WO2019082431A1 - 系統連系蓄電システム及び電流センサの取り付け異常検出方法 - Google Patents
系統連系蓄電システム及び電流センサの取り付け異常検出方法Info
- Publication number
- WO2019082431A1 WO2019082431A1 PCT/JP2018/020549 JP2018020549W WO2019082431A1 WO 2019082431 A1 WO2019082431 A1 WO 2019082431A1 JP 2018020549 W JP2018020549 W JP 2018020549W WO 2019082431 A1 WO2019082431 A1 WO 2019082431A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- power
- current sensor
- current
- storage device
- change
- Prior art date
Links
- 230000005856 abnormality Effects 0.000 title claims abstract description 29
- 238000001514 detection method Methods 0.000 title claims abstract description 23
- 238000006243 chemical reaction Methods 0.000 claims abstract description 22
- 238000010248 power generation Methods 0.000 claims description 29
- 238000000034 method Methods 0.000 claims description 17
- 230000002159 abnormal effect Effects 0.000 claims description 12
- 238000009434 installation Methods 0.000 claims description 11
- 230000002457 bidirectional effect Effects 0.000 claims description 5
- 230000005611 electricity Effects 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 21
- 238000011144 upstream manufacturing Methods 0.000 description 6
- 238000012790 confirmation Methods 0.000 description 3
- 238000005259 measurement Methods 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- HBBGRARXTFLTSG-UHFFFAOYSA-N Lithium ion Chemical compound [Li+] HBBGRARXTFLTSG-UHFFFAOYSA-N 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000012447 hatching Effects 0.000 description 1
- 229910001416 lithium ion Inorganic materials 0.000 description 1
- 230000007935 neutral effect Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000037303 wrinkles Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/34—Parallel operation in networks using both storage and other DC sources, e.g. providing buffering
- H02J7/35—Parallel operation in networks using both storage and other DC sources, e.g. providing buffering with light sensitive cells
Definitions
- the present invention relates to a grid-connected storage system and a method for detecting an installation error of a current sensor.
- a grid-connected power storage system in which a solar power generation device and a power storage device incorporating a storage battery are combined has attracted attention.
- the power storage device is also connected to the AC power path via the power conversion unit to AC power, and power can be supplied from the power storage device to the load in the customer.
- the power generated by solar power generation can be reversed (selling) beyond the power receiving point of the customer, but the reverse flow of the power generated by discharging the storage battery is prohibited.
- a current sensor is provided for monitoring so as not to reverse the power based on the discharge of the storage battery (see, for example, Patent Document 1).
- a current sensor is provided for monitoring so as not to reverse the power based on the discharge of the storage battery (see, for example, Patent Document 1).
- the current sensor is, for example, a clamp-type CT (Current Transformer).
- a CT is mounted in or near a distribution board of a customer.
- a grid-connected storage system is a grid connection including a current sensor for detecting a current flowing through a grid-connected AC electric path of a customer, and a power storage device connected to the AC grid.
- the storage device is located between a storage battery, the storage battery, and the alternating current path, and controls a power conversion unit that performs bidirectional DC / AC power conversion, and controls the power conversion unit.
- a control unit that detects power based on the current detected by the current sensor and the voltage of the alternating current path, the control unit changing the charging power of the storage battery to change the power before and after the change.
- Grid-connected storage with a function of determining the amount of change in power based on the detection of a current sensor, and comparing the amount of change with the amount of change in the charging power to determine the presence or absence of a mounting abnormality in the current sensor. It is a stem.
- a method for detecting a mounting error of a current sensor performed by a power storage device comprising: detecting power based on the current detected by the current sensor and the voltage of the alternating current path; changing the charging power of the storage battery; A current sensor for determining the amount of change in power based on the detection of the current sensor before and after the current sensor, and comparing the amount of change with the amount of change in the charging power to determine presence or absence of a mounting abnormality for the current sensor; It is a mounting error detection method.
- FIG. 1 is a configuration diagram showing an example of a grid-connected storage system using a single-function storage device.
- FIG. 2 is a configuration diagram showing another example of a grid-connected storage system using a single-function storage device.
- FIG. 3 is a diagram showing an example of a grid-connected power storage system using a hybrid type (multiple function) power storage device.
- FIG. 4 is a circuit diagram showing an example of an internal circuit of the power storage device in FIG. 1, for example.
- FIG. 5 is a diagram showing an example of circuit connection in a customer when only a power storage device is provided without a solar power generation device.
- FIG. 1 is a configuration diagram showing an example of a grid-connected storage system using a single-function storage device.
- FIG. 2 is a configuration diagram showing another example of a grid-connected storage system using a single-function storage device.
- FIG. 3 is a diagram showing an example of a grid-connected power storage system using a hybrid type (multiple function) power storage device.
- FIG. 6 is a diagram showing an example of circuit connection in a consumer when a so-called single power generation is performed including a power conditioner for solar power generation and a power storage device.
- FIG. 7 is a diagram showing an example of circuit connection in a consumer when the solar conditioner includes a power conditioner for solar power generation and a power storage device, and performs so-called double power generation.
- FIG. 8 is a diagram showing an example of circuit connection in a consumer when the hybrid type, that is, the function of a power conditioner for solar power generation is mounted on a power storage device.
- FIG. 9 is a diagram showing the current sensor in addition to the correct mounting state as well as a full view of possible erroneous mounting states.
- FIG. 10 is an example of a graph showing a change in power due to the start of charging.
- FIG. 11 is an example of a flowchart showing a procedure for performing a sensor check (detection error in attachment of current sensor).
- FIG. 12 is an image of an oscilloscope showing the result of operation confirmation in a real machine, and No. 1 in FIG. It is a waveform in the case of 1 (normal).
- FIG. 13 is an image of an oscilloscope showing the result of operation confirmation in an actual device, and No. 1 in FIG. It is a waveform in the case of 2 (one current sensor is reverse direction).
- FIG. 14 is an image of an oscilloscope showing the result of operation confirmation in a real machine, and No. 1 in FIG. It is a waveform in the case of 3 (the other current sensor is reverse direction).
- FIG. 12 is an image of an oscilloscope showing the result of operation confirmation in a real machine, and No. 1 in FIG. It is a waveform in the case of 1 (normal).
- FIG. 13 is an image of an oscilloscope showing the result of operation confirmation in an
- FIG. 15 is an image of an oscilloscope showing the result of the operation check in the actual device. It is a waveform in the case of 4 (both current sensors are reverse directions).
- FIG. 16 is an example of a single-line connection diagram in the case where there are a plurality of power storage devices.
- FIG. 17 is another example of a single-line connection diagram in the case where there are a plurality of power storage devices.
- the present disclosure aims to provide a grid-connected storage system and a method of detecting an attachment error of a current sensor, which can automatically check whether the current sensor is correctly attached.
- a grid-connected power storage system comprising: a current sensor for detecting a current flowing through a grid-connected AC electric path of a customer; and a power storage device connected to the AC electric path,
- the power storage device is located between a storage battery, the storage battery, and the alternating current path, and controls a power conversion unit performing bidirectional DC / AC power conversion, and controls the power conversion unit and is detected by the current sensor.
- a control unit that detects power based on a current and a voltage of the alternating current path, wherein the control unit changes the charging power of the storage battery to change the power based on the detection of the current sensor before and after the change.
- the grid-connected storage system has a function of determining a change amount and comparing the change amount with a change of the charging power to determine the presence or absence of a mounting abnormality of the current sensor.
- the charge power of the storage battery is changed to obtain the amount of change in power, and the amount of change is compared with the amount of change in charge power. If the current sensor is properly attached, the amount of change should be a value appropriately reflecting the change in charge power. Therefore, when the amount of change indicates a value that appropriately reflects the amount of change in charging power, it can be determined that the attachment is normal, otherwise the attachment is abnormal. In this way, it is possible to provide a grid-connected storage system capable of automatically checking whether or not the current sensor is correctly attached.
- the control unit mounts the current sensor when the amount of change is within a predetermined range centered on the value of the change in the charging power. Is normal, and the function of determining that the attachment of the current sensor is abnormal may be performed when it is repeated a plurality of times that it is not within the range.
- the power consumption of consumers other than charging power also varies somewhat, so the amount of change is not always equal to the change in charging power.
- the range As described above, by setting the range to a certain extent, it is possible to suppress incorrect determination of the attachment normal as the attachment abnormality. In addition, even if it is not in the range, it is not determined only once, but it is determined that the installation is abnormal when repeated several times, thereby suppressing the incorrect determination of the installation normal as the installation abnormality. can do. Thus, the stability of the determination accuracy can be secured.
- the function can also be periodically executed. In this case, not only immediately after the initial installation work of the current sensor and the power storage device but also after that, it can be continuously monitored whether or not an abnormality has occurred in the attachment state of the current sensor.
- the AC power path can be supplied with power generated by solar power generation, and the power storage device is capable of solar power generation.
- the function may be performed when it is not performed. In this case, the amount of change can be measured accurately without being affected by the power generated by solar power generation.
- a method for detecting a mounting error of a current sensor performed by a device comprising: detecting power based on the current detected by the current sensor and the voltage of the AC path; changing the charging power of the storage battery; Attaching a current sensor, determining the amount of change in power based on the detection of the current sensor before and after, comparing the amount of change with the amount of change in the charging power, and determining the presence or absence of a mounting abnormality for the current sensor It is an abnormality detection method.
- the charge power of the storage battery is changed to obtain the change amount of the power, and the change amount is compared with the change amount of the charge power. If the current sensor is properly attached, the amount of change should be a value that appropriately reflects the change in charge power. Therefore, when the amount of change indicates a value that appropriately reflects the amount of change in charging power, it can be determined that the attachment is normal, otherwise the attachment is abnormal. In this way, it is possible to provide a method for detecting a mounting error of a current sensor that can automatically check whether the current sensor is correctly installed.
- FIG. 1 is a configuration diagram showing an example of a grid-connected storage system using a single-function storage device.
- a power storage device 1 is installed at a customer 100.
- the photovoltaic power generation panel 2 is installed in the customer 100.
- a power conditioner 3 is connected to the photovoltaic panel 2.
- the power conditioner 3 performs maximum power point tracking (MPPT) control, and converts DC power output from the photovoltaic panel 2 into AC power.
- the outputs of the power conditioner 3 include, for example, a single-phase three-wire (AC 200/100 V) grid-connected output terminal T1 and a single-phase two-wire (AC 100 V) free-standing output terminal T2.
- T ⁇ b> 1 is connected to the general load distribution board 4, and the stand-alone output terminal T ⁇ b> 2 is connected to the storage device 1.
