WO2017191743A1 - Système d'analyse du temps de travail, programme d'analyse du temps de travail et procédé d'analyse du temps de travail - Google Patents

Système d'analyse du temps de travail, programme d'analyse du temps de travail et procédé d'analyse du temps de travail Download PDF

Info

Publication number
WO2017191743A1
WO2017191743A1 PCT/JP2017/015099 JP2017015099W WO2017191743A1 WO 2017191743 A1 WO2017191743 A1 WO 2017191743A1 JP 2017015099 W JP2017015099 W JP 2017015099W WO 2017191743 A1 WO2017191743 A1 WO 2017191743A1
Authority
WO
WIPO (PCT)
Prior art keywords
work
time
work item
date
identifier
Prior art date
Application number
PCT/JP2017/015099
Other languages
English (en)
Japanese (ja)
Inventor
高橋 正人
Original Assignee
旭硝子株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 旭硝子株式会社 filed Critical 旭硝子株式会社
Priority to JP2018515414A priority Critical patent/JP6806148B2/ja
Publication of WO2017191743A1 publication Critical patent/WO2017191743A1/fr

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Definitions

  • the present invention relates to a work time analysis system, a work time analysis program, and a work time analysis method.
  • IE Industry Standard Engineering
  • an observer visually observes the state of a worker, and measures the time taken for each work with a stopwatch.
  • VTR video camera
  • a video camera compared to using a stopwatch, the risk of measurement errors can be avoided, and the psychological burden on the worker is relatively reduced, so that more natural work conditions can be measured.
  • Non-Patent Document 3 software has been developed that can automatically analyze the time taken for each operation based on the captured video, although it is simple (see, for example, Non-Patent Document 3).
  • Patent Document 1 describes a technique for determining whether work is being performed reliably using an acceleration sensor or the like worn by an operator.
  • Patent Document 2 in order to analyze the flow line of a monitoring target person, a mobile terminal carried by the monitoring target person calculates the position of the mobile terminal based on the radio wave transmitted from the radio beacon, The technology to notify is described.
  • the purpose is to facilitate the measurement of the work time required for each of the plurality of work performed by the worker.
  • the working time analysis system of the present invention has an information terminal and a server device, and is a working time analysis system that analyzes the working time of a worker.
  • a receiving unit that receives an identifier from the short-range wireless device, and the server device includes an acquiring unit that acquires the identifier or a work item corresponding to the identifier from the information terminal, and the information terminal or the
  • the server device includes: a determination unit that determines a work item corresponding to each identifier received from the plurality of short-range wireless devices by the reception unit; a date and time when each identifier is received by the reception unit; and the determination unit
  • a storage unit that stores the work items determined in association with each other, and the date and time associated with the first work item included in each work item, the start date and time of the first work item And, wherein the end time of the second work the first work item date associated with the item included in each work item comprises an analysis unit for analyzing the operation time for each work item.
  • the work time analysis program of the present invention includes a step of receiving an identifier from a short-range wireless device when the information terminal enters a communication range of the short-range wireless device, and a step of receiving each identifier received from a plurality of short-range wireless devices.
  • a step of determining a corresponding work item, a date and time when each identifier is received a step of storing the determined work item in association with each other, and a first work item included in each of the work items
  • the given date and time is the start date and time of the first work item, and the date and time associated with the second work item included in each work item is the end date and time of the first work item. And analyzing the working time for.
  • the identifier is received from the short-range wireless device, and each identifier received from the plurality of short-range wireless devices is Corresponding to a step of determining a corresponding work item, a date and time when each identifier is received, a step of storing the determined work item in association with each other, and a first work item included in each of the work items
  • the given date and time is the start date and time of the first work item
  • the date and time associated with the second work item included in each work item is the end date and time of the first work item. Analyzing the working time for.
  • FIG. 1 is a diagram illustrating a configuration example of a work time analysis system according to the embodiment.
  • a working time analysis system 1 includes a plurality of information terminals 10a, 10b,... (Hereinafter collectively referred to as “information terminals 10” as appropriate), a server device 20, and a plurality of short-range wireless devices 30a. 30b, ... (hereinafter collectively referred to as "short-range wireless device 30" as appropriate).
