WO2019229881A1 - 部品補給管理システム及び部品実装システム - Google Patents
部品補給管理システム及び部品実装システム Download PDFInfo
- Publication number
- WO2019229881A1 WO2019229881A1 PCT/JP2018/020790 JP2018020790W WO2019229881A1 WO 2019229881 A1 WO2019229881 A1 WO 2019229881A1 JP 2018020790 W JP2018020790 W JP 2018020790W WO 2019229881 A1 WO2019229881 A1 WO 2019229881A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- component
- supply
- information
- work
- time
- Prior art date
Links
- 238000000034 method Methods 0.000 claims abstract description 80
- 238000012544 monitoring process Methods 0.000 claims abstract description 44
- 238000003860 storage Methods 0.000 claims description 160
- 239000000758 substrate Substances 0.000 claims description 29
- 125000004122 cyclic group Chemical group 0.000 claims description 24
- 230000001351 cycling effect Effects 0.000 claims 1
- 238000007726 management method Methods 0.000 description 131
- 238000004519 manufacturing process Methods 0.000 description 85
- 101100281098 Arabidopsis thaliana FKBP42 gene Proteins 0.000 description 22
- 238000004891 communication Methods 0.000 description 20
- 238000001514 detection method Methods 0.000 description 20
- 230000007246 mechanism Effects 0.000 description 16
- 238000010586 diagram Methods 0.000 description 15
- 230000008569 process Effects 0.000 description 13
- 238000012545 processing Methods 0.000 description 9
- 230000004044 response Effects 0.000 description 6
- 230000005540 biological transmission Effects 0.000 description 3
- 239000000725 suspension Substances 0.000 description 2
- 238000011144 upstream manufacturing Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000005304 joining Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K13/00—Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
- H05K13/02—Feeding of components
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07C—TIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
- G07C1/00—Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people
- G07C1/20—Checking timed patrols, e.g. of watchman
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K13/00—Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
- H05K13/08—Monitoring manufacture of assemblages
- H05K13/086—Supply management, e.g. supply of components or of substrates
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T29/00—Metal working
- Y10T29/53—Means to assemble or disassemble
- Y10T29/53004—Means to assemble or disassemble with means to regulate operation by use of templet, tape, card or other replaceable information supply
Definitions
- the present invention relates to a component supply management system that manages a component supply operation for each of a plurality of component supply devices attached to each component mounter of a component mounting line, and a component mounting system including the component supply management system.
- Each component mounter is provided with a plurality of component supply devices on which component storage members can be mounted.
- the component supply device is used according to the amount of consumption of the components accompanying the production of the component mounting board so that the supply of the components from the component supply device stops and the production of the component mounting board does not stop.
- the parts replenishment work for replenishing the parts storage member is performed by the operator.
- Patent Document 1 discloses a technique for improving the efficiency of parts replenishment work by an operator.
- a time zone for notifying that a plurality of component supply devices (feeders) attached to each component mounter are out of service is predicted.
- work is performed in the part run-out notice time zone.
- the timing of supplying the component storage member to each component supply device is only a prediction, and when the worker actually tries to perform the component supply operation, the component supply operation for the component supply device to be performed is performed. May not be possible. In such a case, the worker is confused without knowing how to deal with it. For this reason, there exists a possibility that the work efficiency of the components replenishment work by an operator may fall.
- the present invention has been made in view of such circumstances, and an object of the present invention is to improve the efficiency of component replenishment work for a component supply device attached to each component mounting machine of a component mounting line.
- An object of the present invention is to provide a possible component supply management system and a component mounting system including the same.
- a component replenishment management system includes a plurality of component mounters that mount a component supplied from a plurality of component supply devices capable of mounting a plurality of component storage members on a substrate and produce a component mounting substrate. Further, in one or a plurality of component mounting lines, a system for managing a component replenishment operation for each of the plurality of component supply devices, which is performed by an operator who circulates in a work area set in the component mounting line. .
- the component replenishment management system monitors the supply status of components in each of the plurality of component supply devices, and the preceding component storage member in which the component supply among the plurality of component storage members is performed first is out of components.
- a component supply monitoring unit for estimating a replenishment possible time representing a time until the component replenishment operation for replenishing a new replenishment component storage member is possible for each of the plurality of component supply devices;
- An information acquisition unit that acquires supply component type information for specifying a component type of a component stored in a component storage member; and at the timing when the supply component type information is acquired by the information acquisition unit, the component supply device
- a determination unit that determines whether or not the component supply operation for supplying the component storage member for supply is performed, and the determination unit determines that the component supply operation cannot be performed. If the, and a working guide unit that generates implementation procedures guidance information for guiding the implementation procedure based on the replenishment time of the said parts supplying work.
- a plurality of component mounters for mounting a component supplied from a plurality of component supply devices capable of mounting a plurality of component storage members on a substrate to produce a component mounting substrate are connected.
- One or a plurality of component mounting lines, and the component that manages a component replenishment operation for each of the plurality of component supply devices, performed by an operator who circulates in a work area set in the component mounting line A replenishment management system.
- FIG. 1 is a diagram schematically showing a configuration of a component mounting system according to an embodiment of the present invention. It is a top view which shows the structure of a component mounting machine. It is a figure which shows schematically the tape feeder as a component supply apparatus arrange
- FIG. 1 is a diagram schematically showing a configuration of a component mounting system 1 according to an embodiment of the present invention.
- the component mounting system 1 includes a component mounting line 2L, a component supply management system 3, a production plan management device 4, a board information management device 5, and a cart 6 operated by an operator.
- the component replenishment management system 3 includes a mounting control device 20, a replenishment plan management device 30, and a portable terminal device 30T carried by an operator, which are provided in each component mounter 2 constituting the component mounting line 2L.
- the replenishment plan management device 30 and the portable terminal device 30T are connected to each mounting control device 20 so as to be able to communicate data, and the production plan management device 4 and the board information management device 5 are connected to the replenishment plan management device 30. And data communication is possible.
- the component mounting line 2L is configured by connecting a plurality of component mounting machines 2.
- each of the plurality of component mounting machines 2 is connected so as to be arranged in a straight line by a connecting conveyor that conveys a substrate between the component mounting machines 2.
- six component mounters 2 are connected in the component mounting line 2L.
- the component mounting system 1 may be configured to include a plurality of component mounting lines 2L.
- FIG. 2 is a plan view showing the configuration of the component mounter 2.
- the directional relationship will be described using XY orthogonal coordinate axes.
- One direction side in the X axis direction is referred to as “+ X side”
- the other direction side opposite to the one direction side in the X axis direction is referred to as “ ⁇ X side”.
- One direction side in the Y axis direction is referred to as “+ Y side”
- the other direction side opposite to the one direction side in the Y axis direction is referred to as “ ⁇ Y side”.
- the component mounting machine 2 is a device that mounts components on the substrate P to produce a component mounting substrate.
- the component mounter 2 includes a main body frame 21, a moving frame 22, a conveyor 23, a component supply unit 24, a head unit 25, a first drive mechanism 26, a second drive mechanism 27, and a board support device 28. Is provided.
- the main body frame 21 is a structure in which each part constituting the component mounting machine 2 is arranged, and is formed in a substantially rectangular shape in a plan view as viewed from a direction orthogonal to both the X-axis direction and the Y-axis direction.
- the conveyor 23 extends in the X-axis direction and is disposed on the main body frame 21.
- the conveyor 23 conveys the substrate P in the X-axis direction.
- the substrate P transported on the conveyor 23 is positioned by a substrate support device 28 at a predetermined work position (a component mounting position where components are mounted on the substrate P).
- the substrate support device 28 positions the substrate P by supporting the substrate P with backup pins.
- the component supply unit 24 is arranged in a total of four locations, two in the X-axis direction, respectively, in the + Y side and ⁇ Y side region portions of the main body frame 21 in the Y-axis direction.
- the component supply unit 24 supplies components mounted on the board P, and a plurality of component supply devices are arranged in parallel.
- the component supply device arranged in the component supply unit 24 will be described later.
- the moving frame 22 extends in the X-axis direction and is supported by the main body frame 21 so as to be movable in a predetermined moving direction (Y-axis direction).
- a head unit 25 is mounted on the moving frame 22.
- the head unit 25 is mounted on the moving frame 22 so as to be movable in the X-axis direction. That is, the head unit 25 can move in the Y-axis direction as the moving frame 22 moves, and can move in the X-axis direction along the moving frame 22.
- the head unit 25 is movable over a predetermined working position of the substrate P conveyed by the component supply unit 24 and the conveyor 23, and removes the component from the component supply unit 24 and mounts the extracted component on the substrate P.
- the head unit 25 includes a suction nozzle 251.
- the suction nozzle 251 is a holder that can suck and hold a component supplied by the component supply unit 24.
- the suction nozzle 251 can communicate with any of a negative pressure generator, a positive pressure generator, and the atmosphere via an electric switching valve. That is, by supplying a negative pressure to the suction nozzle 251, it is possible to hold the component by the suction nozzle 251 (removal of the component), and then, by supplying a positive pressure, the suction holding of the component is released.
- the first drive mechanism 26 is disposed at the + X side and ⁇ X side ends of the main body frame 21.
- the first drive mechanism 26 is a mechanism that moves the moving frame 22 in the Y-axis direction.
- the first drive mechanism 26 includes, for example, a drive motor, a ball screw shaft that extends in the Y-axis direction and is coupled to the drive motor, and a ball nut that is disposed on the moving frame 22 and is screwed with the ball screw shaft. Consists of including.
- the first drive mechanism 26 having such a configuration moves the moving frame 22 in the Y-axis direction when the ball nut advances and retreats along the ball screw shaft as the ball screw shaft is driven to rotate by the drive motor.
- the second drive mechanism 27 is disposed on the moving frame 22.
- the second drive mechanism 27 is a mechanism that moves the head unit 25 in the X-axis direction along the moving frame 22. Similar to the first drive mechanism 26, the second drive mechanism 27 is, for example, a drive motor, a ball screw shaft extending in the X-axis direction and coupled to the drive motor, and the head unit 25. And a ball nut screwed together.
- the second drive mechanism 27 having such a configuration moves the head unit 25 in the X-axis direction by the ball nut moving forward and backward along the ball screw shaft as the ball screw shaft is driven to rotate by the drive motor.
- the component supply devices arranged in parallel in the component supply unit 24 are roughly classified into a tape feeder, a tray feeder, and a stick feeder depending on the difference in the component supply method.
- Each component supply unit 24 of the component mounter 2 may be provided with one type of component supply device having the same component supply method, or two or more types of component supply devices having different component supply methods. It may be.
- a tape feeder as a component supply device is configured such that a component storage tape storing components at predetermined intervals is wound around a reel as a component storage member, and the component storage tape is delivered from the reel. Yes.
- the tape feeder is roughly classified into a splicing feeder and an automatic loading feeder (AF).
- the splicing feeder is configured so that one reel is mounted, and before the component storage tape is sent out from the reel and the component is cut out, the component storage tape is transferred to the subsequent component storage tape.
- the end portion of the preceding component storage tape and the leading end portion of the subsequent component storage tape are attached with a splicing tape or the like to connect them.
- the splicing work to be applied with the splicing tape or the like is performed before the parts storage tape from one reel is completed and the parts are cut, so that the subsequent part storage tape is wound.
- the reel supply timing is constrained at the time when the delivery of the preceding component storage tape is completed.
- the AF is configured so that a plurality of reels can be mounted, and a component storage tape (hereinafter referred to as a “preceding component storage tape”) in which a component is supplied in advance among the plurality of reels is wound.
- a component storage tape hereinafter referred to as a “preceding component storage tape”
- the subsequent component storage tape is automatically wound without performing the splicing operation.
- the component storage tape is sent out from the reel. That is, in AF, the supply timing of a new reel is not restricted to the time when the delivery of the component storage tape from the preceding reel on which the preceding component storage tape is wound is completed, and the component storage following the AF is stored. Since parts can be replenished at any time as long as the tape can be inserted, there is a degree of freedom compared to the splicing feeder.
- splicing feeders and AF may be mixed as tape feeders arranged in the component supply unit 24.
- an AF capable of mounting a plurality of reels as component storage members is used as the component supply device.
- a tape feeder made of AF as the component supply apparatus will be described with reference to FIGS.
- FIG. 3 is a diagram schematically showing the configuration of the AF 241
- FIG. 4 is a perspective view showing the component storage tape 243 mounted on the AF 241.
- the AF 241 is disposed on the carriage 242 in the component supply unit 24.
- the AF 241 can mount a plurality of reels 2420 around which the component storage tape 243 is wound.
- the component storage tape 243 includes a carrier tape 2431 and a cover tape 2434.
- the carrier tape 2431 is a tape in which a plurality of component storage portions 2433 that store the components E are arranged at predetermined intervals.
- the carrier tape 2431 is fitted with tooth portions of a first sprocket 2412A and a second sprocket 2413A in an AF 241 described later at one end in the width direction, and the component storage tape 243 is formed by the first sprocket 2412A and the second sprocket 2413A.
- the conveying force transmission holes 2432 to which the conveying force for sending out is transmitted are arranged with a predetermined interval.
- the cover tape 2434 is a tape affixed to the carrier tape 2431 so as to cover the component storage unit 2433.
- the AF 241 is attached to a feeder attachment portion 2417 ⁇ / b> A provided in the component supply portion 24.
- the component supply unit 24 is provided with a feeder mounting portion 2417A and a reel support portion 2419.
- the feeder mounting portion 2417A is provided with a plurality of slots 2417B arranged at regular intervals in the X-axis direction and extending in parallel with each other in the Y-axis direction, and a fixing base 2417C extending in the X-axis direction at a position in front of these slots 2417B. It has been.
- the AF 241 is set in each slot 2417B, and each AF 241 is fixed to the fixed base 2417C. As a result, a plurality of AFs 241 are juxtaposed on the carriage 242 in the component supply unit 24.
- the reel support portion 2419 is located on the lower rear side of the feeder mounting portion 2417A, and supports the first reel holder 2419A and the second reel holder 2419B that rotatably support the reel 2420 while being separated from each other in the vertical direction. To do.
- a component storage tape 243 is wound around a reel 2420 supported by each of the first reel holder 2419A and the second reel holder 2419B.
- the AF 241 includes a feeder main body 2411.
- the AF 241 is fixed to the fixing base 2417C in a state where the feeder main body 2411 is inserted (set) into the slot 2417B.
- the feeder main body 2411 includes a first sprocket 2412A constituting the first tape delivery section 2412 and a second tape delivery section 2413 spaced from the reel support section 2419 with respect to the first sprocket 2412A in the Y-axis direction.
- the second sprocket 2413A that constitutes is supported rotatably.
- Each of the first sprocket 2412A and the second sprocket 2413A includes a plurality of tooth portions arranged with a predetermined interval in the circumferential direction.
- the tooth portions of the first sprocket 2412 ⁇ / b> A and the second sprocket 2413 ⁇ / b> A can be fitted into a conveying force transmission hole 2432 formed in the carrier tape 2431 of the component storage tape 243.
- the component storage tape 243 wound around the reel 2420 supported by each of the first reel holder 2419A and the second reel holder 2419B is guided by a guide roller 2418 provided at the upper end of the reel support portion 2419 while being guided by the first roller holder 2419B. Guided to the sprocket 2412A and the second sprocket 2413A.
- the component storage tape 243 in which the conveying force transmission hole 2432 is fitted to the teeth of the first sprocket 2412A and the second sprocket 2413A is sent out by the rotation of the first sprocket 2412A and the second sprocket 2413A, and the component is received at the component supply position P1. E is taken out.
- the AF 241 further includes a tape support member 2414 detachably fixed to the rear end portion of the feeder main body 2411, an operation input portion 2415 disposed on the upper surface of the rear portion of the feeder main body 2411, and first and second tape detection sensors 2416A. , 2416B.
- the tape support member 2414 has two upper and lower passages (an upper passage 2414AA and a lower passage 2414AB) in the rear end portion of the tape running passage 2414A in which the component storage tape 243 travels inside the feeder main body 2411.
- the component storage tape 243 that passes through the upper passage 2414AA is supported from below.
- the rear end portion of the tape running passage 2414A has a shape that expands in the vertical direction from the front to the rear.
- the tape support member 2414 is inserted into the tape travel path 2414A from the rear of the feeder main body 2411, and is detachably fixed to the feeder main body 2411.
- the rear end portion of the tape running passage 2414A is divided into the upper passage 2414AA and the lower passage 2414AB by the tape support member 2414.
- the first tape detection sensor 2416A and the second tape detection sensor 2416B are provided so as to face the tape travel path 2414A, and detect the presence / absence of the component storage tape 243 that passes through the tape travel path 2414A. More specifically, the first tape detection sensor 2416A is provided at a position in front of the junction of the upper passage 2414AA and the lower passage 2414AB and facing the tape travel passage 2414A from below. On the other hand, the second tape detection sensor 2416B is provided at a position facing the upper passage 2414AA from above, and thereby detects the presence or absence of the component storage tape 243 in the upper passage 2414AA.
- the operation input unit 2415 is for the operator to send and reverse the component storage tape 243 as necessary.
- the component supply operation of the AF 241 configured as described above is as follows. First, as a preparatory work, the worker attaches the reel 2420 around which the component storage tape 243 preceding the first reel holder 2419A on the lower stage of the reel support portion 2419 is wound. At this time, the operator performs a reading operation of reading the component type specifying barcode BR (recording unit, see FIG. 3) provided on the reel 2420 with the barcode reader 7 (FIG. 7).
- the component type identification bar code BR is coded and recorded with supply component type information for identifying the component type of the component E stored in the component storage tape 243 wound around the reel 2420.
- the operator inserts the tip of the component storage tape 243 wound around the reel 2420 attached to the first reel holder 2419A into the upper passage 2414AA from the rear of the feeder body 2411.
- the leading end of the preceding component storage tape 243 is supported by the tape support member 2414 in a state of being fitted to the first sprocket 2412A.
- the operator operates the operation input unit 2415, inputs an instruction to rotate the first sprocket 2412A, sends the component storage tape 243, and fits the tip of the component supply tape 243 with the second sprocket 2413A.
- the AF 241 component supply operation is started.
- the second sprocket 2413 ⁇ / b> A rotates, thereby feeding the component storage tape 243.
- the first sprocket 2412A is configured to idle, and at this time, the component storage tape 243 can be delivered only by rotating the second sprocket 2413A.
- the operator removes the tape support member 2414 from the feeder main body 2411 while the preceding component storage tape 243 is being sent out from the reel 2420.
- the component storage tape 243 is displaced to the bottom surface of the tape travel path 2414A by its own weight. Thereby, the fitting of the preceding component storage tape 243 with the first sprocket 2412A is released.
- the component storage tape 243 is fitted with the second sprocket 2413A, even if the fitting with the first sprocket 2412A is released, the component storage tape tape 243 continues to be sent out by the rotation of the second sprocket 2413A.
- the operator attaches the tape support member 2414 to the feeder main body 2411 and removes the reel 2420 around which the preceding component storage tape 243 is wound. Move from the lower first reel holder 2419A to the upper second reel holder 2419B.
- the operator lowers the reel 2420 around which the subsequent component storage tape 243 is wound. Is attached to the first reel holder 2419A, and the tip of the component storage tape 243 is inserted into the upper passage 2414AA from the rear of the feeder main body 2411.
- the leading end of the subsequent component storage tape 243 is supported by the tape support member 2414 in a state of being fitted to the first sprocket 2412.
- the reel 2420 around which the subsequent component storage tape 243 is wound can be mounted in a state in which the preceding component storage tape 243 wound around the reel 2420 has not been cut.
- the operator can also specify the component type specifying barcode BR provided on the reel 2420 as in the case of the previous component storage tape 243. Is read with the barcode reader 7 (FIG. 7).
- the preceding component storage tape 243 is all pulled out from the reel 2420 supported by the upper second reel holder 2419B, and its rear end passes through the position of the second tape detection sensor 2416B, so that the preceding component storage tape 243 is reached.
- the delivery of the subsequent component storage tape 243 from the reel 2420 supported by the lower first reel holder 2419A is automatically started.
- the operator removes the reel 2420 having run out of components from the upper second reel holder 2419B, and removes the reel 2420 around which the subsequent component storage tape 243 is wound from the lower first reel holder 2419A to the second upper reel. Move to reel holder 2419B.
- the operator can replenish the AF 241 with a new reel around which the component storage tape 243 is wound.
- the new reel supplied to the AF 241 is attached to the lower first reel holder 2419A by the operator.
- the worker performs a reading operation of reading the barcode for identifying the component type provided on the new reel by the barcode reader 7.
- the timing of the component supply operation for the new reel is not constrained by the time when the reel 2420 around which the preceding component storage tape 243 is wound runs out of components, and the component supply management system 3 supplies the supply plan. Identified by device 30.
- the preceding component storage tape 243 is delivered from the reel 2420 supported by the upper second reel holder 2419B, and the subsequent component storage tape 243 wound around the reel 2420 supported by the lower first reel holder 2419A. In the state in which the tip of this is inserted into the upper passage 2414AA, it is impossible to mount a new reel. On the other hand, the preceding component storage tape 243 is all drawn out from the reel 2420 supported by the upper second reel holder 2419B, and the subsequent component storage tape 243 from the reel 2420 supported by the lower first reel holder 2419A. In the state in which the delivery of the machine is automatically started, a new reel can be mounted.
- FIG. 5 is a diagram schematically showing the configuration of the tray feeder 245.
- a plurality of tray feeders 245 can be juxtaposed in the component supply unit 24.
- the tray feeder 245 is configured such that one magazine 2453 can move in the vertical direction within the cover body 2451. In this magazine 2453, a plurality of first pallets 2454, a plurality of second pallets 2455, and a plurality of third pallets 2456 are accommodated.
- Each first pallet 2454 is loaded with at least one first tray TR1 holding a plurality of components.
- the parts held in the first tray TR1 are the same type of parts for each first pallet 2454.
- at least one second tray TR2 holding a plurality of components is placed on each second pallet 2455.
- the parts held in the second tray TR2 are the same type of parts for each second pallet 2455.
- the type of the component held in the second tray TR2 is different from the component held in the first tray TR1.
- Each third pallet 2456 is loaded with at least one third tray TR3 holding a plurality of components.
- the parts held in the third tray TR3 are the same type of parts for each third pallet 2456.
- the types of components held on the third tray TR3 are different from the types of components held on the first tray TR1 and the second tray TR2.
- Each of the first pallet 2454, the second pallet 2455, and the third pallet 2456 has a function as a component storage member on which trays TR1, TR2, and TR3 holding a plurality of components are placed.
- Each of the first pallet 2454, the second pallet 2455, and the third pallet 2456 accommodated in the magazine 2453 is moved to a table 2452 provided to project outward from the cover body 2451 during the production of the component mounting board. As a result, the components are supplied while being held on the trays TR1, TR2 and TR3.
- the other first The pallet 2454 is moved to the table 2452, so that the parts are supplied while being held on the first tray TR1. At this time, the worker can take out the first pallet 2454 that has run out of components from the cover body 2451 during the production of the component mounting board, and supply a new first pallet to the tray feeder 245.
- the second pallet 2455 is moved to the table 2452 so that the parts are supplied while being held on the second tray TR2. At this time, the operator can take out the second pallet 2455 that has run out of components from the cover body 2451 and supply a new second pallet to the tray feeder 245 during the production of the component mounting board.
- the third pallet 2456 is moved to the table 2452, so that the parts are supplied while being held on the third tray TR3. At this time, the operator can take out the third pallet 2456 that has run out of components from the cover body 2451 during the production of the component mounting board, and supply a new third pallet to the tray feeder 245.
- the operator When supplying a new pallet to the tray feeder 245, the operator performs a reading operation of reading the barcode for identifying the component type provided on the new pallet with the barcode reader 7. Management related to a plan for a new pallet component supply operation for the tray feeder 245 is performed by the supply plan management device 30 of the component supply management system 3.
- FIG. 6 is a diagram schematically showing the configuration of the stick feeder 246.
- a plurality of stick feeders 246 can be juxtaposed in the component supply unit 24.
- the stick feeder 246 is configured to supply the component E stored in a stick 2469 as a cylindrical component storage member while being pushed out from the stick 2469.
- the stick feeder 246 includes a frame main body 2461, a stick table 2462 provided at an upper portion of the frame main body 2461, a first chuck 2463 and a second chuck 2464, a component push-out mechanism 2465, a guide frame 2466, and a pair of guides.
- a rail 2467 and a conveyor belt 2468 are provided.
- the frame main body 2461 has a hollow box shape with an open top.
- the stick table 2462 is disposed inside the upper portion of the frame main body 2461.
- a plurality of sticks 2469 can be stacked on the stick table 2462.
- the first chuck 2463 can simultaneously hold the front end portion of the stick 2469 other than the lowest one of the plurality of sticks 2469 on the stick table 2462.
- the second chuck 2464 can simultaneously hold the rear ends of the sticks 2469 other than the lowest one of the plurality of sticks 2469 on the stick table 2462.
- the component push-out mechanism 2465 pushes the component E forward from the lowest stick 2469 among the plurality of sticks 2469 on the stick table 2462.
- the guide frame 2466 is fixed to the front portion of the frame main body 2461, and a pair of guide rails 2467 are supported on the guide frame 2466.
- a conveyance belt 2468 is provided between the pair of guide rails 2467.
- the component E pushed forward by the component push-out mechanism 2465 is conveyed by the conveyor belt 2468 along the pair of guide rails 2467. As a result, the component E stored in the stick 2469 is supplied to the component supply position.
- the first and second chucks 2463 and 2464 hold the sticks 2469 other than the lowermost one.
- the stick table 2462 is displaced to the support release position for releasing the support of the stick 2469, so that only the lowest stick 2469 is dropped by its own weight onto the inner bottom portion of the frame body 2461.
- the stick table 2462 is returned to the support position of the stick 2469, and the first and second chucks 2463 and 2464 are opened, whereby the remaining stick 2469 on the stick table 2462. And the part E is supplied from the next (lowest) stick 2469.
- the operator can supply a new stick to the stick feeder 246.
- the operator performs a reading operation of reading the part type specifying barcode provided on the new stick with the barcode reader 7.
- Management related to a plan of a new stick part supply operation for the stick feeder 246 is performed by the supply plan management apparatus 30 of the part supply management system 3.
- the component replenishment management system 3 is a system that manages component replenishment work performed by an operator according to the production of a component mounting board.
- a new replenishment reel replenishment work for the AF 241 a new replenishment pallet replenishment work for the tray feeder 245, a new replenishment stick replenishment work for the stick feeder 246, and a splicing feeder Includes splicing work.
- the component supply management system 3 includes the mounting control device 20, the supply plan management device 30, and the portable device carried by the operator. Terminal device 30T.
- a mounting control device 20 constituting a part of the component supply management system 3 will be described with reference to the block diagram of FIG.
- the mounting control device 20 is provided in the component mounting machine 2.
