WO2020158592A1 PCT/JP2020/002469 JP2020002469W WO2020158592A1 WO 2020158592 A1 WO2020158592 A1 WO 2020158592A1 JP 2020002469 W JP2020002469 W JP 2020002469W WO 2020158592 A1 WO2020158592 A1 WO 2020158592A1
Authority
WO
WIPO (PCT)
Prior art keywords
power management
power
response
management apparatus
request
Prior art date
Application number
PCT/JP2020/002469
Other languages
English (en)
French (fr)
Inventor
浩征 松本
光夫 小野
Original Assignee
京セラ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 京セラ株式会社 filed Critical 京セラ株式会社
Priority to JP2020569574A priority Critical patent/JP7178429B2/ja
Priority to EP20747913.0A priority patent/EP3920371A4/en
Publication of WO2020158592A1 publication Critical patent/WO2020158592A1/ja
Priority to US17/389,245 priority patent/US20210359542A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00007Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using the power network as support for the transmission
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00034Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • H02J3/144Demand-response operation of the power transmission or distribution network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/28The renewable source being wind energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/30The power source being a fuel cell
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/123Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/14Energy storage units
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/121Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using the power network as support for the transmission

Definitions

  • the present disclosure relates to a power supply method and a power management device.
  • VPP Virtual Power Plant
  • DR Demand Response
  • the VPP in this demonstration is realized by combining the power storage device and power management device (EMS: Energy Management System) of each facility, and each power management device and server device using the Internet environment. It has a system configuration that communicates with.
  • EMS Energy Management System
  • a first feature of the present disclosure is a power supply method, in which a first power management device provided in a first consumer facility transmits a search request and is provided in a second consumer facility. 2
  • the power management apparatus transmits a search response including information on the reliability of the second consumer facility to the first power management apparatus in response to the search request. Furthermore, the first power management apparatus supplies a power amount of a specified value by a demand response to the second power management apparatus selected according to a search response including information on the reliability of the second consumer facility.
  • a demand response request for requesting a request is a power supply method, in which a first power management device provided in a first consumer facility transmits a search request and is provided in a second consumer facility. 2
  • the power management apparatus transmits a search response including information on the reliability of the second consumer facility to the first power management apparatus in response to the search request. Furthermore, the first power management apparatus supplies a power amount of a specified value by a demand response to the second power management apparatus selected according to a search response including information on the reliability of
  • a second feature of the present disclosure is a power supply system that includes a first power management apparatus provided in a first customer facility and a second power management apparatus provided in a second customer facility. It is a power management device that functions as a management device.
  • the power management apparatus includes a search unit, a demand response processing unit, and a report acquisition unit.
  • the search unit transmits a search request for searching a customer facility capable of supplying electric power to the first customer facility.
  • the search unit receives, from the second power management apparatus, a search response including information regarding the reliability of the second consumer facility in response to the second power management apparatus receiving the search request.
  • the demand response processing unit is a demand response for requesting the supply of a specified amount of power by demand response to the second power management device selected according to the information regarding the reliability of the second consumer facility. Submit your request.
  • a third feature of the present disclosure is a power supply system that includes a first power management apparatus provided in a first customer facility and a second power management apparatus provided in a second customer facility. It is a power management device that functions as a management device.
  • the power management device includes a response unit, a demand response processing unit, and a report transmission unit.
  • the response unit transmits a search response including information regarding the reliability of the second consumer facility to the first power management apparatus in response to the search request received from the first power management apparatus.
  • the demand response processing unit receives, from the first power management apparatus, a demand response request for requesting supply of a specified amount of power by a demand response.
  • FIG. 1 is a diagram for explaining a conventional technique.
  • FIG. 2 is a diagram for explaining the conventional technique.
  • FIG. 3 is a diagram illustrating an example of the overall configuration of the power supply system 1 according to the embodiment.
  • FIG. 4 is a diagram illustrating an example of the configuration of the power management apparatus 102A according to the embodiment.
  • FIG. 5 is a figure which shows an example of a structure of the power management apparatus 102B which concerns on one Embodiment.
  • FIG. 6 is a flowchart showing an example of the power supply method according to the embodiment.
  • the communication amount is caused by the report transmitted from the responding side consumer EMS to the requesting side EMS.
  • the processing volume in the EMS of the requesting consumer increases.
  • a request report and a periodic report sequentially report how much power is requested this time or how much power is sent this time among the power amounts requested by the demand response. doing.
  • the periodic report sequentially reports how much power is requested this time, how much power is sent this time, and the like, out of the amount of power requested by the demand response. ..
  • the completion report reports that the demand response is completed.
  • the present disclosure has been made in view of the above problems, and when supplying a desired amount of power from a response side consumer to a request side consumer, the EMS of the response side consumer does not It is possible to reduce the increase in the communication amount and the increase in the processing amount in the EMS of the requesting side consumer due to the report transmitted to the EMS.
  • FIG. 3 is a diagram showing an example of the configuration of the power supply system 1 according to the present embodiment.
  • the power supply system 1 includes a plurality of facilities 100A/100B and a server device 300.
  • the facilities 100A/100B and the server device 300 are connected to the network 200.
  • the network 200 may include the Internet or may include a dedicated line such as a VPN (Virtual Private Network).
  • facilities 100A/100B are illustrated as the plurality of facilities 100.
  • One facility 100 corresponds to one customer facility (hereinafter, simply referred to as “customer”).
  • Each facility 100A/100B is connected to the power system 110.
  • the flow of electric power from the electric power system 110 to the facility 100 is referred to as “tidal flow”, and the flow of electric power from the facility 100 to the electric power system 110 is referred to as “reverse power flow”.