  • the information terminal 10 and the server device 20 are communicably connected via a communication line such as a LAN (Local Area Network), a wireless LAN, or the Internet.
  • a communication line such as a LAN (Local Area Network), a wireless LAN, or the Internet.
  • data of the information terminal 10 may be input to the server device 20 via a recording medium such as an SD memory card.
  • the information terminal 10 is a terminal such as a smart watch, a wearable device, a smartphone, or a tablet.
  • the information terminal 10 when the information terminal 10 is carried by an operator, is brought close to the short-range wireless device 30, and enters the communication range of the short-range wireless device 30, the ID set in the short-range wireless device 30 from the short-range wireless device 30. Receive.
  • the information terminal 10 detects the ID from the short-range wireless device 30 at a data reception interval of 0.5 seconds or less, for example.
  • the worker carrying the information terminal 10 can receive the ID in a state close to the conventional work without having to wait for the reception of the ID after bringing the information terminal 10 close to the short-range wireless device 30. .
  • the shorter the data reception interval the faster the battery of the information terminal 10 is consumed.
  • the information terminal 10 records the date and time when the ID is received in association with the received ID.
  • data such as work content, production type, work area, and the like are set in association with each ID notified from the short-range wireless device 30.
  • the information terminal 10 includes various sensors such as an acceleration sensor, an angular acceleration sensor, an illuminance sensor, and an orientation center, and records the data acquired by the various sensors in association with the date and time when the data is acquired. May be.
  • the information terminal 10 may have a microphone, and may record audio data acquired by the microphone and the date and time when the audio data is acquired in association with each other.
  • the information terminal 10 notifies the server device 20 of the work content, production type, work area, and the like corresponding to each ID notified from the short-range wireless device 30 and the time when each ID is received.
  • the information terminal 10 stores the work content, production type, work area, and the like corresponding to each ID notified from the short-range wireless device 30 and the time at which each ID is received in the auxiliary storage device of the information terminal 10 itself.
  • the information terminal 10 approaches the server device 20 or when the information terminal 10 communicates with the server device 20 via a LAN, a wireless LAN, or the like, the stored data is notified to the server device 20.
  • the server device 20 is a device such as a PC (Personal Computer) or a tablet terminal. Based on the data notified from each information terminal 10, the server device 20 analyzes who, when, where and what work. For example, the server device 20 analyzes the time taken for each work of the worker carrying each information terminal 10.
  • PC Personal Computer
  • the short-range wireless device 30 is, for example, a beacon or a tag, and is set in advance by short-range wireless communication such as BLE (Bluetooth (registered trademark) Low Energy), NFC (Near Field Communication), RFID (Radio Frequency IDentification), and infrared rays.
  • BLE Bluetooth (registered trademark) Low Energy
  • NFC Near Field Communication
  • RFID Radio Frequency IDentification
  • infrared rays notified to the information terminal 10.
  • the near field wireless device 30 is set with an ID for identifying one or more of work contents, production type, work area, work standard time, etc. at the time of factory shipment or when installed in the system.
  • a transmission output (dBm) having a radio field intensity is set such that the communicable range (communication range) is about 15 cm in radius, for example.
  • the transmission output of the radio wave intensity can be adjusted so that the communicable range is 10 cm to 3 m depending on the work content and the production type.
  • a transmission output (dBm) having a radio wave intensity such that the communicable range is, for example, a radius of 20 m to 30 m is set.
  • the transmission output of the radio wave intensity can be adjusted so that the communicable range is 3 m to 30 m depending on the work area.
  • the information terminal 10 enters the communication range when the worker performs a conventional work, for example, near the button of the production facility in the factory. It is installed in such a position.
  • FIG. 2 is a diagram illustrating a hardware configuration example of the information terminal 10 in the embodiment.
  • the information terminal 10 in FIG. 2 includes a drive device 100, an auxiliary storage device 102, a memory device 103, a CPU 104, an interface device 105, a display device 106, an input device 107, and the like that are mutually connected by a bus B.
  • the work time analysis program for realizing the processing in the information terminal 10 is provided by a recording medium 101 such as an SD memory card.
