WO2019207786A1 - 油圧エレベーターのポンプチェック弁取替治具およびポンプチェック弁取替方法 - Google Patents

油圧エレベーターのポンプチェック弁取替治具およびポンプチェック弁取替方法 Download PDF

Info

Publication number
WO2019207786A1
WO2019207786A1 PCT/JP2018/017266 JP2018017266W WO2019207786A1 WO 2019207786 A1 WO2019207786 A1 WO 2019207786A1 JP 2018017266 W JP2018017266 W JP 2018017266W WO 2019207786 A1 WO2019207786 A1 WO 2019207786A1
Authority
WO
WIPO (PCT)
Prior art keywords
check valve
jack
pump
base
valve
Prior art date
Application number
PCT/JP2018/017266
Other languages
English (en)
French (fr)
Inventor
一樹 入江
Original Assignee
三菱電機ビルテクノサービス株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機ビルテクノサービス株式会社 filed Critical 三菱電機ビルテクノサービス株式会社
Priority to JP2018543404A priority Critical patent/JP6558504B1/ja
Priority to CN201880091771.2A priority patent/CN111902356B/zh
Priority to PCT/JP2018/017266 priority patent/WO2019207786A1/ja
Publication of WO2019207786A1 publication Critical patent/WO2019207786A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B9/00Kinds or types of lifts in, or associated with, buildings or other structures
    • B66B9/04Kinds or types of lifts in, or associated with, buildings or other structures actuated pneumatically or hydraulically
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F3/00Devices, e.g. jacks, adapted for uninterrupted lifting of loads
    • B66F3/08Devices, e.g. jacks, adapted for uninterrupted lifting of loads screw operated
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks

