WO2020116190A1 - 熱源システムの管理装置、熱源システムの管理方法、熱源システムの管理情報の表示方法、および、熱源システムの表示装置 - Google Patents

熱源システムの管理装置、熱源システムの管理方法、熱源システムの管理情報の表示方法、および、熱源システムの表示装置 Download PDF

Info

Publication number
WO2020116190A1
WO2020116190A1 PCT/JP2019/045719 JP2019045719W WO2020116190A1 WO 2020116190 A1 WO2020116190 A1 WO 2020116190A1 JP 2019045719 W JP2019045719 W JP 2019045719W WO 2020116190 A1 WO2020116190 A1 WO 2020116190A1
Authority
WO
WIPO (PCT)
Prior art keywords
heat source
information
source system
pattern information
configuration
Prior art date
Application number
PCT/JP2019/045719
Other languages
English (en)
French (fr)
Inventor
徳臣 岡崎
Original Assignee
東芝キヤリア株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 東芝キヤリア株式会社 filed Critical 東芝キヤリア株式会社
Priority to JP2020559913A priority Critical patent/JP7194753B2/ja
Publication of WO2020116190A1 publication Critical patent/WO2020116190A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/52Indication arrangements, e.g. displays
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/65Electronic processing for selecting an operating mode

Definitions

  • the embodiment of the present invention relates to a heat source system management device, a heat source system management method, a heat source system management information display method, and a heat source system display device.
  • the heat energy required by the heat source system of each system varies greatly depending on the season.
  • a heat source system for a cooling system requires a lot of heat energy in the summer
  • a heat source system for a heating system requires a lot of heat energy in the winter. Therefore, it is possible to efficiently supply the necessary hot and cold water by appropriately changing the number of heat source devices belonging to each system in the facility to change the device configuration of the system.
  • the administrator can change the heat source system of each system in the facility to a configuration suitable for the season with a simple operation, but the operation mode, set temperature, ON/OFF of demand control, There is also a problem that the administrator must manually change the specific operation control contents such as the operation priority order for each heat source type, which complicates the process and increases the possibility of setting mistakes. ..
  • the present invention has been made in view of the above circumstances, and in a facility provided with a heat source system of a plurality of systems, the configuration and operation control content of each heat source system can be changed by a simple operation, a heat source system management device, a heat source
  • An object of the present invention is to provide a system management method, a heat source system management information display method, and a heat source system display device.
  • the management device of the heat source system is configured by using at least one of a plurality of heat source devices connected by a water pipe, and includes a control information generation unit.
  • the control information generation unit When any one of a plurality of preset system configuration pattern information is designated, the control information generation unit generates control information for making the heat source system of a plurality of systems into a corresponding configuration. Further, when any one of a plurality of preset operation pattern information is designated for each system of the heat source system, control information for operating the devices in the heat source system of each system according to the corresponding operation pattern information is generated. To do.
  • FIG. 1 is an overall view showing the configuration of a facility management system using a management device according to the first and second embodiments of the present invention.
  • FIG. 2 is a block diagram showing the configuration of the management device according to the first and second embodiments of the present invention.
  • 3A and 3B are examples of system configuration pattern information stored in the management device according to the first embodiment of the present invention.
  • FIGS. 4A and 4B are examples of operation pattern information stored in the management device according to the first embodiment of the present invention.
  • FIG. 5 is an overall view showing a modified configuration of the facility management system using the management device according to the first and second embodiments of the present invention.
  • FIG. 6 is a screen configuration diagram showing an example of calendar information of a predetermined month in the master schedule information displayed by the management device according to the second embodiment of the present invention.
  • FIG. 7 is a screen block diagram which shows an example of the detailed schedule information of the predetermined day in the master schedule information displayed with the management apparatus which concerns on 2nd Embodiment of this invention.
  • FIG. 8 is a screen configuration diagram showing an example when the master schedule information displayed by the management device according to the second embodiment of the present invention is displayed in the management screen of the system.
  • the facility management system 1A using the heat source system includes a plurality of grid systems provided for each load device to be managed, and an equipment management device 200 connected to each of these grid systems.
  • two system systems a first system system 10 and a second system system 20, are provided in the facility management system 1A.
  • the first system 10 is a cooling-only system that has a cooling device 21 that is a load device
  • the second-system system 20 is a heating-only system that has a heating device 22 that is a load device.
  • the facility management system 1A two module controllers (MC) as repeaters (first MC11A and second MC12A) are installed, and 16 heat source devices are connected under each MC to construct a heat source system. ing. Specifically, the heat source devices 11-1 to 11-16 are connected to the first MC 11A, and the heat source devices 12-1 to 12-16 are connected to the second MC 12A. Each of the first MC 11A and the second MC 12A is connected to the equipment management device 200. Note that the number of MCs is not limited to two, and is set according to the scale of the facility. Similarly, the number of heat source devices is not limited to 16 and may be set according to the scale of the facility.
  • a distribution pipe for sending hot/cold water generated by the heat source devices 11-1 to 11-16... 12-1 to 12-16 to the cooling device 21 or the heating device 22.
  • a certain outgoing water pipe 31 and a return water pipe 32 which is a water distribution pipe for returning the water heat-exchanged by the cooling device 21 or the heating device 22 to the heat source devices 11-1 to 11-16... 12-1 to 12-16. And are installed.
  • Each of the heat source devices 11-1 to 11-16... 12-1 to 12-16 generates hot and cold water of a predetermined temperature by heat exchange and supplies it to the corresponding cooling device 21 or heating device 22, and the load device Of the return water is taken in from the return water pipe 32 and water of a predetermined temperature is generated again.
  • the first switching valve 41 is installed, and the second switching valve 42 is installed in the return water pipe 32 at the same position.
  • 11 heat source devices 11-6 to 11-12 adjacent to the group of the heat source devices 12-1 to 12-16 connected to the second MC 12A are connected.
  • a third switching valve 43 is installed in the outgoing water pipe 31 between the 11-16 and the five heat source devices 11-1 to 11-5 which are not adjacent to each other, and the return water pipe 32 in the same position has a third switching valve 43 installed therein.
  • a 4-switching valve 44 is installed.