  • a recording medium 101 such as an SD memory card.
  • the working time analysis program is installed from the recording medium 101 to the auxiliary storage device 102 via the drive device 100.
  • the installation of the work time analysis program is not necessarily performed from the recording medium 101, and may be downloaded from another computer via a network.
  • the auxiliary storage device 102 stores the installed work time analysis program and stores necessary files and data.
  • the memory device 103 reads the program from the auxiliary storage device 102 and stores it when there is an instruction to start the program.
  • the CPU 104 realizes functions related to the information terminal 10 in accordance with a program stored in the memory device 103.
  • the interface device 105 is used as an interface for connecting to a network.
  • the display device 106 displays a GUI (Graphical User Interface) or the like by a program.
  • the input device 107 includes a touch panel and buttons, or a keyboard and mouse, and is used to input various operation instructions.
  • An example of the recording medium 101 is a portable recording medium such as an SD memory card, a CD-ROM, a DVD disk, or a USB memory.
  • a portable recording medium such as an SD memory card, a CD-ROM, a DVD disk, or a USB memory.
  • an HDD Hard Disk Disk Drive
  • a flash memory or the like can be given. Both the recording medium 101 and the auxiliary storage device 102 correspond to computer-readable recording media.
  • the hardware configuration of the server device 20 and the short-range wireless device 30 may be the same as the hardware configuration example of the information terminal 10 illustrated in FIG.
  • FIG. 3 is a functional block diagram of the work time analysis system 1.
  • the information terminal 10 includes a reception unit 12, a determination unit 13, a control unit 14, and a communication unit 15. Each of these units is realized by processing that one or more programs installed in the information terminal 10 cause the CPU 104 of the information terminal 10 to execute.
  • the information terminal 10 includes a storage unit 11.
  • the storage unit 11 is realized using, for example, the auxiliary storage device 102 or the like.
  • the storage unit 11 stores work content data 111, production type data 112, work area data 113, work management data 114, work end determination data 115, immediately preceding required work content data 116, and standard work time data 117. Other data may be stored as necessary.
  • the receiving unit 12 receives an ID (identifier) from each short-range wireless device 30 when entering the communication range of each short-range wireless device 30 among the plurality of short-range wireless devices 30.
  • the determination unit 13 determines a work item corresponding to each ID received from the plurality of short-range wireless devices 30.
  • the work item includes work content information indicating the work content. Further, the work item may include, in addition to work content information, production type indicating the type produced by the work, information on the work area indicating the area where the work is performed, and the like.
  • control unit 14 may control to notify that the ID is received by vibration, light emission, screen display, or the like.
  • control unit 14 may control the predetermined notification based on the start date and time of the first work item determined by the determination unit 13 and the standard work time associated with the first work item. Good.
  • the communication unit 15 communicates with the server device 20.
  • the information terminal 10 is not limited to a terminal such as the above-described smart watch, wearable device, smartphone, or tablet, and may be a device having an apparatus having the above function.
  • the server device 20 includes an analysis unit 22 and a communication unit 23. Each of these units is realized by processing that one or more programs installed in the server device 20 cause the CPU 104 of the server device 20 to execute.
  • the server device 20 has a storage unit 21.
  • the storage unit 21 is realized using, for example, the auxiliary storage device 102 or the like.
  • the storage unit 21 stores all work management data 211, work end determination data 115, standard work time data 117, and work analysis data 118 notified to each information terminal 10.
  • the total work management data 211 stores work management data 114 of each information terminal 10 in association with the worker ID notified to each information terminal 10.
  • the work end determination data 115 and the standard work time data 117 are the same as those stored in each information terminal 10.
  • the analysis unit 22 analyzes the work time and the like for each work item based on the ID received by the information terminal 10 and the date and time when the ID is received.
  • the analysis unit 22 calculates, for example, the total work time for each work item of a plurality of workers, the ratio of each work time, the work content for each time, and stores the work content in the work analysis data 118.
  • the communication unit 23 communicates with the information terminal 10.
