WO2019022166A1 - 鋳型及び鋳造部品の製造方法 - Google Patents

鋳型及び鋳造部品の製造方法 Download PDF

Info

Publication number
WO2019022166A1
WO2019022166A1 PCT/JP2018/027979 JP2018027979W WO2019022166A1 WO 2019022166 A1 WO2019022166 A1 WO 2019022166A1 JP 2018027979 W JP2018027979 W JP 2018027979W WO 2019022166 A1 WO2019022166 A1 WO 2019022166A1
Authority
WO
WIPO (PCT)
Prior art keywords
mold
molten metal
gap
heater
filling
Prior art date
Application number
PCT/JP2018/027979
Other languages
English (en)
French (fr)
Inventor
神山 直久
徹三 西村
真 村上
郁男 片岡
佐藤 慎也
猪狩 隆彰
Original Assignee
カルソニックカンセイ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by カルソニックカンセイ株式会社 filed Critical カルソニックカンセイ株式会社
Priority to DE112018003862.9T priority Critical patent/DE112018003862T5/de
Priority to CN201880048368.1A priority patent/CN110997181A/zh
Priority to US16/634,435 priority patent/US10967424B2/en
Publication of WO2019022166A1 publication Critical patent/WO2019022166A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D19/00Casting in, on, or around objects which form part of the product
    • B22D19/0063Casting in, on, or around objects which form part of the product finned exchangers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/06Permanent moulds for shaped castings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/08Features with respect to supply of molten metal, e.g. ingates, circular gates, skim gates
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D17/00Pressure die casting or injection die casting, i.e. casting in which the metal is forced into a mould under high pressure
    • B22D17/20Accessories: Details
    • B22D17/22Dies; Die plates; Die supports; Cooling equipment for dies; Accessories for loosening and ejecting castings from dies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D19/00Casting in, on, or around objects which form part of the product