- the mounting control device 20 comprehensively controls the component mounting operation of the component mounting machine 2 and the component supply operation of the component supply device including the AF 241, the tray feeder 245, and the stick feeder 246, and the component supply device by the worker It is an apparatus which performs control regarding the parts replenishment work with respect to.
- the mounting control device 20 is composed of a microcomputer having a storage device such as a ROM (Read Only Memory) for storing a control program or a flash memory for temporarily storing data, and the control program is read by reading the control program.
- ROM Read Only Memory
- the mounting control device 20 includes a communication unit 201, a storage unit 202, a display unit 203, an external input / output unit 204, a component mounting operation processing unit 205, a component supply operation processing unit 206, and a work determination unit connected via a bus 20 ⁇ / b> A. 207 and a work guide unit 208.
- the communication unit 201 is an interface for data communication with the component supply device, the replenishment plan management device 30 and the mobile terminal device 30T. All the component supply devices arranged in each component supply unit 24 of the component mounter 2 are connected to the communication unit 201.
- the external input / output unit 204 is an interface for data communication with the barcode reader 7.
- the external input / output unit 204 specifies the component type of the component stored in the component storage member, which is read from the component type specifying barcode of the component storage member by the reading operation using the barcode reader 7 by the operator. It is the information acquisition part which acquires the supply component kind information for
- the storage unit 202 stores the attachment information JH1 shown in FIG.
- the attachment information JH1 is information regarding components in the component supply device arranged in each component supply unit 24 of the component mounter 2.
- Mounting information JH1 includes mounting model information J11, set position information J12, device type information J13, component type information J14, preceding component remaining number information J15, total component remaining number information J16, and component remaining number warning value. This is information that associates the information J17 with the remaining parts stop value information J18.
- the mounted model information J11 is information for specifying the component mounter 2.
- the set position information J12 is information representing a position in the component supply unit 24 of the component supply apparatus.
- the set position information J12 is information specified by the position of the slot 2417B in the feeder mounting portion 2417A. Different slot numbers are assigned to the slots 2417B, and the position of each slot 2417B, that is, the set position is specified by this slot number.
- the device type information J13 is information representing the type of component supply device (the type of component supply method).
- the component type information J14 is information for specifying the component type of the component supplied by each component supply device, and is indicated by identification information for identifying the component, component name information indicating the name of the component, and the like.
- the preceding component remaining number information J15 is information representing the remaining number of components of the preceding component storage member in each component supply apparatus.
- the total component remaining number information J16 is information representing the total number of remaining components in each component supply apparatus.
- the remaining part number warning value information J17 is a predetermined value (parts) in which the total remaining part number represented by the total remaining part number information J16 before the part runs out of parts in each part supply device. (Remaining number warning value).
- the remaining part number stop value information J18 is information applied particularly to the splicing feeder, and the total remaining part number represented by the total remaining part number information J16 is a predetermined value at which the feeding of the tape for splicing work should be stopped. This is information indicating that (the remaining number of parts stop value).
- the splicing operation of joining the replenishing tape can be performed even if the sending of the preceding component storage tape is stopped after the remaining number of components in the previous component storage tape becomes “0: zero”. become unable. For this reason, in the splicing feeder, it is preferable that the component remaining number stop value represented by the component remaining number stop value information J18 is normally set to a value larger than “0: zero”.
- the AF 241, tray feeder 245, and stick feeder 246 do not have the concept of “predetermined value to stop feeding the tape for the splicing operation”. For this reason, in the AF 241, the tray feeder 245, and the stick feeder 246, the component remaining number stop value represented by the component remaining number stop value information J18 is normally “0: zero”, which is when the component actually disappears, It is preferable to set a value smaller than the component remaining number warning value.
- the display unit 203 displays information transmitted from the replenishment plan management device 30 described later, information generated by the work guide unit 208, and the like received by the communication unit 201.
- the component mounting operation processing unit 205 controls the operation of the head unit 25 and the like in the production of the component mounting board by the component mounting machine 2.
- the component supply operation processing unit 206 transmits a control signal to the feeder control unit 240 of each component supply device via the communication unit 201 to perform a process for comprehensively controlling the operation of each component supply device.
- the work determination unit 207 performs a component supply operation for supplying a component storage member for supply to the component supply device at the timing when the supply component type information is acquired by the external input / output unit 204 via the barcode reader 7. Determine whether or not.
- the work guide unit 208 generates execution procedure guide information that guides the execution procedure of the component supply work. Details of the work determination unit 207 and the work guide unit 208 will be described later.
- the component mounter 2 has a work area WA in which a component replenishment work is performed by an operator.
- the component mounter 2 includes a work area WA including a component supply unit 24 disposed on the ⁇ Y side of the component mounter 2, and a component supply unit disposed on the + Y side of the component mounter 2.
- a work area WA including 24 is set.
- work areas WA located on the ⁇ Y side of each component mounter 2 are arranged side by side in the X-axis direction.
- Work areas WA located on the + Y side are arranged side by side in the X-axis direction.
- the replenishment plan management device 30 is a device that manages a plan of component replenishment work performed by an operator in the work area WA set for each component mounter 2. As shown in FIG. 1, the replenishment plan management device 30 is connected to the mounting control device 20, the production plan management device 4, and the board information management device 5 of each component mounter 2 so that data communication is possible.
- the replenishment plan management apparatus 30 includes, for example, a microcomputer, and includes a communication unit 31, an operation unit 32, a display unit 33, and a control unit 34 as shown in the block diagram of FIG.
- the communication unit 31 is an interface for realizing data communication with the mounting control device 20, the production plan management device 4, and the board information management device 5 of each component mounting machine 2.
- the communication unit 31 acquires information transmitted from the mounting control device 20, the production plan management device 4, and the board information management device 5 of each component mounting machine 2, and gives the acquired information to the control unit 34.
- the communication unit 31 is given work list information generated by the replenishment management unit 343 from the control unit 34, and transmits (outputs) the work list information to the mounting control device 20 of each component mounter 2.
- the work list information generated by the supply management unit 343 is transmitted from the mounting control device 20 to the mobile terminal device 7 carried by the worker.
- the operation unit 32 includes a touch panel, a numeric keypad, a start key, a setting key, and the like, and accepts operator operations and various settings for the supply plan management device 30.
- the display unit 33 displays the execution procedure guide information generated by the work guide unit 208 of the mounting control device 20 and input via the communication unit 31 and the work list information generated by the supply management unit 343.
- the production plan management device 4 is a device for managing the production plan of the component mounting board by each component mounting machine 2.
- the production plan management device 4 is composed of a microcomputer, for example.
- the production plan management device 4 transmits production plan information related to the production plan for the component-mounted board to the replenishment plan management device 30 by the operation of the operator who creates the production plan.
- FIG. 10 is a diagram for explaining the production plan information JH2 transmitted from the production plan management device 4 and input to the replenishment plan management device 30.
- the production plan information JH2 is information in which production order information J21, board type information J22, production number information J23, and cycle time information J24 are associated with each other.
- the production order information J21 is information representing the production order of the component mounting boards.
- the board type information J22 is information representing the type of board P used for production of the component mounting board.
- the production number information J23 is information representing the production number of component mounting boards for each board type.
- the cycle time information J24 is information representing the time (seconds / sheet) required to finish one component-mounted substrate when components are mounted on the substrate P.
- the board information management device 5 is a device for managing board information that is referenced when each component mounting machine 2 produces a component mounting board.
- the board information management device 5 is composed of, for example, a microcomputer.
- the board information management device 5 transmits the board information to the replenishment plan management device 30 by the operation of the operator.
- FIG. 11 is a diagram for explaining the board information JH3 transmitted from the board information management apparatus 5 and input to the supply plan management apparatus 30.
- the board information JH3 is information in which the board type information J22, the set position information J12, the component type information J14, and the required component number information J31 are associated with each other.
- the required component number information J31 is information relating to the required number (number / piece) of components required for the production of one component mounting board.
- the board information JH3 is rewritten every time the type of the board P represented by the board type information J22 is switched.
- the board information JH3 is transmitted to the mounting control device 20 of each component mounter 2 through the replenishment plan management device 30, and is referred to when the component mounters 2 produce the component mounted boards.
- the component mounting operation processing unit 205 of the mounting control device 20 controls the operation of the head unit 25 and the like based on the substrate information JH3 in the production of the component mounting board by the component mounting machine 2.
- the board information JH3 when the parts are supplied by the parts supply device arranged at the set position represented by the set position information J12 during the production of the board kind represented by the board type information J22, the head unit 25 is The component represented by the component type information J14 is controlled to be taken out from the component supply device.
- the board information management apparatus 5 stores board information JH3 of the board type currently produced.
- the board information management apparatus 5 when the board information JH3 stored in the board information management apparatus 5 is transmitted to the mounting control apparatus 20 via the replenishment plan management apparatus 30, the component mounting board is produced based on the board information JH3. Become. Therefore, in order to produce a board of the next board type after production of the board of the board type of the current board information JH3 is completed, the board information management device 5 must store the board information JH3 of the next board type. I must.
- the control unit 34 of the replenishment plan management apparatus 30 includes a CPU (Central Processing Unit), a ROM (Read Only Memory) for storing a control program, a RAM (Random Access Memory) used as a work area of the CPU, and the like. .
- the control unit 34 controls the communication unit 31, the operation unit 32, and the display unit 33 by executing a control program stored in the ROM by the CPU, and generates various types of information related to management of the parts supply work plan.
- the control unit 34 includes a component supply monitoring unit 341, a supply management unit 342, and a storage unit 343.
- FIG. 12 is a diagram for explaining the control operations of the component supply monitoring unit 341 and the supply management unit 342.
- FIG. 13 is a diagram for explaining the work list information JH4 generated by the component supply monitoring unit 341 and the supply management unit 342.
- FIG. 14 is a diagram for explaining the operation of the component supply management system 3.
- a work area TWA is set in the component mounting line 2L.
- the work area TWA represents a range in which one worker OP is in charge of a component supply operation for a component supply device attached to each component mounter 2 of the component mounting line 2L.
- the work area TWA includes a work area WA set in the component mounter 2 arranged in the work area TWA.
- the plurality of component mounting lines 2L are included in the work area TWA.
- the worker OP carries the portable terminal device 7 and moves in the work area TWA while pushing the cart 6 on the movement path 6R along the component mounting line 2L passing through the work area WA of each component mounter 2.
- the parts replenishment work is performed in each work area WA.
- the cart 6 has a loading platform 61 that can accommodate an article G for parts supply work.
- the articles G accommodated in the loading platform 61 include new replenishment component storage members (reels, pallets, sticks) necessary for the component replenishment operation, and collection items collected after the component replenishment operation.
- the cart 6 may be unmannedly transported using an AGV (Automated Guided Vehicle) that is an unmanned transport vehicle. In this case, AGV instruction data created based on work list information JH4 described later is distributed to AGV.
- AGV Automatic Guided Vehicle
- the AGV instruction data is a file in which the position of the work area WA where the AGV should stop and the stop time are described.
- the AGV sequentially moves to each work area WA along the movement route 6R so as to guide the worker OP and stops.
- the worker OP can move along the moving route 6R using the AGV as a mark, and can perform the component supply work in the work area WA at the position where the AGV stops.
- the component mounting machines 2 on the component mounting line 2L are sequentially arranged from the upstream side to the downstream side of the moving path 6R in the order of the first component mounting machine 2A and the second component.
- a mounting machine 2B, a third component mounting machine 2C, a fourth component mounting machine 2D, a fifth component mounting machine 2E, and a sixth component mounting machine 2F are shown.
- the work area set in the first component mounting machine 2A is shown as the first work area WA1
- the work area of the second component mounter 2B is the second work area WA2 and the third component mounter.
- the work area of 2C is the third work area WA3, the work area of the fourth component mounter 2D is the fourth work area WA4, the work area of the fifth component mounter 2E is the fifth work area WA5, and the sixth component mounter 2F.
- the work area is indicated as a sixth work area WA6.
- the work area TWA may be set to include a plurality of component mounting lines 2L.
- the movement path 6R in the work area TWA is such that the component supply device that is the target of the component replenishment work in the work area WA arranged on the ⁇ Y side and the + Y side of each component mounting machine 2 in each component mounting line 2L.
- the route is set so as to pass through the arranged work area WA, and is not limited to the route along the component mounting line 2L as shown in FIG.
- a path that zigzags between the work area WA arranged on the ⁇ Y side of each component mounting machine 2 and the work area WA arranged on the + Y side may be set as the movement path 6R.
- a route that goes backward after passing in one direction may be set as the moving route 6R.
- the component supply monitoring unit 341 will be described mainly with reference to FIG.
- a component mounting board of the first board type is produced in the first production period TW01, and then the board type is switched, and a component mounting board of the second board type is produced in the second production period TW02.
- An example is shown.
- in the first production period TW01 among the plurality of component supply devices provided in each component mounting machine 2 of the component mounting line 2L, three AFs 241A1, 241A2, 241A3, two tray feeders 245A1, An example is shown in which components are supplied from 245A2 and one stick feeder 246A1 to produce a component mounting board.
- the parts supply work to be performed by the operator OP in accordance with the production of the parts mounting board includes parts supply work for supplying new supply reels to the AFs 241A1, 241A2, and 241A3, and tray feeders 245A1 and 245A2.
- a parts supply operation for supplying a new supply pallet to each of the parts and a parts supply operation for supplying a new supply stick to the stick feeder 246A1 are included.
- the AF 241A1, 241A2, 241A3, tray feeders 245A1, 245A2, and stick feeder 246A1 are collectively referred to as “component supply devices 241, 245, 246”, and the reel, pallet, and stick are collectively referred to as “component storage member”. Called.
- the component supply monitoring unit 341 acquires a management start time TS that represents the management start time of the component supply work plan for each of the AFs 241A, 241B, 241C, the tray feeders 245A, 245B, and the stick feeder 246A.
- the component supply monitoring unit 341 may acquire the time at which the production of the component mounting board in the first production period TW01 is started as the management start time TS, or the command information for instructing the management start is obtained via the operation unit 32.
- the time when the command information is input may be acquired as the management start time TS.
- the component supply monitoring unit 34 when acquiring the management start time TS, monitors the supply status of the components in each of the component supply devices 241, 245, and 246 from the management start time TS.
- the component supply monitoring unit 341 specifies a replenishable time zone that represents a time zone during which component replenishment work is possible for each of the component supply devices 241, 245, and 246.
- the replenishable time zone TWSA is specified for AF241A1
- the replenishable time zone TWSB is specified for AF241A2
- the replenishable time zone TWSC is specified for AF241A3.
- a replenishable time zone TWSD is specified for the tray feeder 245A1
- a replenishable time zone TWSE is specified for the tray feeder 245A2.
- a replenishable time zone TWSF is specified for the stick feeder 246A1.
- the earliest time in each of the replenishable time zones TWSA to TWSF (hereinafter referred to as “earliest time”) is preceded by component supply among a plurality of component storage members mounted on the component supply devices 241, 245 and 246. This is the time when the preceding component storage member to be performed becomes a component exhaustion. When the preceding component storage member is out of components, a new supply component storage member can be supplied. That is, when the component supply monitoring unit 341 specifies each of the replenishable time zones TWSA to TWSF, the time from the management start time TS until the component replenishment work for replenishing a new component storage member is possible. Is estimated for each of the component supply devices 241, 245, and 246. Replenishable time information J42 representing the replenishable time TT for each of the component supply devices 241, 245, and 246 estimated by the component supply monitoring unit 341 is included in work list information JH4 (FIG. 13) described later.
- the latest time (hereinafter referred to as “latest time”) in each of the replenishable time zones TWSA to TWSF is the total number of remaining parts of the plurality of parts storage members mounted on the parts supply devices 241, 245 and 246. This is the time when the predetermined remaining component warning value is reached.
- latest time the latest time in each of the replenishable time zones TWSA to TWSF.
- Warning time WT to be expressed is estimated for each of the component supply devices 241, 245, and 246.
- the warning time WT for each of the component supply devices 241, 245, 246 estimated by the component supply monitoring unit 341 is longer than the replenishable time TT, and is a time limit until the component supply operation needs to be performed. It is an example of the parts supply time limit shown.
- Warning time information J43 representing a warning time WT as an example of the component supply limit time is included in work list information JH4 (FIG. 13) described later.
- the latest time in each of the replenishable time zones TWSA to TWSF is the time when the total number of remaining parts of the plurality of parts storage members mounted on the parts supply devices 241, 245, and 246 reaches a predetermined remaining number of parts stop value.
- it may be a time limit that allows the component supply devices 241, 245, and 246 to continue component supply according to the production of the component mounting board.
- the total number of remaining parts reaches the remaining number of parts stop value, or when the time limit for allowing the continuation of parts supply has been reached, the total number of remaining parts reaches the same as when the remaining number of parts warning reaches the warning value for remaining parts. Therefore, it is necessary to carry out a component replenishment operation for replenishing a replenishment component storage member.
- the component supply monitoring unit 341 determines the time until the total remaining component number reaches the remaining component number stop value and the component supply operation needs to be performed.
- the stop time ST (refer to FIG. 13) to be expressed, or the production possible time PT (refer to FIG. 13) to indicate the time until reaching the time limit at which the component supply can be continued until the component supply operation needs to be performed, This is estimated for each of the supply devices 241, 245, and 246.
- the stop time ST and the production possible time PT for each of the component supply devices 241, 245, 246 estimated by the component supply monitoring unit 341 are limited time until the component supply operation needs to be performed, as with the warning time WT. It is an example of the parts supply time limit shown.
- the stop time information J44 indicating the stop time ST as an example of the parts supply limit time and the production possible time information J45 representing the production possible time PT are included in the work list information JH4 (FIG. 13) described later.
- the component supply monitoring unit 341 is information given from the communication unit 31 to the control unit 34, and includes mounting information JH 1 from the mounting control device 20 of each component mounting machine 2 and production plan information JH 2 from the production plan management device 4. Based on the board information JH3 from the board information management apparatus 5, the replenishable time zones TWSA to TWSF are specified for each of the component supply apparatuses 241, 245, and 246.
- the component supply monitoring unit 341 first obtains the remaining number of components in the preceding component storage member based on the preceding component remaining number information J15 of the attachment information JH1. Further, the component supply monitoring unit 341 calculates the necessary number for each component specified by the component type information J14 necessary for the production of one component mounting board represented by the component necessary number information J31 of the board information JH3. Divide by the time required to finish one component mounting board for each board specified by board type information J22, which is represented by cycle time information J24 of production plan information JH2, and the number of parts used per second Ask for.
- the component supply monitoring unit 341 calculates the earliest time in each of the replenishable time zones TWSA to TWSF by dividing the number of remaining components in the preceding component storage member by the number of used components per second. On the other hand, the component supply monitoring unit 341 subtracts the number of components obtained by subtracting the component remaining number warning value represented by the remaining component number warning value information J17 from the total remaining component number represented by the total remaining component number information J16. By dividing by the number of used parts per second, the latest time in each of the replenishable time zones TWSA to TWSF is obtained.
- the remaining number of parts in the preceding part storage member represented by the preceding part remaining number information J15 and the total remaining part number represented by the total part remaining number information J16 are picked up by the head unit 25. Subtracted every time. Although details will be described later, the preceding part remaining number information J15 is updated every time a part is taken out from the preceding part storage member. Further, when the preceding component storage member is out of components and a new supply component storage member is supplied to the component supply devices 241, 245 and 246, the component supply member is stored in the new supply component storage member. The total number of remaining parts is updated by adding the number of parts (initial setting number) to the total number of remaining parts that changes each time a part is taken out by the head unit 25.
- the number of parts stored in the new replenishment part storage member (initial setting number) is stored in the ROM or the like of the control unit 34 for each part specified by the part type information J14.
- the actual number of components stored in the component storage member is stored in the ROM of the control unit 34 or the like.
- the initial set number is rewritten.
- the component supply monitoring unit 341 displays the specific results of the replenishable time zones TWSA to TWSF in a predetermined cycle (for example, 30-second cycle). Update.
- the component supply monitoring unit 341 may be configured to specify the replenishable time zones TWSA to TWSF in the first production period TW01 of the first board type, or in addition to the first board type.
- the replenishable time zones TWSA to TWSF may be specified in consideration of the production period after the second board type.
- the replenishment management unit 342 supplies components to each of the AFs 241A1, 241A2, 241A3, the tray feeders 245A1, 245A2, and the stick feeder 246A1 based on the replenishable time zones TWSA to TWSF specified by the component supply monitoring unit 341. Manage work plans.
- the supply management unit 342 includes a supply target specifying unit 3421 and a supply timing specifying unit 3422.
- the replenishment target specifying unit 3421 sets a component supply device that can perform a component replenishment operation based on the component supply status in each of the component supply devices 241, 245, and 246 as a component replenishment target device that is a target of the component replenishment operation. Identify. Specifically, the replenishment target specifying unit 3421 first recognizes overlapping replenishment time zones that overlap in each of the replenishable time zones TWSA to TWSF. In the example illustrated in FIG. 12, the replenishment target specifying unit 3421 includes a plurality of first overlapping replenishment time zone TWD1, second overlapping replenishment time zone TWD2, and third overlapping replenishment time zone TWD3 in order from the earliest in time series. Recognizing overlapping supply hours.
- the first overlapping replenishment time zone TWD1 is a time zone that overlaps the replenishable time zone TWSA of AF241A1 and the replenishable time zone TWSB of AF241A2.
- the earliest time (earliest time) of the first overlapping supply time zone TWD1 coincides with the earliest time T1 in the AF241A2 supply available time zone TWSB, and the latest time (latest time) of the first overlapping supply time zone TWD1 is This corresponds to the latest time T2 in the replenishable time zone TWSA of AF241A1.
- the second overlapping replenishment time zone TWD2 is a time zone that overlaps the replenishable time zone TWSC of the AF 241A3 and the replenishable time zone TWSD of the tray feeder 245A1.
- the earliest time (earliest time) of the second overlapping supply time zone TWD2 coincides with the earliest time T3 in the AF241A3 supply available time zone TWSC, and the latest time (latest time) of the second overlapping supply time zone TWD2 is This corresponds to the latest time T4 in the replenishable time zone TWSD of the tray feeder 245A1.
- the third overlapping replenishment time zone TWD3 is a time zone that overlaps the replenishable time zone TWSE of the tray feeder 245A2 and the replenishable time zone TWSF of the stick feeder 246A1.
- the earliest time (earliest time) of the third overlap supply time zone TWD3 coincides with the earliest time T5 in the supply time zone TWSF of the stick feeder 246A1, and the latest time (latest time) of the third overlap supply time zone TWD3.
- the replenishment target specifying unit 3421 specifies all the component supply devices that can perform the component replenishment work in the overlapping replenishment time zones TWD1, TWD2, and TWD3 as the component replenishment target devices.
- the supply target specifying unit 3421 specifies a component supply target device for each of the first to third overlapping supply time zones TWD1, TWD2, and TWD3.
- the supply target specifying unit 3421 specifies AFs 241 ⁇ / b> A ⁇ b> 1 and 241 ⁇ / b> A ⁇ b> 2 as component supply target devices that can perform component supply work within the first overlapping supply time period TWD ⁇ b> 1.
- the replenishment target specifying unit 3421 specifies the AF 241A3 and the tray feeder 245A1 as component replenishment target devices that can perform the component replenishment work within the second overlapping replenishment time zone TWD2.
- the supply target specifying unit 3421 specifies the tray feeder 245A2 and the stick feeder 246A1 as the component supply target devices that can perform the component supply work in the third overlapping supply time period TWD3.
- the replenishment target specifying unit 3421 specifies all the component supply devices that can perform the component replenishment work in the overlapping replenishment time zones TWD1, TWD2, and TWD3 as the component replenishment target devices.
- component supply work by the operator OP is collectively performed for the component supply devices 241, 245, and 246 that can supply new supply component storage members within the respective overlapping supply time zones TWD 1, TWD 2, and TWD 3. It is possible to perform “collective replenishment”. For this reason, it is possible to reduce the frequency of the worker OP going to each component mounting machine 2 provided with the component supply devices 241, 245, 246, and to reduce the load of the component replenishment work by the worker OP. Can do.
- the supply target specifying unit 3421 updates the specification result of the component supply target device.
- the supply target specifying unit 3421 may be configured to specify a component supply target device in the first production period TW01 of the first board type.
- the component supply target device may be specified in consideration of the production period after the second board type.
- the replenishment timing specifying unit 3422 sets the same replenishment operation timing of the component replenishment work for the component replenishment target device specified by the replenishment target specifying unit 3421 in the first to third overlapping replenishment time zones TWD1, TWD2. , Specified for each TWD3.
- the replenishment timing specifying unit 3422 specifies the first replenishment work timing TH1 as the parts replenishment work timing within the first overlapped replenishment time period TWD1 with respect to the AFs 241A1 and 241A2.
- the replenishment timing specifying unit 3422 specifies the second replenishment work timing TH2 as the timing of parts replenishment work within the second overlapped replenishment time zone TWD2 for the AF 241A3 and the tray feeder 245A1.
- the replenishment timing specifying unit 3422 specifies the third replenishment work timing TH3 as the timing of parts replenishment work within the third overlapping replenishment time period TWD3 for the tray feeder 245A2 and the stick feeder 246A1.
- the replenishment timing identifying unit 3422 identifies the earliest time T1 of the first overlapping replenishment time zone TWD1 as the first replenishment operation timing TH1 within the first overlapping replenishment time zone TWD1.
- the earliest time T1 of the first overlap supply time zone TWD1 is the earliest time in the first overlap supply time zone TWD1.
- the replenishment timing identifying unit 3422 identifies the earliest time T3 of the second overlapping replenishment time zone TWD2 as the second replenishment timing TH2 within the second overlapping replenishment time zone TWD2, and within the third overlapping replenishment time zone TWD3. It is desirable to specify the earliest time T5 of the third overlapping supply time zone TWD3 as the third supply timing TH3.
- the replenishment target specifying unit 3421 may be configured to divide the first production period TW01 into a plurality of specific periods TW11, TW12, and TW13 having a predetermined specific time as a time interval.
- the specific time that defines the time interval between the specific periods TW11, TW12, and TW13 is input by the operator OP via the operation unit 32, and is set to an arbitrary time such as 30 minutes, for example.
- the first specific period TW11, the second specific period TW12, and the third specific period TW13 are referred to in order from the earliest in chronological order.
- the time intervals in each of the first to third specific periods TW11, TW12, and TW13 are set to be constant.
- the replenishment target specifying unit 3421 recognizes first to third overlapping replenishment time zones TWD1 to TWD3 that overlap in the replenishable time zones TWSA to TWSF corresponding to each of the component supply devices 241, 245, and 246. Further, the supply target specifying unit 3421 includes the earliest time in any one of the first to third overlapping supply time zones TWD1 to TWD3 in each of the first to third specific periods TW11, TW12, and TW13. Judge whether or not. In the example shown in FIG. 12, the earliest time of the first overlapping supply time zone TWD1 is included in the first specific period TW11, and the earliest time of the second overlapping supply time period TWD2 is included in the second specific period TW12. The earliest time of the third overlapping replenishment time zone TWD3 is included in the period TW13.