  • the electric power system 110 may be a transmission network outside the customer when the electric power is exchanged between the customers in the area separated from the electric power company.
  • the facility 100A has a distributed power source 101A, an EMS 102A, and a load device 103A
  • the facility 100B has a distributed power source 101B, an EMS 102B, and a load device 103B.
  • the distributed power sources 101A/101B may be fuel cell devices that generate electricity using fuel.
  • a fuel cell device is a device that generates electricity using fuel.
  • the fuel cell device is a solid oxide fuel cell (SOFC: Solid Oxide Fuel Cell), a polymer electrolyte fuel cell (PEFC: Polymer Electrolyte Fuel Cell), a phosphoric acid fuel cell (PAFC: Phosphoric Acid Fuel Cell). , And/or a molten carbonate fuel cell (MCFC: Molten Carbonate Fuel Cell).
  • the distributed power source 101 may be a power generation device that generates power using natural energy such as sunlight, wind power, hydraulic power, or geothermal heat. Further, the dispersed power sources 101A/101B may be power storage devices that charge and discharge electric power.
  • the power storage device is a device that charges and discharges under the control of the EMS 102A/102B.
  • the power storage device is a lithium-ion power storage device, a lead power storage device, a nickel-hydrogen power storage device, or the like.
  • the electric power discharged from the power storage device may be supplied to the load devices 103A/103B in the facilities 100A/100B, or may be supplied to the power system 110. Further, in the present embodiment, the electric power generated by the power generation device may be sold, and the load devices 103A/103B in the facilities 100A/100B may be operated by the “push-up mode” in which the power storage device discharges the load devices 103A/103B.
  • the power storage device can charge, for example, the power supplied by the power grid 110 or the surplus power of the power generation device.
  • the EMS102A/102B is a power management device that manages the power of facilities 100A/100B.
  • the EMS 102A/102B may control the operating states of the distributed power sources 101A/101B and the load device 103. Specifically, the EMS 102A/102B may control charging or discharging of the power storage device.
  • the EMS 102A/102B is an example of VEN (Virtual End Node).
  • the load devices 103A/103B are devices that consume power.
  • the load devices 103A/103B are air conditioning devices, lighting devices, AV (Audio Visual) devices, and the like.
  • the server device 300 is a server device managed by a power company such as a power generation company, a power transmission/distribution company or a retail company, and a resource aggregator.
  • the resource aggregator is a power provider that provides reverse flow power to a power generator, a power transmission and distribution provider, a retailer, and the like in VPP.
  • the server device 300 is an example of a reverse flow power purchase entity.
  • the server device 300 is configured to manage the facilities 100A/100B.
  • the EMS according to this embodiment may have both the configuration of the EMS 102A and the configuration of the EMS 102B.
  • the EMS 102A has a communication unit 111, a database 112, a search unit 113, a DR processing unit 114, a report acquisition unit 115, and a notification unit 116.
  • a part or all of the search unit 113, the DR processing unit 114, the report acquisition unit 115, and the notification unit 116 may be included in the control unit (not shown) of the EMS 102A.
  • the communication unit 111 is composed of a communication module, and communicates with the distributed power source 101A, the load device 103A, and the server device 300 of the facility 100A.
  • the communication unit 111 communicates with the server device 300 according to the first communication protocol.
  • the first communication protocol a communication protocol compliant with Open ADR 2.0 or an original dedicated communication protocol can be used.
  • the communication unit 111 communicates with the distributed power source 101A and the load device 103A according to the second communication protocol.
  • the second communication protocol a communication protocol conforming to ECHONET Lite, SEP (Smart Energy Profile) 2.0, KNX, or an original dedicated communication protocol can be used.
  • the database 112 is configured by a storage medium such as a non-volatile memory or/and an HDD, and stores data regarding the facility 100A.
  • the search unit 113 is configured to send a search request to the network 200 via the communication unit 111.
  • the search request is a signal for searching for another customer who can supply the amount of power to the EMS 102A.
  • the search request includes information indicating the amount of electric power required in the facility 100A.
  • the search request may be, for example, a signal specified by a communication protocol conforming to Open ADR 2.0.
  • the search unit 113 is also configured to receive a search response corresponding to the search request from the EMS of the other facility 100, in the present embodiment, the EMS 102B.
  • the search response includes information indicating the amount of power that can be supplied to the customer of the facility 100A in the EMS 102B.
  • the search response may be, for example, a signal defined by a communication protocol conforming to Open ADR 2.0.
  • the search unit 113 transmits a signal notifying that the acceptance of the search response will be closed to the network 200 via the communication unit 111 after a predetermined period has elapsed since the search request was transmitted. May be configured to do so.
  • the above search request may include information indicating the period for accepting the above search response. Furthermore, the above-mentioned search request may include information regarding the desired unit price of electric power required by the consumer of the facility 100A and/or the reliability of the facility 100A (or the consumer of the facility 100A).
  • the search response described above may include information about the desired unit price of power that can be supplied to the customer of the facility 100A and/or the reliability of the facility 100B (or the customer of the facility 100B). Good.
  • search unit 113 may be configured to be notified of the items that can be transmitted as a report described later by the search response.
  • the DR processing unit 114 is configured to send a demand response request to the EMS 102B via the communication unit 111.
  • the demand response request is a signal for requesting the supply of the specified amount of electric power by the demand response.
  • the demand response request may be, for example, a signal specified by a communication protocol compliant with Open ADR 2.0.
  • the DR processing unit 114 may be configured to select, from a plurality of customers, a customer as a target of the demand response request by a predetermined method.
  • the DR processing unit 114 may be configured to select a customer as a target of a demand response request by using the information regarding the reliability of each customer.
  • the DR processing unit 114 may be configured to acquire the information regarding the reliability from the server device 300.
  • the report acquisition unit 115 is configured to, when the demand response is completed, transmit a result request that requests the EMS 102B to transmit a response result, via the communication unit 111.
  • the result request may be, for example, a signal specified by a communication protocol conforming to Open ADR 2.0.
  • the report acquisition unit 115 is configured to receive the report related to the supply of the above-specified power amount from the EMS 102B via the communication unit 111 in response to the result response of transmitting the response result.
  • the result response may be, for example, a signal specified by a communication protocol conforming to Open ADR 2.0.
  • the report acquisition unit 115 may be configured to determine the content of the result request based on the items that can be transmitted as the report notified by the search response.