Definitions

  • the present invention relates to a mold for forming a cast part and a method of manufacturing the cast part.
  • JP47-30053U discloses a spiral pipe through which a fluid flows, and a heat exchanger in which a sheathed heater that generates heat is cast in a cast part.
  • this kind of heat exchanger After a structure such as a pipe and a sheathed heater is installed in a mold, a molten metal of metal is filled in the mold. A cast part is formed by solidification of the molten metal thus filled. Pipes and sheathed heaters are built in the cast parts taken out of the mold.
  • the cast component is formed by, for example, the die casting method
  • the load received from the molten metal flow may deform the structure such as a pipe.
  • An object of the present invention is to prevent deformation of a structure cast in a cast part.
  • a mold comprising: a filling port opening at a desired position in the gap of the structure of the forming wall portion and allowing the molten metal to flow into the internal space.
  • a method of manufacturing a cast component wherein a cast component is molded by filling a molten metal in an inner space of a mold in which a structure having a gap is installed.
  • a filling step of flowing molten metal into the inner space through the filling port comprising: a forming wall portion forming an inner space; and a filling port opening at a desired position in the gap of the structure of the forming wall;
  • a method of making a cast component is provided.
  • the molten metal flow injected facing the gap from the filling port flows into the inner space through the gap. This prevents the high-speed molten metal stream from hitting the structure, thereby preventing the structure from being deformed by the load received from the molten metal stream.
  • FIG. 1 is a longitudinal sectional view showing a mold according to an embodiment of the present invention.
  • FIG. 2 is a longitudinal sectional view taken along the line II-II in FIG.
  • FIG. 3 is a cross-sectional view taken along the line III-III of FIG.
  • FIG. 4 is a cross-sectional view taken along the line IV-IV of FIG.
  • FIG. 5 is a view showing the arrangement of the heater and the filling port with respect to the internal space.
  • FIG. 6 is a view showing the arrangement of the heater and the filling port with respect to the internal space in a modification of the mold.
  • FIG. 7 is a longitudinal sectional view showing another modification of the mold.
  • FIG. 8 is a cross-sectional view showing still another modification of the mold.
  • FIG. 1 is a longitudinal sectional view showing a mold according to an embodiment of the present invention.
  • FIG. 2 is a longitudinal sectional view taken along the line II-II in FIG.
  • FIG. 3 is a cross-sectional view
  • FIG. 9 is a longitudinal sectional view showing still another modification of the mold.
  • FIG. 10 is a cross-sectional view taken along the line XX in FIG.
  • FIG. 11 is a longitudinal sectional view showing still another modification of the mold.
  • FIG. 12 is a cross-sectional view taken along the line XII-XII of FIG.
  • FIG. 1 to 4 are cross-sectional views showing a casting apparatus 100 to which a mold 30 according to the present embodiment is applied.
  • the casting apparatus 100 is illustrated with a part omitted.
  • the casting apparatus 100 includes a pressure unit (piston) 7 for pressurizing the molten metal injected into the injection chamber 6 and an internal space 90 filled with the molten metal flowing out of the injection chamber 6 by the pressure unit 7. And a mold 30 to be formed.
  • the molten metal is, for example, a molten metal such as an aluminum alloy.
  • the cast part 70 is formed by solidifying the molten metal filled in the internal space 90.
  • the mold 30 comprises a fixed mold 25 and a movable mold 21, lateral slides 22, 23 and a core 24 which are removed after molding.
  • the internal space 90 is formed by moving the movable mold 21, the lateral slides 22 and 23, and the core 24 in the direction indicated by the outlined arrow with respect to the fixed mold 25 and holding it at a predetermined position. .
  • the heater 10 is installed as a structure to be cast into the cast part 70.
  • the heater 10 is a sheathed heater including a heat generating portion (not shown) that generates heat by energization and a metal pipe (pipe) 10 a that houses the heat generating portion.
  • the heater 10 is not limited to this, and may be, for example, a PTC (Positive Temperature Coefficient) heater or the like.
  • the heater 10 has end portions 13 and 14 as fixing portions supported by the mold 30 and a spiral extending portion 15 extending from the end portions 13 and 14. Terminals 16 and 17 to which electrical wiring is connected are provided at the tip end of the end portions 13 and 14.
  • the metal pipe 10a is spirally wound around the center line O.
  • the metal tube 10a is wound with a gap 11 in the direction of the center line O, as shown in FIGS.
  • the metal tube 10a is wound in a substantially annular shape as viewed from the center line O direction.
  • the two end portions 13 and 14 extend from both ends of the extending portion 15 in parallel with each other.
  • the end portions 13 and 14 are formed to be substantially orthogonal to the center line O, as shown in FIG.
  • the end portions 13 and 14 are respectively installed near two opposing corners of the internal space 90, as shown in FIG.
  • the cast part 70 has the cylindrical cylinder part 71 in which the extension part 15 is cast, and the plate-shaped cover part 72 in which the edge parts 13 and 14 are cast.
  • the cylindrical portion 71 and the lid portion 72 are integrally formed.
  • the cylindrical portion 71 has a plurality of fins projecting from its outer surface.
  • the cast part 70 may be in the form of one block into which the extending portion 15 and the end portions 13 and 14 are cast without having the lid portion 72.
  • the mold 30 has a molded wall 32 for molding the cast part 70 and hole-like supports 33 and 34 for supporting the ends 13 and 14 of the heater 10.
  • the forming wall portion 32 includes a wall portion 35 for forming the cylinder portion 71, a wall portion 36 for forming the lid portion 72, and a hole-like wall portion 37 for forming a portion for connecting the cylinder portion 71 and the lid portion 72; And 38.
  • the mold 30 has filling ports 42 to 46 opened to the internal space 90, and a runner 40 communicating the injection chamber 6 with the internal space 90 via the filling ports 42 to 46.
  • the lower filling port 42 facing the lower part of the internal space 90 opens at the lower end face of the wall portion 36.
  • the molten metal filled from the lower filling port 42 into the internal space 90 in the wall portion 36 forms the lid 72 of the cast part 70.
  • the cylinder portion 71 of the cast part 70 is formed by the molten metal filled from the filling ports 43 to 46 into the internal space 90 in the wall portion 35.
  • an installation step of installing the heater 10 in the internal space 90 of the mold 30 is performed.
  • the heater 10 is assembled to the movable mold 21.
  • the heater 10 is installed at a predetermined position in the internal space 90 by inserting the end portions 13 and 14 into the hole-like support portions 33 and 34 through the hole-like wall portions 37 and 38.
  • the movable mold 21, the lateral slides 22 and 23 and the core 24 are assembled to the fixed mold 25 to form an internal space 90.
  • a filling step of filling the inner space 90 with the molten metal is performed.
  • the internal space 90 is filled with an active gas (oxygen).
  • a high temperature molten metal is injected into the injection chamber 6, and the pressurizing unit 7 is driven to pressurize the molten metal.
  • the molten metal extruded from the injection chamber 6 flows from the filling ports 42 to 46 into the internal space 90 through the runner 40 as shown by the arrows in FIG.
  • the molten metal is injected from the filling ports 42 to 46 as high-speed spray into the internal space 90.
  • the active gas is combined with the molten metal to be in a vacuum state, and the molten metal is filled without any gap. This prevents the formation of nests in the cast part 70.
  • the air in the internal space 90 may be discharged to the outside as the internal space 90 is filled with the molten metal by forming a gas venting hole in the mold 30. .
  • the cast part 70 is formed by solidifying the molten metal filled in the internal space 90. Then, the movable mold 21, the lateral slides 22 and 23, and the core 24 are separated from the cast part 70, and the cast part 70 is removed from the fixed mold 25.
  • the cast component 70 is manufactured.
  • the cast part 70 incorporating the heater 10 is assembled to a tank (not shown) as a heater unit.
  • the heat generated by the heater 10 is transferred to the fluid (medium) circulating in the tank through the casting component 70 to heat the fluid.
  • the internal space 90 has an extension region 95 at the center with respect to the center line O direction (vertical direction), and a support region 93 and a support region 94 arranged so as to sandwich the same.
  • the heater 10 is accommodated from the support area 93 over the extension area 95 and the support area 94.
  • the end 13 of the heater 10 and the connecting portion 15a are accommodated.
  • the connecting portion 15 a is a part of the extending portion 15 connected to the end 13.
  • the central extension 15 of the extension 15 of the heater 10 is housed in the central extension area 95.
  • the other support area 94 receives the end 14 of the heater 10 and the connecting portion 15 b.
  • the connecting portion 15 b is a part of the extending portion 15 connected to the end portion 14.
  • the wall portion 35 and the filling ports 43 to 46 constitute a weir for guiding the molten metal injected into the internal space 90 to a predetermined position.
  • the filling ports 43 to 46 are formed in a line at a position facing the central portion of the heater 10 including the central line O (see FIG. 3).
  • the filling ports 43 to 46 have a substantially rectangular channel cross-sectional shape, and the opening widths in the direction orthogonal to the center line O are formed to be substantially equal to each other.
  • the filling ports 43 to 46 are not limited to the above-described configuration, and may be formed at positions not facing the center line O.
