WO2019163050A1 - 送配電設備点検システム - Google Patents

送配電設備点検システム Download PDF

Info

Publication number
WO2019163050A1
WO2019163050A1 PCT/JP2018/006422 JP2018006422W WO2019163050A1 WO 2019163050 A1 WO2019163050 A1 WO 2019163050A1 JP 2018006422 W JP2018006422 W JP 2018006422W WO 2019163050 A1 WO2019163050 A1 WO 2019163050A1
Authority
WO
WIPO (PCT)
Prior art keywords
support column
unit
distance
power transmission
measurement
Prior art date
Application number
PCT/JP2018/006422
Other languages
English (en)
French (fr)
Inventor
喜則 益永
Original Assignee
中国電力株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中国電力株式会社 filed Critical 中国電力株式会社
Priority to PCT/JP2018/006422 priority Critical patent/WO2019163050A1/ja
Priority to JP2018533268A priority patent/JP6428973B1/ja
Publication of WO2019163050A1 publication Critical patent/WO2019163050A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B11/00Measuring arrangements characterised by the use of optical techniques
    • G01B11/02Measuring arrangements characterised by the use of optical techniques for measuring length, width or thickness
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B11/00Measuring arrangements characterised by the use of optical techniques
    • G01B11/26Measuring arrangements characterised by the use of optical techniques for measuring angles or tapers; for testing the alignment of axes