- a general load (not shown) in the customer 100 is connected to the general load distribution board 4 via an indoor wiring, and the general load may be fed from the commercial power grid 200 or the power conditioner 3 it can.
- the power of the output of the power conditioner 3 which is not consumed in the customer 100 can be reversed (sold) to the commercial power grid 200 via the general load distribution board 4.
- a current sensor (usually CT) 7 for detecting reverse current, a watt-hour meter 201 for selling electricity, and purchasing A power meter 202 is provided in the grid-connected AC circuit 6 from the general load distribution board 4 to the commercial power grid 200.
- General load distribution board 4 is connected to power storage device 1 and can charge power storage device 1 from commercial power system 200 or power conditioner 3, and also discharges power storage device 1 to obtain general load distribution board 4. It is also possible to supply a general load connected to That is, this power storage device 1 is a grid-connected power storage device 1 that can be connected also to the AC power path 6.
- the general load distribution board 4 is connected to the important load distribution board 5.
- AC 100 V is supplied directly to the important load distribution board 5 from the general load distribution board 4.
- AC 100 V is supplied from the storage device 1 to the important load distribution board 5.
- the important load distribution board 5 is connected with an important load that is to be used even during a power failure.
- power is supplied from the stand-alone output terminal T2 of the power conditioner 3 at AC 100 V to the power storage device 1 at the time of the power failure.
- Power storage device 1 is connected to remote control device 8, and remote control device 8 can operate power storage device 1. Further, remote control device 8 is also a monitor for displaying the state of power storage device 1, and can perform display such as charge / discharge state or failure. The remote control device 8 can also communicate with the router (gateway) 9 and the portable information terminal 10 installed in the customer 100. The router 9 is connected to the Internet 300.
- FIG. 2 is a configuration diagram showing another example of a grid-connected storage system using a single-function storage device.
- the difference from FIG. 1 is that two power storage devices are provided, one being a master power storage device 1m and the other being a slave power storage device 1s.
- the other configuration is the same as that of FIG. In the case of FIG. 2, the detection output of the current sensor 7 is given only to the power storage device 1m of the master, and the power storage device 1s of the slave is under the control of the power storage device 1m of the master.
- FIG. 1 is an example of the consumer 100 which has solar power generation and the electrical storage apparatus 1, for example, the photovoltaic panel 2 and the power conditioner 3 are not installed in FIG. Some consumers have only one. In this case, for example, inexpensive electric power at night can be stored in the storage device 1 and discharged in the daytime to cover the electric power of the customer. In addition, at the time of a power failure, power can be supplied from the storage device 1 to the customer as an emergency power supply. The same applies to the case of FIG.
- FIG. 3 is a diagram showing an example of a grid-connected power storage system using the hybrid type (multiple function) power storage device 1.
- the difference from FIG. 1 is that there is no single power conditioner, and instead, power storage device 1 also has the function of a power conditioner. Therefore, the output of the solar panel 2 is directly applied to the storage device 1.
- the other configuration is the same as that of FIG.
- FIG. 4 is a circuit diagram showing an example of an internal circuit of power storage device 1 in FIG. 1, for example.
- Power storage device 1 includes an input / output port and an input port.
- the grid interconnection port P1 on the upper left side of the figure is an input / output port, and is connected to the commercial power grid 200 (FIG. 1) via the general load distribution board 4 (FIG. 1).
- varistors C1, C2 and C3 are provided in power storage device 1, varistor C1 is connected between U-O, varistor C2 is connected between W-O, and varistor C3 is connected between U-W, respectively. There is.
- the auxiliary input port P2 on the lower left side of the drawing is connected to the free standing output terminal T2 (AC 100 V) of the power conditioner 3 (FIG. 1).
- the storage device 1 includes one output port P3.
- the important load distribution board 5 (FIG. 1) is connected to the output port P3.
- the storage device 1 includes, for example, a storage battery 1b, which is a lithium ion battery, a power conversion unit (for example, a bidirectional inverter) 1a connected to the storage battery 1b, three switching units SW1, SW2 and SW3, and three voltage sensors V1. , V2 and V3, a current sensor A1 provided on one of the electric paths leading to the output port P3, and a control unit 1c for controlling the power conversion unit 1a and the switching units SW1, SW2 and SW3.
- Power conversion unit 1a can convert DC power output from storage battery 1b into AC capable of grid connection, and conversely converts power supplied from AC circuit 6 into DC voltage and stores it 1b can be charged.
- the switching units SW1, SW2, and SW3 are relay contacts that are controlled to be opened and closed by the control unit 1c.
- the voltage sensors V1 and V2 respectively detect the voltage (AC 200 V) of the grid connection port P1 and the input voltage (AC 100 V) of the auxiliary input port P2.
- the voltage sensor V3 detects the voltage output to the open / close unit SW3.
- the detection outputs of the voltage sensors V1, V2 and V3 are sent to the control unit 1c.
- the current sensor A1 also detects the current flowing to the output port P3, and the detected output is sent to the control unit 1c.
- controller 1 c is also connected to the external current sensors (CT) 7 u and 7 w and the remote control device 8.
- the control unit 1c controls the switching operation of the power conversion unit 1a, and also has a function of detecting abnormal attachment of the current sensors 7u and 7w (details will be described later).
- the control unit 1 c includes, for example, a computer, and the computer executes software (computer program) to realize necessary control functions.
- the software is stored in a storage device (not shown) of the control unit 1c.
- the grid interconnection port P1 is connected to the grid interconnection electric path L1 for connecting the power conversion unit 1a via the opening / closing unit SW1, and the auxiliary input port P2 is led to the output port P3 via the opening / closing unit SW2.
- a self-supporting feed path L2 and a storage battery-side feed path L3 leading from the storage battery 1b to the output port P3 via the power conversion unit 1a are present.
- Power conversion unit 1a during grid connection operates so that the voltage on the AC side is 200 V, and when power is supplied from storage battery 1b to output port P3, the voltage on the AC side becomes 100 V. Do.
- a power conditioner circuit is further mounted.
- FIG. 5 is a figure which shows an example of the circuit connection in a consumer in the case where it does not have a solar power generation device and it is only the electrical storage apparatus 1.
- power is supplied to a general load 11 from an AC power path 6 connected to a single-phase three-wire commercial power grid 200 via a general load distribution board 4.
- the general load distribution board 4 is actually provided with a large number of circuit breakers, and power is supplied to the general load 11 through the circuit breakers and further through the indoor wiring, The illustration of the circuit breaker is omitted, and the indoor wiring is simplified (the same applies hereinafter).
- the current sensors 7u and 7w are typically clamp-type CTs, and each has a single-phase three-line (voltage line: U line, W line, neutral line: O line (N line)) U line, W Attached to the wire.
- Power storage device 1 is connected to a single-phase three-line AC power path 6 and can be grid-connected. However, no reverse tide is observed.
- the switch 13 is connected between the U line and the O line of the AC power path 6 and can also receive the self-sustaining output of the storage device 1. When the voltage of the commercial power system 200 is normal, the switch 13 is internally connected so as to provide a voltage of 100 V AC between the U line and the O line to the important load 12. At the time of a power failure, the connection can be switched to the storage device 1, and the storage device 1 can provide power as a stand-alone output and can provide the important load 12.
- the current sensors 7 u and 7 w are grid connection points of the storage device 1. It is upstream from Ps1.
- the power storage device 1 can detect the reverse current based on the voltage element detected inside and the current element sent from the current sensors 7 u and 7 w. In the case of the circuit configuration of FIG. 5, when the reverse tide is detected, the power storage device 1 limits the output to prevent the reverse tide.
- FIG. 6 is a diagram showing an example of circuit connection in a consumer when the solar battery includes the power conditioner 3 and the power storage device 1 and so-called single power generation is performed.
- the difference from FIG. 5 is that a power conditioner 3 is provided, and it is possible to provide grid connection and to provide a self-sustaining output to the auxiliary input port of power storage device 1.
- the other configuration is the same as that of FIG.
- the grid connection point Ps2 of the power conditioner 3 is on the upstream side of the grid connection point Ps1 of the storage device 1, and the current sensors 7u and 7w are connected to the grid connection point Ps2 of the power conditioner 3. It is more upstream.
- the power storage device 1 can detect the reverse current based on the voltage element detected inside and the current element sent from the current sensors 7 u and 7 w.
- FIG. 6 in single power generation, the discharge from power storage device 1 is stopped.
- the power generated by photovoltaic power generation is interconnected from the power conditioner 3 and is used for power consumption in the customer. Then, even if the power consumption in the customer is sufficient, if there is still surplus power, it becomes a reverse current (sales) to the commercial power grid 200. In this case, there is no problem since the reverse tide is based solely on solar power generation.
- FIG. 7 is a diagram showing an example of circuit connection in a consumer when the solar battery includes the power conditioner 3 and the power storage device 1 and so-called double power generation is performed.
- the difference from FIG. 6 is the positions of the current sensors 7u and 7w.
- the other configuration is the same as that of FIG.
- current sensors 7 u and 7 w are on the upstream side of grid connection point Ps 1 of power storage device 1 and on the downstream side of grid connection point Ps 2 of power conditioner 3. That is, current sensors 7u and 7w are in the middle of two grid connection points Ps1 and Ps2.
- the power storage device 1 can detect the reverse current based on the voltage element detected inside and the current element sent from the current sensors 7 u and 7 w.
- FIG. 8 is a diagram showing an example of circuit connection in a consumer when the hybrid type, that is, when the function of the power conditioner for solar power generation is mounted on the power storage device 1.
- the power conversion unit 1a in this case is not shown, a DC / DC converter for the storage battery 1b and a DC / DC converter for the solar power generation panel 2 are mounted, and a bidirectional inverter is mounted.
- current sensors 7 u and 7 w are on the upstream side of grid connection point Ps 1 of power storage device 1.
- the power storage device 1 can detect the reverse current based on the voltage element detected inside and the current element sent from the current sensors 7 u and 7 w.
- FIG. 9 is a diagram showing a full view of the current sensor 7 u and 7 w, in addition to the correct mounting state, a possible erroneous mounting state.
- No. 1 (upper left) indicates the correct mounting state. That is, the current sensor 7 u and the current sensor 7 w are attached in the correct direction to the voltage line U line and the W line of the single-phase three lines, respectively.
- the current sensor 7u is attached to the correct line in the correct direction, and the current sensor 7w is attached to the wrong line (O line) in the correct direction.
- the current sensor 7u is attached to the correct line in the correct direction, and the current sensor 7w is attached to the wrong line (O line) in the wrong direction.
