WO2019142359A1 - 電縫鋼管製造装置及び電縫鋼管製造方法 - Google Patents

電縫鋼管製造装置及び電縫鋼管製造方法 Download PDF

Info

Publication number
WO2019142359A1
WO2019142359A1 PCT/JP2018/001788 JP2018001788W WO2019142359A1 WO 2019142359 A1 WO2019142359 A1 WO 2019142359A1 JP 2018001788 W JP2018001788 W JP 2018001788W WO 2019142359 A1 WO2019142359 A1 WO 2019142359A1
Authority
WO
WIPO (PCT)
Prior art keywords
plasma flow
steel pipe
pipe manufacturing
pair
plasma
Prior art date
Application number
PCT/JP2018/001788
Other languages
English (en)
French (fr)
Inventor
耕太郎 渡邊
秀樹 濱谷
史徳 渡辺
王治 田中
祐輔 武田
雄也 友永
佳弘 橋本
昌秀 林
Original Assignee
日本製鉄株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本製鉄株式会社 filed Critical 日本製鉄株式会社
Priority to PCT/JP2018/001788 priority Critical patent/WO2019142359A1/ja
Priority to EP18901019.2A priority patent/EP3744466B1/en
Priority to JP2018519881A priority patent/JP6458907B1/ja
Priority to CN201880075091.1A priority patent/CN111372712A/zh
Priority to US16/761,470 priority patent/US20200391318A1/en
Priority to KR1020207013364A priority patent/KR20200064128A/ko
Publication of WO2019142359A1 publication Critical patent/WO2019142359A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K10/00Welding or cutting by means of a plasma
    • B23K10/02Plasma welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K11/00Resistance welding; Severing by resistance heating
    • B23K11/0006Resistance welding; Severing by resistance heating the welding zone being shielded against the influence of the surrounding atmosphere
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/08Making tubes with welded or soldered seams
    • B21C37/0807Tube treating or manipulating combined with, or specially adapted for use in connection with tube making machines, e.g. drawing-off devices, cutting-off
    • B21C37/0811Tube treating or manipulating combined with, or specially adapted for use in connection with tube making machines, e.g. drawing-off devices, cutting-off removing or treating the weld bead
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/08Making tubes with welded or soldered seams
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/08Making tubes with welded or soldered seams
    • B21C37/0818Manufacture of tubes by drawing of strip material through dies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K11/00Resistance welding; Severing by resistance heating
    • B23K11/08Seam welding not restricted to one of the preceding subgroups
    • B23K11/087Seam welding not restricted to one of the preceding subgroups for rectilinear seams
    • B23K11/0873Seam welding not restricted to one of the preceding subgroups for rectilinear seams of the longitudinal seam of tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K11/00Resistance welding; Severing by resistance heating
    • B23K11/36Auxiliary equipment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K13/00Welding by high-frequency current heating
    • B23K13/01Welding by high-frequency current heating by induction heating
    • B23K13/02Seam welding
    • B23K13/025Seam welding for tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K13/00Welding by high-frequency current heating
    • B23K13/06Welding by high-frequency current heating characterised by the shielding of the welding zone against influence of the surrounding atmosphere
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2101/00Articles made by soldering, welding or cutting
    • B23K2101/04Tubular or hollow articles
    • B23K2101/06Tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2103/00Materials to be soldered, welded or cut
    • B23K2103/02Iron or ferrous alloys
    • B23K2103/04Steel or steel alloys