  • the notification unit 116 is configured to notify the server device 300 of predetermined information via the communication unit 111.
  • the predetermined information is information indicating the performance and/or evaluation of the EMS 102B (the facility 100B or the customer of the facility 100B) in response to the above-described demand response request.
  • the notification unit 116 uses, as the predetermined information, at least the achievement rate for the demand response request (the degree of the amount of power achieved (for example,%) when the requested amount of power is 100% during the request period). ) And the average stay rate for the demand response request.
  • the “residence rate” is a rate per unit time of the amount of electric power when the request is met within a certain range (for example, ⁇ 20% or 10%) with respect to the requested amount.
  • the “average stay rate” is an average stay rate within a time period in which demand response is requested.
  • the server device 300 may be configured to calculate the above-mentioned information regarding the reliability of each consumer based on the predetermined information.
  • the report acquisition unit 115 determines that the content of the report (result response) is unreliable, the report acquisition unit 115 executes the sequence of pattern 2 shown in FIG. 2 so that the facility 100B (or the customer of the facility 100B). ) May be configured to be performed.
  • the notification unit 116 may be configured to notify the server device 300 of the evaluation result and the content of the report. With this configuration, the server device 300 can correct the evaluation of the facility 100B (or the customer of the facility 100B).
  • the EMS 102B has a communication unit 121, a database 122, a response unit 123, a DR processing unit 124, and a report transmission unit 125.
  • a part or all of the search unit 113, the response unit 123, the DR processing unit 124, and the report transmission unit 125 may be included in the control unit (not shown) of the EMS 102A.
  • the communication unit 121 is composed of a communication module, and communicates with the distributed power source 101B, the load device 103B, and the server device 300 of the facility 100B.
  • the communication unit 111 communicates with the server device 300 according to the first communication protocol.
  • the first communication protocol a communication protocol compliant with Open ADR 2.0 or an original dedicated communication protocol can be used.
  • the communication unit 121 communicates with the distributed power source 101B and the load device 103B according to the second communication protocol.
  • the second communication protocol it is possible to use a communication protocol conforming to ECHONET Lite, SEP2.0, KNX, or an original dedicated communication protocol.
  • the database 122 is composed of a storage medium such as a non-volatile memory and/or an HDD, and stores data regarding the facility 100B.
  • the response unit 123 is configured to receive a search request from the EMS 102A via the communication unit 121.
  • the response unit 123 is also configured to transmit a search response to the EMS 102A via the communication unit 121 in response to the search request received from the EMS 102A.
  • the response unit 123 may be configured to notify the EMS 102A via the communication unit 121 of the items that can be transmitted as a report to be described later by the search response.
  • the response unit 123 as such an item, the achievement rate for the demand response request in the EMS 102B (the degree of the amount of power achieved (eg, %) during the request period when the requested amount of power is 100%). ), the maximum achievement rate for the demand response request in the EMS 102B (the maximum value of the achievement rate per unit time (for example, %) within the request period), the minimum achievement rate for the demand response request in the EMS 102B (in the request period, unit time)
  • Each of the achievement rates for example,%), the average stay rate for the demand response request, and/or the maximum power error when responding to the demand response request (for example, in units of 1 minute). It may be configured.
  • the "residence rate” is a rate per unit time of the amount of electric power when the request is met within a certain range (for example, ⁇ 20% or 10%) with respect to the requested amount.
  • the “average stay rate” is an average stay rate within a time period in which demand response is requested.
  • the information regarding the reliability of each consumer may be at least one of the degree of achievement of the demand response request and the average stay rate of the demand response request.
  • the DR processing unit 124 is configured to receive a demand response request from the EMS 102A via the communication unit 121.
  • the DR processing unit 124 responds to the demand response request received from the EMS 102A, and supplies the specified amount of electric power requested by the demand response request to the EMS 102A so that the distributed power source managed by the EMS 102B. 101B or the load device 103B is controlled.
  • the report transmission unit 125 is configured to receive a result request from the EMS 102A via the communication unit 121 when the demand response is completed.
  • the report transmission unit 125 transmits a report related to the supply of the above-specified power amount to the EMS 102A via the communication unit 121 in response to the result request received from the EMS 102A, as a result response. Is configured.
  • the report transmission unit 125 may be configured to determine the content of the report based on the items that can be transmitted as a report and the result request notified to the EMS 102A by the search response.
  • the information related to the consideration for the demand response request may be transmitted and received between the server device 300 and the EMS 102A/102B by another protocol.
  • step S101 the EMS 102A transmits a search request
  • step S102 the EMS 102B that receives the search request transmits a search response corresponding to the search request to the EMS 102A.
  • step S103 the EMS 102A selects the EMS 102B from the EMS that has received the search response, and sends a demand response request to the EMS 102B.
  • step S104 the EMS 102B controls the distributed power supply 101B or the load device 103B managed by the EMS 102B so as to supply the specified amount of power requested by the demand response request to the EMS 102A.
  • step S105 the EMS 102A transmits a result request to the EMS 102B when the demand response is completed.
  • step S106 in response to the result request, the EMS 102B transmits, to the EMS 102A, as a result response, a report related to the supply of the above-specified power amount.
  • the present embodiment it is possible to reduce an increase in the communication amount and the processing amount in the EMS when a desired power amount is supplied from the responding side consumer (facility 100B) to the request side consumer (facility 100A). it can.
  • the term “response” is used in this specification as described above, the term “response” is used instead of the term “response” from “acting in response”. Good.
  • the server device 300 may manage one facility 100.
  • the server device 300 may be the EMS 102.
  • the EMS 102 provided in the facility 100 does not necessarily have to be provided in the facility 100.
  • some of the functions of the EMS 102 may be provided by a cloud server provided on the Internet. That is, it may be considered that the EMS 102 includes a cloud server.
  • the first communication protocol is a protocol compliant with Open ADR2.0 and the second communication protocol is a protocol compliant with ECHONET Lite, SEP2.0, or KNX has been exemplified.
  • the first communication protocol may be a protocol standardized as a protocol used for communication between the server device 300 and the EMS 102.
  • the second communication protocol may be a protocol standardized as a protocol used in the facility 100.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