- the current sensor 7u is attached to the correct line in the wrong direction, and the current sensor 7w is attached to the wrong line (O line) in the correct direction.
- the current sensor 7u is attached to the correct line in the wrong direction, and the current sensor 7w is attached to the wrong line (O line) in the wrong direction.
- the current sensor 7u is attached to the wrong line (O line) in the correct direction, and the current sensor 7w is attached to the correct line in the correct direction.
- the current sensor 7u is attached to the wrong line (O line) in the correct direction, and the current sensor 7w is attached to the correct line in the wrong direction.
- the current sensor 7u is attached to the wrong line (O line) in the wrong direction, and the current sensor 7w is attached to the correct line in the correct direction.
- the current sensor 7u is attached to the wrong line (O line) in the wrong direction, and the current sensor 7w is attached to the correct line in the wrong direction.
- the current sensor 7u is attached to the wrong line (W line) in the correct direction, and the current sensor 7w is detached.
- the current sensor 7u is attached to the wrong line (W line) in the wrong direction, and the current sensor 7w is detached.
- FIG. 10 is an example of a graph showing a change in power due to the start of charging.
- FIG. 11 is an example of a flowchart showing such a procedure.
- the execution subject of the flowchart is the control unit 1 c of the power storage device 1.
- control unit 1c measures the peak power of alternating current based on the current flowing through current sensors 7u and 7w before starting charging of storage battery 1b and the voltage of alternating current path 6 (step S1). .
- the controller 1c starts forced charging at 1 kW (step S2).
- it is a short time (for example, 1 second or less) to charge, even if the storage battery 1b is fully charged, it is possible.
- the control unit 1c After the start of charging (however, after the soft start period is over for soft start to suppress rush current immediately after the start), the control unit 1c measures AC peak power again (step S3). Then, the difference between the power measured in step S3 and the power measured in step S1, ie, the amount of change is determined, and it is determined whether the amount of change is within the range of 1 kW ⁇ 0.3 kW (step S4). Here, if the amount of change is within the range of 1 kW ⁇ 0.3 kW, the attachment state of the current sensors 7 u and 7 w is normal, and the process of detecting an attachment abnormality ends.
- step S4 when the variation is not within the range of 1 kW ⁇ 0.3 kW (mostly the variation less than 1 kW-0.3 kW), the control unit 1c performs six retries, for example, to retry six times. Is determined (step S5). Initially, the number of retries is 0. Therefore, the control unit 1c adjusts the retry timing (step S7), and returns to step S1.
- the retry timing adjustment is a process that has meaning in the case where a plurality of sets of (current sensor + power storage device) described later are provided, and in the case of one set, for example, a fixed waiting time for retrying. It only needs to be provided.
- step S6 determines that the current sensors 7u and 7w are improperly installed.
- the peak power is measured in the above-described flowchart (steps S1 and S3), the measurement of power is not limited to the peak. For example, instead of the peak, an average or moving average may be used.
- the control unit 1c in the grid-connected power storage system determines the amount of change in power between charging the storage battery 1b with predetermined charging power and not charging it. It has a function of comparing the amount of change and the charging power to determine the presence or absence of an attachment abnormality of the current sensors 7 u and 7 w.
- the amount of change in power is determined between when the storage battery is charged with a predetermined charge power and when it is not charged. Contrast with If the current sensor is properly attached, the amount of change should be a value that appropriately reflects the charging power. Therefore, when the amount of change indicates a value that appropriately reflects the charging power, it can be determined that the attachment is normal, and otherwise, the attachment is abnormal.
- the attachment of the current sensors 7u and 7w is normal, and within the range
- it is not repeated several times for example, Yes in step S5 of FIG. 11
- the presence or absence of the mounting abnormality is determined based on whether the amount of change from the power before the start of charging to the power after the start of charging is a value that appropriately reflects the charging power.
- Change may be reversed. That is, the presence or absence of the mounting abnormality may be determined based on whether the amount of change from the power after the start of charging to the power after the stop of charging is a value that appropriately reflects the charging power.
- the charge power is changed to, for example, 1000 W to 500 W, as well as the change between charge and charge stop, and the change in the charge power is based on the current detected by the current sensors 7u and 7w. You may look at whether the amount of change in power is properly reflected.
- the voltage which is grid-connected detects the voltage between the U line and the W line by the voltage sensor V1, but instead, the U line, the O line, the W line A voltage sensor may be provided to respectively detect the voltage of the -O line, and the presence or absence of abnormality may be determined using charging power for each phase based on the voltage between the lines.
- control part 1c performs a sensor check regularly, and, after that, performs the driving
