WO2019111916A1 - 冷菓材成形装置および冷菓材成形方法 - Google Patents

冷菓材成形装置および冷菓材成形方法 Download PDF

Info

Publication number
WO2019111916A1
WO2019111916A1 PCT/JP2018/044627 JP2018044627W WO2019111916A1 WO 2019111916 A1 WO2019111916 A1 WO 2019111916A1 JP 2018044627 W JP2018044627 W JP 2018044627W WO 2019111916 A1 WO2019111916 A1 WO 2019111916A1
Authority
WO
WIPO (PCT)
Prior art keywords
frozen dessert
dessert material
frozen
mold
curing
Prior art date
Application number
PCT/JP2018/044627
Other languages
English (en)
French (fr)
Inventor
創太 井上
Original Assignee
赤城乳業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 赤城乳業株式会社 filed Critical 赤城乳業株式会社
Priority to SG11202004919QA priority Critical patent/SG11202004919QA/en
Publication of WO2019111916A1 publication Critical patent/WO2019111916A1/ja

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A23FOODS OR FOODSTUFFS; TREATMENT THEREOF, NOT COVERED BY OTHER CLASSES
    • A23GCOCOA; COCOA PRODUCTS, e.g. CHOCOLATE; SUBSTITUTES FOR COCOA OR COCOA PRODUCTS; CONFECTIONERY; CHEWING GUM; ICE-CREAM; PREPARATION THEREOF
    • A23G9/00Frozen sweets, e.g. ice confectionery, ice-cream; Mixtures therefor
    • A23G9/04Production of frozen sweets, e.g. ice-cream
    • A23G9/14Continuous production
    • AHUMAN NECESSITIES
    • A23FOODS OR FOODSTUFFS; TREATMENT THEREOF, NOT COVERED BY OTHER CLASSES
    • A23GCOCOA; COCOA PRODUCTS, e.g. CHOCOLATE; SUBSTITUTES FOR COCOA OR COCOA PRODUCTS; CONFECTIONERY; CHEWING GUM; ICE-CREAM; PREPARATION THEREOF
    • A23G9/00Frozen sweets, e.g. ice confectionery, ice-cream; Mixtures therefor
    • A23G9/04Production of frozen sweets, e.g. ice-cream
    • A23G9/22Details, component parts or accessories of apparatus insofar as not peculiar to a single one of the preceding groups
    • AHUMAN NECESSITIES
    • A23FOODS OR FOODSTUFFS; TREATMENT THEREOF, NOT COVERED BY OTHER CLASSES
    • A23GCOCOA; COCOA PRODUCTS, e.g. CHOCOLATE; SUBSTITUTES FOR COCOA OR COCOA PRODUCTS; CONFECTIONERY; CHEWING GUM; ICE-CREAM; PREPARATION THEREOF
    • A23G9/00Frozen sweets, e.g. ice confectionery, ice-cream; Mixtures therefor
    • A23G9/44Frozen sweets, e.g. ice confectionery, ice-cream; Mixtures therefor characterised by shape, structure or physical form

