WO2020060083A1 - Moulage préfabriqué et procédé de construction d'un panneau d'aluminium à paroi externe l'utilisant - Google Patents

Moulage préfabriqué et procédé de construction d'un panneau d'aluminium à paroi externe l'utilisant Download PDF

Info

Publication number
WO2020060083A1
WO2020060083A1 PCT/KR2019/011530 KR2019011530W WO2020060083A1 WO 2020060083 A1 WO2020060083 A1 WO 2020060083A1 KR 2019011530 W KR2019011530 W KR 2019011530W WO 2020060083 A1 WO2020060083 A1 WO 2020060083A1
Authority
WO
WIPO (PCT)
Prior art keywords
molding
frame
panel
wall
horizontal
Prior art date
Application number
PCT/KR2019/011530
Other languages
English (en)
Korean (ko)
Inventor
정용수
Original Assignee
정용수
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정용수 filed Critical 정용수
Publication of WO2020060083A1 publication Critical patent/WO2020060083A1/fr

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • E04F19/06Borders; Finishing strips, e.g. beadings; Light coves specially designed for securing panels or masking the edges of wall- or floor-covering elements
    • E04F19/062Borders; Finishing strips, e.g. beadings; Light coves specially designed for securing panels or masking the edges of wall- or floor-covering elements used between similar elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • E04F13/081Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements

Definitions

  • the present invention relates to a prefabricated molding and a method for constructing an outer wall aluminum panel using the same, and more particularly, to a prefabricated molding for assembling an aluminum panel on a building exterior wall and a method for constructing an outer wall aluminum panel using the same.
  • stone, glass, tile, etc. are selectively used for finishing the exterior walls of various buildings.
  • the outer wall construction using a conventional aluminum panel is fixed to each pipe 30 on the support bracket 20 fixed to the anchor bolt 10 to the wall (W), each pipe 30 )
  • the fastening member having an approximately 'U' shape was screwed to each pipe (30), and aluminum on the fastening member (40).
  • the caulking material 50 was inserted between the aluminum panels 1 and finished with silicon 60.
  • the closing cap 90 is sealed on the fixing member 80 that can be fixed by inserting the aluminum panel on both sides, but the fixing member
  • the vertical plate 84 and the horizontal plate 86 are integrally formed so that the gap between the aluminum panels to be fitted on both sides does not meet the specification of the fixing member.
  • the present invention has been devised to solve the above-mentioned problems, and the object of the present invention is to adjust the gap between aluminum panels caused by cutting errors occurring during panel cutting and construction errors continuously connected in multiple stages, and to perform outer wall construction. It is to provide a prefabricated molding that can.
  • the prefabricated molding includes a horizontal frame 12, a rectangular insertion frame 14 formed on one side of the horizontal frame, and a bolted sealing frame formed vertically on the other side of the horizontal frame.
  • the first molding 100 and the horizontal frame 24, which include the insertion groove 110 into which the panel is inserted, are formed of a groove frame 11 formed in a 'b' shape from the horizontal frame 13 and the rivet from the outside.
  • a rectangular rivet airtight frame 23 formed on one side of the horizontal frame to seal, an external airtight frame 26 vertically formed on the other side of the horizontal frame, and a home frame formed in a 'b' shape from the rivet airtight frame 23 Consists of (21) and includes a second molding (200) comprising a rectangular support frame (22) extending from the side of the insertion groove (210) and the groove frame (21) into which the panel is inserted, and removing the first molding 2 molding shovel After inserting into the mouth space 28, it is characterized by assembling the first molding 100 and the second molding 200 by moving in the horizontal direction.
  • the second molding 200 When assembling the second molding 200 to the first molding 100 according to an embodiment of the present invention, it is characterized in that it has an adjustment width 300 equal to the width of the support frame 22 or the insertion frame 14. .
  • a method for constructing an aluminum panel on an outer wall using a prefabricated molding is fixing a support bracket to an outer wall through an anchor bolt, and installing each pipe 30 on the support bracket, inserting groove 110 In the state in which the panel 1 is inserted, the bolt 3 penetrates the horizontal frame 12, the panel 1 and the groove frame 11 to fix the first molding to each pipe 30 and riveting.
  • Fixing the second molding 200 to the first molding 100 by moving the panel 2 through the horizontal direction after inserting the first molding in the insertion space 28 while the panel 2 is connected to the insertion groove.
  • Including, when assembling the second molding 200 to the first molding 100 is characterized in that it has an adjustment width 300 as much as the width of the support frame 22 or the insertion frame (14).
  • the second molding is assembled by moving left and right by an adjustment width, resulting in cutting errors and construction errors. Since the gap between the aluminum panels can be adjusted by the adjustment width, additional work such as cutting or constructing the aluminum panels again can be prevented.
  • each pipe is pre-installed even when equipped with insulation. After the insulation is installed, the risk of fire is also prevented, and the overall work efficiency can be improved and the auxiliary materials can be reduced.
  • FIG. 1 is an exemplary partial cross-sectional view showing an exterior wall finishing example using an aluminum panel according to the prior art.
  • Figure 2 is an exemplary partial cross-sectional view showing a case including an insulating material during the exterior wall finish using an aluminum panel according to the prior art.
  • FIG 3 is a view showing a prefabricated molding according to an embodiment of the present invention.
  • FIG. 4 is a view showing a method of constructing an outer wall aluminum panel using prefabricated molding according to an embodiment of the present invention.
  • 5A to 5C are diagrams for explaining a process in which the first molding and the second molding are assembled and finished according to an embodiment of the present invention.
  • FIG. 6 is a view for explaining a process of assembling the first molding and the second molding according to an embodiment of the present invention with an adjustment width when assembling.
  • FIG. 7 is a view showing a construction method including an insulating material during finishing of an outer wall using an aluminum panel according to an embodiment of the present invention.
  • Figure 4 is a view showing a method for constructing an outer wall aluminum panel using prefabricated molding according to an embodiment of the present invention.
  • the method of constructing the outer wall aluminum panel using the prefabricated molding according to the present invention includes a support bracket fixing step ⁇ each pipe installation step ⁇ a first molding fixing step ⁇ a second molding fixing step.
  • the support bracket fixing step is a step of firmly fixing the support bracket 20 having an approximately 'b' shape with the anchor bolt 10 while anchoring the anchor bolt 10 to the wall W. This is to provide a fixing means for fixing each pipe 30 on the wall (W).
  • the step of installing each pipe is a step of making a frame for fixing the outer wall finishing panel, that is, the aluminum panels 1 and 2 on the support bracket 20, and the supporting bracket 20 is welded to each pipe 30 by welding. Fix it on.
  • it is not necessarily limited to welding, but a welding method is adopted for fixed stability and robustness.
  • the aluminum panel is cut according to the standard, and then the first molding 100 into which the aluminum panel 1 is inserted through the bolt 3 is fastened to each pipe 30. Molding fixing step, next fixed first molding 100 is made of a second molding fixing step that is inserted and assembled into the second molding 200 to which the aluminum panel 2 is fastened through the rivet 4.
  • the penetration of water due to snow, rain, etc. to the bolt space 15 to which the bolt is fastened and the rivet space 27 to which the rivet is fastened is basically performed.
  • the penetration of water due to snow, rain, etc. to the bolt space 15 to which the bolt is fastened and the rivet space 27 to which the rivet is fastened is basically performed.
  • the prefabricated molding for constructing an aluminum panel (hereinafter referred to as a “panel”) on the outer wall includes a first molding 100 and a second molding 200 that is separate from the first molding.
  • the first molding 100 is a 'b' shape from a horizontal frame 12, a rectangular insertion frame 14 formed on one side of the horizontal frame, a bolt sealing frame 13 formed vertically on the other side of the horizontal frame, and a horizontal frame. Consists of a groove frame (11) formed by the may include an insertion groove 110 into which the panel is inserted.
  • the first molding fixing step is a bolt (3) in a bolt space (15) consisting of a horizontal frame (12), an insertion frame (14) and a bolt sealing frame (13) in a state where the panel (1) is inserted into the insertion groove (110). )
  • a bolt space 15 consisting of a horizontal frame (12), an insertion frame (14) and a bolt sealing frame (13) in a state where the panel (1) is inserted into the insertion groove (110).
  • the first molding 100 can be installed on the outer wall.
  • the bolt space 15 is exposed to the outside, so the bolt space 15 may be sealed to the outside through the second molding fixing step.
  • the second molding 200 includes a horizontal frame 24, a rectangular rivet sealing frame 23 formed on one side of the horizontal frame to seal the rivet from the outside, and an external sealing frame 26 vertically formed on the other side of the horizontal frame. , Consisting of a groove frame 21 formed in a 'b' shape from the rivet sealing frame 23, the insertion groove 210 into which the panel is inserted and the rectangular support frame 22 extending from the side of the groove frame 21 It can contain.
  • the second molding 200 may be formed with a contact frame 25 extending from one surface of the horizontal frame 24, and the contact frame 25 may be in contact with the bolt sealing frame 13 of the first molding.
  • the rivet 4 is inserted through the pre-perforated groove frame 21, the panel 2, and the rivet sealing frame 23.
  • the panel 2 can be connected to the second molding.
  • the bolts fastened to the first molding ( 3) can be sealed from the outside.
  • 5A to 5B are diagrams for explaining a process in which the first molding and the second molding are assembled and closed according to an embodiment of the present invention.
  • the first molding 100 is fixed to each pipe (after the first molding fixing step) through a bolt (not shown) fastened to the bolt space 15, the insertion of the second molding 200 It is inserted into the space 28.
  • the second molding is not fixed to the outer wall because the second molding is only covered at the top of the first molding.
  • the second molding is fixed to the first molding It can be assembled and fixed to the outer wall.
  • the opening of the bolt space 15 is covered with the horizontal frame 24 of the second molding, and the gap between the end of the bolt sealing frame 13 and the horizontal frame 24 is also externally closed frame 26 By being sealed by, the bolt space 15 can be completely closed with the outside.
  • the support frame 22 is completely assembled with the insertion frame 14 fixed to the outer wall.
  • the second molding can be completely fixed to the outer wall.
  • FIG. 6 is a view for explaining a process of assembling the first molding and the second molding according to an embodiment of the present invention with an adjustment width when assembling.
  • the present invention has a width 300 of the support frame 22 or the insertion frame 14, and has an adjustment width 300 capable of adjusting cutting errors and construction errors. can do.
  • FIG. 7 is a view showing a construction method including an insulating material during finishing of an outer wall using an aluminum panel according to an embodiment of the present invention.
  • the present invention is sealed by a molding structure by assembling the separated first molding and the second molding together, there is no fear of rainwater or the like, so that a separate sealing operation itself is unnecessary.
  • the present invention can be used in the construction of the aluminum panel of the outer wall so as to reduce the number of work and improve the appearance quality because it is possible to simply and easily and quickly finish the outer wall simply by inserting and fastening it without assembling and finishing with silicon. .