- the processing of the flowchart as shown in FIG. 11 should be performed when solar power generation is not performed (nighttime) Is desirable. In this case, the amount of change can be measured accurately without being affected by the power generated by solar power generation.
- Example of waveform chart >> 12 to 15 are images of an oscilloscope showing the results of operation check in the actual device.
- the horizontal axis (horizontal direction) is time.
- the upper half and the lower half of the images in each figure show the same voltage, current, etc., but the lower half is an enlarged image of the upper half time axis.
- FIG. 12 focusing on the lower half, there are five types of waveforms, and from top to bottom, voltage between U line and O line, current flowing through U line, voltage between W line and O line, current flowing through W line
- an instruction signal for detecting an abnormality H level is an instruction signal. The same applies to the other figures.
- FIG. 16 is an example of a single-line connection diagram in the case where there are a plurality of power storage devices.
- each storage device is connected to the AC power path 6 of the commercial power grid 200.
- Power storage devices 1x, 1y, 1z respectively detect current by current sensors 7x, 7y, 7z.
- a load R is connected to the AC power path 6.
- FIG. 17 is another example of a single-line connection diagram in the case where there are a plurality of power storage devices.
- each storage device is connected to the AC power path 6 of the commercial power grid 200.
- Power storage devices 1x, 1y, 1z respectively detect current by current sensors 7x, 7y, 7z.
- a load R is connected to the AC power path 6. The difference from FIG. 16 is that the current sensors are not arranged at one place but arranged for each set.
- the power storage devices 1x, 1y, 1z shift the execution timing of the sensor check from each other.
- shifting in addition to shifting the timing of starting the sensor check, it is possible to shift the retry timing of step S7 of FIG. 11 individually.
- shifting the timing of the sensor check it is possible to easily determine the presence or absence of an attachment abnormality for each of the plurality of sets of current sensors 7x, 7y, 7z.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
需要家の、系統連系する交流電路に流れる電流を検出する電流センサと、交流電路に接続された蓄電装置と、を備えた系統連系蓄電システムであって、蓄電装置は、蓄電池と、この蓄電池と交流電路との間にあって、直流/交流の双方向の電力変換を行う電力変換部と、電力変換部を制御するとともに、電流センサによって検出される電流及び交流電路の電圧に基づいて電力を検出する制御部と、を含み、制御部は、蓄電池の充電電力を変化させて、変化の前後での電流センサの検出に基づく電力の変化量を求め、当該変化量と充電電力の変化分とを対比して、電流センサについての取り付け異常の有無を判定する機能を有する。
Description
本発明は、系統連系蓄電システム及び電流センサの取り付け異常検出方法に関する。
本出願は、2017年10月26日出願の日本出願第2017-207358号に基づく優先権を主張し、前記日本出願に記載された全ての記載内容を援用するものである。
本出願は、2017年10月26日出願の日本出願第2017-207358号に基づく優先権を主張し、前記日本出願に記載された全ての記載内容を援用するものである。
近年、太陽光発電装置と、蓄電池を内蔵した蓄電装置とを組み合わせた系統連系蓄電システムが注目されている。このようなシステムでは、蓄電装置も交流への電力変換部を経て交流電路に接続されており、蓄電装置から需要家内の負荷に電力を供給することができる。ここで、系統連系規定により、太陽光発電による発電電力は需要家の受電点を越えて逆潮(売電)できるが、蓄電池を放電させた発電電力の逆潮は禁止されている。
そこで、蓄電池の放電に基づく電力を逆潮させないよう、監視用に、電流センサが、設けられている(例えば、特許文献1参照。)。電流センサにより、蓄電池の放電に基づく電力が逆潮していると検出されたときは、直ちに蓄電池の放電電力を低下させるか又は放電を停止させる必要がある。
電流センサは、例えばクランプ型のCT(Current Transformer)である。一般に、CTは、蓄電装置を設置する際に、需要家の分電盤内又はその近傍に取り付けられる。
本開示は、以下の発明を含む。但し、本発明は、請求の範囲によって定められるものである。
本発明の一表現に係る系統連系蓄電システムは、需要家の、系統連系する交流電路に流れる電流を検出する電流センサと、前記交流電路に接続された蓄電装置と、を備えた系統連系蓄電システムであって、前記蓄電装置は、蓄電池と、前記蓄電池と前記交流電路との間にあって、直流/交流の双方向の電力変換を行う電力変換部と、前記電力変換部を制御するとともに、前記電流センサによって検出される電流及び前記交流電路の電圧に基づいて電力を検出する制御部と、を含み、前記制御部は、前記蓄電池の充電電力を変化させて、変化の前後での前記電流センサの検出に基づく電力の変化量を求め、当該変化量と前記充電電力の変化分とを対比して、前記電流センサについての取り付け異常の有無を判定する機能を有する、系統連系蓄電システムである。
本発明の一表現に係る系統連系蓄電システムは、需要家の、系統連系する交流電路に流れる電流を検出する電流センサと、前記交流電路に接続された蓄電装置と、を備えた系統連系蓄電システムであって、前記蓄電装置は、蓄電池と、前記蓄電池と前記交流電路との間にあって、直流/交流の双方向の電力変換を行う電力変換部と、前記電力変換部を制御するとともに、前記電流センサによって検出される電流及び前記交流電路の電圧に基づいて電力を検出する制御部と、を含み、前記制御部は、前記蓄電池の充電電力を変化させて、変化の前後での前記電流センサの検出に基づく電力の変化量を求め、当該変化量と前記充電電力の変化分とを対比して、前記電流センサについての取り付け異常の有無を判定する機能を有する、系統連系蓄電システムである。
また、方法の観点からの一表現によれば、需要家の、系統連系する交流電路に、蓄電池を有する蓄電装置が接続され、前記交流電路に流れる電流を電流センサによって検出する場合に、前記蓄電装置によって実行される電流センサの取り付け異常検出方法であって、前記電流センサによって検出される電流及び前記交流電路の電圧に基づいて電力を検出し、前記蓄電池の充電電力を変化させて、変化の前後での前記電流センサの検出に基づく電力の変化量を求め、前記変化量と前記充電電力の変化分とを対比して、前記電流センサについての取り付け異常の有無を判定する、電流センサの取り付け異常検出方法である。
[本開示が解決しようとする課題]
電流センサとしての前述のCTは例えば2個あり、これらは、逆潮検出のため、正しい位置(線)に正しい方向で取り付けられなければならない。ところが、実際には不注意により間違って取り付けられることもあり得る。また、最初は正しく取り付けられていても、その後脱落することもあり得る。さらには、CTから引き出されている検出信号線が長年の間に劣化したり、鼠にかじられたりして、断線することもあり得る。
電流センサとしての前述のCTは例えば2個あり、これらは、逆潮検出のため、正しい位置(線)に正しい方向で取り付けられなければならない。ところが、実際には不注意により間違って取り付けられることもあり得る。また、最初は正しく取り付けられていても、その後脱落することもあり得る。さらには、CTから引き出されている検出信号線が長年の間に劣化したり、鼠にかじられたりして、断線することもあり得る。
かかる課題に鑑み、本開示は、電流センサが正しく取り付けられているかどうかを自動的にチェックすることができる、系統連系蓄電システム及び電流センサの取り付け異常検出方法を提供することを目的とする。
[本開示の効果]
本開示によれば、電流センサが正しく取り付けられているかどうかを自動的にチェックすることができる。
本開示によれば、電流センサが正しく取り付けられているかどうかを自動的にチェックすることができる。
[実施形態の要旨]
本発明の実施形態の要旨としては、少なくとも以下のものが含まれる。
本発明の実施形態の要旨としては、少なくとも以下のものが含まれる。
(1)これは、需要家の、系統連系する交流電路に流れる電流を検出する電流センサと、前記交流電路に接続された蓄電装置と、を備えた系統連系蓄電システムであって、前記蓄電装置は、蓄電池と、前記蓄電池と前記交流電路との間にあって、直流/交流の双方向の電力変換を行う電力変換部と、前記電力変換部を制御するとともに、前記電流センサによって検出される電流及び前記交流電路の電圧に基づいて電力を検出する制御部と、を含み、前記制御部は、前記蓄電池の充電電力を変化させて、変化の前後での前記電流センサの検出に基づく電力の変化量を求め、当該変化量と前記充電電力の変化分とを対比して、前記電流センサについての取り付け異常の有無を判定する機能を有する、系統連系蓄電システムである。
このような系統連系蓄電システムでは、蓄電池の充電電力を変化させて電力の変化量を求め、当該変化量と充電電力の変化分とを対比する。電流センサが正常に取り付けられていれば変化量は充電電力の変化分を適切に反映した値となるはずである。そこで、変化量が充電電力の変化分を適切に反映した値を示すときは、取り付けは正常、そうでないときは、取り付けは異常、と判定することができる。
このようにして、電流センサが正しく取り付けられているかどうかを自動的にチェックすることができる系統連系蓄電システムを提供することができる。
このようにして、電流センサが正しく取り付けられているかどうかを自動的にチェックすることができる系統連系蓄電システムを提供することができる。
(2)また、(1)の系統連系蓄電システムにおいて、前記制御部は、前記変化量が前記充電電力の変化分の値を中心とした所定の範囲内にあるときは前記電流センサの取り付けが正常であり、前記範囲内にないことが複数回繰り返されるときは前記電流センサの取り付けが異常である、と判定する機能を有するものであってもよい。