Definitions

  • This invention relates to a pump check valve replacement jig and a pump check valve replacement method for a hydraulic elevator.
  • Oil tanks, pumps and valves are installed in the machine room of the hydraulic elevator.
  • the valve is arranged above the pump and connected to the pump via a pump check valve.
  • Patent Document 1 describes a hydraulic elevator.
  • the replacement work of the pump check valve is performed, for example, in a state where a pipe protruding laterally from the valve is lifted by a lashing belt or the like. In this case, since the valve is tilted and unstable, workability is not good.
  • the objective is to provide a pump check valve replacement jig and a pump check valve replacement method for a hydraulic elevator that can easily perform replacement work of the pump check valve.
  • a notch corresponding to the level difference between the floor of the hydraulic elevator machine room and the pump base is formed in the lower portion along the longitudinal direction.
  • a jack base installed below, and a small hydraulic jack installed just below a pipe projecting from the valve on the upper surface of the jack base.
  • the hydraulic elevator pump check valve replacement method includes a jack base in which a notch corresponding to a step between a floor of a hydraulic elevator machine room and a pump base is formed in a lower portion along a longitudinal direction.
  • the jack In the state where the base is installed below the valve, the jack is installed in the upper surface of the jack base just below the pipe protruding from the valve, and the pump check valve is not fixed to the pump.
  • the valve of the hydraulic elevator is pushed up by the small hydraulic jack. For this reason, the replacement work of the pump check valve can be easily performed.
  • FIG. 3 is a first diagram showing a pump check valve replacement jig in the first embodiment. It is a 2nd figure which shows the pump check valve replacement jig in Embodiment 1.
  • FIG. 3 is a first perspective view of a jack base in the first embodiment.
  • FIG. 3 is a second perspective view of a jack base in the first embodiment.
  • FIG. 6 is a first diagram showing how to use the pump check valve replacement jig in the first embodiment.
  • FIG. 10 is a third diagram showing how to use the pump check valve replacement jig in the first embodiment.
  • FIG. 1 is a schematic diagram illustrating an example of the structure of a hydraulic elevator.
  • the hydraulic elevator has a machine room 1 and a hoistway 2.
  • the machine room 1 is provided with an oil tank 3, a motor 4, a pump 5, a valve 6 and a silencer 7.
  • the hoistway 2 is provided with a car hydraulic jack 8 and a car 9.
  • the car hydraulic jack 8 is connected to the silencer 7 by piping.
  • the motor 4, the pump 5 and the silencer 7 are arranged on the floor surface of the machine room 1, for example.
  • the oil tank 3 is disposed above the motor 4, the pump 5, the valve 6 and the silencer 7.
  • the valve 6 is disposed below the oil tank 3 and is disposed above the pump 5 and the silencer 7.
  • the valve 6 is connected to the pump 5 via the pump check valve 10.
  • the lower part of the pump check valve 10 is fixed to the upper part of the pump 5 with, for example, bolts.
  • the upper part of the pump check valve 10 is fixed to the lower part of the valve 6 with a bolt or the like, for example.
  • the valve 6 has a tank side pipe 11 and a silencer side pipe 12.
  • the tank side pipe 11 and the silencer side pipe 12 have, for example, an L shape.
  • the tank side pipe 11 and the silencer side pipe 12 are made of metal, for example.
  • One end of the tank side pipe 11 protrudes laterally from the valve 6.
  • the other end of the tank side pipe 11 is fitted upward with respect to a rubber hose 13 extending downward from the oil tank 3.
  • the end portion of the rubber hose 13 that overlaps the other end portion of the tank side pipe 11 is tightened with a band (not shown), for example.
  • One end of the silencer side pipe 12 projects laterally from the valve 6.
  • One end of the silencer side pipe 12 protrudes on the side opposite to the tank side pipe 11.
  • the other end of the silencer side pipe 12 is connected downward with respect to the silencer 7.
  • the other end of the silencer side pipe 12 is connected to the silencer 7 via a joint member (not shown), for example.
  • FIG. 2 is a first diagram showing a pump check valve replacement jig in the first embodiment.
  • the pump check valve replacement jig of the hydraulic elevator includes a small hydraulic jack 16, a pipe fixing bracket 17, a connecting pipe 18, and a jack base 19.
  • the small hydraulic jack 16 is formed in a size that can be carried.
  • the small hydraulic jack 16 moves the ram upward when driven by a manual lever.
  • the pipe fixing bracket 17 is, for example, a pair of plate-like members having a curved portion and a straight portion. A pair of curved parts are connected with a hinge etc., for example.
  • the diameter of the ring formed by the pair of curved portions when the pipe fixing bracket 17 is closed corresponds to, for example, the diameter of at least one of the tank side pipe 11 and the silencer side pipe 12.
  • the connecting pipe 18 is, for example, a straight pipe.
  • the length of the connecting pipe 18 is smaller than the stroke of the small hydraulic jack 16, for example.
  • the length of the connecting pipe 18 is larger than the length of the straight portion of the pipe fixing bracket 17.
  • the inner diameter of the connecting pipe 18 is larger than the head of the ram of the small hydraulic jack 16, for example.
  • the inner diameter of the connecting pipe 18 is larger than the width of the straight portion of the pipe fixing bracket 17.
  • the connecting pipe 18 has, for example, a receiving portion having an inner diameter smaller than that of the head of the ram inside the intermediate portion in the longitudinal direction.
  • the jack base 19 is made of a light material such as a balsa material, for example.
  • FIG. 3 is a second view showing the pump check valve replacement jig in the first embodiment.
  • FIG. 3 shows a state in which the small hydraulic jack 16, the pipe fixing bracket 17 and the connecting pipe 18 are combined.
  • the ram of the small hydraulic jack 16 is inserted into the connecting pipe 18 from below.
  • the head of the ram supports, for example, a receiving portion of the connecting pipe 18.
  • the pipe fixing bracket 17 is used with the straight portion facing downward.
  • the straight portion is inserted into the connecting pipe 18 from above.
  • the pipe fixing bracket 17 is supported, for example, when the lower end of the curved portion is in contact with the upper end of the connecting pipe 18.
  • the pipe fixing bracket 17 may be supported by, for example, the lower end of the straight portion contacting the head of the ram of the small hydraulic jack 16.
  • FIG. 4 is a first perspective view of the jack base in the first embodiment.
  • FIG. 5 is a second perspective view of the jack base in the first embodiment.
  • FIG. 4 shows a state seen from the upper surface 19 a side of the jack base 19.
  • FIG. 5 shows a state in which the jack base 19 is viewed from the lower surface 19b side.
  • the upper surface 19a is a plane parallel to the lower surface 19b, for example.
  • a notch is formed in the lower portion of the jack base 19.
  • the jack base 19 has, for example, a shape in which a portion corresponding to one of the corners along the longitudinal direction of the quadrangular prism is notched.
  • the notch is formed along the longitudinal direction of the jack base 19 as viewed from above and below.
  • the length of the lower surface 19b in the longitudinal direction is equal to the length of the upper surface 19a in the longitudinal direction, for example.
  • the length of the lower surface 19b in the short direction is shorter than the length of the upper surface 19a in the short direction. Further, the length of the upper surface 19a in the short direction is longer than the width of the bottom of the small hydraulic jack 16, for example.