EMS102Bが、検索要求に応じてEMS102Aに対して第2需要家の信頼度に関する情報を含む検索応答を送信することと、EMS102Aが、第2需要家の信頼度に関する情報に応じて選出したEMS102Bに対してデマンドレスポンスによって指定値の電力量の供給を要請するためのデマンドレスポンス要請を送信することと、EMS102Bが、デマンドレスポンス要請に応答して、EMS102Bによって管理されている分散電源101B又は負荷機器103Bを、第1需要家に対して指定値の電力量を供給するように制御することと、EMS102Aが、デマンドレスポンスが完了した際に、EMS102Bに対して前記デマンドレスポンスの完了時に応答結果を送信することを要求する結果要求を送信することとを有する。

Description

電力供給方法及び電力管理装置
 本開示は、電力供給方法及び電力管理装置に関する。
 近年、VPP(Virtual Power Plant)においては、デマンドレスポンス(DR:Demand Response)の技術を応用して、応答側需要家から要請側需要家に対して所望の電力量を供給する実証が行われている。
 具体的には、かかる実証におけるVPPは、各施設の蓄電装置や電力管理装置(EMS:Energy Management System)を組み合わせて実現されており、また、インターネット環境を使用して各電力管理装置とサーバ装置との間で通信を行うシステム構成となっている。
特開2017-011968号公報
 本開示の第1の特徴は、電力供給方法であって、第1需要家施設に設けられている第1電力管理装置が、検索要求を送信し、第2需要家施設に設けられている第2電力管理装置が、前記検索要求に応じて、前記第1電力管理装置に対して、前記第2需要家施設の信頼度に関する情報を含む検索応答を送信する。さらに、前記第1電力管理装置は、前記第2需要家施設の信頼度に関する情報を含む検索応答に応じて選出した前記第2電力管理装置に対して、デマンドレスポンスによって指定値の電力量の供給を要請するためのデマンドレスポンス要請を送信する。
 本開示の第2の特徴は、第1需要家施設に設けられている第1電力管理装置及び第2需要家施設に設けられている第2電力管理装置を有する電力供給システムにおいて前記第1電力管理装置として機能する電力管理装置である。前記電力管理装置は、検索部と、デマンドレスポンス処理部と、レポート取得部と、を有する。前記検索部は、前記第1需要家施設に対して電力量を供給可能な需要家施設を検索するための検索要求を送信する。前記検索部は、前記第2電力管理装置が前記検索要求を受信したことに応じて、前記第2需要家施設の信頼度に関する情報を含む検索応答を前記第2電力管理装置から受信する。前記デマンドレスポンス処理部は、前記第2需要家施設の信頼度に関する情報に応じて選出した前記第2電力管理装置に対して、デマンドレスポンスによって指定値の電力量の供給を要請するためのデマンドレスポンス要請を送信する。
 本開示の第3の特徴は、第1需要家施設に設けられている第1電力管理装置及び第2需要家施設に設けられている第2電力管理装置を有する電力供給システムにおいて前記第2電力管理装置として機能する電力管理装置である。前記電力管理装置は、応答部と、デマンドレスポンス処理部と、レポート送信部と、を有する。前記応答部は、前記第1電力管理装置から受信した検索要求に応じて、前記第1電力管理装置に対して、前記第2需要家施設の信頼度に関する情報を含む検索応答を送信する。前記デマンドレスポンス処理部は、前記第1電力管理装置から、デマンドレスポンスによって指定値の電力量の供給を要請するためのデマンドレスポンス要請を受信する。
図1は、従来技術を説明するための図である。 図2は、従来技術を説明するための図である。 図3は、一実施形態に係る電力供給システム1の全体構成の一例を示す図である。 図4は、一実施形態に係る電力管理装置102Aの構成の一例を示す図である。 図5は、一実施形態に係る電力管理装置102Bの構成の一例を示す図である。 図6は、一実施形態に係る電力供給方法の一例を示すフローチャートである。
 図1及び図2に、かかるVPPにおけるシーケンスの一例を示す。
 従来の応答側需要家から要請側需要家に対して所望の電力量を供給するVPPでは、応答側需要家のEMSから要請側需要家のEMSに対して送信されるレポートに起因して通信量及び要請側需要家のEMSにおける処理量が増加してしまうという問題点があった。
 具体的には、図1示すパターン1のシーケンスでは、要請中レポート及び定期レポートによって、上述の通信量及び処理量が増加してしまうという問題点があった。ここで、図1に示すパターン1のシーケンスでは、要請中レポート及び定期レポートによって、デマンドレスポンスの要請による電力量のうち、今回どれだけ要請するか或いは今回どれだけ電力量を送ったか等について逐次報告している。
 同様に、図2示すパターン2のシーケンスでは、定期レポートによって、上述の通信量及び処理量が増加してしまうという問題点があった。ここで、図2に示すパターン2のシーケンスにおいても、定期レポートによって、デマンドレスポンスの要請による電力量のうち、今回どれだけ要請するか或いは今回どれだけ電力量を送ったか等について逐次報告している。また、図2に示すパターン2のシーケンスでは、完了時レポートによって、デマンドレスポンスが完了する旨を報告している。
 本開示は、上述の課題に鑑みてなされたものであり、応答側需要家から要請側需要家に対して所望の電力量を供給する場合に、応答側需要家のEMSから要請側需要家のEMSに対して送信されるレポートに起因する通信量の増加及び要請側需要家のEMSにおける処理量の増加を低減することができる。
 以下、本発明の実施形態に係る電力供給システムについて図面を参照しながら説明する。なお、以下の図面の記載において、同一又は類似の部分には、同一又は類似の符号を付している。
 (第1実施形態)
 以下、図2~図6を参照して、本開示の第1実施形態について説明する。図3は、本実施形態に係る電力供給システム1の構成の一例を示す図である。図3に示すように、電力供給システム1は、複数の施設100A/100Bと、サーバ装置300とを有する。各施設100A/100B及びサーバ装置300は、ネットワーク200に接続されている。ネットワーク200は、インターネットを含んでもよいし、VPN(Virtual Private Network)等の専用回線を含んでもよい。
 図3では、複数の施設100として、施設100A/100Bが例示されている。1つの施設100は、1つの需要家施設(以下、単に「需要家」と呼ぶ)に対応する。各施設100A/100Bは、電力系統110に接続される。
 電力系統110から施設100への電力の流れは「潮流」と称され、施設100から電力系統110への電力の流れは「逆潮流」と称される。電力系統110は、電力会社から切り離された地域内の需要家間で電力融通する場合における需要家外の送電網であってもよい。
 施設100Aは、分散電源101Aと、EMS102Aと、負荷機器103Aとを有し、施設100Bは、分散電源101Bと、EMS102Bと、負荷機器103Bとを有する。
 分散電源101A/101Bは、燃料を用いて発電を行う燃料電池装置であってもよい。燃料電池装置は、燃料を用いて発電を行う装置である。例えば、燃料電池装置は、固体酸化物型燃料電池(SOFC:Solid Oxide Fuel Cell)、固体高分子型燃料電池(PEFC:Polymer Electrolyte Fuel Cell)、リン酸型燃料電池(PAFC:Phosphoric Acid Fuel Cell)、及び/又は溶融炭酸塩型燃料電池(MCFC:Molten Carbonate Fuel Cell)であってもよい。また、分散電源101は、太陽光、風力、水力、又は地熱等の自然エネルギーを用いて発電を行う発電装置であってもよい。また、分散電源101A/101Bは、電力の充電及び電力の放電を行う蓄電装置であってもよい。
