WO2018229989A1 - テープフィーダおよびキャリアテープの装填方法 - Google Patents

テープフィーダおよびキャリアテープの装填方法 Download PDF

Info

Publication number
WO2018229989A1
WO2018229989A1 PCT/JP2017/022397 JP2017022397W WO2018229989A1 WO 2018229989 A1 WO2018229989 A1 WO 2018229989A1 JP 2017022397 W JP2017022397 W JP 2017022397W WO 2018229989 A1 WO2018229989 A1 WO 2018229989A1
Authority
WO
WIPO (PCT)
Prior art keywords
tape
cavity
carrier tape
feeder
tip
Prior art date
Application number
PCT/JP2017/022397
Other languages
English (en)
French (fr)
Inventor
広康 大橋
浩規 村瀬
Original Assignee
株式会社Fuji
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社Fuji filed Critical 株式会社Fuji
Priority to JP2019524708A priority Critical patent/JP7001684B2/ja
Priority to US16/620,557 priority patent/US11596090B2/en
Priority to EP17913835.9A priority patent/EP3641521A4/en
Priority to CN201780092005.3A priority patent/CN110754143B/zh
Priority to PCT/JP2017/022397 priority patent/WO2018229989A1/ja
Publication of WO2018229989A1 publication Critical patent/WO2018229989A1/ja
Priority to JP2021164355A priority patent/JP7092931B2/ja
Priority to JP2021164356A priority patent/JP7019861B2/ja
Priority to JP2022014980A priority patent/JP7074942B2/ja
Priority to JP2022096974A priority patent/JP7123280B2/ja

Links

Images

Classifications

    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/02Feeding of components
    • H05K13/021Loading or unloading of containers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H23/00Registering, tensioning, smoothing or guiding webs
    • B65H23/04Registering, tensioning, smoothing or guiding webs longitudinally
    • B65H23/18Registering, tensioning, smoothing or guiding webs longitudinally by controlling or regulating the web-advancing mechanism, e.g. mechanism acting on the running web
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/02Feeding of components
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/04Mounting of components, e.g. of leadless components
    • H05K13/0417Feeding with belts or tapes
    • H05K13/0419Feeding with belts or tapes tape feeders
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/08Monitoring manufacture of assemblages
    • H05K13/086Supply management, e.g. supply of components or of substrates
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/08Monitoring manufacture of assemblages
    • H05K13/0882Control systems for mounting machines or assembly lines, e.g. centralized control, remote links, programming of apparatus and processes as such
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/53Means to assemble or disassemble
    • Y10T29/5313Means to assemble electrical device
    • Y10T29/53174Means to fasten electrical component to wiring board, base, or substrate