  • the support portion filling port 43 facing the end portions 13 and 14 opens at a portion facing the support region 93 of the side end surface 35 a of the molded wall portion 32.
  • the support filling port 43 is formed at a position where the channel center line extends substantially parallel to the end 13 of the heater 10 at a distance.
  • the support portion filling ports 43 and 44 are formed in a slit shape whose opening width in the direction of the center line O is larger than the opening width in the direction orthogonal to the center line O.
  • the support portion filling port 43 is formed in the vicinity of the end portion 13 so as to face the connecting portion 15 a of the extending portion 15 and to be opposed to a position offset with respect to the support portion 33.
  • the support portion filling port 43 faces the center portion including the center line O of the connecting portion 15a as shown in FIG.
  • the support filling port 44 opens at a portion of the side end face 35 a facing the support area 94.
  • the support filling port 44 is formed at a position where the channel center line extends substantially parallel to the end 14 of the heater 10 with a gap.
  • the support portion filling port 44 is formed in the vicinity of the end portion 14 so as to face the connecting portion 15 b of the extending portion 15 and to be opposed to a position offset with respect to the support portion 34.
  • the support filling port 44 faces the center portion including the center line O of the connecting portion 15b.
  • the gap 11 of the heater 10 is a spiral space provided between the metal tubes 10 a and has a portion facing the side end surface 35 a of the molded wall portion 32.
  • the gap 11 is a gap (space) facing the side end surface 35 a of the molded wall portion 32.
  • the gap filling ports 45 and 46 are formed at positions facing the gap 11 of the heater 10.
  • the gap filling ports 45, 46 are formed such that the center lines of the flow paths intersect the gap 11.
  • the opening width of the gap filling ports 45 and 46 is formed smaller than the interval (pitch) in which the spiral metal tube 10a is wound.
  • the gap filling ports 45 and 46 are formed at positions not facing the central portion of the outer peripheral surface of the metal tube 10a. Thereby, the molten metal flow injected from the gap filling ports 45 and 46 into the extension area 95 flows into the inner space 90 through the gap 11 and is suppressed from hitting the central portion of the outer peripheral surface of the metal pipe 10a.
  • the mold 30 provided with the filling ports 43 to 46 for filling the interior space 90 in which the heater 10 is installed with the molten metal is provided.
  • the molten molten metal flows into the internal space 90 from the filling ports 43 to 46 at a speed of, for example, about 50 m / s.
  • the central portion 15c of the extending portion 15 deforms when the high-speed molten metal flow injected from the supporting portion filling ports 43 and 44 hits, because the distance to the supporting portions 33 and 34 is larger than that of the connecting portions 15a and 15b. There is a fear.
  • the heater 10 forms the gap 11 facing the molding wall 32 of the mold 30.
  • the mold 30 is opened at a portion facing the gap 11 of the formed wall portion 32 forming the inner space 90 and the formed wall portion 32, and gap portion filling ports 45, 46 (filling of molten metal into the inner space 90) And the mouth).
  • the molten metal injected from the gap filling ports 45 and 46 so as to face the gap 11 flows into each part of the internal space 90 through the gap 11.
  • the high-speed molten metal flow is suppressed from hitting the heater 10, so that the heater 10 is prevented from being deformed by the load received from the molten metal flow.
  • the molten metal flow smoothly flows in through the gap 11, the molten metal is filled in the respective portions of the internal space 90 without gaps.
  • the cast part 70 is prevented from having a nest inside, and the quality can be improved.
  • the mold 30 is configured to include the support portion filling ports 43 and 44 that open in the portion facing the support regions 93 and 94 of the molded wall portion 32.
  • the mold 30 includes the plurality of support portions 33 and 34.
  • the heater 10 has a configuration in which the extending portion 15 is extended across the plurality of end portions 13 and 14.
  • the heater unit maintains the shape of the deformable spiral metal pipe 10a, and the desired performance is obtained.
  • the mold 30 has small filling ports 47 to 49 having a smaller opening width than the filling ports 43 to 46.
  • the small filling ports 47 to 49 open at a portion of the formed wall portion 32 facing the heater 10.
  • the small filling ports 47 to 49 communicate the adjacent filling ports 43 to 46 with each other.
  • the small filling ports 47 to 49 are formed in the shape of a slit that opens at a position linearly aligned with the filling ports 43 to 46 and the center line O. In the direction orthogonal to the center line O, the opening width of the small filling ports 47 to 49 is smaller than the opening width of the filling ports 43 to 46.
  • the molten metal flow injected from the small filling ports 47 to 49 in the filling step passes through the small filling ports 47 to 49 and is decelerated by the application of resistance.
  • the molten metal flow injected from the small filling ports 47 to 49 is prevented from being deformed by impact.
  • the mold 30 has a gap 61, 62 between the end 13, 14 of the heater 10 and the end wall 35 b, 35 c of the wall portion 35.
  • the gaps 61 and 62 are gaps (spaces) facing the side end surface 35 a of the molded wall 32.
  • the mold 30 has gap filling ports 51 to 58 opened at the side end face 35a.
  • the gap filling ports 51 to 58 individually open in the gaps 61, the gaps 11, and the gaps 62 respectively.
  • the gap portion filling ports 51 to 58 are formed in a line at positions facing the central portion of the heater 10 including the central line O of the side end surface 35a.
  • the molten metal supplied through the runner 40 as shown by the arrow in FIG. 7 is injected from the gap filling ports 51 to 58, and the gaps 61, the gaps 11, and the gaps It flows into each part of the internal space 90 through 62.
  • the heater 10 is suppressed from being hit by the high-speed molten metal flow, and is prevented from being deformed by the molten metal flow.
  • the mold 30 has a gap 73, 74 between the outer periphery of the heater 10 and the wall portion 35 of the forming wall 32.
  • the gaps 73 and 74 are gaps (spaces) opposed to the side end surface 35 a of the molded wall 32.
  • the mold 30 has gap filling ports 65, 66 opened at locations facing the gaps 73, 74 of the side end face 35a.
  • the gap portion filling ports 65 and 66 are formed to be inclined with respect to a center line P extending in a substantially horizontal direction perpendicular to the center line O and to be opposed to the gaps 73 and 74.
  • the molten metal supplied through the runner 40 as shown by the arrow in FIG. 8 is injected from the gap filling ports 65 and 66 and passes through the gaps 73 and 74 in the inner space 90. It flows into each part.
  • the heater 10 is suppressed from being hit by the high-speed molten metal flow, and is prevented from being deformed by the molten metal flow.
  • the gap filling ports 65, 66 extend at an angle to each other to gradually separate from the chamber 59 of the runner 40 to the interior space 90. Thereby, the mold 30 can make the volume of the chamber 59 smaller than that in which the center lines of the gap filling ports 65 and 66 are disposed substantially in parallel. As a result, the material discarded after the molten metal solidifies in the chamber 59 can be reduced.
  • the extending portion 15 of the heater 10 has a serpentine shape in which the metal pipe 10 a reciprocates in the casting part 70.
  • the end portions 13 and 14 of the heater 10 extend from both ends of the extending portion 15 in parallel with each other.
  • the extending portion 15 of the heater 10 has a plurality of gaps 76 facing the side end surface 35 a of the molding wall 32. Gaps 75 and 77 are respectively formed between the end portions 13 and 14 of the heater 10 and both end wall surfaces 35 b and 35 c of the molded wall portion 32. These gaps 75 to 77 are gaps (spaces) facing the side end surface 35 a of the molded wall portion 32.
  • the mold 30 has gap filling ports 81 to 85 which individually face the gaps 75 to 77 of the heater 10.
  • the gap filling ports 81 to 85 are formed in line.
  • the molten metal supplied through the runner 40 as shown by the arrow in FIG. 9 is injected from the gap filling ports 81 to 85 and passes through the gaps 75 to 76 It flows into each part.
  • the heater 10 is suppressed from being hit by the high-speed molten metal flow, and is prevented from being deformed by the molten metal flow.
  • the extending portion 15 of the heater 10 is spirally wound around a center line P in which the metal pipe 10a extends in a substantially horizontal direction.
  • the extending portion 15 of the heater 10 has a gap 79 facing the side end surface 35 a of the molded wall portion 32.
  • the end portions 13 and 14 of the heater 10 extend from both ends of the extending portion 15 in parallel with each other. Gaps 78 and 80 are respectively formed between the end portions 13 and 14 of the heater 10 and both end wall surfaces 35 b and 35 c of the molded wall portion 32.
  • the mold 30 has gap filling ports 86 to 88 that open at opposite locations for each of the gaps 78 to 80.
  • the gap 78 and the gap filling port 86, the gap 79 and the gap filling port 87, and the gap 80 and the gap filling port 88 are formed side by side with respect to the center line P, respectively.
  • the molten metal supplied through the runner 40 as shown by the arrow in FIG. 11 is injected from the gap filling ports 86 to 88 and passes through the gaps 78 to 80 It flows into each part.
  • the heater 10 is suppressed from being hit by the high-speed molten metal flow, and is prevented from being deformed by the molten metal flow.
  • the present invention is suitable as a mold for casting a heater, but is also applicable to a mold for casting a structure other than the heater.
  • this invention is suitable as a casting method by the die-casting method of pressurizing a molten metal and filling a casting_mold