Definitions

  • the present invention relates to a frozen dessert material forming apparatus and a frozen dessert material forming method for molding a part of a frozen dessert material such as ice cream and sherbet.
  • molding container which can shape
  • a frozen drink (frozen drink) by pouring a beverage such as coffee, juice or alcohol into a depression molded into a frozen dessert and mixing the frozen desserts. it can.
  • Patent Document 1 includes a container lid having a conical convex portion, and the container lid can be used to form a conical concave portion in the central portion of the frozen dessert.
  • a container is disclosed.
  • frozen desserts manufactured using frozen dessert containers as described in Patent Document 1 are also sold together, and the consumer purchases the frozen desserts in a frozen state together with the beverage, There is also a service that makes it possible to eat and drink by mixing beverages and frozen desserts.
  • the frozen dessert container described above is configured such that a recess is created in the frozen dessert by removing the lid of the container, and the consumer may break the frozen dessert using the recess, and eat or drink by injecting a beverage or the like. It can be done.
  • the present invention is intended to solve such conventional problems, and in the case of continuously forming a recess in a frozen dessert material by a forming die, it can be continuously produced, and the production efficiency can be improved while the production efficiency is improved.
  • An object of the present invention is to provide a frozen dessert material forming apparatus and a frozen dessert material forming method that can be finished well.
  • the present invention is a frozen dessert material forming apparatus for continuously curing a part of the frozen dessert material in the shape of a hollow recess, comprising: transporting means for transporting a plurality of containers; and filling means for filling the frozen dessert materials in the containers.
  • Forming means for sequentially charging and extracting the cooled convex forming mold into the frozen dessert material to be conveyed and curing at least a part of the frozen dessert material around the forming mold; and supplying a refrigerant to the forming die
  • a predetermined number of curing for a predetermined time period is configured to be cooled to a predetermined temperature.
  • the present invention is a method for forming a frozen dessert material, in which a part of the frozen dessert material is continuously cured in a hollow concave shape, and a step of transporting a plurality of containers and a step of filling the containers with the frozen dessert material And sequentially charging and extracting the cooled convex forming mold into the frozen dessert material to be transported to cure at least a part of the frozen dessert material around the forming mold, and supplying a refrigerant to the molding die
  • the forming die is configured to cure the first frozen dessert material conveyed continuously while curing the predetermined number of times in a predetermined time, and to cure the second frozen dessert material. It is cooled to temperature, It is a frozen dessert material forming method characterized by the above-mentioned.
  • the frozen dessert material forming apparatus and the frozen dessert material forming method according to the present invention in the case where the recess is continuously formed in the frozen dessert material, an excellent effect that the forming finish can be made favorable while improving the production efficiency. Can play.
  • FIG. 1 is a view of a completed state of a frozen dessert (ice dessert) 50 in which the recess is formed by the frozen dessert material forming apparatus 10 according to the embodiment of the present invention
  • FIG. 1 (a) is a cross sectional view
  • FIG. It is a perspective view
  • FIG. 2 is a front external view showing the frozen dessert material forming apparatus 10
  • FIG. 3 is a view showing a forming unit 151U
  • FIG. 2 (a) is a front view
  • FIG. 3 (b) is a top view
  • FIG. (C) is an external view of the forming die 151
  • (d) is a cross-sectional view.
  • a first direction which is a direction from upstream to downstream (direction from left to right in FIG. 1) is taken as a transport direction T and in the transport direction T
  • the second direction, which is the orthogonal direction is referred to as the transport width direction W
  • the third direction, which is the direction (vertical direction in the same drawing) orthogonal to the transport direction T and the transport width direction W is referred to as the transport height direction H.
  • frozen desserts (ice desserts) 50 are accommodated in a cup-shaped container 21 and are frozen in a state in which a recess 30 is formed in a substantially central portion.
  • the shape of the recess 30 is a substantially conical shape in which the top portion is located downward in this embodiment, but the shape is not limited to this shape, and may be, for example, a cylindrical shape, a prismatic shape, or a hemispherical shape.
  • the inside of the recess 30 is a hollow portion.
  • the frozen dessert material forming apparatus 10 is a molding apparatus for continuously curing (freezing) a part of the frozen dessert material 23 into a hollow recess shape, and includes the transport unit 11, the filling unit 13, and the molding unit A refrigerant supply unit 17 and a refrigerant injection unit 19 are provided.
  • the respective units of the frozen confectionery material forming apparatus 10 are generally controlled by a control unit.
  • the control unit comprises a CPU, a RAM, a ROM and the like, and executes various controls.
  • the CPU is a so-called central processing unit, and various programs are executed to realize various functions.
  • the RAM is used as a work area of the CPU.
  • the ROM stores a basic OS and programs executed by the CPU.
  • the transport unit 11 is, for example, a conveyor device that transports a plurality of containers 21 continuously, and in a state where a plurality of (for example, 5 to 10) containers 21 are arranged along the transport width direction W, the transport direction For example, intermittently transport to T.
  • the container 21 is a main body of a container for a frozen dessert (container for frozen dessert material) having a cup-shaped main body (see FIG. 1) and a lid (not shown).
  • the filling means 13 is a mix filling machine 13 for sequentially filling the frozen desserts 23 in the container 21 transported by the transport means 11.
  • the frozen dessert material 23 is a raw material of shaved ice, for example.
  • the mix filling machine 13 is filled with, for example, a frozen dessert 23 mixed with ice and ice cream mix whose particle size has been adjusted by a line crusher (not shown) after being ice-depleted with an ice-dryer (not shown)
  • the container 21 moving downward in the transport height direction H of the mix filling machine 13 is recognized, and the container 21 is filled with a predetermined amount of frozen dessert material 23.
  • the overrun of the frozen dessert material 23 is adjusted to, for example, 10% to 30%.
  • the forming means 15 is a recess forming device 15 which is disposed above the conveying means 11 and continuously cures at least a part of the frozen dessert material 23 into a hollow recess shape.
  • the recess forming device 15 has at least a cooled convex forming die 151 and a drive means 153 for moving the same up and down in the transport height direction H (vertical direction), and the container 21 is filled with the recess forming device 15.
  • the molding die 151 is sequentially introduced into the frozen dessert material 23 conveyed downward, and is extracted from the frozen dessert material 23.
  • the frozen dessert material 23 (the frozen dessert material 23 in contact with the surface of the molding die 151) around the molding die 151 is continuously cooled and hardened (freezed) into a hollow recess shape.
  • the forming die 151 is for forming the shape of the recess 30 shown in FIG. 1, and the whole of the frozen dessert material 23 is not cured in the recess forming device 15, and the whole is cooled and cured in the downstream process (hereinafter simply referred to as curing).
  • the frozen dessert 50 shown in FIG. 1 is manufactured.
  • the refrigerant supply means 17 is a means for supplying a refrigerant to the forming die 151 from a storage tank (not shown) through the pipe 175 to cool the forming die 151.
  • liquid nitrogen liquefied nitrogen: LN2
  • the refrigerant supply means 17 supplies liquefied nitrogen to the concave portion forming device 15 stably by supercooling the liquefied nitrogen in the pipe 175.
  • the refrigerant injection means 19 is a liquid nitrogen injection device which additionally injects a refrigerant (liquid nitrogen) directly to the concave portion of the frozen dessert material 23 hardened by the concave portion forming device 15.
  • the recess forming device 15 has a forming unit 151 U in which a plurality of forming dies 151 are integrally attached.
  • the plurality of forming dies 151 are arranged in a matrix along the transport direction T and the transport width direction W, and the number in the transport width direction W corresponds to the number of containers 21 transported by the transport means 11. Further, in the transport direction T, in this example, a plurality of forming dies 151 aligned in the back and forth direction (upstream and downstream) are provided (the same figure (a), the same figure (b)).
  • the concave portion forming device 15 includes a first forming die 151A positioned on the upstream side (the left side in FIGS. (A) and (b) in the transport direction T, and a downstream side (a in FIG. And the second forming die 151B located on the right side in FIG.
  • a plurality of first molding dies 151A and a plurality of second molding dies 151B are arranged in the transport width direction W (the same figure (b)), the two first molding dies 151A and the first The second molding die 151B will be described.
  • the forming die 151 (151A, 151B) is formed by forming a metal into a substantially conical shape, and the hollow portion 159 is an inner side.
  • the hollow portion 159 has a substantially conical shape along the outer shape, and an opening 157 is provided at a position opposite to the apex T of the cone. And it is attached to hopper 173 (it mentions later) so that top T may be located below conveyance height direction H, ie, it may become convex below.
  • the hollow portion 159 is supplied with liquid nitrogen through the hopper 173, and the substantially conical outer surface is in contact with the frozen dessert material 23.
  • the metal of the forming die 151 is a material that causes no problem even when it comes in direct contact with food, and has a high thermal conductivity to the extent that heat exchange with the frozen dessert material 23 can be efficiently performed. It is a material that is easy to peel, for example, stainless steel (SUS304).
  • the plate thickness D of the substantially conical portion in the completed state shown in the figure is substantially uniform throughout, for example, 0.1 mm to 2.0 mm, preferably 0.3 mm to 1.5 mm, Preferably, it is 0.5 mm to 1.0 mm. In the present embodiment, as an example, the plate thickness D of the forming die 151 is 0.5 mm.
  • At least the outer surface 151O in contact with the frozen dessert material 23 is surface-treated by, for example, electrolytic polishing.
  • the outer surface may be subjected to, for example, processing (for example, concavo-convex processing, water repellent processing, etc.) to prevent adhesion of the frozen dessert material 23.
  • metal is a material which does not have a problem even if it directly touches food, and the heat conductivity is high to the extent that heat exchange with the frozen dessert material 23 can be performed efficiently.
  • gunmetal an alloy of copper (Cu) and tin (Sn): Gunmetal
  • the thermal conductivity of gunmetal is as high as three to four times that of stainless steel, and heat exchange with the frozen dessert material 23 can be performed well.
  • the hardness is lower than that of stainless steel and processing is difficult, since the thermal conductivity is high, the thickness D can be larger than in the case of the above-mentioned stainless steel, and the difficulty in processing can be compensated.
  • the two molds 151A and 151B in the present embodiment have the same configuration.
  • the mold unit 151U approaches and separates relatively to the container 21.
  • the recess forming device 15 causes the first forming die 151A and the second forming die 151B to move up and down at the same time to put them into the frozen dessert material 23 and extract them from the frozen dessert material 23.
  • molding die 151 may not be simultaneous.
  • the transport unit 11 may be configured to move up and down so that the container 21 approaches and separates from the mold unit 151U.
  • the pitch of the first forming die 151A and the second forming die 151B is equal to the pitch of the two (two rows in front and rear) containers 21 aligned along the transport direction T.
  • the distance L between the central axes passing through the top of the first forming die 151A and the second forming die 151B and the substantially conical top It is approximately equal to the distance between the central axes of the shaped containers 21. That is, with the first forming die 151A and the second forming die 151B aligned in the front and back of the transport direction T, the recesses are formed simultaneously (substantially) on the two frozen desserts 23 aligned in the front and back of the transport direction T.