Definitions

  • the present invention relates to an ERW steel pipe manufacturing apparatus and an ERW steel pipe manufacturing method.
  • ERW steel pipe In the production of ERW steel pipe, generally, while continuously conveying a strip steel plate (hereinafter simply referred to as "steel plate”), it is formed into a tubular shape by a large number of rolls, and the butting end faces of the steel plates are induced by a work coil Heating or melting by direct current heating with a contact tip, while pressing with a squeeze roll, forms a welded seam between butt end faces to form a seam welded steel pipe.
  • steel plate strip steel plate
  • Patent Document 1 suppresses oxide formation at the butt end face by spraying a reducing high temperature combustion flame or non-oxidizing high temperature plasma flow of 1400 ° C. or higher onto the butt end face at the time of ERW welding of steel pipe. And methods of promoting oxide emissions are disclosed.
  • plasma shield electric resistance welding a technique of performing electric resistance welding while supplying a plasma flow to a weld. This plasma shield electric resistance welding is fundamentally different in technical thought from plasma welding in which welding is performed by plasma itself.
  • Patent Document 2 discloses a method for stably reducing welding defects caused by oxides by making the plasma jet a laminar flow or pseudo laminar flow.
  • the electric resistance welding process is performed with a plurality of peripheral devices, such as multiple rolls around the weld, coils or contact tips for generating an induced current, disposed around the weld.
  • the plasma flow supply device may not be properly installed in order to interfere with the peripheral equipment. Even if it can be installed, it may not be possible to supply the plasma flow to the weld at an ideal angle or distance.
  • the plasma flow may not be properly shielded, and the amount of oxygen entrainment may increase, oxide defects in the weld may increase, and the condition of the weld may deteriorate. .
  • the present invention has been made in view of the above circumstances, and an object of the present invention is to provide a seam welded steel pipe manufacturing apparatus and a seam welded steel pipe manufacturing method capable of improving the quality of a welded portion and enhancing the reliability of the welded seam steel pipe. I assume.
  • the present inventors diligently studied a method of improving the quality of the welded portion of the ERW steel pipe by supplying a plasma flow to the welded portion in an ideal state. As a result, it turned out that the quality improvement of a welding part is possible by supplying a plasma flow to a welding part from the inside of a steel pipe welded by electric resistance welding.
  • the present invention has been made in view of the above circumstances, and adopts the following aspects.
  • One aspect of the present invention is an ERW steel pipe manufacturing apparatus that performs welding while forming a strip-like steel plate into a tubular shape and supplying a plasma flow to a pair of butt end surfaces to shield while welding, comprising: a mandrel; And a plasma flow supplier provided to supply the plasma flow.
  • At least a part of the plasma flow supply may be accommodated in the mandrel.
  • the apparatus may further include a plasma flow receiving plate for temporarily interrupting the supply of the plasma flow.
  • At least a part of the plasma flow receiving plate may be accommodated in the mandrel.
  • the plasma flow is performed between a shielding position for shielding the plasma flow toward the pair of butting end surfaces and a position other than the shielding position. You may further provide the moving mechanism which moves a receiving board.
  • the ERW steel pipe manufacturing apparatus may further include a cover that covers at least a part of the plasma flow supply device from above.
  • a pair of squeeze top rolls for pressing the strip steel plate so as to join the pair of butting end faces to each other.
  • a protective wall may be further provided to shield the plasma flow from the plasma flow supply to the pair of squeeze top rolls.
  • an adjustment mechanism for adjusting at least one of the relative position and the relative angle of the plasma flow feeder with respect to the mandrel is further provided. You may have.
  • Another aspect of the present invention is a method of manufacturing an ERW steel pipe for welding while forming a strip-like steel plate into a tubular shape and supplying plasma flow to a pair of butt end surfaces to shield while welding. And supplying the plasma flow toward the pair of abutting end surfaces from the inside of the strip steel plate.
  • the method may further include the step of temporarily shielding the plasma flow toward the pair of butting end surfaces before the supply of the plasma flow is started.
  • the position of the plasma flow supply device can be disposed inside the steel plate formed in a tubular shape.
  • the plasma flow supply device By arranging the plasma flow supply device in the steel pipe in this manner, it is possible to avoid space constraints due to interference with a large number of rolls, coils, or peripheral devices such as contact tips. Therefore, the plasma flow can be supplied at an ideal angle and distance to the pair of butt end surfaces to be welded. As a result, it is possible to reliably plasma shield the vicinity of the V-shaped convergence point which is the welding point of the electric resistance welding, and the welding quality can be improved.
  • the plasma flow supply can be brought close to the pair of butting end surfaces without causing interference with the peripheral devices, the Reynolds number at the pair of butting end positions of the plasma flow sprayed from the plasma flow supply can be lowered. Can. Therefore, since the plasma flow can be maintained in a laminar flow at the position of the welding portion, the entrainment of outside air can be reduced and a reliable shielding effect can be exhibited. Therefore, in addition to being not affected by the wind or air flow from the outside air, the generation of oxide-based defects in the welded portion due to the entrainment of ambient oxygen can be suppressed, so the quality of the ERW steel pipe can be improved. Furthermore, since the plasma flow supply device that emits the operation noise is disposed in the tubular steel plate, it is also possible to ensure operation in an environment where noise is suppressed more than in the past.
  • FIG. 1 It is a figure which shows the principal part of the seam welded steel pipe manufacturing apparatus which concerns on 1st Embodiment of this invention, Comprising: (A) is a top view, (B) is a side view. It is a figure which shows the plasma flow supply apparatus of the same ERW steel pipe manufacturing apparatus, Comprising: It is the A section enlarged view of FIG. 1 (B). It is a figure which shows the plasma flow supply apparatus of the ERW steel pipe manufacturing apparatus which concerns on 2nd Embodiment of this invention, Comprising: It is an enlarged side view corresponded to the A section of FIG.1 (B).
  • the ERW steel pipe is formed into a tubular shape by a large number of forming rolls 1 while feeding a strip steel plate W (hereinafter simply referred to as “steel plate W”) along the X direction. It is a steel pipe manufactured continuously by welding butt end face w1, w2 comrades.
  • the steel plate W is formed into a tubular shape by the many forming rolls 1 while being conveyed continuously along the longitudinal direction.
  • the work coil (not shown) with the pair of abutting end faces w1 and w2 interposed therebetween, the both abutting end faces w1 and w2 are heated, and further, the squeeze top roll 1a, A load is applied by 1b, and both butt end faces w1 and w2 are welded by fusion bonding.
  • the electric resistance welded steel pipe is manufactured continuously by the above process.
  • the steel plate W is not completed as a steel pipe in the state before welding, even if it shape
  • the ERW steel pipe manufacturing apparatus of the present embodiment includes a large number of forming rolls 1, a mandrel 2, a bead cutting device 3, a plasma flow supply device 4, a plasma flow receiving plate 5, a cover 6, a protective wall 7 and Is equipped. Then, when welding between the pair of butt end surfaces w1 and w2, the plasma flow PF generated by the plasma flow supply device 4 provided inside the steel plate W formed into a tubular shape is supplied to the pair of butt end surfaces w1 and w2. And plasma shield to cover.