- the replenishment target specifying unit 3421 is between the earliest time of the first overlap supply time zone TWD1 and the latest time (latest time) of the first specific period TW11 in the first overlap supply time zone TWD1.
- AF241A1 and 241A2 are specified as the component supply target devices that can perform the component supply operation during the time period.
- the replenishment target specifying unit 3421 is between the earliest time of the second overlap supply time zone TWD2 and the latest time (latest time) of the second specific period TW12 in the second overlap supply time zone TWD2.
- the AF 241A3 and the tray feeder 245A1 are specified as the component supply target devices that can perform the component supply operation in the time zone.
- the replenishment target specifying unit 3421 is between the earliest time of the third overlap supply time zone TWD3 and the latest time (latest time) of the third specific period TW13 in the third overlap supply time zone TWD3.
- a tray feeder 245A2 and a stick feeder 246A1 are specified as parts supply target devices capable of supplying parts in a time zone.
- the replenishment timing specifying unit 3422 includes, within the first overlapping replenishment time zone TWD1, within the time period between the earliest time of the first overlapping replenishment time zone TWD1 and the latest time of the first specific period TW11, AF241A1, The same first supply work timing TH1 is specified for 241A2. In addition, the replenishment timing specifying unit 3422 is within the time zone between the earliest time of the second overlapping replenishment time zone TWD2 and the latest time of the second specific time period TW12 in the second overlapped replenishment time zone TWD2. The same second supply work timing TH2 is specified for the AF 241A3 and the tray feeder 245A1.
- the replenishment timing specifying unit 3422 is within the time zone between the earliest time of the third overlapping replenishment time zone TWD3 and the latest time of the third specific period TW13 in the third overlapped replenishment time zone TWD3.
- the same third supply work timing TH3 is specified for the tray feeder 245A2 and the stick feeder 246A1.
- the replenishment target specifying unit 3421 of the replenishment management unit 342 generates work list information JH4 shown in FIG. 13 as information representing the result of specifying the component replenishment target device.
- the replenishment target specifying unit 3421 sets work list information JH4 for each overlapping replenishment time zone TWD1, TWD2, and TWD3 shown in FIG. 12 or for each specific period TW11, TW12, and TW13, which is set when the part replenishment target device is specified. Is generated.
- the work list information JH4 is generated by the supply target specifying unit 3421 for each supply timing TH1, TH2, TH3 (see FIG. 12) specified by the supply timing specifying unit 3422.
- the work list information JH4 is a list in which the work target area representing the work area WA of the component mounter 2 in which the component supply target apparatus is arranged is associated with the component supply target apparatus in which the component supply work is performed in the work target area. Information.
- work target areas in which parts supply target devices are arranged are listed in order from upstream to downstream of the movement path 6R of the worker OP.
- the work list information JH4 includes work target area number information J41, the mounting model information J11, the set position information J12, the device type information J13, the part type information J14, and the total part remaining number information. J16, the required number of parts information J31, replenishable time information J42, warning time information J43, stop time information J44, and production possible time information J45 are associated with each other.
- a plurality of AFs 241 are arranged in the first work area WA1 of the first component mounting machine 2A, and three of the AFs 241A are specified as component supply target devices by the supply target specifying unit 3421.
- the first work area WA1 is set as a work target area.
- a plurality of AFs 241 are arranged in the second work target area WA2 of the second component mounter 2B, and one of the AFs 241A is specified as a component supply target device by the supply target specifying unit 3421, and thereby the second work target area WA2 is specified.
- the work area WA2 is a work target area.
- a plurality of AFs 241 are arranged in the third work target area WA3 of the third component mounting machine 2C, and four of the AFs 241A are specified as component supply target devices by the supply target specifying unit 3421, and thereby
- the work area WA3 is a work target area.
- a plurality of tray feeders 245 are arranged in the fourth work area WA4 of the fourth component mounting machine 2D, and two of these tray feeders 245A are specified as component supply target devices by the supply target specifying unit 3421.
- the fourth work area WA4 is set as a work target area.
- a plurality of AFs 241 are arranged in the fifth work area WA5 of the fifth component mounter 2E, but there is no device specified as a component supply target device by the supply target specifying unit 3421.
- a plurality of stick feeders 246 are arranged in the sixth work area WA6 of the sixth component mounting machine 2F, and two of these stick feeders 246A are specified as component supply target devices by the supply target specifying unit 3421.
- the sixth work area WA6 is set as a work target area.
- the work target area number information J41 includes each work target area (first work area WA1, second work area WA2, third work area WA3, fourth) in which the parts supply target device specified by the supply target specifying unit 3421 is arranged. This is information for identifying the work area WA4 and the sixth work area WA6).
- the replenishable time information J42 is a new replenishment time for the parts replenishment target device arranged at the set position represented by the set position information J12 in each work target area represented by the work target area number information J42. It is the information showing the replenishment possible time TT until the component replenishment operation
- the replenishable time TT for each part replenishment target device represented by the replenishable time information J42 is estimated by the parts supply monitoring unit 341.
- the replenishable time TT changes in accordance with the number of remaining parts in the preceding part storage member represented by the preceding part remaining number information J15 or the total number of remaining parts represented by the total part remaining number information J16. Therefore, the replenishable time information J42 is updated at a predetermined cycle (for example, 30-second cycle) in response to the update of the preceding component remaining number information J15 or the total component remaining number information J16.
- the warning time information J43 in the parts supply target device arranged at the set position represented by the set position information J12, the total number of remaining parts represented by the total remaining part number information J16 reaches the remaining part number warning value. It is the information showing warning time WT until.
- the warning time WT for each component supply target device represented by the warning time information J43 is estimated by the component supply monitoring unit 341.
- the warning time WT changes according to the total number of remaining parts represented by the total number of remaining parts information J16. For this reason, the warning time information J43 is updated at a predetermined cycle (for example, 30-second cycle) in response to the update of the total component remaining number information J16.
- the stop time information J44 in the parts supply target device arranged at the set position represented by the set position information J12, the total remaining part number represented by the total remaining part number information J16 reaches the remaining part number stop value. It is the information showing stop time ST until.
- the stop time information J44 is the total part remaining This is information representing the time from the present time until the total number of remaining parts represented by the number information J16 reaches zero (0).
- the stop time information J44 is the total component remaining number information J16. This is information indicating the time from the present time until the total number of remaining parts reaches the predetermined value.
- the stop time ST for each component supply target device represented by the stop time information J44 is estimated by the component supply monitoring unit 341.
- the stop time ST changes according to the total number of remaining parts represented by the total number of remaining parts information J16. Therefore, the stop time information J44 is updated at a predetermined cycle (for example, 30-second cycle) in response to the update of the total component remaining number information J16.
- the production possible time information J45 is information representing the production possible time PT in which the component supply target device arranged at the set position represented by the set position information J12 can continue the component supply according to the production of the component mounting board. It is.
- the production possible time PT represented by the production available time information J45 indicates a time range in which the component supply can be continued from the present time. Further, the production possible time PT represented by the production available time information J45 may be changed by setting, but is usually the same as the stop time ST represented by the stop time information J44. .
- the production available time PT for each part supply target device represented by the production available time information J45 is estimated by the parts supply monitoring unit 341. The production possible time PT changes according to the total number of remaining parts represented by the total number of remaining parts information J16. For this reason, the production possible time information J45 is updated at a predetermined cycle (for example, 30-second cycle) in response to the update of the total component remaining number information J16.
- Each of the warning time information J43, the stop time information J44, and the production possible time information J45 is also information that defines a parts replenishment time limit that represents a time limit until the parts replenishment operation needs to be performed on the part replenishment target device. is there.
- the parts supply devices 241, 245, and 246 are set with a part supply time limit.
- the parts replenishment limit time includes the warning time WT until the total number of remaining parts represented by the total number of remaining parts information J16 reaches the number of remaining parts warning value, and the total number of remaining parts represented by the total number of remaining parts information J16.
- the work list information JH4 is stored in the storage unit 343 of the replenishment plan management device 30 and displayed on the display unit 33. Furthermore, the work list information JH4 is transmitted via the communication unit 31 to the mounting control device 20 of each component mounter 2 and the mobile terminal device 30T carried by the worker OP.
- the storage unit 343 of the replenishment plan management device 30 stores the work list information JH4 updated in response to the replenishment target specifying unit 3421 updating the specification result of the parts replenishment target device at a predetermined cycle.
- the work list information JH4 is input to the mounting control device 20 of each component mounter 2
- the work list information JH4 is displayed on the display unit 203 of the mounting control device 20.
- the work list information JH4 is displayed on the mobile terminal device 30T.
- the worker OP sequentially moves to the work target area represented by the work target area number information J41 in the work area TWA based on the work list information JH4 displayed on the mobile terminal device 30T and the like. Parts replenishment work can be performed in the area.
- the worker OP grasps the parts supply target apparatus arranged in the work target area based on the work list information JH4 displayed on the mobile terminal device 30T or the like. can do.
- the mounting control device 20 provided in each component mounting machine 2 constitutes a part of the component supply management system 3. Details of the work determination unit 207 and the work guide unit 208 provided in the mounting control device 20 will be described below.
- the worker OP circulates in the work area TWA along the movement path 6R every predetermined time (for example, 90 minutes) and performs the parts supply work.
- a cyclic period PP representing the predetermined time is set in advance when the operator OP makes a part replenishment operation while traveling in the work area TWA at regular intervals.
- the operator OP uses the bar code reader 7 to read the part type specifying barcode attached to the new supply part storage member.
- supply component type information JH02 (FIG. 14) is input via the external input / output unit 204 to the mounting control device 20 of the component mounter 2 in which the work target area is set.
- the work determination unit 207 based on the work list information JH4, sets the position associated with the component type information J14 that represents the same type of component as the component type of the supply component type information JH02. Information J12 is extracted. Then, the operation determination unit 207 determines whether or not the component supply operation can be performed on the component supply target device arranged at the set position represented by the extracted set position information J12.
- the replenishment possible detection information JH01 is information indicating that a new replenishment component storage member can be replenished to the component replenishment target device. For example, when the component supply target device is AF241A, all of the preceding component storage tape 243 is pulled out from the reel 2420, and the rear end thereof passes through the position of the second tape detection sensor 2416B and is detected by the preceding component storage tape 243.
- the leading end of the tape passes the position of the first tape detection sensor 2416A, the subsequent component storage tape 243 is detected, and the detection information is output. Then, the detection information becomes replenishable detection information JH01.
- the replenishment impossible information JH03 is information indicating that it is impossible to replenish a new replenishment component storage member to the component replenishment target device. For example, when the component supply target apparatus is AF241A, the preceding component storage tape 243 is detected by the second tape detection sensor 2416B, and detection information is output, and the leading end of the subsequent component storage tape 243 is detected by the first tape. When the detection information is output by detection by the sensor 2416A, the detection information becomes the replenishment impossible detection information JH03.
- FIG. 15 is a diagram for explaining work guidance processing executed by the work guidance unit 208.
- the work guidance unit 208 executes work guidance processing when the work determination unit 207 determines that the component supply work cannot be performed.
- the work guidance unit 208 generates execution procedure guidance information JH5 that guides the execution procedure of the parts replenishment work based on the work list information JH4.
- the work guide unit 208 is included in the work list information JH4 when the work determination unit 207 determines that the part supply work cannot be performed at the timing when the supply part type information JH02 is input.
- the execution procedure guide information JH5 is generated with reference to the replenishable time TT represented by the replenishable time information J42.
- the execution procedure of the component supply work represented by the execution procedure guide information JH5 does not simply indicate that “the component supply operation cannot be performed”, but performs the component supply operation until the replenishable time TT elapses. This indicates that the machine is waiting for the machine, or that the execution of the parts supply work is postponed.
- the execution procedure guidance information JH5 generated by the work guidance unit 208 is displayed on the display unit 203 of the mounting control device 20. Furthermore, the execution procedure guide information JH5 is transmitted to the replenishment plan management device 30 and the portable terminal device 30T carried by the worker OP via the communication unit 201. When the execution procedure guide information JH5 is input to the supply plan management apparatus 30, the execution procedure guide information JH5 is displayed on the display unit 33 of the supply plan management apparatus 30. When the execution procedure guide information JH5 is input to the mobile terminal device 30T carried by the worker OP, the execution procedure guide information JH5 is displayed on the mobile terminal device 30T.
- the operation determination unit 207 performs the component supply operation. It is determined whether or not implementation is possible. If it is determined at this timing that the parts supply operation cannot be performed, the operator OP does not know how to deal with it and may be confused.
- the execution procedure guide information JH5 is information for guiding the execution procedure of the parts supply work based on the supply possible time TT represented by the supply possible time information J42 included in the work list information JH4.
- the operator OP performs the procedure for performing the component supply operation that cannot be performed at the timing when the reading operation of the supply component type information JH02 is performed. I can grasp it. As a result, it is possible to prevent confusion due to unknown handling and to improve the efficiency of the parts supply work by the worker OP.
- FIG. 16 is a flowchart showing a first specific example of work guidance processing executed by the work guidance unit 208.
- the worker OP who circulates in the work area TWA uses a new replenishment item in the work target area indicated by the work target area number J42 registered in the work list information JH4 displayed on the mobile terminal device 30T or the like.
- a reading operation of the supply component type information JH02 for the component storage member is performed.
- the supply component type information JH02 is input via the external input / output unit 204 to the mounting control device 20 of the component mounter 2 in which the work target area is set (step a1).
- the work determination unit 207 When the supply part type information JH02 is input, the work determination unit 207, based on the work list information JH4 transmitted from the supply plan management device 30, represents a part type that represents the same type of part as the part type of the supply part type information JH02. The set position information J12 associated with the information J14 is extracted. The work determination unit 207 determines whether or not the component supply work can be performed on the component supply target device arranged at the set position represented by the extracted set position information J12 (step a2).
- the work guide unit 208 permits the operation of the component supply operation on the component supply target device. Is generated (step a3).
- the work permission information JH50 is, for example, message information such as “The replenished component storage member that has been read can be replenished to the AF disposed at the set position S11”.
- the work permission information JH50 is displayed on the display unit 203 of the mounting control device 20, and is also displayed on the display unit 33 of the replenishment plan management device 30 and the portable terminal device 30T (step a4).
- the operator OP can perform the component supply work regarding the component storage member for supply that has performed the reading operation of the supply component type information JH02. Can be grasped.
- the worker OP can carry out a component supply operation for the component supply target device in accordance with the work permission information JH50.
- the operation guide unit 208 is represented by the replenishable time information J42 included in the operation list information JH4. It is determined whether the possible replenishment time TT is less than a predetermined threshold value or more than a threshold value (step a5).
- the work guide unit 208 If the replenishable time TT is less than the threshold, the work guide unit 208 generates the first guide information JH51 as the execution procedure guide information JH5 (step a6).
- the first guidance information JH51 includes information related to the replenishable time TT, and is information for notifying that the execution of the component replenishment operation for the component replenishment target device is awaited until the replenishable time TT elapses.
- the work guidance unit 208 generates the first guidance information JH51 as the execution procedure guidance information JH5.
- the first guidance information JH51 is information for guiding the execution procedure of waiting for the execution of the parts supply work until the replenishable time TT elapses.
- the first guidance information JH51 is, for example, “The read-out supply component storage member cannot be supplied to the AF arranged at the set position S11. Time until the component supply operation can be performed” Is TT. Please wait until the replenishable time TT elapses. "
- the first guidance information JH51 is displayed on the display unit 203 of the mounting control device 20, and is also displayed on the display unit 33 of the supply plan management device 30 and the mobile terminal device 30T (step a7).
- the operator OP recognizes the replenishable time TT until the parts replenishment work becomes possible, and then the replenishable time TT has elapsed. It can be understood that it is only necessary to wait until it is done.
- the operator OP waits until the replenishable time TT elapses in accordance with the first guidance information JH51, and thereafter can perform a component replenishment operation for the component replenishment target device.
- the work guide unit 208 If the replenishable time TT is equal to or longer than the threshold, the work guide unit 208 generates the second guide information JH52 as the execution procedure guide information JH5 (step a8).
- the second guidance information JH52 is information that recommends postponing the execution of the component supply operation for the component supply target device. More specifically, the second guidance information JH52 is information that recommends that the execution of the parts supply work be postponed during the next patrol in the work area TWA by the worker OP.
- the work guide unit 208 generates the second guide information JH52 as the execution procedure guide information JH5 when the replenishable time TT is equal to or longer than the threshold value, that is, when the time until the parts replenishment work becomes possible is relatively long.
- the second guidance information JH52 is information for guiding an execution procedure of postponing the execution of the component supply work during the next patrol in the work area TWA by the worker OP.
- the second guidance information JH52 is, for example, “The supply component storage member that has been read cannot be supplied to the AF arranged at the set position S11. The component supply operation for this AF is postponed during the next patrol. Then, in this tour, please proceed to the parts supply work for the next parts supply target device. "
- the second guidance information JH52 is displayed on the display unit 203 of the mounting control device 20, and is also displayed on the display unit 33 of the replenishment plan management device 30 and the portable terminal device 30T (step a9).
- the operator OP does not wait until the replenishable time TT elapses in the current tour, and is constant represented by the tour cycle PP. It is possible to grasp that it is only necessary to postpone the parts supply work during the next patrol after the time.
- the operator OP can carry out a component supply operation for the next component supply target device in the current tour, and can perform a component supply operation for the previously supplied component supply target device during the next tour.
- FIG. 17 is a flowchart showing a second specific example of the work guidance process executed by the work guidance unit 208.
- the component mounter 2 in which the work target area is set is displayed.
- Supply component type information JH02 is input to the mounting control device 20 via the external input / output unit 204 (step b1).
- the work determination unit 207 When the supply part type information JH02 is input, the work determination unit 207, based on the work list information JH4 transmitted from the supply plan management device 30, represents a part type that represents the same type of part as the part type of the supply part type information JH02. The set position information J12 associated with the information J14 is extracted. The work determination unit 207 determines whether or not the component supply operation can be performed on the component supply target device arranged at the set position represented by the extracted set position information J12 (step b2).
- the work guide unit 208 permits the operation of the component supply operation on the component supply target device. Is generated (step b3).
- the work permission information JH50 is displayed on the display unit 203 of the mounting control device 20, and is also displayed on the display unit 33 of the replenishment plan management device 30 and the portable terminal device 30T (step b4).
- the operator OP can perform the component supply work regarding the component storage member for supply that has performed the reading operation of the supply component type information JH02. Can be grasped.
- the operation guide unit 208 is represented by the replenishable time information J42 included in the operation list information JH4. It is determined whether the replenishable time TT to be performed is less than or equal to a predetermined threshold value (step b5).
- the work guide unit 208 If the replenishable time TT is less than the threshold, the work guide unit 208 generates the first guide information JH51 as the execution procedure guide information JH5 (step b6).
- the first guidance information JH51 includes information related to the replenishable time TT, and is information for notifying that the execution of the component replenishment operation for the component replenishment target device is awaited until the replenishable time TT elapses.
- the first guidance information JH51 is displayed on the display unit 203 of the mounting control device 20, and is also displayed on the display unit 33 of the replenishment plan management device 30 and the mobile terminal device 30T (step b7).
- the operator OP recognizes the replenishable time TT until the parts replenishment work becomes possible, and then the replenishable time TT has elapsed. It can be understood that it is only necessary to wait until it is done.
- the work guide unit 208 refers to the warning time information J43, the stop time information J44, and the production available time information J45 included in the work list information JH4.
- the warning time WT represented by the warning time information J43, the stop time ST represented by the stop time information J44, and the production possible time PT represented by the production available time information J45 are component replenishment. It defines the part supply time limit until the work needs to be performed. If the replenishable time TT is equal to or greater than the threshold, the work guide unit 208 determines whether the component replenishment restriction time is greater than or equal to the cyclic cycle PP or less than the cyclic cycle PP (step b8).
- the work guide unit 208 When the parts replenishment limit time is equal to or longer than the cyclic period PP in the work area TWA by the worker OP, even during the next round in the work area TWA by the worker OP, the parts replenishment is within the part replenishment time limit. Work can be carried out. Therefore, when the replenishable time TT is equal to or longer than the threshold and the parts replenishment limit time is equal to or longer than the cyclic period PP, the work guide unit 208 generates the second guide information JH52 as the execution procedure guide information JH5. (Step b9).
- the 2nd guidance information JH52 is information which guides the implementation procedure which postpones implementation of parts supply work at the next patrol in worker's OP in work area TWA.
- the second guidance information JH52 is displayed on the display unit 203 of the mounting control device 20 and also displayed on the display unit 33 of the replenishment plan management device 30 and the portable terminal device 30T (step b10).
- the worker OP does not wait until the replenishable time TT elapses at the time of this round, and supplies parts at the next round. Parts replenishment work can be carried out within the time limit.
- the work guide unit 208 When the parts supply restriction time is less than the cyclic period PP in the work area TWA by the worker OP, the parts supply work is performed within the parts supply restriction time at the next circulation in the work area TWA by the worker OP. Cannot be implemented. Therefore, when the replenishable time TT is equal to or longer than the threshold and the parts replenishment limit time is less than the cyclic cycle PP, the work guide unit 208 generates the first guide information JH51 as the execution procedure guide information JH5. (Step b11).
- the first guidance information JH51 includes information related to the replenishable time TT, and is information for notifying that the execution of the component replenishment operation for the component replenishment target device is awaited until the replenishable time TT elapses.
- 1st guidance information JH51 is displayed on the display part 203 of the mounting control apparatus 20, and is displayed on the display part 33 of the replenishment plan management apparatus 30, and the portable terminal device 30T (step b12).
- the operator OP recognizes the replenishable time TT until the parts replenishment work becomes possible, and then the replenishable time TT has elapsed. It can be understood that it is only necessary to wait until it is done. The operator OP can carry out the component supply work within the component supply time limit during the current round, although the waiting time until the component supply operation becomes possible is somewhat longer.
- FIG. 18A and 18B are flowcharts showing a third specific example of the work guidance process executed by the work guidance unit 208.
- FIG. In the work target area indicated by the work target area number J42 in the work list information JH4, when the operator OP performs a read operation on the supply component type information JH02, the component mounter 2 in which the work target area is set is displayed.
- Supply component type information JH02 is input to the mounting control device 20 via the external input / output unit 204 (step c1).
- the work determination unit 207 When the supply part type information JH02 is input, the work determination unit 207, based on the work list information JH4 transmitted from the supply plan management device 30, represents a part type that represents the same type of part as the part type of the supply part type information JH02.
- the set position information J12 associated with the information J14 is extracted.
- the work determination unit 207 determines whether or not a component supply operation can be performed on the component supply target device arranged at the set position represented by the extracted set position information J12 (step c2).
- the work guide unit 208 permits the operation of the component supply operation on the component supply target device. Is generated (step c3).
- the work permission information JH50 is displayed on the display unit 203 of the mounting control device 20, and is also displayed on the display unit 33 of the replenishment plan management device 30 and the mobile terminal device 30T (step c4).
- the operator OP can perform the component supply work regarding the component storage member for supply that has performed the reading operation of the supply component type information JH02. Can be grasped.
- the operation guide unit 208 is represented by the replenishable time information J42 included in the operation list information JH4. It is determined whether the available replenishment time TT is less than a predetermined threshold value or more than a threshold value (step c5).
- the work guide unit 208 When the replenishment available time TT is less than the threshold, the work guide unit 208 generates the first guide information JH51 as the execution procedure guide information JH5 (step c6).
- the first guidance information JH51 includes information related to the replenishable time TT, and is information for notifying that the execution of the component replenishment operation for the component replenishment target device is awaited until the replenishable time TT elapses.
- the first guidance information JH51 is displayed on the display unit 203 of the mounting control device 20, and is also displayed on the display unit 33 of the replenishment plan management device 30 and the mobile terminal device 30T (step c7).
- the operator OP recognizes the replenishable time TT until the parts replenishment work becomes possible, and then the replenishable time TT has elapsed. It can be understood that it is only necessary to wait until it is done.
- the work guide unit 208 determines the parts replenishment restriction represented by the warning time information J43, the stop time information J44, and the production available time information J45 included in the work list information JH4. Browse time.
- the work guide unit 208 determines whether the part replenishment restriction time is equal to or longer than the cyclic cycle PP or less than the cyclic cycle PP (step c8).
- the work guide unit 208 If the replenishable time TT is equal to or greater than the threshold value and the component replenishment limit time is equal to or greater than the cyclic period PP, the work guide unit 208 generates the second guidance information JH52 as the execution procedure guidance information JH5 (step) c9).
- the 2nd guidance information JH52 is information which guides the implementation procedure which postpones implementation of parts supply work at the next patrol in worker's OP in work area TWA.
- the second guidance information JH52 is displayed on the display unit 203 of the mounting control device 20, and is also displayed on the display unit 33 of the replenishment plan management device 30 and the mobile terminal device 30T (step c10).
- the worker OP does not wait until the replenishable time TT elapses at the time of this round, and supplies parts at the next round. Parts replenishment work can be carried out within the time limit.
- the hold list information JH6 is information that lists parts supply target devices that should temporarily hold the execution of the parts supply work.
- the hold list information JH6 is information in which the work target area number information J41, the mounting model information J11, the set position information J12, the device type information J13, the parts type information J14, and flag information J61 are associated with each other.
- the flag information J61 guides the execution procedure of the component supply operation for the component supply target device arranged at the set position represented by the set position information J12 in the work target region represented by the work target region number information J41. Flag.
- the work guide unit 208 holds the hold list information JH6 to which the “hold” flag indicating that the execution of the parts supply work is temporarily held is added as the flag information J61. Is generated.
- the work guide unit 208 When the work guide unit 208 generates the hold list information JH6, the work guide unit 208 generates the third guide information JH53 as the execution procedure guide information JH5 based on the hold list information JH6 (step c12).
- the third guidance information JH53 temporarily suspends the execution of the component supply work for the component supply target device arranged at the set position represented by the set position information J12 of the hold list information JH6, and the next component supply target device It is the information that recommends the implementation of parts replenishment work for.
- the third guide information JH53 is, for example, “The supply component storage member that has been read cannot be supplied to the AF disposed at the set position S13. The component supply operation for this AF is temporarily suspended. , Go to the parts supply work for the next parts supply target device.
- the third guidance information JH53 is displayed on the display unit 203 of the mounting control device 20, and is also displayed on the display unit 33 of the replenishment plan management device 30 and the mobile terminal device 30T (step c13).
- the worker OP temporarily suspends the execution of the parts supply operation corresponding to the third guidance information JH53, for example, another parts supply Work can be carried out.
