の運転員の精神面から見たパフォーマンス状況を示す、チーム内パフォーマンス状況データの項目ごとのデータの例を示す図である。
 また、図12はプラント監視制御方法において、ユーザのパフォーマンスに基づいて、運転支援内容を決定する工程の動作について説明するためのフローチャートであり、図13は、ユーザのパフォーマンスレベルの観点で、ある作業を代行提案する際の運転支援情報の画面表示例を示す図である。なお、実施の形態1と同様部分においては、実施の形態1で用いた図を適宜援用し、本実施の形態2における、運転員のパフォーマンスの状況に応じて、チームとしての運転状況を評価し、運転支援内容を決定・情報提示する例について説明する。
 本実施の形態2にかかるプラント監視制御装置1は、図10に示すように、実施の形態1で説明した図1に対し、生体データ取得装置41とユーザパフォーマンス評価処理部42が追加されている。生体データ取得装置41は、ユーザの心拍、あるいは音声などの生体データを取得する装置である。ユーザパフォーマンス評価処理部42は、生体データ取得装置41から得た生体データおよび手順進捗データベース36に格納されたデータを用い、各ユーザの心理的作業負荷および状況認識力をそれぞれ評価する。そして、評価結果に基づき各ユーザのパフォーマンス状況を推定する処理を行うものである。
 以下、動作の全体の流れについて説明する。実施の形態2では、実施の形態1の図2で説明したユーザ作業状況推定処理部35の処理(ステップST102)については、実施の形態1と同様の処理を実行する。しかし、それらの処理と並行して、生体データ取得装置41による生体データ取得、およびユーザパフォーマンス評価処理部42による各ユーザ(運転員)のパフォーマンス評価も行う。
 本実施の形態2のチーム状況評価処理部37Bは、実施の形態1で説明したチーム状況評価処理部37に対して、新たにユーザパフォーマンス評価処理部42からの出力を元に、チーム状況の評価を行う。また、ステップST103での、図5で説明したチーム内作業状況データD37の生成処理までは実施の形態1と同様である。
 さらには、本実施の形態2のステップST104において、チーム内作業状況データD37内に時間的に切迫した作業ステップがあると判断した場合は、その後のステップST106までの処理は、実施の形態1と同様の処理である。一方、時間的に切迫した作業がないと判断した場合は、ユーザパフォーマンス評価処理部42からの出力を元に、ユーザの精神状態に基づいた、運転支援の必要性の判断も行う。
 例えば、チーム状況評価処理部37Bは、精神状態を総合的に表すパフォーマンスレベルなどを有するチーム内パフォーマンス状況データD43(詳細は後述)を生成し、運転支援内容決定処理部38Bに送信する。なお、実施の形態1で説明した処理に対し、本実施の形態2で新たに追加された処理を実行する処理部については、実施の形態1で説明した「処理部」、との動作の違いを示すため、符号の末尾に「B」を付して区別している。
 また、本実施の形態2の運転支援内容決定処理部38Bは、実施の形態1で説明した運転支援内容決定処理部38での処理に加えて、ユーザパフォーマンスに応じた運転支援情報を決定する。その結果を受けた提示情報生成処理部23Bは、作業時間か、あるいはユーザパフォーマンスに基づいて決定した支援であるかが判別できるよう、各ユーザに対する運転支援情報の画面描画データを生成し、出力装置24に出力する。
 動作の詳細について説明する。生体データ取得装置41は各ユーザの心拍、あるいは音声などの生体データを取得するものであり、ユーザごとに割り当てられている。生体データ取得装置41には、心拍、音声を取得するものが個別に存在し、それぞれを区別するIDが付与され、ユーザIDと関連付けられている。心拍の場合は装着型の心拍センサなどを用い、心拍変動データを取得する。音声の場合は、マイクから取得した音声データを実時間で認識し、テキスト化したデータを得る。取得したデータは、ユーザパフォーマンス評価処理部42に送信される。
 ユーザパフォーマンス評価処理部42は、取得したデータを用いて、ユーザの心理的作業負荷と状況認識力を評価する。心理的作業負荷の評価には、例えば心拍変動データを使用する。心拍変動データは生体データ取得装置41から時系列で連続的に送信される。心理的作業負荷の評価方法としては、例えば心拍変動解析を用いる手法が知られている。心拍変動の時系列データに対して周波数解析を行い、高周波成分(HF)と低周波成分(LF)を抽出し、それらの比であるLF/HFが一定値以上(例えば1.5以上)であれば心理的作業負荷が高レベル、それ以外であれば低レベルであると判断する。なお、LF/HFはこのように予め閾値を定めて全ユーザの判定に用いてもよいし、ユーザごとに定めてもよい。またこの心理的作業負荷の評価方法は一例であり、この方法に限らない。