  • the mandrel 2 is a cylindrical part arranged in the steel plate W so as to be coaxial with the central axis when the steel plate W is formed into a tubular shape, and the upstream end 2a thereof is connected and supported by the support member 2A.
  • the support member 2A is a component extending downward from above in the vertical direction, and the lower end 2Aa of the support member 2A is disposed to extend into the steel plate W formed in a tubular shape. Then, the upstream end 2a of the mandrel 2 is connected to the lower end 2Aa of the support member 2A, whereby the mandrel 2 is supported so as to extend along the horizontal direction (X direction).
  • a bead cutting device 3 for removing a bead formed on the inner surface of the welded portion of the electric resistance welded steel pipe is fixed to the tip of the mandrel 2 (the downstream end in the X direction).
  • the bead cutting device 3 is supported by the support member 2A via the mandrel 2.
  • a storage space 2c opened upward in the vertical direction via the opening 2b is formed at a position upstream of the bead cutting device 3 when the mandrel 2 is viewed along the longitudinal direction thereof.
  • the plasma flow supply device 4 is accommodated in the accommodation space 2c.
  • the accommodation space 2c has a sufficient size to adjust the position adjustment and the inclination angle of the plasma flow supply device 4 disposed therein.
  • the plasma flow supply device 4 is simply arranged in the tubular steel plate W, it can not be arranged due to interference with the mandrel 2, but in the present embodiment, the plasma flow supply device utilizing the presence of the mandrel 2 in reverse. Arrangement of 4 is possible.
  • an impedance (not shown) can also be supported on the mandrel 2. In this case, it can be arranged by winding or placing the above-mentioned impeder at a position near the weld in the longitudinal direction of the mandrel 2.
  • the plasma flow supply device 4 supports the plasma flow supply device 4a for spraying the plasma flow PF toward the butt end faces w1 and w2 of the welding position and the plasma flow supply device 4a from below. And a base 4b installed in the housing space 2c.
  • the plasma flow supply device 4a applies a voltage to the plasma working gas supplied between the cathode and the anode to generate a plasma flow PF.
  • the cathode of the plasma flow supply device 4a is constituted of, for example, a copper main body having a water cooling structure, and a rod-like tungsten cathode inserted into the main body.
  • the cathode and the anode are electrically isolated.
  • a copper member having a water cooling structure can be employed as the anode.
  • the power consumption of the plasma flow supply device 4a of the present embodiment is about 40 kW, which is about 1/10 of the power consumption of the plasma welding apparatus dedicated to welding.
  • the plasma working gas is not particularly limited.
  • a mixed gas of H 2 gas, Ar gas, and N 2 gas is generally used, but a mixed gas containing He gas can also be used.
  • the characteristics of the gas components of H 2 , N 2 and Ar are generally said as follows.
  • H 2 has a high heat transfer coefficient, and has the effect of improving the heat transfer coefficient of the entire gas.
  • an oxygen kill action action to inactivate oxygen taken in from the atmosphere
  • it becomes a plasma flow PF and it combines with oxygen mixed in the plasma flow PF and has an effect of suppressing the formation of oxide.
  • hydrogen has a reducing action, that is, an oxidation inhibiting action, it combines with the oxygen killing action to inhibit the formation of oxides.
  • hydrogen also has the disadvantage of inhibiting the plasma stability and making it difficult to obtain a stable plasma.
  • the Reynolds number (Re) can be lowered. This has the effect of facilitating the laminar flow of the plasma flow PF. Further, the separated nitrogen has the same oxygen kill action as hydrogen, and has the effect of suppressing the formation of oxides by fusing with oxygen in the plasma flow PF.
  • Ar has a plasma stabilization effect. Ar is an element which is easily converted to plasma, and a stable plasma can be obtained by increasing Ar at the time of initial ignition and the like.
  • the length of the plasma flow PF to be generated and the plasma flow supply angle are not particularly limited, but the length of the plasma flow PF is increased, the diameter of the plasma flow PF is increased, and the angle with respect to the welding portion is reduced. It is possible to cover a wide area in the periphery with plasma flow PF. As a result, the length range of the butt end faces w1 and w2 to be shielded is sufficiently secured, which is preferable in that oxidation can be suppressed and welding quality can be secured. Specifically, it is preferable to set the length of the plasma flow to 100 to 500 mm, the plasma diameter to 10 to 35 mm, and the plasma flow supply angle ⁇ (FIG. 2) to 30 ° or less, preferably 20 ° or less.
  • the plasma flow supply angle ⁇ is an angle formed by the central axis line CL of the plasma flow PF when the transport direction (X direction) of the steel plate W is viewed from the side.
  • a cylindrical cover 4a1 is provided at the tip of the plasma flow supply device 4a.
  • the plasma flow supply device 4 which is a precision device in a steel pipe.
  • the plasma flow supply device 4 by adopting a configuration in which the plasma flow supply device 4 is installed in the steel pipe, space constraints due to interference with peripheral devices such as a large number of rolls, coils, or contact tips are avoided. It is possible to supply plasma flow PF at an ideal angle. As a result, a reliable plasma shield is implemented near the V-shaped convergence point which is a welding point of the steel plate W, and welding quality can be improved.
  • the plasma flow PF is blown from the inside of the pipe, the plasma flow PF is not affected by the wind or air flow around the steel pipe.
  • the plasma flow supply device 4 since the plasma flow supply device 4 is disposed in the steel pipe, the above-described interference does not occur, and the plasma flow supply device 4 can be brought close to the welding portion. Therefore, the plasma flow PF sprayed from the plasma flow supply device 4 can be easily kept laminar at the weld position. That is, the Reynolds number at the welding position can be more easily lowered as compared with the conventional structure that sprays from a distant place. Therefore, since the plasma flow PF with little entrainment of outside air can be supplied to the butt end faces w1 and w2, a reliable shielding effect can be exhibited, and the quality of the ERW steel pipe can be further improved.
  • the base 4b shown in FIG. 2 performs position adjustment and inclination angle adjustment of the plasma flow supply device 4a to thereby control the position of the plasma flow PF at the spray destination, the angle of the plasma flow PF with respect to the spray destination, and the plasma flow supply. It is possible to adjust the distance from the vessel 4a to the spray destination. More specifically, the base 4 b includes a drive mechanism (not shown) such as a motor. Then, by operating the drive mechanism, the base 4b is horizontally moved in the housing space 2c, vertically moved up and down in the housing space 2c, tilted in the housing space 2c, and the like. It can be done by combining movements. The operation of the drive mechanism is controlled in accordance with an input signal from a control device (not shown).
  • a control device not shown
  • the cover 6 shown in FIGS. 1 and 2 is a component obtained by bending a rectangular metal plate in an arch at its central position, and is supported by the mandrel 2 via a slide mechanism (not shown).
  • the cover 6 covers the main body portion of the plasma flow supply 4 a from above, including a part of the opening 2 b of the mandrel 2.
  • the portion protruding outward from the cover 6 is only the cover 4a1 portion of the plasma flow supply device 4a.
  • the cover 6 is formed larger than the outer diameter of the mandrel 2 so as not to interfere with the plasma flow supply 4a in consideration of the range of the above-mentioned positional adjustment of the plasma flow supply 4a and the above range of the angular adjustment. ing.
  • the cover 6 can slide along the X direction with respect to the mandrel 2 by the slide mechanism. That is, the cover 6 is slidably movable between a position covering the upper side of the plasma flow supply device 4a and a position sliding on the upstream side in the X direction to fully open the opening 2b. During normal operation of the plasma flow supply device 4a, the cover 6 is at a position covering the upper side of the plasma flow supply device 4a. The cover 6 in this position prevents the cooling water from being applied to the plasma flow supply device 4a. On the other hand, when the plasma flow supply device 4a is accessed for maintenance, the cover 6 is slid to fully open the opening 2b.