  • the recess molding device 15 moves the molding die 151 so that the molding die 151 performs a predetermined number of moldings in a predetermined time. That is, one molding die 151 is repeatedly inserted into and extracted from the frozen dessert material 23 with respect to at least two frozen dessert materials 23 filled in the container 21 and continuously transported, and as a result, the molding die The curing process is performed so that at least a portion of the frozen dessert material 23 in contact with the periphery of the portion 151 has a hollow recess shape.
  • molding die 151 is the first (in the downstream of the conveyance direction T) frozen dessert material (1st frozen dessert material) of two frozen dessert materials 23 continuously conveyed back and forth along the conveyance direction T. It cools to predetermined
  • the frozen dessert material 23 conveyed without being cured is first cured by the first forming die 151A on the upstream side so that a part in the vicinity of the center becomes a recess.
  • a thin skin hardened portion 35 (see FIG. 4) is formed, and the downstream second molding die 151B is inserted into the hardened portion 35 (recessed portion) and is further hardened (overlapped). That is, a plurality of (two in this example) forming dies 151 are formed by inserting and removing the hardened portion 35 of the recessed portion 23 of one frozen dessert material 23, and the recessed portions of one frozen dessert member 23 have different forming molds 151A and 151B. It is inserted and removed.
  • the plurality of molding dies 151 lift and lower the frozen dessert material 23 contained in one container 21 a plurality of times to form a recessed curing unit 35.
  • abuts to the frozen dessert material 23 can be shortened, and a raise (high temperature formation) of the temperature (cooling temperature) of shaping
  • the curing process is performed a plurality of times with respect to one curing portion 35 as the contact time of one molding die 151 is shortened, so that the curing state is favorably maintained (transfer to the next process in a sufficient molding state) can do.
  • molding apparatus 15 is demonstrated with reference to FIG.
  • the figure shows a state corresponding to the time lapse of one frozen dessert material 23, and the figure (a) is a state after being hardened (formed) by the first forming die 151A, b) is then in a state of being hardened (formed) by the second forming die 151 B, and in the same figure (c) is a state in which liquid nitrogen is injected.
  • the forming die 151 when the forming die 151 is moved up and down and cooled under predetermined conditions (time, which will be described later), only a portion of the frozen dessert material 23 in contact with the forming die 151 is hardened. is there. And as shown to the same figure, the hardened part 35 of the thin skin state along the shape of the shaping
  • the thin-skinned cured portion 35 is in a state of being laminated in two layers. Thereby, it is possible to prevent the hardened portion 35 from being broken as compared with the case of one layer.
  • liquid nitrogen 37 is injected into the inside of the hardened portion 35 by the liquid nitrogen injection device 19.
  • the frozen dessert material 23 in the vicinity of the bottom in contact with the liquid nitrogen 37 is also cured (the curing portion 35 is further expanded). Since the vicinity of the bottom portion of the frozen dessert material 23 hardens, even if the frozen dessert material 23 near the opening is not sufficiently hardened, it can withstand those loads, and furthermore, the deformation of the hardened portion 35 can be prevented.
  • the refrigerant supply means (liquid nitrogen supply device) 17 includes a liquid nitrogen storage tank (not shown), a liquid nitrogen supercooling system 171, a hopper 173, a pipe 175 connecting these, and the like.
  • the hopper 173 has, for example, a substantially cubic shape, and a supply port (not shown) is provided at the bottom.
  • the mold unit 151U is attached to the bottom, and the opening 157 of the mold 151 (151A, 151B) completely covers and communicates with the supply port of the hopper 173.
  • the liquid nitrogen in the liquid nitrogen storage tank is supplied to the hopper 173 through the pipe 175 through the liquid nitrogen supercooling system 171, and the hollow portion of the mold 151 from the supply port of the hopper 173 through the opening 157 of the mold 151. It is supplied to 159.
  • the hopper 173 has a liquid level sensor at the top, and switches the solenoid valve to automatically supply the liquid nitrogen to the hollow portion 159 of the mold 151 so as to maintain the liquid level of liquefied nitrogen at an arbitrary position. Thereby, the mold 151 is cooled.
  • the liquid nitrogen supercooling system 171 is a device capable of stably supplying supercooled liquid nitrogen (for example, a subcooler manufactured by Cool Technos Co., Ltd.), and since it is an existing one, the detailed description will be omitted, but Supercooled liquid nitrogen.
  • the liquid nitrogen is at a cryogenic temperature of -196 ° C. at a pressure of 1 atm and the distance from the liquid nitrogen storage tank to the point of use is increased, the liquid nitrogen in the pipe 175 is gasified (nitrogen gas: GN 2) and The supply of liquid nitrogen in the hopper 173 or the like becomes unstable, or a pulse occurs when a liquid nitrogen nozzle or the like is used, resulting in a phenomenon that a slight amount of control can not be performed.
  • the liquid nitrogen supercooling system 171 is installed in the vicinity of the hopper 173, and liquefied nitrogen is stably supplied to the hopper 173 by supercooling the liquefied nitrogen in the pipe 175.
  • the liquid nitrogen injection device 19 is provided downstream of the recess forming device 15 and directly injects a predetermined amount of liquid nitrogen into the recessed curing portion 35 of the frozen dessert material 23 formed by the recess forming device 15.
  • the liquid nitrogen injection device 19 has a hopper 191 and an injection nozzle 193, and is connected to the liquid nitrogen supercooling system 171 by a pipe 175.
  • the liquid nitrogen in the liquid nitrogen storage tank is also supplied to the hopper 191 through the pipe 175 via the liquid nitrogen supercooling system 171.
  • An injection nozzle 193 is attached to the hopper 191, and liquid nitrogen is automatically supplied from the injection nozzle 193 to the hardened portion 35 of the frozen dessert material 23.
  • Liquid nitrogen is continuously injected from the injection nozzle 193, but there is a needle valve (not shown) between the hopper 191 and the injection nozzle 193, and the injection amount of liquid nitrogen can be adjusted by the degree of opening. it can.
  • the injected liquid nitrogen vaporizes until the frozen dessert material 23 reaches the downstream end of the frozen dessert material forming apparatus 10. Then, after the injected liquid nitrogen is vaporized, a lid (not shown) is attached to the container 21.
  • the lid is attached to the container 21 by, for example, a lid attachment device (not shown) provided near the downstream of the frozen dessert material forming apparatus 10, and the frozen dessert material 23 is sealed.
  • the lid may be, for example, a lid having a convex portion along the molded recessed portion-like hardened portion 35, that is, a convex portion similar to the molding die 151 (substantially conical shape), or does not have a convex portion
  • a film-like or flat lid may be used.
  • a recessed curing unit 35 is formed in a substantially central portion of the frozen dessert material 23 by the recess molding apparatus 15 and the liquid nitrogen injection device 19. Then, the frozen dessert material 23 discharged from the frozen dessert material forming apparatus 10 and having the lid attached thereto is transferred to a rapid freezer (not shown), and the uncured frozen dessert material 23 is cooled and hardened.
  • the frozen dessert material forming apparatus 10 employs the above-described recessed portion forming device 15 (forming die 151) in the production of the frozen dessert 50 having the recessed portion 30 near the center, and is effective in forming the recessed portion forming device 15 and the liquid nitrogen injection device 19. By performing control, while improving the production efficiency, the finish of molding is also made good.
  • the operation of the frozen dessert material forming apparatus 10 and the frozen dessert material forming method based thereon will be described, including this point.
  • FIG. 5 is a schematic view for explaining the operation of the recess forming apparatus 15.
  • the left side is the upstream side
  • the right side is the downstream side. 21 are transported from left to right in FIG.
  • an empty container 21 (cup-shaped main body) is supplied at the upstream end of the frozen dessert material forming apparatus 10.
  • the containers 21 are supplied to the transport means 11 so that, for example, eight to ten containers 21 are arranged along the transport width direction W.
  • the frozen food 23 is supplied from the mix filling machine 13 to the containers 21 sequentially transported.
  • the mix filling machine 13 recognizes the container 21 moving downward and fills the container 21 with a predetermined amount of the frozen dessert material 23.
  • liquid nitrogen in the liquid nitrogen storage tank (not shown) is supplied to the hopper 173 through the pipe 175 through the liquid nitrogen supercooling system 171 and supplied to the hollow portion 159 of the mold 151 from the supply port of the hopper 173.
  • the hopper 173 has a liquid level sensor at the top, and switches the solenoid valve to automatically supply the liquid nitrogen to the hollow portion 159 of the mold 151 so as to maintain the liquid level of liquefied nitrogen at an arbitrary position. Thereby, the mold 151 is cooled.
  • the recess forming device 15 forms the recess. That is, as shown in FIG. 5, the recess forming device 15 recognizes the container 21 moving downward and lowers the forming unit 151U (FIG. 5 (a)). Thus, first, the first forming die 151A on the upstream side is inserted into the frozen dessert material 23 (uncured frozen dessert material 23) located on the downstream side among the two frozen dessert materials 23 arranged in the front and back of the transport direction T. (FIG. 5 (b)).
  • the frozen dessert material 23 is cooled and hardened around the first molding die 151 by coming into contact with the first molding die 151A sufficiently cooled by liquid nitrogen, and the hardened portion 35 in a thin skin state Is formed.
  • this curing process is a curing (first curing) process on the previous frozen dessert material 23 in the continuous forming process.
  • the frozen dessert material 23 it is the first curing process, and is the curing (upstream curing) process on the upstream side.
  • a substantially conical hardened portion 35 is formed along the outer surface of the first mold 151A.
  • the recess forming device 15 forms the first forming die 151A (forming The mold unit 151U) is lifted and taken out of the frozen dessert 23 (FIG. 5 (c)).
  • the transport means 11 intermittently transports the container 21 (the frozen dessert material 23) to the downstream. That is, while molding with the molding die 151, the container 21 (the frozen dessert material 23) does not move downstream. Therefore, the forming die 151 (the forming die unit 151U) is configured to perform only the raising and lowering operation.
  • molding die 151 is an example and the said cooling time is so good that it is long, it considers suitably production capacity and is selected suitably.
  • the transport means 11 moves the container 21 (the frozen dessert material 23) in one row in the transport direction T. Then, the mold unit 151U is lowered again (FIG. 5 (d)). At this time, the lowered second molding die 151B on the downstream side is inserted into the recessed portion of the hardened portion 35 which has been hardened (upstream hardening) by the first molding die 151A first (FIG. 5 (e )). Then, the second molding die 151B abuts on or approaches the curing portion 35, and curing proceeds further.
  • this curing process is a curing (first curing) process for the earlier mix of the continuous forming processes. Further, focusing on the frozen dessert material 23, it is the second curing process after the formation of the curing portion 35, and is the curing (downstream curing) process on the downstream side.
  • the first forming die 151A is introduced into a new raw frozen dessert material 23, and the periphery of the first forming die 151A is cooled and hardened.
  • this curing process is a curing (second curing) process on the frozen dessert material 23 in the subsequent forming process. Further, focusing on the frozen dessert material 23, it is the first curing process, and is the curing (upstream curing) process on the upstream side.
  • the mold unit 151U When the mold unit 151U is lifted after a predetermined time (for example, 1 second to 2 seconds, preferably about 1.5 seconds, more preferably about 1.33 seconds) has elapsed (FIG. 5 (f))
  • the transport unit 11 moves the container 21 (the frozen dessert material 23) in one row in the transport direction T.
  • the mold unit 151U is lowered again (FIG. 5 (g)).
  • the lowered second molding die 151B on the downstream side is hardened (hardened upstream) by the first molding die 151A first, and the hardened portion 35 of the frozen dessert material 23 (the frozen dessert material 23 on the downstream side) is formed. (Fig. 5 (h)).
  • This hardening process is a hardening (second hardening) process for the frozen dessert material 23 in the continuous forming process, focusing on the second forming die 151B. Further, focusing on the frozen dessert material 23, it is the second curing process and is the curing (downstream curing) process on the downstream side.