Definitions

  • the present invention relates to a power transmission / distribution equipment inspection system for inspecting power transmission / distribution equipment.
  • the conventional system for checking power transmission and distribution equipment does not take into consideration such sinking and lifting of the support pillars.
  • the power transmission / distribution equipment inspection system includes a power transmission / distribution line that transmits and receives electricity and a plurality of supports that are installed at predetermined intervals and support the transmission / distribution line
  • a power transmission / distribution equipment inspection system comprising a vehicle and a processing device for inspecting power transmission / distribution equipment comprising pillars, wherein the aircraft flies according to a flight path including a predetermined measurement point, and the measurement point And a second distance from the measurement point to a fixed point for fixing the target support column and the power transmission and distribution line to the ground point that is the boundary between the target support column and the foundation ground.
  • the processing device calculates a distance from the ground point to the fixed point based on the first distance and the second distance measured by the measurement unit. 1 calculation unit and calculation by the first calculation unit Distance is compared with a reference value, the difference is and a determination unit for determining whether or exceeds a predetermined difference.
  • the processing apparatus includes a second calculation unit that calculates an inclination of the target support column based on the first distance and the second distance measured by the measurement unit, and the determination unit includes: It is preferable to compare the inclination calculated by the second calculation unit with a reference value and determine whether or not the difference exceeds a predetermined difference.
  • the processing device based on a result measured by the measurement unit, the first electric wire tension applied between the target support column and one support column adjacent to the target support column, A third calculation unit that calculates a second electric wire tension applied between the target support column and the other support column adjacent to the target support column; and the determination unit includes the third calculation unit It is preferable to determine whether the sum of the combined tension of the first electric wire tension and the second electric wire tension calculated by the above and the wind pressure load applied to the target support column exceeds a predetermined value.
  • the processing device calculates a wire tension applied between the target support column and one of the support columns adjacent to the target support column based on a result measured by the measurement unit. It is preferable that the calculation unit includes a calculation unit, and the determination unit determines whether the sum of the wire tension calculated by the fourth calculation unit and the wind pressure load applied to the target support column exceeds a predetermined value. .
  • the flying object includes an imaging unit that images an inspection target, and the processing device includes a difference detection unit that detects a difference between an image previously captured by the imaging unit and an image captured this time at the same measurement point. It is preferable that the determination unit determines whether or not the difference detected by the difference detection unit exceeds a predetermined value.
  • the present invention it is possible to inspect the power transmission and distribution equipment including the sinking and lifting of the support pillars.
  • FIG. 1 is a conceptual diagram showing that measurement is performed while flying around a power transmission / distribution facility by a flying object, and a measurement result is processed by a processing device.
  • FIG. 2 is a diagram illustrating a configuration of a power transmission and distribution equipment inspection system including a flying object and a processing device.
  • FIG. 3 is a diagram for explaining when the measurement unit measures the first distance and the second distance from the measurement point.
  • FIG. 4 is a diagram for explaining the electric wire tension applied in the horizontal direction of the electric wires applied between the support columns.
  • FIG. 5 is a diagram for explaining the procedure for calculating the sum of the first electric wire tension, the second electric wire tension, and the wind pressure load.
  • FIG. 6 is a diagram for explaining a procedure for calculating the sum of the first electric wire tension TL and the wind pressure load.
  • a hydroelectric power generation system that generates electricity using hydropower
  • the power branches to the intake dams or aquariums. It is drawn. This electric wire is called an embankment line or an aquarium line.
  • the embankment line may be laid for several kilometers from the power plant to the intake dam. For example, the embankment line is patroled by a worker once every six months to check for abnormalities, and a regular inspection of the appearance is performed once every six years.
  • the Entsu Line will be laid to connect the power plant to the intake dam with the shortest distance.
  • the embankment line is, for example, laid on a roadway or a forest road along the foot of the mountain, or laid in the forest by cutting trees and the like.
  • the purpose of the present invention is to check power transmission / distribution equipment while reducing the burden on workers and determine whether the power transmission / distribution equipment can withstand the strength assumed at the time of installation.
  • FIG. 1 is a conceptual diagram showing that measurement is performed while flying around the power transmission / distribution facility 100 by the flying object 10, and the measurement result is processed by the processing device 20.
  • the power transmission / distribution facility 100 includes a power transmission / distribution wire (hereinafter referred to as an electric wire) 101 that transmits and distributes electricity generated by a power plant, and a plurality of support columns 102 that are installed at predetermined intervals and support the wire 101.
  • the electric wire 101 is composed of three units in the case of three-phase alternating current, and is composed of two units in the case of single-phase alternating current.
  • the support pillar 102 is a steel tower or a utility pole.
  • the flying object 10 flies around the power transmission and distribution equipment 100 while flying based on the flight route R included in the flight path.
  • the flying object 10 measures the distance from the measurement point to the support column 102 at a predetermined measurement point included in the flight route R.
  • the processing device 20 inspects the power transmission and distribution equipment 100 based on the result measured by the flying object 10.
  • FIG. 2 is a diagram illustrating a configuration of a power transmission / distribution facility inspection system 1 including the flying object 10 and the processing device 20.
  • a control unit 11, a storage unit 12, an attitude sensor 13, a positioning unit 14, a measurement unit 15, an imaging unit 16, and a communication unit 17 are mounted on the flying object 10.
  • the flying object 10 is an unmanned aerial vehicle (UAV, Unmanned Air Vehicle), drone, multi-copter, or the like configured to be able to fly and stop in the air (hovering). Fly according to The flight path is realized by a flight program, for example.
  • UAV Unmanned Air Vehicle
  • drone unmanned Air Vehicle
  • multi-copter multi-copter
  • the control unit 11 is an arithmetic device such as a CPU (Central Processing Unit), for example.
  • CPU Central Processing Unit
  • the storage unit 12 is, for example, at least one of a hard disk drive, a solid state drive, a flash memory, and other storage devices, and stores various data read by the control unit 11.
  • the storage unit 12 stores a flight program.
  • the flight program includes at least a flight route that is a route on which the flying object 10 flies, a measurement point that is a place where the support pillar 102 is measured, and time information that is stationary in the air at the measurement point.
  • the flight route and the measurement point are configured by coordinate information.
  • the coordinate information is composed of, for example, latitude and longitude.
  • a plurality of measurement points are designated on the flight route.
  • the attitude sensor 13 is a measuring instrument that detects the angle (attitude), acceleration, angular velocity, or angular acceleration of the flying object 10.
  • the attitude sensor 13 is realized by, for example, a gyro sensor or an acceleration sensor. Based on the data detected by the attitude sensor 13, the control unit 11 performs attitude control of the flying object 10 at the time of flight or at rest in the air.
  • the positioning unit 14 is a device that receives time signals emitted from a plurality of satellites and measures the position of the flying object 10 on the earth.
  • the positioning unit 14 is realized by, for example, a GPS (Global Positioning System) receiver. Based on the position measured by the positioning unit 14, the control unit 11 causes the flying object 10 to fly along the flight route or causes the flying object 10 to stand still in the air at the measurement point.
  • GPS Global Positioning System
  • the measurement unit 15 includes a first distance from the measurement point to a ground point that is a boundary between the target support column 102 and the foundation ground, and a fixed point that fixes the target support column 102 and the electric wire 101 from the measurement point. To the second distance.
  • the measuring unit 15 is a device that irradiates the support column 102 to be measured with a laser, measures the time taken to come back after hitting the support column 102, and calculates the distance from the measurement result.
  • FIG. 3 is a diagram for explaining the measurement of the first distance D1 and the second distance D2 from the measurement point P1 by the measurement unit 15 mounted on the flying object 10.
  • the measurement point P1 is an intermediate position between the support pillar 102a and the support pillar 102b, but is not limited to the intermediate position.
  • the coordinate position of the measurement point P1 and the coordinate position of the measurement unit 15 are the same.