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Molds, Cores, And Manufacturing Methods Thereof (AREA)

Abstract

ヒータ10(構造物)は、鋳型30の成形壁部32に対向する間隙11を有する。鋳型30は、内部空間90を形成する成形壁部32と、成形壁部32のヒータ10が有する間隙11に望む部位に開口し、溶湯を内部空間90に流入させる間隙部充填口45、46(充填口)と、を備える。

Description

鋳型及び鋳造部品の製造方法
 本発明は、鋳造部品を成形する鋳型、及び鋳造部品の製造方法に関する。
 JP47-30053Uには、流体が流れる螺旋状のパイプ、及び発熱するシーズヒータが鋳造部品に鋳込まれた熱交換器が開示されている。
 この種の熱交換器の製造時には、鋳型内にパイプ及びシーズヒータといった構造物が設置された後に、鋳型内に金属の溶湯が充填される。こうして充填された溶湯が凝固することで鋳造部品が形成される。鋳型内から取り出された鋳造部品には、パイプ及びシーズヒータが内蔵される。
 しかしながら、上記鋳造部品が例えばダイキャスト工法によって形成される場合に、鋳型内に高速で射出される溶湯が構造物に当たると、溶湯流から受ける負荷によってパイプ等の構造物が変形するおそれがある。
 本発明は、鋳造部品に鋳込まれる構造物の変形を防止することを目的とする。
 本発明のある態様によれば、間隙を有する構造物が設置された内部空間に溶湯が充填されることで鋳造部品を成形する鋳型であって、前記内部空間を形成する成形壁部と、前記成形壁部の前記構造物が有する前記間隙に望む部位に開口して溶湯を前記内部空間に流入させる充填口と、を備える鋳型が提供される。
 又、本発明のある態様によれば、間隙を有する構造物が設置された鋳型の内部空間に溶湯を充填することで鋳造部品を成形する鋳造部品の製造方法であって、前記鋳型は、前記内部空間を形成する成形壁部と、前記成形壁部の前記構造物が有する前記間隙に望む部位に開口する充填口と、を備え、溶湯を前記充填口を通じて前記内部空間に流入させる充填工程を備える鋳造部品の製造方法が提供される。
 上記態様によれば、充填口から間隙に対向して射出される溶湯流は、間隙を通じて内部空間に流入する。これにより、高速の溶湯流が構造物に当たることが抑えられるため、構造物が溶湯流から受ける負荷によって変形することが防止される。
図1は、本発明の実施形態に係る鋳型を示す縦断面図である。 図2は、図1のII-II線に沿う縦断面図である。 図3は、図2のIII-III線に沿う横断面図である。 図4は、図2のIV-IV線に沿う横断面図である。 図5は、内部空間に対するヒータ及び充填口の配置を示す図である。 図6は、鋳型の変形例において、内部空間に対するヒータ及び充填口の配置を示す図である。 図7は、鋳型の他の変形例を示す縦断面図である。 図8は、鋳型のさらに他の変形例を示す横断面図である。 図9は、鋳型のさらに他の変形例を示す縦断面図である。 図10は、図9のX-X線に沿う横断面図である。 図11は、鋳型のさらに他の変形例を示す縦断面図である。 図12は、図11のXII-XII線に沿う横断面図である。
 以下、添付図面を参照しながら本発明の実施形態について説明する。
 図1~4は、本実施形態に係る鋳型30が適用される鋳造装置100を示す断面図である。なお、説明の簡略化のため、鋳造装置100は一部を省略して図示している。
 ダイキャスト工法による鋳造装置100は、注入室6内に注入された溶湯を加圧する加圧部(ピストン)7と、加圧部7によって注入室6から流出する溶湯が充填される内部空間90を形成する鋳型30と、を備える。溶湯は、例えばアルミニウム合金等の金属が溶融したものである。後述するように、鋳型30では、内部空間90に充填された溶湯が凝固することによって鋳造部品70が成形される。
 鋳型30は、固定型25と、成形後に取り外される可動型21、横スライド22、23及び中子24と、を備える。鋳型30では、固定型25に対して可動型21、横スライド22、23及び中子24が白抜き矢印で示す方向に移動して所定位置に保持されることによって、内部空間90が形成される。
 鋳型30の内部空間90には、鋳造部品70に鋳込まれる構造物としてヒータ10が設置される。
 ヒータ10は、通電によって発熱する発熱部(図示省略)と、発熱部を収容する金属管(パイプ)10aと、を備えるシーズヒータである。なお、ヒータ10は、これに限らず、例えばPTC(Positive Temperature Coefficient)ヒータなどであってもよい。
 ヒータ10は、鋳型30に支持される固定部としての端部13、14と、端部13、14から延設される螺旋状の延設部15と、を有する。端部13、14の先端部には、電気配線が接続される端子16、17が設けられる。
 延設部15では、金属管10aが中心線Oを中心として螺旋状に巻かれる。金属管10aは、図1、2に示すように、中心線O方向に間隙11を持って巻かれる。金属管10aは、図3に示すように、中心線O方向から見て略円環状に巻かれる。
 2本の端部13、14は、延設部15の両端から互いに略平行に並んで延在する。端部13、14は、図1に示すように、中心線Oと略直交するように形成される。端部13、14は、図2に示すように、内部空間90の対向する2つの隅部の近傍にそれぞれ設置される。
 鋳造部品70は、延設部15が鋳込まれる筒状の筒部71と、端部13、14が鋳込まれる板状の蓋部72と、を有する。筒部71と蓋部72とは、一体に形成される。筒部71は、その外面から突出する複数のフィンを有する。なお、鋳造部品70は、蓋部72を有することなく、延設部15及び端部13、14が鋳込まれる一つのブロック状のものであってもよい。
 鋳型30は、鋳造部品70を成形する成形壁部32と、ヒータ10の端部13、14を支持する孔状の支持部33、34と、を有する。
 成形壁部32は、筒部71を成形する壁部分35と、蓋部72を成形する壁部分36と、筒部71と蓋部72とを接続する部位を成形する孔状の壁部分37、38と、を有する。
 鋳型30は、内部空間90に開口する充填口42~46と、充填口42~46を介して注入室6と内部空間90とを連通する湯道40と、を有する。
 内部空間90の下部に臨む下部充填口42は、壁部分36の下端面に開口する。下部充填口42から壁部分36内の内部空間90に充填される溶湯によって鋳造部品70の蓋部72が形成される。
 内部空間90の側部に臨む充填口43~46は、壁部分35の側端面35aに開口する。充填口43~46から壁部分35内の内部空間90に充填される溶湯によって鋳造部品70の筒部71が形成される。
 次に、鋳造装置100によって鋳造部品70を鋳造する工程について説明する。