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Panels For Use In Building Construction (AREA)

Abstract

La présente invention concerne un moulage préfabriqué qui peut être utilisé pour une construction de paroi externe tout en ajustant un intervalle entre des panneaux d'aluminium qui peut être généré par une erreur de coupe produite lors de la découpe des panneaux et une erreur de construction de connexion continue des panneaux en de multiples étapes. Selon la présente invention, dans un état selon lequel des panneaux d'aluminium sont couplés à deux moulages séparés, après insertion d'un premier moulage dans un second moulage, le second moulage est déplacé horizontalement jusqu'à une largeur de réglage pour l'assemblage, et ainsi, un intervalle entre les panneaux d'aluminium généré par une erreur de coupe et une erreur de construction peut être réglé autant que la largeur de réglage. Ainsi, il est possible d'empêcher un travail supplémentaire tel que la recoupe et la reconstruction des panneaux d'aluminium.
PCT/KR2019/011530 2018-09-18 2019-09-06 Moulage préfabriqué et procédé de construction d'un panneau d'aluminium à paroi externe l'utilisant WO2020060083A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020180111186A KR101936551B1 (ko) 2018-09-18 2018-09-18 조립식 몰딩 및 이를 이용한 외벽 알루미늄패널 시공방법
KR10-2018-0111186 2018-09-18

Publications (1)

Publication Number Publication Date
WO2020060083A1 true WO2020060083A1 (fr) 2020-03-26

Family

ID=65021007

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2019/011530 WO2020060083A1 (fr) 2018-09-18 2019-09-06 Moulage préfabriqué et procédé de construction d'un panneau d'aluminium à paroi externe l'utilisant

Country Status (2)

Country Link
KR (1) KR101936551B1 (fr)
WO (1) WO2020060083A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113279545A (zh) * 2021-07-05 2021-08-20 珠海市三鑫科技发展有限公司 一种幕墙装饰条及具有该幕墙装饰条的幕墙

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101936551B1 (ko) * 2018-09-18 2019-01-08 정용수 조립식 몰딩 및 이를 이용한 외벽 알루미늄패널 시공방법