  • the storage unit 12 stores a measurement program for controlling the operation of the measurement unit 15.
  • the coordinate information of the support column to be measured is described in association with the coordinate information of the measurement point.
  • the coordinate information of the support column 102a and the coordinate information of the support column 102b are associated with the coordinate information of the measurement point P1.
  • the control unit 11 reads the measurement program and acquires the coordinate information of the support column 102a and the coordinate information of the support column 102b when the flying object 10 stops in the air at the measurement point P1.
  • the measurement unit 15 irradiates the support column 102a with laser based on the coordinate information of the support column 102a acquired by the control unit 11.
  • Measuring unit 15 measures the first distance L 1 from the measurement point P1 to earth Sai point P2 is the boundary between the support column 102a and the foundation ground G.
  • the measurement unit 15 measures the second distance L 2 from the measurement points P1 to fixed point P3 for fixing the support column 102a and the wire 101.
  • Measurement unit 15, the angle theta 1 of laser irradiates the earth Sai point P2 with respect to the horizontal direction H of the measurement points P1, laser was irradiated to a fixed point P3 with respect to the horizontal direction H of the measurement points P1
  • the angle ⁇ 2 is measured.
  • the measurement unit 15 irradiates the support column 102b with laser based on the coordinate information of the support column 102b acquired by the control unit 11.
  • Measuring unit 15 measures the first distance L 3 from the measuring point P1 to earth Sai point P4 is the boundary between the support column 102b and the foundation ground G.
  • the measurement unit 15 measures the second distance L 4 from the measurement points P1 to fixed point P5 for fixing the support column 102b and the wire 101.
  • Measuring unit 15 includes a laser of an angle theta 3 which irradiates the earth Sai point P4 with respect to the horizontal direction H of the measurement points P1, laser was irradiated to a fixed point P5 with respect to the horizontal direction H of the measurement points P1 The angle ⁇ 4 is measured.
  • the measurement unit 15 stores the measured first distances L 1 and L 3 , second distances L 2 and L 4 , and laser angles ⁇ 1 , ⁇ 2 , ⁇ 3 , and ⁇ 4 in the storage unit 12.
  • the measurement unit 15 processes the first distances L 1 and L 3 , the second distances L 2 and L 4, and the laser angles ⁇ 1 , ⁇ 2 , ⁇ 3 , and ⁇ 4 via the communication unit 17.
  • a configuration for transmitting to the apparatus 20 may be used.
  • the processing device 20 includes a first calculation unit 21, a determination unit 22, and a communication unit 23.
  • the communication unit 23 and the communication unit 17 are connected wirelessly or by wire, and information obtained by the flying object 10 is transmitted to the processing device 20.
  • the first calculation unit 21 acquires the first distance and the second distance measured by the measurement unit 15 via the communication unit 23, and based on the acquired first distance and second distance, from the ground point Calculate the distance to the fixed point.
  • the first calculation unit 21 calculates the first distances L 1 and L 3 , the second distances L 2 and L 4, and the laser angles ⁇ 1 , ⁇ 2 , ⁇ 3 , and ⁇ 4 . get.
  • the first calculating unit 21 calculates the angle theta 5 from the difference between the angle theta 2 of the laser angle theta 1 and the laser first distance L 1 and the second distance L 2.
  • L 5 ⁇ (L 1 2 + L 2 2 ⁇ 2L 1 ⁇ L 2 ⁇ cos ⁇ 5 ) (1)
  • the first calculating section 21 calculates the difference between the laser angle theta 3 and the laser angle theta 4 between the first distance L 3 the angle theta 6 and the second distance L 4.
  • the first calculating unit 21 a first distance L 3 based on the second distance L 4 and the angle theta 6, equation (2), the distance from the earth Sai point P4 of the support column 102b to a fixed point P5 L 6 Is calculated.
  • L 6 ⁇ (L 3 2 + L 4 2 ⁇ 2L 3 ⁇ L 4 ⁇ cos ⁇ 6 ) (2)
  • the determination unit 22 compares the distance calculated by the first calculation unit 21 with a reference value, and determines whether or not the difference exceeds a predetermined difference.
  • the reference value is, for example, the distance calculated by the first calculation unit 21 in the previous inspection, the average value of a plurality of distances calculated by the first calculation unit 21 in the past n inspections, or the installation of the support column 102 Such as distance of time.
  • the predetermined difference is, for example, a constant such as 1 cm or 2 cm.
  • the determination unit 22 may determine that the difference exceeds a predetermined difference when the distance calculated by the first calculation unit 21 is more than n% away from the reference value.
  • the power transmission and distribution equipment inspection system 1 causes the flying object 10 to fly based on the flight route, and determines the distance from the ground point of the support pillar 102 to the fixed point based on the result measured by the measurement unit 15 by the processing device 20. Calculating and comparing this distance with a reference value to determine whether the difference exceeds a predetermined difference, how much the support pillar 102 is depressed while reducing the burden on the operator, or It is possible to check how much the support pillar 102 is lifted.
  • the worker can grasp the behavior of the power transmission / distribution facility 100 and can grasp a sign that an abnormality occurs in the power transmission / distribution facility 100. For example, the operator can determine whether or not the support pillar 102 can withstand the strength assumed at the time of installation based on the result of the power transmission and distribution equipment inspection system 1.
  • the processing device 20 may include a second calculation unit 24 that calculates the inclination of the target support pillar 102 based on the first distance and the second distance measured by the measurement unit 15.
  • the second calculation unit 24 is fixed from the first distance L 3 measured by the measurement unit 15, the second distance L 4, and the ground point P 4 of the support column 102 b calculated by the first calculation unit 21. based on the distance L 6 to the point P5, the equation (4), calculates an inclination of the support column 102b.
  • the determination unit 22 compares the inclination calculated by the second calculation unit 24 with a reference value, and determines whether the difference exceeds a predetermined difference.
  • the reference value is, for example, the inclination calculated by the second calculation unit 24 in the previous inspection, the average value of a plurality of inclinations calculated by the second calculation unit 24 in the past n inspections, or the installation of the support column 102 Such as the inclination of time.
  • the predetermined difference is, for example, a constant such as 5 degrees or 10 degrees. Further, the determination unit 22 may determine that the difference exceeds a predetermined difference when the slope calculated by the second calculation unit 24 is more than n% away from the reference value.
  • the power transmission and distribution equipment inspection system 1 causes the flying object 10 to fly based on the flight route, calculates the inclination of the support column 102 based on the result measured by the measurement unit 15 by the processing device 20, and this inclination and the reference value Since it is determined whether or not the difference exceeds a predetermined difference, it is possible to check how much the support column 102 is tilted while reducing the burden on the operator.
  • the worker can grasp the behavior of the power transmission / distribution facility 100 and can grasp a sign that an abnormality occurs in the power transmission / distribution facility 100. For example, the operator can determine whether or not the support pillar 102 can withstand the strength assumed at the time of installation based on the result of the power transmission and distribution equipment inspection system 1.
  • the processing device 20 uses the first electric wire between the target support column 102 and one of the support columns 102 adjacent to the target support column 102 based on the result measured by the measurement unit 15.
  • the configuration may include a third calculation unit 25 that calculates the tension and the second electric wire tension applied between the target support column 102 and the other support column 102 adjacent to the target support column 102.
  • FIG. 4 is a diagram for explaining the electric wire tension T applied in the horizontal direction of the electric wire 101 between the support column 102a and the support column 102b.
  • the support pillar 102 is selected according to the required design load and laid according to the conditions of the ground to be installed.
  • the design load can be obtained from the sum (vector sum) of the wire tension (vector) applied to the wire and the wind pressure load (vector) applied to the wire and the support column by the wind.
  • the tension increases, the durability against rain or wind decreases, and the strength of the support column 102 decreases due to vibration such as an earthquake, so that the wire 101 is slackened.
  • span S is a second distance L 2 from the measurement point P1 measured by the measuring unit 15 to the fixing point P3, laser was irradiated with respect to the fixed point P3 with respect to the horizontal direction H of the measurement points P1 Based on the angle ⁇ 2 , it can be calculated by equation (6).
  • S 2 ⁇ L 2 ⁇ cos ⁇ 2 (6)
  • the slack D of the electric wire 101 can be calculated from the expression (5) and the expression (7).
  • D ⁇ ((3S (LS)) / 8) (7)
  • the measurement unit 15 may irradiate the electric wire 101 immediately below the measurement point P1 with a laser, measure the time until it hits the electric wire 101 and returns, and obtains the slack D of the electric wire 101 from the measurement result.
  • FIG. 5 is a plan view of the support columns 102a, 102b, and 102c.
  • the wind pressure load Ww means a composite vector of the wind pressure load (vector) applied to the electric wire 101 and the wind pressure load (vector) applied to the support column 102.
  • 3rd calculation part 25 computes the 1st electric wire tension TL concerning between support pillar 102a used as object, and one support pillar 102b adjacent to support pillar 102a based on a formula (8). Moreover, the 3rd calculation part 25 calculates 2nd electric wire tension