  • the first forming die 151A and the second forming die 151B each continuously form the recessed portion-shaped hardened portion 35 in the frozen dessert material 23. That is, the first forming die 151A repeats the curing process (first curing process) on the uncured preceding frozen dessert material 23 and the curing process (second curing process) on the uncured subsequent frozen dessert material 23. Similarly, in the second molding die 151B, the curing process (first curing process) on the preceding frozen dessert material 23 in which the curing portion 35 is formed, and the curing process on the subsequent frozen dessert material 23 in which the curing section 35 is formed ( Repeat the second curing process).
  • the first forming die 151A is inserted in the uncured state, and the recessed portion-like cured portion 35 is formed (upstream curing) and formed continuously.
  • the second molding die 151B is inserted into the curing section 35, and additional curing (downstream curing process) is performed.
  • the frozen confectionery material forming apparatus 10 includes one molding die unit 151U in the frozen confectionery material forming apparatus 10 capable of producing a predetermined number of curings (for example, eight simultaneously in the transport width direction W)
  • a predetermined number of curings for example, eight simultaneously in the transport width direction W
  • each molding die 151 the second molding die 151B, the first molding die 151A
  • the elevating operation time is controlled so as to be cooled to a predetermined temperature.
  • the predetermined temperature is a temperature sufficient to cure at least a portion of the frozen dessert 23 in contact (or proximity) with the periphery of the forming die 151, and more specifically, the boiling point of liquid oxygen (-183 ° C) low temperature below.
  • Each of the forming dies 151 is subjected to heat exchange with the frozen dessert material 23 by being put into the frozen dessert material 23, and the surface temperature of the forming die 151 rises higher than the boiling point (-196 ° C.) of liquid nitrogen.
  • the molding die 151 is cooled again by the liquid nitrogen, and eventually falls to the boiling point of the liquid nitrogen.
  • the recessed portion forming device 15 extracts a certain forming die 151 (same as any of the first forming die 151A and the second forming die 151B) from the previous frozen dessert material 23, the surface temperature of the forming die 151 is at least After the temperature has dropped to the boiling point of liquid oxygen (-183 ° C.), it is put into the later frozen material 23.
  • the molding die 151 is extracted from the frozen dessert material 23 above, it is in a raised state (chilled dessert material 23) so as to cool to the boiling point of liquid oxygen even at the highest temperature (which may be even lower). Is kept in a non-contact state) (stand by at the upper side), and after sufficiently cooled, it is put into the later frozen dessert material 23 to carry out a second curing treatment.
  • the liquid oxygen adheres to the outer surface 151O of the mold 151 during a period from when it is extracted from the previous freeze-dried material 23 to when it is added to the freeze-dried material 23 later.
  • the operation timing of lifting and lowering of the forming die 151 is controlled.
  • the shortest time until liquid oxygen adheres to the outer surface 151O of the mold 151 extracted from the frozen dessert material 23 and exposed to air is a predetermined time.
  • a production capacity for example, the hardened portion 35 can be formed for 160 frozen desserts 23 in one minute
  • it is, for example, 1 second to 2 seconds, preferably 1.5 seconds to 1.8 seconds. More preferably, it is 1.6 seconds to 1.7 seconds.
  • the speed at which the frozen dessert material 23 hardens (the cured portion 35 is formed) varies depending on the composition and temperature of the frozen dessert material 23. That is, the temperature rise of the forming die 151 in contact with the frozen dessert material 23 is also different depending on the composition and state of the frozen dessert material 23, and the cooling time of the molding die 151 without contact with the frozen dessert material 23 is also Varies depending on the composition and condition.
  • the above-mentioned shortest time until liquid oxygen adheres to the surface of the forming die 151 is an example, and the recess forming device 15 of the present embodiment is each of the forming dies 151 continuously introduced into the frozen dessert material 23
  • the molding die 151 shall be maintained in a non-contact state with the frozen dessert material 23, and for the period maintained in a non-contacted state It is appropriately selected according to the composition, state, and the like.
  • the timing of the raising and lowering operation of the forming die 151 can be set arbitrarily, and one raising and lowering operation (hereinafter referred to as "one shot") of one forming die 151 is performed by, for example, an air cylinder. Adjust and synchronize with the moving speed of the container 21.
  • the container 21 is conveyed further downstream, and liquid nitrogen is injected into the formed curing portion 35 by the liquid nitrogen injection device 19 (see FIG. 2).
  • the injection amount is, for example, about 1 ⁇ 5 to 1 ⁇ 2 of the depth D1 of the hardened portion 35, and preferably about 1 ⁇ 4 (volume is, for example, about 9 ml).
  • the hardened portion 35 formed by the concave portion forming device 15 and the vicinity thereof are hardened more reliably.
  • a hardened portion 35 in which the frozen dessert material 23 is hardened in a thin skin state is formed.
  • the additional curing process curing process by liquid nitrogen injection
  • the uncured portion, in particular, the frozen dessert material 23 near the bottom can not withstand the weight of the frozen dessert material 23 near the opening, It causes the hardened portion 35 to collapse.
  • the hardened portion 35 even if the whole is not hardened, it can be sealed with a lid and transferred to a downstream freezer, ie, a rapid freezer. That is, it is sufficient if only the curing portion 35 can be formed in a short time.
  • the injection amount of liquid nitrogen is, for example, the depth D1 of the entire recess 30.
  • the depth (for example, about 9 ml in volume) was set so as to satisfy, for example, about 1 ⁇ 4 from the bottom. In this way, the hardening of the frozen dessert material 23 particularly near the bottom can be promoted, so that it is possible to prevent the load of the frozen dessert material 23 near the opening from being broken, and in the state where the hardened section 35 is formed well It can be transferred to the freezer.
  • liquid nitrogen is injected at timing (broken line t2) four lines downstream (after 12 seconds) from the first forming die 151A on the upstream side (broken line t1 shown in FIG. 2).
  • the injection amount of liquid nitrogen is injected to a depth of about 1 ⁇ 4 of the depth D1 of the hardened portion 35, the timing of six rows downstream (after 18 seconds) after injection under the environment in the manufacturing process
  • the liquid nitrogen is vaporized by (dashed line t3). That is, the lid 21 can be attached to the container 21 if it is after the 7th row downstream of the injection.
  • the periphery of the curing unit 35 is the minimum injection amount that can be sufficiently cured by the transfer to the downstream process, so that the lid is attached and the transfer to the downstream rapid freezer is also possible. It can be done in the shortest time, preventing cost increase and shortening the working time.
  • the container 21 discharged from the frozen dessert material forming apparatus 10 (the frozen dessert material 23 in which the hardened portion 35 is formed is sealed by the lid is sealed) is transferred to a tray after discharging and is not shown (for example, a rapid freezer (not shown) Cure for example for 20 minutes at -40.degree. Thereby, the frozen dessert 50 (refer FIG. 1) which has the recessed part 30 in center vicinity is obtained.
  • the frozen dessert material 23 is, for example, a mixture of crushed ice cream ice, and as a raw material of the ice cream mix, for example, saccharides, dairy products, coffee, and flavors. Also, the solid content of the mix before mixing crushed ice is, for example, 40%.
  • the transfer means 11 moves the containers 21 for one row in the transfer direction T in one second, and performs an intermittent operation of stopping for two seconds.
  • One lifting operation (one shot) of one forming die 151 is performed in 3 seconds.
  • the hardened portion 35 can be formed for about 80 to 240 frozen desserts 23 in one minute.
  • the recess forming device 15 holds the forming dies 151 for about 0.33 seconds after inserting the forming dies 151 into the frozen dessert material 23 to obtain the previous frozen dessert material 23 (first frozen dessert material To form a hardened portion 35). Then, the period until the molding die 151 is extracted from the frozen dessert material 23 and then inserted into the frozen dessert material 23 (second frozen dessert material) is about 1.67 seconds.
  • the first forming die 151A is charged and thereby cured for 1.33 seconds (the first forming die 151A is extracted), and after 1.67 seconds, the second forming die 151B It is introduced and cured for an additional 1.33 seconds.
  • the frozen dessert material 23 does not adhere to the forming die 151, and the formed cured portion 35 is sufficiently cured to the extent that it does not collapse before being transferred to the downstream process (rapid freezer), and the cured portion 35
  • the adhesion of the unnecessary frozen dessert material 23 was not seen on the surface of either, and it was in the good state.
  • the crevice molding device 15 of the present invention has a cooling effect of cooling the later frozen dessert material 23 different from the previous frozen dessert material 23 conveyed continuously by at least one molding die 151 If the configuration is such that the mold 151 taken out of the previous frozen dessert material 23 is kept (waited) in the air until the temperature falls below the boiling point of the liquid oxygen, and then the subsequent frozen dessert material 23 is cooled It is not limited to the example.
  • a plurality of forming dies 151 (two in this example) and different forming dies 151A and 151B are inserted into and removed from the hardened portion 35 of one frozen dessert material 23
  • the structure formed by is preferable, it is not restricted to said example. That is, a plurality of (two in this example) molding dies 151 may be inserted into and removed from the hardened portion 35 of one frozen dessert material 23 for molding.
  • the forming time of one hardening portion 35 by the forming die 151 is 1/2 T time, and is inserted and removed twice.
  • the increase in the surface temperature of the mold 151 can be suppressed to a low level compared to the case where the molding time of the hardened portion 35 is T time by one insertion and removal of the mold 151, and in the air Since the waiting time of can be shortened, efficient molding can be performed.
  • the forming die 151 may be inserted and removed a plurality of times with respect to one frozen dessert material 23, but it may be performed once.
  • the mold unit 151U has a plurality of rows and a plurality of columns of molding dies 151 arranged in the transport width direction W (for example, row direction) and the transport direction T (for example, column direction).
  • the forming dies 151 may be arranged in one row ⁇ a plurality of columns, or may be arranged in a plurality of rows ⁇ one column.
  • the temperature is controlled to fall below the boiling point of liquid oxygen during the period.
  • a single molding die (1 row ⁇ 1 row) is formed in the molding die unit 151U. ) Is provided to sequentially shape the frozen dessert material 23, and the time for waiting in the air between the previous frozen dessert material 23 and the subsequent frozen dessert material 23 is as long as the temperature lower than the boiling point of liquid oxygen Good.
  • the forming means 15 may be configured to be able to move up and down the plurality of forming dies 151 individually. In this case, for example, control is performed such that the trailing molding die 151B is lifted when the leading molding die 151A is lowered, and the trailing molding die 151B is lowered when the leading molding die 151A is raised. You may
  • the transport means transports intermittently
  • the recess forming device 15 and the liquid nitrogen injection device 19 can be moved along the transport direction T in synchronization with the transport means 11.
  • the apparatus and control since the apparatus and control become complicated, it is desirable to reduce the cost if it is operated intermittently as described above.
  • composition (ratio of raw materials) of the frozen dessert material 23 and the values of the overrun and the like are not limited to the above-described example, and are appropriately selected according to the status of the frozen dessert (ice dessert) 50.
  • the frozen dessert material 23 is not limited to the mix of shaved ice, and may be a mix of ice creams, sherbet, and other desserts provided in a frozen (freezed) state.
  • the operating conditions of the above-described frozen dessert material forming apparatus 10 are also an example, and are appropriately selected so that the hardened portion 35 is molded according to the composition and state of the frozen dessert material 23 and the state of the frozen dessert 50 to be manufactured.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Food Science & Technology (AREA)
  • Polymers & Plastics (AREA)
  • Manufacturing & Machinery (AREA)
  • Confectionery (AREA)
  • Freezing, Cooling And Drying Of Foods (AREA)