  • the notch of the jack base 19 is formed in a size corresponding to the step between the floor of the machine room 1 and the base of the pump 5.
  • the jack base 19 is installed on the floor surface between the motor 4 and the pump 5, for example.
  • the jack base 19 is installed so that, for example, the notched ceiling portion 19 c is supported by a plurality of bolts attached to the upper surface near the left end of the base of the pump 5.
  • the length in the short direction of the jack base 19 as viewed from the vertical direction is set so as not to interfere with the motor 4.
  • the width W of the notch is set based on the distance from the left end of the base of the pump 5 to the right end of the bolt.
  • the height H of the notch is set corresponding to the height from the floor surface of the machine room 1 to the upper end of the bolt.
  • FIG. 6 is a first diagram showing how to use the pump check valve replacement jig in the first embodiment.
  • FIG. 7 is a second diagram showing how to use the pump check valve replacement jig in the first embodiment.
  • FIG. 8 is a third diagram showing how to use the pump check valve replacement jig in the first embodiment.
  • FIGS. 6 and 8 are front views showing the periphery of the valve 6.
  • FIG. 7 is a plan view showing the vicinity of the left end of the base of the pump 5.
  • the pulley 14 and the belt 15 are not shown.
  • the first release process is performed.
  • the maintenance person releases the fixing of the pump check valve 10 to the pump 5 by, for example, removing a bolt or the like from the lower part of the pump check valve 10.
  • the maintenance staff releases the fixing of the tank side pipe 11 to the rubber hose 13 by, for example, removing the band from the end of the rubber hose 13.
  • the maintenance staff does not release the fixing of the silencer side pipe 12 to the silencer 7, for example.
  • a base installation process is performed.
  • the base installation process is performed, for example, after the first release process.
  • the maintenance staff installs the jack base 19 below the left side of the valve 6 as shown in FIG.
  • the lower surface 19 b of the jack base 19 is in contact with the floor surface of the machine room 1.
  • the notched ceiling portion 19 c of the jack base 19 contacts the upper end of the bolt 20 attached to the upper surface near the left end of the base of the pump 5.
  • the notched ceiling portion 19 c is supported by the plurality of bolts 20.
  • the jack installation process is carried out.
  • the maintenance person installs the small hydraulic jack 16 at a position directly below the tank side pipe 11 protruding from the valve 6 on the upper surface 19 a of the jack base 19.
  • the small hydraulic jack 16 is installed in front of the center in the longitudinal direction of the jack base 19.
  • the small hydraulic jack 16 is installed with the manual lever facing the back side.
  • Jack installation process includes a connection process.
  • the connecting step as shown in FIG. 6, the maintenance staff connects the straight portion of the pipe fixing bracket 17 attached so as to sandwich the tank-side pipe 11 between the curved portions and the ram of the small hydraulic jack 16 to the connecting pipe 18.
  • the small hydraulic jack 16, the pipe fixing bracket 17, and the connecting pipe 18 are combined in the same relationship as in FIG.
  • the second release process is performed.
  • the maintenance person releases the fixing of the silencer side pipe 12 to the silencer 7 by removing the joint member from the other end of the silencer side pipe 12, for example.
  • the location where the fixation is released in the first release step and the second release step may be different from the above description.
  • the first release step if the pump check valve 10 is fixed to the pump 5, the tank side pipe 11 is fixed to the rubber hose 13, and the silencer side pipe 12 is fixed to the silencer 7, two or one place is fixed. Good.
  • the second release step it is only necessary to release the remaining one or two places that were not released in the first release step. By implementing the 2nd cancellation process after a jack installation process, it can avoid that valve 6 will be in the state where nothing is supported.
  • the push-up step is performed.
  • the maintenance person pushes up the valve 6 using the small hydraulic jack 16 in a state where the pump check valve 10 is fixed to the valve 6 and not fixed to the pump 5 as shown in FIG.
  • the maintenance staff operates the manual lever of the small hydraulic jack 16 from the back side of the jack base 19.
  • the other end of the tank side pipe 11 enters the rubber hose 13 deeper than the state of FIG.
  • the other end of the silencer side pipe 12 comes out from the silencer 7.
  • a replacement process is performed.
  • the maintenance staff replaces the pump check valve 10 fixed to the valve 6 while the valve 6 is pushed up.
  • the maintenance staff releases the pressure of the small hydraulic jack 16 and lowers the valve 6 to the original height.
  • the maintenance staff fixes a new pump check valve 10 to the pump 5.
  • the maintenance staff also fixes the tank side pipe 11 to the rubber hose 13. Further, the maintenance staff fixes the silencer side pipe 12 to the silencer 7.
  • the maintenance staff removes the small hydraulic jack 16, the pipe fixing bracket 17, the connecting pipe 18, and the jack base 19.
  • the jack base 19 is formed with a notch corresponding to a step between the floor surface of the machine room 1 of the hydraulic elevator and the base of the pump 5 in the lower part along the longitudinal direction. And installed below the valve 6.
  • the small hydraulic jack 16 is installed directly below the pipe protruding from the valve 6 on the upper surface of the jack base 19. For this reason, the small hydraulic jack 16 can be pushed up in a stable state without tilting the valve 6. As a result, workability and safety can be improved, and replacement work of the pump check valve 10 can be easily performed.
  • the jack base 19 is formed such that the length in the longitudinal direction is larger than the interval between the plurality of bolts 20 attached to the upper surface of the base of the pump 5, and the height of the notch ceiling portion 19c is the floor surface. To the upper end of the plurality of bolts 20. For this reason, the small hydraulic jack 16 can be installed directly under the pipe projecting beside the valve 6.
  • the pipe fixing bracket 17 is attached to a pipe protruding laterally from the valve 6.
  • the connecting pipe 18 connects the lower part of the pipe fixing bracket 17 and the upper part of the small hydraulic jack 16. For this reason, the force of the small hydraulic jack 16 can be reliably transmitted to the valve 6.
  • the jack base 19 may be installed on the floor surface between the silencer 7 and the pump 5, for example.
  • the jack base 19 may be supported by, for example, a plurality of bolts in which the notched ceiling portion 19 c is attached to the upper surface near the right end of the base of the pump 5.
  • the length of the jack base 19 in the short direction viewed from the top and bottom is set so as not to interfere with the silencer 7.
  • the width W of the notch is set based on the distance from the right end of the base of the pump 5 to the left end of the bolt.
  • the height H of the notch is set corresponding to the height from the floor surface of the machine room 1 to the upper end of the bolt.
  • the pipe fixing bracket 17 and the connecting pipe 18 may have a structure capable of connecting both the tank side pipe 11 and the silencer side pipe 12 to the small hydraulic jack 16 at the same time, for example. In this case, it is possible to push up the valve 6 by applying a force to both the two pipes projecting to the left and right of the valve 6.
  • the jack base 19 may be capable of fixing the small hydraulic jack 16 to the upper surface 19a, for example. In this case, safety can be further improved.
  • This invention can be used when replacing the pump check valve of a hydraulic elevator.