  • the determination unit 22 determines whether the sum of the combined tension of the first electric wire tension and the second electric wire tension calculated by the third calculation unit 25 and the wind pressure load applied to the target support column 102 exceeds a predetermined value. Determine.
  • the predetermined value is a design load determined for each type of support column 102. For example, each of the support columns 102 has a size, a volume, a weight, a design load, and the like specified by a unique “name”.
  • the diameter d of the electric wire 101 does not consider snow accretion.
  • the number n of the electric wires 101 is “3” in the case of a three-phase alternating current, and “2” in the case of a single-phase alternating current.
  • the horizontal angle of the electric wire 101 is not taken into consideration.
  • the determination unit 22 calculates a combined tension T0 (vector) of the first electric wire tension TL (vector) and the second electric wire tension TR (vector), and the combined tension T0 (vector) and the wind pressure load.
  • a sum W1 (vector sum) with Ww (vector) is calculated, and it is determined whether or not the calculated sum W1 (vector sum) exceeds a predetermined value.
  • the power transmission / distribution equipment inspection system 1 determines whether or not the support column 102 always exceeds the design load that is equal to or less than the assumed load. Therefore, the load applied to the support column 102 is reduced while reducing the burden on the operator. Can be checked.
  • the worker can grasp the behavior of the power transmission / distribution facility 100 and can grasp a sign that an abnormality occurs in the power transmission / distribution facility 100. For example, the operator can determine whether or not the support pillar 102 can withstand the strength assumed at the time of installation based on the result of the power transmission and distribution equipment inspection system 1.
  • the support pillars 102a, 102b, and 102c have been described on the assumption that they are laid in a straight line.
  • the transmission / distribution equipment inspection system 1 is applicable even when it is not laid in a straight line. Can do.
  • the direction of the first electric wire tension TL (vector) and the second electric wire tension TR (vector) are compared with the case where the support columns 102a, 102b, and 102c are laid in a straight line. It is expected that the direction will be different.
  • the determination unit 22 includes, for example, a combined tension T0 (vector) of the first electric wire tension TL (vector) and the second electric wire tension TR (vector). ) Is calculated, a process of adding or multiplying correction values according to the laying form of the support pillars 102a, 102b, 102c is performed.
  • the determination unit 22 determines whether, for example, the support columns 102a, 102b, and 102c are laid in a straight line.
  • the laying form of the support pillars 102a, 102b, and 102c may be known or may be determined from an image captured by the imaging unit 16.
  • the determination unit 22 determines that the support columns 102a, 102b, and 102c are not laid in a straight line, the determination unit 22 calculates the angles of the support columns 102a and 102b and the support columns 102a and 102c, and calculates the calculated angles.
  • the combined tension T0 (vector) is calculated using the corresponding correction value.
  • the processing device 20 determines the wire tension applied between the target support column 102 and one of the support columns 102 adjacent to the target support column 102.
  • the configuration may include a fourth calculation unit 26 for calculating.
  • the design load is equal to or less than the emergency emergency load in consideration of the disconnection of the electric wire 101 will be described.
  • FIG. 6 is a plan view of the support columns 102a and 102b and is a diagram for explaining a procedure for calculating the sum W2 (vector sum) of the first electric wire tension TL (vector) and the wind pressure load Ww (vector). is there.
  • the wind pressure load Ww means a combined vector of the wind pressure load (vector) applied to the electric wire 101 and the wind pressure load (vector) applied to the support column 102.
  • the fourth calculation unit 26 calculates the first electric wire tension TL applied between the target support column 102a and one support column 102b adjacent to the support column 102a based on the equation (8).
  • the determination unit 22 determines whether the sum W2 of the first wire tension TL calculated by the fourth calculation unit 26 and the wind pressure load Ww applied to the target support column 102a exceeds a predetermined value.
  • the predetermined value is a design load determined for each type of support column 102.
  • the power transmission / distribution equipment inspection system 1 determines whether or not the support column 102 exceeds the design load that is equal to or less than the emergency assumed load, so the load applied to the support column 102 while reducing the burden on the operator. Can be checked.
  • the worker can grasp the behavior of the power transmission / distribution facility 100 and can grasp a sign that an abnormality occurs in the power transmission / distribution facility 100.
  • the operator can determine whether or not the support pillar 102 can withstand the strength assumed at the time of installation based on the result of the power transmission and distribution equipment inspection system 1.
  • the processing device 20 may include a difference detection unit 27 that detects a difference between an image previously captured by the imaging unit 16 and an image captured this time at the same measurement point.
  • the storage unit 12 stores an imaging program for controlling the operation of the imaging unit 16.
  • the imaging program describes information about the coordinates and direction for imaging.
  • the control unit 11 reads an imaging program when the flying object 10 stops in the air at a measurement point P1 at an intermediate position between the support column 102a and the support column 102b. Get information.
  • the control unit 11 moves the flying object 10 to the position of the coordinates to be imaged, and directs the imaging unit 16 in the imaging direction.
  • the control unit 11 controls the imaging unit 16 to perform imaging.
  • the imaging unit 16 performs imaging according to control by the control unit 11. For example, the imaging unit 16 images five locations at one measurement point.
  • the imaging unit 16 captures an image from the position of the measurement point P1 toward the fixed point P3 of the support column 102a, and stores the obtained image Pic1 in the storage unit 12.
  • the imaging unit 16 captures an image from the position of the measurement point P1 toward the fixed point P5 of the support column 102b, and stores the obtained image Pic2 in the storage unit 12.
  • the imaging unit 16 captures an image directly below the measurement point P1, and stores the obtained image Pic3 in the storage unit 12.
  • the imaging unit 16 captures an image from directly above the support pillar 102a and stores the obtained image Pic4 in the storage unit 12.
  • the imaging unit 16 captures an image from directly above the support pillar 102b and stores the obtained image Pic5 in the storage unit 12.
  • the storage unit 12 stores the images Pic1, Pic2, Pic3, Pic4, and Pic5 in association with the measurement point P1.
  • the difference detection unit 27 reads an image from the storage unit 12 and detects a difference between the image captured last time by the imaging unit 16 and the image captured this time at the same measurement point.
  • the difference detection unit 27 detects, for example, the difference between the image captured last time and the image captured this time based on the number of pixels.
  • the determination unit 22 determines whether or not the difference detected by the difference detection unit 27 exceeds a predetermined value. For example, the determination unit 22 determines whether or not the number of pixels of the difference detected by the difference detection unit 27 exceeds a predetermined value (for example, 100 pixels).
  • the power transmission and distribution equipment inspection system 1 detects the difference between the image captured last time by the imaging unit 16 and the image captured this time, and determines whether or not the difference exceeds a predetermined value.
  • the load applied to the support column 102 can be inspected while reducing the burden.
  • the worker can grasp the behavior of the power transmission / distribution facility 100 and can grasp a sign that an abnormality occurs in the power transmission / distribution facility 100. For example, the operator can determine whether or not the support pillar 102 can withstand the strength assumed at the time of installation based on the result of the power transmission and distribution equipment inspection system 1.
  • the determination unit 22 may comprehensively determine at least two of the degree of sinking and lifting of the support pillar 102, the degree of inclination of the support pillar 102, and the degree of design load, and issue a warning.
  • the determination unit 22 assigns a score according to the degree of subsidence of the support column 102, and assigns a score according to the degree of inclination of the support column 102, and the total of the points exceeds a predetermined value. , Issue a warning.
  • the power transmission and distribution equipment inspection system 1 calculates the distance from the ground point of the support pillar 102 to the fixed point, compares the distance with the reference value, and the difference exceeds a predetermined difference. Even if not, a warning can be issued depending on the degree of inclination of the support pillar 102, and a sign that an abnormality has occurred in the power transmission and distribution equipment 100 can be grasped.
  • the configuration described in the above embodiment shows an example of the contents of the present invention, and can be combined with another known technique, and can be combined with other configurations without departing from the gist of the present invention. It is also possible to omit or change the part.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Electric Cable Installation (AREA)
  • Force Measurement Appropriate To Specific Purposes (AREA)
  • Length Measuring Devices By Optical Means (AREA)