Abstract

成形型によって冷菓材に凹部を連続成形する場合において、連続して生産でき、生産効率を向上させつつ、成形の仕上がりも良好にすることができる、冷菓材成形装置及 び冷菓材成形方法を提供する。 冷菓材23の一部を中空の凹部形状に連続的に硬化させる冷菓材成形装置10であって、複数の容器21を搬送する搬送手段11と、容器21内に冷菓材23を充填する充填手段13と、冷却した凸状の成形型151を搬送される冷菓材23内に順次投入および抜き出して該成形型151の周囲の冷菓材23の少なくとも一部を硬化させる成形手段15と、冷媒を成形型151に供給する冷媒供給手段17と、を有し、成形型151は、所定時間に所定数の硬化を行いつつ、連続して搬送される第一の冷菓材の硬化から第二の冷菓材の硬化までの間に所定の温度に冷却される。

Description

冷菓材成形装置および冷菓材成形方法
 本発明は、アイスクリームやシャーベットなどの冷菓材の一部を成形するための冷菓材成形装置および冷菓材成形方法に関する。
 従来、アイスクリームなどの冷菓(氷菓)に、コーヒー,ジュース,アルコールなどの飲料を注ぎ込むための窪み(凹部)を成形することが可能な成形容器が広く知られている。このような成形容器によれば、コーヒー,ジュース,アルコールなどの飲料を、冷菓に成形された窪みに注ぎ込んで、冷菓を混ぜ合わせることで、フローズン状の飲料(フローズン飲料)を簡単に作ることができる。
 このような成形容器の一例として、例えば、特許文献1には、円錐形状の凸部を有する容器蓋を備え、この容器蓋によって冷菓の中心部に円錐形状の凹部を成形することが可能な冷菓(氷菓)容器が開示されている。
 また、近年ではコンビニエンスストアなどにおいて、コーヒー等の専用サーバを設置し、消費者がセルフサービス方式で飲料を購入するシステムが広がっている。
 そしてコンビニエンスストア等においては、特許文献1に記載されているような冷菓容器を用いて製造した冷菓も合わせて販売し、消費者が飲料と併せて冷凍状態の当該冷菓を購入し、店頭にて飲料と冷菓を混合して飲食可能となるサービスも提供されている。上記の冷菓容器は、容器蓋を外すことで冷菓に凹部が創出されるように構成されており、消費者は当該凹部を利用して冷菓を崩し、飲料を注入するなどして飲食することができるようになっている。
 このようなサービスの広がりによって、冷菓を崩し、また飲料の注入を許容する凹部が成形された冷菓の需要も急激に増加しており、市場に十分に供給するために当該冷菓の生産効率(冷菓材の成形効率)の向上が強く望まれている。
特許5536273号公報
 しかしながら、凹部を有する冷菓の製造技術については様々な方法があり、いまだ検討の余地がある。具体的には、例えば、特許文献1に記載のような容器蓋を用いる場合、その特殊な形状から一般的な冷菓材の蓋体よりもコストがかかる問題がある。
 また、上記の容器蓋を用いずに、成形型によって冷菓材に凹部を成形する(冷菓材を凹部状に凍結させる)ことも考えられるが、この場合連続して生産でき、生産効率を上げつつ、成形の仕上がりも良好にするといった技術については、知られているものはない。
 本発明は、このような従来の問題点を解決するためのものであって、成形型によって冷菓材に凹部を連続成形する場合において、連続して生産でき、生産効率を向上させつつ、成形の仕上がりも良好にすることができる、冷菓材成形装置及び冷菓材成形方法を提供することを目的とする。
 本発明は、冷菓材の一部を中空の凹部形状に連続的に硬化させる冷菓材成形装置であって、複数の容器を搬送する搬送手段と、前記容器内に前記冷菓材を充填する充填手段と、冷却した凸状の成形型を搬送される前記冷菓材内に順次投入および抜き出して該成形型の周囲の前記冷菓材の少なくとも一部を硬化させる成形手段と、冷媒を前記成形型に供給する冷媒供給手段と、を有し、前記成形型は、所定時間に所定数の硬化を行いつつ、連続して搬送される第一の冷菓材の硬化から第二の冷菓材の硬化までの間に所定の温度に冷却されるように構成される、ことを特徴とする冷菓材成形装置である。
 また、本発明は、冷菓材の一部を中空の凹部形状に連続的に硬化させる冷菓材成形方法であって、複数の容器を搬送する工程と、前記容器内に前記冷菓材を充填する工程と、冷却した凸状の成形型を搬送される前記冷菓材内に順次投入および抜き出して該成形型の周囲の前記冷菓材の少なくとも一部を硬化させる工程と、冷媒を前記成形型に供給する工程と、を有し、前記成形型は、所定時間に所定数の硬化を行いつつ、連続して搬送される第一の冷菓材の硬化から第二の冷菓材の硬化までの間に所定の温度に冷却される、ことを特徴とする冷菓材成形方法である。
 本発明に係る冷菓材成形装置及び冷菓材成形方法によれば、冷菓材に凹部を連続成形する場合において、生産効率を向上させつつ、成形の仕上がりも良好にすることができる、という優れた効果を奏し得る。
本発明の実施形態に係る冷菓材成形装置によって製造した冷菓を示す図であり、(a)断面図、(b)外観斜視図である。 本発明の実施形態に係る冷菓材成形装置の概要を示す正面図である。 本発明の実施形態に係る凹部成形装置を説明する図であり、(a)正面図、(b)上面図、(c)成形型の外観図、(d)成形型の断面図である。 本発明の実施形態に係る硬化部を示す概念図である。 本発明の実施形態に係る凹部成形装置の動作を説明する概略図である。
 以下、図面を用いて、本発明の冷菓材成形装置10について詳細に説明する。
 <全体構成>
 図1は、本発明の実施形態に係る冷菓材成形装置10で凹部を成形した冷菓(氷菓)50の完成状態の図であり、同図(a)が断面図、同図(b)が外観斜視図である。図2は、冷菓材成形装置10を示す正面外観図であり、図3は成形型ユニット151Uを示す図であり、同図(a)が正面図、同図(b)が上面図、同図(c)が成形型151の外観図、同図(d)が断面図である。
 なお、説明の便宜上、冷菓材成形装置10における各種方向の定義として、上流から下流に向かう方向(図1の左から右に向かう方向)となる第一方向を搬送方向Tとし、搬送方向Tに直交する方向となる第二方向を搬送幅方向Wとし、搬送方向T及び搬送幅方向Wに対して直交する方向(同図の上下方向)となる第三方向を搬送高さ方向Hと称する。
 図1に示すように、冷菓(氷菓)50は、カップ状の容器21に収容され、略中央部分に凹部30が形成された状態で冷凍されている。凹部30の形状は、本実施形態では頂部が下方に位置する略円錐形状であるが、この形状に限定されず、例えば円柱状、角柱状、半球状などであってもよい。凹部30の内部は中空部分となっている。
 図2を参照して冷菓材成形装置10は、冷菓材23の一部を中空の凹部形状に連続的に硬化(凍結)させる成形装置であり、搬送手段11と、充填手段13と、成形手段15と、冷媒供給手段17と、冷媒注入手段19を有する。これら冷菓材成形装置10の各部は、制御ユニットによって統括的に制御される。制御ユニットは、CPU、RAM、及びROMなどから構成され、各種制御を実行する。CPUは、いわゆる中央演算処理装置であり、各種プログラムが実行されて各種機能を実現する。RAMは、CPUの作業領域として使用される。ROMは、CPUで実行される基本OSやプログラムを記憶する。
 搬送手段11は、複数の容器21を連続して搬送する例えばコンベア装置であり、搬送幅方向Wに沿って複数(例えば、5個~10個など)の容器21を並べた状態で、搬送方向Tに例えば間欠的に搬送する。容器21はここでは、カップ状の本体(図1参照)と蓋体(不図示)とを有する冷菓用容器(冷菓材用容器)のうちの本体である。
 充填手段13は、搬送手段11によって搬送される容器21内に冷菓材23を順次充填するミックス充填機13である。冷菓材23は例えばかき氷アイスの原材料である。ミックス充填機13には、例えば、削氷装置(不図示)で削氷された後、ラインクラッシャー(不図示)で粒度が調整された氷とアイスクリームミックスを混合した冷菓材23が充填されており、ミックス充填機13の搬送高さ方向Hの下方に移動する容器21を認識して所定量の冷菓材23を容器21に充填する。充填時に、冷菓材23のオーバーランは例えば10%~30%に調整される。
 成形手段15は、搬送手段11の上方に配置され、冷菓材23の少なくとも一部を中空の凹部形状に連続的に硬化させる凹部成形装置15である。凹部成形装置15は、冷却された凸状の成形型151と、これを搬送高さ方向H(上下方向)に昇降移動させる駆動手段153を少なくとも有し、容器21に充填されて凹部成形装置15の下方に搬送される冷菓材23内に成形型151を順次投入し、また冷菓材23から抜き出す。これにより成形型151の周囲の冷菓材23(成形型151の表面と当接する冷菓材23)の少なくとも一部が中空の凹部形状に連続的に冷却硬化(凍結)される。成形型151は、図1に示す凹部30の形状を成形するものであり、冷菓材23の全体は凹部成形装置15においては硬化されず、下流工程において全体が冷却硬化(以下、単に硬化という)されて図1に示す冷菓50が製造される。
 冷媒供給手段17は、貯槽(不図示)から配管175を通じて冷媒を成形型151に供給して成形型151を冷却する手段である。本実施形態では一例として冷媒に液体窒素(液化窒素:LN2)を採用する。冷媒供給手段17は、配管175内の液化窒素を過冷却状態にすることで、安定的に凹部成形装置15に液化窒素を供給する。
 冷媒注入手段19は、凹部成形装置15によって硬化された冷菓材23の凹部分に追加で冷媒(液体窒素)を直接注入する液体窒素注入装置である。
<凹部成形装置>
 図3を参照して、凹部成形装置15は、複数の成形型151が一体的に取り付けられた成形型ユニット151Uを有する。複数の成形型151は搬送方向Tおよび搬送幅方向Wに沿って行列状に並び、搬送幅方向Wの数は搬送手段11によって搬送される容器21の数に対応している。また、搬送方向Tには、この例では前後(上流側と下流側)に並ぶ複数の成形型151を有する(同図(a),同図(b))。
 具体的には、凹部成形装置15は、搬送方向Tにおいては上流側(同図(a),同図(b)では左側)に位置する第1成形型151Aと、下流側(同図(a),同図(b)では右側)に位置する第2成形型151Bと、を有する。なお上述のとおり、第1成形型151Aと第2成形型151Bはそれぞれ搬送幅方向Wに複数並んでいるが(同図(b))、以下では便宜上、2個の第1成形型151Aと第2成形型151Bとして説明する。
 同図(c)、同図(d)を参照して、成形型151(151A,151B)は、金属を略円錐形状に成形したものであり、内側が中空部分159となっている。中空部分159の形状は外形状に沿った略円錐形状であり、円錐の頂部Tに対向する位置には開口部157が設けられている。そして頂部Tが搬送高さ方向Hの下方に位置するように、すなわち下に凸となる状態でホッパー173(後述する)に取り付けられる。中空部分159にはホッパー173を介して液体窒素が供給され、略円錐形状の外表面が冷菓材23と接触する。
 成形型151の金属は、食品に直接触れても問題がない材質であって、冷菓材23との熱交換が効率良く行える程度に熱伝導率が高く、図示のような略円錐形状などの加工がしやすい材料であり、例えば、ステンレス(SUS304)である。また、同図に示す完成状態での略円錐部分の板厚Dは全体に亘って略均一であり、例えば、0.1mm~2.0mm、好適には、0.3mm~1.5mm、より好適には0.5mm~1.0mmである。本実施形態では一例として、成形型151の板厚Dを0.5mmとした。
 また、少なくとも、冷菓材23と接触する外表面151Oは、例えば電解研磨で表面処理されている。なお、外表面は例えば、冷菓材23の付着を防止するような加工(例えば,凹凸加工や撥水加工など)を施してもよい。
 なお、金属は、食品に直接触れても問題がない材質であって、冷菓材23との熱交換が効率良く行える程度に熱伝導率が高く、加工がしやすい材料であればステンレスに限らない。例えば、成形型151の金属としては砲金(銅(Cu)と錫(Sn)の合金:Gunmetal)でもよい。砲金の熱伝導率はステンレスの3倍~4倍と高く、冷菓材23との熱交換も良好に行える。一方で、ステンレスよりも硬度が低く加工はしにくいが、高熱伝導率であるため、上記のステンレスの場合よりも板厚Dを厚くでき、加工のしにくさを補うことができる。なお、本実施形態の2つの成形型151A、151Bは同様の構成である。
 成形型ユニット151Uは、容器21に対して相対的に近接・離間する。例えば、凹部成形装置15は、成形型ユニット151Uを昇降させることで、第1成形型151Aと第2成形型151Bを同時に昇降させてそれぞれを冷菓材23内に投入させ、冷菓材23から抜き出す。なお、第1成形型151Aと第2成形型151の昇降は、同時でなくても良い。また、容器21が成形型ユニット151Uに近接・離間するように搬送手段11が昇降移動する構成であってもよい。
 第1成形型151Aと第2成形型151Bとのピッチは、搬送方向Tに沿って並ぶ2つ(前後2列)の容器21のピッチと同等である。詳細には、第1成形型151Aと第2成形型151Bと略円錐状の頂部を通る中心軸間の距離L(同図(a)参照)は、搬送方向Tに沿って前後に並ぶ略円筒形の容器21の中心軸間の距離とほぼ同等である。つまり、搬送方向Tの前後に並ぶ第1成形型151Aと第2成形型151Bによって、搬送方向Tの前後に並ぶ2個の冷菓材23に対して(略)同時に、凹部の成形を行う。