  • the short-range wireless device 30 includes a setting unit 31 and a transmission unit 32.
  • the setting unit 31 accepts settings such as radio field intensity, transmission interval, and ID.
  • the transmission unit 32 transmits the ID set in the setting unit 31 with the radio wave intensity and transmission interval set in the setting unit 31.
  • FIG. 4 is a diagram illustrating an example of a processing sequence of the work time analysis system 1.
  • step S ⁇ b> 101 when the information terminal 10 enters the communication range of the short-range wireless device 30, the information terminal 10 receives an ID set in the short-range wireless device 30 from the short-range wireless device 30.
  • the information terminal 10 stores data related to the work item corresponding to the received ID in association with the date and time when the ID is received (step S102).
  • the information terminal 10 performs a work determination process based on the stored work items, and notifies the worker (step S103). Details of the work determination process will be described later.
  • the information terminal 10 When the information terminal 10 enters the communication range of the server device 20, the information terminal 10 notifies the server device 20 of the stored date and time, work item data, and worker ID (step S104). Note that the worker ID is specified by the user of the information terminal 10 when the information terminal 10 is activated.
  • the server device 20 sums up the work time for the work item of each worker carrying the information terminal 10, the ratio of the work time, and the work content for each time. Etc., and the analysis result is stored in the work analysis data 118 (step S105).
  • the server device 20 notifies the information terminal 10 of the analysis result (step S106).
  • the information terminal 10 stores the notified analysis result (step S107).
  • step S104 the notification from the information terminal 10 to the server device 20 in step S104 is performed every time an ID is received from the short-range wireless device 30 when the information terminal 10 and the server device 20 are always connected by a wireless LAN or the like. May be.
  • step S106 and step S107 need not be performed.
  • FIG. 5 is a flowchart illustrating an example of the work determination process.
  • step S201 the determination unit 13 refers to the work content data 111, the production type data 112, and the work area data 113, and acquires the work content, production type, or work area associated with the acquired ID.
  • FIG. 6 is a diagram illustrating an example of the work content data 111.
  • work content is set in association with the ID.
  • the ID is information indicating one or more of work contents, production types, and work areas.
  • the work content is information indicating the content of work to be performed or completed by the worker.
  • FIG. 7 is a diagram showing an example of the production type data 112.
  • the production type is set in association with the ID.
  • the production type is information indicating the type of product or the like to be produced in the work to be performed or completed by the worker.
  • FIG. 8 is a diagram illustrating an example of the work area data 113.
  • a work area is set in association with the ID.
  • the work area is information indicating an area where the worker is currently located.
  • the determination unit 13 determines whether there is information on the work content associated with the ID acquired this time (step S202).
  • the determination unit 13 associates the ID with the date and time when the ID is acquired, and the production type or work associated with the ID.
  • the area information is recorded in the work management data 114 (step S203), and the process ends.
  • the determination unit 13 When there is information on the work content associated with the ID acquired this time (YES in step S202), the determination unit 13 refers to the work management data 114, and the most recently acquired production type and the most recently acquired work area. Is acquired (step S204). If the ID acquired this time includes an ID associated with the production type or work area, the determination unit 13 selects the production type or work area most recently acquired according to the ID acquired this time. Let it be an area. If the ID acquired this time does not include the ID associated with the production type or work area, the determination unit 13 records each of the production type and work area recorded in the work management data 114. Among the (row data), the latest date and time is set as the latest acquired production type and work area.
  • the determination unit 13 may determine that there is no work type and no work area when the ID acquired this time does not include an ID associated with a production type or work area.
  • the determination unit 13 records the work content, the most recently acquired production type, and the most recently acquired work area information in the work management data 114 in association with the date and time when the ID is acquired (step S205). .
  • FIG. 9 is a diagram illustrating an example of the work management data 114.
  • the work management data 114 stores work content, production type, and work area information in association with the date and time.