Abstract

電気を送配電する送配電線と、所定間隔で設置され、前記送配電線を支持する複数の支持柱とにより構成される送配電設備を点検する飛行体と処理装置とを備える送配電設備点検システムである。飛行体は、所定の測定点を含む飛行経路にしたがって飛行し、測定点から対象となる支持柱と基礎地盤との境目である地際点までの第1距離と、測定点から対象となる支持柱と送配電線とを固定する固定点までの第2距離とを測定する測定部を備える。処理装置は、測定部により測定された第1距離と第2距離とに基づいて、地際点から固定点までの距離を算出する第1算出部と、第1算出部により算出された距離を基準値と比較して、その差分が所定の差分を超えているかどうかを判定する判定部とを備える。

Description

送配電設備点検システム
 本発明は、送配電設備を点検する送配電設備点検システムに関する。
 架空送配電線への接近樹木の点検、敷地の点検、線下地状況の点検および鉄塔の点検などを無人飛行体を用いて行うことが知られている(例えば、特許文献1)。また、送配電線を支持する支持柱は、支持柱自体の重量、送配電線の重量や張力、支持柱に付着する氷雪の重量などにより、垂直方向に荷重が加わり、沈み込んだり、または、浮き上がったりすることがある。
特開2005-265699号公報
 しかしながら、従来の送配電設備を点検するシステムでは、このような支持柱の沈み込みや浮き上がりが考慮されていない。
 本発明では、支持柱の沈み込みや浮き上がりを含めた送配電設備の点検を行うことができる送配電設備点検システムを提供することを目的とする。
 上述した課題を解決し、目的を達成するために、本発明の送配電設備点検システムは、電気を送配電する送配電線と、所定間隔で設置され、前記送配電線を支持する複数の支持柱とにより構成される送配電設備を点検する飛行体と処理装置とを備える送配電設備点検システムであって、前記飛行体は、所定の測定点を含む飛行経路にしたがって飛行し、前記測定点から対象となる支持柱と基礎地盤との境目である地際点までの第1距離と、前記測定点から前記対象となる支持柱と前記送配電線とを固定する固定点までの第2距離とを測定する測定部を備え、前記処理装置は、前記測定部により測定された前記第1距離と前記第2距離とに基づいて、前記地際点から前記固定点までの距離を算出する第1算出部と、前記第1算出部により算出された距離を基準値と比較して、その差分が所定の差分を超えているかどうかを判定する判定部とを備える。
 前記処理装置は、前記測定部により測定された前記第1距離と前記第2距離とに基づいて、前記対象となる支持柱の傾きを算出する第2算出部を備え、前記判定部は、前記第2算出部により算出された傾きを基準値と比較して、その差分が所定の差分を超えているかどうかを判定することが好ましい。
 前記処理装置は、前記測定部により測定された結果に基づいて、前記対象となる支持柱と、当該対象となる支持柱に隣接する一方の支持柱との間にかかる第1電線張力と、前記対象となる支持柱と、当該対象となる支持柱に隣接する他方の支持柱との間にかかる第2電線張力とを算出する第3算出部を備え、前記判定部は、前記第3算出部により算出された第1電線張力と第2電線張力との合成張力と、前記対象となる支持柱にかかる風圧荷重との和が所定値を超えているかどうかを判定することが好ましい。
 前記処理装置は、前記測定部により測定された結果に基づいて、前記対象となる支持柱と、当該対象となる支持柱に隣接する一方の支持柱との間にかかる電線張力を算出する第4算出部を備え、前記判定部は、前記第4算出部により算出された電線張力と、前記対象となる支持柱にかかる風圧荷重との和が所定値を超えているかどうかを判定することが好ましい。
 前記飛行体は、点検対象を撮像する撮像部を備え、前記処理装置は、同じ測定点において、前記撮像部により前回撮像された画像と今回撮像された画像との差分を検出する差分検出部を備え、前記判定部は、前記差分検出部により検出された差分が所定値を超えているかどうかを判定することが好ましい。
 本発明によれば、支持柱の沈み込みや浮き上がりを含めた送配電設備の点検を行うことができる。
図1は、飛行体により送配電設備の周辺を飛行しつつ測定を行い、処理装置により測定結果を処理することを示す概念図である。 図2は、飛行体と処理装置とを備える送配電設備点検システムの構成を示す図である。 図3は、測定部により測定点から第1距離と第2距離とを測定するときの説明に供する図である。 図4は、支持柱の間にかかっている電線の水平方向にかかる電線張力についての説明に供する図である。 図5は、第1電線張力と、第2電線張力と、風圧荷重との和を算出する手順についての説明に供する図である。 図6は、第1電線張力TLと、風圧荷重との和を算出する手順についての説明に供する図である。
 水力を利用して電気を発電する水力発電システムでは、取水ダムまたは水槽に設置した取水ゲート等の動力電源を供給するため、発電所または一般配電線から分岐して、取水ダムまたは水槽まで電線が延線されている。この電線は、えん堤線または水槽線などと称される。
 えん堤線は、発電所から取水ダムまでの数キロメートルに及んで敷設されることがある。えん堤線は、例えば、半年に1回の頻度で作業員により巡視され、異常の有無が点検され、また、6年に1回の頻度で外観の定期点検が実施される。
 えん堤線は、発電所から取水ダムまでを最短距離で結ぶように敷設される。えん堤線は、例えば、山麓沿いの車道または林道に敷設されたり、樹木などを伐採して森林の中に敷設される。
 作業者は、えん堤線に沿って移動しながら送配電設備の巡視を行うため、労力および時間がかかる。また、前回巡回したときに送配電設備を撮影した写真などの情報があればよいが、このような情報がない場合、作業者は、前回の記憶に基づいて点検することになり、送配電設備のわずかな変化を把握し、送配電設備に異常が生じることを予測することは困難である。
 また、目視による巡視では、送配電設備が設置時に想定した強度に耐えうる状態か否かを判断することはできず、改めて送配電設備を停電させて測量等の調査を行う必要がある。
 本発明では、作業員の負担を軽減しつつ、送配電設備の点検を行い、送配電設備が設置時に想定した強度に耐えうる状態か否かを判断することを目的とする。
 以下に、本発明の実施形態を、図面を参照して詳細に説明する。図1は、飛行体10により送配電設備100の周辺を飛行しつつ測定を行い、処理装置20により測定結果を処理することを示す概念図である。
 送配電設備100は、発電所により発電された電気を送配電する送配電線(以下、電線という。)101と、所定間隔で設置され、電線101を支持する複数の支持柱102とにより構成される。電線101は、三相交流の場合、3本の単位で構成され、単相交流の場合、2本の単位で構成される。支持柱102は、鉄塔または電柱などである。
 飛行体10は、飛行経路に含まれている飛行ルートRに基づいて飛行しながら送配電設備100の周辺を飛行する。また、飛行体10は、飛行ルートRに含まれている所定の測定点において、測定点から支持柱102までの距離などを測定する。処理装置20は、飛行体10によって測定された結果に基づいて、送配電設備100の点検を行う。
 図2は、飛行体10と処理装置20とを備える送配電設備点検システム1の構成を示す図である。飛行体10には、制御部11と、記憶部12と、姿勢センサ13と、測位部14と、測定部15と、撮像部16と、通信部17と、が搭載されている。
 飛行体10は、飛行および空中静止(ホバリング)が可能に構成された無人航空機(UAV、Unmanned Air Vehicle)、ドローン、マルチコプタ等であり、制御部11の制御によって、所定の測定点を含む飛行経路にしたがって飛行する。なお、飛行経路は、例えば、飛行プログラムにより実現される。
 制御部11は、例えば、CPU(Central Processing Unit)等の演算装置である。
 記憶部12は、例えば、ハードディスクドライブ、ソリッドステートドライブ、フラッシュメモリーその他の記憶装置のうち少なくとも1つであり、制御部11によって読み出される各種のデータを記憶する。記憶部12には、飛行プログラムが保存されている。
 飛行プログラムには、少なくとも、飛行体10が飛行する経路である飛行ルートと、支持柱102を測定する箇所である測定点と、測定点において空中静止する時間情報などが含まれている。飛行ルートおよび測定点は、座標情報により構成されている。座標情報は、例えば、緯度と経度とにより構成されている。測定点は、飛行ルート上に複数個所指定されている。
 姿勢センサ13は、飛行体10の角度(姿勢)、加速度、角速度または角加速度を検出する計測器である。姿勢センサ13は、例えば、ジャイロセンサまたは加速度センサなどにより実現される。制御部11は、姿勢センサ13により検出されたデータに基づいて、飛行時や空中静止時などの飛行体10の姿勢制御を行う。
 測位部14は、複数個の衛星から発射された時刻信号を受信し、飛行体10の地球上の位置を測位する機器である。測位部14は、例えば、GPS(Global Positioning System)受信機により実現される。制御部11は、測位部14により測位した位置に基づいて、飛行ルートに沿って飛行体10を飛行させたり、測定点において飛行体10を空中静止させたりする。
 測定部15は、測定点から対象となる支持柱102と基礎地盤との境目である地際点までの第1距離と、測定点から対象となる支持柱102と電線101とを固定する固定点までの第2距離とを測定する。
 測定部15は、測定対象となる支持柱102にレーザを照射し、支持柱102に当たって戻ってくるまでの時間を測定し、その測定結果から距離を算定する機器である。