 状況認識力は、例えば監督者ユーザの発話による指示があった時点から、運転員ユーザが作業を開始するまでの時間に応じて評価する。監督者ユーザの発話があれば、生体データ取得装置41により音声テキスト化され、ユーザパフォーマンス評価処理部42に送付される。手順進捗データベース36内にデータが格納された状態(事象が1つ以上特定された後)であれば、音声テキストデータと手順進捗データベース36内のデータを照合し、監督者の発話で指示した作業IDを特定、その時刻(指示開始時刻)を記憶する。
 その後、運転員ユーザによる作業(確認・操作)が実施されると、手順進捗データベース36に新たな作業ステップのデータが格納される。ユーザパフォーマンス評価処理部42は、手順進捗データベース36をあらかじめ定められた周期で参照し、発話で指示した作業IDと合致する作業ステップの作業IDデータD363があるかどうか確認する。合致した場合は、その時刻(作業開始時刻)から記憶した指示開始時刻を引いた差分時間を算出する。算出した差分時間があらかじめ定められた閾値の時間より短い場合は、監督者の指示を運転員が適切に認識して行動しているとして、状況認識力が高レベルにあると判断する。一方、差分時間が、閾値の時間より長い場合は、状況認識力が低下している、または正しく認識できていないとして状況認識力が低レベルにあると判断する。
 ユーザの心理的作業負荷と状況認識力の評価結果が揃った後、それらを総合して、精神的負荷で左右される、ユーザのパフォーマンスを評価する。例えば、表1に示すパフォーマンス評価テーブルを用い、心理的作業負荷と状況認識力の組み合わせに応じてパフォーマンス状態の種別を判別する。
Figure JPOXMLDOC01-appb-T000001
 表1において、心理的作業負荷レベルが低く、状況認識レベルが高い場合は、精神的負荷が小さく、ユーザのパフォーマンスは高いレベル(“高”)にあると判断する。心理的作業負荷レベルが高く、状況認識レベルが低い場合は、精神的負荷が大きく、適切な状況認識ができないほどの高負荷がユーザにかかっている、パフォーマンスが最も低いレベル(“低-1”)であると判断する。心理的作業負荷が高く、状況認識レベルが高い場合は、ユーザが負荷を感じているが状況認識は適切にできているとして、次にパフォーマンスが低いレベル(“低-2”)と判断する。心理的作業負荷レベルが低く、状況認識レベルが低い場合は、ユーザは負荷を感じていないが状況認識は適切ではなく、例えば注意散漫になっている可能性があり、その次にパフォーマンスが低いレベル(“低-3”)と判断する。その後、判断したパフォーマンスレベルのデータおよびユーザIDを、チーム状況評価処理部37Bに送信する。
 チーム状況評価処理部37Bは、実施の形態1と同様、図5に示すチーム内作業状況データD37を生成し、チーム状況を考慮した運転支援が必要かどうかを判定する。次作業の時間余裕度データD376が“低”の作業がある場合は、実施の形態1と同様にステップST201~ST206の処理を行う。
 そうではない場合、本実施の形態2では、ユーザの精神的負荷の観点で、運転支援の必要があるかどうかを判定する。パフォーマンスレベルが“低-1”、“低-2”、“低-3”のいずれかのように“低”の場合は、運転支援の必要があると判断し、図11に示すようなチーム内パフォーマンス状況データD43を生成し、運転支援内容決定処理部38Bに送信する。一方、ユーザのパフォーマンスレベルが“高”のみの場合は、提示情報生成処理部23に、作業に問題がないことを示す提示情報生成信号を生成し、送信する。
 運転支援内容決定処理部38Bは、チーム内作業状況データD37を受信した場合は、実施の形態1と同様の処理を行う。一方、チーム内パフォーマンス状況データD43を受信した場合は、図12に示すように、ユーザのパフォーマンスの状態に応じた運転支援情報を生成する。まず、チーム内パフォーマンス状況データD43のパフォーマンスレベルデータD435を参照し、パフォーマンスレベルに“低”があるユーザの中で、最もパフォーマンスレベルが低いユーザを要支援候補ユーザとして抽出する(ステップST301)。
 抽出した要支援候補ユーザのパフォーマンスレベルが“低-1”、“低-2”の場合は、作業分担が必要で、低-3”の場合は作業分担が不要とし、作業分担が不要か必要か、つまりパフォーマンスレベルが“低-3”か否かを判断する(ステップST302)。パフォーマンスレベルが“低-1”、“低-2”の場合(ステップST302で「No」)、つまり、レベルが最低として抽出した要支援候補ユーザのレベルが、“低-1”、“低-2”の場合は、とくに、作業分担が必要な要支援者として、作業分担の検討を行う。