Definitions

  • the present invention relates to a tape feeder and a carrier tape loading method.
  • the tape feeder is used in an electronic component mounting machine that mounts components on a circuit board.
  • the tape feeder for example, as disclosed in Patent Document 1, there is an autoloading type capable of automatically loading a carrier tape inserted from an insertion portion provided at a rear portion of the tape feeder.
  • an autoloading tape feeder positions a cavity in a supply unit that supplies electronic components to an electronic component mounting machine, for example.
  • the conveyance may be continued to some extent even after the tip of the carrier tape passes through the supply unit.
  • the electronic component is wasted without being supplied to the electronic component mounting machine.
  • an empty cavity is provided near the tip of the carrier tape, the empty cavity is positioned in the supply unit, and a supply error may occur.
  • the present specification is provided in the feeder main body having an insertion portion into which a front end of a carrier tape containing electronic components is inserted, a feeder main body that supplies the electronic components to the electronic component mounting machine, and the feeder main body,
  • a control device for controlling the driving device to carry and performing a loading process for loading the carrier tape, wherein the carrier tape has a plurality of cavities respectively storing the electronic components in the carrying direction.
  • the control device is configured to start from the front end side of the plurality of cavities in the loading process.
  • a tape feeder that starts and positions the first cavity at a predetermined position in the feeder body according to the detection result of the detection sensor.
  • the present specification is a loading method for loading a carrier tape containing electronic components into a tape feeder, wherein the tape feeder includes an insertion portion into which a tip of the carrier tape is inserted, and the electronic component mounting machine includes the electronic tape.
  • a feeder main body having a supply section for supplying parts, a drive device provided in the feeder main body for conveying the carrier tape, and a leading end of the carrier tape detected in a conveyance path between the insertion section and the supply section And a control device for controlling the driving device so as to transport the carrier tape inserted in the insertion portion to the supply portion, and executing a loading process for loading the carrier tape,
  • a plurality of cavities for respectively storing the electronic components are formed at predetermined intervals in the transport direction.
  • the loading process in the loading process, adjustment is performed in advance so that the length from the first cavity that initially stores the electronic component to the front end of the carrier tape from the front end side of the plurality of cavities becomes a predetermined length. And when the adjusted carrier tape is inserted into the insertion portion, the carrier tape starts to be conveyed, and the first cavity is set at a predetermined position in the feeder body according to the detection result by the detection sensor. And a positioning step for positioning the carrier tape.
  • the carrier tape whose length from the first cavity to the tip is adjusted to a specified length is positioned at a predetermined position in the feeder body. Can be loaded.
  • the first cavity is positioned in the supply part, the position in the width direction of the carrier tape is stabilized because the tip part of the specified length is secured, and as a result, the supply of electronic components can be stabilized. it can.
  • no electronic component is stored on the tip side from the first cavity, it is possible to prevent generation of useless electronic components.
  • Embodiment 1-1 Outline of Tape Feeder 1
  • the tape feeder 1 is an autoloading tape feeder used in an electronic component mounting machine that mounts components on a circuit board to produce a substrate product.
  • the electronic component mounting machine is referred to as “component mounting machine”
  • the tape feeder is referred to as “feeder”
  • the circuit board is referred to as “substrate”
  • the electronic component is referred to as “component”.
  • the feeder 1 executes a loading process of conveying along the rail 11 from the insertion portion Pi into which the carrier tape 90 is inserted.
  • the feeder 1 transports the loaded carrier tape 90 to the supply unit Pt that supplies the components to the component mounting machine, and enables the supply unit Pt to supply the components.
  • the feeder 1 conveys the carrier tape 90 by feeding and moving the carrier tape 90 at a predetermined pitch in a state where it is set in the component mounting machine. For example, when the remaining amount of the current carrier tape 90 that is in use is less than a specified amount, the feeder 1 conveys the carrier tape 90 for supply. Thereby, the feeder 1 can supply components continuously without splicing the carrier tape 90 for supply to the current carrier tape 90. Moreover, the feeder 1 performs the unloading process which conveys the carrier tape 90 to the insertion part Pi side, when removing the carrier tape 90 currently loaded.
  • the carrier tape 90 accommodates a large number of parts in a row.
  • the carrier tape 90 includes a base tape 91 and a cover tape 92.
  • the base tape 91 is formed of a flexible material such as paper or resin.
  • a cavity 95 is formed near the center in the width direction (vertical direction in FIG. 2).
  • the cavity 95 has a concave shape having a bottom.
  • the cavities 95 are formed at predetermined intervals in the transport direction of the base tape 91 (the longitudinal direction of the carrier tape 90 and the left-right direction in FIG. 2). Each cavity 95 houses one part.
  • the base tape 91 is formed with an engagement hole 96 at one edge in the width direction.
  • the engagement holes 96 are formed at predetermined intervals in the longitudinal direction of the base tape 91.
  • the engagement hole 96 penetrates in the thickness direction of the carrier tape 90 (the front-rear direction in FIG. 2).
  • the plurality of cavities 95 are formed at predetermined intervals in the transport direction. The interval T1 between the cavities 95 is appropriately set according to the dimensions of the components to be accommodated.
  • Etc. 4 shows the carrier tape 90 in which the interval T1 between the cavities 95 is set equal to the interval T2 between the engagement holes 96, like the carrier tape 90 in the third stage from the top in FIG.
  • the cover tape 92 is omitted, the cavity 95 containing the components is indicated by hatching, and the empty cavity 95 is indicated by no hatching.
  • the cover tape 92 is formed of a thin film polymer film. Both edges in the width direction of the cover tape 92 are bonded to the upper surface of the base tape 91. Thereby, the cover tape 92 closes the opening of the cavity 95. This prevents the components stored in the cavity 95 of the base tape 91 from falling off.
  • the cover tape 92 is peeled off by the tape guide 50 of the feeder 1 immediately before the supply part Pt of the feeder 1.
  • the carrier tape is referred to as “tape”.
  • the feeder 1 includes a feeder body 10, a first drive device 20, a second drive device 30, a tape support unit 40, a tape guide 50, and an urging device 55. And a detection sensor 61 and a control device 70.
  • the downstream side (the right side in FIG. 1) in the transport direction in which the tape 90 is transported in the loading process is the front, and the upstream side (the left side in FIG. 1) in the transport direction is the rear.
  • the feeder main body 10 is formed in a flat box shape, and is set in a slot of a component supply device that constitutes a component mounting machine.
  • the feeder body 10 includes a rail 11 that forms a transport path R1 between the insertion portion Pi and the supply portion Pt.
  • the first drive unit 20 includes a first sprocket 21 and a second sprocket 22 that are rotatably supported by the feeder body 10.
  • the first sprocket 21 and the second sprocket 22 are provided in the insertion portion Pi.
  • the 2nd drive device 30 has the 3rd sprocket 31 and the 4th sprocket 32 which were provided under the rail in supply part Pt.
  • engagement protrusions 311 and 321 are arranged at equal intervals in the circumferential direction over the entire circumference.
  • the second drive device 30 has a stepping motor 33 as a drive source for rotating the third sprocket 31 and the fourth sprocket 32.
  • Stepping motor 33 rotates the rotating shaft according to the input pulse power.
  • the reduction gear 34 that meshes with the drive gear provided on the rotating shaft rotates.
  • the driving force output by the stepping motor 33 is transmitted to the third sprocket 31 and the fourth sprocket 32 via an intermediate gear 35 that meshes with the reduction gear 34.
  • the intermediate gear 35 always meshes with a sprocket gear 312 provided on the third sprocket 31 and a sprocket gear 322 provided on the fourth sprocket 32.
  • the intermediate gear 35 is shared so that both the third sprocket 31 and the fourth sprocket 32 are directly rotated.
  • the second drive device 30 has an angle detection device 36 that detects the angle of the intermediate gear 35.
  • the angle detection device 36 includes a hall magnet and a hall sensor. One hall magnet is provided at a specified position in the intermediate gear 35.
  • the hall sensor is fixed to the feeder body 10 and detects the hall magnet.
  • the tape support unit 40 is disposed above the rail 11 where the first drive device 20 is located in the transport direction of the tape 90.
  • the tape support unit 40 presses the tape 90 interposed between the rail 11 and the rail 11 to restrict the upward movement of the tape 90.
  • the tape support unit 40 assists the engagement between the engagement hole 96 of the tape 90 and the first sprocket 21 and the second sprocket 22 of the first drive device 20.
  • the tape support unit 40 supports the replenishment tape 90 inserted in a reserved manner with respect to the current tape 90.
  • the tape guide 50 is disposed above the rail 11 where the third sprocket 31 and the fourth sprocket 32 of the second drive device 30 are positioned in the transport direction of the tape 90.
  • the tape guide 50 regulates the upward movement and the width direction movement of the tape 90 and guides the engagement between the tape 90 and the third sprocket 31 and the fourth sprocket 32.
  • the tape guide 50 includes a guide main body 51, a peeling device 52, and a bending device 53.
  • the guide body 51 is formed in a U-shaped cross section with the lower part opened as an overall shape.
  • a cutout portion 511 is formed in the upper wall of the guide body 51 in a range including the supply portion Pt.
  • the tape guide 50 can extract components from the cavity 95 of the tape 90 positioned in the supply part Pt.
  • the tape guide 50 is configured such that the cavity 95 at the standby position Ps on the insertion portion side (left side in FIG. 4) from the cavity 95 in the supply portion Pt does not expose the opening.
  • the peeling device 52 is provided on the guide main body 51.
  • the peeling device 52 has a peeling blade 521 that cuts into an adhesive portion between the base tape 91 and the cover tape 92.
  • the peeling blade 521 is disposed so that the blade edge protrudes downward from the inner peripheral surface of the upper wall of the guide body 51 by the thickness of the cover tape 92 (see FIG. 7A). Thereby, the peeling blade 521 cuts into the adhesion part of the base tape 91 and the cover tape 92 with the conveyance of the tape 90, and peels the cover tape 92 (refer FIG. 7C).
  • the peeling blade 521 has one side in the blade width direction (the lower side in FIG. 4) positioned on the outer side in the width direction of the tape 90, and the other side in the blade width direction (the upper side in FIG. 4). It is located inside 90 in the width direction. Accordingly, the cover tape 92 is maintained in a state where the edge portion of the base tape 91 on the side of the engagement hole 96 in the width direction is bonded to the base tape 91. As described above, the peeling device 52 peels from the base tape 91 while leaving a part in the width direction of the cover tape 92.
  • the bending device 53 is provided in the guide main body 51, and is positioned on the supply unit Pt side of the peeling device 52 with respect to the cutting edge of the peeling blade 521.
  • the bending device 53 starts up the portion of the cover tape 92 that has been peeled off from the base tape 91 by the peeling device 52, and bends it toward the engagement hole 96. As a result, the opening of the cavity 95 of the base tape 91 is not blocked by the cover tape 92.
  • the bending device 53 starts up and bends the cover tape 92 (shown with hatched portions visible in FIG. 4) peeled in a certain section in the transport direction. .
  • the cover tape 92 is completely bent toward the engagement hole 96 before and after the standby position Ps.
  • the folding device 53 is in contact with the edge in the width direction of the back surface (the surface bonded to the base tape 91) of the folded cover tape 92 and maintains the state of the folded cover tape 92. Part 531.
  • the urging device 55 urges the guide body 51 toward the rail 11 so that the tape 90 is held between the rail 11 and the guide body 51 constituting the transport path R1.
  • the urging device 55 includes protrusions 551 and 552 that are engaged with the guide body 51 in the vertical direction before and after the side walls on both sides of the guide body 51.
  • the urging device 55 urges the guide main body 51 locked to the protrusions 551 and 552 downward as a whole by the elastic force of a spring (not shown).
  • the tape guide 50 holds the tape 90 between the rail 11 and the guide body 51 when the tape 90 is conveyed to the supply unit Pt side. Further, the tape guide 50 is bent while peeling the cover tape 92 from the base tape 91 as the tape 90 is transported, and exposes the parts in the supply section Pt so that the parts can be collected. A portion of the tape 90 that has passed through the supply portion Pt is discharged to the outside of the feeder 1 from a tape discharge portion (not shown) formed in the front portion of the feeder body 10.
  • the detection sensor 61 detects the tip of the tape 90 in the transport path R1 between the insertion part Pi and the supply part Pt.
  • the detection sensor 61 detects the front end (or rear end) of the tape 90 when the presence or absence of the tape 90 at the detection position is switched.
  • a contact type or non-contact type sensor can be adopted as the detection sensor 61.
  • the detection sensor 61 is arranged such that the transport distance from the supply unit Pt is a specified distance in the transport direction of the tape 90.
  • the control device 70 is mainly composed of a CPU, various memories, and a control circuit.
  • the control device 70 is supplied with electric power from the component mounting machine via the connector and can communicate with the component mounting machine.
  • the control device 70 controls the operations of the first drive device 20 and the second drive device 30 based on a control command from the component mounting machine. Thereby, the control device 70 executes a loading process for loading the tape 90 into the feeder 1, a supply process for feeding and moving the tape 90 at a predetermined pitch, and an unloading process for removing the tape 90 from the feeder 1.
  • the control device 70 when the control device 70 detects that the front end of the tape 90 is inserted from the insertion portion Pi by a sensor (not shown), the control device 70 drives the first drive device 20 to convey the tape 90. To start. At this time, the engagement projections of the first sprocket 21 and the second sprocket 22 are sequentially engaged with the engagement hole 96 at the tip of the tape 90, and the tape 90 is conveyed to the supply portion Pt side at a constant speed.
  • the control device 70 calculates the remaining transport amount according to the transport distance from the detection sensor 61 to the supply unit Pt.
  • the first cavity 95F in which components are first stored from the front end side is defined as a first cavity 95F (see FIG. 6).
  • the control device 70 also determines the tape 90 based on the angle and the rotation amount of the first sprocket 21 and the second sprocket 22 of the first drive device 20 and the third sprocket 31 and the fourth sprocket 32 of the second drive device 30. Control the transport amount. More specifically, the control device 70 determines the third sprocket based on the rotation amount of the intermediate gear 35 according to the angle of the intermediate gear 35 detected by the angle detection device 36 and the pulse power input to the stepping motor 33. The angles of 31 and the fourth sprocket 32 are calculated.
  • the control device 70 is based on the amount of rotation of the intermediate gear 35 according to the pulse power input to the stepping motor 33 from when the angle detection device 36 detects that the intermediate gear 35 is at the specified angle.
  • the rotation amounts of the third sprocket 31 and the fourth sprocket 32 are acquired.
  • the control device 70 calculates the angles of the first sprocket 21 and the second sprocket 22 in the first drive device 20 and acquires the rotation amounts thereof.
  • the control device 70 synchronizes the first drive device 20 and the second drive device 30 to position the cavity 95 of the tape 90 at a predetermined position such as the supply unit Pt.
  • the loading process by the feeder 1 and the loading method of the tape 90 will be described with reference to FIGS. 4 to 7C. 7A to 7C, the components housed in the cavity 95 are indicated by hatching.
  • the tape 90 loaded in the feeder 1 is assumed to be a new tape 90 or an already-used tape 90 removed from the feeder 1 by, for example, an unloading process.
  • the new tape 90 may have a number of empty cavities 95 on the tip side from the first cavity 95F in which the parts are initially stored.
  • the used tape 90 varies in the presence and quantity of empty cavities 95 on the tip side from the first cavities 95F, for example, in accordance with an arbitrary position cut by an operator.
  • the empty cavities 95 are kept until the first cavities 95F for housing components are positioned in the supply part Pt in the subsequent mounting process. Is positioned. As a result, a supply error in which parts are not supplied may occur. Therefore, in order to suppress the occurrence of supply mistakes, it is preferable that the number of empty cavities 95 existing on the tip side from the first cavities 95F is small.
  • the following problems may occur.