  • the ID “01” is associated with the date and time.
  • the work content “inspection work”, the latest (most recently) acquired production type “product A”, and the latest acquired work area “area A” are stored.
  • the determination unit 13 determines whether or not the current record stored in the work management data 114 in step S205 is information indicating the start of work related to the work item (step S206).
  • the determination unit 13 for example, in the work management data 114, the work content, production type, and work area of the current record stored in the work management data 114 in step S 205, and the record recorded immediately before the current record It is determined whether or not the work content, production type, and work area match. If they do not match, it is determined that the work has started.
  • the work end determination data 115 is referred to, and it is determined whether or not the record recorded immediately before the current record indicates the work end, and the record recorded immediately before the current record Indicates the end of work, it is determined that the current record is the start of work.
  • FIG. 10 is a diagram illustrating an example of the work end determination data 115.
  • the work end determination condition is information that specifies a work content condition associated with an ID acquired from the short-range wireless device 30.
  • the work being executed is information for designating the condition of the work performed by the worker immediately before the ID is acquired from the short-range wireless device 30.
  • step S205 If the current record (row) recorded in the work management data 114 in step S205 is “press work”, “product A”, “area A”, the record immediately before recorded in the work management data 114 However, other than the date and time, it is also assumed that “press work”, “product A”, and “area A” are the same.
  • step S205 when the current record (line) recorded in the work management data 114 in step S205 is “press work”, “product A”, and “area A”, immediately before being recorded in the work management data 114. Are “inspection work”, “product A”, and “area A”.
  • the example shown in FIG. 10 indicates the end of the “inspection work” being executed in “area A” and “product A” and the start of the work of “press work” which is another work content. It is determined that there is.
  • the short-range wireless device 30 to which the “inspection work end” ID is set is separately provided. You can avoid installing it.
  • step S206 If the current record is not information indicating the start of work (NO in step S206), the process is terminated.
  • the determination unit 13 refers to the immediately preceding required work content data 116, and before starting the work related to the current record, the required work It is determined whether the item is performed (step S207). Note that the processing may be terminated instead of performing the processing in step S207.
  • FIG. 11 is a diagram illustrating an example of the immediately-preceding essential work content data 116.
  • the work content that needs to be executed before starting a certain work is set in the immediately preceding required work content data 116.
  • the area, production type, work content, and immediately preceding required work content are set in association with each other.
  • the immediately preceding required work content is information indicating the work content that needs to be performed before the work related to the area, production type, and work content associated with the immediately previous required work content is started.
  • the current record (row) recorded in the work management data 114 in step S205 is “transportation work”, “product A”, “area A”, the record immediately before recorded in the work management data 114 Are “inspection work”, “product A”, and “area A”.
  • the previous record is “Area A”, “Product A”, and “Press work” with respect to the current record “Area A”, “Product A”, and “Transportation work”. Therefore, it is determined that the essential work content has not been performed.
  • step S207 If the essential work content has been performed before starting the work related to the current record (YES in step S207), the process proceeds to step S209 described later. Note that the process may be terminated instead of proceeding to the process of step S209.
  • step S207 If the required work content has not been performed before starting the work related to the current record (NO in step S207), the control unit 14 indicates that the required work content has not been performed, Control to notify by vibration is performed (step S208).
  • control unit 14 starts a timer (step S209), and the determination unit 13 refers to the standard work time data 117 and acquires the standard work time associated with the work item related to the current record ( Step S210). Note that the processing may be terminated without performing the processing in steps S209 to S211.
  • FIG. 12 is a diagram showing an example of the standard work time data 117.
  • the standard work time data 117 stores areas, production types, work contents, and standard work times in association with each other.
  • the standard work time is a work time predetermined according to each work item in the work time analysis.