- the work guide unit 208 determines whether or not the replenishable time TT represented by the replenishable time information J42 included in the work list information JH4 has elapsed (step c14). When the replenishable time TT has elapsed, the work guide unit 208 determines whether or not the parts replenishment work (pending work) for which the work has been temporarily suspended is registered in the hold list information JH6 (step c15). ). When the “hold” flag is added to the flag information J61 of the hold list information JH6, the work guide unit 208 determines that the hold work is registered in the hold list information JH6. If the suspended work is not registered in the suspended list information JH6, the work guidance unit 208 ends the work guidance process.
- the work guide unit 208 changes the flag information J61 of the hold list information JH6 from the “hold” flag to “work possible” after the replenishment possible time TT has elapsed. ”Flag (see FIG. 19B).
- the “work ready” flag indicates that the parts supply work can be performed after the supply possible time TT has elapsed.
- the work guide unit 208 generates the fourth guide information JH54 as the execution procedure guide information JH5 (step c16).
- the 4th guidance information JH54 is information which requests work implementation about the part replenishment work temporarily suspended after progress of replenishment possible time TT.
- the 4th guidance information JH54 is message information, such as "Please carry out the component replenishment operation
- 4th guidance information JH54 is displayed on the display part 203 of the mounting control apparatus 20, and is displayed on the display part 33 of the replenishment plan management apparatus 30, and the portable terminal device 30T (step c17).
- the worker OP grasps that the parts replenishment work temporarily suspended can be performed, and this time The part replenishment work can be performed within the part replenishment time limit.
- a component replenishment management system includes a plurality of component mounters that mount a component supplied from a plurality of component supply devices capable of mounting a plurality of component storage members on a substrate and produce a component mounting substrate. Further, in one or a plurality of component mounting lines, a system for managing a component replenishment operation for each of the plurality of component supply devices, which is performed by an operator who circulates in a work area set in the component mounting line. .
- the component replenishment management system monitors the supply status of components in each of the plurality of component supply devices, and the preceding component storage member in which the component supply among the plurality of component storage members is performed first is out of components.
- a component supply monitoring unit for estimating a replenishment possible time representing a time until the component replenishment operation for replenishing a new replenishment component storage member is possible for each of the plurality of component supply devices;
- An information acquisition unit that acquires supply component type information for specifying a component type of a component stored in a component storage member; and at the timing when the supply component type information is acquired by the information acquisition unit, the component supply device
- a determination unit that determines whether or not the component supply operation for supplying the component storage member for supply is performed, and the determination unit determines that the component supply operation cannot be performed. If the, and a working guide unit that generates implementation procedures guidance information for guiding the implementation procedure based on the replenishment time of the said parts supplying work.
- the component supply monitoring unit monitors the component supply status in the component supply device attached to each component mounter on the component mounting line.
- the component supply monitoring unit estimates, for each component supply device, a replenishable time that represents a time until a worker can perform a component replenishment operation.
- the worker can carry out the component supply operation for the component supply device, using the replenishable time estimated by the component supply monitoring unit as a guide.
- the determination unit determines whether or not the component supply operation can actually be performed.
- the timing at which the determination unit determines whether or not the component supply operation can be performed is the timing at which the supply component type information is acquired by the information acquisition unit.
- This supply component type information is information for specifying the component type of the component stored in the supply component storage member, and is read from the supply component storage member by the operator's operation during the component supply operation. Information. That is, the determination unit determines whether or not the component replenishment operation can be performed at the timing when the operator performs the component replenishment operation using the component storage member for replenishment and performs the reading operation of the replenishment component type information. . If it is determined at this timing that the parts replenishment work cannot be performed, the worker does not know how to deal with the situation and may be confused.
- This execution procedure guidance information is information for guiding the execution procedure based on the replenishable time of the parts supply work.
- the worker can grasp the execution procedure of the component supply operation that cannot be performed at the timing when the supply component type information is read. Thereby, the confusion resulting from the unknown handling can be prevented, and the efficiency of the parts replenishment work by the operator can be improved.
- a cyclic period representing the predetermined time is set in advance when the worker circulates within the work area at regular intervals to perform the parts supply work. Then, the work guidance unit determines whether the replenishable time is less than a predetermined threshold or greater than or equal to the threshold, and if the replenishable time is less than the threshold, the replenishable time has elapsed. First guidance information for informing that the execution of the parts replenishment operation is awaited until it is performed is generated as the execution procedure guidance information, and when the replenishable time is equal to or greater than the threshold, the work by the operator
- the configuration may be such that second guidance information that recommends deferring execution of the parts replenishment work during the next round in the area is generated as the implementation procedure guidance information.
- the work guidance unit generates the first guidance information as the execution procedure guidance information when the replenishable time is less than the threshold value, that is, when the time until the parts replenishment work becomes possible is relatively short.
- the first guidance information is information for guiding an execution procedure of waiting for execution of parts supply work until the replenishable time elapses.
- the work guide unit when the replenishable time is equal to or greater than the threshold value, that is, when the time until the parts replenishment work becomes possible is relatively long, the work guide unit generates second guidance information as the execution procedure guidance information.
- the second guidance information is information for guiding an execution procedure in which the execution of the parts supply work is postponed during the next patrol in the work area by the worker. By referring to the second guidance information, the worker can grasp that the parts supply work should be postponed at the next patrol without waiting until the replenishable time elapses.
- the component supply monitoring unit sets a component supply limit time until the component supply operation needs to be performed, which is longer than the replenishable time. It is configured to estimate for each device.
- the work guide unit may be configured to generate the second guidance information when it is determined that the replenishable time is equal to or greater than the threshold and the component replenishment limit time is equal to or greater than the cyclic period. .
- the component supply member for replenishment is inserted into the component supply device before all the components of the component storage members mounted on the component supply device run out. It is necessary to carry out parts replenishment work for replenishing parts. If the parts replenishment restriction time until the execution of this parts replenishment work is more than the cyclic cycle in the work area by the worker, even during the next round in the work area by the worker, Parts replenishment work can be performed within the parts replenishment time limit. Therefore, when the replenishable time is equal to or greater than the threshold and the time until the component replenishment work becomes possible is relatively long and the component replenishment limit time is equal to or greater than the cyclic period, the work guide unit performs the component replenishment operation.
- Second guidance information that is recommended to be postponed at the next patrol is generated.
- the worker should perform the parts replenishment work within the parts replenishment time limit at the next round without waiting until the replenishable time elapses during the current round. Can do.
- the operation guide unit determines that the replenishable time is equal to or greater than the threshold value and the component supply limit time is less than the cyclic period, the first guidance is provided.
- generates information may be sufficient.
- the work guide unit If the parts replenishment limit time is less than the cyclic period, the parts replenishment work cannot be carried out within the parts replenishment limit time during the next round in the work area by the worker. Therefore, when the parts replenishment limit time is less than the cyclic period, the work guide unit generates first guidance information for informing that the system waits until the replenishable time elapses. By referring to the first guide information, the worker must perform the parts replenishment work within the parts replenishment time limit during the current round, although the waiting time until the parts replenishment work becomes possible is somewhat longer. Can do.
- the component replenishment management system when the operation guide unit determines that the replenishable time is equal to or greater than the threshold value, and the component replenishment restriction time is less than the cyclic period, the component replenishment operation is performed.
- the work guide unit when the replenishable time is equal to or greater than the threshold value and the part replenishment limit time is less than the cyclic period, the work guide unit notifies the temporary suspension of the execution of the parts replenishment work.
- the fourth guide information for requesting execution of the parts replenishment work after the replenishable time elapses.
- the worker can temporarily hold the part supply work corresponding to the third guide information, and perform another part supply work, for example. Then, by referring to the fourth guide information, the worker grasps that the temporarily reserving operation of the parts can be carried out, and the part is within the time limit for parts supply during this round. Replenishment work can be performed.
- a plurality of component mounters for mounting a component supplied from a plurality of component supply devices capable of mounting a plurality of component storage members on a substrate to produce a component mounting substrate are connected.
- One or a plurality of component mounting lines, and the component that manages a component replenishment operation for each of the plurality of component supply devices, performed by an operator who circulates in a work area set in the component mounting line A replenishment management system.
- the component supply management system capable of improving the efficiency of the component supply operation for the component supply device
- the delay of the component supply operation by the operator during the production of the component mounting board is provided. Due to this, the supply of parts from the parts supply device is stopped as much as possible. Thereby, the fall of the production efficiency of a component mounting board can be suppressed.
- a component replenishment management system capable of improving the efficiency of component replenishment work for a component supply device attached to each component mounter of a component mounting line, and a component provided with the same An implementation system can be provided.
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Manufacturing & Machinery (AREA)
- Finance (AREA)
- Accounting & Taxation (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Supply And Installment Of Electrical Components (AREA)
Abstract
部品補給管理システム(3)において部品供給監視部(341)は、部品補給作業が可能となるまでの時間を表す補給可能時間を部品供給装置(241,245,246)ごとに推定する。作業判定部(207)は、外部入出力部(204)により補給部品種情報(JH02)が取得されたタイミングにおいて、実際に部品補給作業の実施が可能であるか否かの可否を判定する。作業判定部(207)により部品補給作業の実施が不可であると判定された場合、作業案内部(208)は、実施手順案内情報(JH5)を生成する。この実施手順案内情報(JH5)は、部品補給作業の補給可能時間(TT)に基づく実施手順を案内するための情報である。
Description
本発明は、部品実装ラインの各部品実装機に付設された複数の部品供給装置の各々に対する部品補給作業を管理する部品補給管理システム、及びそれを備えた部品実装システムに関する。
プリント配線板等の基板上に電子部品(以下、単に「部品」という)が搭載された部品搭載基板を生産する部品実装ラインは、部品を基板上に搭載する複数の部品実装機を連結して構成されている。各部品実装機には、部品収納部材を装着可能な部品供給装置が複数並設されている。部品実装ラインの各部品実装機による部品搭載基板の生産に際しては、部品搭載基板の生産計画に基づいて、生産に必要な部品収納部材を部品供給装置に装着する等の段取り作業が作業者によって行われ、その後、生産が開始される。部品搭載基板の生産中においては、部品供給装置からの部品の供給が停止し、部品搭載基板の生産が停止しないように、部品搭載基板の生産に伴う部品の消費量に応じて、部品供給装置に対して部品収納部材を補給する部品補給作業が作業者によって行われる。
作業者による部品補給作業の効率化を図るための技術が、例えば特許文献1に開示されている。特許文献1に開示される技術では、複数の部品実装機が配置された部品実装ラインにおいて、各部品実装機に付設された複数の部品供給装置(フィーダー)の部品切れを予告する時間帯を予測する処理を実行し、その部品切れ予告時間帯に部品補給作業を行う作業者を割り当てる処理を実行する。
各部品供給装置に対する部品収納部材の補給タイミングは、あくまでも予測であって、実際に作業者が部品補給作業を実施しようとしたときに、その作業の対象となる部品供給装置に対する部品補給作業の実施が不可である場合がある。このような場合、作業者は、どのように対処すればよいのか分からず、混乱してしまう。このため、作業者による部品補給作業の作業効率が低下する虞がある。
本発明は、このような事情に鑑みてなされたものであり、その目的とするところは、部品実装ラインの各部品実装機に付設された部品供給装置に対する部品補給作業の効率化を図ることが可能な部品補給管理システム、及びそれを備えた部品実装システムを提供することにある。