  • an error that the first cavity 95F is shifted in the width direction of the tape 90 may occur. This is because when the cover tape 92 peeled off from the base tape 91 is bent by the bending device 53, the adhesive state of a part of the cover tape 92 in the width direction is maintained, so that the cover tape 92 returns to its original state. It is thought to be due to the action of the force to try.
  • the tape 90 may move slightly in the width direction as a whole due to the reaction force. This slight movement of the tape 90 also moves the components housed in the first cavity 95F, which can be a factor that makes the supply of the components unstable. Note that the reaction force gradually increases in a certain section in the conveyance direction in which the folding device 53 bends the cover tape 92. When the loading is completed, the reaction force becomes substantially constant and slight movement of the tape 90 in the width direction does not occur.
  • the control device 70 conveys the leading end portion of the tape 90 so as to pass a certain length from the supply portion Pt in the loading process.
  • the components stored in the cavity 95 that has passed through the supply unit Pt are not supplied to the component mounting machine and are wasted.
  • FIG. As shown, the tape guide 50 is pushed upward against the biasing force of the biasing device 55 by the tip of the tape 90. At this time, when only the insertion portion Pi side is pushed up, the guide body 51 is inclined as a whole in the transport direction.
  • the cutting edge of the peeling blade 521 is at a position lower than the height after the completion of loading, and the cutting edge may be cut downward from the bonding portion of the base tape 91 and the cover tape 92 by the descending amount M1.
  • the peeling blade 521 cuts into a deep position with respect to the cavity 95 at the front end portion of the tape 90, and if there is a part stored in the cavity 95, there is a possibility that it will come into contact with the part. is there. Therefore, in order to prevent contact between the component and the peeling blade 521, it is preferable that no component is stored at the tip of the tape 90.
  • the tip of the base tape 91 that has passed through the cutting position Pc of the peeling blade 521 resists the biasing force of the biasing device 55, and the peeling blade 521 is moved to the rail 11.
  • the guide body 51 is pushed up as a whole so as to be parallel to the rail 11, as shown in FIG. 7C.
  • the cutting height of the peeling blade 521 becomes substantially the same as that after the completion of loading, and the peeling blade 521 is cut into the bonding portion between the base tape 91 and the cover tape 92.
  • the tape 90 to be loaded may be provided with a redundant portion of an appropriate length that does not house components on the tip side of the cavity 95 that is first positioned in the supply portion Pt after loading. desirable.
  • a redundant portion from the tip end side of the tape 90 to the tip end of the tape 90 from the end portion on the tip end side of the first cavity 95 ⁇ / b> F that first accommodates components is defined as a redundant portion.
  • an adjustment process step 10 (hereinafter referred to as “step 10”) is performed in advance so that the length from the first cavity 95F to the tip of the tape 90, that is, the length of the redundant portion becomes the specified length Ls.
  • “Step” is expressed as “S”).
  • the specified length Ls is set based on the type of the tape 90 (S11).
  • the type of the tape 90 is classified by the relationship between the interval T1 of the cavity 95 and the interval T2 of the engagement hole 96.
  • the specified length Ls is specifically set so as to satisfy the following condition (A) -condition (E).
  • the condition (A) is a specified length longer than the length (hereinafter referred to as “first length L1” (see FIG. 4)) from the supply unit Pt to the regulation unit 531 of the bending device 53 in the transport direction of the tape 90. Is to set Ls (Ls ⁇ L1).
  • the problem that the error that the cavity 95 positioned in the supply portion Pt is shifted in the width direction may be caused by the action of the force that the cover tape 92 peeled from the base tape 91 returns to the original state.
  • the folding device 53 regulates the folded cover tape 92 by gradually increasing the number of contact points from the bent part to the edge as it goes to the tip side of the feeder 1.
  • the folding device 53 maintains the state of the folded cover tape 92 by contacting the edge in the width direction of the back surface of the cover tape 92 by the restricting portion 531 provided at the specified position in the transport direction.
  • the specified length Ls is set to be equal to or greater than the first length L1 (Ls ⁇ L1).
  • the condition (B) is equal to or longer than the length (hereinafter referred to as “second length L2”) from the cut position Pc in the transport direction of the tape 90 to the position Pe (see FIG. 7C) where the push-up by the base tape 91 ends.
  • second length L2 the length from the cut position Pc in the transport direction of the tape 90 to the position Pe (see FIG. 7C) where the push-up by the base tape 91 ends.
  • the specified length Ls is set to be equal to or greater than the second length L2 (Ls ⁇ L2).
  • Condition (C) is that the specified length Ls is not less than twice the length T2 of the engagement holes 96 and not more than five times the distance T2 of the engagement holes 96 from the first cavity 95F to the tip side. (5 ⁇ T2 ⁇ Ls ⁇ 2 ⁇ T2). According to such a configuration, the length from the first cavity 95F to the tip of the tape 90 is appropriately adjusted, so that the supply of parts can be stabilized and the generation of useless parts can be reduced.
  • the condition (C) may be a condition for setting the specified length Ls within a further limited range within the above range according to the configuration of the tape guide 50 and the like.
  • the condition (C) is that the length of the engagement hole 96 is not less than three times the interval T2 and the engagement hole 96 is not less than five times the length T2 in order to make the supply of parts more stable.
  • the prescribed length Ls is set below (5 ⁇ T2 ⁇ Ls ⁇ 3 ⁇ T2).
  • the condition (D) is to set the specified length Ls to a length that is disengaged from the empty cavity 95 that does not house components on the tip side from the first cavity 95F.
  • the leading end of the tape 90 whose redundant portion has the specified length Ls is a position that avoids an empty cavity located on the leading end side from the first cavity 95F. It has been found that when the tip of the tape 90 has no cross section of the cavity 95, the occurrence of problems in the loading process can be suppressed. Therefore, by setting the specified length Ls so as to satisfy the condition (D) as described above, it is possible to suppress the occurrence of problems in the loading process.
  • the condition (E) is to set the specified length Ls so as to be the shortest in principle after satisfying the above condition (A) -condition (D).
  • the condition (E) is to set the specified length Ls so as to be the shortest in principle after satisfying the above condition (A) -condition (D).
  • the above condition (A) There are a plurality of candidates (Cp1, Cp2,%) As adjustment positions that satisfy the condition (D).
  • the first and second tapes 90 from the top in FIG. 6 are of the same type, but the position of the first candidate Cp1 is shifted depending on the positional relationship between the first cavity 95F and the engagement hole 96. For this reason, when the first candidate Cp1 having the shortest length from the first cavity 95F to the tip is always employed, it is necessary to grasp the positional relationship between the first cavity 95F and the engagement hole 96, which may reduce workability. There is.
  • the condition (E) satisfies the above condition (A) -condition (D), and from a predetermined engagement hole 96 (for example, the fourth engagement hole 96 from the first cavity 95F to the tip side).
  • the first candidate located on the first cavity 95F side (the second candidate Cp2 in the first stage from the top in FIG. 6 and the first candidate Cp1 in the second stage from the top in FIG. 6) is set to the specified length Ls. It is said.
  • the fourth engagement hole 96 accordinging to the condition (C) to the front end side from the first cavity 95F
  • the first empty cavity 95 on the first cavity 95F side is adjacent (according to the condition (D)).
  • the specified length Ls is set according to the positional relationship between the first cavity 95F and the engagement hole 96, and the adjustment position is constant with respect to the predetermined engagement hole 96. As a result, the operator can easily recognize the adjustment position, and the workability of adjusting the tape 90 is ensured.
  • the tape 90 is adjusted based on the specified length Ls set in S11 (S12).
  • various methods can be adopted. For example, when a new tape 90 is loaded, the operator cuts at a specified length Ls so as to leave a part of a large number of empty cavities 95 existing on the tip side from the first cavity 95F. The tape 90 is adjusted. Thereby, for example, in the case of the tape 90 in which the interval T1 of the cavity 95 is set to half of the interval T2 of the engagement hole 96, as shown in the first and second stages from the top of FIG. The tip of the tape 90 is at a position where it is out of the cavity 95 and the engagement hole 96.
  • the cutting by the worker is exemplified, but in addition, an external device that automatically cuts the tape 90 based on the specified length Ls set in S11.
  • the tape 90 may be cut by the above.
  • the tip of the used tape 90 if the tip of the used tape 90 has a sufficient length, it can be handled by cutting in the same manner as the adjustment for the new tape 90 described above. it can.
  • the redundant part of the specified length Ls is obtained by removing the part from one or a plurality of cavities 95 that house the part at the tip. You may adjust so that a part may be ensured. Further, an auxiliary tape corresponding to the redundant portion may be connected to the front end of the used tape 90 so that the specified length Ls can be secured. Adjustments including removal of parts from the used tape 90 and connection of auxiliary tape may be automatically performed by an external device, as with the new tape 90.
  • the control device 70 of the feeder 1 determines whether or not the tip of the adjusted tape 90 is inserted into the insertion portion Pi in a state where power is supplied from the component mounting machine via the connector ( S20).
  • the control device 70 maintains the standby state so as to repeat the above determination while the adjusted tip end of the tape 90 is not inserted (S20: No).
  • the control apparatus 70 performs a positioning process (S30).
  • the controller 70 In the positioning step, when the adjusted tape 90 is inserted into the insertion portion Pi (S20: Yes), the controller 70 first starts transporting the tape 90 (S31). Thereby, the tape 90 moves along the rail 11 which comprises the conveyance path R1 by operation
  • the control device 70 determines whether or not the front end of the tape 90 has been detected based on the detection result of the detection sensor 61 (S32). The control device 70 repeats the above determination while the leading end of the tape 90 is not detected (S32: No).
  • the control device 70 determines the remaining conveyance amount based on the conveyance distance from the detection sensor 61 to the supply unit Pt. Calculate (S33).
  • the control device 70 operates in synchronization with the first drive device 20 even though the tip of the tape 90 has not reached the position where it engages with the third sprocket 31 of the second drive device 30. To start. Then, the control device 70 calculates the angle of the fourth sprocket 32 based on the detection result of the angle detection device 36 and the pulse power supplied to the stepping motor 33.
  • the control device 70 positions the first cavity 95F at a predetermined position in the feeder body 10 based on the detection result by the detection sensor 61, the angle of the fourth sprocket 32, and the interval T1 between the plurality of cavities 95.
  • the remaining transport amount is calculated (S33).
  • the control device 70 operates the first driving device 20 and the second driving device 30 in synchronization according to the calculated remaining conveyance amount, thereby positioning the first cavity 95F at a predetermined position (S34).
  • the remaining conveyance amount is calculated (S33) in the adjustment step (S10) when the tape 90 is adjusted by cutting or the like, and the length from the first cavity 95F to the tip is determined in S11.
  • an error may be included in the calculated ideal specified length Ls. That is, when the detection sensor 61 detects the leading end of the tape 90 and transports the tape 90 for a certain distance, an error is included in the position where the first cavity 95F is positioned by the error generated by the adjustment. Therefore, the control device 70 attempts to improve the positioning accuracy of the first cavity 95F based on the angle of the fourth sprocket 32 and the interval T1 between the plurality of cavities 95.
  • the control device 70 can accurately grasp the distance from the tip of the tape 90 to the first cavity 95F based on the detection result by the detection sensor 61 and the angle of the fourth sprocket 32. That is, even if it is cut in the adjustment step (S10) and has an error with respect to the specified length Ls, the first cavity 95F can be positioned so as to absorb the error.
  • the predetermined position at which the first cavity 95F is positioned is the standby position Ps where the first cavity 95F is positioned when one of the cavities 95 on the tip side of the first cavity 95F is positioned at the supply part Pt. It is.
  • the first cavity 95F positioned at the standby position Ps is maintained in a state where the opening is not exposed to the outside by the tape guide 50 although the cover tape 92 is peeled off. Thereby, it is possible to prevent the component from falling off from the first cavity 95F due to some factor.
  • the tip of the tape 90 enters between the rail 11 and the tape guide 50, and the tape guide 50 is partially pushed up.
  • the cover tape 92 is peeled off by the peeling device 52 and started to be folded by the folding device 53. At this time, even if the cutting edge of the peeling blade 521 is cut below the bonding portion of the base tape 91 and the cover tape 92, no component is stored in the redundant portion, and contact between the peeling blade 521 and the component is prevented.
  • the peeling blade 521 is pushed up by the base tape 91 from which the cover tape 92 has been peeled off, and the cutting edge of the peeling blade 521 reaches a height at which the cutting edge is cut into the bonding portion between the base tape 91 and the cover tape 92.
  • the tip of the tape 90 is positioned at the position Pe (see FIG. 7C) where the push-up of the peeling blade 521 by the base tape 91 ends.
  • the first cavity 95F is located closer to the insertion portion Pi than the standby position Ps. Thereby, the contact between the component housed in the first cavity 95F and the peeling blade 521 is prevented.
  • the control device 70 positions the first cavity 95F at the standby position Ps as described above, the control device 70 stops the operation of the first drive device 20 and the second drive device 30 and ends the loading process.
  • the leading end of the tape 90 is positioned closer to the supply unit Pt by the interval T1 of the cavity 95 than the regulating unit 531 of the bending device 53.
  • the feeder 1 stands by in this state.
  • the tape 90 is positioned so that the first cavity 95F is positioned at the supply unit Pt. Is moved by an interval T1.
  • the cover tape 92 In the positioning step (S30), when the cover tape 92 peeled off from the base tape 91 by the peeling device 52 is bent toward the engagement hole 96 by the bending device 53, the cover tape 92 tries to return to the original state.
  • the tape 90 can move slightly in the width direction by the force.
  • the cover tape 92 is moved to the restricting portion 531 of the bending device 53 when the first cavity 95F is positioned at the supply portion Pt at the latest. To reach. Thereby, the position in the width direction of the first cavity 95F becomes stable, and as a result, the supply of components in the supply process can be stabilized.
  • the length from the first cavity 95F to the tip is defined.
  • the tape 90 adjusted to the length Ls can be loaded so that the first cavity 95F is positioned at a predetermined position in the feeder body 10.
  • the position in the width direction of the tape 90 is stabilized because the tip portion of the specified length Ls is secured, and as a result, the supply of components is stabilized. be able to.
  • no components are stored on the tip side from the first cavity 95F, it is possible to prevent generation of useless electronic components.
  • the specified length Ls is set so as to satisfy the exemplified condition (A) -condition (E).
  • the specified length Ls may be set so that at least one of condition (A) -condition (D) is satisfied.
  • the condition (B) is given because the tape guide 50 is biased by the biasing device 55 and the tape guide 50 is tilted. However, the tape guide 50 is not tilted. The specified length Ls does not need to satisfy this condition (B).
  • the peeling device 52 of the tape guide 50 when the peeling device 52 of the tape guide 50 is peeled from the base tape 91 while leaving a part in the width direction of the cover tape 92, a part of the engagement state on the engagement hole 96 side is maintained. To peel off.
  • the peeling device 52 may be peeled so as to leave only a part of the side opposite to the engagement hole 96 side, or on the side opposite to the engagement hole 96 side and the engagement hole 96 side. You may peel off leaving both parts. In such a configuration as well, the same effect can be obtained by setting the specified length Ls so as to satisfy each condition.
  • the predetermined position for positioning the first cavity 95F in the positioning step (S30) is the standby position Ps on the insertion portion Pi side for the interval T1 from the supply portion Pt to the cavity 95.
  • various positions can be adopted as the predetermined position.
  • the control device 70 may set the supply part Pt at a predetermined position, or may be a position moved from the standby position Ps to the insertion part Pi side by an integral multiple of the interval T1 of the cavity 95.
  • the angle detection device 36 is configured by a hall magnet and a hall sensor.
  • the angle detection device 36 may employ a magnetic type or an encoder type.
  • the angle detection device 36 is configured to detect the angles of the third sprocket 31 and the fourth sprocket 32 interlocked with the intermediate gear 35 based on the angle of the intermediate gear 35.
  • the angle detection device 36 may be configured to directly detect the angle of the fourth sprocket 32, for example.