  • control unit 14 may perform notification based on the standard work time and the timer (step S211). For example, if the standard work time is 1 minute, the control unit 14 may be, for example, 5 seconds before the start of work related to the current record, for example, 5 seconds before or 2 minutes after the start of work. However, when the work is not finished, control is performed to notify by display or vibration.
  • FIG. 13 is a flowchart illustrating an example of work time analysis processing by the analysis unit.
  • step S301 the analysis unit 22 acquires the work management data 114 from the information terminal 10.
  • the analysis unit 22 extracts a record indicating the start of work and a record indicating the end of work from the work management data 114 (step S302).
  • the record indicating the start of work is extracted by performing the same process as the process of determining whether or not the record is information indicating the start of work in step S206 by the determination unit 13 for each record.
  • the record indicating the end of work is extracted by performing the same process as the work end determination process using the work end determination data 115 of FIG.
  • the analysis unit 22 calculates the total work time of each work item of each of the plurality of workers carrying the plurality of information terminals 10, the ratio of each work time, the work content for each time, and the like (step S303). .
  • the calculated data is stored in the work analysis data 118 by the analysis unit 22.
  • FIG. 14 is a diagram illustrating a display example based on the analysis result by the analysis unit 22.
  • FIG. 14 (A) the work time ratio of each worker is shown in a graph.
  • a factory manager can carry out work items that have been worked on by three workers in the past by two workers. You can consider whether you can. Alternatively, it is possible to examine whether the operating speed of the production facility can be increased by 1.5 times and the productivity can be increased by 1.5 times. Alternatively, when the worker A is performing a certain task and the worker B is waiting, the worker B can be instructed to help the task.
  • FIG. 14 (B) the ratio of work time by product is shown in a graph.
  • FIG. 14C the ratio of work time by work area is shown in a graph.
  • FIG. 14D the work content for each time zone is shown in a graph.
  • the determination unit 13 When the determination unit 13 detects the end of the predetermined work item, the determination unit 13 causes the control unit 14 to display the preset next work item on the screen of the information terminal 10 and instruct the worker to start the next work item. May be. Alternatively, when the end of a predetermined work item is detected, for example, information on the production facility that is stopped may be displayed on the screen, and the worker may be instructed to go to the state of the production facility.
  • the determination unit 13 calculates a score based on the current work time of the predetermined work item and the standard work time for the predetermined work item, and performs control.
  • the score may be displayed on the screen of the information terminal 10 by the unit 14. For example, if the current work time is 1 minute and the standard work time is 1 minute, 80 points are displayed.
  • an information terminal 10 is installed in an arm of a production facility, and the data recorded by various sensors such as an acceleration sensor, an angular acceleration sensor, and an illuminance sensor included in the information terminal 10 and a microphone are notified to the server device 20. Good.
  • the server apparatus 20 can grasp
  • the manager of the factory can examine whether the operation rate of the equipment can be improved by changing the work method.
  • the worker may carry the short-range wireless device 30 and notify the server device 20 of the worker's ID via the information terminal 10.
  • Each functional unit of the information terminal 10 and the server device 20 may be realized by cloud computing including, for example, one or more computers.
  • Each functional unit of the information terminal 10 or the server device 20 may be configured to be included in any device.
  • the determination unit 13 may be configured in the server device 20, and the analysis unit 22 may be configured in the information terminal 10.
  • you may comprise the information terminal 10 and the server apparatus 20 as an integrated apparatus.
  • the functions of the units of the information terminal 10, the server device 20, and the short-range wireless device 30 described above are performed by the CPU 104 executing a program stored in the auxiliary storage device 102, the memory device 103, the recording medium 101, or the like. Can be realized.
  • the present invention is not limited to this, and at least a part of the functions of each unit of the information terminal 10, the server device 20, and the short-range wireless device 30 may be realized by a dedicated hardware circuit (for example, a semiconductor integrated circuit).
  • the determination unit 13 and the analysis unit 22 may be realized by using a semiconductor integrated circuit such as an FPGA (Field Programmable Gate Array) or an ASIC (Application Specific Integrated Circuit).