 蓄電装置は、EMS102A/102Bの制御下で充電及び放電を行う装置である。例えば、蓄電装置は、リチウムイオン蓄電装置、鉛蓄電装置又はニッケル・水素蓄電装置等である。
 なお、蓄電装置が放電する電力は、施設100A/100B内の負荷機器103A/103Bに供給されてもよいし、電力系統110に供給されてもよい。また、本実施形態において、発電装置によって発電された電力を売電し、施設100A/100B内の負荷機器103A/103Bを蓄電装置の放電により賄う「押し上げモード」にて運用されてもよい。蓄電装置は、例えば、電力系統110によって供給される電力或いは発電装置の余剰電力を充電することができる。
 EMS102A/102Bは、施設100A/100Bの電力を管理する電力管理装置である。EMS102A/102Bは、分散電源101A/101B及び負荷機器103の動作状態を制御してもよい。具体的には、EMS102A/102Bは、蓄電装置の充電又は放電を制御してよい。EMS102A/102Bは、VEN(Virtual End Node)の一例である。
 負荷機器103A/103Bは、電力を消費する機器である。例えば、負荷機器103A/103Bは、空調機器、照明機器、又はAV(Audio Visual)機器等である。
 サーバ装置300は、発電事業者、送配電事業者或いは小売事業者、リソースアグリゲータ等の電力事業者によって管理されるサーバ装置である。リソースアグリゲータは、VPPにおいて発電事業者、送配電事業者及び小売事業者などに逆潮流の電力を提供する電力事業者である。本実施形態において、サーバ装置300は、逆潮流の電力の買取エンティティの一例である。本実施形態では、サーバ装置300は、施設100A/100Bを管理するように構成されている。
 以下、図4を参照して、電力供給システム1においてEMS102A(第1電力管理装置)として機能するEMSの構成の一例について説明する。また、図5を参照して、電力供給システム1においてEMS102B(第2電力管理装置)として機能するEMSの構成の一例について説明する。なお、本実施形態に係るEMSは、EMS102Aの構成及びEMS102Bの構成の両方を有していてもよい。
 図4に示すように、EMS102Aは、通信部111と、データベース112と、検索部113と、DR処理部114と、レポート取得部115と、通知部116とを有している。ここで、検索部113、DR処理部114、レポート取得部115及び通知部116の一部又は全部は、EMS102Aの制御部(図示せず)に含まれていてもよい。
 通信部111は、通信モジュールによって構成されており、施設100Aの分散電源101A、負荷機器103A及びサーバ装置300と通信を行う。通信部111は、サーバ装置300との間で、第1通信プロトコルに従って通信を行う。例えば、第1通信プロトコルとしては、Open ADR 2.0に準拠する通信プロトコル、或いは、独自の専用通信プロトコルを用いることができる。一方、通信部111は、分散電源101A及び負荷機器103Aとの間で、第2通信プロトコルに従って通信を行う。例えば、第2通信プロトコルは、ECHONET Liteに準拠する通信プロトコル、SEP(Smart Energy Profile)2.0、KNX、或いは、独自の専用通信プロトコルを用いることができる。
 データベース112は、不揮発性メモリ又は/及びHDD等の記憶媒体によって構成されており、施設100Aに関するデータを記憶する。
 検索部113は、通信部111を介して、ネットワーク200に対して検索要求を送信するように構成されている。ここで、検索要求は、EMS102Aに対して電力量を供給可能な他の需要家を検索するための信号である。かかる検索要求には、施設100Aにおいて必要な電力量を示す情報が含まれている。かかる検索要求は、例えば、Open ADR 2.0に準拠する通信プロトコルで規定されている信号であってもよい。
 また、検索部113は、他の施設100のEMS、本実施形態では、EMS102Bから、検索要求に対応する検索応答を受信するように構成されている。かかる検索応答には、EMS102Bにおいて施設100Aの需要家に対して供給可能な電力量を示す情報が含まれている。かかる検索応答は、例えば、Open ADR 2.0に準拠する通信プロトコルで規定されている信号であってもよい。
 なお、検索部113は、上述の検索要求を送信してから所定期間が経過した後に、通信部111を介して、ネットワーク200に対して、かかる検索応答の受付を締め切る旨を通知する信号を送信するように構成されていてもよい。
 また、上述の検索要求には、上述の検索応答を受け付ける期間を示す情報が含まれていてもよい。更に、上述の検索要求には、施設100Aの需要家において必要な電力の希望単価、及び/又は施設100A(或いは、施設100Aの需要家)の信頼度に関する情報が含まれていてもよい。
 同様に、上述の検索応答は、施設100Aの需要家に対して供給可能な電力の希望単価、及び/又は施設100B(或いは、施設100Bの需要家)の信頼度に関する情報が含まれていてもよい。
 また、検索部113は、かかる検索応答によって、後述するレポートとして送信可能な項目を通知されるように構成されていてもよい。
 DR処理部114は、通信部111を介して、EMS102Bに対してデマンドレスポンス要請を送信するように構成されている。ここで、デマンドレスポンス要請は、デマンドレスポンスによって指定値の電力量の供給を要請するための信号である。かかるデマンドレスポンス要請は、例えば、Open ADR 2.0に準拠する通信プロトコルで規定されている信号であってもよい。
 また、DR処理部114は、複数の需要家の中から、所定方法で、デマンドレスポンス要請の対象の需要家を選出するように構成されていてもよい。
 例えば、DR処理部114は、各需要家の信頼度に関する情報を用いて、デマンドレスポンス要請の対象の需要家を選出するように構成されていてもよい。DR処理部114は、サーバ装置300から、かかる信頼度に関する情報について取得するように構成されていてもよい。
 レポート取得部115は、デマンドレスポンスが完了した際に、通信部111を介して、EMS102Bに対して、応答結果を送信することを要求する結果要求を送信するように構成されている。かかる結果要求は、例えば、Open ADR 2.0に準拠する通信プロトコルで規定されている信号であってもよい。
 また、レポート取得部115は、通信部111を介して、EMS102Bから、応答結果を送信する結果応答によって、上述の指定値の電力量の供給に係るレポートを受信するように構成されている。かかる結果応答は、例えば、Open ADR 2.0に準拠する通信プロトコルで規定されている信号であってもよい。
 なお、レポート取得部115は、検索応答によって通知されたレポートとして送信可能な項目に基づいて、結果要求の内容を決定するように構成されていてもよい。
 通知部116は、通信部111を介して、サーバ装置300に対して、所定情報を通知するように構成されている。かかる所定情報は、上述のデマンドレスポンス要請に対するEMS102B(施設100B或いは施設100Bの需要家)の実績及び/又は評価を示す情報である。
 例えば、通知部116は、かかる所定情報として、少なくともデマンドレスポンス要請に対する達成率(要請期間中に、要請された電力量を100%とした場合に対して達成した電力量の度合い(例えば、%))及びデマンドレスポンス要請に対する平均滞在率のいずれか一方を通知するように構成されている。ここで、「滞在率」は、要請に応じていた際の電力量が、要請量に対しある範囲(例えば、±20%や10%)に入っていた時間の単位時間当たりの割合である。「平均滞在率」は、デマンドレスポンスが要請されている時間の範囲で滞在率を平均したものである。
 ここで、サーバ装置300は、かかる所定情報に基づいて、上述の各需要家の信頼度に関する情報を算出するように構成されていてもよい。