 凹部成形装置15は、成形型151が所定時間に所定数の成形を行うように成形型151を移動させる。つまり一つの成形型151は、容器21に充填されて連続して搬送される少なくとも2個の冷菓材23に対して、当該冷菓材23内への投入と抜き出しが繰り返され、その結果、成形型151の周囲と当接する冷菓材23の少なくとも一部が中空の凹部形状になるように硬化処理を行う。
 そして、一つの成形型151は、搬送方向Tに沿って前後に連続して搬送される2個の冷菓材23のうち、先行する(搬送方向Tの下流の)冷菓材(第一の冷菓材)の硬化処理から、後行(搬送方向Tの上流)の冷菓材(第二の冷菓材)の硬化処理までの間に所定の温度に冷却される。すなわち、凹部成形装置15は、下流側の冷菓材23の硬化処理(詳細には、一部を硬化した冷菓材23からの抜き出し)から上流側の冷菓材23硬化処理(ミックスへの再投入)までの間に、成形型151が所定の温度に冷却される速度で、成形型151を上下に昇降移動させる。
 具体的には、ある1つの冷菓材23に着目した場合、未硬化で搬送される冷菓材23は先ず上流側の第1成形型151Aによって中央付近の一部が凹部となるように硬化されて薄皮状態の硬化部35(図4参照)が形成され、その硬化部35(凹部状の部分)に下流側の第2成形型151Bが挿入されて更に(重ねて)硬化される。つまり、1つの冷菓材23の凹部状の硬化部35は成形型151が複数(この例では2回)挿抜されて形成され、さらに、1つの冷菓材23の凹部は異なる成形型151A、151Bが挿抜されて形成される。
 本実施形態では、複数の成形型151(151A,151B)によって、1つの容器21に収容された冷菓材23に対して複数回の昇降動作を行い、凹部状の硬化部35を形成する。これにより、それぞれの成形型151A,151Bが冷菓材23に当接する時間を短縮し、成形型151A,151Bの温度(冷却温度)の上昇(高温化)を最小限にすることができる。また、1つの成形型151の当接時間を短縮した分、1つの硬化部35について複数回の成形処理を行うことで、硬化の状態を良好に維持する(十分な成形状態で次工程に移送する)ことができる。
 図4を参照して凹部成形装置15によって形成された凹部30について説明する。同図は、或る1つの冷菓材23の時間経過に応じた状態を示しており、同図(a)が第1成形型151Aによって硬化(成形)された後の状態であり、同図(b)がその後に第2成形型151Bによって硬化(成形)された状態であり、同図(c)は液体窒素が注入された状態である。
 同図(a)に示すように、所定の条件(時間、後述する)で成形型151を昇降させて冷却した場合、硬化されるのは成形型151と接触する一部の冷菓材23のみである。そして同図に示すように成形型151の形状に沿った薄皮状態の硬化部35が形成される。硬化部35の形成によって、冷菓材23の中央付近に凹部30が創出されている。
 また、同図(b)に示すように2回目(第2成形型151B)により追加の硬化を行うと、薄皮状態の硬化部35が2層に積層された状態となる。これにより、1層の場合と比較して硬化部35が崩れることを防止できる。
 そして、同図(c)に示すように、硬化部35の内側に液体窒素注入装置19によって液体窒素37を注入する。これにより液体窒素37に接触している底部付近の冷菓材23も硬化する(硬化部35が更に広がる)。冷菓材23の底部付近が硬化するため、開口部付近の冷菓材23の硬化が十分でなくても、それらの荷重に耐えることができ、さらに硬化部35の崩れを防止できる。
 なお、一つの冷菓材23に対して挿抜する成形型の数(回数)を増やせば、薄皮状態の硬化部35の積層数が増えるため、硬化部35の崩れの防止には効果的であるが、下流工程(急速冷凍庫)への移送が遅れる。また、冷菓材23の組成によっても、硬化の程度は異なる。従って、処理効率、冷菓材23の組成等に応じて、上記の処理条件(動作条件)や、成形型151による成形回数は適宜選択する。
<冷媒供給手段>
 再び図2を参照して、冷媒供給手段(液体窒素供給装置)17は不図示の液体窒素貯槽と、液体窒素過冷却システム171,ホッパー173及びこれらを接続する配管175などを備える。図3に示すようにホッパー173は例えば略立方体形状であり、底部に供給口(不図示)が設けられている。この底部に成形型ユニット151Uが取り付けられ、成形型151(151A,151B)の開口部157がホッパー173の供給口を完全に覆うとともにこれと連通する。
 液体窒素貯槽内の液体窒素は、液体窒素過冷却システム171を介して配管175を通じてホッパー173に供給され、ホッパー173の供給口から成形型151の開口部157を介して、成形型151の中空部分159に供給される。ホッパー173は上部に液面センサを備え、液化窒素の液面を任意の位置に維持するよう、電磁弁を切り替えて、成形型151の中空部分159に液体窒素を自動で供給する。これにより、成形型151が冷却される。
 液体窒素過冷却システム171は安定的に過冷却の液体窒素を供給できる装置(例えば、クールテクノス社製サブクーラーなど)であり、既存のものであるため詳細な説明は省略するが、配管175中の液体窒素を過冷却するものである。液体窒素は1気圧下での沸点が-196℃の極低温で、液体窒素貯槽からユースポイントまでの距離が長くなると、配管175中の液体窒素がガス化(窒素ガス:GN2)され、末端(ホッパー173など)での液体窒素の供給が不安定になったり、液体窒素ノズルなどを用いている場合には脈動を起こし、微量のコントロールができないといった現象が起こる。本実施形態では、液体窒素過冷却システム171をホッパー173の近傍に設置し、配管175中の液化窒素を過冷却状態にすることで、安定的にホッパー173に液化窒素を供給している。
<液体窒素注入装置>
 液体窒素注入装置19は、凹部成形装置15の下流に設けられ、凹部成形装置15によって成形された冷菓材23の凹部状の硬化部35に所定量の液体窒素を直接注入する。液体窒素の注入によって硬化部35およびその付近の硬化をより十分に行い(追加の硬化処理を行い)、下流工程に移送するまでの硬化部35の崩れを防止する。
 液体窒素注入装置19は、ホッパー191と注入ノズル193を有しており、配管175によって液体窒素過冷却システム171と接続している。液体窒素貯槽内の液体窒素は、液体窒素過冷却システム171を介して配管175を通じホッパー191にも供給される。ホッパー191には注入ノズル193が取り付けられ、当該注入ノズル193から、冷菓材23の硬化部35に対して液体窒素が自動供給される。液体窒素は、注入ノズル193から連続的に注入されるが、ホッパー191と注入ノズル193の間には不図示のニードルバルブがあり、その開度の強弱で液体窒素の注入量を調整することができる。
 注入された液体窒素は、冷菓材23が冷菓材成形装置10の下流端部に到達するまでの間に気化する。そして注入された液体窒素が気化した後に、容器21に対して蓋体(不図示)が装着される。蓋体は例えば、冷菓材成形装置10の下流付近に設けられた蓋体装着装置(不図示)などにより容器21に装着され、冷菓材23が封止される。蓋体は例えば、成形された凹部状の硬化部35に沿う、すなわち成形型151と同様の凸状部を有する(略円錐形状の)蓋体であってもよいし、凸状部を有しない、例えば、フィルム状や平板状の蓋体であってもよい。
 本実施形態の冷菓材成形装置10は、凹部成形装置15と液体窒素注入装置19によって、冷菓材23の略中央部分に凹部状の硬化部35が形成される。そして冷菓材成形装置10から排出されて蓋体が装着された冷菓材23を、急速冷凍庫(不図示)に移送し、未硬化の冷菓材23部分を冷却硬化させる。
 冷菓材成形装置10は、中央付近に凹部30を有する冷菓50の製造に際し、上述の凹部成形装置15(成形型151)を採用するとともに、凹部成形装置15および液体窒素注入装置19の効果的な制御を行うことによって、生産効率を向上させつつ、成形の仕上がりも良好にしている。以下、この点を含めて冷菓材成形装置10の動作およびこれによる冷菓材成形方法について説明する。
<冷菓材成形装置の動作および冷菓材成形方法>
 図5および図2を参照して冷菓材成形装置10の動作および冷菓材成形方法について説明する。図5は、凹部成形装置15の動作を説明する概略図であり、図5(a)~同図(h)ではそれぞれの左側が上流側、右側が下流側であり、冷菓材23入りの容器21は図5の左から右に搬送される。
 まず、図2を参照して、冷菓材成形装置10の上流端部において空の容器21(カップ形状の本体)が供給される。容器21は、搬送幅方向Wに沿って例えば8個~10個が並ぶように、搬送手段11に供給される。
 その下流では、順次搬送される容器21に対して、ミックス充填機13から冷菓材23が供給される。ミックス充填機13は、下方に移動する容器21を認識して所定量の冷菓材23を容器21に充填する。
 また、液体窒素貯槽内(不図示)の液体窒素は、液体窒素過冷却システム171を介して配管175を通じホッパー173に供給され、ホッパー173の供給口から成形型151の中空部分159に供給される。ホッパー173は上部に液面センサを備え、液化窒素の液面を任意の位置に維持するよう、電磁弁を切り替えて、成形型151の中空部分159に液体窒素を自動で供給する。これにより、成形型151が冷却される。
 そして、凹部成形装置15にて凹部の成形を行う。すなわち、図5に示すように凹部成形装置15は、その下方に移動する容器21を認識して成形型ユニット151Uを下降させる(図5(a))。これによりまず、搬送方向Tの前後に並ぶ或る2つの冷菓材23のうち下流側に位置する冷菓材23(未硬化の冷菓材23)に対して、上流側の第1成形型151Aが投入される(図5(b))。
 図4に示すように、冷菓材23は、液体窒素によって十分に冷却された第1成形型151Aと当接することによって、当該第1成形型151の周囲が冷却硬化され、薄皮状態の硬化部35が形成される。この硬化処理は、第1成形型151Aに着目すると、連続する成形処理のうち先の冷菓材23に対する硬化(第一の硬化)処理となる。また、冷菓材23に着目すると、1回目の硬化処理であり、上流側における硬化(上流側硬化)処理となる。これにより、第1成形型151Aの外表面に沿って略円錐形状の硬化部35が形成される。
 所定の時間(例えば、1秒~2秒、好適には1.5秒前後、より好適には、1.33秒程度)が経過した後に、凹部成形装置15は、第1成形型151A(成形型ユニット151U)を上昇させ、冷菓材23から抜き出す(図5(c))。なお、本実施形態では、搬送手段11は、容器21(冷菓材23)を間欠的に下流に搬送する。つまり、成形型151にて成形している間は、容器21(冷菓材23)は下流側に移動しない。したがって、成形型151(成形型ユニット151U)は、昇降動作のみを行うように構成されている。
 なお、上記の成形型151による冷却時間は、一例であり、当該冷却時間は長いほどよいが、生産能力を勘案して適宜選択される。
 成形型ユニット151Uが上昇すると、搬送手段11は搬送方向Tに容器21(冷菓材23)を一列移動させる。そして成形型ユニット151Uを再び下降させる(図5(d))。このとき、下降した下流側の第2成形型151Bは、先に第1成形型151Aによって硬化(上流側硬化)されて形成された硬化部35の凹部状部分に挿入される(図5(e))。そして硬化部35に第2成形型151Bが当接または近接し、更に硬化が進む。この硬化処理は、第2成形型151Bに着目すると、連続する成形処理のうち先のミックスに対する硬化(第一の硬化)処理となる。また、冷菓材23に着目すると、硬化部35形成後の2回目の硬化処理であり下流側における硬化(下流側硬化)処理となる。
 このとき同時に、上流側では第1成形型151Aは新たな未加工の冷菓材23内に投入され、第1成形型151Aの周囲が冷却硬化される。この硬化処理は、第1成形型151Aに着目すると、連続する成形処理のうち後の冷菓材23に対する硬化(第二の硬化)処理となる。また、冷菓材23に着目すると、1回目の硬化処理であり、上流側における硬化(上流側硬化)処理となる。
 所定の時間(例えば、1秒~2秒、好適には1.5秒前後、より好適には、1.33秒程度)が経過した後に成形型ユニット151Uが上昇すると(図5(f))、搬送手段11は搬送方向Tに容器21(冷菓材23)を一列移動させる。そして成形型ユニット151Uを再び下降させる(図5(g))。このとき、下降した下流側の第2成形型151Bは、先に第1成形型151Aによって硬化(上流側硬化)がされて形成された冷菓材23(下流側の冷菓材23)の硬化部35に挿入される(図5(h))。そして硬化部35に第2成形型151Bが当接または近接し、更に硬化が進む。この硬化処理は、第2成形型151Bに着目すると、連続する成形処理のうち後の冷菓材23に対する硬化(第二の硬化)処理となる。また、冷菓材23に着目すると、2回目の硬化処理であり下流側における硬化(下流側硬化)処理となる。