Abstract

La présente invention concerne un terminal d'informations qui est pourvu d'une unité de réception qui reçoit un identifiant en provenance d'un dispositif sans fil à courte portée lorsqu'il entre dans la zone de communication du dispositif sans fil à courte portée. Un dispositif de serveur est pourvu d'une unité d'acquisition qui acquiert, du terminal d'informations, l'identifiant ou un élément de travail correspondant à l'identifiant. Le terminal d'informations ou le dispositif de serveur est pourvu : d'une unité de détermination qui détermine l'élément de travail correspondant à chaque identifiant reçu d'une pluralité de dispositifs sans fil à courte portée par l'unité de réception ; d'une unité de stockage qui stocke la date à laquelle chaque identifiant a été reçu par l'unité de réception en association avec chaque élément de travail déterminé à l'aide de l'unité de détermination de sorte à être associés l'un à l'autre ; et d'une unité d'analyse qui analyse le temps de travail pour chaque élément de travail, la date étant associée à un premier élément de travail inclus dans les éléments de travail en tant que date de début du premier élément de travail et la date étant associée à un second élément de travail inclus dans les éléments de travail en tant que date de fin du premier élément de travail.
PCT/JP2017/015099 2016-05-02 2017-04-13 Système d'analyse du temps de travail, programme d'analyse du temps de travail et procédé d'analyse du temps de travail WO2017191743A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018515414A JP6806148B2 (ja) 2016-05-02 2017-04-13 作業時間分析システム、作業時間分析プログラム、及び作業時間分析方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2016-092559 2016-05-02
JP2016092559 2016-05-02

Publications (1)

Publication Number Publication Date
WO2017191743A1 true WO2017191743A1 (fr) 2017-11-09

Family

ID=60202884

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2017/015099 WO2017191743A1 (fr) 2016-05-02 2017-04-13 Système d'analyse du temps de travail, programme d'analyse du temps de travail et procédé d'analyse du temps de travail

Country Status (2)

Country Link
JP (1) JP6806148B2 (fr)
WO (1) WO2017191743A1 (fr)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020017160A1 (fr) * 2018-07-18 2020-01-23 パナソニックIpマネジメント株式会社 Dispositif d'identification de séquence d'opérations, système d'identification de séquence d'opérations, procédé d'identification de séquence d'opérations, et programme
JP2020194261A (ja) * 2019-05-27 2020-12-03 大日本印刷株式会社 作業実績収集システム,スマートウォッチおよびアプリケーションプログラム

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008299555A (ja) * 2007-05-31 2008-12-11 Hitachi Ltd 作業管理システムおよび作業管理方法
JP2010097490A (ja) * 2008-10-17 2010-04-30 Ihi Corp 技能管理システム、技能管理装置および技能管理プログラム
JP2011081682A (ja) * 2009-10-08 2011-04-21 Ricoh Co Ltd 作業時間分析支援システム、ならびに、プログラム
WO2015098577A1 (fr) * 2013-12-27 2015-07-02 日本郵船株式会社 Système de gestion de travail