  • at least one of the plurality of heat source devices 11-1 to 11-16 and 12-1 to 12-16 connected by a water pipe is a switching valve. Connections are made based on the open/closed states of 41 to 44.
  • the facility management device 200 includes a setting information storage unit 201, an input unit 202, a display information generation unit 203, a display unit 204, a control information generation unit 205, and a communication unit 206. ..
  • the setting information storage unit 201 stores a plurality of preset system configuration pattern information relating to the system configuration in the facility management system 1A and a plurality of operation pattern information preset for each system in the facility management system 1A.
  • the input unit 202 inputs operation information by an administrator of the facility management system 1A.
  • the display information generation unit 203 generates display information using the information stored in the setting information storage unit 201 according to the instruction input from the input unit 202.
  • the display unit 204 displays the display information generated by the display information generation unit 203.
  • the control information generation unit 205 has a configuration indicated by the system configuration pattern information designated by the administrator based on the information stored in the setting information storage unit 201 and the information input from the input unit 202.
  • the control information for switching the opening and closing of the switching valves 41 to 44 in the system 1A is generated.
  • the control information generation unit 205 generates control information for operating the devices in each power system according to the operation pattern information specified by the administrator for each power system.
  • the communication unit 206 transmits the control information generated by the control information generation unit 205 to the corresponding device.
  • the facility management apparatus 200 generates the control signal and transmits the control signal to the corresponding device, but the present invention is not limited to this, the control signal is transmitted from another control apparatus, and the facility management apparatus 200 switches.
  • a mode in which the switching states of the valves 41 to 44 are received and the information is stored may be used.
  • the setting information storage unit 201 of the facility management apparatus 200 eight pieces of system configuration pattern information (first system configuration pattern information to eighth system) that are preset and related to the system configuration in the facility management system 1A are set.
  • the configuration pattern information is stored.
  • the heat source devices 11-1 to 11-16 connected to the first MC 11A belong to the first system and the heat source connected to the second MC 12A.
  • Information in which the devices 12-1 to 12-16 belong to the second system is stored.
  • the heat source devices 11-1 to 11-5 in the heat source device connected to the first MC 11A belong to the first system
  • the heat source device 11- Information that the heat source devices 12-1 to 12-16 connected to 6 to 11-16 and the second MC 12A belong to the second system is stored.
  • Name information indicating the function provided to the load device (cooling device 21 and heating device 22) to be managed when the heat source system operates in the configuration is added to each of the system configuration pattern information. ..
  • This name information includes, for example, "cooling priority”, “heating priority”, “cooling/heating simultaneous extraction”, and the like.
  • the setting information storage unit 201 stores in advance a plurality of operation pattern information indicating operation control contents which are preset for each of the first system 10 and the second system 20 in the facility management system 1A. There is.
  • the name information includes, for example, "cooling”, “heating”, “energy saving”, “gas machine priority”, and the like.
  • the process executed when the system configuration in the facility management system 1A and the operation control contents of the devices in each system are changed by the operation of the administrator will be described.
  • the facility management system 1A is configured based on the first system configuration pattern information
  • the devices in the first system system 10 are controlled based on the 1-1st operation pattern information
  • the second system system is controlled.
  • the devices in 20 are controlled based on the 2-1 operation pattern information.
  • the first switching valve 41 and the second switching valve 42 are closed, and the third switching valve 43 and the fourth switching valve 44 are open. Therefore, 16 heat source devices belong to each of the first system 10 and the second system 20.
  • the inside of the current system 1A is configured according to the first system configuration pattern information, the devices within the first system system 10 are controlled based on the 1-1st operation pattern information, and the second Display information indicating that the devices in the power system 20 are controlled based on the 2-1 operation pattern information is generated and displayed on the display unit 204.
  • the name information of the first system configuration pattern information, the 1-1st operation pattern information, and the 2-1st operation pattern information are also displayed.
  • the input unit 202 When the administrator refers to the name information and performs an operation for changing the system configuration in the facility management system 1A to the system configuration based on the second system configuration pattern information, the input unit 202 The operation information is input from.
  • control information generation unit 205 controls to open the first switching valve 41 and the second switching valve 42 and close the third switching valve 43 and the fourth switching valve 44.
  • Information is generated and transmitted from the communication unit 206 to each of the switching valves 41 to 44.
  • Each of the switching valves 41 to 44 switches the open/closed state according to the transmitted control information.
  • the heat source devices belonging to the first system 10 are five heat source devices 11-1 to 11-5.
  • the heat source devices belonging to the second system 20 are changed to 27 heat source devices 11-6 to 11-16 and 12-1 to 12-16.
  • the administrator changes the operation of the device in the first system 10 in the facility management system 1A from the control based on the 1-1st operation pattern information to the control based on the 1-2nd operation pattern information.
  • these operations are performed from the input unit 202. Information is entered.
  • control information generation unit 205 When the operation information is input, the control information generation unit 205 generates control information for operating the device in the first system 10 based on the 1-2 operation pattern information, and the communication unit 206 applies the control information. Sent to heat source equipment. In addition, control information for operating the device in the second system 20 based on the 2-2nd operation pattern information is generated and transmitted from the communication unit 206 to the corresponding heat source device. The operation of each heat source device is executed according to the transmitted control information.
  • the manager can easily configure the configuration of each heat source system and the operation control content of each heat source device in a facility equipped with a plurality of heat source systems having a large number of heat source devices. Can be changed.
  • the operation control content of each system when changing, can be selected from the eight operation patterns for each of the eight system configuration patterns, and various demand states can be accommodated. Then, the setting state can be easily changed.