 まずは、要支援者が次に実施する作業のうち、分担できそうな作業の有無を判断する(ステップST303)。作業状態データD433が“実施中”の作業があれば、要支援者が実施する次作業IDデータD434を参照する。手順進捗データベース36の中から、参照した次作業IDデータD434と同一の作業IDデータD363の条件データD362を参照する。条件データD362に、“AND”の作業(並行可能な作業)があれば、同じ“AND”条件が付与されている作業ステップのうち、作業状態データD364が“未着手”である作業IDデータD363を取得する。例えば、図11における現作業の作業IDデータD432が“S002”の作業に対して、図4Aの作業IDデータが“S003”の作業ステップを取得し、分担可能な作業あり(ステップST303で「Yes」)と判定する。
 そのような作業ステップがない場合は、手順進捗データベース36を参照し、要支援者が作業する他の手順における分担可否を確認する。つまり、要支援者の作業ユーザIDデータD431と同じ作業ユーザIDデータD365を用いて、他の手順(手順IDデータD360が異なる手順)の中から、次のように確認する。要支援者の作業状態データD364が“実施中”である次の作業ステップ、または途中の作業ステップまで完了しているがその後が“未着手”である作業ステップを取得する。例えば、図4Bの作業IDデータが“S022”の作業ステップを取得し、分担可能な作業あり(ステップST303で「Yes」)と判定する。
 ステップST303において、上記に該当する作業ステップが見いだせなかった場合(ステップST303で「No」)は、分担不可能である。そこで、例えば、監督者に対して作業分担は不可能であるが、パフォーマンスレベルが低いユーザが存在する等の状況を提示して対策を促すといった情報提示をするための処理を行う(ステップST306)。なお、要支援者の作業状態データD433に“実施中”の作業がない場合も、当該ユーザは現在作業を実施してはいないが、パフォーマンスに問題があるとして、同じくステップST306の処理を行う。
 ステップST303で、分担可能な作業有り、と判定した場合、その作業を分担可能なユーザ(分担候補者)の有無を判定する(ステップST304)。監視制御手順データベース34を参照し、取得した作業ステップの権限ユーザIDデータD347に、要支援者以外のユーザIDが登録されているかを確認する。登録があれば、チーム内パフォーマンス状況データD43を参照し、パフォーマンスレベルデータD435が“高”であるユーザがいるかどうかを確認する。そのようなユーザがいる場合(ステップST304で「Yes」)は、分担候補ユーザとして、要支援者の作業の分担を提起する運転支援を行うことを決定し、ステップST305に移行する。それ以外の場合(ステップST304で「No」)は、分担不可であるとして、上述したステップST306に移行する。
 作業分担を促す運転支援を行う場合は、チーム内パフォーマンス状況データD43を参照し、例えば、以下のデータを集める。要支援者と分担候補ユーザそれぞれの作業ユーザIDデータD431、要支援者の作業ユーザIDデータD431、分担する作業ステップの手順IDデータD430と現作業IDデータD432と次作業IDデータD434、および監督者のユーザIDデータ。集めたデータとともに、例えば、具体的なパフォーマンスレベル(“低-1”または”低-2“)を提示し、そのレベルであることにより作業分担による支援実施を示す提示情報生成信号を、提示情報生成処理部23に送信する(ステップST305)。
 一方、抽出した要支援候補ユーザのパフォーマンスレベルが“低-3”の場合(ステップST302で「Yes」)は、注意喚起等の支援は必要であるが、作業分担まで提示する必要はないと判断する。そして、監督者に対して要支援候補ユーザのレベルが“低―3”である状況を提示し、注意喚起等の対策を促すなどの情報提示をするための処理を行う(ステップST307)。具体的には、要支援候補ユーザの作業ユーザIDデータD431、要支援候補ユーザが実施する手順IDデータD430と作業IDデータD432と次作業IDデータD434、および監督者のユーザIDデータを集める。そして、集めたデータとともに、パフォーマンスレベル“低-3”の対策を促す支援実施を示す提示情報生成信号を、提示情報生成処理部23に送信する。