本発明の一の局面に係る部品補給管理システムは、部品収納部材を複数装着可能な複数の部品供給装置から供給された部品を基板に搭載し部品搭載基板を生産する部品実装機が複数連結された1つ又は複数の部品実装ラインにおいて、当該部品実装ラインに設定された作業エリア内を巡回する作業者によって実施される、前記複数の部品供給装置の各々に対する部品補給作業を管理するシステムである。この部品補給管理システムは、前記複数の部品供給装置の各々における部品の供給状況を監視し、前記複数の部品収納部材のうちの部品供給が先行して行われる先行の部品収納部材が部品切れとなり、新たな補給用の部品収納部材を補給する前記部品補給作業が可能となるまでの時間を表す補給可能時間を、前記複数の部品供給装置ごとに推定する部品供給監視部と、前記補給用の部品収納部材に収納された部品の部品種を特定するための補給部品種情報を取得する情報取得部と、前記情報取得部により前記補給部品種情報が取得されたタイミングにおいて、前記部品供給装置に対して前記補給用の部品収納部材を補給する前記部品補給作業の実施の可否を判定する判定部と、前記判定部により前記部品補給作業の実施が不可であると判定された場合に、当該部品補給作業の前記補給可能時間に基づく実施手順を案内する実施手順案内情報を生成する作業案内部と、を備える。
本発明の他の局面に係る部品実装システムは、部品収納部材を複数装着可能な複数の部品供給装置から供給された部品を基板に搭載し部品搭載基板を生産する部品実装機が複数連結された1つ又は複数の部品実装ラインと、前記部品実装ラインに設定された作業エリア内を巡回する作業者によって実施される、前記複数の部品供給装置の各々に対する部品補給作業を管理する、上記の部品補給管理システムと、を備える。
本発明の目的、特徴及び利点は、以下の詳細な説明と添付図面とによって、より明白となる。
以下、本発明の実施形態に係る部品補給管理システム及び部品実装システムについて図面に基づいて説明する。
[部品実装システムの全体構成]
図1は、本発明の一実施形態に係る部品実装システム1の構成を概略的に示す図である。部品実装システム1は、部品実装ライン2Lと、部品補給管理システム3と、生産計画管理装置4と、基板情報管理装置5と、作業者により操作されるカート6と、を備える。部品補給管理システム3は、部品実装ライン2Lを構成する各部品実装機2に備えられる実装制御装置20と、補給計画管理装置30と、作業者が携帯する携帯端末装置30Tとを含む。部品実装システム1においては、補給計画管理装置30及び携帯端末装置30Tは、各実装制御装置20とデータ通信可能に接続され、生産計画管理装置4及び基板情報管理装置5は、補給計画管理装置30とデータ通信可能に接続されている。
図1は、本発明の一実施形態に係る部品実装システム1の構成を概略的に示す図である。部品実装システム1は、部品実装ライン2Lと、部品補給管理システム3と、生産計画管理装置4と、基板情報管理装置5と、作業者により操作されるカート6と、を備える。部品補給管理システム3は、部品実装ライン2Lを構成する各部品実装機2に備えられる実装制御装置20と、補給計画管理装置30と、作業者が携帯する携帯端末装置30Tとを含む。部品実装システム1においては、補給計画管理装置30及び携帯端末装置30Tは、各実装制御装置20とデータ通信可能に接続され、生産計画管理装置4及び基板情報管理装置5は、補給計画管理装置30とデータ通信可能に接続されている。
部品実装ライン2Lは、複数の部品実装機2が連結されて構成されている。部品実装ライン2Lにおいて、複数の部品実装機2の各々は、部品実装機2間において基板を搬送する連結コンベアによって、直線状に並ぶように連結される。図1に示す例では、部品実装ライン2Lにおいて、6台の部品実装機2が連結されている。なお、図1では、1つの部品実装ライン2Lのみを図示しているが、部品実装システム1は、複数の部品実装ライン2Lを備えた構成であってもよい。
<部品実装機の構成>
まず、図2を参照して部品実装機2の構成を説明する。図2は、部品実装機2の構成を示す平面図である。なお、以下では、方向関係についてはXY直交座標軸を用いて説明する。X軸方向の一方向側を「+X側」と称し、X軸方向の一方向側とは反対の他方向側を「-X側」と称する。また、Y軸方向の一方向側を「+Y側」と称し、Y軸方向の一方向側とは反対の他方向側を「-Y側」と称する。
まず、図2を参照して部品実装機2の構成を説明する。図2は、部品実装機2の構成を示す平面図である。なお、以下では、方向関係についてはXY直交座標軸を用いて説明する。X軸方向の一方向側を「+X側」と称し、X軸方向の一方向側とは反対の他方向側を「-X側」と称する。また、Y軸方向の一方向側を「+Y側」と称し、Y軸方向の一方向側とは反対の他方向側を「-Y側」と称する。
部品実装機2は、基板Pに部品を搭載して部品搭載基板を生産する装置である。部品実装機2は、本体フレーム21と、移動フレーム22と、コンベア23と、部品供給部24と、ヘッドユニット25と、第1駆動機構26と、第2駆動機構27と、基板支持装置28とを備える。
本体フレーム21は、部品実装機2を構成する各部が配置される構造体であり、X軸方向及びY軸方向の両方向と直交する方向から見た平面視で略矩形状に形成されている。コンベア23は、X軸方向に延び、本体フレーム21に配置される。コンベア23は、基板PをX軸方向に搬送する。コンベア23上を搬送される基板Pは、所定の作業位置(基板P上に部品が搭載される部品搭載位置)に、基板支持装置28によって位置決めされるようになっている。基板支持装置28は、バックアップピンにより基板Pを支持することにより、当該基板Pを位置決めする。
部品供給部24は、本体フレーム21におけるY軸方向の+Y側及び-Y側の領域部分にそれぞれ、X軸方向に2箇所ずつ合計4箇所に配置される。部品供給部24は、基板Pに搭載される部品を供給するものであり、複数の部品供給装置が並設される。部品供給部24に配置される部品供給装置については後述する。
移動フレーム22は、X軸方向に延び、本体フレーム21に、所定の移動方向(Y軸方向)に移動可能に支持される。この移動フレーム22にヘッドユニット25が搭載されている。ヘッドユニット25は、X軸方向に移動可能となるように、移動フレーム22に搭載される。すなわち、ヘッドユニット25は、移動フレーム22の移動に伴ってY軸方向に移動可能であり、且つ、移動フレーム22に沿ってX軸方向に移動可能である。ヘッドユニット25は、部品供給部24とコンベア23により搬送された基板Pの所定の作業位置とにわたって移動可能とされ、部品供給部24から部品を取り出すとともに、その取り出した部品を基板P上に搭載(実装)する。ヘッドユニット25は、吸着ノズル251を備えている。吸着ノズル251は、部品供給部24により供給された部品を吸着して保持可能な保持具である。吸着ノズル251は、電動切替弁を介して負圧発生装置、正圧発生装置及び大気の何れかに連通可能とされている。つまり、吸着ノズル251に負圧が供給されることで当該吸着ノズル251による部品の吸着保持(部品の取り出し)が可能となり、その後、正圧が供給されることで当該部品の吸着保持が解除される。
第1駆動機構26は、本体フレーム21の+X側及び-X側の端部に配設される。第1駆動機構26は、移動フレーム22をY軸方向に移動させる機構である。第1駆動機構26は、例えば、駆動モーターと、Y軸方向に延び、駆動モーターに連結されるボールねじ軸と、移動フレーム22に配設されてボールねじ軸と螺合するボールナットと、を含んで構成される。このような構成の第1駆動機構26は、駆動モーターによるボールねじ軸の回転駆動に伴ってボールナットがボールねじ軸に沿って進退することにより、移動フレーム22をY軸方向に移動させる。
第2駆動機構27は、移動フレーム22に配設される。第2駆動機構27は、ヘッドユニット25を移動フレーム22に沿ったX軸方向に移動させる機構である。第2駆動機構27は、第1駆動機構26と同様に、例えば、駆動モーターと、X軸方向に延び、駆動モーターに連結されるボールねじ軸と、ヘッドユニット25に配設されてボールねじ軸と螺合するボールナットと、を含んで構成される。このような構成の第2駆動機構27は、駆動モーターによるボールねじ軸の回転駆動に伴ってボールナットがボールねじ軸に沿って進退することにより、ヘッドユニット25をX軸方向に移動させる。
<部品供給装置について>
部品供給部24に並設される部品供給装置は、部品供給方式の違いにより、テープフィーダー、トレイフィーダー及びスティックフィーダーに大別される。部品実装機2の各部品供給部24には、部品供給方式が同一の1種の部品供給装置が配置されていてもよいし、部品供給方式が異なる2種以上の部品供給装置がそれぞれ配置されていてもよい。
部品供給部24に並設される部品供給装置は、部品供給方式の違いにより、テープフィーダー、トレイフィーダー及びスティックフィーダーに大別される。部品実装機2の各部品供給部24には、部品供給方式が同一の1種の部品供給装置が配置されていてもよいし、部品供給方式が異なる2種以上の部品供給装置がそれぞれ配置されていてもよい。
(テープフィーダー)
まず、部品供給装置としてのテープフィーダーは、部品収納部材としてのリールに、部品を所定間隔おきに収納した部品収納テープが巻回され、そのリールから部品収納テープが送出されるように構成されている。テープフィーダーは、一般的に、スプライシングフィーダーと自動ローディングフィーダー(AF)とに大別される。スプライシングフィーダーは、1本のリールが装着されるように構成されており、そのリールからの部品収納テープの送出が完了して部品切れになる前に、当該部品収納テープから後続の部品収納テープへと移行させるために、先行する部品収納テープの末端部と後続の部品収納テープの先端部との間をスプライシングテープ等で貼り付けて両者を接続する。すなわち、スプライシングフィーダーでは、1本のリールからの部品収納テープの送出が完了して部品切れになる前に、スプライシングテープ等で貼り付けるスプライシング作業が行われるので、後続の部品収納テープが巻回されたリールの補給タイミングは、先行の部品収納テープの送出が完了した時点に拘束される。
まず、部品供給装置としてのテープフィーダーは、部品収納部材としてのリールに、部品を所定間隔おきに収納した部品収納テープが巻回され、そのリールから部品収納テープが送出されるように構成されている。テープフィーダーは、一般的に、スプライシングフィーダーと自動ローディングフィーダー(AF)とに大別される。スプライシングフィーダーは、1本のリールが装着されるように構成されており、そのリールからの部品収納テープの送出が完了して部品切れになる前に、当該部品収納テープから後続の部品収納テープへと移行させるために、先行する部品収納テープの末端部と後続の部品収納テープの先端部との間をスプライシングテープ等で貼り付けて両者を接続する。すなわち、スプライシングフィーダーでは、1本のリールからの部品収納テープの送出が完了して部品切れになる前に、スプライシングテープ等で貼り付けるスプライシング作業が行われるので、後続の部品収納テープが巻回されたリールの補給タイミングは、先行の部品収納テープの送出が完了した時点に拘束される。
一方、AFは、複数のリールが装着可能に構成されており、複数のリールのうち、部品供給が先行して行われる部品収納テープ(以下、「先行の部品収納テープ」という)が巻回された先行のリールからの部品収納テープの送出が完了すると、AFに挿入済みの後続する部品収納テープがあればスプライシング作業を行うことなく自動的に、後続する部品収納テープが巻回された後続のリールから部品収納テープが送出される。すなわち、AFにおいて、新たなリールの補給タイミングは、先行の部品収納テープが巻回された先行のリールからの部品収納テープの送出が完了した時点に拘束されることなく、AFに後続する部品収納テープを挿入可能な状態であればいつでも部品補給作業を行うことができるため、スプライシングフィーダーに比べて自由度がある。
本実施形態では、部品供給部24に配置されるテープフィーダーとしては、スプライシングフィーダーとAFとが混在しても構わないが、部品収納部材としてのリールを複数装着可能なAFが、部品供給装置として複数配置されている。この部品供給装置としてのAFからなるテープフィーダーについて、図3及び図4を参照して説明する。図3はAF241の構成を概略的に示す図であり、図4はAF241に装着される部品収納テープ243を示す斜視図である。
部品供給部24においてAF241は、台車242に配置される。AF241は、部品収納テープ243が巻回された複数のリール2420を装着可能である。
AF241の構成を説明するに先立って、図4を参照して部品収納テープ243を説明する。部品収納テープ243は、キャリアテープ2431とカバーテープ2434とからなる。キャリアテープ2431は、部品Eを収納する部品収納部2433が所定の間隔をおいて複数配列されたテープである。また、キャリアテープ2431には、その幅方向一端部に、後述するAF241における第1スプロケット2412A及び第2スプロケット2413Aの歯部と嵌合し、第1スプロケット2412A及び第2スプロケット2413Aにより部品収納テープ243を送出させるための搬送力が伝達される搬送力伝達孔2432が所定の間隔を有して配列されている。カバーテープ2434は、部品収納部2433を覆うようにキャリアテープ2431に貼付されたテープである。
図3に示すように、AF241は、部品供給部24に設けられたフィーダー取付部2417Aに取り付けられている。詳しくは、部品供給部24には、フィーダー取付部2417Aと、リール支持部2419とが設けられている。フィーダー取付部2417Aには、X軸方向に一定間隔で並びかつY軸方向に互いに平行に延びる複数のスロット2417Bと、これらスロット2417Bよりも前側の位置でX軸方向に延びる固定台2417Cとが設けられている。そして、各スロット2417BにAF241がセットされ、各AF241が固定台2417Cに固定されている。これにより、部品供給部24において複数のAF241が台車242に並設されている。
リール支持部2419は、フィーダー取付部2417Aの後方下側に位置しており、リール2420を回転可能に支持する第1リールホルダ2419A及び第2リールホルダ2419Bを、上下方向に互いに離間した状態で支持する。第1リールホルダ2419A及び第2リールホルダ2419Bの各々に支持されるリール2420には、部品収納テープ243が巻回されている。
AF241は、フィーダー本体2411を備えている。AF241は、スロット2417Bにフィーダー本体2411が挿入(セット)された状態で、固定台2417Cに固定されている。フィーダー本体2411には、第1テープ送出部2412を構成する第1スプロケット2412Aと、その第1スプロケット2412Aに対してリール支持部2419から離れるようにY軸方向に離間した、第2テープ送出部2413を構成する第2スプロケット2413Aとが、回転可能に支持されている。第1スプロケット2412A及び第2スプロケット2413Aはそれぞれ、周方向に所定の間隔を有して配列した複数の歯部を備える。第1スプロケット2412A及び第2スプロケット2413Aの歯部は、部品収納テープ243のキャリアテープ2431に形成された搬送力伝達孔2432と嵌合可能である。
第1リールホルダ2419A及び第2リールホルダ2419Bの各々に支持されるリール2420に巻回された部品収納テープ243は、リール支持部2419の上端に配設されたガイドローラー2418にガイドされつつ第1スプロケット2412A及び第2スプロケット2413Aに導かれる。搬送力伝達孔2432が第1スプロケット2412A及び第2スプロケット2413Aの歯部と嵌合された部品収納テープ243は、第1スプロケット2412A及び第2スプロケット2413Aの回転により送出され、部品供給位置P1で部品Eの取り出しが行われる。
AF241は、更に、フィーダー本体2411の後端部に着脱可能に固定されたテープ支持部材2414と、フィーダー本体2411の後部上面に配置された操作入力部2415と、第1、第2テープ検知センサ2416A、2416Bと、を備えている。
テープ支持部材2414は、図3に示すように、フィーダー本体2411の内部において部品収納テープ243が走行するテープ走行通路2414Aの後端部分を、上下の2つの通路(上側通路2414AA、下側通路2414AB)に分けるとともに、上側通路2414AAを通過する部品収納テープ243を下側から支持するものである。詳しくは、テープ走行通路2414Aの後端部分は、その前方から後方に向かって上下方向に広がる形状とされている。テープ支持部材2414は、フィーダー本体2411の後方からテープ走行通路2414A内に挿入され、当該フィーダー本体2411に着脱可能に固定されている。これにより、テープ走行通路2414Aの後端部分が、テープ支持部材2414によって上側通路2414AAと下側通路2414ABとに分けられている。
第1テープ検知センサ2416A及び第2テープ検知センサ2416Bは、テープ走行通路2414Aに臨む状態で設けられており、テープ走行通路2414Aを通過する部品収納テープ243の有無を検出する。より具体的には、第1テープ検知センサ2416Aは、上側通路2414AAと下側通路2414ABとの合流地点よりも前方であってテープ走行通路2414Aに下方から臨む位置に設けられている。一方、第2テープ検知センサ2416Bは、上側通路2414AAに上方から臨む位置に設けられており、これにより、上側通路2414AAにおける部品収納テープ243の有無を検知する。
操作入力部2415は、作業者が必要に応じて部品収納テープ243の送出及び逆送を行うものである。
以上のように構成されるAF241の部品供給動作は、次の通りである。まず準備作業として、作業者は、リール支持部2419の下段の第1リールホルダ2419Aに先行する部品収納テープ243が巻回されたリール2420を取り付ける。この際、作業者は、リール2420に設けられた部品種特定用バーコードBR(記録部、図3参照)をバーコードリーダ7(図7)で読み取る読取操作を行う。部品種特定用バーコードBRは、リール2420に巻回された部品収納テープ243に収納された部品Eの部品種を特定するための補給部品種情報等をコード化して記録されたものである。
作業者は、第1リールホルダ2419Aに取り付けたリール2420に巻回された部品収納テープ243の先端部をフィーダー本体2411の後方から上側通路2414AAに挿入する。これにより、先行する部品収納テープ243の先端部は、第1スプロケット2412Aと嵌合された状態で、テープ支持部材2414により支持される。その後、作業者は、操作入力部2415を操作し、第1スプロケット2412Aを回転させる指示を入力して部品収納テープ243を送出させ、部品供給テープ243の先端部を第2スプロケット2413Aと嵌合させる。
上記の準備作業が終了した状態で、AF241の部品供給動作が開始される。AF241において、第2スプロケット2413Aは回転し、これにより部品収納テープ243を送出する。なお、第1スプロケット2412Aは空転するように構成されており、このとき、第2スプロケット2413Aを回転させるのみで部品収納テープ243を送出することができる。
次に、リール2420から先行する部品収納テープ243が送出されている状態で、作業者は、フィーダー本体2411からテープ支持部材2414を取り外す。テープ支持部材2414が取り外されると、部品収納テープ243がその自重によってテープ走行通路2414A底面部に変位する。これにより、先行する部品収納テープ243の第1スプロケット2412Aとの嵌合が解除される。このとき、部品収納テープテープ243は、第2スプロケット2413Aと嵌合されているので、第1スプロケット2412Aとの嵌合が解除されても、第2スプロケット2413Aの回転により送出され続ける。
次に、リール2420から先行する部品収納テープ243が送出されている状態で、作業者は、テープ支持部材2414をフィーダー本体2411に装着し、先行する部品収納テープ243が巻回されたリール2420を下段の第1リールホルダ2419Aから上段の第2リールホルダ2419Bに移動させる。次に、上段の第2リールホルダ2419Bに支持されたリール2420から先行する部品収納テープ243が送出されている状態で、作業者は、後続する部品収納テープ243が巻回されたリール2420を下段の第1リールホルダ2419Aに取り付け、その部品収納テープ243の先端部をフィーダー本体2411の後方から上側通路2414AAに挿入する。これにより、後続する部品収納テープ243の先端部は、第1スプロケット2412と嵌合された状態で、テープ支持部材2414により支持される。このようにして、リール2420に巻回される先行の部品収納テープ243の部品切れが発生していない状態で、後続の部品収納テープ243が巻回されたリール2420を装着することができる。なお、後続の部品収納テープ243が巻回されたリール2420を装着する際も、先行の部品収納テープ243の場合と同様に、作業者は、リール2420に設けられた部品種特定用バーコードBRをバーコードリーダ7(図7)で読み取る読取操作を行う。
その後、上段の第2リールホルダ2419Bに支持されたリール2420から、先行する部品収納テープ243が全て引き出され、その後端が第2テープ検知センサ2416Bの位置を通過して、先行する部品収納テープ243が無いことが検知されると、下段の第1リールホルダ2419Aに支持されたリール2420からの、後続する部品収納テープ243の送出が自動的に開始される。そして、作業者は、部品切れとなったリール2420を上段の第2リールホルダ2419Bから取り外し、後続する部品収納テープ243が巻回されたリール2420を下段の第1リールホルダ2419Aから上段の第2リールホルダ2419Bに移動させる。このとき、作業者は、部品収納テープ243が巻回された新たなリールを、AF241に対して補給することができる。AF241に対して補給された新たなリールは、作業者によって下段の第1リールホルダ2419Aに取り付けられる。この際にも、作業者は、新たなリールに設けられた部品種特定用バーコードをバーコードリーダ7で読み取る読取操作を行う。ここで、新たなリールの部品補給作業のタイミングは、先行する部品収納テープ243が巻回されたリール2420が部品切れとなる時点に拘束されることはなく、部品補給管理システム3の補給計画管理装置30によって特定される。
なお、上段の第2リールホルダ2419Bに支持されたリール2420から先行する部品収納テープ243が送出され、下段の第1リールホルダ2419Aに支持されたリール2420に巻回された後続する部品収納テープ243の先端部が上側通路2414AAに挿入された状態では、新たなリールの装着が不能である。一方、上段の第2リールホルダ2419Bに支持されたリール2420から、先行する部品収納テープ243が全て引き出され、下段の第1リールホルダ2419Aに支持されたリール2420からの、後続する部品収納テープ243の送出が自動的に開始された状態では、新たなリールの装着が可能である。
(トレイフィーダー)
次に、部品供給装置としてのトレイフィーダーについて、図5を参照して説明する。図5は、トレイフィーダー245の構成を概略的に示す図である。部品供給部24には、複数のトレイフィーダー245が並設可能である。トレイフィーダー245は、1つのマガジン2453がカバー体2451内を上下方向に移動可能に構成されている。このマガジン2453には、複数の第1パレット2454と、複数の第2パレット2455と、複数の第3パレット2456とが収容されている。
次に、部品供給装置としてのトレイフィーダーについて、図5を参照して説明する。図5は、トレイフィーダー245の構成を概略的に示す図である。部品供給部24には、複数のトレイフィーダー245が並設可能である。トレイフィーダー245は、1つのマガジン2453がカバー体2451内を上下方向に移動可能に構成されている。このマガジン2453には、複数の第1パレット2454と、複数の第2パレット2455と、複数の第3パレット2456とが収容されている。
各第1パレット2454には、複数の部品が保持された少なくとも1つの第1トレイTR1が載置されている。第1トレイTR1に保持される部品は、第1パレット2454ごとに同じ種類の部品である。同様に、各第2パレット2455には、複数の部品が保持された少なくとも1つの第2トレイTR2が載置されている。第2トレイTR2に保持される部品は、第2パレット2455ごとに同じ種類の部品である。但し、第2トレイTR2に保持される部品は、第1トレイTR1に保持される部品とは種類が異なる。また、各第3パレット2456には、複数の部品が保持された少なくとも1つの第3トレイTR3が載置されている。第3トレイTR3に保持される部品は、第3パレット2456ごとに同じ種類の部品である。但し、第3トレイTR3に保持される部品は、第1トレイTR1及び第2トレイTR2の各々に保持される部品とは種類が異なる。
第1パレット2454、第2パレット2455、及び第3パレット2456の各々は、複数の部品が保持されたトレイTR1,TR2,TR3が載置される、部品収納部材としての機能を有する。マガジン2453に収容された第1パレット2454、第2パレット2455、及び第3パレット2456の各々は、部品搭載基板の生産時に、カバー体2451から外方に突出して設けられたテーブル2452に移動され、これによってトレイTR1,TR2,TR3に保持された状態で部品が供給される。
部品搭載基板の生産中において、複数の第1パレット2454のうちの1つの第1パレット2454に載置された第1トレイTR1に保持された部品が部品切れになったとしても、他の第1パレット2454がテーブル2452に移動され、これによって第1トレイTR1に保持された状態で部品が供給される。このとき、作業者は、部品搭載基板の生産中において、部品切れとなった第1パレット2454をカバー体2451から取り出し、新たな第1パレットをトレイフィーダー245に対して補給することができる。同様に、部品搭載基板の生産中において、複数の第2パレット2455のうちの1つの第2パレット2455に載置された第2トレイTR2に保持された部品が部品切れになったとしても、他の第2パレット2455がテーブル2452に移動され、これによって第2トレイTR2に保持された状態で部品が供給される。このとき、作業者は、部品搭載基板の生産中において、部品切れとなった第2パレット2455をカバー体2451から取り出し、新たな第2パレットをトレイフィーダー245に対して補給することができる。また、部品搭載基板の生産中において、複数の第3パレット2456のうちの1つの第3パレット2456に載置された第3トレイTR3に保持された部品が部品切れになったとしても、他の第3パレット2456がテーブル2452に移動され、これによって第3トレイTR3に保持された状態で部品が供給される。このとき、作業者は、部品搭載基板の生産中において、部品切れとなった第3パレット2456をカバー体2451から取り出し、新たな第3パレットをトレイフィーダー245に対して補給することができる。
なお、新たなパレットをトレイフィーダー245に対して補給する際には、作業者は、新たなパレットに設けられた部品種特定用バーコードをバーコードリーダ7で読み取る読取操作を行う。トレイフィーダー245に対する新たなパレットの部品補給作業の計画に関する管理は、部品補給管理システム3の補給計画管理装置30によって行われる。
(スティックフィーダー)
次に、部品供給装置としてのスティックフィーダーについて、図6を参照して説明する。図6は、スティックフィーダー246の構成を概略的に示す図である。部品供給部24には、複数のスティックフィーダー246が並設可能である。スティックフィーダー246は、筒状の部品収納部材としてのスティック2469に収納された部品Eを当該スティック2469から押し出しながら供給するように構成されている。スティックフィーダー246は、フレーム本体2461と、このフレーム本体2461の上部に設けられたスティックテーブル2462、第1チャック2463及び第2チャック2464と、部品押し出し機構部2465と、ガイドフレーム2466と、一対のガイドレール2467と、搬送ベルト2468と、を備える。
次に、部品供給装置としてのスティックフィーダーについて、図6を参照して説明する。図6は、スティックフィーダー246の構成を概略的に示す図である。部品供給部24には、複数のスティックフィーダー246が並設可能である。スティックフィーダー246は、筒状の部品収納部材としてのスティック2469に収納された部品Eを当該スティック2469から押し出しながら供給するように構成されている。スティックフィーダー246は、フレーム本体2461と、このフレーム本体2461の上部に設けられたスティックテーブル2462、第1チャック2463及び第2チャック2464と、部品押し出し機構部2465と、ガイドフレーム2466と、一対のガイドレール2467と、搬送ベルト2468と、を備える。
フレーム本体2461は、上部が開口した中空箱形の形状を有している。スティックテーブル2462は、フレーム本体2461の上部内側に配設されている。スティックテーブル2462上には、複数のスティック2469を積層状態で載置することが可能である。第1チャック2463は、スティックテーブル2462上の複数のスティック2469のうちの最下位以外のスティック2469の前端部を同時に保持することが可能である。同様に、第2チャック2464は、スティックテーブル2462上の複数のスティック2469のうちの最下位以外のスティック2469の後端部を同時に保持することが可能である。
部品押し出し機構部2465は、スティックテーブル2462上の複数のスティック2469のうち、最下位のスティック2469からその前方に部品Eを押し出す。ガイドフレーム2466は、フレーム本体2461の前部に固定され、このガイドフレーム2466に一対のガイドレール2467が支持されている。そして、一対のガイドレール2467の間に搬送ベルト2468が設けられている。部品押し出し機構部2465により前方に押し出された部品Eは、一対のガイドレール2467に沿って、搬送ベルト2468によって搬送される。これにより、スティック2469に収納された部品Eが、部品供給位置に供給される。
部品供給動作に伴い最下位のスティック2469が部品切れとなると、第1及び第2チャック2463,2464が最下位以外のスティック2469を保持する。この状態でスティックテーブル2462がスティック2469の支持を解除する支持解除位置に変位することによって、最下位のスティック2469のみを自重でフレーム本体2461の内底部に落下させるようになっている。なお、部品切れのスティック2469の廃棄後は、スティックテーブル2462がスティック2469の支持位置に復帰し、第1及び第2チャック2463,2464が開放されることにより、スティックテーブル2462上に残りのスティック2469が載置され、次の(最下位の)スティック2469から部品Eの供給が行われる。
部品搭載基板の生産中において、部品切れとなったスティック2469がフレーム本体2461の内底部に落下すると、作業者は、新たなスティックをスティックフィーダー246に対して補給することができる。なお、新たなスティックをスティックフィーダー246に対して補給する際には、作業者は、新たなスティックに設けられた部品種特定用バーコードをバーコードリーダ7で読み取る読取操作を行う。
スティックフィーダー246に対する新たなスティックの部品補給作業の計画に関する管理は、部品補給管理システム3の補給計画管理装置30によって行われる。
[部品補給管理システムの構成]
部品補給管理システム3は、部品搭載基板の生産に応じて作業者によって実施される部品補給作業を管理するシステムである。部品補給作業としては、AF241に対する新たな補給用のリールの補給作業、トレイフィーダー245に対する新たな補給用のパレットの補給作業、並びにスティックフィーダー246に対する新たな補給用のスティックの補給作業、スプライシングフィーダーに対するスプライシング作業が含まれる。
部品補給管理システム3は、部品搭載基板の生産に応じて作業者によって実施される部品補給作業を管理するシステムである。部品補給作業としては、AF241に対する新たな補給用のリールの補給作業、トレイフィーダー245に対する新たな補給用のパレットの補給作業、並びにスティックフィーダー246に対する新たな補給用のスティックの補給作業、スプライシングフィーダーに対するスプライシング作業が含まれる。
図1にて説明したように、部品補給管理システム3は、部品実装ライン2Lを構成する各部品実装機2に備えられる実装制御装置20と、補給計画管理装置30と、作業者が携帯する携帯端末装置30Tとを含む。
<実装制御装置について>
部品補給管理システム3の一部を構成する実装制御装置20について、図7のブロック図を参照して説明する。実装制御装置20は、部品実装機2に備えられている。実装制御装置20は、部品実装機2の部品搭載動作と、AF241、トレイフィーダー245、及びスティックフィーダー246を含む部品供給装置の部品供給動作とを統括的に制御するとともに、作業者による部品供給装置に対する部品補給作業に関する制御を実行する装置である。実装制御装置20は、例えば制御プログラムを記憶するROM(Read Only Memory)や一時的にデータを記憶するフラッシュメモリ等の記憶装置が内蔵されたマイクロコンピュータからなり、前記制御プログラムが読み出されることにより、前記部品搭載動作及び前記部品供給動作の制御、並びに部品補給作業に関する制御を実行する。実装制御装置20は、バス20Aを介して接続された、通信部201、記憶部202、表示部203、外部入出力部204、部品搭載動作処理部205、部品供給動作処理部206、作業判定部207及び作業案内部208を含む。
部品補給管理システム3の一部を構成する実装制御装置20について、図7のブロック図を参照して説明する。実装制御装置20は、部品実装機2に備えられている。実装制御装置20は、部品実装機2の部品搭載動作と、AF241、トレイフィーダー245、及びスティックフィーダー246を含む部品供給装置の部品供給動作とを統括的に制御するとともに、作業者による部品供給装置に対する部品補給作業に関する制御を実行する装置である。実装制御装置20は、例えば制御プログラムを記憶するROM(Read Only Memory)や一時的にデータを記憶するフラッシュメモリ等の記憶装置が内蔵されたマイクロコンピュータからなり、前記制御プログラムが読み出されることにより、前記部品搭載動作及び前記部品供給動作の制御、並びに部品補給作業に関する制御を実行する。実装制御装置20は、バス20Aを介して接続された、通信部201、記憶部202、表示部203、外部入出力部204、部品搭載動作処理部205、部品供給動作処理部206、作業判定部207及び作業案内部208を含む。