  • the sliding motion of the cover 6 may be either manual or motorized.
  • the plasma flow receiving plate 5 is disposed in the housing space 2c of the mandrel 2 and downstream of the plasma flow supply device 4a in the X direction.
  • the plasma flow receiving plate 5 includes a main body 5a and a support 5b for supporting the main body 5a in the housing space 2c.
  • the main body 5a has a rectangular plate shape, and is inclined such that the surface facing the plasma flow supply device 4a is directed downward when viewed from the side.
  • the supporting material 5b is being fixed to the back surface of the main body 5a so that it may support in such an inclined state.
  • the length of the plasma flow PF When the length of the plasma flow PF is increased, it may take time from the start of supply of the plasma flow PF to the stabilization of the plasma flow PF. At this time, when waiting for the plasma flow PF to stabilize in a state where the plasma flow PF is applied to the peripheral equipment or the steel plate W, the peripheral equipment or the steel steel W may be damaged. Therefore, it is preferable to adjust the position and the angle of the plasma flow supply device 4a so that the plasma flow PF does not hit the peripheral equipment or the steel plate W until the plasma flow PF is stabilized.
  • the plasma flow receiving plate 5 for temporarily shielding the plasma flow PF is disposed in front of the plasma flow supply device 4a, and the plasma flow receiving plate 5 is used for plasma flow until the plasma flow PF is stabilized. I am relying on the flow PF.
  • a water-cooled metal plate such as a water-cooled copper plate, a highly heat resistant ceramic, or the like can be used. Since the main body 5a is inclined downward, the plasma flow PF that has hit the surface of the main body 5a is not returned again toward the plasma flow supply device 4a.
  • the protective wall 7 protects the pair of squeeze top rolls 1a and 1b that press the steel plate W so as to join the pair of butting end faces w1 and w2 from the plasma flow PF.
  • the protective wall 7 is interposed between the squeeze top rolls 1a and 1b and the plasma flow supply unit 4a, and shields the plasma flow PF directed from the plasma flow supply unit 4a to the pair of squeeze top rolls 1a and 1b.
  • a water-cooled metal plate such as a water-cooled copper plate, a ceramic with high heat resistance, or the like can be used.
  • the ERW steel pipe manufacturing apparatus of this embodiment performs welding while shielding by supplying the plasma flow PF between the pair of butt end faces w1 and w2 while forming the steel plate W into a tubular shape.
  • This ERW steel pipe manufacturing apparatus includes a mandrel 2 and a plasma flow supply device 4a provided on the mandrel 2 for supplying a plasma flow PF.
  • the plasma flow supply device 4 a is accommodated in the mandrel 2.
  • a part of the plasma flow supply device 4a may be out of the mandrel 2 or the plasma flow supply The vessel 4 a may be completely out of the mandrel 2.
  • the ERW steel pipe manufacturing apparatus of the present embodiment further includes the plasma flow receiving plate 5 that temporarily blocks the supply of the plasma flow PF. Further, in the ERW steel pipe manufacturing apparatus of the present embodiment, at least a part of the plasma flow receiving plate 5 is accommodated in the mandrel 2. In this embodiment, the case where substantially the whole of the plasma flow receiving plate 5 is accommodated in the mandrel 2 is illustrated. However, not limited to this configuration, a configuration in which the plasma flow receiving plate 5 is partially out of the mandrel 2 or a configuration in which the entire plasma flow receiving plate 5 is out of the mandrel 2 may be employed.
  • the ERW steel pipe manufacturing apparatus of this embodiment is further provided with the cover 6 which covers at least one part of plasma flow supply device 4a from upper direction.
  • the cover 6 if it can prevent that a cooling water is applied to the plasma flow supply device 4a, although the structure which covers only a part of plasma flow supply device 4a is also employable, it is the plasma flow like this embodiment. It is more preferable to cover the whole of the feeder 4a.
  • the ERW steel pipe manufacturing apparatus of the present embodiment further includes a base (adjustment mechanism) 4 b for adjusting at least one of the relative position and the relative angle of the plasma flow supply device 4 a with respect to the mandrel 2.
  • the following electric resistance welded steel pipe manufacturing method is implemented using the electric resistance welded pipe manufacturing apparatus which has the said structure. That is, in the electric resistance welded steel pipe manufacturing method of the present embodiment, welding is performed while shielding and feeding the plasma flow PF to the pair of butting end faces w1 and w2 while forming the steel plate W into a tubular shape. Then, there is a step of supplying a plasma flow PF toward the pair of butting end faces w1 and w2 from the inside of the tubular steel plate W.
  • the electric resistance welded steel pipe manufacturing method of the present embodiment further includes the step of temporarily shielding the plasma flow PF going between the pair of butting end faces w1 and w2 before the supply of the plasma flow PF is started. Further, in the electric resistance welded steel pipe manufacturing method of the present embodiment, when the center line CL of the plasma flow PF is viewed from the side, the angle between the center line CL and the direction parallel to the feeding direction of the steel plate W is 30 ° or less ing.
  • the ERW steel pipe manufacturing apparatus of the present embodiment differs from the configuration of the first embodiment in that a movable plasma flow receiving plate 15 shown in FIG. 3 is provided instead of the plasma flow receiving plate 5.
  • the plasma flow receiving plate 15 of the present embodiment is disposed in the housing space 2 c of the mandrel 2 and on the downstream side in the X direction from the plasma flow supply device 4 a.
  • the plasma flow receiving plate 15 includes a main body 15 a and a moving mechanism (not shown) for supporting the main body 15 a so as to be able to move up and down in the housing space 2 c.
  • the main body 15a is a rectangular plate when viewed from the front and in an arc shape when viewed from the side, and is inclined so that the concave facing the plasma flow supply device 4a is directed downward when viewed from the side.
  • the said moving mechanism is being fixed to the back surface of the main body 15a so that it may support in such an inclined state.
  • the shielding position upper position shown by a solid line
  • the position other than the shielding position lower position shown by an imaginary line
  • the plasma flow PF is applied to the main body 5a by changing the inclination angle of the plasma flow supply device 4a from the start of the supply of the plasma flow PF to the stabilization of the plasma flow PF, whereby peripheral equipment Damage to the steel plate W, etc. was prevented.
  • the inclination angle of the plasma flow supply device 4a is constant, and the plasma flow PF at the start of the supply is started by moving the main body 15a upward by the moving mechanism It prevents hitting peripheral equipment and steel plate W etc. Then, after the plasma flow PF is stabilized, the main body 15a is moved downward by the moving mechanism to permit the supply of the plasma flow PF to the weld.
  • a water-cooled metal plate such as a water-cooled copper plate, a highly heat resistant ceramic, or the like can be used.
  • the configuration is described in which the plasma flow PF is supplied to the welded portion only from within the steel plate W, but if necessary, the plasma flow PF is added to the welded portion from outside the steel plate W in addition to the steel plate W. You may employ
  • the plasma flow is supplied at an ideal angle and distance with respect to the welding portion, and the plasma shield is reliably carried out near the V-shaped convergence point which is the welding point of ERW welding.
  • Industrial applicability is large because the quality of welded steel pipe can be improved and the quality of ERW steel pipe can be improved.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Plasma & Fusion (AREA)
  • Arc Welding In General (AREA)