充電電力以外の需要家の消費電力も多少の変動があるため、変化量が充電電力の変化分と常に等しいとは限らない。このように、ある程度の範囲を設けることで、取り付け正常を、取り付け異常と誤判定することを抑制することができる。また、範囲内にないことがあっても1回だけでは判定せず、複数回繰り返されたことをもって取り付けが異常であると判定することにより、取り付け正常を、取り付け異常と誤判定することを抑制することができる。こうして、判定精度の安定性を確保することができる。
(3)また、(1)又は(2)の系統連系蓄電システムにおいて、前記蓄電装置及び前記電流センサを1セットとすると、これらは複数セットあって、それぞれの前記蓄電装置が前記交流電路に接続されており、複数の前記蓄電装置は、前記機能の実行タイミングを互いにずらして行うようにしてもよい。
この場合、複数セットの電流センサのそれぞれについて、取り付けの異常の有無を容易に判定することができる。
この場合、複数セットの電流センサのそれぞれについて、取り付けの異常の有無を容易に判定することができる。
(4)また、(1)~(3)のいずれかの系統連系蓄電システムにおいて、前記機能を、定期的に実行することもできる。
この場合、電流センサ及び蓄電装置の初期の据付工事直後だけでなく、その後も、電流センサの取り付け状態に異常が発生していないかどうかを、監視し続けることができる。
この場合、電流センサ及び蓄電装置の初期の据付工事直後だけでなく、その後も、電流センサの取り付け状態に異常が発生していないかどうかを、監視し続けることができる。
(5)また、(1)~(4)のいずれかの系統連系蓄電システムにおいて、前記交流電路には、太陽光発電の発電電力が供給可能であり、前記蓄電装置は、太陽光発電が行われていないときに、前記機能を実行するようにしてもよい。
この場合、太陽光発電の発電電力の影響を受けずに正確に変化量を測定することができる。
この場合、太陽光発電の発電電力の影響を受けずに正確に変化量を測定することができる。
(6)方法の観点からは、これは、需要家の、系統連系する交流電路に、蓄電池を有する蓄電装置が接続され、前記交流電路に流れる電流を電流センサによって検出する場合に、前記蓄電装置によって実行される電流センサの取り付け異常検出方法であって、前記電流センサによって検出される電流及び前記交流電路の電圧に基づいて電力を検出し、前記蓄電池の充電電力を変化させて、変化の前後での前記電流センサの検出に基づく電力の変化量を求め、前記変化量と前記充電電力の変化分とを対比して、前記電流センサについての取り付け異常の有無を判定する、電流センサの取り付け異常検出方法である。
このような電流センサの取り付け異常検出方法によれば、蓄電池の充電電力を変化させて電力の変化量を求め、当該変化量と充電電力の変化分とを対比する。電流センサが正常に取り付けられていれば変化量は充電電力の変化分を適切に反映した値となるはずである。そこで、変化量が充電電力の変化分を適切に反映した値を示すときは、取り付けは正常、そうでないときは、取り付けは異常、と判定することができる。
このようにして、電流センサが正しく取り付けられているかどうかを自動的にチェックすることができる電流センサの取り付け異常検出方法を提供することができる。
このようにして、電流センサが正しく取り付けられているかどうかを自動的にチェックすることができる電流センサの取り付け異常検出方法を提供することができる。
[実施形態の詳細]
以下、本発明の実施形態に係る系統連系蓄電システムについて、図面を参照して説明する。
まず、需要家に設けられた系統連系蓄電システムの構成例について説明する。
以下、本発明の実施形態に係る系統連系蓄電システムについて、図面を参照して説明する。
まず、需要家に設けられた系統連系蓄電システムの構成例について説明する。
《システム構成例》
図1は、単機能の蓄電装置を用いた系統連系蓄電システムの一例を示す構成図である。図において、需要家100には、蓄電装置1が設置されている。また、需要家100には太陽光発電パネル2が設置されている。
図1は、単機能の蓄電装置を用いた系統連系蓄電システムの一例を示す構成図である。図において、需要家100には、蓄電装置1が設置されている。また、需要家100には太陽光発電パネル2が設置されている。
太陽光発電パネル2にはパワーコンディショナ3が接続されている。パワーコンディショナ3は、MPPT(Maximum Power Point Tracking)制御を行うと共に、太陽光発電パネル2の出力する直流電力を交流電力に変換する。パワーコンディショナ3の出力には、例えば、単相3線(AC200/100V)の系統連系出力端子T1と、単相2線(AC100V)の自立出力端子T2とがあり、系統連系出力端子T1は一般負荷分電盤4に、自立出力端子T2は蓄電装置1に、それぞれ接続されている。
一般負荷分電盤4には需要家100内の一般負荷(図示せず。)が屋内配線を介して接続されており、一般負荷には商用電力系統200又はパワーコンディショナ3から給電することができる。パワーコンディショナ3の出力のうち、需要家100内で消費されない分の電力は、一般負荷分電盤4を介して商用電力系統200に逆潮(売電)することができる。一般負荷分電盤4から商用電力系統200までの、系統連系する交流電路6には、逆潮検出のための電流センサ(通常はCT)7、売電用電力量計201及び買電用電力量計202が設けられている。
また、一般負荷分電盤4は、蓄電装置1と接続されており、商用電力系統200又はパワーコンディショナ3から蓄電装置1を充電できるほか、蓄電装置1を放電させて一般負荷分電盤4に接続された一般負荷に給電することもできる。すなわち、この蓄電装置1は、交流電路6にも接続され得る系統連系型の蓄電装置1である。
また、一般負荷分電盤4は重要負荷分電盤5と接続されている。重要負荷分電盤5には一般負荷分電盤4から直接、AC100Vが供給されている。また、停電時には蓄電装置1からAC100Vが、重要負荷分電盤5に供給される。重要負荷分電盤5には、停電時にも使用したい重要負荷が接続されている。停電時の蓄電装置1には、太陽光発電中であれば、パワーコンディショナ3の自立出力端子T2からAC100Vで電力が供給される。
蓄電装置1はリモコン装置8と接続されており、リモコン装置8から蓄電装置1を操作することができる。また、リモコン装置8は、蓄電装置1の状態を表示するモニタでもあり、充放電状態や故障等の表示を行うことができる。リモコン装置8は、需要家100内に設置されたルーター(ゲートウェイ)9及び携帯情報端末10とも通信を行うことができる。ルーター9は、インターネット300に接続されている。
図2は、単機能の蓄電装置を用いた系統連系蓄電システムの他の例を示す構成図である。図1との違いは、蓄電装置が2台設けられ、1台はマスターの蓄電装置1m、もう1台はスレーブの蓄電装置1sである点である。その他の構成は図1と同様である。図2の場合、電流センサ7の検出出力はマスターの蓄電装置1mにのみ与えられ、スレーブの蓄電装置1sは、マスターの蓄電装置1mの管理下にある。
なお、図1,図2は共に、太陽光発電と蓄電装置1とを有する需要家100の例であるが、例えば図1において太陽光発電パネル2及びパワーコンディショナ3は設置されず、蓄電装置1のみを有する需要家もある。この場合、例えば電気料金の割安な夜間電力を蓄電装置1に蓄え、昼間に放電させて需要家の電力を賄うことができる。また、停電時には、非常用電源として、蓄電装置1から需要家に電力を供給することができる。
図2の場合も同様である。
図2の場合も同様である。
図3は、ハイブリッド型(複合機能)の蓄電装置1を用いた系統連系蓄電システムの一例を示す図である。図1との違いは、単体としてのパワーコンディショナが無い点であり、その代わりに、蓄電装置1がパワーコンディショナの機能も有している。従って、太陽光発電パネル2の出力は直接、蓄電装置1に与えられる。その他の構成は図1と同様である。
《蓄電装置の内部回路の一例》
図4は、例えば図1における蓄電装置1の内部回路の一例を示す回路図である。
蓄電装置1は、入出力ポート及び入力ポートを備えている。図の左上側にある系統連系ポートP1は、入出力ポートであり、一般負荷分電盤4(図1)を介して商用電力系統200(図1)と接続される。蓄電装置1内には例えばバリスタC1,C2,C3が設けられており、バリスタC1はU-O間に、バリスタC2はW-O間に、バリスタC3はU-W間に、それぞれ接続されている。
図4は、例えば図1における蓄電装置1の内部回路の一例を示す回路図である。
蓄電装置1は、入出力ポート及び入力ポートを備えている。図の左上側にある系統連系ポートP1は、入出力ポートであり、一般負荷分電盤4(図1)を介して商用電力系統200(図1)と接続される。蓄電装置1内には例えばバリスタC1,C2,C3が設けられており、バリスタC1はU-O間に、バリスタC2はW-O間に、バリスタC3はU-W間に、それぞれ接続されている。
図の左下側にある補助入力ポートP2は、パワーコンディショナ3(図1)の自立出力端子T2(AC100V)と接続される。
一方、蓄電装置1は、1つの出力ポートP3を備えており、この出力ポートP3には、重要負荷分電盤5(図1)が接続される。
一方、蓄電装置1は、1つの出力ポートP3を備えており、この出力ポートP3には、重要負荷分電盤5(図1)が接続される。
蓄電装置1は、例えばリチウムイオン電池である蓄電池1bと、この蓄電池1bに接続された電力変換部(例えば双方向インバータ)1aと、3つの開閉部SW1,SW2,SW3と、3つの電圧センサV1,V2,V3と、出力ポートP3に至る電路の一方に設けられた電流センサA1と、電力変換部1a及び開閉部SW1,SW2,SW3を制御する制御部1cとを備えている。電力変換部1aは、蓄電池1bから出力される直流の電力を、系統連系可能な交流に変換することができるとともに、逆に、交流電路6から提供された電力を直流電圧に変換して蓄電池1bを充電することができる。
開閉部SW1,SW2,SW3は、制御部1cによって開閉制御されるリレー接点である。電圧センサV1及びV2は、それぞれ、系統連系ポートP1の電圧(AC200V)及び補助入力ポートP2の入力電圧(AC100V)を検出する。電圧センサV3は、開閉部SW3に出力される電圧を検出する。各電圧センサV1,V2,V3の検出出力は、制御部1cに送られる。また、電流センサA1は、出力ポートP3に流れる電流を検出し、その検出出力は制御部1cに送られる。
また、制御部1cは、前述のように、外部の電流センサ(CT)7u,7w、及び、リモコン装置8にも接続されている。
制御部1cは、電力変換部1aのスイッチング動作を制御する他、電流センサ7u,7wの取り付け異常検出機能も有している(詳細後述)。制御部1cは例えば、コンピュータを含み、ソフトウェア(コンピュータプログラム)をコンピュータが実行することで、必要な制御機能を実現する。ソフトウェアは、制御部1cの記憶装置(図示せず。)に格納される。
上記の蓄電装置1内には、系統連系ポートP1を、開閉部SW1を経て電力変換部1aに接続する系統連系電路L1と、補助入力ポートP2から開閉部SW2を経て出力ポートP3に導く自立給電路L2と、蓄電池1bから電力変換部1aを経て出力ポートP3に導く蓄電池側給電路L3とが存在していることになる。なお、系統連系時の電力変換部1aは、交流側の電圧が200Vとなるよう動作し、また、蓄電池1bから出力ポートP3へ給電する時は、交流側の電圧が100Vとなるように動作する。
なお、需要家に太陽光発電装置が無い場合は、補助入力ポートP2への入力は無い。また、図3の蓄電装置1のようなハイブリッド型の場合は、図4の回路構成に加えて、さらに、パワーコンディショナの回路を搭載することになる。
《系統連系蓄電システムとしての回路接続について》
次に、主として蓄電装置と電流センサ(CT)とに注目しつつ、種々の回路接続のパターンについて説明する。
次に、主として蓄電装置と電流センサ(CT)とに注目しつつ、種々の回路接続のパターンについて説明する。
(パターン1)
図5は、太陽光発電装置を備えず、蓄電装置1のみである場合の、需要家内の回路接続の一例を示す図である。図において、単相3線の商用電力系統200と接続された交流電路6から、一般負荷分電盤4を介して、一般負荷11に電力が供給される。なお、一般負荷分電盤4には実際には、回路遮断器が多数設けられており、当該回路遮断器を通して、さらに屋内配線を介して、一般負荷11に電力が供給されるのであるが、回路遮断器の図示は省略し、屋内配線も簡略化して示している(以下同様。)。
図5は、太陽光発電装置を備えず、蓄電装置1のみである場合の、需要家内の回路接続の一例を示す図である。図において、単相3線の商用電力系統200と接続された交流電路6から、一般負荷分電盤4を介して、一般負荷11に電力が供給される。なお、一般負荷分電盤4には実際には、回路遮断器が多数設けられており、当該回路遮断器を通して、さらに屋内配線を介して、一般負荷11に電力が供給されるのであるが、回路遮断器の図示は省略し、屋内配線も簡略化して示している(以下同様。)。
電流センサ7u,7wは、典型的にはクランプ型のCTであり、それぞれ、単相3線(電圧線:U線,W線,中性線:O線(N線))のU線,W線に取り付けられる。蓄電装置1は、交流電路6の単相3線に接続され、系統連系が可能である。但し、逆潮は認められない。切替器13は、交流電路6のU線-O線間に接続されるとともに、蓄電装置1の自立出力を受けることもできる。商用電力系統200の電圧が正常である場合は、切替器13は、U線-O線間のAC100Vの電圧を重要負荷12に提供するよう内部接続している。停電時は、接続を蓄電装置1に切り替えて、蓄電装置1から自立出力として電力の提供を受け、重要負荷12に与えることができる。