  • system 1A there are two system systems built in the system 1A, but a larger number of system systems (for example, 3 to 16 systems) may be built. In that case, a predetermined number (e.g., 8) of operation pattern information is stored in advance for all the constructed systems.
  • the setting information storage unit 201 of the facility management apparatus 200 stores a plurality of schedule information indicating an application pattern of the system configuration and the application schedule of the operation control content in one day. Further, master schedule information indicating the applied schedule information for each day is further stored.
  • the control information generation unit 205 generates control information for operating the devices in each system according to the master schedule information stored in the setting information storage unit 201.
  • the setting information storage unit 201 of the facility management apparatus 200 stores a plurality of schedule information indicating a pattern of an application schedule of the system configuration and operation control content in one day.
  • the first weekly schedule information (W1) the system configuration applies the first system configuration pattern throughout the day, and the operation control content is from 8:00 to 20:00.
  • the 2nd system applies the 2nd-2nd operation pattern information, and in the other time zones, the 1st system has the 1st-1st operation pattern information and the 2nd system has the 2nd-1st operation pattern information in advance. It is set and stored.
  • the first singular day schedule information (S1), and the second singular day schedule information (S2) are set in advance,
  • the first singular day schedule information (S1), and the second singular day schedule information (S2) are set in advance,
  • the display information generation unit 203 when the operation of starting the generation process of the master schedule information is performed by the operation of the administrator, the display information generation unit 203 generates the display information of the monthly calendar and displays it on the display unit 204.
  • the administrator performs an operation of designating which schedule information is applied to which day on the displayed monthly calendar information.
  • master schedule information of the facility management system 1B is generated by performing an operation of designating schedule information for each day on the calendar information of each month. An example of the generated master schedule information is shown in FIG.
  • FIG. 6 shows calendar information of a predetermined month in the master schedule information.
  • the first weekly schedule information (W1) is applied to the 1st to 19th days of the month, and the second special day is set to the 20th. It is shown that the schedule information (S2) is applied and the information to which the second weekly schedule information (W2) is applied is input on the 21st to 31st days.
  • the operation of specifying the schedule information may be performed on a daily basis, or may be performed on a weekly basis, a day of the week, or a monthly basis.
  • the generated master schedule information is set so that the administrator can manually change it for a predetermined period after the current date and time, for example, for one week. By setting in this way, it is possible to deal with a case where it is desired to change the operating time of the air conditioning system due to an event or the like scheduled after the master schedule information is generated.
  • the detailed schedule information 140 has a band-shaped date display section at the top and a date/time display section at the bottom of which displays the selected date and the time axis of the day.
  • the system configuration pattern display unit 141 showing the setting state of each time zone of the system configuration pattern corresponding to the time axis of the date and time display unit, and the operation showing the setting state of each operating time period of the operation pattern
  • a pattern display section 142, a set temperature display section 143 showing the temperature setting state for each time zone, and a demand level display section 144 showing the setting state of the demand level for each time zone are displayed side by side in the vertical direction.
  • the setting state of each item that changes along the axis is displayed so that it can be viewed on one screen. It is possible to change the setting contents by selecting the item whose setting is to be changed in the detailed schedule information 140 thus displayed.
  • the control information generation unit 205 performs control for operating each device in the facility management system 1B based on the master schedule information. Information is generated. Specifically, control information for switching the open/closed states of the switching valves 41 to 44 and control information for operating the devices in the heat source system of each system according to the corresponding operation pattern information are generated. The generated control information is transmitted to the corresponding device via the communication unit 206. In each device, the operation is executed according to the control information transmitted from the facility management device 200.
  • a part of the detailed schedule information is displayed in the lower part of the management screen 100 that has a device status display area 105 related to the heat source device and MC in the facility management system 1B displayed by the operation of the administrator.
  • the device status display area 105 a schematic view of the configuration of the water distribution pipe constructed in the system system specified by the tab is displayed, the direction of water flow is indicated by arrows, and the heat source device connected to the water distribution pipe is displayed. Information for each group is displayed at the corresponding position in the schematic.
  • a system configuration pattern display unit 151 and an operation pattern display unit 152 arranged below the system configuration pattern display unit 151 are displayed.
  • a schedule button 170 for opening the detailed schedule display screen To the right of the simple schedule display area 150, a schedule button 170 for opening the detailed schedule display screen, a trend button 171 for opening a screen displaying past trends, and a past power consumption display screen for opening. Icons for opening other screens such as the electric power button 172 are displayed. This facilitates access to other screens for displaying information that is lacking in the management screen 100.
  • the equipment configuration of each heat source system and the operation control content of each heat source equipment are preset for each day in a facility equipped with a plurality of heat source systems having a large number of heat source equipment.
  • the pattern can be automatically switched to drive.
  • the facility management device of the facility management system sets the operation pattern and the system configuration pattern separately, and further displays them side by side on the same time axis, which results in high visibility and operability. Have. This makes it possible to easily perform flexible setting operation, system configuration, operation status confirmation, and setting operation.
  • system configuration pattern information in the above embodiment, the system configuration is changed by switching the piping valve, but in addition to this, the system configuration pattern may be changed by performing grouping of heat source devices that operate. You can
  • the settings such as operating three devices and the remaining two backup devices may be registered as a device configuration pattern.