 ここで、測定部15の動作について、図3を用いて説明する。図3は、飛行体10に搭載されている測定部15により測定点P1から第1距離D1と第2距離D2とを測定する説明に供する図である。以下では、飛行体10は、測定点P1に空中静止しているものとする。測定点P1は、支持柱102aと支持柱102bの中間位置とするが、中間位置に限られない。また、測定点P1の座標位置と、測定部15の座標位置とは同じであるとする。
 また、記憶部12には、測定部15の動作を制御するための測定プログラムが保存されているものとする。測定プログラムには、測定対象となる支持柱の座標情報が測定点の座標情報に関連付けられて記述されている。例えば、測定点P1の座標情報には、支持柱102aの座標情報と支持柱102bの座標情報とが関連付けられている。
 制御部11は、飛行体10を測定点P1で空中静止したときに、測定プログラムを読み込んで、支持柱102aの座標情報と支持柱102bの座標情報とを取得する。
 測定部15は、制御部11により取得された支持柱102aの座標情報に基づいて、支持柱102aにレーザを照射する。測定部15は、測定点P1から支持柱102aと基礎地盤Gとの境目である地際点P2までの第1距離Lを測定する。また、測定部15は、測定点P1から支持柱102aと電線101とを固定する固定点P3までの第2距離Lを測定する。測定部15は、測定点P1の水平方向Hに対して地際点P2に対して照射したレーザの角度θと、測定点P1の水平方向Hに対して固定点P3に対して照射したレーザの角度θとを測定する。
 同様に、測定部15は、制御部11により取得された支持柱102bの座標情報に基づいて、支持柱102bにレーザを照射する。測定部15は、測定点P1から支持柱102bと基礎地盤Gとの境目である地際点P4までの第1距離Lを測定する。また、測定部15は、測定点P1から支持柱102bと電線101とを固定する固定点P5までの第2距離Lを測定する。測定部15は、測定点P1の水平方向Hに対して地際点P4に対して照射したレーザの角度θと、測定点P1の水平方向Hに対して固定点P5に対して照射したレーザの角度θとを測定する。
 測定部15は、測定した第1距離L,Lと、第2距離L,Lと、レーザの角度θ,θ,θ,θを記憶部12に保存する。なお、測定部15は、第1距離L,Lと、第2距離L,Lと、レーザの角度θ,θ,θ,θとを通信部17を介して処理装置20に送信する構成でもよい。
 処理装置20は、第1算出部21と、判定部22と、通信部23とを備える。通信部23と通信部17とは、無線または有線により接続され、飛行体10で得られた情報が処理装置20に送信される。
 第1算出部21は、通信部23を介して測定部15により測定された第1距離と第2距離とを取得し、取得した第1距離と第2距離とに基づいて、地際点から固定点までの距離を算出する。
 図3に示す例では、第1算出部21は、第1距離L,Lと、第2距離L,Lと、レーザの角度θ,θ,θ,θとを取得する。
 第1算出部21は、レーザの角度θとレーザの角度θとの差分から第1距離Lと第2距離Lとの角度θを算出する。第1算出部21は、第1距離Lと第2距離Lと角度θとに基づいて、(1)式により、支持柱102aの地際点P2から固定点P3までの距離Lを算出する。
 L=√(L +L -2L×L×cosθ) ・・・(1)
 また、第1算出部21は、レーザの角度θとレーザの角度θとの差分から第1距離Lと第2距離Lとの角度θを算出する。第1算出部21は、第1距離Lと第2距離Lと角度θとに基づいて、(2)式により、支持柱102bの地際点P4から固定点P5までの距離Lを算出する。
 L=√(L +L -2L×L×cosθ) ・・・(2)
 判定部22は、第1算出部21により算出された距離を基準値と比較して、その差分が所定の差分を超えているかどうかを判定する。基準値とは、例えば、前回の点検において第1算出部21により算出された距離、過去n回の点検において第1算出部21により算出された複数の距離の平均値、または支持柱102の設置時の距離などである。所定の差分とは、例えば、1cm,2cmなどの定数である。また、判定部22は、第1算出部21により算出された距離が基準値からn%以上離れている場合には、差分が所定の差分を超えていると判断してもよい。
 よって、送配電設備点検システム1は、飛行ルートに基づいて飛行体10を飛行させ、処理装置20により測定部15により測定した結果に基づいて支持柱102の地際点から固定点までの距離を算出し、この距離と基準値とを比較し、差分が所定の差分を超えているかどうかを判定するので、作業者の負担を軽減しつつ、支持柱102がどの程度沈み込んでいるのか、または、支持柱102がどの程度浮き上がっているのかを点検することができる。作業員は、送配電設備100の挙動を把握することができ、送配電設備100に異常が発生する前兆を把握することができる。例えば、作業者は、送配電設備点検システム1による結果に基づいて、支持柱102が設置時に想定した強度に耐えうる状態か否かを判断することができる。
 また、処理装置20は、測定部15により測定された第1距離と第2距離とに基づいて、対象となる支持柱102の傾きを算出する第2算出部24を備える構成でもよい。
 図3に示す例では、第2算出部24は、測定部15により測定された第1距離Lと、第2距離Lと、第1算出部21により算出された支持柱102aの地際点P2から固定点P3までの距離Lとに基づいて、(3)式により、支持柱102aの傾きを算出する。第2算出部24は、傾きを角度θとして算出する。
 cosθ=(L +L -L )/(2×L×L) ・・・(3)
 同様に、第2算出部24は、測定部15により測定された第1距離Lと、第2距離Lと、第1算出部21により算出された支持柱102bの地際点P4から固定点P5までの距離Lとに基づいて、(4)式により、支持柱102bの傾きを算出する。第2算出部24は、傾きを角度θとして算出する。
 cosθ=(L +L -L )/(2×L×L) ・・・(4)
 判定部22は、第2算出部24により算出された傾きを基準値と比較して、その差分が所定の差分を超えているかどうかを判定する。基準値とは、例えば、前回の点検において第2算出部24により算出された傾き、過去n回の点検において第2算出部24により算出された複数の傾きの平均値、または支持柱102の設置時の傾きなどである。所定の差分とは、例えば、5度,10度などの定数である。また、判定部22は、第2算出部24により算出された傾きが基準値からn%以上離れている場合には、差分が所定の差分を超えていると判断してもよい。
 よって、送配電設備点検システム1は、飛行ルートに基づいて飛行体10を飛行させ、処理装置20により測定部15により測定した結果に基づいて支持柱102の傾きを算出し、この傾きと基準値とを比較し、差分が所定の差分を超えているかどうかを判定するので、作業者の負担を軽減しつつ、支持柱102がどの程度傾いているのかを点検することができる。作業員は、送配電設備100の挙動を把握することができ、送配電設備100に異常が発生する前兆を把握することができる。例えば、作業者は、送配電設備点検システム1による結果に基づいて、支持柱102が設置時に想定した強度に耐えうる状態か否かを判断することができる。
 また、処理装置20は、測定部15により測定された結果に基づいて、対象となる支持柱102と、当該対象となる支持柱102に隣接する一方の支持柱102との間にかかる第1電線張力と、対象となる支持柱102と、当該対象となる支持柱102に隣接する他方の支持柱102との間にかかる第2電線張力とを算出する第3算出部25を備える構成でもよい。
 ここで、第3算出部25の動作について図4を用いて説明する。図4は、支持柱102aと支持柱102bとの間にかかっている電線101の水平方向にかかる電線張力Tについての説明に供する図である。
 支持柱102は、必要な設計荷重に応じて品種が選定され、設置する地面の条件に応じて敷設される。設計荷重は、電線にかかる電線張力(ベクトル)と、風により電線と支持柱とにかかる風圧荷重(ベクトル)との和(ベクトルの和)により求めることができる。以下では、設計荷重は、電線101の断線を考慮せず、常時想定荷重以下である場合について説明する。
 電線101は、弛みなくぴんと張ってしまうと張力が大きくなり、雨または風に対する耐久性が低くなったり、地震などの振動により支持柱102の強度が低くなるため、弛みを持たせてある。
 支持柱102aと支持柱102bとの間にかかっている電線101の長さLは、電線101の弛みDと、支持柱102aと支持柱102bとの間の距離である径間Sとに基づいて、(5)式により算出することができる。
 L=S+8D/3S ・・・(5)
 ここで、電線101の長さLは既知であるとする。また、径間Sは、測定部15により測定された測定点P1から固定点P3までの第2距離Lと、測定点P1の水平方向Hに対して固定点P3に対して照射したレーザの角度θとに基づいて、(6)式により算出することができる。
 S=2×L×cosθ ・・・(6)
 よって、(5)式を展開して、(7)式により、電線101の弛みDを算出することができる。
 D=√((3S(L-S))/8) ・・・(7)
 なお、測定部15は、測定点P1の直下の電線101にレーザを照射し、電線101に当たって戻ってくるまでの時間を測定し、その測定結果から電線101の弛みDを求めてもよい。
 また、電線101の水平方向にかかる電線張力Tは、電線101の弛みDと、単位長さあたりの電線101の荷重Wと、径間Sとに基づいて、(8)式により算出することができる。なお、単位長さあたりの電線101の荷重Wは、既知であるとする。
 T=WS/8D ・・・(8)