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014056410A (ja) * 2012-09-12 2014-03-27 Ricoh Co Ltd 情報処理装置、行動管理システム及び行動管理方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008299555A (ja) * 2007-05-31 2008-12-11 Hitachi Ltd 作業管理システムおよび作業管理方法
JP2010097490A (ja) * 2008-10-17 2010-04-30 Ihi Corp 技能管理システム、技能管理装置および技能管理プログラム
JP2011081682A (ja) * 2009-10-08 2011-04-21 Ricoh Co Ltd 作業時間分析支援システム、ならびに、プログラム
WO2015098577A1 (fr) * 2013-12-27 2015-07-02 日本郵船株式会社 Système de gestion de travail

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020017160A1 (fr) * 2018-07-18 2020-01-23 パナソニックIpマネジメント株式会社 Dispositif d'identification de séquence d'opérations, système d'identification de séquence d'opérations, procédé d'identification de séquence d'opérations, et programme
JPWO2020017160A1 (ja) * 2018-07-18 2021-08-02 パナソニックIpマネジメント株式会社 作業系列識別装置、作業系列識別システム、作業系列識別方法、及びプログラム
JP2020194261A (ja) * 2019-05-27 2020-12-03 大日本印刷株式会社 作業実績収集システム,スマートウォッチおよびアプリケーションプログラム
JP7354587B2 (ja) 2019-05-27 2023-10-03 大日本印刷株式会社 作業実績収集システム,スマートウォッチおよびアプリケーションプログラム

Also Published As

Publication number Publication date
JP6806148B2 (ja) 2021-01-06
JPWO2017191743A1 (ja) 2019-03-28

Similar Documents

Publication Publication Date Title
CN108140297B (zh) 可疑人员检测系统和可疑人员检测方法
EP2998822A2 (fr) Dispositif de communication mobile utilisant plusieurs dispositifs portables en parallèle
US10271200B2 (en) Provisioning wireless device profiles
CN109427056B (zh) 对供数据传输的图像数据进行优化的方法和系统
US20170221011A1 (en) System, method, and machine-readable medium for managing network-connected industrial assets
KR102327779B1 (ko) 이미지 처리 방법 및 장치
US20160285516A1 (en) Control method for battery storage apparatus, battery storage apparatus, and control method for information terminal
CN112419693A (zh) 设备控制方法、装置、显示设备及计算机可读存储介质
US20150312742A1 (en) Electronic device and method for providing emergency video call service
EP3737102A1 (fr) Appareil électronique, terminal utilisateur et procédé de commande de l'appareil électronique et du terminal utilisateur
JP7027601B2 (ja) ロボット制御装置、ロボット制御方法及びロボット
WO2017191743A1 (fr) Système d'analyse du temps de travail, programme d'analyse du temps de travail et procédé d'analyse du temps de travail
CN112071016A (zh) 火灾监控方法、装置、设备及存储介质
WO2019019837A1 (fr) Procédé d'identification biologique et produit associé
CN111310351A (zh) 车间设备的状态监测方法、装置、终端设备及存储介质
TWI687906B (zh) 用於進行基於安全的電腦之候選者評估的系統和方法以及執行方法之非暫時性電腦可讀媒體
US10685555B2 (en) Information processing apparatus, information processing method, and program
JP5956035B1 (ja) 待ち時間推定システムおよび待ち時間推定方法
JP5820255B2 (ja) 通信装置、および、通信装置の制御方法
US10162898B2 (en) Method and apparatus for searching
EP3280149A1 (fr) Procédé de fourniture de contenu supplémentaire à un terminal, et terminal utilisant ce procédé
TW201347727A (zh) 自動上傳非連接式醫療檢測裝置之量測資料的方法與電腦裝置
KR101874078B1 (ko) 앱의 e2e 지연 측정 장치 및 그 방법
KR20160060374A (ko) 이동 단말기 및 그 제어 방법
JP6964756B2 (ja) 表示データ生成装置及びプログラム

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2018515414

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17792676

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 17792676

Country of ref document: EP

Kind code of ref document: A1