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Human Computer Interaction (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

配水管で接続された複数の熱源機器の少なくともいずれかを用いて構成される複数系統の熱源システムの管理装置(1A,1B)は制御情報生成部(205)を備える。制御情報生成部(205)は、予め設定された複数のシステム構成パターン情報のいずれかが指定されると、複数系統の熱源システムを該当する構成にするための制御情報を生成する。また、熱源システムの系統ごとに、予め設定された複数の運転パターン情報のいずれかが指定されると、各系統の熱源システム内の機器を該当する運転パターン情報に従って運転させるための制御情報を生成する。

Description

熱源システムの管理装置、熱源システムの管理方法、熱源システムの管理情報の表示方法、および、熱源システムの表示装置
 本発明の実施形態は、熱源システムの管理装置、熱源システムの管理方法、熱源システムの管理情報の表示方法、および、熱源システムの表示装置に関する。
 従来、工場や倉庫などの規模の大きい施設には、建屋ごとまたは設備ごとに構築された複数の系統の熱源システムが備えられ、各熱源システムから該当する系統内の空調機器等の負荷機器に温冷水が供給される。これらの各系統の熱源システム内には、温冷水を生成する多数の熱源機器が、配水管で接続されて設置されている。
 このような施設において、各系統の熱源システムで必要とする熱エネルギーは、季節等により大きく異なる。例えば、冷却専用系統の熱源システムでは夏場に多くの熱エネルギーを必要とし、加熱専用系統の熱源システムでは、冬場に多くの熱エネルギーを必要とする。そのため、当該施設内で、需要に応じて各系統に所属させる熱源機器の台数を適宜変更してシステムの機器構成を変更することで、効率よく必要な温冷水を供給することができる。
特開2017-83058号公報
 上述したような規模の大きい施設では、設置される熱源機器の数が膨大であり、施設内の各系統に所属させる熱源機器を変更するには操作が煩雑になる。そのため、どの熱源機器をどの系統の熱源システムに所属させるかを予め設定したシステム構成パターンを複数(例えば8個)用意しておき、季節ごと等で管理者が適用するシステム構成パターンを変更することが行われている。
 このように処理することにより、管理者は簡易な操作で施設内の各系統の熱源システムを季節に適した構成に変更することができるが、運転モードや設定温度、デマンド制御のON/OFF、熱源種別ごとの運転優先順位など、具体的な運転制御内容に関してはやはり管理者が手動で変更する必要があり、処理が煩雑であるとともに設定間違いが発生する可能性が高くなるという問題があった。
 発明は上記事情に鑑みてなされたものであり、複数系統の熱源システムを備えた施設内で、各熱源システムの構成および運転制御内容を、簡易な操作で変更可能な熱源システムの管理装置、熱源システムの管理方法、熱源システムの管理情報の表示方法、および、熱源システムの表示装置を提供することを目的とする。
 上記目的を達成するために、実施形態に係る熱源システムの管理装置は、配水管で接続された複数の熱源機器の少なくともいずれかを用いて構成され、制御情報生成部を備える。制御情報生成部は、予め設定された複数のシステム構成パターン情報のいずれかが指定されると、複数系統の熱源システムを該当する構成にするための制御情報を生成する。また、熱源システムの系統ごとに、予め設定された複数の運転パターン情報のいずれかが指定されると、各系統の熱源システム内の機器を該当する運転パターン情報に従って運転させるための制御情報を生成する。
図1は、本発明の第1および第2実施形態に係る管理装置を用いた施設管理システムの構成を示す全体図である。 図2は、本発明の第1および第2実施形態に係る管理装置の構成を示すブロック図である。 図3(a)、(b)は、本発明の第1実施形態に係る管理装置に記憶されるシステム構成パターン情報の一例である。 図4(a)、(b)は、本発明の第1実施形態に係る管理装置に記憶される運転パターン情報の一例である。 図5は、本発明の第1および第2実施形態に係る管理装置を用いた施設管理システムの変更後の構成を示す全体図である。 図6は、本発明の第2実施形態に係る管理装置で表示されたマスタースケジュール情報内の所定月のカレンダー情報の一例を示す画面構成図である。 図7は、本発明の第2実施形態に係る管理装置で表示されたマスタースケジュール情報内の所定日の詳細スケジュール情報の一例を示す画面構成図である。 図8は、本発明の第2実施形態に係る管理装置で表示されたマスタースケジュール情報をそのシステムの管理画面内に表示させたときの一例を示す画面構成図である。
 《第1実施形態》
 本実施形態による熱源システムを用いた施設管理システム1Aの構成について、図1を参照して説明する。本実施形態による施設管理システム1Aは、管理対象の負荷機器ごとに設けられた複数の系統システムと、これらの各系統システムに接続された設備管理装置200とを備える。本実施形態においては、施設管理システム1A内には、第1系統システム10と第2系統システム20との2つの系統システムが設けられている。第1系統システム10は負荷機器である冷却機器21を有する冷却専用のシステムであり、第2系統システム20は負荷機器である加熱機器22を有する加熱専用のシステムである。
 施設管理システム1A内には、中継器としてのモジュールコントローラ(MC)が2台(第1MC11Aおよび第2MC12A)設置され、各MCの配下にそれぞれ16台の熱源機器が接続されて熱源システムが構築されている。具体的には、第1MC11Aには熱源機器11-1~11-16が接続され、第2MC12Aには熱源機器12-1~12-16が接続されている。第1MC11Aおよび第2MC12Aはそれぞれ、設備管理装置200に接続されている。なお、MCの数は2台に限られず、施設の規模等に応じて設定される。同様に、熱源機器も16台に限られず、施設の規模等に応じて設定される。
 また、施設管理システム1A内には、各熱源機器11-1~11-16・・・12-1~12-16で生成された温冷水を冷却機器21または加熱機器22に送水する配水管である往水配管31と、冷却機器21または加熱機器22で熱交換された水を熱源機器11-1~11-16・・・12-1~12-16に戻す配水管である還水配管32とが設置されている。各熱源機器11-1~11-16・・・12-1~12-16は、熱交換により所定温度の温冷水を生成して該当する冷却機器21または加熱機器22に供給し、負荷機器からの還水を還水配管32から取り込んで再び所定温度の水を生成する。
 また、第1MC11Aに接続された熱源機器11-1~11-16のグループと、第2MC12Aに接続された熱源機器12-1~12-16のグループとの間の往水配管31内には第1切替バルブ41が設置され、同位置の還水配管32内には第2切替バルブ42が設置されている。また、第1MC11Aに接続された熱源機器11-1~11-16の中で、第2MC12Aに接続された熱源機器12-1~12-16のグループに隣接する11個の熱源機器11-6~11-16と、隣接しない5個の熱源機器11-1~11-5との間の往水配管31内には第3切替バルブ43が設置され、同位置の還水配管32内には第4切替バルブ44が設置されている。第1系統システム10および第2系統システム20の熱源システムはそれぞれ、配水管で接続された複数の熱源機器11-1~11-16および12-1~12-16の少なくともいずれかが、切替バルブ41~44の開閉状態に基づいて接続されている。
 設備管理装置200は、図2に示すように、設定情報記憶部201と、入力部202と、表示情報生成部203と、表示部204と、制御情報生成部205と、通信部206とを有する。