 図5は、支持柱102a,102b,102cの平面図であり、第1電線張力TL(ベクトル)と、第2電線張力TR(ベクトル)と、風圧荷重Ww(ベクトル)との和W1(ベクトル和)を算出する手順についての説明に供する図である。なお、風圧荷重Wwは、電線101にかかる風圧荷重(ベクトル)と、支持柱102にかかる風圧荷重(ベクトル)との合成ベクトルを意味している。
 第3算出部25は、(8)式に基づいて、対象となる支持柱102aと、支持柱102aに隣接する一方の支持柱102bとの間にかかる第1電線張力TLを算出する。また、第3算出部25は、(8)式に基づいて、対象となる支持柱102aと、支持柱102aに隣接する他方の支持柱102cとの間にかかる第2電線張力TRとを算出する。
 判定部22は、第3算出部25により算出された第1電線張力と第2電線張力との合成張力と、対象となる支持柱102にかかる風圧荷重との和が所定値を超えているかどうかを判定する。所定値とは、支持柱102の種類ごとに定められている設計荷重である。支持柱102は、例えば、それぞれ固有の「呼び名」により寸法、体積、重量、設計荷重などが規定されている。
 風圧荷重Ww(ベクトル)は、単位面積あたりの風圧荷重αと、第1電線張力TL(ベクトル)と、第2電線張力TR(ベクトル)と、電線101の径dと、電線101の本数nとに基づいて、(9)式により算出することができる。
 Ww=(TL+TR)×d×n×α ・・・(9)
 なお、電線101の径dは、着雪を考慮しないものとする。また、電線101の本数nは、三相交流の場合には「3」であり、単相交流の場合には「2」である。また、(9)式では、電線101の水平角を考慮していない。
 図5に示す例では、判定部22は、第1電線張力TL(ベクトル)と第2電線張力TR(ベクトル)との合成張力T0(ベクトル)を算出し、合成張力T0(ベクトル)と風圧荷重Ww(ベクトル)との和W1(ベクトル和)を算出し、算出した和W1(ベクトル和)が所定値を超えているかどうかを判定する。
 よって、送配電設備点検システム1は、支持柱102が常時想定荷重以下である設計荷重を超えているかどうかを判定するので、作業者の負担を軽減しつつ、支持柱102にかかっている荷重を点検することができる。作業員は、送配電設備100の挙動を把握することができ、送配電設備100に異常が発生する前兆を把握することができる。例えば、作業者は、送配電設備点検システム1による結果に基づいて、支持柱102が設置時に想定した強度に耐えうる状態か否かを判断することができる。
 なお、上述では、支持柱102a,102b,102cは、一直線状に敷設されている場合を想定して説明したが、送配電設備点検システム1は、一直線状に敷設されていない場合でも適用することができる。
 また、支持柱102a,102b,102cが一直線状に敷設されていない場合、一直線状に敷設されている場合に比べて、第1電線張力TL(ベクトル)の向きと第2電線張力TR(ベクトル)の向きとが異なることが予想される。
 判定部22は、支持柱102a,102b,102cが一直線状に敷設されていない場合には、例えば、第1電線張力TL(ベクトル)と第2電線張力TR(ベクトル)との合成張力T0(ベクトル)を算出するときに、支持柱102a,102b,102cの敷設形態に応じた補正値を加算または乗算する処理を行う。
 判定部22は、例えば、支持柱102a,102b,102cが一直線状に敷設されているかどうかを判定する。支持柱102a,102b,102cの敷設形態は、既知であってもよいし、撮像部16により撮像した画像から判定してもよい。
 判定部22は、支持柱102a,102b,102cが一直線状に敷設されていないと判定した場合、支持柱102aおよび支持柱102bと、支持柱102aおよび102cとの角度を算出し、算出した角度に応じた補正値を用いて合成張力T0(ベクトル)を算出する。
 また、処理装置20は、測定部15により測定された結果に基づいて、対象となる支持柱102と、当該対象となる支持柱102に隣接する一方の支持柱102との間にかかる電線張力を算出する第4算出部26を備える構成でもよい。以下では、設計荷重は、電線101の断線を考慮し、非常時想定荷重以下である場合について説明する。
 図6は、支持柱102a,102bの平面図であり、第1電線張力TL(ベクトル)と、風圧荷重Ww(ベクトル)との和W2(ベクトル和)を算出する手順についての説明に供する図である。なお、図6では、支持柱102aと支持柱102cとの間の電線101が断線した場合を想定している。また、風圧荷重Wwは、電線101にかかる風圧荷重(ベクトル)と、支持柱102にかかる風圧荷重(ベクトル)との合成ベクトルを意味している。
 第4算出部26は、(8)式に基づいて、対象となる支持柱102aと、支持柱102aに隣接する一方の支持柱102bとの間にかかる第1電線張力TLを算出する。
 判定部22は、第4算出部26により算出された第1電線張力TLと、対象となる支持柱102aにかかる風圧荷重Wwとの和W2が所定値を超えているかどうかを判定する。所定値とは、支持柱102の種類ごとに定められている設計荷重である。
 よって、送配電設備点検システム1は、支持柱102が非常時想定荷重以下である設計荷重を超えているかどうかを判定するので、作業者の負担を軽減しつつ、支持柱102にかかっている荷重を点検することができる。作業員は、送配電設備100の挙動を把握することができ、送配電設備100に異常が発生する前兆を把握することができる。例えば、作業者は、送配電設備点検システム1による結果に基づいて、支持柱102が設置時に想定した強度に耐えうる状態か否かを判断することができる。
 また、処理装置20は、同じ測定点において、撮像部16により前回撮像された画像と今回撮像された画像との差分を検出する差分検出部27を備える構成でもよい。
 ここで、撮像部16により支持柱102を撮像する動作について説明する。なお、記憶部12には、撮像部16の動作を制御するための撮像プログラムが保存されているものとする。撮像プログラムには、撮像する座標と方向の情報が記述されている。
 例えば、制御部11は、飛行体10が図3に示すように、支持柱102aと支持柱102bの中間位置の測定点P1で空中静止したとき、撮像プログラムを読み込んで、撮像する座標と方向の情報を取得する。制御部11は、撮像する座標の位置に飛行体10を移動し、撮像部16を撮像する方向に向ける。制御部11は、撮像部16により撮像を行うように制御する。
 撮像部16は、制御部11による制御にしたがって、撮像を行う。例えば、撮像部16は、一つの測定点において、5つの場所を撮影する。撮像部16は、測定点P1の位置から支持柱102aの固定点P3の方向に向かって撮像し、得られた画像Pic1を記憶部12に保存する。撮像部16は、測定点P1の位置から支持柱102bの固定点P5の方向に向かって撮像し、得られた画像Pic2を記憶部12に保存する。撮像部16は、測定点P1の直下に向かって撮像し、得られた画像Pic3を記憶部12に保存する。撮像部16は、支持柱102aの上空から直下に向かって撮像し、得られた画像Pic4を記憶部12に保存する。撮像部16は、支持柱102bの上空から直下に向かって撮像し、得られた画像Pic5を記憶部12に保存する。記憶部12は、画像Pic1,Pic2,Pic3,Pic4,Pic5を測定点P1に関連付けて記憶する。
 差分検出部27は、記憶部12から画像を読み出して、同じ測定点において、撮像部16により前回撮像された画像と今回撮像された画像との差分を検出する。差分検出部27は、例えば、前回撮像された画像と今回撮像された画像との差分を画素数で検出する。
 判定部22は、差分検出部27により検出された差分が所定値を超えているかどうかを判定する。判定部22は、例えば、差分検出部27により検出された差分の画素数が所定値(例えば、100画素)を超えているかどうかを判定する。
 よって、送配電設備点検システム1は、撮像部16により前回撮像された画像と今回撮像された画像との差分を検出し、この差分が所定値を超えているかどうかを判定するので、作業者の負担を軽減しつつ、支持柱102にかかっている荷重を点検することができる。作業員は、送配電設備100の挙動を把握することができ、送配電設備100に異常が発生する前兆を把握することができる。例えば、作業者は、送配電設備点検システム1による結果に基づいて、支持柱102が設置時に想定した強度に耐えうる状態か否かを判断することができる。
 また、判定部22は、支持柱102の沈み込みや浮き上がりの程度と、支持柱102の傾きの程度と、設計荷重の程度との二つ以上を総合的に判断して、警告を発する構成でもよい。例えば、判定部22は、支持柱102の沈み込みの程度に応じて点数を付け、また、支持柱102の傾きの程度に応じて点数を付け、点数の合計が所定の値を超えていれば、警告を発する。このような構成によれば、送配電設備点検システム1は、支持柱102の地際点から固定点までの距離を算出し、この距離と基準値とを比較し、差分が所定の差分を超えていなくても、支持柱102の傾きの程度により、警告を発することができ、送配電設備100に異常が発生する前兆を把握することができる。
 以上の実施の形態に示した構成は、本発明の内容の一例を示すものであり、別の公知の技術と組み合わせることも可能であるし、本発明の要旨を逸脱しない範囲で、構成の一部を省略、変更することも可能である。
1 送配電設備点検システム
10 飛行体
11 制御部
12 記憶部
13 姿勢センサ
14 測位部
15 測定部
16 撮像部
17 通信部
20 処理装置
21 第1算出部
22 判定部
23 通信部
24 第2算出部
25 第3算出部
26 第4算出部
27 差分検出部
100 送配電設備
101 送配電線(電線)
102,102a,102b,102c 支持柱
G 基礎地盤
H 水平方向
P1 測定点
P2,P4 地際点
P3,P5 固定点
R 飛行ルート