通信部201は、部品供給装置、補給計画管理装置30及び携帯端末装置30Tとデータ通信するためのインターフェースである。部品実装機2の各部品供給部24に配置される部品供給装置は全て、通信部201に接続されている。外部入出力部204は、バーコードリーダ7とデータ通信するためのインターフェースである。外部入出力部204は、作業者によるバーコードリーダ7を用いた読取操作によって部品収納部材の部品種特定用バーコードから読み取られた、当該部品収納部材に収納された部品の部品種を特定するための補給部品種情報を取得する情報取得部である。
記憶部202は、図8に示す取付情報JH1を記憶する。取付情報JH1は、部品実装機2の各部品供給部24に配置される部品供給装置における部品に関する情報である。取付情報JH1は、実装機種情報J11と、セット位置情報J12と、装置種情報J13と、部品種情報J14と、先行部品残数情報J15と、合計部品残数情報J16と、部品残数警告値情報J17と、部品残数停止値情報J18とを関連付けた情報である。実装機種情報J11は、部品実装機2を特定するための情報である。セット位置情報J12は、部品供給装置の部品供給部24内での位置を表す情報である。部品供給装置がAF241である場合、セット位置情報J12は、フィーダー取付部2417Aにおけるスロット2417Bの位置で特定される情報である。各スロット2417Bには、互いに異なるスロット番号が割り当てられており、このスロット番号によって各スロット2417Bの位置、すなわちセット位置が特定されるようになっている。装置種情報J13は、部品供給装置の種類(部品供給方式の種類)を表す情報である。
部品種情報J14は、各部品供給装置により供給される部品の部品種を特定するための情報であり、部品を識別する識別情報や部品の名称を表す部品名情報などで示される。先行部品残数情報J15は、各部品供給装置において、先行の部品収納部材の部品残数を表す情報である。合計部品残数情報J16は、各部品供給装置における部品の合計部品残数を表す情報である。部品残数警告値情報J17は、各部品供給装置において、部品が部品切れとなる前の、前記合計部品残数情報J16で表される合計部品残数が、警告を報知すべき所定値(部品残数警告値)である旨を表す情報である。部品残数停止値情報J18は、特にスプライシングフィーダーに適用される情報であり、前記合計部品残数情報J16で表される合計部品残数が、スプライシング作業用にテープの送出を停止すべき所定値(部品残数停止値)である旨を表す情報である。スプライシングフィーダーにおいては、先行の部品収納テープにおける部品残数が「0:ゼロ」になってから当該先行の部品収納テープの送出を停止させても補給用のテープを繋ぎ合わせるスプライシング作業を行うことができなくなる。このため、スプライシングフィーダーにおいて、部品残数停止値情報J18にて表される部品残数停止値は、通常、「0:ゼロ」より大きな値に設定されるのが好ましい。AF241、トレイフィーダー245、及びスティックフィーダー246には、スプライシングフィーダーのように「スプライシング作業用にテープの送出を停止すべき所定値」という概念は存在しない。このため、AF241、トレイフィーダー245、及びスティックフィーダー246において、部品残数停止値情報J18にて表される部品残数停止値は、通常、実際に部品がなくなるときである「0:ゼロ」若しくは前記部品残数警告値よりも小さい値に設定されるのが好ましい。
表示部203は、通信部201によって受信される、後述の補給計画管理装置30から送信される情報や、作業案内部208によって生成される情報などを表示する。部品搭載動作処理部205は、部品実装機2による部品搭載基板の生産において、ヘッドユニット25などの動作を制御する。部品供給動作処理部206は、通信部201を介して各部品供給装置のフィーダー制御部240に制御信号を送信することにより、各部品供給装置の動作を統括的に制御する処理を行う。
作業判定部207は、外部入出力部204によりバーコードリーダ7を介して補給部品種情報が取得されたタイミングにおいて、部品供給装置に対して補給用の部品収納部材を補給する部品補給作業の実施の可否を判定する。作業案内部208は、作業判定部207により部品補給作業の実施が不可であると判定された場合に、当該部品補給作業の実施手順を案内する実施手順案内情報を生成する。これら作業判定部207及び作業案内部208の詳細については、後述する。
なお、図2に示すように、部品実装機2には、作業者による部品補給作業が行われる作業領域WAが設定されている。本実施形態では、部品実装機2には、部品実装機2の-Y側に配置された部品供給部24が含まれる作業領域WAと、部品実装機2の+Y側に配置された部品供給部24が含まれる作業領域WAとが設定されている。部品実装機2が複数連結されてなる部品実装ライン2Lにおいては、各部品実装機2の-Y側に位置する作業領域WAがX軸方向に並んで配置されるとともに、各部品実装機2の+Y側に位置する作業領域WAがX軸方向に並んで配置される。
<補給計画管理装置について>
補給計画管理装置30は、各部品実装機2に設定された作業領域WA内で作業者によって実施される部品補給作業の計画を管理する装置である。補給計画管理装置30は、図1に示すように、各部品実装機2の実装制御装置20、生産計画管理装置4及び基板情報管理装置5とデータ通信可能に接続されている。また、補給計画管理装置30は、例えばマイクロコンピュータを含み、図9のブロック図に示すように、通信部31、操作部32、表示部33、及び制御部34を備えている。
補給計画管理装置30は、各部品実装機2に設定された作業領域WA内で作業者によって実施される部品補給作業の計画を管理する装置である。補給計画管理装置30は、図1に示すように、各部品実装機2の実装制御装置20、生産計画管理装置4及び基板情報管理装置5とデータ通信可能に接続されている。また、補給計画管理装置30は、例えばマイクロコンピュータを含み、図9のブロック図に示すように、通信部31、操作部32、表示部33、及び制御部34を備えている。
通信部31は、各部品実装機2の実装制御装置20、生産計画管理装置4、及び基板情報管理装置5とのデータ通信を実現させるためのインターフェースである。通信部31は、各部品実装機2の実装制御装置20、生産計画管理装置4、及び基板情報管理装置5から送信される情報を取得し、その取得した情報を制御部34に与える。また、通信部31は、補給管理部343により生成される作業リスト情報が制御部34から与えられ、その作業リスト情報を各部品実装機2の実装制御装置20に送信(出力)する。なお、補給管理部343により生成される作業リスト情報は、実装制御装置20から作業者が携帯する携帯端末装置7に送信される。
操作部32は、タッチパネル、テンキー、スタートキー及び設定キー等を備え、補給計画管理装置30に対する作業者の操作や各種の設定を受付ける。表示部33は、実装制御装置20の作業案内部208により生成され、通信部31を介して入力された実施手順案内情報や、補給管理部343により生成される作業リスト情報を表示する。
ここで、補給計画管理装置30とデータ通信可能に接続される生産計画管理装置4及び基板情報管理装置5について説明する。生産計画管理装置4は、各部品実装機2による部品搭載基板の生産計画を管理するための装置である。生産計画管理装置4は、例えばマイクロコンピュータからなる。生産計画管理装置4は、生産計画を立案する作業者の操作によって、部品搭載基板の生産計画に関する生産計画情報を補給計画管理装置30に送信する。図10は、生産計画管理装置4から送信され、補給計画管理装置30に入力される生産計画情報JH2を説明するための図である。生産計画情報JH2は、生産順序情報J21、基板品種情報J22、生産数情報J23、及びサイクルタイム情報J24が関連付けられた情報である。生産順序情報J21は、部品搭載基板の生産順序を表す情報である。基板品種情報J22は、部品搭載基板の生産に供される基板Pの品種を表す情報である。生産数情報J23は、基板品種ごとの部品搭載基板の生産数を表す情報である。サイクルタイム情報J24は、基板Pに部品を搭載するときに1枚の部品搭載基板を仕上げるのに要する時間(秒/枚)を表す情報である。
基板情報管理装置5は、各部品実装機2による部品搭載基板の生産時に参照される基板情報を管理するための装置である。基板情報管理装置5は、例えばマイクロコンピュータからなる。基板情報管理装置5は、作業者の操作によって、基板情報を補給計画管理装置30に送信する。図11は、基板情報管理装置5から送信され、補給計画管理装置30に入力される基板情報JH3を説明するための図である。基板情報JH3は、前記基板品種情報J22、前記セット位置情報J12、前記部品種情報J14、及び部品必要数情報J31が関連付けられた情報である。部品必要数情報J31は、1枚の部品搭載基板の生産に必要な部品の必要数(数/枚)に関する情報である。基板情報JH3は、基板品種情報J22にて表される基板Pの品種が切り換えられる毎に、書き換えられる。
基板情報JH3は、補給計画管理装置30を介して各部品実装機2の実装制御装置20に送信され、各部品実装機2による部品搭載基板の生産時に参照される。具体的には、実装制御装置20の部品搭載動作処理部205は、部品実装機2による部品搭載基板の生産において、基板情報JH3に基づきヘッドユニット25などの動作を制御する。基板情報JH3において、基板品種情報J22にて表される基板品種の生産時に、セット位置情報J12にて表されるセット位置に配置された部品供給装置によって部品が供給されると、ヘッドユニット25は、部品種情報J14にて表される部品を部品供給装置から取り出すように制御される。基板情報管理装置5に格納されているのは現在生産している基板品種の基板情報JH3である。言い換えると、基板情報管理装置5に格納された基板情報JH3が補給計画管理装置30を介して実装制御装置20に送信されると、当該基板情報JH3に基づき部品搭載基板の生産が行われることとなる。従って、現在の基板情報JH3の基板品種の基板の生産が終了した後に次の基板品種の基板の生産をするためには、次の基板品種の基板情報JH3を基板情報管理装置5に格納させなければならない。
補給計画管理装置30の制御部34は、CPU(Central Processing Unit)、制御プログラムを記憶するROM(Read Only Memory)、CPUの作業領域として使用されるRAM(Random Access Memory)等から構成されている。制御部34は、CPUがROMに記憶された制御プログラムを実行することにより通信部31、操作部32及び表示部33を制御するとともに、部品補給作業の計画の管理に関する各種情報を生成する。制御部34は、図9に示すように、部品供給監視部341と、補給管理部342と、記憶部343とを含む。
図9に加えて図12~図14を参照して、制御部34における部品供給監視部341、補給管理部342及び記憶部343を説明する。図12は、部品供給監視部341及び補給管理部342の制御動作を説明するための図である。図13は、部品供給監視部341及び補給管理部342により生成される作業リスト情報JH4を説明するための図である。図14は、部品補給管理システム3の動作を説明するための図である。
図14に示すように、部品実装ライン2Lには作業エリアTWAが設定されている。作業エリアTWAは、部品実装ライン2Lの各部品実装機2に付設される部品供給装置に対する部品補給作業の、1人の作業者OPが担当する範囲を表す。作業エリアTWA内には、当該作業エリアTWA内に配置される部品実装機2に設定された作業領域WAが含まれる。作業者OPが部品補給作業を担当する部品実装機2が複数の部品実装ライン2Lに跨る場合には、作業エリアTWA内には当該複数の部品実装ライン2Lが含まれる。
作業者OPは、携帯端末装置7を携帯し、作業エリアTWA内において、各部品実装機2の作業領域WAを通る部品実装ライン2Lに沿った移動経路6R上を、カート6を押しながら移動して各作業領域WAにて部品補給作業を実施する。なお、カート6は、部品補給作業用の物品Gを収容可能な荷台部61を有する。荷台部61に収容される物品Gとしては、部品補給作業に必要な新たな補給用の部品収納部材(リール、パレット、スティック)や部品補給作業後に回収される回収物などが含まれる。また、カート6は、無人搬送車であるAGV(Automated Guided Vehicle)を用いて無人搬送させるようにしてもよい。この場合、後述の作業リスト情報JH4に基づいて作成されたAGV用指示データがAGVに配信される。AGV用指示データは、AGVが停止すべき作業領域WAの位置、停止時間などが記述されたファイルである。AGVは、作業エリアTWA内において、作業者OPを誘導するように移動経路6Rに沿って各作業領域WAに順次移動して停車する。これにより、作業者OPは、AGVを目印として移動経路6Rに沿って移動し、AGVが停車した位置の作業領域WAにおいて部品補給作業を実施することができる。
なお、図14に示す例では、作業エリアTWA内において、部品実装ライン2Lの各部品実装機2が、移動経路6Rの上流から下流に向かって順番に、第1部品実装機2A、第2部品実装機2B、第3部品実装機2C、第4部品実装機2D、第5部品実装機2E、第6部品実装機2Fと示されている。また、第1部品実装機2Aに設定された作業領域が第1作業領域WA1と示されており、同様に、第2部品実装機2Bの作業領域が第2作業領域WA2、第3部品実装機2Cの作業領域が第3作業領域WA3、第4部品実装機2Dの作業領域が第4作業領域WA4、第5部品実装機2Eの作業領域が第5作業領域WA5、第6部品実装機2Fの作業領域が第6作業領域WA6と示されている。なお、前述したように作業エリアTWAが複数の部品実装ライン2Lを含むように設定されることもある。また、作業エリアTWA内の移動経路6Rは、各部品実装ライン2Lにおける各部品実装機2の-Y側及び+Y側に配置された作業領域WAにおいて、部品補給作業の対象となる部品供給装置が配置された作業領域WAを通るように設定される経路であり、図14に示すような部品実装ライン2Lに沿った経路に限定されるものではない。例えば、各部品実装機2の-Y側に配置された作業領域WAと+Y側に配置された作業領域WAとの間をジグザグに通過するような経路が移動経路6Rとして設定されてもよいし、場合によっては一方向に通過した後に逆戻りするような経路が移動経路6Rとして設定されてもよい。
(部品供給監視部について)
主として図12を参照して部品供給監視部341について説明する。図12は、第1生産期間TW01において第1の基板品種の部品搭載基板が生産され、その後、基板品種が切換えられて、第2生産期間TW02において第2の基板品種の部品搭載基板が生産される例を示している。また、図12では、第1生産期間TW01において、部品実装ライン2Lの各部品実装機2に備えられる複数の部品供給装置のうち、3台のAF241A1、241A2、241A3、2台のトレイフィーダー245A1、245A2、及び1台のスティックフィーダー246A1から部品を供給し、部品搭載基板を生産する例が示されている。部品搭載基板の生産に応じて作業者OPが実施すべき部品補給作業としては、AF241A1、241A2、241A3の各々に対して新たな補給用のリールを補給する部品補給作業、トレイフィーダー245A1、245A2の各々に対して新たな補給用のパレットを補給する部品補給作業、並びにスティックフィーダー246A1に対して新たな補給用のスティックを補給する部品補給作業が含まれる。AF241A1、241A2、241A3、トレイフィーダー245A1、245A2、及びスティックフィーダー246A1を総称するときには、「部品供給装置241、245、246」と称し、リール、パレット及びスティックを総称するときには、「部品収納部材」と称する。
主として図12を参照して部品供給監視部341について説明する。図12は、第1生産期間TW01において第1の基板品種の部品搭載基板が生産され、その後、基板品種が切換えられて、第2生産期間TW02において第2の基板品種の部品搭載基板が生産される例を示している。また、図12では、第1生産期間TW01において、部品実装ライン2Lの各部品実装機2に備えられる複数の部品供給装置のうち、3台のAF241A1、241A2、241A3、2台のトレイフィーダー245A1、245A2、及び1台のスティックフィーダー246A1から部品を供給し、部品搭載基板を生産する例が示されている。部品搭載基板の生産に応じて作業者OPが実施すべき部品補給作業としては、AF241A1、241A2、241A3の各々に対して新たな補給用のリールを補給する部品補給作業、トレイフィーダー245A1、245A2の各々に対して新たな補給用のパレットを補給する部品補給作業、並びにスティックフィーダー246A1に対して新たな補給用のスティックを補給する部品補給作業が含まれる。AF241A1、241A2、241A3、トレイフィーダー245A1、245A2、及びスティックフィーダー246A1を総称するときには、「部品供給装置241、245、246」と称し、リール、パレット及びスティックを総称するときには、「部品収納部材」と称する。
まず、部品供給監視部341は、AF241A、241B、241C、トレイフィーダー245A、245B、及びスティックフィーダー246Aの各々に対する部品補給作業の計画の、管理の開始時刻を表す管理開始時刻TSを取得する。部品供給監視部341は、第1生産期間TW01での部品搭載基板の生産を開始する時刻を管理開始時刻TSとして取得してもよいし、管理開始を指令する指令情報が操作部32を介して入力された場合に、その指令情報が入力された時刻を管理開始時刻TSとして取得してもよい。
部品供給監視部341は、管理開始時刻TSを取得すると、当該管理開始時刻TSから部品供給装置241、245、246の各々における部品の供給状況を監視する。部品供給監視部341は、部品補給作業が可能な時間帯を表す補給可能時間帯を、部品供給装置241、245、246ごとに特定する。図12に示す例では、AF241A1に対しては補給可能時間帯TWSAが特定され、AF241A2に対しては補給可能時間帯TWSBが特定され、AF241A3に対しては補給可能時間帯TWSCが特定されている。また、トレイフィーダー245A1に対しては補給可能時間帯TWSDが特定され、トレイフィーダー245A2に対しては補給可能時間帯TWSEが特定されている。更に、スティックフィーダー246A1に対しては補給可能時間帯TWSFが特定されている。
補給可能時間帯TWSA~TWSFの各々における最も早い時刻(以下、「最早時刻」という)は、部品供給装置241、245、246に装着された複数の部品収納部材のうちの、部品供給が先行して行われる先行の部品収納部材が部品切れとなる時刻である。先行の部品収納部材が部品切れとなると、新たな補給用の部品収納部材の補給が可能となる。つまり、部品供給監視部341は、補給可能時間帯TWSA~TWSFの各々を特定する際に、管理開始時刻TSから新たな補給用の部品収納部材を補給する部品補給作業が可能となるまでの時間を表す補給可能時間TT(図13参照)を、部品供給装置241、245,246ごとに推定することになる。部品供給監視部341により推定された部品供給装置241、245、246ごとの補給可能時間TTを表す補給可能時間情報J42は、後述の作業リスト情報JH4(図13)に含まれる。
また、補給可能時間帯TWSA~TWSFの各々における最も遅い時刻(以下、「最遅時刻」という)は、部品供給装置241、245、246に装着された複数の部品収納部材の合計部品残数が所定の部品残数警告値に達する時刻である。部品供給装置241、245、246からの部品の供給が停止しないようにするためには、複数の部品収納部材の合計部品残数が部品残数警告値に達したときには、新たな補給用の部品収納部材を補給する部品補給作業の実施が必要となる。つまり、部品供給監視部341は、補給可能時間帯TWSA~TWSFの各々を特定する際に、合計部品残数が部品残数警告値に達して部品補給作業の実施が必要となるまでの時間を表す警告時間WT(図13参照)を、部品供給装置241、245、246ごとに推定することになる。部品供給監視部341により推定された部品供給装置241、245、246ごとの警告時間WTは、補給可能時間TTよりも長い時間であって、部品補給作業の実施が必要となるまでの制限時間を表す部品補給制限時間の一例である。部品補給制限時間の一例となる警告時間WTを表す警告時間情報J43は、後述の作業リスト情報JH4(図13)に含まれる。
なお、補給可能時間帯TWSA~TWSFの各々における最遅時刻は、部品供給装置241、245、246に装着された複数の部品収納部材の合計部品残数が所定の部品残数停止値に達する時刻であってもよいし、部品供給装置241、245、246において部品搭載基板の生産に応じた部品供給の継続が可能な制限時刻であってもよい。合計部品残数が部品残数停止値に達したとき、或いは、部品供給の継続が可能な制限時刻に達したときには、合計部品残数が部品残数警告値に達したときと同様に、新たな補給用の部品収納部材を補給する部品補給作業の実施が必要となる。
つまり、部品供給監視部341は、補給可能時間帯TWSA~TWSFの各々を特定する際に、合計部品残数が部品残数停止値に達して部品補給作業の実施が必要となるまでの時間を表す停止時間ST(図13参照)、或いは、部品供給の継続が可能な制限時刻に達して部品補給作業の実施が必要となるまでの時間を表す生産可能時間PT(図13参照)を、部品供給装置241、245、246ごとに推定することになる。部品供給監視部341により推定された部品供給装置241、245、246ごとの停止時間ST及び生産可能時間PTは、警告時間WTと同様に、部品補給作業の実施が必要となるまでの制限時間を表す部品補給制限時間の一例である。部品補給制限時間の一例となる停止時間STを表す停止時間情報J44、並びに、生産可能時間PTを表す生産可能時間情報J45は、後述の作業リスト情報JH4(図13)に含まれる。
部品供給監視部341は、通信部31から制御部34に与えられた情報であって、各部品実装機2の実装制御装置20からの取付情報JH1、生産計画管理装置4からの生産計画情報JH2、及び基板情報管理装置5からの基板情報JH3に基づいて、部品供給装置241、245、246ごとに補給可能時間帯TWSA~TWSFを特定する。
具体的には、部品供給監視部341は、まず、取付情報JH1の先行部品残数情報J15に基づき、先行の部品収納部材における部品残数を求める。更に、部品供給監視部341は、基板情報JH3の部品必要数情報J31にて表される、1枚の部品搭載基板の生産に必要な部品種情報J14で特定される部品ごとの必要数を、生産計画情報JH2のサイクルタイム情報J24にて表される、基板品種情報J22で特定される基板ごとの、1枚の部品搭載基板を仕上げるのに要する時間で除算し、1秒当たりの使用部品数を求める。そして、部品供給監視部341は、先行の部品収納部材における前記部品残数を、1秒当たりの前記使用部品数で除算することにより、補給可能時間帯TWSA~TWSFの各々における最早時刻を求める。一方、部品供給監視部341は、合計部品残数情報J16にて表される合計部品残数から、部品残数警告値情報J17にて表される部品残数警告値を減算した部品数を、1秒当たりの前記使用部品数で除算することにより、補給可能時間帯TWSA~TWSFの各々における最遅時刻を求める。
ところで、先行部品残数情報J15にて表される先行の部品収納部材における部品残数と、合計部品残数情報J16にて表される合計部品残数は、ヘッドユニット25にて部品が取り出されるごとに減算される。詳細については後述するが、先行の部品収納部材から部品が取り出されるごとに先行部品残数情報J15が更新される。また、先行の部品収納部材が部品切れとなり、部品供給装置241、245、246に対して新たな補給用の部品収納部材が補給されたときには、その新たな補給用の部品収納部材に収納される部品の数(初期設定数)を、ヘッドユニット25にて部品が取り出されるごとに変化する合計部品残数に加算することにより、合計部品残数が更新される。新たな補給用の部品収納部材に収納される部品の数(初期設定数)は、制御部34のROM等に、部品種情報J14で特定される部品ごとに記憶されている。なお、使用途中の部品収納部材が新たな補給用の部品収納部材として補給された場合には、その部品収納部材に収納されている実際の部品数にて、制御部34のROM等に記憶されている前記初期設定数が書き換えられる。
部品供給監視部341は、先行部品残数情報J15及び合計部品残数情報J16が更新されることに応じて、所定の周期(例えば30秒周期)で補給可能時間帯TWSA~TWSFの特定結果を更新する。また、部品供給監視部341は、第1の基板品種の第1生産期間TW01における補給可能時間帯TWSA~TWSFを特定するように構成されていてもよいし、第1の基板品種に加えて第2の基板品種以降の生産期間をも考慮して補給可能時間帯TWSA~TWSFを特定するように構成されていてもよい。
(補給管理部について)
次に、補給管理部342は、部品供給監視部341により特定された補給可能時間帯TWSA~TWSFに基づいて、AF241A1、241A2、241A3、トレイフィーダー245A1、245A2、及びスティックフィーダー246A1の各々に対する部品補給作業の計画を管理する。補給管理部342は、図9に示すように、補給対象特定部3421と補給タイミング特定部3422とを含む。
次に、補給管理部342は、部品供給監視部341により特定された補給可能時間帯TWSA~TWSFに基づいて、AF241A1、241A2、241A3、トレイフィーダー245A1、245A2、及びスティックフィーダー246A1の各々に対する部品補給作業の計画を管理する。補給管理部342は、図9に示すように、補給対象特定部3421と補給タイミング特定部3422とを含む。
補給対象特定部3421は、部品供給装置241、245、246の各々における部品の供給状況に基づいて、部品補給作業が可能な部品供給装置を、当該部品補給作業の対象となる部品補給対象装置として特定する。具体的には、補給対象特定部3421は、まず、補給可能時間帯TWSA~TWSFの各々で重複する重複補給時間帯を認識する。図12に示す例では、補給対象特定部3421は、時系列の早い方から順に、第1重複補給時間帯TWD1、第2重複補給時間帯TWD2、及び第3重複補給時間帯TWD3の、複数の重複補給時間帯を認識している。第1重複補給時間帯TWD1は、AF241A1の補給可能時間帯TWSAと、AF241A2の補給可能時間帯TWSBとで重複する時間帯である。第1重複補給時間帯TWD1の最も早い時刻(最早時刻)は、AF241A2の補給可能時間帯TWSBにおける最早時刻T1に一致し、第1重複補給時間帯TWD1の最も遅い時刻(最遅時刻)は、AF241A1の補給可能時間帯TWSAにおける最遅時刻T2に一致している。
第2重複補給時間帯TWD2は、AF241A3の補給可能時間帯TWSCと、トレイフィーダー245A1の補給可能時間帯TWSDとで重複する時間帯である。第2重複補給時間帯TWD2の最も早い時刻(最早時刻)は、AF241A3の補給可能時間帯TWSCにおける最早時刻T3に一致し、第2重複補給時間帯TWD2の最も遅い時刻(最遅時刻)は、トレイフィーダー245A1の補給可能時間帯TWSDにおける最遅時刻T4に一致している。第3重複補給時間帯TWD3は、トレイフィーダー245A2の補給可能時間帯TWSEと、スティックフィーダー246A1の補給可能時間帯TWSFとで重複する時間帯である。第3重複補給時間帯TWD3の最も早い時刻(最早時刻)は、スティックフィーダー246A1の補給可能時間帯TWSFにおける最早時刻T5に一致し、第3重複補給時間帯TWD3の最も遅い時刻(最遅時刻)は、トレイフィーダー245A2の補給可能時間帯TWSEにおける最遅時刻T6に一致している。
そして、補給対象特定部3421は、各重複補給時間帯TWD1、TWD2、TWD3内で部品補給作業が可能な全ての部品供給装置を、部品補給対象装置として特定する。補給対象特定部3421は、第1~第3重複補給時間帯TWD1、TWD2、TWD3ごとに、部品補給対象装置を特定する。図12に示す例では、補給対象特定部3421は、第1重複補給時間帯TWD1内で部品補給作業が可能な部品補給対象装置として、AF241A1、241A2を特定する。また、補給対象特定部3421は、第2重複補給時間帯TWD2内で部品補給作業が可能な部品補給対象装置として、AF241A3、トレイフィーダー245A1を特定する。また、補給対象特定部3421は、第3重複補給時間帯TWD3内で部品補給作業が可能な部品補給対象装置として、トレイフィーダー245A2、スティックフィーダー246A1を特定する。
このように、補給対象特定部3421は、各重複補給時間帯TWD1、TWD2、TWD3内で部品補給作業が可能な全ての部品供給装置を、部品補給対象装置として特定する。これにより、各重複補給時間帯TWD1、TWD2、TWD3内で新たな補給用の部品収納部材を補給可能な部品供給装置241、245、246に対しては、作業者OPによる部品補給作業をまとめて行う、「まとめ補給」が可能となる。このため、部品供給装置241、245、246が付設された各部品実装機2のもとに作業者OPが行く頻度を低減することができ、作業者OPによる部品補給作業の負荷を軽減することができる。
なお、上記のように、部品供給監視部341による補給可能時間帯TWSA~TWSFの特定結果が所定の周期で更新されると、補給対象特定部3421は、部品補給対象装置の特定結果を更新する。また、部品供給監視部341と同様に、補給対象特定部3421は、第1の基板品種の第1生産期間TW01における部品補給対象装置を特定するように構成されていてもよいし、第1の基板品種に加えて第2の基板品種以降の生産期間をも考慮して部品補給対象装置を特定するように構成されていてもよい。
次に、補給タイミング特定部3422は、補給対象特定部3421により特定された部品補給対象装置に対して同一の、部品補給作業の補給作業タイミングを、第1~第3重複補給時間帯TWD1、TWD2、TWD3ごとに特定する。図12に示す例では、補給タイミング特定部3422は、AF241A1、241A2に対して同一の、第1重複補給時間帯TWD1内での部品補給作業のタイミングとして、第1補給作業タイミングTH1を特定する。また、補給タイミング特定部3422は、AF241A3、トレイフィーダー245A1に対して同一の、第2重複補給時間帯TWD2内での部品補給作業のタイミングとして、第2補給作業タイミングTH2を特定する。また、補給タイミング特定部3422は、トレイフィーダー245A2、スティックフィーダー246A1に対して同一の、第3重複補給時間帯TWD3内での部品補給作業のタイミングとして、第3補給作業タイミングTH3を特定する。
補給タイミング特定部3422は、第1重複補給時間帯TWD1内での第1補給作業タイミングTH1として、第1重複補給時間帯TWD1の最早時刻T1を特定することが望ましい。第1重複補給時間帯TWD1の最早時刻T1は、当該第1重複補給時間帯TWD1内で最も早い時刻である。このような、第1重複補給時間帯TWD1内で最も早い時刻となる最早時刻T1を、第1補給作業タイミングTH1とすることによって、作業者OPは、時間的な余裕がある状態で、AF241A1、241A2に対する部品補給作業を、まとめて行うことができる。
同様に、補給タイミング特定部3422は、第2重複補給時間帯TWD2内での第2補給タイミングTH2として第2重複補給時間帯TWD2の最早時刻T3を特定し、第3重複補給時間帯TWD3内での第3補給タイミングTH3として第3重複補給時間帯TWD3の最早時刻T5を特定することが望ましい。
(補給管理部の変形例)
また、補給対象特定部3421は、第1生産期間TW01を、所定の特定時間を時間間隔とする複数の特定期間TW11、TW12、TW13に区画するように構成されていてもよい。各特定期間TW11、TW12、TW13の時間間隔を規定する前記特定時間は、操作部32を介して作業者OPにより入力され、例えば30分間などの任意の時間に設定される。以下では、時系列の順序で早い方から順に、第1特定期間TW11、第2特定期間TW12、第3特定期間TW13と称する。第1~第3特定期間TW11、TW12、TW13の各々における時間間隔は、一定に設定される。
また、補給対象特定部3421は、第1生産期間TW01を、所定の特定時間を時間間隔とする複数の特定期間TW11、TW12、TW13に区画するように構成されていてもよい。各特定期間TW11、TW12、TW13の時間間隔を規定する前記特定時間は、操作部32を介して作業者OPにより入力され、例えば30分間などの任意の時間に設定される。以下では、時系列の順序で早い方から順に、第1特定期間TW11、第2特定期間TW12、第3特定期間TW13と称する。第1~第3特定期間TW11、TW12、TW13の各々における時間間隔は、一定に設定される。
補給対象特定部3421は、部品供給装置241、245、246の各々に対応した補給可能時間帯TWSA~TWSFで重複する第1~第3重複補給時間帯TWD1~TWD3を認識する。更に、補給対象特定部3421は、第1~第3特定期間TW11、TW12、TW13の各々において、第1~第3重複補給時間帯TWD1~TWD3のいずれかの時間帯の最早時刻が含まれるか否かを判断する。図12に示す例では、第1特定期間TW11に第1重複補給時間帯TWD1の最早時刻が含まれ、第2特定期間TW12に第2重複補給時間帯TWD2の最早時刻が含まれ、第3特定期間TW13に第3重複補給時間帯TWD3の最早時刻が含まれている。