 設定情報記憶部201は、予め設定された、施設管理システム1A内のシステム構成に関する複数のシステム構成パターン情報、および、施設管理システム1A内の系統ごとに予め設定された、複数の運転パターン情報を記憶する。入力部202は、施設管理システム1Aの管理者による操作情報を入力する。表示情報生成部203は、入力部202から入力された指示に従って、設定情報記憶部201に記憶された情報を用いた表示情報を生成する。表示部204は、表示情報生成部203で生成された表示情報を表示する。
 制御情報生成部205は、設定情報記憶部201に記憶された情報、および入力部202から入力された情報に基づいて、管理者により指定されたシステム構成パターン情報で示される構成になるように、システム1A内の切替バルブ41~44の開閉を切り替えるための制御情報を生成する。また、制御情報生成部205は、管理者により系統システムごとに指定された運転パターン情報に従って、各系統システム内の機器を動作させるための制御情報を生成する。通信部206は、制御情報生成部205で生成された制御情報を、該当する機器に送信する。
 なお、本実施形態では設備管理装置200で制御信号を生成し該当する機器に制御信号を送信しているが、これに限らず別の制御装置から制御信号を送信し、設備管理装置200は切替バルブ41~44の切替状態を受信し、その情報を記憶する態様としてもよい。
 本実施形態において、設備管理装置200の設定情報記憶部201には、予め設定された、施設管理システム1A内のシステム構成に関する8個のシステム構成パターン情報(第1システム構成パターン情報~第8システム構成パターン情報)が記憶されている。
 例えば、第1システム構成パターン情報として、図3(a)に示すように、第1MC11Aに接続された熱源機器11-1~11-16が第1系統に所属し、第2MC12Aに接続された熱源機器12-1~12-16が第2系統に所属する情報が記憶されている。また、第2システム構成パターンとして、図3(b)に示すように、第1MC11Aに接続された熱源機器内の熱源機器11-1~11-5が第1系統に所属し、熱源機器11-6~11-16および第2MC12Aに接続された熱源機器12-1~12-16が第2系統に所属する情報が記憶されている。
 これらのシステム構成パターン情報にはそれぞれ、当該構成で当該熱源システムが稼働するときに、管理対象の負荷機器(冷却機器21および加熱機器22)に提供される機能を示す名称情報が付加されている。この名称情報としては例えば、「冷却優先」、「加熱優先」、「冷却加熱同時取り出し」等がある。
 また、設定情報記憶部201には、予め、施設管理システム1A内の第1系統システム10および第2系統システム20それぞれについて予め設定された、運転制御内容を示す複数の運転パターン情報が記憶されている。
 例えば、第1系統システム10の運転パターン情報として、図4(a)に示すように、第1-1運転パターン情報[運転モード「冷却」、設定温度「7.0℃」、デマンド制御レベル「0」]、第1-2運転パターン情報[運転モード「冷却」、設定温度「7.0℃」、デマンド制御レベル「1」]、第1-3運転パターン情報[運転モード「冷却」、設定温度「8.0℃」、デマンド制御レベル「2」]、第1-4運転パターン情報[運転モード「加熱」、設定温度「45.0℃」、デマンド制御レベル「0」]、第1-5運転パターン情報[運転モード「加熱」、設定温度「45.0℃」、デマンド制御レベル「1」]、第1-6運転パターン情報[運転モード「停止」、設定温度「7.0℃」、デマンド制御レベル「0」]、第1-7運転パターン情報[運転モード「停止」、設定温度「7.0℃」、デマンド制御レベル「0」]、第1-8運転パターン情報[運転モード「停止」、設定温度「7.0℃」、デマンド制御レベル「0」]が記憶されている。また、第2系統システム20の運転パターン情報として、図4(b)に示すように、第2-1運転パターン情報・・・第2-8運転パターン情報が記憶されている。
 これらの運転パターン情報にはそれぞれ、該当する運転パターンで該当する負荷機器が稼働するときに当該負荷機器により提供される機能を示す名称情報が付加されている。この名称情報としては例えば、「冷却」、「加熱」、「省エネ」、「ガス機優先」等がある。
 これらの情報が記憶された状態で、管理者の操作により、施設管理システム1A内のシステム構成および各系統システム内の機器の運転制御内容が変更されるときに実行される処理について説明する。初期状態では、施設管理システム1A内が第1システム構成パターン情報に基づいて構成されており、第1系統システム10内の機器が第1-1運転パターン情報に基づいて制御され、第2系統システム20内の機器が第2-1運転パターン情報に基づいて制御されている。第1システム構成パターン情報に基づいて構成されたシステム構成では、第1切替バルブ41および第2切替バルブ42が閉状態にされ、第3切替バルブ43および第4切替バルブ44が開状態にされることで、第1系統システム10および第2系統システム20にはそれぞれ16台ずつの熱源機器が所属している。このとき、表示情報生成部203では、現在システム1A内が、第1システム構成パターン情報に従って構成され、第1系統システム10内の機器が第1-1運転パターン情報に基づいて制御され、第2系統システム20内の機器が第2-1運転パターン情報に基づいて制御されていることを示す表示情報が生成され、表示部204に表示されている。このとき、第1システム構成パターン情報、第1-1運転パターン情報、および第2-1運転パターン情報の名称情報も併せて表示される。
 そして、設備管理装置200において、管理者により名称情報が参照されて施設管理システム1A内のシステム構成を第2システム構成パターン情報に基づくシステム構成に変更するための操作が行われると、入力部202からその操作情報が入力される。
 操作情報が入力されると、制御情報生成部205により、第1切替バルブ41および第2切替バルブ42を開状態にし、第3切替バルブ43および第4切替バルブ44を閉状態にするための制御情報が生成され、通信部206から各切替バルブ41~44に送信される。各切替バルブ41~44では、送信された制御情報に従って開閉状態が切り替えられる。
 このように切替バルブ41~44の開閉が切り替えられると、図5に示すように、第1系統システム10に所属する熱源機器が、熱源機器11-1~11-5の5台になるように変更され、第2系統システム20に所属する熱源機器が、熱源機器11-6~11-16および熱源機器12-1~12-16の27台になるように変更される。
 また、管理者により、施設管理システム1A内の第1系統システム10内の機器の動作を、第1-1運転パターン情報に基づく制御から第1-2運転パターン情報に基づく制御に変更し、第2系統システム20内の機器の動作を、第2-1運転パターン情報に基づく制御から第2-2運転パターン情報に基づく制御に変更するための操作が行われると、入力部202からこれらの操作情報が入力される。
 操作情報が入力されると、制御情報生成部205により、第1系統システム10内の機器を第1-2運転パターン情報に基づいて動作させるための制御情報が生成され、通信部206から該当する熱源機器に送信される。また、第2系統システム20内の機器を第2-2運転パターン情報に基づいて動作させるための制御情報が生成され、通信部206から該当する熱源機器に送信される。各熱源機器では、送信された制御情報に従って運転が実行される。
 以上の第1実施形態によれば、多数の熱源機器を有する複数系統の熱源システムを備えた施設内で、各熱源システムの構成および各熱源機器の運転制御内容を、管理人が簡易な操作で変更することができる。例えば、上述した第1実施形態では、変更の際に、8つのシステム構成パターンそれぞれに対し、各系統の運転制御内容を8つの運転パターンの中から選択することができ、様々な需要状態に対応して設定状態を簡易に変更することができる。
 本実施形態においてシステム1A内に構築された系統システムは2つであるが、さらに多数の系統システム(例えば3~16系統)を構築してもよい。その場合は、構築されたすべての系統に関し、それぞれ所定数(例えば8個)の運転パターン情報が予め記憶される。このような多数の系統システムが構築された施設管理システムに適用することで、さらに複雑な運転制御内容の操作を簡略化させることができる。