Abstract

帯状鋼板を管状に成形しつつ、一対の突合せ端面にプラズマ流を供給してシールドしながら溶接を行う電縫鋼管製造装置であって、マンドレルと、前記マンドレルに設けられて前記プラズマ流を供給するプラズマ流供給器と、を備える。

Description

電縫鋼管製造装置及び電縫鋼管製造方法
 本発明は、電縫鋼管製造装置及び電縫鋼管製造方法に関する。
 電縫鋼管の製造においては、一般に、帯状鋼板(以下、単に「鋼板」と称する)を連続的に搬送しながら、多数のロール群により管状に成形し、鋼板の突合せ端面同士をワークコイルによる誘導加熱又はコンタクトチップによる直接通電加熱により溶融させるとともに、スクイズロールにより加圧しながら、突合せ端面間に溶接シームを形成して電縫鋼管とする。
 電縫溶接時には、突合せ端面が大気に曝されるため、その表面に酸化物が生成される。この酸化物が残留した場合、溶接部に、ペネトレーターと称される酸化物に起因する溶接欠陥が発生することがある。この溶接欠陥を抑制する手段として、電縫溶接時の溶接部にプラズマ流を供給するプラズマシールド電縫溶接が知られている。
 例えば特許文献1には、鋼管の電縫溶接時に、突合せ端面に1400℃以上の還元性高温燃焼炎又は非酸化性高温プラズマ流を所定流速で吹き付けることにより、突合せ端面での酸化物生成を抑制し、かつ酸化物の排出を促進させる方法が開示されている。以下、溶接部にプラズマ流を供給しながら電縫溶接を行う技術を、プラズマシールド電縫溶接と称する。このプラズマシールド電縫溶接は、プラズマそのものにより溶接を行うプラズマ溶接とは、技術思想が根本的に異なる。
 特許文献2には、プラズマジェットを層流又は擬似層流とすることにより、酸化物に起因する溶接欠陥を安定して低減する方法が開示されている。
 プラズマシールド電縫溶接では、溶接部にプラズマガスを供給することにより、鋼板の突合せ端部が加熱、溶融する過程において、イオン化されたプラズマガスによる突合せ端部のシールド作用や、イオン化されたプラズマガスによる還元作用等により、突合せ端部が酸素濃度の低い状態に保持される。その結果、溶接後に酸化物欠陥となる可能性のある突合せ端部の酸化膜の発生を抑制でき、欠陥の少ない溶接が可能となる。
日本国特開2004-298961号公報 国際公開第2008/108450号
 電縫溶接プロセスは、溶接部周辺に多数のロールや、誘導電流を発生させるためのコイルもしくはコンタクトチップなど、複数の周辺機器が溶接部の周囲に配置された状態で行われる。その際、従来のように、電縫溶接される鋼板の外側からプラズマ流を供給する場合、上記周辺機器と干渉するためにプラズマ流供給装置を適切に設置できない場合がある。仮に設置出来たとしても、溶接部にプラズマ流を理想的な角度や距離で供給できない場合がある。また、外気の風や気流の影響を受けると、プラズマ流によるシールドが適切になされずに酸素の巻き込み量が増え、溶接部の酸化物系欠陥が増え、溶接部の状態が劣化する場合がある。
 本発明は、上記事情に鑑みてなされたものであり、溶接部の品質を向上させ、電縫鋼管の信頼性を高めることができる、電縫鋼管製造装置及び電縫鋼管製造方法の提供を課題とする。
 本発明者らは、溶接部にプラズマ流を理想的な状態で供給することにより、電縫鋼管の溶接部の品質を向上させる方法について鋭意検討した。その結果、電縫溶接される鋼管の内側から溶接部にプラズマ流を供給することにより、溶接部の品質向上が可能であることを知見した。
 本発明は、上記事情に鑑みてなされたものであって、以下の態様を採用した。
(1)本発明の一態様は、帯状鋼板を管状に成形しつつ、一対の突合せ端面にプラズマ流を供給してシールドしながら溶接を行う電縫鋼管製造装置であって、マンドレルと、前記マンドレルに設けられて前記プラズマ流を供給するプラズマ流供給器と、を備える。
(2)上記(1)に記載の電縫鋼管製造装置において、前記プラズマ流供給器の少なくとも一部が、前記マンドレル内に収容されていてもよい。
(3)上記(1)または(2)に記載の電縫鋼管製造装置において、前記プラズマ流の供給を一時的に遮るプラズマ流受け止め板をさらに備えてもよい。
(4)上記(3)に記載の電縫鋼管製造装置において、前記プラズマ流受け止め板の少なくとも一部が、前記マンドレル内に収容されていてもよい。
(5)上記(3)または(4)に記載の電縫鋼管製造装置において、前記一対の突合せ端面に向かう前記プラズマ流を遮る遮蔽位置と、前記遮蔽位置以外の位置との間で前記プラズマ流受け止め板を移動させる移動機構をさらに備えてもよい。
(6)上記(1)~(5)の何れか1項に記載の電縫鋼管製造装置において、前記プラズマ流供給器の少なくとも一部を上方より覆うカバーをさらに備えてもよい。
(7)上記(1)~(6)の何れか1項に記載の電縫鋼管製造装置において、前記一対の突合せ端面同士を接合させるように前記帯状鋼板を加圧する一対のスクイズトップロールと、前記プラズマ流供給器から前記一対のスクイズトップロールに向かう前記プラズマ流を遮蔽する防護壁と、をさらに備えてもよい。
(8)上記(1)~(7)の何れか1項に記載の電縫鋼管製造装置において、前記マンドレルに対する前記プラズマ流供給器の相対位置及び相対角度の少なくとも一方を調整する調整機構をさらに備えてもよい。
(9)本発明の他の態様は、帯状鋼板を管状に成形しつつ、一対の突合せ端面にプラズマ流を供給してシールドしながら溶接を行う電縫鋼管製造方法であって、前記管状をなす前記帯状鋼板の内側より、前記一対の突合せ端面に向けて前記プラズマ流を供給する工程を有する。
(10)上記(9)に記載の電縫鋼管製造方法において、前記プラズマ流の供給開始前に、前記一対の突合せ端面に向かう前記プラズマ流を一時的に遮蔽する工程をさらに有してもよい。
(11)上記(9)または(10)に記載の電縫鋼管製造方法において、前記プラズマ流の中心線を側面視した場合、前記中心線が、前記帯状鋼板の送り出し方向に平行な方向に対してなす角度を30°以下にしてもよい。
 本発明の上記各態様によれば、プラズマ流供給器をマンドレルに設けたことで、プラズマ流供給器の位置を、管状に形成される鋼板の内側に配置することができる。このようにプラズマ流供給器を鋼管内に配置することで、多数のロールやコイルもしくはコンタクトチップ等の周辺機器との干渉によるスペース制約を回避できる。よって、溶接部となる一対の突合せ端面に対し、理想的な角度及び距離でプラズマ流を供給できる。その結果、電縫溶接の溶接点となるV字収束点付近を確実にプラズマシールドすることができ、溶接品質を向上させることができる。また、上記周辺機器との干渉を生じることなく、プラズマ流供給器を一対の突合せ端面に近付けることができるので、プラズマ流供給器から吹き付けるプラズマ流の、一対の突合せ端面位置におけるレイノルズ数を下げることができる。よって、溶接部位置においてプラズマ流を層流に保つことができるので、外気の巻き込みが少なく確実なシールド効果を発揮できる。したがって、外気の風や気流の影響を受けないことに加えて、周囲酸素の巻き込みによる溶接部の酸化物系欠陥の発生を抑えることができるので、電縫鋼管の品質を向上させることができる。
 さらに言うと、作動音を発するプラズマ流供給器を管状の鋼板内に配置するので、従来よりも騒音が抑えられた環境での作業を確保することも可能となる。
本発明の第1実施形態に係る電縫鋼管製造装置の要部を示す図であって、(A)が平面図であり、(B)が側面図である。 同電縫鋼管製造装置のプラズマ流供給装置を示す図であって、図1(B)のA部拡大図である。 本発明の第2実施形態に係る電縫鋼管製造装置のプラズマ流供給装置を示す図であって、図1(B)のA部に相当する拡大側面図である。
 本発明の電縫鋼管製造装置及び電縫鋼管製造方法の各実施形態について、図面を参照しながら以下に説明を行う。
[第1実施形態]
 図1に示すように、電縫鋼管は、帯状鋼板W(以下、単に「鋼板W」と言う)をX方向に沿って送り出しながら多数の成型ロール1によって管状に成形し、さらに、その一対の突合せ端面w1,w2同士を溶接することにより、連続的に製造される鋼管である。
 より具体的に言うと、電縫鋼管を製造する場合には、まず、鋼板Wをその長手方向に沿って連続的に搬送しながら、多数の成型ロール1によって管状に成形する。その際、一対の突合せ端面w1,w2を間に挟んでワークコイル(不図示)から通電することにより両突合せ端面w1,w2を加熱し、さらに、多数の成型ロール1中のスクイズトップロール1a,1bで荷重を加えて、両突合せ端面w1,w2同士を溶融圧着によって溶接する。以上の工程により、電縫鋼管を連続的に製造する。なお、鋼板Wは、管状に成形されても溶接前の状態では鋼管として完成していないので、オープン管とも呼ばれる。