 まず、鋳型30の内部空間90にヒータ10を設置する設置工程が行なわれる。この設置工程において、まず、可動型21にヒータ10が組み付けられる。このときに、ヒータ10は、その端部13、14が孔状の壁部分37、38を通して孔状の支持部33、34に挿入されることで、内部空間90の所定位置に設置される。続いて、可動型21、横スライド22、23及び中子24が固定型25に組み付けられて、内部空間90が形成される。
 続いて、内部空間90に溶湯を充填する充填工程が行なわれる。この充填工程において、まず、内部空間90に活性ガス(酸素)が充填される。続いて、注入室6内に高温の溶湯が注入され、加圧部7を駆動して溶湯を加圧する。これにより、注入室6から押し出される溶湯は、図1に矢印で示すように、湯道40を通じて充填口42~46から内部空間90に流入する。このときに、溶湯は、充填口42~46から高速の噴霧となって内部空間90に射出される。これに伴って、内部空間90では、活性ガスが金属の溶湯と結合することで真空状態となり、溶湯が隙間なく充填される。これにより、鋳造部品70に巣が生じることが防止される。なお、これに限らず、例えば、鋳型30にガス抜き孔を形成して、内部空間90に溶湯が充填されるのに伴って、内部空間90の空気が外部に排出されるようにしてもよい。
 その後、鋳型30では、内部空間90に充填された溶湯が凝固することによって鋳造部品70が成形される。そして、可動型21、横スライド22、23及び中子24を鋳造部品70から離し、固定型25から鋳造部品70が取り外される。
 以上のようにして、鋳造部品70が製造される。ヒータ10を内蔵した鋳造部品70は、ヒータユニットとしてタンク(図示省略)に組み付けられる。ヒータユニットは、ヒータ10が発生する熱が鋳造部品70を介してタンク内を循環する流体(媒体)に伝えられ、流体を加熱するようになっている。
 次に、鋳型30の内部空間90に対するヒータ10及び充填口43~46の配置について説明する。
 図5に示すように、内部空間90は、中心線O方向(鉛直方向)について中央の延設領域95と、これを挟むように並ぶ支持領域93及び支持領域94と、を有する。ヒータ10は、支持領域93から延設領域95及び支持領域94にわたって収容される。
 一方の支持領域93には、ヒータ10の端部13及び連接部分15aが収容される。連接部分15aは、端部13に連接する延設部15の一部である。
 中央の延設領域95には、ヒータ10の延設部15の中央部分15cが収容される。
 他方の支持領域94には、ヒータ10の端部14及び連接部分15bが収容される。連接部分15bは、端部14に連接する延設部15の一部である。
 壁部分35及び充填口43~46は、内部空間90に射出される溶湯を所定の位置に導く堰を構成する。
 充填口43~46は、中心線Oを含むヒータ10の中心部に対向する位置に一列に並んで形成される(図3参照)。充填口43~46は、略矩形の流路断面形状を有し、中心線Oと直交方向の開口幅が互いに略等しい寸法に形成される。
 なお、充填口43~46は、上記した構成に限らず、中心線Oに対向しない位置に形成してもよい。
 端部13、14に対向する支持部充填口43は、成形壁部32の側端面35aの支持領域93に面する部位に開口する。支持部充填口43は、その流路中心線がヒータ10の端部13に対して間隔を持って略平行に延在する位置に形成される。
 支持部充填口43、44は、中心線O方向の開口幅が、中心線Oと直交方向の開口幅より大きいスリット状に形成される。
 支持部充填口43は、端部13の近傍で延設部15の連接部分15aに対向し、支持部33に対してオフセットされた位置に対向するように形成される。支持部充填口43は、図3に示すように、連接部分15aの中心線Oを含む中心部に対向する。
 これにより、支持部充填口43から射出される溶湯は、ヒータ10の端部13に沿って支持領域93の中央部に流入する。
 支持部充填口44は、側端面35aの支持領域94に面する部位に開口する。支持部充填口44は、その流路中心線がヒータ10の端部14に対して間隔を持って略平行に延在する位置に形成される。
 支持部充填口44は、端部14の近傍で延設部15の連接部分15bに対向し、支持部34に対してオフセットされた位置に対向するように形成される。支持部充填口44は、連接部分15bの中心線Oを含む中心部に対向する。
 これにより、支持部充填口44から射出される溶湯は、ヒータ10の端部14に沿って支持領域94の中央部に流入する。
 なお、上記した構成に限らず、支持部充填口43、44は、支持部33、34にそれぞれ対向するように、内部空間90の隅部近傍に臨む位置に形成してもよい。
 ヒータ10の間隙11は、金属管10aの間に設けられる螺旋状の空間であり、成形壁部32の側端面35aに対向する部位を有する。この間隙11は、成形壁部32の側端面35aに対向する間隙(空間)である。
 間隙部充填口45、46は、ヒータ10の間隙11に対向する位置に形成される。間隙部充填口45、46は、それぞれの流路中心線が間隙11と交差するように形成される。
 中心線O方向について、間隙部充填口45、46の開口幅は、螺旋状の金属管10aが巻かれる間隔(ピッチ)より小さく形成される。そして、間隙部充填口45、46は、金属管10aの外周面の中央部に対向しない位置に形成される。これにより、間隙部充填口45、46から延設領域95に射出される溶湯流は、間隙11を通じて内部空間90に流入し、金属管10aの外周面の中央部に当たることが抑えられる。
 以上のように、本実施形態によれば、ヒータ10が設置された内部空間90に溶湯を充填する充填口43~46を備える鋳型30が提供される。
 上記溶湯充填時に、噴霧状の溶湯が充填口43~46から例えば50m/s程度の速度で内部空間90に流入する。
 延設部15の中央部分15cは、支持部33、34に対する距離が連接部分15a、15bに比べて大きいため、支持部充填口43、44から射出される高速の溶湯流が当たると、変形するおそれがある。
 この対処方法として、本実施形態によれば、ヒータ10(構造物)は、鋳型30の成形壁部32に対向する間隙11を形成する。そして、鋳型30は、内部空間90を形成する成形壁部32と、成形壁部32の間隙11に対向する部位に開口し、溶湯を内部空間90に流入させる間隙部充填口45、46(充填口)と、を備える構成とした。
 このように構成することで、間隙部充填口45、46から間隙11に対向して射出される溶湯は、間隙11を通じて内部空間90の各部に流入する。これにより、高速の溶湯流がヒータ10に当たることが抑えられるため、ヒータ10が溶湯流から受ける負荷によって変形することが防止される。そして、溶湯流が間隙11を通じて円滑に流入するため、溶湯が内部空間90の各部に隙間なく充填される。これにより、鋳造部品70は、内部に巣が生じることが防止され、品質の向上が図れる。
 又、本実施形態によれば、鋳型30は、成形壁部32の支持領域93、94に面する部位に開口する支持部充填口43、44を備える構成とした。