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Operations Research (AREA)
  • Automation & Control Theory (AREA)
  • Supply And Installment Of Electrical Components (AREA)

Abstract

テープフィーダの制御装置は、ローディング処理において、複数のキャビティのうち先端側から最初に電子部品を収納した第一キャビティからキャリアテープの先端までの長さが規定長さとなるように予め調整されたキャリアテープが挿入部に挿入された場合に、キャリアテープの搬送を開始するとともに、検出センサによる検出結果に応じて第一キャビティをフィーダ本体における所定位置に位置決めする。

Description

テープフィーダおよびキャリアテープの装填方法
 本発明は、テープフィーダおよびキャリアテープの装填方法に関するものである。
 テープフィーダは、回路基板に部品を装着する電子部品装着機に用いられる。テープフィーダには、例えば特許文献1に開示されているように、テープフィーダの後部に設けられた挿入部から挿入されたキャリアテープを自動で装填可能なオートローディング式がある。オートローディング式のテープフィーダは、新規または補充のキャリアテープを装填する場合に、例えば電子部品装着機に電子部品を供給する供給部にキャビティを位置決めする。
国際公開第2015/181958号
 ここで、キャリアテープの装填直後において電子部品の供給を安定させるために、キャリアテープの先端が供給部を通過してからもある程度搬送を継続させることがある。このような場合に、供給部を通過したキャビティに電子部品が収納されていると、当該電子部品は、電子部品装着機に供給されずに無駄となる。また、キャリアテープの先端付近に空のキャビティを設けると、空のキャビティが供給部に位置決めされて、供給ミスが発生するおそれがある。
 本明細書は、キャリアテープの装填直後において電子部品の供給を安定させ、且つ無駄な電子部品の発生を防止できるテープフィーダおよびキャリアテープの装填方法を提供することを目的とする。
 本明細書は、電子部品を収納したキャリアテープの先端を挿入される挿入部、および前記電子部品装着機に前記電子部品を供給する供給部を有するフィーダ本体と、前記フィーダ本体に設けられ、前記キャリアテープを搬送する駆動装置と、前記挿入部と前記供給部との間の搬送路において前記キャリアテープの先端を検出する検出センサと、前記挿入部に挿入された前記キャリアテープを前記供給部まで搬送するように前記駆動装置を制御し、前記キャリアテープを装填するローディング処理を実行する制御装置と、を備え、前記キャリアテープには、前記電子部品をそれぞれ収納する複数のキャビティが搬送方向に所定の間隔で形成され、前記制御装置は、前記ローディング処理において、複数の前記キャビティのうち先端側から最初に前記電子部品を収納した第一キャビティから前記キャリアテープの先端までの長さが規定長さとなるように予め調整された前記キャリアテープが前記挿入部に挿入された場合に、前記キャリアテープの搬送を開始するとともに、前記検出センサによる検出結果に応じて前記第一キャビティを前記フィーダ本体における所定位置に位置決めする、テープフィーダを開示する。
 本明細書は、電子部品を収納したキャリアテープをテープフィーダに装填する装填方法であって、前記テープフィーダは、前記キャリアテープの先端を挿入される挿入部、および前記電子部品装着機に前記電子部品を供給する供給部を有するフィーダ本体と、前記フィーダ本体に設けられ、前記キャリアテープを搬送する駆動装置と、前記挿入部と前記供給部との間の搬送路において前記キャリアテープの先端を検出する検出センサと、前記挿入部に挿入された前記キャリアテープを前記供給部まで搬送するように前記駆動装置を制御し、前記キャリアテープを装填するローディング処理を実行する制御装置と、を備え、前記キャリアテープには、前記電子部品をそれぞれ収納する複数のキャビティが搬送方向に所定の間隔で形成され、前記装填方法は、前記ローディング処理において、複数の前記キャビティのうち先端側から最初に前記電子部品を収納した第一キャビティから前記キャリアテープの先端までの長さが規定長さとなるように予め調整する調整工程と、調整された前記キャリアテープが前記挿入部に挿入された場合に、前記キャリアテープの搬送を開始するとともに、前記検出センサによる検出結果に応じて前記第一キャビティを前記フィーダ本体における所定位置に位置決めする位置決め工程と、を備える、キャリアテープの装填方法を開示する。
 このようなテープフィーダおよびキャリアテープの装填方法の構成によると、第一キャビティから先端までの長さが規定長さに調整されたキャリアテープを、第一キャビティをフィーダ本体における所定位置に位置決めするように装填することができる。これにより、第一キャビティが供給部に位置決めされた場合に、規定長さの先端部が確保されていることからキャリアテープの幅方向位置が安定し、結果として電子部品の供給を安定させることができる。また、第一キャビティより先端側に電子部品が収納されていないので、無駄な電子部品の発生を防止できる。
実施形態におけるテープフィーダの全体を示す側面図である。 キャリアテープの一部を示す上面図である。 図1における先端部を拡大して示す斜視図である。 図1における先端部を拡大して示す上面図である。 キャリアテープのローディング処理を示すフローチャートである。 複数種類のキャリアテープにおける規定長さを示す説明図である。 キャリアテープが装填される前のテープガイドの状態を示す断面図である。 キャリアテープの剥離初期において剥離刃がキャリアテープの先端に切り込むときの状態を示す断面図である。 キャリアテープの先端が切り込み位置からテープガイドの押し上げが終了する位置まで搬送された状態を示す断面図である。
 1.実施形態
 1-1.テープフィーダ1の概要
 テープフィーダ1は、回路基板に部品を装着して基板製品を生産する電子部品装着機に用いられるオートローディング式のテープフィーダである。以下では、電子部品装着機を「部品装着機」、テープフィーダを「フィーダ」、回路基板を「基板」、電子部品を「部品」と称する。フィーダ1は、図1に示すように、キャリアテープ90を挿入する挿入部Piからレール11に沿って搬送するローディング処理を実行する。フィーダ1は、部品装着機に部品を供給する供給部Ptに、装填されたキャリアテープ90を搬送して、供給部Ptにおいて部品を供給可能とする。
 フィーダ1は、部品装着機にセットされた状態において、キャリアテープ90を所定ピッチで送り移動させることにより、キャリアテープ90を搬送する。フィーダ1は、例えば使用中である現行のキャリアテープ90の残量が規定量未満となった場合に、補給用のキャリアテープ90を搬送する。これにより、フィーダ1は、現行のキャリアテープ90に補給用のキャリアテープ90をスプライシングすることなく、連続的に部品を供給可能としている。また、フィーダ1は、装填されているキャリアテープ90を取り外す場合には、キャリアテープ90を挿入部Pi側に搬送するアンローディング処理を実行する。
 1-2.キャリアテープ90の構成
 キャリアテープ90は、図2に示すように、多数の部品を一列に収納する。キャリアテープ90は、ベーステープ91と、カバーテープ92とを有する。ベーステープ91は、紙材や樹脂等の可撓性を有する材料により形成される。ベーステープ91には、幅方向(図2の上下方向)の中央付近にキャビティ95が形成される。キャビティ95は、底部を有する凹状をなす。キャビティ95は、ベーステープ91の搬送方向(キャリアテープ90の長手方向であって、図2の左右方向)に所定の間隔で形成される。それぞれのキャビティ95は、一つの部品を収納する。
 また、ベーステープ91には、幅方向の一方側の縁部に係合穴96が形成される。係合穴96は、ベーステープ91の長手方向に所定の間隔で形成される。係合穴96は、キャリアテープ90の厚み方向(図2の前後方向)に貫通している。ここで、複数のキャビティ95は、複数の係合穴96と同様に、搬送方向に所定の間隔で形成される。キャビティ95の間隔T1は、収容する部品の寸法に応じて適宜設定される。
 例えば、キャビティ95の間隔T1は、図6に示すように、係合穴96の間隔T2の半分(T1=T2/2)に設定され、または係合穴96の間隔T2に等しく(T1=T2)などに設定される。なお、図4は、図6の上から3段目のキャリアテープ90と同様に、キャビティ95の間隔T1が係合穴96の間隔T2と等しく設定されたキャリアテープ90を示す。なお、図6は、カバーテープ92を省略して示し、部品を収納したキャビティ95を斜線付きで示し、空のキャビティ95を斜線なしで示す。
 カバーテープ92は、薄い膜状の高分子フィルムにより形成されている。カバーテープ92の幅方向の両縁部は、ベーステープ91の上面に接着されている。これにより、カバーテープ92は、キャビティ95の開口部を閉塞する。これにより、ベーステープ91のキャビティ95に収納された部品の脱落が防止されている。なお、カバーテープ92は、フィーダ1の供給部Ptの直前において、フィーダ1のテープガイド50により剥離される。以下、キャリアテープを「テープ」と称する。
 1-3.フィーダ1の詳細構成
 フィーダ1は、図1に示すように、フィーダ本体10と、第一駆動装置20と、第二駆動装置30と、テープ支持ユニット40と、テープガイド50と、付勢装置55と、検出センサ61と、制御装置70とを備える。以下の説明において、ローディング処理においてテープ90が搬送される搬送方向の下流側(図1の右側)を前方とし、搬送方向の上流側(図1の左側)を後方とする。フィーダ本体10は、扁平な箱形状に形成され、部品装着機を構成する部品供給装置のスロットにセットされる。フィーダ本体10は、挿入部Piと供給部Ptとの間の搬送路R1を構成するレール11を有する。
 第一駆動装置20は、フィーダ本体10に回転可能に支持される第一スプロケット21および第二スプロケット22を有する。第一スプロケット21および第二スプロケット22は、挿入部Piに設けられる。第二駆動装置30は、供給部Ptにおけるレールの下方に設けられた第三スプロケット31および第四スプロケット32を有する。第三スプロケット31および第四スプロケット32は、係合突起311,321(図4を参照)が全周に亘って周方向に等間隔で配置されている。
 第一駆動装置20の第一スプロケット21と第二スプロケット22を回転させる構成、および第二駆動装置30の第三スプロケット31と第四スプロケット32を回転させる構成は、実質的に同様であるため、以下では、第二駆動装置30について説明する。第二駆動装置30は、図1に示すように、第三スプロケット31および第四スプロケット32を回転させる駆動源としてのステッピングモータ33を有する。
 ステッピングモータ33は、入力されるパルス電力に応じて回転軸を回転させる。ステッピングモータ33の回転軸が回転すると、上記の回転軸に設けられたドライブギヤに噛合する減速ギヤ34が回転する。ステッピングモータ33により出力される駆動力は、減速ギヤ34に噛合する中間ギヤ35を介して第三スプロケット31および第四スプロケット32に伝達される。中間ギヤ35は、第三スプロケット31に設けられたスプロケットギヤ312、および第四スプロケット32に設けられたスプロケットギヤ322に常時噛合する。本実施形態において、中間ギヤ35は、第三スプロケット31および第四スプロケット32をともに直接的に回転させるように共用される。
 また、第二駆動装置30は、中間ギヤ35の角度を検出する角度検出装置36を有する。角度検出装置36は、ホールマグネットおよびホールセンサにより構成される。ホールマグネットは、中間ギヤ35における規定位置に1つ設けられている。ホールセンサは、フィーダ本体10に固定され、ホールマグネットを検出する。このような構成により、第二駆動装置30は、角度検出装置36の検出結果に基づいて、中間ギヤ35、中間ギヤ35により回転される第三スプロケット31および第四スプロケット32が規定角度にあることを検出する。
 テープ支持ユニット40は、テープ90の搬送方向において、第一駆動装置20が位置するレール11の上方に配置される。テープ支持ユニット40は、レール11との間に介在するテープ90をレール11に押し付けて、テープ90の上方移動を規制する。これにより、テープ支持ユニット40は、テープ90の係合穴96と第一駆動装置20の第一スプロケット21および第二スプロケット22の係合を補助する。また、テープ支持ユニット40は、現行のテープ90に対して予約的に挿入された補給用のテープ90を支持する。
 テープガイド50は、テープ90の搬送方向において、第二駆動装置30の第三スプロケット31および第四スプロケット32が位置するレール11の上方に配置される。テープガイド50は、テープ90の上方移動および幅方向移動を規制して、テープ90と第三スプロケット31および第四スプロケット32の係合を案内する。テープガイド50は、図3および図4に示すように、ガイド本体51と、剥離装置52と、折り曲げ装置53とを有する。
 ガイド本体51は、全体形状としては、下方が開放する断面U字形に形成される。ガイド本体51の上壁には、供給部Ptを含む範囲に、切欠き部511が形成される。これにより、テープガイド50は、供給部Ptに位置決めされたテープ90のキャビティ95から部品を採取可能とする。一方で、テープガイド50は、供給部Ptにキャビティ95から一つ挿入部側(図4の左側)の待機位置Psにあるキャビティ95が開口部を露出しないように構成される。
 剥離装置52は、ガイド本体51に設けられる。剥離装置52は、ベーステープ91とカバーテープ92との接着部に切り込む剥離刃521を有する。剥離刃521は、刃先がガイド本体51の上壁の内周面からカバーテープ92の厚み程度だけ下方に突出するように配置される(図7Aを参照)。これにより、剥離刃521は、テープ90の搬送に伴って、ベーステープ91とカバーテープ92との接着部に切り込んで、カバーテープ92を剥離する(図7Cを参照)。
 また、本実施形態において、剥離刃521は、刃幅方向の一方側(図4の下側)がテープ90の幅方向外側に位置し、刃幅方向の他方側(図4の上側)がテープ90の幅方向内側に位置する。これにより、カバーテープ92は、幅方向におけるベーステープ91の係合穴96側の縁部がベーステープ91に接着した状態を維持される。このように、剥離装置52は、ベーステープ91からカバーテープ92の幅方向の一部を残して剥離する。