この場合、補給対象特定部3421は、第1重複補給時間帯TWD1内において、当該第1重複補給時間帯TWD1の最早時刻と、第1特定期間TW11の最も遅い時刻(最遅時刻)との間の時間帯で部品補給作業が可能な部品補給対象装置として、AF241A1、241A2を特定する。また、補給対象特定部3421は、第2重複補給時間帯TWD2内において、当該第2重複補給時間帯TWD2の最早時刻と、第2特定期間TW12の最も遅い時刻(最遅時刻)との間の時間帯で部品補給作業が可能な部品補給対象装置として、AF241A3、トレイフィーダー245A1を特定する。また、補給対象特定部3421は、第3重複補給時間帯TWD3内において、当該第3重複補給時間帯TWD3の最早時刻と、第3特定期間TW13の最も遅い時刻(最遅時刻)との間の時間帯で部品補給作業が可能な部品補給対象装置として、トレイフィーダー245A2、スティックフィーダー246A1を特定する。
補給タイミング特定部3422は、第1重複補給時間帯TWD1内において、当該第1重複補給時間帯TWD1の最早時刻と、第1特定期間TW11の最遅時刻との間の時間帯内で、AF241A1、241A2に対して同一の第1補給作業タイミングTH1を特定する。また、補給タイミング特定部3422は、第2重複補給時間帯TWD2内において、当該第2重複補給時間帯TWD2の最早時刻と、第2特定期間TW12の最遅時刻との間の時間帯内で、AF241A3、トレイフィーダー245A1に対して同一の第2補給作業タイミングTH2を特定する。また、補給タイミング特定部3422は、第3重複補給時間帯TWD3内において、当該第3重複補給時間帯TWD3の最早時刻と、第3特定期間TW13の最遅時刻との間の時間帯内で、トレイフィーダー245A2、スティックフィーダー246A1に対して同一の第3補給作業タイミングTH3を特定する。
(補給管理部により生成される作業リスト情報について)
補給管理部342の補給対象特定部3421は、部品補給対象装置の特定結果を表す情報として、図13に示す作業リスト情報JH4を生成する。補給対象特定部3421は、部品補給対象装置を特定する際に設定した、図12に示す各重複補給時間帯TWD1,TWD2,TWD3、又は各特定期間TW11,TW12,TW13毎に、作業リスト情報JH4を生成する。換言すると、作業リスト情報JH4は、補給タイミング特定部3422により特定された各補給タイミングTH1,TH2,TH3(図12参照)毎に、補給対象特定部3421により生成される。作業リスト情報JH4は、部品補給対象装置が配置される部品実装機2の作業領域WAを表す作業対象領域を、当該作業対象領域内で部品補給作業が実施される部品補給対象装置と関連付けてリスト化した情報である。作業リスト情報JH4においては、部品補給対象装置が配置される作業対象領域が、作業者OPの移動経路6Rの上流から下流に向かって順番に並べられてリスト化されている。
補給管理部342の補給対象特定部3421は、部品補給対象装置の特定結果を表す情報として、図13に示す作業リスト情報JH4を生成する。補給対象特定部3421は、部品補給対象装置を特定する際に設定した、図12に示す各重複補給時間帯TWD1,TWD2,TWD3、又は各特定期間TW11,TW12,TW13毎に、作業リスト情報JH4を生成する。換言すると、作業リスト情報JH4は、補給タイミング特定部3422により特定された各補給タイミングTH1,TH2,TH3(図12参照)毎に、補給対象特定部3421により生成される。作業リスト情報JH4は、部品補給対象装置が配置される部品実装機2の作業領域WAを表す作業対象領域を、当該作業対象領域内で部品補給作業が実施される部品補給対象装置と関連付けてリスト化した情報である。作業リスト情報JH4においては、部品補給対象装置が配置される作業対象領域が、作業者OPの移動経路6Rの上流から下流に向かって順番に並べられてリスト化されている。
作業リスト情報JH4は、図13に示すように、作業対象領域番号情報J41、前記実装機種情報J11、前記セット位置情報J12、前記装置種情報J13、前記部品種情報J14、前記合計部品残数情報J16、前記部品必要数情報J31、補給可能時間情報J42、警告時間情報J43、停止時間情報J44、及び生産可能時間情報J45が関連付けられた情報である。
作業リスト情報JH4を構成する各情報について、図13及び図14を参照して説明する。図14に示す例では、第1部品実装機2Aの第1作業領域WA1には、複数のAF241が配置され、これらのうちの3台のAF241Aが補給対象特定部3421によって部品補給対象装置として特定され、これにより第1作業領域WA1が作業対象領域とされている。第2部品実装機2Bの第2作業対象領域WA2には、複数のAF241が配置され、これらのうちの1台のAF241Aが補給対象特定部3421によって部品補給対象装置として特定され、これにより第2作業領域WA2が作業対象領域とされている。第3部品実装機2Cの第3作業対象領域WA3には、複数のAF241が配置され、これらのうちの4台のAF241Aが補給対象特定部3421によって部品補給対象装置として特定され、これにより第3作業領域WA3が作業対象領域とされている。第4部品実装機2Dの第4作業領域WA4には、複数のトレイフィーダー245が配置され、これらのうちの2台のトレイフィーダー245Aが補給対象特定部3421によって部品補給対象装置として特定され、これにより第4作業領域WA4が作業対象領域とされている。第5部品実装機2Eの第5作業領域WA5には、複数のAF241が配置されているが、これらの中には補給対象特定部3421によって部品補給対象装置として特定された装置は存在していない。第6部品実装機2Fの第6作業領域WA6には、複数のスティックフィーダー246が配置され、これらのうちの2台のスティックフィーダー246Aが補給対象特定部3421によって部品補給対象装置として特定され、これにより第6作業領域WA6が作業対象領域とされている。
作業対象領域番号情報J41は、補給対象特定部3421により特定された部品補給対象装置が配置される各作業対象領域(第1作業領域WA1、第2作業領域WA2、第3作業領域WA3、第4作業領域WA4、第6作業領域WA6)を識別するための情報である。
補給可能時間情報J42は、作業対象領域番号情報J42にて表される各作業対象領域において、セット位置情報J12にて表されるセット位置に配置される部品補給対象装置に対し、新たな補給用の部品収納部材を補給する部品補給作業が可能となるまでの補給可能時間TTを表す情報である。補給可能時間情報J42にて表される部品補給対象装置ごとの補給可能時間TTは、部品供給監視部341により推定されたものである。補給可能時間TTは、先行部品残数情報J15にて表される先行の部品収納部材における部品残数、又は、合計部品残数情報J16にて表される合計部品残数に応じて変化する。このため、補給可能時間情報J42は、先行部品残数情報J15又は合計部品残数情報J16が更新されることに応じて、所定の周期(例えば30秒周期)で更新される。
警告時間情報J43は、セット位置情報J12にて表されるセット位置に配置される部品補給対象装置において、合計部品残数情報J16にて表される合計部品残数が部品残数警告値に達するまでの警告時間WTを表す情報である。警告時間情報J43にて表される部品補給対象装置ごとの警告時間WTは、部品供給監視部341により推定されたものである。警告時間WTは、合計部品残数情報J16にて表される合計部品残数に応じて変化する。このため、警告時間情報J43は、合計部品残数情報J16が更新されることに応じて、所定の周期(例えば30秒周期)で更新される。
停止時間情報J44は、セット位置情報J12にて表されるセット位置に配置される部品補給対象装置において、合計部品残数情報J16にて表される合計部品残数が部品残数停止値に達するまでの停止時間STを表す情報である。部品補給対象装置としてのAF241A、トレイフィーダー(TF)245A、及びスティックフィーダー(SF)246Aにおいて、例えば前記部品残数停止値がゼロ(0)に設定された場合、停止時間情報J44は合計部品残数情報J16にて表される合計部品残数がゼロ(0)に達するまでの現時点からの時間を表す情報となる。部品補給対象装置としてのスプライシングフィーダーにおいて、例えば前記部品残数停止値がスプライシング作業用にテープの送出を停止すべき所定値に設定された場合、停止時間情報J44は合計部品残数情報J16にて表される合計部品残数が前記所定値に達するまでの現時点からの時間を表す情報となる。停止時間情報J44にて表される部品補給対象装置ごとの停止時間STは、部品供給監視部341により推定されたものである。停止時間STは、合計部品残数情報J16にて表される合計部品残数に応じて変化する。このため、停止時間情報J44は、合計部品残数情報J16が更新されることに応じて、所定の周期(例えば30秒周期)で更新される。
生産可能時間情報J45は、セット位置情報J12にて表されるセット位置に配置される部品補給対象装置において、部品搭載基板の生産に応じた部品供給の継続が可能な生産可能時間PTを表す情報である。生産可能時間情報J45にて表される生産可能時間PTは、現時点からの部品供給の継続が可能な時間範囲を示す。また、生産可能時間情報J45にて表される生産可能時間PTは、設定によって変えられるようにしてもよいが、停止時間情報J44にて表される停止時間STと同じとなるのが通常である。生産可能時間情報J45にて表される部品補給対象装置ごとの生産可能時間PTは、部品供給監視部341により推定されたものである。生産可能時間PTは、合計部品残数情報J16にて表される合計部品残数に応じて変化する。このため、生産可能時間情報J45は、合計部品残数情報J16が更新されることに応じて、所定の周期(例えば30秒周期)で更新される。
警告時間情報J43、停止時間情報J44及び生産可能時間情報J45の各々は、部品補給対象装置に対して部品補給作業の実施が必要となるまでの制限時間を表す部品補給制限時間を規定する情報でもある。部品供給装置241,245,246には、部品補給制限時間が設定されている。部品補給制限時間としては、合計部品残数情報J16にて表される合計部品残数が部品残数警告値に達するまでの警告時間WT、合計部品残数情報J16にて表される合計部品残数が部品残数停止値に達するまでの停止時間ST、並びに、部品補給対象装置による部品供給の継続が不能となるまでの生産可能時間PT、などが挙げられる。つまり、部品補給制限時間に達するまでに部品補給対象装置に対する部品補給作業を実施しないと、部品補給対象装置による部品供給停止の可能性が高まり、部品搭載基板の生産に影響を及ぼす。
作業リスト情報JH4は、補給計画管理装置30の記憶部343に記憶されるとともに、表示部33に表示される。更には、作業リスト情報JH4は、通信部31を介して各部品実装機2の実装制御装置20、及び作業者OPが携帯する携帯端末装置30Tに送信される。補給計画管理装置30の記憶部343は、補給対象特定部3421が所定の周期で部品補給対象装置の特定結果を更新することに応じて更新された作業リスト情報JH4を記憶する。各部品実装機2の実装制御装置20に作業リスト情報JH4が入力されると、実装制御装置20の表示部203には当該作業リスト情報JH4が表示される。また、作業者OPが携帯する携帯端末装置30Tに作業リスト情報JH4が入力されると、携帯端末装置30Tには当該作業リスト情報JH4が表示される。
作業者OPは、携帯端末装置30T等に表示された作業リスト情報JH4に基づいて、作業エリアTWA内において、作業対象領域番号情報J41にて表される作業対象領域に順次移動し、各作業対象領域において部品補給作業を実施することができる。各作業対象領域において部品補給作業を実施するに際しては、作業者OPは、携帯端末装置30T等に表示された作業リスト情報JH4に基づいて、当該作業対象領域に配置された部品補給対象装置を把握することができる。
<実装制御装置における作業判定部及び作業案内部の動作について>
前述したように、各部品実装機2に備えられる実装制御装置20は、部品補給管理システム3の一部を構成する。この実装制御装置20に備えられる作業判定部207及び作業案内部208の詳細について、以下に説明する。
前述したように、各部品実装機2に備えられる実装制御装置20は、部品補給管理システム3の一部を構成する。この実装制御装置20に備えられる作業判定部207及び作業案内部208の詳細について、以下に説明する。
(作業判定部について)
図14に示すように、作業者OPは、一定時間(例えば90分)ごとに移動経路6Rに沿って作業エリアTWA内を巡回して部品補給作業を実施する。作業者OPが一定時間ごとに作業エリアTWA内を巡回して部品補給作業を実施する際の、前記一定時間を表す巡回周期PPが予め設定されている。
図14に示すように、作業者OPは、一定時間(例えば90分)ごとに移動経路6Rに沿って作業エリアTWA内を巡回して部品補給作業を実施する。作業者OPが一定時間ごとに作業エリアTWA内を巡回して部品補給作業を実施する際の、前記一定時間を表す巡回周期PPが予め設定されている。
作業対象領域番号情報J42にて表される作業対象領域において、作業者OPによるバーコードリーダ7を用いた、新たな補給用の部品収納部材に付設された部品種特定用バーコードの読取操作が行われると、当該作業対象領域が設定された部品実装機2の実装制御装置20に、外部入出力部204を介して補給部品種情報JH02(図14)が入力される。補給部品種情報JH02が入力されたタイミングにおいて、作業判定部207は、作業リスト情報JH4に基づき、当該補給部品種情報JH02の部品種と同種の部品を表す部品種情報J14と関連付けられたセット位置情報J12を抽出する。そして、作業判定部207は、抽出したセット位置情報J12にて表されるセット位置に配置された部品補給対象装置に対する部品補給作業の実施の可否を判定する。
作業判定部207は、補給部品種情報JH02が入力されたタイミングにおいて、部品補給対象装置から補給可能検知情報JH01(図14)が出力されている場合には、当該部品補給対象装置に対する部品補給作業の実施が可能であると判定する。補給可能検知情報JH01は、部品補給対象装置に対して新たな補給用の部品収納部材を補給することが可能であることを表す情報である。例えば、部品補給対象装置がAF241Aである場合、先行の部品収納テープ243の全てがリール2420から引き出され、その後端が第2テープ検知センサ2416Bの位置を通過して先行の部品収納テープ243の検知が終了し、且つ、後続の部品収納テープ243の送出が自動的に開始され、その先端が第1テープ検知センサ2416Aの位置を通過して後続の部品収納テープ243が検知されて検知情報が出力されると、その検知情報が補給可能検知情報JH01となる。
一方、作業判定部207は、補給部品種情報JH02が入力されたタイミングにおいて、部品補給対象装置から補給不可検知情報JH03(図14)が出力されている場合には、当該部品補給対象装置に対する部品補給作業の実施が不可であると判定する。補給不可情報JH03は、部品補給対象装置に対して新たな補給用の部品収納部材を補給することが不可能であることを表す情報である。例えば、部品補給対象装置がAF241Aである場合、先行の部品収納テープ243が第2テープ検知センサ2416Bによって検知されて検知情報が出力され、且つ、後続の部品収納テープ243の先端が第1テープ検知センサ2416Aによって検知されて検知情報が出力されていると、その検知情報が補給不可検知情報JH03となる。
(作業案内部について)
図15は、作業案内部208により実行される作業案内処理を説明するための図である。作業案内部208は、作業判定部207により部品補給作業の実施が不可であると判定された場合に、作業案内処理を実行する。この作業案内処理において、作業案内部208は、作業リスト情報JH4に基づき、当該部品補給作業の実施手順を案内する実施手順案内情報JH5を生成する。具体的には、作業案内部208は、補給部品種情報JH02が入力されたタイミングにおいて作業判定部207によって部品補給作業の実施が不可であると判定された場合に、作業リスト情報JH4に含まれる補給可能時間情報J42にて表される補給可能時間TTを参照し、実施手順案内情報JH5を生成する。実施手順案内情報JH5にて表される部品補給作業の実施手順は、単に「部品補給作業の実施が不可である」ことを示すものではなく、補給可能時間TTが経過するまで部品補給作業の実施を待機することを示したり、部品補給作業の実施を先送りすることを示したりするものである。
図15は、作業案内部208により実行される作業案内処理を説明するための図である。作業案内部208は、作業判定部207により部品補給作業の実施が不可であると判定された場合に、作業案内処理を実行する。この作業案内処理において、作業案内部208は、作業リスト情報JH4に基づき、当該部品補給作業の実施手順を案内する実施手順案内情報JH5を生成する。具体的には、作業案内部208は、補給部品種情報JH02が入力されたタイミングにおいて作業判定部207によって部品補給作業の実施が不可であると判定された場合に、作業リスト情報JH4に含まれる補給可能時間情報J42にて表される補給可能時間TTを参照し、実施手順案内情報JH5を生成する。実施手順案内情報JH5にて表される部品補給作業の実施手順は、単に「部品補給作業の実施が不可である」ことを示すものではなく、補給可能時間TTが経過するまで部品補給作業の実施を待機することを示したり、部品補給作業の実施を先送りすることを示したりするものである。
作業案内部208により生成された実施手順案内情報JH5は、実装制御装置20の表示部203に表示される。更には、実施手順案内情報JH5は、通信部201を介して補給計画管理装置30、及び作業者OPが携帯する携帯端末装置30Tに送信される。補給計画管理装置30に実施手順案内情報JH5が入力されると、補給計画管理装置30の表示部33には当該実施手順案内情報JH5が表示される。また、作業者OPが携帯する携帯端末装置30Tに実施手順案内情報JH5が入力されると、携帯端末装置30Tには当該実施手順案内情報JH5が表示される。
前述したように、補給用の部品収納部材を用いた部品補給作業を実施しようとして作業者OPが、補給部品種情報JH02の読取操作を行ったタイミングにおいて、作業判定部207によって当該部品補給作業の実施の可否が判定される。このタイミングにおいて、部品補給作業の実施が不可であると判定された場合、作業者OPはどのように対処すればよいのか分からず、混乱してしまう可能性がある。
そこで、作業判定部207により部品補給作業の実施が不可であると判定された場合に、作業案内部208が、実施手順案内情報JH5を生成する。この実施手順案内情報JH5は、作業リスト情報JH4に含まれる補給可能時間情報J42にて表される補給可能時間TTに基づく、部品補給作業の実施手順を案内するための情報である。携帯端末装置30T等に表示された実施手順案内情報JH5を参照することによって作業者OPは、補給部品種情報JH02の読取操作を行ったタイミングにおいて実施が不可とされた部品補給作業の実施手順を把握することができる。これにより、対処不明に起因した混乱を防止し、作業者OPによる部品補給作業の効率化を図ることができる。
<作業案内部により実行される作業案内処理の具体例>
次に、実施手順案内情報JH5を生成する際に作業案内部208により実行される作業案内処理の具体例について、以下に説明する。
次に、実施手順案内情報JH5を生成する際に作業案内部208により実行される作業案内処理の具体例について、以下に説明する。
(第1具体例)
図16は、作業案内部208により実行される作業案内処理の第1具体例を示すフローチャートである。作業エリアTWA内を巡回する作業者OPは、携帯端末装置30T等に表示された作業リスト情報JH4に登録されている作業対象領域番号J42にて表される作業対象領域において、新たな補給用の部品収納部材に対する補給部品種情報JH02の読取操作を行う。これにより、作業対象領域が設定された部品実装機2の実装制御装置20に、外部入出力部204を介して補給部品種情報JH02が入力される(ステップa1)。
図16は、作業案内部208により実行される作業案内処理の第1具体例を示すフローチャートである。作業エリアTWA内を巡回する作業者OPは、携帯端末装置30T等に表示された作業リスト情報JH4に登録されている作業対象領域番号J42にて表される作業対象領域において、新たな補給用の部品収納部材に対する補給部品種情報JH02の読取操作を行う。これにより、作業対象領域が設定された部品実装機2の実装制御装置20に、外部入出力部204を介して補給部品種情報JH02が入力される(ステップa1)。
補給部品種情報JH02が入力されると、作業判定部207は、補給計画管理装置30から送信された作業リスト情報JH4に基づき、当該補給部品種情報JH02の部品種と同種の部品を表す部品種情報J14と関連付けられたセット位置情報J12を抽出する。作業判定部207は、その抽出したセット位置情報J12にて表されるセット位置に配置された部品補給対象装置に対する部品補給作業の実施の可否を判定する(ステップa2)。
作業判定部207によって部品補給対象装置に対する部品補給作業の実施が可能であると判定された場合には、作業案内部208は、部品補給対象装置に対する部品補給作業の実施を許可する作業許可情報JH50を生成する(ステップa3)。作業許可情報JH50は、例えば「読取操作された補給用の部品収納部材は、セット位置S11に配置されたAFに対して補給することが可能です。」等のメッセージ情報である。作業許可情報JH50は、実装制御装置20の表示部203に表示されるとともに、補給計画管理装置30の表示部33や携帯端末装置30Tに表示される(ステップa4)。携帯端末装置30T等に表示された作業許可情報JH50を参照することによって作業者OPは、補給部品種情報JH02の読取操作を行った補給用の部品収納部材に関する部品補給作業が実施可能であることを把握することができる。作業者OPは、作業許可情報JH50に従って、部品補給対象装置に対する部品補給作業を実施することができる。
一方、作業判定部207によって部品補給対象装置に対する部品補給作業の実施が不可であると判定された場合には、作業案内部208は、作業リスト情報JH4に含まれる補給可能時間情報J42にて表される補給可能時間TTが所定の閾値未満又は閾値以上の何れであるかを判定する(ステップa5)。
補給可能時間TTが前記閾値未満である場合には、作業案内部208は、第1案内情報JH51を前記実施手順案内情報JH5として生成する(ステップa6)。第1案内情報JH51は、補給可能時間TTに関する情報を含み、当該補給可能時間TTが経過するまで部品補給対象装置に対する部品補給作業の実施を待機する旨を報知する情報である。作業案内部208は、補給可能時間TTが閾値未満である場合、すなわち部品補給作業が可能となるまでの時間が比較的短い場合、実施手順案内情報JH5として第1案内情報JH51を生成する。この第1案内情報JH51は、補給可能時間TTが経過するまで部品補給作業の実施を待機するという実施手順を案内する情報である。第1案内情報JH51は、例えば「読取操作された補給用の部品収納部材は、セット位置S11に配置されたAFに対して補給することができません。部品補給作業の実施が可能となるまでの時間はTTです。補給可能時間TTが経過するまで待機して下さい。」等のメッセージ情報である。
第1案内情報JH51は、実装制御装置20の表示部203に表示されるとともに、補給計画管理装置30の表示部33や携帯端末装置30Tに表示される(ステップa7)。携帯端末装置30T等に表示された第1案内情報JH51を参照することによって作業者OPは、部品補給作業が可能となるまでの補給可能時間TTを認識した上で、その補給可能時間TTが経過するまで待機すればよいことを把握することができる。作業者OPは、第1案内情報JH51に従って補給可能時間TTが経過するまで待機し、その後、部品補給対象装置に対する部品補給作業を実施することができる。
補給可能時間TTが前記閾値以上である場合には、作業案内部208は、第2案内情報JH52を前記実施手順案内情報JH5として生成する(ステップa8)。第2案内情報JH52は、部品補給対象装置に対する部品補給作業の実施を先送りすることを推奨する情報である。より詳しくは、第2案内情報JH52は、作業者OPによる作業エリアTWA内の次回の巡回時に部品補給作業の実施を先送りすることを推奨する情報である。作業案内部208は、補給可能時間TTが閾値以上である場合、すなわち部品補給作業が可能となるまでの時間が比較的長い場合、実施手順案内情報JH5として第2案内情報JH52を生成する。この第2案内情報JH52は、作業者OPによる作業エリアTWA内の次回の巡回時に部品補給作業の実施を先送りするという実施手順を案内する情報である。第2案内情報JH52は、例えば「読取操作された補給用の部品収納部材は、セット位置S11に配置されたAFに対して補給することができません。このAFに対する部品補給作業は次回の巡回時に先送りし、今回の巡回においては次の部品補給対象装置に対する部品補給作業に進んで下さい。」等のメッセージ情報である。
第2案内情報JH52は、実装制御装置20の表示部203に表示されるとともに、補給計画管理装置30の表示部33や携帯端末装置30Tに表示される(ステップa9)。携帯端末装置30T等に表示された第2案内情報JH52を参照することによって作業者OPは、今回の巡回において補給可能時間TTが経過するまで待機することなく、巡回周期PPにて表される一定時間後の次回の巡回時に部品補給作業を先送りすればよいことを把握することができる。作業者OPは、今回の巡回においては次の部品補給対象装置に対する部品補給作業を実施し、先送りした部品補給対象装置に対する部品補給作業については次回の巡回時において実施することができる。
(第2具体例)
図17は、作業案内部208により実行される作業案内処理の第2具体例を示すフローチャートである。作業リスト情報JH4の作業対象領域番号J42にて表される作業対象領域において、作業者OPによって補給部品種情報JH02の読取操作が行われると、当該作業対象領域が設定された部品実装機2の実装制御装置20に、外部入出力部204を介して補給部品種情報JH02が入力される(ステップb1)。
図17は、作業案内部208により実行される作業案内処理の第2具体例を示すフローチャートである。作業リスト情報JH4の作業対象領域番号J42にて表される作業対象領域において、作業者OPによって補給部品種情報JH02の読取操作が行われると、当該作業対象領域が設定された部品実装機2の実装制御装置20に、外部入出力部204を介して補給部品種情報JH02が入力される(ステップb1)。
補給部品種情報JH02が入力されると、作業判定部207は、補給計画管理装置30から送信された作業リスト情報JH4に基づき、当該補給部品種情報JH02の部品種と同種の部品を表す部品種情報J14と関連付けられたセット位置情報J12を抽出する。作業判定部207は、その抽出したセット位置情報J12にて表されるセット位置に配置された部品補給対象装置に対する部品補給作業の実施の可否を判定する(ステップb2)。
作業判定部207によって部品補給対象装置に対する部品補給作業の実施が可能であると判定された場合には、作業案内部208は、部品補給対象装置に対する部品補給作業の実施を許可する作業許可情報JH50を生成する(ステップb3)。作業許可情報JH50は、実装制御装置20の表示部203に表示されるとともに、補給計画管理装置30の表示部33や携帯端末装置30Tに表示される(ステップb4)。携帯端末装置30T等に表示された作業許可情報JH50を参照することによって作業者OPは、補給部品種情報JH02の読取操作を行った補給用の部品収納部材に関する部品補給作業が実施可能であることを把握することができる。
一方、作業判定部207によって部品補給対象装置に対する部品補給作業の実施が不可であると判定された場合には、作業案内部208は、作業リスト情報JH4に含まれる補給可能時間情報J42にて表される補給可能時間TTが所定の閾値未満又は閾値以上の何れであるかを判定する(ステップb5)。
補給可能時間TTが前記閾値未満である場合には、作業案内部208は、第1案内情報JH51を前記実施手順案内情報JH5として生成する(ステップb6)。第1案内情報JH51は、補給可能時間TTに関する情報を含み、当該補給可能時間TTが経過するまで部品補給対象装置に対する部品補給作業の実施を待機する旨を報知する情報である。第1案内情報JH51は、実装制御装置20の表示部203に表示されるとともに、補給計画管理装置30の表示部33や携帯端末装置30Tに表示される(ステップb7)。携帯端末装置30T等に表示された第1案内情報JH51を参照することによって作業者OPは、部品補給作業が可能となるまでの補給可能時間TTを認識した上で、その補給可能時間TTが経過するまで待機すればよいことを把握することができる。
補給可能時間TTが前記閾値以上である場合には、作業案内部208は、作業リスト情報JH4に含まれる警告時間情報J43、停止時間情報J44及び生産可能時間情報J45を参照する。前述したように、警告時間情報J43にて表される警告時間WT、停止時間情報J44にて表される停止時間ST、及び生産可能時間情報J45にて表される生産可能時間PTは、部品補給作業の実施が必要となるまでの部品補給制限時間を規定するものである。補給可能時間TTが前記閾値以上である場合、作業案内部208は、部品補給制限時間が巡回周期PP以上又は巡回周期PP未満の何れであるかを判定する(ステップb8)。
部品補給制限時間が作業者OPによる作業エリアTWA内の巡回周期PP以上である場合には、作業者OPによる作業エリアTWA内の次回の巡回時であっても、部品補給制限時間以内に部品補給作業を実施することができる。そこで、補給可能時間TTが前記閾値以上であり、且つ部品補給制限時間が巡回周期PP以上である場合には、作業案内部208は、第2案内情報JH52を前記実施手順案内情報JH5として生成する(ステップb9)。第2案内情報JH52は、作業者OPによる作業エリアTWA内の次回の巡回時に部品補給作業の実施を先送りするという実施手順を案内する情報である。
第2案内情報JH52は、実装制御装置20の表示部203に表示されるとともに、補給計画管理装置30の表示部33や携帯端末装置30Tに表示される(ステップb10)。携帯端末装置30T等に表示された第2案内情報JH52を参照することによって作業者OPは、今回の巡回時においては補給可能時間TTが経過するまで待機することなく、次回の巡回時において部品補給制限時間以内で部品補給作業を実施することができる。
部品補給制限時間が作業者OPによる作業エリアTWA内の巡回周期PP未満である場合には、作業者OPによる作業エリアTWA内の次回の巡回時においては、部品補給制限時間以内で部品補給作業を実施することができない。そこで、補給可能時間TTが前記閾値以上であり、且つ部品補給制限時間が巡回周期PP未満である場合には、作業案内部208は、第1案内情報JH51を前記実施手順案内情報JH5として生成する(ステップb11)。第1案内情報JH51は、補給可能時間TTに関する情報を含み、当該補給可能時間TTが経過するまで部品補給対象装置に対する部品補給作業の実施を待機する旨を報知する情報である。
第1案内情報JH51は、実装制御装置20の表示部203に表示されるとともに、補給計画管理装置30の表示部33や携帯端末装置30Tに表示される(ステップb12)。携帯端末装置30T等に表示された第1案内情報JH51を参照することによって作業者OPは、部品補給作業が可能となるまでの補給可能時間TTを認識した上で、その補給可能時間TTが経過するまで待機すればよいことを把握することができる。作業者OPは、部品補給作業が可能となるまでの待機時間が多少長くはなるけれども、今回の巡回時において部品補給制限時間以内で部品補給作業を実施することができる。
(第3具体例)
図18A及び図18Bは、作業案内部208により実行される作業案内処理の第3具体例を示すフローチャートである。作業リスト情報JH4の作業対象領域番号J42にて表される作業対象領域において、作業者OPによって補給部品種情報JH02の読取操作が行われると、当該作業対象領域が設定された部品実装機2の実装制御装置20に、外部入出力部204を介して補給部品種情報JH02が入力される(ステップc1)。
図18A及び図18Bは、作業案内部208により実行される作業案内処理の第3具体例を示すフローチャートである。作業リスト情報JH4の作業対象領域番号J42にて表される作業対象領域において、作業者OPによって補給部品種情報JH02の読取操作が行われると、当該作業対象領域が設定された部品実装機2の実装制御装置20に、外部入出力部204を介して補給部品種情報JH02が入力される(ステップc1)。
補給部品種情報JH02が入力されると、作業判定部207は、補給計画管理装置30から送信された作業リスト情報JH4に基づき、当該補給部品種情報JH02の部品種と同種の部品を表す部品種情報J14と関連付けられたセット位置情報J12を抽出する。作業判定部207は、その抽出したセット位置情報J12にて表されるセット位置に配置された部品補給対象装置に対する部品補給作業の実施の可否を判定する(ステップc2)。
作業判定部207によって部品補給対象装置に対する部品補給作業の実施が可能であると判定された場合には、作業案内部208は、部品補給対象装置に対する部品補給作業の実施を許可する作業許可情報JH50を生成する(ステップc3)。作業許可情報JH50は、実装制御装置20の表示部203に表示されるとともに、補給計画管理装置30の表示部33や携帯端末装置30Tに表示される(ステップc4)。携帯端末装置30T等に表示された作業許可情報JH50を参照することによって作業者OPは、補給部品種情報JH02の読取操作を行った補給用の部品収納部材に関する部品補給作業が実施可能であることを把握することができる。