 本実施形態の電縫鋼管製造装置は、多数の成型ロール1と、マンドレル2と、ビード切削装置3と、プラズマ流供給装置4と、プラズマ流受け止め板5と、カバー6と、防護壁7とを備えている。そして、一対の突合せ端面w1,w2間を溶接するに際し、管状に成形された鋼板Wの内側に設けられたプラズマ流供給装置4で発生させたプラズマ流PFを一対の突合せ端面w1,w2に供給して被覆するプラズマシールドを行う。
 マンドレル2は、鋼板Wが管状に成形された際の中心軸線と同軸をなすように鋼板W内に配置される円柱形状の部品であり、その上流端2aが支持部材2Aに接続及び支持されている。支持部材2Aは、鉛直方向上方から下方に向かって延在する部品であり、その下端2Aaが、管状に形成される鋼板W内に至るように配置されている。そして、支持部材2Aの下端2Aaに対してマンドレル2の上流端2aが接続されることで、マンドレル2が水平方向(X方向)に沿って延在するように支持される。
 マンドレル2の先端(X方向の下流端)には、電縫鋼管の溶接部内面に生じたビードを除去するためのビード切削装置3が固定されている。よって、ビード切削装置3は、マンドレル2を介して、支持部材2Aに支持されている。
 図2に示すように、マンドレル2をその長手方向に沿って見た場合のビード切削装置3よりも上流側の位置に、開口2bを介して鉛直方向上方に開放された収容空間2cが形成されている。この収容空間2c内に、プラズマ流供給装置4が収容されている。収容空間2cは、その内部に配置されたプラズマ流供給装置4の位置調整及び傾斜角度を調整するのに十分な広さを有している。
 プラズマ流供給装置4を単純に、管状の鋼板W内に配置しようとすると、マンドレル2との干渉により配置できないが、本実施形態では、そのマンドレル2の存在を逆に利用してプラズマ流供給装置4の配置を可能としている。
 ビード切削装置3に加えて、インピーダ(不図示)もマンドレル2に支持させることができる。この場合は、マンドレル2の長手方向で溶接部に近い位置に、前記インピーダを巻いたり置いたりすることで配置可能である。
 図2に示すように、プラズマ流供給装置4は、プラズマ流PFを溶接位置の突き合わせ端面w1,w2に向かって吹き付けるプラズマ流供給器4aと、このプラズマ流供給器4aをその下方より支持した状態で収容空間2c内に据え付けられえた基台4bとを備えている。
 プラズマ流供給器4aは、カソード及びアノード間に供給したプラズマ作動ガスに電圧を印加してプラズマ流PFを生成する。プラズマ流供給器4aのカソードは、例えば、水冷構造を有する銅製の本体部と、本体部に挿入された棒状のタングステン製の陰極とから構成される。カソードとアノードとの間は電気的に絶縁されている。アノードは、例えば、水冷構造を有する銅製部材を採用できる。
 なお、本実施形態のプラズマ流供給器4aは消費電力が約40kWであり、これは、溶接専用のプラズマ溶接装置の消費電力の約1/10である。
 前記プラズマ作動ガスは、特に限定されるものではない。例えば、Hガス、Arガス、及びNガスからなる混合ガスが一般的であるが、さらにHeガスを含む混合ガス等を用いることもできる。H、N、Ar、それぞれのガス成分の特徴は、一般的に以下のように言われている。
 Hは、熱伝達率が高く、ガス全体の熱伝達率を向上させる効果がある。また、プラズマ流PFになったときに酸素キル作用(大気から巻き込んだ酸素を不活性にする作用)があり、プラズマ流PF中に混入した酸素と結合し、酸化物の生成抑制効果がある。水素は還元作用、つまり酸化抑制作用を有するので、酸素キル作用とあいまって、酸化物の生成を抑制効果する。しかしながら、水素はプラズマ安定性の阻害作用があり、安定したプラズマが得にくいという欠点もある。
 Nは、質量がArより軽いため、レイノルズ数(Re)を低くできる。このため、プラズマ流PFを層流化しやすくする効果がある。また、乖離した窒素には、水素と同様に酸素キル作用があり、プラズマ流PF中の酸素と融合して酸化物の生成を抑制する効果がある。
 Arは、プラズマ安定化効果がある。Arは、プラズマ化しやすい元素であり、初期着火時などにArを多くすると、安定したプラズマが得られる。
 発生させるプラズマ流PFの長さや、プラズマ流供給角度は特に限定されないが、プラズマ流PFの長さを長くし、プラズマ流PFの径を大きくし、溶接部に対する角度を小さくすることで、溶接部周辺の広い範囲をプラズマ流PFで覆うことが可能となる。これにより、シールドされる突合せ端面w1,w2の長さ範囲が十分に確保されるので、酸化を抑制して溶接品質を確保できる点で好ましい。具体的には、プラズマ流の長さを100~500mm、プラズマ径を10~35mm、プラズマ流供給角度θ(図2)を30°以下、好ましくは20°以下とするのが好ましい。ここで、プラズマ流供給角度θは、鋼板Wの搬送方向(X方向)を側面視した場合の、プラズマ流PFの中心軸線CLがなす角度である。
 ところで、鋼板Wを管状に成形する成型ロール1を冷却するために、冷却水が供給される。この冷却水がプラズマ流供給器4aの吹き出し口に直接かからないようにするために、本実施形態では、プラズマ流供給器4aの先端に、筒状のカバー4a1が設けられている。
 従来は、精密機器であるプラズマ流供給装置4を鋼管内に配置する発想が無かった。これに対し、本実施形態では、プラズマ流供給装置4を鋼管内に設置する構成を採用したことで、多数のロールやコイルもしくはコンタクトチップ等の周辺機器との干渉によるスペース制約を受けずに、理想的な角度でプラズマ流PFの供給を可能としている。その結果、鋼板Wの溶接点であるV字収束点付近に確実なプラズマシールドが実施され、溶接品質を向上させることができる。また、プラズマ流PFを管内側から吹き付けるため、プラズマ流PFが鋼管周辺の風や気流の影響を受けることがない。よって、酸素巻き込みによる溶接部の酸化物系の欠陥発生を抑え、材質が劣化するのを抑止し、もって電縫鋼管の品質を向上させることができる。
 また、作動音を発するプラズマ流供給装置4を管内に配置することにより、従来よりも騒音が抑えられた環境での作業を確保することが可能となる。
 さらに言うと、上述の通り、従来は、鋼管周囲にある周辺機器との干渉を避けるために、プラズマ流供給装置4の位置を溶接部からある程度離す必要があった。これに対し、本実施形態では、鋼管内にプラズマ流供給装置4を配置するため、上記の干渉が生じず、プラズマ流供給装置4を溶接部に近付けることが可能となった。よって、プラズマ流供給装置4から吹き付けるプラズマ流PFを溶接部位置において簡単に層流に保つことができる。すなわち、遠いところから吹き付ける従来構造に比べて、溶接位置でのレイノルズ数をより簡単に下げられる。よって、外気の巻き込みが少ないプラズマ流PFを突合せ端面w1,w2に供給できるので、確実なシールド効果を発揮でき、電縫鋼管の品質をさらに向上させることができる。
 図2に示す前記基台4bは、プラズマ流供給器4aの位置調整及び傾斜角度調整を行うことにより、プラズマ流PFの吹き付け先の位置や、吹き付け先に対するプラズマ流PFの角度や、プラズマ流供給器4aから吹き付け先までの距離などを調整することが可能になっている。
 より具体的に言うと、基台4bは、例えばモータなどの図示されない駆動機構を備えている。そして、前記駆動機構を動作させることにより、基台4bを収容空間2c内で水平移動させたり、収容空間2c内で鉛直方向に昇降させたり、収容空間2c内で傾動させたり、さらにはこれらの動きを組み合わせて行うことができる。前記駆動機構の動作は、図示されない制御装置からの入力信号に従って制御される。
 図1及び図2に示す前記カバー6は、矩形の金属板をその中央位置でアーチ状に折り曲げ加工した部品であり、図示されないスライド機構を介してマンドレル2に支持されている。
 カバー6は、マンドレル2の開口2bの一部も含めて、プラズマ流供給器4aの本体部分をその上方から覆っている。平面視した場合、カバー6から外方にはみ出ている部分は、プラズマ流供給器4aのカバー4a1部分のみとなっている。また、カバー6は、プラズマ流供給器4aの上記位置調整の範囲及び上記角度調整の範囲を考慮して、プラズマ流供給器4aと干渉しないように、マンドレル2の外径よりも大きめに形成されている。
 カバー6は、前記スライド機構により、マンドレル2に対してX方向に沿ってスライド移動可能である。すなわち、カバー6は、プラズマ流供給器4aの上方を覆う位置と、X方向の上流側にスライドして開口2bを全開させる位置との間でスライド移動可能になっている。
 プラズマ流供給器4aの通常運転時には、カバー6がプラズマ流供給器4aの上方を覆う位置にある。この位置にあるときのカバー6は、プラズマ流供給器4aに冷却水がかかるのを防いでいる。一方、プラズマ流供給器4aをメンテナンスするためにアクセスする場合には、カバー6をスライドさせて開口2bを全開させる。