図5において、商用電力系統200側を「上流」、一般負荷11及び重要負荷12のある方を「下流」と、それぞれ定義した場合、電流センサ7u,7wは、蓄電装置1の系統連系点Ps1より上流側にある。蓄電装置1は、内部で検出する電圧要素と、電流センサ7u,7wから送られてくる電流要素とに基づいて、逆潮を検出することができる。図5の回路構成の場合、逆潮を検出すれば、蓄電装置1は、出力を制限して逆潮を防止する。
(パターン2)
図6は、太陽光発電用のパワーコンディショナ3と、蓄電装置1とを備え、かつ、いわゆるシングル発電を行う場合の、需要家内の回路接続の一例を示す図である。図5との違いは、パワーコンディショナ3が設けられ、系統連系すると共に、自立出力を蓄電装置1の補助入力ポートに与えることができる点である。その他の構成は、図5と同様である。
図6は、太陽光発電用のパワーコンディショナ3と、蓄電装置1とを備え、かつ、いわゆるシングル発電を行う場合の、需要家内の回路接続の一例を示す図である。図5との違いは、パワーコンディショナ3が設けられ、系統連系すると共に、自立出力を蓄電装置1の補助入力ポートに与えることができる点である。その他の構成は、図5と同様である。
図6において、パワーコンディショナ3の系統連系点Ps2は、蓄電装置1の系統連系点Ps1より上流側にあり、さらに、電流センサ7u,7wは、パワーコンディショナ3の系統連系点Ps2より上流側にある。蓄電装置1は、内部で検出する電圧要素と、電流センサ7u,7wから送られてくる電流要素とに基づいて、逆潮を検出することができる。
図6において、シングル発電では、蓄電装置1からの放電は停止している。太陽光発電の発電電力はパワーコンディショナ3から系統連系され、需要家内での電力消費に充てられる。そして、需要家内での電力消費に充ててもなお余剰電力がある場合は、商用電力系統200への逆潮(売電)となる。この場合、逆潮は太陽光発電にのみ基づくものであるため、問題は無い。
(パターン3)
図7は、太陽光発電用のパワーコンディショナ3と、蓄電装置1とを備え、かつ、いわゆるダブル発電を行う場合の、需要家内の回路接続の一例を示す図である。図6との違いは、電流センサ7u,7wの位置である。その他の構成は、図6と同様である。
図7は、太陽光発電用のパワーコンディショナ3と、蓄電装置1とを備え、かつ、いわゆるダブル発電を行う場合の、需要家内の回路接続の一例を示す図である。図6との違いは、電流センサ7u,7wの位置である。その他の構成は、図6と同様である。
図7において、電流センサ7u,7wは、蓄電装置1の系統連系点Ps1より上流側にあり、かつ、パワーコンディショナ3の系統連系点Ps2よりは下流側にある。すなわち、電流センサ7u,7wは、2つの系統連系点Ps1,Ps2の中間にある。蓄電装置1は、内部で検出する電圧要素と、電流センサ7u,7wから送られてくる電流要素とに基づいて、逆潮を検出することができる。
図7において、ダブル発電では、太陽光発電の発電電力は全て売電される。需要家内の全負荷に要する電力は、基本的に、蓄電装置1からの放電により賄われる。この場合、パワーコンディショナ3から出力される電力の逆潮は問題無いが、当該電力を超える電力が逆潮されているとすると、それは蓄電装置1からの逆潮ということになるので、もしそのような逆潮が検出されれば、蓄電装置1は出力を制限しなければならない。
(パターン4)
図8は、ハイブリッド型、すなわち、太陽光発電用のパワーコンディショナの機能が蓄電装置1に搭載されている場合の、需要家内の回路接続の一例を示す図である。この場合の電力変換部1aは、図示は省略するが、蓄電池1b用のDC/DCコンバータと、太陽光発電パネル2用のDC/DCコンバータとを搭載し、かつ、双方向インバータを搭載する。
図8は、ハイブリッド型、すなわち、太陽光発電用のパワーコンディショナの機能が蓄電装置1に搭載されている場合の、需要家内の回路接続の一例を示す図である。この場合の電力変換部1aは、図示は省略するが、蓄電池1b用のDC/DCコンバータと、太陽光発電パネル2用のDC/DCコンバータとを搭載し、かつ、双方向インバータを搭載する。
図8において、電流センサ7u,7wは、蓄電装置1の系統連系点Ps1より上流側にある。蓄電装置1は、内部で検出する電圧要素と、電流センサ7u,7wから送られてくる電流要素とに基づいて、逆潮を検出することができる。
《電流センサの取り付けについて》
上記の各パターンにおいて、電流センサ7u,7wが、図示した正しい位置に正しい方向(極性)で取り付けられていれば、逆潮する電力を確実に検出することができる。逆潮をしてはならない場合に逆潮を検出すれば、蓄電装置1は、出力を制限して逆潮を防止する。しかしながら、電流センサ7u,7wが、正しい位置に正しい方向で取り付けられていない場合が、現実には起こり得る。
上記の各パターンにおいて、電流センサ7u,7wが、図示した正しい位置に正しい方向(極性)で取り付けられていれば、逆潮する電力を確実に検出することができる。逆潮をしてはならない場合に逆潮を検出すれば、蓄電装置1は、出力を制限して逆潮を防止する。しかしながら、電流センサ7u,7wが、正しい位置に正しい方向で取り付けられていない場合が、現実には起こり得る。
図9は、電流センサ7u,7wについて、正しい取り付け状態の他、起こり得る誤った取り付け状態の全容を示す図である。No.1(左上)は、正しい取り付け状態を表している。すなわち、単相3線のうちの電圧線U線及びW線に対してそれぞれ、電流センサ7u及び電流センサ7wが正しい方向に取り付けられている。
No.1の正しい取り付け状態と異なる誤った取り付け状態となるのは、「取り付ける線を間違える」か、「方向が逆になる」か、あるいは「脱落している」か、である。「脱落している」ことには、正しく取り付けているが検出出力信号線が断線していることも含まれる。
図9のNo.2では、電流センサ7u,7wの2個とも、取り付ける線は正しいが、W線の電流センサ7wが逆方向を向いている(図のハッチングは逆方向であることを表している。)。
No.3では、電流センサ7u,7wの2個とも、取り付ける線は正しいが、U線の電流センサ7uが逆方向を向いている。
No.4では、電流センサ7u,7wの2個とも、取り付ける線は正しいが、2個とも逆方向を向いている。
No.3では、電流センサ7u,7wの2個とも、取り付ける線は正しいが、U線の電流センサ7uが逆方向を向いている。
No.4では、電流センサ7u,7wの2個とも、取り付ける線は正しいが、2個とも逆方向を向いている。
No.5では、電流センサ7u,7wが互いに逆の線に、正しい方向で取り付けられている。
No.6では、電流センサ7u,7wが互いに逆の線に取り付けられ、かつ、電流センサ7uは逆方向を向いている。
No.7では、電流センサ7u,7wが互いに逆の線に取り付けられ、かつ、電流センサ7wは逆方向を向いている。
No.8では、電流センサ7u,7wが互いに逆の線に取り付けられ、かつ、電流センサ7u,7wが共に逆方向を向いている。
No.6では、電流センサ7u,7wが互いに逆の線に取り付けられ、かつ、電流センサ7uは逆方向を向いている。
No.7では、電流センサ7u,7wが互いに逆の線に取り付けられ、かつ、電流センサ7wは逆方向を向いている。
No.8では、電流センサ7u,7wが互いに逆の線に取り付けられ、かつ、電流センサ7u,7wが共に逆方向を向いている。
No.9では、電流センサ7uは正しい線に正しい方向で取り付けられ、かつ、電流センサ7wは誤った線(O線)に正しい方向で取り付けられている。
No.10では、電流センサ7uは正しい線に正しい方向で取り付けられ、かつ、電流センサ7wは誤った線(O線)に誤った方向で取り付けられている。
No.11では、電流センサ7uは正しい線に誤った方向で取り付けられ、かつ、電流センサ7wは誤った線(O線)に正しい方向で取り付けられている。
No.12では、電流センサ7uは正しい線に誤った方向で取り付けられ、かつ、電流センサ7wは誤った線(O線)に誤った方向で取り付けられている。
No.10では、電流センサ7uは正しい線に正しい方向で取り付けられ、かつ、電流センサ7wは誤った線(O線)に誤った方向で取り付けられている。
No.11では、電流センサ7uは正しい線に誤った方向で取り付けられ、かつ、電流センサ7wは誤った線(O線)に正しい方向で取り付けられている。
No.12では、電流センサ7uは正しい線に誤った方向で取り付けられ、かつ、電流センサ7wは誤った線(O線)に誤った方向で取り付けられている。
No.13では、電流センサ7uは誤った線(O線)に正しい方向で取り付けられ、かつ、電流センサ7wは正しい線に正しい方向で取り付けられている。
No.14では、電流センサ7uは誤った線(O線)に正しい方向で取り付けられ、かつ、電流センサ7wは正しい線に誤った方向で取り付けられている。
No.15では、電流センサ7uは誤った線(O線)に誤った方向で取り付けられ、かつ、電流センサ7wは正しい線に正しい方向で取り付けられている。
No.16では、電流センサ7uは誤った線(O線)に誤った方向で取り付けられ、かつ、電流センサ7wは正しい線に誤った方向で取り付けられている。
No.14では、電流センサ7uは誤った線(O線)に正しい方向で取り付けられ、かつ、電流センサ7wは正しい線に誤った方向で取り付けられている。
No.15では、電流センサ7uは誤った線(O線)に誤った方向で取り付けられ、かつ、電流センサ7wは正しい線に正しい方向で取り付けられている。
No.16では、電流センサ7uは誤った線(O線)に誤った方向で取り付けられ、かつ、電流センサ7wは正しい線に誤った方向で取り付けられている。
No.17では、電流センサ7uは正しい線に正しい方向で取り付けられ、かつ、電流センサ7wは脱落している。
No.18では、電流センサ7uは正しい線に誤った方向で取り付けられ、かつ、電流センサ7wは脱落している。
No.19では、電流センサ7uは誤った線(O線)に正しい方向で取り付けられ、かつ、電流センサ7wは脱落している。
No.20では、電流センサ7uは誤った線(O線)に誤った方向で取り付けられ、かつ、電流センサ7wは脱落している。
No.18では、電流センサ7uは正しい線に誤った方向で取り付けられ、かつ、電流センサ7wは脱落している。
No.19では、電流センサ7uは誤った線(O線)に正しい方向で取り付けられ、かつ、電流センサ7wは脱落している。
No.20では、電流センサ7uは誤った線(O線)に誤った方向で取り付けられ、かつ、電流センサ7wは脱落している。
No.21では、電流センサ7uは誤った線(W線)に正しい方向で取り付けられ、かつ、電流センサ7wは脱落している。
No.22では、電流センサ7uは誤った線(W線)に誤った方向で取り付けられ、かつ、電流センサ7wは脱落している。
No.22では、電流センサ7uは誤った線(W線)に誤った方向で取り付けられ、かつ、電流センサ7wは脱落している。
No.23では、電流センサ7wは正しい線に正しい方向で取り付けられ、かつ、電流センサ7uは脱落している。
No.24では、電流センサ7wは正しい線に誤った方向で取り付けられ、かつ、電流センサ7uは脱落している。
No.24では、電流センサ7wは正しい線に誤った方向で取り付けられ、かつ、電流センサ7uは脱落している。
No.25では、電流センサ7wは誤った線(O線)に正しい方向で取り付けられ、かつ、電流センサ7uは脱落している。
No.26では、電流センサ7wは誤った線(O線)に誤った方向で取り付けられ、かつ、電流センサ7uは脱落している。
No.26では、電流センサ7wは誤った線(O線)に誤った方向で取り付けられ、かつ、電流センサ7uは脱落している。
No.27では、電流センサ7wは誤った線(U線)に正しい方向で取り付けられ、かつ、電流センサ7uは脱落している。
No.26では、電流センサ7wは誤った線(U線)に誤った方向で取り付けられ、かつ、電流センサ7uは脱落している。
そしてNo.28では、電流センサ7u,7wが2つとも脱落している。
No.26では、電流センサ7wは誤った線(U線)に誤った方向で取り付けられ、かつ、電流センサ7uは脱落している。
そしてNo.28では、電流センサ7u,7wが2つとも脱落している。
次に、図9の29種類の取り付け状態について、蓄電装置1で1kWの充電を行った場合に、電流センサ7u,7wの位置での電力を測定した。なお、負荷は蓄電池のみとした。従って、充電を開始する前の電力消費は0である。
結果は、以下の表1の通りである。なお、「No」は、図9におけるNoと対応している。表中の上向き矢印は取り付けの方向が正しく、下向きの矢印は取り付けの方向が誤っていることを示している。
結果は、以下の表1の通りである。なお、「No」は、図9におけるNoと対応している。表中の上向き矢印は取り付けの方向が正しく、下向きの矢印は取り付けの方向が誤っていることを示している。