 分担可能と判定して、ステップST305の処理が行われると、提示情報生成処理部23Bは、運転支援内容決定処理部38が送信したデータを元に、出力装置24に出力する画面描画データをユーザごとに生成する。例えば、パフォーマンスレベルが“低-1”または“低-2”の場合、監督者用には、当該運転員の状況と、その作業を他の運転員に分担させることを推奨するメッセージの画面描画データを生成する。
 そして、図13に示すように、監督者のユーザIDに紐づけられた出力装置24の監視画面G24内に、要支援者のパフォーマンスが低下している旨と、分担候補ユーザに代行させることを推奨するメッセージGm24を表示させる。要支援者、分担候補ユーザには、それぞれ、実施の形態1の図7Bと図7Cと同様の分担予告のメッセージGm24の画面描画データを生成し、監視画面G24内に出力する。
 一方、分担不可能と判定してステップST306の処理が行われると、注意喚起としての情報提示を行う。例えば、監督者向けに、パフォーマンス低下がみられる要支援者と特定した運転員の状況(心理的作業負荷増加および状況認識力低下などのパフォーマンス低下要因)、実施中の監視制御手順と作業を記載した上で、運転への支援を促すメッセージを出力する。また、パフォーマンスレベルが“低-3”の場合は、例えば監督者向けに、要支援候補ユーザとして特定した運転員に対して注意を促すメッセージを出力する。作業を分担した運転員(分担候補ユーザ)が分担対象の作業を実施した際の処理は、実施の形態1で説明した場合と同様である。
 つまり、本実施の形態2では、ある構成員が、精神的負荷(心理的作業負荷、状況認識力低下)により、パフォーマンスレベルが低下して、支援が必要となった(要支援者と特定できた)とき、担当する作業について、他の構成員による代行の可能性について検討する。そして、検討した情報を、要支援者を含むチーム内の複数人(例えば、監督者、代行予定の構成員)のそれぞれに適した形態で提示するようにした。その結果、要支援の状態を、要支援者自身の努力、あるいは工夫だけでは解決できないレベルである場合でも、チーム内の協力を得られることで、連携による最適な監視制御が実行できる。とくに、プラントの監視制御においては、専門性を要する事項が多く、他者に支援を要請することは容易ではないが、操作権限のあるものから代行する候補を選定しているので、スムーズに応援要請ができる。また、要支援者は、そのような状況にあることすら把握できないこともあるが、他の構成員にも情報が提示されるので、スムーズに作業代行ができ、連携による最適な監視制御を行うことができる。
 また、チーム構成員が監視制御室にいる場合、あるいは遠隔地にいる場合に限らず、他者の作業負荷状況を把握できるようになる。そのため、作業代行できる候補者を選定できなかったとしても、要支援者は、苦しい状況を理解してもらえたと認識できたことで、精神的負荷が低減され、代行の必要性自体が解消されることもある。それに基づきチーム全体のパフォーマンスを向上させる対策を講じることができ、連携によるプラントの監視制御の正確性が向上する効果が得られる。
 なお、本実施の形態2では、心理的作業負荷および状況認識力を指標として、精神的負荷によるユーザのパフォーマンス状況を推定する例を示したが、精神的負荷の指標はどちらか一方のみ使用してもかまわない。さらには、異なる指標を組み合わせるようにしてもよい。また、ユーザパフォーマンス評価処理部42が心理的作業負荷または状況認識力の評価を行う際、ある閾値を超えた時点でパフォーマンスが低下していると評価するが、すぐに判断せず、一定時間または一定回数その状態の判定が持続すればパフォーマンスが低下していると評価してもよい。
 また、心理的作業負荷の評価には、心拍変動データを利用する例を示したが、これに限ることはなく、例えば、音声の周波数、震え等を指標にしてもよい。さらには、状況認識力の発話のタイミングも、必ずしも音声データに限ることはなく、例えば、出力装置に指示が表示されたタイミング、あるいは、出力装置から音声信号が出力されたタイミングで規定してもよい。
 また、支援の必要性については、ユーザの運転状況よりも、パフォーマンスレベルの状態を優先して判断するようにしてもよく、それぞれ単独で評価してもよい。さらには、例えば、ある運転員の様子を見たものが、直感的に支援が必要と感じた場合でも、入力装置21にその旨を入力することで、要支援候補ユーザとして、別途評価対象として選出できるようにしてもよい。その際、監督者が、真に支援が必要とした場合は、要支援候補ユーザを要支援者として登録し、それに対して、図6で説明した支援内容を決定するようにしてもよい。この場合でも、要支援者の作業をチーム内の余力のある者で代行させることにより、チームのパフォーマンスを向上させることができる。