 《第2実施形態》
 上述した第1実施形態では、施設管理システム1A内のシステム構成と運転制御内容が、管理人が指定したパターンに従って切り替えられる場合を示したが、第2実施形態では、予め設定されたスケジュール情報に従ってこれらが切り替えられる場合について説明する。
 第2実施形態による施設管理システム1Bの構成は、第1実施形態で説明した施設管理システム1Aの構成と同様であるため、同一機能を有する部分の詳細な説明は省略する。
 本実施形態において設備管理装置200の設定情報記憶部201には、1日の中における、システム構成および運転制御内容の適用スケジュールの適用パターンを示す複数のスケジュール情報が記憶されている。また、適用するスケジュール情報を日ごとに示したマスタースケジュール情報をさらに記憶する。制御情報生成部205は、設定情報記憶部201に記憶されたマスタースケジュール情報に従って、各系統内の機器を動作させるための制御情報を生成する。
 本実施形態において、設備管理装置200の設定情報記憶部201には、1日の中でのシステム構成および運転制御内容の適用スケジュールのパターンを示す複数のスケジュール情報が記憶されている。例えば、第1週間スケジュール情報(W1)として、システム構成は終日第1システム構成パターンを適用し、運転制御内容は、8時~20時までは第1系統は第1-2運転パターン情報、第2系統は第2-2運転パターン情報を適用し、それ以外の時間帯は、第1系統は第1-1運転パターン情報、第2系統は第2-1運転パターン情報を適用する情報が予め設定されて記憶されている。このようにして、第2週間スケジュール情報(W2)、第3週間スケジュール情報(W3)・・・、第1特異日スケジュール情報(S1)、第2特異日スケジュール情報(S2)が予め設定され、記憶されている。
 そして、管理者の操作により、マスタースケジュール情報の生成処理を開始する操作が行われると、表示情報生成部203により月間カレンダーの表示情報が生成され、表示部204に表示される。管理者は、表示された月間カレンダー情報上で、どの日にどのスケジュール情報を適用するかを指定する操作を行う。同様にして、各月のカレンダー情報上でスケジュール情報を日ごとに指定する操作を行うことで、施設管理システム1Bのマスタースケジュール情報が生成される。生成されたマスタースケジュール情報の一例を、図6に示す。
 図6は、マスタースケジュール情報の中の所定月のカレンダー情報を示しており、当該月の1日~19日には第1週間スケジュール情報(W1)を適用し、20日には第2特異日スケジュール情報(S2)を適用し、21日~31日には第2週間スケジュール情報(W2)を適用する情報が入力されたことが示されている。スケジュール情報の指定操作は、日ごとに行ってもよいし、一週間ごと、曜日ごと、または月ごとに一括して行ってもよい。
 生成されたマスタースケジュール情報は、現在日時から先の所定期間、例えば1週間分に関しては、管理者により手動で変更可能となるように設定されている。このように設定されることにより、マスタースケジュール情報の生成時以降に予定が入ったイベント等により空調システムの稼働時間を変更したい場合等に対応することができる。
 例えば、図6のカレンダー情報の中から、マスタースケジュール情報を変更したい日付「9月21日」を指定することで、図7に示すような当該日の詳細スケジュール情報140が表示される。詳細スケジュール情報140は、最上段に帯状の日付表示部を有し、その下段に選択された日付と当該日の時間軸とを表示する日時表示部を備えている。さらにその下段には、日時表示部の時間軸に対応して、システム構成パターンの時間帯ごとの設定状態を示したシステム構成パターン表示部141、運転パターンの時間帯ごとの設定状態を示した運転パターン表示部142、時間帯ごとの温度設定状態を示した設定温度表示部143、およびデマンドレベルの時間帯ごとの設定状態を示したデマンドレベル表示部144が上下に順次並べて表示されており、時間軸に沿って推移する各項目の設定状態が1画面にて視認できるように表示されている。このように表示された当該詳細スケジュール情報140内の設定変更したい項目を選択して、設定内容の更操作を行うことができる。
 このようにして生成されたマスタースケジュール情報が設定情報記憶部201に記憶されると、制御情報生成部205により、当該マスタースケジュール情報に基づいて施設管理システム1B内の各機器を動作させるための制御情報が生成される。具体的には、切替バルブ41~44の開閉状態を切り替えるための制御情報、および各系統システムの熱源システム内の機器を該当する運転パターン情報に従って運転させるための制御情報が生成される。生成された制御情報は、通信部206を介して該当する機器に送信される。各機器では、設備管理装置200から送信された制御情報に従って、動作が実行される。
 また、図8に示すように、管理者の操作により表示される、施設管理システム1B内の熱源機器やMCに関する機器状態表示エリア105を有する管理画面100内の下部に、詳細スケジュール情報の一部を示す簡易スケジュール表示エリア150を表示させるようにしてもよい。機器状態表示エリア105には、タブで指定された系統システム内に構築された配水管の構成の概略図が表示されて水の流れる方向が矢印で示されるとともに、配水管に接続された熱源機器グループごとの情報が、概略図の該当する位置に表示される。簡易スケジュール表示エリア150には、システム構成パターン表示部151と、その下方に配置された運転パターン表示部152とが表示される。
 また、簡易スケジュール表示エリア150の右方には、詳細スケジュール表示画面を開くためのスケジュールボタン170、過去のトレンドを表示する画面を開くためのトレンドボタン171、過去の消費電力量表示画面を開くための電力量ボタン172等のその他画面を開くためのアイコンが表示されている。これにより、管理画面100の状態で不足している情報を表示するためのその他の画面へのアクセスを容易にしている。
 以上の第2実施形態によれば、多数の熱源機器を有する複数系統の熱源システムを備えた施設内で、各熱源システムの機器構成および各熱源機器の運転制御内容を、予め日ごとに設定したパターンに自動で切り替えて運転させることができる。
 上記のように、本実施形態による施設管理システムの設備管理装置は、運転パターンとシステム構成パターンとを分けて設定し、さらにそれらを同一時間軸上に並べて表示させるため、高い視認性と操作性を有する。これにより柔軟な設定操作とシステム構成、運転状況の確認と設定操作を容易に行うことができる。
 すなわち、従来は様々な運転パターンにシステム構成を考慮した様々な状態を個々の場合に分けて設定していたが、本実施形態で示したようにシステム構成パターンと運転パターンを表示しそれぞれを設定可能とすることで、これらのパターンの組み合わせにより、設定項目を簡易的に視認性よく表示しつつ、複雑な設定操作を簡易的に行うことができる。また、必要に応じて個々の設定項目へのアクセスも直観的に行うことができ、システムの状態確認および設定操作を容易に行うことができる。
 また、システム構成パターン情報について、上記の実施形態では配管バルブの切替によって、システム構成を変更しているが、この他にも、動作する熱源機器のグルーピングを行うことでシステム構成パターンを変更するようにしてもよい。
 例えば、第1系統システムの11-1~11-5の内、運転する機器を3台とし残り2台をバックアップ機器とする等の設定を機器構成パターンとして登録してもよい。
 以上、本発明の実施形態を説明したが、この実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。この新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。この実施形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれる。