表1の右欄の電力測定結果を見ると、No.1では、1000Wの充電電力による電力増加分が正確に反映され検出されている。また、U線に取り付けるべき電流センサ7uと、W線に取り付けるべき電流センサ7wとがそっくり入れ替わった状態のNo.8も、1000Wを検出している。しかし、それ以外は、-1000W、-500W、0W、500Wのいずれかになっていることがわかる。すなわち、No.8のみを除き、検出される電力の値(符号も含む)が大きく異なることがわかる。そこで、蓄電装置1により、所定の電力で充電を行うことが反映され、検出されなければ、誤った取り付け若しくは断線が起きていると判断することができる。なお、No.8については、逆ではあるが、実用上は特に問題無い。
図10は、充電開始による電力の変化を示すグラフの一例である。実際には需要家内の何らかの負荷に電力P01が給電されている状態から蓄電装置1による充電を開始するので、充電開始前の負荷電力が、所定電力(1kW)での充電開始により、所定電力に相当する電力の変動が見られるかどうか、によって誤った取り付け若しくは断線を検出することができる。負荷電力の変動もあるので、若干の余裕を見て、充電開始後の電力がP01+1kW=P02を中心として、±0.3kW程度の範囲内に収まれば、変化量は、充電電力によって変化したものと考えられる。
上記のような考え方に基づいて、センサチェック(電流センサの取り付け異常検出)をする手順について説明する。図11は、このような手順を示すフローチャートの一例である。フローチャートの実行主体は蓄電装置1の制御部1cである。
図11において、まず、制御部1cは、蓄電池1bの充電を開始する前の電流センサ7u,7wに流れる電流と交流電路6の電圧とに基づいて、交流のピーク電力を測定する(ステップS1)。次に制御部1cは、1kWでの強制的な充電を開始する(ステップS2)。なお、充電を行うのは短時間(例えば1秒以下)であるので、蓄電池1bが満充電であっても可能である。
充電開始後(但し開始直後は突入電流を抑制するソフトスタートを行うため、ソフトスタートの期間終了後)、制御部1cは、再び交流のピーク電力を測定する(ステップS3)。そして、ステップS3で測定した電力とステップS1で測定した電力との差すなわち変化量を求め、この変化量が1kW±0.3kWの範囲内か否かを判定する(ステップS4)。ここで、変化量が1kW±0.3kWの範囲内であれば、電流センサ7u,7wの取り付け状態は正常であり、取り付け異常を検出する処理は終了となる。
一方、ステップS4において、変化量が1kW±0.3kWの範囲内でない場合(多くは1kW-0.3kWより低い変化量)、制御部1cは、例えば6回リトライするべく、リトライ回数が6回に達したか否かを判定する(ステップS5)。最初はリトライ回数は0であり、従って、制御部1cは、リトライタイミングを調整し(ステップS7)、ステップS1に戻る。なお、リトライタイミング調整は、後述の、(電流センサ+蓄電装置)のセットが複数設けられている場合に意味を持つ処理であり、1セットの場合は、例えばリトライのための一定の待ち時間を設けるだけでよい。
ステップS1から、S2→S3→S4→S5→S7→S1が繰り返されリトライ回数が6回に達すると(ステップS5のYes)制御部1cは、電流センサ7u,7wの取り付け異常と判定する(ステップS6)。
なお、上記のフローチャートでは、ピーク電力を測定するようにしたが(ステップS1,S3)、電力の測定はピークに限られる訳ではない。例えば、ピークに代えて、平均又は移動平均等を用いることもできる。
なお、上記のフローチャートでは、ピーク電力を測定するようにしたが(ステップS1,S3)、電力の測定はピークに限られる訳ではない。例えば、ピークに代えて、平均又は移動平均等を用いることもできる。
《ここまでのまとめ》
以上のように、この系統連系蓄電システムにおける制御部1cは、需要家の負荷電力に加えて蓄電池1bを所定の充電電力で充電する場合と充電しない場合とで、電力の変化量を求め、当該変化量と充電電力とを対比して、電流センサ7u,7wについての取り付け異常の有無を判定する機能を有する。
以上のように、この系統連系蓄電システムにおける制御部1cは、需要家の負荷電力に加えて蓄電池1bを所定の充電電力で充電する場合と充電しない場合とで、電力の変化量を求め、当該変化量と充電電力とを対比して、電流センサ7u,7wについての取り付け異常の有無を判定する機能を有する。
このような系統連系蓄電システム(又は電流センサの取り付け異常検出方法)では、蓄電池を所定の充電電力で充電する場合と充電しない場合とで、電力の変化量を求め、当該変化量と充電電力とを対比する。電流センサが正常に取り付けられていれば変化量は充電電力を適切に反映した値となるはずである。そこで、変化量が充電電力を適切に反映した値を示すときは、取り付けは正常、そうでないときは、取り付けは異常、と判定することができる。
また、詳細には、変化量が充電電力の値(例えば1kW)を中心とした所定の範囲内(±0.3kW)にあるときは電流センサ7u,7wの取り付けが正常であり、範囲内にないことが複数回繰り返されるとき(例えば図11のステップS5のYes)は電流センサ7u,7wの取り付けが異常である、と判定することができる。すなわち、充電電力以外の需要家の消費電力には多少の変動があるため、変化量が充電電力と常に等しいとは限らない。このように、ある程度の範囲を設けることで、取り付け正常を、取り付け異常と誤判定することを抑制することができる。また、範囲内にないことがあっても1回だけでは判定せず、複数回繰り返されたことをもって取り付けが異常であると判定することにより、取り付け正常を、取り付け異常と誤判定することを抑制することができる。こうして、判定精度の安定性を確保することができる。
なお、上記実施形態では、充電開始前の電力から充電開始後の電力への変化量が、適切に充電電力を反映した値であるか否かにより、取り付け異常の有無を判定するようにしたが、変化は逆でもよい。すなわち、充電開始後の電力から充電停止後の電力への変化量が、適切に充電電力を反映した値であるか否かにより、取り付け異常の有無を判定するようにしてもよい。
さらに、充電と充電停止との間で変化量を見る以外にも、充電電力を例えば1000Wから500Wというように変化させて、その充電電力の変化分が電流センサ7u,7wの検出する電流に基づく電力の変化量に適切に反映されるかどうかを見てもよい。
また、図4の回路例では、系統連系している電圧は、電圧センサV1によってU線-W線間の電圧を検出しているが、これに代えて、U線-O線、W線-O線の電圧をそれぞれ検出する電圧センサを設け、各線間の電圧に基づいて、片相ずつの充電電力を用いて異常の有無を判断するようにしてもよい。
さらに、充電と充電停止との間で変化量を見る以外にも、充電電力を例えば1000Wから500Wというように変化させて、その充電電力の変化分が電流センサ7u,7wの検出する電流に基づく電力の変化量に適切に反映されるかどうかを見てもよい。
また、図4の回路例では、系統連系している電圧は、電圧センサV1によってU線-W線間の電圧を検出しているが、これに代えて、U線-O線、W線-O線の電圧をそれぞれ検出する電圧センサを設け、各線間の電圧に基づいて、片相ずつの充電電力を用いて異常の有無を判断するようにしてもよい。
また、制御部1cは、センサチェックを定期的に実行し、その後に、本来の充電又は放電の運転を行うことが好ましい。定期的に、とは、例えば1日のうちの、決まった時間(例えば夜の12時)に実行することである。定期的に実行することにより、電流センサ7u,7w及び蓄電装置1の初期の据付工事直後だけでなく、その後も、例えば脱落や断線により電流センサ7u,7wの取り付け状態に異常が発生していないかどうかを、監視し続けることができる。
また、交流電路6に、太陽光発電用のパワーコンディショナ3が接続されている場合は、図11のようなフローチャートの処理は、太陽光発電が行われていないとき(夜間)に実行することが望ましい。この場合、太陽光発電の発電電力の影響を受けずに正確に変化量を測定することができる。
《波形図の例示》
図12~図15は、実機にて動作確認をした結果を示すオシロスコープの画像である。横軸(横方向)は時間である。各図の画像の上半分と下半分とでは同じ電圧・電流等を表しているが、下半分は、上半分の時間軸を拡大した画像である。例えば図12において、下半分に注目すると、波形は5種類あり、上から順に、U線-O線間の電圧、U線に流れる電流、W線-O線間の電圧、W線に流れる電流、及び、異常検出を行う指示信号(Hレベルが指示信号あり)である。他の図も同様である。
図12~図15は、実機にて動作確認をした結果を示すオシロスコープの画像である。横軸(横方向)は時間である。各図の画像の上半分と下半分とでは同じ電圧・電流等を表しているが、下半分は、上半分の時間軸を拡大した画像である。例えば図12において、下半分に注目すると、波形は5種類あり、上から順に、U線-O線間の電圧、U線に流れる電流、W線-O線間の電圧、W線に流れる電流、及び、異常検出を行う指示信号(Hレベルが指示信号あり)である。他の図も同様である。
図12は、図9及び表1におけるNo.1(正常)の場合の波形である。時刻t1より少し前から充電開始となり、開始直後を避けた時刻t1から異常検出を実行し、時刻t2までに判定する。図12の場合は、U相(500W)+W相(500W)=1000Wが検出され、正常である。
図13は、図9及び表1におけるNo.2(電流センサ7wが逆方向)の場合の波形である。この場合は、W相の電流が反転するので、U相(500W)+W相(-500W)=0Wが検出され、異常である。
図14は、図9及び表1におけるNo.3(電流センサ7uが逆方向)の場合の波形である。この場合は、U相の電流が反転するので、U相(-500W)+W相(500W)=0Wが検出され、異常である。
図15は、図9及び表1におけるNo.4(電流センサ7u,7wが共に逆方向)の場合の波形である。この場合は、U相、W相の電流が共に反転するので、U相(-500W)+W相(-500W)=-1000Wが検出され、異常である。
図14は、図9及び表1におけるNo.3(電流センサ7uが逆方向)の場合の波形である。この場合は、U相の電流が反転するので、U相(-500W)+W相(500W)=0Wが検出され、異常である。
図15は、図9及び表1におけるNo.4(電流センサ7u,7wが共に逆方向)の場合の波形である。この場合は、U相、W相の電流が共に反転するので、U相(-500W)+W相(-500W)=-1000Wが検出され、異常である。
《蓄電装置が複数台の場合の異常検出について》
図16は、蓄電装置が複数台ある場合の単線接続図の一例である。図において、蓄電装置及び電流センサを1セットとすると、これらが複数セットあって、それぞれの蓄電装置が商用電力系統200の交流電路6に接続されている。蓄電装置1x,1y,1zは、それぞれ、電流センサ7x,7y,7zにより電流を検出する。交流電路6には負荷Rが接続されている。
図16は、蓄電装置が複数台ある場合の単線接続図の一例である。図において、蓄電装置及び電流センサを1セットとすると、これらが複数セットあって、それぞれの蓄電装置が商用電力系統200の交流電路6に接続されている。蓄電装置1x,1y,1zは、それぞれ、電流センサ7x,7y,7zにより電流を検出する。交流電路6には負荷Rが接続されている。
図17は、蓄電装置が複数台ある場合の単線接続図の他の例である。図において、蓄電装置及び電流センサを1セットとすると、これらが複数セットあって、それぞれの蓄電装置が商用電力系統200の交流電路6に接続されている。蓄電装置1x,1y,1zは、それぞれ、電流センサ7x,7y,7zにより電流を検出する。交流電路6には負荷Rが接続されている。図16との違いは、電流センサが1箇所にまとめて並ぶのではなく、セットごとに配置されている点である。
図16及び図17の場合、異常検出を3台が同時に行うと異常検出のための充電のタイミングが同時になるため、異常検出に失敗する場合がある。
そこで、このような場合は、各蓄電装置1x,1y,1zは、センサチェックの実行タイミングを互いにずらして行う。ずらし方としては、センサチェックを開始するタイミングをずらすほか、図11のステップS7のリトライタイミングも個別にずらすことができる。
このように、センサチェックのタイミングをずらすことにより、複数セットの電流センサ7x,7y,7zのそれぞれについて、取り付けの異常の有無を容易に判定することができる。
そこで、このような場合は、各蓄電装置1x,1y,1zは、センサチェックの実行タイミングを互いにずらして行う。ずらし方としては、センサチェックを開始するタイミングをずらすほか、図11のステップS7のリトライタイミングも個別にずらすことができる。
このように、センサチェックのタイミングをずらすことにより、複数セットの電流センサ7x,7y,7zのそれぞれについて、取り付けの異常の有無を容易に判定することができる。
なお、上記のずらし方の具体例としては、例えば、蓄電装置ごとの固有の番号である製造番号の数字を利用して相互に同時にセンサチェックにならないよう、設定することができる。
《補記》
なお、今回開示された実施の形態はすべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は請求の範囲によって示され、請求の範囲と均等の意味及び範囲内での全ての変更が含まれることが意図される。
なお、今回開示された実施の形態はすべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は請求の範囲によって示され、請求の範囲と均等の意味及び範囲内での全ての変更が含まれることが意図される。