 支持部充填口43、44から支持領域93、94に射出される溶湯流は、高速でヒータ10の端部13、14及び連接部分15a、15bに当たる。ヒータ10は、高速の溶湯流が当たる部位と支持部33、34との距離が短いため、溶湯流によって生じる曲げ応力が小さく抑えられる。これにより、ヒータ10は、溶湯流から受ける負荷に対する強度が確保され、溶湯流によって変形することが防止される。
 又、本実施形態によれば、鋳型30は、複数の支持部33、34を備える。そして、ヒータ10は、複数の端部13、14の間にわたって延設部15が延設される構成とした。
 このように構成することで、ヒータ10の延設部15は、複数の端部13、14に両持ち支持されるため、溶湯流によって生じる曲げ応力が小さく抑えられる。これにより、ヒータ10の変形を有効に防止できる。
 こうして、本実施形態によれば、鋳型30を用いてヒータ10を鋳込んだ鋳造部品70を製造する鋳造部品70の製造方法を提供することができる。
 又、本実施形態によれば、内部空間90に設置される構造物として、螺旋状の金属管10aを鋳込んだ鋳造部品70を製造する鋳造部品70の製造方法を提供することができる。
 これにより、ヒータユニットは、変形しやすい螺旋状の金属管10aの形状が保たれ、所期の性能が得られる。
 次に、図6に示す鋳型30の変形例について説明する。
 鋳型30は、充填口43~46に比べて小さい開口幅を有する小充填口47~49を有する。小充填口47~49は、成形壁部32のヒータ10に対向する部位に開口する。小充填口47~49は、隣り合う充填口43~46どうしをそれぞれ連通する。
 小充填口47~49は、充填口43~46と中心線Oに沿って直線上に並ぶ位置に開口するスリット状に形成される。中心線Oと直交する方向について、小充填口47~49の開口幅は、充填口43~46の開口幅に比べて小さい。
 このように構成することで、充填工程において、小充填口47~49から射出される溶湯流は、小充填口47~49を通過して抵抗が付与されることで減速する。これにより、ヒータ10の延設部15は、小充填口47~49から射出される溶湯流が当たって変形することが防止される。
 次に、図7に示す鋳型30の変形例について説明する。
 鋳型30は、ヒータ10の端部13、14と壁部分35の両端壁面35b、35cとの間に間隙61、62を有する。間隙61、62は、成形壁部32の側端面35aに対向する間隙(空間)である。
 鋳型30は、側端面35aに開口する間隙部充填口51~58を有する。間隙部充填口51~58は、間隙61、各間隙11、及び間隙62に個別に対向して開口する。間隙部充填口51~58は、側端面35aの中心線Oを含むヒータ10の中心部に対向する部位に一列に並んで形成される。
 このように構成することで、充填工程において、図7に矢印で示すように湯道40を通じて供給される溶湯は、間隙部充填口51~58から射出され、間隙61、各間隙11、及び間隙62を通じて内部空間90の各部に流入する。これにより、ヒータ10は、高速の溶湯流が当たることが抑えられ、溶湯流によって変形することが防止される。
 次に、図8に示す鋳型30の変形例について説明する。
 鋳型30は、ヒータ10の外周と成形壁部32の壁部分35との間に間隙73、74を有する。この間隙73、74は、成形壁部32の側端面35aに対向する間隙(空間)である。
 鋳型30は、側端面35aの間隙73、74に対向する部位に開口する間隙部充填口65、66を有する。間隙部充填口65、66は、中心線Oに直交して略水平方向に延びる中央線Pに対して傾斜し、間隙73、74に対向するように並んで形成される。
 このように構成することで、充填工程において、図8に矢印で示すように湯道40を通じて供給される溶湯は、間隙部充填口65、66から射出され、間隙73、74を通じて内部空間90の各部に流入する。これにより、ヒータ10は、高速の溶湯流が当たることが抑えられ、溶湯流によって変形することが防止される。
 間隙部充填口65、66は、湯道40のチャンバ59から内部空間90にかけて次第に離れるように互いに傾斜して延在する。これにより、鋳型30は、間隙部充填口65、66の中心線が略平行に配置されるものに比べて、チャンバ59の容積を小さくすることができる。この結果、溶湯がチャンバ59内で凝固した後に廃棄される材料を減らすことができる。
 次に、図9、10に示すヒータ10及び鋳型30の変形例について説明する。
 ヒータ10の延設部15は、金属管10aが鋳造部品70内を往復するつづら折り形状を有する。ヒータ10の端部13、14は、延設部15の両端から互いに略平行に並んで延在する。
 ヒータ10の延設部15は、成形壁部32の側端面35aに対向する複数の間隙76を有する。ヒータ10の端部13、14と成形壁部32の両端壁面35b、35cとの間には、間隙75、77がそれぞれ形成される。これらの間隙75~77は、成形壁部32の側端面35aに対向する間隙(空間)である。
 鋳型30は、ヒータ10の間隙75~77に個別に対向する間隙部充填口81~85を有する。間隙部充填口81~85は、一列に並んで形成される。
 このように構成することで、充填工程において、図9に矢印で示すように湯道40を通じて供給される溶湯は、間隙部充填口81~85から射出され、間隙75~76を通じて内部空間90の各部に流入する。これにより、ヒータ10は、高速の溶湯流が当たることが抑えられ、溶湯流によって変形することが防止される。
 次に、図11、12に示すヒータ10及び鋳型30の変形例について説明する。
 ヒータ10の延設部15は、金属管10aが略水平方向に延びる中央線Pを中心として螺旋状に巻かれる。ヒータ10の延設部15は、成形壁部32の側端面35aに対向する間隙79を有する。
 ヒータ10の端部13、14は、延設部15の両端から互いに略平行に並んで延在する。ヒータ10の端部13、14と成形壁部32の両端壁面35b、35cとの間には、間隙78、80がそれぞれ形成される。
 鋳型30は、間隙78~80毎に対向する部位に開口する間隙部充填口86~88を有する。間隙78と間隙部充填口86、間隙79と間隙部充填口87、間隙80と間隙部充填口88は、それぞれ中央線Pについて並んで形成される。
 このように構成することで、充填工程において、図11に矢印で示すように湯道40を通じて供給される溶湯は、間隙部充填口86~88から射出され、間隙78~80を通じて内部空間90の各部に流入する。これにより、ヒータ10は、高速の溶湯流が当たることが抑えられ、溶湯流によって変形することが防止される。
 以上、本発明の実施形態について説明したが、上記実施形態は本発明の適用例の一部を示したに過ぎず、本発明の技術的範囲を上記実施形態の具体的構成に限定する趣旨ではない。
 本発明は、ヒータを鋳込む鋳型として好適であるが、ヒータ以外の構造物を鋳込む鋳型にも適用できる。
 本発明は、溶湯を加圧して鋳型に充填するダイキャスト工法による鋳造方法として好適であるが、他の鋳造方法にも適用できる。
 本願は、2017年7月28日に日本国特許庁に出願された特願2017-146978に基づく優先権を主張する。この出願のすべての内容は参照により本明細書に組み込まれる。