 また、レポート取得部115は、かかるレポート(結果応答)の内容について信用できないと判断した場合には、図2に示すパターン2のシーケンスを実施することで、施設100B(或いは、施設100Bの需要家)の評価を実施するように構成されていてもよい。かかる評価の結果及びレポートの内容が異なる場合、通知部116は、かかる評価の結果及びレポートの内容について、サーバ装置300に通知するように構成されていてもよい。かかる構成によれば、サーバ装置300において、施設100B(或いは、施設100Bの需要家)の評価を修正することができる。
 図5に示すように、EMS102Bは、通信部121と、データベース122と、応答部123と、DR処理部124と、レポート送信部125とを有している。ここで、検索部113、応答部123、DR処理部124及びレポート送信部125の一部又は全部は、EMS102Aの制御部(図示せず)に含まれていてもよい。
 通信部121は、通信モジュールによって構成されており、施設100Bの分散電源101B、負荷機器103B及びサーバ装置300と通信を行う。通信部111は、サーバ装置300との間で、第1通信プロトコルに従って通信を行う。例えば、第1通信プロトコルとしては、Open ADR 2.0に準拠する通信プロトコル、或いは、独自の専用通信プロトコルを用いることができる。一方、通信部121は、分散電源101B及び負荷機器103Bとの間で、第2通信プロトコルに従って通信を行う。例えば、第2通信プロトコルは、ECHONET Liteに準拠する通信プロトコル、SEP2.0、KNX、或いは、独自の専用通信プロトコルを用いることができる。
 データベース122は、不揮発性メモリ又は/及びHDD等の記憶媒体によって構成されており、施設100Bに関するデータを記憶する。
 応答部123は、通信部121を介して、EMS102Aから検索要求を受信するように構成されている。
 また、応答部123は、EMS102Aから受信した検索要求に応じて、通信部121を介して、EMS102Aに対して検索応答を送信するように構成されている。
 ここで、応答部123は、通信部121を介して、EMS102Aに対して、かかる検索応答によって、後述するレポートとして送信可能な項目を通知するように構成されていてもよい。
 例えば、応答部123は、かかる項目として、EMS102Bにおけるデマンドレスポンス要請に対する達成率(要請期間中に、要請された電力量を100%とした場合に対して達成した電力量の度合い(例えば、%))、EMS102Bにおけるデマンドレスポンス要請に対する最大達成率(要請期間内、単位時間ごとの達成率(例えば、%)のうち最大の値)、EMS102Bにおけるデマンドレスポンス要請に対する最低達成率(要請期間内、単位時間ごとの達成率(例えば、%)のうち最小の値)、デマンドレスポンス要請に対する平均滞在率、及び/又はデマンドレスポンス要請に対する応答時の最大電力誤差(例えば、1分単位)等を通知するように構成されていてもよい。ここで、「滞在率」は、要請に応じていた際の電力量が、要請量に対しある範囲(例えば、±20%や10%)に入っていた時間の単位時間当たりの割合である。「平均滞在率」は、デマンドレスポンスが要請されている時間の範囲で滞在率を平均したものである。
 ここで、各需要家の信頼度に関する情報は、少なくともデマンドレスポンス要請に対する達成度及びデマンドレスポンス要請に対する平均滞在率のいずれか一方であってもよい。
 なお、EMS102Bが、EMS102Aからのデマンドレスポンス要請に対して応答した場合には、供給した電力量に対する対価として金銭の支払いが発生する。従って、上述の構成によれば、各項目の内容に応じてデマンドレスポンス要請に対する達成具合を把握することができ、必要に応じて対価を減額することも可能になる。
 DR処理部124は、通信部121を介して、EMS102Aから、デマンドレスポンス要請を受信するように構成されている。
 また、DR処理部124は、EMS102Aから受信したデマンドレスポンス要請に応答して、EMS102Aに対してデマンドレスポンス要請によって要請された指定値の電力量を供給するように、EMS102Bによって管理されている分散電源101B又は負荷機器103Bを制御するように構成されている。
 レポート送信部125は、デマンドレスポンスが完了した際に、通信部121を介して、EMS102Aから結果要求を受信するように構成されている。
 また、レポート送信部125は、EMS102Aから受信した結果要求に応じて、通信部121を介して、EMS102Aに対して、結果応答によって、上述の指定値の電力量の供給に係るレポートを送信するように構成されている。
 更に、レポート送信部125は、検索応答によってEMS102Aに通知したレポートとして送信可能な項目及び結果要求に基づいて、かかるレポートの内容について決定するように構成されていてもよい。
 なお、上述のデマンドレスポンス要請に対する対価に係る情報は、別プロトコルによって、サーバ装置300とEMS102A/102Bとの間で送受信されるように構成されていてもよい。
 以下、図6を参照して、本実施形態に係る電力供給方法の一例について説明する。
 図6に示すように、ステップS101において、EMS102Aは、検索要求を送信し、ステップS102において、かかる検索要求を受信したEMS102Bは、EMS102Aに対して、かかる検索要求に対応する検索応答を送信する。
 ステップS103において、EMS102Aは、検索応答を受信したEMSの中から、EMS102Bを選出し、EMS102Bに対して、デマンドレスポンス要請を送信する。
 ステップS104において、EMS102Bは、EMS102Aに対してデマンドレスポンス要請によって要請された指定値の電力量を供給するように、EMS102Bによって管理されている分散電源101B又は負荷機器103Bを制御する。
 ステップS105において、EMS102Aは、デマンドレスポンスが完了した際に、EMS102Bに対して、結果要求を送信する。
 ステップS106において、EMS102Bは、かかる結果要求に応じて、EMS102Aに対して、結果応答によって、上述の指定値の電力量の供給に係るレポートを送信する。
 本実施形態によれば、応答側需要家(施設100B)から要請側需要家(施設100A)に対して所望の電力量を供給する場合における通信量及びEMSにおける処理量の増加を低減することができる。なお、上述のように、本明細書において「応答」という用語が使われているが、「応答して動作すること」から、かかる「応答」という用語の代わりに「応動」という用語を用いてもよい。
 本開示は上述した実施形態によって説明したが、この開示の一部をなす論述及び図面は、この発明を限定するものであると理解すべきではない。この開示から当業者には様々な代替実施形態、実施例及び運用技術が明らかとなろう。
 実施形態では、サーバ装置300が複数の施設100を管理するケースについて例示した。しかしながら、サーバ装置300が1つの施設100を管理してもよい。このようなケースにおいて、サーバ装置300は、EMS102であってもよい。
 実施形態では特に触れていないが、施設100に設けられるEMS102は、必ずしも施設100内に設けられていなくてもよい。例えば、EMS102の機能の一部は、インターネット上に設けられるクラウドサーバによって提供されてもよい。すなわち、EMS102がクラウドサーバを含むと考えてもよい。
 実施形態では、第1通信プロトコルがOpen ADR2.0に準拠するプロトコルであり、第2通信プロトコルがECHONET Lite、SEP2.0、或いはKNXに準拠するプロトコルであるケースについて例示した。しかしながら、実施形態はこれに限定されるものではない。第1通信プロトコルは、サーバ装置300とEMS102との間の通信で用いるプロトコルとして規格化されたプロトコルであればよい。第2通信プロトコルは、施設100で用いるプロトコルとして規格化されたプロトコルであればよい。
 本願は、日本国特許出願第2019-014433号(2019年1月30日出願)の優先権を主張し、その内容の全てが本願明細書に組み込まれている。