1,1m,1s,1x,1y,1z 蓄電装置
1a 電力変換部
1b 蓄電池
1c 制御部
2 太陽光発電パネル
3 パワーコンディショナ
4 一般負荷分電盤
5 重要負荷分電盤
6 交流電路
7,7u,7w,7x,7y,7z 電流センサ
8 リモコン装置
9 ルーター
10 携帯情報端末
11 一般負荷
12 重要負荷
13 切替器
100 需要家
200 商用電力系統
201 売電用電力量計
202 買電用電力量計
300 インターネット
A1 電流センサ
C1,C2,C3 バリスタ
L1 系統連系電路
L2 自立給電路
L3 蓄電池側給電路
P1 系統連系ポート
P2 補助入力ポート
P3 出力ポート
Ps1,Ps2 系統連系点
R 負荷
SW1,SW2,SW3 開閉部
T1 系統連系出力端子
T2 自立出力端子
V1,V2,V3 電圧センサ
1a 電力変換部
1b 蓄電池
1c 制御部
2 太陽光発電パネル
3 パワーコンディショナ
4 一般負荷分電盤
5 重要負荷分電盤
6 交流電路
7,7u,7w,7x,7y,7z 電流センサ
8 リモコン装置
9 ルーター
10 携帯情報端末
11 一般負荷
12 重要負荷
13 切替器
100 需要家
200 商用電力系統
201 売電用電力量計
202 買電用電力量計
300 インターネット
A1 電流センサ
C1,C2,C3 バリスタ
L1 系統連系電路
L2 自立給電路
L3 蓄電池側給電路
P1 系統連系ポート
P2 補助入力ポート
P3 出力ポート
Ps1,Ps2 系統連系点
R 負荷
SW1,SW2,SW3 開閉部
T1 系統連系出力端子
T2 自立出力端子
V1,V2,V3 電圧センサ
Claims (6)
- 需要家の、系統連系する交流電路に流れる電流を検出する電流センサと、前記交流電路に接続された蓄電装置と、を備えた系統連系蓄電システムであって、前記蓄電装置は、
蓄電池と、
前記蓄電池と前記交流電路との間にあって、直流/交流の双方向の電力変換を行う電力変換部と、
前記電力変換部を制御するとともに、前記電流センサによって検出される電流及び前記交流電路の電圧に基づいて電力を検出する制御部と、を含み、
前記制御部は、前記蓄電池の充電電力を変化させて、変化の前後での前記電流センサの検出に基づく電力の変化量を求め、当該変化量と前記充電電力の変化分とを対比して、前記電流センサについての取り付け異常の有無を判定する機能を有する、系統連系蓄電システム。 - 前記制御部は、前記変化量が前記充電電力の変化分の値を中心とした所定の範囲内にあるときは前記電流センサの取り付けが正常であり、前記範囲内にないことが複数回繰り返されるときは前記電流センサの取り付けが異常である、と判定する機能を有する、請求項1に記載の系統連系蓄電システム。
- 前記蓄電装置及び前記電流センサを1セットとすると、これらは複数セットあって、それぞれの前記蓄電装置が前記交流電路に接続されており、
複数の前記蓄電装置は、前記機能の実行タイミングを互いにずらして行う、請求項1又は請求項2に記載の系統連系蓄電システム。 - 前記機能を、定期的に実行する請求項1~請求項3のいずれか1項に記載の系統連系蓄電システム。
- 前記交流電路には、太陽光発電の発電電力が供給可能であり、
前記蓄電装置は、太陽光発電が行われていないときに、前記機能を実行する請求項1~請求項4のいずれか1項に記載の系統連系蓄電システム。 - 需要家の、系統連系する交流電路に、蓄電池を有する蓄電装置が接続され、前記交流電路に流れる電流を電流センサによって検出する場合に、前記蓄電装置によって実行される電流センサの取り付け異常検出方法であって、
前記電流センサによって検出される電流及び前記交流電路の電圧に基づいて電力を検出し、
前記蓄電池の充電電力を変化させて、変化の前後での前記電流センサの検出に基づく電力の変化量を求め、
前記変化量と前記充電電力の変化分とを対比して、前記電流センサについての取り付け異常の有無を判定する、
電流センサの取り付け異常検出方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019549833A JP7151715B2 (ja) | 2017-10-26 | 2018-05-29 | 系統連系蓄電システム及び電流センサの取り付け異常検出方法 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017207358 | 2017-10-26 | ||
JP2017-207358 | 2017-10-26 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2019082431A1 true WO2019082431A1 (ja) | 2019-05-02 |
Family
ID=66247213
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2018/020549 WO2019082431A1 (ja) | 2017-10-26 | 2018-05-29 | 系統連系蓄電システム及び電流センサの取り付け異常検出方法 |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP7151715B2 (ja) |
WO (1) | WO2019082431A1 (ja) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2021027763A (ja) * | 2019-08-08 | 2021-02-22 | 住友電気工業株式会社 | 分散型電源システム及びその運用方法 |
JP2022032088A (ja) * | 2020-08-11 | 2022-02-25 | 東京電力ホールディングス株式会社 | 充電設備、充電制御装置、充電制御方法、及びプログラム |
JP2023054994A (ja) * | 2021-10-05 | 2023-04-17 | 住友電気工業株式会社 | 蓄電システム及びその制御方法 |
WO2025011329A1 (zh) * | 2023-07-13 | 2025-01-16 | 浙江艾罗网络能源技术股份有限公司 | 一种电流传感器的安装状态检测方法及装置 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2017184399A (ja) * | 2016-03-29 | 2017-10-05 | パナソニックIpマネジメント株式会社 | 電力変換装置および電力変換装置の制御方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6176573B2 (ja) | 2013-09-12 | 2017-08-09 | パナソニックIpマネジメント株式会社 | 逆電力検出装置 |
-
2018
- 2018-05-29 JP JP2019549833A patent/JP7151715B2/ja active Active
- 2018-05-29 WO PCT/JP2018/020549 patent/WO2019082431A1/ja active Application Filing
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2017184399A (ja) * | 2016-03-29 | 2017-10-05 | パナソニックIpマネジメント株式会社 | 電力変換装置および電力変換装置の制御方法 |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2021027763A (ja) * | 2019-08-08 | 2021-02-22 | 住友電気工業株式会社 | 分散型電源システム及びその運用方法 |
JP7234852B2 (ja) | 2019-08-08 | 2023-03-08 | 住友電気工業株式会社 | 分散型電源システム及びその運用方法 |
JP2023054203A (ja) * | 2019-08-08 | 2023-04-13 | 住友電気工業株式会社 | 分散型電源システム及びその運用方法 |
JP7439971B2 (ja) | 2019-08-08 | 2024-02-28 | 住友電気工業株式会社 | 分散型電源システム及びその運用方法 |
JP2022032088A (ja) * | 2020-08-11 | 2022-02-25 | 東京電力ホールディングス株式会社 | 充電設備、充電制御装置、充電制御方法、及びプログラム |
JP7559418B2 (ja) | 2020-08-11 | 2024-10-02 | 東京電力ホールディングス株式会社 | 充電設備、充電制御方法、及びプログラム |
JP2023054994A (ja) * | 2021-10-05 | 2023-04-17 | 住友電気工業株式会社 | 蓄電システム及びその制御方法 |
JP7694319B2 (ja) | 2021-10-05 | 2025-06-18 | 住友電気工業株式会社 | 蓄電システム及びその制御方法 |
WO2025011329A1 (zh) * | 2023-07-13 | 2025-01-16 | 浙江艾罗网络能源技术股份有限公司 | 一种电流传感器的安装状态检测方法及装置 |
Also Published As
Publication number | Publication date |
---|---|
JPWO2019082431A1 (ja) | 2020-11-19 |
JP7151715B2 (ja) | 2022-10-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6496039B2 (ja) | 電力制御装置、電力制御装置の制御方法、電力制御システム及び電力制御システムの制御方法 | |
WO2019082431A1 (ja) | 系統連系蓄電システム及び電流センサの取り付け異常検出方法 | |
JP6105705B2 (ja) | 系統連系用リレーの異常検出装置、及びパワーコンディショナ | |
JP5352743B2 (ja) | 分散型電源システム及びその制御方法 | |
US20120286759A1 (en) | Distributed power generation system | |
EP3252908B1 (en) | Power management device configured to determine mounting directions of current sensors of a power grid | |
US9935463B2 (en) | Redundant point of common coupling (PCC) to reduce risk of microgrid's islanding | |
JP2012222923A (ja) | 分散型発電装置 | |
JP4439350B2 (ja) | 自家発電システム | |
JP7176384B2 (ja) | 蓄電システム及び、電流センサの異常判定方法 | |
JP4353114B2 (ja) | パワーコンディショナ | |
JP6176573B2 (ja) | 逆電力検出装置 | |
JP6050111B2 (ja) | 電流センサ検出方法および電力制御システム | |
JP6114068B2 (ja) | 電流センサ検出方法 | |
JP2014217177A (ja) | 電力供給システムおよび蓄電装置 | |
JP5903592B2 (ja) | 電力変換システム | |
JP7259742B2 (ja) | 蓄電池システム、及び電力表示装置 | |
JP6673784B2 (ja) | 電力管理装置 | |
JP2025036123A (ja) | 系統連系蓄電システム及び電流センサの取り付け異常検出方法 | |
JP6731417B2 (ja) | 電力制御システム及び電力制御システムの制御方法 | |
WO2013128588A1 (ja) | 電力変換システム | |
JP6204258B2 (ja) | 電力制御システムの制御方法、電力制御装置、および電力制御システム | |
JP6022980B2 (ja) | センサ位置判定方法 | |
JP7314707B2 (ja) | 蓄電システム及びその制御方法 | |
JP6891209B2 (ja) | 無停電切替装置、切替ブレーカ装置及び無停電切替システム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18871240 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2019549833 Country of ref document: JP Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 18871240 Country of ref document: EP Kind code of ref document: A1 |