 折り曲げ装置53は、ガイド本体51に設けられ、剥離装置52に剥離刃521の刃先よりも供給部Pt側に位置する。折り曲げ装置53は、剥離装置52によりベーステープ91から一部を残して剥離されたカバーテープ92の部位を立ち上げて、係合穴96側へと折り曲げる。これにより、ベーステープ91のキャビティ95の開口部が、カバーテープ92によって閉塞されない状態となる。
 より詳細には、折り曲げ装置53は、図4に示すように、搬送方向の一定区間において剥離されたカバーテープ92(図4において視認可能な部位に斜線を付して示す)を立ち上げるとともに折り曲げる。これにより、カバーテープ92は、待機位置Psの前後において係合穴96側に完全に折り曲げられた状態となる。さらに、折り曲げ装置53は、折り曲げられたカバーテープ92の裏面(ベーステープ91に接着されていた面)のうち幅方向の縁部に接触して、折り曲げられたカバーテープ92の状態を維持する規制部531を有する。
 付勢装置55は、搬送路R1を構成するレール11とガイド本体51との間でテープ90が保持されるように、ガイド本体51をレール11側に付勢する。具体的には、付勢装置55は、ガイド本体51の両側の側壁の前後において、ガイド本体51と上下方向に係止する突起部551,552を有する。付勢装置55は、スプリング(図示しない)の弾性力によって、突起部551,552に係止するガイド本体51を全体として下方に付勢する。
 上記のような構成により、テープガイド50は、テープ90が供給部Pt側に搬送されることによって、レール11とガイド本体51との間でテープ90を保持する。さらに、テープガイド50は、テープ90の搬送に伴って、ベーステープ91からカバーテープ92を剥離しつつ折り曲げ、供給部Ptにおいて部品を採取可能に露出させる。テープ90のうち供給部Ptを通過した部位は、フィーダ本体10の前部に形成されたテープ排出部(図示しない)よりフィーダ1の外部に排出される。
 検出センサ61は、挿入部Piと供給部Ptとの間の搬送路R1においてテープ90の先端を検出する。検出センサ61は、検出位置におけるテープ90の有無が切り替わったことをもってテープ90の先端(または後端)を検出する。検出センサ61としては、接触式または非接触式のセンサを採用し得る。また、検出センサ61は、テープ90の搬送方向において、供給部Ptからの搬送距離が規定距離となるように配置される。
 制御装置70は、主として、CPUや各種メモリ、制御回路により構成される。制御装置70は、フィーダ1が部品装着機にセットされると、コネクタを介して部品装着機から電力が供給され、また部品装着機との間で通信可能な状態となる。制御装置70は、部品装着機による制御指令などに基づいて、第一駆動装置20および第二駆動装置30の動作を制御する。これにより、制御装置70は、フィーダ1にテープ90を装填するローディング処理、テープ90を所定ピッチで送り移動させる供給処理、フィーダ1からテープ90を取り外すためのアンローディング処理を実行する。
 ここで、上記のローディング処理では、制御装置70は、テープ90の前端が挿入部Piから挿入されたことを図略のセンサにより検出すると、第一駆動装置20を駆動させて、テープ90の搬送を開始する。このとき、テープ90の先端の係合穴96に第一スプロケット21および第二スプロケット22の係合突起が順次係合して、テープ90が供給部Pt側へと一定速度で搬送される。
 制御装置70は、検出センサ61によりテープ90の先端を検出した場合に、検出センサ61から供給部Ptまでの搬送距離に応じて残りの搬送量を算出する。ここで、テープ90における複数のキャビティ95のうち先端側から最初に部品を収納したキャビティ95を第一キャビティ95Fとする(図6を参照)。制御装置70は、ローディング処理において、検出センサ61によりテープ90の先端が検出された後に、上記のように算出された搬送量だけテープ90を搬送し、第一キャビティ95Fをフィーダ本体10における所定位置に位置決めする。ローディング処理の詳細については後述する。
 また、制御装置70は、第一駆動装置20の第一スプロケット21と第二スプロケット22、および第二駆動装置30の第三スプロケット31と第四スプロケット32の角度および回転量に基づいて、テープ90の搬送量を制御する。より具体的には、制御装置70は、角度検出装置36により検出された中間ギヤ35の角度およびステッピングモータ33に入力されたパルス電力に応じた中間ギヤ35の回転量に基づいて、第三スプロケット31および第四スプロケット32の角度を算出する。
 そして、制御装置70は、角度検出装置36により中間ギヤ35が規定角度にあることが検出されてから現在までにステッピングモータ33に入力されたパルス電力に応じた中間ギヤ35の回転量に基づいて、第三スプロケット31および第四スプロケット32の回転量を取得する。同様に、制御装置70は、第一駆動装置20における第一スプロケット21および第二スプロケット22の角度を算出するとともに、これらの回転量を取得する。制御装置70は、ローディング処理および供給処理において、第一駆動装置20および第二駆動装置30を同期させて、テープ90のキャビティ95を供給部Ptなどの所定位置に位置決めする。
 1-4.フィーダ1によるローディング処理、およびテープ90の装填方法
 上記のフィーダ1によるローディング処理、およびテープ90の装填方法について、図4-図7Cを参照して説明する。なお、図7A-図7Cにおいて、キャビティ95に収納された部品に斜線を付して示す。ここで、フィーダ1に装填されるテープ90には、新規のテープ90、または例えばアンローディング処理によりフィーダ1から取り外された使いかけのテープ90が想定される。新規のテープ90は、最初に部品が収納された第一キャビティ95Fから先端側に多数の空のキャビティ95が存在することがある。使いかけのテープ90は、例えば作業者により切断された任意の位置に応じて、第一キャビティ95Fより先端側に空のキャビティ95の有無および数量が変動する。
 新規のテープ90のように多数の空のキャビティ95が存在したテープ90をローディング処理すると、その後の装着処理において部品を収納する第一キャビティ95Fが供給部Ptに位置決めされるまでは空のキャビティ95が位置決めされる。これにより、部品が供給されない供給ミスが発生し得る。そのため、供給ミスの発生を抑制するためには、第一キャビティ95Fより先端側に存在する空のキャビティ95が少ない方が好ましい。
 一方で、仮に第一キャビティ95Fより先端側に空のキャビティ95が存在しないように切断されたテープ90をフィーダ1に装填しようとすると、下記のような問題が発生し得る。第一に、第一キャビティ95Fを供給部Ptに位置決めした場合に、第一キャビティ95Fがテープ90の幅方向にずれる誤差が発生し得る。これは、ベーステープ91から剥離されたカバーテープ92が折り曲げ装置53により折り曲げられると、カバーテープ92の幅方向の一部の接着状態が維持されているため、カバーテープ92が元の状態に戻ろうとする力の作用に起因すると考えられる。
 詳細には、復元しようとするカバーテープ92が折り曲げ装置53により立ち上げ姿勢を規制されるため、その反力によってテープ90が全体として幅方向に僅かに移動することがある。このテープ90の僅かな移動により第一キャビティ95Fに収納されている部品も移動することになり、部品の供給を不安定にする要因となり得る。なお、折り曲げ装置53がカバーテープ92を折り曲げる搬送方向の一定区間において上記の反力は漸増し、装填が完了すると反力はほぼ一定となりテープ90の幅方向の僅かな移動は発生しない。
 そのため、テープ90の幅方向の移動を抑制するためには、ある程度の長さ以上にテープ90が供給部Ptを通過させてから供給処理を実行することが好ましい。上記の問題に対応するために、制御装置70は、ローディング処理において、テープ90の先端部が供給部Ptからある程度の長さ通過するように搬送する。しかしながら、このような処理では、供給部Ptを通過したキャビティ95に収納された部品が部品装着機に対して供給されずに無駄となる。
 第二に、第一キャビティ95Fより先端側に空のキャビティ95が存在しないように切断されたテープ90をフィーダ1に装填しようとすると、テープ90の先端部のキャビティ95に収納された部品とテープガイド50の剥離刃521が接触するおそれがある。部品と剥離刃521とが接触すると、両者の破損を招来するおそれがある。具体的には、レール11とテープガイド50との間にテープ90が到達していない段階では、付勢装置55により下方に付勢されたテープガイド50は、図7Aに示すように、テープガイド50の上壁の内面がテープ90の上面よりも下方に位置する。
 レール11とテープガイド50との間にテープ90が進入し、且つテープ90の先端が剥離刃521の切り込み位置Pc(搬送方向における剥離刃521の刃先の位置)に到達した段階では、図7Bに示すように、テープガイド50は、テープ90の先端により付勢装置55の付勢力に抗して上方に押し上げられる。このとき、ガイド本体51は、挿入部Pi側のみが押し上げられると、全体として搬送方向に傾斜した状態となる。
 そうすると、剥離刃521の刃先は、装填完了後の高さと比較して低い位置にあり、ベーステープ91とカバーテープ92の接着部から下降量M1だけ下側に切り込むことがある。この状態でテープ90が搬送されると、剥離刃521は、テープ90の先端部のキャビティ95に対して深い位置に切り込み、仮に当該キャビティ95に部品が収納されていると部品と接触するおそれがある。そのため、部品と剥離刃521の接触を防止するためには、テープ90の先端部には部品が収納されていないことが好ましい。
 ところで、テープ90の先端部に剥離刃521が切り込む剥離初期において、剥離刃521の切り込み位置Pcを通過したベーステープ91の先端が付勢装置55による付勢力に抗して剥離刃521をレール11とは反対側に押し上げる。これにより、ガイド本体51は、図7Cに示すように、レール11に平行となるように全体として押し上げられた状態となる。そうすると、剥離刃521の切り込み高さも装填完了後と概ね同じ高さとなり、剥離刃521がベーステープ91とカバーテープ92の接着部に切り込む状態となる。
 上記のような事情を勘案すると、装填されるテープ90には、装填後に最初に供給部Ptに位置決めされるキャビティ95よりも先端側に部品を収納しない適宜長さの冗長部を確保することが望ましい。ここで、テープ90の先端側から最初に部品を収納した第一キャビティ95Fの先端側の端部からテープ90の先端までを冗長部と定義する。ローディング処理において、図5に示すように、第一キャビティ95Fからテープ90の先端までの長さ、即ち冗長部の長さが規定長さLsとなるように予め調整する調整工程(ステップ10(以下、「ステップ」を「S」と表記する))が実行される。
 詳細には、調整工程(S10)では先ず、テープ90の種別に基づいて、規定長さLsが設定される(S11)。テープ90の種別は、キャビティ95の間隔T1と係合穴96の間隔T2との関係により区分される。本実施形態において、規定長さLsは、具体的には以下の条件(A)-条件(E)を満たすように設定される。条件(A)は、テープ90の搬送方向における供給部Ptから折り曲げ装置53の規制部531までの長さ(以下、「第一長さL1」と称する(図4を参照))以上に規定長さLsを設定することである(Ls≧L1)。
 上記のように、供給部Ptに位置決めしたキャビティ95が幅方向にずれる誤差が発生し得る問題は、ベーステープ91から剥離されたカバーテープ92が元の状態に戻ろうとする力の作用に起因する。ここで、本実施形態において、折り曲げ装置53は、フィーダ1の先端側に向かうに従って、折り曲げられたカバーテープ92を折り曲げ部位から縁部へと徐々に接触箇所を増加させて規制する。折り曲げ装置53は、搬送方向の規定位置に設けられた規制部531によりカバーテープ92の裏面のうち幅方向の縁部に接触して、折り曲げられたカバーテープ92の状態を維持する。
 そのため、規制部531をテープ90の先端が通過すると、カバーテープ92が受ける反力は概ね一定となり、テープ90の幅方向の僅かな移動が発生しない状態になる。そこで、規定長さLsを、上記の第一長さL1以上に設定するようにしている(Ls≧L1)。これにより、第一キャビティ95Fが供給部Ptに位置決めされたときにはテープ90の先端が規制部531に到達していることになる。つまり、第一キャビティ95Fの幅方向の位置が安定した状態となり、結果として部品の供給を安定させることができる。
 条件(B)は、テープ90の搬送方向における切り込み位置Pcからベーステープ91による押し上げが終了する位置Pe(図7Cを参照)までの長さ(以下、「第二長さL2」と称する)以上に規定長さLsを設定することである(Ls≧L2)。上記のように、剥離刃521がベーステープ91とカバーテープ92の接着部より下側に切り込むことによりテープ90の先端部に収納された部品と剥離刃521が接触し得る問題は、レール11とテープガイド50との間にテープ90が進入した初期にテープガイド50が傾斜すること起因する。
 ここで、テープ90の先端が切り込み位置Pcを通過してからある程度搬送されると、ベーステープ91の先端部が付勢装置55による付勢力に抗して剥離刃521をレール11とは反対側に押し上げて、剥離刃521の刃先がベーステープ91とカバーテープ92の接着部の高さとなる。そこで、規定長さLsを、上記の第二長さL2以上に設定するようにしている(Ls≧L2)。これにより、剥離刃521の刃先が接着部の高さまで押し上げられる前にキャビティ95に切り込んだとしても、当該キャビティ95が空であることから、部品と剥離刃521の接触を確実に防止することができる。
 条件(C)は、第一キャビティ95Fから先端側に係合穴96の間隔T2の2倍の長さ以上、且つ係合穴96の間隔T2の5倍の長さ以下に規定長さLsを設定することである(5・T2≧Ls≧2・T2)。このような構成によると、第一キャビティ95Fからテープ90の先端までの長さが適宜調整されるので、部品の供給を安定させ、且つ無駄な部品の発生を低減できる。なお、条件(C)は、テープガイド50等の構成に応じて、上記範囲内においてさらに制限された範囲で規定長さLsを設定する条件としてもよい。本実施形態において、条件(C)は、部品の供給をより安定させるために、係合穴96の間隔T2の3倍の長さ以上、且つ係合穴96の間隔T2の5倍の長さ以下に規定長さLsを設定することとしている(5・T2≧Ls≧3・T2)。