Abstract

ポンプチェック弁の取替作業を容易に行うことができる油圧エレベーターのポンプチェック弁取替治具およびポンプチェック弁取替方法を提供する。この発明に係る油圧エレベーターのポンプチェック弁取替治具は、油圧エレベーターの機械室(1)の床面とポンプ(5)の基台との段差に対応する切欠きが長手方向に沿って下部に形成され、バルブ(6)の下方に設置されるジャッキ用土台(19)と、ジャッキ用土台(19)の上面のうちバルブ(6)から突出する配管(11)の真下に設置される小型油圧ジャッキ(16)と、を備える。

Description

油圧エレベーターのポンプチェック弁取替治具およびポンプチェック弁取替方法
 この発明は、油圧エレベーターのポンプチェック弁取替治具およびポンプチェック弁取替方法に関する。
 油圧エレベーターの機械室には、油タンク、ポンプおよびバルブが設けられる。バルブは、ポンプの上方に配置され、ポンプチェック弁を介してポンプと接続される。下記特許文献1には、油圧エレベーターが記載されている。
日本特開2017-052610号公報
 ポンプチェック弁の取替作業は、例えば、バルブから横に突出する配管をラッシングベルト等で吊り上げた状態で行われる。この場合、バルブが傾き不安定な状態となるため、作業性が良くない。
 この発明は、上記の課題を解決するためになされた。その目的は、ポンプチェック弁の取替作業を容易に行うことができる油圧エレベーターのポンプチェック弁取替治具およびポンプチェック弁取替方法を提供することである。
 この発明に係る油圧エレベーターのポンプチェック弁取替治具は、油圧エレベーターの機械室の床面とポンプの基台との段差に対応する切欠きが長手方向に沿って下部に形成され、バルブの下方に設置されるジャッキ用土台と、ジャッキ用土台の上面のうちバルブから突出する配管の真下に設置される小型油圧ジャッキと、を備える。
 この発明に係る油圧エレベーターのポンプチェック弁取替方法は、油圧エレベーターの機械室の床面とポンプの基台との段差に対応する切欠きが長手方向に沿って下部に形成されたジャッキ用土台をバルブの下方に設置する土台設置工程と、ジャッキ用土台の上面のうちバルブから突出する配管の真下に小型油圧ジャッキを設置するジャッキ設置工程と、ポンプチェック弁がポンプに固定されていない状態で小型油圧ジャッキを用いてバルブを押し上げる押し上げ工程と、バルブが押し上げられた状態でポンプチェック弁を取り替える取替工程と、を備える。
 これらの発明によれば、油圧エレベーターのバルブは、小型油圧ジャッキによって押し上げられる。このため、ポンプチェック弁の取替作業を容易に行うことができる。
油圧エレベーターの構造の一例を示す模式図である。 実施の形態1におけるポンプチェック弁取替治具を示す第1の図である。 実施の形態1におけるポンプチェック弁取替治具を示す第2の図である。 実施の形態1におけるジャッキ用土台の第1斜視図である。 実施の形態1におけるジャッキ用土台の第2斜視図である。 実施の形態1におけるポンプチェック弁取替治具の使い方を示す第1の図である。 実施の形態1におけるポンプチェック弁取替治具の使い方を示す第2の図である。 実施の形態1におけるポンプチェック弁取替治具の使い方を示す第3の図である。
 以下、添付の図面を参照して実施の形態について説明する。各図において、同一または相当する部分には同一の符号が付される。重複する説明は、適宜簡略化あるいは省略する。
実施の形態1.
 図1は、油圧エレベーターの構造の一例を示す模式図である。
 油圧エレベーターは、機械室1および昇降路2を備える。機械室1には、油タンク3、モーター4、ポンプ5、バルブ6およびサイレンサー7が設けられる。昇降路2には、かご用油圧ジャッキ8およびかご9が設けられる。かご用油圧ジャッキ8は、配管によってサイレンサー7と接続される。
 モーター4、ポンプ5およびサイレンサー7は、例えば、機械室1の床面上に配置される。油タンク3は、モーター4、ポンプ5、バルブ6およびサイレンサー7よりも上方に配置される。バルブ6は、油タンク3よりも下方に配置され、ポンプ5およびサイレンサー7よりも上方に配置される。
 バルブ6は、ポンプチェック弁10を介してポンプ5と接続される。ポンプチェック弁10の下部は、例えば、ボルト等でポンプ5の上部に固定される。ポンプチェック弁10の上部は、例えば、ボルト等でバルブ6の下部に固定される。
 バルブ6は、タンク側配管11およびサイレンサー側配管12を有する。タンク側配管11およびサイレンサー側配管12は、例えば、L字状を呈する。タンク側配管11およびサイレンサー側配管12は、例えば、金属で形成される。
 タンク側配管11の一端部は、バルブ6から横に突出する。タンク側配管11の他端部は、油タンク3から下方に延びたゴムホース13に対して上向きに嵌め込まれる。タンク側配管11の他端部と重なるゴムホース13の端部は、例えば、図示しないバンドで締め付けられる。
 サイレンサー側配管12の一端部は、バルブ6から横に突出する。サイレンサー側配管12の一端部は、タンク側配管11とは反対側に突出する。サイレンサー側配管12の他端部は、サイレンサー7に対して下向きに接続される。サイレンサー側配管12の他端部は、例えば、図示しない継手部材を介してサイレンサー7に接続される。
 モーター4とポンプ5のプーリー14との間には、無端状のベルト15が巻き掛けられる。モーター4によってポンプ5が駆動されると、油タンク3内の油がタンク側配管11、バルブ6、サイレンサー側配管12およびサイレンサー7を通ってかご用油圧ジャッキ8に送り込まれる。かご用油圧ジャッキ8は、例えば、ロープを介してかご9を上昇させる。