Claims (8)

  1.  配水管で接続された複数の熱源機器の少なくともいずれかを用いて構成される複数系統の熱源システムの管理装置であって、
     予め設定された、前記複数系統の熱源システムの構成に関する複数のシステム構成パターン情報、および、前記熱源システムの系統ごとの複数の運転パターン情報を記憶する設定情報記憶部と、
     前記設定情報記憶部に記憶された複数のシステム構成パターン情報のいずれかが指定されると、前記複数系統の熱源システムを当該システム構成パターン情報で示される構成にするための制御情報を生成し、前記熱源システムの系統ごとに、該当する複数の運転パターン情報のいずれかが指定されると、各系統の熱源システム内の機器を該当する運転パターン情報に従って運転させるための制御情報を生成する制御情報生成部とを備えることを特徴とする熱源システムの管理装置。
  2.  前記複数系統の熱源システムの構成は、前記配水管内に設置された複数の切替バルブの開閉状態を切り替えることで変更されることを特徴とする請求項1に記載の熱源システムの管理装置。
  3.  前記設定情報記憶部に記憶される前記複数のシステム構成パターン情報にはそれぞれ、該当する構成で前記複数の熱源システムが稼働するときに管理対象の負荷機器により提供される機能を示す名称情報が付加され、前記複数の運転パターン情報にはそれぞれ、該当する運転パターンで該当する負荷機器が稼働するときに当該負荷機器により提供される機能を示す名称情報が付加されることを特徴とする請求項1または2に記載の熱源システムの管理装置。
  4.  前記設定情報記憶部は、前記システム構成パターン情報および前記運転パターン情報の適用スケジュールが設定されたスケジュール情報を記憶し、
     前記制御情報生成部は、前記設定情報記憶部に記憶された適用スケジュールに従って、前記複数系統の熱源システムを該当するシステム構成パターンで示される構成にするための制御情報および各系統の熱源システム内の機器を該当する運転パターン情報に従って運転させるための制御情報を生成することを特徴とする請求項1~3いずれか1項に記載の熱源システムの管理装置。
  5.  前記設定情報記憶部に記憶されたシステム構成パターン情報、運転パターン情報、および現在日時から所定期間先までの適用スケジュール情報は、ユーザの操作により変更可能に設定されることを特徴とする請求項1~4いずれか1項に記載の熱源システムの管理装置。
  6.  配水管で接続された複数の熱源機器の少なくともいずれかを用いて構成される複数系統の熱源システムの管理装置が、
     予め設定された、前記複数系統の熱源システムの構成に関する複数のシステム構成パターン情報、および、前記熱源システムの系統ごとの複数の運転パターン情報を記憶し、
     記憶された複数のシステム構成パターン情報のいずれかが指定されると、前記複数系統の熱源システムを当該システム構成パターン情報で示される構成にするための制御情報を生成し、前記熱源システムの系統ごとに、該当する複数の運転パターン情報のいずれかが指定されると、各系統の熱源システム内の機器を該当する運転パターン情報に従って運転させるための制御情報を生成することを特徴とする熱源システムの管理方法。
  7.  配水管で接続された複数の熱源機器の少なくともいずれかを用いて構成される複数系統の熱源システムの管理情報の表示方法であって、
     予め設定された、前記複数系統の熱源システムの構成に関する時間帯ごとのシステム構成パターン情報、および、前記熱源システムの系統ごとおよび時間帯ごとの運転パターン情報を、同一時間軸上に並べて表示させることを特徴とする熱源システムの管理情報の表示方法。
  8.  配水管で接続された複数の熱源機器の少なくともいずれかを用いて構成される複数系統の熱源システムの表示装置であって、
     予め設定された、切替可能な前記複数系統の熱源システムの構成に関する時間帯ごとのシステム構成パターン情報、および、少なくとも運転モードおよびデマンド制御レベルを有する前記熱源システムの系統ごとおよび時間帯ごとの運転パターン情報を同一時間軸上に並べた管理画面を表示させる表示部を備えることを特徴とする熱源システムの表示装置。
PCT/JP2019/045719 2018-12-03 2019-11-22 熱源システムの管理装置、熱源システムの管理方法、熱源システムの管理情報の表示方法、および、熱源システムの表示装置 WO2020116190A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020559913A JP7194753B2 (ja) 2018-12-03 2019-11-22 熱源システムの管理装置、熱源システムの管理方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018226468 2018-12-03
JP2018-226468 2018-12-03