 条件(D)は、第一キャビティ95Fよりも先端側において部品を収納しない空のキャビティ95から外れる長さに規定長さLsを設定することである。このような構成によると、冗長部を規定長さLsとされたテープ90の先端は、第一キャビティ95Fから先端側に位置する空のキャビティを避けた位置となる。テープ90の先端にはキャビティ95の断面がない方が、ローディング処理における不具合の発生を抑制できることが見出された。そこで、上記のような条件(D)を満たすように規定長さLsを設定することにより、ローディング処理における不具合の発生を抑制できる。
 条件(E)は、上記の条件(A)-条件(D)を満たした上で、原則として最も短くなるように規定長さLsを設定することである。これにより、規定長さLsが過剰になることを防止できるので、空のキャビティ95の多くが供給部Ptに位置決めされるような供給ミスの発生を抑制できる。また、ローディング処理におけるテープ90の搬送量を低減できるので、処理の所要時間を短縮することができる。但し、種々の事情により必ずしも最短の候補で規定長さLsを設定するとは限らない。上記の事情としては、例えばテープ90の調整の作業性確保が想定される。
 具体的には、キャビティ95の間隔T1が係合穴96の間隔T2の半分に設定されたテープ90の場合に(図6の上から1段目および2段目)、上記の条件(A)-条件(D)を満たす調整位置としての候補(Cp1,Cp2,・・)が複数ある。ここで、図6の上から1段目および2段目のテープ90は同型であるが、第一キャビティ95Fと係合穴96との位置関係によって第一候補Cp1の位置がずれる。そのため、第一キャビティ95Fから先端までの長さが最短となる第一候補Cp1を常に採用すると、第一キャビティ95Fと係合穴96の位置関係を把握する必要があるため作業性が低下するおそれがある。
 そこで、条件(E)は、上記の条件(A)-条件(D)を満たしつつ、所定の係合穴96(例えば、第一キャビティ95Fから先端側に4つ目の係合穴96)から第一キャビティ95F側に最初に位置する候補(図6の上から1段目では第二候補Cp2、同図の上から2段目では第一候補Cp1)を、規定長さLsに設定することとしている。これにより、例えば第一キャビティ95Fから先端側に4つ目の係合穴96(条件(C)による)から第一キャビティ95F側において最初に隣り合う空のキャビティ95の間(条件(D)による)に調整位置が設定される。よって、第一キャビティ95Fと係合穴96の位置関係に応じて規定長さLsを設定し、且つ所定の係合穴96に対しては調整位置が一定となる。結果として、作業者が調整位置を認識しやすくなり、テープ90の調整の作業性が確保される。
 次に、S11にて設定された規定長さLsに基づいて、テープ90を調整する(S12)。テープ90の調整方法としては、種々の方法が採用され得る。例えば、新規のテープ90を装填する場合には、第一キャビティ95Fよりも先端側に存在する多数の空のキャビティ95のうち一部を残すように、作業者により規定長さLsで切断することでテープ90を調整する。これにより、例えば、キャビティ95の間隔T1が係合穴96の間隔T2の半分に設定されたテープ90の場合には、図6の上から1段目および2段目に示すように、調整後のテープ90の先端がキャビティ95からも係合穴96からも外れた位置となる。
 また、キャビティ95の間隔T1が係合穴96の間隔T2と等しく設定されたテープ90の場合には、図6の上から3段目に示すように、調整後のテープ90の先端がキャビティ95からのみ外れ係合穴96の中央部に位置する。さらに、キャビティ95の間隔T1が係合穴96の間隔T2の2倍に設定されたテープ90の場合には、図6の上から4段目に示すように、調整後のテープ90の先端が隣り合うキャビティ95間の中央、および隣り合う係合穴96間の中央に位置する。
 また、上記のように、テープ90の調整方法としては、作業者による切断を例示したが、その他に、S11にて設定された規定長さLsに基づいてテープ90を自動的に切断する外部装置によりテープ90が切断される構成としてもよい。また、使いかけのテープ90を調整する場合には、当該使いかけのテープ90の先端部に十分な長さがある場合には、上記の新規のテープ90に対する調整と同様に切断することで対応できる。
 一方で、使いかけのテープ90の先端部が規定長さLsよりも短い場合には、先端部において部品を収納する1または複数のキャビティ95から部品を除去することで、規定長さLsの冗長部を確保するように調整してもよい。また、使いかけのテープ90の先端に、規定長さLsを確保可能となるように、冗長部に相当する補助テープを接続してもよい。使いかけのテープ90に対する部品の除去や補助テープの接続を含む調整は、新規のテープ90と同様に、外部装置により自動的に行われる構成としてもよい。
 続いて、フィーダ1の制御装置70は、コネクタを介して部品装着機から電力を供給された状態で、挿入部Piに対して調整されたテープ90の先端が挿入されたか否かを判定する(S20)。制御装置70は、調整されたテープ90の先端が挿入されていない間は(S20:No)、上記の判定を繰り返すように待機状態を維持する。一方で、制御装置70は、挿入部Piに対して調整されたテープ90の先端が挿入されたと判定した場合に(S20:Yes)、位置決め工程を実行する(S30)。
 位置決め工程において、制御装置70は、調整されたテープ90が挿入部Piに挿入された場合に(S20:Yes)、先ずテープ90の搬送を開始する(S31)。これにより、テープ90は、第一駆動装置20の動作によって搬送路R1を構成するレール11に沿って移動する。制御装置70は、検出センサ61の検出結果に基づいてテープ90の先端が検出されたか否かを判定する(S32)。制御装置70は、テープ90の先端が検出されていない間は(S32:No)、上記の判定を繰り返す。
 一方で、制御装置70は、検出センサ61によりテープ90の先端が検出されたと判定した場合に(S32:Yes)、検出センサ61から供給部Ptまでの搬送距離に基づいて、残りの搬送量を算出する(S33)。また、制御装置70は、テープ90の先端が第二駆動装置30の第三スプロケット31に係合する位置まで到達していないものの、第二駆動装置30を第一駆動装置20に同期させて動作を開始する。そして、制御装置70は、角度検出装置36の検出結果およびステッピングモータ33に供給したパルス電力に基づいて、第四スプロケット32の角度を算出する。
 本実施形態において、制御装置70は、検出センサ61による検出結果、第四スプロケット32の角度、および複数のキャビティ95の間隔T1に基づいて、第一キャビティ95Fをフィーダ本体10における所定位置に位置決めするように残りの搬送量を算出する(S33)。制御装置70は、算出された残りの搬送量に応じて第一駆動装置20および第二駆動装置30を同期して動作させることによって、第一キャビティ95Fを所定位置に位置決めする(S34)。
 上記のように、残りの搬送量を算出するのは(S33)は、調整工程(S10)にてテープ90が切断等により調整されると第一キャビティ95Fから先端までの長さと、S11にて算出された理想の規定長さLsとに誤差が含まれることがあるからである。即ち、検出センサ61がテープ90の先端を検出してから一定距離だけテープ90を搬送すると、調整により発生した誤差の分だけ第一キャビティ95Fが位置決めされる位置に誤差が含まれる。そこで、制御装置70は、第四スプロケット32の角度および複数のキャビティ95の間隔T1に基づいて、第一キャビティ95Fの位置決め精度の向上を図っている。
 ここで、部品の供給処理において複数のキャビティ95の一つを供給部Ptに位置決めしたときに、第四スプロケット32における複数の係合突起321の一つが第四スプロケット32の回転中心Crの真上に位置する角度に角度決めされる(図4を参照)。そのため、制御装置70は、検出センサ61による検出結果、および第四スプロケット32の角度に基づいて、テープ90の先端から第一キャビティ95Fまでの距離を正確に把握することができる。つまり、調整工程(S10)にて切断等されて規定長さLsに対して誤差を有していたとしても、当該誤差を吸収するように第一キャビティ95Fを位置決めできる。
 なお、本実施形態において、第一キャビティ95Fが位置決めされる所定位置は、第一キャビティ95Fより一つ先端側のキャビティ95を供給部Ptに位置決めしたときに第一キャビティ95Fが位置する待機位置Psである。待機位置Psに位置決めされた第一キャビティ95Fは、カバーテープ92を剥離されているもののテープガイド50により開口部が外部に露出しない状態を維持される。これにより、何らかの要因により第一キャビティ95Fから部品が脱落することを防止できる。
 上記のように、第一キャビティ95Fが待機位置Psまで移動する間に、テープ90の先端がレール11とテープガイド50との間に進入してテープガイド50が部分的に押し上げられる。さらにテープ90が搬送されると、カバーテープ92が剥離装置52により剥離されるとともに折り曲げ装置53により折り曲げられ始める。このとき、剥離刃521の刃先がベーステープ91とカバーテープ92の接着部よりも下方に切り込んでいたとしても、冗長部には部品が収納されておらず剥離刃521と部品の接触が防止される。
 その後に、カバーテープ92を剥離されたベーステープ91により剥離刃521が押し上げられて、剥離刃521の刃先がベーステープ91とカバーテープ92の接着部に切り込む高さとなる。これに対して、調整工程(S10)により規定長さLsが確保されているため、ベーステープ91による剥離刃521の押し上げが終了する位置Pe(図7Cを参照)にテープ90の先端が位置する段階では、第一キャビティ95Fは、待機位置Psよりも挿入部Pi側に位置する。これにより、第一キャビティ95Fに収納されている部品と剥離刃521の接触が防止される。
 制御装置70は、上記のように第一キャビティ95Fを待機位置Psに位置決めすると、第一駆動装置20および第二駆動装置30の動作を停止して、ローディング処理を終了する。本実施形態において、ローディング処理が終了すると、テープ90の先端は、折り曲げ装置53の規制部531のよりもキャビティ95の間隔T1程度、供給部Pt側に位置する。フィーダ1は、この状態で待機し、例えば供給処理が開始されて、部品装着機より部品を供給するように要求があった場合に、第一キャビティ95Fを供給部Ptに位置決めするようにテープ90を間隔T1だけ送り移動する。
 また、位置決め工程(S30)において、剥離装置52によりベーステープ91から剥離されたカバーテープ92が折り曲げ装置53により係合穴96側へと折り曲げられると、カバーテープ92が元の状態に戻ろうとする力によりテープ90が幅方向に僅かに移動し得る。これに対して、調整工程(S10)により規定長さLsが確保されているため、遅くとも第一キャビティ95Fが供給部Ptに位置決めされる際にはカバーテープ92が折り曲げ装置53の規制部531に到達する。これにより、第一キャビティ95Fの幅方向の位置が安定した状態となり、結果として供給処理における部品の供給を安定させることができる。
 2.実施形態の構成による効果
 上記のフィーダ1の構成、および調整工程(S10)と位置決め工程(S30)とを備えるキャリアテープの装填方法の構成によると、第一キャビティ95Fから先端までの長さが規定長さLsに調整されたテープ90を、第一キャビティ95Fをフィーダ本体10における所定位置に位置決めするように装填することができる。これにより、第一キャビティ95Fが供給部Ptに位置決めされた場合に、規定長さLsの先端部が確保されていることからテープ90の幅方向位置が安定し、結果として部品の供給を安定させることができる。また、第一キャビティ95Fより先端側に部品が収納されていないので、無駄な電子部品の発生を防止できる。
 3.実施形態の変形態様
 3-1.テープ90の規定長さLsについて
 実施形態において、規定長さLsは、例示した条件(A)-条件(E)を満たすように設定されるものとした。これに対して、規定長さLsは、条件(A)-条件(D)の少なくとも一つが満たされるように設定されてもよい。例えば、実施形態では、テープガイド50が付勢装置55により付勢される構成でありテープガイド50が傾斜することから条件(B)を挙げたが、テープガイド50が傾斜しない構成を採用する場合には、規定長さLsがこの条件(B)を満たす必要はない。
 3-2.その他
 実施形態において、テープガイド50の剥離装置52は、ベーステープ91からカバーテープ92の幅方向の一部を残して剥離する際に、係合穴96側の一部の接着状態が維持されるように剥離する。これに対して、剥離装置52は、係合穴96側とは反対側の一部のみを残すように剥離してもよいし、係合穴96側および係合穴96側とは反対側の両部を残して剥離してもよい。このような構成においても同様に、各条件を満たすように規定長さLsを設定することにより同様の効果を奏する。
 また、実施形態において、位置決め工程(S30)にて第一キャビティ95Fを位置決めする所定位置は、供給部Ptからキャビティ95の間隔T1だけ挿入部Pi側の待機位置Psとした。これに対して、所定位置は、種々の位置を採用し得る。例えば、制御装置70は、所定位置に供給部Ptを設定してもよいし、また待機位置Psからさらにキャビティ95の間隔T1の整数倍だけ挿入部Pi側に移動させた位置としてもよい。
 実施形態において、角度検出装置36は、ホールマグネットとホールセンサとにより構成されるものとした。これに対して、角度検出装置36は、第三スプロケット31および第四スプロケット32の角度を検出可能であれば、種々の態様を採用し得る。具体的には、角度検出装置36は、磁気式またはエンコーダ式を採用し得る。また、角度検出装置36は、中間ギヤ35の角度に基づいて、中間ギヤ35に連動する第三スプロケット31および第四スプロケット32の角度を検出する構成とした。これに対して、角度検出装置36は、例えば第四スプロケット32の角度を直接的に検出する構成としてもよい。
 1:テープフィーダ、 10:フィーダ本体、 11:レール、 20:第一駆動装置、 30:第二駆動装置、 31:第三スプロケット、 32:第四スプロケット、 36:角度検出装置、 40:テープ支持ユニット、 50:テープガイド、 51:ガイド本体、 52:剥離装置、 521:剥離刃、 53:折り曲げ装置、 531:規制部、 55:付勢装置、 61:検出センサ、 70:制御装置、 90:キャリアテープ、 91:ベーステープ、 92:カバーテープ、 95:キャビティ、 95F:第一キャビティ、 96:係合穴、 Pi:挿入部、 Pt:供給部、 Pc:切り込み位置、 Pe:押し上げが終了する位置、 R1:搬送路