 図2は、実施の形態1におけるポンプチェック弁取替治具を示す第1の図である。
 図2に示すように、油圧エレベーターのポンプチェック弁取替治具は、小型油圧ジャッキ16、配管固定用金具17、連結用パイプ18およびジャッキ用土台19を備える。
 小型油圧ジャッキ16は、持ち運び可能な大きさに形成されている。小型油圧ジャッキ16は、手動レバーで駆動されると、ラムを上方に移動させる。
 配管固定用金具17は、例えば、湾曲部および直線部を有する一対の板状部材である。一対の湾曲部は、例えば、蝶番などで連結されている。配管固定用金具17が閉じた状態で一対の湾曲部が形成する輪の径は、例えば、タンク側配管11およびサイレンサー側配管12の少なくとも一方の径に対応する。
 連結用パイプ18は、例えば、直線状の管である。連結用パイプ18の長さは、例えば、小型油圧ジャッキ16のストロークよりも小さい。連結用パイプ18の長さは、例えば、配管固定用金具17の直線部の長さよりも大きい。連結用パイプ18の内径は、例えば、小型油圧ジャッキ16のラムの頭部よりも大きい。連結用パイプ18の内径は、例えば、配管固定用金具17の直線部の幅よりも大きい。連結用パイプ18は、例えば、長手方向における中間部の内側に、ラムの頭部よりも内径が小さい受け部を有する。
 ジャッキ用土台19は、例えば、バルサ材などの軽い素材で形成される。
 図3は、実施の形態1におけるポンプチェック弁取替治具を示す第2の図である。図3は、小型油圧ジャッキ16、配管固定用金具17および連結用パイプ18を組み合わせた状態を示す。
 図3に示すように、小型油圧ジャッキ16のラムは、連結用パイプ18に下から挿入される。ラムの頭部は、例えば、連結用パイプ18の受け部を支持する。
 図3に示すように、配管固定用金具17は、直線部を下向きにして使用される。直線部は、連結用パイプ18に上から挿入される。配管固定用金具17は、例えば、湾曲部の下端が連結用パイプ18の上端に接することで支持される。配管固定用金具17は、例えば、直線部の下端が小型油圧ジャッキ16のラムの頭部に接することで支持されてもよい。
 図4は、実施の形態1におけるジャッキ用土台の第1斜視図である。図5は、実施の形態1におけるジャッキ用土台の第2斜視図である。
 図4は、ジャッキ用土台19の上面19a側から見た状態を示す。図5は、ジャッキ用土台19を下面19b側から見た状態を示す。上面19aは、例えば、下面19bに平行な平面である。
 図4および図5に示すように、ジャッキ用土台19の下部には、切欠きが形成される。ジャッキ用土台19は、例えば、四角柱の長手方向に沿った角のうち1つに相当する箇所が切欠きになった形状を呈する。切欠きは、上下方向から見たジャッキ用土台19の長手方向に沿って形成される。下面19bの長手方向における長さは、例えば、上面19aの長手方向における長さと等しい。下面19bの短手方向における長さは、上面19aの短手方向における長さよりも短い。また、上面19aの短手方向における長さは、例えば、小型油圧ジャッキ16の底部の幅よりも長い。
 ジャッキ用土台19の切欠きは、機械室1の床面とポンプ5の基台との段差に対応した大きさに形成される。
 ジャッキ用土台19は、例えば、モーター4とポンプ5との間の床面上に設置される。ジャッキ用土台19は、例えば、切欠きの天井部分19cがポンプ5の基台の左端付近の上面に取り付けられた複数のボルトに支持されるように設置される。この場合、上下方向から見たジャッキ用土台19の短手方向における長さは、モーター4と干渉しないように設定される。この場合、切欠きの横幅Wは、ポンプ5の基台の左端から当該ボルトの右端までの距離に基づいて設定される。この場合、切欠きの高さHは、機械室1の床面から当該ボルトの上端までの高さに対応して設定される。
 次に、図6から図8を参照して、油圧エレベーターのポンプチェック弁取替方法を説明する。
 図6は、実施の形態1におけるポンプチェック弁取替治具の使い方を示す第1の図である。図7は、実施の形態1におけるポンプチェック弁取替治具の使い方を示す第2の図である。図8は、実施の形態1におけるポンプチェック弁取替治具の使い方を示す第3の図である。
 図6および図8は、バルブ6周辺を示す正面図である。図7は、ポンプ5の基台の左端付近を示す平面図である。なお、図6から図8において、プーリー14およびベルト15の図示は省略されている。
 ポンプチェック弁10の取り替え時には、第1解除工程が実施される。第1解除工程において、保守員は、例えば、ポンプチェック弁10の下部からボルト等を取り外すことで、ポンプ5に対するポンプチェック弁10の固定を解除する。また、第1解除工程において、保守員は、例えば、ゴムホース13の端部からバンドを取り外すことで、ゴムホース13に対するタンク側配管11の固定を解除する。第1解除工程において、保守員は、例えば、サイレンサー7に対するサイレンサー側配管12の固定を解除しない。
 ポンプチェック弁10の取り替え時には、土台設置工程が実施される。土台設置工程は、例えば、第1解除工程の後に実施される。土台設置工程において、保守員は、図6に示すように、ジャッキ用土台19をバルブ6の左側の下方に設置する。この際、図6に示すように、ジャッキ用土台19の下面19bは、機械室1の床面に接する。この際、図6に示すように、ジャッキ用土台19の切欠きの天井部分19cは、ポンプ5の基台の左端付近の上面に取り付けられたボルト20の上端に接する。この際、図7に示すように、切欠きの天井部分19cは、複数のボルト20に支持される。