 また、本実施の形態2では、監督者と作業代理に関係する運転員を対象にメッセージを生成する例を示したが、その他のチーム構成員に対しても運転員間で作業を交代する旨のメッセージを生成し提示するようにしてもよい。例として作業分担の提起、特定運転員の注意喚起を促す運転支援情報を提示したが、運転支援情報の内容はこの限りではない。
 また、本実施の形態2では、監督者にパフォーマンスが低下している運転員の状況をメッセージとして提示する例を示したが、これに限ることはない。例えば、別途監督者用に運転員のパフォーマンス状況を一覧できる画面を設け、チーム内パフォーマンス状況データD43を元に全運転員のパフォーマンス状況を示す画面描画データを生成し出力してもよい。さらに、チーム内作業状況データD37を元にして、全運転員の作業進捗状況とパフォーマンス状況を併せて示す画面描画データを生成し出力してもよい。
 また、本実施の形態2では、運転員の精神的負荷に基づくパフォーマンスを評価する例を示したが、監視制御手順の内容を監督者の手順に広げ、かつ監督者のユーザデータを取得することにより、監督者のパフォーマンスを評価しても良い。さらに、監督者の作業負荷状況および精神的負荷状況などの情報をプラント運転チーム外の組織の出力装置24に提示し、監督者を含めてチームパフォーマンスを向上させる対策を講じることができるようにしてもよい。
 なお、本願は、様々な例示的な実施の形態および実施例が記載されているが、1つ、または複数の実施の形態に記載された様々な特徴、態様、および機能は特定の実施の形態の適用に限られるのではなく、単独で、または様々な組み合わせで実施の形態に適用可能である。従って、例示されていない無数の変形例が、本願明細書に開示される技術の範囲内において想定される。例えば、少なくとも1つの構成要素を変形する場合、追加する場合または省略する場合、さらには、少なくとも1つの構成要素を抽出し、他の実施の形態の構成要素と組み合わせる場合が含まれるものとする。
 以上のように、各実施の形態にかかるプラント監視制御装置1によれば、複数の構成員(ユーザ)が連携して(複数のプラント機器900を有する)プラントを監視制御するためのプラント監視制御装置1であって、複数の構成員それぞれに対応して設けられ、監視制御のための入出力操作を受け付ける入出力部(入力装置21、出力装置24)、プラントで生じうる事象に応じて予め定められた監視制御手順について、手順ごとの複数の作業それぞれについての、作業内容(作業内容データD345)と、複数の構成員のなかの当該作業の操作権限を有する構成員の識別情報(権限ユーザIDデータD347)とが、紐づけて記録された監視制御手順データベース34、入出力操作、および事象の発生に対応し、手順ごとの複数の作業それぞれについての、進捗状況(作業状態データD364)と、当該作業を実行中または担当予定の構成員の識別情報(作業ユーザIDデータD365)とが紐づけられた記録が更新される手順進捗データベース36、手順進捗データベース36の記録更新に応じ、複数の構成員それぞれの状況(作業負荷、精神的負荷等)を評価し、監視制御における作業上の支援を要する構成員がいるか否かの判断、および特定を行う状況評価部(チーム状況評価処理部37、37B)、支援を要する構成員が特定されると、手順進捗データベース36に記録された情報から、特定された構成員(要支援者)が担当予定の作業を抽出し、監視制御手順データベース34に記録された情報から、抽出した作業に対する操作権限を有する構成員による代行の可能性を判断し、抽出した作業の代行に関する(代行不要の注意喚起も含む)情報を支援内容として決定する支援内容決定部(運転支援内容決定処理部38、38B)、および決定した支援内容に基づき、複数の構成員のなかから当該支援内容の提示対象として、特定された構成員(要支援者)を含めた複数人を選定し、選定された複数人のそれぞれに応じた提示情報を生成する提示情報生成部(提示情報生成処理部23、23B)、を備えるように構成した。そのため、ある構成員が、作業に支障をきたす状況に陥った場合、その構成員が担当する作業を、操作権限を有する他の構成員により、円滑に代行させることができる。その状況が、個人の努力、あるいは工夫だけでは解決できないレベルである場合は、一層効果的である。とくに、プラントの監視制御においては、専門性を要する事項が多く、作業範囲にも制約があり、他者に支援を要請することは容易ではないが、代行できるものを選定してもらえるので、スムーズに応援要請ができる。また、要支援者は、そのような状況にあることすら把握できないこともあるが、他の構成員にも情報が提示されるので、スムーズに作業代行ができ、連携による最適な監視制御を行うことができる。