Claims (10)

  1.  電子部品を収納したキャリアテープの先端を挿入される挿入部、および電子部品装着機に前記電子部品を供給する供給部を有するフィーダ本体と、
     前記フィーダ本体に設けられ、前記キャリアテープを搬送する駆動装置と、
     前記挿入部と前記供給部との間の搬送路において前記キャリアテープの先端を検出する検出センサと、
     前記挿入部に挿入された前記キャリアテープを前記供給部まで搬送するように前記駆動装置を制御し、前記キャリアテープを装填するローディング処理を実行する制御装置と、を備え、
     前記キャリアテープには、前記電子部品をそれぞれ収納する複数のキャビティが搬送方向に所定の間隔で形成され、
     前記制御装置は、前記ローディング処理において、複数の前記キャビティのうち先端側から最初に前記電子部品を収納した第一キャビティから前記キャリアテープの先端までの長さが規定長さとなるように予め調整された前記キャリアテープが前記挿入部に挿入された場合に、前記キャリアテープの搬送を開始するとともに、前記検出センサによる検出結果に応じて前記第一キャビティを前記フィーダ本体における所定位置に位置決めする、テープフィーダ。
  2.  前記キャリアテープは、
     前記キャビティを形成されたベーステープと、
     前記キャビティの開口部を閉塞するカバーテープと、を有し、
     前記テープフィーダは、前記フィーダ本体の前記供給部に設けられるテープガイドをさらに備え、
     前記テープガイドは、
     ガイド本体と、
     前記ガイド本体に設けられ、前記ベーステープから前記カバーテープの幅方向の一部を残して剥離する剥離装置と、
     前記ガイド本体に設けられ、前記ベーステープから剥離された前記カバーテープの部位を折り曲げる折り曲げ装置と、を有する、請求項1に記載のテープフィーダ。
  3.  前記折り曲げ装置は、折り曲げられた前記カバーテープの裏面のうち幅方向の縁部に接触して、折り曲げられた前記カバーテープの状態を維持する規制部を有し、
     前記規定長さは、前記キャリアテープの搬送方向における前記供給部から前記規制部までの長さ以上に設定される、請求項2に記載のテープフィーダ。
  4.  前記テープフィーダは、前記搬送路を構成するレールと前記ガイド本体との間で前記キャリアテープが保持されるように、前記ガイド本体を前記レール側に付勢する付勢装置をさらに備える、請求項2または3に記載のテープフィーダ。
  5.  前記剥離装置は、前記ベーステープと前記カバーテープとの接着部に切り込む剥離刃を有し、
     前記キャリアテープの先端に前記剥離刃が切り込む剥離初期において、前記剥離刃の切り込み位置を通過した前記ベーステープの先端が前記付勢装置による付勢力に抗して前記剥離刃を前記レールとは反対側に押し上げ、
     前記規定長さは、前記キャリアテープの搬送方向における前記切り込み位置から前記ベーステープによる押し上げが終了する位置までの長さ以上に設定される、請求項4に記載のテープフィーダ。
  6.  前記駆動装置は、周方向に等間隔で複数の係合突起が配置されたスプロケットを備え、
     前記キャリアテープには、前記スプロケットの前記係合突起と係合する複数の係合穴が前記キャリアテープの搬送方向に所定の間隔で形成され、
     前記規定長さは、前記第一キャビティから先端側に前記係合穴の間隔の2倍の長さ以上、且つ前記係合穴の間隔の5倍の長さ以下に設定される、請求項1-5の何れか一項に記載のテープフィーダ。
  7.  前記規定長さは、前記第一キャビティよりも先端側において前記電子部品を収納しない前記キャビティから外れる長さに設定される、請求項1-6の何れか一項に記載のテープフィーダ。
  8.  前記ローディング処理において前記第一キャビティが位置決めされる前記所定位置は、前記第一キャビティより一つ先端側の前記キャビティを前記供給部に位置決めしたときに前記第一キャビティが位置する待機位置である、請求項1-7の何れか一項に記載のテープフィーダ。
  9.  前記駆動装置は、前記キャリアテープに所定の間隔で形成された複数の係合穴に係合する係合突起を周方向に等間隔で配置されたスプロケットを備え、
     前記制御装置は、前記ローディング処理において、前記検出センサによる検出結果、前記スプロケットの角度、および複数の前記キャビティの間隔に基づいて、前記第一キャビティを前記フィーダ本体における前記所定位置に位置決めする、請求項1-8の何れか一項に記載のテープフィーダ。
  10.  電子部品を収納したキャリアテープをテープフィーダに装填する装填方法であって、
     前記テープフィーダは、
     前記キャリアテープの先端を挿入される挿入部、および電子部品装着機に前記電子部品を供給する供給部を有するフィーダ本体と、
     前記フィーダ本体に設けられ、前記キャリアテープを搬送する駆動装置と、
     前記挿入部と前記供給部との間の搬送路において前記キャリアテープの先端を検出する検出センサと、
     前記挿入部に挿入された前記キャリアテープを前記供給部まで搬送するように前記駆動装置を制御し、前記キャリアテープを装填するローディング処理を実行する制御装置と、を備え、
     前記キャリアテープには、前記電子部品をそれぞれ収納する複数のキャビティが搬送方向に所定の間隔で形成され、
     前記装填方法は、
     前記ローディング処理において、複数の前記キャビティのうち先端側から最初に前記電子部品を収納した第一キャビティから前記キャリアテープの先端までの長さが規定長さとなるように予め調整する調整工程と、
     調整された前記キャリアテープが前記挿入部に挿入された場合に、前記キャリアテープの搬送を開始するとともに、前記検出センサによる検出結果に応じて前記第一キャビティを前記フィーダ本体における所定位置に位置決めする位置決め工程と、
     を備える、キャリアテープの装填方法。
PCT/JP2017/022397 2017-06-16 2017-06-16 テープフィーダおよびキャリアテープの装填方法 WO2018229989A1 (ja)