Claims (5)

  1.  電気を送配電する送配電線と、所定間隔で設置され、前記送配電線を支持する複数の支持柱とにより構成される送配電設備を点検する飛行体と処理装置とを備える送配電設備点検システムであって、
     前記飛行体は、
      所定の測定点を含む飛行経路にしたがって飛行し、
      前記測定点から対象となる支持柱と基礎地盤との境目である地際点までの第1距離と、前記測定点から前記対象となる支持柱と前記送配電線とを固定する固定点までの第2距離とを測定する測定部を備え、
     前記処理装置は、
      前記測定部により測定された前記第1距離と前記第2距離とに基づいて、前記地際点から前記固定点までの距離を算出する第1算出部と、
      前記第1算出部により算出された距離を基準値と比較して、その差分が所定の差分を超えているかどうかを判定する判定部とを備える、
     送配電設備点検システム。
  2.  前記処理装置は、前記測定部により測定された前記第1距離と前記第2距離とに基づいて、前記対象となる支持柱の傾きを算出する第2算出部を備え、
     前記判定部は、前記第2算出部により算出された傾きを基準値と比較して、その差分が所定の差分を超えているかどうかを判定する、
     請求項1に記載の送配電設備点検システム。
  3.  前記処理装置は、前記測定部により測定された結果に基づいて、前記対象となる支持柱と、当該対象となる支持柱に隣接する一方の支持柱との間にかかる第1電線張力と、前記対象となる支持柱と、当該対象となる支持柱に隣接する他方の支持柱との間にかかる第2電線張力とを算出する第3算出部を備え、
     前記判定部は、前記第3算出部により算出された第1電線張力と第2電線張力との合成張力と、前記対象となる支持柱にかかる風圧荷重との和が所定値を超えているかどうかを判定する、
     請求項1または2に記載の送配電設備点検システム。
  4.  前記処理装置は、前記測定部により測定された結果に基づいて、前記対象となる支持柱と、当該対象となる支持柱に隣接する一方の支持柱との間にかかる電線張力を算出する第4算出部を備え、
     前記判定部は、前記第4算出部により算出された電線張力と、前記対象となる支持柱にかかる風圧荷重との和が所定値を超えているかどうかを判定する、
     請求項1または2に記載の送配電設備点検システム。
  5.  前記飛行体は、点検対象を撮像する撮像部を備え、
     前記処理装置は、同じ測定点において、前記撮像部により前回撮像された画像と今回撮像された画像との差分を検出する差分検出部を備え、
     前記判定部は、前記差分検出部により検出された差分が所定値を超えているかどうかを判定する、
     請求項1から4のいずれか一項に記載の送配電設備点検システム。
PCT/JP2018/006422 2018-02-22 2018-02-22 送配電設備点検システム WO2019163050A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PCT/JP2018/006422 WO2019163050A1 (ja) 2018-02-22 2018-02-22 送配電設備点検システム
JP2018533268A JP6428973B1 (ja) 2018-02-22 2018-02-22 送配電設備点検システム

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2018/006422 WO2019163050A1 (ja) 2018-02-22 2018-02-22 送配電設備点検システム

Publications (1)

Publication Number Publication Date
WO2019163050A1 true WO2019163050A1 (ja) 2019-08-29

Family

ID=64480471

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/006422 WO2019163050A1 (ja) 2018-02-22 2018-02-22 送配電設備点検システム

Country Status (2)

Country Link
JP (1) JP6428973B1 (ja)
WO (1) WO2019163050A1 (ja)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7074043B2 (ja) * 2018-12-17 2022-05-24 日本電信電話株式会社 設備状態検出装置、設備状態検出方法、及びプログラム
JP7184207B2 (ja) * 2019-10-23 2022-12-06 日本電信電話株式会社 演算装置、設備管理方法、及びプログラム
JP7436403B2 (ja) 2021-01-28 2024-02-21 株式会社日立製作所 計測システム

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0368884A (ja) * 1989-08-09 1991-03-25 Hitachi Cable Ltd 送電線用鉄塔の変位監視方法
JPH06313715A (ja) * 1993-04-30 1994-11-08 Chubu Electric Power Co Inc 地上断面のプロフィールおよび離隔測定方法および装置
JPH07154909A (ja) * 1993-11-26 1995-06-16 Sumitomo Electric Ind Ltd 架空電線の線下物体距離測定装置
JP2006353031A (ja) * 2005-06-17 2006-12-28 Nippon Telegr & Teleph Corp <Ntt> 電柱設計方法および電柱設計装置
JP2009275385A (ja) * 2008-05-13 2009-11-26 Zivil Investigation Design Ltd 構造物の点検装置
WO2017027939A1 (en) * 2015-08-14 2017-02-23 Centrais Elétricas Do Norte Do Brasil S.A - Eletrobras Eletronorte Process of using an aerostat in transmission lines

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0368884A (ja) * 1989-08-09 1991-03-25 Hitachi Cable Ltd 送電線用鉄塔の変位監視方法
JPH06313715A (ja) * 1993-04-30 1994-11-08 Chubu Electric Power Co Inc 地上断面のプロフィールおよび離隔測定方法および装置
JPH07154909A (ja) * 1993-11-26 1995-06-16 Sumitomo Electric Ind Ltd 架空電線の線下物体距離測定装置
JP2006353031A (ja) * 2005-06-17 2006-12-28 Nippon Telegr & Teleph Corp <Ntt> 電柱設計方法および電柱設計装置
JP2009275385A (ja) * 2008-05-13 2009-11-26 Zivil Investigation Design Ltd 構造物の点検装置
WO2017027939A1 (en) * 2015-08-14 2017-02-23 Centrais Elétricas Do Norte Do Brasil S.A - Eletrobras Eletronorte Process of using an aerostat in transmission lines

Also Published As

Publication number Publication date
JP6428973B1 (ja) 2018-11-28
JPWO2019163050A1 (ja) 2020-02-27

Similar Documents

Publication Publication Date Title
US20220107643A1 (en) Control device, imaging device, control method, imaging method, and computer program
US20230298202A1 (en) Information processing device, information processing method, and computer program
JP6428973B1 (ja) 送配電設備点検システム
WO2016006283A1 (ja) 構造物維持管理システム
US9823664B2 (en) Unmanned aircraft for positioning an instrument for inspection purposes and methods of inspecting a target surface
US10873831B2 (en) Sensitive area management
CN106226830B (zh) 一种海洋磁力探测方法及装置
CN103135550A (zh) 用于电力巡线的无人机多重避障控制方法
JP7436403B2 (ja) 計測システム
US20220058307A1 (en) Equipment state detection device, equipment state detection method, and program
JP2018031693A (ja) 架空送電線の離隔評価方法,離隔評価装置,及び離隔評価プログラム、並びに、離隔評価データの表示方法
JP6371895B1 (ja) 風況の計測方法
KR101861065B1 (ko) 파도 예측을 통한 선박 안전 항해 지원 시스템
JP2007002494A (ja) 架設管理システム
Ćmielewski et al. Detection of crane track geometric parameters using UAS
Garg Displacement measurement using a laser doppler vibrometer mounted on an unmanned aerial vehicles
JP2022161060A (ja) 架空送電線への着氷雪量測定システム及び架空送電線への着氷雪量測定方法
CN113591190A (zh) 一种隧道洞口高边坡进行精准防护的方法
KR102520273B1 (ko) 송배전설비 감시용 무인항공기의 회피구역 설정방법
Gura et al. Security of infrastructural linear objects by using three-dimensional laser scanning technology
KR20230018455A (ko) 구조물의 조사 지원 장치, 구조물의 조사 지원 방법, 및 프로그램
CN110471027A (zh) 无人机盲区环境下检测的导航方法
JP2010218321A (ja) 移動体の物体投下装置、物体投下システム及びそれらに用いる物体投下方法
JP2016161277A (ja) 橋梁計測装置

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2018533268

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18907091

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18907091

Country of ref document: EP

Kind code of ref document: A1