 とくに、状況評価部(チーム状況評価処理部37)は、複数の構成員それぞれの、実行中、および担当予定の作業における時間的余裕(余裕時間データD368、時間余裕度データD369)を算出し、時間的余裕が基準よりも低く算出された構成員を、支援を要する構成員として特定するようにすれば、支援を要する構成員を的確に特定できる。
 また、複数の構成員それぞれの精神的負荷の大きさを評価する精神的負荷評価部(ユーザパフォーマンス評価処理部42)を備え、状況評価部(チーム状況評価処理部37B)は、精神的負荷が基準よりも大きい(ユーザパフォーマンスが基準よりも低い)と評価された構成員を、支援を要する構成員として特定するようにすれば、精神的な面から支援を要する構成員を的確に特定できる。
 その際、複数の構成員それぞれの生体データを取得する生体データ取得装置41を備え、精神的負荷評価部(ユーザパフォーマンス評価処理部42)は、生体データ取得装置41が取得した生体データに基づいて、複数の構成員それぞれの精神的負荷を評価するようにしたので、定量的に精神的負荷を評価することができる。
 また、支援内容決定部(運転支援内容決定処理部38、38B)は、抽出した作業に対する操作権限を有する構成員に対する、実行中、および担当予定の作業における時間的余裕(余裕時間データD368、時間余裕度データD369)を推定し、推定した時間的余裕が基準よりも高い構成員を、抽出した作業の代行者として選定するようにしたので、最適な代行者を選定できる。
 また、各実施の形態にかかるプラント監視制御方法によれば、複数の構成員(ユーザ)が連携して(複数のプラント機器900を有する)プラントを監視制御するためのプラント監視制御方法であって、プラントで生じうる事象に応じて予め定められた監視制御手順における、手順ごとの複数の作業それぞれについて、(作業内容データD345)と、複数の構成員のなかの当該作業の操作権限を有する構成員の識別情報(権限ユーザIDデータD347)とを紐づけて監視制御手順データベース34に記録するステップ、監視制御のための入出力操作、および事象の発生に対応し、手順ごとの複数の作業それぞれについての、進捗状況(作業状態データD364)と、当該作業を実行中または担当予定の構成員の識別情報(作業ユーザIDデータD365)とを紐づけて、手順進捗データベース36の記録を更新するステップ(ステップST101、ST102)、手順進捗データベース36の記録更新に応じ、複数の構成員それぞれの状況(作業負荷、精神的負荷等)を評価し、監視制御における作業上の支援を要する構成員がいるか否かの判断、および特定を行う状況評価ステップ(ステップST103、ST104)、支援を要する構成員が特定されると、手順進捗データベース36に記録された情報から、特定された構成員(要支援者)が担当予定の作業を抽出し、監視制御手順データベース34に記録された情報から、抽出した作業に対する操作権限を有する構成員による代行の可能性を判断し、抽出した作業の代行に関する(代行不要の注意喚起も含む)情報を支援内容として決定する支援内容決定ステップ(ステップST105)、および決定した支援内容に基づき、複数の構成員のなかから当該支援内容の提示対象として、特定されたものを含めた複数人を選定し、選定された複数人のそれぞれに応じた提示情報を生成・表示する提示情報表示ステップ(ステップST106)、を含むように構成した。そのため、ある構成員が、作業に支障をきたす状況に陥った場合、その構成員が担当する作業を、操作権限を有する他の構成員により、円滑に代行させることができる。その状況が、個人の努力、あるいは工夫だけでは解決できないレベルである場合は、一層効果的である。とくに、プラントの監視制御においては、専門性を要する事項が多く、作業範囲にも制約があり、他者に支援を要請することは容易ではないが、代行できるものを選定してもらえるので、スムーズに応援要請ができる。また、支援を要する構成員は、そのような状況にあることすら把握できないこともあるが、他の構成員にも情報が提示されるので、スムーズに作業代行ができ、連携による最適な監視制御を行うことができる。
 1:プラント監視制御装置、 2:監視制御部、 3:運転支援処理部、 21:入力装置、 22:データ処理部、 23、23B:提示情報生成処理部、 24:出力装置、 31:プラント情報データベース、 32:プラント状況診断処理部、 33:作業履歴データベース、 34:監視制御手順データベース、 35:ユーザ作業状況推定処理部、 36:手順進捗データベース、 37、37B:チーム状況評価処理部、 38、38B:運転支援内容決定処理部、 41:生体データ取得装置、 42:ユーザパフォーマンス評価処理部、 900:プラント機器、 D37:チーム内作業状況データ、 D43:チーム内パフォーマンス状況データ。