 これを順次繰り返し、第1成形型151Aおよび第2成形型151Bはそれぞれ連続的に冷菓材23に凹部状の硬化部35を形成する。つまり第1成形型151Aは未硬化の先行する冷菓材23に対する硬化処理(第一の硬化処理)と、未硬化の後続の冷菓材23に対する硬化処理(第二の硬化処理)を繰り返す。また第2成形型151Bは同様に、硬化部35が形成された先行する冷菓材23に対する硬化処理(第一の硬化処理)と、硬化部35が形成された後続の冷菓材23に対する硬化処理(第二の硬化処理)を繰り返す。
 また、ある1つの冷菓材23に着目すると未硬化の状態で第1成形型151Aが投入されて凹部状の硬化部35の形成(上流側硬化処理)が行われ、連続して、形成された硬化部35に第2成形型151Bが挿入されて、追加の硬化(下流側硬化処理)が行われる。
 このとき、本実施形態の冷菓材成形装置10は、所定時間に所定数の硬化(例えば、同時に搬送幅方向Wに8個(8列)生産できる冷菓材成形装置10において成形型ユニット151Uを1分間に20回を昇降動作させた場合、1分間に160個の硬化)を連続して行いつつも、それぞれの成形型151(第2成形型151B、第1成形型151A)において、第一の硬化(先の冷菓材23の硬化)処理から第二の硬化(後の冷菓材23の硬化)処理までの間に、所定の温度に冷却されるように昇降動作(の時間)が制御される。
 この所定の温度は、成形型151の周囲に接触(または近接)する冷菓材23の少なくとも一部を硬化させるために十分な温度であり、より具体的には、液体酸素の沸点(-183°C)以下の低温である。
 成形型151はそれぞれ、冷菓材23に投入することによって冷菓材23との熱交換が起こり、成形型151の表面温度は、液体窒素の沸点(-196℃)よりも上昇する。そして先の冷菓材23について第一の硬化処理が終了して、冷菓材23から抜き出されると、成形型151は液体窒素によって再び冷却され、いずれは液体窒素の沸点まで低下する。凹部成形装置15は、或る1つの成形型151(第1成形型151A、第2成形型151Bのいずれも同様)について、先の冷菓材23から抜き出した場合、成形型151の表面温度が少なくとも液体酸素の沸点(-183°C)まで低下した後に、後の冷菓材23に投入する。換言すると、先の冷菓材23から成形型151を抜き出した後、最も高温であっても液体酸素の沸点までは冷却する(それより更に低温でもよい)ように、上昇させた状態(冷菓材23とは非接触の状態)を維持(上方で待機し)、十分冷却したあとに、後の冷菓材23に投入して第二の硬化処理を行う。
 中空部分159に液体窒素が供給された成形型151を空気中に曝すと、空気中の酸素ガスが成形型151の外表面151Oに接触し液体酸素となる。そして、成形型151の外表面151Oに液体酸素が付着した状態で冷菓材23に投入すると、外表面151Oが乾いた状態で成形型151を投入する場合と比較して、成形型151に付着する冷菓材23の量を大幅に低減することができる。また、冷菓材23との接触によって成形型151に冷菓材23が付着した場合であっても、冷菓材23から抜き出して空気中に曝し、液体酸素を成形型151の表面に付着させることによって付着している冷菓材23を成形型151から剥離することも可能になる。
 本実施形態では、ある1つの成形型151について、先の冷菓材23から抜き出した後に後の冷菓材23に投入するまでの期間に、当該成形型151の外表面151Oに液体酸素が付着するように、成形型151の昇降の動作タイミングを制御する。
 例えば、ある組成の冷菓材23に硬化部35を形成する場合、冷菓材23から抜き出して空気中に曝された成形型151の外表面151Oに液体酸素が付着するまでの最短時間は、所定の生産能力(例えば1分間に160個の冷菓材23について硬化部35を形成可能)を前提とすると、例えば1秒~2秒であり、好適には、1.5秒~1.8秒であり、より好適には、1.6秒~1.7秒である。
 なお、冷菓材23が硬化する(硬化部35が形成される)速度は、冷菓材23の組成や温度により異なる。つまり、冷菓材23に接触した成形型151の温度上昇も冷菓材23の組成や状態により異なり、ひいては、冷菓材23と非接触の状態で成形型151が冷却される時間も、冷菓材23の組成や状態により異なる。
 つまり、上記の、成形型151の表面に液体酸素が付着するまでの最短時間は一例であり、本実施形態の凹部成形装置15は、連続して冷菓材23に投入される成形型151のそれぞれについて、少なくとも成形型151の表面に液体酸素が付着するまでの期間は、成形型151を冷菓材23と非接触の状態で維持するものとし、非接触の状態で維持する期間は冷菓材23の組成や状態などに応じて適宜選択される。
 なお、成形型151(成形型ユニット151U)の昇降動作のタイミングは任意に設定可能であり、1個の成形型151の1回の昇降動作(以下「1ショット」という)を例えばエアシリンダなどによって調整し、容器21の移動速度と同期させる。
 硬化部35が成形された後、容器21は更に下流に搬送され、液体窒素注入装置19によって、成形された硬化部35に液体窒素が注入される(図2参照)。注入量は例えば、硬化部35の深さD1の1/5~1/2程度であり、好適には1/4程度(容量は、例えば、約9ml)である。
 この処理は、凹部成形装置15によって成形された硬化部35およびその近傍をより確実に硬化させるものである。凹部成形装置15による成形後は、図4に示すように、冷菓材23が薄皮状態で硬化した硬化部35が形成されている。このような場合に追加の硬化処理(液体窒素注入による硬化処理)を行わないと、未硬化の部分、特に、底部付近の冷菓材23が開部付近の冷菓材23の重量に耐えられず、硬化部35が崩れる原因となる。
 一方で、このように薄皮状態であっても硬化部35が形成されていれば(全体が硬化されなくても)、蓋体で封止して下流工程である急速冷凍庫に移送できる。つまり、短時間で硬化部35のみを形成できれば十分である。
 また、製造工程中に使用する液体窒素の量が少ないほどコストの低減に寄与する。本実施形態では、後の急速冷凍工程に移送するまでに、硬化部35が崩れない程度に十分に硬化ができる条件として、液体窒素の注入量を例えば,凹部30の全体の深さD1のうち底部から例えば1/4程度が満たされる深さ(容量で例えば、約9ml)とした。これにより、特に底部付近の冷菓材23の硬化を進めることができるので、開口部付近の冷菓材23の荷重によって崩れることを防止でき、良好に硬化部35が形成された状態で、下流の急速冷凍庫に移送することができる。
 また、例えば、上流側の第1成形型151A(図2に示す破線t1)から4列下流側(12秒後)のタイミング(破線t2)で液体窒素を注入するように構成している。この場合、液体窒素の注入量を硬化部35の深さD1の1/4程度までの深さに注入すると、製造工程内の環境下では、注入後6列下流側(18秒後)のタイミング(破線t3)までには液体窒素は気化する。つまり、注入後7列下流側以降であれば、容器21に蓋体を装着することができる。
 注入量が多いと気化するタイミングも遅れ、蓋体の装着が遅れると下流工程への移送も遅れる。本実施形態の注入量であれば、硬化部35の周囲を下流工程への移送が十分な程度に硬化できる最小限の注入量としているので、蓋体の装着および下流の急速冷凍庫への移送も最短で行うことができ、コストの増加防止と、作業時間の短縮が実現する。
 冷菓材成形装置10から排出された容器21(蓋体で硬化部35が形成された冷菓材23が封止されている)は、排出後、トレーに移載され、不図示の急速冷凍庫(例えば-40℃)で例えば20分間硬化させる。これにより、中央付近に凹部30を有する冷菓50(図1参照)が得られる。
 ある1つの成形型151について、先の冷菓材23から抜き出した後に空気中に曝した場合、約1.5秒~1.8秒で成形型151の表面に液体酸素が付着した。これを踏まえて、以下の条件で硬化部35を形成し、良好な硬化が可能であるとともに所定の生産能力が得られることを実証した。
 冷菓材23は、一例として、アイスクリームミックに破砕された氷を混合したものであり、アイスクリームミックスの原料としては、例えば、糖類、乳製品、コーヒー、香料である。また、粉砕した氷を混ぜる前のミックスの固形は例えば、40%である。
 搬送手段11は1秒間で容器21を搬送方向Tに1列分移動させ、2秒間停止する間欠動作を行う。1個の成形型151の1回の昇降動作(1ショット)は3秒で行う。これにより、例えば、1分間に80個~240個程度の冷菓材23について硬化部35が形成できる。
 この場合、或る1つの成形型151に着目すると、凹部成形装置15は、成形型151を冷菓材23に投入後、約1.33秒間維持して先の冷菓材23(第一の冷菓材)に硬化部35を形成する。そして、成形型151を冷菓材23から抜き出した後に後の冷菓材23(第2の冷菓材)に投入するまでの期間は、約1.67秒となる。
 つまり1つの冷菓材23に着目すると、第1成形型151Aが投入されてこれにより1.33秒間硬化され(第1成形型151Aが抜き出され)、1.67秒後に第2成形型151Bが投入されて更に1.33秒間硬化される。
 その後、形成された凹部状の硬化部35に、液体窒素注入装置19によって、約9mlの液体窒素を注入した。
 この結果、成形型151に冷菓材23が付着することもなく、形成された硬化部35は、下流の工程(急速冷凍庫)に移送するまでに崩れない程度に十分硬化されるとともに、硬化部35の表面に不要な冷菓材23の付着も見られず、良好な状態であった。
 以上、本実施形態の一例について説明したが、本発明の凹部成形装置15は、少なくとも1つの成形型151によって連続して搬送される先の冷菓材23と別の後の冷菓材23を冷却効果する場合、先の冷菓材23から抜き出した成形型151が液体酸素の沸点よりも低い温度に下がるまで空中で維持(待機)し、その後に後の冷菓材23を冷却する構成であれば上記の例に限らない。
 また、成形型151の温度上昇を防ぐためには上述のとおり、1つの冷菓材23の硬化部35に対して成形型151が複数(この例では2回)且つ、異なる成形型151A、151Bの挿抜で形成される構成が好適であるが、上記の例に限らない。すなわち、1つの冷菓材23の硬化部35に対して1つの成形型151を複数(この例では2回)挿抜して成形するようにしてもよい。
 例えば、1個の冷菓50について凹部30を成形するための総時間をT時間とした場合、成形型151による1回の硬化部35の成形時間は1/2T時間とし、2回挿抜させる。このようにすることで、1回の成形型151の挿抜で硬化部35の成形時間をT時間とした場合と比較して、成形型151の表面温度の上昇を低く抑えることができ、空中での待機時間を短くできるので、効率の良い成形ができる。
 また、好適には、1つの冷菓材23に対して複数回、成形型151を挿抜するとよいが、1回でもよい。
 成形型ユニット151Uは、上記の例では搬送幅方向W(例えば、行方向)および搬送方向T(例えば、列方向)それぞれに複数行、複数列の成形型151が並ぶ場合を示したが、例えば、成形型151が1行×複数列に並ぶものであってもよいし、複数行×1列に並ぶものであってもよい。
 搬送方向Tに沿う複数個(M個)の成形型151を設ける場合は、それぞれをN個(N=M-1>0)おきに冷菓材23内に挿抜することになり、その挿抜の待機期間中に液体酸素の沸点よりも低い温度に下がるように制御する。
 また、冷菓材23の状態(硬化のし易さ、ミックス状態での粘性、冷菓材23にした場合の硬度など)に応じて、成形型ユニット151Uに単一の成形型(1行×1列)が設けられて冷菓材23を順次成形するものとし、先の冷菓材23から後の冷菓材23までの間において空中で待機する時間を、液体酸素の沸点よりも低い温度に下がるまでとしてもよい。
 また、成形手段15は、複数の成形型151を個別に昇降移動可能に構成されていてもよい。この場合例えば、先行する成形型151Aが下降している際に後行の成形型151Bが上昇し、先行する成形型151Aが上昇している際に後行の成形型151Bが下降するように制御してもよい。
 また、上記の実施形態では、搬送手段が間欠的に搬送する例を示したが、連続して搬送するようにしてもよい。この場合、凹部成形装置15と液体窒素注入装置19を搬送手段11と同期して搬送方向Tに沿って移動可能にする。しかし、この場合は装置や制御が複雑になるので、上記のように間欠動作させるとコストも抑えられて望ましい。
 また、冷菓材23の組成(原料の割合)、オーバーラン等の値も上記の例に限らず、冷菓(氷菓)50の状態に応じて適宜選択される。また、冷菓材23はかき氷アイスのミックスに限らず、アイスクリーム類、シャーベットやその他冷凍(凍結)状態で提供されるデザート類等のミックスであってもよい。
 また、上述の冷菓材成形装置10の動作条件も一例であり、冷菓材23の組成や状態、製造する冷菓50の状態に応じて、硬化部35が成形されるよう、適宜選択される。
 以上、本発明は上記実施形態に限らず、本発明の趣旨を逸脱しない範囲で適宜変更が可能である。
10  冷菓材成形装置
11  搬送手段
13  充填手段(ミックス充填機)
15  成形手段(凹部成形装置)
17  冷媒供給手段
19  冷媒注入手段(液体窒素注入装置)
21  容器
23  冷菓材
30  凹部
35  硬化部
37  液体窒素
50  冷菓
151、151A,151B    成形型
171  液体窒素過冷却システム
173  ホッパー
175  配管
191  ホッパー
193  注入ノズル