Claims (9)

  1.  第1需要家施設に設けられている第1電力管理装置が、検索要求を送信することと、
     第2需要家施設に設けられている第2電力管理装置が、前記検索要求に応じて、前記第1電力管理装置に対して、前記第2需要家施設の信頼度に関する情報を含む検索応答を送信することと、
     前記第1電力管理装置が、前記第2需要家施設の信頼度に関する情報に応じて選出した前記第2電力管理装置に対して、デマンドレスポンスによって指定値の電力量の供給を要請するためのデマンドレスポンス要請を送信することと、を有する電力供給方法。
  2.  前記第2電力管理装置が、前記デマンドレスポンス要請に応答して、前記第2電力管理装置によって管理されている分散電源及び負荷機器のうち少なくとも一方を、前記第1需要家施設に対して前記指定値の電力量を供給するように制御することと、
     前記第1電力管理装置が、前記デマンドレスポンスが完了した際に、前記第2電力管理装置に対して、前記デマンドレスポンスの完了時に応答結果を送信することを要求する結果要求を送信することと、を更に有する、請求項1に記載の電力供給方法。
  3.  前記第2需要家施設の信頼度に関する情報は、少なくとも前記デマンドレスポンス要請に対する達成度及び前記デマンドレスポンス要請に対する平均滞在率のいずれか一方であり、
     前記平均滞在率は、要請に応じていた際の電力量が要請量に対して所定範囲内に入っていた時間の割合を示す、請求項1又は2に記載の電力供給方法。
  4.  前記第2電力管理装置が、前記結果要求に応じて、前記第1電力管理装置に対して、前記デマンドレスポンスの完了時に応答結果を送信する結果応答によって、前記指定値の電力量の供給に係るレポートを送信すること、を更に有する、請求項2に記載の電力供給方法。
  5.  前記検索応答の送信において、前記第2電力管理装置は、前記第1電力管理装置に対して、前記検索応答によって、前記レポートとして送信可能な項目を通知する、請求項4に記載の電力供給方法。
  6.  前記レポートの送信において、前記第2電力管理装置は、前記第1電力管理装置に対して、前記レポートとして、前記第2需要家施設の信頼度を送信する、請求項3又は5に記載の電力供給方法。
  7.  前記第1電力管理装置が、前記第1電力管理装置を管理するサーバ装置に対して、前記第2需要家施設の信頼度に関する情報を通知することを更に含む、請求項1~6のいずれか一項に記載の電力供給方法。
  8.  第1需要家施設に設けられている第1電力管理装置及び第2需要家施設に設けられている第2電力管理装置を有する電力供給システムにおいて前記第1電力管理装置として機能する電力管理装置であって、
     前記第1需要家施設に対して電力量を供給可能な需要家施設を検索するための検索要求を送信し、前記第2電力管理装置が前記検索要求を受信したことに応じて、前記第2需要家施設の信頼度に関する情報を含む検索応答を前記第2電力管理装置から受信する検索部と、
     前記第2需要家施設の信頼度に関する情報に応じて選出した前記第2電力管理装置に対して、デマンドレスポンスによって指定値の電力量の供給を要請するためのデマンドレスポンス要請を送信するデマンドレスポンス処理部と、を有する、電力管理装置。
  9.  第1需要家施設に設けられている第1電力管理装置及び第2需要家施設に設けられている第2電力管理装置を有する電力供給システムにおいて前記第2電力管理装置として機能する電力管理装置であって、
     前記第1電力管理装置から受信した検索要求に応じて、前記第1電力管理装置に対して、前記第2需要家施設の信頼度に関する情報を含む検索応答を送信する応答部と、
     前記第1電力管理装置から、デマンドレスポンスによって指定値の電力量の供給を要請するためのデマンドレスポンス要請を受信するデマンドレスポンス処理部と、を有する、電力管理装置。
PCT/JP2020/002469 2019-01-30 2020-01-24 電力供給方法及び電力管理装置 WO2020158592A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2020569574A JP7178429B2 (ja) 2019-01-30 2020-01-24 電力供給方法及び電力管理装置
EP20747913.0A EP3920371A4 (en) 2019-01-30 2020-01-24 POWER SUPPLY METHOD AND POWER MANAGEMENT DEVICE
US17/389,245 US20210359542A1 (en) 2019-01-30 2021-07-29 Power supply method and energy management system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019-014433 2019-01-30
JP2019014433 2019-01-30