Claims (6)

  1.  複数の構成員が連携してプラントを監視制御するためのプラント監視制御装置であって、
     前記複数の構成員それぞれに対応して設けられ、前記監視制御のための入出力操作を受け付ける入出力部、
     前記プラントで生じうる事象に応じて予め定められた監視制御手順における、手順ごとの複数の作業それぞれについての、作業内容と、前記複数の構成員のなかの当該作業の操作権限を有する構成員の識別情報とが紐づけて記録された監視制御手順データベース、
     前記入出力操作、および前記事象の発生に対応し、前記手順ごとの複数の作業それぞれについての、進捗状況と、当該作業を実行中または担当予定の構成員の識別情報とが紐づけられた記録が更新される手順進捗データベース、
     前記手順進捗データベースの記録更新に応じ、前記複数の構成員それぞれの状況を評価し、前記監視制御における作業上の支援を要する構成員がいるか否かの判断、および特定を行う状況評価部、
     前記支援を要する構成員が特定されると、前記手順進捗データベースに記録された情報から、特定された構成員が担当予定の作業を抽出し、前記監視制御手順データベースに記録された情報から、抽出した作業に対する前記操作権限を有する構成員による代行の可能性を判断し、抽出した作業の代行に関する情報を支援内容として決定する支援内容決定部、および
     決定した支援内容に基づき、前記複数の構成員のなかから当該支援内容の提示対象として、前記特定された構成員を含めた複数人を選定し、選定された複数人のそれぞれに応じた提示情報を生成する提示情報生成部、
     を備えたことを特徴とするプラント監視制御装置。
  2.  前記状況評価部は、前記複数の構成員それぞれの、実行中、および担当予定の作業における時間的余裕を算出し、前記時間的余裕が基準よりも低く算出された構成員を、前記支援を要する構成員として特定することを特徴とする請求項1に記載のプラント監視制御装置。
  3.  前記複数の構成員それぞれの精神的負荷の大きさを評価する精神的負荷評価部を備え、
     前記状況評価部は、前記精神的負荷が基準よりも大きいと評価された構成員を、前記支援を要する構成員として特定することを特徴とする請求項1または2に記載のプラント監視制御装置。
  4.  前記複数の構成員それぞれの生体データを取得する生体データ取得装置を備え、
     前記精神的負荷評価部は、前記生体データ取得装置が取得した生体データに基づいて、前記複数の構成員それぞれの精神的負荷を評価することを特徴とする請求項3に記載のプラント監視制御装置。
  5.  前記支援内容決定部は、前記抽出した作業に対する前記操作権限を有する構成員に対する、実行中、および担当予定の作業における時間的余裕を推定し、推定した時間的余裕が基準よりも高い構成員を、前記抽出した作業の代行者として選定することを特徴とする請求項1から4のいずれか1項に記載のプラント監視制御装置。
  6.  複数の構成員が連携してプラントを監視制御するためのプラント監視制御方法であって、
     前記プラントで生じうる事象に応じて予め定められた監視制御手順における、手順ごとの複数の作業それぞれについて、作業内容と、前記複数の構成員のなかの当該作業の操作権限を有する構成員の識別情報とを紐づけて監視制御手順データベースに記録するステップ、
     前記監視制御のための入出力操作、および前記事象の発生に対応し、前記手順ごとの複数の作業それぞれについての、進捗状況と、当該作業を実行中または担当予定の構成員の識別情報とを紐づけて、手順進捗データベースの記録を更新するステップ、
     前記手順進捗データベースの記録更新に応じ、前記複数の構成員それぞれの状況を評価し、前記監視制御における作業上の支援を要する構成員がいるか否かの判断、および特定を行う状況評価ステップ、
     前記支援を要する構成員が特定されると、前記手順進捗データベースに記録された情報から、特定された構成員が担当予定の作業を抽出し、前記監視制御手順データベースに記録された情報から、抽出した作業に対する前記操作権限を有する構成員による代行の可能性を判断し、抽出した作業の代行に関する情報を支援内容として決定する支援内容決定ステップ、および
     決定した支援内容に基づき、前記複数の構成員のなかから当該支援内容の提示対象として、前記特定された構成員を含めた複数人を選定し、選定された複数人のそれぞれに応じた提示情報を生成・表示する提示情報表示ステップ、
     を含むことを特徴とするプラント監視制御方法。
PCT/JP2019/010490 2019-03-14 2019-03-14 プラント監視制御装置およびプラント監視制御方法 WO2020183690A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
UAA202105060A UA127878C2 (uk) 2019-03-14 2019-03-14 Апарат виробничого моніторингу і контролю і спосіб виробничого моніторингу і контролю
US17/424,514 US20220128974A1 (en) 2019-03-14 2019-03-14 Plant monitoring and control apparatus and plant monitoring and control method
JP2021504743A JP7066044B2 (ja) 2019-03-14 2019-03-14 プラント監視制御装置およびプラント監視制御方法
PCT/JP2019/010490 WO2020183690A1 (ja) 2019-03-14 2019-03-14 プラント監視制御装置およびプラント監視制御方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2019/010490 WO2020183690A1 (ja) 2019-03-14 2019-03-14 プラント監視制御装置およびプラント監視制御方法