Claims (5)

  1.  間隙を有する構造物が設置された内部空間に溶湯が充填されることで鋳造部品を成形する鋳型であって、
     前記内部空間を形成する成形壁部と、
     前記成形壁部の前記構造物が有する前記間隙に望む部位に開口し、溶湯を前記内部空間に流入させる充填口と、
     を備える鋳型。
  2.  請求項1に記載の鋳型であって、
     前記構造物は、
     前記成形壁部に支持される固定部と、
     前記固定部から延設される延設部と、を有し、
     前記内部空間は、
     前記固定部を収容する支持領域と、
     前記延設部を収容する延設領域と、を有し、
     前記成形壁部の前記支持領域に面する部位に開口する支持部充填口をさらに備える鋳型。
  3.  請求項1又は2に記載の鋳型であって、
     前記成形壁部の前記構造物に対向する部位に開口し、前記充填口に比べて小さい開口幅を有する小充填口をさらに備える鋳型。
  4.  間隙を有する構造物が設置された鋳型の内部空間に溶湯を充填することで鋳造部品を成形する鋳造部品の製造方法であって、
     前記鋳型は、
     前記内部空間を形成する成形壁部と、
     前記成形壁部の前記構造物が有する前記間隙に望む部位に開口する充填口と、を備え、
     溶湯を前記充填口を通じて前記内部空間に流入させる充填工程を備える鋳造部品の製造方法。
  5.  請求項4に記載の鋳造部品の製造方法であって、
     前記構造物として、螺旋状の金属管を鋳込む鋳造部品の製造方法。
PCT/JP2018/027979 2017-07-28 2018-07-25 鋳型及び鋳造部品の製造方法 WO2019022166A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
DE112018003862.9T DE112018003862T5 (de) 2017-07-28 2018-07-25 Gussform und herstellungsverfahren eines gussteils
CN201880048368.1A CN110997181A (zh) 2017-07-28 2018-07-25 铸造模具及铸件的制造方法
US16/634,435 US10967424B2 (en) 2017-07-28 2018-07-25 Casting mold and manufacturing method of cast part

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017146978A JP7017877B2 (ja) 2017-07-28 2017-07-28 鋳型及び鋳造部品の製造方法
JP2017-146978 2017-07-28

Publications (1)

Publication Number Publication Date
WO2019022166A1 true WO2019022166A1 (ja) 2019-01-31

Family

ID=65040486

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/027979 WO2019022166A1 (ja) 2017-07-28 2018-07-25 鋳型及び鋳造部品の製造方法

Country Status (5)

Country Link
US (1) US10967424B2 (ja)
JP (1) JP7017877B2 (ja)
CN (1) CN110997181A (ja)
DE (1) DE112018003862T5 (ja)
WO (1) WO2019022166A1 (ja)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6228058A (ja) * 1985-07-30 1987-02-06 Hitachi Metals Ltd パイプ鋳包み鋳造法
JPH0248266U (ja) * 1988-09-30 1990-04-03
JPH03142057A (ja) * 1989-10-30 1991-06-17 Atsugi Unisia Corp 鋳包み鋳造方法
JP2017053615A (ja) * 2015-09-09 2017-03-16 カルソニックカンセイ株式会社 流体加熱装置及びその製造方法
JP2018124022A (ja) * 2017-02-02 2018-08-09 株式会社サンテック 熱交換器、及びその製造方法