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US17/389,245 Continuation US20210359542A1 (en) 2019-01-30 2021-07-29 Power supply method and energy management system

Publications (1)

Publication Number Publication Date
WO2020158592A1 true WO2020158592A1 (ja) 2020-08-06

Family

ID=71840981

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/002469 WO2020158592A1 (ja) 2019-01-30 2020-01-24 電力供給方法及び電力管理装置

Country Status (4)

Country Link
US (1) US20210359542A1 (ja)
EP (1) EP3920371A4 (ja)
JP (1) JP7178429B2 (ja)
WO (1) WO2020158592A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4037128A1 (en) 2021-01-28 2022-08-03 Toyota Jidosha Kabushiki Kaisha Power management apparatus and power management method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003324850A (ja) * 2002-04-26 2003-11-14 Nippon Telegr & Teleph Corp <Ntt> 電力需給調整システムおよび電力需要家制御装置
JP2015171269A (ja) * 2014-03-09 2015-09-28 国立大学法人神戸大学 ルールを用いた自動デマンドレスポンス実行装置および実行システム
JP2017011968A (ja) 2015-06-26 2017-01-12 株式会社明電舎 分散型エネルギーシステムの運転計画作成装置および運転計画作成方法
WO2017018395A1 (ja) * 2015-07-29 2017-02-02 京セラ株式会社 管理サーバ及び管理方法
JP2017169418A (ja) * 2016-03-18 2017-09-21 株式会社エヌ・ティ・ティ・データ エネルギー需要制御装置、エネルギー需要制御方法、エネルギー需要制御システム、およびプログラム
WO2018158794A1 (ja) * 2017-02-28 2018-09-07 三菱電機株式会社 需要調整装置
JP2019014433A (ja) 2017-07-10 2019-01-31 株式会社Subaru 車両の操舵制御装置

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120065802A1 (en) * 2010-09-14 2012-03-15 Joulex, Inc. System and methods for automatic power management of remote electronic devices using a mobile device
JP5790081B2 (ja) * 2011-03-30 2015-10-07 富士通株式会社 電力制御装置、電力制御プログラムおよび電力制御方法
WO2013030937A1 (ja) * 2011-08-29 2013-03-07 株式会社日立製作所 地域電力管理システム及び地域電力管理方法
JP6236587B2 (ja) * 2011-09-16 2017-11-29 オートグリッド インコーポレイテッド デマンドレスポンス及び分散エネルギーリソースを最適化及び管理するシステム及び方法
JP6076164B2 (ja) * 2013-03-22 2017-02-08 京セラ株式会社 制御システム、機器、制御装置及び制御方法
JP6544720B2 (ja) * 2015-06-17 2019-07-17 パナソニックIpマネジメント株式会社 管理装置、管理方法、及び管理用プログラム

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003324850A (ja) * 2002-04-26 2003-11-14 Nippon Telegr & Teleph Corp <Ntt> 電力需給調整システムおよび電力需要家制御装置
JP2015171269A (ja) * 2014-03-09 2015-09-28 国立大学法人神戸大学 ルールを用いた自動デマンドレスポンス実行装置および実行システム
JP2017011968A (ja) 2015-06-26 2017-01-12 株式会社明電舎 分散型エネルギーシステムの運転計画作成装置および運転計画作成方法
WO2017018395A1 (ja) * 2015-07-29 2017-02-02 京セラ株式会社 管理サーバ及び管理方法
JP2017169418A (ja) * 2016-03-18 2017-09-21 株式会社エヌ・ティ・ティ・データ エネルギー需要制御装置、エネルギー需要制御方法、エネルギー需要制御システム、およびプログラム
WO2018158794A1 (ja) * 2017-02-28 2018-09-07 三菱電機株式会社 需要調整装置
JP2019014433A (ja) 2017-07-10 2019-01-31 株式会社Subaru 車両の操舵制御装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4037128A1 (en) 2021-01-28 2022-08-03 Toyota Jidosha Kabushiki Kaisha Power management apparatus and power management method

Also Published As

Publication number Publication date
US20210359542A1 (en) 2021-11-18
EP3920371A4 (en) 2022-12-21
JPWO2020158592A1 (ja) 2021-11-25
EP3920371A1 (en) 2021-12-08
JP7178429B2 (ja) 2022-11-25

Similar Documents

Publication Publication Date Title
US11362516B2 (en) Power management server and power management method
WO2020158592A1 (ja) 電力供給方法及び電力管理装置
WO2018139603A1 (ja) 電源制御方法、電源制御装置及び電源制御システム
JP2019017154A (ja) 電源管理方法及び電源管理装置
JP2023005861A (ja) 電力管理装置、電力管理システム及び電力管理方法
JP2019030123A (ja) 電源管理方法、電源管理サーバ及び電源管理装置
US11658321B2 (en) Energy management method, energy management apparatus, and energy management system
JP7037583B2 (ja) 電力管理システム、電力管理サーバ及び電力管理方法
JPWO2020080284A1 (ja) 電力管理装置、電力管理システム及び電力管理方法
US20220383404A1 (en) Bid assistance system and bid assistance method
JP7237851B2 (ja) 電力管理サーバ及び電力管理方法
WO2021079957A1 (ja) 取引支援システム及び取引支援方法
JP7480246B2 (ja) 電力管理装置及び電力管理方法
WO2021060142A1 (ja) 電力管理システム及び電力管理方法
US20220216695A1 (en) Internet of things (iot) energy device for renewable energy-based micro-grid infrastructure
JP6781274B2 (ja) 電源制御方法、電源制御装置及び電源制御システム
WO2021060143A1 (ja) 電力管理システム及び電力管理方法
JP2018117508A (ja) 電源制御方法及び制御装置
JP2020124040A (ja) サーバ装置及び制御方法
JP2023005124A (ja) 電力管理装置、電力管理システム及び電力管理方法
WO2018181732A1 (ja) 電源制御方法、第2事業者サーバ及び制御装置
JP2022114955A (ja) 蓄電装置管理システム及び蓄電装置管理方法
JP2023108966A (ja) 電力管理装置及び電力管理方法
JP2020182299A (ja) サーバ装置及び制御方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20747913

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2020569574

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2020747913

Country of ref document: EP

Effective date: 20210830