Claims (16)

  1.  冷菓材の一部を中空の凹部形状に連続的に硬化させる冷菓材成形装置であって、
     複数の容器を搬送する搬送手段と、
     前記容器内に前記冷菓材を充填する充填手段と、
     冷却した凸状の成形型を搬送される前記冷菓材内に順次投入および抜き出して該成形型の周囲の前記冷菓材の少なくとも一部を硬化させる成形手段と、
     冷媒を前記成形型に供給する冷媒供給手段と、
    を有し、
     前記成形型は、所定時間に所定数の硬化を行いつつ、連続して搬送される第一の冷菓材の硬化から第二の冷菓材の硬化までの間に所定の温度に冷却されるように構成される、
    ことを特徴とする冷菓材成形装置。
  2.  前記所定の温度は、該成形型の周囲の前記冷菓材の少なくとも一部を硬化させるために十分な温度である、
    ことを特徴とする請求項1に記載の冷菓材成形装置。
  3.  前記成形手段は、前記第一の冷菓材から抜き出した前記成形型の表面温度が少なくとも液体酸素の沸点まで低下した後に前記第二の冷菓材に投入する、
    ことを特徴とする請求項1または請求項2に記載の冷菓材成形装置。
  4.  前記成形型は、板厚が1mmより小さい金属により構成される、
    ことを特徴とする請求項1から請求項3のいずれか一項に記載の冷菓材成形装置。
  5.  前記成形手段は、前記冷菓材のそれぞれに、前記成形型を複数回挿入する、
    ことを特徴とする請求項1から請求項4のいずれか一項に記載の冷菓材成形装置。
  6. 前記成形手段は、複数の成形型を有し、
    前記複数の成形型を昇降移動させて前記冷菓材内に投入させる、
    ことを特徴とする請求項1から請求項4のいずれか一項に記載の冷菓材成形装置。
  7.  前記成形型によって硬化された凹部に冷媒を注入する注入手段を備える、
    ことを特徴とする請求項1から請求項6のいずれか一項に記載の冷菓材成形装置。
  8.  前記成形手段は、毎分80個~240個程度の硬化を行う、
    ことを特徴とする請求項1から請求項7のいずれか一項に記載の冷菓材成形装置。
  9.  冷菓材の冷菓材の一部を中空の凹部形状に連続的に硬化させる冷菓材成形方法であって、
     複数の容器を搬送する工程と、
     前記容器内に前記冷菓材を充填する工程と、
     冷却した凸状の成形型を搬送される前記冷菓材内に順次投入および抜き出して該成形型の周囲の前記冷菓材の少なくとも一部を硬化させる工程と、
     冷媒を前記成形型に供給する工程と、
    を有し、
     前記成形型は、所定時間に所定数の硬化を行いつつ、連続して搬送される第一の冷菓材の硬化から第二の冷菓材の硬化までの間に所定の温度に冷却される、
    ことを特徴とする冷菓材成形方法。
  10.  前記所定の温度は、該成形型の周囲の前記冷菓材の少なくとも一部を硬化させるために十分な温度である、
    ことを特徴とする請求項9に記載の冷菓材成形方法。
  11.  前記成形型を前記第一の冷菓材から抜き出し、該成形型の表面温度が少なくとも液体酸素の沸点まで低下した後に前記第二の冷菓材に投入する、
    ことを特徴とする請求項9または請求項10に記載の冷菓材成形方法。
  12.  前記成形型は、板厚が1mmより小さい金属により構成される、
    ことを特徴とする請求項9から請求項11のいずれか一項に記載の冷菓材成形方法。
  13.  複数の前記成形型を同期して昇降移動させて前記冷菓材内に投入する、
    ことを特徴とする請求項9から請求項12のいずれか一項に記載の冷菓材成形方法。
  14.  前記冷菓材のそれぞれに、前記成形型を複数回挿入する、
    ことを特徴とする請求項9から請求項13のいずれか一項に記載の冷菓材成形方法。
  15.  前記成形型によって硬化された凹部に冷媒を注入する、
    ことを特徴とする請求項9から請求項14のいずれか一項に記載の冷菓材成形方法。
  16.  前記成形型によって、毎分80個~240個程度の硬化を行う、
    ことを特徴とする請求項9から請求項15のいずれか一項に記載の冷菓材成形方法。
PCT/JP2018/044627 2017-12-06 2018-12-04 冷菓材成形装置および冷菓材成形方法 WO2019111916A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SG11202004919QA SG11202004919QA (en) 2017-12-06 2018-12-04 Frozen dessert ingredients molding apparatus and frozen dessert ingredients molding method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017233897A JP6592068B2 (ja) 2017-12-06 2017-12-06 冷菓材成形装置および冷菓材成形方法
JP2017-233897 2017-12-06

Publications (1)

Publication Number Publication Date
WO2019111916A1 true WO2019111916A1 (ja) 2019-06-13

Family

ID=66751113

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/044627 WO2019111916A1 (ja) 2017-12-06 2018-12-04 冷菓材成形装置および冷菓材成形方法

Country Status (4)

Country Link
JP (1) JP6592068B2 (ja)
SG (1) SG11202004919QA (ja)
TW (1) TWI820062B (ja)
WO (1) WO2019111916A1 (ja)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020010651A (ja) * 2018-07-19 2020-01-23 フタバ食品株式会社 冷菓製造装置、及び冷菓の製造方法
JP6799349B1 (ja) * 2020-07-03 2020-12-16 株式会社イシダ 食品用搬送装置、組合せ計量装置及び食品用搬送装置の製造方法
JP7558067B2 (ja) * 2021-01-05 2024-09-30 株式会社ロッテ 容器入り冷菓の製造方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58141751A (ja) * 1982-02-18 1983-08-23 Meiji Milk Prod Co Ltd 氷菓の多段階圧縮成形法
JPH11225679A (ja) * 1998-02-19 1999-08-24 Kanebo Ltd 組み合わせ冷菓の製造方法
JP2002360177A (ja) * 2001-06-07 2002-12-17 Kanebo Ltd 冷菓及びその製法
JP2010046015A (ja) * 2008-08-21 2010-03-04 Ezaki Glico Co Ltd 多層構造冷菓及びその製造方法
JP2017013904A (ja) * 2016-10-14 2017-01-19 赤城乳業株式会社 冷菓材用容器、冷菓材、冷菓材の飲食方法、飲食方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58141751A (ja) * 1982-02-18 1983-08-23 Meiji Milk Prod Co Ltd 氷菓の多段階圧縮成形法
JPH11225679A (ja) * 1998-02-19 1999-08-24 Kanebo Ltd 組み合わせ冷菓の製造方法
JP2002360177A (ja) * 2001-06-07 2002-12-17 Kanebo Ltd 冷菓及びその製法
JP2010046015A (ja) * 2008-08-21 2010-03-04 Ezaki Glico Co Ltd 多層構造冷菓及びその製造方法
JP2017013904A (ja) * 2016-10-14 2017-01-19 赤城乳業株式会社 冷菓材用容器、冷菓材、冷菓材の飲食方法、飲食方法

Also Published As

Publication number Publication date
JP6592068B2 (ja) 2019-10-16
JP2019097516A (ja) 2019-06-24
TW202332381A (zh) 2023-08-16
SG11202004919QA (en) 2020-06-29
TWI820062B (zh) 2023-11-01
TW201936060A (zh) 2019-09-16

Similar Documents

Publication Publication Date Title
WO2019111916A1 (ja) 冷菓材成形装置および冷菓材成形方法
AU746611B2 (en) Iced confectionery product, method, apparatus and mould for making same
EP0827696B2 (en) Method and apparatus for moulding a food product
US6216472B1 (en) Process and apparatus for molding ice confectionery with separable mold parts
US20050160741A1 (en) Apparatus and method for producing ice container using ice powders
CN101019595B (zh) 一种含有大颗粒物外壳的雪糕的生产工艺
US3274958A (en) Comestible
US4557117A (en) Machine for producing and dispensing ice-lollies and the like
JP7227337B2 (ja) 冷菓材成形装置および冷菓材成形方法
JP6994487B2 (ja) 冷菓材成形装置および冷菓材成形方法
US20080118618A1 (en) Process and an apparatus for moulding frozen edible products
JP2020010651A (ja) 冷菓製造装置、及び冷菓の製造方法
KR101938286B1 (ko) 비노출형 코어를 가진 아이스 바의 제조 장치 및 방법
EP3756469B1 (en) Insulation plate to minimize energy consumption for ice cream moulding
FI68756C (fi) Metod och utrustning foer aoterformning av djupfryst konfekt
EP2434902B1 (en) Process and apparatus for producing frozen confections
MXPA99004373A (en) Procedure and molding apparatus of congela repostery articles
WO2011064590A1 (en) Apparatus and method for the manufacture of confectionery
JPS6036730B2 (ja) 凍結菓子の再成形方法及び機械
KR20060008794A (ko) 냉장고의 빙설/얼음 제조방법 및 그 장치
US20130228945A1 (en) Method and assembly for manufacturing ingestible products
WO2008156706A1 (en) Method and assembly for manufacturing ingestible products

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18886689

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18886689

Country of ref document: EP

Kind code of ref document: A1