Family Cites Families (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4730053U (ja) 1971-04-30 1972-12-05
JPS5256436A (en) * 1975-10-31 1977-05-09 Tokico Ltd Manufacturing process of heat-pipe unit
JPS54106569A (en) * 1978-02-07 1979-08-21 Mitsuboshi Belting Ltd Injection molding of resin product having insert
JPS57201638A (en) * 1981-06-08 1982-12-10 Ichikoh Ind Ltd Insert molding method of thin-wall parts
EP0081318B1 (en) * 1981-12-07 1986-11-12 Burwell, Reed And Kinghorn Limited A cast metal composite component
JPS58125362A (ja) * 1981-12-07 1983-07-26 バ−ウエル・リ−ド・アンド・キングホ−ン・リミテツド 鋳型及びそれを製造する方法
JPH04288942A (ja) * 1991-03-15 1992-10-14 Ube Ind Ltd 精密鋳造金型の製造方法
JP2000102856A (ja) * 1998-09-28 2000-04-11 Sintokogio Ltd 鋳造方法
JP3237646B2 (ja) 1999-03-09 2001-12-10 日本軽金属株式会社 ブレーキキャリパ鋳造用金型
JP4393687B2 (ja) * 2000-09-18 2010-01-06 株式会社堀場エステック 熱交換器、気化器、および、この気化器を用いた気化システム
US20050259507A1 (en) * 2004-05-24 2005-11-24 Entek Manufacturing Inc. Cast extrusion barrel with integral heat-exchangers and method for making same
JP2008229708A (ja) 2007-03-23 2008-10-02 Tanaka Electronics Ind Co Ltd インゴット製造用鋳型及び伸線用インゴット製造装置
US8215372B2 (en) * 2008-10-17 2012-07-10 Brp Us Inc. Method and apparatus for consumable-pattern casting
CN101693293B (zh) * 2009-10-01 2011-02-09 遵义拓特铸锻有限公司 用于环蒸炉的双金属温控式导体铸造工艺
JP2011247545A (ja) 2010-05-28 2011-12-08 Horiba Stec Co Ltd 熱交換器の製造方法及び熱交換器、気化器
JP5502670B2 (ja) 2010-09-14 2014-05-28 本田金属技術株式会社 ピストンの鋳造方法
CN104308090B (zh) * 2014-10-24 2016-08-24 永济市泰昌铝业加工有限公司 螺旋冷却通道铸铝机座整体铸造模具及方法
CN204182867U (zh) * 2014-11-11 2015-03-04 沈阳黎明航空发动机(集团)有限责任公司 一种滑油泵壳体铸件细孔铸造浇注系统
CN108027167B (zh) 2015-09-09 2022-06-10 马瑞利(中国)汽车空调有限公司 流体加热装置及其制造方法
CN105680608B (zh) * 2016-01-16 2019-03-01 上海雷祥压铸有限公司 水冷管、电机外壳及其制造方法
JP2017146978A (ja) 2017-03-23 2017-08-24 株式会社リコー 機器、情報処理端末、情報処理システム、表示制御方法、及びプログラム

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6228058A (ja) * 1985-07-30 1987-02-06 Hitachi Metals Ltd パイプ鋳包み鋳造法
JPH0248266U (ja) * 1988-09-30 1990-04-03
JPH03142057A (ja) * 1989-10-30 1991-06-17 Atsugi Unisia Corp 鋳包み鋳造方法
JP2017053615A (ja) * 2015-09-09 2017-03-16 カルソニックカンセイ株式会社 流体加熱装置及びその製造方法
JP2018124022A (ja) * 2017-02-02 2018-08-09 株式会社サンテック 熱交換器、及びその製造方法

Also Published As

Publication number Publication date
US10967424B2 (en) 2021-04-06
CN110997181A (zh) 2020-04-10
JP7017877B2 (ja) 2022-02-09
DE112018003862T5 (de) 2020-04-30
US20200164427A1 (en) 2020-05-28
JP2019025515A (ja) 2019-02-21

Similar Documents

Publication Publication Date Title
DE102012209510A1 (de) Integrierter Auslasszylinderkopf
JP5866011B2 (ja) 吸気マニホールド
KR20100047309A (ko) 내연 기관용 실린더 크랭크케이스
JP4440957B2 (ja) 熱交換器
CN204457982U (zh) 排气歧管
WO2019022165A1 (ja) 鋳型及び鋳造部品の製造方法
WO2019022166A1 (ja) 鋳型及び鋳造部品の製造方法
WO2019022167A1 (ja) 鋳型及び鋳造部品の製造方法
JP5279462B2 (ja) 燃料電池の外部マニホールド及びその製造方法
CN111151735B (zh) 铸型
EP2422901B1 (de) Vorrichtung zum Gießen von Gußeisen in einer Kokille
JP6726056B2 (ja) 隔壁プレート
JP5336227B2 (ja) 射出成形品の製造方法及び射出成形装置
WO2016132503A1 (ja) 低圧鋳造装置の湯口構造及び該湯口を有する低圧鋳造装置
SE519097C2 (sv) Förfarande för framställning av en produkt medelst pressgjutning
JP6657974B2 (ja) 金属樹脂一体成形品及びその製造方法
JP7512217B2 (ja) 樹脂製タンク
US9079242B2 (en) Hot-top for continuous casting and method of continuous casting
JP4139754B2 (ja) 鋳造方法
JP6771679B2 (ja) 金型および金型の製造方法
JP2017170508A (ja) シリンダヘッド鋳造用中子
JP2010174868A (ja) シリンダブロック
JP2009228915A (ja) 車両用熱交換器のタンク構造
JP2007296572A (ja) 金型の冷却構造
JP2007132277A (ja) ラジエータ構造

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18838015

Country of ref document: EP

Kind code of ref document: A1

DPE1 Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101)
122 Ep: pct application non-entry in european phase

Ref document number: 18838015

Country of ref document: EP

Kind code of ref document: A1