Priority Applications (9)

Application Number Priority Date Filing Date Title
JP2019524708A JP7001684B2 (ja) 2017-06-16 2017-06-16 テープフィーダおよびキャリアテープの装填方法
US16/620,557 US11596090B2 (en) 2017-06-16 2017-06-16 Tape feeder and carrier tape loading method
EP17913835.9A EP3641521A4 (en) 2017-06-16 2017-06-16 STRIP DISPENSER AND METHOD OF LOADING MEDIA STRIP
CN201780092005.3A CN110754143B (zh) 2017-06-16 2017-06-16 带式供料器及载带的装填方法
PCT/JP2017/022397 WO2018229989A1 (ja) 2017-06-16 2017-06-16 テープフィーダおよびキャリアテープの装填方法
JP2021164355A JP7092931B2 (ja) 2017-06-16 2021-10-05 テープフィーダおよびキャリアテープの調整方法
JP2021164356A JP7019861B2 (ja) 2017-06-16 2021-10-05 テープフィーダおよびキャリアテープの装填方法
JP2022014980A JP7074942B2 (ja) 2017-06-16 2022-02-02 キャリアテープの調整方法
JP2022096974A JP7123280B2 (ja) 2017-06-16 2022-06-16 テープフィーダ

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2017/022397 WO2018229989A1 (ja) 2017-06-16 2017-06-16 テープフィーダおよびキャリアテープの装填方法

Publications (1)

Publication Number Publication Date
WO2018229989A1 true WO2018229989A1 (ja) 2018-12-20

Family

ID=64659787

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2017/022397 WO2018229989A1 (ja) 2017-06-16 2017-06-16 テープフィーダおよびキャリアテープの装填方法

Country Status (5)

Country Link
US (1) US11596090B2 (ja)
EP (1) EP3641521A4 (ja)
JP (3) JP7001684B2 (ja)
CN (1) CN110754143B (ja)
WO (1) WO2018229989A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4030882A4 (en) * 2019-09-13 2022-09-21 Fuji Corporation FEED DEVICE AND COMPONENT ASSEMBLY DEVICE

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020162159A1 (ja) * 2019-02-08 2020-08-13 パナソニックIpマネジメント株式会社 部品供給装置
CN114982394B (zh) * 2020-02-06 2023-05-02 株式会社富士 带引导件以及元件供给装置
DE112020007775T5 (de) * 2020-11-16 2023-09-21 Fuji Corporation Bandzuführer

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015103663A (ja) * 2013-11-25 2015-06-04 パナソニックIpマネジメント株式会社 部品供給装置および部品供給方法、およびトップテープ剥離部
WO2015181958A1 (ja) 2014-05-30 2015-12-03 富士機械製造株式会社 フィーダ
WO2016117091A1 (ja) * 2015-01-22 2016-07-28 富士機械製造株式会社 フィーダ装置
WO2016203628A1 (ja) * 2015-06-18 2016-12-22 富士機械製造株式会社 テープ切断処理装置および処理方法

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4610083A (en) * 1985-08-26 1986-09-09 Zenith Electronics Corporation Method and apparatus for electronic component matching
JP2010212681A (ja) * 2009-03-09 2010-09-24 Koshoku Kin 部品実装機用キャリアテープ自動供給装置
JP5528316B2 (ja) * 2010-12-20 2014-06-25 富士機械製造株式会社 部品供給装置、電子部品実装機、部品供給方法
JP6010755B2 (ja) * 2012-07-27 2016-10-19 パナソニックIpマネジメント株式会社 テープフィーダおよびテープセット方法
EP2938177B1 (en) * 2012-12-21 2017-10-18 Fuji Machine Mfg. Co., Ltd. Automatic tape processing apparatus and automatic tape setting apparatus
JP6245517B2 (ja) * 2013-06-14 2017-12-13 パナソニックIpマネジメント株式会社 部品供給装置および部品供給方法
JP6271562B2 (ja) * 2013-08-26 2018-01-31 富士機械製造株式会社 フィーダ
CN105474772B (zh) * 2013-08-26 2018-10-09 株式会社富士 供料器
JP6413087B2 (ja) * 2015-01-08 2018-10-31 パナソニックIpマネジメント株式会社 電子部品供給装置
US10729047B2 (en) * 2015-03-31 2020-07-28 Fuji Corporation Automatic splicing device
JP6635706B2 (ja) * 2015-07-31 2020-01-29 株式会社Fuji スプライシング装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015103663A (ja) * 2013-11-25 2015-06-04 パナソニックIpマネジメント株式会社 部品供給装置および部品供給方法、およびトップテープ剥離部
WO2015181958A1 (ja) 2014-05-30 2015-12-03 富士機械製造株式会社 フィーダ
WO2016117091A1 (ja) * 2015-01-22 2016-07-28 富士機械製造株式会社 フィーダ装置
WO2016203628A1 (ja) * 2015-06-18 2016-12-22 富士機械製造株式会社 テープ切断処理装置および処理方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3641521A4

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4030882A4 (en) * 2019-09-13 2022-09-21 Fuji Corporation FEED DEVICE AND COMPONENT ASSEMBLY DEVICE

Also Published As

Publication number Publication date
EP3641521A1 (en) 2020-04-22
JP7019861B2 (ja) 2022-02-15
JP2022000924A (ja) 2022-01-04
CN110754143B (zh) 2021-04-20
JPWO2018229989A1 (ja) 2020-02-27
CN110754143A (zh) 2020-02-04
JP7001684B2 (ja) 2022-01-19
JP7092931B2 (ja) 2022-06-28
JP2022000925A (ja) 2022-01-04
US11596090B2 (en) 2023-02-28
EP3641521A4 (en) 2020-05-27
US20210153397A1 (en) 2021-05-20

Similar Documents

Publication Publication Date Title
JP7092931B2 (ja) テープフィーダおよびキャリアテープの調整方法
JP4820728B2 (ja) 部品供給装置、並びに表面実装機
EP3250019B1 (en) Feeder device
JP4891832B2 (ja) 部品供給装置、及び表面実装機
EP3393224B1 (en) Tape feeder
US9957126B2 (en) Component supply device
WO2021014503A1 (ja) テープガイド、部品供給装置、及びテープガイドの使用方法
JP7074942B2 (ja) キャリアテープの調整方法
JP7123280B2 (ja) テープフィーダ
JP7230263B2 (ja) テープフィーダ
JP7282993B2 (ja) テープフィーダ
JPWO2016139714A1 (ja) 部品実装装置における部品供給装置および供給方法
WO2018185886A1 (ja) フィーダ
EP3151648A1 (en) Feeder
JP2017135208A (ja) テープフィーダ及び部品実装装置
JP6534049B2 (ja) 部品供給装置
JPWO2019087301A1 (ja) 部品供給装置および部品実装装置
JPWO2018008131A1 (ja) フィーダ装置
US20230044719A1 (en) Tape guide and component supplying equipment
JP2017135207A (ja) テープフィーダ及び部品実装装置
JP6675178B2 (ja) フィーダ
JP2012223827A (ja) 部品供給装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17913835

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2019524708

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2017913835

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2017913835

Country of ref document: EP

Effective date: 20200116