Publications (1)

Publication Number Publication Date
WO2020116190A1 true WO2020116190A1 (ja) 2020-06-11

Family

ID=70973614

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/045719 WO2020116190A1 (ja) 2018-12-03 2019-11-22 熱源システムの管理装置、熱源システムの管理方法、熱源システムの管理情報の表示方法、および、熱源システムの表示装置

Country Status (2)

Country Link
JP (1) JP7194753B2 (ja)
WO (1) WO2020116190A1 (ja)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008170065A (ja) * 2007-01-11 2008-07-24 Toshiba Corp 空調制御システム
JP2011002112A (ja) * 2009-06-16 2011-01-06 Shimizu Corp 空調熱源機運転ナビゲーションシステム
JP2014009824A (ja) * 2012-06-28 2014-01-20 Mitsubishi Electric Corp 電力管理装置
WO2015194020A1 (ja) * 2014-06-19 2015-12-23 三菱電機株式会社 冷凍サイクル装置および冷凍サイクルシステム

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0510936U (ja) * 1991-07-19 1993-02-12 三菱電機株式会社 スケジユール管理装置
JP2010025466A (ja) * 2008-07-22 2010-02-04 Hitachi Plant Technologies Ltd 熱源システム
JP5955206B2 (ja) * 2012-12-10 2016-07-20 三菱電機株式会社 デマンド制御装置及びその方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008170065A (ja) * 2007-01-11 2008-07-24 Toshiba Corp 空調制御システム
JP2011002112A (ja) * 2009-06-16 2011-01-06 Shimizu Corp 空調熱源機運転ナビゲーションシステム
JP2014009824A (ja) * 2012-06-28 2014-01-20 Mitsubishi Electric Corp 電力管理装置
WO2015194020A1 (ja) * 2014-06-19 2015-12-23 三菱電機株式会社 冷凍サイクル装置および冷凍サイクルシステム

Also Published As

Publication number Publication date
JPWO2020116190A1 (ja) 2021-09-27
JP7194753B2 (ja) 2022-12-22

Similar Documents

Publication Publication Date Title
CN108700323A (zh) 空调系统
TWI489067B (zh) Air conditioning management system
JP2004191037A (ja) エアコンの中央制御システムおよびその動作方法
US10990261B2 (en) HVAC graphical user interface with visual obscurity and methods of use thereof
CN102734894B (zh) 空调管理系统
CN105204454A (zh) 操作建筑物家庭自动化设施的控制设备的方法和控制设备
JP2008532166A5 (ja)
CN105899883A (zh) 热泵系统的远程控制装置
EP2400235B1 (en) Air-conditioning control monitoring device and air-conditioning control monitoring system
US20180216842A1 (en) Systems and methods for monitoring and controlling an energy plant
JP5338693B2 (ja) 空気調和システム
EP2058598A2 (en) Air conditioner and operating method thereof
CN104240033A (zh) 一种电网检修计划图形编排的方法和系统
JP5516448B2 (ja) 空調機システム
WO2020116190A1 (ja) 熱源システムの管理装置、熱源システムの管理方法、熱源システムの管理情報の表示方法、および、熱源システムの表示装置
JP6087783B2 (ja) 集中制御システム
JP3169265U (ja) 冷暖房集中管理システム
KR100529924B1 (ko) 통합제어형 멀티에어컨 시스템 및 그 동작방법
JP6761760B2 (ja) 空調管理装置
US10900687B2 (en) Flexible scheduling HVAC graphical user interface and methods of use thereof
JPH0863223A (ja) 設備機器の監視制御装置
RU2237960C2 (ru) Распределительное устройство системы электропитания потребителей здания
Popa et al. Study on designing an automated system of efficient HVAC control for energy saving in industrial buildings
JP2003303228A (ja) 設備機器管理システムのスケジュール設定方法および設備機器管理システム
Miltiades Your HVAC system can manage its own energy use: advantages of variable refrigerant flow (VRF) zoning systems

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19893470

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2020559913

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19893470

Country of ref document: EP

Kind code of ref document: A1