 土台設置工程の後、ジャッキ設置工程が実施される。ジャッキ設置工程において、保守員は、図6に示すように、ジャッキ用土台19の上面19aのうちバルブ6から突出するタンク側配管11の真下の位置に小型油圧ジャッキ16を設置する。この際、図7に示すように、小型油圧ジャッキ16は、ジャッキ用土台19の長手方向における中心よりも手前側に設置される。この際、ジャッキ用土台19の手前にはベルト15が存在するため、小型油圧ジャッキ16は、手動レバーを奥側に向けた状態で設置される。
 ジャッキ設置工程は、連結工程を含む。連結工程において、保守員は、図6に示すように、タンク側配管11を湾曲部で挟むように取り付けられた配管固定用金具17の直線部と小型油圧ジャッキ16のラムとを連結用パイプ18で連結する。この際、小型油圧ジャッキ16、配管固定用金具17および連結用パイプ18は、図3と同様の関係で組み合わせられる。
 ジャッキ設置工程の後、第2解除工程が実施される。第2解除工程において、保守員は、例えば、サイレンサー側配管12の他端部から継手部材を取り外すことで、サイレンサー7に対するサイレンサー側配管12の固定を解除する。
 なお、第1解除工程および第2解除工程において固定が解除される箇所は、上記の説明とは異なってもよい。第1解除工程では、ポンプ5に対するポンプチェック弁10の固定、ゴムホース13に対するタンク側配管11の固定およびサイレンサー7に対するサイレンサー側配管12の固定のうち、2箇所または1箇所の固定が解除されればよい。第2解除工程では、第1解除工程で解除されなかった残りの1箇所または2箇所の固定が解除されればよい。第2解除工程がジャッキ設置工程の後に実施されることで、バルブ6が何にも支持されない状態となることを回避できる。
 第2解除工程の後、押し上げ工程が実施される。押し上げ工程において、保守員は、図8に示すように、ポンプチェック弁10がバルブ6に固定され且つポンプ5には固定されていない状態で、小型油圧ジャッキ16を用いてバルブ6を押し上げる。この際、保守員は、ジャッキ用土台19の奥側から小型油圧ジャッキ16の手動レバーを操作する。この際、タンク側配管11の他端部は、図6の状態よりも深くゴムホース13内に入り込む。この際、サイレンサー側配管12の他端部は、サイレンサー7から上に抜ける。
 押し上げ工程の後、取替工程が実施される。取替工程において、保守員は、バルブ6が押し上げられた状態で、バルブ6に固定されているポンプチェック弁10を取り替える。
 その後、保守員は、小型油圧ジャッキ16の圧力を抜き、バルブ6を元の高さまで下げる。
 その後、保守員は、ポンプ5に対して新しいポンプチェック弁10を固定する。また、保守員は、ゴムホース13に対してタンク側配管11を固定する。また、保守員は、サイレンサー7に対してサイレンサー側配管12を固定する。
 その後、保守員は、小型油圧ジャッキ16、配管固定用金具17、連結用パイプ18およびジャッキ用土台19を撤去する。
 以上で説明した実施の形態1によれば、ジャッキ用土台19は、油圧エレベーターの機械室1の床面とポンプ5の基台との段差に対応する切欠きが長手方向に沿って下部に形成され、バルブ6の下方に設置される。小型油圧ジャッキ16は、ジャッキ用土台19の上面のうちバルブ6から突出する配管の真下に設置される。このため、小型油圧ジャッキ16により、バルブ6を傾けることなく安定した状態で押し上げることができる。その結果、作業性および安全性を向上させ、ポンプチェック弁10の取替作業を容易に行うことができる。
 また、ジャッキ用土台19は、長手方向における長さがポンプ5の基台の上面に取り付けられた複数のボルト20同士の間隔よりも大きく形成され、切欠きの天井部分19cの高さが床面から当該複数のボルト20の上端までの高さに対応して形成される。このため、バルブ6の横に突出する配管の真下に小型油圧ジャッキ16を設置することができる。
 また、配管固定用金具17は、バルブ6から横に突出する配管に取り付けられる。連結用パイプ18は、配管固定用金具17の下部と小型油圧ジャッキ16の上部とを連結する。このため、バルブ6に対して小型油圧ジャッキ16の力を確実に伝えることができる。
 また、ジャッキ用土台19は、例えば、サイレンサー7とポンプ5との間の床面上に設置されてもよい。ジャッキ用土台19は、例えば、切欠きの天井部分19cがポンプ5の基台の右端付近の上面に取り付けられた複数のボルトに支持されてもよい。この場合、上下方向から見たジャッキ用土台19の短手方向における長さは、サイレンサー7と干渉しないように設定される。この場合、切欠きの横幅Wは、ポンプ5の基台の右端から当該ボルトの左端までの距離に基づいて設定される。この場合、切欠きの高さHは、機械室1の床面から当該ボルトの上端までの高さに対応して設定される。
 また、配管固定用金具17および連結用パイプ18は、例えば、タンク側配管11およびサイレンサー側配管12の双方を同時に小型油圧ジャッキ16と連結可能な構造を有してもよい。この場合、バルブ6の左右に突出する2つの配管の双方に対して力を加えてバルブ6を押し上げることができる。
 また、ジャッキ用土台19は、例えば、上面19aに小型油圧ジャッキ16を固定可能であってもよい。この場合、より安全性を向上させることができる。
 この発明は、油圧エレベーターのポンプチェック弁を取り替える際に利用できる。
1 機械室
2 昇降路
3 油タンク
4 モーター
5 ポンプ
6 バルブ
7 サイレンサー
8 かご用油圧ジャッキ
9 かご
10 ポンプチェック弁
11 タンク側配管
12 サイレンサー側配管
13 ゴムホース
14 プーリー
15 ベルト
16 小型油圧ジャッキ
17 配管固定用金具
18 連結用パイプ
19 ジャッキ用土台
19a 上面
19b 下面
19c 天井部分
20 ボルト