 カバー6のスライド動作は、手動及び電動の何れでもよい。
 図2に示すように、前記プラズマ流受け止め板5は、マンドレル2の収容空間2c内でかつ、プラズマ流供給器4aよりもX方向の下流側に配置されている。プラズマ流受け止め板5は、本体5aと、この本体5aを収容空間2c内に支持する支持材5bとを備えている。
 本体5aは矩形板形状を有し、側面視した場合に、プラズマ流供給器4aに対向する表面が下向きとなるように傾斜している。そして、このような傾斜状態に支持するよう、本体5aの裏面に支持材5bが固定されている。
 プラズマ流PFの長さを長くすると、プラズマ流PFの供給開始からプラズマ流PFが安定するまでに時間がかかる場合がある。このとき、プラズマ流PFを周辺機器や鋼板Wに当てた状態でプラズマ流PFが安定するのを待つと、周辺機器や鋼板Wにダメージを与える場合がある。そのため、プラズマ流PFが安定するまでは、周辺機器や鋼板Wにプラズマ流PFが当たらないように、プラズマ流供給器4aの位置や角度を調整することが好ましい。
 しかしながら、鋼板W内は狭いため、プラズマ流供給器4aの位置や角度を調整するためのスペースが確保できない場合がある。そのため、本実施形態では、プラズマ流PFを一時的に遮蔽するプラズマ流受け止め板5をプラズマ流供給器4aの前方に設置し、プラズマ流PFが安定するまでの間、プラズマ流受け止め板5にプラズマ流PFを当てている。プラズマ流受け止め板5の本体5aとしては、水冷銅板等の水冷金属板や、高耐熱性のセラミック等を用いることができる。
 本体5aが下向きに傾斜しているので、本体5aの表面に当たったプラズマ流PFが再び、プラズマ流供給器4aに向かって戻されることはない。
 図2に示すように、前記防護壁7は、一対の突合せ端面w1,w2同士を接合させるように鋼板Wを加圧する一対のスクイズトップロール1a,1bをプラズマ流PFより保護する。この防護壁7は、スクイズトップロール1a,1bとプラズマ流供給器4aとの間に介在し、プラズマ流供給器4aから一対のスクイズトップロール1a,1bに向かうプラズマ流PFを遮蔽する。防護壁7としては、水冷銅板等の水冷金属板や、高耐熱性のセラミック等を用いることができる。
 以上説明の本実施形態の骨子を以下に纏める。
 本実施形態の電縫鋼管製造装置は、鋼板Wを管状に成形しつつ、一対の突合せ端面w1,w2間にプラズマ流PFを供給してシールドしながら溶接を行う。この電縫鋼管製造装置は、マンドレル2と、マンドレル2に設けられてプラズマ流PFを供給するプラズマ流供給器4aとを備える。
 また、本実施形態の電縫鋼管製造装置では、プラズマ流供給器4aの少なくとも一部が、マンドレル2内に収容されている。なお、本実施形態では、プラズマ流供給器4aの全体がマンドレル2内に収容されている場合を例示したが、この構成のみに限られない。管状に成形された鋼板Wの内側にプラズマ流供給器4aを干渉無く配置できるのであれば、プラズマ流供給器4aの一部がマンドレル2の外部に出ていてもよいし、または、プラズマ流供給器4aが完全にマンドレル2の外部に出ていてもよい。
 また、本実施形態の電縫鋼管製造装置は、プラズマ流PFの供給を一時的に遮るプラズマ流受け止め板5をさらに備えている。
 また、本実施形態の電縫鋼管製造装置では、プラズマ流受け止め板5の少なくとも一部が、マンドレル2内に収容されている。本実施形態では、プラズマ流受け止め板5の略全体がマンドレル2内に収容されている場合を例示した。しかし、この構成のみに限らず、プラズマ流受け止め板5が部分的にマンドレル2外に出ている構成や、プラズマ流受け止め板5の全体がマンドレル2外に出ている構成も採用可能である。
 また、本実施形態の電縫鋼管製造装置は、プラズマ流供給器4aの少なくとも一部を上方より覆うカバー6をさらに備えている。なお、カバー6としては、プラズマ流供給器4aに冷却水がかかるのを防げるのであれば、プラズマ流供給器4aの一部分のみを覆う構成も採用可能であるが、本実施形態のようにプラズマ流供給器4aの全体を覆う構成の方がより好ましい。
 また、本実施形態の電縫鋼管製造装置は、一対の突合せ端面w1,w2同士を接合させるように鋼板Wを加圧する一対のスクイズトップロール1a,1bと、プラズマ流供給器4aから一対のスクイズトップロール1a,1bに向かうプラズマ流PFを遮蔽する防護壁7と、をさらに備えている。
 また、本実施形態の電縫鋼管製造装置は、マンドレル2に対するプラズマ流供給器4aの相対位置及び相対角度の少なくとも一方を調整する基台(調整機構)4bをさらに備えている。
 さらに、上記構成を有する電縫鋼管製造装置を用いて、下記の電縫鋼管製造方法を実行する。
 すなわち、本実施形態の電縫鋼管製造方法は、鋼板Wを管状に成形しつつ、一対の突合せ端面w1,w2にプラズマ流PFを供給してシールドしながら溶接を行う。そして、管状をなす鋼板Wの内側より、一対の突合せ端面w1,w2に向けてプラズマ流PFを供給する工程を有する。
 また、本実施形態の電縫鋼管製造方法は、プラズマ流PFの供給開始前に、一対の突合せ端面w1,w2間に向かうプラズマ流PFを一時的に遮蔽する工程をさらに有する。
 また、本実施形態の電縫鋼管製造方法では、プラズマ流PFの中心線CLを側面視した場合、中心線CLが、鋼板Wの送り出し方向に平行な方向に対してなす角度を30°以下にしている。
[第2実施形態]
 続いて、本発明の第2実施形態について図3を参照しながら以下に説明する。図3及び以下の説明においては、上記第1実施形態で説明した各構成要素と同じ構成要素については同一符号を付し、説明を省略する。以下、主に上記第1実施形態との相違点を中心に説明する。
 本実施形態の電縫鋼管製造装置は、前記プラズマ流受け止め板5に代えて、図3に示す移動式のプラズマ流受け止め板15を備えた点が、上記第1実施形態の構成と相違している。
 本実施形態のプラズマ流受け止め板15は、マンドレル2の収容空間2c内でかつ、プラズマ流供給器4aよりもX方向の下流側に配置されている。プラズマ流受け止め板15は、本体15aと、この本体15aを収容空間2c内で上下動可能に支持する移動機構(不図示)とを備えている。
 本体15aは、正面視した場合に矩形でかつ、側面視した場合に円弧状をなす板材であり、側面視した場合に、プラズマ流供給器4aに対向する凹面が下向きとなるように傾斜している。そして、このような傾斜状態に支持するよう、本体15aの裏面に前記移動機構が固定されている。
 そして、前記移動機構により、本体15aを、一対の突合せ端面w1,w2に向かうプラズマ流PFを遮る遮蔽位置(実線で示す上方位置)と、前記遮蔽位置以外の位置(仮想線で示す下方位置)との間で本体15aを移動させる。
 上記第1実施形態では、プラズマ流PFの供給開始からプラズマ流PFが安定するまでの間、プラズマ流供給器4aの傾斜角度を変えてプラズマ流PFを前記本体5aに当て、これにより、周辺機器や鋼板W等の損傷を防いでいた。
 一方、本実施形態では、プラズマ流供給器4aの傾斜角度は一定で溶接部を向いたままとし、本体15aの方を前記移動機構によって上方に移動させることで、供給開始時のプラズマ流PFが周辺機器や鋼板W等に当たるのを防いでいる。そして、プラズマ流PFが安定した後は、本体15aを前記移動機構によって下方に移動させることで、溶接部へのプラズマ流PFの供給を許可する。
 なお、本体15aとしては、前記本体5aと同様に、水冷銅板等の水冷金属板や、高耐熱性のセラミック等を用いることができる。
 以上、本発明の各実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態は、発明の範囲や要旨に含まれると同時に、特許請求の範囲に記載された発明とその均等の範囲に含まれるものである。また、上述した各実施形態及びその変形は、互いに適宜組み合わせることができる。
 なお、上記実施形態では、鋼板W内のみからプラズマ流PFを溶接部に供給する構成を説明したが、必要に応じ、鋼板W内に加えて鋼板W外から溶接部に対してプラズマ流PFを吹き付ける構成を採用してもよい。
 本発明によれば、溶接部に対して理想的な角度や距離でプラズマ流を供給し、電縫溶接の溶接点であるV字収束点付近に確実にプラズマシールドが実施されることにより、電縫鋼管の溶接品質を向上させ、電縫鋼管の品質を向上させることができるので、産業上の利用可能性は大きい。
 1a,1b スクイズトップロール
 2 マンドレル
 4a プラズマ流供給器
 4b 基台(調整機構)
 5,15 プラズマ流受け止め板
 6 カバー
 7 防護壁
 PF プラズマ流
 W 鋼板(帯状鋼板)
 w1,w2 突合せ端面