Publications (1)

Publication Number Publication Date
WO2020183690A1 true WO2020183690A1 (ja) 2020-09-17

Family

ID=72426590

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/010490 WO2020183690A1 (ja) 2019-03-14 2019-03-14 プラント監視制御装置およびプラント監視制御方法

Country Status (4)

Country Link
US (1) US20220128974A1 (ja)
JP (1) JP7066044B2 (ja)
UA (1) UA127878C2 (ja)
WO (1) WO2020183690A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7102634B1 (ja) 2022-02-28 2022-07-19 東京瓦斯株式会社 熱処理設備の運転支援システム、運転支援プログラム
WO2023223545A1 (ja) * 2022-05-20 2023-11-23 三菱電機株式会社 プラント運転支援システム

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11748561B1 (en) * 2022-03-15 2023-09-05 My Job Matcher, Inc. Apparatus and methods for employment application assessment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000172758A (ja) * 1998-12-09 2000-06-23 Sharp Corp 作業者配置決定システム
JP2014146147A (ja) * 2013-01-29 2014-08-14 Mitsubishi Electric Corp プラントの異常状態解決支援システム
JP2017211845A (ja) * 2016-05-26 2017-11-30 三菱電機株式会社 プラント監視制御システムおよびプラント運転操作卓

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001084025A (ja) * 1999-09-09 2001-03-30 Toshiba Corp プラント監視制御装置
JP4729352B2 (ja) * 2005-07-08 2011-07-20 富士通株式会社 作業支援システム,作業支援方法および作業支援用プログラム
JP5014370B2 (ja) * 2009-03-27 2012-08-29 三菱電機株式会社 プラント監視制御システム
JP5748596B2 (ja) * 2011-07-28 2015-07-15 株式会社日立システムズ 運用自動化支援システムにおけるサービスシナリオの遂行統制方式及びサービスシナリオの遂行統制装置並びサービスシナリオの遂行統制方法
JP6004831B2 (ja) * 2012-05-23 2016-10-12 三菱重工業株式会社 トレーサビリティ管理システム及び方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000172758A (ja) * 1998-12-09 2000-06-23 Sharp Corp 作業者配置決定システム
JP2014146147A (ja) * 2013-01-29 2014-08-14 Mitsubishi Electric Corp プラントの異常状態解決支援システム
JP2017211845A (ja) * 2016-05-26 2017-11-30 三菱電機株式会社 プラント監視制御システムおよびプラント運転操作卓

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
KAGIMOTO, MAMI ET AL.: "The Proposal of Crew Communication Support Methods on Plant Operation System.", PROCEEDINGS OF THE 74TH NATIONAL CONVENTION OF IPSJ (4), no. 4, 6 March 2012 (2012-03-06) *
YAMAMOTO, MIYUKI.: "Proposal for a Progress Monitoring Method Using Non-Synchronous Information Sharing in Distributed Development", IPSJ SYMPOSIUM SERIES: MULTIMEDIA, DISTRIBUTED, COOPERATIVE, AND MOBILE SYMPOSIUM (DICOMO), vol. 2018, no. 1, 4 July 2018 (2018-07-04), pages 844 - 849 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7102634B1 (ja) 2022-02-28 2022-07-19 東京瓦斯株式会社 熱処理設備の運転支援システム、運転支援プログラム
JP2023125872A (ja) * 2022-02-28 2023-09-07 東京瓦斯株式会社 熱処理設備の運転支援システム、運転支援プログラム
WO2023223545A1 (ja) * 2022-05-20 2023-11-23 三菱電機株式会社 プラント運転支援システム

Also Published As

Publication number Publication date
US20220128974A1 (en) 2022-04-28
UA127878C2 (uk) 2024-01-31
JP7066044B2 (ja) 2022-05-12
JPWO2020183690A1 (ja) 2021-09-13

Similar Documents

Publication Publication Date Title
JP7066044B2 (ja) プラント監視制御装置およびプラント監視制御方法
JP6909078B2 (ja) 疾病発症予測装置、疾病発症予測方法およびプログラム
CN102388599B (zh) 在医疗优先级调度系统中识别代码层级偏差的方法和系统
CN108140175B (zh) 劳务管理系统、劳务管理方法、以及劳务管理程序
US20120296671A1 (en) Guideline-based patient discharge planning
CN102576449A (zh) 用于紧急调度的中风诊断和干预工具
RU2619644C2 (ru) Клиническая система поддержки принятия решений для прогнозирующего планирования выписки
CN102203786A (zh) 可执行的临床指南以及指南工具
JP5302911B2 (ja) 疲労度評価システムおよびそれを用いた企業内疲労度評価システム並びに疲労度評価方法
JP4272249B1 (ja) 作業者の疲労度管理装置、方法及びコンピュータプログラム
US20180173854A1 (en) Monitoring predictive models
JP6418677B2 (ja) 医療情報支援システム、医療情報支援方法及び医療情報支援プログラム
WO2018005230A1 (en) Systems and methods of adaptive management of caregivers
CN112970070A (zh) 用于健康护理提供者辅助系统的方法和系统
US20200026401A1 (en) Remote medical evaluation heuristic
US20130282405A1 (en) Method for stepwise review of patient care
US20220319662A1 (en) Rehabilitation work support apparatus, rehabilitation work support system, rehabilitation work support method, and computer readable medium
US8447778B2 (en) Adaptively optimizing order entry system
WO2019023464A1 (en) AUTOMATED EVALUATION OF MEDICAL CONDITIONS
US9111024B2 (en) Medical treatment management device, method, and program for tracking and advising patient caregivers
JP7186924B2 (ja) 作業割当て装置
JP6506882B2 (ja) 問診支援システム
US11728033B2 (en) Dynamic adaptation of clinical procedures and device assessment generation based on determined emotional state
WO2021191941A1 (ja) プラント運転支援装置、プラント運転支援方法
EP4181155A1 (en) Generating information indicative of an interaction

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19919395

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021504743

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19919395

Country of ref document: EP

Kind code of ref document: A1