Claims (6)

  1.  油圧エレベーターの機械室の床面とポンプの基台との段差に対応する切欠きが長手方向に沿って下部に形成され、バルブの下方に設置されるジャッキ用土台と、
     前記ジャッキ用土台の上面のうちバルブから突出する配管の真下に設置される小型油圧ジャッキと、
    を備えた油圧エレベーターのポンプチェック弁取替治具。
  2.  前記ジャッキ用土台は、長手方向における長さがポンプの基台の上面に取り付けられた複数のボルト同士の間隔よりも大きく形成され、前記切欠きの天井部分の高さが床面から当該複数のボルトの上端までの高さに対応して形成された請求項1に記載の油圧エレベーターのポンプチェック弁取替治具。
  3.  バルブから突出する配管に取り付けられる配管固定用金具と、
     前記配管固定用金具と前記小型油圧ジャッキの上部とを連結する連結用パイプと、
    を更に備えた請求項1または請求項2に記載の油圧エレベーターのポンプチェック弁取替治具。
  4.  油圧エレベーターの機械室の床面とポンプの基台との段差に対応する切欠きが長手方向に沿って下部に形成されたジャッキ用土台をバルブの下方に設置する土台設置工程と、
     前記ジャッキ用土台の上面のうちバルブから突出する配管の真下に小型油圧ジャッキを設置するジャッキ設置工程と、
     ポンプチェック弁がポンプに固定されていない状態で前記小型油圧ジャッキを用いてバルブを押し上げる押し上げ工程と、
     バルブが押し上げられた状態でポンプチェック弁を取り替える取替工程と、
    を備えた油圧エレベーターのポンプチェック弁取替方法。
  5.  前記土台設置工程において、前記ジャッキ用土台は、前記切欠きの天井部分がポンプの基台の上面に取り付けられた複数のボルトに支持されるように設置される請求項4に記載の油圧エレベーターのポンプチェック弁取替方法。
  6.  前記ジャッキ設置工程は、
     バルブから突出する配管に取り付けられた配管固定用金具と前記小型油圧ジャッキの上部とを連結用パイプで連結する連結工程、
    を含む請求項4または請求項5に記載の油圧エレベーターのポンプチェック弁取替方法。
PCT/JP2018/017266 2018-04-27 2018-04-27 油圧エレベーターのポンプチェック弁取替治具およびポンプチェック弁取替方法 WO2019207786A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2018543404A JP6558504B1 (ja) 2018-04-27 2018-04-27 油圧エレベーターのポンプチェック弁取替治具およびポンプチェック弁取替方法
CN201880091771.2A CN111902356B (zh) 2018-04-27 2018-04-27 液压电梯的泵止回阀更换辅具及泵止回阀更换方法
PCT/JP2018/017266 WO2019207786A1 (ja) 2018-04-27 2018-04-27 油圧エレベーターのポンプチェック弁取替治具およびポンプチェック弁取替方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2018/017266 WO2019207786A1 (ja) 2018-04-27 2018-04-27 油圧エレベーターのポンプチェック弁取替治具およびポンプチェック弁取替方法