Claims (11)

  1.  帯状鋼板を管状に成形しつつ、一対の突合せ端面にプラズマ流を供給してシールドしながら溶接を行う電縫鋼管製造装置であって、
     マンドレルと、
     前記マンドレルに設けられて前記プラズマ流を供給するプラズマ流供給器と、
    を備えることを特徴とする電縫鋼管製造装置。
  2.  前記プラズマ流供給器の少なくとも一部が、前記マンドレル内に収容されている
    ことを特徴とする請求項1に記載の電縫鋼管製造装置。
  3.  前記プラズマ流の供給を一時的に遮るプラズマ流受け止め板をさらに備えることを特徴とする請求項1または2に記載の電縫鋼管製造装置。
  4.  前記プラズマ流受け止め板の少なくとも一部が、前記マンドレル内に収容されている
    ことを特徴とする請求項3に記載の電縫鋼管製造装置。
  5.  前記一対の突合せ端面に向かう前記プラズマ流を遮る遮蔽位置と、前記遮蔽位置以外の位置との間で前記プラズマ流受け止め板を移動させる移動機構をさらに備えることを特徴とする請求項3または4に記載の電縫鋼管製造装置。
  6.  前記プラズマ流供給器の少なくとも一部を上方より覆うカバーをさらに備えることを特徴とする請求項1~5の何れか1項に記載の電縫鋼管製造装置。
  7.  前記一対の突合せ端面同士を接合させるように前記帯状鋼板を加圧する一対のスクイズトップロールと、
     前記プラズマ流供給器から前記一対のスクイズトップロールに向かう前記プラズマ流を遮蔽する防護壁と、
    をさらに備えることを特徴とする請求項1~6の何れか1項に記載の電縫鋼管製造装置。
  8.  前記マンドレルに対する前記プラズマ流供給器の相対位置及び相対角度の少なくとも一方を調整する調整機構をさらに備えることを特徴とする請求項1~7の何れか1項に記載の電縫鋼管製造装置。
  9.  帯状鋼板を管状に成形しつつ、一対の突合せ端面にプラズマ流を供給してシールドしながら溶接を行う電縫鋼管製造方法であって、
     前記管状をなす前記帯状鋼板の内側より、前記一対の突合せ端面に向けて前記プラズマ流を供給する工程
    を有することを特徴とする電縫鋼管製造方法。
  10.  前記プラズマ流の供給開始前に、前記一対の突合せ端面に向かう前記プラズマ流を一時的に遮蔽する工程
    をさらに有することを特徴とする請求項9に記載の電縫鋼管製造方法。
  11.  前記プラズマ流の中心線を側面視した場合、前記中心線が、前記帯状鋼板の送り出し方向に平行な方向に対してなす角度が30°以下である
    ことを特徴とする請求項9または10に記載の電縫鋼管製造方法。
PCT/JP2018/001788 2018-01-22 2018-01-22 電縫鋼管製造装置及び電縫鋼管製造方法 WO2019142359A1 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
PCT/JP2018/001788 WO2019142359A1 (ja) 2018-01-22 2018-01-22 電縫鋼管製造装置及び電縫鋼管製造方法
EP18901019.2A EP3744466B1 (en) 2018-01-22 2018-01-22 Electric resistance welded steel pipe manufacturing device and electric resistance welded steel pipe manufacturing method
JP2018519881A JP6458907B1 (ja) 2018-01-22 2018-01-22 電縫鋼管製造装置及び電縫鋼管製造方法
CN201880075091.1A CN111372712A (zh) 2018-01-22 2018-01-22 电焊钢管制造装置和电焊钢管制造方法
US16/761,470 US20200391318A1 (en) 2018-01-22 2018-01-22 Electric resistance welded steel pipe manufacturing device and electric resistance welded steel pipe manufacturing method
KR1020207013364A KR20200064128A (ko) 2018-01-22 2018-01-22 전봉강관 제조 장치 및 전봉강관 제조 방법

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2018/001788 WO2019142359A1 (ja) 2018-01-22 2018-01-22 電縫鋼管製造装置及び電縫鋼管製造方法

Publications (1)

Publication Number Publication Date
WO2019142359A1 true WO2019142359A1 (ja) 2019-07-25

Family

ID=65228995

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/001788 WO2019142359A1 (ja) 2018-01-22 2018-01-22 電縫鋼管製造装置及び電縫鋼管製造方法

Country Status (6)

Country Link
US (1) US20200391318A1 (ja)
EP (1) EP3744466B1 (ja)
JP (1) JP6458907B1 (ja)
KR (1) KR20200064128A (ja)
CN (1) CN111372712A (ja)
WO (1) WO2019142359A1 (ja)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102295379B1 (ko) * 2018-01-22 2021-08-31 닛폰세이테츠 가부시키가이샤 용접 조업 감시 시스템 및 용접 조업 감시 방법
CN113798719B (zh) * 2021-11-16 2022-02-11 四川富士电机有限公司 一种用于雨刮器支撑杆件的焊接装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5650579U (ja) * 1979-09-27 1981-05-06
JPH0523867A (ja) * 1991-07-19 1993-02-02 Nippon Steel Corp 電縫鋼管溶接部の溶接欠陥防止方法
JP2004298961A (ja) 2003-03-19 2004-10-28 Nippon Steel Corp 溶接部品質の優れた電縫鋼管の製造方法
WO2008108450A1 (ja) 2007-03-02 2008-09-12 Nippon Steel Corporation 電縫鋼管の製造方法および高Siまたは高Cr含有電縫鋼管
JP2013107122A (ja) * 2011-11-24 2013-06-06 Tetsuo Harada 電縫鋼管製造方法とその製造装置及び電縫鋼管

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4348403B1 (ja) * 2008-03-14 2009-10-21 新日本製鐵株式会社 電縫鋼管の内面ビード切削装置
EP3269490A4 (en) * 2015-03-10 2018-11-14 JFE Steel Corporation Method of monitoring manufacturing status of electric resistance welded pipe, device for monitoring manufacturing status of electric resistance welded pipe, and method of manufacturing electric resistance welded pipe

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5650579U (ja) * 1979-09-27 1981-05-06
JPH0523867A (ja) * 1991-07-19 1993-02-02 Nippon Steel Corp 電縫鋼管溶接部の溶接欠陥防止方法
JP2004298961A (ja) 2003-03-19 2004-10-28 Nippon Steel Corp 溶接部品質の優れた電縫鋼管の製造方法
WO2008108450A1 (ja) 2007-03-02 2008-09-12 Nippon Steel Corporation 電縫鋼管の製造方法および高Siまたは高Cr含有電縫鋼管
JP2013107122A (ja) * 2011-11-24 2013-06-06 Tetsuo Harada 電縫鋼管製造方法とその製造装置及び電縫鋼管

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3744466A4

Also Published As

Publication number Publication date
JPWO2019142359A1 (ja) 2020-01-23
US20200391318A1 (en) 2020-12-17
EP3744466A4 (en) 2021-09-08
EP3744466A1 (en) 2020-12-02
KR20200064128A (ko) 2020-06-05
EP3744466B1 (en) 2023-11-22
JP6458907B1 (ja) 2019-01-30
CN111372712A (zh) 2020-07-03

Similar Documents

Publication Publication Date Title
EP2744619B1 (en) Method to start and use combination filler wire feed and high intensity energy source for welding
KR100979836B1 (ko) 입향자세 용접방법
US20130092667A1 (en) Method and System to Start and Use Combination Filler Wire Feed and High Intensity Energy Source for Welding
EP2532466A2 (en) Two-electrode welding method
US20100059493A1 (en) Induction heated, hot wire welding
US20060289394A1 (en) TIG welding or braze welding with metal transfer via a liquid bridge
US9925622B2 (en) Hybrid welding method and welding torch for hybrid welding
JP5589079B2 (ja) 複合溶接方法
WO2019142359A1 (ja) 電縫鋼管製造装置及び電縫鋼管製造方法
US20220250182A1 (en) Device for cleaning and cooling a workpiece upon wire-arc additive manufacturing (waam)
CN109465526B (zh) 一种小角度填丝等离子焊接装置及方法
RU2563067C2 (ru) Способ производства стальной трубы с помощью лазерной сварки
KR20190077757A (ko) 강재 용접장치 및 강재 용접방법
JP2010227947A (ja) アーク溶接装置、溶接ロボット及びアーク溶接方法
JP6036773B2 (ja) 電縫鋼管の素管被溶接部シールド装置および素管被溶接部シールド方法
JPH11197841A (ja) 狭開先溶接用トーチ及び狭開先溶接方法
CN107635706B (zh) 焊接方法以及焊接装置
JP2010234409A (ja) 狭開先溶接トーチ及び該溶接トーチを備えたタンデムアーク溶接装置
KR20190029082A (ko) 용접 토치
JP2004160516A (ja) レーザーフィラー溶接方法
JPH0577050A (ja) Tigア−ク溶接用トーチ及びパルスtigア−ク溶接方法
JP2003290949A (ja) Yagレーザ誘起アークフィラーワイヤ複合溶接方法および装置
EP4223444A1 (en) Multi wire feed gmaw
JP2008238242A (ja) 接合方法、およびこの接合方法に利用可能なプラズマトーチ
KR101707396B1 (ko) 플라스마 전극, 그를 포함한 용접토치 및 그를 이용한 플라스마 하이브리드 용접장치

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2018519881

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18901019

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20207013364

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2018901019

Country of ref document: EP

Effective date: 20200824