一方、作業判定部207によって部品補給対象装置に対する部品補給作業の実施が不可であると判定された場合には、作業案内部208は、作業リスト情報JH4に含まれる補給可能時間情報J42にて表される補給可能時間TTが所定の閾値未満又は閾値以上の何れであるかを判定する(ステップc5)。
補給可能時間TTが前記閾値未満である場合には、作業案内部208は、第1案内情報JH51を前記実施手順案内情報JH5として生成する(ステップc6)。第1案内情報JH51は、補給可能時間TTに関する情報を含み、当該補給可能時間TTが経過するまで部品補給対象装置に対する部品補給作業の実施を待機する旨を報知する情報である。第1案内情報JH51は、実装制御装置20の表示部203に表示されるとともに、補給計画管理装置30の表示部33や携帯端末装置30Tに表示される(ステップc7)。携帯端末装置30T等に表示された第1案内情報JH51を参照することによって作業者OPは、部品補給作業が可能となるまでの補給可能時間TTを認識した上で、その補給可能時間TTが経過するまで待機すればよいことを把握することができる。
補給可能時間TTが前記閾値以上である場合には、作業案内部208は、作業リスト情報JH4に含まれる警告時間情報J43、停止時間情報J44及び生産可能時間情報J45にて表される部品補給制限時間を参照する。補給可能時間TTが前記閾値以上である場合、作業案内部208は、部品補給制限時間が巡回周期PP以上又は巡回周期PP未満の何れであるかを判定する(ステップc8)。
補給可能時間TTが前記閾値以上であり、且つ部品補給制限時間が巡回周期PP以上である場合には、作業案内部208は、第2案内情報JH52を前記実施手順案内情報JH5として生成する(ステップc9)。第2案内情報JH52は、作業者OPによる作業エリアTWA内の次回の巡回時に部品補給作業の実施を先送りするという実施手順を案内する情報である。第2案内情報JH52は、実装制御装置20の表示部203に表示されるとともに、補給計画管理装置30の表示部33や携帯端末装置30Tに表示される(ステップc10)。携帯端末装置30T等に表示された第2案内情報JH52を参照することによって作業者OPは、今回の巡回時においては補給可能時間TTが経過するまで待機することなく、次回の巡回時において部品補給制限時間以内で部品補給作業を実施することができる。
補給可能時間TTが前記閾値以上であり、且つ部品補給制限時間が巡回周期PP未満である場合には、作業案内部208は、図19(A)に示す保留リスト情報JH6を生成する(ステップc11)。保留リスト情報JH6は、部品補給作業の実施を一時的に保留すべき部品補給対象装置をリスト化した情報である。保留リスト情報JH6は、前記作業対象領域番号情報J41、前記実装機種情報J11、前記セット位置情報J12、前記装置種情報J13、前記部品種情報J14、及びフラグ情報J61が関連付けられた情報である。フラグ情報J61は、作業対象領域番号情報J41にて表される作業対象領域における、セット位置情報J12にて表されるセット位置に配置された部品補給対象装置に対する部品補給作業の実施手順を案内するフラグである。作業案内部208は、部品補給制限時間が巡回周期PP未満である場合に、部品補給作業の実施を一時的に保留することを示す「保留」フラグがフラグ情報J61として付加された保留リスト情報JH6を生成する。
作業案内部208は、保留リスト情報JH6を生成すると、その保留リスト情報JH6に基づき第3案内情報JH53を前記実施手順案内情報JH5として生成する(ステップc12)。第3案内情報JH53は、保留リスト情報JH6のセット位置情報J12にて表されるセット位置に配置された部品補給対象装置に対する部品補給作業の実施を一時的に保留し、次の部品補給対象装置に対する部品補給作業の実施を推奨する情報である。第3案内情報JH53は、例えば「読取操作された補給用の部品収納部材は、セット位置S13に配置されたAFに対して補給することができません。このAFに対する部品補給作業は一時的に保留し、次の部品補給対象装置に対する部品補給作業に進んで下さい。」等のメッセージ情報である。第3案内情報JH53は、実装制御装置20の表示部203に表示されるとともに、補給計画管理装置30の表示部33や携帯端末装置30Tに表示される(ステップc13)。携帯端末装置30T等に表示された第3案内情報JH53を参照することによって作業者OPは、当該第3案内情報JH53に対応した部品補給作業の実施を一時的に保留し、例えば別の部品補給作業を実施することができる。
次に、作業案内部208は、作業リスト情報JH4に含まれる補給可能時間情報J42にて表される補給可能時間TTが経過したか否かを判定する(ステップc14)。補給可能時間TTが経過した場合、作業案内部208は、作業の実施が一時的に保留された部品補給作業(保留作業)が保留リスト情報JH6に登録されているか否かを判定する(ステップc15)。作業案内部208は、保留リスト情報JH6のフラグ情報J61に「保留」フラグが付加されている場合に、当該保留リスト情報JH6に保留作業が登録されていると判定する。保留リスト情報JH6に保留作業が登録されていなかった場合には、作業案内部208は、作業案内処理を終了する。
一方、保留リスト情報JH6に保留作業が登録されていた場合には、作業案内部208は、補給可能時間TTの経過後において、保留リスト情報JH6のフラグ情報J61を「保留」フラグから「作業可能」フラグに変更する(図19(B)参照)。「作業可能」フラグは、補給可能時間TTの経過によって部品補給作業の実施が可能になったことを示す。そして、作業案内部208は、第4案内情報JH54を前記実施手順案内情報JH5として生成する(ステップc16)。第4案内情報JH54は、一時的に保留された部品補給作業について、補給可能時間TTの経過後に作業実施を要請する情報である。第4案内情報JH54は、例えば「一時的に保留していた、部品実装機M1のセット位置S13に配置されたAFに対する部品補給作業を実施して下さい。」等のメッセージ情報である。
第4案内情報JH54は、実装制御装置20の表示部203に表示されるとともに、補給計画管理装置30の表示部33や携帯端末装置30Tに表示される(ステップc17)。携帯端末装置30T等に表示された第4案内情報JH54を参照することによって作業者OPは、一時的に保留していた部品補給作業の実施が可能になったことを把握し、今回の巡回時において部品補給制限時間以内で当該部品補給作業を実施することができる。
なお、上述した具体的実施形態には以下の構成を有する発明が主に含まれている。
本発明の一の局面に係る部品補給管理システムは、部品収納部材を複数装着可能な複数の部品供給装置から供給された部品を基板に搭載し部品搭載基板を生産する部品実装機が複数連結された1つ又は複数の部品実装ラインにおいて、当該部品実装ラインに設定された作業エリア内を巡回する作業者によって実施される、前記複数の部品供給装置の各々に対する部品補給作業を管理するシステムである。この部品補給管理システムは、前記複数の部品供給装置の各々における部品の供給状況を監視し、前記複数の部品収納部材のうちの部品供給が先行して行われる先行の部品収納部材が部品切れとなり、新たな補給用の部品収納部材を補給する前記部品補給作業が可能となるまでの時間を表す補給可能時間を、前記複数の部品供給装置ごとに推定する部品供給監視部と、前記補給用の部品収納部材に収納された部品の部品種を特定するための補給部品種情報を取得する情報取得部と、前記情報取得部により前記補給部品種情報が取得されたタイミングにおいて、前記部品供給装置に対して前記補給用の部品収納部材を補給する前記部品補給作業の実施の可否を判定する判定部と、前記判定部により前記部品補給作業の実施が不可であると判定された場合に、当該部品補給作業の前記補給可能時間に基づく実施手順を案内する実施手順案内情報を生成する作業案内部と、を備える。
この部品補給管理システムによれば、部品実装ラインの各部品実装機に付設される部品供給装置における部品の供給状況が、部品供給監視部によって監視される。この部品供給監視部は、作業者による部品補給作業が可能となるまでの時間を表す補給可能時間を部品供給装置ごとに推定する。作業者は、部品供給監視部によって推定された補給可能時間を目安として、部品供給装置に対する部品補給作業を実施することができる。ここで、実際に部品補給作業の実施が可能であるか否かの可否が、判定部によって判定される。判定部が部品補給作業の実施の可否を判定するタイミングは、情報取得部により補給部品種情報が取得されたタイミングである。この補給部品種情報は、補給用の部品収納部材に収納された部品の部品種を特定するための情報であって、部品補給作業の際に作業者の操作によって補給用の部品収納部材から読み取られる情報である。つまり、補給用の部品収納部材を用いた部品補給作業を実施しようとして作業者が、補給部品種情報の読取操作を行ったタイミングにおいて、判定部によって当該部品補給作業の実施の可否が判定される。このタイミングにおいて、部品補給作業の実施が不可であると判定された場合、作業者はどのように対処すればよいのか分からず、混乱してしまう可能性がある。
そこで、判定部により部品補給作業の実施が不可であると判定された場合に、作業案内部が、実施手順案内情報を生成する。この実施手順案内情報は、部品補給作業の補給可能時間に基づく実施手順を案内するための情報である。実施手順案内情報を参照することによって作業者は、補給部品種情報の読取操作を行ったタイミングにおいて実施が不可とされた部品補給作業の実施手順を把握することができる。これにより、対処不明に起因した混乱を防止し、作業者による部品補給作業の効率化を図ることができる。
上記の部品補給管理システムにおいて、前記作業者が一定時間ごとに前記作業エリア内を巡回して前記部品補給作業を実施する際の、前記一定時間を表す巡回周期が予め設定されている。そして、前記作業案内部は、前記補給可能時間が所定の閾値未満又は前記閾値以上の何れであるかを判定し、前記補給可能時間が前記閾値未満である場合には、前記補給可能時間が経過するまで前記部品補給作業の実施を待機する旨を報知する第1案内情報を、前記実施手順案内情報として生成し、前記補給可能時間が前記閾値以上である場合には、前記作業者による前記作業エリア内の次回の巡回時に前記部品補給作業の実施を先送りすることを推奨する第2案内情報を、前記実施手順案内情報として生成する構成であってもよい。
この態様では、作業案内部は、補給可能時間が閾値未満である場合、すなわち部品補給作業が可能となるまでの時間が比較的短い場合、実施手順案内情報として第1案内情報を生成する。この第1案内情報は、補給可能時間が経過するまで部品補給作業の実施を待機するという実施手順を案内する情報である。第1案内情報を参照することによって作業者は、部品補給作業が可能となるまでの補給可能時間を認識した上で、その補給可能時間が経過するまで待機すればよいことを把握することができる。
一方、補給可能時間が閾値以上である場合、すなわち部品補給作業が可能となるまでの時間が比較的長い場合、作業案内部は、実施手順案内情報として第2案内情報を生成する。この第2案内情報は、作業者による作業エリア内の次回の巡回時に部品補給作業の実施を先送りするという実施手順を案内する情報である。第2案内情報を参照することによって作業者は、補給可能時間が経過するまで待機することなく、部品補給作業を次回の巡回時に先送りすればよいことを把握することができる。
上記の部品補給管理システムにおいて、前記部品供給監視部は、前記補給可能時間よりも長い時間であって、前記部品補給作業の実施が必要となるまでの部品補給制限時間を、前記複数の部品供給装置ごとに推定するように構成される。前記作業案内部は、前記補給可能時間が前記閾値以上であると判定した際に、前記部品補給制限時間が前記巡回周期以上である場合に前記第2案内情報を生成する構成であってもよい。
部品供給装置からの部品の供給が停止しないようにするためには、部品供給装置に装着された各部品収納部材の全部品が部品切れなどする前に、補給用の部品収納部材を部品供給装置に補給する部品補給作業の実施が必要となる。この部品補給作業の実施が必要となるまでの部品補給制限時間が、作業者による作業エリア内の巡回周期以上である場合には、作業者による作業エリア内の次回の巡回時であっても、部品補給制限時間以内に部品補給作業を実施することができる。そこで、補給可能時間が閾値以上であって部品補給作業が可能となるまでの時間が比較的長く、部品補給制限時間が巡回周期以上である場合に、作業案内部は、部品補給作業の実施を次回の巡回時に先送りすることを推奨する第2案内情報を生成する。この第2案内情報を参照することによって作業者は、今回の巡回時においては補給可能時間が経過するまで待機することなく、次回の巡回時において部品補給制限時間以内で部品補給作業を実施することができる。
上記の部品補給管理システムにおいて、前記作業案内部は、前記補給可能時間が前記閾値以上であると判定した際に、前記部品補給制限時間が前記巡回周期未満である場合には、前記第1案内情報を生成する構成であってもよい。
部品補給制限時間が巡回周期未満である場合には、作業者による作業エリア内の次回の巡回時においては、部品補給制限時間以内で部品補給作業を実施することができない。そこで、部品補給制限時間が巡回周期未満である場合には、作業案内部は、補給可能時間が経過するまで待機する旨を報知する第1案内情報を生成する。この第1案内情報を参照することによって作業者は、部品補給作業が可能となるまでの待機時間が多少長くはなるけれども、今回の巡回時において部品補給制限時間以内で部品補給作業を実施することができる。
上記の部品補給管理システムにおいて、前記作業案内部は、前記補給可能時間が前記閾値以上であると判定した際に、前記部品補給制限時間が前記巡回周期未満である場合には、前記部品補給作業の実施の一時的な保留を報知する第3案内情報と、前記補給可能時間の経過後に一時的に保留された前記部品補給作業の実施を要請する第4案内情報とを、前記実施手順案内情報として生成する構成であってもよい。
この態様では、補給可能時間が閾値以上であり、且つ部品補給制限時間が巡回周期未満である場合には、作業案内部は、部品補給作業の実施の一時的な保留を報知する第3案内情報を生成するとともに、補給可能時間の経過後に当該部品補給作業の実施を要請する第4案内情報を生成する。第3案内情報を参照することによって作業者は、当該第3案内情報に対応した部品補給作業の実施を一時的に保留し、例えば別の部品補給作業を実施することができる。そして、第4案内情報を参照することによって作業者は、一時的に保留していた部品補給作業の実施が可能になったことを把握し、今回の巡回時において部品補給制限時間以内で当該部品補給作業を実施することができる。
本発明の他の局面に係る部品実装システムは、部品収納部材を複数装着可能な複数の部品供給装置から供給された部品を基板に搭載し部品搭載基板を生産する部品実装機が複数連結された1つ又は複数の部品実装ラインと、前記部品実装ラインに設定された作業エリア内を巡回する作業者によって実施される、前記複数の部品供給装置の各々に対する部品補給作業を管理する、上記の部品補給管理システムと、を備える。
この部品実装システムによれば、部品供給装置に対する部品補給作業の効率化を図ることが可能な部品補給管理システムを備えているので、部品搭載基板の生産中に、作業者による部品補給作業の遅れに起因して部品供給装置からの部品の供給が停止することが、可及的に抑止される。これにより、部品搭載基板の生産効率の低下を抑止することができる。
以上説明した通り、本発明によれば、部品実装ラインの各部品実装機に付設された部品供給装置に対する部品補給作業の効率化を図ることが可能な部品補給管理システム、及びそれを備えた部品実装システムを提供することができる。
1 部品実装システム
2 部品実装機
2L 部品実装ライン
20 実装制御装置
204 外部入出力部(情報取得部)
207 作業判定部
208 作業案内部
241,245,246 部品供給装置
3 部品補給管理システム
30 補給計画管理装置
31 通信部
32 操作部
33 表示部
34 制御部
341 部品供給監視部
342 補給管理部
343 記憶部
30T 携帯端末装置
JH02 補給部品種情報
JH4 作業リスト情報
JH5 実施手順案内情報
JH51 第1案内情報
JH52 第2案内情報
JH53 第3案内情報
JH54 第4案内情報
2 部品実装機
2L 部品実装ライン
20 実装制御装置
204 外部入出力部(情報取得部)
207 作業判定部
208 作業案内部
241,245,246 部品供給装置
3 部品補給管理システム
30 補給計画管理装置
31 通信部
32 操作部
33 表示部
34 制御部
341 部品供給監視部
342 補給管理部
343 記憶部
30T 携帯端末装置
JH02 補給部品種情報
JH4 作業リスト情報
JH5 実施手順案内情報
JH51 第1案内情報
JH52 第2案内情報
JH53 第3案内情報
JH54 第4案内情報
Claims (6)
- 部品収納部材を複数装着可能な複数の部品供給装置から供給された部品を基板に搭載し部品搭載基板を生産する部品実装機が複数連結された1つ又は複数の部品実装ラインにおいて、当該部品実装ラインに設定された作業エリア内を巡回する作業者によって実施される、前記複数の部品供給装置の各々に対する部品補給作業を管理する部品補給管理システムであって、
前記複数の部品供給装置の各々における部品の供給状況を監視し、前記複数の部品収納部材のうちの部品供給が先行して行われる先行の部品収納部材が部品切れとなり、新たな補給用の部品収納部材を補給する前記部品補給作業が可能となるまでの時間を表す補給可能時間を、前記複数の部品供給装置ごとに推定する部品供給監視部と、
前記補給用の部品収納部材に収納された部品の部品種を特定するための補給部品種情報を取得する情報取得部と、
前記情報取得部により前記補給部品種情報が取得されたタイミングにおいて、前記部品供給装置に対して前記補給用の部品収納部材を補給する前記部品補給作業の実施の可否を判定する判定部と、
前記判定部により前記部品補給作業の実施が不可であると判定された場合に、当該部品補給作業の前記補給可能時間に基づく実施手順を案内する実施手順案内情報を生成する作業案内部と、を備える、部品補給管理システム。 - 前記作業者が一定時間ごとに前記作業エリア内を巡回して前記部品補給作業を実施する際の、前記一定時間を表す巡回周期が予め設定されており、
前記作業案内部は、前記補給可能時間が所定の閾値未満又は前記閾値以上の何れであるかを判定し、
前記補給可能時間が前記閾値未満である場合には、前記補給可能時間が経過するまで前記部品補給作業の実施を待機する旨を報知する第1案内情報を、前記実施手順案内情報として生成し、
前記補給可能時間が前記閾値以上である場合には、前記作業者による前記作業エリア内の次回の巡回時に前記部品補給作業の実施を先送りすることを推奨する第2案内情報を、前記実施手順案内情報として生成する、請求項1に記載の部品補給管理システム。 - 前記部品供給監視部は、前記補給可能時間よりも長い時間であって、前記部品補給作業の実施が必要となるまでの部品補給制限時間を、前記複数の部品供給装置ごとに推定するように構成され、
前記作業案内部は、前記補給可能時間が前記閾値以上であると判定した際に、前記部品補給制限時間が前記巡回周期以上である場合に前記第2案内情報を生成する、請求項2に記載の部品補給管理システム。 - 前記作業案内部は、前記補給可能時間が前記閾値以上であると判定した際に、前記部品補給制限時間が前記巡回周期未満である場合には、前記第1案内情報を生成する、請求項3に記載の部品補給管理システム。
- 前記作業案内部は、前記補給可能時間が前記閾値以上であると判定した際に、前記部品補給制限時間が前記巡回周期未満である場合には、前記部品補給作業の実施の一時的な保留を報知する第3案内情報と、前記補給可能時間の経過後に一時的に保留された前記部品補給作業の実施を要請する第4案内情報とを、前記実施手順案内情報として生成する、請求項3に記載の部品補給管理システム。
- 部品収納部材を複数装着可能な複数の部品供給装置から供給された部品を基板に搭載し部品搭載基板を生産する部品実装機が複数連結された1つ又は複数の部品実装ラインと、
前記部品実装ラインに設定された作業エリア内を巡回する作業者によって実施される、前記複数の部品供給装置の各々に対する部品補給作業を管理する、請求項1~5のいずれか1項に記載の部品補給管理システムと、を備える、部品実装システム。
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US17/049,319 US11778797B2 (en) | 2018-05-30 | 2018-05-30 | Component replenishment management system and component mounting system |
CN201880093590.3A CN112166655B (zh) | 2018-05-30 | 2018-05-30 | 元件补给管理系统和元件安装系统 |
JP2020522459A JP6950090B2 (ja) | 2018-05-30 | 2018-05-30 | 部品補給管理システム及び部品実装システム |
DE112018007667.9T DE112018007667T5 (de) | 2018-05-30 | 2018-05-30 | Bauteilwiederauffüllungs-verwaltungssystem und bauteilmontagesystem |
PCT/JP2018/020790 WO2019229881A1 (ja) | 2018-05-30 | 2018-05-30 | 部品補給管理システム及び部品実装システム |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2018/020790 WO2019229881A1 (ja) | 2018-05-30 | 2018-05-30 | 部品補給管理システム及び部品実装システム |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2019229881A1 true WO2019229881A1 (ja) | 2019-12-05 |
Family
ID=68696903
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2018/020790 WO2019229881A1 (ja) | 2018-05-30 | 2018-05-30 | 部品補給管理システム及び部品実装システム |
Country Status (5)
Country | Link |
---|---|
US (1) | US11778797B2 (ja) |
JP (1) | JP6950090B2 (ja) |
CN (1) | CN112166655B (ja) |
DE (1) | DE112018007667T5 (ja) |
WO (1) | WO2019229881A1 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023007742A1 (ja) * | 2021-07-30 | 2023-02-02 | ヤマハ発動機株式会社 | 部品実装システム |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113597259B (zh) * | 2021-07-30 | 2023-09-15 | 广州佳帆计算机有限公司 | 供料器状态检测方法及装置 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004021281A (ja) * | 2002-06-12 | 2004-01-22 | Ricoh Microelectronics Co Ltd | 物品製造システム |
JP2004134691A (ja) * | 2002-10-15 | 2004-04-30 | Fuji Mach Mfg Co Ltd | 部品補給管理システム、部品補給管理方法および部品補給管理プログラム |
JP2012028660A (ja) * | 2010-07-27 | 2012-02-09 | Fuji Mach Mfg Co Ltd | 部品実装ラインの部品補給最適化装置及び部品補給最適化方法 |
JP2012142519A (ja) * | 2011-01-06 | 2012-07-26 | Fuji Mach Mfg Co Ltd | 部品補給時の案内装置 |
WO2015079488A1 (ja) * | 2013-11-26 | 2015-06-04 | 富士機械製造株式会社 | キャリアテープの連結の可否を判定する装置 |
JP2015130403A (ja) * | 2014-01-07 | 2015-07-16 | 富士機械製造株式会社 | 支援装置 |
JP2016143784A (ja) * | 2015-02-03 | 2016-08-08 | 富士機械製造株式会社 | 情報処理装置、および対基板作業システム |
JP2016225387A (ja) * | 2015-05-28 | 2016-12-28 | パナソニックIpマネジメント株式会社 | 部品実装ラインにおける部品補給支援方法および部品補給支援システム |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3859266B2 (ja) * | 1996-06-12 | 2006-12-20 | 松下電器産業株式会社 | 部品実装方法 |
CN1189436A (zh) | 1997-01-28 | 1998-08-05 | 三星电子株式会社 | 托盘供给装置 |
JP3973439B2 (ja) | 2002-02-07 | 2007-09-12 | 松下電器産業株式会社 | 電子部品実装装置及び方法 |
JP2005347317A (ja) * | 2004-05-31 | 2005-12-15 | Yamaha Motor Co Ltd | 部品供給装置およびそれを備えた実装機 |
JP4955631B2 (ja) * | 2007-09-25 | 2012-06-20 | パナソニック株式会社 | 部品搭載装置 |
JP5478163B2 (ja) * | 2009-09-07 | 2014-04-23 | 富士機械製造株式会社 | 電子部品供給装置および電子部品供給方法 |
EP2874481B1 (en) | 2012-07-13 | 2023-01-25 | FUJI Corporation | Component mounting system |
JP5860357B2 (ja) * | 2012-07-31 | 2016-02-16 | ヤマハ発動機株式会社 | 部品実装システム |
CN104996006B (zh) * | 2013-02-18 | 2017-12-19 | 富士机械制造株式会社 | 电子电路元件安装装置 |
JP6097937B2 (ja) * | 2014-01-27 | 2017-03-22 | パナソニックIpマネジメント株式会社 | 部品照合方法および部品照合システム |
JP6427763B2 (ja) * | 2014-12-12 | 2018-11-28 | パナソニックIpマネジメント株式会社 | 管理装置 |
CN107535083B (zh) * | 2015-04-27 | 2020-07-31 | 株式会社富士 | 供料器的管理装置 |
JP6782425B2 (ja) * | 2016-04-26 | 2020-11-11 | パナソニックIpマネジメント株式会社 | 生産能力推定装置および生産能力推定方法 |
-
2018
- 2018-05-30 WO PCT/JP2018/020790 patent/WO2019229881A1/ja active Application Filing
- 2018-05-30 DE DE112018007667.9T patent/DE112018007667T5/de active Pending
- 2018-05-30 CN CN201880093590.3A patent/CN112166655B/zh active Active
- 2018-05-30 US US17/049,319 patent/US11778797B2/en active Active
- 2018-05-30 JP JP2020522459A patent/JP6950090B2/ja active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004021281A (ja) * | 2002-06-12 | 2004-01-22 | Ricoh Microelectronics Co Ltd | 物品製造システム |
JP2004134691A (ja) * | 2002-10-15 | 2004-04-30 | Fuji Mach Mfg Co Ltd | 部品補給管理システム、部品補給管理方法および部品補給管理プログラム |
JP2012028660A (ja) * | 2010-07-27 | 2012-02-09 | Fuji Mach Mfg Co Ltd | 部品実装ラインの部品補給最適化装置及び部品補給最適化方法 |
JP2012142519A (ja) * | 2011-01-06 | 2012-07-26 | Fuji Mach Mfg Co Ltd | 部品補給時の案内装置 |
WO2015079488A1 (ja) * | 2013-11-26 | 2015-06-04 | 富士機械製造株式会社 | キャリアテープの連結の可否を判定する装置 |
JP2015130403A (ja) * | 2014-01-07 | 2015-07-16 | 富士機械製造株式会社 | 支援装置 |
JP2016143784A (ja) * | 2015-02-03 | 2016-08-08 | 富士機械製造株式会社 | 情報処理装置、および対基板作業システム |
JP2016225387A (ja) * | 2015-05-28 | 2016-12-28 | パナソニックIpマネジメント株式会社 | 部品実装ラインにおける部品補給支援方法および部品補給支援システム |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023007742A1 (ja) * | 2021-07-30 | 2023-02-02 | ヤマハ発動機株式会社 | 部品実装システム |
Also Published As
Publication number | Publication date |
---|---|
JPWO2019229881A1 (ja) | 2021-04-01 |
DE112018007667T5 (de) | 2021-03-04 |
CN112166655A (zh) | 2021-01-01 |
US11778797B2 (en) | 2023-10-03 |
CN112166655B (zh) | 2022-03-01 |
US20210059086A1 (en) | 2021-02-25 |
JP6950090B2 (ja) | 2021-10-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11240949B2 (en) | Component mounting line | |
US11470751B2 (en) | Component-mounting system and management device | |
JP6732958B2 (ja) | 部品補給管理システム及び部品実装システム | |
JP2024036630A (ja) | 部品実装ラインおよび部品供給方法 | |
WO2019229881A1 (ja) | 部品補給管理システム及び部品実装システム | |
JP6902671B2 (ja) | 作業計画管理システム及び部品実装システム | |
WO2019167162A1 (ja) | 部品補給管理システム及び部品実装システム | |
WO2019187036A1 (ja) | 部品実装システム | |
US11968786B2 (en) | Component replenishment management system and component mounting system | |
WO2019229880A1 (ja) | 部品補給管理システム及び部品実装システム | |
JP2020014021A (ja) | ユニット保管庫および部品実装ライン | |
JP2020014019A (ja) | 部品実装ライン | |
WO2020179024A1 (ja) | セットアップ支援装置 | |
JP2019160950A (ja) | 作業管理システム及び部品実装システム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18920870 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2020522459 Country of ref document: JP Kind code of ref document: A |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 18920870 Country of ref document: EP Kind code of ref document: A1 |