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010255352A (ja) * 2009-04-28 2010-11-11 Daiwa House Industry Co Ltd 鋼製胴縁の無塗装・無溶接取付け構造
KR101068472B1 (ko) * 2011-02-21 2011-09-28 (주)이에프코리아 벽체용 패널 이음 장치 및 그 시공방법
KR101625501B1 (ko) * 2015-08-26 2016-05-30 맹윤섭 알루미늄복합재를 이용한 벽체 시공방법
JP2016204860A (ja) * 2015-04-16 2016-12-08 旭化成建材株式会社 意匠パネル、壁構造及び施工方法
KR101786432B1 (ko) * 2017-07-31 2017-10-17 정용수 조립식 몰딩을 이용한 외벽 알루미늄패널 시공방법
KR101936551B1 (ko) * 2018-09-18 2019-01-08 정용수 조립식 몰딩 및 이를 이용한 외벽 알루미늄패널 시공방법

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010255352A (ja) * 2009-04-28 2010-11-11 Daiwa House Industry Co Ltd 鋼製胴縁の無塗装・無溶接取付け構造
KR101068472B1 (ko) * 2011-02-21 2011-09-28 (주)이에프코리아 벽체용 패널 이음 장치 및 그 시공방법
JP2016204860A (ja) * 2015-04-16 2016-12-08 旭化成建材株式会社 意匠パネル、壁構造及び施工方法
KR101625501B1 (ko) * 2015-08-26 2016-05-30 맹윤섭 알루미늄복합재를 이용한 벽체 시공방법
KR101786432B1 (ko) * 2017-07-31 2017-10-17 정용수 조립식 몰딩을 이용한 외벽 알루미늄패널 시공방법
KR101936551B1 (ko) * 2018-09-18 2019-01-08 정용수 조립식 몰딩 및 이를 이용한 외벽 알루미늄패널 시공방법

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113279545A (zh) * 2021-07-05 2021-08-20 珠海市三鑫科技发展有限公司 一种幕墙装饰条及具有该幕墙装饰条的幕墙

Also Published As

Publication number Publication date
KR101936551B1 (ko) 2019-01-08

Similar Documents

Publication Publication Date Title
WO2013069928A1 (fr) Structure d'assemblage pour portes et fenêtres présentant une partie de jonction à 45 degrés
WO2020060083A1 (fr) Moulage préfabriqué et procédé de construction d'un panneau d'aluminium à paroi externe l'utilisant
CN209837410U (zh) 一种洞口内框架幕墙安装连接结构及其系统
WO2015122558A1 (fr) Système d'isolation extérieur et procédé d'installation de paroi extérieure l'utilisant
WO2012138077A2 (fr) Paroi de rideau
KR101710526B1 (ko) 창문과 창문 틀 프레임 호환이 가능한 커튼 월 시스템
WO2013141424A1 (fr) Procédé d'installation de panneaux alc à l'aide de dispositifs de fixation au mur dans le sens de la longueur
IL107888A (en) Method and device for installing a shaft door in elevators
US11498812B2 (en) Elevator landing door assembly and its installation method
JP2002004526A (ja) 太陽電池屋根材モジュール取付構造
JP2014118680A (ja) カーテンウォールの外装材の取付け構造
CN205077670U (zh) 一种单元装配式建筑外围护系统
KR20150045807A (ko) 오픈조인트공법용 기능성 외장마감재 고정장치
GB2482902A (en) A Curtain Wall System For Attaching A Variety Of Panels
CN205077678U (zh) 一种建筑外围护系统的面板单元
CN210976215U (zh) 一种单元式幕墙的密封装置
CN207017511U (zh) 一种带防水板安装的陶板幕墙连接系统
CN205077671U (zh) 一种设有条窗的单元装配式建筑外围护系统
WO2022131426A1 (fr) Système de paroi de plateforme multifonctionnelle
CN1265443A (zh) 分隔办公室空间的方法
CN205046717U (zh) 一种设有条窗的单元装配式建筑外围护系统
CN105113683B (zh) 一种设有条窗的单元装配式建筑外围护系统的施工方法
CN218786930U (zh) 一种开缝挂接铝板幕墙结构
CN213741617U (zh) 装配式建筑连接结构
CN211341341U (zh) 一种玻璃幕墙安装系统

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19861850

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19861850

Country of ref document: EP

Kind code of ref document: A1