Publications (1)

Publication Number Publication Date
WO2019207786A1 true WO2019207786A1 (ja) 2019-10-31

Family

ID=67614904

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/017266 WO2019207786A1 (ja) 2018-04-27 2018-04-27 油圧エレベーターのポンプチェック弁取替治具およびポンプチェック弁取替方法

Country Status (3)

Country Link
JP (1) JP6558504B1 (ja)
CN (1) CN111902356B (ja)
WO (1) WO2019207786A1 (ja)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6443091U (ja) * 1987-05-09 1989-03-15
JP2001048485A (ja) * 1999-08-12 2001-02-20 Nichias Corp 配管のジャッキアップ装置およびジャッキアップ方法
JP2003049535A (ja) * 2001-08-03 2003-02-21 Sekisui House Ltd 段差部用足場ベース架台
US20170182604A1 (en) * 2015-12-29 2017-06-29 Sumner Manufacturing Co., Inc. Jack stand apparatus adaptable to various diameters of pipe

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0330499Y2 (ja) * 1985-10-19 1991-06-27
CN2510545Y (zh) * 2001-08-17 2002-09-11 福建省建筑科学研究院 一种顶升纠倾结构
CN202252649U (zh) * 2011-09-05 2012-05-30 武昌造船厂集团有限公司 一种斜面顶升调节装置
CN205043725U (zh) * 2015-08-14 2016-02-24 兰成刚 多功能高压阀门更换器
CN105127951A (zh) * 2015-09-29 2015-12-09 云南大红山管道有限公司 一种高压矿浆隔膜泵单向阀阀座取出器
CN206345630U (zh) * 2016-12-02 2017-07-21 翟淑丽 一种阀门助力更换器
CN206623045U (zh) * 2017-03-29 2017-11-10 神华集团有限责任公司 阀门拆装工具

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6443091U (ja) * 1987-05-09 1989-03-15
JP2001048485A (ja) * 1999-08-12 2001-02-20 Nichias Corp 配管のジャッキアップ装置およびジャッキアップ方法
JP2003049535A (ja) * 2001-08-03 2003-02-21 Sekisui House Ltd 段差部用足場ベース架台
US20170182604A1 (en) * 2015-12-29 2017-06-29 Sumner Manufacturing Co., Inc. Jack stand apparatus adaptable to various diameters of pipe

Also Published As

Publication number Publication date
CN111902356B (zh) 2022-06-03
JPWO2019207786A1 (ja) 2020-04-30
CN111902356A (zh) 2020-11-06
JP6558504B1 (ja) 2019-08-14

Similar Documents

Publication Publication Date Title
CN1962387B (zh) 建造电梯设备的方法及用于该目的的电梯设备
US9382094B2 (en) Elevator refurbishment method
US20130140113A1 (en) Rope braking apparatus
JP6558504B1 (ja) 油圧エレベーターのポンプチェック弁取替治具およびポンプチェック弁取替方法
KR20100084348A (ko) 대형 실린더 운반용 지그
JP5490483B2 (ja) 荷受台昇降装置
JP4867987B2 (ja) 乗客コンベア
JPH01242386A (ja) 流体圧エレベータ
JP3140819U (ja) 油圧シリンダを使用した昇降装置
JP6504946B2 (ja) 流体機材搬出設備及び流体機材搬出方法
CN101153476B (zh) 弹条安装机
KR101298681B1 (ko) 누수 방지구조를 가지는 탈착식 수중펌프용 압착장치
JP2002037563A (ja) 油圧エレベータのリニューアル方法
CN207018811U (zh) Poc型煤气柜
CN215626454U (zh) 一种用于泵管安装的辅助提升装置
JP2019168025A (ja) 油圧パワーユニット
JP3110090U (ja) 昇降床の固定装置
KR200457651Y1 (ko) 선박용 카고 펌프 어셈블리의 테스트를 위한 보조장치
KR101144311B1 (ko) 수동 리프트용 가변식 유압전달 장치
JP2000247562A (ja) 油圧式エレベータ
CN105905832A (zh) 一种举升机
KR200296110Y1 (ko) 수중펌프와 엘보우관의 수밀구조
KR200162848Y1 (ko) 배큐엄카의 진공과 압축을 위한 배관장치
CN205740176U (zh) 一种举升机
JP2697214B2 (ja) 油圧エレベータ用ポンプ

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2018543404

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18916594

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18916594

Country of ref document: EP

Kind code of ref document: A1